DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2002 AMENDED BUDGET SUBMISSION JUSTIFICATION OF ESTIMATES JUNE 2001 OTHER PROCUREMENT, NAVY BUDGET ACTIVITY 2 UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM SUMMARY ($ IN MILLIONS) APPROPRIATION: OTHER PROCUREMENT, NAVY ------------------------------------ACTIVITY -------- JUNE 2001 FY 2000 ------- FY 2001 ------- FY 2002 ------- 899.4 619.7 742.0 1,932.7 1,556.7 1,411.9 03. AVIATION SUPPORT EQUIPMENT 246.5 257.7 228.4 04. ORDNANCE SUPPORT EQUIPMENT 629.1 470.4 663.2 63.9 108.4 84.3 06. SUPPLY SUPPORT EQUIPMENT 147.6 150.1 512.0 07. PERSONNEL AND COMMAND SUPPORT EQUIPMENT 104.3 109.9 221.6 08. SPARES AND REPAIR PARTS 260.6 206.4 234.1 4,284.1 3,479.3 4,097.6 01. SHIPS SUPPORT EQUIPMENT 02. COMMUNICATIONS AND ELECTRONICS EQUIPMENT 05. CIVIL ENGINEERING SUPPORT EQUIPMENT TOTAL OTHER PROCUREMENT, NAVY PAGE N-20 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- BUDGET ACTIVITY 01: ------------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - SHIPS SUPPORT EQUIPMENT SHIP PROPULSION EQUIPMENT 1 LM-2500 GAS TURBINE A 6.7 6.9 7.1 U 2 ALLISON 501K GAS TURBINE A 8.2 6.2 6.9 U 3.7 4.5 U PROPELLERS 3 SUBMARINE PROPELLERS A NAVIGATION EQUIPMENT 4 OTHER NAVIGATION EQUIPMENT A 94.5 50.0 45.9 U A 14.5 8.3 1.8 U A 62.2 18.8 29.2 U 7 FIREFIGHTING EQUIPMENT A 15.5 16.7 17.5 U 8 COMMAND AND CONTROL SWITCHBOARD A 17.0 10.4 9.1 U 9 POLLUTION CONTROL EQUIPMENT B 103.7 47.4 67.0 U 10 SUBMARINE SUPPORT EQUIPMENT A 51.2 11.3 6.8 U 11 SUBMARINE BATTERIES A 13.2 12.3 10.9 U 12 STRATEGIC PLATFORM SUPPORT EQUIP A 20.8 18.0 11.3 U 13 DSSP EQUIPMENT A 7.8 5.3 7.5 U 14 LCAC A 4.0 3.5 15 MINESWEEPING EQUIPMENT A 20.5 16.4 UNDERWAY REPLENISHMENT EQUIPMENT 5 UNDERWAY REPLENISHMENT EQUIPMENT PERISCOPES 6 SUB PERISCOPES & IMAGING EQUIP OTHER SHIPBOARD EQUIPMENT U 20.2 PAGE N-21 UNCLASSIFIED U UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------125.1 FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 64.9 79.3 U 16 ITEMS LESS THAN $5 MILLION A 17 SURFACE IMA A 18 SUBMARINE LIFE SUPPORT SYSTEM A 1.8 4.8 4.9 U A 197.4 201.5 208.8 U 20 DIVING AND SALVAGE EQUIPMENT A 5.4 5.6 5.7 U 21 EOD UNDERWATER EQUIPMENT B * A 3.2 2.7 32.2 U A 3.8 3.3 16.8 U A 7.7 19.5 27.5 U A 108.0 80.1 121.1 U A 6.9 ------899.4 ------619.7 ------742.0 2.0 U REACTOR PLANT EQUIPMENT 19 REACTOR COMPONENTS OCEAN ENGINEERING U SMALL BOATS 22 STANDARD BOATS TRAINING EQUIPMENT 23 OTHER SHIPS TRAINING EQUIPMENT PRODUCTION FACILITIES EQUIPMENT 24 OPERATING FORCES IPE OTHER SHIP SUPPORT 25 NUCLEAR ALTERATIONS DRUG INTERDICTION SUPPORT 26 DRUG INTERDICTION SUPPORT TOTAL SHIPS SUPPORT EQUIPMENT BUDGET ACTIVITY 02: ------------------- U COMMUNICATIONS AND ELECTRONICS EQUIPMENT SHIP RADARS 27 AN/SPS-49 A 2.2 U PAGE N-22 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- 24.8 S E C - 28 RADAR SUPPORT A 19.8 U 29 TISS A 1.8 30 AN/SQQ-89 SURF ASW COMBAT SYSTEM A 31.3 14.2 16.6 U 31 SSN ACOUSTICS A 211.9 111.6 113.0 U 32 UNDERSEA WARFARE SUPPORT EQUIPMENT A 11.5 2.8 4.3 U 33 SURFACE SONAR WINDOWS AND DOME A 34 SONAR SUPPORT EQUIPMENT A 3.0 35 SONAR SWITCHES AND TRANSDUCERS A 13.2 10.6 10.8 U 36 SUBMARINE ACOUSTIC WARFARE SYSTEM A 13.0 10.6 12.6 U 37 FIXED SURVEILLANCE SYSTEM A 16.2 29.6 33.7 U 38 SURTASS A 7.1 5.5 17.7 U 39 ASW OPERATIONS CENTER A 4.3 6.2 6.1 U 40 AN/SLQ-32 A 1.9 2.0 U 41 INFORMATION WARFARE SYSTEMS A 4.0 3.9 2.9 U 42 SHIPBOARD IW EXPLOIT A 50.3 60.5 57.5 U 43 COMMON HIGH BANDWIDTH DATA LINK A 35.3 A 39.3 U SHIP SONARS 5.0 U U ASW ELECTRONIC EQUIPMENT ELECTRONIC WARFARE EQUIPMENT RECONNAISSANCE EQUIPMENT U SUBMARINE SURVEILLANCE EQUIPMENT 44 SUBMARINE SUPPORT EQUIPMENT PROG 17.2 22.9 PAGE N-23 UNCLASSIFIED U UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - OTHER SHIP ELECTRONIC EQUIPMENT 45 NAVY TACTICAL DATA SYSTEM A 28.8 6.9 U 46 COOPERATIVE ENGAGEMENT CAPABILITY B 59.4 33.5 77.1 U 47 GCCS-M EQUIPMENT A 25.6 43.1 61.1 U 48 NAVAL TACTICAL COMMAND SUPPORT SYSTEM A 57.7 54.4 42.8 U 49 ATDLS A 18.4 19.0 10.0 U 50 MINESWEEPING SYSTEM REPLACEMENT A 18.0 12.8 8.9 U 51 SHALLOW WATER MCM B 11.3 16.2 52 NAVSTAR GPS RECEIVERS (SPACE) A 8.6 9.5 9.9 U 53 ARMED FORCES RADIO AND TV A 9.4 9.0 14.6 U 54 STRATEGIC PLATFORM SUPPORT EQUIP A 24.1 15.2 11.4 U 55 OTHER SPAWAR TRAINING EQUIPMENT A 1.0 1.3 1.8 U 56 OTHER TRAINING EQUIPMENT A 50.3 29.1 37.2 U 57 MATCALS A 10.6 4.2 1.0 U 58 SHIPBOARD AIR TRAFFIC CONTROL B 7.4 7.8 8.0 U 59 AUTOMATIC CARRIER LANDING SYSTEM A 17.9 18.2 15.6 U 60 NATIONAL AIR SPACE SYSTEM B 34.3 30.0 43.6 U 61 AIR STATION SUPPORT EQUIPMENT A 8.8 6.6 7.4 U 62 MICROWAVE LANDING SYSTEM A 5.2 5.0 5.4 U 63 FACSFAC A 3.6 4.2 1.2 U 64 ID SYSTEMS A 9.2 14.0 18.3 U U TRAINING EQUIPMENT AVIATION ELECTRONIC EQUIPMENT PAGE N-24 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 65 SURFACE IDENTIFICATION SYSTEMS A .6 1.5 U 66 TAC A/C MISSION PLANNING SYS(TAMPS) A 20.5 11.8 67 GCCS-M EQUIPMENT ASHORE A 9.1 68 TADIX-B A 18.3 6.0 69 NAVAL SPACE SURVEILLANCE SYSTEM A 7.6 2.7 70 GCCS-M EQUIPMENT TACTICAL/MOBILE A 13.7 71 COMMON IMAGERY GROUND SURFACE SYSTEMS A 40.3 46.2 58.4 U 72 RADIAC A 4.2 8.2 7.9 U 73 GPETE A 7.6 7.3 4.7 U 74 INTEG COMBAT SYSTEM TEST FACILITY A 4.3 4.4 4.5 U 75 EMI CONTROL INSTRUMENTATION A 6.4 8.3 5.2 U 76 ITEMS LESS THAN $5 MILLION A 13.9 11.8 6.3 U 77 SHIPBOARD TACTICAL COMMUNICATIONS A 25.8 78 SHIP COMMUNICATIONS AUTOMATION A 229.1 79 SHIP COMM ITEMS UNDER $5 MILLION A 26.8 80 COMMUNICATIONS ITEMS UNDER $5M A 13.4 U OTHER SHORE ELECTRONIC EQUIPMENT U U 4.9 U U SHIPBOARD COMMUNICATIONS U 184.4 121.2 U U 43.1 24.3 U SUBMARINE COMMUNICATIONS 81 SHORE LF/VLF COMMUNICATIONS A 35.1 31.1 17.5 U 82 SUBMARINE COMMUNICATION EQUIPMENT A 83.2 77.2 89.3 U A 219.4 SATELLITE COMMUNICATIONS 83 SATCOM SHIP TERMINALS (SPACE) U PAGE N-25 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 201.0 198.1 U 84 SATELLITE COMMUNICATIONS SYSTEMS A 85 SATCOM SHORE TERMINALS (SPACE) A 56.1 86 JCS COMMUNICATIONS EQUIPMENT A 3.6 87 ELECTRICAL POWER SYSTEMS A 88 NSIPS A 4.8 1.8 89 JEDMICS A 16.9 11.9 90 NAVAL SHORE COMMUNICATIONS A 124.1 163.1 66.8 U A 61.6 58.0 78.2 U U SHORE COMMUNICATIONS 2.4 4.6 U 1.3 U 14.2 U U CRYPTOGRAPHIC EQUIPMENT 91 INFO SYSTEMS SECURITY PROGRAM (ISSP) CRYPTOLOGIC EQUIPMENT 92 SPECIAL DCP A 14.8 U 93 CRYPTOLOGIC COMMUNICATIONS EQUIP A 20.6 17.0 15.6 A 3.8 ------1,932.7 ------1,556.7 ------1,411.9 U DRUG INTERDICTION SUPPORT 94 OTHER DRUG INTERDICTION SUPPORT TOTAL COMMUNICATIONS AND ELECTRONICS EQUIPMENT BUDGET ACTIVITY 03: ------------------- U AVIATION SUPPORT EQUIPMENT SONOBUOYS 95 PASSIVE SONOBUOYS (NON-BEAM FORMING) A 20.1 U 96 AN/SSQ-62 (DICASS) A 16.6 U 97 AN/SSQ-101 (ADAR) B 16.6 U 98 SONOBUOYS - ALL TYPES A 57.5 57.9 PAGE N-26 UNCLASSIFIED U UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- 99 MISCELLANEOUS SONOBUOYS LESS THAN $5 M FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - A 2.2 U 100 WEAPONS RANGE SUPPORT EQUIPMENT A 22.8 38.7 10.1 U 101 EXPEDITIONARY AIRFIELDS A .1 3.2 7.6 U 102 AIRCRAFT REARMING EQUIPMENT A 12.2 10.5 12.3 U 103 AIRCRAFT LAUNCH & RECOVERY EQUIPMENT A 39.6 35.8 27.5 U 104 METEOROLOGICAL EQUIPMENT A 31.6 30.6 29.8 U 105 OTHER PHOTOGRAPHIC EQUIPMENT A 1.6 1.7 1.7 U 106 AVIATION LIFE SUPPORT A 36.0 26.2 21.0 U 107 AIRBORNE MINE COUNTERMEASURES A 39.9 31.8 46.9 U 108 OTHER AVIATION SUPPORT EQUIPMENT A 7.3 ------246.5 21.7 ------257.7 13.6 ------228.4 U 6.8 4.4 17.9 U .6 U AIRCRAFT SUPPORT EQUIPMENT TOTAL AVIATION SUPPORT EQUIPMENT BUDGET ACTIVITY 04: ------------------- ORDNANCE SUPPORT EQUIPMENT SHIP GUN SYSTEM EQUIPMENT 109 GUN FIRE CONTROL EQUIPMENT A 110 NAVAL FIRES CONTROL SYSTEM A SHIP MISSILE SYSTEMS EQUIPMENT 111 NATO SEASPARROW A 2.1 8.1 10.7 U 112 RAM GMLS A 37.9 36.5 31.8 U 113 SHIP SELF DEFENSE SYSTEM B 37.3 9.3 34.4 U 114 AEGIS SUPPORT EQUIPMENT A 79.5 29.4 155.1 U 115 SURFACE TOMAHAWK SUPPORT EQUIPMENT A 79.7 69.3 61.2 U PAGE N-27 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 116 SUBMARINE TOMAHAWK SUPPORT EQUIP A 3.5 2.8 3.1 U 117 VERTICAL LAUNCH SYSTEMS A 5.3 6.9 6.9 U 118 STRATEGIC PLATFORM SUPPORT EQUIP A 9.2 2.9 9.8 U 119 STRATEGIC MISSILE SYSTEMS EQUIP A 236.7 165.1 205.1 U 120 SSN COMBAT CONTROL SYSTEMS A 35.4 19.4 40.7 U 121 SUBMARINE ASW SUPPORT EQUIPMENT A 4.1 3.9 5.9 U 122 SURFACE ASW SUPPORT EQUIPMENT A 6.0 13.1 3.2 U 123 ASW RANGE SUPPORT EQUIPMENT A 6.3 6.8 6.0 U 124 EXPLOSIVE ORDNANCE DISPOSAL EQUIP B 8.8 7.5 9.4 U 125 ITEMS LESS THAN $5 MILLION A 4.3 5.6 5.8 U 126 ANTI-SHIP MISSILE DECOY SYSTEM A 32.1 37.8 27.5 U 127 SURFACE TRAINING DEVICE MODS A 7.0 7.9 7.3 U 128 SUBMARINE TRAINING DEVICE MODS A 27.1 ------629.1 33.7 ------470.4 20.8 ------663.2 U .4 U 1.4 U FBM SUPPORT EQUIPMENT ASW SUPPORT EQUIPMENT OTHER ORDNANCE SUPPORT EQUIPMENT OTHER EXPENDABLE ORDNANCE TOTAL ORDNANCE SUPPORT EQUIPMENT BUDGET ACTIVITY 05: ------------------- CIVIL ENGINEERING SUPPORT EQUIPMENT CIVIL ENGINEERING SUPPORT EQUIPMENT 129 ARMORED SEDANS A 130 PASSENGER CARRYING VEHICLES A .6 .1 PAGE N-28 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 131 GENERAL PURPOSE TRUCKS A 2.1 1.0 1.5 U 132 CONSTRUCTION & MAINTENANCE EQUIP A 5.0 8.2 9.6 U 133 FIRE FIGHTING EQUIPMENT A 2.3 2.5 5.3 U 134 TACTICAL VEHICLES B 5.9 20.3 20.2 U 135 AMPHIBIOUS EQUIPMENT A 15.9 51.1 14.6 U 136 POLLUTION CONTROL EQUIPMENT A 23.9 22.0 20.0 U 137 ITEMS UNDER $5 MILLION A 8.4 ------63.9 3.4 ------108.4 11.3 ------84.3 U TOTAL CIVIL ENGINEERING SUPPORT EQUIPMENT BUDGET ACTIVITY 06: ------------------- SUPPLY SUPPORT EQUIPMENT SUPPLY SUPPORT EQUIPMENT 138 MATERIALS HANDLING EQUIPMENT A 6.3 7.6 8.8 U 139 OTHER SUPPLY SUPPORT EQUIPMENT A 5.4 5.1 7.5 U 140 FIRST DESTINATION TRANSPORTATION A 3.1 4.0 5.2 U 141 SPECIAL PURPOSE SUPPLY SYSTEMS A 132.7 ------147.6 133.4 ------150.1 490.4 ------512.0 U 3.1 6.7 1.1 U 23.4 22.7 28.8 U TOTAL SUPPLY SUPPORT EQUIPMENT BUDGET ACTIVITY 07: ------------------- PERSONNEL AND COMMAND SUPPORT EQUIPMENT TRAINING DEVICES 142 TRAINING SUPPORT EQUIPMENT A COMMAND SUPPORT EQUIPMENT 143 TRAINING SUPPORT EQUIPMENT A 144 OTHER TRAINING EQUIPMENT A 145 COMMAND SUPPORT EQUIPMENT A PAGE N-29 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 6.6 U 146 EDUCATION SUPPORT EQUIPMENT A 3.5 147 MEDICAL SUPPORT EQUIPMENT A 5.0 7.3 7.7 U 148 INTELLIGENCE SUPPORT EQUIPMENT A 149 OPERATING FORCES SUPPORT EQUIPMENT A 7.3 24.8 15.8 U 150 MOBILE SENSOR PLATFORM A 4.0 U 151 ENVIRONMENTAL SUPPORT EQUIPMENT A 18.2 19.1 25.2 U 152 PHYSICAL SECURITY EQUIPMENT A 7.3 9.5 116.9 U A 4.2 A 13.0 ------104.3 ------109.9 ------221.6 260.6 ------260.6 ------4,284.1 206.4 ------206.4 ------3,479.3 234.1 ------234.1 ------4,097.6 PRODUCTIVITY PROGRAMS 153 JUDGEMENT FUND REIMBURSEMENT U OTHER 154 CANCELLED ACCOUNT ADJUSTMENTS TOTAL PERSONNEL AND COMMAND SUPPORT EQUIPMENT BUDGET ACTIVITY 08: ------------------- U SPARES AND REPAIR PARTS SPARES AND REPAIR PARTS 155 SPARES AND REPAIR PARTS TOTAL SPARES AND REPAIR PARTS TOTAL OTHER PROCUREMENT, NAVY A PAGE N-30 UNCLASSIFIED U CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy/BA-2 COMMUNICATION & ELECT. EQ Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) ID Code DATE: June 2001 P-1 ITEM NOMENCLATURE AN/SPS-49 / 201505/201506 Other Related Program Elements FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete 0 0 0 0 0 0 0 N/A $2.2 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 N/A $2.2 $0.2 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 N/A $0.2 FY2000 Total THE AN/SPS-49(V) IS A NARROW BEAM, VERY LONG RANGE, TWO DIMENSIONAL AIR SEARCH RADAR WHICH WAS DEVELOPED IN RESPONSE TO SOR-17-07 AND APPROVED FOR SERVICE USE IN JULY 1977. IT PROVIDES FREQUENCY DIVERSITY IN A PREVIOUSLY UNUSED FREQUENCY BAND, REDUCES ELECTRONIC INTERFERENCE BETWEEN SHIPS AND DIMINISHES THE EFFECTIVENESS OF JAMMERS BY FORCING THEM TO SPREAD THEIR JAMMING ENERGY OVER A WIDER RANGE OF FREQUENCIES. EQUIPMENT INSTALLATION - FUNDING IS FOR THE INSTALLATION OF EQUIPMENT, INCLUDING FLEET MODERNIZATION PROGRAM INSTALLATIONS, INSTALLATION OF TRAINING EQUIPMENT AND INSTALLATION OF EQUIPMENT IN OTHER SHORE FACILITIES. DD Form 2454, JUN 86 P-1 SHOPPING LIST ITEM NO. 27 AGE NO. 1 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY RADAR SUPPORT / 204000 Program Element for Code B Items: Other Related Program Elements Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) ID Code FY2000 FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 To Complete Total SEE NOTE $24.8 $44.7 $0.0 AN/BPS RADAR AND UPGRADE KITS - PROVIDES REPLACEMENT RADAR FOR OBSOLETE SUBMARINE RADAR AND PROVIDES ELECTRONIC CHART DISPLAY INFORMATION SYSTEM UPGRADES. AN/SPS-73(V) RADAR - PROVIDES REPLACEMENT RADAR FOR AN/SPS-64 RADAR ON ALL SHIP CLASSES AND REPLACEMENT FOR AN/SPS-55 AND AN/SPS-67(V)1 RADAR ON VARIOUS CLASS SHIPS. FFG UPGRADES (NRF) - PROVIDES WEAPON/COMBAT SYSTEM UPGRADES FOR NAVAL RESERVE FORCE FFG. EQUIPMENT INSTALLATION - FUNDING IS THE INSTALLATION OF EQUIPMENT INCLUDING FLEET MODERNIZATION PROGRAM INSTALLATIONS, INSTALLATION OF TRAINING EQUIPMENT, INSTALLATION OF EQUIPMENT IN OTHER SHORE FACILITIES AND INSTALLATION/CERTIFICATION/TESTING OF EQUIPMENT. NOTE: FROM FY01 AND OUT THE RADAR SUPPORT BUDGET WAS TRANSFERRED TO BLI 298000. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 28 CLASSIFICATION: PAGE NO. 1 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy RADAR SUPPORT / 204000 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY2000 Quantity Unit Cost FY2001 Total Cost Quantity Unit Cost FY2002 Total Cost Quantity Unit Cost FY2003 Total Cost Quantity Unit Cost Total Cost N87 SPONSOR SUBMARINE EQUIPMENT KG015 AN/BPS RADAR, UPGRADE KITS A a. AN/BPS-16 FIELD CHANGE 79 100 7,900 a. AN/BPS-15/16 ECDIS-N FC 45 22 1,000 140 98 13,798 60 166 9,973 N86 SPONSOR SURFACE SHIPS EQUIPMENT KG018 AN/SPS-73(V) RADAR A KG019 AN/SYS-2 A KG830 PRODUCTION ENGINEERING A 78 98 7,695 1,231 INSTALLATION AN/SPS-73 KG5IN INSTALLATION OF EQUIPMENT - FMP DD FORM 2446, JUN 86 3,008 0 P-1 SHOPPING LIST ITEM NO. 28 19,834 24,771 0 CLASSIFICATION: 0 PAGE NO. 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System B. APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy Cost Element/ FISCAL YEAR FISCAL YEAR (00) * KG018 AN/SPS-73(V) ** KG015 AN/BPS-16 FC A. DATE June 2001 SUBHEAD 82KG C. P-1 ITEM NOMENCLATURE RADAR SUPPORT / 204000 CONTRACT METHOD CONTRACTOR & TYPE AND LOCATION QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE 78 79 986.538 100 USCG NAVSEA N/A 3/00 SS/FP SS/FP 45 140 60 222.222 985.571 166.216 NAVSEA NAVSEA NAVSEA 12/00 3/00 7/00 SS/FP SS/FP SS/SFP N SERVICES CO-PORTSMO N MARINE-CHARLOTTESVIL DATE OF SPECS DATE AWARD FIRST AVAILABLE REVISIONS DATE DELIVERY NOW AVAILABLE 07/01 4/00 12/01 01/01 YES YES N MARINE- CHAROTTESVILL 05/01 REATHON SERVICES CO-PO 09/01 NORDON, NY 06/01 12/01 02/02 12/02 YES YES FISCAL YEAR (001) * KG015 AN/BPS-15/16 ECDISKG018 AN/SPS-73(V) KG019 AN/SYS-2 NOTE: FROM FY01 AND OUT THE RADAR SUPPORT BUDGET WAS TRANSFERRED TO BLI 29800. D. REMARKS * FUNDING ALSO INCLUDES SPS-73(V) RADAR PRODUCTION NRE AND FUNDING FOR PRE-PLANNED PRODUCT IMPROVEMENTS. ** THE UNIT COST INCLUDES FUNDING TO FIELD ACTIVITIES IN SUPPORT OF PRODUCTION ENGINEERING, QUALITY ASSURANCE, ACCEPTANCE TEST & EVALUATION, AND NRE FOR ECDIS-NAVY REQUIREMENTS. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 28 PAGE NO. 3 Classification: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION RADAR SUPPORT (204000) TYPE MODIFICATION: N/A MODIFICATION TITLE: AN/SPS-73(V) RADAR (N86) FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: PROVIDE REPLACEMENT RADARS FOR LN-66, AN/SPS-64(V)9, AN/SPS-55 AND AN/SPS-67(V)1. NOTE: FROM FY 01 AND OUT, THE RADAR SUPPORT BUDGET WAS TRANSFERRED TO BLI 2980. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E 0 0.0 0 0.0 PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 0.0 120 18.2 78 7.8 140 13.8 338 39.9 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 0.0 SUPPORT EQUIPMENT 0.0 OTHER (Production Engineering) 3.2 OTHER (Consulting Services) 1.1 1.2 4.4 1.1 OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST 6.2 3.0 TOTAL PROCUREMENT 22.5 9.0 ITEM 28 PAGE 4 45.4 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTEDRADAR SUPPORT MODIFICATION TITLE: . INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ALTERATION INSTALLATION TEAM (AIT) ADMINISTRATIVE LEADTIME: 6 MONTHS PRODUCTION LEADTIME: CONTRACT DATES: FY 1999: 7/99 FY 2000: N/A DELIVERY DATE: FY 1999: 9/99 FY 2000: N/A FY 2000 Cost: Qty $ FY2000 Qty $ FY2001 Qty $ AN/SPS-73(V) RADAR (N86) 2 Months FY 2001: FY 2001: ($ in Millions) FY2003 FY2004 Qty $ Qty $ FY2002 Qty $ Qty N/A FY2005 $ Qty FY2006 $ Qty FY2007 $ To Complete Total Qty $ Qty $ PRIOR YEARS FY 2000 EQUIPMENT 78 3.0 0 0.0 78 3.0 FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT 0 0.0 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT 0 0.0 FY 2006 EQUIPMENT 0 0.0 FY 2007 EQUIPMENT 0 0.0 TO COMPLETE INSTALLATION SCHEDULE: FY 1998 & Prior FY 1999 1 2 3 FY 2000 4 1 2 3 FY 2001 4 1 2 3 FY 2002 4 1 2 3 FY 2003 4 1 2 3 FY 2004 4 1 2 3 FY 2005 4 1 2 3 TC 4 TOTAL In 5 3 2 3 1 1 0 20 20 12 12 12 1 78 Out 5 3 2 3 1 1 0 20 20 12 12 12 1 78 ITEM 28 PAGE 5 P-3A CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENTS SCHEDULE (SUPPLEMENT SHEET-INSTALLATION DATA) P-23A RADAR SUPPORT (82KG) - AN/SPS-73(V) RADAR (KG018) Other Procurement, Navy E.I./L NSWC PHD VA BEACH (AIT) 2ND QTR QTY E.I./L June 2001 Installing Agent APPROPRIATION/BUDGET ACTIVITY 1ST QTR DATE P-1 ITEM NOMENCLATURE/PROJECT UNIT 3RD QTR QTY E.I./L 4TH QTR QTY E.I./L 1ST QTR QTY E.I./L FY 2000 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L 2001 ITEM NO. 28 P-1 SHOPPING LIST PAGE NO. 6 CLASSIFICATION: UNCLASSIFIED 4TH QTR QTY E.I./L QTY UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENTS SCHEDULE (SUPPLEMENT SHEET-INSTALLATION DATA) P-23A RADAR SUPPORT (82KG) - AN/SPS-73(V) RADAR (KG018) Other Procurement, Navy E.I./L NSWC PHDiv VA BEACH (AIT) 2ND QTR QTY E.I./L June 2001 Installing Agent APPROPRIATION/BUDGET ACTIVITY 1ST QTR DATE P-1 ITEM NOMENCLATURE/PROJECT UNIT 3RD QTR QTY E.I./L 4TH QTR QTY 1ST QTR E.I./L QTY E.I./L FY 2002 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L 4TH QTR QTY FY 2003 INSTALLATIONS DURING FY 00 AND OUT WILL OCCUR BY BATTLEGROUPS PRIOR TO TCD DATES, SUBJECT TO AVAILABILITY CONFERENCES. ITEM NO. 28 P-1 SHOPPING LIST PAGE NO.7 CLASSIFICATION: UNCLASSIFIED E.I./L QTY UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENTS SCHEDULE (SUPPLEMENT SHEET-INSTALLATION DATA) P-23A RADAR SUPPORT (82KG) - AN/SPS-73(V) RADAR (KG018) Other Procurement, Navy E.I./L NSWC PHDiv VA BEACH (AIT) 2ND QTR QTY E.I./L June 2001 Installing Agent APPROPRIATION/BUDGET ACTIVITY 1ST QTR DATE P-1 ITEM NOMENCLATURE/PROJECT UNIT 3RD QTR QTY E.I./L 4TH QTR QTY 1ST QTR E.I./L QTY E.I./L FY 2004 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L 4TH QTR QTY FY 2005 INSTALLATIONS DURING FY 00 AND OUT WILL OCCUR BY BATTLEGROUPS PRIOR TO TCD DATES, SUBJECT TO AVAILABILITY CONFERENCES. FY 2006 FY 2007 ITEM NO. 28 P-1 SHOPPING LIST PAGE NO. 8 CLASSIFICATION: UNCLASSIFIED E.I./L QTY UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY: BA-2/Communication & Elect. Eq THERMAL IMAGING SENSOR SYSTEM (TISS) - 204300 Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) Other Related Program Elements ID Code FY 2000 N/A A $1.8 N/A A $2.0 FY 2001 FY 2002 PROGRAM DESCRIPTION/JUSTIFICATION: The AN/SAY-1 is a lightweight, state-of-the-art imaging/laser system manufactured by Boeing Company, formerly McDonnell Douglas Aircraft, Huntington Beach, California. Funds are requested to acquire Electro-Optic (EO) capabilities for improvement of Integrated Ship Defense (ISD) system against air Anti-Ship Missile defense and surface (mine and small boat attack) threats. Beginning with the FY 98 budget submission the Thermal Imaging Sensor System (TISS), now nomenclatured as the AN/SAY-1, will be budgeted in this line item. The AN/SAY-1 TISS systems are installed by Tiger Teams prior to ship deployment. The AN/SAY1 is a Non Developmental Item (NDI) procurement which was developed in FY 95 RDT&E,N Program Element 0604755N, Project U0665 Infrared Search and Track (IRST) at a contractual cost of $3.0M. The date of limited approval for service use was approved in August 1996 and full rate production was approved 22 April 1997. FY 2000 program consists of funding for the installation of AN/SAY-1 TISS systems procured in prior years. Current Development and Test Status a. DEV TEST & EVAL (DT&E) b. INITIAL OP TEST & EVAL (IOT&E) c. OP TEST & EVAL (OT&E) d. AVAILABLE DATE OF PERFORMANCE SPECIFICATIONS e. LRIP f. APPROVAL FOR SERVICE USE Schedule Date Current Last Reported N/A Jul-93 Apr-96 May-95 Aug-96 Apr-97 Reason for Delay N/A Jul-93 Apr-96 May-95 Aug-96 Apr-97 An Engineering Test Unit (ETU) performance test was successfully completed aboard the PEO(TAD) Self Defense Test Ship in May 1996. All detection parameters for floating mines, small crafts and aircraft were demonstrated successfully. Maintenance demonstration and suitability testing were also successfully conducted on the USS TICONDEROGA during the first quarter of FY 97. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 29 CLASSIFICATION: PAGE NO. 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA:2 Communications & Electronics Equipment Program Element for Code B Items: AN/SQQ-89(V) Surface ASW Combat System/213600/5 Other Related Program Elements Surface ASW Combat Sys Integration/PE 0205620N Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) ID Code FY 2000 FY 2001 FY 2002 $31.3 $14.2 $16.6 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total $62.1 $0.0 The AN/SQQ-89 is a fully integrated surface ship ASW combat system with capability to detect, classify, localize and attack submarine targets. AN/SQQ-89(V) is the ASW Combat System for new construction DDG51 class ships and backfitted on CG47, DD963, and DDG51 class ships. The AN/SQQ-89(V) configuration will vary based upon ship class, system production configuration, and prebackfit configuration of each ship. This budget supports modernization of existing AN/SQQ-89(V) systems. The AN/SQQ-89(V)12 upgrade (EC-84) replaces the analog electronics of the SQS-53B Sonar with digital COTS processing and modern displays on CG47 class ships. The AN/SQQ-89A(V)15 backfit upgrade will capitalize on the AN/SQQ-89(V)15 forward fit investment and will integrate a new tactical towed array sensor (MFTA) to provide a COTS-based USW combat system which will provide the capability for medium-frequency bistatic and multi-static sonar operations. The Torpedo Alertment Upgrade focuses on providing a commercially-basedOpen System Architecture into which we insert torpedo alertment capabilities (TRAFS - Torpedo Recognition and Alertment Functional Segment), integrated tactical picture capabilities (TDSS/CADRT - Tactical Decision Support Subsystem/ComputerAided Dead Reckoning Tracer), a SIMAS II performance prediction system (AN/UYQ-25B), and the System Level Recorder. The Torpedo Alertment Upgrade EC’s lines will take advantage of advances in technology by upgrading previously installed TRAFS systems with improved processing/reliability and with more mature algorithms to improve false alert/alarm rates, and by incorporating flat screen technology into previously installed TDSS/CADRT systems. The Fire Control/TDSS EC’s lines include the AEGIS Tactical Executive System (ATES) upgrade for DDGs 51 thru 53 and CGs 65 thru 72, upgrade of previously procured TDSS systems to the CADRT configuration, and upgrade of the MK 116 Fire Control System to enable the AN/SQQ-89(V) system to continue to interface with the AEGIS C&D (Command and Decision) system and provide safe tactical employment of new weapon types including the MK50 and MK 54 torpedoes. The SSAAC (Surface Ship Acoustic Analysis Center) upgrade improves ASW data analysis and display capabilities at the Norfolk, VA center. FMP Installation: Funding is for the installation of equipment by "K" ALTs through shipyards and/or Alteration Installation Teams (AIT). DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 30 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy / 02 AN/SQQ-89(V) Surface ASW Combat System/213600/5/C2DB/72DB TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost DB100 DB100 DB100 N763 AN/UYQ-25B TDSS EC’s Torpedo Alertment Upgrade EC’s DB006 INSTALLATION FOR DB100 DB300 DB300 DB300 DB300 DB300 DB300 DB300 AN/SQQ-89(V)12 AN/UYQ-25B System Level Recorder TDSS/CADRT TRAFS Fire Control/TDSS EC’s Torpedo Alertment Upgrade EC’s DB006 INSTALLATION FOR DB300 DB400 DB400 DB400 DB400 DB400 AN/UYQ-25B TDSS/CADRT TRAFS Fire Control/TDSS EC’s Torpedo Alertment Upgrade EC’s DB006 INSTALLATION FOR DB400 DB600 DB600 DB600 AN/SQQ-89A(V)15 System Level Recorder TDSS EC’s A A A DB700 DB700 DB700 DB700 DB700 AN/SQQ-89A(V)15 Components System Level Recorder TDSS EC’s SSAAC Upgrade Torpedo Alertment Upgrade EC’s A A A A A DB830 Production Engineering 3,199 1,424 3,182 DB900 Consulting Services 1,927 1,249 1,489 DB984 Systems Technical Support DD FORM 2446, JUN 86 A A A 2 A A A A A A A 3 2 6 4 21 42 1,600 21 285 315 370 500 413 126 835 1,703 63 570 1,890 1,480 3,528 970 3,795 A A A A A 1 2 315 370 315 740 3,660 3,757 1 Unit Cost Total Cost 830 2,824 413 830 1,908 1,920 500 414 1,815 1,069 310 285 291 3,000 1 194 221 300 300 187 985 0 P-1 SHOPPING LIST ITEM NO. 285 Quantity 30 1,905 1,154 2,200 31,291 14,160 16,561 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD Other Procurement, Navy / 02 AN/SQQ-89(V) Surface ASW Combat System Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION C2DB/72DB AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW FISCAL YEAR (00) DB100/AN/UYQ-25B DB300/AN/UYQ-25B DB300/System Level Rcdr DB300/TDSS/CADRT DB300/TRAFS DB400/TDSS/CADRT DB400/TRAFS DB600/System Level Rcdr 2 3 2 6 4 1 2 1 21 21 285 315 370 315 370 285 NAVSEA NAVSEA NAVSEA NAVSEA NUWC, NEWPORT NAVSEA NUWC, NEWPORT NAVSEA Aug-95 Aug-95 Aug-95 Aug-95 May-94 Aug-95 May-94 Aug-95 Option FP Option FP Option FP FFP Option FP FFP Option FP Option FP Lockheed,Syracuse Lockheed,Syracuse Lockheed,Syracuse Lockheed,Syracuse Northrop Grumman, MD Lockheed,Syracuse Northrop Grumman, MD Lockheed,Syracuse Feb 00 Feb 00 Feb 00 Nov 99 Dec 99 Nov 99 Dec 99 Feb 00 Jan 01 Jan 01 Jan 01 Jan 01 Jan 01 Jan 01 Jan 01 Jan 01 Yes Yes Yes Yes Yes Yes Yes Yes 1 300 NAVSEA Aug-95 FFP Lockheed, Syracuse May 01 Jun 02 Yes FISCAL YEAR (01) DB700/System Level Rcdr D. REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST 30 ITEM NO. PAGE NO. 3 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: DD 963 Class Ships / DB100 Added Capability MODIFICATION TITLE: AN/SQQ-89 Surf ASW Combat Sys DESCRIPTION/JUSTIFICATION: Installation of AN/SQQ-89 ASW Combat System modifications of Analog to Digital components and upgrades to provide improved torpedo alertment and automated USW contact management on previously installed systems. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 2000 FY 2001 FY 1999 & Prior QTY $ QTY $ QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS 0.0 INSTALLATION KITS - UNIT COST 0.0 INSTALLATION KITS NONRECURRING 0.0 EQUIPMENT 30 276.6 30 276.6 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 0.0 SUPPORT EQUIPMENT 0.0 OTHER - ECPs Var OTHER - ENGINEERING SUPPORT 14.5 Var 219.8 1.6 Var 0.4 0.9 0.2 Var 0.8 17.8 0.4 220.8 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST TOTAL PROCUREMENT 30 97.0 607.9 Var 0.1 2.1 Var 0.8 1.9 0.0 1.2 ITEM 30 0.0 0.0 0.0 PAGE 4 0.0 0.0 0.0 30 97.9 0.0 613.1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: DD963 Class ShipsMODIFICATION TITLE: AN/SQQ-89(V) Surface ASW Combat Sys Components INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: Shipyards & AITs ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Feb 00 FY 2001: DELIVERY DATE: FY 2000: Jan 01 FY 2001: Cost: FY 1999 & Prior Qty PRIOR YEARS $ 30 FY 2000 Qty $ FY 2001 Qty $ Various for torpedo alertment upgrade components FY 2002: FY 2002: ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Total Qty $ Qty $ 97.0 FY 2000 EQUIPMENT Var 0 97.0 0.1 Var 0.5 0 0.6 Var 0.3 0 0.3 FY 2002 EQUIPMENT 0 0.0 FY 2003 EQUIPMENT 0 0.0 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT 0 0.0 FY 2006 EQUIPMENT 0 0.0 FY 2007 EQUIPMENT 0 0.0 TO COMPLETE 0 0.0 FY 2001 EQUIPMENT INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TC & Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 In 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30 Out 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30 ITEM 30 PAGE 5 P-3A CLASSIFICATION: UNCLASSIFIED TOTAL CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: CG47 Class Ships / DB300 Added Capability MODIFICATION TITLE: AN/SQQ-89 Surf ASW Combat Sys DESCRIPTION/JUSTIFICATION: Installation of AN/SQQ-89 ASW Combat System modifications of Analog to Digital components and upgrades to provide improved torpedo alertment and automated USW contact management on previously installed systems. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: In Production FY 2000 FY 2001 FY 1999 & Prior QTY $ QTY $ QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS 0.0 INSTALLATION KITS - UNIT COST 0.0 INSTALLATION KITS NONRECURRING 0.0 EQUIPMENT 11 16.9 11 16.9 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 0.0 SUPPORT EQUIPMENT 0.0 OTHER - ECPs Var OTHER - ENGINEERING SUPPORT 10.4 Var 22.5 9.2 Var 2.6 4.2 Var 1.9 0.8 24.6 0.5 27.5 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST TOTAL PROCUREMENT 9 12.3 62.1 2 3.8 15.6 Var 1.9 8.0 Var 1.9 3.2 ITEM 30 11 0.0 0.0 PAGE 6 0.0 0.0 0.0 19.9 0.0 88.9 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: CG47 Class Ships MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: Shipyards & AITs ADMINISTRATIVE LEADTIME: 3 Months CONTRACT DATES: FY 2000 Dec 99 DELIVERY DATE: FY 2000 Jan 01 Cost: FY 1999 & Prior Qty PRIOR YEARS $ 9 FY 2000 Qty $ 12.3 FY 2000 EQUIPMENT AN/SQQ-89(V) Surface ASW Combat Sys PRODUCTION LEADTIME: FY 2001: FY 2001: FY 2001 Qty $ Various for torpedo alertment components FY 2002: FY 2002: ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Total Qty $ Qty $ 2 3.7 Var 1.1 11 17.1 Var 0.1 Var 0.5 0 0.6 FY 2001 EQUIPMENT Var 0.3 Var 1.8 0 2.1 Var 0.1 FY 2002 EQUIPMENT 0 0.1 FY 2003 EQUIPMENT 0 0.0 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT 0 0.0 FY 2006 EQUIPMENT 0 0.0 FY 2007 EQUIPMENT 0 TO COMPLETE 0 0.0 INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TC & Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 In 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 Out 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 ITEM 30 PAGE 7 P-3A CLASSIFICATION: UNCLASSIFIED TOTAL CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION DDG 51 Class Ships / DB400 TYPE MODIFICATION: Added Capability MODIFICATION TITLE: AN/SQQ-89 Surf ASW Combat Sys DESCRIPTION/JUSTIFICATION: Installation of AN/SQQ-89 ASW Combat System upgrades to provide improved torpedo alertment and automated USW contact management on previously installed systems. The AN/SQQ-89A(V)15 backfit upgrade will capitalize on the AN/SQQ-89(V)15 forward fit investment and will integrate a new tactical towed array sensor (MFTA) to provide a COTS-based USW combat system which will provide the capability for me frequency bistatic and multi-static sonar operations. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: AN/SQQ-89A(V)15 Engineering Development Model (EDM) to be completed in FY03, installed in FY04 (RDT&E PE 0205620N) FY 1999 & Prior FY 2000 FY 2001 QTY $ QTY $ QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS 0.0 INSTALLATION KITS - UNIT COST 0.0 INSTALLATION KITS NONRECURRING 0.0 EQUIPMENT 27 0.0 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 0.0 SUPPORT EQUIPMENT 0.0 OTHER - ECPs Var OTHER - ENGINEERING SUPPORT 13.9 Var 8.8 4.7 Var 3.8 0.9 Var 1.6 1.8 21.3 3.4 17.6 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST TOTAL PROCUREMENT Var 3.0 25.7 Var 3.8 12.3 Var 1.1 3.6 Var 0.3 5.5 ITEM 30 27 0.0 0.0 PAGE 8 0.0 0.0 0.0 8.2 0.0 47.1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: DDG 51 Class INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AITs ADMINISTRATIVE LEADTIME: 3 Months CONTRACT DATES: FY 2000 Dec 99 DELIVERY DATE: FY 2000 Jan 01 Cost: FY 1999 & Prior Qty PRIOR YEARS $ Var FY 2000 EQUIPMENT AN/SQQ-89(V) Surface ASW Combat Sys PRODUCTION LEADTIME: FY 2001 FY 2001 FY 2000 Qty $ 3.0 Var MODIFICATION TITLE: FY 2001 Qty $ Various for torpedo alertment upgrade components FY 2002 FY 2002 ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Total Qty $ Qty $ 3.6 Var 0.2 Var 1.1 0 6.6 0 1.3 FY 2001 EQUIPMENT Var 0.1 0 0.1 FY 2002 EQUIPMENT Var 0.2 0 0.2 FY 2003 EQUIPMENT 0 0.0 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT 0 0.0 FY 2006 EQUIPMENT 0 0.0 FY 2007 EQUIPMENT 0 0.0 TO COMPLETE 0 0.0 INSTALLATION SCHEDULE: FY 2000 & Prior FY 2002 FY 2001 1 2 3 4 1 2 3 FY 2003 4 1 2 3 FY 2004 4 1 2 3 FY 2005 4 1 2 3 FY 2006 4 1 2 3 FY 2007 4 1 2 3 TC 4 TOTAL In 0 0 0 0 0 0 0 0 0 27 27 Out 0 0 0 0 0 0 0 0 0 27 27 ITEM 30 PAGE 9 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: Trainers & Shore Sites / DB600 & DB700 Added Capability MODIFICATION TITLE: AN/SQQ-89 Surf ASW Combat Sys DESCRIPTION/JUSTIFICATION: Procurement of AN/SQQ-89 Surface ASW Combat System equipment to match upgrades to current ship systems. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: AN/SQQ-89A(V)15 Engineering Development Model (EDM) to be completed in FY03, installed in FY04 (RDT&E PE 0205620N) FY 1999 & Prior FY 2000 FY 2001 QTY $ QTY $ QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS 0.0 INSTALLATION KITS - UNIT COST 0.0 INSTALLATION KITS NONRECURRING 0.0 EQUIPMENT 0.0 EQUIPMENT NONRECURRING 0.0 ENGINEERING SUPPORT 0.0 DATA 0.0 TRAINING EQUIPMENT Var 17.0 Var 0.6 SUPPORT EQUIPMENT Var 38.8 Var 0.4 OTHER - ENGINEERING SUPPORT 39.3 0.2 1 Var 0.5 0.2 Var 17.6 4.0 43.7 2.0 41.7 OTHER 0.0 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST 0.0 TOTAL PROCUREMENT 95.1 1.2 0.7 6.0 ITEM 30 0.0 0.0 PAGE 10 0.0 0.0 0.0 0.0 1 103.0 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA 2 SSN ACOUSTICS 214700 Program Element for Code B Items: Other Related Program Elements 0604503N Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) N/A ID Code To FY 2000 FY 2001 FY 2002 $211.9 $111.6 $113.0 $12.3 $7.0 $5.6 B This program procures submarine systems and equipment to maintain clear acoustic, tactical, and operational superiority over the entire spectrum of submarine and surface combatant threats. Procurements provide upgrades/support to 688 Class, 688I Flight and SEAWOLF Class SSN’s. All future Acoustic Upgrades of Acoustic-Rapid COTS Insertion (A-RCI) equipment are incorporated into this budget item. A-RCI is a multi-phased, evolutionaryeffort geared toward addressing Acoustic Superiority through the rapid introduction of interim development products applicable to SSN 688 and 688I Class Submarines. A-RCI includes the AN/BSY-1 ECP 1000 Acoustic Upgrade, Medium Frequency Active Improvement(MFAI), and the AN/BSY-1 HF Upgrade programs. A-RCI Phase II provides full Towed Array processing including TB-29 Spatial Vernier and integrates the first Advanced Processing Build (APB) accommodatedthrough a Technical Refresh/Insertion of the production hardware and adds a second display. Phase III completes system integration and is the baseline for SSN 688 Class Submarines. Phase III provides Spherical Array (SA) Processing. Phase IV provides AN/BSY-1 High Frequency Active Upgrades and is the baseline for SSN688I and SSN21 class submarines. A-RCI receivedMSII approvalon 05/96, including the decision to procure the first two (2) A-RCI TA Upgrade Kits for 688 and 688I. The program successfully completed a program review in April 98 for FY98 and FY99 procurement options; in April 99 for remaining FY99 procurement options; and December 99 for FY00 procurement options. The RDT&E program element is PE 0604503N/F0219. TECH EVAL/OPEVAL is scheduled for completion in 4Q/FY01 and Milestone III approval is planned for 1Q/FY02. ACINT 21 upgrades provides Towed/Hull/Sphere/Sail Array recording/playbackand event reconstruction. Program provides for ONI element level recording. ACINT 21 Lite provides for processed data and replay capability and formatted data for executing "realtime" Reachback to Battle Group and /or ONI to preclude requiring the Submarine return to port to provide tactically critical ACINT data. ACINT 21 Heavy provides additional storage for element level sensor data and onboard reprocessing as well as data formatting for real time reachback and provides full program implementation. Total Ship Monitoring System (TSMS) provides own ship environmental and noise monitoring to enhance the ships situational awareness and provides necessary information for tactical decisions. Precision Bottom Mapping also referred to as Precision Underwater Mapping (PUMA) upgrades A-RCI Phase IV shipsets to provide 3-D "look-ahead" profiling and visualizationwith enhanced resolution for better discrimination of targets of interest. Towed Systems procurements provide upgrades/support for TB-16 Series Towed Arrays, TB-23 Towed Arrays, TB-29 Series Towed Arrays, OK-276 Series Towed Array Handlers, OK-634 Towed Array Han and OA-9070 Series Handlers installed on SSN688, SSN 688I, SSN21 and SSBN726 Class Submarines. These upgrades provide increased sensor capability to maintain acoustic superiority and reliability improvementsto increase the service life, reduce failures, and increase the inventoryof arrays and handlers availablefor fleet use. Increased capability is being provided with TB-29 array, which provides improved low frequency performance, passive localization,increased directivity index, and higher search speed. The TB-29 A Towed Array maintains TB-29 Towed Array capability at a reduced cost using COTS based telemetry, lower cost hydrophones and reduced number of non-acoustic sensors. SA101 ACOUSTICS UPGRADES: Procures A-RCI TA, SA, HA, and HF Upgrade Kits, Precision Bottom Mapping Kits, TSMS and ACINT-21 Lite and Heavy. This line also supports the refurbishment and installation of the upgrades. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 31 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED Page 1 of 33 CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA: 2 SSN ACOUSTICS 214700 SA102 TOWED SYSTEMS: This line procures TB-29 A Towed Arrays, OA-9070B Towed Array Handler Kits, and refurbishment/upgrade material to support reliability improvements to SPALT 9080, TB-16, TB-23, TB-29 Towed Arrays and Towed Array Handling Systems. Handling System reliability improvements include: improved cables in the outboard systems, improved slip rings, EMI improvements, roller boxes, and improved hydraulic filtering. Towed Array reliability improvements include: improved internal connectors, hydrophones, and Vibration Isolation Modules (VIMs) for the TB-23 Array. Towed Array improvements to increase performance include: Light Weight Tow Cables for the TB-29 and TB-29 A Towed Arrays, Heading Sensors for TB-23 Arrays, and Wideband OMNI capability in TB-16 Arra SA201 BLOCK CHANGES: Minor ECP’s and hardware changes affecting the SSN688 Class and 688I Flight submarines are procured through this line. Funding contained In this line will be used to support non-recurring first article test efforts associated with the changing COTS environmentas well as Reliability, Maintainabilityand Availabilitymodifications requested by the Fleet. This line also supports the procurement of hardware necessary to implement the ECP’s into the System or end item being procured. SA202 PRODUCTION/ENGINEERING SUPPORT: Funding supports the procurement of Acoustics Upgrades equipment and Towed System hardware. SA203 UNIQUE TEST EQUIPMENT: Funding procures various towed array and towed array handling system/stowage tube inspection test equipment. SA301 MSRA/SMF: Provides software updates to end-of-life changes as well as software updates to Test Program Set (TPSs) module testing software. SA302 OP TRAINER UPGRADES: Funding procures hardware upgrades and production engineering for Acoustics Upgrades operational trainer sites. SA303 COTS SUPPORTABILITY UPGRADES: Provides for Technology Refresh/Insertion for A-RCI kits. Tech Refresh provides for Software and Hardware updates to accomodate shifts in technology to the execution procurement years’ "current state-of-the-practice" hardware. A-RCI has already undergone three technology insertion phases to accomodate integrating Advanced Processing Builds (APBs). Updates are necessary for signal and display processing hardware as APBs are introduced or as commercial support for the hardware is phased out. Tech Insertion procures the hardware necessary to upgrade and backfit the A-RCI kits. When A-RCI systems are being upgraded to subsequent phases of A-RCI (e.g. from Phase II to Phase IV), upgrades to the Phase II signal processing and display hardware will be procured from this line to accomadatecommon technology consistant with the APB being implementedin the year of introduction. In future years, requirements will be included to fund complete system technologyinsertion as the COTS hardware becomes unsupportable. SA401 INITIAL TRAINING: Provides for initial training curriculum development, training management materials, exercise control group development, pilot services and services to the Fleet. SA500 AN/BQG-5 WIDE APPERATURE ARRAY (WAA): Funding supports Wide Apperature Array Shore Spares for both AN/BQG-5 and AN/BSY-2 systems. Funding also supports engineering changes and support unique to the AN/BQG-5 systems. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 31 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED Page 2 of 33 CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA: 2 SSN ACOUSTICS 214700 SA501 AN/BSY-2: Funding supports engineering changes and upgrade and an End of Life Parts program. This funding also supports procurement, installation and test of ARCI-HF Kits, ARCI SA Kits, ARCI (V)5 Kits and MK2/VA Class Combat Control System Kits. SA502 COMBAT SYSTEMS COMMONALITY: Funding supports combat systems commonalityefforts and incorporates increased funding provided by OSD Action. Funds provided in FY 00 for procurement and installation of improved processor cards and disc drives for Signal Data Convertor Stores which supports the fleet release of SFMPL 6.1 which provides complete range dependent search planning capability. SA5IN EQUIPMENT INSTALLATION: Funds actual hardware installation during shipyard and pierside availabilities. SA900 CONSULTING SERVICES: Includes specification validation, contract deliverable monitoring, prime contractor monitoring for cost, schedule and performance slips, ILS planning and coordination of GFI. Additional support will in production planning, business case analysis, technical refresh and insertion planning and market analysis to review implementation strategies for procurement of current year "state of the practice" hardware in Acoustics programs. Consulting services will also provide production monitoring, installation planning and coordination support. Note: This budget exhibit includes a realignment from DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 31 PAGE NO. 3 CLASSIFICATION: UNCLASSIFIED Page 3 of 33 UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT P-1 ITEM NOMENCLATURE/SUBHEAD B SSN ACOUSTICS/H2SA TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost SPONSOR: N87 SA101 ACOUSTICS UPGRADES $16,025 INSTALL SUPPORT A 659 1,925 REFURBISHMENT MATERIAL A 4,550 1,060 ACINT-21 KITS HEAVY B ACINT-21 KITS LITE B BQS-15 EC-19 DRAWERS A BQS-15 EC-17 -19 KITS B A-RCI SA KITS (688) B A-RCI TA RCI KITS (688) B A-RCI TA TO SA UPGRADES KITS (688) B A-RCI TA RCI KITS (688I) B $26,797 6,183 389 1 511 511 2,000 5 4 5,321 21,285 1 5,404 2,821 14,110 5,404 A-RCI SA KITS (688I) B 5 7,471 37,355 A-RCI HF KITS B 9 2,817 25,353 1 2,865 2,865 A-RCI TA TO SA UPGRADES KITS (688I) B 4 4,698 18,792 1 4,771 4,771 BOTTOM MAPPING B 6 184 1,104 HF WINDOWS B 13 192 2,500 TSMS KITS B SA5IN INSTALLATION SA102 TOWED SYSTEMS SA5IN $107,994 20,283 19,522 $36,725 3,657 $37,501 21,935 $37,398 TOWED ARRAY REFURBISHMENT & UPGRADE A TOWED ARRAY HANDLING SYSTEM REFURBS A TB-29 A B 3 2,127 6,381 5 2,163 10,815 8 2,200 17,600 OA-9070 B UPGRADES A 4 655 2,620 8 669 5,352 8 684 5,472 TB-16 REPLACEMENT A 5,789 5,751 P-1 SHOPPING LIST ITEM NO. 31 10,876 4,523 8,529 INSTALLATION DD FORM 2446, JUN 86 16,811 3,450 7,593 CLASSIFICATION: PAGE NO. 4 Page 4 of 33 Total Cost UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT SSN ACOUSTICS/H2SA TOTAL COST IN THOUSANDS OF DOLLARS COST CODE SA201 ELEMENT OF COST ID Code Prior Years Total Cost BLOCK CHANGES Quantity Unit Cost FY 2001 Total Cost Quantity $4,678 ACOUSTICS UPGRADES Unit Cost FY 2002 Total Cost $2,878 854 SSEP 1,079 Quantity Unit Cost Total Cost 200 TOWED ARRAYS 200 1,624 200 1,599 1,208 $5,636 $4,509 $5,141 ACOUSTICS UPGRADES 2,460 1,462 2,088 TOWED ARRAYS/HANDLING EQUIP 3,176 3,047 3,053 PROD/ENG’G SUPPT $2,906 $2,884 $2,926 SA301 MSRA/SMF $1,037 $979 $0 0 0 0 SOFTWARE MAINTENANCE FACILITY 1,037 979 0 OP TRAINER UPGRADES $643 $1,004 $1,265 ENGINEERING CHANGES 643 1,004 1,265 MODULE SCREEN & REPAIR ACTIVITY SA401 $9,666 $5,313 $12,914 COTS TECH INSERTION 5,327 4,260 11,854 COTS TECH REFRESH 4,339 1,053 1,060 $2,318 $939 $1,043 2,089 703 800 229 236 243 COTS SUPPORTABILITY UPGRADES INITIAL TRAINING ACOUSTICS TOWED ARRAY/HANDLING EQUIPMENT DD FORM 2446, JUN 86 Total Cost 1,360 UNIQUE TEST EQUIPMENT SA303 Unit Cost $2,768 SA203 SA302 Quantity 2,000 DESK TOP CALCULATOR SA202 FY2000 P-1 SHOPPING LIST ITEM NO. 31 CLASSIFICATION: PAGE NO. 5 UNCLASSIFIED Page 5 of 33 UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT P-1 ITEM NOMENCLATURE/SUBHEAD SSN ACOUSTICS/H2SA TOTAL COST IN THOUSANDS OF DOLLARS COST CODE SA500 ELEMENT OF COST ID Code Prior Years Total Cost FY2000 Quantity Unit Cost FY 2001 Total Cost AN/BQG-5 WAA $101 ENGINEERING CHANGES 101 Quantity Unit Cost FY 2002 Total Cost $2,660 103 WAA OUTBD SPARES Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost $62 62 2,557 ENGINEERING SUPPORT SA501 $4,677 $8,474 $8,052 EOL PARTS 1,103 514 2,183 ENGINEERING CHANGE/UPGRADES 2,018 941 4,399 INSTALLATION & TEST 1,556 336 1,470 AN/BSY-2 ARCI HF KIT 1 6,683 6,683 ARCI SA KIT ARCI (V)5 KITS SA51N EQUIPMENT INSTALLATION SA900 CONSULTING SERVICES SA502 100 200 2,801 COMBAT SYSTEMS COMMONALITY 2,974 3,048 111,613 113,026 CLASSIFICATION: $3,848 SDCS 63 61 3,848 211,942 DD FORM 2446, JUN 86 362 P-1 SHOPPING LIST ITEM NO. 31 PAGE NO. 6 UNCLASSIFIED Page 6 of 33 UNCLASSIFIED CLASSIFICATION: BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy SSN ACOUSTICS/H2SA SUBHEAD BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE FY 2000 SA101 - A-RCI TA - SA KITS (688) SA101 - A-RCI SA KITS (688) SA101 - A-RCI HF KITS (688I) SA101 - A-RCI TA-SA KITS (688I) SA102 - TB-29 A ARRAYS SA102 - OA-9070 B Upgrade kits SA502 - SDCS 4 5 9 4 3 4 63 $5,321 $7,471 $2,817 $4,698 $2,127 $655 $61 NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NUWC,NEWPORT SS/FP/Opt SS/FP/Opt SS/FP/Opt SS/FP/Opt C/IF/Opt C/FFP/Opt C/FP/Opt Lockheed Martin, VA Lockheed Martin, VA Lockheed Martin, VA Lockheed Martin, VA Lockheed Martin, MD Lockheed Martin, MD NUWC,NEWPORT 3/00 3/00 3/00 3/00 3/00 7/00 3/00 3/01 3/01 3/01 3/01 9/01 3/01 9/00 YES YES YES YES YES YES YES 1 1 1 5 8 1 $5,404 $4,771 $2,865 $2,163 $669 $6,683 NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA SS/CPIF/Opt SS/CPIF/Opt SS/CPIF/Opt C/IF/Opt C/FFP/Opt SS/FP/OPT Lockheed Martin, VA Lockheed Martin, VA Lockheed Martin, VA Lockheed Martin, MD Lockheed Martin, MD Lockheed Martin, VA 3/01 3/01 3/01 2/01 12/00 2/01 3/02 3/02 3/02 8/02 8/01 2/02 YES YES YES YES YES YES 1 6 8 8 5 $511 $184 $2,200 $684 $2,821 NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA SS/CPIF/Opt SS/CPIF/Opt C/IF/Opt C/FFP/Opt DSR, VA Lockheed Martin, VA Lockheed Martin, MD Lockheed Martin, MD 2/02 1/02 5/02 2/02 6/02 6/02 11/03 10/02 YES YES YES YES FY 2001 SA101 - A-RCI TA - SA KITS (688) SA101 - A-RCI TA-SA (688I) SA101 - A-RCI HF KITS (688I) SA102 - TB-29 A ARRAYS SA102 - OA-9070 B Upgrade kits SA501 - ARCVI-(V)5 KIT (see note on P3A FY 2002 SA101 - ACINT-21 HEAVY SA101 - BOTTOM MAPPING SA102 - TB-29 A ARRAYS SA102 - OA-9070 B Upgrade kits SA101 - A-RCI TA KITS (688I) D. REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. PAGE NO. 7 31 Classification: Page 7 of 33 UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: 688 A-RCI TA KITS SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: PROVIDES TB-29 ARRAY CAPABILITY AND IMPROVED DETECTION DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIOR QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS 20 INSTALLATION KITS - UNIT COST 50.502 2.525 INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT 1 2.682 SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 4 2.910 60.885 16 11.170 11.170 ITEM 31 PAGE 8 Page 8 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: 688 TA KITS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: N/A FY 2001: 12 Months FY 2002: FY 2002: N/A ($ in Millions) Cost: Prior Years Qty $ PRIOR YEARS 4 FY2000 Qty $ FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty 2.910 FY 2000 EQUIPMENT FY 2001 EQUIPMENT 16 11.170 FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 20 0 0 0 0 0 0 0 0 Out 20 0 0 0 0 0 0 0 0 ITEM 31 PAGE 9 P-3A CLASSIFICATION: UNCLASSIFIED Page 9 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: 688 A-RCI TA-SA KITS SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: PROVIDES SPHERICAL ARRAY PROCESSING CAPABILITY DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 FY 2001 FY 2002 QTY $ QTY $ QTY $ 1 4.319 4 21.285 1 5.404 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST 4.319 5.321 5.404 INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 1 4.319 1.350 22.635 4 5.219 10.623 1 1.505 1.505 ITEM 31 PAGE 10 Page 10 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: 688 A-RCI TA-SA KITS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: 03/00 DELIVERY DATE: FY 2000: 03/01 SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: 03/01 FY 2001: 03/02 12 Months FY 2002: FY 2002: N/A ($ in Millions) Cost: Prior Years Qty $ FY2000 Qty $ PRIOR YEARS 1 FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty 1.350 FY 2000 EQUIPMENT 4 5.219 FY 2001 EQUIPMENT 1 1.505 FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 1 0 2 2 0 0 1 0 0 Out 1 0 2 2 0 0 1 0 0 ITEM 31 PAGE 11 Page 11 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: 688 A-RCI SA KITS SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: PROVIDES SPHERICAL ARRAY PROCESSING CAPABILITY DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST 1 8.281 8.281 INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 1 8.281 2.234 2.234 ITEM 31 PAGE 12 CLASSIFICATION: UNCLASSIFIED Page 12 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: 688 A-RCI SA KITS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A 12 Months FY 2002: FY 2002: N/A ($ in Millions) Cost: Prior Years Qty $ FY2000 Qty $ PRIOR YEARS 1 FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty 2.234 FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 In 1 0 0 0 0 0 0 0 4 0 Out 1 0 0 0 0 0 0 0 0 ITEM 31 PAGE 13 P-3A CLASSIFICATION: UNCLASSIFIED Page 13 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: 688I A-RCI TA KITS SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: PROVIDES TB-29 ARRAY PROCESSING CAPABILITY AND IMPROVED DETECTION. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS 12 INSTALLATION KITS - UNIT COST 32.494 2.708 INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 10 7.741 40.235 2 2.266 2.266 ITEM 31 PAGE 14 CLASSIFICATION: UNCLASSIFIED Page 14 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: 688I A-RCI TA KITS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A 12 Months FY 2002: FY 2002: N/A ($ in Millions) Cost: Prior Years Qty $ PRIOR YEARS 10 FY2000 Qty $ 7.741 2 FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty 2.266 FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 12 0 0 0 0 0 0 0 0 Out 12 0 0 0 0 0 0 0 0 ITEM 31 PAGE 15 P-3A CLASSIFICATION: UNCLASSIFIED Page 15 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION 688I A-RCI TA-SA/HF KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: TA - SA KITS PROVIDES SPHERICAL ARRAY PROCESSING - * HF KITS ARE NOT INSTALLED ALONE. HF KITS ARE INSTALLED WITH TA-SA KITS AS SHOWN ON THIS PAGE, AND WITH SA KITS AS SHOWN ON PAGE 18. THE TOTAL NUMBER OF HF KITS LISTED ON THE P-5 WILL ADD TO THE TOTALS FOR HF KITS ON PAGE 16 & 18. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS/TA-SA KITS 1 INSTALLATION KITS - UNIT COST * INSTALLATION KITS/HF UPGRADE INSTALLATION KITS - UNIT COST 3.495 4 3.495 1 2.770 18.792 1 4.698 4 2.770 11.268 4.771 4.771 1 2.817 2.865 2.865 EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 1 6.265 1.333 31.393 4 5.152 1 1.460 12.788 1.460 ITEM 31 PAGE 16 CLASSIFICATION: UNCLASSIFIED Page 16 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: 688I A-RCI TA-SA/HF KITS INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: 3/00 DELIVERY DATE: FY 2000: 3/01 MODIFICATION TITLE: SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: 3/01 FY 2001: 3/02 12 Months FY 2002: FY 2002: N/A ($ in Millions) Cost: Prior Years Qty $ FY2000 Qty $ PRIOR YEARS 1 FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty 1.333 FY 2000 EQUIPMENT 4 5.152 FY 2001 EQUIPMENT 1 1.460 FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 1 0 2 2 0 0 1 0 0 Out 1 0 2 2 0 0 1 0 0 ITEM 31 PAGE 17 P-3A CLASSIFICATION: UNCLASSIFIED Page 17 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION 688I A-RCI SA KITS/HF UPGRAD TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: SA KITS PROVIDES SPHERICAL ARRAY PROCESSING - *HF KITS ARE NOT INSTALLED ALONE. HF KITS ARE INSTALLED WITH SA KITS AS SHOWN ON THIS PAGE, AND WITH TA-SA KITS AS SHOWN ON PAGE 16. THE TOTAL NUMBER OF HF KITS LISTED ON THE P-5 WILL ADD TO THE TOTALS FOR HF KITS ON PAGE 16 & 18. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS/SA KITS 1 INSTALLATION KITS - UNIT COST * INSTALLATION KITS/HF UPGRADE INSTALLATION KITS - UNIT COST 7.346 5 7.346 1 2.770 37.355 7.471 5 2.770 14.085 2.817 EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 1 10.116 1.930 53.370 5 9.151 9.151 ITEM 31 PAGE 18 CLASSIFICATION: UNCLASSIFIED Page 18 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: 688I A-RCI SA/HF UPGRADES INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: 3/00 DELIVERY DATE: FY 2000: 3/01 MODIFICATION TITLE: SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A 12 Months FY 2002: FY 2002: N/A ($ in Millions) Cost: Prior Years Qty $ FY2000 Qty $ PRIOR YEARS 1 FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty 1.930 FY 2000 EQUIPMENT 5 9.151 FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 1 0 1 2 2 0 0 0 0 Out 1 0 1 2 2 0 0 0 0 ITEM 31 PAGE 19 P-3A CLASSIFICATION: UNCLASSIFIED Page 19 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION 688I PRECISION BOTTOM MAPP TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: PROVIDES 688I CLASS SUBMARINES UNDER ICE AND BOTTOM MAPPING CAPABILITY DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT ITEM 31 PAGE 20 CLASSIFICATION: UNCLASSIFIED Page 20 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: 688I PRECISION BOTTOM MAPPMODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A 6 Months FY 2002: FY 2002: 1/02 6/02 ($ in Millions) Cost: Prior Years Qty $ FY2000 Qty $ FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty PRIOR YEARS FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT 6 0.324 FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 0 0 0 0 0 0 0 3 3 Out 0 0 0 0 0 0 0 3 3 ITEM 31 PAGE 21 P-3A CLASSIFICATION: UNCLASSIFIED Page 21 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION ACINT TA (LITE) TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: ACINT 21 Lite provides an interim display level record/playback. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT ITEM 31 PAGE 22 CLASSIFICATION: UNCLASSIFIED Page 22 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: ACINT 21 TA (LITE) MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A 5 Months FY 2002: FY 2002: N/A N/A ($ in Millions) Cost: Prior Years Qty $ FY2000 Qty $ FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty PRIOR YEARS FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 0 0 0 0 0 0 0 0 0 Out 0 0 0 0 0 0 0 0 0 ITEM 31 PAGE 23 P-3A CLASSIFICATION: UNCLASSIFIED Page 23 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION ACINT TA/SA (HEAVY) TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: ACINT 21 Heavy provides full program implementaion. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST 1 0.511 0.511 INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 1 0.368 0.879 ITEM 31 PAGE 24 CLASSIFICATION: UNCLASSIFIED Page 24 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: ACINT 21 TA/SA (HEAVY) INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A MODIFICATION TITLE: SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A 5 Months FY 2002: FY 2002: 2/02 6/02 ($ in Millions) Cost: Prior Years Qty $ FY2000 Qty $ FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty PRIOR YEARS FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT 1 0.368 FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 0 0 0 0 0 0 0 0 1 Out 0 0 0 0 0 0 0 0 1 ITEM 31 PAGE 25 P-3A CLASSIFICATION: UNCLASSIFIED Page 25 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TSMS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: Total Ship Monitoring System (TSMS) provides own ship environmental and noise monitoring to enhance the ships situational awareness and provides necessary information for tactical decisions DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT ITEM 31 PAGE 26 CLASSIFICATION: UNCLASSIFIED Page 26 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: TSMS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A 12 Months FY 2002: FY 2002: N/A N/A ($ in Millions) Cost: Prior Years Qty $ FY2000 Qty $ FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty PRIOR YEARS FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 In 0 0 0 0 0 0 0 0 4 0 Out 0 0 0 0 0 0 0 0 0 ITEM 31 PAGE 27 P-3A CLASSIFICATION: UNCLASSIFIED Page 27 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: OA-9070 A/B UPGRADE SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: PROVIDES NECESSARY TECHNICAL CONVERSION TO ACCOMMODATE TB-29 SERIES ARRAYS NOTE: FY00 INSTALL COST (AND PRIOR YEARS PROCUREMENT) INCLUDES ONE 9070A HANDLER PROCURED IN FY94. THE 9070A HAS A DIFFERENT PROCUREMENT AND INSTALLATION COST. FY01 REFLECTS PROCUREMENT OF AN ADDITIONAL 2 OA-9070B KITS TO OFFSET THE NEW REQUIREMENT FOR BOATS BEING DEPLOYED TO GUAM. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST 4 3.347 4 0.837 2.620 7 0.655 4.683 0.669 8 5.472 0.684 INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT 1 0.669 SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 4 3.347 8.529 11.149 6 5.751 5 7.593 11.103 13.065 ITEM 31 PAGE 28 CLASSIFICATION: UNCLASSIFIED Page 28 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: OA 9070 A/B UPGRADE MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIP ALT ADMINISTRATIVE LEADTIME: 24 MOS CONTRACT DATES: FY 2000: 7/00 DELIVERY DATE: FY 2000: 3/01 SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: 12/00 FY 2001: 8/01 8 - 12 Months FY 2002: FY 2002: 2/02 10/02 ($ in Millions) Cost: Prior Years Qty $ FY2000 Qty $ PRIOR YEARS 4 FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty 8.529 FY 2000 EQUIPMENT 4 3.825 FY 2001 EQUIPMENT 2 1.926 5 7.593 FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2001 FY 2002 & Prior 1 2 3 4 1 2 3 4 In 4 0 1 2 3 1 2 1 1 Out 4 0 1 2 3 1 2 1 1 ITEM 31 PAGE 29 P-3A CLASSIFICATION: UNCLASSIFIED Page 29 of 33 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: ARCI-(V)5 KITS SHIPALT MODIFICATION TITLE: SSN Acoustics DESCRIPTION/JUSTIFICATION: ARCI-(V)5 KITS INCORPORATE ARCI PHASE II-IV CAPABILITY FOR THE SEAWOLF CLASS SUBMARINE. NOTE: THE BALANCE OF FY01 KIT COST OF $5,703K BEING FUNDED BY PMS350 UNDER OPN BLI 094100 SUBHEAD H1PB. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS 1 INSTALLATION KITS - UNIT COST 6.683 13.386 INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT AP 0.100 0.100 AP 0.200 6.883 AP 0.362 0.362 ITEM 31 PAGE 30 CLASSIFICATION: UNCLASSIFIED Page 30 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: ARCI-(V)5 KITS INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIPYARD ADMINISTRATIVE LEADTIME: 3-4 MOS CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A MODIFICATION TITLE: SSN ACOUSTICS PRODUCTION LEADTIME: FY 2001: 2/01 FY 2001: 2/02 9-12 Months FY 2002: FY 2002: ($ in Millions) Cost: Prior Years FY 2000 Qty $ Qty $ FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty PRIOR YEARS FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 3 4 1 2 3 4 In 0 0 0 0 0 0 0 0 0 0 Out 0 0 0 0 0 0 0 0 0 0 ITEM 31 PAGE 31 P-3A CLASSIFICATION: UNCLASSIFIED Page 31 of 33 CLASSIFICATION: P3A UNCLASSIFIED INDIVIDUAL MODIFICATION MODELS OF SYSTEM AFFECTED: MK2/VA CLASS VARIANT KITS TYPE MODIFICATION: SHIPALT MODIFICATION TITLE: SSN ACOUSTICS DESCRIPTION/JUSTIFICATION: REPLACES AN/BSY-2 COMBAT CONTROL SYSTEM WITH MK2/VA CLASS VARIANT COMBAT CONTROL SYSTEM DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & PRIORFY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT/ PHASE II KIT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT ITEM 31 PAGE 32 CLASSIFICATION: UNCLASSIFIED Page 32 of 33 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: MK2/VA CLASS VARIAMODIFICATION TITLE: SSN ACOUSTICS INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIPYARD ADMINISTRATIVE LEADTIME: 3-4 MOS CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A 9-12 PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A Months FY 2002: FY 2002: N/A N/A ($ in Millions) Cost: Prior Years FY 2000 Qty $ Qty $ FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty PRIOR YEARS FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 3 4 1 2 3 4 In 0 0 0 0 0 0 0 0 0 0 Out 0 0 0 0 0 0 0 0 0 0 ITEM 31 PAGE 33 P-3A CLASSIFICATION: UNCLASSIFIED Page 33 of 33 CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE Undersea Warfare Support Equipment OTHER PROCUREMENT, NAVY BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Program Element for Code B Items: Prior Years BLI: 217600,217605,217606 72VM Other Related Program Elements ID Code QUANTITY COST (In Millions) SPARES COST (In Millions) FY 2000 FY 2001 FY 2002 $11.5 $2.8 $4.3 This P-1 consolidates BLIs 221300/221305 SSTD, 217800 Surface Sonar Windows and Domes, 221500 Acoustic Communications, and 224700/224705/224706 Carrier ASW Module for FY 2000 through 2007. Surface Programs Surface Ship Torpedo Defense The Surface Ship Torpedo Defense (SSTD) System consists of the AN/SLQ-25A towed torpedo countermeasureand Launched ExpendableAcoustic Devices (LEAD). The SSTD system enhances ship survival capability against advancedacoustic and non-acoustic homing torpedoes. The AN/SLQ-25A is in the CountermeasurePassive Subsystem of the SSTD System. The AN/SLQ-25A projects decoy signals into the water via a towed body deployed astern of the ship. The projected signals are generated by a transmitter located on the ship which is controlled by an operator. The LEAD Program provides the capability for launching acoustic countermeasures from surface ships. LEAD was developed under RDT&E PE 0603506N Surface Ship Torpedo Defense. The LEAD Initial Development Test and Evaluationoccurred in October 1995 and Initial OperationalTest and Evaluationoccurred in October 1996. As a cost avoidancemeasure, initial procurement of LEAD components was approved 31 October 1996. Operational Test and Evaluation was completed in April 1997. Approval for limited production was granted in July 1997. Approval for full production was granted in May 1998. Surface Sonar Windows and Domes AN/SQS-26/53 Sonar Dome Rubber Windows are installed in CG47, DDG51, and DDG993 class ships. This program provides emergency replacement wire-reinforced, pressurized rubber acoustic windows which experiencefailure due to corrosion, fatigue, and impact in the splice region. The SDRW significantly improves the surface ship sonar performance by reducing flow-induced self-noise, and by providing increased source level receiving and sensitivity resulting from reduced attenuation. AN/SQS-56 SRD provides emergency replacement Sonar Rubber Domes for FFG-7 Class AN/SQS-56 active/passive duct sonar systems. Production engineering support provides technical evaluation, failure analyses, implementationof the inwater one-side backscatter xray program, manufacturer GFE refurbishments, engineering and field service. An FY00 Congressional Plus-Up was authorized for continued development and implementation of composite bow dome technology, including initial fabrication of permanent production tooling. DD Form 2454, JUN 86 Item No. 32 P-1 SHOPPING LIST Page No. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE Undersea Warfare Support Equipment OTHER PROCUREMENT, NAVY BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Program Element for Code B Items: BLI: 217600,217605,217606 72VM Other Related Program Elements Submarine Programs Acoustic Communications Acoustic Communications provides two-way and one-way acoustic communications equipment for submarines and surface ships. The equipment consists of : (1) AN/WQC-2/2A, a stand alone, single side band, general purpose, voice, continuous wave, multiple tone communication for surface ships, submarines, and some shore activities; (2) AN/WQC-6, which provides long range coded signaling from surface ASW ships to attack submarines when interfaced with the AN/SQS-26/53 and AN/BQQ-5; (3) AN/BQC-1( ), a stand-alone emergency voice and signal beacon for submarines, and (4) technical improvements(Engineering Changes) to acoustic communication equipment. Funding will provide for continued procurement of both Probe Alert (AN/WQC-6) improvements and AN/WQC-2A Engineering Changes plus associated production engineering support and consulting services for the SSN 21, SSN 637, SSN 688, SSBN 726, DD963, DDG 51, CG 47, MHC 51, MCM 1, CVN 65, ARS 50, FFG 7, and CVN 68 class ships and submarines. Aircraft Carrier Programs Aircraft Carrier Tactical Support Center The CV-TSC of the Carrier Combat Direction System (CDS) is the focal point of supply for force ASW/SUW functions. The system supports the multi-mission, tactical deploymentof embarkedairborne weapon systems (S-3B and SH-60 Helicopters) by providing mission planning, in-flight support and post mission assessment/intelligencecollection. CV-TSC provides real time and post mission analysis of relayed or taped acoustic and non-acoustic signals to support CV/CVN USW Self Defense. The system consists of digital computers, commercial workstation displays, mass memories, plotters, acoustic analysis equipment and interface devices. The CV-TSC furnishes timely evaluatedUSW and SUW information to the Officer in Tactical Command as inputs to the decision making process. Procurement of AN/SQQ-34A(V) CV-TSC baseline systems completed during FY98. Procurement of non-developmentalengineering changes to maintain system IT-21 supportability and interoperability with embarkedaircraft, airborne sensors, and shipboard interfaces will continue. Naval Undersea Warfare Center (NUWC), Division Keyport has been designated as the Alteration Installation Team (AIT) for all items. Installations will be accomplished at NUWC, the CV-TSC training site at Fleet Combat Training Center Atlantic (FCTCL) Dam Neck, VA, CV-TSC Ashore NAS/JAX, FL, and on board CV63 through CVN-75. P-1 SHOPPING LIST DD Form 2454, JUN 86 Item No. 32 CLASSIFICATION: Page No. 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE Undersea Warfare Support Equipment OTHER PROCUREMENT, NAVY Procurement Items Surface Ship Programs LEAD MK 15 LEAD MK 12 DEC SQS-26/53 SDRW Production Support Services BLI: 217600,217605,217606 72VM ID Code A A A A A SUB-TOTAL Submarine Programs Acoustic Comm Production Support Services A A SUB-TOTAL Aircraft Carrier Programs CV-ASWM EC-1 CV-ASWM EC-2 CV-TSC SNEATT RT SENS DATA LINK SQQ-34A(V)5 CV-TSC Production Support Services Installation FMP A A A A A A A Prior Years FY 2000 FY 2001 FY 2002 3,454 2,565 500 2,496 1,177 2,438 453 10,192 2,891 243 130 267 123 282 121 373 390 403 369 139 525 1,989 151 24 13 139 735 23 211 SUB-TOTAL 918 2,431 969 GRAND TOTAL 11,483 2,821 4,263 DD Form 2454, JUN 86 P-1 SHOPPING LIST Item No. 32 Page No. 3 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SURFACE SONAR WINDOWS AND DOME (217800) 72VH BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) Other Related Program Elements ID Code FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total $0.0 $5.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 N/A $5.0 N/A $0.0 Sonar Dome Rubber Windows (SDRW) are installed in CG47, DDG51 and DDG993 class ships. The SDRW significantly improves the surface ship sonar performance by reducing flow-induced selfnoise, and by providing increased source level receiving and sensitivity resulting from reduced attenuation. Production engineering support provides technical evaluation,failure analyses, implementation of the inwater one-side backscatter xray program, manufacturer GFE refurbishments, engineering and field service. An FY00 Congressional Plus-Up was authorized (under BLI 218000/Subhead C2WK) for continued developmentand implementationof composite bow dome technology, including initial fabrication of permanent production tooling. This FY 01 Congressional Plus-up was authorized for completion of fabrication of production tooling and first article production dome with new materials system. P-1 SHOPPING LIST DD Form 2454, JUN 86 Item No. 33 CLASSIFICATION: Page No. 1 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE/SUBHEAD A SURFACE SONAR WINDOWS AND DOME (217800) C2VH TOTAL COST IN THOUSANDS OF DOLLARS COST CODE VH001 VH830 ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost SONAR DOME COMPOSITE WINDOW A 3,954 PRODUCTION ENGINEERING A 1,000 Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost SUPPORT 0 DD FORM 2446, JUN 86 P-1 SHOPPING LIST Item No. 33 4,954 0 CLASSIFICATION: 0 Page No. 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE SONAR SUPPORT EQUIPMENT/C2WK/218000 OTHER PROCUREMENT, NAVY BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) Other Related Program Elements ID Code FY 2000 FY 2001 FY 2002 $3.0 $0.0 $0.0 Starting with the FY 2000 Budget, this program was consolidated into the Submarine Support Equipment line (256000). However, FY 00 had a Congressional Plus-Up of $3.0M to procure CV-Tactical Support Center (CV-TSC) equipment. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 34 PAGE NO. CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/LINE ITEM # OTHER PROCUREMENT, NAVY BA-2: COMMUNICATIONS & ELECTRONICS EQUIPMENT SONAR SWITCHES AND TRANSDUCERS 218100 Program Element for Code B Items: OTHER RELATED PROGRAM ELEMENTS PE# 0204281N Prior Years ID Code QUANTITY EQUIPMENT COST (In Millions) SPARES COST (In Millions) FY 2000 FY 2001 FY 2002 N/A N/A N/A $13.2 $10.6 $10.8 $0.4 $0.4 $0.4 PROGRAM DESCRIPTION/JUSTIFICATION: This program procures hydrophones, transducers, cables, and acoustic windows for In Service Under Sea Warfare Sonars on all classes of submarines. The components are required to support units in the fleet on a replacement basis, at regularly scheduled ship overhauls, and at interim availabilities when units are defective, and for upgrades. PU100 SONAR SWITCHES AND TRANSDUCERS Included in this line are procurements of transducers, hydrophones, windows, cables and domes and their support equipment and materials for the following Under Sea Warfare Sonars: BSY-1, BSY-2, BQQ-5, BQQ-6, BQQ-10, BQG-5, BQS-15, BQS-14A, WQC-2, WLR-9/12, WLY-1, BQN-13, BQN-17, BQA-8, and BQH-1. PU200 ENGINEERING CHANGES Funds ECPs and hardware changes affecting the SSN 688, 688I, SSN 21, and SSBN 726 (TRIDENT) Class submarines. PU300 PROGRAM SUPPORT Supports the procurement of equipment of sonar hydrophones, trandsducers, cables, and acoustic windows for In Service Under Sea Warfare Sonars. DD Form 2454, JUN 86 P-1 SHOPPING LIST ITEM NO. 35 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 APPROPRIATION/BUDGET ACTIVITY Weapon System DATE: JUNE 2001 ID Code Other Procurement, Navy BA-2: COMMUNICATIONS & ELECTRONICS EQUIPMENT P-1 ITEM NOMENCLATURE/SUBHEAD SONAR SWITCHES AND TRANSDUCERS (H2PU) TOTAL COST IN THOUSANDS OF DOLLARS COST CODE PU100 ELEMENT OF COST SONAR SWITCHES & TRANSDUCERS TR-353A CW-1147 CW-1181C MX-10624 MX-10616 () MX-11474 () DT-574 DT-511B DT-513 ( ) DT-592 DT-592R TR-232() TR-233B TR-302B & CBL TR-302(WINDOW) TR-321() TR-338A & CBL TR-341() ROC WAA NCC CONNECTORS DT-699() HFSP RECEIVE TR-364() HFSP XMIT ID Code A A A A A A A A A A A A A A A A A A A A A A A FY 2000 FY 2001 UNIT COST TOTAL COST QTY UNIT COST 725 30 70 23 2.7 8.3 17.3 11.3 1,954 249 1,214 260 550 25 25 15 2.7 8.5 17.4 2.9 1,475 213 434 44 150 0.8 116 350 0.7 248 26 33 20 10 56 14.1 18.0 26.6 0.6 6.8 367 594 533 6 380 35 75 14.5 4.9 10 86 0 150 570 10 5 8.4 0.6 118.5 253.0 TOTAL PU100 TOTAL COST FY 2002 1,257 363 1,185 1,265 QTY 175 193 15 4 UNIT COST QTY TOTAL COST 25 8.5 213 506 368 117 15 15 35 30 2.4 37.6 42.9 16.4 7.2 280 565 644 572 215 0.6 5.3 6 452 10 75 0.6 7.7 6 576 0.0 0 75 18.8 1,413 1,303 147 941 544 125 950 19 4 7.8 0.6 45.3 93.7 7.4 0.8 62.7 136.0 972 614 860 375 9,740 6,681 7,304 PU200 ENGINEERING CHANGES A 494 0 220 PU300 PROGRAM SUPPORT A 3,015 2,590 3,284 13,249 9,271 10,808 TOTAL DD FORM 2446, JUN 86 ITEM NO. 35 0 CLASSIFICATION: P-1 SHOPPING LIST PAGE NO. 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2: COMMUNICATIONS & ELECTRONICS EQUIPMENT Cost Element/ FISCAL YEAR QTY UNIT COST (000) LOCATION RFP ISSUE OF PCO DATE C. P-1 ITEM NOMENCLATURE SUBHEAD SONAR SWITCHES AND TRANSDUCERS H2PU CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION DATE OF AWARD FIRST DATE DELIVERY SPECS AVAILABLE NOW OPTION OPTION OPTION C/FP OPTION OPTION C/FP OPTION WR OPTION C/FP C/FP C/FP C/FP HAZELTINE-MASSA ANTENNA ASSOCIATES BF GOODRICH NUWC SEABEAM EDO HARRIS EDO NUWC ITC EDO VARIOUS HARRIS HARRIS 4/00 3/00 3/00 3/00 3/00 3/00 3/00 3/00 1/00 3/00 5/00 4/00 4/00 4/00 4/01 5/01 5/01 3/01 3/01 3/01 3/01 3/01 3/01 3/01 3/01 4/01 4/01 4/01 YES YES YES YES YES YES YES YES YES YES YES YES YES YES OPTION OPTION OPTION WR OPTION OPTION OPTION WR OPTION OPTION C/FP OPTION OPTION C/FP HAZELTINE-MASSA ANTENNA ASSOCIATES BF GOODRICH NUWC SEABEAM EDO HARRIS NUWC ITC EDO ITC HARRIS HARRIS VARIOUS 3/01 3/01 3/01 3/01 3/01 3/01 3/01 1/01 3/01 3/01 3/01 3/01 3/01 3/01 3/02 3/02 3/02 3/02 3/02 3/02 3/02 3/02 3/02 3/02 3/02 3/02 3/02 3/02 YES YES YES YES YES YES YES YES YES YES YES YES YES YES IF NO WHEN AVAILABLE PU100 FY 2000 TR-353A (AN/BSY2) CW-1147 (AN/WLR-9) CW-1181C (AN/WLR-9) MX-10624 (AN/BSY-2, BSY-1)* DT-513() (AN/BQA-8) TR-232() (AN/WQC-2) TR-233B (AN/WQC-2)* TR-302B & CABLE (AN/BQN-17) TR-302 WINDOW (AN/BQN-17) TR-321() (AN/BQH-1C) WAA (ANBQG-5) NCC CONNECTORS DT-699()HFSP REC (AN/BSY-1)* TR-364()HFSP XMIT (AN/BSY-1)* 725 30 70 23 150 26 33 20 10 56 150 570 10 5 2.695 8.287 17.339 11.301 0.770 14.106 18.015 26.641 0.569 6.778 8.377 0.636 118.500 253.000 NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC 550 25 25 15 350 35 75 10 86 175 0 15 4 193 2.681 8.504 17.356 2.948 0.708 14.465 4.910 0.579 5.261 7.444 0.000 62.747 136.046 0.760 NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC 10/99 10/99 10/99 10/99 FY 2001 TR-353A (AN/BSY2) CW-1147 (AN/WLR-9) CW-1181C (AN/WLR-9) MX-10624 (AN/BSY-2, BSY-1) DT-513() (AN/BQA-8) TR-232() (AN/WQC-2) TR-233B (AN/WQC-2) TR-302 WINDOW (AN/BQN-17) TR-321() (AN/BQH-1C) WAA (AN/BQG-5) TR-341() (AN/BQN-13A)* DT-699()HFSP REC (AN/BSY-1) TR-364()HFSP XMIT (AN/BSY-1) NCC CONNECTORS D. 10/00 REMARKS * INCLUDES FIRST ARTICLE COSTS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 35 PAGE NO. 3 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2: COMMUNICATIONS & ELECTRONICS EQUIPMENT Cost Element/ FISCAL YEAR QTY UNIT COST (000) LOCATION RFP ISSUE OF PCO DATE C. P-1 ITEM NOMENCLATURE SUBHEAD SONAR SWITCHES AND TRANSDUCERS CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION OPTION OPTION C/FP OPTION OPTION WR OPTION OPTION C/FP OPTION OPTION OPTION OPTION ANTENNA ASSOCIATES SEABEAM UNKNOWN EDO HARRIS NUWC ITC EDO UNKNOWN UNKNOWN HARRIS HARRIS VARIOUS H2PU DATE OF AWARD FIRST DATE DELIVERY SPECS AVAILABLE NOW IF NO WHEN AVAILABLE PU100 FY 2002 CW-1147 (AN/WLR-9) DT-513() (AN/BQA-8) DT-592 (AN/WLR-9)* TR-232() (AN/WQC-2) TR-233B (AN/WQC-2) TR-302 WINDOW (AN/BQN-17) TR-321() (AN/BQH-1C) WAA (AN/BQG-5)* DT-592R (AN/WLY-1)* TR-341() (AN/BQN-13A) DT-699()HFSP REC (AN/BSY-1) TR-364()HFSP XMIT (AN/BSY-1) NCC CONNECTORS D. 25 117 15 35 30 10 75 125 15 75 19 4 950 8.512 2.397 37.636 16.353 7.170 0.589 7.675 7.773 42.927 18.835 45.281 93.701 0.646 NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC NUWC 10/01 10/01 3/02 3/02 3/02 3/02 3/02 1/02 3/02 3/02 3/02 3/02 3/02 3/02 3/02 3/03 3/03 4/03 3/03 3/03 3/03 3/03 3/03 3/03 3/03 3/03 3/03 3/03 YES YES YES YES YES YES YES YES YES YES YES YES YES REMARKS * INCLUDES FIRST ARTICLE COSTS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 35 PAGE NO. 4 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA-2 BLI 22100 SUBMARINE ACOUSTIC WARFARE SYSTEM (SAWS) / H2WM Program Element for Code B Items: Other Related Program Elements 0101226N Prior Years ID Code QUANTITY COST (In Millions) SPARES COST (In Millions) FY 2000 FY 2001 FY 2002 $13.0 $10.6 $12.6 PROGRAM DESCRIPTION/JUSTIFICATION: The Submarine Acoustic Warfare System (SAWS) provides submarines with an enhanced capability against guided and unguided torpedoes and the means to reduce the effectiveness of enemy sensors. This program provides ongoing production of countermeasure devices needed to sustain fleet inventories, production of preplanned improvements to enhance the readiness and effectiveness of acoustic intercept receivers and processors, and production of countermeasure devices and associated countermeasure launcher systems. The FY00 funds are required to procure 6" Countermeasures (ADC MK 3 with associated launch tubes), ADC MK 2, CSA MK 2 Mod 1 Countermeasure Launchers, CSA MK 2 CABLE Procurement, AN/WLY-1, GG MK 77 for 6" Countermeasures and GG MK 77 Engineering Changes, and associated production support. The FY01 funds are required to procure 6" Countermeasures (ADC MK 3 with associated launch tubes), ADC MK 2, CSA MK 2 Mod 1 Countermeasure Launchers, CSA MK 2 CABLE Procurement, AN/WLR-9 Engineering Changes, GG MK 77 for 6" Countermeasures, and associated production support. The FY02 funds are required to procure 6" Countermeasures (ADC MK 3 with associated launch tubes), ADC MK 2, CSA MK 2 Mod 1 Countermeasure Launchers, CSA MK 2 CABLE Procurement, AN/WLR-9 Engineering Changes, GG MK 77 for 6" Countermeasures, and associated production support. CSA MK 2 Cable Installation: Type Date TEMPALT 2Q/FY01 TEMPALT 2Q/FY01 SHIPALT 1Q/FY01 SHIPALT 2Q/FY01 SHIPALT 3Q/FY01 SHIPALT 3Q/FY02 SHIPALT 3Q/FY02 SHIPALT 4Q/FY02 DD Form 2454, JUN 86 End Item Funding SSN762 .100M SSN765 .100M SSN764 .100M SSN754 .100M SSN773 .100M SSN753 .100M SSN758 .100M SSN757 .100M Type Date ITEM NO. End Item Funding P-1 SHOPPING LIST 36 PAGE NO. 1 Type Date End Item CLASSIFICATION: UNCLASSIFIED Funding UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System ID Code APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy BA-(2): Communication and Electronic Equipment - ASW SUBMARINE ACOUSTIC WARFARE SYSTEM (SAWS) / H2WM TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code WM014 ADC MK3 MOD 1 (TORPEDO) A WM014 ADC MK 4 MOD 1 (SONAR) A WM014 6" COUNTERMEASURE NON-RECUR A WM014 6" COUNTERMEASURE LAUNCH TUBE WM015 Prior Years Total Cost FY 2000 Quantity FY 2001 Unit Cost Total Cost 1,918 Quantity FY 2002 Unit Cost 86 22 A 72 5 ADC MK 2 MOD 1 A 241 2 WM016 ADC MK 1 RE-MANUFACTURE A WM017 AN/WLR-9 ENGINEERING CHANGE A WM019 CSA MK 2 MOD 1 LCP ENG. CHANGE A 2 302 604 2 WM019 CSA MK 2 CABLE PROCUREMENT A 5 230 1,150 3 WM019 CSA MK 2 NON-RECURRING A 0 0 491 WM019 INSTALLATION & CHECK CABLES A 0 0 0 WM5IN CSA MK CABLE INSTALLATION A 0 0 100 WM021 AN/WLY-1 HARDWARE B 2 1,291 2,582 WM022 GAS GENERATOR MK 77 A 55 5 280 WM022 GAS GENRATOR MK 77 ECP WM830 PRODUCTION ENGINEERING WM900 CONSULTING SERVICES Total Cost Quantity Unit Cost Total Cost 139 21 2,882 181 20 3,538 372 93 5 488 181 5 967 524 350 2 643 600 4 2,670 1,696 1 329 329 307 614 1 312 238 715 6 206 1 46 46 1 77 77 5 102 508 3 103 311 93 5 481 181 2,539 165 5 316 5 312 1,239 950 200 1,622 1,660 1,507 600 700 725 12,983 10,598 NOTE 1: FY00/01 WM015 - Unit Cost represents remanufacturing units DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. 36 12,624 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD Other Procurement, Navy H2WM SUBMARINE ACOUSTIC WARFARE SYSTEM Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE OPTION WR SS2/FFP WR SS3/FFP WR WR BAE Systems, Braintree, MA NRAD, SAN DIEGO, CA BAE Systems, Braintree, MA NUWC, NEWPORT, RI BAE Systems, Greenlawn, NY NUWC, NEWPORT, RI UPCO, PHOENIX, AZ 12/99 1/00 1/01 12/99 09/00 12/99 5/00 12/00 7/00 7/01 12/00 1/01 12/00 5/01 YES YES YES YES YES YES YES N/A N/A N/A N/A N/A N/A N/A FY00 ADC MK 3 -WM014 LAUNCH TUBES - WM014 ADC MK 2 MOD 1 - WM015 CSA MK 2 MOD 1 LCP ECP- WM019 CSA MK 2 CABLES - WM019 AN/WLY-1 - WM021 GG MK 77 - WM022 86 72 241 2 5 2 55 22.302 5.174 2.175 302.117 230 1291.225 5.091 NAVSEA NSWC/CRANE NAVSEA NUWCDIVNPT NAVSEA NUWCDIVNPT NSWC/CRANE FY01 ADC MK 3 - WM014 LAUNCH TUBES - WM014 ADC MK 2 MOD 1 - WM015 AN/WLR-9 ENG. CHANGE - WM017 CSA MK 2 MOD 1 LCP ECP- WM019 CSA MK 2 CABLES - WM019 GG MK 77 - WM022 139 93 350 5 2 3 93 20.7338 5.25 1.838 316 306.8 238.3333 5.17 NAVSEA NSWC/CRANE NAVSEA NUWCDIV/NPT NAVSEA NAVSEA NSWC/CRANE OPTION WR OPTION WR OPTION OPTION OPTION BAE Systems, Braintree, MA NRAD, SAN DIEGO, CA BAE Systems, Braintree, MA NUWC, NEWPORT, RI NSWC, CRANE, IN BAE Systems, Greenlawn, NY UPCO, PHOENIX, AZ 12/00 1/01 5/01 2/01 1/01 1/01 1/01 12/01 7/01 1/02 2/02 1/02 1/02 1/02 YES YES YES YES YES YES YES N/A N/A N/A N/A N/A N/A N/A FY02 ADC MK 3 - WM014 LAUNCH TUBES - WM014 ADC MK 2 MOD 1 - WM015 AN/WLR-9(B) EC - WM017 CSA MK 2 MOD 1 LCP ECP- WM019 CSA MK 2 CABLES - WM019 GG MK 77 - WM022 181 181 600 1 1 6 181 19.546 5.34 4.45 328.571 311.81 206.42 5.254 NAVSEA NSWC/CRANE NAVSEA NUWCDIV/NPT NAVSEA NAVSEA NSWC/CRANE OPTION WR OPTION WR OPTION OPTION OPTION BAE Systems, Braintree, MA NRAD, SAN DIEGO, CA BAE Systems, Braintree, MA NUWC, NEWPORT, RI NSWC, CRANE, IN BAE Systems, Greenlawn, NY UPCO, PHOENIX, AZ 1/02 1/02 1/02 1/02 1/02 11/01 1/02 1/03 7/02 1/03 1/03 1/03 6/02 1/03 YES YES YES YES YES YES YES N/A N/A N/A N/A N/A N/A N/A D. 7/98 11/99 5/00 REMARKS NOTE 1: FY00/01 WM015 - Unit Cost represents remanufacturing units DD Form 2446-1, JUL 87 P-1 SHOPPING LIST 36 PAGE NO. 3 Classification: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: TYPE MODIFICATION: CSA MK 2 SYSTEM (CABLE) SHIPALT MODIFICATION TITLE: DESCRIPTION/JUSTIFICATION: Installation of the CSA MK 2 Cables. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Prior QTY $ FY 2000 FY 2001 FY 2002 QTY $ QTY $ QTY $ 5 1.2 3 0.7 6 1.2 0.1 5 0.5 3 0.3 1.3 3 1.2 6 FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 5 1.5 ITEM 36 PAGE 4 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: INDIVIDUAL MODIFICATION (Continued) CSA MK 2 (CABLE) MODIFICATION TITLE: SHIPALT Shipyard PRODUCTION LEADTIME: FY 2001: FY 2001: 12 Months FY 2002: FY 2002: ($ in Millions) Cost: Prior Qty $ FY 2000 Qty $ FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty PRIOR YEARS Prior FY 2000 EQUIPMENT 0.1 5 0.5 FY 2001 EQUIPMENT 3 0.3 FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 0 1 3 1 0 0 0 2 1 Out 0 1 3 1 0 0 0 2 1 NOTE: 36 PAGE 5 P-3A CLASSIFICATION: UNCLASSIFIED DATE FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY June 2001 P-1 ITEM NOMENCLATURE Weapon System OTHER PROCUREMENT, NAVY Production Rate Item 6" COUNTERMEASURES LAUNCH TUBES ADC MK 2 GG MK 77 Manufacturer’s Name and Location BAE, BRAINTREE, MA NSWC, CRANE, INDIANA BAE, BRAINTREE, MA UPCO, PHOENIX, AZ MSR 1-8-5 10 200 40 400 10 10 MAX 200 400 200 200 ALT Prior to Oct 1 Procurement Leadtimes ALT After Initial Reorder Oct 1 Mfg PLT Mfg PLT FISCAL YEAR 2000 ITEM / MANUFACTURER F Y S V C Q D B T Y E L A L ADC MK 3 BAE Systems, Braintree, MA BAE Systems, Braintree, MA BAE Systems, Braintree, MA 00 01 02 86 139 181 0 0 0 86 139 181 ADC MK 4 BAE Systems, Braintree, MA BAE Systems, Braintree, MA BAE Systems, Braintree, MA 00 01 02 0 0 0 0 0 0 0 0 0 Q D B T Y E L A L 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R Unit of Measure Total M A Y J U N J U L CALENDAR YEAR 2001 S E P A U G A O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G 10 10 A 10 10 10 10 10 10 6 S E P FISCAL YEAR 2002 F Y S V C ADC MK 3 BAE Systems, Braintree, MA BAE Systems, Braintree, MA BAE Systems, Braintree, MA 00 01 02 86 139 181 86 0 0 0 139 181 ADC MK 4 BAE Systems, Braintree, MA BAE Systems, Braintree, MA BAE Systems, Braintree, MA 00 01 02 0 0 0 0 0 0 0 0 0 2001 O C T N O V CALENDAR YEAR 2002 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 12 A 12 12 12 12 12 12 12 12 HARDWARE CONTINUED ON P21(2) Remarks: DD Form 2445, JUL 87 311 / 244 0 139 181 0 0 0 HARDWARE CONTINUED ON P21(2) ITEM / MANUFACTURER B A L Previous editions are obsolete P-1 SHOPPING LIST ITEM NO 36 PAGE 6 Exhibit P-21 Production Schedule DATE FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY June 2001 P-1 ITEM NOMENCLATURE Weapon System OTHER PROCUREMENT, NAVY Production Rate Item 6" COUNTERMEASURES LAUNCH TUBES ADC MK 2 GG MK 77 Manufacturer’s Name and Location BAE, BRAINTREE, MA NSWC, CRANE, INDIANA BAE, BRAINTREE, MA UPCO, PHOENIX, AZ MSR 1-8-5 10 200 40 400 10 10 MAX 200 400 200 200 Procurement Leadtimes ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT FISCAL YEAR 2000 ITEM / MANUFACTURER F Y S V C Q D B T Y E L A L 1999 O C T FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C N O V J A N F E B M A R Unit of Measure Total M A Y A P R J U N J U L CALENDAR YEAR 2001 S E P A U G ADC MK 2 MOD 1 BAE Systems, Braintree, MA BAE Systems, Braintree, MA BAE Systems, Braintree, MA 00 01 02 241 350 600 0 0 0 241 350 600 LAUNCH TUBES/NSWC CRANE NRAD, SAN DIEGO, CA NRAD, SAN DIEGO, CA NRAD, SAN DIEGO, CA 00 01 02 72 93 181 0 0 72 93 181 Q D B T Y E L A L O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 20 20 20 20 30 A 20 30 20 30 20 30 20 30 21 30 30 30 30 91 90 O C T N O V D E C J A N F E B M A R A P R M A Y A J U N J U L A U G S E P 20 20 20 A A 72 A 93 FISCAL YEAR 2002 ITEM / MANUFACTURER F Y S V C ADC MK 2 MOD 1 BAE Systems, Braintree, MA BAE Systems, Braintree, MA BAE Systems, Braintree, MA 00 01 02 241 350 600 60 0 0 181 350 600 LAUNCH TUBES/NSWC CRANE NRAD, SAN DIEGO, CA NRAD, SAN DIEGO, CA NRAD, SAN DIEGO, CA 00 01 02 72 93 181 72 93 0 0 0 181 2001 CALENDAR YEAR 2002 A Remarks: DD Form 2445, JUL 87 311 / 244 Previous editions are obsolete P-1 SHOPPING LIST ITEM NO 36 PAGE 7 Exhibit P-21 Production Schedule B A L 181 350 600 0 0 181 DATE FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY June 2001 P-1 ITEM NOMENCLATURE Weapon System OTHER PROCUREMENT, NAVY Production Rate Item 6" COUNTERMEASURES LAUNCH TUBES ADC MK 2 GG MK 77 Manufacturer’s Name and Location BAE, BRAINTREE, MA NSWC, CRANE, INDIANA BAE, BRAINTREE, MA UPCO, PHOENIX, AZ MSR 1-8-5 10 200 40 400 10 10 ALT Prior to Oct 1 MAX 200 400 200 200 Procurement Leadtimes ALT After Initial Reorder Oct 1 Mfg PLT Mfg PLT FISCAL YEAR 2000 ITEM / MANUFACTURER GG MK 77 UPCO, PHOENIX, AZ UPCO, PHOENIX, AZ UPCO, PHOENIX, AZ F Y S V C 00 01 02 Q D B T Y E L A L 55 93 181 0 0 0 55 93 181 Q D B T Y E L A L 55 93 181 55 0 0 0 93 181 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A Y A P R M A R Unit of Measure Total J U N A U G J U L CALENDAR YEAR 2001 S E P O C T N O V D E C J A N A F E B M A R A P R M A Y J U N J U L A U G S E P 15 10 10 10 10 A FISCAL YEAR 2002 ITEM / MANUFACTURER GG MK 77 UPCO, PHOENIX, AZ UPCO, PHOENIX, AZ UPCO, PHOENIX, AZ F Y 00 01 02 S V C 2001 O C T N O V CALENDAR YEAR 2002 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 15 A 10 10 10 10 10 10 10 8 Remarks: DD Form 2445, JUL 87 311 / 244 Previous editions are obsolete P-1 SHOPPING LIST ITEM NO 36 PAGE 8 Exhibit P-21 Production Schedule B A L 0 93 181 UNCLASSIFIED CLASSIFICATION DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY P-1 ITEM NOMENCLATURE BLI 2225 FIXED SURVEILLANCE SYSTEMS (FSS) FY 2000 FY 2001 FY 2002 $16.2 $29.6 $33.7 June 2001 SUBHEAD 52WQ QUANTITY COST (in millions) The Fixed Surveillance System (FSS) program is a major portion of the Integrated Undersea Surveillance System (IUSS). FSS consists of fixed deep water arrays connected to shore processing sites, called Naval Ocean Processing Facilities, by over 30,000 nautical miles of undersea cable. The system supports Fleet Commands and tactical forces by detecting, tracking, and reporting information on submarines, surface ships and aircraft over the oceans. In addition to this primary mission the system is also used for other surveillance and research efforts such as: long term oceanographic studies, undersea geological observation, mammal research, fishery regulation, environmental research and drug interdiction. The objectives of the current program are: a. To reduce system operations and maintenance costs by upgrading the current shore processing with improved NDI electronics at all active sites. b. To retain the capability to both maintain and install undersea surveillance systems. c. To improve tactical communications with the Fleet. Improved communications using standard Navy equipment will decrease reporting time and reduce the maintenance requirements. The program includes the following major elements: a. Ship Improvement: Procurement of mission equipment to improve operational readiness for IUSS cable ship. b. Shore Electronics: Communications and ASWC4I procurements to provide upgraded capabilities and interoperability. c. International Programs: Hardware procurements in accordance with International Agreements. d. Shore Processing: Procurement of improved shore processing equipment to include Acoustic Rapid COTS Insertion (ARCI) and Tech Refresh. The FY00 through FY07 program procures upgraded ship electronics, handling, tracking and repair equipment; procures Communications and ASWC4I systems to ensure operational and tactical information availability and to maintain communications connectivity; and to provide improved shore processing capability. FSS maintains cooperative agreements with foreign countries. The details of these International agreements are of a higher classification. INSTALLING AGENTS: General Dynamics, Greensboro, NC; Lockheed/Martin, Manassas, VA; SSC Charleston, Charleston, SC; SSC San Diego, San Diego, CA and MSC, Washington, D.C. P-1 SHOPPING LIST - Item No ITEM NO. PAGE NO. 37 01 of 9 Exhibit P-40 Unclassified UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST PY ID TOTAL CODE COST QTY UNIT COST TOTAL COST QTY FY 2000 UNIT TOTAL COST COST P-1 ITEM NOMENCLATURE SUBHEAD FIXED SURVEILLANCE SYSTEMS (FSS) 52WQ TOTAL COST IN THOUSANDS OF DOLLARS FY 2001 FY 2002 UNIT TOTAL UNIT TOTAL UNIT QTY COST COST QTY COST COST QTY COST WQ002 SHIP EQUIPMENT Var 1,387 Var 2,100 Var 10,265 WQ004 SHORE ELECTRONICS Var 372 Var 1,449 Var 2,920 WQ006 INTERNATIONAL PROGRAMS FDS C1 FDS C2, PHASE 1 FDS C2, PHASE 2 PRODUCTION SPT / INTEGRATION Var 9,615 Var 23,849 Var 16,178 5,633 3,429 19,331 3,514 12,613 553 1,004 3,565 WQ009 SHORE PROCESSING SYSTEMS Var 3,491 Var 0 Var 3,300 WQ011 SITE SURVEYS Var 947 Var 375 Var 375 WQ776 INSTALLATION OF EQUIPMENT Var 343 Var 1,822 Var 654 TOTAL CONTROL 16,155 29,595 TOTAL COST 33,692 Remarks: 1) Quantities are various due to procurement of various types of equipment to upgrade three IUSS Shore Sites and the USNS ZEUS. P-1 SHOPPING LIST ITEM NO. 37 PAGE NO. 02 of 9 Exhibit P-5, Budget Item Justification DD FORM 2446, JUN 86 Unclassified UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST WQ002 SHIP EQUIPMENT WQ004 SHORE ELECTRONICS WQ006 INTERNATIONAL PROGRAMS WQ009 SHORE PROCESSING FIXED SURVEILLANCE SYSTEMS (FSS) RFP DATE ISSUE AWARD OF FIRST DATE DATE CONTRACTOR AND LOCATION CONTRACT & TYPE LOCATION OF PCO 01 02* 02 MSC MIDLANT WX WASH. DC N/A Mar-01 Dec-01 MSC MIDLANT WX WASH. DC N/A Oct-01 Apr-02 MSC MIDLANT WX WASH. DC N/A Mar-02 01 02 SSC SD WX SSC SD N/A SSC SD WX SSC SD N/A 00 00 01 01 02 Lockheed Martin Option SPAWAR SD N/A Lockheed Martin Option SPAWAR SD N/A Lockheed Martin Option SPAWAR SD Lockheed Martin Option Lockheed Martin Option 02 Lockheed Martin Option FY METHOD SUBHEAD 52WQ SPECS DATE UNIT COST AVAILABLE REVISIONS NOW AVAILABLE 1 2,100 YES 1 5,000 YES Dec-02 1 5,265 YES Mar-01 Sep-01 3 1,449 YES Mar-02 Sep-02 3 2,920 YES Dec-99 Jun-01 1 5,633, C1 YES Jan-00 May-01 1 3,429, C2 YES N/A Oct-00 Apr-02 1 19,331, C1 YES SPAWAR SD N/A Oct-00 May-01 1 3,514, C2 YES SPAWAR SD N/A Oct-01 Apr-03 1 12,613, C1 YES SPAWAR SD N/A Mar-02 Jan-03 8 3,300 Est 10/00 QTY D. REMARKS WQ009 - FY00 unit cost is the shore processing system procured as part of the total C2 FDS system. The underwater segment is procured under WQ006. Received delivery of equipment in the amount $2,891K. WQ002- FY02* provides for procurement of an ROV. DD FORM 2446, JUN 87 P-1 SHOPPING LIST ITEM NO. 37 PAGE NO. 03 of 9 Exhibit P-5A UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: SHIP EQUIPMENT / CABLE UPGRADE WQ002 FIXED SURVEILLANCE SYSTEMS MISSION EQUIPMENT CONSISTS OF CABLE MACHINERY, ACOUSTIC SOURCE ELECTRONICS, BATHYMETRIC SYSTEM, TRANSMISSIONS TEST SETS AND SLICING EQUIPMENT TO IMPROVE OPERATIONAL READINESS FOR THE IUSS PROJECT SHIP. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP FY99 FY00 FY01 FY02 Qty $ Qty $ Qty $ Qty $ Qty $ 7 4.9 1 1.9 1 1.4 1 2.1 2 10.3 7 4.9 1 1.9 1 1.3 1 2.0 2 10.2 0.1 6 6 TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: 2.8 2.8 1 1 2.8 7.7 0.5 0.5 0.5 2.4 1 1 0.3 0.3 0.1 1 0.4 1 0.4 0.3 1.7 0.1 2 0.5 1 1 0.4 0.1 0.4 0.5 2.5 10.8 ADMINISTRATIVE LEADTIME: 6 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Mar-00 FY 2001: Mar-01 FY 2002: DELIVERY DATES: FY 2000: Nov-00 FY 2001: Dec-01 FY 2002: PY 1 2 Mar-02 Dec-02 FY 02 FY 01 INSTALLATION SCHEDULE: 9 3 4 1 2 INPUT 8 1 2 OUTPUT 8 1 2 3 4 Notes/Comments P-1 SHOPPING LIST ITEM NO. PAGE NO. 37 P-3A Exhibit 04 of 9 Unclassified UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: SHORE ELECTRONICS WQ004 FIXED SURVEILLANCE SYSTEMS PROCURE COMMUNICATIONS AND ASWC4I SYSTEMS TO SUPPORT IUSS REQUIREMENTS TO ENSURE CURRENT OPERATIONAL AND TACTICAL INFORMATION AVAILABILITY AND TO MAINTAIN COMMUNICATIONS CONNECTIVITY. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP FY99 FY00 FY01 FY02 Qty $ Qty $ Qty $ Qty $ Qty $ 1 2.9 3 0.8 1 0.4 3 1.5 3 2.9 1 2.9 3 0.8 1 0.4 3 1.5 3 2.9 1 1 0.3 0.3 3 3 0.2 0.2 1 0.0 0 0.0 3 0.2 1 0.0 3 0.2 TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: 0.3 3.2 0.2 1.0 0.0 0.4 0.0 0.2 1.5 3.1 ADMINISTRATIVE LEADTIME: 6 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Mar-00 FY 2001: Mar-01 FY 2002: DELIVERY DATES: FY 2000: Sep-00 FY 2001: Sep-01 FY 2002: FY 01 INSTALLATION SCHEDULE: PY 1 INPUT 5 OUTPUT 5 2 6 Mar-02 Sep-02 FY 02 3 4 1 2 3 4 3 3 Notes/Comments P-1 SHOPPING LIST ITEM NO. PAGE NO. 37 P-3A Exhibit 05 of 9 Unclassified June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: INTERNATIONAL PROGRAMS WQ006 FIXED SURVEILLANCE SYSTEM FIXED SURVEILLANCE SYSTEMS’ MAINTAIN INTERNATIONAL AGREEMENTS. DUE TO THE HIGH COST OF THESE SYSTEMS, THE COMPLETE SYSTEM IS PROCURED AS INDIVIDUAL STAND ALONE SUBSYSTEMS. FUNDING FOR INSTALLATION OF THESE SYSTEMS IS IAW INTERNATIONAL AGREEMENTS. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: FY99 FY00 FY01 FY02 Qty $ Qty $ Qty $ Qty $ Qty $ 3 22.0 0 0.0 2 9.6 2 23.8 1 16.2 3 22.0 2 9.0 2 22.8 1 12.6 1 1 5.6 3.4 1 1 19.3 3.5 1 12.6 0 0 3.6 3.6 0 0.0 Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment FDS C1 FDS C2 PHASE 1 FDS C2 PHASE 2 FDS C3 FDS C4 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support / Integration FDS C1 FDS C2 PHASE 1 FDS C2 PHASE 2 FDS C3 FDS C4 Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP 4 4 12.2 12.2 0 0.0 0 0.6 0 1.0 0 0.6 0 1.0 0 0.0 FY 01 EQUIP 2 1.4 1 0.9 1 0.5 FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP INSTALL C2 PHASE 1 TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: 12.2 34.2 CONTRACT DATES: FY 2000: DELIVERY DATES: FY 2000: 0.0 0.0 0.0 9.6 1.4 0.0 25.2 16.2 ADMINISTRATIVE LEADTIME: PY 1 INPUT 4 OUTPUT 4 2 PRODUCTION LEADTIME: Dec-99 FY 2001: Oct-00 FY 2002: Oct-01 Jun-01 FY 2001: Apr-02 FY 2002: Apr-03 FY 01 INSTALLATION SCHEDULE: 2 Various FY 02 3 4 1 2 3 4 2 2 Notes/Comments 1) PY - PMW181 Received Other Customer Funds (OCF) to procure system and FSS funded installation. 2) FUNDING FOR SYSTEM C1: FY 00, FY 01 and FY 02 3) FUNDING FOR SYSTEM C2, PHASE 1: FY 00 and FY 01, INSTALL PLANNED FY 01 4) Contract and Delivery dates show the longest production lead-time of the different components being procured. P-1 SHOPPING LIST ITEM NO. PAGE NO. 37 06 of 9 P-3A Exhibit UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: SHORE PROCESSING SYSTEMS WQ009 FIXED SURVEILLANCE SYSTEMS PROCURE SHORE PROCESSING UPGRADES FOR IUSS AND INTERNATIONAL SITES. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP FY99 FY00 FY01 FY02 Qty $ Qty $ Qty $ Qty $ Qty $ 11 15.1 0 0.0 3 3.5 0 0.0 8 3.3 11 15.1 3 3.5 8 3.3 10 10 10.8 10.8 1 0.0 2 0.0 0 0.0 1 0.0 2 0.0 TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: 1 1 10.8 25.9 7.6 7.6 7.6 7.6 0.0 3.5 0.0 0.0 0.0 3.3 ADMINISTRATIVE LEADTIME: 8 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Mar-00 FY 2001: FY 2002: Mar-02 DELIVERY DATES: FY 2000: Sep-00 FY 2001: FY 2002: Jan-03 FY 02 FY 01 INSTALLATION SCHEDULE: PY 1 INPUT 12 OUTPUT 12 2 1 12 3 4 1 2 3 4 1 1 1 Notes/Comments 1) FY01 - One of the two installs is the shore processing system being procured as part of the total C2 FDS system. The underwater segment is procured under WQ006. 2) All procurements are turnkey . 3) Installations will be performed at three IUSS 4) Shore Processing Sites and five International Sites. P-1 SHOPPING LIST ITEM NO. PAGE NO. 37 07 of 9 P-3A Exhibit Unclassified UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE FIXED SURVEILLANCE SYSTEMS (FSS) ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N 1-Oct 1-Oct C O E A E A P T V C N B R R S COST ITEM/MANUFACTURER CODE V FY D 01 FISCAL YEAR CALENDAR YEAR J F M SUBHEAD NO. 52WQ A M J J A U U Y N L 01 A 02 CALENDAR YEAR S O N D J F M A U E C O E A E A P G P T V C N B R R M 02 J J A S A U U U E Y N L G P WQ002 SHIP EQUIPMENT / MSC 01 SHIP EQUIPMENT / MSC 02A SHIP EQUIPMENT / MSC 02B WQ004 SHORE ELECTRONICS / SSC SD 00 SHORE ELECTRONICS / SSC SD 01 SHORE ELECTRONICS / SSC SD 02 1 1 1 0 0 0 1 1 1 1 3 3 1 0 0 0 3 3 A 1 A A A 3 A OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR 3 APR PRODUCTION RATE JUL AUG SEP ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Name and Location WQ002 / CABLE ALCATEL 0 8 12 12 LOT WQ002 / SHIP EQUIPMENT MILITARY SEALIFT COMMAND (MSC) 0 6 9 N/A EA WQ004 / SHORE ELECTRONICS SPAWAR SYSTEMS CENTER (SSC SD) 0 6 6 N/A EA P-1 SHOPPING LIST 37 MAX ALT Prior ITEM ITEM NO. 1-8-5 JUN PROCUREMENT LEADTIMES Manufacturer’s MSR MAY Total Measure Exhibit P-21 Production Schedule PAGE NO. Unclassified 08 of 9 Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE FIXED SURVEILLANCE SYSTEMS (FSS) ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N 1-Oct 1-Oct C O E A E A P T V C N B R R S COST ITEM/MANUFACTURER CODE V FY WQ006 INTERNATIONAL PROGRAMS / LOCKHEED MARTIN INTERNATIONAL PROGRAMS / LOCKHEED MARTIN INTERNATIONAL PROGRAMS / LOCKHEED MARTIN INTERNATIONAL PROGRAMS / LOCKHEED MARTIN INTERNATIONAL PROGRAMS / LOCKHEED MARTIN WQ009 SHORE PROCESSING / LOCKHEED MARTIN SHORE PROCESSING / LOCKHEED MARTIN SHORE PROCESSING / LOCKHEED MARTIN SHORE PROCESSING / LOCKHEED MARTIN 00 00 01 01 02 1 1 1 1 1 1 1 1 1 1 00 00 00 02 1 1 1 1 D 01 FISCAL YEAR CALENDAR YEAR J F M SUBHEAD NO. 52WQ A M J J A U U Y N L 01 A 02 CALENDAR YEAR S O N D J F M A U E C O E A E A P G P T V C N B R R MAY 02 J J A S A U U U E Y N L G P JUN JUL AUG SEP 1 1 A 1 1 A 0 0 1 1 8 8 1 A OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR PRODUCTION RATE PROCUREMENT LEADTIMES Manufacturer’s ITEM M Name and Location MSR 1-8-5 MAX ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure WQ006 / INTERNATIONAL PROGRAMS LOCKHEED MARTIN 2 18 N/A EA WQ009 / SHORE PROCESSING WQ009 / SHORE PROCESSING LOCKHEED MARTIN TBD 8 12 N/A EA P-1 SHOPPING LIST ITEM NO. 37 Exhibit P-21 Production Schedule PAGE NO. Unclassified 9 of 9 Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY P-1 ITEM NOMENCLATURE BLI 2237 Surveillance Towed Array Sensor (SURTASS) FY 2000 FY 2001 FY 2002 $7.1 $5.5 $17.7 June 2001 SUBHEAD 52VG QUANTITY COST (in millions) PROGRAM COVERAGE: Surveillance Towed Array Sensor System (SURTASS) is the mobile, tactical and strategic arm of the Navy’s undersea surveillance capability that provides deep ocean and littoral acoustic detection and cueing for tactical weapons platforms against both diesel and nuclear submarines. Dedicated T-AGOS ships tow long acoustic arrays that collect acoustic data and relay that data to shore facilities via SHF satellites for processing and fusion of the resulting contact data with other sensors. There are three configurations of T-AGOS ships with differing capabilities as follows: (1). T-AGOS monohull ships (SCN funded FY79 to FY87), are currently equipped with long passive A180R receiving arrays or A180R twinline receiving arrays with the TX or Next Evolution processing and display suite. Of the original eighteen monohulls, three are in active service. (2). Four "small" T-AGOS Small Waterplane Area Twin Hull (SWATH) ships were SCN funded FY87 through FY89. This ship incorporates the improved detection and classification capabilities and onboard analysis of the TX Block Upgrade processing and display suite with the Reduced Diameter Array (RDA) or Production Baseline Array (PBA) long line array. The RDA arrays provide improved detection and classification capability and allow those ships equipped with it to operate in a bi-static mode with T-AGOS ships equipped with Low Frequency Active (LFA) systems. These four small SWATH ships are equipped with standard Desktop Computer (DTC II) processing and display configuration and have been upgraded with an improved tactical communications suite. (3). The first "large" SWATH ship, T-AGOS 23, will be delivered in FY01. It will include the Next Evolution architecture with Force and UltraSPARC high speed computers and large storage devices, and will be the first T-AGOS ship equipped with Low Frequency Active (LFA) capability. This active capability will provide greatly improved detection against diesel submarines as well as the quiet nuclear threat. In addition to the eight T-AGOS ships above, three shore sites will be configured with the Next Evolution processing and display suites by Sep. 00 to receive the TAGOS acoustic data via SHF satellite communication links, analyze the acoustic data and correlate resulting contact information with the IUSS fixed shore site arrays for forwarding to the Battle Group tactical commanders. Acoustic Rapid COTS Insertion (IUSS) (ARCI-(I)) processing and display upgrades provide improved common ship processing suites for twinline arrays. A cost sharing agreement with Japan also provides a shore site and two Japanese SWATH ships with similar capability to the TAGOS SWATH ships for the Western Pacific region. The Japanese Auxiliary Ocean Surveillance Ship (JAOS) SWATH ships have been upgraded with the Next Evolution computer processing and display suites in FY98 and FY99 and currently utilize the original Production Baseline Arrays. Under the cost sharing agreement, the JAOS ships are being upgraded with the newer twinline A180R passive receiving arrays in FY00 and FY01. SURTASS OPN funded procurements include:VG006 which provides for procurement and upgrade of twinline arrays, TRU/common tow cables, common TB-29A arrays, ShoreTrainers/Configuration Control Models (CCM) and Communication/C4I upgrades; VG007 provides for procurement of field change kits resulting from in-service improvements of communications equipment, arrays, processing and display equipment and supporting systems; VG010 provides for procurement and upgrade of ship electronics suites; and VG776 provides for installation of equipment. Specific procurements by FY are as follows: FY00: Funds have been obligated for the following: VG006 Block Upgrade (J-AOS 1 & 2) procures an A180R twinline passive array for J-AOS ship #1. Trainer (Next Evolution) at SUBTRAFAC, Norfolk, VA provides for initial and refresher operator/maintenance training of IUSS personnel. TRU/Common Tow Cable provides array processing improvement for SWATH ships. LFA Mitigation Sonar provides mammal search in vicinity of active SURTASS platforms. VG007 Field Changes/Modifications provide for correction of deficiencies identified by Fleet use, array support equipment, communication equipment, and replacement of aging/unsupportable equipment. VG776 Installation of equipment. FY01: Funds are required for the following: VG006 Block Upgrade (J-AOS 1 & 2) procures an A180R twinline passive array for J-AOS ship #2. TRU/Common Tow Cable provides array processing improvement for a SWATH ship. Trainer (Next Evolution) at IOSC, Norfolk, VA provides for initial and refresher operator and maintenance training of MILDET and SURTASS ship personnel. VG007 Field Changes.Modifications provide for correction of deficiencies identified by Fleet use, array support equipment, communication equipment, and replacement of aging/unsupportable equipment. VG776 Installation of equipment. P-1 Shopping List-Item No - 38 (1 of 12) Exhibit P-40, Budget Item Justification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continued) DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE BLI 2237 Surveillance Towed Array Sensor (SURTASS) June 2001 SUBHEAD 52VG FY02: Funds are required for the following: VG006 Twinline array procures initial, improved and common directional array. Communications/C4I Upgrade procures IT 21 ADNS/DMR/SHF C/X terminal for network centric connectivity to BG. VG007 Field Changes/Modifications provide for correction of deficiencies identified by Fleet use, array support equipment, communication equipment, replacement of aging/unsupportable equipment. VG010 Acoustic Rapid COTS Insertion (IUSS) (ARCI (I)) processing and display upgrades provides three ships with improved common ship processing suites for twinline arrays. VG776 Installation of equipment. JUSTIFICATION OF BUDGET YEAR: Procurement of twinline arrays (one in FY02) to provide common arrays used on submarines. Procurement of three suites of Communication Upgrades in FY02to provide network centric connectivity to the Battle Group with installation of ADNS, DMR and SHF C/X Terminal. Procure three ship sets of ARCI (I) ship processing and display suites in FY02 and FY03 that will run advanced ARCI (I) software build 0 and that is common with the submarine SONAR system software. Field change/modifications in FY02 replace aging/unsupportable shipboard equipment. INSTALLATION AGENTS: SSC Charleston, SSC San Diego, DSR, Fairfax, VA, Competitive Contract beginning in FY02 MODIFICATION SUMMARY Listed below are the costs for equipment being procured in this line item that have associated installation costs budgeted. FY00 EQUIPMENT Block Upgrade (J-AOS 1 & 2) 2.02 J-AOS 3 Array & Processing Suite 0.00 Twinline Arrays 0.00 TRU/Common Tow Cable 0.23 Trainers/CCM 1.60 Communication/C4I Upgrade 0.00 Field Changes/Mods. 1.14 ARCI (I) Ship Electronics 0.00 ARCI (I) Refresh Technology 0.00 FY01 2.05 0.00 0.00 0.21 1.44 0.00 0.74 0.00 0.00 FY02 0.00 0.00 5.61 0.00 0.00 3.60 0.73 4.07 0.00 P-1 Shopping List-Item No - 38 (2 of 12) Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE VG006 ELEMENT OF COST UPGRADE PROCUREMENT Block Upgrade (J-AOS 1 & 2) J-AOS 3 Array & Processing Suite Twinline Arrays ID CODE QTY FY99 UNIT COST A TOTAL COST QTY 1 FY 2000 (2) UNIT TOTAL COST COST 2,024 2,024 1 2,046 2,046 A (3) B TRU/Common Tow Cables Twinline SWATH Modifications Trainers/CCM (1) Communication/C4I Upgrades LFA Mitigation Sonar A VG007 FIELD CHANGES/MODIFICATIONS A VG010 ELECTRONICS UPGRADE ARCI (I) Ship Electronics ARCI (I) Ship Electronics Refresh Technology A VG776 PY TOTAL COST P-1 ITEM NOMENCLATURE BLI 2237 SUBHEAD Surveillance Towed Array Sensor (SURTASS) 52VG TOTAL COST IN THOUSANDS OF DOLLARS FY 2001 (2) FY 2002 UNIT TOTAL UNIT TOTAL QTY COST COST QTY COST COST A A 1 2 1 231 75 1,599 231 150 1,599 1 1,100 1,100 1 213 1 1,444 1,141 5,612 5,612 3 1,200 3,599 213 1,444 A A 1 741 729 3 1,355 4,065 A INSTALLATION OF EQUIPMENT (NON FMP) TOTAL CONTROL 836 1,021 3,645 7,081 5,465 17,650 Remarks: (1) (2) (3) Original LFA trainer lines in VG006 were renamed Trainers/CCM Reflect new pricing for FY00 and FY01 Twinline Array unit cost in FY02 includes NRE and NATSC, Norfolk, VA startup cost P-1 Shopping List-Item No 38 (3 of 12) Exhibit P-5, Budget Item Justification DD FORM 2446, JUN 86 Unclassified UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE COST ELEMENT OF COST CODE VG006 Upgrade Procurement FY BLI 2237 SUBHEAD Surveillance Towed Array Sensor (SURTASS) OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT CONTRACTOR AND LOCATION & TYPE LOCATION OF PCO RFP ISSUE DATE AWARD DATE DATE OF FIRST Delivery Apr-99 CONTRACT METHOD QTY 52VG UNIT COST SPECS DATE AVAILABLE REVISIONS NOW AVAILABLE 00 01 Lockheed Martin CPFF SSC-Charl. Mar-00 Aug-01 1 2,024 Yes n/a Block Upgrade (J-AOS 1 & 2) Lockheed Martin CPFF-OP SSC-Charl. Oct-00 Apr-02 1 2,046 Yes n/a Twinline Arrays 02 Lockheed Martin CPFF/OP NAVSEA Oct-01 May-03 1 5,612 Yes n/a TRU/ Common Tow Cable 00 01 Digital System Resources CPFF/OP SPAWAR Oct-99 Jul-00 1 231 Yes n/a Digital System Resources CPFF/OP SPAWAR Oct-00 Jul-01 1 213 Yes n/a Trainers/CCM Trainers/CCM 00 01 Digital System Resources Digital System Resources CPFF/OP CPFF/OP SPAWAR SPAWAR Oct-99 Oct-00 Nov-00 Jul-01 1 1 1,599 1,444 Yes Yes n/a n/a Communication/C4I Upgrades 02 TBD TBD SPAWAR Oct-01 Jul-02 3 1,200 Yes n/a LFA Mitigation Sonar 00 Scientific Solutions, Inc. CPFF/OP NUWC,RI Oct-99 Aug-00 1 1,100 Yes n/a 02 TBD TBD SPAWAR Oct-01 Jul-02 3 1,355 Yes n/a Block Upgrade (J-AOS 1 & 2) TRU/Common Tow Cable Dec-00 VG010 Electronics Upgrade ARCI (I) Ship Electronics Dec-00 D. REMARKS VG006 J-AOS Inboard Ship Mission Equipment is funded in FY98 and FY99 for ships 1 & 2. J-AOS Twinline Arrays for ships 1 & 2 are funded in FY00 and FY01. NATSC, Norfolk VA awarded competitive contract for J-AOS Arrays in Mar 2000. P-1 Shopping List-Item No 38 (4 of 12) Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE: MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Block Upgrade (J-AOS 1 & 2) VG006 SURTASS TAGOS Ships and Arrays Block upgrade (JAOS) provides one A180R Twinline Array for JAOS #1 in FY00 and one A180R twinline array for JAOS #2 ship in FY01. OPN data shown is US cost share. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A PrIior Yrs FY 99 FY 00 FINANCIAL PLAN: ($ in millions) Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 1 2.23 1 2.02 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 1 0.17 PRIOR YR EQUIP 1 0.17 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.00 0 0.00 1 0.17 TOTAL PROCUREMENT COST 0 0.00 1 2.23 1 2.19 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 01 FY 02 Qty $ 1 2.05 1 0.14 1 0.14 1 1 0.14 2.19 Qty $ 1 0.15 1 0.15 1 0 0.15 0.15 ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000 Mar-00 FY 2001 DELIVERY DATES: FY 2000 Aug-01 FY 2001 PY 1 2 FY 00 3 4 June 2001 1 2 FY 01 3 Oct-00 PRODUCTION LEADTIME: Arrays - 17 months FY 2002: Apr-02 4 2 Months FY 2002: 1 2 FY 02 3 INPUT 1 1 1 OUTPUT 1 1 1 P-1 Shopping List-Item No 38 (5 of 12) 4 Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE: MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June 2001 Twinline Arrays VG006 SURTASS T-AGOS Ships The Twinline is a shallow water variant of the common array that is being produced by NAVSEA. The array consists of 2 short array lengths and is designed for incresed surveillance capability in high clutter environments and littoral areas. The inventory objective for the Common Twinline Aray is 10 arrays with procurement beginning in FY02. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A FINANCIAL PLAN: ($ in millions) PrIior Yrs FY 99 FY 00 Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.00 0 0.00 0 0.00 TOTAL PROCUREMENT COST 0 0.00 0 0.00 0 0.00 METHOD OF IMPLEMENTATION: CONTRACT DATES: DELIVERY DATES: INSTALLATION SCHEDULE: PY FY 01 Qty 0 0 $ 0.00 0.00 2 $ 1 5.61 0 1 0.00 5.61 ADMINISTRATIVE LEADTIME: FY 2000 FY 2000 1 FY 02 Qty FY 01 3 FY 2001 FY 2001 4 FY 2002 FY 2002 1 2 FY 02 3 2 months PRODUCTION LEADTIME: 19 months Oct-01 May-03 4 INPUT OUTPUT Notes/Comments (1) Includes NRE and NATSC support equipment P-1 Shopping List-Item No 38 (6 of 12) Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Telemetry Receive Unit/(TRU)/Common Tow Cable June 2001 VG006 SURTASS T-AGOS Ships TRU/Common tow cable provides capability of SWATH ships with RDA arrays to be configured with a coax tow cable in the event that a failure of the RDA fiber optic tow cable occurs. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A FINANCIAL PLAN: ($ in millions) PrIior Yrs FY 99 FY 00 FY 01 FY 02 Qty $ Qty $ Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 1 0.23 1 0.21 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 1 0.04 1 0.02 PRIOR YR EQUIP FY 00 EQUIP 1 0.04 FY 01 EQUIP 1 0.02 FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.00 0 0.00 1 0.04 1 0.02 0 0.00 TOTAL PROCUREMENT COST 0 0.00 0 0.00 1 0.27 1 0.23 0 0.00 METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 month PRODUCTION LEADTIME: 10 months MODIFICATION TITLE: COST CODE: MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: CONTRACT DATES: FY 2000 Oct-99 FY 2001 Oct-00 FY 2002: DELIVERY DATES: FY 2000 Jul-00 FY 2000 Jul-01 FY 2002: FY 00 INSTALLATION SCHEDULE: PY 1 2 FY 01 3 4 1 2 3 4 INPUT 1 1 OUTPUT 1 1 P-1 Shopping List-Item No 38 (7 of 12) 1 2 FY 02 3 4 Unclassified Classification UNCLASSIFIED June 2001 Trainers/Configuration Control Model (CCM) VG006 SURTASS Shore Trainers and Configuration Control Model (CCM) The Next Evolution Trainer at SUBTRAFAC, Norfolk, VA in FY00 provides operation and maintenance training suite for shore, ship, or MILDET personnel. The trainer will provide processing strings and STIM for passive training and/or post mission analysis. The Next Evolution Trainer at IOSC, Norfolk VA., in FY01 provides operation and maintenance training suite for MILDET and SURTASS ship personnel. The ARCI (I) configuration Control Model (CCM) at the SURTASS software developer’s lab will provide a hardware suite for software maintenance and test purposes. MODIFICATION TITLE: COST CODE: MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A FINANCIAL PLAN: ($ in millions) PrIior Yrs FY 99 FY 00 Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment 1 1.60 Support Equipment Other Interm Contractor Support Installation of Hardware 1 0.05 PRIOR YR EQUIP FY 00 EQUIP 1 0.05 FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.00 0 0.00 1 0.05 TOTAL PROCUREMENT COST 0 0.00 0 0.00 1 1.65 METHOD OF IMPLEMENTATION: CONTRACT DATES: FY 2000 DELIVERY DATES: FY 2000 FY 01 Qty $ 1 1.44 1 0.05 1 0.05 1 1 0.05 1.50 FY 02 Qty $ 0 0 0.00 0.00 ADMINISTRATIVE LEADTIME: Oct-99 Nov-00 FY 2001 Oct-00 FY2002 FY 2001 Jul-01 FY2002 FY 00 INSTALLATION SCHEDULE: INPUT OUTPUT PY 1 2 3 4 1 1 FY01 2 3 4 1 month 1 FY02 2 3 PRODUCTION LEADTIME: 10 months 4 1 1 1 Unclassified P-1 Shopping List-Item No 38 (8 of 12) Classification UNCLASSIFIED Communications/C4I Upgrades June 2001 VG006 SURTASS T-AGOS Ships Communication/C4I Upgrades provides IT-21 communications upgrades for SURTASS ships for improved network centric connectivity to deploying Battle Groups. FY 02provides SHF C/X terminal, ADNS, DMR, GCCS-M and integration of suite. MODIFICATION TITLE: COST CODE: MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A FINANCIAL PLAN: ($ in millions) PrIior Yrs FY 99 FY 00 Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.00 0 0.00 0 0.00 TOTAL PROCUREMENT COST 0 0.00 0 0.00 0 0.00 METHOD OF IMPLEMENTATION: CONTRACT DATES: PY 0 0 $ 0.00 0.00 FY 02 Qty $ 3 3.60 3 2.84 3 2.84 3 3 2.84 6.44 ADMINISTRATIVE LEADTIME: FY 2000 DELIVERY DATES: INSTALLATION SCHEDULE: FY 01 Qty FY 2001 FY 2000 1 2 FY 01 3 FY 2002 FY 2001 4 1 2 FY 2002 FY 02 3 PRODUCTION LEADTIME: FY02 upgrade - 10 mos. Oct-01 Jul-02 4 INPUT 3 OUTPUT 3 Notes/Comments T.C. unit cost reflects a mixed quantity of EHF MDR/GBS/GCCS-M FY02 upgrade - 1 mo. P-1 Shopping List-Item No 38 (9 of 12) Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 Field Changes/Modifications VG007 SURTASS T-AGOS Ship and Shore Facilities Field Changes/Modifications for correction of deficiencies identified by Fleet use, array support, communications equipment and replacement of aging/unsupportable equipment. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A FINANCIAL PLAN: ($ in millions) PrIior Yrs FY 99 FY 00 FY 01 FY 02 Qty $ Qty $ Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits 9 1.14 14 0.74 7 0.73 Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 9 0.58 14 0.81 7 0.23 PRIOR YR EQUIP FY 00 EQUIP 9 0.58 FY 01 EQUIP 14 0.81 FY 02 EQUIP 7 0.23 FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.00 0 0.00 9 0.58 14 0.81 7 0.23 TOTAL PROCUREMENT COST 0 0.00 0 0.00 9 1.72 14 1.55 7 0.96 METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 months PRODUCTION LEADTIME: 10 months MODIFICATION TITLE: COST CODE: MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: INSTALLATION SCHEDULE: CONTRACT DATES: FY 2000 Oct-99 FY 2001 Oct-00 FY 2002: Oct-01 DELIVERY DATES: FY 2000 Jul-00 FY 2001 Jul-01 FY 2002: Jul-02 PY 1 2 FY 00 3 FY 01 4 1 2 3 4 1 2 FY 02 3 4 INPUT 9 14 7 OUTPUT 9 14 7 Notes/Comments Quantity reflects various field changes Exhibit P-3a, Individual Modification Program Unclassified P-1 Shopping List-Item No 38 (10 of 12) Classification UNCLASSIFIED June 2001 ARCI (I) Ship Electronics VG010 SURTASS T-AGOS Ships ARCI (I) Ship Electronics provides upgraded ship processing and display suite consisting of SMP technology server configuration to accommodate improved and expanded twinline data from SURTASS Ships. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A FINANCIAL PLAN: ($ in millions) PrIior Yrs FY 99 FY 00 FY 01 FY 02 Qty $ Qty $ Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 3 4.07 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 3 0.43 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP 3 0.43 FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.00 0 0.00 0 0.00 0 0.00 3 0.43 TOTAL PROCUREMENT COST 0 0.00 0 0.00 0 0.00 0 0.00 3 4.50 METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 month PRODUCTION LEADTIME: 10 m onths MODIFICATION TITLE: COST CODE: MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: INSTALLATION SCHEDULE: CONTRACT DATES: FY 2000 FY 2001 FY 2002 Oct-01 DELIVERY DATES: FY 2000 FY 2001 FY 2002 Jul-02 PY 1 2 FY 01 3 4 1 2 FY 02 3 4 INPUT 3 OUTPUT 3 Exhibit P-3a, Individual Modification Program Unclassified P-1 Shopping List-Item No 38 (11 of 12) Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE BLI 2237 Surveillance Towed Array Sensor (SURTASS) S COST ITEM/MANUFACTURER CODE E PROC R QTY V ACCEP BAL FISCAL YEAR PRIOR DUE CY 00 TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P AUG SEP FY 01 FISCAL YEAR SUBHEAD NO. 52VG CALENDAR YEAR 01 02 CALENDAR YEAR VG006 Block Upgrade (J-AOS 1 & 2) Lockheed Martin 2001 1 1 A 1 2001 1 1 A 1 2001 1 1 A 1 2002 1 2002 3 3 A 3 2002 3 3 A 3 VG006 TRU/Common Tow Cable Digital System Resources VG006 Trainers/CCM Digital System Resources VG006 Twinline Array Lockheed Martin 1 A VG006 Communication/C4I Upgrades TBD VG010 ARCI(I) Ship Electronics TBD OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR PRODUCTION RATE Name and Location MSR 1-8-5 P-1 Shopping List-Item No 38 (12 of 12) JUN JUL PROCUREMENT LEADTIMES Manufacturer’s ITEM MAY MAX ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure Exhibit P-21 Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY P-1 ITEM NOMENCLATURE Tactical Support Centers (# 2246) FY 2000 FY 2001 FY 2002 $4.3 $6.2 $6.1 FY 2003 FY 2004 FY 2005 FY 2006 June 2001 SUBHEAD 52WH FY 2007 TO COMP TOTAL QUANTITY COST (in millions) Continuing Continuing Narrative Description/Justification: The Tactical Support Center (TSC) program provides evolutionary systems and ancillary equipment upgrades to support the Maritime Sector Commanders (Ashore) with the capability to plan, direct and control the tactical operations of Joint and Naval Expeditionary Forces and other assigned units within their respective area of responsibility. These operations include littoral, open ocean, and over land all sensor (i.e. EO, IR, ISAR, etc.) surveillance, anti-surface warfare, over-the-horizon targeting, counter-drug operations, power projection, antisubmarine warfare, mining, search and rescue, and special operations. The Tactical Support Center (TSC) program includes fixed site TSCs and Mobile Operations Control Centers (MOCCs). TSC’s provide C4I capability, air-ground, satellite and point-to-point communications systems; sensor analysis capabilities; avionics and weapons system interfaces and facilities equipment. MOCC is a scalable and mobile version of the TSC for contingency operations and for support of operations from airfields that do not have a TSC. WH046. Upgrade Equipment. This cost code contains TSC sensor analysis capabilities, avionics and weapons system interfaces, computer upgrades and associated software for interfacing analysis and processing equipment to the supported weapons systems (aircraft). WH050. Facilities Equipment. This Cost Code contains the Facilities Equipment necessary to power and support the processing equipment and interfaces. The FY00 Budget Request Procures: 1. TSC Upgrade Equipment; 2. Facilities Equipment; and 3. Installation of Equipment. The FY01 Budget Request Procures: 1. TSC Upgrade Equipment; 2. Facilities Equipment; and 3. Installation of Equipment. The FY02 Budget Request Procures: 1. TSC Upgrade Equipment; 2. Facilities Equipment; and 3. Installation of Equipment. INSTALLATION DATA: 14 TSC systems at 12 operational sites (located at Keflavik, Iceland; Brunswick, ME; Jacksonville, FL; Sigonella, Italy; Kaneohe Bay, HI; Whidbey Island, WA; Kadena, Japan; Misawa, Japan; North Island, CA; Diego Garcia, Indian Ocean; Roosevelt Roads, Puerto Rico, and Masirah, Oman); 1 training site at Fleet Combat Training Center (FCTC) Dam Neck, VA and 1 lab site at SSC CHARLESTON DET Patuxent River, MD. 9 MOCCs at 8 operational sites (Homeported at Brunswick, ME; Jacksonville, FL; Sigonella, Italy; 2 at Barbers Point/Kaneohe Bay, HI; Misawa, Japan; Whidbey Island, WA; Willow Grove, PA; and Point Mugu, CA.) and 1 MOCC C2 Engineering Development, Software Support Facility (SSC CHARLESTON). P-1 Shopping List No. 39-1 of 39-4 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE COST ANALYSIS June 2001 APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Tactical Support Centers (# 2246) COST CODE ELEMENT OF COST WHO46 ANALYSIS INTERFACE EQUIP WHO50 FACILITIES EQUIP WH776 NON-FMP INSTALLATION TOTAL CONTROL PY ID TOTAL CODE COST A A A QTY FY 2000 UNIT TOTAL COST COST QTY SUBHEAD 52WH FY 2001 UNIT TOTAL COST COST QTY FY 2002 UNIT TOTAL COST COST 3,242 300 754 4,861 407 887 5,072 103 884 4,296 6,155 6,059 QTY FY 2003 UNIT TOTAL COST COST Remarks: DD FORM 2446, JUN 86 P-1 Shopping List No. 39-2 of 39-4 Exhibit P-5, Budget Item Justification Unclassified Classification UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: TACTICAL SUPPORT CENTERS (TSC) SUBHEAD/COST CODE: 52WH/WH046 WHO46 N/A DESCRIPTION/JUSTIFICATION: This cost code contains TSC sensor analysis capabilities, avionics and weapons system interfaces, computer upgrades and associated software for interfacing analysis and processing equipment to the supported weapons systems (aircraft). DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Evolutionary Acquisition of COTS equipment; anticipate OT every 24 months. FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 99 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ Qty $ VAR 41.00 VAR 1.7 VAR 3.24 VAR 4.86 VAR 126 126 11.50 11.50 18 14 4 3.6 0.6 3.0 16 0.75 21 0.82 16 0.75 21 0.82 11.50 52.50 3.6 5.3 0.75 4.00 Qty FY 04 Qty FY 05 $ Qty $ 5.07 CONT CONT VAR 54.18 19 0.87 CONT CONT 19 0.87 CONT CONT CONT CONT VAR 140 20 21 19 0 0 0 0 0 VAR 13.94 11.50 0.75 0.82 0.87 0.00 0.00 0.00 0.00 0.00 CONT 13.94 68.12 0.00 0.00 $ 0.00 0.00 VAR CONTRACT DATES: FY 2001: VAR FY 2002: VAR FY 2003: FY 2004: VAR DELIVERY DATES: FY 2001: VAR FY 2002: VAR FY 2003: FY 2004: VAR FY 01 INSTALLATION SCHEDULE: PY FY 02 1 3 4 TC TOTAL INPUT CONT CONT OUTPUT CONT CONT OUTPUT 160 3 4 2 9 10 2 9 10 3 4 1 2 3 4 10 5 4 10 5 3 4 FY 05 INSTALLATION SCHEDULE: 1 2 4 1 2 1 2 FY 04 4 160 2 FY 03 3 INPUT 1 Total $ 0.00 0.00 PRODUCTION LEADTIME: Qty TC Qty 0.00 0.00 Qty FY 07 $ 0.00 0.00 VAR $ FY 06 Qty 0.82 0.87 5.68 5.95 ADMINISTRATIVE LEADTIME: $ FY 06 1 2 2 3 4 FY 07 Notes/Comments * P-5 contains various quantities of equipment procured. P-3A contains "Shore Sites installed" as measures of quantity * Install costs vary across fiscal years due to different equipment mix and locations. P-1 Shopping List-Item No 39-3 of 39-4 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: TACTICAL SUPPORT CENTERS (TSC) SUBHEAD/COST CODE: 52WH/WH050 WHO50 N/A This Cost Code contains the Facilities Equipment necessary to power and support the processing equipment and interfaces. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Evolutionary Acquisition of COTS equipment; anticipate OT every 24 months. FINANCIAL PLAN: ($ in millions) FY 99 FY 00 FY 01 FY 02 PY Qty $ Qty $ Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment VAR 5.70 VAR 0.0 VAR 0.30 VAR 0.41 VAR 0.10 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware* 14 1.90 0 0.0 0 0.00 7 0.07 1 0.01 PRIOR YR EQUIP 14 1.90 FY 00 EQUIP 3 0.00 FY 01 EQUIP 4 0.07 FY 02 EQUIP 1 0.01 FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 1.90 0.0 0.00 0.07 0.01 TOTAL PROCUREMENT COST 7.60 0.0 0.30 0.48 0.11 METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: FY 03 Qty FY 04 $ Qty 0.00 0.00 VAR FY 05 $ 0.00 0.00 Qty FY 06 $ Qty FY 07 $ 0.00 0.00 PRODUCTION LEADTIME: Qty 0.00 0.00 0.00 0.00 FY 2001: VAR FY 2002: VAR FY 2003: FY 2004: DELIVERY DATES: FY 2001: VAR FY 2002: VAR FY 2003: FY 2004: FY 02 FY 01 PY 1 2 3 4 1 2 FY 03 CONT CONT 22 14 1.98 1.90 3 4 1 0 0 0 0 0 0 0.00 0.07 0.01 0.00 0.00 0.00 0.00 0.00 0.00 1.98 8.49 CONT CONT FY 04 INPUT CONT CONT OUTPUT CONT CONT 17 2 3 2 1 3 4 FY 05 INSTALLATION SCHEDULE: 1 2 2 6.51 TOTAL OUTPUT 1 VAR TC 1 4 CONT 4 2 3 CONT 3 3 2 $ 1 2 1 Qty 4 17 4 $ 3 INPUT 3 Total Qty VAR CONTRACT DATES: INSTALLATION SCHEDULE: TC $ FY 06 1 2 2 3 4 FY 07 Notes/Comments * P-5 contains various quantities of equipment procured. P-3A contains "Shore Sites installed" as measures of quantity P-1 Shopping List-Item No 39-4 of 39-4 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY 2-COMMUNICATIONS AND ELECTRONIC EQUIPMENT Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) AN/SLQ-32(V)/2312 Other Related Program Elements ID Code FY 2000 FY 2001 FY 2002 $1.9 $1.9 $0.0 $2.0 $0.6 $0.1 $0.0 $0.0 FY 2003 $0.0 FY 2004 $0.0 FY 2005 FY 2006 $0.0 $0.0 FY 2007 $0.0 To Complete Total CONT $5.8 CONT $0.7 PROGRAM PROGRAMDESCRIPTION/JUSTIFICATION: DESCRIPTION/JUSTIFICATION: The AN/SLQ-32(V) provides a family of modular shipborne electronic warfare equipment which is installed in most combatants, CV/CVN, amphibs and auxiliaries in the Navy. The system, whichofconsists ofshipborne five configurations, the mission of early detection, analyses, threat warning, protection from anti-ship Thesurface AN/SLQ-32(V) provides a family modular electronic performs warfare equipment which is installed in most combatants, CV/CVN,and amphibs and auxiliaries in missiles. The (V)1 and (V)2 are computer controlled Electronic Support (ES) Systems that detect, sort, classify, identify and continuouslydisplay signals within frequency the surface Navy. The systems, which consists of five configurations, performs the mission of early detection, analyses, threat warning, and protection from anti-ship ranges. (V)3 and (V)4 provide the capabilities of theElectronic passive system plus an Systems integratedthat Active Electronic Attack (EA) response for all signals classified as awithin threat. missiles.The The (V)1 and (V)2 are computer controlled Support (ES) detect, sort, classify, identify and continuously display signals The (V)5 provides an(V)3 EA capability on smaller ships. of the passive system plus an integrated Active Electronic Attack (EA) response for all signals classified frequency ranges.for The and (V)4 provide the class capabilities R091300Z Julon99smaller identified theships. AN/SLQ-32(V) system asand experiencing extensive operational and readiness deficiencies. JFCOM, asCINCLANTFLT/CINCPACFLT a threat. The (V)5 provides formsg an EA capability class JFCOM, PACOM, EUCOM have all submitted Component Commander Issue Papers PACOM, and EUCOM all submitted Component (CCIP) stating the needhave to keep the AN/SLQ-32 viable. Commander Issue Papers stating the need to keep the AN/SLQ-32 viable. Procurement and installation of targeted improvements, ES/EA enhancements, and techniques for new threats are all necessary to ensure future mission tactical suitability and viability until it is replaced by approximately FY2020. FYAN/SLY-2 00: FMP in - Installation of Field Change Kits for the Fleet Modernization Program (FMP). FY 01: Unfunded FY FY00: 02: FMP FMP--Installation of Field Change Kits for the Fleet Modernization Program (FMP). FY 01: THRU Not Applicable. FY02 FY 07 - Field Change Kits - System modifications ensure future tactical suitability and viability of the AN/SLQ-32(V). These systems will remain in the Fleet for another 15 to 20 years. Field Change Kits consist of: Digital Radio Frequency Memory Units (DRFMU), Deceptive Electronic Countermeasures/Decoy FY 02 thru FY(DDI), 07 - ECPs/Field Change Kits - Initiate procurement of hardware software modifications to ensure tactical suitability and viability of the AN/SLQIntegrations Video Blanking, Sidekicks, Cartridge Tape Transport (CTT)and replacement, EMI Fixes, and ES/EAfuture Enhancements. 32(V). Resume Field Change Kits consisting of: Digital Radio Frequency Memory Units (DRFMU), Deceptive Electronic Countermeasures/Decoy Integrations (DDI), Video Blanking, CFR Blanking, Sidekicks, Cartridge Tape Transport (CTT) replacement, EMI Fixes, AFT Facing Launchers and ES/EA Enhancements. FY 02 thru FY 07: FMP - Resume installation of Field Change Kits for the Fleet Modernization Program (FMP). DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 40 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System ID Code APPROPRIATION/BUDGET ACTIVITY DATE: JUNE 2001 P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy AN/SLQ-32(V)/2312 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST TC055 ECP/FIELD CHANGE KITS TC5IN FMP INSTALLATION DD FORM 2446, JUN 86 ID Code Prior Years Total Cost 1,940 1,940 P-1 SHOPPING LIST ITEM NO. 40 FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost 0 0 666 1,883 0 1,305 1,883 PAGE NO. 0 Quantity 1,971 CLASSIFICATION: Unit Cost Total Cost 0 2 UNCLASSIFIED Exhibit P-18 Initial and Replenishment Spare and Repair Parts Justification Appropriation (Treasury) OPN/2/234000/234006 Prior PY End Item P-1 Line Item Years FY 2000 INITIAL Information Warfare Spares .325 CY FY 2001 BY1 FY 2002 .650 .150 TOTAL INITIAL .650 .150 .325 Date: June 2001 BY2 FY 2003 Information Warfare Systems BY2+1 BY2+2 BY2+3 FY 2004 FY 2005 FY 2006 BY2+4 FY 2007 To Complete Total REPLENISHMENT N/A TOTAL REPLENISHMENT Remarks: Funded initial Spares P-1 Shopping List Item No 41-1 of 41-1 Exhibit P-18, Initial and Replenishment Spares and Repair Parts Justification 4-1 Exhibit P-40a, Budget Item Justification for Aggregated Items Appropriation/Budget Activity OPN/2/234000/234006 ID Prior Code Procurement Items Years FY 1999 FY 2000 Production Spt A 11.450 0.000 0.000 (Var) IW/CW Equipment A 0.400 0.000 0.000 EA Equipment A 2.200 (3) 1.760 (3) 1.700 EA Installation A 0.000 0.000 0.300 Percep Mngmnt A 0.000 0.000 0.000 Trng Perception Mngmnt A 0.000 0.000 0.000 So Perception Mngmnt A 1.193 0.700 0.513 E IMPACTS Training A 0.000 0.225 0.500 IMPACTS Support A 0.000 0.100 0.000 IMPACTS Hardware A 0.000 0.400 0.380 IMPACTS Software A 0.000 (6) 0.150 (6) 0.250 IW Misc. A 0.000 0.000 0.200 ICADS Non-FMP A 0.000 0.195 0.160 Total Quantity Total Cost A Var 15.243 Var 3.530 11 4.003 Date June 2001 Information Warfare Systems FY 2001 0.000 FY 2002 0.000 FY 2003 0.000 FY 2004 0.000 FY 2005 0.000 FY 2006 0.000 FY 2007 0.000 To Comp Cont. Total 11.450 0.500 2.000 0.000 0.090 1.000 0.000 (1) 0.600 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 (0) 0.000 0.000 0.000 0.000 (0) 0.000 0.000 0.000 0.000 (0) 0.000 0.000 0.000 Cont. Cont. Cont. Cont. 1.900 7.66 0.900 0.090 0.150 0.000 0.000 0.000 0.000 0.000 0.000 Cont. 0.150 0.215 0.000 0.000 0.000 0.000 0.000 0.000 Cont. 2.621 0.200 0.000 0.271 (6) 0.250 0.000 0.190 0.300 0.258 0.300 (6) 0.250 0.000 0.200 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 (0) 0.000 0.000 0.000 0.000 0.000 0.000 (0) 0.000 0.000 0.000 0.000 0.000 0.000 (0) 0.000 0.000 0.000 0.000 0.000 0.000 (0) 0.000 0.000 0.000 Cont. Cont. Cont. Cont. Cont. Cont. 1.225 0.358 1.351 0.900 0.200 0.745 16 3.866 7 1.908 0 0 0 0 0 P-1 Shopping List - Item No 41-2 of 41-2 Exhibit P-40a, Budget Item Justification for Aggregated Items 4-2 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE: APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY P-1 ITEM NOMENCLATURE SHIPBOARD IW EXPLOIT SYSTEMS 2360 FY 2000 FY 2001 FY 2002 85.6 60.5 57.5 FY 2003 FY 2004 June 2001 SUBHEAD 521U FY 2005 FY 2006 FY2007 QUANTITY COST (in millions) PROGRAM COVERAGE: JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: This budget line is a consolidation of several shipboard Information Warfare (IW) exploit systems procurement lines (COMBAT DF (NARM 2419), OUTBOARD (NARM 2430), EW Support (SSEE) (NARM 2343), Battle Group Passive Horizon Extension System (BGPHES) (NARM 2434), Common Data Link-Navy (CDL-N) (NARM 2434)). These lines are being consolidated for efficiency of management and also as a reflection of greater commonality in the systems. This latter point reflects the continuing effort to collapse "stovepipes" in order to achieve a scaleable, modular open architecture cryptologic system made up of common hardware components and running common operator interface software. This consolidation aligns the procurement budget structure to coincide with the R&D and O&MN structures which were consolidated previously into common Shipboard IW Exploit Systems lines. (U) This line procures the following: (U) Automated Digital Acquisition Subsystem (ADAS) hardware and associated installation and production support. ADAS is an upgrade to the Combat DF (AN/SRS-1) system. Combat DF is an information warfare exploitation and direction finding system with the capability to detect, locate and identify hostile targets at long-range and input this information into the ship’s tactical data system. The ADAS upgrade provides the foundation for exploitation of unconventional and Low Probability of Intercept (LPI) signal types. (U) A Cooperative Outboard Logistics Update (COBLU) joint cooperative program between the United States and the United Kingdom (U.K.) was established 1 July 1994 with a Memorandum of Understanding (MOU) being signed by both governments. The COBLU program provides upgrades to the existing OUTBOARD System (AN/SSQ-108) to provide Comprehensive Surface Tactical (CESM) capability to the 21st century. The program will make maximum use of already developed military and commercial signal exploitation equipment. The systems architecture will require minimal effort to implement future technologies necessary to handle the evolving threat. Program is being executed in two phases; Phase 0 is an interim update that focuses on transitioning Human Computer Interface (HCI) to a Joint Maritime Command Information System (JMCIS) environment and integrating with Direction Finding Engineering Change Proposal (DFECP). Phase 1 focuses on a total update of front-end sensors. (U) The Ships Signal Exploitation Equipment (SSEE) Phase 2 program is an evolutionary acquisition, commercial off-the-shelf/non-developmental item (COTS/NDI) program designed as the building block to improve the tactical cryptologic and Information Warfare (C2W/IW) exploitation capability across Navy surface combatant platforms. SSEE provides the afloat cryptologist with threat identification and analysis of Communications Intelligence (COMINT) as well as queuing of radio direction finding assets. Equipment Includes Receivers, RF Management Systems, Recorders, Audio Distribution Systems, Computers, Antennas and Ancillary Hardware. The system is upgraded incrementally, as improvements are developed. Currently, Increment D is in production and fielding. SSEE PHASE 2 Increment D: Procures equipment that digitizes the Receivers and RF Management systems, adds signal analysis/processing capability and provides an open architecture that accommodates additional functional capabilities. SSEE Increment E shall employ the Maritime Cryptologic Strategy for the 21st century (MCS-21) concept of a single core architecture that is easily modernized and scaled in capability. The system design permits the rapid insertion of new and emerging P3I to address the evolving threat. The system will utilize generic processor technology to counteract obsolescence issues with Digital Signal Processing (DSP) technologies and provide software receivers for ease of modification to deal with known and projected exotic threat signals of interest. Automated signal acquisition and integrated Radio Direction Finding (RDF) will be incorporated into the Increment E system. P-1 Shopping List-Item No 42 Page 1 of 30 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE: APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE SHIPBOARD IW EXPLOIT SYSTEMS 2360 June 2001 SUBHEAD 521U JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: (continued) (U) The Transportable Radio Direction Finding (T-RDF) and associated deck and/or mast antenna is a complete communication band shipboard Direction Finding system for bearing computation for surface combatants and is designed to operate in the harsh shipboard environment. (U) The Battle Group Passive Horizon Extension System-Surface Terminal (BGPHES-ST) provides the ability for cryptologic operators to monitor, record and analyze selected signals of interest. Reports can be prepared and information disseminated from the surface terminal via the Sensitive Compartmented Information-Advanced Digital Network System (SCI-ADNS) or directly to the host ship’s C4I network. BGPHES-ST SYGATE allows for real time airborne payload connection/control using over-the horizon satellite communications as the link and allows the ship to conduct operations without a line of sight dedicated asset. BGPHES-ST PROFORMA will convert BGPHES ST (V.1) system to (V.2) system , thus allowing for insertion of ELINT and Proforma subsystems. BGPHES-ST is interoperable with the USAF Direction Finding/Communication Intelligence (DF/COMINT) and can be expanded to provide Electronic Intelligence (ELINT) coverage. BGPHES-ST will become the Navy’s Signals Intelligence (SIGINT) component of the Distributed Common Ground Station (DCGS) and be multi-service interoperable and Joint SIGINT Avionics Family (JSAF) compliant. The BGPHES-ST provides the ability for cryptologic operators to monitor, record and analyze selected signals of interest. Reports can be prepared and information disseminated from the surface terminal via the Sensitive Compartmented Information-Advanced Digital Network System (SCI-ADNS) or directly to the host ship’s C4I network. BGPHES-ST is a fully digital, open architecture system residing on the SCIGCCS-M LAN. It utilizes full Cryptologic Unified Digital Special Signals Processor, Desperado and GCP ELINT processors will be added to the surface terminal to complement the Airborne receive and the Local VME (Versa Module Europa) Extended for Instrumentation (VUI) receive subsystems. (U) The Common Data Link - NAVY (CDL-N) (formerly called Common High Bandwidth Data Link-Shipboard Terminal (CHBDL-ST)) will provide a wideband data link between Navy/Joint airborne sensor systems and the shipboard processors of national second tactical reconnaissance programs. It is designed to communicate with the BGPHES-ST, the Joint Services Imagery Processing System - Navy (JSIPS-N), the Aircraft Carrier Tactical Support Center (CV-TSC), and the Joint Surveillance Target Attack Radar System (Joint STARS). CDL-N benefits the fleet by providing a horizon extension for line-of-sight sensor systems for use in battle damage assessment or mission planning and is interoperable with the USAF U2 aircraft. Test support equipment has been budgeted for FY2000 to procure Programmable Ground/Support Equipment (PGSE) for Common Data Link, interoperability tests with UAV flight tests and manned aircraft flight tests. The ATM backfit kit provides network interface capability, wideband encryption and command link upgrades to the CDL-N system. (U) ECP/Obsolecence integration procures COTS/NDI equipment to replace obsolete and unsupportable equipment for the SSEE, COBLU, BGPHES-ST and COMBAT DF/ADAS programs. These changes allow for a common logistic support baseline for these programs and provides the hardware to support the DII COE/GCCS-M software upgrades. Additionally this line supports the procurement of the Cryptologic On-Line Trainer (COLT) hardware for Shipboard IW team training and procurement of antenna modification kits to extend the frequency range/performance of the existing shipboard DF and acquisition antennas. (U) Special Modulation Detection Assembly (SMDA). A VME compliant digitizer used by Navy Electronic Support Measures (ESM) processors to provide a digitized intermediate frequency suitable for obtaining a Specific Emitter ID (SEI) signature on certain types of radiated electronic signals. This digitized signal is then used by algorithms developed and supported by the Naval Research Lab within the host processor to provide the SEI signature to the system. The current production model SMDA consists of a two VME card set. Current processors which are compatible with the SEI SMDA are the AN/SP-160 installed in the P-3C AIP (SMDA funding executed by NAVAIR PMA-290C) and the AN/SP-110 (a subcomponent of the BLQ-10 ESM system procured by NAVSEA PMS-473). The SMDA cards supported by this line item are intended for the SP-110 and are delivered to Naval Surface Warfare Center Dahlgren, VA. for installation under the SP-110 program. Total procurement across the FYDP provides one assembly for each SP-110 processor. (U) Installation Agent(s): Installations are accomplished by formal shipalt by Alteration Installation Team (AIT). P-1 Shopping List-Item No 42 Page 2 of 30 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION COST ANALYSIS APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST 1U001 ADAS 1U015 ADAS TSTAR MOD KITS ID CODE A A QTY P-1 ITEM NOMENCLATURE SHIPBOARD IW EXPLOIT SYSTEMS 2360 TOTAL COST IN THOUSANDS OF DOLLARS PY FY 1999 FY 2000 TOTAL UNIT TOTAL UNIT TOTAL COST QTY COST COST QTY COST COST QTY 4 1,700 6,801 8 445 3,559 DATE: June 2001 SUBHEAD 521U FY2001 UNIT TOTAL COST COST QTY FY2002 UNIT TOTAL COST COST 1U004 COBLU PHASE I A 3 6,668 20,005 3 6,548 19,645 2 7,193 14,386 1U008 SSEE PHASE 2 INCREMENT D A 7 906 6,342 4 939 3,754 4 1,007 4,028 1U020 SMDA Equipment A 7 67 470 1U009 1U010 T-RDF SYSTEMS T-RDF ANTENNAS A A 3 7 376 193 1,128 1,351 1U013 ECP/OBSOLECENCE A VAR 1,965 1U019 1U021 1U024 1U026 BGPHES-ST BGPHES AIRBORNE TEST FIXTURE (BATF) SYGATE UPGRADE KITS PROFORMA UPGRADE KITS A A A A XU003 1U027 XU007 1U028 XU008 XU009 CDL - N CDL - N ATM BACKFIT KITS ATM BACKFIT KITS TEST EQUIPMENT DUAL BAND BACKFIT KITS A A A A A A 2 4 353 119 706 476 3 1,695 5,085 7 2 160 200 1,119 400 3 6,549 19,646 3 755 2,265 1 1 1,995 1,198 1,995 1,198 PRODUCTION SUPPORT 1U555 PRODUCTION SUPPORT XU555 PRODUCTION SUPPORT INSTALLATION 1U777 INSTALL-FMP 1U777 DSA XU777 INSTALL-FMP XU777 DSA 1U776 INSTALLATION-NON FMP XU776 INSTALLATION NON - FMP 2 2 369 208 738 416 VAR VAR 750 VAR 1 1 6 4 1,765 1,765 160 200 1,765 1,765 960 800 2 1,800 3,600 2 6,727 13,454 2 6,828 13,656 3 760 2,280 3 761 2,283 5,863 2,342 3,521 2,771 2,771 2,696 2,696 10,124 2,389 1,101 5,656 745 11,366 8,955 674 11,972 10,282 1,000 1,737 690 60,464 57,535 233 TOTALS TOTAL BLI 2360 TOTAL BLI 2434 85,584 50,325 35,259 Cost Code: 1U013 Unit cost and quantity varies because the equipment being procured is COTS/NDI and supports all the programs within the Shipboard IW Exploit Budget. This program now includes OPN P-1 Line Item Common Data Link (BLI 2434) beginning in FY01. FY00 detail information is provided for budget comparability DD FORM 2446, JUN 86 P-1 Shopping List-Item No 42 Page 3 of 30 Exhibit P-5, Cost Analysis Unclassified UNCLASSIFIED CLASSIFICATION DATE: PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT SUBHEAD SHIPBOARD IW EXPLOIT SYSTEMS 2360 RFP DATE LOCATION ISSUE AWARD OF FIRST QTY UNIT OF PCO DATE DATE DELIVERY COST FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE 1U001 ADAS 99 00 SANDERS/NH SANDERS/NH OPTION OPTION OSP OSP N/A N/A Feb-99 Jan-00 Dec-00 Jul-01 5 4 1U015 ADAS T-STAR MOD KITS 00 SANDERS/NH OPTION OSP N/A Mar-00 May-01 1U004 COBLU PHASE 1 SYSTEM 00 01 02 SANDERS/NH SANDERS/NH SANDERS/NH SS OPTION OPTION OSP OSP OSP Sep-99 N/A N/A Jun-00 Feb-01 Jan-02 1U008 SSEE PHASE 2 INCREMENT D 00 01 02 VARIOUS VARIOUS VARIOUS FFP FFP FFP SSC/SC SSC/SC SSC/SC N/A N/A N/A 1U020 SMDA Equipment 02 TBD OPT SSC,SD N/A COST CODE ELEMENT OF COST 521U SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE 2,200 1,700 YES YES N/A N/A 8 445 YES N/A Feb-02 Sep-02 Sep-03 3 3 2 6,668 6,548 7,193 YES YES YES N/A N/A N/A Jan-00 Jan-01 Jan-02 Jun-00 Jun-01 Jun-02 7 4 4 906 939 1,007 YES YES YES N/A N/A N/A Jan 02 Jun 02 7 67 YES N/A D. REMARKS IU008: Commercial off the shelf hardware procured, using various types of contracts. FFP is the predominant type of contract. Various: Commercial Off the Shelf Equipment (COTS) DD FORM 2446, JUN 87 P-1 Shopping List-Item No 42 Page 4 of 30 Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE: PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT CONTRACTOR COST ELEMENT OF COST FY AND CODE LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO SUBHEAD SHIPBOARD IW EXPLOIT SYSTEMS 2360 RFP DATE ISSUE AWARD OF FIRST QTY DATE DATE DELIVERY 521U UNIT COST SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE 1U009 T-RDF SYSTEMS 00 01 02 SWRI SA, TEXAS SWRI SA, TEXAS SWRI SA, TEXAS FFP OPTION OPTION SSC/CH SSC/CH SSC/CH N/A N/A N/A Mar-00 Jan-01 Jan-02 Aug-00 Jun-01 Jun-02 2 2 3 353 369 376 YES YES YES N/A N/A N/A 1U010 T-RDF ANTENNAS 00 01 02 SWRI SA, TEXAS SWRI SA, TEXAS SWRI SA, TEXAS FFP OPTION OPTION SSC/CH SSC/CH SSC/CH N/A N/A N/A Mar-00 Jan-01 Jan-02 Aug-00 Jun-01 Jul-02 4 2 7 119 208 193 YES YES YES N/A N/A N/A 1U019 BGPHES-ST 00 01 02 VARIOUS VARIOUS VARIOUS FFP FFP FFP SSC/CH SSC/CH SSC/CH N/A N/A N/A Dec-99 Dec-00 Dec-01 May-01 May-02 Dec-02 3 1 2 1,695 1,765 1,800 YES YES YES N/A N/A N/A 1U021 BATF 01 VARIOUS FFP SSC/CH N/A Mar-01 Mar-02 1 1,765 YES 1U024 SYGATE UPGRADE KITS 00 01 VARIOUS VARIOUS FFP FFP SSC/CH SSC/CH N/A N/A Feb-00 Feb-01 Jan-01 Jun-01 7 6 160 160 YES YES N/A N/A 1U026 PROFORMA UPGRADE KITS 00 01 VARIOUS VARIOUS FFP FFP SSC/CH SSC/CH N/A N/A Feb-00 Dec-00 Nov-00 Dec-01 2 4 200 200 YES YES NA N/A D. REMARKS 1U019/24/26: Commercial off the shelf hardware procured for these cost codes using various types of contracts. FFP is the predominant type of contract. DD FORM 2446, JUN 87 P-1 Shopping List-Item No 42 Page 5 of 30 Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE: PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT CONTRACTOR COST ELEMENT OF COST FY AND CODE LOCATION CONTRACT METHOD & TYPE SUBHEAD SHIPBOARD IW EXPLOIT SYSTEMS 2360 RFP DATE LOCATION ISSUE AWARD OF FIRST OF PCO DATE DATE DELIVERY 521U QTY UNIT COST SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE XU003 CDL - N 1U027 CDL - N 00 01 02 L3 COMMUNICATIONS L3 COMMUNICATIONS L3 COMMUNICATIONS OPTION OPTION OPTION SPAWAR SPAWAR SPAWAR N/A N/A N/A Dec-99 Dec-00 Dec-01 Mar-01 Mar-02 Mar-03 3 2 2 6,549 6,727 6,828 YES YES YES N/A N/A N/A XU007 DSM/ATM BACKFIT KITS 1U028 DSM/ATM BACKFIT KITS 00 01 02 L3 COMMUNICATIONS L3 COMMUNICATIONS L3 COMMUNICATIONS OPTION OPTION OPTION SPAWAR SPAWAR SPAWAR N/A N/A N/A Jul-00 Dec-00 Dec-01 Jul-01 Dec-01 Dec-02 3 3 3 755 760 761 YES YES YES N/A N/A N/A XU008 TEST EQUIPMENT 00 L3 COMMUNICATIONS OPTION SPAWAR N/A Jul-00 Jul-01 1 1,995 YES N/A XU009 DUAL BAND BACKFIT KIT 00 L3 COMMUNICATIONS OPTION SPAWAR N/A Jul-00 Apr-01 1 1,198 YES N/A D. REMARKS DD FORM 2446, JUN 87 P-1 Shopping List-Item No 42 Page 6 of 30 Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: ADAS-SHIP COST CODE 1U001/1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: (U) Automated Digital Acquisition Subsystem (ADAS) hardware and associated installation and production support. ADAS is an upgrade to the Combat DF (AN/SRS-1) system. The ADAS upgrade provides the foundation for exploitation of unconventional and Low Probability of Intercept (LPI) signal types. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 4 10.5 5 11.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 1 0.2 2 0.5 PRIOR YR EQUIP 1 0.2 2 0.5 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP TOTAL INSTALLATION COST 0.2 0.5 TOTAL PROCUREMENT COST 10.7 11.5 METHOD OF IMPLEMENTATION: FY 00 Qty $ 1 FY 01 Qty $ $ FY03 Qty $ FY04 Qty $ FY05 Qty $ FY06 Qty $ 0.3 0.3 0.5 0.1 5 5 0.33 2.23 1.3 1.3 1 0.3 1 0.3 10 9 1 0 0 0 0 0 0 0 1.4 0.4 1.9 0.5 ADMINISTRATIVE LEADTIME: 0.0 0.0 3 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: Jan-00 FY 2001: FY 2002: FY 2003: FY 2000: Jul-01 FY 2001: FY 2002: FY 2003: FY 01 2 3 4 1 INPUT 4 2 2 1 1 OUTPUT 4 2 2 1 1 2 3 INSTALLATION SCHEDULE: FY05 1 4 1 Total Qty $ 2 2 FY 02 3 FY06 3 4 23.2 0.8 0.23 FY 2000: 1 $ 0.1 0.1 DELIVERY DATES: PY TC Qty 10 CONTRACT DATES: INSTALLATION SCHEDULE: FY07 Qty $ 1.7 0.2 0.03 1 1 FY02 Qty FY 03 4 1 0.0 0.0 0.0 0.0 2.6 2.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.83 26.83 18 MOS FY 04 1 2 3 2 FY07 3 4 4 1 2 3 4 TC TOTAL INPUT 10 OUTPUT 10 Notes/Comments P-1 Shopping List - Item No. 42 Page 7 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: ADAS-SHORE COST CODE 1U001/1U776 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: (U) Automated Digital Acquisition Subsystem (ADAS) hardware and associated installation and production support. ADAS is an upgrade to the Combat DF (AN/SRS-1) system. The ADAS upgrade provides the foundation for exploitation of unconventional and Low Probability of Intercept (LPI) signal types. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 2 5.1 0 0.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware 1 0.2 1 0.3 PRIOR YR EQUIP 1 0.2 1 0.3 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP TOTAL INSTALLATION COST 0.2 0.3 TOTAL PROCUREMENT COST 5.3 0.3 METHOD OF IMPLEMENTATION: FY 00 Qty $ 3 FY 01 Qty $ FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ 0 0.0 2 0.2 1 0.3 2 0.2 1 0.3 0.0 5.1 5 2 3 0 0 0 0 0 0 0 0.2 0.3 0.2 0.3 ADMINISTRATIVE LEADTIME: 0.0 0.0 3 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: FY 2001: FY 2002: FY 2003: DELIVERY DATES: FY 2000: Jul-01 FY 2001: FY 2002: FY 2003: FY 01 2 3 4 1 2 INPUT 2 2 1 OUTPUT 2 2 1 FY05 INSTALLATION SCHEDULE: 1 2 3 4 Total Qty $ 10.2 0.0 0.0 Jan-00 1 $ 5 FY 2000: PY TC Qty 5.1 CONTRACT DATES: INSTALLATION SCHEDULE: FY 07 Qty $ 1 2 FY 02 3 FY06 3 FY 03 0.0 0.0 0.0 0.0 18 MOS FY 04 4 1 2 3 4 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 5 OUTPUT 5 Notes/Comments * Production Support shown on P-3A, ADAS-SHIP. P-1 Shopping List - Item No. 42 Page 8 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification 1.0 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 11.2 UNCLASSIFIED June 2001 MODIFICATION TITLE: ADAS T-STAR MOD KITS- SHIP COST CODE 1U015/1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: ADAS T-STAR Mod Kits provides the foundation for exploitation of unconventional and low probability of intercept (LPI) signal types DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ 7 FY 01 Qty $ $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ 0.0 0.2 7 0.2 0.2 0.0 0.2 0.0 ADMINISTRATIVE LEADTIME: 0.0 0.0 3 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: FY 2003: DELIVERY DATES: FY 2000: May-01 FY 2001: FY 2002: FY 2003: FY 01 1 INPUT 3 4 OUTPUT 3 3 1 4 1 2 FY05 INSTALLATION SCHEDULE: 1 2 3 3.2 7 FY 2002: 4 7 0.2 0.0 3.2 3 $ 7 FY 2001: 2 Total Qty 0.2 Mar-00 1 $ 7 FY 2000: PY TC Qty 0.0 CONTRACT DATES: INSTALLATION SCHEDULE: FY 07 Qty $ 3.2 0.0 0 FY 02 Qty 2 FY 02 3 FY06 3 FY 03 0.0 0.0 0.0 0.0 2.0 3.4 14 MOS FY 04 4 1 2 3 4 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 7 OUTPUT 7 Notes/Comments * Production Support shown on P-3A ADAS Ship P-1 Shopping List - Item No. 42 -Page 9 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: ADAS T-STAR MOD KITS- SHORE COST CODE 1U015/1U776 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: ADAS T-STAR Mod Kits Provides the foundation for expoitation of unconventional and low probability of intercept (LPI) signal types DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ 1 0.4 0 0.0 FY 01 Qty $ FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ 1 0.023 0.0 0.4 0.023 0.0 0.023 0.0 ADMINISTRATIVE LEADTIME: 0.0 0.0 3 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: DELIVERY DATES: FY 2000: May-01 FY 2001: FY 2002: FY 2003: FY 01 INPUT 1 OUTPUT 1 1 2 1 2 FY05 INSTALLATION SCHEDULE: 1 2 3 4 0.4 0.023 FY 2003: 4 1 1 FY 2002: 3 $ 0.023 FY 2001: 2 Total Qty 1 Mar-00 1 $ 0.023 FY 2000: PY TC Qty 1 CONTRACT DATES: INSTALLATION SCHEDULE: FY 07 Qty $ FY 02 3 FY06 3 FY 03 0.0 0.0 0.0 0.0 0.023 4.023 14 MOS FY 04 4 1 2 3 4 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 1 OUTPUT 1 Notes/Comments * Production Support shown on P-3A, ADAS Ship. P-1 Shopping List - Item No. 42 -Page 10 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COBLU-SHIP COST CODE 1U004/1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: (U) The COBLU system provides comprehensive surface tactical CESM capability into the 21st century and focuses on a total update of OUTBOARD sensors DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 1 2.4 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 2.4 METHOD OF IMPLEMENTATION: FY 00 Qty $ 2 FY 01 Qty $ 13.3 3 0.5 0.2 - - 1 1 0.2 14.0 FY 02 FY 03 Qty $ FY 04 Qty $ FY 05 14.4 8 49.7 0.8 0.0 2 0.9 0.2 0 2 2.2 0.4 4 2.8 2 2 1.4 1.4 5 1 2 2 0 0 0 0 0 0 0 2.8 0.0 1.4 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.2 55.1 0.0 0.0 3 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 Jun-00 FY 2001: Feb-01 FY 2002: Jan-02 FY 2003: DELIVERY DATES: FY 2000: Feb-02 FY 2001: Sep-02 FY 2002: Sep-03 FY 2003: FY 01 1 2 3 4 1 2 FY 02 3 4 FY 03 INPUT 1 2 2 OUTPUT 1 2 1 INSTALLATION SCHEDULE: 1 FY 05 2 3 4 1 2 FY06 3 4 1 2 3 4 1 2 FY07 3 4 1 FY 04 2 3 $ 0.0 0.0 20 MOS FY 2000: PY Qty Total Qty 2 CONTRACT DATES: INSTALLATION SCHEDULE: TC 19.6 0.0 3.0 20.4 18.3 ADMINISTRATIVE LEADTIME: $ FY 07 Qty $ $ 0.0 0.0 Qty FY 06 Qty $ Qty 4 TC TOTAL INPUT 5 OUTPUT 4 Notes/Comments: FY99 hardware buy is EDM upgrade. Install is not priced seperately in FY01 because it is a turnkey installation. P-1 Shopping List - Item No. 42 Page 11 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification $ UNCLASSIFIED June 2001 MODIFICATION TITLE: COBLU-SHORE COST CODE 1U004/1U776 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: (U) The COBLU Phase provides comprehensive surface tactical CESM capability into the 21st century and focuses on a total update of OUTBOARD sensors DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ 1 6.7 0 0.0 FY 01 Qty $ 0.0 6.7 FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 0.4 1 0.4 0.0 0.0 3 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 FY 2003: DELIVERY DATES: FY 2000: Feb-02 FY 2001: FY 2002: FY 2003: 4 1 2 INPUT 1 OUTPUT 1 FY 05 INSTALLATION SCHEDULE: 1 2 3 4 1 2 FY 02 3 FY06 3 FY 03 0.0 0.0 0.4 7.1 20 MOS FY 2002: 3 6.7 1 0.0 0.4 0.0 0.4 ADMINISTRATIVE LEADTIME: FY 01 1 0.4 FY 2001: 2 $ 1 Jun-00 1 Qty 0.4 FY 2000: PY Total $ 1 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty FY 04 4 1 2 3 4 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 1 OUTPUT 1 Notes/Comments: * Production Support shown on P3-A, COBLU SHIP P-1 Shopping List - Item No. 42 Page 12 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: SSEE INCREMENT D- SHIP COST CODE 1U008/1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: (U) The SSEE Program will provide the battle group the capability to exploit Signals Of Interest (SOI) by providing a state-of-the-art system which detects, acquires, and collects data on any potential threat to the battle group. This information, in conjunction with Combat/EW Systems and C3I elements, supports the tactical combat decision making process and the national or strategic collection objective DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 7 6.3 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 7 1.2 PRIOR YR EQUIP 7 1.2 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 1.2 TOTAL PROCUREMENT COST 0.0 7.5 METHOD OF IMPLEMENTATION: FY 00 Qty $ 7 6.3 FY 01 Qty $ 4 3.8 0.7 0.8 7 0.9 7 0.9 FY 02 Qty $ 4 4.0 0.3 0.1 4 0.7 4 0.7 1.7 8.7 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 4 0.7 4 0.7 22 7 7 4 4 0 0 0 0 0 0 0.8 0.8 4.9 5.1 ADMINISTRATIVE LEADTIME: 0.0 0.0 3 MOS 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: FY 2001: Jan-01 FY 2002: Jan-02 FY 2003: DELIVERY DATES: FY 2000: Jun-00 FY 2001: Jun-01 FY 2002: Jun-02 FY 2003: FY 01 2 3 4 1 2 FY 02 3 FY 03 4 INPUT 14 4 4 OUTPUT 14 4 4 FY 05 INSTALLATION SCHEDULE: 1 2 3 4 1 2 FY06 3 4 $ 20.4 1.3 1.0 Jan-00 1 Total Qty 0.3 0.1 FY 2000: PY $ 22 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 3.5 1.2 0.9 0.7 0.7 0.0 0.0 0.0 0.0 0.0 0.0 4.5 26.2 5 MOS FY 04 1 2 3 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 22 OUTPUT 22 Notes/Comments P-1 Shopping List - Item No. 42 Page 13 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: T-RDF ANTENNAS-SHIP COST CODE 1U010 / 1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: (U) Transportable Radio Direction Finding (T-RDF) is a complets communication band shipboard T-RDF system for signal acquisition and bearing computation for surface combantants and is designed to opertate in the harsh shipboard enviornment. A total of 44 associated antenna suites will be procured. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 9 0.7 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 4 0.5 PRIOR YR EQUIP 4 0.5 FY 00 EQUIP FY 00 Qty $ 4 0.5 FY 01 Qty $ 2 0.4 0.3 0.1 4 0.8 4 0.8 FY 01 EQUIP FY 02 Qty $ 7 1.4 0.1 0.2 2 1.1 2 1.1 FY 02 EQUIP FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ TC Qty $ 22 0.1 0.3 4 2.3 4 2.3 1 0.6 1 0.6 FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP 0.0 0.0 0.5 1.2 0.9 1.7 1.3 2.6 1.8 4.1 ADMINISTRATIVE LEADTIME: 0.0 0.0 3 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 6 MOS CONTRACT DATES: FY 2000: Mar-00 FY 2001: Jan-01 FY 2002: Jan-02 FY 2003: DELIVERY DATES: FY 2000: Aug-00 FY 2001: Jun-01 FY 2002: Jun-02 FY 2003: FY 01 INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 FY 02 3 FY 03 4 INPUT 8 2 4 OUTPUT 8 2 4 FY 05 INSTALLATION SCHEDULE: 1 2 3 4 1 2 FY06 3 4 $ 3.0 0.5 0.6 FY 03 EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: Total Qty 15 4 4 2 4 0 0 0 0 1 0 0.6 0.6 FY 04 1 2 3 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 1 15 OUTPUT 1 15 Notes/Comments: *FY 99 reflects the procurement of individual antennas vice a suite of antennas which is reflected in the procurement quantities FY 00-FY 07. Each installed suite includes 1 mast and 6 deck edge antennas. These installs are required to utilize the T-RDF systems as carry-on hardware during critical missions P-1 Shopping List - Item No. 42 Page 14 of 30 . Exhibit P-3A, Individual Modification Program Unclassified Classification 5.3 0.5 0.8 1.1 2.3 0.0 0.0 0.0 0.0 0.6 0.0 5.9 9.4 UNCLASSIFIED June 2001 MODIFICATION TITLE: Battle Group Passive Horizon Extension System-Surface Terminal (BGPHES-ST) -Ship COST CODE XU001/1U019/XU777/1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: (U) The Battle Group Passive Horizon Extension System-Surface Terminal (BGPHES-ST) extends the Battle Groups line-of-sight radio horizon by controlling remote receivers in an aircraft sensor payload. BGPHES-ST provides the ability for cryptologic operators to monitor, record, and analyze selected signal of interest. Reports can be prepared and information disseminated from BGPHES-ST via the Tactical Intelligence Information Exchange System (TACINTEL) or directly to the host ship’s C4I network. Total inventory objective for BGPHES-ST is 34 which consist of 31 Ship installations and 3 Shore Installations. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 7 9.2 4 6.7 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 3 2.4 4 3.4 PRIOR YR EQUIP 3 2.4 4 3.4 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 2.4 3.4 TOTAL PROCUREMENT COST 11.6 10.1 METHOD OF IMPLEMENTATION: FY 00 Qty $ 1 1.7 FY 01 Qty $ 0 0.0 0.8 0.4 4 4 2.1 2.1 FY 02 Qty $ 2 3.6 0.2 0.2 1 0.5 1 0.5 2.5 5.0 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 0 0.0 0 0.0 0 0.7 0.1 0.9 3.9 ADMINISTRATIVE LEADTIME: 0.0 0.0 0.0 0.0 2 MOS 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 17 MOS FY 2001: FY 2002: Dec-01 FY 2003: DELIVERY DATES: FY 2000: May-01 FY 2001: FY 2002: Dec-02 FY 2003: FY 01 2 3 4 INPUT 11 1 OUTPUT 11 1 1 2 1 2 FY 05 INSTALLATION SCHEDULE: 1 2 3 4 FY 02 3 FY06 3 $ 21.2 1.2 0.7 Dec-99 1 Total Qty 0.2 0.1 FY 2000: PY $ 14 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty FY 03 4 1 2 3 4 4 1 2 FY07 3 4 1 2 FY 04 3 0 12 11 1 0 0 0 0 0 0 0 0 0.0 0.0 8.4 7.9 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.1 31.5 4 TC TOTAL INPUT 12 OUTPUT 12 Notes/Comments P-1 Shopping List - Item No. 42 Page 15 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: Battle Group Passive Horizon Extension System-Surface Terminal (BGPHES-ST) (XU001/XU776) - Shore COST CODE XU001/XU776 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 2 2.4 1 1.7 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 2 0.1 PRIOR YR EQUIP 2 0.1 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.1 TOTAL PROCUREMENT COST 2.4 1.8 METHOD OF IMPLEMENTATION: FY 00 Qty $ FY 01 Qty $ 2 3.4 1 1.8 1 1 0.3 0.3 2 1.0 2 1.0 0.3 3.7 FY 02 Qty $ 1 0.2 1 0.2 FY 03 Qty $ 0 FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 1.0 0.2 0.0 2.8 0.2 0.0 ADMINISTRATIVE LEADTIME:3 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 Dec-99 FY 2001: Dec-00 FY 2002: FY 2003: DELIVERY DATES: FY 2000: May-01 FY 2001: May-02 FY 2002: FY 2003: FY 01 1 2 3 4 1 2 FY 02 3 FY 03 4 INPUT 3 2 1 OUTPUT 3 2 1 FY 05 INSTALLATION SCHEDULE 1 2 3 4 1 2 FY06 3 4 Total Qty $ 6 9.3 6 3 2 1 0 0 0 0 0 0 0 1.6 0.4 1.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 10.9 0.0 0.0 12 MOS FY 2000: PY $ 0 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty FY 04 1 2 3 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 6 OUTPUT 6 Notes/Comments * Production Support on P-3A, BGPHES-ST -SHIP P-1 Shopping List - Item No. 42 Page 16 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: BGPHES-ST Airborne Test Fixture (BATF) 1U021 Test fixture for simulating airborne payloads in the absence of airborne assets. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ FY 01 Qty $ 1 FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 0.0 0.0 0.0 1 0.0 1 0.0 0 0 0.0 1.8 0.0 0.0 1.8 0.0 ADMINISTRATIVE LEADTIME: 0.0 0.0 3 Months 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 12 Months FY 2002: FY 2003: DELIVERY DATES: FY 2000: FY 2001: Mar-02 FY 2002: FY 2003: FY 01 3 FY 02 4 1 2 FY 03 3 INPUT 1 OUTPUT 1 INSTALLATION SCHEDULE: 1 2 FY 05 3 4 1 2 FY06 3 1.8 1 Mar-01 2 1 0.0 FY 2001: 1 Total Qty $ 1 FY 2000: PY $ 1.8 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 0.0 0.0 0.0 0.0 FY 04 4 1 2 3 4 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 1 OUTPUT 1 Notes/Comments: FY02 Install is a turnkey installation with no cost associated with the install. P-1 Shopping List - Item No. 42 Page 17 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: BGPHES-ST SYGATE Upgrade Kits - Ship 1U024/1U777 BGPHES-ST SYGATE allows for real time airborne payload connection/control using over-the horizon satelite communications as the link and allows the ship to conduct operations without a line of sight, dedicated asset. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 0.6 10 1.6 6 0.2 4 0.2 10 0.4 6 0.2 4 0.2 6 4 0 0.2 0.2 0.0 0 0 0.4 2.0 0.2 1.2 0.2 0.0 0.8 0.0 ADMINISTRATIVE LEADTIME: 0.0 0.0 2 Months 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 4 Months FY 2001: Feb-01 FY 2002: FY 2003: DELIVERY DATES: FY 2000: Jan-01 FY 2001: Jun-01 FY 2002: FY 2003: 3 4 1 2 FY 02 3 INPUT 1 4 1 3 1 OUTPUT 1 4 1 3 1 3 4 1 2 FY06 3 FY 01 2 FY 05 INSTALLATION SCHEDULE: 1 2 $ 4 Feb-00 1 Qty 1.0 FY 2000: PY Total $ 6 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty FY 03 0.0 0.0 0.0 0.0 FY 04 4 1 2 3 4 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 10 OUTPUT 10 Notes/Comments: * Production Support shown on P-3A, BGPHES-ST SHIP P-1 Shopping List - Item No. 42 Page 18 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: BGPHES-ST SYGATE Upgrade Kits - Shore 1U024/1U777 BGPHES-ST SYGATE allows for real time airborne payload connection/control using over-the horizon satelite communications as the link and allows the ship to conduct operations without a line of sight, dedicated asset. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 2 0.3 3 0.5 1 0.04 2 0.1 3 0.1 1 0.04 2 0.1 1 2 0 0.04 0.1 0.0 0 0 0.1 0.6 0.0 0.2 0.1 0.0 0.4 0.0 ADMINISTRATIVE LEADTIME: 0.0 0.0 2 Months 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 4 Months 0.0 0.0 Feb-00 FY 2001: Feb-01 FY 2002: FY 2003: DELIVERY DATES: FY 2000: Jan-01 FY 2001: Jun-01 FY 2002: FY 2003: 1 FY 01 2 3 4 INPUT 0 2 1 OUTPUT 0 2 1 FY 05 2 3 4 INSTALLATION SCHEDULE: 1 Total Qty $ 0.2 FY 2000: PY $ 1 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 1 2 1 2 FY 02 3 FY 03 FY06 3 0.0 0.0 FY 04 4 1 2 3 4 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 3 OUTPUT 3 Notes/Comments: * Production Support shown on P-3A, BGPHES-ST SHIP P-1 Shopping List - Item No. 42 Page 19 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: BGPHES-ST PROFORMA Upgrade Kits - Ship COST CODE 1U026 /1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: BGPHES-ST PROFORMA will convert BGPHES-ST (V.1) system to (V.2) system , thus allowing for insertion of ELINT and Proforma subsystems. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 4 0.8 5 1.0 1 0.5 4 2.0 5 2.5 1 0.5 0 4 0.0 2.0 2 4 0.1 0.2 0.5 0.5 2.0 0.0 0.0 1.0 0.0 0.0 ADMINISTRATIVE LEADTIME: 2 Months 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 10 Months Feb-00 FY 2001: Dec-00 FY 2002: FY 2003: DELIVERY DATES: FY 2000: Nov-00 FY 2001: Dec-01 FY 2002: FY 2003: 1 2 FY 02 3 4 FY 01 1 2 3 4 FY 03 INPUT 0 1 1 1 1 1 OUTPUT 0 1 1 1 1 1 1 2 FY 05 INSTALLATION SCHEDULE: 1 2 3 4 Total Qty $ 0.2 FY 2000: PY $ 1 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty FY06 3 4 0.0 0.0 0.0 0.0 2.5 1.5 FY 04 1 2 3 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 5 OUTPUT 5 Notes/Comments: * Production Support shown on P-3A, BGPHES-ST SHIP P-1 Shopping List - Item No. 42 Page 20 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: BGPHES-ST PROFORMA Upgrade Kits - Shore COST CODE 1U026 /1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: BGPHES-ST PROFORMA will convert BGPHES-ST (V.1) system to (V.2) system , thus allowing for insertion of ELINT and Proforma subsystems. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 1 0.2 1 0.1 1 0.1 1 0.1 1 0.1 0.1 0.5 0.0 0.0 0.0 1.0 0.0 0.0 ADMINISTRATIVE LEADTIME: 2 Months 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 10 Months Feb-00 FY 2001: Dec-00 FY 2002: FY 2003: DELIVERY DATES: FY 2000: Nov-00 FY 2001: Dec-01 FY 2002: FY 2003: FY 01 INPUT 0 OUTPUT 0 1 2 3 4 1 2 1 2 FY 02 3 FY 03 0.0 0.0 0.0 0.0 0.1 1.5 FY 04 4 1 2 3 4 4 1 2 FY07 3 4 1 2 3 4 1 1 FY 05 INSTALLATION SCHEDULE: Total Qty $ 0.2 FY 2000: PY $ 1 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 1 2 3 4 FY06 3 TC TOTAL INPUT 1 OUTPUT 1 Notes/Comments: * Production Support shown on P-3A, BGPHES-ST SHIP P-1 Shopping List - Item No. 42 Page 21 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: Common Data Link - NAVY (CDL-N) - Ship COST CODE XU003/1U027/XU777/1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Will provide a wideband data link between Navy/Joint Airborne systems and the shipboard processors of national tactical reconnaissance programs. It is designed to communicate with the BGPHES-ST, the Joint Services Imagery Processing System - Navy (JSIPS-N), the Aircraft Carrier Tactical Support Center (CV-TSC), and the Joint Surveillance Target Attack Radar System (JSTARS). DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 7 50.9 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 3 3.7 PRIOR YR EQUIP 3 3.7 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 3.7 TOTAL PROCUREMENT COST 54.6 METHOD OF IMPLEMENTATION: FY 99 $ 4 27.4 FY 00 Qty $ 0 0.0 FY 01 Qty $ 2 13.5 3.5 0.4 4 4 5.0 5.0 5.0 32.4 3 3 3.4 3.4 FY 02 Qty $ 2 0.8 0.2 1 1 1.1 1.1 3.8 7.3 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 13.7 2 2.2 2 2.2 1.3 2.4 15.6 16.9 ADMINISTRATIVE LEADTIME: 0.0 0.0 2 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: FY 2001: Dec-00 FY 2002: Dec-01 FY 2003: FY 2001: Mar-02 FY 2002: Mar-03 FY 2003: FY 01 INPUT 10 1 OUTPUT 10 1 FY 02 3 4 1 2 1 FY 05 INSTALLATION SCHEDULE: 1 2 3 4 1 2 FY 03 3 1 7.3 16 112.8 4 3 3.6 2 1 2.4 1.2 3.6 10.9 16 11 0 2 0 0 0 0 0 2 1 19.0 13.2 0.0 2.2 0.0 0.0 0.0 0.0 0.0 2.4 1.2 19.8 137.7 15 MOS FY 2000: 2 $ 0.0 0.0 FY 2000: 1 Qty 5.1 0.8 DELIVERY DATES: PY Total $ 0.8 0.2 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty FY 04 1 2 3 4 1 2 FY07 3 4 1 2 3 4 1 1 1 FY06 3 4 TC TOTAL INPUT 3 16 OUTPUT 3 16 Notes/Comments P-1 Shopping List - Item No. 42 Page 22 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: Common Data Link - NAVY (CDL-N) - Shore COST CODE XU003/1U027/XU776/1U776 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Will provide a wideband data link between Navy/Joint Airborne systems and the shipboard processors of national tactical reconnaissance programs. It is designed to communicate with the BGPHES-ST, the Joint Services Imagery Processing Sysem - Navy (JSIPS-N), the Aircraft Carrier Tactical Support Center (CV-TSC) and the Joint Survillance Target Attack Radar System (JSTARS). DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 1 3.8 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 3.8 METHOD OF IMPLEMENTATION: FY 00 Qty $ 3 FY 01 Qty $ FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 4 1 3 0.0 19.6 3.4 0.5 2.9 3.4 0.0 0.0 1.5 0.0 0.0 ADMINISTRATIVE LEADTIME 2 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 Dec-99 FY 2001: FY 2002: FY 2003: DELIVERY DATES: FY 2000: Mar-01 FY 2001: FY 2002: FY 2003: FY 01 1 2 3 4 INPUT 0 2 1 1 OUTPUT 0 1 1 2 3 4 1 2 1 2 FY 05 INSTALLATION SCHEDULE: 1 2 FY 02 3 FY06 3 FY 03 Qty $ 4 23.4 4 1 3 3.4 0.5 2.9 0.0 0.0 3.4 26.8 15 MOS FY 2000: PY Total $ 19.6 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty FY 04 4 1 2 3 4 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 4 OUTPUT 4 Notes/Comments * Production Support shown on P-3A, CDL-N SHIP P-1 Shopping List - Item No. 42 Page 23 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: CDL-N ATM Backfit Kits - Ship COST CODE XU007/1U028/XU777/1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Increases the CDL-N capability as follows: adds an ATM Network Interface Unit (NIU) for interoperability with TCDL equipped Navy aircraft, increases the Command Link to 10.71 Mbps, and adds wideband bulk encryption for interoperability with USAF Dual Data Link II equipped Special Aircraft and Global Hawk HAE UAV. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY FY 98 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: FY 99 $ FY 00 Qty $ FY 01 Qty $ 3 2.3 FY 02 Qty $ 2 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ 0.0 0.0 3 0.3 3 0.3 0.0 0.0 0.3 0.0 2.3 1.8 ADMINISTRATIVE LEADTIME: 2 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 Dec-00 FY 2002: Dec-01 FY 2003: FY 2001: Dec-01 FY 2002: Dec-02 FY 2003: FY 01 FY 02 4 1 FY 03 2 3 INPUT 0 2 1 OUTPUT 0 1 2 2 FY06 3 FY 05 INSTALLATION SCHEDULE: 1 2 3 4 5 3.8 1 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 4.1 12 MOS FY 2001: 3 $ 3 0 0 3 0 0 0 0 0 0 0 FY 2000: 2 Qty 0.0 0.0 FY 2000: 1 Total $ 0.0 DELIVERY DATES: PY TC Qty 1.5 CONTRACT DATES: INSTALLATION SCHEDULE: FY 07 Qty $ FY 04 4 1 2 3 4 4 1 2 FY07 3 4 1 2 3 4 TC TOTAL INPUT 3 OUTPUT 3 Notes/Comments * Production Support shown on P-3A, CDL-N Ship. P-1 Shopping List - Item No. 42 Page 24 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: CDL-N ATM Backfit Kit - Shore COST CODE XU007/1U028/XU776/1U776 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Increases the CDL-N capability as follows: adds and ATM Network Inteface Unit (NIU) for interoperability with TCDL equipped Navy aircraft, increases the Command Link to 10.71 Mbps, and adds wideband bulk encryption for interoperability with USAF Dual Data Link II equipped Special Aircraft and Global Hawk HAE UAV. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: FY 99 $ FY 00 Qty $ 3 0.0 0.0 FY 01 Qty $ 2.3 3 0.3 3 0.3 0.0 2.3 FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 3.1 0 0.0 3 0.3 3 0.3 0 0.0 0.3 0.0 0.1 0.3 0.8 0.1 ADMINISTRATIVE LEADTIME: 2 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 Jul-00 FY 2001: FY 2002: Dec-01 FY 2003: Jul-01 FY 2001: FY 2002: Dec-02 FY 2003: FY 01 FY 02 3 4 1 INPUT 0 1 2 OUTPUT 0 1 1 1 3 4 1 1 2 0.1 3.4 FY 04 2 3 4 1 2 3 4 2 FY06 3 4 1 2 FY07 3 4 FY 05 INSTALLATION SCHEDULE: FY 03 0.0 0.0 12 MOS FY 2000: 2 $ 4 FY 2000: 1 Qty 0.8 DELIVERY DATES: PY Total $ 1 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 1 2 3 4 TC TOTAL INPUT 3 OUTPUT 3 Notes/Comments * Production Support shown on P-3A, CDL-N, Ship. P-1 Shopping List - Item No. 42 Page 25 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: CDL-N - Dual Band Backfit Kit - Ship COST CODE XU009/XU777 /1U777 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Adds Ku-band capability to the X-band only systems. All current CDL efforts in the Navy are for Ku-band airborne systems. Without the Dual Band Backfit Kit, the CDL-N system would not have the ability to receive Ku-band sensor data to ship processors. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 1 OTE 1 1 1.3 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 1.3 METHOD OF IMPLEMENTATION: FY 00 Qty $ 1 FY 01 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 0.2 0.2 1 0.1 1 0.1 0.2 1.6 0.1 0.0 0.0 0.1 0.0 0.0 ADMINISTRATIVE LEADTIME2 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 Jul-00 FY 2001: FY 2002: FY 2003: DELIVERY DATES: FY 2000: Apr-01 FY 2001: FY 2002: FY 2003: 4 1 2 FY 02 3 4 1 FY 03 2 3 4 1 2 FY06 3 4 1 2 FY 01 1 2 3 INPUT 2 1 OUTPUT 2 1 FY 05 INSTALLATION SCHEDULE: 1 2 3 Qty $ 3 2.7 3 2 1 0.3 0.2 0.1 FY07 3 0.0 0.0 0.3 3.0 12 MOS FY 2000: PY Total $ 0.0 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 1.2 0.0 2 2 FY 02 Qty $ FY 04 4 4 1 2 3 4 TC TOTAL INPUT 3 OUTPUT 3 Notes/Comments 1. ONE DUAL BAND BACK FIT KIT WAS PROCURED IN FY97 BUT WAS NOT SEPARATELY PRICED. AWARDED AS PART OF CDL SYSTEM CLIN. * Production Support Shown on P-3A, CDL-N Ship. P-1 Shopping List - Item No. 42 Page 26 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: ECP/Obsolecence - SHIP COST CODE 1U013/1U777 MODELS OF SYSTEMS AFFECTED: Technology refresh procures COTS/NDI equipment to replace obsolete and unsupportable equipment for the SSEE, COBLU, BGPHES-ST and COMBAT DF/ADAS programs. These changes allow for a common logistic support baseline for these DESCRIPTION/JUSTIFICATION: programs and provides the hardware to support the DII COE/GCCS-M software upgrades. Additionally this line supports the procurement of the Cryptologic On-Line Trainer (COLT) hardware for Shipboard IW team training and procurement of antenna modification kits to extend the frequency range/performance of the existing shipboard DF and acquisition antennas. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: FY 99 FY 00 $ 0.0 0.0 Qty FY 01 $ FY 02 FY 03 Qty $ Qty $ VAR 0.8 VAR 0.0 0.0 Qty FY 04 Qty FY 05 $ Qty $ $ cont VAR cont 0.1 cont cont VAR 0.7 cont VAR 0.7 FY 2000: FY 2001: Mar-01 FY 2002: FY 2003: FY 2000: FY 2001: Jun-01 FY 2002: FY 2003: FY 01 INPUT 0 OUTPUT 0 1 2 1 2 FY 02 VAR VAR VAR VAR VAR VAR VAR VAR VAR VAR VAR VAR VAR cont 0.0 0.0 0.0 0.7 0.9 2.8 2.5 3.7 3.7 cont cont cont FY 04 3 4 1 2 3 4 1 2 3 4 3 4 1 2 FY06 3 4 1 2 FY07 3 4 FY 05 INSTALLATION SCHEDULE: FY 03 cont cont 6 MOS DELIVERY DATES: PY cont cont cont 0.0 0.0 CONTRACT DATES: INSTALLATION SCHEDULE: Qty Total 1.4 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: Qty TC $ 0.0 0.0 Qty FY 07 Qty 0.0 0.0 2 MOS $ FY 06 $ 0.0 0.7 0.8 2.2 ADMINISTRATIVE LEADTIME: $ 1 2 3 4 TC TOTAL INPUT OUTPUT Notes/Comments No install dollars associated with FY01 ECP/OBS Equipment because it was a joint installation with the ADAS/T-STAR Mod Kits. P-1 Shopping List - Item No. 42 Page 27 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: ECP/OBSOLECENCE - SHORE COST CODE 1U013/1U777 MODELS OF SYSTEMS AFFECTED: Technology refresh procures COTS/NDI equipment to replace obsolete and unsupportable equipment for the SSEE, COBLU, BGPHES-ST and COMBAT DF/ADAS programs. These changes allow for a common logistic support baseline for these DESCRIPTION/JUSTIFICATION: programs and provides the hardware to support the DII COE/GCCS-M software upgrades. Additionally this line supports the procurement of the Cryptologic On-Line Trainer (COLT) hardware for Shipboard IW team training and procurement of antenna modification kits to extend the frequency range/performance of the existing shipboard DF and acquisition antennas. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support * Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: FY 99 $ 0.0 0.0 FY 00 Qty $ FY 01 Qty $ 0.0 0.0 FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ VAR cont VAR 0.2 cont. VAR 0.2 VAR VAR VAR VAR VAR VAR VAR VAR VAR VAR var cont 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 cont cont cont 0.0 0.2 0.0 0.7 ADMINISTRATIVE LEADTIME: 0.0 0.0 2 MOS 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 6 MOS FY 2001: FY 2002: FY 2003: FY 2001: FY 2002: FY 2003: FY 01 INPUT 0 OUTPUT 0 1 2 FY 02 FY 04 3 4 1 2 3 4 1 2 3 4 3 4 1 2 FY06 3 4 1 2 FY07 3 4 FY 05 INSTALLATION SCHEDULE: FY 03 cont. cont. cont. 0.0 0.0 FY 2000: 2 $ cont. FY 2000: 1 Qty 0.5 DELIVERY DATES: PY Total $ VAR CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 1 2 3 4 TC TOTAL INPUT OUTPUT Notes/Comments * Production Support shown on P-3A, Technology Refresh-Ship P-1 Shopping List - Item No. 42 Page 28 of 30 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE SHIPBOARD IW EXPLOIT SYSTEMS 2360 FISCAL YEAR COST ITEM/MANUFACTURER/ FISCAL CARRY CODE PROCUREMENTY YEAR YEAR OVER CY00 01 CALENDAR YEAR SUBHEAD NO. 521U FISCAL YEAR 01 02 CALENDAR YEAR 02 L A O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S T C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 1 1 1 1 1U001 1U001 ADAS ADAS 99 00 5 4 1U015 ADAS T-STAR MOD KITS 00 8 1U004 1U004 1U004 COBLU PHASE 1 SYSTEM COBLU PHASE 1 SYSTEM COBLU PHASE 1 SYSTEM 00 01 02 3 3 2 1U008 1U008 1U008 SSEE PHASE 2 INCREMENT D SSEE PHASE 2 INCREMENT D SSEE PHASE 2 INCREMENT D 00 01 02 0 4 4 1U020 SMDA Equipment 02 7 1U009 1U009 1U009 T-RDF SYSTEMS T-RDF SYSTEMS T-RDF SYSTEMS 00 01 02 0 2 3 A 1U010 1U010 1U010 T-RDF ANTENNAS T-RDF ANTENNAS T-RDF ANTENNAS 00 01 02 0 2 7 A 1U019 1U019 1U019 BGPHES-ST BGPHES-ST BGPHES-ST 00 01 02 3 1 2 1U021 BATF 01 1 1U024 1U024 SYGATE Upgrade Kits SYGATE Upgrade Kits 00 01 7 6 1U026 1U026 PROFORMA Upgrade Kits PROFORMA Upgrade Kits 00 01 2 4 1 2 1 1 1 2 1 1 1 2 0 1 1 1 0 1 1 A A 2 1 0 0 0 0 2 A 2 2 A 2 2 2 A 1 1 1 0 0 0 2 0 0 0 1 0 1 2 A 1 1 2 2 1 1 A 1 A 1 NOV 1 A 1 3 1 2 1 2 0 0 2 1 A DEC 0 0 0 1 A 1 JAN FEB MAR R 0 0 A OCT APR MAY JUN JUL AUG SEP OCT NOV 0 0 1 1 1 1 DEC JAN FEB MAR APR MAY PRODUCTION RATE Manufacturer’s Name and Location MSR 1-8-5 MAX 1U004 - COBLU Phase 1 Systems 1U008 - SSEE Phase 2 Inc D* 1U017 - SSEE Phase 2 Increment E Variant 1 1U009 - T-RDF Systems 1U010 - T-RDF Antennas 1U020 - SMDA Equipment 1U019 - BGPHES-ST 1U024 - Sygate Upgrade Kits 1U026 - PROFORMA Upgrade Kits 1U027 - CDL-N SANDERS, NH Various Competitive, TBD SWRI SA, Texas 2 4 12 2 8 10 SWRI SA, Texas 2 16 20 TBD Various Various Various L3 Communications, UT L3 Communications, UT * * * 2 2 2 2 2 5 5 5 4 3 15 15 15 5 6 P-1 Shopping List - Item No. 42 Page 29 of 30 JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP PROCUREMENT LEADTIMES ITEM 1U028 - DSM/ATM Backfit Kits * SSEE is COTS procurement, there is no MSR or MAX *TBD- Competitive Contract to be awarded FY01. NAVMAT FORM 7110/4 (REVISED 11/77) FISCAL YEAR 03 CALENDAR YEAR 03 ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure Exhibit P-21A, Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE: PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE SHIPBOARD IW EXPLOIT SYSTEMS 2360 FISCAL YEAR COST ITEM/MANUFACTURER/ FISCAL CARRY CODE PROCUREMENTY YEAR YEAR OVER XU003 CDL-N 1U027 CDL-N 1U027 CDL-N 00 XU007 ATM KITS 1U028 ATM KITS 1U028 ATM KITS XU008 TEST EQUIPMENT XU009 DUAL BAND BACKFIT KITS 01 3 2 02 2 00 02 3 3 3 00 1 00 1 01 CY00 01 CALENDAR YEAR SUBHEAD NO. 521U FISCAL YEAR 01 02 CALENDAR YEAR 02 L 03 A O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S T C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P R 1 1 1 A 1 0 0 2 1 A 1 1 1 A 1 A 1 0 0 0 1 1 0 1 OCT NOV DEC JAN FEB MAR APR 0 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR PRODUCTION RATE Name and Location MSR 1-8-5 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP PROCUREMENT LEADTIMES Manufacturer’s ITEM FISCAL YEAR 03 CALENDAR YEAR MAX ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure NAVMAT FORM 7110/4 (REVISED 11/77) P-1 Shopping List - Item No. 42 Page 30 of 30 Exhibit P-21A, Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE: APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY FY 2000 FY 2001 P-1 ITEM NOMENCLATURE Common High Bandwidth Data Link FY 2002 FY 2003 FY 2004 FY 2005 2434 FY 2006 June 2001 SUBHEAD 52XU TO COMP TOTAL QUANTITY COST (in millions) $35.3 Note: Common High Bandwidth Data Link transfers to the SHIPBOARD IW EXPLOIT SYSTEMS BLI 2360 in FY 01. Detail budget justification material for PY through FY00 is included in the SHIPBOARD IW EXPLOIT SYSTEMS for budget comparability. PROGRAM COVERAGE: (U) The Battle Group Passive Horizon Extension System (BGPHES AND/ULQ-20) extends the Battle Group’s line-of-sight radio horizon by controlling remote receivers in an aircraft sensor payload. Intercepted signals of interest are sent via the Common High Bandwidth Data Link (CHBDL) to the surface terminal (BGPHES-ST). BGPHES-ST is interoperable with the USAF Direction Finding/Communication Intelligence (DF/COMINT) and can be expanded to provide Electronic Intelligence (ELINT) coverage. BGPHES will become the Navy’s Signals Intelligence (SIGINT) component of the Distributed Common Ground Station (DCGS) and be multi-service interoperable and Joint SIGINT Avionics Family (JSAF) compliant. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: (U) The BGPHES-ST provides the ability for cryptologic operators to monitor, record and analyze selected signals of interest. Reports can be prepared and information disseminated from the surface terminal via the Tactical Intelligence Information Exchange System (TACINTEL) or directly to the host ship’s C4I network. BGPHES-ST is a fully digital, open architecture system residing on the SCI-GCSS LAN. It utilizes full Cryptologic Unified Digital Special Signals Processor, Desperado and GCP-8 ELINT processors will be added to the surface terminal to complement the Airborne receive and the Local VME (Versa Module Europa) Extended for Instrumentation (VUI) receive subsystems. Beginning in FY 00, the BGPHES-ST portion of this budget has been consolidated into the Shipboard IW Exploit budget (NARM 2360). (U) The Common High Bandwidth Data Link - Shipboard Terminal (CHBDL - ST) will provide a wideband data link between Navy/Joint airborne sensor systems and the shipboard processors of national second tactical reconnaissance programs. It is designed to communicate with the BGPHES, the Joint Services Imagery Processing System - Navy (JSIPS-N), the Aircraft Carrier Tactical Support Center (CV-TSC), and the Joint Surveillance Target Attack Radar System (Joint STARS). CHBDL - ST benefits the fleet by providing a horizon extension for line-of-sight sensor systems for use in battle damage assessment or mission planning and is interoperable with the USAF U2 ircraft. Test support equipment has been budgeted for FY2000 to procure Programmable Ground/Support Equipment (PGSE) for for CHBDL CDL, Common Data Link, interoperability tests with UAV flight tests and and manned aircraft flight tests. (U) FY 99 procures 5 BGPHES - ST systems, 5 CHBDL - ST systems, 1 Dual Band backfit kit, production support, and installation. (U) FY 00 procures 3 CHBDL - ST systems, 6 Dual Simultaneous Mission (DSM)/Asynchronous Transfer Mode (ATM) backfit kits, 1 Dual Band backfit kit, 1 CHBDL test support equipment, production support, and installation. (U) FY 01 procures 2 CHBDL - ST systems, 3 Dual Simultaneous Mission (DSM)/Asynchronous Transfer Mode (ATM) backfit kits, production support, and installation. (U) Installation Agent(s): Installations are accomplished by formal shipalt by Alteration Installation Team (AIT). P-1 Shopping List - Item No. 43 -1 of 43 -1 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/BA-2 QUANTITY COST (In Millions) SPARES COST (In Millions) JUNE 2001 P-1 ITEM NOMENCLATURE SUBMARINE SUPPORT EQUIPMENT/256000/256005 Program Element for Code B Items: Prior Years DATE: Other Related Program Elements ID Code FY 2000 FY 2001 FY 2002 $39.3 $17.2 $22.9 ES SYSTEMS This program consolidates the following programs in FY2000: From: 251600 218000/05 232000/05 AN/WLQ-4 Sonar Support Equipment AN/WLR-1 To: 256000/05 Submarine Support Equipment Program SSEP: (U) The Submarine Support Equipment Program was established to develop and support systems which provide the capability to exploit signal intercepts for tactical support and early warning of threat sensors. Funds procure AN/BLQ-10(V)2/3 Electronic Warfare Support (ES) systems to provide a modern ES capability to SSN 688 and SEAWOLF Class Submarines. Funds also procure Reliability & Maintainability,obsolescence and Operational Field Change Kits for the AN/WLR-8(V)2, a tactical ES Receiver for the SSN 688 Class Submarines providing intercept, surveillance, and signal parameter analysis of electromagnetic signals for threat warning. Funds buy unique equipment in limited quantities that are maintained in a pool and rotated among attack submarines as dictated by scheduled operations and to provide specific capability improvements to major SSN sensor systems. This also procures support equipment for shore based acoustic iintelligence analysis centers. This program procures Field Changes to the AN/WLR-8 (V)2 Threat Detection System with an Instantaneous Frequency Monitoring (IFM) signal intercept capability that provides near 100% probability of intercept throughout the SHF and EHF frequency bands. This improvementsignificantly increases the systems’ capability to detect short duration and wideband threat emissions and will sustain the AN/WLR-8 as a viable ES System beyond FY-2010. A. ML003 - SSEP special support equipment allows the procurement of special purpose test equipment utilized by the Type Commander Groom Teams. Exact quantities vary from year to year based on Fleet requirements. Provides analysis equipment for SSEP Aural Analysis Booths at New London, CT; Pearl Harbor, HI; and San Diego, CA. Equipment is used for analysis of AN/BQH-5(V)4 acoustic intelligence data. Variable quantities and types are bought in each fiscal year. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 44 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY DATE: JUNE 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 SUBMARINE SUPPORT EQUIPMENT/256000/256005 B. ML005 - Procures AN/BRD-7 Reliability and Maintainability (R&M), obsolescence and operational Field Change Kits (i.e.); Digital Compression Filter, Bearing Calculator Upgrade, Signal Class Recognizer, AN/BRD-7 Integrated ES System Upgrade, and related H,M&E components. C. ML011 - Procures AN/WLR-8 R&M Field Change Kits (i.e.); Hunter Digital IF Analyzer and Processing Upgrades, Receiver Upgrade, Tactical Interface Data System (TIDS) SUBLAN Integration Upgrade, and Digital Display Unit (DDU) Obsolescence Upgrade, Specific Emitter Identification (SEID) Upgrade and Human/Machine Interface (HMI) Upgrades. D. ML013 - Procures special purpose test equipment to aid in testing and troubleshooting ES Systems at the Submarine Intermediate Maintenance Activity (IMAs) and depot facilities. E. ML015 - Procures the AN/BLQ-10(V)2/3 SSN ES Backfit System for installation on SSN 688 class and SEAWOLF Class submarines. F. ML016 - Procures HPI Reliability & Maintainability and obsolescence Field Change Kits (i.e.); Control Display Processor Unit (CDPU) and Receiver Processor Unit (RPU). G. ML017 - Procures AN/BLQ-10 (V) Product Improvement Field Change Kits. H. ML018 - Procures Integrated Electronic Mast, Sensors, and Subsystems for the AN/BLQ-10 (V) System. I. ML5IN - Provides for the Installation of Equipment including Fleet Modernization Program Installations for shipboard systems. J. MLDSA - The budget reflects the transfer of design services into the appropriate equipment P1 line item in accordance with full funding policy. K. MLXX1 - Procures the Troll COMINT Exploitation Suite. This line provides an enhanced COMINT exploitationcapability for the AN/BLQ-10 (V)2/3 System in support of CVBG, fleet and national operational requirements, implements Maritime Cryptologic Architecture (MCA), and is synchronized with Navy IT-21 to deliver critical intelligence to tactical, theater and national commanders in real time. L. MLXX2 - Procures the COMMS Acquisition and Direction Finding (CADF) capability for the AN/BLQ-10 (V)1 Land Base Trainer. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 44 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 SUBMARINE SUPPORT EQUIPMENT/256000/256005 AN/WLQ-4 (U) This line procures upgrades to the AN/WLQ-4(V)1 and modification kits resulting from redesign of obsolescent subassemblies of the AN/WLQ-4(V) Submarine ESM Systems. It procures spares and repair parts for the Mini-N-Suite. It supports training curricula updates for the WLQ-4(V)1 System. It procures upgrades to the AN/WLQ-4(V)/(V)1 software support and maintenance support equipment. Funding also procures Test Program Sets (TPS) which provide technical and workload capability to test all analog, digital, radio frequency, and hybrid spare units of the AN/WLQ-4(V)/(V)1 systems. TPSs are used with existing Automatic Test Equipment (ATE) located at the Repair Depot, SSC, San Diego. The Repair/Test Stations inlude ATE, TPS, test fixtures special repair tools, test equipment and documentation. The AN/WLQ-4 and AN/WLQ-4(V)1 Systems use many of the same modules. The description of each building block line item is as follows: A. ML019 - Reliability & Maintainability Mod Kits provides various AN/WLQ-4(V)1 upgrades, AN/WLQ-4(V)/(V)1 obsolescence replacement kits,, R&M Kits and Software Support Activity (SSA) equipment upgrades. B. ML020 - Mini-N-Suite - The funds will be used to purchase repair parts for the Mini-N-Suite. C. ML021 - AN/WLQ-4(V)1 Trainer - The funds will be used to procure curriculum updates associated with system upgrades and various R&M Mod Kits. D. ML022 - AN/WLQ-4(V)1 Depot Upgrade - The funds will be used to provide various upgrades to system Test Program Sets (TPS) as well as upgrades to Depot Test Support Equipment. E. ML024 - AN/WLQ-4(V)1 Intermediate Maintenance Activity (IMA) Support. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 44 PAGE NO. CLASSIFICATION: 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 SUBMARINE SUPPORT EQUIPMENT/256000/256005 SONAR SUPPORT EQUIPMENT Program provides significant OPNAV approvedperformance enhancementfield changes for in-service ASW sonars on submarines. It also provides life cycle support in producing field changes required because of aging, obsolete, or unreliable components or casualities. Funding is included for the installation of equipment including Fleet Modernization Program installations, trainer and shore site installations. In addition, various modifications to sonar general equipments are procured. This funding includes execution of the following major upgrades: A. ML025* - Procures planned improvements for ancillary sonars, including their support equipment and materials. Procurement of the AN/BQS-15 Remote Ahead Profiling (RAP) improvement began in FY96. RAP provides a major display improvement for under-ice and mine avoidance operations. The total objective is 29 kits. One kit was procured in FY96; ten in FY97 and six in FY98. Twelve (12) will be procured in later years. Procurement of nineteen (19) AN/UNQ-9 (IDARs replacement) systems in FY 98 and 39 iin FY 99 for all FAST ATTACK Submarines. These will be a COTS modified system. Procurement of thirty-two (32) COTS AN/BQN-17 UPGRADES, which is the primary depth sounder on SSN 688 Class Submarines, is planned FY-00. Procurement of the AN/BQS-15 EC-19 Precision Bottom Mapping Upgrade is planned to start in FY02. This upgrade assists the ship in making decisions on how to safely exit the minefield. The total objective is thirty two (32) kits. Nine (9) kits are planned for FY 02. B. ML026 - Provides engineering upgrades for the Signal Data Converter Storer (SDCS) Interface Units. Upgrades incorporate combat system updates, and Submarine Fleet Mission Profile Library. C. ML830 - Funds production engineering services that support procurement and installation of these systems. D. ML900 - Funds consulting services that support procurement and installation of these systems. E. ML5IN - Funds actual hardware installation during shipyard availabilities. *ML025 (AN/BQN-17) FY00 Total cost includes contractor first article costs. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 44 PAGE NO. CLASSIFICATION: 4 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY DATE: JUNE 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 SUBMARINE SUPPORT EQUIPMENT/256000/256005 AN/WLR-1G AIR - N78 A. ML027 - Funding is for the procurement of modification kits . These modification kits are required to replace obsolete and high maintenancecomponents and to extend the life cycle of the system on CV/CVNs. Requirements include the installation of COTS/NDI equipment and the installation and support of the upgraded equipment. B. ML5IN: Funding is for the installation of modification kits. These modification kits are required to replace obsolete and high maintenance components and to extend the life cycle of the system on CV/CVNs. Requirements include the installation of COTS/NDI equipment and the installation and support of the upgraded equipment. AN/WLR-1 SURFACE - N76 SURFACE WARFARE (N76): A. ML028 - Funding is for the procurement of modification kits. These modification kits are required to replace obsolete and high maintenancecomponents and to extend the life cycle of the system on WHEC Class Cutters. Requirements include the installatin of COTS/NDI equipment and the installation and support of the upgraded equipment. B. ML5IN: Funding is for the installation of modification kits. These modification kits are required to replace obsolete and high maintenance components and to extend the life cycle of the system on WHEC Class Cutters. Requirements include the installation of COTS/NDI equipment and the installation and support of the upgraded equipment.on WHEC Class Cutters. Requirements include the installatin of COTS/NDI equipment and the installation and support of the upgraded equipment. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 44 PAGE NO. 5 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA2: COMMUNICATION & ELECTRONIC EQUIPMENT ID Code P-1 ITEM NOMENCLATURE/SUBHEAD A SUBMARINE SUPPORT EQUIPMENT/H2ML/256000 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code FY 2000 Total Cost Quantity FY 2001 Unit Cost Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost SUBMARINE WARFARE (N77) ML003 SSEP Special Support Equipment 294 277 280 ML005 AN/BRD-7 FCKs 888 1,755 1,303 ML011 AN/WLR-8 R&M FCKs A 757 2,138 1,327 ML013 ESM IMA Support A ML015 AN/BLQ-10(V) SSN ES Backfit System A ML016 HPI R&M FCKs A 0 0 0 ML017 AN/BLQ-10(V) FCKs A 0 0 299 ML018 AN/BLQ-10(V) IEM, Sensors & Subystems A 0 0 0 R&M Kits: Mod Kits, ERTS/CRTS Upg., A 583 139 139 ML019 158 4 3,959 15,837 168 1 5,400 5,400 171 2 5,274 10,548 SSA, ADP & GFE ML020 Mini-N-Suite A 70 68 69 ML021 AN/WLQ(V) Trainer A 321 340 344 ML022 AN/WLQ-4(V)1 Depot Upgrade A 19 20 0 18,927 10,305 DD FORM 2446, JUN 86 0 P-1 SHOPPING LIST ITEM NO. 44 PAGE NO 14,480 CLASSIFICATION: 6. UNCLASSIFIED 0 UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy/BA-2 BA2: COMMUNICATION & ELECTRONIC EQUIPMENT ID Code P-1 ITEM NOMENCLATURE/SUBHEAD A SUBMARINE SUPPORT EQUIPMENT/H2ML/256000 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code FY 2000 Total Cost Quantity FY 2001 Unit Cost Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost SUBMARINE WARFARE (N77) ML024 AN/WLQ-4(V)1 IMA Support A ML025 Ancillary Sonar Improvement A 133 AN/BQS-15 EC-19 (Bottom Mapping) AN/BQN-17 (Upgrade) ML026 ADAP Engr. Upgrades/Sub. Flt. Mission 8 257 2,055 32 314 10,032 A 25 25 9 295 188 0 2,655 0 671 0 Profile Library ML027 Air AN/WLR-1H(V)7 Mod Kits - N78 A 2 489 ML028 Surface AN/WLR-1H(V)7 Mod Kits - N76 A 3 ML830 Sonar Production Support A 3,705 2,275 387 ML900 Sonar Consulting Services A 495 495 361 ML5IN FMP Installation of Equipment 477 959 1 499 499 1 492 492 1,430 1 515 515 3 494 1,482 AN/BLQ-10(V) SSN ES Backfit System A 0 760 1,186 AN/BLQ-10(V) SSN ES Backfit Sys DSA A 23 193 371 AN/BQS-15 EC-18 (RAP) A 0 445 0 AN/BQS-15 EC-18 (RAP) DSA A 0 150 0 AN/UNQ-9 (IDARS Replacement) A 117 147 150 AN/UNQ-9 (IDARS Replacement) DSA A 0 64 47 AN/BQS-15 (EC-19 Bottom Mapping) A 0 0 104 AN/BQS-15 (EC-19 Bottm. Mapping) DSA A 0 0 120 18,949 6,427 DD FORM 2446, JUN 86 0 P-1 SHOPPING LIST ITEM NO. 44 PAGE NO. 7,380 CLASSIFICATION: 7 UNCLASSIFIED 0 CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY Other Procurement, NavyBA-2 BA2: COMMUNICATION & ELECTRONIC EQUIPMENT ID Code P-1 ITEM NOMENCLATURE/SUBHEAD A SUBMARINE SUPPORT EQUIPMENT/H2ML/256000 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code FY 2000 Total Cost Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost MLXX1 TROLL COMINT Exploitation Suite 0 0 0 MLXX2 COMMS Acquisition & DF (CADF) 0 0 0 ML5IN FMP Installation of Equipment (Con’t) AN/BQN-17 Upgrade - N77 A 235 75 206 AN/BQN-17 DSA - N77 A 0 25 73 Air AN/WLR-1H(V)7 - N78 A Surface AN/WLR-1H(V)7 - N76 DD FORM 2446, JUN 86 0 P-1 SHOPPING LIST ITEM NO. 44 609 125 610 586 200 179 1,430 PAGE NO. 425 Quantity Unit Cost 1,068 CLASSIFICATION: 8 UNCLASSIFIED Total Cost 0 CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 SUBMARINE SUPPORT EQUIPMENT/256000/05 H2ML QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE ML015- AN/BLQ-10 4 3959.25 NASD 10/99 ML025 AN/BQN-17 ML025 BQS-15 EC-19 (BM) ML028 Sur.WLR-1H(V)7MK 32 8 3 313.500 256.875 476.666 NUWC NAVSEA NAVSEA 1 1 1 5400 499.0 515.0 NASD NAVSEA NAVSEA Cost Element/ FISCAL YEAR SUBHEAD CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE SS/FFP Lockheed Martin Syracuse, NY 12/99 8/01 YES N/A 10/99 10/99 05/01 C/FP C/FP C/FFP EDO NSWC CRANE COTS/NDI / TBD 3/00 2/00 9/01 9/00 8/00 5/02 YES YES YES N/A N/A N/A 10/00 05/01 05/01 SS/FFP C/FFP C/FFP Lockheed Martin COTS/NDI / TBD COTS/NDI / TBD 3/01 9/01 9/01 9/02 5/02 5/02 YES YES YES N/A N/A N/A FY-00 FY-01 ML015- AN/BLQ-10 ML027Air WLR-1H(V)7MK ML028 Sur.WLR-1H(V)7MK D. REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. PAGE NO. 44 9 Classification: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 SUBHEAD SUBMARINE SUPPORT EQUIPMENT/256000/05 H2ML QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE ML015- AN/BLQ-10 ML025 AN/BQS-15 EC-19 2 9 5,274.0 295.0 NASD NAVSEA 10/01 10/01 SS/FFP C/FP Lockheed Martin NSWC CRANE 3/02 10/01 9/03 7/02 YES YES N/A N/A ML027Air WLR-1H(V)7 1 3 492.0 494.0 NAVSEA NAVSEA 10/01 10/01 C/FFP C/FFP COTS/NDI / TBD COTS/NDI / TBD 10/01 10/01 6/02 6/02 YES YES N/A N/A Cost Element/ FISCAL YEAR FY-02 ML028 Sur.WLR-1H(V)7 D. REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. PAGE NO. 10 44 Classification: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION AN/BLQ-10 SSN ES Backfit SysTYPE MODIFICATION: Shipalt MODIFICATION TITLE: AN/BLQ-10(V)2/3 ML015 DESCRIPTION/JUSTIFICATION: Provides fully Integrated, covert, forward area radar signal intercept and ID capability for installation on SSN 688I and SSN 21 Submarines. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 4 15.8 1 5.4 2 10.6 0.0 1 1.0 3 1.6 4 15.8 1 5.4 2 10.6 EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER: CCM OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0 0.0 ITEM 44 PAGE 11 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: AN/BLQ-10 SSN ES Backfit Sys.MODIFICATION TITLE: ML015 INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AITs ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Mar-00 FY 2001: Mar-01 DELIVERY DATE: FY 2000: Sep-01 FY 2001: Sep-02 ($ in Millions) Prior Years FY 2000 Qty $ Qty $ Cost: FY 2001 Qty $ Qty AN/BLQ-10(V)2/3 18 Months FY 2002: FY 2002: FY 2002 $ Mar-02 Sep-03 FY 2003 Qty PRIOR YEARS FY 2000 EQUIPMENT 0.0 1 1.0 3 1.6 FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 In 0 0 0 0 1 0 0 2 4 1 Out 0 0 0 0 1 0 0 2 1 ITEM 44 PAGE 12 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION AN/BQS-15 TYPE MODIFICATION: MODIFICATION TITLE: Remote Ahead Profiling Upgrade ML025 DESCRIPTION/JUSTIFICATION: Provides enhanced display features for mine detection for SSN 688 Class Submarines. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 8 2.1 EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER: OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0 0.0 8 2.1 8 0.6 0 0.0 0 0.0 ITEM 44 PAGE 13 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: AN/BQS-15 INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: MODIFICATION TITLE: AITs 1 Month Feb-00 Jul-00 Remote Ahead Profiling Upgrade/ML025 PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A 5 Months FY 2002: FY 2002: N/A N/A ($ in Millions) Cost: Prior Years Qty $ FY 2000 Qty FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty PRIOR YEARS FY 2000 EQUIPMENT 8 0.6 FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 0 4 2 2 0 0 0 0 0 Out 0 4 2 2 0 0 0 0 0 ITEM 44 PAGE 14 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION AN/BQS-15 EC-19 BM TYPE MODIFICATION: MODIFICATION TITLE: Bottom Mapping ML025 DESCRIPTION/JUSTIFICATION: Provides ship capability to map littoral areas. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 9 2.7 3 0.2 EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER: OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0.0 0 0.0 0 0.0 0 0.0 9 2.7 ITEM 44 PAGE 15 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: AN/BSQ-15 EC19 INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: AITs 1 Month N/A N/A MODIFICATION TITLE: Bottom Mapping ML025 PRODUCTION LEADTIME: FY 2001: FY 2001: 5 FY 2002: FY 2002: Oct-01 Mar-02 ($ in Millions) Cost: Prior Years Qty $ FY 2000 Qty FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty PRIOR YEARS FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT 3 0.2 FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 0 0 0 0 0 3 3 3 0 Out 0 0 0 0 0 3 3 3 0 ITEM 44 PAGE 16 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION AN/BQN-17 TYPE MODIFICATION: MODIFICATION TITLE: AN/BQN-17 ML025 DESCRIPTION/JUSTIFICATION: This is a COTS Upgrade. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 29 9.1 TRAINING EQUIPMENT 1 0.3 SUPPORT EQUIPMENT 1 0.3 OTHER: SPARES 1 0.3 32 10.0 EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0 0.0 3 0.1 8 0 0.0 0 0.3 0.0 ITEM 44 PAGE 17 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: AN/BQN-17 INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: MODIFICATION TITLE: AITs 1 Month Feb-00 Jul-00 PRODUCTION LEADTIME: FY 2001: Feb-01 FY 2001: Jul-01 5 Months FY 2002: FY 2002: Feb-02 Jul-02 ($ in Millions) Cost: Prior Years Qty $ FY 2000 Qty $ FY 2001 Qty $ FY 2002 Qty $ FY 2003 Qty PRIOR YEARS FY 2000 EQUIPMENT 3 0.1 8 0.3 FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 0 0 1 1 1 2 2 2 2 Out 0 0 1 1 1 2 2 2 2 ITEM 44 PAGE 18 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION AN/UNQ-9 TYPE MODIFICATION: MODIFICATION TITLE: AN/UNQ (IDARS) ML025 DESCRIPTION/JUSTIFICATION: IDARS is a COTS Recorder. This change will provide a common recorder across the entire SSN-688 Class. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER: OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST 8 0.5 6 0.4 12 0.2 13 TOTAL PROCUREMENT 0 0.0 0 0.0 0 0.0 0 0.2 0.0 ITEM 44 PAGE 19 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: AN/UNQ-9 INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: MODIFICATION TITLE: AITs 1 Month N/A N/A PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A AN/UNQ-9 (IDARS) 2 Months FY 2002: FY 2002: N/A N/A ($ in Millions) Cost: Prior Years Qty $ PRIOR YEARS 8 FY 2000 Qty 0.5 6 FY 2001 Qty $ 0.4 12 FY 2002 Qty $ 0.2 13 FY 2003 Qty 0.2 FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 14 3 2 3 4 2 5 3 3 Out 14 3 2 3 4 2 5 3 3 ITEM 44 PAGE 20 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION AN/WLR-1H(V)7 TYPE MODIFICATION: MODIFICATION TITLE: AN/WLR-1H(V)7 MOD KITS ML028 DESCRIPTION/JUSTIFICATION: Funding is for the procurement of modifications kits. These modification kits are required to replace obsolete and high maintenance components to extend the life cycle of the system until installation of AIEWS Increment 1 aboard CV/CVNs (N78) and to replace existing systems on WHEC Class Cutters (N76). Requirement includes the procurement of COTS/NDI equipment and the installation and support of the upgraded equipment. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 1 0.5 3 1.4 2 1.0 4 2.0 6 1.2 2 0.3 4 0.8 1 0.5 3 1.4 2 1.0 4 2.0 EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER: OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT ITEM 44 PAGE 21 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: AN/WLR-1H(V)7 MODIFICATION TITLE: 2 Months Mar-01 Sep-01 PRODUCTION LEADTIME: FY 2001: Mar-01 FY 2001: Sep-02 AN/WLR-1H(V)7 Mod Kits ML025 6 Months FY 2002: FY 2002: ($ in Millions) Cost: Prior Years Qty $ FY 2000 Qty FY 2001 Qty $ PRIOR YEARS 1 0.1 FY 2000 EQUIPMENT 5 1.1 FY 2001 EQUIPMENT 2 FY 2002 Qty $ FY 2003 Qty 0.3 FY 2002 EQUIPMENT 4 0.8 FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 & Prior 1 2 3 4 1 2 3 4 In 1 0 0 0 2 2 2 1 0 Out 1 0 0 0 0 2 2 2 1 ITEM 44 PAGE 22 P-3A CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT NAVY TACTICAL DATA SYSTEM (NTDS)/260500 (ADVANCED COMBAT DIRECTION SYSTEM (ACDS)) Other Related Program Elements Program Element for Code B Items: RDT&E PROGRAM ELEMENT: 0604518N QUANTITY COST (In Millions) SPARES COST (In Millions) Prior Years ID Code N/A A To FY 2000 FY 2001 FY 2002 $12.1 $28.8 $6.9 $0.0 $0.2 $0.1 $0.1 $0.0 PROGRAM DESCRIPTION/JUSTIFICATION: The Navy Tactical Data System Program provides for the Advanced Combat Direction System (ACDS) as a general purpose Combat Direction System (CDS) in major warships, permitting rapid integration of ship sensor information, analysis and display of tactical information, and designation of weapon systems to force threats. ACDS consists of three major subsystems, namely, the Data Processing, Data Display and Data Link Subsystems. Data Processing and Data Display Subsystems are assigned to the Program Executive Office, Theater Surface Combatants and the Data Links are assigned to the Space and Naval Warfare Systems Command. The ACDS is an upgrade to the NTDS Data Processing and Data Display subsystems and associated computer programs and documentation. FY-00 Funds are for: (LU059) LHA ACDS - Funding is for the upgrade of the Integrated Tactical Amphibious Warfare Data System (ITAWDS) to an ACDS Block 0 in LHA 5 configuration during her FY 00 Complex Overhaul and the LHA 3 availability in FY01. ITAWDS is no longer supportable and interoperability with other units is severely limited. (LU059) LHA ACDS - Funding is for upgrade of the LHA combat display consoles to AN/UYQ-70(v) window/Intel processor-based shipboard display emulators to replace obsolescent, maintenance intensive AN/UYA-4(v) display consoles and support equipment. (LU06I) Shore Site Emulation Equipment - Funding is for the procurement of display emulator systems/equipment and for upgrade of existing display emulator systems/equipment for shore sites. FY-01 Funds are for: (LU06I) Shore Site Emulation Equipment - Funding is for the procurement of display emulator systems/equipment and for upgrade of existing display emulator systems/equipment for shore sites. DD Form 2454, JUN 86 P-1 SHOPPING LIST Item No. 45 PAGE NO.1 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy P-1 ITEM NOMENCLATURE/SUBHEAD NAVY TACTICAL DATA SYSTEM (NTDS)/260500 (ADVANCED COMBAT DIRECTION SYSTEM (ACDS))/A2LU TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost Surface Ships (N86) LU047 CV/CVN ACDS A Command Table LU059 LHA/ACDS A LHA ITAWDS Upgrade 4,100 LHA Shipboard Display Emulators LU005 Field Change Kits (Multi-Class) LU055 Computer Programs, Docmentation 2 3,254 6,507 3 6,609 19,827 A System Engineerin;g, Testing, ILS LU056 Initial Training LU061 Shore Site Emulation Equipment LU830 Production Engineering LU900 Consulting Services LU5IN Installation of Equipment - FMP LU6IN Installation of Equipment - NON-FMP DD FORM 2446, JUN 86 A 7,967 12,067 P-1 SHOPPING LIST Item NO. 45 2,486 6,936 28,820 6,936 0 CLASSIFICATION: 0 PAGE NO. 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT NAVY TACTICAL DATA SYSTEM (NTDS)/260500 (ADVANCED COMBAT DIRECTION SYSTEM (ACDS)) Cost Element/ FISCAL YEAR SUBHEAD A2LU QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW 2 3254 NSWC PHD (R2) (R1) NSWC PHD 2/00 7/00 YES 3 6609 NAVSEA (R1) FFP Lockheed/Martin 9/00 5/01 YES FISCAL YEAR 00 LU059 LHA ACDS ITAWDS Upgrade LU059 LHA Shipboard Display Emulators LU06I Shore Site Emulation Equipment Bethesda, Md/ DRS Technologics Parsippany, NJ/ NSWC PHD Dam Neck(R3) 1 2486 NSWC IHD (R1) FFP DRS Technologics Parsippany, NJ 8/00 5/01 YES 6936 NAVSEA (R1) FFP Lockheed/Martin 05/01 12/01 YES FISCAL YEAR 01 LU06I Shore Site Emulation Equipment Bethesda, Md/ DRS Technologics Parsippany, NJ/ D. REMARKS: (1) Contracts in place; procurement will be accomplished by placing delivery order and task instructions on contract. (2) NAVSEA Dam neck is responsible for procurement of material, reconfiguration and assembly of equipment, installation, test, embedded computer program and documentation. (3) NAVSEA Dam Neck will accomplish the equipment installation. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Item NO. 45 PAGE NO. 3 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 Cooperative Engagement Capability (CEC)/260600 Program Element for Code B Items: Other Related Program Elements 0603755N (FY 1994-97); 0603658N (FY 1998-07) Prior Years QUANTITY ID Code N/A FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete FY 2000 FY 2001 FY 2002 Total 13 3 3 6 25 $148.6 $59.4 $33.5 $77.1 318.6 $5.5 $2.0 $4.3 COST (In Millions) SPARES COST (In Millions) Cont. Cont. A. (U) Mission Description and Budget Item Justification: Cooperative Engagement Capability (CEC) significantly improves Battle Force Anti-Air Warfare (AAW) capability by coordinating all Battle Force AAW sensors into a single, real-time, composite track picture capable of fire control quality. CEC distributes sensor data from each ship and aircraft, or cooperating unit (CU), to all other CUs in the battle force through a real-time, line of sight, high data rate sensor and engagement data distribution network. CEC is highly resistant to jamming and provides accurate gridlocking between CUs. Each CU independently employs high capacity, parallel processing and advanced algorithms to combine all distributed sensor data into a fire control quality track picture which is the same for all CUs. CEC data is presented as a superset of the best AAW sensor capabilities from each CU, all of which are integrated into a single input to each CU’s combat weapons system. CE will significantly improve our Battle Force defense in depth, including both local area and ship defense capabilities against current and future AAW threats. Moreover, CEC will provide critical connectivity and integration of over-land air defense systems capable of countering emerging air threats, including land attack cruise missiles, in a complex littoral environment. (U) CEC consists of the Data Distribution System (DDS), the Cooperative Engagement Processor (CEP), and Combat System modifications. The DDS encodes and distributes ownship sensor and engagement data, is a high capacity, jam resistant, directive system providing a precision gridlocking and high throughput of data. The CEP is a high capacity distributed processor that is able to process force levels of data in near real-time. This data is passed to the ship’s combat system as high quality data, which the ship can use to cue its onboard sensors to engage targets without actually tracking them. CEC is planned for shipboard installationsat various Naval and commercial shipyards aboard CG, DDG 51, CV/CVN, LHD, LHA and LSD 41 ship classes and at land based test sites during scheduled ship availability periods. CEC was approved for entry into Engineering and Manufacturing Development (E&MD) in May 1995. Eleven (11) Advanced Development Models (ADM) and Engineering Development Models (EDM), and eleven (11) Pre-Production Units (PPU) were purchased under the development contract. DD Form 2454, JUN 86 P-1 SHOPPING LIST ITEM NO. 46 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: JUNE 2001 ID Code APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/BA-2 B P-1 ITEM NOMENCLATURE/SUBHEAD Cooperative Engagement Capability (CEC)/A2UC TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost 3 9,332.67 FY 2001 Total Cost 27,997 Quantity *3 Unit Cost 6,787.67 FY 2002 Total Cost 20,363 Quantity 6 Unit Cost 9,381.00 Total Cost UC001 Coop. Eng. Transmitting/Proc. Sys. (CETPS) (AN/USG-2) B 102,375 UC002 AN/UYQ-70 Display A 21,494 UC830 Production Engr. Support A 17,019 4,415 0 5,362 UC004 ECP/Kit Procurement A 779 5,741 5,436 6,200 UC005 Non-recurring Depot Cost 1,000 3,500 UC006 VISTA Training UC007 CETPS (AN/USG-3) (Airborne)* UC008 Supply Support UC51N UC61N INSTALLATION: FMP Non-FMP Quantity Unit Cost Total Cost 56,286 700 B 0 0 6,510 0 0 2,233 2,972 2,118 9,135 6,499 1,244 8,252 1,033 *Actual procurement is five (5) AN/USG-2 shipboard units. FY 1999 funds ($21,900) previously budgeted for Aircraft Procurement sets were funded by a FY 2000 Congressional add into APN, BA5. These FY 1999 funds are being applied to sustain the FY 2001 procurement of two AN/USG-2 (shipboard) systems. 148,572 59,416 33,542 77,133 DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. 46 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 Cooperative Engagement Capability (CEC)/2606 Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION SUBHEAD A2UC AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE FY 2000 AN/USG-2 3 9,333 Arlington, VA Jan-00 FPIF Raytheon Sys. Co., St. Petersburg, FL May-00 Nov-01 Yes N/A FY 2001 * AN/USG-2 3 6,788 Arlington, VA Feb-01 FPIF Raytheon Sys. Co., St. Petersburg, FL May-01 Nov-02 Yes N/A FY 2002 AN/USG-2 6 9,381 Arlington, VA Dec-01 FPIF Raytheon Sys. Co., St. Petersburg, FL Jun-02 Dec-03 Yes N/A D. REMARKS * Actual procurement is five (5) AN/USG-2 shipboard systems. FY1999 funds previously budgeted for Aircraft Procurement sets were funded by a FY 2000 Congressional add into APN, BA5. These FY 1999 funds are being applied to sustain the FY 2001 procurement of two AN/USG-2 (shipboard) systems. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 46 AGE NO. 4 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A INDIVIDUAL MODIFICATION MODELS OF SYSTEM AFFECTED: AN/USG-2 TYPE MODIFICATION: BGAAW Improvement CETPS MODIFICATION TITLE: DESCRIPTION/JUSTIFICATION: Battle Group Anti-Air Warfare (AAW) Improvement M/S II (May 95) M/S III (1Q FY 2002) TDP AVAIL (Sep 98) DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E 22 1292.4 182.3 177.6 47.2 Cont. 22 Cont. PROCUREMENT INSTALLATION KITS 0.0 INSTALLATION KITS - UNIT COST 0.0 INSTALLATION KITS NONRECURRING 0.0 EQUIPMENT (AN/USG-2) 6 49.0 3 28.0 3 20.4 6 56.3 EQUIPMENT (AN/USG-3) 18 153.7 0 0.0 ENGINEERING CHANGE ORDERS 0.0 SUPPLY SUPPORT TRAINING EQUIPMENT (AN/USG-2) 6.5 7 6.5 53.4 7 53.4 SUPPORT EQ. (VISTA Trng) 0.7 0.7 OTHER (N/R Depot Standup) 1.0 3.5 OTHER (ECP/Kit Procurement) 0.8 5.7 5.4 6.2 18.1 OTHER (Production Engr. Support) 17.0 4.4 0.0 5.3 26.7 4.7 10.0 5.0 7.5 27.2 4.5 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST * TOTAL PROCUREMENT * Includes FMP and Non-FMP 13 126.6 3 58.1 3 30.8 6 75.3 0 0.0 0 0.0 P-1 SHOPPING LIST ITEM NO. 46 PAGE NO. 5 0 0.0 0 0.0 0 0.0 0 CLASSIFICATION: 0.0 25 290.8 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: AN/USG-2 CETPS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 18 Months CONTRACT DATES: FY 2000: May 2000 FY 2001: May 2001 FY 2002: June 2002 DELIVERY DATE: FY 2000: November 2001 FY 2001: November 2002 FY 2002: December 2003 Prior Years Qty $ FY 2000 Qty $ Cost: PRIOR YEARS 4 FY 2001 Qty $ 5 FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty Total $ 3.8 1 1.2 10 19.7 FY 2000 EQUIPMENT 1.1 2 3.0 2 4.1 FY 2001 EQUIPMENT 0.1 1 2.6 1 2.7 0.7 0 0.7 FY 2003 EQUIPMENT 0 0.0 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT 0 0.0 FY 2006 EQUIPMENT 0 0.0 FY 2007 EQUIPMENT 0 0.0 97 210.9 4.7 10.0 ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ FY 2002 EQUIPMENT TO COMPLETE 97 210.9 INSTALLATION SCHEDULE: FY 2000 FY 2001 FY 2002 FY 2003 TC TOTAL 0 109 122 0 109 122 & Prior 1 2 3 4 1 2 3 4 IN 4 1 0 2 2 0 1 3 OUT 4 1 0 2 2 0 1 3 1 2 ITEM 3 46 FY 2004 4 1 2 PAGE 6 3 FY 2005 4 1 2 3 FY 2006 4 1 2 3 FY 2007 4 1 2 3 4 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A INDIVIDUAL MODIFICATION MODELS OF SYSTEM AFFECTED: AN/UYQ-70 TYPE MODIFICATION: BGAAW Improvement CETPS MODIFICATION TITLE: DESCRIPTION/JUSTIFICATION: Battle Group Anti-Air Warfare (AAW) Improvement M/S II (May 95) M/S III (1Q FY 2002) TDP AVAIL (Sep 98) DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E 22 1292.4 182.3 177.6 47.2 Cont. 22 Cont. PROCUREMENT INSTALLATION KITS 0.0 INSTALLATION KITS - UNIT COST 0.0 INSTALLATION KITS NONRECURRING EQUIPMENT (AN/UYQ-70) 0.0 47 21.5 47 21.5 EQUIPMENT 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT (AN/UYQ-70) 0.0 SUPPORT EQ. 0.0 OTHER 0.0 OTHER 0.0 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST TOTAL PROCUREMENT 0.5 47 22.0 1.3 0 1.3 2.7 0 2.7 1.8 0 1.8 6.3 0 0.0 0 0.0 P-1 SHOPPING LIST ITEM NO. 46 PAGE NO. 7 0 0.0 0 0.0 0 0.0 0 CLASSIFICATION: 0.0 47 27.8 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) AN/UYQ-70 MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 12 Months PRODUCTION LEADTIME: 18 Months CONTRACT DATES: FY 2000: FY 2001: FY 2002: DELIVERY DATE: FY 2000: FY 2001: FY 2002: Cost: Prior Years Qty $ PRIOR YEARS FY 2000 Qty $ FY 2001 Qty $ 1.3 32 ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ 15 FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty 1.3 Total $ 47 5.8 0 0.0 0 0.6 FY 2002 EQUIPMENT 0 0.0 FY 2003 EQUIPMENT 0 0.0 0 0.0 0 0.0 0.5 2.7 FY 2005 Qty $ FY 2000 EQUIPMENT FY 2001 EQUIPMENT 0.1 0.5 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT FY 2006 EQUIPMENT 0 0.0 0 0.0 FY 2007 EQUIPMENT 0 0.0 0 0.0 0 0.0 TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2001 FY 2002 FY 2003 TC TOTAL 0 59 104 0 59 104 & Prior 1 2 3 4 1 2 3 4 IN 0 0 0 0 30 15 0 0 OUT 0 0 0 0 30 15 0 0 1 2 ITEM 3 46 FY 2004 4 1 2 PAGE 8 3 FY 2005 4 1 2 3 FY 2006 4 1 2 3 FY 2007 4 1 2 3 4 P-3A CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 P-1 ITEM NOMENCLATURE GCCS-M (#2608) FY 2000 FY 2001 FY 2002 $25.6 $43.1 $61.1 FY 2003 FY 2004 FY 2005 SUBHEAD 52JG FY 2006 FY 2007 To COMP TOTAL QUANTITY COST (in millions) Continuing Continuing PROGRAM COVERAGE/JUSTIFICATION FOR BUDGET YEAR REQUIREMENTS: GCCS-M (Overall Description): Global Command and Control System-Maritime (GCCS-M) is the Navy’s fielded Command and Control system, a key component of the Copernicus forward C4ISR strategy and is the Navy’s tactical implementation of the Joint Services Global Command and Control System (GCCS). GCCS-M has aggressively pursued an Evolutionary Acquisition strategy in rapidly developing and fielding new Command, Control, Computers and Intelligence (C3I) capabilities for Navy users. GCCS-M's latest phase includes migration to DISA's Defense Information Infrastructure (DII) Common Operating Environment (COE), incorporation of Fleet requirements for merging tactical and non-tactical networks, support for the IT-21 / Network Centric Warfare initiative and utilization of PC, WEB and other COTS Information Technology. System upgrades are required to support the evolutionary nature of the GCCS-M software releases in order to meet Fleet / mission requirements. JG010: GCCS-M Afloat provides Tactical C3I systems tailored to meet platform missions and functions to ensure joint interoperability among Numbered Fleet Commanders (NFC), Commander, Joint Task Force (CJTF), Joint Force Air Component Commander (JFACC), Officer in Tactical Command (OTC), Composite Warfare Commander (CWC), Subordinate Warfare Commanders (SWC), Commander Amphibious Task Forces (CATF), Commander, Landing Forces (CLF) and Commanding Officer/Tactical Action Officer (CO/TAO). GCCS-M Afloat provides both General Service (GENSER) and Sensitive Compartmented Information (SCI) source information management systems which receive, process, correlate, fuse, assess, and display the readiness and disposition of own, neutral, and potentially hostile forces together with Electronic Warfare (EW) resource and environmental information. GCCS-M Afloat provides tactical commanders with an accurate, reliable and survivable Common Operational Picture (COP) which includes complete all-source information management, display and dissemination, rapid access to organic/theater/national intelligence and databases, and multi-source data fusion and imagery exploitation. GCCS-M Afloat provides C3I capability to 29 Force Level Ships (i.e., CV/CVN, LCC, LHA, LHD, MCS and AGF), 204 Unit Level Ships (i.e., AO/AOE/AE/ARS, CG, DD/DDG, FFG, MHC/MCM, LPD/LSD/LST), 71 Submarines (i.e., SSN/SSBN), the Software Support Activity (SSA), and the In-Service Engineering Activity (ISEA). GCCS-M Afloat consists of the following tactical systems: GCCS-M, Shipboard Video Distribution System (SVDS), and Contingency Theater Automated Planning Systems (CTAPS) / Theater Battle Management Core Systems (TBMCS). Force Level ships receive a GCCS-M GENSER system (UNIX and NT), a GCCS-M SCI system (UNIX and NT), a Shipboard Video Distribution System, a CTAPS / TBMCS system and a Radiant Mercury system. Unit Level ships receive a GCCS-M GENSER system (UNIX and NT). Submarines receive a GCCS-M GENSER system (UNIX and NT). Training Sites, the SSA and ISEA receive a GCCS-M GENSER system (UNIX and NT), a GCCS-M SCI system (UNIX and NT), a Shipboard Video Distribution System, a CTAPS / TBMCS system and a Radiant Mercury system. JG020: GCCS-M Ashore. Provides evolutionary systems and ancillary equipment upgrades to support CNO, Fleet Commanders in Chief, Unified Commanders, Type Commanders, Force Anti-Submarine Warfare (ASW) Commanders, and Submarine Operating Authorities worldwide. The GCCS-M Ashore provides a single system to receive, process, display, maintain and/or assess unit characteristics, employment scheduling, material condition, combat readiness, warfighting capabilities, and positional information of own, allied, and hostile forces. GCCS-M Ashore provides the tools necessary for Fleet and Shore based commanders to execute plans, transmit tasking, and provide tactical information to subordinate forces. GCCS-M Ashore has assimulated the 22 GCCS-M Fleet training sites and will provide the GCCS-M system (hardware and software). P-1 Shopping List-Item No 47-1 of 47-18 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continued) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE GCCS-M (#2608) June 2001 SUBHEAD 52JG JG030: Trusted Information Systems. (formerly JMCIS OED) Trusted Information Systems (TIS) is a combination of the Ocean Surveillance Information System (OSIS) Evolutionary Development (OED) system, the Radiant Mercury (RM) system and multi-level security (MLS) web technologies. TIS provides the core on-line, automated, near-real time, multi-level secure, information analysis, dissemination, and receipt capabilities that enable Unified Commanders-in-Chief and Joint Task Force Commanders afloat and ashore to disseminate and receive critical operational and intelligence information with own forces and Coalition/Allied forces via tactical and record communications circuits. TIS provides evolutionary systems and ancillary equipment upgrades to support three Joint Intelligence Centers (JIC) and the Office of Naval Intelligence (ONI). OED provides near-real-time all-source fusion, correlation and analysis tools for the analysis of multi-source intelligence to produce comprehensive tactical threat warnings, decision making support, and support of Over-the-Horizon-Targeting. Radiant Mercury is a tool for the automated sanitizing, downgrading, and transliteration of formatted message traffic. A linchpin of network-centric warfare aboard afloat platforms, Radiant Mercury helps ensure critical Indications and Warning intelligence is provided quickly to operational decision-makers. JG040: GCCS (Joint). Is an operational multi-service/agency C4I program encompassing both strategic and tactical C4I functions. GCCS (Joint) supports the National Command Authority and the CINCs by providing C4I data processing capabilities, including status of forces and support requirements for use in national security decision making, force preparation and operational planning execution. JG050: GCCS-M Tactical/Mobile program provides evolutionary systems and ancillary equipment upgrades to support the Unified, Fleet, and Navy Component Commanders, the Maritime Sector, Theater, and the Naval Liaison Element Commanders (Ashore) with the capability to plan, direct and control the tactical operations of Joint and Naval Expeditionary Forces and other assigned units within their respective area of responsibility. These operations include littoral, open ocean, and over land all sensor (i.e. EO, IR, ISAR, etc.) surveillance, anti-surface warfare, over-the-horizon targeting, counter-drug operations, power projection, antisubmarine warfare, mining, search and rescue, and special operations. The Command and Control services provided include core GCCS-M capabilities, analysis and correlation of diverse sensor information; data management support, command decision aids; access to rapid data communication, mission planning and evaluation; dissemination of ocean surveillance positional data and threat alerts to operational users ashore and afloat. The GCCS-M Tactical/Mobile System includes the fixed site Tactical Support Centers (TSCs) and the Mobile Operations Control Centers (MOCCs) which is a mobile version of the TSC for contingency operations, the highly portable Mobile Ashore Support Terminals (MASTs) and the more robust Mobile Integrated Command Facilities (MICFACs). Beginning in FY01, the MAST and MICFAC systems have begun to transition into a single system called the Joint Mobile Ashore Support terminal (JMAST). This budget also includes funds for the Mobile Inshore Undersea Warfare (MIUW) Van Upgrades. PROCUREMENT DATA: The FY 00 Budget Procured: 1. GCCS-M Ashore Command Center Equipment; 2. TIS upgrades; 3. GCCS (JOINT) Workstations, Servers, LAN hardware and software, communications equipment; 4. TSC Upgrade Equipment; 5. MAST/MICFAC Equipment; 6. GCCS-M Afloat C3I systems; and installation of Equipment, production engineering support and training of the initial cadre of instructors. The FY 01 Budget Procured: 1. GCCS-M Ashore Command Center Equipment; 2. TIS upgrades; 3. GCCS (JOINT) Workstations, Servers, LAN hardware and software, communications equipment; 4. TSC Upgrade Equipment; 5. MAST/MICFAC Equipment; 6. GCCS-M Afloat C3I systems; and installation of Equipment, production engineering support and training of the initial cadre of instructors. The FY 02 Budget Procures: 1. GCCS-M Ashore Command Center Equipment; 2. TIS upgrades; 3. GCCS (JOINT) Workstations, Servers, LAN hardware and software, communications equipment; 4. TSC Upgrade Equipment; 5. MAST/MICFAC Equipment; 6. GCCS-M Afloat C3I systems; and installation of Equipment, production engineering support and training of the initial cadre of instructors. P-1 Shopping List-Item No 47-2 of 47-18 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continued) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE GCCS-M (#2608) June 2001 SUBHEAD 52JG INSTALLATION DATA: GCCS-M Afloat, in FY00, includes funds to procure and install equipment for 21 Force Level Ships, 75 Unit Level Ships (including 18 submarines), 1 mine ship and 8 shore support sites. GCCS-M Afloat, in FY01, includes funds to procure and install equipment for 15 Force Level Ships, 59 Unit Level Ships (including 8 submarines) and 10 shore support sites. GCCS-M Afloat in FY 02, includes funds to procure and install equipment for 8 Force Level Ships, 28 Unit Level Ships (this includes 8 submarines). GCCS-M Ashore include: Navy Command Centers: CNO, Alternate National Command (Site R), Fleet Command Centers: CINCLANTFLT, CINCPACFLT, CINCUSNAVEUR , COMUSNAVCENT (Forward) BAHRAIN, COMUSNAVCENT (Rear) Tampa Florida, Joint Command Center: AFSOUTH and USPACOM, ASW Force Commander: CTF 12/Makalapa, CTF 67/Naples, CTF 72/Kamiseya, CTF 84/Norfolk, Submarine Operation Authorities; COMSUBGRU EIGHT/NAPLES, COMSUBGRU NINE/Whidbey Island, COMSUBGRU SEVEN/Yokosuka, COMSUBGRU TEN/Kings Bay, COMSUBLANT Representative UK/ Northwood, UK,COMSUBLANT/Norfolk, COMSUBPAC Representative San Diego, COMSUBPAC/Pearl Harbor, Type Commanders: COMNAVAIRLANT, COMNAVAIRPAC, COMNAVSURFLANT, COMNAVSURFPAC, COMSUBLANT, COMSUBPAC; IUSS COMMAND CENTERS: Joint Maritime Facility, St. Mawgans UK, NOPF Dam Neck, NOPF Whidbey Island, Site 6300, Site 6400, Site 5200; Range Operation Center: Atlantic Fleet Weapons Training Facility (AFWTF); Primary Training Site: ATG Mayport, ATG MIDPAC Pear Harbor, ATG Norfolk, ATG San Diego, ATG WESTPAC Yokosuka, FCTCLANT Dan Neck, FCTCPAC San Diego, FITCPAC San Diego, FTC San Diego, MINEWARTRACEN Ingleside, NAVSTKWARCEN Fallon, NAVSUBSCOL Groton, NMITC Dam Neck, NTTC Corry Station, SWOSCOLCOM Newport, NAS Lemoore; Secondary Training Sites: EWTGLANT Norfolk, EWTGPAC San Diego; NAVPGSCOL Monterey, Naval War College Newport, TACTRAGRULANT Norfolk, TACTRAGRUPAC San Diego, Engineering Support Sites: SSC San Diego, GCCS Host Sites: CINCLANTFLT, CINCPACFLT, CNO, COMUSNAVCENT, CINCUSNAVEUR London; GCCS Remote Sites: CNFJ, COMCARGRU 6, COMCRUDESGRU 12, COMLOGWESTPAC, COMNAVRESFOR, COMPHIBGRU 1, COMPHIBGRU 2, COMPHIBGRU 3, COMSUBGRU 7, COMSUBPAC, COMWESTHEMGRU, CTF-72, NAVFAC, COMNAVFAC ENGINEERING COMMAND , CBC Gulfport, COMCARGRU TWO, NAVAMMOLOGCEN, and SECOND NCB. GCCS (Joint) equipment is scheduled for installation at Navy supported sites: USJFCOM, USPACOM, US FORCES JAPAN, COMALCOM and 3 remote sites. GCCS-T equipment is installed at 1 Host Site and 8 Remote Sites. GCCS I3 is installed at 4 Intelligence Sites: JICPAC, JFIC, Pass-J and PASS-SD. Trusted Information Systems (TIS) equipment installation sites include ONI, JICPAC, JFIC and JAC MOLESWORTH GCCS-M Tactical/Mobile sites include 14 TSC systems at 12 operational sites (located at Keflavik, Iceland; Brunswick, ME; Jacksonville, FL; Sigonella, Italy; Rota, Spain; Kaneohe Bay, HI; Whidbey Island, WA; Kadena, Japan; Misawa, Japan; North Island, CA; Diego Garcia, Indian Ocean; Roosevelt Roads, Puerto Rico, and Masirah, Oman); 1 training site at Fleet Combat Training Center (FCTC) Dam Neck, VA and 1 ISEA site at SSC CHARLESTON DET Patuxent River. 8 MOCCs (Homeported at Brunswick, ME; Jacksonville, FL; Sigonella, Italy; Kaneohe Bay, HI; Misawa, Japan; Willow Grove, PA; and Point Mugu, CA) and 1 MOCC C2 Engineering Development, Software Support Facility (SSC CHARLESTON). 4 MICFACs (homeported at Bahrain; Sigonella, Sicily; Pearl Harbor, HI; and St. Juliens Creek, VA; 4 MASTS (homeported at Bahrain; Rota, Spain; Pearl Harbor, HI; and St. Juliens Creek, VA). Beginning in FY01, the MAST and MICFAC systems have begun to transition into a single system called the Joint Mobile Ashore Support terminal (JMAST). Four JMASTs will be homeported at St. Juliens Creek, VA (FY01); Sigonella, Sicily (FY02); and Pearl Harbor, HI (FY02). P-1 Shopping List-Item No 47-3 of 47-18 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE COST ANALYSIS June 2001 APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST P-1 ITEM NOMENCLATURE SUBHEAD GCCS-M (#2608) PY ID TOTAL CODE COST QTY FY 2000 UNIT TOTAL COST COST GCCS-M-Afloat 11,158 JG023 JG010 JG028 JG010 JG029 JG010 JG030 JG010 JG031 JG041 JG010 JG042 JG010 GCCS-M Shipboard Video Distrib. System (FY00) GCCS-M Shipboard Video Distrib. System (FY01/02) GCCS-M Afloat Unit Level (FY00) GCCS-M Afloat Unit Level (FY01/02) GCCS-M Aloat Force Level (FY00) GCCS-M Aloat Force Level (FY01/02) GCCS-M Afloat Shore Site (FY00) GCCS-M Afloat Shore Site (FY01) GCCS-M Afloat/MIW System Equip (FY00) TBMCS Afloat Force Level H/W (FY00) TBMCS Afloat Force Level H/W (FY01/02) TBMCS Shore Site H/W (FY00) TBMCS Shore Site H/W (FY01) N/A N/A A A A A A A A 1 900.0 900 75 91.0 6,826 21 102.2 2,146 6 47.2 283 1 1 63.0 514.0 63 514 2 213.0 426 JH031 JG020 GCCS-M Ashore (FY00) GCCS-M Ashore (FY01/02) A A Trusted Information Systems (TIS) (formerly JMCIS OED) A JH011 JG030 JMCIS OED (FY00) Trusted Information Systems (TIS) (FY01/02) A A GCCS (Joint) Support Equip A JH036 JG040 GCCS (Joint) Support Equipment (FY00) GCCS (Joint) Support Equipment (FY01/02) A A 15 T4371 JG050 T4500 JG050 T4600 Upgrade Equipment TSC (FY00) Upgrade Equipment TSC (FY01) MAST/MICFAC (FY00) JMAST (FY01) MIUW Van Upgrades (FY00) A A A A A 4 989.8 3,959 1 1823.0 1,823 GCCS-M ASHORE 14,925 107.0 800.0 1,600 2 818.0 1,636 59 109.5 6,458 28 185.8 5,203 15 231.8 3,477 8 1564.6 12,517 6 250.0 1,500 14 100.0 1,400 7 260.0 1,820 4 122.5 490 3,440 61.4 429 143.0 65 116.3 981 327.0 1,113 7,559 1,956 981 4 489.0 1,021 1,956 1,898 1,113 15 GCCS-M TACTICAL MOBILE 3,440 429 3 74.2 7,559 6,101 56 3 68.1 12,782 1,021 20 94.9 6,385 1,898 8,798 7 604.7 4,233 14 374.2 5,239 1 2152.0 2,152 1 3559.0 3,559 7,000 JG555 Production Support 925 702 606 JG666 Training of the Initial Cadre of Instructors 339 675 602 Remarks: QTY FY 2003 UNIT TOTAL COST COST 21,176 2 6,101 57 52JG TOTAL COST IN THOUSANDS OF DOLLARS FY 2002 FY 2001 UNIT TOTAL UNIT TOTAL QTY COST COST QTY COST COST 1 GCCS-M quantities reflect number of ships or shore sites installed. 2. Unit Costs are based on the average cost of all the number of ships or shore sites installed. Variances are due to the diverse types of ship or shore site requirements. DD FORM 2446, JUN 86 P-1 Shopping List-Item No 47-4 of 47-18 Exhibit P-5, Budget Item Justification Unclassified UNCLASSIFIED CLASSIFICATION DATE COST ANALYSIS June 2001 APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE JG777 P-1 ITEM NOMENCLATURE ID CODE ELEMENT OF COST INSTALLATION SUBHEAD GCCS-M (#2608) PY TOTAL COST QTY FY 2000 UNIT TOTAL COST COST 52JG TOTAL COST IN THOUSANDS OF DOLLARS FY 2001 FY 2002 UNIT TOTAL UNIT TOTAL QTY COST COST QTY COST COST 15,617 14,928 18,490 645 1092 25 358 916 900 655 77 325 1,087 0 2,013 78 532 2,061 11,456 1,125 10,834 1,050 12,380 1,426 TOTAL 48,464 43,057 61,085 TOTAL BLI 2608 TOTAL BLI 2804 TOTAL BLI 2906 25,648 9,118 13,698 43,057 0 0 61,085 0 0 QTY FY 2003 UNIT TOTAL COST COST Non FMP JG776/JG777 JH776/JG777 JJ776/JG777 NW776/JG777 T4776/JG777 JG777 JG777 GCCS-M Afloat GCCS-M Ashore Trusted Information Systems (formerly JMCIS OED) GCCS (Joint) Support Equipment GCCS-M Tactical Mobile FMP GCCS-M Afloat GCCS-M Afloat - DSA DD FORM 2446, JUN 86 P-1 Shopping List-Item No 47-5 of 47-18 Exhibit P-5, Budget Item Justification Unclassified UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST FY JG010 GCCS-M Afloat Shipboard Video Distribution System 01 02 CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO C. P-1 ITEM NOMENCLATURE GCCS-M (#2608) RFP DATE ISSUE AWARD OF FIRST DATE DATE DELIVERY Various Various Option C/FFP Option C/FFP SPAWAR SPAWAR Nov-00 Nov-01 SUBHEAD 52JG QTY UNIT COST SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE Jan-01 Jan-02 2 2 800 818 YES YES N/A N/A JG010 GCCS-M Afloat Unit Level 01 02 SSC Charleston/San Diego SSC Charleston/San Diego WX WX SPAWAR SPAWAR Oct-00 Oct-01 Jan-01 Jan-02 59 28 109 186 YES YES N/A N/A JG010 GCCS-M Afloat Force Level 01 02 SSC Charleston/San Diego SSC Charleston/San Diego WX WX SPAWAR SPAWAR Oct-00 Oct-01 Jan-01 Jan-02 15 8 232 1,565 YES YES N/A N/A JG010 GCCS -M Afloat Shore Site 01 SSC Charleston/San Diego WX SPAWAR Nov-00 Jan-01 6 250 YES N/A JG010 TBMCS Force Level 01 02 SSC Charleston/San Diego SSC Charleston/San Diego WX WX SPAWAR SPAWAR Dec-00 Dec-01 Feb-01 Feb-02 14 7 100 260 YES YES N/A N/A JG010 TBMCS Shore Site H/W 01 SSC Charleston/San Diego WX SPAWAR Feb-00 Feb-01 4 123 YES N/A D. REMARKS JG028/JG029/JG030/JG041/JG042: SSC Charleston/San Diego are integrating agents. There are multiple hardware contracts awarded under each cost code. Exhibit P-5A, Procurement History and Planning P-1 Shopping List-Item No 47-6 of 47-18 Unclassifed Classification UNCLASSIFIED Jun-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: GCCS-M Afloat Shipboard Video Distribution System JG023/JG010 The GCCS-M Afloat Shipboard Video Distribution System upgrade for Force Level ships provides the ability to route video signals (up to 96 inputs and 96 outputs) throughout selected areas of the ship. The system will be upgraded provide digital signal routing via the IT-21 LAN to configured command, control and mission planning spaces on force level combatants and off board ship via VIXIS. These systems are part of GCCS-M Afloat with installations continuing through FY07. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 99 PY Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 7 3.60 0 0.00 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 7 3.60 0 0.00 PRIOR YR EQUIP 7 3.60 FY 99 EQUIP 0 0.00 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 3.60 0.00 TOTAL PROCUREMENT COST 7.20 0.00 METHOD OF IMPLEMENTATION: FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ 1 0.90 2 1.60 2 1.64 0.00 0.00 1 0.91 1 0.91 0.08 0.175 1 0.80 1 0.80 0.91 1.81 0.80 2.65 Qty FY 05 $ Qty FY 06 $ Qty FY 07 $ Qty 2 1.64 2 1.64 1.64 3.53 0.00 0.0 0.00 0.00 ADMINISTRATIVE LEADTIME: 0.00 0.00 2 mos. 0.00 0.00 FY 2001: Nov-00 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000: Feb-00 FY 2001: Jan-01 FY 2002: Jan-02 FY 2003: 8 OUTPUT 8 2 4 1 1 2 3 1 1 1 FY 05 1 2 4 1 1 3 4 1 2 1 2 FY 06 3 4 Qty $ CONT CONT 12 7.74 FY 03 FY 02 3 $ 1 2 0.0 0.00 0.00 PRODUCTION LEADTIME: Dec-99 1 Total Qty 0 FY 2000: PY TC $ 0.23 0.28 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: Qty 0.15 0.10 FY 01 INSTALLATION SCHEDULE: FY 04 $ 11 7 0 1 1 2 0 0 0 0 0 0 0.0 6.95 3.60 0.00 0.91 0.80 1.64 0.00 0.00 0.00 0.00 0.00 0.00 6.95 15.19 3 mos. FY 04 3 4 1 3 4 TC 2 3 4 FY 07 TOTAL INPUT 11 OUTPUT 11 Notes/Comments: Quantities refer to number of Force Level Ships. Currently, there are 29 Force Level Ships in the Fleet. Prior year installations were for "analog 23TV systems". FY00 and outyear installations are for "GCCS-M Afloat Shipboard Video Distribution System". P-1 Shopping List-Item No 47-7 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Jun-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: GCCS-M Afloat Unit Level JG028/JG010 The GCCS-M Afloat Unit Level system is the tactical C3I system for the BG / ARG Unit Level warfighting combatants and submarines and consists of both UNIX and NT servers and workstations running on a IT-21 LAN while providing the tactical commander with the COP, automated decision aids and an integrated tactical shipboard intelligence system that utilize joint organic, non-organic (remote sources) and environmental information/intelligence in the decision making and warfighting process. It also provides tactical commanders with an accurate, reliable and survivable Common Operational Picture (COP) which includes complete all-source information management, display and dissemination, rapid access to organic/theater/national intelligence and databases, and multi-source data fusion and imagery exploitation. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 104 3.90 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 104 3.30 PRIOR YR EQUIP 104 3.30 FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 3.30 TOTAL PROCUREMENT COST 7.20 METHOD OF IMPLEMENTATION: FY 99 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ 109 11.00 75 6.83 59 6.46 28 5.20 0.00 1.06 109 13.10 109 13.10 75 6.20 75 6.20 13.10 24.10 0.26 0.61 59 5.01 59 5.01 6.20 14.08 Qty Qty Qty FY 06 $ Qty FY 07 $ Qty 5.01 12.33 28 5.26 28 5.26 5.26 11.30 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: 0.00 0.00 2 mos. 0.00 0.00 FY 2001: Various FY 2002: Various FY 2003: DELIVERY DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: FY 03 FY 02 3 4 1 2 3 4 288 21 29 9 10 10 8 OUTPUT 288 21 29 9 10 10 8 FY 05 1 2 1 2 1 2 FY 06 3 4 1 2 0.0 0.00 0.00 PRODUCTION LEADTIME: Various 2 $ 0 FY 2000: 1 Total Qty Qty $ 375 33.39 0.41 2.36 CONTRACT DATES: PY TC $ 0.14 0.70 INPUT INSTALLATION SCHEDULE: FY 05 $ CONT FY 01 INSTALLATION SCHEDULE: FY 04 $ 375 104 109 75 59 28 0 0 0 0 0 0 0.0 0.00 32.86 3.30 13.10 6.20 5.01 5.26 0.00 0.00 0.00 0.00 0.00 0.00 32.86 69.02 3 mos. FY 04 3 4 1 3 4 TC 2 3 4 FY 07 3 4 TOTAL INPUT 375 OUTPUT 375 Notes/Comments: Quantities refer to Unit Level ships and submarines. Currently, there are 204 Unit Level ships and 71 submarines in the Fleet. P-1 Shopping List-Item No 47-8 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Jun-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: GCCS-M Afloat Force Level JG029/JG010 The GCCS-M Afloat Force Level system is the core battle group/force commander’s warfighting system and consists of both UNIX and NT servers and workstations, color large screen displays, remote displays and video switches running on a IT-21 LAN while providing the tactical commander with the COP, automated decision aids and an integrated tactical shipboard intelligence system that utilize joint organic, non-organic (remote sources) and environmental information/intelligence in the decision making and warfighting process. The Force Level system provides Tactical C3I systems tailored to meet platform missions and functions to ensure joint interoperability among various Fleet Commanders. It also provides both General Service (GENSER) and Sensitive Compartmented Information (SCI) source information management systems which receive, process, correlate, fuse, assess, and display the readiness and disposition of own, neutral, and potentially hostile forces together with Electronic Warfare (EW) resource and environmental information. Lastly, it provides tactical commanders with an accurate, reliable and survivable Common Operational Picture (COP) which includes complete all-source information management, display and dissemination, rapid access to organic / theater / national intelligence and databases, and multi-source data fusion and imagery exploitation. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 42 23.30 24 7.60 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 42 23.30 24 3.80 PRIOR YR EQUIP 42 23.30 FY 99 EQUIP 24 3.80 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP 23.30 3.80 TOTAL PROCUREMENT COST 46.60 11.40 METHOD OF IMPLEMENTATION: FY 00 FY 01 Qty $ Qty $ 21 2.15 15 3.88 21 3.88 3.48 8 0.08 0.14 0.42 21 FY 02 Qty $ 15 4.43 15 4.43 3.88 6.45 FY 03 Qty $ FY 06 Qty $ FY 07 Qty $ 4.43 8.12 6 4.70 6 4.70 CONT 4.70 17.82 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: 0.00 0.00 2 mos. 0.00 0.00 Various FY 2002: Various FY 2003: DELIVERY DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: 87 OUTPUT 87 8 7 4 8 1 2 3 4 3 2 1 3 2 3 4 7 2 1 2 1 2 FY 06 FY 05 1 FY 03 FY 02 3 3 4 1 2 0.0 0 0.00 0.00 PRODUCTION LEADTIME: FY 2001: 2 Qty $ 110 49.04 0.23 1.01 Various 1 Total $ 0.16 0.45 FY 2000: PY TC Qty CONT CONTRACT DATES: INPUT INSTALLATION SCHEDULE: FY 05 Qty $ 12.52 FY 01 INSTALLATION SCHEDULE: FY 04 Qty $ 108 42 24 21 15 6 0 0 0 0 0 0 40.11 23.30 3.80 3.88 4.43 4.70 0.00 0.00 0.00 0.00 0.00 0.00 40.11 90.38 0.0 0.00 3 mos. FY 04 3 4 1 3 4 TC 2 3 4 FY 07 TOTAL INPUT 108 OUTPUT 107 Notes/Comments: Quantities refer to Force Level ships. Currently, there are 29 Force Level ships in the Fleet. P-1 Shopping List-Item No 47-9 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Jun-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: GCCS-M Afloat Shore Site Upgrade JG030/JG010 The GCCS-M Afloat Shore Site systems include 17 training sites, the Software Support Activity (SSA), and the In-Service Engineering Activity (ISEA). Shore site upgrades are required to support the evolutionary nature of the GCCS-M Afloat software releases in order to meet Fleet training / readiness requirements. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 3 0.80 7 1.40 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 3 0.80 7 0.60 PRIOR YR EQUIP 3 0.80 FY 99 EQUIP 7 0.60 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.80 0.60 TOTAL PROCUREMENT COST 1.60 2.00 METHOD OF IMPLEMENTATION: FY 00 FY 01 FY 02 Qty $ Qty $ 6 0.28 6 1.50 Qty FY 03 $ Qty FY 04 $ Qty FY 05 $ Qty FY 06 $ Qty FY 07 $ Qty Total Qty $ Qty $ 22 3.98 22 3 7 6 6 0 0 0 0 0 0 2.50 0.80 0.60 0.50 0.60 0.00 0.00 0.00 0.00 0.00 0.00 0.08 6 0.50 6 0.50 6 0.60 6 0.60 0.50 0.79 0.60 2.18 0 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: 0.00 0 0.00 0.00 2 mos. 0.00 0.00 0.00 0 FY 2000: Various FY 2001: Various FY 2002: FY 2003: DELIVERY DATES: FY 2000: Various FY 2001: Various FY 2002: FY 2003: FY 01 INSTALLATION SCHEDULE: 1 3 2 4 4 1 2 1 2 0 FY 03 FY 02 2 0.00 3 4 1 2 3 4 1 2 0.00 0.00 0.00 PRODUCTION LEADTIME: CONTRACT DATES: PY TC $ 0.00 0.00 2.50 6.49 2 mos. FY 04 3 4 1 3 4 TC 2 3 4 INPUT 16 OUTPUT 16 4 2 3 4 FY 05 INSTALLATION SCHEDULE: 1 2 FY 06 FY 07 TOTAL INPUT 22 OUTPUT 22 Notes/Comments: Quantities represent sites P-1 Shopping List-Item No 47-10 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Jun-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: GCCS-M Afloat / MIW System Equip JG031/JG010 Supports the acquisition of hardware and software for mine warfare ships. This system supports the mine ship Commanding Officer by providing a composite tactical picture, command and control. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 24 5.70 1 0.20 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 24 5.70 1 0.10 PRIOR YR EQUIP 24 5.70 FY 99 EQUIP 1 0.10 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 5.70 0.10 TOTAL PROCUREMENT COST 11.40 0.30 METHOD OF IMPLEMENTATION: FY 00 FY 01 Qty $ Qty 1 0.06 1 0.11 1 0.11 FY 02 $ Qty FY 03 $ Qty Qty FY 05 $ Qty FY 06 $ Qty FY 07 $ Qty 0 0.00 0.11 0.19 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: 0.00 0 0.00 0.00 2 mos. 0.00 0.00 0.00 0 FY 2000: Dec-99 FY 2001: FY 2002: FY 2003: DELIVERY DATES: FY 2000: Feb-00 FY 2001: FY 2002: FY 2003: INPUT 26 OUTPUT 26 1 2 1 2 4 1 2 3 4 1 2 0.00 $ 0 FY 03 FY 02 3 FY 05 INSTALLATION SCHEDULE: Total Qty 3 4 1 2 3 4 1 2 FY 06 0.00 0.00 0.00 PRODUCTION LEADTIME: CONTRACT DATES: PY TC $ Qty $ 26 5.96 26 24 1 1 0 0 0 0 0 0 0 0 5.91 5.70 0.10 0.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.91 11.87 0.03 FY 01 INSTALLATION SCHEDULE: FY 04 $ 0.00 0.00 3 mos. FY 04 3 4 1 3 4 TC 2 3 4 FY 07 TOTAL INPUT 26 OUTPUT 26 Notes/Comments: Quantities refer to various Mine Warfare ships. P-1 Shopping List-Item No 47-11 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Jun-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: TBMCS Afloat Force Level H/W JG041/JG010 Supports aquisition of hardware and software for the Theater Battle Management Core Systems (TBMCS). This system is a suite of USAF software applications that support air and space opertions. TBMCS provides US forces with the ability to plan and control air operations. All DoD air operations, planners will use TBMCS to produce, generate, disseminate, and monitor execution of the ATO, air defense plan, master air attack plan, target nomination list, joint integrated DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 0 0.00 0 0.00 PRIOR YR EQUIP 0 0.00 FY 99 EQUIP 0 0.00 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.00 0.00 TOTAL PROCUREMENT COST 0.00 0.00 METHOD OF IMPLEMENTATION: FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ 1 0.51 14 1.40 7 1.82 0.00 0.00 1 0.36 1 0.36 0.15 0.13 14 0.60 14 0.60 0.36 0.87 Qty FY 05 $ Qty FY 06 $ Qty FY 07 $ Qty 0.60 2.28 7 0.79 7 0.79 0.79 2.94 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: 0.00 0.00 2 mos. 0.00 0.00 FY 2001: Dec-00 FY 2002: Dec-01 FY 2003: DELIVERY DATES: FY 2000: Feb-00 FY 2001: Feb-01 FY 2002: Feb-02 FY 2003: 1 OUTPUT 1 3 7 7 4 7 1 2 3 4 3 7 FY 05 1 2 4 4 3 3 4 1 2 1 2 FY 06 3 4 Qty $ CONT CONT 22 3.73 FY 03 FY 02 2 $ 1 2 0.00 0.00 0.00 PRODUCTION LEADTIME: Dec-99 1 Total Qty 0 FY 2000: PY TC $ 0.30 0.31 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: Qty 0.15 0.17 FY 01 INSTALLATION SCHEDULE: FY 04 $ 22 0 0 1 14 7 0 0 0 0 0 0 0.00 0.00 1.75 0.00 0.00 0.36 0.60 0.79 0.00 0.00 0.00 0.00 0.00 0.00 1.75 6.09 3 mos. FY 04 3 4 1 3 4 TC 2 3 4 FY 07 TOTAL INPUT 22 OUTPUT 22 Notes/Comments: Quantities refer to number of Force Level ships. Currently there are 29 Force Level ships in the Fleet. P-1 Shopping List-Item No 47-12 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Jun-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: TBMCS Shore Site H/W JG042/JG010 Supports aquisition of hardware and software for shore sites for the Theater Battle Management Core Systems (TBMCS). This system is a suite of USAF software applications that support air and space operations. TBMCS provides US forces with the ability to plan and control air operations, including air and space control and air and missile defense. All DoD air operations, planners will use TBMCS to produce, generate, disseminate, and monitor execution of the air DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.00 0.00 TOTAL PROCUREMENT COST 0.00 0.00 METHOD OF IMPLEMENTATION: FY 00 FY 01 FY 02 Qty $ Qty $ 2 0.43 4 0.49 Qty FY 03 $ Qty FY 04 $ Qty FY 05 $ Qty FY 06 $ Qty FY 07 $ Qty 2 0.14 2 0.14 4 0.30 4 0.30 0.14 0.57 0 0.30 0.85 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: 0.00 0 0.00 0.00 2 mos. 0.00 0.00 0.00 0 Dec-99 FY 2001: Dec-00 FY 2002: FY 2003: DELIVERY DATES: FY 2000: Feb-00 FY 2001: Feb-01 FY 2002: FY 2003: FY 01 1 INPUT 2 OUTPUT 2 3 2 2 4 2 1 2 1 2 1 2 3 4 1 2 Qty $ 4 0.92 0 3 4 1 2 0.00 6 0 0 2 4 0 0 0 0 0 0 0 0.44 0.00 0.00 0.14 0.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.44 1.36 0.00 0.00 3 mos. FY 04 3 4 1 3 4 TC 2 3 4 2 FY 06 3 0.00 FY 03 FY 02 2 FY 05 INSTALLATION SCHEDULE: $ 0.00 0.00 PRODUCTION LEADTIME: FY 2000: PY Total Qty 0.06 CONTRACT DATES: INSTALLATION SCHEDULE: TC $ 4 FY 07 TOTAL INPUT 6 OUTPUT 6 Notes/Comments: Quantities represent sites. P-1 Shopping List-Item No 47-13 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Jun-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: GCCS-M Ashore JH031/JG020 N/A Provides evolutionary systems and ancillary equipment upgrades to support CNO, Fleet Commanders in Chief, Unified Commanders, Type Commanders, Force Anti-Submarine Warfare (ASW) Commanders, and Submarine Operating Authorities worldwide. The GCCS-M Ashore provides a single system to receive, process, display, maintain and/or assess unit characteristics, employment scheduling, material condition, combat readiness, warfighting capabilities, and positional information of own, allied, and hostile forces. GCCS-M Ashore provides the tools necessary for Fleet and Shore based commanders to execute plans, transit tasking, and provide tactical information to subordinate forces. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 23 2.80 26 3.60 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 23 0.50 26 0.37 PRIOR YR EQUIP 23 0.50 FY 99 EQUIP 26 0.37 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.50 0.37 TOTAL PROCUREMENT COST 3.30 3.97 METHOD OF IMPLEMENTATION: FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ 57 6.10 56 3.44 65 57 1.09 56 0.66 57 1.09 56 0.66 1.09 7.19 FY 04 Qty $ Qty FY 06 Qty 7.56 CONT CONT. 227 20.70 65 2.01 CONT CONT. 65 2.01 227 23 26 57 56 65 0 0 0 0 0 Var. 4.13 0.50 0.37 1.09 0.66 2.01 0.00 0.00 0.00 0.00 0.00 CONT. 4.13 24.83 0.00 0.00 Qty $ CONT CONT. 0.00 CONT. 0.00 0.00 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: DELIVERY DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: FY 01 INSTALLATION SCHEDULE: PY 1 FY 03 FY 02 2 3 4 1 2 3 4 1 3 4 TC TOTAL INPUT Cont. 227 OUTPUT Cont. 227 INPUT 106 28 28 33 32 OUTPUT 106 28 28 33 32 FY 05 1 2 4 1 2 4 1 2 FY 06 3 4 1 2 3 mos. FY 04 3 INSTALLATION SCHEDULE: Total $ 0.00 0.00 2 mos. $ TC Qty 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: $ FY 07 $ 2.01 9.57 $ FY 05 Qty 0.66 4.10 Qty 2 3 4 FY 07 3 Notes/Comments: Quantities represent sites. P-1 Shopping List-Item No 47-14 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Jun-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Trusted Information Systems (formerly JMCIS OED) JJ011/JH011/JG030 N/A Trusted Information Systems (TIS) provides for the analysis of intelligence information from multiple sources to produce a comprehensive report of foreign forces and potential hostile activity. In addition, it provides near-real-time allsource fusion, correlation and analysis tools, directly feeding automated reporting capabilities. TIS provides positional data and operational intelligence to commanders at all levels. TIS does automated sanitizing, downgrading, and transliteration of formatted message traffic. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 99 $ 0 0 0 0.00 0.00 0.00 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ 3 0.90 3 0.43 3 0.98 4 3 0.03 3 0.03 3 0.08 3 0.03 3 0.03 3 0.08 0.03 0.93 0.03 0.45 0.08 1.06 Qty FY 04 Qty FY 05 $ Qty FY 06 Qty $ 1.96 Var. CONT. 13 4.27 4 0.08 Var. CONT. 4 0.08 13 0 3 3 6 4 0 0 0 0 0 Var. 0.21 0.00 0.03 0.03 0.08 0.08 0.00 0.00 0.00 0.00 0.00 CONT. 0.21 4.48 0.00 0.00 Qty Var. CONT. 0.00 CONT. 0.00 0.00 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: DELIVERY DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: FY 02 FY 01 INSTALLATION SCHEDULE: PY 1 2 3 4 1 FY 03 2 3 4 INPUT 6 1 2 2 1 1 OUTPUT 6 1 2 2 1 1 3 4 FY 05 INSTALLATION SCHEDULE: 1 2 1 2 1 2 FY 06 3 4 1 2 $ Total Qty 0.00 0.00 2 mos. $ TC $ 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: $ FY 07 Qty 0.08 2.03 $ 3 mos. FY 04 3 4 3 4 1 2 3 4 FY 07 TC TOTAL INPUT CONT 13 OUTPUT CONT 13 Notes/Comments: Quantities represent sites. P-1 Shopping List-Item No 47-15 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Jun-01 Global Command and Control System (GCCS) NW036/JH036/JG040 GCCS is an operational multi-service/agency program. GCCS supports the National Command Authority (NCA) and the CINC’s by providing Command, Control and Communication (C3) data processing capabilities including status of forces and support requirements for use in security decision making, force preparation and operational planning execution. Equipment is Scheduled for installation at Navy supported GCCS shore sites. Procurements includes intelligent workstations, servers and software equipment DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 6 1.20 11 1.70 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 6 0.60 11 0.80 PRIOR YR EQUIP 6 0.60 FY 99 EQUIP 11 0.80 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.00 0.80 TOTAL PROCUREMENT COST 1.80 2.50 METHOD OF IMPLEMENTATION: FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ 15 1.11 15 1.02 20 15 0.36 15 0.33 15 0.36 15 0.33 0.36 1.47 0.33 1.35 Qty FY 04 Qty FY 05 $ Qty FY 06 Qty $ 1.90 Var. CONT. 67 6.93 20 0.53 Var. CONT. 20 0.53 67 6 11 15 15 20 0 0 0 0 0 Var. 2.62 0.60 0.80 0.36 0.33 0.53 0.00 0.00 0.00 0.00 0.00 CONT. 2.62 9.55 0.00 0.00 Qty Var. CONT. 0.00 CONT. 0.00 0.00 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: DELIVERY DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: FY 01 INSTALLATION SCHEDULE: PY INPUT OUTPUT 1 FY 03 FY 02 2 3 4 32 6 9 32 4 7 4 3 4 1 $ Total Qty 0.00 0.00 1 mo. $ TC $ 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: $ FY 07 Qty 0.53 2.43 $ 2 3 9 11 5 9 6 4 1 3 4 3 4 TC TOTAL INPUT CONT. 67 OUTPUT CONT. 67 FY 05 1 2 1 2 1 2 FY 04 3 INSTALLATION SCHEDULE: 4 2 mos. FY 06 1 2 2 3 4 FY 07 Notes/Comments: Quantities represent sites. P-1 Shopping List-Item No 47-16 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Jun-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: GCCS-M Tactical Mobile (#2906) T4371/JG050 N/A This line procures various types of C4I Equipment in order to provide a new or an increased capability to the present TSC and MOCC systems and to replace the equipment when it has reached the end of service life, assuring the existing system remains interoperable with updated aircraft, sensors, and weapons systems. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring 39 1.10 Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 39 1.40 PRIOR YR EQUIP 39 1.40 FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 1.40 TOTAL PROCUREMENT COST 2.50 METHOD OF IMPLEMENTATION: FY 99 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ 10 2.80 4 3.96 7 4.23 14 10 1.10 3 0.92 7 0.77 10 1.10 3 0.92 1 6 0.47 0.30 1.10 3.90 0.92 4.88 0.77 5.01 Qty FY 04 Qty FY 05 $ Qty FY 06 Qty $ 5.24 CONT CONT 74 17.33 13 1.53 CONT CONT 1 12 0.30 1.23 CONT 0.00 0.00 PRODUCTION LEADTIME: CONT CONT 0.00 72 39 10 4 7 12 0 0 0 0 0 CONT 5.72 1.40 1.10 1.39 0.60 1.23 0.00 0.00 0.00 0.00 0.00 CONT 5.72 23.05 0.00 0.00 Qty CONTRACT DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: DELIVERY DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: FY 02 FY 01 INSTALLATION SCHEDULE: PY 3 4 TC TOTAL INPUT CONT 72 OUTPUT CONT 72 52 1 2 4 1 2 3 4 1 2 3 2 4 7 4 1 3 5 4 4 1 2 3 4 FY 05 INSTALLATION SCHEDULE: 1 2 4 1 2 1 2 FY 04 1 OUTPUT 3 FY 03 4 52 2 Various 3 INPUT 1 $ Total Qty 0.00 0.00 Various $ TC $ 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: $ FY 07 Qty 1.53 6.77 $ FY 06 2 3 4 FY 07 Notes/Comments: Quantities represent sites. P-1 Shopping List-Item No 47-17 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Jun-01 GCCS-M Tactical Mobile (#2906) T4500/JG050 N/A DESCRIPTION/JUSTIFICATION: Mobile Ashore Support Terminal/Mobile Integrated Command Facility (MAST/MICFAC). This line procures various types of C4I equipment in order to provide a new or increased capability to the present MAST and MICFAC systems, and to replace the equipment when it has reached the end of service life, assuring interoperability with other C4I systems. These facilities were established and will be upgraded using the evolutio acquisition approach. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 6 2.90 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 6.0 0.30 PRIOR YR EQUIP 6 0.30 FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.30 TOTAL PROCUREMENT COST 3.20 METHOD OF IMPLEMENTATION: FY 99 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ 5 0.60 1 1.82 1 2.15 1 5 0.30 0 0.00 1 0.31 5 0.30 1 0.31 0.30 0.90 0.00 1.82 0.31 2.47 Qty FY 04 Qty FY 05 $ Qty FY 06 Qty $ 3.56 CONT CONT 14 11.03 2 0.54 CONT CONT 1 1 0.29 0.25 CONT 0.00 0.00 PRODUCTION LEADTIME: CONT CONT 0.00 14 6 5 1 1 1 0 0 0 0 0 CONT 1.45 0.30 0.30 0.31 0.29 0.25 0.00 0.00 0.00 0.00 0.00 CONT 1.45 12.48 0.00 0.00 Qty CONTRACT DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: DELIVERY DATES: FY 2000: Various FY 2001: Various FY 2002: Various FY 2003: FY 01 INSTALLATION SCHEDULE: PY 1 FY 03 FY 02 1 3 4 TC TOTAL INPUT CONT 14 OUTPUT CONT 14 OUTPUT 11 4 1 1 2 3 1 1 1 FY 05 INSTALLATION SCHEDULE: 1 2 4 1 1 3 4 1 2 1 2 FY 04 4 11 3 Various 3 INPUT 2 $ Total Qty 0.00 0.00 Various $ TC $ 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: $ FY 07 Qty 0.54 4.09 $ FY 06 3 4 1 2 2 3 4 FY 07 Notes/Comments: Quantities represent sites. P-1 Shopping List-Item No 47-18 of 47-18 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT June 2001 P-1 ITEM NOMENCLATURE 261100 Naval Tactical Command Support System PY FY 2000 FY 2001 FY 2002 $185.6 $57.7 $54.4 $42.8 FY 2003 FY 2004 FY 2005 FY 2006 SUBHEAD 52DY FY 2007 TO COMP TOTAL QUANTITY COST (in millions) Narrative Description/Justification: PROGRAM COVERAGE/JUSTIFICATION FOR BUDGET YEAR REQUIREMENTS: The Naval Tactical Command Support System (NTCSS) is a multi-function program designed to provide standard tactical support information systems to various afloat and associated shore-based fleet activities. The mission is to provide the full range of responsive tactical support ADP hardware and software in support of the management of information, personnel, material and funds required to maintain and operate ships, submarines, and aircraft. NTCSS is to provide an efficient management of afloat tactical support data, through the use of standardized hardware and software, to meet the mission support information management requirements for force sustainment. On 6 June 1995, NTCSS and its component subsystems, discussed below, were selected as Command and Control migration systems under the auspices of ASD (C3I). NTCSS incorporates the functionality of the Shipboard Non-Tactical ADP Program (SNAP) systems, the Naval Aviation Logistics Command Management Information System (NALCOMIS), and the Maintenance Resource Management System (MRMS). SNAP is an automated information system that supports organizational level maintenance, supply, financial and administrative functions on afloat units, at Marine Aviation Logistics Squadrons (MALS) and at associated shore activities. Due to the age and obsolescence of SNAP I and SNAP II, these systems are being replaced with SNAP III in the 1994 through 2000 time frame. SNAP improves equipment supportability and maintainability and thus readiness through: improvement in the accuracy of maintenance, supply, financial and related support data maintained and reported by the ship; and acceleration of management report preparation and data transmission. The scope of SNAP includes approximately 300 sites. NALCOMIS is an automated, real time, interactive, management information system that provides a modern management tool for day-to-day management of aircraft maintenance at the organizational and intermediate levels. NALCOMIS automates management of the aviation repairables inventory, providing nose-to-tail tracking through the repair and operations cycles. The scope of NALCOMIS includes 66 aviation intermediate maintenance activities located afloat (CV/LHA/LHD/MALS), at Naval Air Stations (NASs), and approximately 326 Navy and Marine Squadrons. MRMS is an automated information system that supports ship intermediate maintenance management of the Atlantic and Pacific Fleets. MRMS supports Type Commands, Group Commanders, Area Coordinators, Readiness Support Groups, Submarine Squadrons, Ship Repair Facilities, and various Intermediate Maintenance Activities, both afloat and ashore, for budgeting, planning, production and analysis of ship maintenance. MRMS improves ship readiness through improved maintenance and ship repair management, information resource management , and maintenance data processing. The scope of MRMS includes approximately 16 shipboard and 65 shore based intermediate and maintenance and planning activities. Funding for FY99-07 procures: 1) NTCSS system upgrades for ships; 2) NTCSS system upgrades for Naval Air Stations, Squadrons, Shore Support Facilities, Fleet Training Centers and MALS; and 3) necessary production engineering and installation support. INSTALLATION AGENT: All FMP installations will be accomplished by Alteration Installation Team (AIT). P-1 SHOPPING LIST ITEM NO. PAGE NO. 48 1 Exhibit P-40, Budget Item Justification UNCLASSIFIED CLASSIFICATION UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE 261100 Naval Tactical Command Support System June 2001 SUBHEAD 52DY Narrative Description/Justification: (continued) The Navy Marine Corps Intranet (N/MCI) will provide end-to-end secure voice, video, and data services across the DoN shore network starting in FY01. The plan for funding N/MCI is to award a services contract during FY01 for up to 485,000 seats, at a fixed cost per seat for communications, services, desktop and network hardware, and commercial off-the-shelf (COTS) software. Prior to the N/MCI contract award, NTCSS will continue to procure and install personal computers (PCs), COTS software, printers, and NTCSS application servers and server software. Because ships, OCONUS sites, MALS, and Navy and Marine aviation squadrons are not included in the scope of the seat management concept under N/MCI, NTCSS will continue to procure and install PCs, COTS software, printers, and NTCSS application servers and server software. Under the seat management concept, NMCI will provide the LAN and PCs at CONUS naval air stations and training sites. NTCSS will continue to procure and install application servers and server software, and printers for CONUS naval air stations and training sites. Accordingly, funding associated with the PC procurement for CONUS naval air stations and training sites was reduced for FY01 and out . P-1 SHOPPING LIST ITEM NO. PAGE NO. 48 2 Exhibit P-40, Budget Item Justification UNCLASSIFIED CLASSIFICATION UNCLASSIFIED CLASSIFICATION DATE COST ANALYSIS June 2001 APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST ID CODE DY002 DY004 DY005 DY006 MALS/Shore Equipment Ship Set Equipment Ship Set Equipment Upgrades MALS/Shore Equipment Upgrades A A A A DY500 DY555 Production Support Production Support A P-1 ITEM NOMENCLATURE 261100 Naval Tactical Command Support System QTY 29 93 19,636 12 53,803 29 20 61 23,272 Non-FMP Installation NTCSS FMP Installation NTCSS NTCSS-DSA A FY 1999 UNIT TOTAL COST COST 785.25 734.03 918.45 275.44 QTY 9,423 21,287 18,369 69 16,802 64 TOTAL COST IN THOUSANDS OF DOLLARS FY 2000 FY 2001 UNIT TOTAL UNIT TOTAL COST COST QTY COST COST 368.00 265.70 25,392 17,005 36 103 539.00 155.00 19,404 15,965 QTY 20 97 FY 2002 UNIT COST 538.00 157.00 TOTAL COST QTY FY 2003 UNIT COST TOTAL COST 10,760 15,229 5,268 871 3,571 2,327 1,997 9,920 11,718 16,691 14,840 29 1,240 73 4,178 64 64.78 4,146 103 77.51 7,984 97 88.94 8,627 93 22,032 49 5,173 53 569 125.83 6,669 903 43 188.53 8,107 600 25 233.40 5,835 378 A TOTAL CONTROL DD FORM 2446, JUN 86 QTY 6,958 INSTALLATION DY777 PY TOTAL COST SUBHEAD 52DY 103,669 81,940 57,686 P-1 SHOPPING LIST ITEM NO. 48 54,387 42,826 Exhibit P-5, Cost Analysis PAGE NO. 3 UNCLASSIFIED CLASSIFICATION UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE DY005 ELEMENT OF COST FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO C. P-1 ITEM NOMENCLATURE 261100 Naval Tactical Command Support System RFP DATE ISSUE AWARD OF FIRST QTY DATE DATE DELIVERY SUBHEAD 52DY UNIT COST SPECS AVAILABLE NOW Ship Set Equipment Upgrades 01 Hewlett Packard/TAC 4 SPAWAR Consolidated Various IDIQ IDIQ IDIQ Navy Navy Navy Nov-00 Nov-00 Nov-00 Feb-01 Feb-01 Feb-01 36 36 36 $109,663 $162,169 $267,150 Yes Yes Yes Ship Set Equipment Upgrades 02 Hewlett Packard/TAC 4 SPAWAR Consolidated Various IDIQ IDIQ IDIQ Navy Navy Navy Nov-01 Nov-01 Nov-01 Feb-02 Feb-02 Feb-02 20 20 20 $95,002 $191,916 $251,293 Yes Yes Yes DATE REVISIONS AVAILABLE D. REMARKS Between years, the composition of ships change, i.e., one year may have more larger ships like CVs while another year may consist mainly of SSNs. As a result, the per unit costs are different. Moreover, different ships require different peripherals listed under the "Various" category, which leads to per unit cost differences in that category. DD FORM 2446, JUN 87 P-1 SHOPPING LIST ITEM NO. PAGE NO. 48 4 Exhibit P-5A, Procurement History and Planning UNCLASSIFIED CLASSIFICATION UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING B. APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT CONTRACTOR COST ELEMENT OF COST FY AND CODE LOCATION DY006 June 2001 CONTRACT METHOD & TYPE LOCATION OF PCO C. P-1 ITEM NOMENCLATURE 261100 Naval Tactical Command Support System RFP DATE ISSUE AWARD OF FIRST QTY DATE DATE DELIVERY SUBHEAD 52DY UNIT COST SPECS AVAILABLE NOW MALS Equipment Upgrades 01 Hewlett Packard/TAC 4 SPAWAR Consolidated Various IDIQ IDIQ IDIQ Navy Navy Navy Nov-00 Nov-00 Nov-00 Jan-01 Jan-01 Jan-01 103 103 103 $70,429 $78,354 $6,065 Yes Yes Yes MALS Equipment Upgrades 02 Hewlett Packard/TAC 4 SPAWAR Consolidated Various IDIQ IDIQ IDIQ Navy Navy Navy Nov-01 Nov-01 Nov-01 Jan-02 Jan-02 Jan-02 97 97 97 $75,411 $79,737 $1,763 Yes Yes Yes DATE REVISIONS AVAILABLE D. REMARKS Between years, shore site configurations changed, i.e., more larger sites in one year compared to another. As a result, the per unit costs are different. Moreover, different shore site configurations require different peripherals listed under the "Various" category, which leads to per unit cost differences in that category. DD FORM 2446, JUN 87 P-1 SHOPPING LIST ITEM NO. PAGE NO. 48 5 Exhibit P-5A, Procurement History and Planning UNCLASSIFIED CLASSIFICATION UNCLASSIFIED June 2001 261100 Naval Tactical Command Support Syste Ship Set Equipment Upgrades (52DY/DY005) MODELS OF SYSTEMS AFFECTED: Provides modern centrally managed mission support ADP system upgrades and NTCSS-Optimized software to replace aging systems for Battle Group and unit level ships. DESCRIPTION/JUSTIFICATION: Application subsystems include/financial/inventory management, organizational and surface maintenance management, and administrative information systems support. NTCSS procurements will also provide ship capabilities for displaying and storing Computer-aided Acquisition and Logistics Support (CALS) initiative information (digitized engineering drawings, automated technical manuals, etc.). MODIFICATION TITLE: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 97 EQUIP FY 98 EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 99 Qty $ FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ 20 18.4 69 25.4 36 19.4 20 10.8 20 20 1.7 0.3 53 53 2.1 0.9 43 43 1.3 0.6 25 25 0.8 0.4 20 2.4 53 6.7 43 8.1 25 5.8 20 2.4 53 6.7 16 27 3.0 5.1 9 16 1.6 4.2 20 2.4 22.8 53 6.7 35.1 43 FY 03 Qty $ 8.1 25 5.8 29.4 17.8 ADMINISTRATIVE LEADTIME: FY 04 Qty $ 3 months FY 05 Qty $ FY 06 Qty $ PRODUCTION LEADTIME: FY 07 Qty $ TC Qty FY 2000: Nov-99 FY 2001: Nov-00 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000: Jan-00 FY 2001: Feb-01 FY 2002: Feb-02 FY 2003: 1 2 1 2 FY 02 FY 01 FY 03 PY 1 2 3 4 1 2 3 4 INPUT 73 9 12 11 11 7 6 6 6 OUTPUT 73 9 12 11 11 7 6 6 6 1 2 4 1 2 3 4 FY 06 FY 05 INSTALLATION SCHEDULE: 3 Qty $ 3 months CONTRACT DATES: INSTALLATION SCHEDULE: Total $ FY 04 3 4 1 3 4 TC 2 3 4 FY 07 TOTAL * INPUT OUTPUT * Total is the inventory objective. P-1 SHOPPING LIST ITEM NO. PAGE NO. 48 6 P-3A Exhibit,Individual Modification History UNCLASSIFIED UNCLASSIFIED June 2001 261100 Naval Tactical Command Support Syste MALS/Shore Equipment Upgrades(52DY/DY006) MODELS OF SYSTEMS AFFECTED: Provides modern centrally managed mission support ADP system upgrades, and IMA-Optimized and OMA-Optimized software to replace aging systems at MALS, Naval Air Stations, squadrons, and training sites. IMA is the aviationIntermediate Maintenance Activity and OMA is the aviationOrganizational Maintenance Activity. DESCRIPTION/JUSTIFICATION: Application subsystems include/financial/inventory management, organizational and surface maintenance management, and administrative information systems support. NTCSS procurements will also provide ship/shore capabilities for displaying and storing Computer-aided Acquisition and Logistics Support (CALS) initiative information (digitized engineering drawings, automated technical manuals, etc.). MODIFICATION TITLE: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 97 EQUIP FY 98 EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 99 Qty $ FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ 61 16.8 64 17.0 103 16.0 97 15.2 61 1.6 64 1.4 103 1.1 97 1.2 61 2.7 64 4.1 103 8.0 97 8.6 61 2.7 64 4.1 103 8.0 97 8.6 61 2.7 21.1 64 4.1 22.5 103 FY 03 Qty $ 8.0 97 8.6 25.1 25.0 ADMINISTRATIVE LEADTIME: FY 04 Qty $ 3 months FY 05 Qty $ FY 06 Qty $ PRODUCTION LEADTIME: FY 07 Qty $ TC Qty FY 2000: Nov-99 FY 2001: Nov-00 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000: Jan-00 FY 2001: Jan-01 FY 2002: Jan-02 FY 2003: 1 2 1 2 FY 02 FY 01 PY INPUT OUTPUT 1 2 3 4 125 34 34 125 34 34 1 3 4 35 32 32 33 35 32 32 33 3 4 FY 06 FY 05 INSTALLATION SCHEDULE: 1 2 3 FY 03 2 4 1 2 Qty $ 3 months CONTRACT DATES: INSTALLATION SCHEDULE: Total $ FY 04 3 4 1 3 4 TC 2 3 4 FY 07 TOTAL * INPUT OUTPUT * Total is the inventory objective. P-1 SHOPPING LIST ITEM NO. PAGE NO. 48 7 P-3A Exhibit,Individual Modification History UNCLASSIFIED UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT S COST ITEM/MANUFACTURER CODE P-1 ITEM NOMENCLATURE 261100 Naval Tactical Command Support System FISCAL YEAR 01 FISCAL YEAR SUBHEAD NO. 52DY 02 FISCAL YEAR 03 ACCEP BAL E PROC PRIOR DUE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 2 5 A 2 3 4 2 3 4 3 4 4 3 4 4 3 A 2 2 2 2 2 2 2 2 2 2 2 A 11 11 10 11 10 11 11 11 11 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP V FY DY005 DY005 DY005 COTS H/W and S/W COTS H/W and S/W COTS H/W and S/W 00 01 02 69 36 20 53 27 16 DY006 DY006 DY006 COTS H/W and S/W COTS H/W and S/W COTS H/W and S/W 00 01 02 64 103 97 64 103 97 16 9 4 CY 00 CALENDAR YEAR A OCT NOV 11 DEC JAN 11 FEB 12 MAR 11 APR 11 MAY 12 JUN 11 JUL 01 12 CALENDAR YEAR 02 CALENDAR YEAR 03 12 AUG SEP OCT NOV DEC PRODUCTION RATE PROCUREMENT LEADTIMES Manufacturer’s ALT Prior ALT After Initial Reorder ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure COTS Hardware and Software N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21, Production Schedule P-1 SHOPPING LIST ITEM NO. 48 Unit of PAGE NO. 8 UNCLASSIFIED CLASSIFICATION UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 DATE P-1 ITEM NOMENCLATURE Advanced Tactical Data Link Systems 2614 FY 2000 FY 2001 FY 2002 $18.4 $19.0 $10.0 FY 2003 FY 2004 FY 2005 FY 2006 SUBHEAD 52DR FY 2007 TO COMP TOTAL QUANTITY COST (in millions) PROGRAM COVERAGE: The Advanced Tactical Data Link Systems (ATDLS) funds the Time Division Multiple Access (TDMA) family of Link 16 terminals in the Joint Tactical Information Distribution System (JTIDS) terminals and the Multifunctional Information Distribution System - Low Volume Terminal (MIDS-LVT) and the Tactical Digital Information Link J (TADIL J) message standard databases resident in the Command & Control Processor (C2P) sub-system. The Common Data Link Management System (CDLMS) is designated as Pre-planned Product Improvement (P3I) of the C2P. ATDLS also funds the LMS 16 Link Monitoring System and the Dual Net Link 11 CDLMS Upgrade. AN/URC-107(V) TERMINALS (JTIDS): AN/URC-107(V) Joint Tactical Information Distribution System (JTIDS) is an advanced radio system that provides information distribution, position location, and identification capabilities in an integrated form for application to military operations. The system is able to distribute information at high rates, encrypted to provide security, and with sufficient jam resistance to yield high reliability communications in a hostile electromagnetic environment. JTIDS provides the ability to interconnect multiple sources (air, ground, maritime, subsurface, and electronic warfare) and users of information. It provides surface and airborne elements with both a position location capability within a common position reference grid and an intrinsic identification capability through the dissemination of secure position and identity information. It is a multiservice system in that Army JTIDS interoperates with the U.S. Air Force, U.S. Navy, and U.S. Marines JTIDS Class 2 terminals. AN/UYQ-86 COMMAND AND CONTROL PROCESSOR (C2P) REHOST (C2P(R))/COMMON DATA LINK MANAGEMENT SYSTEM (CDLMS): AN/UYQ-86 C2P(R)/CDLMS program is the acquisition of commercial-offthe-shelf (COTS) versa module eurocards (VME) based Navy computers in conjunction with a software suite to provide the interface between tactical and digital communication systems and selected shipboard processors (Advanced Combat Direction Systems (ACDS) and AEGIS Command & Decision (C&D)). C2P extracts information from the Tactical Digital Information Links (TADILS) A, C & J (or Link 11, Link 4A, and Link 16), translates between TADILS and provides the information back to the on-board processor. This provides flexible capability for rapidly exchanging tactical information using a universal database for translating various Link formats while remaining independent of communication equipment and tactical data computing systems. C2P Rehost uses COTS hardware (AN/UYQ-70), making the system easier and cheaper to upgrade and maintain. CDLMS is designated as the pre-planned product improvement to the C2P. It is integrated with the C2P(R) via a set of commercial VME to provide enhanced, consolidated displays to monitor and analyze multi-TADIL networks graphically. All procurement of CDLMS hardware will include the Satellite-TADIL-J (S-TADIL-J), and the Electronic JTIDS Network Library (EJNL) . S-TADIL-J is an additional set of cards and cables integrated into the CDLMS chassis, enabling the system to send Link 16 information over satellite, providing range extension beyond the Theater of Operation. E-JNL provides pre-defined networks (configurations of ships and aircraft) allowing immediate access to different operational configurations. This minimizes delays for reconfiguring the network when new platforms are introduced to a mission. P-1 Shopping List-Item No-49-1 of 12 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION ET ITEM JUSTIFICATION SHEET (Continued) June 2001 DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE SUBHEAD Advanced Tactical Data Link System 2614 52DR LMS 16 (LINK MONITORING SYSTEM): The LMS 16 provides for improved Link 16 network diagnostics, system monitoring and control capabilities. Network performance monitoring by platform and time slot allocation provide critical data to optimize the Link 16 network. Ruggedized LMS 16 hardware/software will allow the operator to analyze the Link 16 network in real-time and adjust network performance to support Theater Air Defense/Theater Missile Defense by Battle Groups and Joint Task Forces. DUAL NET LINK 11 CDLMS UPGRADE: The Dual Net Link 11 CDLMS Upgrade provides additional processing cards to simultaneously process and monitor two independent Link 11 networks. MIDS ON SHIP (MOS): The Multi-Functional Information Distribution System Low Volume Terminal (MIDS-LVT) is a five nation cooperative program that provides a third generation Link-16 system that satisfies U.S. and allied requirements to exchange tactical information in a digital format across a broad range of sources. Building on JTIDS, MIDS uses the latest technology to reduce system size and weight. It is designed to be readily reconfigurable for different user needs. MOS consists of a MIDS-LVT integrated into a JTIDS type Electronics Cabinet Assembly including a Terminal Controller, High Power Amplifier/Adapter, and Power Supplies. JUSTIFICATION OF FY 00 REQUIREMENTS: FY 00 funds were used to procure C2P(R)/ CDLMS backfits including S-TADIL-J and E-JNL, and associated production support. Installation funding includes CDLMS backfits to upgrade AN/UYK-43 to the AN/UYQ-86 configuration, including (3) training facilities, and AIT and shipyard installs for JTIDS terminals. JUSTIFICATION OF FY 01 REQUIREMENTS: FY 01 funds will be used to procure C2P(R) /CDLMS backfits, LMS-16 and associated production support. Funding will also be used for Link 16 Alteration Installation Team (AIT) and shipyard installs of CDLMS backfits and JTIDS terminals. JUSTIFICATION OF FY 02 REQUIREMENTS: FY 02 funds will be used to procure a C2P(R) /CDLMS backfit and associated production support. Funding will also be used for Link 16 Alteration Installation Team (AIT) and shipyard installs of CDLMS backfits and JTIDS terminals. INSTALLATION AGENT: Space and Naval Warfare Systems Center, San Diego (SSC-SD) and Charleston (SSC-CH). P-1 Shopping List-Item No-49-2 of 12 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION ET ITEM JUSTIFICATION SHEET (Continued) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT June 2001 DATE P-1 ITEM NOMENCLATURE SUBHEAD Advanced Tactical Data Link System 2614 52DR DEFINITIONS OF COST CODES: DR001: AN/URC-107(V) (JTIDS): All hardware costs associated with AN/URC-107(V) JTIDS terminal hardware, antennas, filter devices and Engineering Change Proposals (ECP). Procurement of JTIDS terminals continued in FY 99 due to slip in MIDS production decision. DR003: AN/UYQ-86 (C2P/C2P(R)/CDLMS): All hardware costs associated with Command and Control Processor (C2P), C2P Rehost, Common Data Link Management System (CDLMS), Common Shipboard Data Terminal Sets (CSDTS), Satellite-TADIL-J, Electronic JTIDS Network Library (E-JNL), Dual Net Link 11 CDLMS Upgrades, and all associated ECPs. DR006: LMS-16 (LINK MONITORING SYSTEM): All hardware costs associated with a stand-alone LMS-16 workstation which includes monitor, keyboard, associated antenna and software license agreement. DR010: MIDS ON SHIP: All hardware and nonrecurring engineering cost associated with MIDS on Ship High Power Link 16 terminal includes MIDS Low Volume Terminal (LVT), Ship Antennas, Electronic Cabinet Assembly, Filtering devices, High Power Amplifier Group (HPAG), Terminal controller, and all associated ECPs. MOS terminals scheduled to be procured for training sites will not require the procurement of a new antenna DR555: PRODUCTION SUPPORT (AN/UYQ-86): Annualized production support includes evaluation of C2P(R)/CDLMS ECPs and production support services for CDLMS, S-TADIL-J, E-JNL, and Dual Net Link 11 CDLMS Upgrades; and MIDS on Ship production support services and the evaluation of MIDS Engineering Change Proposals (ECPs). DR666: TRAINING CURRICULUM: Training Curriculum (end-item) for CDLMS, MIDS Ship Terminal, and Dual Net Link 11 CDLMS Upgrades. DR777: INSTALLATION: Link 16 equipment installations into shore and training facilities. Link 16 Alteration Installation Team (AIT), shipyard installs and DSA, Electronic Environment Effects testing (EEE), and installation engineering and integration coordination for the Fleet. Covers AIT ship installs for JTIDS/C2P(R), initial MIDS, MIDS/CDLMS, MIDS backfits, C2P(R)/CDLMS backfits, S-TADIL-J backfits, E-JNL backfits, and Dual Net Link 11 CDLMS Upgrades. P-1 Shopping List-Item No-49-3 of 12 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ID CODE ELEMENT OF COST DR003 DR003 DR006 DR010 AN/UYQ-86 (C2P / C2P(R) / CDLMS) Dual Net Link 11 CDLMS Upgrade LMS-16 (Link Monitoring System) MIDS on Ship DR555 Production Support Production Support (AN/URC-107(V)) Production Support (AN/UYQ-86) Production Support (MIDS on Ship) DR666 Training Curriculum DR777 Installation Installation of Equipment / Non-FMP Installation of Equipment / FMP DSA A PY TOTAL COST QTY FY99 UNIT COST TOTAL COST QTY 17 P-1 ITEM NOMENCLATURE SUBHEAD Advanced Tactical Data Link Systems 2614 52DR TOTAL COST IN THOUSANDS OF DOLLARS FY 2000 FY 2001 FY 2002 FY 2003 UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL COST COST QTY COST COST QTY COST COST QTY COST COST 529.3 8,998 8 560.8 4,486 5 521.4 2,607 1 591.0 591 B A B 429 280 106 429 280 106 8,975 11,604 9,268 548 6,792 1,635 500 10,578 526 0 8,646 622 18,402 18,977 9,965 N/A N/A N/A N/A N/A N/A TOTAL CONTROL P-1 Shopping List-Item No-49-4 of 12 DD FORM 2446, JUN 86 Exhibit P-5, Budget Item Justification Unclassified UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST DR003 AN/UYQ-86 (C2P / C2P(R) / CDLMS) DR006 LMS-16 (Link Monitoring System) D. 1. 2. 3. FY CONTRACTOR AND LOCATION CONTRACT & TYPE LOCATION OF PCO METHOD SUBHEAD Advanced Tactical Data Link Systems 2614 RFP DATE ISSUE AWARD OF FIRST QTY DATE DATE Delivery 52DR SPECS DATE UNIT COST AVAILABLE REVISIONS NOW AVAILABLE 00 01 02 Various 1 FFP Various N/A May-00 May-01 17 529 YES N/A Various 2 FFP Various N/A Feb-01 Feb-02 8 561 YES N/A Various 3 FFP Various N/A Feb-02 Feb-03 1 591 YES N/A 01 Logicon, San Diego, CA IDIQ NAVSEA N/A Dec-00 Jun-01 5 521 YES N/A REMARKS ACS Technologies, Sherikon, GAC Inc. and RJO Inc. ACS Technologies and Sherikon integrate various commercial-off-the-shelf components. Sherikon, DRS Inc. and RJO Inc. Sherikon integrates various commercial-off-the-shelf components. Competitive selection on GSA schedule. P-1 Shopping List-Item No-49-5 of 12 Exhibit P-5a, Procurement History and Planning Unclassified Classification June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: AN/URC-107(V) (JTIDS) SHIP INSTALLATIONS DR001 JTIDS is an advanced radio system providing information distribution, position location, and identification capability at high rates of speed, crypto-secure, and jam resistant. In FY 99, we procured the final JTIDS terminals, with installations scheduled within FY 03. JTIDS will be replaced with the next generation equipment, Multi-functional Information Distribution System (MIDS) on Ship. Installation costs associated with JTIDS includes the cost of AN/UYQ-86 (C2P(R)/CDLMS). DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: POST-MS III FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 54 66.6 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 43 34.5 43 34.5 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 34.5 TOTAL PROCUREMENT COST 101.1 METHOD OF IMPLEMENTATION: FY 99 FY 00 Qty $ 8 8.1 Qty FY 01 $ FY 02 Qty $ 3 3 2.1 2.1 FY 03 Qty $ 3 3 1.5 1.5 Qty FY 04 $ Qty FY 05 $ Qty FY 06 $ Qty FY 07 $ Qty TC $ Qty Total $ Qty 0.1 0.2 0.9 9 9 5.7 5.7 5.7 15.0 0.4 3 3 2.4 2.4 0.0 2.4 2.9 0.0 2.1 1.5 2.1 1.6 ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 18 MOS CONTRACT DATES: FY 2000: FY 2001: FY 2002: FY 2003: DELIVERY DATES: FY 2000: FY 2001: FY 2002: FY 2003: FY 01 INSTALLATION SCHEDULE: PY INPUT 55 OUTPUT 55 FY 02 1 2 3 4 1 1 1 1 1 1 3 4 1 2 FY 03 1 2 3 1 1 1 1 1 1 3 4 FY 05 INSTALLATION SCHEDULE: $ 4 1 2 1 2 FY 06 1 2 FY 04 3 4 1 3 4 TC 2 3 4 FY 07 TOTAL INPUT OUTPUT Notes/Comments 1. Total quantity meets inventory objective. 2. JTIDS and C2P(R) are installed as a ship set. 3. JTIDS and C2P(R)/CDLMS are installed as a ship set except for command ships. JTIDS is being installed on one command ship in FY 01, two command ships in FY 02, and one command ship in FY 03. Installation schedule changed from the FY 01 PB due to change in ship availability and to improve capability. 4. FY 99 JTIDS procurement was a buy-out for eight remaining ship requirements. Future procurements will be MIDS on Ship terminals. 5. Non-recurring Installation Kits are Long Lead Time Material. P-1 Shopping List-Item No-49-6 of 12 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: AN/UYQ-86 (C2P(R)/CDLMS) SHORE INSTALLATIONS DR003 The C2P(R)CDLMS equipment performs data link processing functions and provides the interface between the Tactical Digital Information Links (TADILS) and selected shipboard processors. CDLMS provides the ability to graphically display multiple TADIL networks for monitoring and analysis. These efforts provide CDLMS shore installations at selected training sites. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: POST MS III FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 15 27.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 15 3.5 PRIOR YR EQUIP 15 3.5 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 3.5 TOTAL PROCUREMENT COST 30.5 METHOD OF IMPLEMENTATION: FY 99 FY 00 Qty $ 3 1.8 Qty 3 3 0.0 1.8 FY 01 $ Qty FY 02 $ Qty FY 03 $ Qty FY 04 $ Qty FY 05 $ Qty FY 06 $ Qty FY 07 $ Qty TC $ Qty 0.5 0.5 0.5 0.5 0.0 0.0 0.0 0.0 ADMINISTRATIVE LEADTIME: 0.0 0.0 2 MOS 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 FY 2001: FY 2002: FY 2003: DELIVERY DATES: FY 2000: FY 2001: FY 2002: FY 2003: FY 01 INPUT 18 OUTPUT 18 1 2 1 2 FY 02 3 4 1 2 3 4 1 2 4 1 2 3 4 1 2 FY 06 FY 05 INSTALLATION SCHEDULE: FY 03 3 $ 18 28.8 0 0.0 18 18 0 0 0 0 0 0 0 0 0 4.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 32.8 0.0 0.0 FY 2000: PY Qty 12 MOS CONTRACT DATES: INSTALLATION SCHEDULE: Total $ FY 04 3 4 1 3 4 TC 2 3 4 FY 07 TOTAL INPUT 18 OUTPUT 18 Notes/Comments 1. Total quantity meets inventory objective. P-1 Shopping List-Item No-49-7 of 12 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: AN/UYQ-86 (C2P(R)/CDLMS) FORWARD FIT INSTALLATIONS DR003 The C2P(R)CDLMS equipment performs data link processing functions and provides the interface between the Tactical Digital Information Links (TADILS) and selected shipboard processors. CDLMS provides the ability to graphically display multiple TADIL networks for monitoring and analysis. The cost of installing C2P(R)/CDLMS is included in the JTIDS terminal installation cost (reflected in P3-A for DR001) for FY 99-03 and in MIDS on Ship Installation cost (reflected in P-3A for DR010) for FY 04-07. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: POST MS III FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 54 55.6 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 43 0.0 PRIOR YR EQUIP 43 0.0 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 55.6 METHOD OF IMPLEMENTATION: FY 99 FY 00 Qty $ 4 2.4 9 9 0.0 0.0 0.0 2.4 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ 3 3 0.0 0.0 2 2 0.0 0.0 1 1 0.0 0.0 0.0 0.0 Qty 0.0 0.0 0.0 0.0 ADMINISTRATIVE LEADTIME: FY 04 $ Qty FY 05 $ 2 MOS Qty FY 06 $ Qty FY 07 $ PRODUCTION LEADTIME: Qty TC $ Qty FY 2000: FY 2001: FY 2002: FY 2003: DELIVERY DATES: FY 2000: FY 2001: FY 2002: FY 2003: FY 01 PY INPUT 55 OUTPUT 55 1 2 1 1 FY 02 3 4 1 2 1 1 2 4 1 2 4 1 2 FY 04 3 4 1 3 4 TC 2 3 4 1 1 1 FY 06 FY 05 INSTALLATION SCHEDULE: FY 03 3 Qty 18 MOS CONTRACT DATES: INSTALLATION SCHEDULE: Total $ 3 4 1 2 FY 07 3 TOTAL INPUT OUTPUT Notes/Comments 1. Total quantity meets inventory objective. 2. Production leadtime varies between 12 to 18 months. For forward fit ships, JTIDS or MIDS on Ship and UYQ-86(C2P/CDLMS) are installed as a ship set except for command ships. Delivery of forward fit units takes six months longer than those procured into existing suites. This is due to longer integration and testing time at the SPAWAR Systems Center. 3. Installation costs are included in the JTIDS (DR001) or MIDS on Ship (DR010) installation costs. P-1 Shopping List-Item No-49-8 of 12 Exhibit P-3A, Individual Modification Program Unclassified Classification $ UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: AN/UYQ-86 (C2P(R)/CDLMS) BACKFIT SHIP INSTALLATIONS DR003 The C2P(R)/CDLMS equipment performs data link processing functions and provides the interface between the Tactical Digital Information Links (TADILS) and selected shipboard processors. CDLMS provides the ability to graphically display multiple TADIL networks for monitoring and analysis. The purpose of C2P(R)/ CDLMS backfits is to upgrade the outdated AN/UYK-43 in the fleet with the newer AN/UYQ-86 COTS equipment. CDLMS includes S-TADIL-J and E-JNL. Identified installation costs include S-TADIL-J installations planned in FY 99 and FY 01; and E-JNL installations planned in FY 01. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: POST MS III FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: FY 99 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ 12 7.1 17 0.4 9.0 8 4.5 1 0.6 0.2 0.3 0 0 1.3 1.3 0.4 1.2 7 7 1.3 8.8 3.8 3.8 0.3 0.5 14 5 9 3.8 14.9 8.5 3.0 5.5 Qty FY 04 $ Qty FY 05 $ Qty FY 06 $ Qty FY 07 $ Qty TC $ Qty 14 7.1 8 6 4.1 3.0 8.5 7.1 13.8 8.4 ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: May-00 FY 2001: Feb-01 FY 2002: Feb-02 FY 2003: DELIVERY DATES: FY 2000: May-01 FY 2001: Feb-02 FY 2002: Feb-03 FY 2003: FY 01 INPUT 7 OUTPUT 7 FY 02 FY 03 1 2 3 4 1 2 3 4 4 1 2 7 5 3 3 3 4 1 2 7 5 3 3 3 4 1 2 3 4 FY 05 INSTALLATION SCHEDULE: 1 2 $ 12 MOS FY 2000: PY Qty 0.1 0.6 CONTRACT DATES: INSTALLATION SCHEDULE: Total $ 1 2 1 2 FY 06 FY 04 3 4 1 3 4 TC 2 3 4 FY 07 TOTAL INPUT OUTPUT Notes/Comments 1. Total quantity meets inventory objective. 2. In FY 99 no quantities are shown because only S-TADIL-J (and not AN/UYQ-86) is being installed. 3. Non-Recurring Installation Kits are Long Lead Time Material. P-1 Shopping List-Item No-49-9 of 12 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: LMS-16 LINK MONITORING SYSTEM SHORE INSTALLATIONS DR006 LMS-16 provides improved Link 16 network diagnostics, system monitoring and control capabilities. Network performance monitoring by platform and time slot allocation provide critical data to optimize the Link 16 network. LMS-16 are being installed at five NCTSI shore based detachments. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: POST-MS III FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: FY 99 Qty FY 00 $ 0.0 0.0 Qty FY 01 $ FY 02 Qty $ 5 2.6 5 0.5 5 0.5 Qty FY 03 $ Qty 0.5 0.0 3.1 0.0 ADMINISTRATIVE LEADTIME: 0.0 FY 04 $ Qty FY 05 $ 2 MOS Qty FY 06 $ Qty FY 07 $ PRODUCTION LEADTIME: Qty TC $ Qty FY 2000: FY 2001: Dec-00 FY 2002: FY 2003: DELIVERY DATES: FY 2000: FY 2001: Jun-01 FY 2002: FY 2003: FY 01 PY 1 2 FY 02 3 4 1 INPUT 5 OUTPUT 3 2 4 1 2 FY 05 INSTALLATION SCHEDULE: 1 2 FY 03 3 4 1 2 3 4 1 2 FY 06 3 2 Qty 6 MOS CONTRACT DATES: INSTALLATION SCHEDULE: Total $ FY 04 3 4 1 3 4 1 FY 06 2 3 4 3 4 FY 07 2 TC TOTAL INPUT OUTPUT Notes/Comments 1. Total quantity meets inventory objective. P-1 Shopping List-Item No-49-10 of 12 Exhibit P-3A, Individual Modification Program Unclassified Classification $ UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE Advanced Tactical Data Link Systems 2614 ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 2 2 2 2 2 2 2 1 1 1 1 1 1 APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY DR003 AN/UYQ-86 (C2P/C2P(R)/CDLMS) 02 17 8 1 17 8 1 01 5 5 00 01 DR006 LMS-16 (Link Monitoring System) 01 FISCAL YEAR SUBHEAD NO. 52DR CALENDAR YEAR 01 2 1 A OCT NOV DEC JAN FEB MAR APR MAY 3 2 JUN JUL AUG SEP OCT NOV DEC JAN FEB 1 MAR PRODUCTION RATE 1-8-5 03 CALENDAR YEAR 03 PROCUREMENT LEADTIMES ALT Prior ALT After Initial Reorder MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Manufacturer’s MSR FISCAL YEAR 02 1 A A 02 CALENDAR YEAR ITEM Name and Location AN/UYQ-86 (C2P/C2P(R)/CDLMS) Sherikon/ACS 5 40 12 months Dual Net Link 11 CDLMS Upgrade* Various TBD 12 48 12 months LMS-16 (Link Monitoring System) Logicon, San Diego, CA 1 12 6 months MIDS on Ship* Various TBD 1 72 20 months Unit of Total Measure *NOTE: Initial Award for Dual Net Link 11 CDLMS Upgrade and MIDS on Ship in FY 03, no production rate data available at this time. Exhibit P-21A, Production Schedule Unclassifed Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE Advanced Tactical Data Link Systems 2614 FISCAL YEAR COST ITEM/MANUFACTURER/ CODE PROCUREMENT YEAR DR003 C2P/C2P(R)/ CDLMS DR006 LMS-16 (Link Monitoring System) FISCAL CARRY YEAR OVER CY03 04 CALENDAR YEAR FISCAL YEAR 04 SUBHEAD NO. 52DR 05 CALENDAR YEAR 06 CALENDAR YEAR L 06 A O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S T C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P R 02 0 0 0 0 0 0 01 0 0 00 01 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR PRODUCTION RATE MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP PROCUREMENT LEADTIMES ALT Prior ALT After Initial Reorder MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Manufacturer’s ITEM Name and Location MSR AN/UYQ-86 (C2P/C2P(R)/CDLMS) Dual Net Link 11 CDLMS Upgrade* LMS-16 (Link Monitoring System) Sherikon/ACS Various TBD Logicon, San Diego, CA Various TBD 5 40 12 months 12 1 1 48 12 72 12 months 6 months 20 months MIDS on Ship* FISCAL YEAR 05 1-8-5 Unit of Total Measure *NOTE: Initial Award for Dual Net Link 11 CDLMS Upgrade and MIDS on Ship in FY 03, no production rate data available at this time. NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21A, Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY P-1 ITEM NOMENCLATURE BA-2: COMMUNICATIONS/ELECTRONICS Program Element for Code B Items: 0603502N ID Code QUANTITY EQUIPMENT COST (In Millions) SPARES COST (In Millions) MINESWEEPING SYSTEM REPLACEMENT/262200/72LV Other Related Program Elements Prior Years PE 0204302N FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total A N/A $18.0 $12.8 $8.9 CONT. CONT. A N/A $3.9 $2.0 $2.0 CONT. CONT. PROGRAM DESCRIPTION/JUSTIFICATION : Provide systems, subsystems, and engineering change kits for minehunting, navigation, and tactical display operations by the surface MCM force. Engineering change kits improve reliability and maintainability and correct deficiencies to allow equipment to perform in accordance with operational requirements. Also includes funding for the installation of equipment including Fleet Modernization Program installation. Remote Minehunting System (RMS) (LV064) : The AN/WLD-1(V)1 system will consist of Remote Minehunting Vehicle (RMV), Variable Depth MIW Sensor (VDS), and shipboard equipment consisting of a Launch and Recovery System, radio antennas and support equipment. MIW sensors are specifically designed for the detection, classification, and localization of subsurface mines. Closed Loop Degaussing (LV065) : The Closed Loop Degaussing (CLDG) system automaticallymonitors and maintains a ship’s static magnetic signature through on-board magnetic field measurements, a computer algorithm for predicting off-board magnetic fields, and an advanced degaussing control system. Integrated Combat Weapon System (ICWS) (LV066): The Integrated Combat Weapons System (ICWS) Program is a series of major, incremental Block upgrades to the current combat systems to ultimately provide to the MCM Class Ships an affordable and fully integrated combat weapon system comprised of the AN/SQQ-32 Mine Hunting Sonar, the AN/SLQ-48 Mine Neutralization System, the AN/SSQ-94 Combat System Onboard Trainer, and the AN/SSN-2 Navigation System. There are three block upgrades: Block 0 - Establishes a baseline for shipboard configuration. Block 1 - Transitions combat systems to an open systems architecture, develops common operator consoles and establishes an ATM/SONET local area network (LAN). Block 2 - Improves performance of "wet end" equipment (sonar and mine neutralization vehicle). High Resolution Multibeam Side Scan (LV068): The high resolution multi-beam side-scan sonar and associated initial spares and support will be procured for use in forward deployed mine countermeasure ships in the Arabian Gulf and Korean Peninsula regions. The sonar is a Commercial, Off-the-Shelf (COTS) high resolution multi-beam side-scan sonar presently used by Naval Oceanographic Office research vessels and the commercial off-shore industry. The side scan sonar will provide knowledge of sea bed conditions and pre-existing targets providing invaluableinformation to the MCM vessels and helicopters, reducing time required for MCM operations, as well as reducing risk to personnel and equipment. The Sea Bottom Mapping and Characterization Program will enhance the capability of the MCM Forces by providing sea bottom maps and other data necessary for timely execution of assigned MCM tasks. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 50 PAGE NO. CLASSIFICATION: 1 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 CONTINUATION APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY DATE: June 2001 P-1 ITEM NOMENCLATURE BA-2: COMMUNICATIONS / ELECTRONICS MINESWEEPING SYSTEM REPLACEMENT/ 262200/72LV ITEM DESCRIPTION / JUSTIFICATION (CONTINUED) : Engine Upgrade (LV067): FY00-Procure level 2 drawings and engine sustainment items to support MCM 1 and MCM 2 Waukesha engines from the OEM. Engine sustainment items are required due to the fact the OEM will no longer be manufacturing these engines. Installation of Equipment (LV5IN) : Funding is for the installation of equipment including fleet modernization program installations, installations of training equipment in other shore facilities. Items procured in FY 00: CLDG 2 systems. Integrated Combat Weapons System, consisting of Doppler Speed Log Replacement, Battle Space Profiler, SQQ-32 upgrade, and the following Engineering changes: MCM and MHC Doppler Sonar ECP Upgrade, SLQ-48 ECPs for acoustic quieting, PDU/CCU redesign, and TRS completion, SQQ-32 ECPs for the reduction of Magnetic Signature, inproved reliability, implementation of Replica Correlator, trainer safety, shock improvements, and MCM (V)3 upgrade, and SSQ-94(V)3 upgrade for MHC Class ships. Items being procured in FY 01: CLDG 1 system. Integrated Combat Weapons System, consisting of Doppler Speed Log Replacement and the following Engineering changes: OK-520 ECP to improve HPU maintainability, MCM and MHC Doppler Sonar ECP upgrade, SQQ-32 ECPs for the reduction of Magnetic Signature, improved reliability, CAD/CAC improvements, and MCM (V)3 upgrade, SSQ94(V)3 upgrades for MHC Class ships, SLQ-48 ECP for the redesign of the PDU/CCU, and Common combat system printer ECP. High resolution multi beam side scan sonar for forward deployed MCM ships. Items to be procured in FY 02: CLDG 2 systems. Integrated Combat Weapons System consisting of the following engineering changes: SQQ-32 ECPs for the replacement of an obsolete touch panel, CAD/CAC improvements, and MCM (V)3 upgrade, and SLQ-48 ECP for the redesign of the PDU/CCU. Code "B" Items: RMS Systems, PE 0603502N DT/OA TECHEVAL Phase I TECHEVAL Phase II/OPEVAL Planned Jul - Sep 02 Jul - Oct 03 Jul - Sep 04 Estimates include competitive sourcing savings associated with consolidation of production support contracting efforts. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 50 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2: COMMUNICATIONS / ELECTRONICS ID Code P-1 ITEM NOMENCLATURE/SUBHEAD A MINESWEEPING SYSTEM REPLACEMENT/262200/72LV TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost 2 2,860.5 FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost MINE WARFARE, N852 LV065 CLOSED LOOP DEGAUSSING (CLDG) A LV066 ICWS A LV068 HI-RES MULTI-BEAM SIDE SCAN LV830 PRODUCTION ENGINEERING 119 141 598 LV900 CONSULTING SERVICES 378 366 854 LV5IN INSTALLATION OF EQUIPMENT ICWS ECPs TOTAL DD FORM 2446, JUN 86 5,721 1 2,890 2,890 (9,431) VAR VAR 9,431 2 2,700 5,400 (5,437) VAR A VAR 5,437 (2,051) VAR VAR 2,051 4,000 2,359 0 18,008 12,834 P-1 SHOPPING LIST ITEM NO. 50 8,903 CLASSIFICATION: PAGE NO. 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2: COMMUNICATIONS / ELECTRONICS MINESWEEPING SYSTEM REPLACEMENT/262200 Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) LOCATION OF PCO CONTRACT METHOD & TYPE RFP ISSUE DATE SUBHEAD CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY 72LV SPECS AVAILABLE NOW FISCAL YEAR 00 LV065 CLDG 2 2860.5 NSWC, CARDEROCK N/A WR VARIOUS 7/00 4/02 YES LV066 ICWS VAR* VAR* NAVSEA/ NSWC CRANE/ DAHL/ CSS N/A SS/FP VARIOUS VAR** VAR** YES FISCAL YEAR 01 LV065 CLDG 1 2890 NSWC CARDEROCK N/A WR VARIOUS 12/00 8/02 YES LV066 ICWS VAR* VAR* NAVSEA/ NSWC CRANE/ DAHL/ CSS N/A OPTION, WR VARIOUS VAR** VAR** YES LV065 CLDG 2 2700 NSWC, CARDEROCK N/A WR VARIOUS 12/01 8/03 YES LV066 ICWS VAR* VAR* NAVSEA/ NSWC CRANE/ DAHL/ CSS N/A OPTION, WR VARIOUS VAR** VAR** YES FISCAL YEAR 02 D. REMARKS * SEE SYSTEM DESCRIPTION ON P-40 FOR MORE DETAILS ** Dates of award and delivery vary based on when ECPs are submitted and approved. P-1 SHOPPING LIST DD Form 2446-1, JUL 87 ITEM NO. 50 PAGE NO. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE DATE FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY June 2001 P-1 ITEM NOMENCLATURE Minesweeping System Replacement/262200/72LV Weapon System OTHER PROCUREMENT, NAVY Procurement Lead-times ALT Prior ALT After Initial MAX to Oct 1 Oct 1 Mfg PLT 4 8 Production Rate Item LV065- CLDG Manufacturer’s Name and Location NSWC, CARDEROCK, MD MSR 1 1-8-5 2 Reorder Mfg PLT 8 FISCAL YEAR 2000 ITEM / MANUFACTURER LV065 CLDG LV065 CLDG F Y S V C Q D B T Y E L A L 00 01 N N 2 1 0 0 2 1 F Y S V C Q D B T Y E L A L 00 01 02 N N N 2 1 2 0 0 0 2 1 2 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R F E B M A Y J U N A U G J U L CALENDAR YEAR 2001 S E P O C T N O V D E C J A N LV065 CLDG LV065 CLDG LV065 CLDG F E B M A R A P R M A Y J U N J U L A U G S E P A 2001 O C T N O V FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 2 DD Form 2445, JUL 87 Previous editions are obsolete A P-1 SHOPPING LIST ITEM NO 50 PAGE 5 B A L 0 0 0 1 Remarks: 311 / 244 B A L 2 1 A FISCAL YEAR 2002 ITEM / MANUFACTURER Unit of Measure EACH Total Exhibit P-21 Production Schedule CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: MCM-1 Class Ships ALT MODIFICATION TITLE: AN/SQQ-32 SONAR Backfit FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: Installation of AN/SQQ-32 Sonar replaces the AN/SQQ-30 Sonar in MCM-1 through MCM-8. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 2000 FY 2001 FY 1999 & Prior QTY $ QTY $ QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS 0.0 INSTALLATION KITS - UNIT COST 0.0 INSTALLATION KITS NONRECURRING 0.0 EQUIPMENT 8 55.9 8 55.9 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 0.0 SUPPORT EQUIPMENT 0.0 OTHER - ECPs 0.0 OTHER - ENGINEERING SUPPORT 0.0 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST TOTAL PROCUREMENT 7 9.5 65.4 1 1.6 0.0 1.6 0.0 0.0 0.0 0.0 0.0 ITEM 50 0.0 0.0 PAGE 6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8 11.1 0.0 67.0 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: AMCM-1 Class Ships INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: Contractor ADMINISTRATIVE LEADTIME: 4 Months CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: FY 1999 & Prior Qty PRIOR YEARS $ 7 1 AN/SQQ-32 SONAR Backfit PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 2000 Qty $ 9.5 MODIFICATION TITLE: FY 2001 Qty $ 28 Months FY 2002: FY 2002: ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Total Qty $ Qty $ 1.6 1 11.1 FY 2000 EQUIPMENT 0 0.0 FY 2001 EQUIPMENT 0 0.0 FY 2002 EQUIPMENT 0 0.0 FY 2003 EQUIPMENT 0 0.0 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT 0 0.0 FY 2006 EQUIPMENT 0 0.0 FY 2007 EQUIPMENT 0 0.0 TO COMPLETE 0 0.0 INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TC & Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 In 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 Out 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 50 PAGE ITEM 7 P-3A CLASSIFICATION: UNCLASSIFIED TOTAL CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: AN/SSQ-94 ALT MODIFICATION TITLE: AN/SSQ-94 FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 2000 FY 2001 FY 1999 & Prior QTY $ QTY $ QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS 0.0 INSTALLATION KITS - UNIT COST 0.0 INSTALLATION KITS NONRECURRING 0.0 EQUIPMENT Var 11.2 11 11.2 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 0.0 SUPPORT EQUIPMENT 0.0 OTHER - ECPs 0.0 OTHER - ENGINEERING SUPPORT 0.0 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST TOTAL PROCUREMENT Var 3.0 14.2 Var 0.5 0.0 0.5 0.0 0.0 0.0 0.0 0.0 ITEM 50 0.0 0.0 PAGE 8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11 3.5 0.0 14.7 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: CMCM-1 Class ShipsMODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Var CONTRACT DATES: FY 2000 DELIVERY DATE: FY 2000 Cost: AIT (Tiger Team) PRIOR YEARS $ Var PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A N/A N/A FY 1999 & Prior Qty AN/SSQ-94 Trainer FY 2000 Qty $ 3.0 Var FY 2001 Qty $ Var FY 2002: FY 2002: ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Total Qty $ Qty $ #### 3.5 FY 2000 EQUIPMENT 0.5 0 0.0 FY 2001 EQUIPMENT 0 0.0 FY 2002 EQUIPMENT 0 0.0 FY 2003 EQUIPMENT 0 0.0 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT 0 0.0 FY 2006 EQUIPMENT 0 0.0 FY 2007 EQUIPMENT 0 0.0 TO COMPLETE 0 0.0 INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TC & Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 In Var 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 #VALUE! Out Var 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 #VALUE! 50 PAGE ITEM 9 P-3A CLASSIFICATION: UNCLASSIFIED TOTAL CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: MCM-1 Class Ships ALT MODIFICATION TITLE: AN/SQQ-32 Upgrade FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: This Alteration modifies and upgrades the AN/SQQ-32 Sonar in the 14 ships of the Avenger (MCM-1) Class. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 2000 FY 2001 FY 1999 & Prior QTY $ QTY $ QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT Var 16.9 Var 16.9 INSTALLATION KITS 0.0 INSTALLATION KITS - UNIT COST 0.0 INSTALLATION KITS NONRECURRING 0.0 EQUIPMENT 0.0 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 0.0 SUPPORT EQUIPMENT 0.0 OTHER - ECPs 0.0 OTHER - ENGINEERING SUPPORT 0.0 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST 0.0 0.3 0.0 TOTAL PROCUREMENT 0.0 0.3 0.0 0.0 0.0 0.0 0.0 ITEM 50 0.0 0.0 PAGE 10 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.3 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: MCM-1 Class Ships MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT (Tiger Team) ADMINISTRATIVE LEADTIME: 3 Months CONTRACT DATES: FY 2000 N/A DELIVERY DATE: FY 2000 N/A Cost: FY 1999 & Prior Qty $ PRIOR YEARS FY 2000 Qty $ Var AN/SQQ-32 SONAR Upgrade PRODUCTION LEADTIME: FY 2001 N/A FY 2001 N/A FY 2001 Qty $ 12-15 Months FY 2002 FY 2002 ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Total Qty $ Qty $ 0.3 0 0.3 FY 2000 EQUIPMENT 0 0.0 FY 2001 EQUIPMENT 0 0.0 FY 2002 EQUIPMENT 0 0.0 FY 2003 EQUIPMENT 0 0.0 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT 0 0.0 FY 2006 EQUIPMENT 0 0.0 FY 2007 EQUIPMENT 0 0.0 TO COMPLETE 0 0.0 INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TC & Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL In Var 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 #VALUE! Out Var 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 #VALUE! ITEM 50 PAGE 11 P-3A CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENT SCHEDULE P-23 1 ACTIVE FORCE INVENTORY SCHOOLS/OTHER TRAINING (P) (P) (P) OTHER (P) TOTAL PHASED REQ (C) ASSETS ON HAND (BP) DELIVERY FY 99 & PRIOR (P) FY 00 (P) FY 01 (P) FY 02 (P) FY 03 (P) FY 04 (P) FY 05 (P) FY 06 (P) FY 07 (P) To Complete (P) TOTAL ASSETS QTY OVER (+) OR SHORT (-) D. REMARKS (C) FY 2000 2 3 A. APPROPRIATION/BUDGET ACTIVITY B. P-1 ITEM NOMENCLATURE Other Procurement, Navy Minesweeping System Replacement/262200/72LV 4 1 FY 2001 2 3 4 1 FY 2002 2 3 1 0 0 0 0 0 0 0 0 0 1 SSMYP 1 4 FY 2003 2 3 1 4 C. DATE 1 FY 2004 2 3 June 2001 4 1 FY 2005 2 3 4 FY 2006 2 3 LATER 4 1 8 2 13 2 SSMYP 1 SSMYP 0 0 0 0 0 0 0 0 0 2 2 3 13 0 0 0 0 0 0 0 0 0 1 1 1 0 E. RQMT (QTY) 1. APPN - OPN 2. APPN - 3. PROCUREMENT LEADTIME TOTAL RQMT INSTALLED 13 0 ON HAND AS OF / /99 0 FY 99 & PRIOR UNDELIVERED 0 UNFUNDED LV065 - Closed Loop Degaussing DD for 2447, JUN 86 1 ADMIN 6 Months INITIAL ORDER 15 months P-1 SHOPPING LIST ITEM NO 50 PAGE NO REORDER 6 Month CLASSIFICATION: 12 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENTS SCHEDULE (SUPPLEMENT SHEET-INSTALLATION DATA) P-23A Minesweeping System Replacement/262200/72LV Other Procurement, Navy E.I./L 2ND QTR QTY E.I./L June 2001 Installing Agent NSWC Carderock, MD APPROPRIATION/BUDGET ACTIVITY 1ST QTR DATE P-1 ITEM NOMENCLATURE/PROJECT UNIT 3RD QTR QTY E.I./L 4TH QTR QTY E.I./L 1ST QTR QTY E.I./L 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L FY 1999 FY 2000 FY 2001 FY 2002 MCM 10 P-1 SHOPPING LIST ITEM NO. 50 PAGE NO. 13 4TH QTR QTY 1 E.I./L QTY MCM 6 1 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA-2: Communications/Electronics SHALLOW WATER MCM/262400/72SW Program Element for Code B Items: Other Related Program Elements PE 0603502N Surface and Shallow Water Mine Countermeasures QUANTITY COST (In Millions) SPARES COST (In Millions) ID Code Prior Years FY 2000 FY 2001 FY 2002 B 7.3 $13.0 $0.0 $0.0 B $0.6 $0.1 $0.2 $0.1 PE 0204302N FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total PROGRAM DESCRIPTION/ JUSTIFICATION : Shallow Water Mine Countermeasures(SWMCM) equipment is being developedto enable the US Navy to clear mines and light obstacles from the very shallow water and surf zones in preparationfor an amphibious assault by the US Marines. Each of the equipments below is necessary to complete a "toolbox" for the Navy to perform this task. SHALLOW WATER ASSAULT BREACHING SYSTEM (SABRE) - SW021: A linear demolition charge deployedinto the deep end of the surf zone (10’ - 3’) to clear anti-invasionmines from the assault lanes. NON-RECURRING (SABRE) - SW021: Explosives facility rehabilitation/upgrades and qualification as well as tooling essential to begin production. FULL SCALE INERT TRAINERS - SW022: A full size inert version of the explosive SABRE system, to be used for mission training during operational exercises. SUB-CALIBER TRAINERS - SW023: An inert, small scale version of the explosive SABRE system, to be used for school and unit training. LAUNCH CONTROLLERS - SW024: An electrical control box for centralized initiation and status check of the Assault Breaching systems on board the Landing Craft Air Cushion (LCAC) mission platform. FULL MISSION TRAINER - SW025: An upgrade to the existing LCAC Full Mission Trainer (FMT) to incorporate essential Assault Breaching Systems functionality. DISTRIBUTED EXPLOSIVE TECHNOLOGY (DET) - SW031: An array of detonating cord deployed into the shallow end of the surf zone (3’ - 0’) to clear anti-invasion and land mines from the assault lane. Overall Flyaway costs remain at $363K per system however, tactical systems are split into critical sub cost codes: DET FUZE - includes tactical, first article, lot acceptance, samples and quality evaluations (QE) samples DET ENERGETICS - includes detonating cord, QE detonating cord samples, and rocket motors. DET Hardware - includes LCAC interface kits, container, exoskeleton, launcher, parachutes, harness, and all other minor hardware. DET Non recurring - includes first articles. FULL SCALE INERT TRAINERS - SW032: A full size inert version of the tactical DET system, to be used for mission training during operational exercises. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 51 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 CONTINUATION APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA-2: Communications/Electronics SHALLOW WATER MCM/262400/72SW SUB-CALIBER TRAINERS - SW033: An inert small scale version of the explosive DET system, to be used for school and unit training. AUTOPILOT - SW061: An integratedimprovementto the LCAC navigationsystem for craft control that allows precise movementand hovering within the breached lane during the deploymentof DET and SABRE, and precise navigation of breached lanes. EGI PROCUREMENT - Autopilot - SW062 : Economical buy of EGI (Embedded GPS INS), a subcomponent of Autopilot to avoid additional system cost. The thirty five EGI will be integrated into AUTOPILOT to meet current LCAC requirements. The remaining EGI will be procured, under separate procurement funding - PMS377J, as part of the LCAC Service Life Extension Program (SLEP). PE #0603502N DT OT TDP PRODUCTION DECISION DD Form 2454, JUN 86 DET SEP 00 OCT 00 OCT 00 JAN 01 ITEM NO. P-1 SHOPPING LIST 51 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2: COMMUNICATION / ELECTRONICS B P-1 ITEM NOMENCLATURE/SUBHEAD SHALLOW WATER MCM/262400/72SW TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost SW024 LAUNCH CONTROLLERS 94 16.82 1,581 SW025 FULL MISSION TRAINERS 1 1,000.00 1,000 SW031 DET TACTICAL SYSTEMS* 8 555.75 B Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost (4,446) DET FUZE DET ENERGETICS 1,879 DET HARDWARE 8 266.9 2,135 6 238.2 1,429 100 10.4 1,040 2 197.0 394 34 70.12 2,384 DET NON- RECURRING 430 SW032 DET FULL SCALE INERT TRAINERS ** SW033 DET SUB-CALIBER TRAINERS *** SW061 AUTOPILOT A SW062 AUTOPILOT- EGI A SW830 PRODUCTION ENGINEERING 549 282 SW900 CONSULTING SERVICES 343 400 6,364 * DET TACTICAL SYSTEMS (SW031) are made up of DET FUZE, DET ENERGETICS, DET HARDWARE, and DET NON_RECURRING ** DET FULL SCALE INERT TRAINERS (SW032) consists of inert system, 2 MK22 MOD 4 rockets, and non-recurring refurbishment of training hardware. *** DET SUB-CALIBER TRAINERS (SW033) consists of sub-caliber system and 2 MK127 rockets. Note: In FY 01 all tactical, first article, lot acceptance, and QE fuzes are procured for the total (20) tactical systems. This economic buy prevents an additional $2.6M cost. (Each fuze lot requires 16 first article samples, 16 lot acceptance samples, and 16 QE samples) Note: FY00 funds were to be used to FY 01 SABRE per FY 01 FMB Budget hearing agreement between FMB and PMS407. FY00 SABRE funds identified as an asset because of program slip. 7,256 12,955 P-1 SHOPPING LIST DD FORM 2446, JUN 86 ITEM NO. 51 0 PAGE NO. 0 CLASSIFICATION: 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2: COMMUNICATIONS / ELECTRONICS SHALLOW WATER MCM/262400 QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE FISCAL YEAR 2000 SW024 94 16.82 N/A N/A WR SW025 SW031 SW032 SW033 SW061 SW062 1 8 6 100 2 34 1,000.00 555.75 238.20 10.40 197.00 70.12 NAWC, TSD NAVSEA NAVSEA NAVSEA N/A N/A N/A 05/00 05/00 05/00 N/A N/A OPTION C/FP C/FP C/FP WR PD Cost Element/ FISCAL YEAR SUBHEAD 72SW CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW NSWC, IH Indian Head, MD Raytheon, Portsmouth RI UNKNOWN UNKNOWN UNKNOWN NSWC, CSS NAVAIR 05/00 06/01 YES 02/00 08/00 08/00 08/00 12/99 07/00 11/00 02/02 08/01 08/01 09/01 04/01 YES YES YES YES YES YES D. REMARKS SW025 - Option to PMS 377 contract #N61339-96-C-0109 (Raytheon); SW031 - Deliveries will be shown for DET Tactical Systems only. P-1 SHOPPING LIST DD Form 2446-1, JUL 87 ITEM NO. 51 PAGE NO. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY June 2001 DATE Weapon System P-1 ITEM NOMENCLATURE - SHALLOW WATER OTHER PROCUREMENT, NAVY Production Rate Manufacturer’s Name and Location Item SW031 UNKNOWN SW032 UNKNOWN SW033 UNKNOWN MSR TBD* TBD* TBD* 1-8-5 ALT Prior MAX to Oct 1 TBD* TBD* TBD* Procurement Leadtimes ALT After Initial Reorder Oct 1 Mfg PLT Mfg PLT EA FISCAL YEAR 2000 ITEM / MANUFACTURER SW031 DET TACTICAL SW032 DET INERT TRAINER SW033 DET SUB-CALIBER TRAINER F Y S V C Q D B T Y E L A L 00 00 00 N N N 8 6 100 0 0 0 8 6 100 F Y S V C Q D B T Y E L A L 00 00 N N 8 100 0 50 8 50 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N SW031 DET TACTICAL SW033 DET SUB-CALIBER TRAINER Remarks: M A R A P R M A Y J U N J U L 2001 O C T N O V J A N F E B M A R A P R M A Y S E P Previous editions are obsolete B A L 8 0 50 6 50 FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C A U G J U N J U L A U G CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 8 50 B A L 0 0 Production Rate and Procurement Leadtimes will be determined after contract award. DD Form 2445, JUL 87 311 / 244 F E B A A A FISCAL YEAR 2002 ITEM / MANUFACTURER Unit of Measure Total P-1 SHOPPING LIST ITEM NO 51 PAGE 5 Exhibit P-21 Production Schedule FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY June 2001 DATE Weapon System P-1 ITEM NOMENCLATURE - SHALLOW WATER OTHER PROCUREMENT, NAVY Production Rate Manufacturer’s Name and Location Item SW061 UNKNOWN SW062 UNKNOWN MSR 2 4 1-8-5 MAX 24 ALT Prior to Oct 1 Procurement Leadtimes ALT After Initial Reorder Oct 1 Mfg PLT Mfg PLT EA FISCAL YEAR 2000 ITEM / MANUFACTURER SW061 AUTOPILOT SW062 AUTOPILOT EGI F Y S V C Q D B T Y E L A L 00 00 N N 2 34 0 0 2 34 F Y S V C Q D B T Y E L A L 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N A U G J U L CALENDAR YEAR 2001 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G A 2001 O C T N O V 14 J A N F E B M A R A P R M A Y 20 J U N J U L A U G DD Form 2445, JUL 87 Previous editions are obsolete 0 0 CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Remarks: 311 / 244 B A L FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C S E P 2 A FISCAL YEAR 2002 ITEM / MANUFACTURER Unit of Measure Total P-1 SHOPPING LIST ITEM NO 51 PAGE 6 Exhibit P-21 Production Schedule B A L FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY June 2001 DATE Weapon System P-1 ITEM NOMENCLATURE - SHALLOW WATER OTHER PROCUREMENT, NAVY Production Rate Manufacturer’s Name and Location Item MSR 1-8-5 MAX ALT Prior to Oct 1 Procurement Leadtimes ALT After Initial Reorder Oct 1 Mfg PLT Mfg PLT EA SW024 NSWC, Indian Head MD SW025 Raytheon, Portsmouth RI FISCAL YEAR 2000 ITEM / MANUFACTURER SW024 LAUNCH CONTROLLER SW025 FULL MISSION TRAINER F Y S V C Q D B T Y E L A L 00 00 N N 94 1 0 0 94 1 F Y S V C Q D B T Y E L A L 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N F E B M A R A P R M A Y A A 2001 O C T N O V J A N F E B J U L A U G S E P 24 24 23 23 M A R A P R M A Y A U G S E P DD Form 2445, JUL 87 Previous editions are obsolete 0 0 J U N J U L A U G CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Remarks: 311 / 244 B A L FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C J U N 1 FISCAL YEAR 2002 ITEM / MANUFACTURER Unit of Measure Total P-1 SHOPPING LIST ITEM NO 51 PAGE 7 Exhibit P-21 Production Schedule B A L UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 DATE P-1 ITEM NOMENCLATURE NAVSTAR GPS BLI 2657 FY 2000 FY 2001 FY 2002 $8.6 $9.5 $9.9 FY 2003 FY 2004 FY 2005 SUBHEAD 521R FY 2006 FY 2007 TO COMP TOTAL QUANTITY COST (in millions) Cont. Cont. PROGRAM COVERAGE: Navigation Sensor System Interface (NAVSSI) is a surface based system that integrates shipboard navigation signals and distributes the processed output to user systems and networks. NAVSSI provides position, velocity, time and almanac data to onboard command and control systems in real time with Global Positioning System (GPS) as the primary source of navigation data. The navigation team uses an automated work station that includes automated planning functions and the use of Digital Nautical Charts (DNC). NAVSSI uses Non-Developmental Item (NDI) hardware and a combination of commercial off the shelf (COTS) and newly developed software. The GPS VME (Versa Module Europa) Receiver Card (GVRC) replaces the 13 card GPS receiver with a single card and is hosted within NAVSSI. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS:Procurement and installation of Navigation Sensor System Interface (NAVSSI) are required to provide Global Positioning System (GPS) and other navigation sensor data to ship-board C4ISR, Combat, and Weapons Systems. NAVSSI enables utilization and display of electronic chart products. NAVSSI is the only available system that performs the full functions of collection, integration, and distribution of navigation data. Common charting and precision navigation data are required to allow a common and correlated ship-to-ship tactical and operational picture. NAVSSI ensures precise Strike and Theater Ballistic Missile Defense (TBMD) weapon systems to have the necessary navigational data. Failure to procure and install NAVSSI on the above platforms would result in loss of critical navigation data required by Combat and Weapons Systems. FY00 funding procures 7 NAVSSI systems, 2 RTS/DCS retrofit kits, installation of 8 NAVSSI systems and install of 2 RTS/DCS retrofits. FY01 funding procures 10 NAVSSI systems, 1 RTS/DCS retrofit kit, installation of 11 NAVSSI systems and install of 1 RTS/DCS retrofit. FY02 funding procures 9 NAVSSI systems, 4 RTS/DCS retrofit kits, installation of 9 NAVSSI systems and install of 4 RTS/DCS retrofits Installations are being done for each class/ship through the preparation of ship alteration proposals and ship alteration records. P-1 Shopping List-Item No - 52 (1 of 8) Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continued) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT June 2001 DATE P-1 ITEM NOMENCLATURE SUBHEAD NAVSTAR GPS BLI 2657 521R PROGRAM COVERAGE: OSD directed (by PBD) the start of Navy Global Positioning System (GPS) Navigation Warfare (NAVWAR) procurements starting in 2001 (in the APN account) in order to equip Naval platforms with GPS Anti-Jam upgrades to enable them to operate in an environment with GPS interference. Anti-jam antenna user equipment and prevention capabilities have been identified as a requirement in the Navigation Warfare Mission Need Statement which has been validated by the Joint Oversight Requirements Council. The military forces must meet the precise position, velocity, and time requirements defined in the Operational Requirements Document (ORD) for Global Positioning System – Navigation Warfare. The Naval Research Advisory Committee (NRAC) GPS Vulnerability Study Panel tasked by OPNAV N6 and ASN(RD&A), assessed the Navy's GPS Vulnerabilities and recommended specific actions to resolve serious vulnerabilities. Subsequently a GPS Executive Committee (EXCOMM) was established under DASN (C4I) and N6 co-chair to provide oversight to the Navy’s NAVWAR efforts. This has become the Navy’s GPS NAVWAR program. Given the current threat to GPS navigation from jamming, and the increasing use of GPS by potential adversaries, it is necessary to implement the NAVWAR/GPS modernization program and equip the Fleet with a robust anti-jam GPS capability. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: Procurement and installation anti-jam GPS user equipment and prevention equipment is required to ensure the continued utility of GPS signals from space in a hostile jamming environment. The NAVWAR program will equip selected ships and submarines with anti-jam GPS antennas and other GPS Modernization enhancements to ensure the continued availability of GPS to support surface and subsurface combat operations and provide reliable GPS and other navigation sensor data to ship-board C4ISR, Combat, and Weapons Systems. Failure to procure and install NAVWAR anti-jam antennas on the above platforms would result in the potential loss of critical GPS information resulting in serious impact on platform combat mission effectiveness. FY02 Initial funding procures 18 NAVWAR GAS-1 Anti-Jam Antenna Shipsets. Installations are being done for each class/ship through the preparation of ship alteration proposals and ship alteration records. Installation Agent: Installation teams and/or overhaul - to be determined for each ship class during execution. P-1 Shopping List-Item No - 52 (2 of 8) Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST ID CODE P-1 ITEM NOMENCLATURE SUBHEAD 521R TOTAL COST IN THOUSANDS OF DOLLARS FY 2001 FY 2002 FY 2003 UNIT TOTAL UNIT TOTAL UNIT COST COST QTY COST COST QTY COST NAVSTAR GPS BLI 2657 PY TOTAL COST QTY FY99 UNIT COST TOTAL COST QTY FY 2000 UNIT COST TOTAL COST QTY 1R555 Production Support 399 1R009 NAVSSI A 7 485 3,395 10 480 4,800 9 465 4,185 1R011 1R012 1R013 NAVSSI - Retrofit NAVSSI - Land Based Test Facility NAVWAR A 2 240 480 798 1 240 240 4 255 1,020 18 43 774 1R777 Installation A B Install - NAVSSI FMP Install - NAVSSI Retrofit Install - Design Service Agent (NAVSSI) A Install - NAVWAR Install - Design Service Agent (NAVWAR) B TOTAL CONTROL 509 A A TOTAL COST 452 3,524 3,970 3,426 2,270 464 790 3,116 220 634 2,160 764 438 64 B 8,596 9,519 9,857 Remarks: Note 1: 1R009 Unit cost is the average cost of the hardware on different classes of ships. Starting in FY 02 some ships require less hardware resulting in lower costs per unit. Note 2: 1R011 Unit cost is the average cost of retrofit hardware on different classes of ships. Starting in FY 02 major combatants, which require more hardware, will be retrofitted, resulting in higher costs per unit. Note 3: 1R012 Procure hardware, acceptance testing, integration and certification for a system that will save installation and hardware costs in the future. P-1 Shopping List-Item No 52 (3 of 8) Exhibit P-5, Budget Item Justification DD FORM 2446, JUN 86 Unclassified UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST 1R009 NAVSSI 1R011 NAVSSI - Retrofit 1R013 NAVWAR Hardware NAVSTAR GPS BLI 2657 RFP ISSUE AWARD DATE DATE CONTRACT FY CONTRACTOR AND LOCATION & TYPE LOCATION OF PCO 00 Various WX/RCP Various Various Feb-00 01 02 Various WX/RCP Various Various Various WX/RCP Various Various 01 02 Various WX/RCP Various Various Various WX/RCP Various Various 02 TBD C/FFP GPS JPO Jul-00 Dec-01 METHOD SUBHEAD 521R DATE OF FIRST Delivery SPECS DATE QTY UNIT COST AVAILABLE REVISIONS NOW AVAILABLE Jul-00 7 485,000 Yes Dec-00 Apr-01 10 480,000 Yes Nov-01 Mar-02 9 465,000 Yes Mar-01 Jun-01 1 240,000 Yes Nov-01 Mar-02 4 255,000**** Yes Oct-02 18 43,000 Yes** D. REMARKS * FY00 and FY01 Retrofit procurements are for RTS/DCS enhancement retrofit kits. Subsequent retrofits minimize the DCS function and adds NRS connection to a shipwide network server. ** Initial specifications for the GAS-1 array and Antenna Electronics are currently available, but these have not yet been tailored to include Navy unique requirements. *** 1R009 Unit cost is the average cost of the hardware on different classes of ships. Starting in FY 02 some ships require less hardware resulting in lower costs per unit **** 1R011 Unit cost is the average cost of retrofit hardware on different classes of ships. Starting in FY 02 major combatants, which require more hardware, will be retrofitted, resulting in higher costs per unit. P-1 Shopping List-Item No 52 (4 of 8) Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June 2001 NAVSTAR Global Positioning System (GPS) (521R) NAVSSI 1R009 All models of ships will have NAVSTAR GPS The NAVSTAR Global Positioning System (GPS) is a joint Service Program which will provide advance satellite positioning. The ultimate system will consist of a constellation of satellites, control/tracking network, and user equipment installed aboard a variety of airborne, shipborne and land-based platforms. With the advent of Over the Horizon - Targeting (OTH-T), it is imperative that all ships continuously know their geographic position to correlate sensor data and prevent escort ships from becoming unwilling targets. To meet this need, the Navigation Sensor System Interface (NAVSSI) program was initiated. NAVSSI will distribute position, velocity, time and almanac data to onboard command and control and combat systems in real time with GPS as the primary source of navigation data. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 65 10.7 12 5.3 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support 2.9 0.5 Other (DSA) 0.2 Interm Contractor Support Installation of Hardware 65 13.7 9 2.4 PRIOR YR EQUIP 65 13.7 9 2.4 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 13.7 2.4 TOTAL PROCUREMENT COST 27.3 8.4 METHOD OF IMPLEMENTATION: FY 00 Qty $ 7 4.2 FY 01 Qty $ 10 0.4 0.8 8 3 5 2.3 0.8 1.5 4.8 FY 02 Qty $ 9 0.5 0.6 11 3.1 2 9 0.8 2.3 2.3 7.7 3.1 9.0 FY 03 Qty $ FY 04 Qty $ FY 06 Qty $ FY 07 Qty $ TC Qty $ Total Qty 103 4.2 $ 29.2 0.4 0.5 9 2.1 1 8 0.2 1.9 4.7 2.1 0 2.1 7.2 0.0 0.0 0.0 0.0 ADMINISTRATIVE LEAD-TIME: 0.0 0.0 0.0 0.0 1 FY 2000: Feb-00 FY 2001: Dec-00 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000: Jul-00 FY 2001: Apr-01 FY 2002: Mar-02 FY 2003: PY 1 2 FY 01 3 4 1 2 FY 02 3 4 INPUT 82 1 1 5 4 1 2 4 2 OUTPUT 82 1 1 5 4 0 3 4 2 1 2 FY 05 3 4 1 2 FY 03 3 4 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 INPUT 0.0 102 77 7 10 8 0 0 0 0 0 0 23.6 16.9 2.3 2.5 1.9 0.0 0.0 0.0 0.0 0.0 0.0 23.6 59.6 0.0 0.0 0.0 0.0 PRODUCTION LEAD-TIME: CONTRACT DATES: INSTALLATION SCHEDULE: INSTALLATION SCHEDULE: FY 05 Qty $ 2 FY 04 3 5 4 TOTAL 102 OUTPUT 102 Notes/Comments FY00 Equipment cost includes the Land Base Acceptance Test Facility funding of $798K. P-1 Shopping List-Item No 52 (5 of 8) Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June 2001 NAVSTAR Global Positioning System (GPS) (521R) NAVSSI Retrofit 1R011 All models of ships will have NAVSTAR GPS The NAVSTAR Global Positioning System (GPS) is a joint Service Program which will provide advance satellite positioning. The ultimate system will consist of a constellation of satellites, control/tracking network, and user equipment installed aboard a variety of airborne, shipborne and land-based platforms. With the advent of Over the Horizon - Targeting (OTH-T), it is imperative that all ships continuously know their geographic position to correlate sensor data and prevent escort ships from becoming unwilling targets. To meet this need, the Navigation Sensor System Interface (NAVSSI) program was initiated. NAVSSI will distribute position, velocity, time and almanac data to onboard command and control and combat systems in real time with GPS as the primary source of navigation data. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 25 0.9 11 0.3 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 17 0.6 19 0.6 PRIOR YR EQUIP 17 0.6 19 0.6 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.6 0.6 TOTAL PROCUREMENT COST 1.5 0.9 METHOD OF IMPLEMENTATION: FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ 2 0.5 1 0.2 4 1.0 1 0.4 2 0.2 4 0.8 1 0.4 1 1 0.2 4 0.8 0.4 0.9 0.2 0.4 FY 03 Qty $ FY 04 Qty $ FY 06 Qty $ FY 07 Qty $ TC Qty 0 0.8 1.8 0.0 0.0 0.0 0.0 ADMINISTRATIVE LEADTIME: 0.0 0.0 0.0 0.0 1 FY 2000 Nov-99 FY 2001 Mar-01 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000 Feb-00 FY 2001 Jun-01 FY 2002: Mar-02 FY 2003: PY 1 2 FY 01 3 4 1 2 FY 02 3 4 INPUT 38 0 1 0 0 0 2 2 0 OUTPUT 38 0 0 1 0 0 0 2 2 1 2 FY 05 3 4 1 2 FY 03 3 4 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 INPUT $ 0.0 Total Qty 2 FY 04 3 2.9 43 36 2 1 4 0 0 0 0 0 0 2.6 1.2 0.4 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 2.6 5.5 4 4 TOTAL 43 OUTPUT 43 Notes/Comments P-1 Shopping List-Item No 52 (6 of 8) $ 43 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: CONTRACT DATES: INSTALLATION SCHEDULE: INSTALLATION SCHEDULE: FY 05 Qty $ Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June 2001 NAVSTAR Global Positioning System (GPS) (521R) NAVWAR 1R013 LCACs, all M-Class, all CG, DDG, DD, FFGs, all CV/CVN, all L-Class, and all SSNs will be equipped with Anti-Jam Antennas. Procurement and installation of anti-jam GPS user equipment and prevention equipment is required to ensure the continued utility of GPS signals from space in a hostile jamming environment. The NAVWAR program will equip selected ships and submarines with anti-jam GPS antennas and other GPS Modernization enhancements to ensure the continued availability of GPS to support surface and subsurface combat operations and provide reliable GPS and other navigation sensor data to ship-board C4ISR, Combat, and Weapons Systems. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ 18 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ $ Total Qty 18 0.77 0.8 0.05 0.06 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.00 0.88 0.00 0.00 0.00 0.00 ADMINISTRATIVE LEADTIME: 0.00 0.00 1 0.00 0.00 0.00 0.00 PRODUCTION LEADTIME: FY 2000 FY 2001 FY 2002: Dec-01 FY 2003: DELIVERY DATES: FY 2000 FY 2001 FY 2002: Oct-02 FY 2003: 1 2 FY 01 3 4 1 2 1 2 FY 05 3 4 1 2 FY 02 3 FY 03 4 1 2 3 4 1 4 1 2 FY 07 3 4 TC 2 FY 04 3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11 4 INPUT OUTPUT INSTALLATION SCHEDULE: $ 0.0 0.0 0.0 0.1 0.0 CONTRACT DATES: PY TC Qty FY 06 3 INPUT TOTAL 0 OUTPUT 0 Notes/Comments: Unit costs for NAVWAR systems vary because some ships require one antenna and some require two. P-1 Shopping List-Item No 52 (7 of 8) Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE NAVSTAR GPS BLI 2657 ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 1 2 2 1 1 2 1 2 2 1 1 1 1 1 1 1 1 APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY 1R009 NAVSSI 1R011 NAVSSI - Retrofit 1R013 NAVWAR Hardware SUBHEAD NO. 521R 01 02 10 9 10 9 01 02 1 4 1 4 01 02 11 18 01 FISCAL YEAR CALENDAR YEAR A 01 A A 02 FISCAL YEAR CALENDAR YEAR 02 03 CALENDAR YEAR 03 1 A 1 A OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR PRODUCTION RATE PROCUREMENT LEADTIMES Manufacturer’s ITEM Name and Location MSR 1-8-5 MAX NAVSSI NAVSSI ACS 8 25 50 LITTON 8 25 NAVWAR TBD 50 250 480 1272 P-1 Shopping List-Item No 52 (8 of 8) ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure Exhibit P-21 Production Schedule 1R011 for Retrofit: As of FY00 there is no MSR for 1R011 because these are kits and not a full system. MSR could change for outyears. Unclassified 1R013 NAVWAR is a joint service program, production rates apply to a combination of all the military services procurements. Classification UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronic Equipment Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) Armed Forces Radio and Television/BLI: 266600 - Subhead 82K0 Other Related Program Elements ID Code FY 2000 FY 2001 FY 2002 $9.4 $9.0 $14.6 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total PUC K0001: AFRTS Program - AFRTS shipboard entertainmentsystems provide improved quality of life at sea and at overseas shore bases. These systems contribute significantly to the habitabilityof Navy ships by providing and distributing news, command information, training, and entertainmentprogramming using the latest technologyavailable. These systems improve morale, combat effectiveness and retention rates of deployed personnel. All AFRTS systems use Commercial-Off-the-Shelf (COTS) equipment. Naval Media Center (NAVMEDIACEN) Fleet Support Detachments (FSDs) are the Installing agents for these systems. Each system installation is made based on ship availability. The AFRTS program consists of the following systems: (a) SITE 2000/500 - This SITE system is designed for aircraft carriers (CV/CVN). It is used to playback videocassettesand compact discs distributed by AFRTS and NMPS over four channels on a cable distribution system. System also allows for the production of training tapes and command information programs. Systems are designed to interface with pierside cable systems where available. Requires manpower of two dedicated technicians and three operators. A total of seven systems required at an estimated unit cost of $387K. Two units were procured in FY00 and prior. The remaining five (5) units will be procured in FY01 through FY 05. Each system requires three to ten months lead time to procure and install. SITE 2000/500 includes Television Direct-to-Sailor (TV-DTS) equipment upgrades. SITE CCTV - Digital/500 is the next generation of the SITE 2000/500 project beginning in FY 2006. A total of twelve (12) SITE CCTV - Digital/500 units will be procured. (b) SITE 2000/400 - This SITE system is designed for large amphibious and auxiliary ship classes (AGF/AOE/AS/LCC/LHA/LHD/LPD/LSD). Same as SITE 2000/500 system, with the exception of studio production capability and lesser editing capability. Requires manpower of one dedicated technician and operator. A total of 30 systems are required at an estimated unit cost of $218K. Thirteen units were procured in FY00 and prior. The remaining 17 units will be procured in FY01 through FY 05. Each system requires two to eight months lead time to be procured and installed. SITE 2000/400 includes TV-DTS equipment upgrades. SITE CCTV - Digital/400 is the next generation of the SITE 2000/400 project beginning in FY 2006. A total of thirty (30) SITE CCTV - Digital/400 units will be procured. (c) SITE 2000/300 - This SITE system is designed for smaller combatants ship classes (CG/DD/DDG/FFG). This system is used primarily for playback of AFRTS and NMPS cassettes over two channels. Capable of producing simple local programs for training and command information. Requires manpower of one dedicated technician who also serves as operator. A total of 111 systems are required at an estimated unit cost of $86K. Twenty three units were procured in FY00 and prior. The remaining 88 units will be procured in FY01 through FY 06. Each system requires two to eight months DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 53 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 CONTINUATION DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronic Equipment Armed Forces Radio and Television/BLI: 266600 - Subhead 82K0 lead time to procure and install. SITE 2000/300 includes TV-DTS equipment upgrades. SITE CCTV - Digital/300 is the next generation of the SITE 2000/300 project beginning in FY 2006. A total of (110) SITE CCTV - Digital/300 units will be procured. (d) SITE 2000/200 - Compact system used to playback AFRTS and NMPS cassettes over two channels on submarines (SSN/SSBN). Capable of making simple recordings for training and command information. Requires no dedicated technician or operator. A total of 50 systems are required at an estimated unit cost of $59K. Fifteen units were procured in FY00 and prior. The remaining 35 units will be procured in FY01 through FY05. Each system requires two to eight months lead time to procure and install. SITE CCTV - Digital/200 is the next generation of the SITE 2000/200 project beginning in FY 2006. A total of (50) SITE CCTV - Digital/200 units will be procured. (e) SAES - Shipboard Audio Entertainment System (SAES) upgrade is an assemblage of COTS items providing a standard/reliablemeans to play audio program material distributed by the AFRTS. A total of 84 systems are required. 81 units have been procured to date leaving 3 units to be procured in FY 01. Each system requires two to six months lead time to procure and install. In FY02 the SAES system will be integrated into the SITE system. The following ship classes require the total of 84 SAES Units: CG, DD, DDG, FFG. (f) IRFDS - Integrated Radio Frequency Distribution System (IRFDS) provides ship-wide transmission of command information, training and entertainmenttelevision programming. The IRFDS receives television signals from the ship’s SITE system or antenna and distributes the signals to all installed TV receivers. This system replaces the unsupportable Circuit 14TV. IRFDS is a COTS system. IRFDS procurement also includes the purchase of equipment to integrate all television displays onto one distribution system. Total of 106 systems are required. An averageunit cost to engineer, furnish and install is $277K. Three units will be procured in FY 02. Each system requires a three to ten months lead time to be procured and installed. The following ship classes require the total of 106 IRFDS units: CG, CV/CVN, DD, DDG, FFG. PUC K0INS: This funding supports the installation of SITE, SAES, and IRFDS systems onboard Navy ships. Installations are performed by Naval Media Center Fleet Support Detachments and are based on TYCOM nominations. PUC K0002: SPAWAR Program - Television Direct-to-Sailors (TV-DTS) will provide a receive-only television capability to 178 ships in the Fleet. This capability will feature two full-time news and entertainment television channels as well as two stereo audio music channels, one monographic audio radio news and sports channel, one 128kbps data channel, and an electronic program guide. AFRTS will provide the programming. Satellite transponders, ground-based earth stations and leases for terrestrial connectivity will be provided by SPAWAR (via O&MN funding). Each ship will be outfitted with COTS 1.3 meter C/Ku-band satellite stabilized antenna terminal for reception of the television signal. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 53 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2 Communications and Electronic Equipment P-1 ITEM NOMENCLATURE/SUBHEAD Armed Forces Radio and Television/82K0 - Subhead 82K0 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost A 7 57.6 FY 2001 Total Cost Quantity Unit Cost 403.2 7 57.3 FY 2002 Total Cost FY 2003 Quantity Unit Cost Total Cost 401.1 7 58.9 412.3 Quantity Unit Cost Total Cost SUBMARINES (N87) K0001 SITE 2000/200 K0001 SITE 2000/300 A 14 81.7 1,143.8 15 83.6 1254.0 19 85.8 1630.2 K0001 SITE 2000/400 A 7 204.6 1,432.2 4 208.5 834.0 4 218.0 872.0 K0001 SAES A 4 27.0 108.0 3 27.7 83.1 K0001 IRFDS A 2 267.5 535.0 4 268.7 1074.8 3 277.1 831.3 K0001 SITE 2000/500 A 1 372.8 372.8 1 374.0 374.0 1 387.2 387.2 KOINS EQUIPMENT INSTALLATION (NON-FMP) A SURFACE SHIPS (N86) AIRCRAFT CARRIERS (N88) 158.0 159.0 Total NAVSEA 4,154.0 161.0 4,179.0 4,294.0 NAVY SPACE SYSTEM DIVISON (N63) K0002 TV-DTS (SPAWAR) K0002 EQUIPMENT INSTALLATION (SPAWAR) A 4 A 24 PRODUCTION SUPPORT 310.0 14 65.9 8.0 DSA TOTAL SPAWAR DD FORM 2446, JUN 86 79.0 4,223.0 53 35 109.0 20 3,034.0 63.5 2,223.0 164.0 46 7,209.0 719.0 718.0 719.0 5,260.0 4,784.0 10,315.0 9,414.0 8,963.0 P-1 SHOPPING LIST ITEM NO. 923.0 PAGE NO. 14,609.0 CLASSIFICATION: 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 Communications and Electronic Equipment SUBHEAD Armed Forces Radio & Television 82K0 CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW TV Audio Sprt Activity TV Audio Sprt Activity MIPR MIPR Various Various 1/00 1/00 3/00 3/00 YES YES 204.6 372.8 27.0 267.5 TV Audio Sprt Activity TV Audio Sprt Activity TV Audio Sprt Activity TV Audio Sprt Activity MIPR MIPR MIPR MIPR Various Various Various Various 1/00 1/00 1/00 1/00 3/00 4/00 3/00 3/00 YES YES YES YES 4 79.0 SPAWAR SYSCEN FP MTN, Miami, FL 3/00 6/00 YES SITE 2000/200 SITE 2000/300 SITE 2000/400 SITE 2000/500 SAES IRFDS (Note (1)) 7 15 4 1 3 4 57.3 83.6 208.5 374.0 27.7 268.7 TV Audio Sprt Activity TV Audio Sprt Activity TV Audio Sprt Activity TV Audio Sprt Activity TV Audio Sprt Activity TV Audio Sprt Activity MIPR MIPR MIPR MIPR MIPR MIPR Various Various Various Various Various Various 12/00 12/00 12/00 12/00 12/00 12/00 1/01 1/01 1/01 3/01 2/01 2/01 YES YES YES YES YES YES K0002 TV-DTS 14 65.9 SPAWAR SYSCEN FP MTN, Miami, FL 3/01 6/01 YES 7 19 4 1 3 58.9 85.8 218.0 387.2 277.1 TV Audio Sprt Activity TV Audio Sprt Activity TV Audio Sprt Activity TV Audio Sprt Activity TV Audio Sprt Activity MIPR MIPR MIPR MIPR MIPR Various Various Various Various Various 12/01 12/01 12/01 12/01 12/01 1/02 1/02 1/02 2/02 2/02 YES YES YES YES YES FP MTN, Miami, FL 3/02 6/02 YES Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) LOCATION OF PCO SITE 2000/200 SITE 2000/300 7 14 57.6 81.7 SITE 2000/400 SITE 2000/500 SAES IRFDS (Note (1)) 7 1 4 2 K0002 TV-DTS RFP ISSUE DATE FY 00 FY 01 FY 02 SITE 2000/200 SITE 2000/300 SITE 2000/400 SITE 2000/500 IRFDS (Note (1)) K0002 TV-DTS (Note (2)) 35 68.2 SPAWARSYSCEN D. REMARKS (1) In addition to hardware, total cost includes $135K/unit for engineering and installation support. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. PAGE NO. 53 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENT SCHEDULE P-23 1 ACTIVE FORCE INVENTORY FY 2000 2 3 A. APPROPRIATION/BUDGET ACTIVITY B. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 SITE - K0001 4 1 FY 2001 2 3 4 1 C. DATE June-01 FY 2002 2 3 4 (P) 11 12 8 8 7 7 7 7 6 8 8 8 11 23 31 39 46 53 60 67 73 81 89 97 (P) 17 6 8 15 7 7 13 8 8 15 FY 2003 2 3 1 4 FY 2004 2 3 1 4 FY 2005 2 3 1 4 1 SCHOOLS/OTHER TRAINING OTHER TOTAL PHASED REQ ASSETS ON HAND DELIVERY FY 99 & PRIOR FY 99 & PRIOR FY 00 (C) FY 01 (C) FY 02 (C) FY 03 (C) FY 04 (C) FY 05 (C) FY 06 (C) To Complete (C) TOTAL ASSETS (C) QTY OVER (+) OR SHORT (-) D. REMARKS 17 23 31 46 46 53 60 73 73 81 89 104 6 0 0 7 0 0 0 6 0 0 0 7 E. RQMT (QTY) 198 TOTAL RQMT 198 INSTALLED Installations determined by TYCOM Nominations DD for 2447, JUN 86 ON HAND 7 1. APPN - 2. APPN - 3. PROCUREMENT LEADTIME ADMIN 2 Months 53 PAGE NO FY 99 & PRIOR 0 UNFUNDED 0 UNDELIVERED INITIAL ORDER 1 Month P-1 SHOPPING LIST ITEM NO 0 REORDER 1 Month CLASSIFICATION: 5 UNCLASSIFIED FY 2006 2 3 LATER 4 UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENTS SCHEDULE (SUPPLEMENT SHEET-INSTALLATION DATA) P-23A SITE/K0001 Other Procurement, Navy BA-2 Communications and Electronic Equipment E.I./L 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L June 2001 Installing Agent N/A APPROPRIATION/BUDGET ACTIVITY 1ST QTR 4TH QTR QTY E.I./L 1ST QTR QTY E.I./L 2ND QTR QTY E.I./L FY 2000 AOE 2 CG 63 CV 63 DDG 69,70 FFG 39 LHD 1 FFG 53 FFG 57 SSN 688 SSN 750 1 1 1 1,1 1 1 1 1 1 1 CG 57, 54 DD 992,965 DD 977 FFG 32 FFG 45 FFG 56 FFG 58 LSD 42 SSN 766 SSN 701 1,1 1,1 1 1 1 1 1 1 1 1 AGF 3 ARS 50 FFG 36 FFG 40 LHA 2 LHD 3 LSD 45 SSN 698 1 1 1 1 1 1 CG 49 CG 60 CG 72 DD 985 LPD 14 SSN 709 SSN 719 SSN 720 1 1 1 1 1 1 1 1 CG 48 CG 53 CG 55 CG 66 DDG 62 LPD 15 SSN 725 SSN 769 3RD QTR QTY 4TH QTR E.I./L QTY E.I./L QTY DD 982 DD 991 FFG 51 FFG 54 FFG 59 FFG 61 SSN 705 1 1 1 1 1 1 1 DD 989 DD 987 FFG 49 LCC 20 LPD 10 SSN 707 SSN 718 1 1 1 1 1 1 1 FY 2001 1 1 1 1 1 1 1 1 ARS 52 FFG 43 FFG 48 LHD 2 LSD 43 LSD 48 SSN 770 SSN 772 1 1 1 1 1 1 1 1 LSD 47 CVN 74 LHA 5 FFG 37 FFG 60 SSN 753 SSN 767 FY 2002 AGF 11 AOE 8 CVN 71 DD 967 LPD 12 LSD 39 DATE P-1 ITEM NOMENCLATURE/PROJECT UNIT 1 1 1 1 1 1 1 FFG 46 FFG 47 FFG 52 FFG 55 LHD 4 LSD 49 SSN 756 1 1 1 1 1 1 1 FY 2003 1 1 1 1 1 1 1 1 DD 972 DD 988 DDG 66 DDG 67 FFG 50 LHA 3 SSN 761 SSN 768 1 1 1 1 1 1 1 1 P-1 SHOPPING LIST ITEM NO. 53 PAGE NO. 6 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENTS SCHEDULE (SUPPLEMENT SHEET-INSTALLATION DATA) P-23A SITE/K0001 Other Procurement, Navy BA-2 Communications and Electronic Equipment E.I./L 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L June 2001 Installing Agent N/A APPROPRIATION/BUDGET ACTIVITY 1ST QTR DATE P-1 ITEM NOMENCLATURE/PROJECT UNIT 4TH QTR QTY E.I./L 1ST QTR QTY E.I./L FY 2004 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L 4TH QTR QTY E.I./L FY 2005 FY 2006 P-1 SHOPPING LIST ITEM NO. 53 PAGE NO. 7 CLASSIFICATION: UNCLASSIFIED QTY UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENT SCHEDULE P-23 1 ACTIVE FORCE INVACTIVE FORCE INVENTORY (P) FY 2000 2 3 A. APPROPRIATION/BUDGET ACTIVITY B. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 SAES - K0001 4 2 1 1 2 3 4 2 1 1 1 FY 2001 2 3 4 1 1 1 4 5 6 7 0 1 1 1 1 C. DATE June-01 FY 2002 2 3 4 1 FY 2003 2 3 4 FY 2004 2 3 1 4 FY 2005 2 3 1 4 1 SCHOOLS/OTHER TSCHOOLS/OTHER TRAINING OTHER OTHER TOTAL PHASED RE TOTAL PHASED REQ 0 7 7 7 7 ASSETS ON HAND ASSETS ON HAND DELIVERY FY 00 & PDELIVERY FY 99 & PRIOR FY 00 & PRIOR FY 99 & PRIOR FY 01 FY 00 (C ) FY 02 FY 01 (C ) FY 03 FY 02 FY 04 FY 03 FY 05 FY 04 FY 06 FY 05 FY 07 FY 06 To Complete To Complete TOTAL ASSETS TOTAL ASSETS QTY OVER (+) OR SQTY OVER (+) OR SHORT (-) D. REMARKS 0 2 3 4 4 5 6 7 7 7 7 7 0 0 0 0 0 0 0 0 0 0 0 0 D. REMARKS Installations det Installations determined by TYCOM Nominations DD for 2447, JUN 86 E. RQMT (QTY) 1. APPN - 2. APPN - 3. PROCUREMENT LEADTIME 84 TOTAL RQMT 84 INSTALLED 77 ADMIN 2 Months INITIAL ORDER 2 Months P-1 SHOPPING LIST ITEM NO 53 PAGE NO ON HAND AS OF 6/1/00 0 FY 98 & PRIOR UNDELIVERED 0 UNFUNDED REORDER 1 Month CLASSIFICATION: 8 UNCLASSIFIED 0 FY 2006 2 3 LATER 4 UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENTS SCHEDULE (SUPPLEMENT SHEET-INSTALLATION DATA) P-23A SAES/K0001 Other Procurement, Navy BA-2 Communications and Electronic Equipment E.I./L 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L June 2001 Installing Agent N/A APPROPRIATION/BUDGET ACTIVITY 1ST QTR 4TH QTR QTY E.I./L 1ST QTR QTY E.I./L 2ND QTR QTY E.I./L FY 2000 CG 65 DD 965 1 1 CG 62 DATE P-1 ITEM NOMENCLATURE/PROJECT UNIT 3RD QTR QTY 4TH QTR E.I./L QTY E.I./L QTY CG 55 1 CG 63 1 FY 2001 1 CG 73 1 P-1 SHOPPING LIST ITEM NO. 53 PAGE NO. 9 CG 72 1 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENT SCHEDULE P-23 1 ACTIVE FORCE INVENTORY A. APPROPRIATION/BUDGET ACTIVITY B. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 IRFDS - K0001 FY 2000 2 3 4 1 1 1 0 1 1 2 2 1 1 (P) FY 2001 2 3 C. DATE June-01 FY 2002 2 3 4 1 4 1 1 1 1 1 1 3 4 5 6 7 8 9 1 1 2 1 1 1 1 FY 2003 2 3 4 FY 2004 2 3 1 4 FY 2005 2 3 1 4 1 SCHOOLS/OTHER TRAINING OTHER TOTAL PHASED REQ 0 0 ASSETS ON HAND DELIVERY FY 99 & PRIOR FY 99 & PRIOR FY 00 (C) FY 01 (C) FY 02 (C) FY 03 (C) FY 04 (C) FY 05 (C) FY 06 (C) To Complete (C) TOTAL ASSETS 0 0 1 2 2 3 4 6 6 7 8 9 QTY OVER (+) OR SHORT (-) 0 0 0 0 0 0 0 1 0 0 0 0 D. REMARKS E. Installations determined by TYCOM Nominations 1. APPN - 2. APPN - 3. PROCUREMENT LEADTIME DD for 2447, JUN 86 RQMT (QTY) 106 TOTAL RQMT 106 INSTAL ADMIN 2 Months 17 INITIAL ORDER 2 Months P-1 SHOPPING LIST ITEM NO 53 PAGE NO ON HAND AS OF 6/1/00 0 FY 99 & PRIOR UNDELIVERED 0 UNFUNDED 0 REORDER 1 Month CLASSIFICATION: 10 UNCLASSIFIED FY 2006 2 3 LATER 4 UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENTS SCHEDULE (SUPPLEMENT SHEET-INSTALLATION DATA) P-23A IRFDS/K0001 Other Procurement, Navy BA-2 Communications and Electronic Equipment E.I./L 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L June 2001 Installing Agent N/A APPROPRIATION/BUDGET ACTIVITY 1ST QTR 4TH QTR QTY E.I./L 1ST QTR QTY E.I./L 2ND QTR QTY E.I./L FY 2000 CG 51 1 CG 56 1 CG 52 3RD QTR QTY 4TH QTR E.I./L QTY E.I./L QTY DD 977 1 DD 982 1 FY 2001 1 CG 47 1 FY 2002 DD 991 DATE P-1 ITEM NOMENCLATURE/PROJECT UNIT CG 48 1 FY 2003 1 CG 50 1 P-1 SHOPPING LIST ITEM NO. 53 PAGE NO. 11 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENTS SCHEDULE (SUPPLEMENT SHEET-INSTALLATION DATA) P-23A IRFDS/K0001 Other Procurement, Navy BA-2 Communications and Electronic Equipment E.I./L 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L June 2001 Installing Agent N/A APPROPRIATION/BUDGET ACTIVITY 1ST QTR DATE P-1 ITEM NOMENCLATURE/PROJECT UNIT 4TH QTR QTY E.I./L 1ST QTR QTY E.I./L 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L FY 2004 FY 2005 FY 2006 FY 2007 P-1 SHOPPING LIST ITEM NO. 53 PAGE NO. 12 4TH QTR QTY E.I./L CLASSIFICATION: UNCLASSIFIED QTY CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: TV-DTS MODIFICATION TITLE: TV-DTS FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT 125 8.7 4 0.3 14 1.0 35 2.4 88 13.9 24 4.9 20 3.8 46 7.9 INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 22.6 5.2 4.8 10.3 ITEM 53 PAGE 13 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: TV-DTS INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: Prior Years Qty $ MODIFICATION TITLE: AIT 1 Month Mar-00 Jun-00 TV-DTS PRODUCTION LEADTIME: FY 2001: Mar-01 FY 2001: Jun-01 FY 2000 & Prior Qty $ Qty FY 2001 $ Qty 3 Months FY 2002: FY 2002: ($ in Millions) FY 2003 Qty $ FY 2002 $ FY 2004 Qty $ Qty Mar-02 Jun-02 FY 2005 $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty Total $ PRIOR YEARS FY 1998 EQUIPMENT 8 1.5 FY 1999 EQUIPMENT 112 18.8 5 0.9 FY 2000 EQUIPMENT 4 0.8 FY 2001 EQUIPMENT 3 0.6 FY 2002 EQUIPMENT 11 1.9 35 6.0 FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 FY 2003 1 3 1 4 1 2 3 4 1 2 3 4 1 2 3 TC 4 1 2 3 4 In 112 6 6 5 3 20 19 6 1 178 Out 112 3 6 8 3 11 19 15 1 178 14 3 FY 2007 3 PAGE 2 FY 2006 2 53 4 FY 2005 1 ITEM NO. 2 FY 2004 & Prior 4 P-3A CLASSIFICATION: UNCLASSIFIED TOTAL DATE FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY June 2001 P-1 ITEM NOMENCLATURE Weapon System OTHER PROCUREMENT, NAVY/BA2 Production Rate Manufacturer’s Name and Location Item MSR 1-8-5 MAX ALT Prior to Oct 1 Procurement Leadtimes ALT After Initial Reorder Oct 1 Mfg PLT Mfg PLT FISCAL YEAR 1998 ITEM / MANUFACTURER TV-DTS (SPAWAR) F Y S V C 99 Q D B T Y E L A L 5 1997 O C T N O V J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 1999 S E P O C T N O V D E C J A N TV-DTS (SPAWAR) TV-DTS (SPAWAR) TV-DTS (SPAWAR) F Y 00 01 02 S V C F E B 5 Q D B T Y E L A L 4 14 35 M A R A P R M A Y A FISCAL YEAR 2000 ITEM / MANUFACTURER 1999 O C T N O V 4 14 35 J A N F E B M A R A P R M A Y A J U N J U L S E P Previous editions are obsolete O C T N O V D E C J A N J U N J U L A U G F E B S E P O C T N O V D E C J A N F E B M A R M A R A P R M A Y J U N A P R M A Y J U N J U L S E P B A L O C T N O V D E C J A N F E B M A R A P R M A Y J U N 14 A P-1 SHOPPING LIST ITEM NO 53 PAGE 15 A U G S E P A U G S E P B A L CALENDAR YEAR 2001 A U G 4 A J U L FISCAL YEAR 2002 CALENDAR YEAR 2001 Remarks: DD Form 2445, JUL 87 B A L 5 ‘ 311 / 244 Unit of Measure Total CALENDAR YEAR 1999 A U G FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C Reorder Mfg PLT FISCAL YEAR 1999 CALENDAR YEAR 1998 D E C Initial Mfg PLT Unit of Measure Total Exhibit P-21 Production Schedule 35 J U L B A L UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY - (BA-2) Communications & Electronics Equipment Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) Strategic Platform Support Equipment/#267600/#267606 Other Related Program Elements ID Code A FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 $24.1 $15.2 $11.4 $17.4 $16.9 $9.3 $23.9 $14.5 To Complete Total $132.7 $0.0 PROGRAM DESCRIPTION/JUSTIFICATION: Funding in this P-1 line provides electronics equipment that will be installed aboard ships and in the TRIDENT Training Facility (TRITRAFAC) and the TRIDENT Refit Facility (TRIREFFAC) located at Naval Submarine Bases (Bangor, WA and Kings Bay, GA) and other TRIDENT shore facilities. The TRIDENT program has shifted from its modernization phase to a program designed to maintain TRIDENT’s capability to perform its defined mission. This will be accomplished via the Obsolete Equipment Replacement (OER) Program. OBSOLETE EQUIPMENT REPLACEMENT (OER) - Replacement of existing hardware/softwarethat, though functional, has become operationallyobsolete, is no longer in production or supportable with spare parts, has a high failure rate, or is no longer cost effective to maintain. OER hardware/softwarechanges would be expected to provide significant cost savings in reduced maintenance costs and would use Commercial-Off-The-Shelf (COTS) technology where ever possible as long as all technical requirements are m INSTALLATION (ELECTRONICS) - Provides funding for electronic equipment installation resulting from the OER Program. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 54 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2: Communications & Electronics Equipment DATE: June 2001 ID Code P-1 ITEM NOMENCLATURE/SUBHEAD A Strategic Platform Support Equipment/82P1 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost P1221 Equipment OER A 22 Various Note 1/2 12,653 5 Various Note 2 3,934 5 Various Note 1 8,421 P1INS Installation A 4 Various Note 3 11,473 4 Various Note 4 11,280 5 Various Note 5 2,940 Quantity Unit Cost Total Cost Note 1: Procures various quantities at various cost. Note 2: Initiate ARCI procurement. (see attached ARCI/CCS Block 1C schedule). Note 3: Installs 4 hardware packages on SSBN 732 at various cost. Note 4: Installs 4 hardware packages on SSBN 733 at various cost and one shore site. Note 5: Installs various quantities at various costs. Including 1 Shipset each year (FY02/03). 24,126 P-1 SHOPPING LIST DD FORM 2446, JUN 86 ITEM NO. 54 15,214 11,361 CLASSIFICATION: 0 PAGE NO. 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2: Communications & Electronic Equipment Strategic Platform Support Equipment P1221 Obsolete Equipment Replacement Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) SUBHEAD 82P1 LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CPFF CPFF WR CPFF WR CPFF WR WR CPFF WR WR CPFF WR WR WR WR CPFF WR WR WR CPFF WR WR WR WR WR WR CPFF DSR, Fairfax, VA Lockheed M., Manassas, VA NUWC Newport, RI Lockheed M., Manassas, VA NUWC Newport, RI Lockheed M., Manassas, VA NUWC Newport, RI NUWC Newport, RI Lockheed M., Manassas, VA NSWC Crane, IN NSWC CARD, Bethesda, MD FTSC, Norfolk, VA NSWC Crane, IN NUWC Newport, RI NUWC Newport, RI NSWC CARD, Bethesda, MD Lockheed M., Manassas, VA NUWC Newport, RI NUWC Keyport, WA PSNS, Bremerton WA EB, Corp., Groton CT NUWC Newport, RI NUWC Newport, RI NUWC Newport, RI NUWC Newport, RI NUWC Newport, RI NUWC Newport, RI Lockheed M., Manassas, VA 12/00 12/01 8/00 12/00 8/00 3/00 3/00 3/00 2/00 12/99 1/00 2/00 5/00 12/99 12/99 4/00 2/00 4/00 5/00 6/00 8/00 8/00 7/00 4/00 4/00 5/00 7/00 5/00 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Fiscal Year (00) ARCI Phase I/II (TA & HA MPP) (P) ARCI Phase I/II (TA & HA MPP) (P) ARCI Phase I/II (TA & HA MPP) (P) ARCI Phase I/II (TA & HA MPP) (SS) ARCI Phase I/II (TA & HA MPP) (SS) ARCI Phase I/II (TA & HA MPP) (TUE) #1 Rev. 7.0 Certification/Testing Rev. 7.0 TSS (DPS) ARCI/SA Remote Display ARCI/SA Remote Display ARCI/TDR Interface ARCI Phase I/II (TA & HA MPP) ILS ARCI Phase I/II (TA & HA MPP) ILS DPS Rev. 7.0 S/W H/W Changes DPS Chg. MS Rev. 70 AN/UYK-43 Opt. MS Rev 7.0 AN/UYK-43 Option CCS C4 to D5 Conversion OK-276 Overhaul for SSBN 733 BQR-15 Field Support PSNS SSBN 732 Overhaul 6 Inch Countermeasures Upgrade Fiber Optic Cable Tester C4-D5 Conversion 732 EOH Support Depot Pedestal Cost OK-276 & OK542 ISEA DPS Mod for CCS Rev. 7.0.1 AN/UYK-43/Payback MK2 Block 1C D. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,011.40 $1,389.00 $50.00 $482.70 $13.50 $1,686.80 $2,189.00 $502.00 $112.90 $426.80 $172.00 $93.20 $16.00 $634.00 $24.00 $132.00 $225.00 $420.00 $200.00 $1,038.90 $410.00 $38.00 $15.00 $621.60 $277.00 $160.00 $275.00 $37.20 REMARKS Note #1 ARCI Phase (I/II) TA & HA MPP will support commonality, COTS equipment, and open system architecture. P-1 SHOPPING LIST DD Form 2446-1, JUL 87 ITEM NO. 54 PAGE NO. 3 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2: Communications & Electronic Equipmen Strategic Platform Support Equipment P1221 Obsolete Equipment Replacement Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) SUBHEAD 82P1 LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW NAVSEA N/A WR NSWC CARD, Bethesda, MD 9/01 6/02 Yes NAVSEA N/A WR NSWC CARD, Bethesda, MD 9/01 6/02 Yes NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A WR CPFF CPFF WR WR WR WR CPFF WR CPFF CPFF CPFF WR WR NUWC Newport, RI 9/01 9/01 9/01 7/01 7/01 9/01 7/01 9/01 7/01 5/01 5/01 3/01 12/00 9/01 6/02 6/02 6/02 6/02 6/02 6/02 6/02 6/02 6/02 6/02 6/02 6/02 6/02 6/02 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Fiscal Year (01) MS Rev. 7.1 Software Clean-up 1 MS Rev. 7.1 Clean-up of AN/UYK-43 1 ARCI//AN/BQQ-6 SA Remote Display ARCI Phase I/II (P)SIU,PCU, PreCable ARCI Phase I/II (P) System Spt ARCI Phase I/II (TA HA MPP) Install Spt ARCI Phase I/II (TA HA MPP) Testing ARCI Phase I/II (TA HA MPP) IETM ARCI Phase I/II (TA HA MPP) ECI ARCI Phase I/II (TA HA MPP) ECI ARCI Phase I/II CDR/VCU Sys Engr&Tes ARCI Phase I/II (P) (TARPU) ARCI Phase I/II (P) ECDWS Rev 7.0 Planning Yard CCS Rev. 7.0.1 DPS Modifications CCS Rev. Testing 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D. $80.25 $35.25 $50.00 $891.00 $325.00 $50.00 $30.00 $16.00 $10.00 $7.00 $20.00 $849.00 $467.10 $92.00 $466.90 $544.50 Lockheed M., Manassas, VA Lockheed M., Manassas, VA NUWC Newport, RI NUWC Newport, RI NSWC CARD, Bethesda, MD NUWC Newport, RI FTSC, Norfolk, VA NUWC Newport, RI DSR, Fairfax, VA Lockheed M., Manassas, VA EB Corp., Groton, CT NUWC Newport, RI NUWC Newport, RI REMARKS Note #1 ARCI Phase (I/II) TA & HA MPP will support commonality, COTS equipment, and open system architecture. P-1 SHOPPING LIST DD Form 2446-1, JUL 87 ITEM NO. 54 PAGE NO. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE UNCLASSIFIED CLASSIFICATION: BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2: Communications & Electronic Equipment Strategic Platform Support Equipment P1221 Obsolete Equipment Replacement Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) SUBHEAD 82P1 LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CPFF WR WR WR WR WR CPFF WR WR CPFF CPFF WR CPFF CPFF CPFF CPFF Lockheed M., Manassas, VA NUWC Newport, RI NUWC Newport, RI NSWC Card, Bethesda, MD NSWC Card, Bethesda, MD NUWC Newport, RI EB Corp., Groton, CT NUWC Newport, RI NUWC Newport, RI EB Corp., Groton, CT DSR, Fairfax, VA NUWC Newport, RI EB Corp., Groton, CT EB Corp., Groton, CT EB Corp., Groton, CT EB Corp., Groton, CT 2/02 2/02 2/02 2/02 2/02 2/02 2/02 6/02 2/02 2/02 2/02 2/02 2/02 2/02 2/02 2/02 6/03 6/03 6/03 6/03 6/03 6/03 6/03 6/03 6/03 6/03 6/03 6/03 6/03 6/03 6/03 6/03 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Fiscal Year (02) ARCI Phase I/II (AN/BQQ-10) (Trainer) ARCI Phase I/II (AN/BQQ-10) (TUE) TSS Chgs. For Rev. 7 Series Monitoring Subsystem Rev. 7.1 Workstation Soft Monitoring Subsystem Rev. 7.1 Cleanup of AN/U CCS Rev. 7.1 Certification/Testing CCS Rev. 7.1 Planning Yard CCS Rev. 7.2 Certification/Testing CCS Rev. 7.3 Non-TIDS Development CCS Rev. 7.3 Planning Yard ARCI Phase I/II (AN/BQQ-10)(Shipsets)(Rev. 8.0 ARCI//An/BQQ-5E Spherical Array (SA) Flat Pan CCS Rev. 6.4 Planning Yard Ship Conotrol Station Obsolete Equipment Upgra CCS Rev. 8.0 ECP004 HM&E Material Rev. 5.6 AN/BPS-15J/VMS HM&E Mtrl. D. 1 * 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $518.00 $1,051.00 $57.00 $100.00 $66.00 $900.00 $204.00 $100.00 $1,000.00 $300.00 $2,726.00 $405.00 $230.00 $230.00 $317.00 $217.00 REMARKS Note #1 ARCI Phase (I/II) TA & HA MPP will support commonality, COTS equipment, and open system architecture. P-1 SHOPPING LIST DD Form 2446-1, JUL 87 ITEM NO. 54 PAGE NO. 5 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE UNCLASSIFIED CLASSIFICATION: BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2: Communications & Electronic Equipment Strategic Platform Support Equipment P1INS Installation Cost Element/ FISCAL YEAR SUBHEAD 82P1 QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $768.00 $4,560.00 $30.00 $20.00 $530.30 $51.10 $147.50 $42.50 $22.70 $36.00 $42.00 $4,802.90 $220.00 $200.00 NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A WR WR WR WR WR CPFF WR WR WR WR WR WR WR CPFF PSNS Bremerton, WA PSNS Bremerton, WA NUWC Newport, RI NUWC Newport, RI NUWC Newport, RI EB Corp., Groton, CT NSWC Crane, in NUWC Newport, RI NUWC Newport, RI NSWC Crane, in NAWC, TSD PSNS Bremerton, WA PSNS Bremerton, WA EB Corp., Groton, CT 6/00 6/00 4/00 4/00 3/00 7/00 3/00 7/00 3/00 3/00 4/00 6/00 5/00 7/00 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 6/01 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes DATE REVISIONS AVAILABLE Fiscal Year (00) ARCI Phase I/II (MPP)/Block 1C #1 OK-542A TAHS on SSBN 732 ARCI Phase I/II (TA MPP) (ILS) ARCI/SA Remote Display/ System Eng SWS C4 to D5 Conversion (SSBN 732-733) SWS C4 to D5 Conversion 6" Countermeasures (JCF 96033) 6" Countermeasures (JCF 96033) 6" Countermeasure LCP 421 (JCF 97049) 6" Countermeasure LCP 421 (JCF 97049) 6" Countermeasure LCP 421 (JCF 97049) CCS Install Rev 7.0/5.6 Installation Cost EA Advanced Planning on SSBN 733 CCS Rev 7.0 Planning Yard Fiscal Year (01) OK-542A TAHS on SSBN 732/733 ARCI Ph. I/II (MPP)/Block 1C Install Cost #1 CCS Rev 7.0.1 DPS Modification #2 CCS Install Rev. 7.0/5.6 Install Cost Countermeasures LCP 421 (JCF 97049) CCS Planning Yard HM&E Material Rev. 7.0.1 Sys. Level Changes CCS Rev. Testing 1 1 1 1 1 1 1 1 $4,670.00 $790.00 $23.00 $4,375.00 $46.00 $270.00 $622.00 $484.00 NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA NAVSEA N/A N/A N/A N/A N/A N/A N/A N/A PO PO WR PO WR CPFF WR WR PSNS Bremerton, WA PSNS Bremerton, WA NUWC Newport, RI PSNS Bremerton, WA NUWC, Newport, RI EB Corp. Groton, CT NUWC, Newport, RI NUWC Newport, RI 2/01 2/01 12/00 2/01 12/00 3/01 12/00 9/01 6/02 6/02 6/02 6/02 6/02 6/02 6/02 6/02 Yes Yes Yes Yes Yes Yes Yes Yes 3 1 1 1 $50.00 $237.00 $953.00 $1,600.00 NAVSEA NAVSEA NAVSEA NAVSEA N/A N/A N/A N/A CPFF CPFF CPFF WR EB Corp., Groton, CT EB Corp., Groton, CT EB Corp., Groton, CT NUWC Newport, RI 6/02 6/02 6/02 6/02 6/03 6/03 6/03 6/03 Yes Yes Yes Yes Fiscal Year (02) CCS Rev. 7.2 Backfit (SSBNs 732, 733, 735) H CCS Rev. 7.3 (CCS MK2 Block 1C ECP 004) P CCS Rev. 8.0 Planning Yard CCS Rev. 8.0 Certification/Testing D. REMARKS Note #1 Support installation of ARCI Phase I/II on SSBN 732 & 733 during D-5 Conversion shipyard period and installation of CCS MK2 Block 1C. Note #2 CCS Rev 5.6/7.0 Certification/Testing procures and tests miscellaneous installation material to support the installation of CCS Revision Engineering Kits aboard SSBN’s 732 and 733 during D-5 Modernization. Classification: P-1 SHOPPING LIST DD Form 2446-1, JUL 87 ITEM NO. 54 PAGE NO. 6 UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED INDIVIDUAL MODIFICATION Trident Sonar (Replaces AN/BQQ-5E(V)// MODELS OF SYSTEM AFFECTED: AN/BQQ-6 Towed Array Processing) Acoustic Rapid COTS Insertion (ARCI TYPE MODIFICATION: MODIFICATION TITLE: Obsolete Equipment Replacement Phase I/II Multi-Purpose Processor (MPP) DESCRIPTION/JUSTIFICATION: Acoustic Rapid COTS Insertion (ARCI) (Phase I/II) Multi Purpose Processor (MPP) replaces obsolete AN/BQQ5E(V)//AN/BQQ-6 Sonar Towed and Hull array processing equipment with a COTS based open system architecture with increased acoustic advantage. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: OPEVAL = 12/97 FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E 4.6 0.5 0 5.1 0 0.0 PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 0.0 1 3.60 1 2.5 1 2.7 1 2.7 3 8.4 2 5.7 1 2.9 4 11.9 14 40.4 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 1 0.5 2 0.5 3 SUPPORT EQUIPMENT 1 OTHER 2.4 0.43 2.6 0.70 0.1 3.0 0.1 1.0 1 3.0 0 6.3 OTHER 0.00 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST TOTAL PROCUREMENT 1 3.60 1 0.8 1 0.80 2 0.0 2 0.8 3 1.40 3 2.10 1 0.9 4 2.5 2 6.20 1 3.93 3 5.80 3 9.90 2 7.20 1 5.10 4 12.80 1 5.50 ITEM 54 PAGE 7 1 0.03 18 9.33 0 0.03 18 60.1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: Prior Years Qty $ MODIFICATION TITLE: Acoustic Rapid COTS Insertion (ARCI) Phase I/II Multi-Purpose Processor (MPP) Engineered Overhauls/ERPs/Refits PRODUCTION LEADTIME: 12/99 FY 2001: 12/00 12/00 FY 2001: 12/01 FY 2000 Qty $ PRIOR YEARS 1 FY 2001 Qty $ 12 Months - 18 Months FY 2002: FY 2002: ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ 12/01 12/02 FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty 0.8 FY 2000 EQUIPMENT *1 0.8 FY 2001 EQUIPMENT Total $ 1 0.8 1 0.0 2 0.8 1 0.0 1 0.0 3 1.0 FY 2002 EQUIPMENT *2 0.8 *1 FY 2003 EQUIPMENT 0.2 2 1.2 FY 2004 EQUIPMENT 1 0.6 3 1.8 2 1.5 2 1.5 1 0.9 FY 2005 EQUIPMENT 1 0.9 FY 2006 EQUIPMENT 4 2.5 FY 2007 EQUIPMENT *1 0.3 4 2.5 1 0.3 TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TC & Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 In 1 0 1 0 0 0 0 1 0 0 0 1 0 1 0 1 0 1 1 1 0 1 0 0 0 1 1 1 1 0 14 Out 0 0 0 0 0 1 0 0 2 0 0 0 1 0 1 0 1 0 0 1 1 0 0 0 1 0 1 1 2 1 14 ITEM 54 Note: * FY2002- shoresite San Diego * FY2003- shoresite Kings Bay * FY2004- shoresite Bangor * To Complete- TLCSF PAGE 8 P-3A CLASSIFICATION: UNCLASSIFIED TOTAL CLASSIFICATION: P3A UNCLASSIFIED INDIVIDUAL MODIFICATION OK-542 Towed Array Handling System on MODELS OF SYSTEM AFFECTED: Thin Line Towed Array Handling System TYPE MODIFICATION: Obsolete Equipment Replacement MODIFICATION TITLE: SSBNs 732-733 FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: Replaces the SPALT 9080 Thin Line Towed Array Handling System (TLTAHS) with OK-542A TLTAHS on SSBNs 732-733. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E 0 0.0 0 0.0 PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 0.0 2 2.60 2 2.6 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 0.0 SUPPORT EQUIPMENT 0.0 OTHER 0.0 OTHER 0.0 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST TOTAL PROCUREMENT 2 2.60 1 4.56 1 4.67 0 4.56 0 4.67 2 0 0.00 0 ITEM 54 0.00 0 PAGE 0.00 0 9 0.00 0 0.00 0 0.00 9.2 0 0.00 2 11.8 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: TLTAHS INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: Prior Years Qty $ MODIFICATION TITLE: OK-542 Towed Array Handling System on 732-733 Engineered Overhauls/ERPs PRODUCTION LEADTIME: 12/99 FY 2001: 12/00 6/00 FY 2001: 6/01 FY 2000 Qty $ PRIOR YEARS 1 FY 2001 Qty $ 4.56 1 18 Months FY 2002: FY 2002: ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Total Qty $ Qty $ 2 9.2 FY 2000 EQUIPMENT 4.67 0 0.0 FY 2001 EQUIPMENT 0 0.0 FY 2002 EQUIPMENT 0 0.0 FY 2003 EQUIPMENT 0 0.0 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT 0 0.0 FY 2006 EQUIPMENT 0 0.0 FY 2007 EQUIPMENT 0 0.0 TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TC & Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 In 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 Out 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 ITEM 54 PAGE 10 P-3A CLASSIFICATION: UNCLASSIFIED TOTAL CLASSIFICATION: P3A UNCLASSIFIED INDIVIDUAL MODIFICATION Installation of OER and Common Capabilities (SSN (SSBN) Modernizations on MODELS OF SYSTEM AFFECTED: TYPE MODIFICATION: Various Obsolete Equipment Replacement MODIFICATION TITLE: OHIO Class Submarine FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: SSBN 732 (EOH) Includes C4-D5 Missile Conversion = 5/00 FY 1999 & Prior FY 2000 QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E 0 0.0 0 0.0 PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 0.0 12 1.1 12 1.10 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 0.0 SUPPORT EQUIPMENT 0.0 OTHER 0.0 OTHER 0.0 OTHER * 7.28 * 0.87 * 2.56 * 6.36 * 6.39 * 1.53 * 6.81 * 4.35 36.2 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST 12 1.25 1 6.11 1 5.81 * 2.94 * 1.21 TOTAL PROCUREMENT 12 2.35 0 13.39 0 6.68 0 5.50 0 7.57 ITEM 54 * - CCS Revision 5.6/7.0/8.0 Planning Yard and other OER material. * 3.35 1 2.67 1 4.32 * 0 9.74 0 4.20 0 11.13 0 PAGE 11 4.61 8.96 16 32.27 0 0.00 12 69.52 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: Various INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: Prior Years Qty $ PRIOR YEARS MODIFICATION TITLE: Installation of TRIDENT OER Modifications on OHIO Class Submarine Various PRODUCTION LEADTIME: FY 2001: FY 2001: FY 2000 Qty $ 12 1 FY 2001 Qty $ Various FY 2002: FY 2002: ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Total Qty $ Qty $ 6.11 FY 2000 EQUIPMENT 1 13 6.1 1 5.8 0 2.9 5.81 FY 2001 EQUIPMENT * 2.94 FY 2002 EQUIPMENT * 1.21 FY 2003 EQUIPMENT * 3.35 FY 2004 EQUIPMENT 1 2.67 FY 2005 EQUIPMENT 1 4.32 FY 2006 EQUIPMENT * 4.61 FY 2007 EQUIPMENT 0 1.2 0 3.4 1 2.7 1 4.3 0 4.6 0 0.0 TO COMPLETE INSTALLATION SCHEDULE: FY 2000 FY 2002 FY 2001 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TC & Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 In 13 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 16 Out 12 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 16 ITEM 54 PAGE 12 P-3A CLASSIFICATION: UNCLASSIFIED TOTAL UNCLASSIFIED CLASSIFICATION DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 P-1 ITEM NOMENCLATURE BLI: 2760 OTHER SPAWAR TRNG. EQUIP. SUBHEAD 52DF FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TO COMP TOTAL 1.0 1.3 1.8 1.8 3.1 2.4 2.7 2.9 CONT CONT QUANTITY COST (in millions) PROGRAM COVERAGE/JUSTIFICATION FOR BUDGET YEAR REQUIREMENTS: The mission of The Joint Simulation System (JSIMS) is to provide a readily available, operationally valid synthetic environment for the Commanders-in-Chief (CINCs), their components, other Joint organizations and the Services to: jointly train, educate, develop doctrine and tactics, formulate and assess operational plans, assess warfighting situations, define operational requirements, and provide operational inputs to the acquisition process. In short, JSIMS will provide not only an improved certified capability for inter-Service operability but also an enhanced Joint Battle Staff training capability for the warfighting CINCs. All service Executive Agents (EAs) and Development Agents (DAs) are required to contribute to the initial population of the JSIMS architecture with facilities, services and tools, to meet an Initial Operational Capability (IOC) for Joint Task Force (JTF) training of no later than March 2003. In keeping with the premise that the Services/components are best able to define their own capabilities and functionality, the JSIMS Alliance Executive Office (AEO) is working in concert with the Services to import Service-provided functionality such as land, air, naval and littoral warfare to JSIMS. The AEO will integrate these functionalities for use by Joint Army/Marine/Navy/Air Force exercise. JSIMS development is incremental. In June 1994 the Services and Director Joint Program Office signed a Memorandum of Agreement (MOA) to establish JSIMS; a critical next-generation Modeling and Simulation (M&S) system. The long-term goal of the agreement is to integrate the range of missions of the Armed Forces within a common framework. That framework provides a balanced melding of live, virtual and constructive M&S representations, with Command, Control, Communications, Computers and Intelligence (C4I) fully supported, and interfaces using real-world equipment. As the Maritime Warfare EA, OPNAV N7, on 29 August 1995, assigned NAVSEA as the JSIMS Maritime Development Agent (DA). The objective of the JSIMS Maritime portion of the JSIMS Program is to train at all levels of command, in all warfare areas, including joint and service specific training. JSIMS Maritime is developing the Maritime Mission Space Objects for the JSIMS Program, as well as selected portions of the core infrastructure and services to be determined when the Joint Object Model is partitioned. Program was transferred from NAVSEA to SPAWAR PD-13 at the beginning of FY99. On 16 December 1999, USD (AT&L) published a memorandum directing that JSIMS be reorganized per the recommendations made by the JSIMS Senior Review Board. These recommendations were detailed in a 19 November 1999 Senior Review Board memorandum. Specifically, JSIMS was directed to convert system architecture to the High-Level Architecture (HLA) standard, establish a JSIMS Alliance Executive Office, develop a new Acquisition Program Baseline (APB), and transfer Program Executive Office (PEO) responsibilities from Air Force to Army. USD (AT&L) has also designated JSIMS as an ACAT-1D program. The JSIMS Alliance was directed to develop a new JSIMS Alliance MOA. The JSIMS MOA, dated 15 Dec 00, is in routing for final signatures. This BLI procures the equipment on which the JSIMS simulations will run in support of fleetwide training. Navy will equip active training sites at Tactical Training Group, Atlantic, Norfolk, VA; Expeditionary Warfare Training Group, Atlantic, Norfolk, VA; Tactical Training Group, Pacific, San Diego, CA; Expeditionary Warfare Training Group, Pacific, San Diego, CA; and the Naval War College, Newport, RI. FY00 budget procurement: JSIMS--Procure essential systems engineering support and hardware to start equipping the Tactical Training Group, Atlantic, site. FY01 budget procurement: JSIMS--Procure essential systems engineering support and hardware to continue equipping the Tactical Training Group, Atlantic site, and a Beta suite at the Naval War College site. FY02 budget procurement: JSIMS-- Procure essential systems engineering support and hardware to complete JSIMS sites at Tactical Training Group, Atlantic and Expeditionary Warfare Training Group, Atlantic. P-1 Shopping List - Item No - 55 - 1 of 3 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE COST ANALYSIS June 2001 P-1 ITEM NOMENCLATURE BLI 2760 OTHER SPAWAR TRAINING EQUIPMENT TOTAL COST IN THOUSANDS OF DOLLARS FY 2000 FY 2001 FY 2002 UNIT TOTAL UNIT TOTAL UNIT QTY COST COST QTY COST COST QTY COST APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT PY COST CODE DF001 ID CODE ELEMENT OF COST JSIMS-MARITIME TOTAL CONTROL QTY TOTAL COST QTY FY 1999 UNIT TOTAL COST COST 0 0 0 0 1* 979 979 2* 1,329 2* 1,329 SUBHEAD 52DF TOTAL COST QTY FY 2003 UNIT COST 1,793 1,793 Remarks: *QTY Column reflects number of shore sites receiving various quantities of computer and network hardware. UNIT COST varies with configuration, and sites are partially equipped in some years. First site begins in FY00 and completed in FY02. Exhibit P-5, Cost Analysis Unclassified Classification P-1 Shopping List-Item No 70-2 of 70-3 TOTAL COST 0 UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE BLI 2760 OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST DF001 JSIMS MARITIME DF001 JSIMS MARITIME DF001 JSIMS MARITIME FY 00 01 02 CONTRACTOR AND LOCATION VARIOUS VARIOUS VARIOUS CONTRACT METHOD & TYPE C-FP C-FP C-FP LOCATION OF PCO SSCSD SSCSD SSCSD RFP ISSUE DATE Jul-99 May-00 Nov-01 SUBHEAD OTHER SPAWAR TRNG EQUIP AWARD DATE Jul-00 Jun-01 Jan-02 DATE OF FIRST DELIVERY Aug-00 Jul-01 Mar-02 QTY 52DF UNIT COST 1* 2* 2* SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE Yes Yes No N/A May-01 N/A D. Remarks: *QTY Column reflects number of shore sites receiving various quantities of computer and network hardware. UNIT COST varies with configuration, and sites are partially equipped in some years. First site begins in FY00 and completed in FY02. DD FORM 2446, JUN 87 P-1 Shopping List - Item No - 55 - 3 of 3 Exhibit P-5A, Procurement History and Planning Unclassified Classification UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronic Equipment OTHER TRAINING EQUIPMENT/BLI: 2762 Program Element for Code B Items: Other Related Program Elements Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) ID Code FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 N/A N/A N/A N/A N/A N/A N/A N/A $50.3 $29.1 $37.2 To Complete Total CONT. $0.0 The equipment procured under the Other Training Equipment for NAVSEA line supports various types of Communication and Electronic training requirements: Procures sustaining and training equipment/systems,training aids and logistic support equipment to support Fleet training requirements. Representativetraining systems include, but are not limited to: Integrated Undersea Surveillance Systems (IUSS) On Board Trainers (OBT), Computer Improved Instructors Training Aid (CIITA), Acoustic Analysis Trainers, Ship Characteristic Demonstrators/Models, Ship Handling System, the Virtual EnvironmentSubmarine (VESUB), Submarine Piloting and NavigationTrainer (SPAN), and the Authorizing Instructional Material (AIM) System. Supports training support equipment requirements developed by the Chief of Naval Education and Training (CNET), and approved by CNO. (MB032) SUSTAINING TECHNICAL TRAINING EQUIPMENT Funds procure Communication and Electronic Technical Training Equipment (TTE) identified by the Chief of Naval Education and Training (CNET) and the Surface Warfare Training Requirements Review (SWTRR) process, as approved by CNO. This TTE sustains a better quality of training and/or replaces equipment beyond economical repair. (MB040) BATTLE FORCE TACTICAL TRAINING (BFTT) Funds will procure equipment/systems to support the Battle Force Tactical Training (BFTT) Program, which will provide the capability for coordinated shipboard combat system team and Battle Group/Battle Force (BG/BF) training in port. BFTT will provide realistic joint warfare training across the spectrum of armed conflict, realistic unit level team training in all warfare areas, a means to link ships together which are in different homeports for coordinated training, external stimulation of shipboard training systems and simulation of non-shipboard forces such as friendly, neutral, and enemy ships, aircraft and submarines. BFTT will use a distributed architecture in order to integrate existing on-board/embeddedtrainers, and will utilize Distributed Interactive Simulation (DIS) protocols to provide Battle Group/Force Commanders with the ability to conduct coordinated, realistic, high stress, interactive combat system training. In FY 00 the projected Baseline Procurement consists of one full BFTT system for (1) CVN 68 Class, (3) CG 47 Class, (2) LSD 41 Class, (1) LHD 1 Class, and (5) DDG 51 Class ships, Production Integration, ILS/Spares, (8) Rehosted ACTS, (30) Shipboard RF/IF Stimulators, (10) BFTT Electronic Warfare Trainers (BEWTs), CSTS/BFTT System IntegrationHardware, (4) BFTT ATC Stimulators, and (42) BFTT EW Trainers. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 56 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 CONTINUATION DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronic Equipment OTHER TRAINING EQUIPMENT/BLI: 2762 In FY 01 the projected Baseline Procurement consists of one full BFTT system for (1) LHD 1 Class, (3) CG 47 Class, and (2) DDG 51 Class ships, Production Integration, ILS/Spares, (13) Shipboard RF/IF Stimulators, (49) BFTT Electronic Warfare Trainers (BEWTs), (5) BFTT ATC Stimulators, and CSTS/BFTT System Integration Hardware. In FY 02 the projected Baseline Procurement consists of one full BFTT system for (2) CV/CVN Class, (1) CG 47 Class, (2) LHD Class, and (9) DDG 51 Class ships, Production Integration,ILS/Spares, (20) Shipboard RF/IF Stimulators, (10) BFTT Electronic Warfare Trainers (BEWTs), and CSTS/BFTT System Integration Hardware. (MB041) SUBMARINE SYNTHETIC WARFARE/COMBINED TEAM TRAINER MODE (CTTM)/ELECTRONIC CLASSROOMS This line procures the submarine-unique requirements to support the Synthetic Warfare (SW), Combined Team Trainer Mode (CTTM), and Electronic Classroom (EC) Systems. FY99, FY00 and FY01 funds procure additional capability for the submarine training sites to support Synthetic Warfare, CTTM, and EC requirements identified by TYCOM. (MB050) SUBMARINE SONAR EMPLOYMENT TRAINER (SET) The SET provides acoustic operator employmenttraining for submarine sonar systems. It uses entirely commercial components to contain contact and environment models, simulations of the sensors and signal processing, simulated operator consoles, and an instructional subsystem including an instructor’s console. FY00 procures a SET system for the Naval Submarine School at Groton, CT. The SET will support Sensor/Combat Systems programs of all currently deployedsubmarine classes, and will be a critical part of the training plans of the new SSN, Virginia, class in the future. The SET will be an essential component of an emerging shore based training system that will support the projected technology in the Fleet systems that are designed to meet current and future threats: the Acoustics, Rapid Commercial-Off-The-Shelf (COTS) Insertion (A-RCI) and C3I. The design concept for SET is based on the widely recognized and proven successful Interactive Multisensor Acoustic Trainer (IMAT) visualization and simulation technologies. The SET will be part of the solution to a deficiency in operatorcompetenceand data recognition due to a lack of employmenttraining by its use of 3-D graphics, animation, audio, and scientific visualization methods to illustrate highly complex displays and concepts of oceanographic physics. The demands of curriculum and student throughput at the primary submarine training site at NavSubScol, Groton dictates the number and configuration of trainers provided by the N87 budgets, including the SET. The estimates include competitive sourcing savings associated with consolidation of production support contracting efforts. (MB054) RADAR/ECS TRAINING This line procures electronics training for SSNs such as radar, and exterior communictions (ECS). DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 56 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy BA-2 Communications and Electronic Equipment Other Training Equipment/82MB TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost EXPEDITIONARY WARFARE (N85) MB040 Battle Force Tactical Training (BFTT) 3,472 2,298 1,138 SURFACE WARFARE (N86) MB032 Surface Sustaining/TTE MB040 Battle Force Tactical Training (BFTT) 94 60 92 27,225 14,020 32,491 BFTT Air Traffic Control (ATC) 3,000 3,972 BFTT Electronic Warfare Trainer (BEWT) 4,200 3,973 SUBMARINE WARFARE (N87) MB041 Submarine Synthetic Warfare, CTTM,EC MB044 Training Support Equipment / Sub 637 229 2,329 4,563 1,880 IUSS OBT (342) (218) (100) Computer Imprvd, Instr. Trng. Aid (300) (225) (280) Minor Training Support Equipment (664) (443) (343) TAC III/IV / OBT DS (255) (498) (151) (768) 1 650 (650) (0) SPAN (0) 1 1,554 (1554) (0) VA SPAN (0) (0) (0) Acoustic Analysis Trnr (0) VESUB MB050 1 768 1 975 (975) 2 503 (1006) SUBMARINE SONAR EMPLOYMENT TRAINER (SET) 1 MB054 Radar/ECS Training MB043 Training Support Equipment 9,300 9,300 0 0 0 0 1,624 MANPOWER/TRAINING (N7) Authorizing Instructional Material (AIM) 10 5 0 Subtotal (N85/N86) 37,991 24,323 33,721 Subtotal (N87) 12,266 4,792 3,504 Subtotal (N7) 10 5 50,267 P-1 SHOPPING LIST 29,120 DD FORM 2446, JUN 86 ITEM NO. 56 0 37,225 CLASSIFICATION: 0 PAGE NO. 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 Communications and Electronic Equipment SUBHEAD 82MB Other Training Equipment QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW MULTIPLE 1 3 5 2 1 4 42 922 1504 1532 1565 945 1700 750 100 VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS N/A N/A VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS CPIF(Option) Phase III (SBIR) VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS AAI, HUNT VALLEY, MD EWA, FAIRMONT, WV 11/99 01/00 01/00 02/00 03/00 03/00 03/00 01/00 02/00 07/00 04/00 05/00 06/00 06/00 09/00 04/00 YES YES YES YES YES YES YES YES BEWT 10 100 PHD/NSWC, CA PHD/NSWC, CA PHD/NSWC, CA PHD/NSWC, CA PHD/NSWC, CA PHD/NSWC, CA NAVSEA, ARL VA NAVSEA, ARL VA NAVSEA ARL, VA NAVSEA N/A Phase III (SBIR) EWA, FAIRMONT, WV 10/99 01/00 YES STIM/SIM P&I (30) CSTS/BFTT INTEGRATION PRODUCTION INTEGRATION 30 260 ARL, VA 10/97 CPIF(Option) AAI, HUNT VALLEY, MD 03/00 06/00 YES 1 1540 PHD/NSWC, CA VARIOUS VARIOUS VARIOUS 02/00 06/00 YES 12 160 PHD/NSWC, CA VARIOUS VARIOUS VARIOUS 10/99 02/00 YES MB044 IUSS CIITA TSE TACIII/IV / OBT DS VESUB MULTIPLE MULTIPLE MULTIPLE MULTIPLE 1 768 NAWC/TSD NAWC/TSD NAWC/TSD NAWC/TSD NAWC/TSD VARIOUS VARIOUS VARIOUS VARIOUS 09/16/98 VARIOUS VARIOUS VARIOUS VARIOUS C/FFP(Option) VARIOUS VARIOUS VARIOUS VARIOUS RDR, INC. VARIOUS VARIOUS VARIOUS VARIOUS 02/00 VARIOUS VARIOUS VARIOUS VARIOUS 02/01 YES YES YES YES YES 1 9300 NSWC/CD N/A WR/RC NSWC/CD 11/99 06/02 YES Cost Element/ FISCAL YEAR FY 2000 MB040 ILS/SPARES CVN 68 CLASS P&I CG 47 CLASS P&I DDG 51 CLASS P&I LSD 41 CLASS P&I LHD 1 CLASS P&I BFTT ATC (Stim) BFTT EW Trnr (Congress) MB050 SET D. REMARKS P-1 SHOPPING LIST DD Form 2446-1, JUL 87 ITEM NO. 56 PAGE NO. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 Communications and Electronic Equipment Other Training Equipment SUBHEAD 82MB QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW MULTIPLE 3 2 1 5 39 833 1532 1565 1700 794.4 101.9 PHD/NSWC, CA PHD/NSWC, CA PHD/NSWC, CA PHD/NSWC, CA NAVSEA, ARL VA NAVSEA, ARL VA VARIOUS VARIOUS VARIOUS VARIOUS N/A N/A VARIOUS VARIOUS VARIOUS VARIOUS CPIF (Option) Phase III (SBIR) VARIOUS VARIOUS VARIOUS VARIOUS AAI, Hunt Valley MD EWA, Fairmont, WV 11/00 02/01 02/01 02/01 03/01 01/01 02/01 05/01 05/01 08/01 09/01 04/01 YES YES YES YES YES YES BEWT 10 100 NAVSEA ARL, VA N/A Phase III (SBIR) EWA, FAIRMONT, WV 10/00 01/01 YES STIM/SIM P&I (13) 13 260 ARL, VA 10/97 CPIF AAI, HUNT VALLEY, MD 03/01 06/01 YES 1 689 PHD/NSWC, CA VARIOUS VARIOUS VARIOUS 02/01 08/01 YES 6 165 PHD/NSWC, CA VARIOUS VARIOUS VARIOUS 10/00 05/01 YES 650 1554 980 NAWC/TSD NAWC/TSD NAWC/TSD NAWC/TSD NAWC/TSD NAWC/TSD NSWC/CD VARIOUS VARIOUS VARIOUS VARIOUS 09/16/98 N/A 08/00 VARIOUS VARIOUS VARIOUS VARIOUS C/FFP(OPTION) WR WR/RCP VARIOUS VARIOUS VARIOUS VARIOUS RDR, INC. NAWC/TSD ORLANDO FL NSWC/CD VARIOUS VARIOUS VARIOUS VARIOUS 03/01 02/01 02/01 VARIOUS VARIOUS VARIOUS VARIOUS 08/01 08/02 06/02 YES YES YES YES YES NO NO PAGE NO. 5 Cost Element/ FISCAL YEAR FY 2001 MB040 ILS/SPARES CG 47 CLASS P&I DDG 51 CLASS P&I LHD 1 CLASS P&I BFTT ATC (STIM) Congre BFTT EW Trainer Congres DATE REVISIONS AVAILABLE CSTS/BFTT INTEGRATION PRODUCTION INTEGRATION MB044 IUSS CIITA TSE TACIII/IV / OBT DS VESUB SPAN Acoustic Analysis Trnr D. MULTIPLE MULTIPLE MULTIPLE MULTIPLE 1 1 1 REMARKS P-1 SHOPPING LIST DD Form 2446-1, JUL 87 ITEM NO. 56 Classification: UNCLASSIFIED 09/00 08/00 CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 Communications and Electronic Equipment SUBHEAD 82MB Other Training Equipment QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW MULTIPLE 2 1 9 2 1 1823 1810 1475 1525 1665 576 VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS 11/01 02/02 02/02 02/02 02/02 03/02 02/02 05/02 05/02 05/02 08/02 08/02 YES YES YES YES YES YES BEWT 10 100 PHD/NSWC, CA PHD/NSWC, CA PHD/NSWC, CA PHD/NSWC, CA PHD/NSWC, CA PHD/NSWC, CA NAVSEA ARL, VA N/A Phase III (SBIR) EWA, FAIRMONT, WV 10/01 01/02 YES STIM/SIM P&I (20) 20 260 ARL, VA 10/97 CPIF AAI, HUNT VALLEY, MD 03/02 06/02 YES CSTS/BFTT INTEGRATION 1 500 PHD/NSWC, CA VARIOUS VARIOUS VARIOUS 02/02 08/02 YES PRODUCTION INTEGRATION 14 170 PHD/NSWC, CA VARIOUS VARIOUS VARIOUS 10/01 05/02 YES 503 NAWC/TSD NAWC/TSD NAWC/TSD NAWC/TSD NSWC/CD VARIOUS VARIOUS VARIOUS VARIOUS 08/00 VARIOUS VARIOUS VARIOUS VARIOUS WR/RC VARIOUS VARIOUS VARIOUS VARIOUS NSWC/CD VARIOUS VARIOUS VARIOUS VARIOUS 02/02 VARIOUS VARIOUS VARIOUS VARIOUS 06/03 YES YES YES YES NO NAVSEA TBD TBD TBD 02/02 VARIOUS YES Cost Element/ FISCAL YEAR FY 2002 MB040 ILS/SPARES CVN/CV CLASS P&I CG 47 CLASS P&I DDG 51 CLASS P&I LHD 1 CLASS P&I CSTS/BFTT HARDWARE MB044 IUSS CIITA TSE TACIII/IV / OBT DS Acoustic Analysis Trnr MULTIPLE MULTIPLE MULTIPLE MULTIPLE 2 MB054 Radar/ECS Trainer MULTIPLE D. REMARKS P-1 SHOPPING LIST DD Form 2446-1, JUL 87 ITEM NO. 56 PAGE NO. 6 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE 08/00 UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENT SCHEDULE P-23 1 ACTIVE FORCE INVENTORY SCHOOLS/OTHER TRAINING (P) (P) (P) OTHER (P) TOTAL PHASED REQ (C) 43 ASSETS ON HAND (BP) 0 DELIVERY FY 99 & PRIOR (P) 43 FY 99 & PRIOR (P) 0 FY 00 (P) 0 FY 01 (P) FY 02 (P) FY 03 (P) FY 04 (P) FY 05 (P) FY 06 (P) To Complete (P) TOTAL ASSETS QTY OVER (+) OR SHORT (-) D. REMARKS DD for 2447, JUN 86 (C) FY 2000 2 3 A. APPROPRIATION/BUDGET ACTIVITY B. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 AN/USQ-T46 BFTT 4 1 FY 2001 2 3 4 1 C. DATE June 2001 FY 2002 2 3 4 1 FY 2003 2 3 4 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 LATER 4 35 1 10 1 0 0 6 0 0 0 7 7 0 0 2 2 0 0 3 1 0 0 4 1 0 0 6 1 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 44 54 55 55 55 61 61 61 61 68 75 75 75 77 79 79 79 82 83 83 83 87 88 88 88 94 95 1 10 1 0 0 6 0 0 0 7 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 120 0 43 44 54 55 55 55 61 61 61 61 68 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA E. RQMT (QTY) 1. APPN - 2. APPN - OPN 3. N/A PROCUREMENT LEADTIME TOTAL RQMT 120 ON HAND AS OF 7/1/00 INSTALLED 120 43 ADMIN 6 Month 0 INITIAL ORDER 6 Month P-1 SHOPPING LIST ITEM NO 56 FY 99 & PRIOR UNDELIVERED PAGE NO UNFUNDED 0 0 REORDER 6 Months CLASSIFICATION: 7 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: TIME PHASED REQUIREMENTS SCHEDULE (SUPPLEMENT SHEET-INSTALLATION DATA) P-23A AN/USQ-T46 BFTT Other Procurement, Navy BA-2 Communications and Electronic Equipment E.I./L 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L June 2001 Installing Agent N/A APPROPRIATION/BUDGET ACTIVITY 1ST QTR DATE P-1 ITEM NOMENCLATURE/PROJECT UNIT 4TH QTR QTY E.I./L 1ST QTR QTY E.I./L FY 2000 2ND QTR QTY E.I./L 3RD QTR QTY E.I./L 4TH QTR QTY E.I./L FY 2001 1 10 1 FY 2002 6 FY 2003 7 7 P-1 SHOPPING LIST ITEM NO. 56 PAGE NO. 8 CLASSIFICATION: UNCLASSIFIED QTY UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY MARINE AIR TRAFFIC CONTROL & LANDING SYSTEMS 42MJ Program Element for Code B Items: Other Related Program Elements NOT APPLICABLE Prior Years QUANTITY COST (In Millions) $39.0 ID Code FY 2000 $10.6 FY 2001 $4.2 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 $1.0 To Complete Cont Total Cont DESCRIPTION: Marine Air Traffic Control & Landing System (MATCALS) is a fully automated all weather expeditionary terminal Air Traffic Control System that provides arrival/ departure and enroute surveillance control, automated precision approach and landi control, or Ground Controlled Approach (GCA). MATCALS satisfies the operational requirements set forth by Specific Operational Requirements (SOR) 34-22 of 12 July 1973. MATCALS is also comprised of other visual and navigational aids including Pulse Coded Microwave Landing Systems (SOR 34-26 of 30 APRT5), ATC systems and ancillary equipment. ORD 341-88-93 of 1 Sep 93 also applies. MATCALS, with other Marine Air Command and Control Systems and federal agencies, provides the ability to project air combat power in the Amphibious Operations Area (AOA) without regard to weather. Air traffic control and landing automation reduces air traffic controllers’ traffic handling and management time, allowing more time for mission response and task accomplishment. It supports a required increase in aircraft sortie rates and contributes to extended time on target. The system provides for integration of Air Traffic Control (ATC) into the total Marine Air Command and Control System (MACCS). MATCALS has three primary subsystems: (1) Air Traffic Control Subsystem (ATCS) consisting of AN/TPS-73 Airport Surveillance Radar and various peripheral equipment; (2) All-Weather Landing Subsystem (ALS) consisting of an AN/TPN-22 Precision Approach Landing Radar, AN/UYK-44 computer and peripheral equipment; and (3) the Control and Communications Subsystem (CCS) (AN/TSQ-131(V)) with a Communications Control Group (CCG), radios, computer software, multi mode displays and peripherals. Other Fleet Marine Force ATC equipment supported by the funding line MATCALS are the AN/TSQ-120 Tower, AN/TRN-44 TACAN, AN/TPN-30 Marine Remote Area Approach & Landing Set (MRAALS), the AN/TSQ-216 Remote Landing Site Tower (RLST), the AN/TSM-170 Maintenance Shelters and various support items. Total requirement is for 17 subsystems: 12 for the Marine Air Traffic Control Detachments (MATCD); 1 for the Aviation Ground Support Element at 29 Palms, CA; 1 for operational contingencies/ISEA Test Bed at San Diego, CA; 2 for the Naval Air Technical Training Center (NATTC) in Pensacola, FL; and 1 for NAWCAD Landing Systems Test Facility, Patuxent River, MD. A POM-00 initiative resulted in approval to transition the current MATCALS to the Air Surveillance and Precision Approach Radar Control System (ASPARCS) (ORD 518-88-99 of 12 May 99). ASPARCS will consist of an Air Surveillance Radar which will replace the AN/TPS-73, a Precision Approach Radar which will replace the AN/TPN-22, and an Operations/Communications Subsystem which will replace the AN/TSQ-131. ASPARCS will provide greater mobility, transportability, reliability, maintainability, and interoperability with Marine Corps/Navy Command and Control Systems than the current MATCALS. Total OPN requirement for ASPARCS is 11 units: 8 for the Marine Air Traffic Control Detachments (MATCD’s), 2 for the Naval Air Technical Training Center (NATTC) in Pensacola, FL, and 1 for the Depot (TBD). To identify and define both the MATCALS and ASPARCS Systems radio requirements, two new Cost Codes and Elements of Cost have been added beginning with FY 2000. They are; MJ431 MATCALS RADIO ASPARCS - ARC-210 and MJ433 MATCALS RADIO ASPARCS - PRC-117F. FY00 funding procured 55 MATCALS Radio ARC-210, 6 RLSTs, 33 Manpack Radios PRC-117F, 1 AN/TSQ-120 Upgrade and various maintainability/reliability improvements and related installation. FY01 funding procures 33 MATCALS Radio ARC-210, 9 MATCALS Radio ASPARCS ARC-210, 4 MATCALS Radio ASPARCS PRC-117F, 1 AN/TSQ-120 Upgrade, 12 Manpack Radios PRC-138 and various maintainabillity/reliability improvements and related installation. FY02 funding procures 8 MATCALS Radio ARC-210 and various maintainabillity/reliability improvements and related installation. INSTALLATION AGENT: SPAWARSYSCEN, SD: Facilities that are to receive the equipment: Marine Corps air traffic control facilities, expeditionary airfields, and remote landing sites. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 57 CLASSIFICATION: PAGE NO. 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY Procurement Items MJ413 AN/TPN-30 MOD QTY FUNDING MJ429 AN/TSQ-216 (RLST) MARINE AIR TRAFFIC CONTROL & LANDING SYSTEMS Prior Years FY 2000 FY 2001 FY 2002 33 1.518 8 0.376 75 5.479 A QTY FUNDING MJ430 MATCALS RADIO - ARC-210 June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY ID Code A DATE: 7 10.338 6 4.591 63 3.825 55 2.530 A QTY FUNDING MJ431 MATCALS RADIO ASPARCS - ARC-210 A QTY FUNDING MJ433 MATCALS RADIO ASPARCS - PRC-117F 9* 0.414 A QTY FUNDING MJ437 AN/UYQ-42 UPGRD 4* 0.112 A QTY FUNDING MJ439 AN/TSQ-120 UPRGD 34 1.466 A QTY FUNDING MJ432 MANPACK RADIOS 4 1.786 1 0.515 33 0.889 12 0.310 2.065 10.590 1.352 4.221 A QTY FUNDING MJ434 ASPARCS System 1 0.515 A QTY FUNDING MJ425 AN/TPN-20 SSM QTY FUNDING OTHER COSTS TOTAL FUNDING A 17 8.115 8.027 39.036 0.629 1.005 * BTR to RDT&E,N during execution for the ASPARCS 1st Article. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 57 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED 42MJ UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT DATE: June 2001 P-1 ITEM NOMENCLATURE/SUBHEAD MARINE AIR TRAFFIC CONTROL & LANDING SYSTEMS 42MJ TOTAL COST IN THOUSANDS OF DOLLARS COST CODE MJ413 MJ425 MJ427 MJ429 MJ430 MJ431 MJ432 MJ433 MJ434 MJ437 MJ439 MJ800 MJ830 MJ831 MJ860 MJ900 MJ990 ELEMENT OF COST AN/TPN-30 MOD AN/TPN-22 SOLID STATE MODULATOR MAINT/RELIABILITY IMPROVEMENT AN/TSQ-216 (RLST) MATCALS RADIO ARC-210 MATCALS RADIO ASPARCS - ARC-210 MANPACK RADIOS MATCALS RADIO ASPARCS - PRC-117F ASPARCS System AN/UYQ-42 UPGRADE AN/TSQ-120 UPGRADE INTEGRATED LOGISTICS SUPPORT PRODUCTION ENGINEERING PRODUCTION SUPPORT ACCEPTANCE TEST & EVALUATION NON-FMP INSTALLATION INITIAL TRAINING ID Code A A A A A A A A A A A N/A N/A N/A N/A N/A N/A Prior Years Total Cost 5,479 8,115 2,843 10,338 3,825 FY 2000 Quantity Unit Cost FY 2001 Total Cost VAR 6 55 762 46 538 4,591 2,530 33 27 889 1 515 515 307 780 1,466 1,786 561 1,755 618 516 1,554 180 39,036 Quantity Unit Cost VAR FY 2002 Total Cost Quantity 535 VAR 8 Unit Cost Total Cost 118 33 *9 12 *4 46 46 26 28 1,518 414 310 112 47 376 1 515 515 189 339 166 75 68 333 39 81 168 40 91 121 58 10,590 4,221 1,005 *BTR to RDT&E,N during execution for the ASPARCS 1st Article. DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. 57 CLASSIFICATION: PAGE NO. 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA2 - Communications and Electronic Equipment SUBHEAD MARINE AIR TRAFFIC CONTROL & LANDING SYSTEM 42MJ QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW 6 761.8 NAVAIR Nov-98 C/OPTION SIERRA NEVADA CORP SPARKS, NV Dec-99 Jun-01 YES MJ430 MATCALS RADIO ARC-210 FY - 01 33 FY - 02 8 45.8 46.6 NAVAIR NAVAIR Nov-00 Nov-01 SS/OPTION SS/OPTION COLLINS RADIO CEDAR RAPIDS, IA CEDAR RAPIDS, IA Apr-01 Apr-02 Apr-02 Apr-03 YES YES MJ431 MATCALS RADIO ASPARCS - ARC-210 FY - 01 9 45.8 NAVAIR Nov-00 SS/OPTION COLLINS RADIO CEDAR RAPIDS, IA Apr-01 Apr-02 YES MJ433 MATCALS RADIO ASPARCS - PRC-117F FY - 01 4 27.9 NAVAIR Nov-00 SS/OPTION COLLINS RADIO CEDAR RAPIDS, IA Apr-01 Apr-02 YES NAWCAD Oct-00 GOTS HARRIS COMM Nov-00 Nov-01 YES Cost Element/ FISCAL YEAR MJ429 RLST FY - 00 MJ432 MANPACK RADIO FY - 01 D. 12 25.8 REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 57 PAGE NO. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: Expeditionary airfield and remote area landing sites Operational Enhancement MODIFICATION TITLE:Various (MJ413, MJ425, MJ427, MJ430) DESCRIPTION/JUSTIFICATION: ECP AN/TPN-30 MRAALS upgrade modification for fleet operational commitments. Directs Aircraft into final flight approach pattern. Provides highly mobile navigational aid to tactical aircraft. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A FY 1999 FY 1998 & Prior QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT * 17.965 * 2.297 * 3.068 * 2.053 * 0.494 * 0.602 18.567 * 0.463 2.760 * 0.333 3.401 * 0.168 2.221 * 0.121 0.615 ITEM 57 PAGE 5 NOTE: TOTAL QUANTITY REFLECTS THE INVENTORY OBJECTIVE FOR THIS ITEM. MATCALS PROGRAM TRANSFERRED FROM SPAWAR TO NAVAIR IN FY97. HIGHER INSTALL COST PRIOR TO FY99 REFLECTS NON-RECURRING REQUIREMENT FOR PROCUREMENT OF PECULIAR INSTALLATION JIGS AND DIES. * Quantities can not be shown because of mix of install kits, install equipment, or engineering change order quantities being procured. CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: Expeditionary airfield and remote area landing sites. INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: Various CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ * 0.602 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 FY 2001 2 3 0 0 0 0 4 0 0 1 0 0 Various (MJ413, MJ425, MJ427, MJ430) PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A N/A N/A FY 1999 Qty $ 0.463 * MODIFICATION TITLE: FY 2000 Qty $ 0.000 * 0.237 * 0.096 * FY 2002 2 3 0 0 0 0 4 0 0 1 0.068 0.100 FY 2003 2 3 FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ * * Various 4 * * FY 2004 Qty $ Qty N/A N/A FY 2005 $ FY 2006 Qty $ FY 2003: FY 2003: FY 2007 Qty $ To Complete Qty $ N/A N/A Qty Total $ 0.099 0.022 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL The equipment and installation costs represented on the P3-A are for individual modification programs that do not exceed $5 million in either budget year or $10 million in all years. * Quantities can not be shown because of mix of install kits, install equipment, or engineering change order quantities being procured. * Production Leadtime for the MJ430 MATCALS RADIO ARC-210 can vary from 2 months to 6 months or even 12 months due to the delivery schedule which is based on production needs of the joint PMA 209 contract. * Administrative Leadtime for the MJ430 will be 8 months for FY99, 4 months in FY00 and 7 months in FY00, respectively and 7 months thereafter. P-3A CLASSIFICATION: UNCLASSIFIED ITEM 57 PAGE 5A CLASSIFICATION: UNCLASSIFIED Exhibit P-20, Requirements Study APPROPRIATION/BUDGET ACTIVITY BA-2 COMMUNICATIONS Other Procurement Navy P-1 ITEM NOMENCLATURE Admin Leadtime (after Oct1): MJ434 ASPARCS SYSTEMS FY 2001 Other than Training Usage FY 1998 thru XXXXX: FY 1997: FY 1996: FY 1995: FY 2002 12 Months FY 2003 Disposals (Vehicles/Other) FY 1998 thru XXXXX: FY 1997: FY 1996: FY 1995: ITEM NO. 57 FY 2004 FY 2005 Vehicles Eligible for FY 2000 Replacement: Vehicles Eligible for FY 2001 Replacement: Vehicle Augment: P-1 SHOPPING LIST DD Form 2454, JUN 86 June 2001 Prod Leadtime : 3 Months FY 2000 Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from all prior year funding Deliveries from FY 2000 funding Deliveries from FY 2001 funding Deliveries from FY 2002 funding Deliveries from subsequent years’ funding Other Gains Combat Losses/Usage Training Losses/Usage Test Losses/Usage Other Losses/Usage Disposals/Retirements/Attritions/etc. End of Year Asset Position Inventory Objective or Current Authorized Allowance Inventory Objective Actual Training 11 Expenditures Assets Rqd For Combat FY 1998 thru Loads: XXXXX: WRM Rqmt: FY 1997: Pipeline: FY 1996: Other: FY 1995: TOTAL: Remarks: DATE: AND ELECTRONIC EQUIPMENT FY 2006 Aircraft: TOAI: PAA: TAI Attrition Res: BAI Inactive Inv: Storage: CLASSIFICATION: PAGE NO. 6 UNCLASSIFIED FY 2007 UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY Shipboard Air Traffic Control (SATC) Program Element for Code B Items: Not Applicable QUANTITY COST (In Millions) 42MP NARM #283100 Other Related Program Elements 0604504N Prior Years ID Code FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total $83.2 A $7.4 $7.8 $8.0 $8.0 $8.2 $8.2 $8.5 $8.7 CONT CONT DESCRIPTION: Shipboard Air Traffic Control (SATC) systems are responsible for safe and expeditious control of air traffic within 50 NM of a ship. SATC systems include the air traffic surveillance radar, AN/SPN-43, and the air traffic central tracking and control system, AN/TPX-42, which has two major configurations: Carrier Air Traffic Control Center-Direct Altitude and Identity Readout (CATCC-DAIR) and Amphibious Air Traffic Control-Direct Altitude and Identity Readout (AATC-DAIR). Both DAIR systems use AN/SPN-43 and Identification Friend or Foe (IFF) inputs to track and control aircraft. Obsolescence problems are being addressed through various upgrades. The major upgrades include AN/SPN-43C, CATCC-to-AATC field change, and AN/TPX42(V) Advanced Display System (ADS) upgrade. FY 2000 funded the procurement of two CATCC-to-AATC field change kits and various SATC modification kits. It also funded the installation of one CATCC-to-AATC field change, one AN/SPN-43C upgrade and various SATC modification kits. FY 2001 funded the procurement of two CATCC-to-AATC field change kits and various SATC modification kits. It also funded the installation of one CATCC-to-AATC field change, one AN/TPX-42(V)14 and various SATC modification kits. FY 2002 funds the procurement of two CATCC-to-AATC field change kits and one AN/TPX-42(V) ADS upgrade. It also funds the installation of two CATCC-to-AATC field changes and various SATC modification kits. Installing Agent: Shipyards and Alteration Installation Teams When installation to be made: ROH/SRA/RAV Ships or facilities to receive the equipment: CV/CVNs, LHD/LHAs, Software Support Activity (NAWCAD, St Inigoes), Integrated Combat System Test Facility (San Diego), Landing Systems Test Facility (NAWCAD, Patuxent River), and training sites. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 58 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY Procurement Items MP031 AN/SPN-43C UPG A QTY FUNDING MP040 AN/TPX-42A(V)14 A QTY FUNDING MP042 CATCC to AATC F/C KIT N/A QTY FUNDING Shipboard Air Traffic Control (SATC) Prior Years To FY 2000 FY 2001 FY 2002 23 5.179 6 22.295 7 11.053 2 5.007 2 5.033 2 5.233 MP043 AN/TPX-42 ADS UPG QTY FUNDING OTHER COST TOTAL P-1 FUNDING N/A 1 0.860 44.658 83.185 2.355 7.361 2.774 1.943 7.807 8.036 P-1 SHOPPING LIST DD Form 2454, JUN 86 June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY ID Code DATE: ITEM NO. 58 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS Weapon System DATE: P-5 June 2001 APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy A Shipboard Air Traffic Control 42MP TOTAL COST IN THOUSANDS OF DOLLARS COST CODE MP023 MP031 MP040 MP042 MP043 MP800 MP830 MP840 MP860 MP900 MP910 ELEMENT OF COST ID Code SATC MOD KITS AN/SPN-43C UPGRADE AATC-DAIR SYSTEM AN/TPX-42(V)14 CATCC TO AATC F/C KITS AN/TPX-42 ADS UPGRADE INTEGRATED LOGISTICS SUPPORT PRODUCTION ENGINEERING SPT QUALITY ASSURANCE ACCEPTANCE TEST & EVALUATION NON-FMP INSTALLATION FMP INSTALLATION VARIOUS 1/ DD FORM 2446, JUN 86 N/A N/A A N/A N/A N/A N/A N/A N/A N/A N/A N/A Prior FY 2000 Years Total Cost Quantity Unit Cost Total Cost 449 5,179 22,295 11,053 390 926 70 314 953 29,345 12,211 83,185 P-1 SHOPPING LIST ITEM NO. 1/ Prior year funding associated with cost elements not financed after FY 1994. 58 VAR 2 2,504 FY 2001 Quantity 72 VAR 5,007 2 162 344 79 142 745 810 7,361 PAGE NO. FY 2002 Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost 612 2,517 5,033 112 243 96 5,233 860 184 304 97 1,119 592 349 1,009 7,807 2 1 2,617 860 8,036 CLASSIFICATION: 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy C. P-1 ITEM NOMENCLATURE BA2-Communications and Electronics Equipment SUBHEAD Shipboard Air Traffic Control (SATC) 42MP QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE MP042 CATTC to AATC-DAIR F/C Kits FY00 FY01 FY02 2 2 2 $2,504 $2,517 $2,617 NAVAIR NAVAIR NAVAIR N/A N/A N/A PO PO PO NAWCAD St. Inigoes NAWCAD St. Inigoes NAWCAD St. Inigoes 3/00 3/01 3/02 9/01 9/02 9/03 YES YES YES MP043 AN/TPX-42 ADS UPGRADE FY02 1 $860 NAVAIR N/A PO NAWCAD St. Inigoes 2/02 2/03 YES Cost Element/ FISCAL YEAR D. CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE REMARKS 1. System integration and assembly will be accomplished by the field activity, NAWCAD, after procuring individual components through existing contractual vehicles. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 58 PAGE NO. 4 Classification: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION CVs, CVNs, LHDs, LHAs, and selected shore sites. TYPE MODIFICATION: R&M MODIFICATION TITLE: SATC Modification Kit Summary (MP023) DESCRIPTION/JUSTIFICATION: SATC MODIFICATION KIT SUMMARY This exhibit summarizes procurement and installation for project unit MP023. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL $ QTY $ 0 0.000 FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT VAR 0.287 VAR 0.162 VAR 0.072 VAR 0.612 VAR 0.652 VAR 1.863 VAR 0.172 VAR 1.692 VAR 1.592 VAR CONT CONT 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 VAR 0.295 VAR 0.069 VAR 0.245 VAR 0.768 VAR 0.349 VAR 1.022 VAR 0.253 VAR 0.614 VAR 0.645 VAR 0.147 VAR CONT CONT 0.582 0.231 0.317 1.380 0.349 1.674 2.116 0.786 2.337 1.739 CONT CONT ITEM 58 PAGE 5 CLASSIFICATION: UNCLASSIFIED The equipment and installation costs represented on this P-3a are for individual modification programs that do not exceed $5 million in either budget year or $10 million in all years. CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ Var. 0.295 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 MODIFICATION TITLE: CVs, CVNs, LHDs, LHAs, and selected shore sites. N/A SATC Modification Kit Summary PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A N/A N/A FY 1999 Qty $ FY 2000 Qty $ Var. Var. Var. 0.069 0.244 0.001 Var. Var. N/A FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ 0.150 0.618 Var. (MP023) FY 2004 Qty $ FY 2003: FY 2003: N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ 1.022 Var. 0.614 Var. 0.645 Var. 1 0 0 FY 2002 2 3 0 0 0 0 4 0 0 1 0 0 FY 2003 2 3 0 0 0 0 4 0 0 1 0 0 ITEM Qty 0.253 Var. 4 0 0 To Complete Qty $ 0.349 Var. FY 2001 2 3 0 0 0 0 N/A N/A FY 2004 2 3 0 0 0 0 4 0 0 58 PAGE 1 0 0 FY 2005 2 3 0 0 0 0 5A 4 0 0 1 0 0 FY 2006 2 3 0 0 0 0 4 0 0 1 0 0 FY 2007 2 3 0 0 0 0 0.147 TC 4 0 0 0 0 TOTAL 0 0 P-3A CLASSIFICATION: UNCLASSIFIED Total $ 0.295 0.313 0.151 0.967 0.000 1.275 0.614 0.645 0.147 CONT CONT CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION CVs, CVNs, LHDs, LHAs and selected shore sites. TYPE MODIFICATION: R & M Upgrade MODIFICATION TITLE: AN/SPN-43C Upgrade (MP031) DESCRIPTION/JUSTIFICATION: This kit replaces the obsolete and unprocurable AN/SPN-43B receiver and transmitter units with a dual channel receiver/transmitter using state-of-the-art solid state circuitry. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Fielded FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL $ QTY $ 0 0.000 23 5.179 FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 22 21 4.980 0.226 18.644 23.624 1 1 0.199 0.199 0.254 0.453 1 0.443 0.443 0 0.000 0.000 0 0.000 0.000 ITEM 0 58 0.000 0 0.000 PAGE 0.000 0.000 5D 0 0.000 0.000 0 0.000 0.000 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0.000 23 19.341 0.000 0.000 24.520 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ 21 18.644 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 23 0 Out 23 0 MODIFICATION TITLE: CVs, CVNs, LHDs, LHAs and selected shore sites. AIT N/A FY 2001 2 3 0 0 0 0 PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A N/A N/A FY 1999 Qty $ 1 4 0 0 AN/SPN-43C Upgrade FY 2000 Qty $ 1 0.443 N/A FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ (MP031) FY 2004 Qty $ FY 2003: FY 2003: N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ N/A N/A To Complete Qty $ 0.254 1 0 0 FY 2002 2 3 0 0 0 0 4 0 0 1 0 0 FY 2003 2 3 0 0 0 0 4 0 0 1 0 0 FY 2004 2 3 0 0 0 0 4 0 0 1 0 0 FY 2005 2 3 0 0 0 0 4 0 0 1 0 0 FY 2006 2 3 0 0 0 0 4 0 0 1 0 0 FY 2007 2 3 0 0 0 0 Qty 22 1 TC 4 0 0 0 0 TOTAL 23 23 The total inventory objective is 29 units, of which 6 are SCN funded and 23 OPN funded. FY 1999 equipment has been assembled by field activity (NAWCAD), using decommissioned assets in part. P-3A CLASSIFICATION: UNCLASSIFIED ITEM 58 PAGE 5E Total $ 19.087 0.254 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION CVNs, LHDs, and LHAs TYPE MODIFICATION: SAFETY MODIFICATION TITLE: AN/TPX-42(V)14 (MP040) DESCRIPTION/JUSTIFICATION: AN/TPX-42 is processing and display equipment that uses radar returns and Identification Friend or Foe (IFF) signals from friendly aircraft to provide identity, altitude and status information on display terminals. Air Traffic Controllers using these displays, safely guide aircraft to, from, and around aviation capable ships (CV, CVN, LHA, LHD). DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Full Production 1/90 FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL $ QTY $ 0 0.000 0 0.000 FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 5 19.754 1 2.541 4 6.871 26.625 1 1.325 3.866 0.000 22.295 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0.000 6 8.547 0.000 0.000 30.842 CLASSIFICATION: UNCLASSIFIED 6 0 0.000 0.000 1 0.351 0.351 0 0.000 0.000 ITEM 0 58 0.000 0 0.000 PAGE 0.000 0.000 5F 0 0.000 0.000 0 0.000 0.000 0 CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) MODIFICATION TITLE: CVNs, LHDs, LHAs INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 8 Months CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ 4 6.871 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 5 0 Out 5 0 FY 1999 Qty $ 1 1.325 PRODUCTION LEADTIME: FY 2001: N/A FY 2001: 3/01 FY 2000 Qty $ 4 0 0 1 0 0 FY 2002 2 3 0 0 0 0 4 0 0 1 0 0 22 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ 1 FY 2001 2 3 1 0 0 1 AN/TPX-42(V)14 (MP040) FY 2004 Qty $ FY 2003: FY 2003: N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ N/A N/A To Complete Qty $ 0.351 FY 2003 2 3 0 0 0 0 4 0 0 ITEM 1 0 0 58 FY 2004 2 3 0 0 0 0 4 0 0 1 0 0 FY 2005 2 3 0 0 0 0 PAGE 5G 4 0 0 1 0 0 FY 2006 2 3 0 0 0 0 4 0 0 1 0 0 FY 2007 2 3 0 0 0 0 Qty 5 1 0 0 0 0 0 0 0 0 0 TC 4 0 0 0 0 TOTAL 6 6 P-3A CLASSIFICATION: UNCLASSIFIED Total $ 8.196 0.351 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION CVs, CVNs, LHDs, LHAs, and selected shore sites. TYPE MODIFICATION: SAFETY ENHANCEMENT MODIFICATION TITLE: CATCC to AATC F/C Kits (MP042) DESCRIPTION/JUSTIFICATION: This kit retrofits CV/CVNs with improvements from the AATC-DAIR system configuration. Previously CATCC-to-AATC kits were being procured without the Advanced Display System ECP (ADS incorporates standard AN/UYQ-70 components). Beginning in FY 1999 the kits are being procured with ADS. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Production ECP 1/97 (configuration with ADS) FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL $ QTY $ 0 0.000 16 34.480 FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 6 4 8.582 1.430 1.682 10.264 The total quantity reflects the inventory objective for this item. 1 1 2.471 2.471 0.715 3.186 2 1 5.007 2.504 0.867 5.874 2 1 5.033 2.517 0.592 5.625 2 2 5.233 2.617 1.009 6.242 ITEM 1 2 58 2.664 2.664 1 1.029 2 3.693 PAGE 2.718 2.718 0.848 3.566 5H 1 1 2.772 2.772 0.536 3.308 1 0.546 0.546 1 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.486 0 0.000 16 8.310 0.486 0.000 42.790 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE AIT 6 Months 3/00 9/01 Prior Years Qty $ 4 1.682 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 7 0 Out 6 1 MODIFICATION TITLE: CVs, CVNs, LHDs, LHAs, and selected shore sites. FY 2001 2 3 0 0 0 0 PRODUCTION LEADTIME: FY 2001: 3/01 FY 2001: 9/02 FY 1999 Qty $ 1 0.715 4 1 0 1 1 0 FY 2000 Qty $ 1 0.572 AP 0.295 FY 2002 2 3 0 0 1 1 4 1 0 1 1 1 0.445 0.147 FY 2003 2 3 0 0 0 1 18 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ 1 AP CATCC to AATC F/C Kits (MP042) 4 1 0 2 AP 1 1 0 ITEM 0.879 0.130 2 AP 0.897 0.132 FY 2004 2 3 0 0 1 1 4 1 0 58 PAGE 1 0 1 FY 2004 Qty $ 2 AP FY 2005 2 3 0 0 0 0 5I FY 2005 Qty $ 0.781 0.067 4 1 0 3/02 9/03 1 0 0 1 AP FY 2006 Qty $ 0.467 0.069 FY 2006 2 3 0 0 0 1 4 1 0 1 AP 0.476 0.070 1 0 0 FY 2007 2 3 0 0 1 0 FY 2007 Qty $ 1 To Complete Qty $ 0.486 Qty 6 1 2 2 2 1 1 1 TC 4 0 0 0 0 TOTAL 16 16 P-3A CLASSIFICATION: UNCLASSIFIED Total $ 2.969 0.740 1.026 1.027 0.913 0.534 0.545 0.556 0.000 0.000 0.000 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION CVs, CVNs, LHDs, LHAs, and selected shore sites. TYPE MODIFICATION: R&M MODIFICATION TITLE: AN/TPX-42 ADS Upgrade (MP043) FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: This upgrade replaces obsolete display terminals with the Advanced Display System (ADS), and improves system software. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: TPX-42(V)14 ECP 1/94 FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC TOTAL $ QTY $ 0 0.000 12 11.110 FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST 0 0.000 0 TOTAL PROCUREMENT 0.000 The total quantity reflects the inventory objective for this item. 1 0.000 0.000 0 0.000 0.000 0 0.000 0.000 0 0.860 0.860 0.000 0.860 ITEM 1 1 58 0.876 0.876 1 0.312 1 1.188 PAGE 0.893 0.893 0.318 1.211 5J 2 1 1.822 0.911 0.394 2.216 2 2 1.859 0.930 0.663 2.522 2 2 1.896 0.948 3 2.904 0.968 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.639 5 1.242 12 3.568 2.535 4.146 14.678 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 5 Months CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: MODIFICATION TITLE: CVs, CVNs, LHDs, LHAs, and selected shore sites. Prior Years Qty $ PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 1999 Qty $ FY 2000 Qty $ 12 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 1 AP FY 2001 2 3 0 0 0 0 4 0 0 1 0 0 FY 2002 2 3 0 0 0 0 4 0 0 1 0 0 FY 2003 2 3 1 0 1 0 AN/TPX-42 ADS Upgrade (MP043) 4 0 0 1 0 0 ITEM 0.246 0.066 FY 2004 2 3 1 0 1 0 4 0 0 58 PAGE 1 0 0 FY 2004 Qty $ 1 AP FY 2005 2 3 1 0 1 0 5K FY 2005 Qty $ 0.251 0.067 4 0 0 2/02 2/03 1 0 0 1 AP FY 2006 Qty $ 0.257 0.137 FY 2006 2 3 1 1 0 2 4 0 0 2 AP 1 0 0 0.523 0.140 FY 2007 2 3 1 1 1 1 FY 2007 Qty $ 2 AP 0.496 0.143 To Complete Qty $ 5 1.242 TC 4 0 0 5 5 Total $ 0.000 0.000 0.000 0.000 1 0.246 1 0.317 1 0.324 2 0.660 2 0.636 5 1.385 0.000 Qty TOTAL 12 12 P-3A CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY Automatic Carrier Landing System (ACLS) NARM# 283200 0604504N Program Element for Code B Items: Not Applicable QUANTITY COST (In Millions) 42PN Other Related Program Elements Prior Years ID Code FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total $176.7 A 17.9 18.2 15.6 17.8 18.3 18.7 19.2 19.6 CONT CONT The Automatic Carrier Landing System (ACLS) provides the primary precision electronic guidance for landing aircraft under all weather conditions on CVs, CVNs, LHAs, LHDs and at selected Naval Air Stations. Many of the components in the system have been in service for more than twenty years. This program funds maintainability, reliability and supportability improvements to existing equipment components that can no longer be maintained and supported, as well as items providing upgraded operational capability. Due to design engineering and maintenance deficiencies, and length of time in service, the AN/SPN-42A landing system was replaced with the AN/SPN-46(V)1 on CVs and CVNs. FY 2000 - Procured two AN/SPN-41 Independent Landing Monitors (ILMs), various ACLS Modification Kits, and associated installation efforts. FY 2001 - Procured two AN/SPN-41 ILMs, various ACLS Modification Kits, and associated installation efforts. FY 2002 - Procures one AN/SPN-41 ILM, various ACLS Modification Kits, and associated installation efforts. Installing Agent: Shipyards and Alteration Installation Teams (AITs). Ships or facilities to receive equipment: CV/CVNs, LHAs, LHDs, selected LPHs, the In-Service Engineering Agent (ISEA-NAWCAD, St. Inigoes), selected shore sites and the training site. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 59 PAGE NO. CLASSIFICATION: 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY Procurement Items PN403 AN/SPN-46(V) Quantity Funding PN404 AN/SPN-41 Quantity Funding Other Costs Total Funding DD Form 2454, JUN 86 June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY ID Code DATE: Prior Years Automatic Carrier Landing System (ACLS) 42PN To FY 2000 FY 2001 FY 2002 A 8 71.440 A 15 24.543 2 4.812 2 3.048 1 2.444 80.728 13.128 15.140 13.173 176.711 17.940 18.188 15.617 ITEM NO. P-1 SHOPPING LIST 59 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS Weapon System DATE: P-5 June 2001 APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy A TOTAL COST IN THOUSANDS OF DOLLARS COST CODE PN404 PN408 PN800 PN830 PN840 PN860 PN900 PN910 ELEMENT OF COST AN/SPN-41 Ind. Landing Monitor (ILM) 1/ ACLS Mod Kits Integrated Logistics Support Production Engineering Support Quality Assurance Acceptance Test and Evaluation /2 Non-FMP Installation FMP Installation Various 3/ ID Code A N/A N/A N/A N/A N/A N/A N/A Prior Years Total Cost 24,543 15,250 675 1,544 783 1,639 49,497 Automatic Carrier Landing System (ACLS) FY2000 Quantity 2 VAR FY 2001 Unit Cost Total Cost 2,406 4,812 9,242 354 1,096 105 1,076 648 607 Quantity 2 VAR 42PN FY 2002 Unit Cost Total Cost 1,524 3,048 5,088 409 469 128 1,900 28 7,118 Quantity 1 VAR Unit Cost Total Cost 2,444 2,444 5,827 185 23 15 550 Quantity Unit Cost Total Cost 6,573 82,780 1/ The FY2001 unit cost of $1,524 thousand is the average of a new system cost and an upgrade system cost ($2,424 thousand and $624 thousand, respectively). The upgrade will convert a decommissioned AN/SPN-41 to an AN/SPN-41A. 2/ AT&E costs in FY 2000-2001 are nonrecurring costs related to Production Acceptance Testing of AN/SPN-35C Upgrade LRIP units. 3/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY 1998 and beyond. DD FORM 2446, JUN 86 176,711 P-1 SHOPPING LIST ITEM NO. 59 17,940 18,188 15,617 CLASSIFICATION: PAGE NO. 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy Cost Element/ FISCAL YEAR PN404 AN/SPN-41 ILM FY01 * FY02 C. P-1 ITEM NOMENCLATURE BA-2-Communications and Electronics Equipment SUBHEAD Automatic Carrier Landing Systems (ACLS) QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE 2 1 $1,524 $2,444 NAVAIR NAVAIR N/A N/A PO PO CONTRACTOR AND LOCATION NAWCAD St. Inigoes NAWCAD St. Inigoes 42PN AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW 11/00 11/01 1/02 1/03 YES YES DATE REVISIONS AVAILABLE D. REMARKS System integration and assembly will be accomplished by the field activity, NAWCAD, after procuring individual components through various contractual vehicles. Some components will be reused assets refurbished and modified by NAWCAD. * In FY01 the $1,524K unit cost is the average for a new system and an upgraded one. $624K is for upgrade of a decommissioned AN/SPN-41 to an AN/SPN-41A, the configuration required for air-capable amphibious ships. The new system will cost $2,424K. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 59 PAGE NO. 4 Classification: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION CVs/CVNs, LHAs, LHDs and selected shore sites. TYPE MODIFICATION: Flight Safety MODIFICATION TITLE: AN/SPN-41 (PN404) FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: Provides independent landing monitor capability for carriers and amphibious classes. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: IOC 1994 FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC TOTAL $ QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0.000 0.000 14 22.175 1 2.368 2 4.812 2 3.048 1 2.444 1 2.489 13 14.411 36.586 1 1.003 3.371 1 0.635 5.447 2 4.745 7.793 2 4.392 6.836 ITEM 1 2.251 1 4.740 PAGE The total inventory objective for this item is twenty-seven, of which twenty-one are OPN funded and six SCN funded. 59 0.000 37.336 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0.000 21 29.733 0.000 0.000 67.069 CLASSIFICATION: UNCLASSIFIED 21 2.296 2.296 5 0 0.000 0.000 0 0.000 0.000 0 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: CVs/CVNs, LHAs, LHDs and AN/SPN-41 (PN404) selected shore sites. INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ 13 14.411 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 15 0 Out 15 0 AIT 2 Months 11-99 1-01 FY 1999 Qty $ 1 1.003 PRODUCTION LEADTIME: 11-00 FY 2001: 1-02 FY 2001: FY 2000 Qty $ 1 AP 2 AP 4.591 0.154 2 AP 4.235 0.157 1 FY 2004 Qty $ 4 0 1 1 0 0 FY 2002 2 3 1 1 0 1 4 0 1 1 0 0 FY 2003 2 3 1 0 0 1 4 0 0 1 0 0 FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ 2.251 1 FY 2001 2 3 1 1 0 1 11-01 1-03 FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ 0.200 0.435 14 Months FY 2004 2 3 1 0 1 0 4 0 0 59 PAGE 1 0 0 FY 2005 2 3 0 0 0 0 2.296 4 0 0 1 0 0 FY 2006 2 3 0 0 0 0 4 0 0 1 0 0 FY 2007 2 3 0 0 0 0 Qty 14 1 2 2 1 1 0 0 0 0 0 TC 4 0 0 0 0 TOTAL 21 21 This is an in house build by NAWCAD St. Inigoes. ITEM 5A P-3A CLASSIFICATION: UNCLASSIFIED Total $ 15.414 0.200 5.026 4.389 2.408 2.296 0.000 0.000 0.000 0.000 0.000 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION CV/CVN, LHAs, LHDs and selected shore sites. TYPE MODIFICATION: Flight Safety MODIFICATION TITLE: ACLS Mod Kits Summary (PN408) DESCRIPTION/JUSTIFICATION: Summary: the equipment and installation costs on this P-3a are for individual modification programs that do not exceed $5 million in either budget year or $10 million in all years. Mod Kits not differentiated on the exhibits that follow include AN/SPN-46 Moving Target Detection, Passive Point Source, and various ACLS Improvements. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL $ QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0.000 Var. 4.006 1.649 5.655 Var. 1.670 Var. 1.350 Var. 1.639 0.344 2.014 0.397 1.747 0.130 1.769 Var. 1.066 0.155 1.221 ITEM Var. 59 0.585 Var. 7.870 0.105 0.690 PAGE 0.054 7.924 5B Var. 8.778 Var. 12.352 Var. 13.206 Var. 3.375 12.153 2.617 14.969 CONT. CONT. 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.606 CONT. CONT. 15.812 CONT. CONT. CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) MODIFICATION TITLE: CV/CVN, LHAs, LHDs and ACLS Mod Kits Summary (PN408) selected shore sites. INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: N/A CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ 1.649 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A N/A N/A FY 1999 Qty $ 0.344 FY 2000 Qty $ FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ 0.252 0.145 N/A FY 2004 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty 0.130 0.155 0.105 0.054 3.375 2.617 2.606 CONT. CONT. FY 2001 2 3 0 0 0 0 4 0 0 1 0 0 FY 2002 2 3 0 0 0 0 4 0 0 1 0 0 FY 2003 2 3 0 0 0 0 4 0 0 1 0 0 ITEM FY 2004 2 3 0 0 0 0 4 0 0 59 PAGE 1 0 0 FY 2005 2 3 0 0 0 0 5C 4 0 0 1 0 0 FY 2006 2 3 0 0 0 0 4 0 0 1 0 0 FY 2007 2 3 0 0 0 0 TC 4 0 0 0 0 TOTAL 0 0 P-3A CLASSIFICATION: UNCLASSIFIED Total $ 1.993 0.252 0.275 0.155 0.105 0.054 3.375 2.617 2.606 CONT. CONT. CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION CVs, CVNs and selected shore sites. TYPE MODIFICATION: Flight Safety MODIFICATION TITLE: AN/SPN-46(V)3 PIP Field Change Kit (PN408) DESCRIPTION/JUSTIFICATION: The field change corrects parts obsolescence problems, as well as enhancing maintainability. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Production ECP 9/96 FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL $ QTY $ 0 0.000 12 26.548 FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 4 1 8.134 2.693 1.553 9.687 2 AP 4.485 2.243 0.757 5.242 2 1 4.351 2.176 0.223 4.574 1 2 2.392 2.392 2.271 4.663 2 3 The inventory objective for this item is thirteen, of which twelve are OPN funded and one SCN funded. 4.761 2.381 1.806 6.567 ITEM 1 3 59 2.425 2.425 2.498 1 4.923 PAGE 1.036 1.036 5D 1 1.009 1.009 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 12 11.153 0.000 0.000 37.701 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) MODIFICATION TITLE: CV/CVN, LHAs, LHDs and selected shore sites. INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 4 Months CONTRACT DATES: FY 2000: 1/00 DELIVERY DATE: FY 2000: 5/01 Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ 1 1.553 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 3 2 Out 2 0 FY 2001 2 3 0 2 2 0 FY 1999 Qty $ AP 0.757 4 0 0 1 1 1 AN/SPN-46(V)3 PIP Field Change Kit (PN408) PRODUCTION LEADTIME: FY 2001: 1/01 FY 2001: 5/02 FY 2000 Qty $ 1 0.223 FY 2002 2 3 0 1 1 1 4 0 0 1 0 1 FY 2001 Qty $ 2 1.726 AP 0.398 AP 0.147 FY 2003 2 3 0 1 0 1 4 0 1 16 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 2 1 1 1 0 1.104 0.702 1 1 1 0.793 0.793 0.912 FY 2004 2 3 0 1 1 0 4 0 0 59 PAGE 1 0 0 FY 2004 Qty $ 1 AP FY 2005 2 3 0 0 1 0 FY 2005 Qty $ 0.911 0.125 4 0 0 1/02 5/03 1 0 0 1 FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ 1.009 FY 2006 2 3 0 0 0 0 4 0 0 1 0 0 FY 2007 2 3 0 0 0 0 Qty 4 2 2 1 2 1 TC 4 0 0 0 0 TOTAL 12 12 Installation costs are ship dependent. ITEM 5E CLASSIFICATION: UNCLASSIFIED Total $ 4.259 1.502 1.642 0.793 1.823 1.134 0.000 0.000 0.000 0.000 0.000 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION LHAs, LHDs, MCS-12 and selected shore sites. TYPE MODIFICATION: Flight Safety MODIFICATION TITLE: AN/SPN-35C Upgrade (PN408) DESCRIPTION/JUSTIFICATION: This modification improves reliability and maintainability in a system baseline that is many years old. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: LRIP Decision 12/99 FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL $ QTY $ 0 0.000 14 16.824 FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0.237 3 3.541 1.180 4 4.625 1.156 3 3.538 1.179 2 2.405 1.203 1 1.227 1.227 1 Var. 1.057 0 0.000 0.237 0 0.000 0.000 0 0.000 3.541 0 0.000 1.057 The inventory objective for this item is fifteen, of which fourteen will be OPN funded, and one SCN funded. 1 0.220 0.220 ITEM 2 59 1.281 4 5.906 PAGE 2.598 6.136 5F 3 1.997 4.402 2 1.338 2.565 1 1.251 1.251 0.000 0.000 0.000 0.000 0.000 1.057 0.000 0.000 0.000 0.000 0.000 0.683 1 0.697 14 8.814 1.934 0.697 26.695 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE NARM# OTHER PROCUREMENT, NAVY/BA2 - COMMUNICATIONS AND ELECTRONICS EQUIPMENT Program Element for Code B Items: NATIONAL AIRSPACE SYSTEM (NAS) 284000 Other Related Program Elements 0204696N Prior Years QUANTITY COST (In Millions) $9.9 0604504N ID Code FY 2000 FY 2001 FY 2002 B $34.3 $30.0 $43.6 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total CONT CONT DESCRIPTION: The Joint Department of Defense (DOD)/Federal Aviation Administration (FAA) National Airspace System (NAS) modernizationprogram upgrades the DOD Air Traffic Control systems at Approach Control Facilities in concert with the Federal Aviation Administration’s (FAA) upgrade of the National Air Traffic Control System. Since existing DOD Air Traffic Control facilities interface with the FAA’s facilities, the military must maintain interoperability and retain vital special-use airspace for combat readiness training. These funds will procure Air Traffic Control hardware for the Navy/Marine Air Traffic Control facilities. The Air Force is the DoD lead activity for the Joint Acquisition Program. The Joint Program Office (JPO) is located at Hanscom AFB, MA. FY00 provided funding to procure: 4 DOD Advanced Automation System (DAAS); 9 Digital Airport Surveillance Radar (DASR); and 7 Tower Automation Systems. FY01 provides funding to procure: 7 DAAS; 4 DASR; and 7 Tower Automation Systems. FY02 provides funding to procure: 5 DAAS; 9 DASR; and 9 Tower Automation Systems. Installing Agent: Alteration Installation Teams (AIT) When installation to be made: N/A Activities to receive equipment: Navy and Marine Corps shore based Air Traffic Control facilities. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 60 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA2 - COMMUNICATIONS AND ELECTRONICS EQUIPMENT NATIONAL AIRSPACE SYSTEM (NAS) Prior Years FY 2000 FY2001 FY 2002 1 1.605 4 3.842 7 6.414 5 3.201 0.057 9 20.633 4 10.491 9 23.713 3 1.196 7 1.751 7 1.211 9 1.507 OTHER COSTS 6.070 8.048 11.903 15.197 TOTAL FUNDING 9.876 34.274 30.019 43.618 Procurement Items CB010 DOD ADVANCED AUTOMATION SYS QTY FUNDING CB020 MILITARY AIR SPACE MANAGEMENT SYS QTY FUNDING CB030 RADAR (DASR) QTY FUNDING CB040 TOWER AUTOMATION QTY FUNDING DD Form 2454, JUN 86 ID Code B FY 2003 DATE: June 2001 FY 2004 FY 2005 FY 2006 B 60 0.948 B B P-1 SHOPPING LIST ITEM NO. 60 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED FY 2007 To Complete Total CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System ID Code APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY BA2 - COMMUNICATIONS AND ELECTRONICS EQUIPMENT B DATE: June 2001 P-1 ITEM NOMENCLATURE/SUBHEAD NATIONAL AIRSPACE SYSTEM (NAS) 42CB TOTAL COST IN THOUSANDS OF DOLLARS COST CODE CB010 CB020 CB030 CB040 CB800 CB830 CB900 CB990 ELEMENT OF COST DOD ADVANCED AUTOMATION SYS MAMS RADAR (DASR) TOWER AUTOMATION INTEGRATED LOGISTICS SUPPORT PRODUCTION ENGINEERING INSTALLATION (NON-FMP) INITIAL TRAINING ID Code Prior Years Total Cost B B B B N/A N/A N/A N/A 1,605 948 57 1,196 914 4,240 916 FY 2000 FY 2001 Quantity Unit Cost Total Cost 4 961 3,842 9 7 2,293 250 20,633 1,751 881 3,891 3,151 125 Quantity FY 2002 FY 2003 Unit Cost Total Cost Quantity Unit Cost Total Cost 7 916 6,414 5 640 3,201 4 7 2,623 173 10,491 1,211 1,027 3,591 7,155 130 9 9 2,635 167 23,713 1,507 976 3,515 10,576 130 Quantity Unit Cost Total Cost * Configuration and resulting unit costs vary by site size and usage requirements. Unit cost shown represents average cost. DD FORM 2446, JUN 86 9,876 P-1 SHOPPING LIST ITEM NO. 60 34,274 30,019 43,618 CLASSIFICATION: 0 PAGE NO. 3 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY Cost Element/ FISCAL YEAR QUANTITY CB010 DOD ADVANCED AUTOMATION SYSTEM 1/ FY00 FY01 FY02 BA2 - COMMUNICATIONS AND ELECTRONICS EQUIPMENT UNIT COST (000) SUBHEAD NATIONAL AIRSPACE SYSTEM (NAS) 42CB LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW IPR/OPTION IPR/OPTION IPR/OPTION RAYTHEON, MA RAYTHEON, MA RAYTHEON, MA 05/00 03/01 01/02 06/01 03/02 01/03 YES YES YES 4 7 5 960.5 916.3 640.0 FAA, WASH DC FAA, WASH DC FAA, WASH DC 03/96 03/96 03/96 FY00 9 2292.5 USAF,Hanscom, MA 02/96 C/FFP RAYTHEON, CA 04/00 10/01 YES FY01 4 2623.0 USAF,Hanscom, MA 02/96 MIPR/OPTION RAYTHEON, CA 05/01 05/03 YES FY02 9 2635.0 USAF,Hanscom, MA 02/96 MIPR/OPTION RAYTHEON, CA 01/02 01/04 YES FY00 FY01 FY02 7 7 9 250.1 173.0 167.0 SPAWAR, CHASN SPAWAR, CHASN SPAWAR, CHASN N/A N/A N/A PO/ D.O. PO/ D.O. PO/ D.O. PEN-TECH CHASN, SC PEN-TECH CHASN, SC PEN-TECH CHASN, SC 01/00 01/01 01/02 04/01 01/02 01/03 YES YES YES CB030 RADAR (DASR) 2/ CB040 TOWER AUTOMATION 3/ D. REMARKS 1/ DOD Advanced Automation System (DAAS) unit costs vary per site. P-5 page unit cost is only average of sites each year. Delivery dates are for Navy DAAS. 2/ RADAR is Digital Airport Surveillance Radar (DASR). 3/ Tower Automation is a Government propriety system and unit costs vary per site. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 60 PAGE NO. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE CLASSIFICATION: P3A UNCLASSIFIED INDIVIDUAL MODIFICATION MODELS OF SYSTEM AFFECTED: NAS TYPE MODIFICATION: SAFETY MODIFICATION TITLE: DOD ADVANCED AUTOMATION SYSTEMS (CB010) DESCRIPTION/JUSTIFICATION: The DOD Advanced Automation System (DAAS) is being developed as part of a joint DOD/FAA program to modernize and standardize Air Traffic Control equipment in the National Air Traffic Control System. The systems will be installed at Navy Air Traff Control facilities to replace aging, obsolete equipment and comply with the joint DOD/FAA modernization program agreements. DAAS provides for processors and displays for tower and approach controls. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior FY 1999 QTY $ QTY $ MILESTONE III (MARCH 2001) FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 1 0.860 0 0.000 0.860 0 0.745 4 3.842 7 6.414 5 3.201 0.533 1.278 1 1.699 5.541 4 3.440 9.854 7 4.275 7.476 0 ITEM NO. 60 0.000 0.000 0 0.000 0.000 0 0.000 0.000 PAGE 5 NOTE: FY99 funds under the CB010 line provide interim collision avoidance capablity for Navy Air Traffic Control facilities as approved by the House Appropriations Committee as a risk reduction measure. 0 0.000 0.000 0 TC TOTAL QTY $ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 NA NA 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0.000 0 0.000 0.000 0.000 0.000 CLASSIFICATION: UNCLASSIFIED QTY $ CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued NAS MODIFICATION TITLE: DOD ADVANCED AUTOMATION SYSTEMS (CB010) INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 3 Months (Various) CONTRACT DATES: FY 2000: 5/00 DELIVERY DATE: FY 2000: 6/01 Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years FY 1999 Qty $ Qty $ 0.031 AP VAR 0.150 0.352 AP INSTALLATION SCHEDULE: FY 2000 FY 2001 & Prior 1 2 3 4 In 1 0 0 4 0 Out 1 0 0 2 2 1 0 0 PRODUCTION LEADTIME: FY 2001: 03/01 FY 2001: 03/02 FY 2000 Qty $ 1 0.050 FY 2001 Qty $ AP 4 AP FY 2002 2 3 7 0 2 2 1.649 4 0 3 1 0 0 ($ in Millions) FY 2002 Qty $ 1.637 1.803 FY 2003 2 3 12 Months (Various) FY 2002: FY 2002: 7 AP 4 1 1/02 1/03 FY 2003 Qty 3.050 1.225 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL NOTE: $150K of installation funds provided in FY 99 for interim collision avoidance capablity as approved by the House Appropriations Committee as a risk reduction measure. ITEM NO. 60 PAGE 5A P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION NAS TYPE MODIFICATION: SAFETY MODIFICATION TITLE: RADAR (DASR) (CB030) DESCRIPTION/JUSTIFICATION: The Digital Airport Surveillance Radar (DASR) is being developed as part of a joint DOD/FAA program to modernize and standardize air traffic control equipment in the National Air Traffic Control System. The DASR will be installed at Navy air traffic control facilities to replace aging, obsolete approach control radars and comply with the joint DOD/FAA modernization program agreements. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & FY 1999 QTY $ TY $ MILESTONE III (AUGUST 2001) FY 2000 TY $ FY 2001 TY $ FY 2002 TY $ FY 2003 TY $ FY 2004 TY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT * 0.057 9 20.633 4 10.491 9 23.713 0 0.000 0 0.000 * 0.293 0.350 0 1.042 21.675 0 5.269 28.982 2.991 9 13.482 ITEM NO. 60 *Funding for ancillary equipment. PAGE 5B FY 2005 TY $ FY 2006 TY $ FY 2007 TY $ TC TY $ TY TOTAL $ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: NAS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 3 Months (Various) CONTRACT DATES: FY 2000: 4/00 DELIVERY DATE: FY 2000: 10/01 Cost: Prior Years Qty $ PRIOR YEARS FY 1999EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE PRODUCTION LEADTIME: FY 2001: 05/01 FY 2001: 05/03 FY 1999 Qty $ FY 2000 Qty $ AP AP 0.293 FY 2001 Qty $ 1.042 AP RADAR (DASR) (CB030) 24 Months (Various) FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 9 2.991 AP 01/02 01/04 FY 2004 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Total Qty $ 0 0.000 0 0.000 3.363 1.906 INSTALLATION SCHEDULE: FY 2000 & Prior In Out 0 0 1 0 0 FY 2001 2 3 0 0 0 0 4 0 0 1 2 2 FY 2002 2 3 4 3 3 3 4 0 1 1 FY 2003 2 3 4 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 NOTE: USN Radar deliveries included in waterfall with USAF, USA, and FAA deliveries. Navy delivery dates will vary within FY depending on inter-service agency priorities. NOTE: Advanced installation planning included in install funds one year prior to installs. ITEM NO. 60 PAGE 5C TOTAL P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED INDIVIDUAL MODIFICATION MODELS OF SYSTEM AFFECTED: NAS TYPE MODIFICATION: SAFETY MODIFICATION TITLE: TOWER AUTOMATION (CB040) DESCRIPTION/JUSTIFICATION: The Tower Automation is being developed as part of a joint DOD/FAA program to modernize and standardize air traffic control equipment in the National Air Traffic Control System. The Tower Automation will be installed at Navy air traffic control facilities to replace aging, obsolete equipment and comply with the joint DOD/FAA modernization program agreements. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ MILESTONE III (MARCH 2001) FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 3 1.196 7 1.751 7 1.211 9 FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.507 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0.000 0.000 0 0.015 1.211 3 0.410 2.161 7 0.724 1.935 7 1.032 2.539 ITEM NO. 60 PAGE 5D CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: NAS INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: Prior Years Qty $ PRIOR YEARS FY 1999EQUIPMENT FY 2000EQUIPMENT FY 2001 EQUIPMENT FY 2002EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006EQUIPMENT FY 2007EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 3 0 Out 3 0 2 Months 1/00 4/01 FY 1999 Qty $ AP FY 2001 2 3 0 7 0 5 MODIFICATION TITLE: 4 0 2 0.015 1 0 0 TOWER AUTOMATION (CB040) PRODUCTION LEADTIME: FY 2001: 1/01 FY 2001: 1/02 FY 2000 Qty $ 3 AP FY 2001 Qty $ 0.374 0.036 FY 2002 2 3 4 4 3 0 3 3 1 1 7 AP FY 2002 Qty $ 0.683 0.041 FY 2003 2 3 7 AP 4 1 12 Months * FY 2002: FY 2002: 1/02 1/03 ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ Qty FY 2005 $ Qty FY 2006 $ FY 2007 Qty $ To Complete Qty $ 0.985 0.047 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 2 FY 2007 3 TC 4 TOTAL * Production Leadtime varies per site. Using 12 months as an average. ITEM NO. 60 PAGE 5E P-3A CLASSIFICATION: UNCLASSIFIED Total Qty 0 3 7 7 $ 0.000 0.389 0.719 1.026 UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE AIR STATION ATC EQUIPMENT* OTHER PROCUREMENT, NAVY/ BA2-COMMUNICATIONS AND ELECTRONIC EQUIPMENT Program Element for Code B Items: NARM# 284500 Not Applicable Prior Years 42MR Other Related Program Elements ID Code 0204696N FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total $8.8 $6.6 $7.4 $7.6 $7.8 $8.0 $8.1 $8.3 CONT CONT QUANTITY (In Millions) $105.1 DESCRIPTION: The Chief of Naval Operations (CNO) tasked the Naval Air Systems Command (NAVAIR) with the requirement to provide shore based Air Traffic Control (ATC) terminal facilities and equipment that is required in joint efforts to efficiently and safely monitor and direct military and commercial air traffic in national and international air space. Many of these systems are required to interface through automated means with Federal Aviation Administration (FAA). Additionally, NAVAIR has material support responsibility for Air Navigation Aid Systems, Tactical Communications, Mobile ATC Equipment, Special Instrumentation Systems, and Ancillary Equipment used at Navy and Marine Corps Aviation Shore activities in the continental United States and overseas. (1) Communications Systems Upgrade Program - This program procures and installs advanced, commercial state-of-the-art, ATC voice switching and recording/reproduction equipment which will be used to replace aging AN/FSA-52/58 and OJ-314 voice communication switching systems and the RD-379/379A/390 and RP-214 recorder/reproducers. Existing equipment use 1950's toggle switch & 1960's push-button analog technology that is becoming logistically unsupportable. (2) UHF/VHF Radio Replacement Program - This program modernizes unsupportable Navy and Marine Corps UHF/VHF voice communication transmitter and receiver equipment. This equipment is the central core of all critical Air Traffic Control communications. This program is replacing the aging AN/GRT-21/22 VHF/UHF (10 watt) transmitters, AM-6154/GRT-21 & AM6155/GRT-22 VHF/UHF (50 watt) Linear Power Amplifiers, and AN/GRR-23/24 VHF/UHF receivers. Replacement of these radios is the number one ATC priority of both the Fleet and OPNAV Sponsor. This is a safety-of-flight issue. (3) Engineering Change Proposal (ECP)/Operational Capability Improvement Request (OCIR) modernization: The ECP/OCIR program provides for the procurement, and or modification, of critically needed communications, radar, displays, data processors, and other electronic systems/equipment needed at Navy/Marine Corps Air Traffic Control facilities worldwide. ECP/OCIR procurements replace and modernize costly-to-maintain systems and equipment in order to increase Air Traffic Control efficiency and safety, improve affordable readiness, and reduce total ownership costs. FY 00 through FY 02 funds have or are planned to procure: FY 00: Various UHF/VHF Radio Replacements (MR407); 9 Communication System Upgrades (MR408); and various ECPs/OCIRs (MR069) for approved sites. FY 01: Various UHF/VHF Radio Replacements(MR407); 8 Communication System Upgrades (MR408); and various ECPs/OCIRs (MR069) for approved sites. FY 02: Various UHF/VHF Radio Replacements (MR407); 7 Communication System Upgrades (MR408); and various ECPs/OCIRs (MR069) for approved sites. *Note: P-1 item nomenclature changes Air Station ATC Equipment, formerly Air Station Support Equipment. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 61 CLASSIFICATION: PAGE NO. 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/ BA2-COMMUNICATIONS AND ELECTRONIC EQUIPMENT Procurement Items MR404 UHF/VHF ID Code Prior Years AIR STATION ATC EQUIPMENT FY 2000 FY 2001 FY 2002 10 3.176 9 2.456 8 2.524 7 2.275 96.446 6.302 4.065 5.146 105.145 8.758 6.589 7.421 FY 2003 FY 2004 FY 2005 FY 2006 N/A ANTENNA UPGRADE QTY FUNDING MR405 RATCF/DAIR UPGRADE 34 4.335 N/A QTY FUNDING MR408 COMMUNICATION SYSTEM UPGRADE 17 1.188 N/A QTY FUNDING MR430 FIBER OPTIC INTERSITE UPGRADE N/A QTY FUNDING MR435 NEXT GENERATION COMMUNICATION SYSTEM UPGRADE N/A QTY FUNDING OTHER COST TOTAL FUNDING N/A P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 61 PAGE NO. 2 UNCLASSIFIED FY 2007 To Complete Total UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS Weapon System DATE: P-5 June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY P-1 ITEM NOMENCLATURE/SUBHEAD BA2 - COMMUNICATIONS AND AIR STATION ATC EQUIPMENT ELECTRONICS EQUIPMENT 42MR TOTAL COST IN THOUSANDS OF DOLLARS COST CODE MR069 MR404 MR405 MR407 MR408 MR430 MR435 MR800 MR830 MR900 MR990 ELEMENT OF COST ECP/OCIR UHF/VHF ANTENNA UPGRADE RATCF/DAIR UPGRADE UHF/VHF RADIO REPLACEMENT 2/ COMMUNICATION SYSTEM UPGRADE FIBER OPTIC INTERSITE UPGRADE NEXT GENERATION COMMUNICATION SYSTEM UPGRADE INTEGRATED LOGISTICS SUPPORT PRODUCTION ENGINEERING INSTALLATION OF EQUIPMENT (NON-FMP) INITIAL TRAINING ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost Total Cost Quantity 2,385 2,456 VAR 8 Quantity VAR 1,472 2,524 VAR 7 Total Cost 4,877 12,423 22,908 301 902 2,145 266 576 1,552 152 512 2,243 N/A 682 170 103 51 8,758 6,589 316 96 Unit Cost N/A N/A N/A 273 VAR Total Cost FY 2003 5,555 4,335 1,188 5,204 3,176 VAR 9 399 Unit Cost FY 2002 N/A N/A N/A N/A N/A VARIOUS 1/ VAR FY 2001 Quantity Unit Cost Total Cost 76 325 2,112 2,275 44,797 1/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY 1997 and beyond. 2/ MR407 - The term various (VAR) is used because the quantities shown previously were based on average cost of multiple types of radios. DD FORM 2446, JUN 86 105,145 P-1 SHOPPING LIST ITEM NO. 61 7,421 CLASSIFICATION: 0 PAGE NO. 3 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY Cost Element/ FISCAL YEAR C. P-1 ITEM NOMENCLATURE BA2 - COMMUNICATIONS AND ELECTRONICS EQUIPMENT SUBHEAD AIR STATION ATC EQUIPMENT QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE 8 7 315.5 325.0 FAA, WASH.,D.C. FAA, WASH.,D.C. 02/95 02/95 FFP/OPTION FFP/OPTION CONTRACTOR AND LOCATION DENRO, GAITHERSBURG, MD DENRO, GAITHERSBURG, MD 42MR AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW 12/00 12/01 06/01 06/02 YES YES MR408 COMM SYSTEM UPGRADE FY01 FY02 D. REMARKS MR408 - Communication System Upgrade requirements vary from site to site, which causes equipment size and costs to vary from site to site, average unit costs are shown. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 61 PAGE NO. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE CLASSIFICATION: UNCLASSIFIED P3A MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION AIR STATION TYPE MODIFICATION: CAPABILITY IMPROVEMENT MODIFICATION TITLE: VARIOUS MR069, MR404 DESCRIPTION/JUSTIFICATION: The ECP/OCIR program provides for the procurement, and or modification, of critically needed communications, radar, displays, data processors, and other electronic systems/equipment needed at Navy/Marine Corps Air Traffic Control facilities worldwide. ECP/OCIR procurements replace and modernize costly-to-maintain systems and equipments in order to increase Air Traffic Control efficiency and safety, improve affordable readiness, and reduce total ownership costs. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 FY 1998 & Prior* QTY $ QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT FY 2000 QTY $ FY 2001 QTY $ N/A FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ * 9.555 * 0.335 * 0.399 * 0.096 * 0.076 * 0.083 * 0.087 * 0.096 * 0.060 * * 8.305 17.860 * 0.821 1.156 * 0.685 1.084 * 0.036 0.132 * 0.051 0.127 * 0.052 0.135 * 0.053 0.140 * 0.054 0.150 * 0.023 0.083 * ITEM NO. 61 PAGE 5 NOTE: * The equipment and installation costs represented on this P-3A are for individual modification programs that do not exceed $5 Million in either budget year or $10 Million in all years. 0.324 TC QTY $ CONT CONT TOTAL QTY $ CONT CONT 0.183 CONT CONT CONT CONT 0.507 CONT CONT CONT CONT CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: AIR STATION MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: MONTHS (Various) CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ * 8.305 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 FY 2001: FY 2001: FY 1999 Qty $ * 0.361 * 0.460 FY 2000 Qty $ * 0.340 * VARIOUS MR069, MR404 PRODUCTION LEADTIME: N/A N/A FY 2001 Qty $ FY 2002 Qty $ MONTHS (Various) FY 2002: N/A FY 2002: N/A ($ in Millions) FY 2003 Qty $ FY 2004 Qty $ FY 2005 Qty $ Qty FY 2006 $ Qty FY 2007 $ To Complete Qty $ 0.345 * 0.036 * 0.051 * 0.052 * 0.053 * 0.054 * 0.023 * 0.183 * FY 2001 2 3 0 0 0 0 4 0 0 1 0 0 FY 2002 2 3 0 0 0 0 4 0 0 1 0 0 FY 2003 2 3 0 0 0 0 4 0 0 1 0 0 ITEM NO. 61 FY 2004 2 3 0 0 0 0 4 0 0 1 0 0 PAGE FY 2005 2 3 0 0 0 0 5A 4 0 0 1 0 0 FY 2006 2 3 0 0 0 0 4 0 0 1 0 0 FY 2007 2 3 0 0 0 0 CONT TC 4 0 0 0 0 TOTAL 0 0 P-3A CLASSIFICATION: UNCLASSIFIED Qty 0 0 0 0 0 0 0 0 0 0 0 Total $ 9.006 0.460 0.345 0.036 0.051 0.052 0.053 0.054 0.023 0.183 CONT CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION AIR STATION TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: UHF/VHF RADIO REPLACEMENT (MR407) DESCRIPTION/JUSTIFICATION: Replacement Program - This program modernizes aging Navy and Marine Corps UHF/VHF transmitter and receiver equipment that is the central core of all critical Air Traffic Control communications. This program is procuring NDIs previously developed by Motorola for the FAA as form, fit, and function replacements of the aging AN/GRT-21/22 VHF/UHF (10 watt) transmitters, AM-6154/GRT-21 & AM-6155/GRT-22 VHF/UHF (50 watt) Linear Power Amplifiers, and AN/GRR-23/24 VHF/UHF receivers that are the same as those used by the Navy and Marine Corps. The existing radios use 1960's analog technology with the LPAs still using vacuum tubes and other out-of-production components and cause numerous casualty reports (CASREPs) and logistics supportability problems due to equipment and parts obsolescence. The actual costs and quantities of the radios procured in the year of execution will vary based on the mix of radio types required. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ NDI FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL $ QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0 VAR 4.558 VAR 0.646 VAR 2.385 VAR 1.472 VAR 2.112 VAR 2.162 VAR 1.781 VAR 3.694 VAR 3.658 0 VAR 0.477 5.035 VAR 0.028 VAR 0.320 VAR 0.182 VAR 0.272 0.674 2.705 1.654 2.384 VAR 0.282 VAR 0.230 VAR 0.475 VAR 0.466 2.444 2.011 4.169 4.124 0 ITEM NO. 61 Note: PAGE 5B MR407 - The team various (VAR) is used because the quantities shown previoulsy were based on average cost of multiple types of radios. 0.000 0.000 0 0.000 0.000 0.000 0.000 0 0.000 VAR 22.468 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0.000 VAR 2.732 0.000 0.000 25.200 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: AIR STATION MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 2 MONTHS (NOMINAL) CONTRACT DATES: FY 2000: 3/00 DELIVERY DATE: FY 2000: 5/00 Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 & Prior In 0 Out 0 Prior Years Qty $ VAR 0.477 FY 1999 Qty $ VAR 0.020 VAR 0.008 PRODUCTION LEADTIME: FY 2001: FY 2001: FY 2000 Qty $ VAR VAR FY 2001 Qty $ UHF/VHF RADIO REPLACEMENT (MR407) 5 MONTHS (NOMINAL) 12/00 4/01 FY 2002 Qty $ FY 2002: FY 2002: ($ in Millions) FY 2003 Qty $ Qty 12/01 4/02 FY 2004 $ Qty FY 2005 $ Qty 0.282 VAR 0.230 VAR 0.475 VAR 1 0 0 FY 2002 2 3 0 0 0 0 To Complete Qty $ 0.272 VAR 4 0 0 FY 2007 $ 0.182 VAR FY 2001 2 3 0 0 0 0 Qty 0.039 0.281 VAR 1 0 0 FY 2006 $ 4 0 0 1 0 0 2 0 0 FY 2003 3 0 0 4 0 0 1 0 0 ITEM NO. 61 FY 2004 2 3 0 0 0 0 4 0 0 1 0 0 PAGE FY 2005 2 3 0 0 0 0 5C 4 0 0 1 0 0 2 0 0 FY 2006 3 0 0 4 0 0 1 0 0 0.466 FY 2007 2 3 0 0 0 0 TC 4 0 0 0 0 TOTAL 0 0 P-3A CLASSIFICATION: UNCLASSIFIED Total Qty 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ 0.497 0.047 0.281 0.182 0.272 0.282 0.230 0.475 0.466 0.000 0.000 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION AIR STATION TYPE MODIFICATION: COMMUNICATION SYSTEM UPGRADE (MR408) Communications Systems Upgrade - Advanced commercial state-of-the-art ATC voice switching and recording/reproduction equipment which will be used to replace existing AN/FSA-52/58 and OJ-314 voice communications switching systems and the RD379/379A/390 and RP-214 recorder/reproducers. Existing systems and equipment use 1950's toggle switch & 1960's push-button analog technology, are no longer in production, and causing numerous casualty reports (CASREPs) and logistics supportability problems due to system and parts obsolescence. The voice switching system selected for use by the Navy is a Non-Developmental Item, developed by the FAA via a, full and open competition, contract which was awarded by the FAA to Denro, Inc. The recorder/reproducer system selected for use by the Navy is a commercial item produced by Advanced Integrated Recorders, Inc. and are be obtained through a contract awarded to AIR, Inc. on 7/31/98 by our coordinating field activity, SPAWAR Charleston, SC. The existing equipment is obsolete and becoming logistically unsupportable. Note - New recorder/reproducers will be procured and installed at all Navy/Marine Corps Air Stations with up to two new recorder/reproducers systems needed per each communications system upgrade shown below. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ MODERNIZATION MODIFICATION TITLE: NDI FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ 0.000 FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 4 1.416 6 1.760 9 2.456 8 2.524 7 2.275 7 2.317 8 2.704 0 0.000 0 0.000 0 0.000 0 0 0.652 2.068 5 1.397 3.157 8 1.140 3.596 8 1.334 3.858 8 1.920 4.195 8 1.952 4.269 8 1.992 4.696 4 1.016 1.016 0 0.000 0.000 0 0.000 0.000 0 ITEM NO. 61 PAGE 5D The total Quantity reflects the inventory objective for this item. MR408 Equipment size and cost will vary from site to site,applicable installation costs will vary based on equipment size and location of installation, average costs are shown for budgeting and planning purposes. 0.000 0.000 CLASSIFICATION: TOTAL QTY $ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 49 15.452 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 49 11.403 26.855 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: AIR STATION INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE AIT 3 MONTHS 12/99 06/00 Prior Years Qty $ AP 0.652 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 13 2 Out 13 2 MODIFICATION TITLE: FY 2001 2 3 2 2 2 2 FY 1999 Qty $ 4 1.118 0.279 1 4 2 2 1 2 2 PRODUCTION LEADTIME: FY 2001: FY 2001: FY 2000 Qty $ 5 3 FY 2002 2 3 2 2 2 2 FY 2001 Qty $ 0.725 0.415 4 2 2 6 2 1 2 2 FY 2002 Qty $ 1.005 0.329 FY 2003 2 3 2 2 2 2 4 2 2 1 2 2 6 MONTHS FY 2002: FY 2002: 12/00 6/01 ($ in Millions) FY 2003 Qty $ 1.440 0.480 6 2 COMMUNICATION SYSTEM UPGRADE (MR408) FY 2004 2 3 2 2 2 2 5 3 Qty 1.220 0.732 4 2 2 1 2 2 4 4 FY 2005 2 3 2 0 2 0 12/01 6/02 FY 2004 $ Qty 0.996 0.996 4 0 0 4 1 0 0 FY 2005 $ Qty FY 2006 $ FY 2007 Qty $ To Complete Qty $ 1.016 FY 2006 2 3 0 0 0 0 4 0 0 1 0 0 FY 2007 2 3 0 0 0 0 TC 4 0 0 0 0 TOTAL 49 49 NOTE: Equipment costs and installation efforts/costs will vary from air station to air station based on facility requirements and location. ITEM NO. 61 PAGE 5E P-3A CLASSIFICATION: UNCLASSIFIED Qty 4 6 9 8 7 7 8 0 0 0 0 Total $ 1.770 1.004 1.420 1.769 1.700 1.728 2.012 0.000 0.000 0.000 0.000 UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/ BA2-COMMUNICATIONS AND ELECTRONIC EQUIPMENT Program Element for Code B Items: LANDING SYSTEMS (LS) Other Related Program Elements Not Applicable Prior Years QUANTITY COST (In Millions) $23.4 ID Code NARM# 284600 Not Applicable FY 2000 FY 2001 FY 2002 $5.2 $5.0 $5.4 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total CONT CONT DESCRIPTION: The Chief of Naval Operations (CNO) tasked Naval Air Systems Command (NAVAIR) with the requirement to provide shore based Air Traffic Control (ATC) terminal facilities and equipment that is required in joint efforts to efficiently and safely monitor and direct military and commercial air traffic in national and internationalair space. Many of these systems are required to interface through automated means with Federal Aviation Admininistration (FAA). Additionally, NAVAIR has material support responsibility for Air Navigation Aid Systems, Tactical Communications, Mobile ATC Equipment, Special Instrumentation Systems, and Ancillary Equipment used for ATC&LS by the Navy and Marine Corps. This Landing Systems (LS) 42X1 program, in conjunction with the other three programs (Air Station Support Equipment 42MR, Fleet Area Control and Surveillance Facility (FACSFAC) 42TT, and the National Airspace System Modernization42CB) which make up program element 0204696N, provide the four pillars by which NAVAIR supports and meets established requirements to modernize and ensure reliable, safe and effective operations of ATC&LS used at Navy and Marine Corps air stations and ATC facilities worldwide. This Landing Systems (LS) budget provides funding to modernize and ensure the reliability and safety of existing Precision Approach Radars (PAR), Tactical Air Navigation (TACAN) systems, Instrument Landing Systems (ILS), and other aircraft navigation aids used by the Navy and Marine Corps. This program also ensures that all interservice interoperability requirements identified in the National Airspace System Plan (NASP), the Federal Radio Navigation Plan (FRNP), and the Joint Chiefs of Staff (JCS) master navigation plan are fulfilled. Funding in FY00 through FY02 provides procurement of the following: FY 00 provided funding to procure 5 AN/FPN-63 Environmental Shelters and various ECPs/OCIRs as required for approved sites. FY 01 provides funding to procure 1 commercial Instrument Landing System and various ECPs/OCIRs as required for approved sites. FY 02 provides funding to procure various ECPs/OCIRs as required for approved sites. CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 62 PAGE NO. 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY Procurement Items X1020 ENVIRONMENTAL SHELTERS QTY FUNDING June 2001 P-1 ITEM NOMENCLATURE LANDING SYSTEMS (LS) OTHER PROCUREMENT, NAVY/ BA2-COMMUNICATIONS AND ELECTRONICS EQUIPMENT ID Code DATE: Prior Years FY 2000 37 4.991 5 0.742 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 X1102 INSTRUMENT LANDING SYSTEM QTY FUNDING 13 3.325 1 0.310 X1025 GPS LAAS UPGRADE QTY FUNDING OTHER COSTS 15.126 4.448 4.725 5.409 TOTAL FUNDING 23.442 5.190 5.035 5.409 NOTE: GPS LAAS Upgrade is an acronym for Global Positioning System (GPS) Local Area Augmentation System (LAAS) upgrade. Name was changed from Shore JPALS to more accurately reflect effort of procurement. CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 62 PAGE NO. 2 UNCLASSIFIED 42X1 To Complete Total UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System ID Code APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE/SUBHEAD OTHER PROCUREMENT, NAVY/ BA2-COMMUNICATIONS AND ELECTRONICS EQUIPMENT LANDING SYSTEMS (LS) 42X1 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE X1017 X1020 X1102 X1800 X1830 X1840 X1900 ELEMENT OF COST ECP/OCIR ENVIRONMENTAL SHELTERS INSTRUMENT LANDING SYSTEM INTEGRATED LOGISTICS SUPPORT PRODUCTION ENGINEERING QUALITY ASSURANCE INSTALLATION (NON-FMP) *’VARIOUS DD FORM 2446, JUN 86 ID Code N/A N/A N/A Prior Years Total Cost 769 4,991 3,325 693 1,451 148 8,906 3,159 23,442 P-1 SHOPPING LIST ITEM NO. 62 FY 2000 Quantity VAR 5 FY 2001 Unit Cost Total Cost 148 1,266 742 Quantity VAR 1 301 396 81 2,404 5,190 Unit Cost FY 2002 Total Cost 1,806 310 310 169 272 70 2,408 5,035 Quantity VAR Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost 2,999 274 407 97 1,632 5,409 CLASSIFICATION: PAGE NO. 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy Cost Element/ FISCAL YEAR BA2 - COMMUNICATIONS AND ELECTRONICS EQUIPMENT SUBHEAD LANDING SYSTEMS (LS) QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE 1 310.0 SPAWARSYSCEN SAN DIEGO, CA 11/00 C/FFP 42X1 CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY AIRSYSATM, INC. SHAWNEE, KS 03/01 08/01 SPECS AVAILABLE NOW Yes X1102 INSTRUMENT LANDING SYSTEM FY 01 D. REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 62 Page No. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION Landing Systems TYPE MODIFICATION: VARIOUS MODIFICATION TITLE: VARIOUS X1017,X1020, X1102 DESCRIPTION/JUSTIFICATION: The Engineering Change Proposal (ECP)/Operational Capability Improvement Request (OCIR) program provides for the procurement and installation of critically needed equipment and modifications required to modernize and ensure the safe, efficient, and reliable operation of Precision Approach Radar (PAR) systems, Tactical Air Navigation (TACAN) systems, Instrument Landing Systems (ILS), and other air navigation systems used at Navy/Marine Corps Air Traffic Control facilities worldwide. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ N/A FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT * 7.300 * 1.785 * 2.008 * 2.116 * 2.999 * 6.803 14.103 * 1.939 3.724 * 2.404 4.412 * 2.408 4.524 * 1.632 4.631 ITEM NO. 62 0.000 0.000 0.000 0.000 PAGE 5 * The equipment and installation costs represented on this P3A are for individual modification programs that do not exceed $5 Million in either budget year or $10 Million in all years. 0.000 0.000 0.000 0.000 0.000 Cont Cont Cont Cont 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Cont Cont Cont Cont 0.000 Cont Cont Cont Cont CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: LANDING SYSTEMS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: Alteration Installation Team (AIT) ADMINISTRATIVE LEADTIME: Various CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ * 6.803 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 FY 1999 Qty $ 0.957 * * 0.982 VARIOUS X1017, X1020,X1102 PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 2000 Qty $ * 0.882 * 1.233 * 0.289 FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ * * * Various 0.512 0.641 1.255 * * FY 2004 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty 0.628 1.004 Cont Cont FY 2001 2 3 0 0 0 0 4 0 0 1 0 0 FY 2002 2 3 0 0 0 0 4 0 0 1 0 0 FY 2003 2 3 0 0 0 0 4 0 0 1 0 0 ITEM NO. 62 FY 2004 2 3 0 0 0 0 4 0 0 1 0 0 PAGE 5A FY 2005 2 3 0 0 0 0 4 0 0 1 0 0 FY 2006 2 3 0 0 0 0 4 0 0 1 0 0 FY 2007 2 3 0 0 0 0 TC 4 0 0 0 0 TOTAL 0 0 P-3A CLASSIFICATION: UNCLASSIFIED Total $ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Cont UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE Fleet Area Control and Surveillance Facility (FACSFAC) OTHER PROCUREMENT, NAVY/BA2-COMMUNICATIONS AND ELECTRONICS EQUIPMENT Program Element for Code B Items: Other Related Program Elements Not Applicable Prior Years QUANTITY COST (In Millions) $140.7 NARM # 284700 ID Code Not Applicable FY2000 FY2001 FY2002 $3.6 $4.2 $1.2 FY2003 FY2004 FY2005 FY2006 FY2007 To Complete Total CONT CONT DESCRIPTION: Fleet Area Control and Surveillance Facilities (FACSFAC) are established to provide multi-mission Air Traffic Control and training area management services to the fleet. This service includes scheduling of surface, subsurface, and air operations in off-shore operating areas, surveillancecontrol of air operations and related training evolutionssuch as Ground Control Intercept and Air Combat Maneuvers. The basic purpose of FACSFAC is to prevent mid-air collisions between military and civilian aircraft and to be responsible for the management and protection of Navy training airspace. Eight FACSFAC system supported sites have been established as follows: FACSFAC Virginia Capes, FACSFAC Jacksonville, FACSFAC Caribbean, FACSFAC Pensacola, FACSFAC San Diego, FACSFAC Pearl Harbor, NAS Fallon and NAWCAD St. Inigoes. In order to accommodatemission expansionand maintain a required interoperabilitywith the FAA National Air Traffic Control System, FACSFACs must be periodically provided with new or upgraded capabilities. Funding in FY 00 through FY 02 provides for procurement and installation of the following: FY 00: 17 Display Replacements (TT176); miscellaneous enhancements for selected sites (ECPs/OCIRs) (TT145). FY 01: 24 Display Replacements (TT176); 2 FACTS 3200 Radar Input Capacity (RIC) Upgrades (TT177); miscellaneous enhancements for selected sites (ECPs/OCIRs) (TT145). FY 02: 1 FACTS 3200 RIC Upgrades (TT177); miscellaneous enhancements for selected sites (ECPs/OCIRs) (TT145). P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 63 CLASSIFICATION: PAGE NO. 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA2-COMMUNICATIONS AND ELECTRONICS EQUIPMENT ID Prior Procurement Items Code Years FY2000 FY2001 FY2002 TT171 MODE S INTERFACE DATE: Fleet Area Control and Surveillance Facility (FACSFAC) FY2003 FY2004 FY2005 FY2006 FY2007 N/A QTY FUNDING TT172 MAMS CAPABILITY UPGRADE QTY FUNDING N/A TT175 RADAR BEACON DIGITIZER QTY FUNDING TT176 DISPLAY REPLACEMENTS 10 1.595 N/A QTY FUNDING TT177 FACTS 3200 RADAR INPUT CAPACITY 32 5.725 17 1.159 24 1.512 AP 0.020 2 0.940 N/A QTY FUNDING TT179 AUTOMATIC DEPENDENT SURVEILLANCE (ADS) 2/ 1 0.478 N/A QTY FUNDING TT180 COMMUNICATION UPGRADE N/A QTY FUNDING TT181 FLIGHT PLAN INTERFACE N/A QTY FUNDING TT 184 APPROACH CONTROL INTERFACE N/A QTY FUNDING P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 63 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED To Complete Total UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY Prior Years VARIOUS 1/ N/A 29.870 OTHER COSTS N/A Procurement Items June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA2-COMMUNICATIONS AND ELECTRONICS EQUIPMEN ID Code DATE: FY 2000 FY 2001 FY 2002 103.526 2.409 1.789 0.673 140.716 3.588 4.241 1.151 FY 2003 Fleet Area Control and Surveillance Facility (FACSFAC) FY 2004 FY 2005 FY 2006 FY 2007 TT185 DAAS CONVERSION QTY FUNDING TOTAL FUNDING 1/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY 1997 and beyond. 2/ Title changed from Global Positioning System to Automatic Dependent Surveillance (ADS) to comply with Federal Aviation Administration (FAA) terminology. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 63 CLASSIFICATION: PAGE NO. 2A UNCLASSIFIED To Complete Total CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/BA2-COMMUNICATIONS AND ELECTRONICS EQUIPMENT COST CODE TT145 TT168 TT171 TT172 TT173 TT174 TT175 TT176 TT177* TT179 TT184 TT300 TT800 TT830 TT900 TT990 ELEMENT OF COST FACSFAC ECPs/OCIRs PORT RADAR RECORDER MODE S INTERFACE 3/ MAMS CAPABILITY UPGRADE RADAR INPUT UNIT REPLACEMENTS LINK 11 SECURITY FILTER RADAR BEACON DIGITIZER (RBD) REPLACEMENTS DISPLAY REPLACEMENTS FACTS 3200 RADAR INPUT CAPACITY UPGRADE AUTOMATIC DEPENDENT SURVEILLANCE (ADS) 2/ APPROACH CONTROL INTERFACE JARCC/CARIBROC UPGRADE INTEGRATED LOGISTICS SUPPORT PRODUCTION ENGINEERING INSTALLATION (NON-FMP) VARIOUS 1/ INITIAL TRAINING Fleet Area Control and Surveillance Facility (FACSFAC) ID Code Prior Years Total Cost N/A N/A 9,497 218 N/A N/A N/A 800 651 1,595 N/A N/A 5,725 N/A N/A N/A N/A N/A N/A 71,594 3,189 8,150 9,302 29,870 125 FY 2000 Quantity Unit Cost VAR 17 VAR 68 FY 2001 Total Cost Quantity 921 VAR 1,159 20 24 2 358 694 436 Unit Cost 42TT FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost 315 63 470 1,512 940 1 478 214 378 882 478 71 100 502 *FACTS 3200 Radar Input Capacity (RIC) Upgrade (TT177) was rescheduled due to integration activity workload. 1/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY 1997 and beyond. 2/ TT179 Title changed from Global Positioning System to Automatic Dependent Surveillance (ADS) to comply with Federal Aviation Administration (FAA) terminology. 3/ Mode S Interface (TT171) slipped FY03 to FY04 due to delays in FAA Implementation. DD FORM 2446, JUN 86 140,716 P-1 SHOPPING LIST ITEM NO. 63 3,588 4,241 1,151 CLASSIFICATION: 0 PAGE NO. 3 UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: FACSFAC CAPABILITY UPGRADE MODIFICATION TITLE: VARIOUS TT145,TT172,TT176, TT177 TT179 SUMMARY DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 TY $ FY 2002 QTY $ FY 2003 TY $ FY 2004 TY $ FY 2005 QTY $ FY 2006 FY 2007 TY $ QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT * 10.774 2.131 * 2.288 * 2.100 * 2.767 * 0.478 * 2.052 14.957 * 0.397 2.685 * 0.436 2.536 * 0.882 3.649 * 0.502 0.980 ITEM NO. 63 PAGE 4 "The equipment and installation costs represented on this P-3A are for individual modification programs that do not exceed $5 million in either budget year or $10 million in all years." TC QTY $ TOTAL QTY $ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 CONT CONT CONT CONT 2.131 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 CONT CONT CONT CONT CONT CONT CONT CONT CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: FACSFAC INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ * 2.052 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 MODIFICATION TITLE: N/A N/A N/A Qty * VARIOUS TT145, TT172,TT176,TT177, TT179 PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 1999 $ 0.397 FY 2000 Qty $ * 0.110 * 0.040 * 0.286 FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ * N/A 0.882 * * 0.125 0.377 Qty N/A N/A FY 2004 $ Qty FY 2003: FY 2003: FY 2005 $ FY 2006 Qty $ FY 2007 Qty $ N/A N/A To Complete Qty $ Qty * CONT FY 2001 2 3 0 0 0 0 4 0 0 1 0 0 FY 2002 2 3 0 0 0 0 4 0 0 1 0 0 FY 2003 2 3 0 0 0 0 4 0 0 1 0 0 ITEM NO. 63 FY 2004 2 3 0 0 0 0 4 0 0 1 0 0 PAGE 5 FY 2005 2 3 0 0 0 0 4 0 0 1 0 0 FY 2006 2 3 0 0 0 0 4 0 0 1 0 0 FY 2007 2 3 0 0 0 0 TC 4 0 0 0 0 TOTAL 0 0 P-3A CLASSIFICATION: UNCLASSIFIED Total $ CONT CONT CONT CONT CONT CONT CONT CONT CONT CONT CONT UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY IDENTIFICATION SYSTEMS NAVAIRSYSCOM 42MT Program Element for Code B Items: Other Related Program Elements NOT APPLICABLE Prior Years QUANTITY COST (In Millions) $127.5 ID Code FY 2000 $9.2 FY 2001 $14.0 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total $18.3 DESCRIPTION: The Identification Systems program funds the following procurements: AN/UPX-37 Digital Interrogator (DI), Common Digital Transponder (CXP), Combat Information Center (CIC), AN/UPX-29(V) Improvements, and MK XIIA Mode 5. The Air Traffic Control System, Identification Friend or Foe, MK XII System (AIMS) is a DOD directed tri-service program designed to provide a universal air traffic control radar beacon system compatiblewith the National Airspace System Program. It provides a secure identification system for military use on all combatant ships, selected auxiliaries, patrol craft, and selected Coast Guard ships by allowing all friendly forces to identify each other and neutral forces. The air traffic control radar system supports several missions such as anti-airwarfare,aerial bombardment,and naval attack. The purpose of the AN/UPX-37 Digital Interrogator (DI), Common Digital Transponder (CXP), and Combat Information Center (CIC) is to replace 20-25 year old equipment with a reliability and maintenance enhancement through the use of COTS/NDI form/fit/function equipment. These new systems will be enhanced with state-of-the-arttechnology and open systems architecture, and will be purchased with existing MK XII Improvements funding. Growth capability to incorporate Mode 5 and Mode S functionality is incorporated in equipment design. The AN/UPX-24(V) Field Change 5 provides open systems architecture for increased expansion capability. The AN/UPX-24(V) Mode S provides improved shipboard combat identification and increases the probability of identification of neutral aircraft. FY00 funded the procurement of 5 AN/UPX-37 Digital Interrogators and 10 Common Digital Transponders. FY01 funds the procurement of 70 AN/UPX-37 Digital Interrogators and 36 Common Digital Transponders. FY02 funds the procurement of 60 AN/UPX-37 Digital Interrogators, 35 Common Digital Transponders, 3 Combat Identification Center upgrades, and 8 AN/UPX-24(V) FC 5s. Installing Agent: Shipyard, Alteration Teams (AIT). When installation to be made: ROH/RAV/SRA. Type ship to receive equipment: An IFF system is on every ship in the fleet. SARTIS will be installed on CG-47 class. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 64 CLASSIFICATION: PAGE NO. 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY Procurement Items ID Code IDENTIFICATION SYSTEMS NAVAIRSYSCOM 42MT Prior Years FY 2000 FY 2001 FY 2002 110 9,883 5 352 70 5,067 60 4,417 10 1,776 36 1,620 35 1,602 B MTTBD MK XIIA MODE 5 QTY FUNDING MT031 AN/UPX-37 DIGITAL INTERROGATOR 2/ A QTY FUNDING MT032 MK XII COMMON DIGITAL TRANSPONDER (CXP) QTY FUNDING A MT033 MK XII CIC UPGRADE A QTY FUNDING MT034 AN/UPX-24(V) FC5 3 900 A QTY FUNDING MT035 AN/UPX-24(V) Mode S 8 2,800 A QTY FUNDING VARIOUS 1/ 68,030 OTHER COSTS TOTAL FUNDING 49,540 127,453 7,035 9,163 7,345 14,032 8,591 18,310 P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 64 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED 1/ THE AMOUNT IDENTIFIED AGAINST THIS COST ELEMENT REFLECTS TOTAL PRIOR YEAR FUNDING ASSOCIATED WITH COST ELEMENTS NO LONGER FINANCED IN FY97 AND BEYOND. 2/ FY99 FUNDS WERE USED TO PROCURE 60 DIGITAL INTERROGATORS IN FY99 AND 40 DIGITAL INTERROGATORS IN FY00 FOR A GRAND TOTAL OF 100 UNITS. CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System ID Code APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY DATE: June 2001 P-1 ITEM NOMENCLATURE/SUBHEAD BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT IDENTIFICATION SYSTEMS NAVAIRSYSCOM 42MT TOTAL COST IN THOUSANDS OF DOLLARS COST CODE MTTBD MT003 MT016 MT024 MT027 MT031 MT110 MT700 MT032 MT033 MT034 MT035 MT800 MT830 MT840 MT850 MT860 MT870 MT900 MT910 MT990 ELEMENT OF COST MK XIIA MODE 5 AN/UPM-155 MK XII RADAR TEST SET MK XII AIMS IMPROVEMENTS AN/UPX-25 INTERROGATOR SET (USCG) AN/UPX-27 HARDWARE MK XII DIGITAL INTERROGATOR SARTIS AN/UPX-29(V) IMPROVEMENTS (N865) MK XII COMMON DIGITAL TRANSPONDER MK XII CIC UPGRADE AN/UPX-24(V) FC5 AN/UPX-24(V) Mode S INTEGRATED LOGISTICS SUPPORT PRODUCTION ENGINEERING QUALITY ASSURANCE PRODUCT IMPROVEMENT ACCEPTANCE TEST & EVALUATION DEPOT INSTALLATION OF EQUIPMENT (NON-FMP) INSTALLATION OF EQUIPMENT (FMP) INITIAL TRAINING VARIOUS 1/ DD FORM 2446, JUN 86 ID Code B A A A A A B A A A A A N/A N/A N/A N/A N/A N/A N/A N/A N/A Prior Years Total Cost 23,693 16,679 2,716 150 9,883 7,173 17,619 7,593 17,013 60 1,953 5,206 633 7,795 250 421 8,616 127,453 P-1 SHOPPING LIST ITEM NO. 64 FY 2000 Quantity Unit Cost FY 2002 FY 2001 Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost FY 2003 Total Cost 5 70 352 70 72 5,067 60 74 4,417 10 178 1,776 36 45 1,620 35 3 8 46 300 350 1,602 900 2,800 1,118 2,508 1,130 2,865 1,401 2,074 451 700 519 436 1,778 318 162 1,486 277 632 3,101 910 30 704 9,163 14,032 371 18,310 CLASSIFICATION: PAGE NO. 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA2 - Communications and Electronic Equipment SUBHEAD IDENTIFICATION SYSTEMS NAVAIRSYSCOM 42MT QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW MT031 MK XII DI FY-01 FY-02 70 60 72.4 73.6 NAVAIR NAVAIR Mar-97 Mar-97 C/FP Option C/FP Option BAE, GREENLAWN, NY BAE , GREENLAWN, NY Dec-00 Apr-02 Nov-01 Mar-03 YES YES MT032 MK XII CXP FY-01 FY-02 36 35 45.0 45.8 NAVAIR NAVAIR Jul-01 Apr-02 C/FP Option C/FP Option BAE, GREENLAWN, NY BAE , GREENLAWN, NY Jun-01 Mar-02 Jun-02 Mar-03 YES YES MT033 MK XII CIC UPGRD FY-02 3 300.0 NAVAIR Oct-01 C/FPI TBD Dec-01 Dec-02 NO MT034 AN/UPX-24(V) FC5 FY-02 8 350.0 ST INIGOES May-00 PO Dec-01 Dec-02 YES ITEM NO. 64 PAGE NO. 4 Cost Element/ FISCAL YEAR D. LITTON IND, AGOURA HILLS, CA REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: VARIOUS VARIOUS MODIFICATION TITLE: MT016, MT110, MT700 FY 2005 QTY $ FY 2007 QTY $ DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ Fielded FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2006 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 1201 11.484 25 7.173 700 3.894 22.551 AP 2.242 185 1.846 167 2.242 1.846 1.328 1.328 6 0.272 0.272 ITEM NO. 64 "The equipment and installation costs represented on this P3a are for individual modification programs that do not exceed $5 million in either budget year or $10 million in all years." NOTE: Total quantity reflects the inventory objective for this item. PAGE 5 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: VARIOUS INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: N/A CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ 700 3.894 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 FY 2001 2 3 0 0 0 0 MT016, MT110, MT700 MODIFICATION TITLE: AIT N/A PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A N/A N/A FY 1999 Qty $ AP 2.242 4 0 0 1 0 0 FY 2000 Qty $ 185 1.846 FY 2002 2 3 0 0 0 0 4 0 0 1 FY 2001 Qty $ 167 1.328 FY 2003 2 3 4 N/A FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 6 0.272 1 FY 2004 2 3 ITEM NO. 64 4 1 PAGE FY 2004 Qty $ FY 2005 2 3 5A 4 N/A N/A FY 2005 Qty $ 1 FY 2006 2 3 FY 2006 Qty $ 4 1 FY 2007 2 3 FY 2007 Qty $ To Complete Qty $ Total Qty TC 4 TOTAL P-3A CLASSIFICATION: UNCLASSIFIED $ CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: AN/UPX-27 Reliability MODIFICATION TITLE: AN/UPX-37 DIGITAL INTERROGATOR (MT031) DESCRIPTION/JUSTIFICATION: Current AN/UPX-27 is late 60’s technology and no longer meets operational availability requirements due to use beyond its intended life cycle. High cost of ownership due to parts obsolescence, frequent labor intensive alignments and poor reliability continue to be problems associated with the current system. Further, the current system suffers upgrade integration problems due to its dated architecture and offers no growth capabilities. A more reliable system with the same functionality, that provides growth capability to include Mode 5 and Mode S, is required. Milestone III decision June 1998. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 10 2.779 0.000 2.779 100 6.882 VAR 0.222 10 0.180 7.284 5 0.352 70 5.067 60 4.417 50 0.250 0.602 55 0.395 5.462 70 0.360 4.777 ITEM NO. 64 PAGE 5B CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) AN/UPX-27 INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: *7 CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ MODIFICATION TITLE: AIT Months PRODUCTION LEADTIME: Dec-00 FY 2001: Nov-01 FY 2001: Jan-00 Dec-00 FY 1999 Qty $ 10 0.180 INSTALLATION SCHEDULE: FY 2000 FY 2001 & Prior 1 2 3 4 In 70 11 11 11 12 Out 60 10 20 13 12 FY 2000 Qty $ 50 0.250 50 5 FY 2002 2 3 4 18 17 17 18 17 17 1 11 Months Apr-02 Mar-03 FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ FY 2004 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty 0.359 0.036 70 1 18 18 AN/UPX-37 DIGITAL INTERROGATOR (MT031) FY 2003 2 3 4 1 0.360 FY 2004 2 3 ITEM NO. 64 4 1 PAGE FY 2005 2 3 5C 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL P-3A CLASSIFICATION: UNCLASSIFIED FY99 FUNDS WERE USED TO PROCURE 60 DIGITAL INTERROGATORS IN FY99 AND 40 DIGITAL INTERROGATORS IN FY00 FOR A GRAND TOTAL OF 100 UNITS. *ADMINISTRATIVE LEAD TIME VARIES, RANGING FROM 4 MONTHS IN FY00, 3 MONTHS IN FY01 AND 7 MONTHS IN FY02. Total $ CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION UPA-59 Video Decoder, C-8430 Interrogator TYPE MODIFICATION: Control, C-10064 and C-10065 Control Indicators Reliability and Maintainability MODIFICATION TITLE: CIC UPGRADE (MT033) DESCRIPTION/JUSTIFICATION: The Combat Information Center Upgrade (CICU) is an R&M upgrade strategy to replace antiquated 1960’s technology MKXII control and display equipment that is experiencing parts obsolescence. It is the final step of the successful 3-Step R&M Upgrade Strategy (Digital Interrogator and Digital Transponder being the first 2 successful events) to bring digital technology and open system architecture concepts to the MKXII control and display systems. The CIC concept involves common control of multiple IFF systems and the capability to accommodate new modes such as Mode S and Mode 5. Pre-Milestone III based on NDI development DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0.000 0.000 0 0.000 0.000 0 0.000 0.000 0 0.000 0.000 3 0.900 0 0.000 0.900 ITEM NO. 64 PAGE 5D . CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: ontrol, C-10064 and C-10065 Control Indicator UPA-59 Video Decoder, C-8430 Interrogator INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 Months CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: Prior Years Qty $ CIC UPGRADE (MT033) AIT PRODUCTION LEADTIME: 12 months N/A FY 2001: N/A FY 2001: N/A N/A FY 1999 Qty $ FY 2000 Qty $ ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ Dec-01 Dec-02 FY 2002: FY 2002: FY 2004 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 FY 2001 2 3 0 0 0 0 4 0 0 1 0 0 FY 2002 2 3 0 0 0 0 4 0 0 1 FY 2003 2 3 4 1 FY 2004 2 3 ITEM NO. 64 4 1 PAGE FY 2005 2 3 5E 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL P-3A CLASSIFICATION: UNCLASSIFIED Total Qty $ CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: IDENTIFICATION SYSTEMS Maintenance/Reliability MODIFICATION TITLE: ANUPX-24(V) FC5 (MT034) DESCRIPTION/JUSTIFICATION: Provides interrogator set AN/UPX-24(V) with an open architecture configuration to reduce problems caused by parts obsolescence and to provide the capability for future operational enhancements, in particular Mode S and Mode 5.This configuration will provide increased interface capabilities in a fully redundant system with a significantly reduced number of line replaceable units. ECP DNS 001 approved 9/99 DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0.000 0.000 0.000 0.000 0 0.000 0.000 0 0.000 0.000 8 2.800 0 0.000 2.800 ITEM NO. 64 PAGE 5F CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 months CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: MODIFICATION TITLE: IDENTIFICATION SYSTEMS Prior Years Qty $ ANUPX-24(V) FC5 (MT034) AIT PRODUCTION LEADTIME: N/A FY 2001: N/A FY 2001: N/A N/A FY 1999 Qty $ FY 2000 Qty $ 12 Months ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ Dec-01 Dec-02 FY 2002: FY 2002: FY 2004 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 FY 2001 2 3 0 0 0 0 4 0 0 1 0 0 FY 2002 2 3 0 0 0 0 4 0 0 1 FY 2003 2 3 4 1 FY 2004 2 3 ITEM NO. 64 4 1 PAGE FY 2005 2 3 5G 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL P-3A CLASSIFICATION: UNCLASSIFIED Total $ CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: IDENTIFICATION SYSTEMS Maintenance/Reliability MODIFICATION TITLE: MK XII COMMON DIGITAL TRANSPONDER (MT032) DESCRIPTION/JUSTIFICATION: Current MK-XII transponder systems no longer meet operational Reliability and Maintainability (R&M) requirements due to use beyond their intended life cycle and suffer high cost of ownership due to parts obsolescence. Current surface ship MK-XII transponders will be replaced to continue incremental digital and R&M upgrades to the MK-XII IFF System. The common digital transponder will use an open systems architecture to allow future growth, including Mode 5 and Mode S. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ Milestone III scheduled for April 2002 FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 0 0.000 0.000 0 0.000 0.000 10 1.776 36 1.620 35 1.602 0 0.000 1.776 10 0.040 1.660 36 0.072 1.674 ITEM NO. 64 PAGE 5H CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: IDENTIFICATION SYSTEMS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 6 MONTHS Mar-00 CONTRACT DATES: FY 2000: Mar-01 DELIVERY DATE: FY 2000: Cost: Prior Years Qty $ FY 1999 Qty $ PRODUCTION LEADTIME: Jun-01 FY 2001: Jun-02 FY 2001: FY 2000 Qty $ 10 FY 2001 2 3 4 3 4 3 4 3 3 1 0 0 FY 2002 2 3 4 12 12 12 12 12 12 1 12 MONTHS Mar-02 Mar-03 FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 0 0 Out 0 0 MK XII COMMON DIGITAL TRANSPONDER (MT032) FY 2004 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty 0.040 FY 2003 2 3 4 36 0.072 1 FY 2004 2 3 ITEM NO. 64 4 1 PAGE FY 2005 2 3 5I 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL P-3A CLASSIFICATION: UNCLASSIFIED Total $ UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY / BA-2 SURFACE IDENTIFICATON SYSTEMS Program Element for Code B Items: Other Related Program Elements NARM # 285600 42DB Not Applicable QUANTITY COST (In Millions) Prior Years ID Code FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total 15.6 A $0.6 $1.5 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $17.7 DESCRIPTION: Surface Identification Systems funds procurement of the AN/SLQ-20(B) which provides a greater capability than the obsolete AN/SLQ-20A; Auto-ID prototype upgrades; and the update of the Advanced Radar Target Identification System (SARTIS) AN/UPX-34 radar track discriminator data base to current target standards. The AN/SLQ-20(B) capability is for AEGIS CG Class ships. SARTIS is a Non-Cooperative Target Recognition (NCTR) System for AEGIS CG Class ships. FY 1999 provided funding to adapt seven (7) AN/SLQ-20(B) systems (which were originally procured for AEGIS DDG Class ships) to AEGIS CG Class ships systems (from AN/SPS-67 to AN/SPS-49 Radar Antenna Pedestals). FY 1999 funds installed three (3) of the previously procured units. FY 2000 provided funding to install the remaining four (4) of the previously procured units. FY 2001 provides Congressional Add funding to update new target standards for 25 previously procured SARTIS units.1 ‘ Installing Agent: Alteration Installation Team (AIT) When Installation to be made: N/A Ships or facilities to receive the equipment: CG-47 Class and CV/CVN Class 1 This Congressional Add augments the FY 1997 plus-up of 25 SARTIS units procured under BLI 285100. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 65 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY Procurement Items DB011 AN/SLQ-20(B) QTY FUNDING * OTHER COSTS TOTAL Prior Years June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY ID Code DATE: SURFACE IDENTIFICATION SYSTEMS FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Total A 7 $11,355 7 $11,355 $4,293 $577 $1,486 $6,356 $15,648 $577 $1,486 $17,711 * The amount identified against this cost element reflects total prior years funding associated with cost elements no longer financed in FY 1998 and beyond. DD Form 2454, JUN 86 To Complete ITEM NO. P-1 SHOPPING LIST 65 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System ID Code APPROPRIATION /BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy A Surface Identification Systems 42DB TOTAL COST IN THOUSANDS OF DOLLARS COST CODE DB010 DB011 DB013 DB800 DB830 DB840 DB850 DB860 DB900 DB910 DB990 ELEMENT OF COST AN/UPX-34 SARTIS AN/SLQ-20(B) NOTE: 1 AUTO-ID UPGRADE INTEGRATED LOGISTICS SUPPORT PRODUCTION ENGINEERING QUALITY ASSURANCE PRODUCT IMPROVEMENT ACCEPTANCE, TEST & EVALUATION INSTALLATION (NON-FMP) INSTALLATION (FMP) INITIAL TRAINING ID Code A A A N/A N/A N/A N/A N/A N/A N/A N/A Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost 24 11,355 1,100 311 1,873 53 Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost 636 850 29 903 567 10 NOTE: 1 - Related RDT&E Elements W0676 Improved ID Developments DD FORM 2446, JUN 86 15,648 P-1 SHOPPING LIST ITEM NO. 65 577 1,486 0 CLASSIFICATION: 0 PAGE NO. 3 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA-2; Communications and Electronics Equipment Naval Mission Planning Systems (NavMPS) formerly Tactical Automated Mission Planning System (TAMPS) Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) Other Related Program Elements ID Code $102.6 FY 2000 FY 2001 FY 2002 $20.5 $11.8 $13.4 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total Naval Mission Planning System (NavMPS) This line item provides funding to procure NavMPS for USN/USNR/USMC/USMCR. Program cost is not directly related to FY hardware quantity; software is a cost factor independent of FY hardware quantity and cost. Installations are planned for aviation capable ships, air stations, aviation training/support facilities and deployed aviation units. Items to be funded in this line include: Work Station Components - NavMPS procures tactical computer hardware through the non-developmental item acquisition strategy. Tactical computer equipment is used to plan and analyze aircraft routes under various mission configurations and operational threat environments. Primary output is route plans and mission essential data loads for mission execution. New workstations consist of the components to make a complete workstation. Production Support Services - Cost element includes production support services, engineering support services, independent verification and validation test and acceptance, site activation, quality assurance efforts, etc. Software Releases - NavMPS produces software releases via an evolutionary acquisition process. These releases contain enhancements based on fleet inputs and emerging technology. They also contain changes required to retain compatibility with supported platforms, associated weapons, and threat and imagery data bases providing input to NavMPS. Software releases are independent of hardware buys. The hardware mix has changed due to N62/N88 direction to accelerate migration to Global Command and Control System (GCCS)/Defense Information Infrastructure-Common Operating Environment (DII-COE) PC based environment and to reflect product mix, fleet needs, migration to Joint Mission Planning System (JMPS) and migration from UNIX based hardware to PC, desk top and laptops. PMA-233 will provide installed Mission Planning hardware, planning stations, on a 3 year replacement cycle. Mission Planning servers will be replaced on a 5 year cycle CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 66 PAGE NO. 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY Server Suite ID Code A Naval Mission Planning System (NavMPS) formerly Tactical Automated Mission Planning System (TAMPS) 8 1 3 2.0 0.2 0.8 120 102 181 6.6 6.1 1.7 895 270 770 718 3.5 1.2 4.0 3.8 A A Quantity Funding Trusted System FY 2002 A Quantity Funding Force Planning Seat FY 2001 A Quantity Funding Flight Planning Seat FY 2000 318 18.5 Quantity Funding Combat Planning Seat Prior Years 23 46 1.3 2.7 A Quantity Funding 60 60 3.3 0.6 Other Costs 67.5 10.3 7.8 6.6 102.7 20.5 11.8 13.4 Total P-1 Funding ** ** Numbers may not add due to rounding. DD Form 2454, JUN 86 June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY, BA-2; Communications and Electronics Equipment Procurement Items New Workstations Quantity Funding DATE: CLASSIFICATION: ITEM NO. 66 PAGE NO. 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2; Communications and Electronics Equipment A P-1 ITEM NOMENCLATURE/SUBHEAD Naval Mission Planning Systems (NavMPS) formerly Tactical Automated Mission Planning System (TAMPS) TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost 3 251 181 9 1,707 718 5 3,759 60 9 566 S7400 New Work Stations S7401 Server Suite 1,960 1 241 241 S7402 Combat Planning Seat 6,564 102 59 6,052 S7403 Flight Planning Seat 3,539 270 4 1,153 S7406 Force Planning Seat 1,256 46 59 2,730 S7407 Trusted System 3,317 S7410 Software Release 42,092 5,382 2,843 3,805 S7430 Production Support 21,559 3,266 4,202 2,042 S7900 Non-FMP Installation 3,425 1,264 753 778 S7910 FMP Installation 374 369 Quantity Unit Cost Total Cost 18,479 Total ** DD FORM 2446, JUN 86 ** Numbers may not add due to rounding. 102,565 P-1 SHOPPING LIST ITEM NO. 66 419 20,457 770 770 5 3,973 11,771 962 754 13,411 CLASSIFICATION: PAGE NO. 3 UNCLASSIFIED 1:29 PM7/14/01 CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2; Communications and Electronics Equipment Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) FY01 Flight Planning Seat 770 3 251 Combat Planning Seat 181 9 Flight Planning Seat 718 5 60 9 Trusted System D. REMARKS DD Form 2446-1, JUL 87 Y2S7 Naval Mission Planning Systems (NavMPS) formerly Tactical Automated Mission Planning System (TAMPS) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW SPAWAR 1/ Phil, PA N/A C/FP TBD 6/01 8/01 Yes SPAWAR 1/ Phil, PA N/A C/FP TBD 1/02 3/02 Yes 5 FY02 Server Suite SUBHEAD 1/ Streamlined acquisition process. Contracts are coordinated through SPAWAR SSC C4I Programs Office, Philadelphia. Contracts are awarded for COTS hardware on a best value basis. The existing NAVAIR CAD2 contract with Intergraph Corp. will be utilized if it meets the requirements and provides best cost. P-1 SHOPPING LIST ITEM NO. 66 PAGE NO. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE June 2001 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION Aviation Capable Ships, Air Stations Aviation Units, Aviation Training Naval Mission Planning Systems (NavMPS) formerly TYPE MODIFICATION: Support Facilities Added Capability MODIFICATION TITLE: Tactical Automated Mission Planning System (TAMPS) DESCRIPTION/JUSTIFICATION: NavMPS provides USN and USMC planners a common automated system for rapidly processing large quantities of digitized terrain, threat and environmental data, and aircraft and weapon system parameters. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ NavMPS is post milestone III FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ 10.7 17.4 21.8 FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E 0604231N PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER-SOFTWARE RELEASE OTHER-PRODUCTION SUPPORT OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT ** **Numbers may not add due to rounding. 13.5 560 24.2 12.4 864 37.9 15.5 560 1.7 79.3 10.9 419 4.2 6.0 864 2.1 23.2 10.2 770 5.4 3.3 419 1.6 20.5 4.0 962 2.8 4.2 770 0.8 11.8 6.8 3.8 2.0 962 0.8 13.4 ITEM 66 PAGE 5 CLASSIFICATION: UNCLASSIFIED June 2001 CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued Aviation Capable Ships, Air Stations Aviation Units, Aviation Training Support Facilities MODIFICATION TITLE: MODELS OF SYSTEMS AFFECTED: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: Field Installation Team ADMINISTRATIVE LEADTIME: 3 to 4 Months CONTRACT DATES: FY 2000: Jan-00 DELIVERY DATE: FY 2000: Mar-00 Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ 560 FY 1999 Qty $ PRODUCTION LEADTIME: FY 2001: Jun-01 FY 2001: Aug-01 FY 2000 Qty $ Naval Mission Planning Systems (NavMPS) formerly Tactical Automated Mission Planning System (TAMPS) N/A Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ FY 2004 Qty $ Jan-02 Mar-02 FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Total Qty $ 1.7 864 2.1 419 1.6 770 0.8 962 0.8 Total INSTALLATION SCHEDULE: FY 2000 & Prior 1 1843 In Out 1843 FY 2001 2 3 4 770 1 FY 2002 2 3 4 1 FY 2003 2 3 4 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL 962 390 380 485 477 ITEM 66 PAGE 6 P-3A CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY FY 2000 P-1 ITEM NOMENCLATURE GCCS-M Ashore (LI #2804) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 June 2001 SUBHEAD 52JH FY 2006 TO COMP TOTAL QUANTITY COST (in millions) $9.1 NOTE: GCCS-M Ashore transfers to the GCCS-M (BLI 2608) in FY01. Detail budget justification material for FY00 is included in the GCCS-M P-1 for budget comparability. PROGRAM COVERAGE: JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: The Global Command and Control System - Maritime Ashore program (formerly JMCIS Ashore) provides evolutionary systems and ancillary equipment upgrades to support the CNO, Fleet Commanders in Chief, Unified Commanders, Type Commanders, Force Anti-Submarine Warfare (ASW) Commander, and Submarine Operating Authorities worldwide. The Command, Control, Communications, Computers, and Intelligence (C4I) services provide a single system to receive, process, display, maintain and/or assess the unit characteristics, employment scheduling, material condition, combat readiness, warfighting capabilities, positional information and disposition of own and Allied forces, and to optimize the allocation of those resources. GCCS-M Ashore will provide current geolocational information on hostile land, sea and air forces integrated with environmental and other nationally derived information. GCCS-M Ashore will provide the tools necessary for operational commanders to execute plans, and to transmit tasking and tactical information to forces. The Joint Maritime Command Information System (JMCIS) OSIS Baseline Upgrade (OBU) Evolutionary Development (OED) program (previously OBU and included in LI 2906 NCCS Ashore) provides evolutionary systems and ancillary equipment upgrades to support three Joint Intelligence Centers (JIC), one JIC Detachment, one Training Center and one Software Support Activity. JMCIS OED provides for the analysis of multi-source intelligence to produce comprehensive reports of foreign forces and potential hostile activity. It also provides near-real-time all-source fusion, correlation and analysis tools, directly feeding automated reporting capabilities. JMCIS OED maintains characteristics and performance data on weapons platforms, collecting non-organic data from ashore and afloat sensors, and developing an all-source tactical picture. This data is disseminated to the operating forces for tactical threat warnings, decision making support, and support of Over-theHorizon-Targeting. This line item contains equipment to support the Joint Global Command and Control System (GCCS). GCCS (Joint) is an operational multi-service/agency C4I program encompassing both strategic and tactical C4I functions. GCCS (Joint) supports the National Command Authority and the CINCs by providing C4I data processing capabilities, including status of forces and support requirements for use in national security decision making, force preparation and operational planning execution. The Navy’s procurement provides equipment to support the GCCS (Joint) Automated Data Processing Equipment configuration. JH031. GCCS-M Ashore . Provides the Navy Command Center and Fleet, Unified and TYCOM Command Centers with a common C4I capability. Using iterative hardware/software releases, GCCS-M Ashore implements incremental changes in an evolutionary manner using modular segments as operational requirements dictate and as funding and technology allow. Hardware suites to support GCCS-M Ashore follow an iterative hardware and software release along with IT-21 compatible client/server design implementing LAN and WAN architecture, serial and parallel processors, communications and database servers. GCCS-M Ashore also offers distributed briefing capabilities among commands using video and large screen displays. JH011. JMCIS OED Upgrade. Ocean Surveillance Information System Baseline Upgrade (OBU) Evolutionary Development (OED) provides for the analysis of intelligence information from multiple sources to produce a comprehensive report of activities. OED provides positional data and operational intelligence to commanders at all levels. JH036. GCCS (Joint). All procurements will directly support GCCS (Joint) and is in accordance with Joint Staff direction. GCCS (Joint) consists of standard hardware, standard software, and service/site unique software. GCCS (Joint) is an open systems client-server environment using COTS and NDI software and hardware and service/site unique software. Procurements will include Workstations to replace Database and Application Servers, Local Area Network (LAN) hardware, and software communications equipment. GCCS-T has the same hardware and additional encryption equipment. Exhibit P-40, Budget Item Justification P-1 Shopping List-Item No 67-1 of 67-2 Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT GCCS-M Ashore (LI #2804) 52JH PROGRAM COVERAGE: JH776. Installation of Equipment. Provides for installation of equipment at the shore sites listed below. The FY 00 Budget Request Procures: 1. GCCS-M Ashore Command Center Equipment; JMCIS OED upgrades; GCCS (JOINT) Workstations, Servers, LAN hardware and software, communications equipment. 2. Installation of Equipment. INSTALLATION DATA: GCCS-M Ashore equipment installation sites include the Navy Command Center Pentagon, Alternate National Command Center (Site R), USCINCPAC, CINCLANTFLT, CINCPACFLT, CINCUSNAVEUR (London UK and Naples IT); Software Support Activity SSC San Diego; 2 Training sites at Fleet Computer Training Centers sites Dam Neck and San Diego; 8 Submarine Operating Command Center sites: SUBLANT at Norfolk, SUBGRU8 at Naples, SUBPAC at Pearl Harbor, SUBGRU7 at Yokosuka, COMSUBGRU9 at Bangor, COMSUBGRU10 at Kings Bay, COMSUBLANT REP UK at Northwood UK; and SUBPACREP at San Diego; 4 ASW Command Center sites: CTF84 at Norfolk; CTF67 at Naples, CTF12 at Pearl Harbor, and CTF72 at Kamiseya, 6 TYCOM Command Center sites: SUBLANT, SURFLANT, and AIRLANT at Norfolk; SUBPAC at Pearl Harbor; SURFPAC and AIRPAC at San Diego; and 5 Integrated Underwater Surveillance System (IUSS) Command Center sites at NAVOCEANPROFACs at Whidbey Island and Dam Neck; JOINT MARITIME FACILITY at St. Mawgans UK, and sites 7900 and 5200; and 24 GCCS (Joint) collocated/remote sites. JMCIS OED equipment installation sites include ONI, JICPAC, JICPAC DETACHMENT, AIC, NMITC, and JAC MOLESWORTH. All GCCS (Joint) equipment is scheduled for installation at Navy supported sites: USACOM (4), USPACOM, and US FORCES JAPAN. GCCS-T equipment is installed at 1 Host Site and 8 Remote Sites: CINCPACFLT/GSF(Host), USACOM(Remote), COMSOCACOM(Remote), CTF-69(Remote), COMICEDEFOR(Remote), USCINCPAC(Remote), CINCLANTFLT(Remote), CINCUSNAVEUR(Remote), US Forces Japan(Remote). Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 67-2 of 67-2 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 DATE P-1 ITEM NOMENCLATURE TADIX- B 2900 FY 2000 FY 2001 $18.3 $6.0 FY 2002 FY 2003 FY 2004 FY 2005 SUBHEAD 52DH FY 2006 FY 2007 TO COMP TOTAL QUANTITY COST (in millions) PROGRAM COVERAGE: Narrative Description/Justification: Commander’s Tactical Terminals/Joint Tactical Terminals (CTTs/JTTs) provide designated platforms with the critical capability to receive near-real-time (NRT contact data reports via Ultra High Frequency (UHF) communications links called Tactical Data Information Exchange Subsystem (TADIXS) B and Tactical Related Applications (TRAP) Data Dissemination System (TDDS) and to receive and transmit tactical intelligence dissemination networks, such as Tactical Information Broadcast Service (TIBS). This data provides over-the-horizon targeting (OTH-T) for the targeting and retargetting of missiles, global detection and cueing information from multiple sources to tactical users worldwide, theater information with tracking accuracy of fast moving targets to joint operational users, and direct dedicated links for critical time sensitive surveillance information to battlefield commanders. The CTT is one of two migration systems identified in the DOD approved Integrated Broadcast Service (IBS) Plan presented to the House Permanent Select Committee on Intelligence (HPSCI). The JTT, as required by the IBS Plan, will replace CTT and OPTEVFOR will participate in Multi-service Test and Evaluation (MOT&E). Common IBS Modules (CIBS-M) provide expanded capability for JTT to meet outyear and emergent requirements and allow JTT functionality to be incorporated into other open architecture systems. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: The last year of CTT procurement was FY 97; installs continue. FY99 funds are for production support and installation of CTTs and procurement of JTTs. FY00 funds are for procurement, production support and installation of JTTs. FY01 funds procure JTT systems and provides production support. P-1 Shopping List-Item No - 68 - 1 of 68 -7 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST P-1 ITEM NOMENCLATURE SUBHEAD TADIX- B 2900 52DH TOTAL COST IN THOUSANDS OF DOLLARS PY FY2000 FY 2001 ID TOTAL UNIT TOTAL UNIT TOTAL CODE COST QTY COST COST QTY COST COST DH555 DH520 Production Support JTT Systems B DH777 DH777 DH777 DH777 Installation CTT FMP Installation JTT FMP Installation DSA F F F F DH776 Non FMP Installation Equipment F 16 235.6 25 238.6 TOTAL COST 32 5,965 5,760 2_/ 0 5,114 646 698 Airborne Application NRE 6,000 TOTAL CONTROL Remarks: 2,068 1_/ 3,769 3_/ QTY FY 2002 UNIT COST 18,295 5,997 1_/ Of this amount, $1,323K funds production support efforts in FY 02 2_/ Funds the installation of all units procured in FY 98 & prior year. 3_/ Contract award will occur in June 2002 and installations will commence in October 03 (FY 04). P-1 Shopping List-Item No - 68 - 2 of 68 -7 DD FORM 2446, JUN 86 Exhibit P-5, Cost Analysis Unclassified Classification UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 C. P-1 ITEM NOMENCLATURE B. APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST DH520 JTT Systems FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO 97 98 00 01 E-Systems; St. Petersburg, FL E-Systems; St. Petersburg, FL E-Systems; St. Petersburg, FL E-Systems; St. Petersburg, FL FFP FFP FFP FFP Army; PM JSTAR Army; PM JSTAR Army; PM JSTAR Army; PM JSTAR TADIX- B RFP ISSUE DATE AWARD DATE Sep-97 Apr-98 Jun-02 Jun-02 SUBHEAD 2900 DATE OF FIRST QTY Delivery Jun-00 Apr-01 Oct-03 Jan-04 30 11 16 25 52DH UNIT COST SPECS AVAILABLE NOW 418.0 320.0 235.6 238.6 YES YES YES YES DATE REVISIONS AVAILABLE D. REMARKS P-1 Shopping List-Item No - 68 - 3 of 68 -7 Exhibit P-5A, Procurement History and Planning Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: TADIXS B 2900 DH520 Joint Tactical Terminals (JTT) Army is the lead service for JTT procurement per OSD direction in PBD77720 dtd 22 Jan 1996. This display includes installation of shipboard (FMP) equipment. Ancillary equipment being procured in same year as installation. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 34 16.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 0.0 PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 16.0 METHOD OF IMPLEMENTATION: CONTRACT DATES: DELIVERY DATES: FY 99 Qty $ 0 0.8 FY 00 Qty $ 16 3.8 6.0 2.7 0 0.0 0.0 3.5 FY 01 Qty $ 25 2.1 0.6 34 34 5.1 5.1 PY 1 INPUT 0 0.0 5.1 17.6 0 0.0 0 0.0 0 0.0 0.0 6.0 0.0 ADMINISTRATIVE LEADTIME: 0.0 FY2001: Jan-04 FY2002: 3 4 5 FY 05 4 1 2 0.0 0 0.0 FY 07 Qty $ 0 0.0 TC Qty $ 0 0.0 Total Qty $ 75 4 4 5 3 4 26.5 6.0 0.0 0.0 0.0 0 0.0 0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0 0.0 0.0 0.0 0.0 0.0 41 6.2 16 25 2.4 3.8 6.2 6.2 75 34 0 16 25 0 0 0 0 0 0 0 11.3 5.1 0.0 2.4 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.3 49.2 16 Mo. FY 2003: 1 2 3 4 5 4 8 4 5 4 8 3 4 FY 06 3 0 FY 03 2 4 0.0 FY 06 Qty $ FY 2003: FY 02 1 0 0.0 0.0 8 Mo. FY2000: Oct-03 4 0 FY 05 Qty $ 4.8 0.6 FY2002: 3 FY 04 Qty $ 0.0 Jun-02 2 2 0.0 FY2001: 4 1 FY 03 Qty $ FY2000: Jun-02 OUTPUT INSTALLATION SCHEDULE: 0 0.0 FY 01 INSTALLATION SCHEDULE: 6.0 FY 02 Qty $ 1 FY 04 2 3 4 4 FY 07 1 2 TC TOTAL INPUT 41 75 OUTPUT 41 75 Notes/Comments: Initial 7 installations in FY00 are to labs and test platforms supporting acceptance testing. These installations will be completed quickly using all available installation activities to support product acceptance and familiarizing installers with equipment and process. Later installs are started as soon as possible following equipment availability. Completion quarter is dependent on ship availability and battlegroup schedules P-1 Shopping List-Item No - 68 - 4 of 68 -7 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: TADIXS B 2900 DH520 Joint Tactical Terminals (JTT) Army is the lead service for JTT procurement per OSD direction in PBD77720 dtd 22 Jan 1996. This display includes installation of Shore (Non-FMP) equipment. Ancillary equipment being procured in same year as installation. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 7 1.8 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 0.0 PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 1.8 METHOD OF IMPLEMENTATION: FY 99 Qty $ FY 00 Qty $ FY 01 Qty $ Total Qty $ 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 7 1.8 0 0.0 7 7 0.7 0.7 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 7 7 0 0 0 0 0 0 0 0 0 0 0.7 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 2.5 0.7 0.7 0.0 0.0 0.0 0.0 ADMINISTRATIVE LEADTIME: 0.0 0.0 8 Mo. FY2002: FY2001: FY2002: 3 $ 0 FY2001: OUTPUT TC Qty 0.0 FY2000: 3 FY 07 Qty $ 0 0.0 0.0 2 FY 06 Qty $ 0.0 FY2000: 1 FY 05 Qty $ 0 DELIVERY DATES: PY FY 04 Qty $ 0.0 CONTRACT DATES: INPUT 3 4 1 2 0.0 0.0 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME:14 Mo. 0.0 0.0 0.0 0.0 FY 2003: FY 2003: FY 02 FY 03 3 4 1 2 3 4 1 2 3 4 3 4 1 FY 04 2 3 4 4 4 FY 03 INSTALLATION SCHEDULE: FY 03 Qty $ 0 FY 01 INSTALLATION SCHEDULE: FY 02 Qty $ 1 2 FY 04 3 4 1 2 FY 05 TC TOTAL INPUT 7 OUTPUT 7 Notes/Comments: Initial 7 installations in FY00 are to labs and test platforms supporting acceptance testing. These installations will be completed quickly using all available installation activities to support product acceptance and familiarizing installers with equipment and process. Later installs are started as soon as possible following equipment availability. Completion quarter is dependent on ship availability and battlegroup schedules P-1 Shopping List-Item No - 68 - 5 of 68 -7 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE TADIX- B ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 3 27 11 16 25 2 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY DH520 JTT Systems 97 98 00 01 SUBHEAD NO. 52DH 2900 30 11 16 25 01 FISCAL YEAR CALENDAR YEAR 01 02 FISCAL YEAR CALENDAR YEAR 02 03 CALENDAR YEAR 03 A A OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR PRODUCTION RATE Name and Location TADIX Raytheon MSR 60/yr JUN PROCUREMENT LEADTIMES Manufacturer’s ITEM MAY 1-8-5 MAX 180/yr 360/yr P-1 Shopping List-Item No - 68 - 6 of 68 -7 ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT 960 420 30 30 Unit of Total 1440 Measure Days Exhibit P-21A Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE TADIX- B ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 03 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 3 27 11 16 25 5 5 5 1 5 5 5 5 5 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY DH520 JTT Systems 97 98 00 01 30 11 16 25 OCT NOV DEC 04 FISCAL YEAR CALENDAR YEAR 04 05 PRODUCTION RATE Name and Location MSR FISCAL YEAR CALENDAR YEAR 1-8-5 P-1 Shopping List-Item No - 68 - 7 of 68 -7 05 06 CALENDAR YEAR 06 PROCUREMENT LEADTIMES Manufacturer’s ITEM SUBHEAD NO. 52DH 2900 MAX ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure Exhibit P-21A Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 P-1 ITEM NOMENCLATURE BLI 2901 NAVAL SPACE SURVEILLANCE SYSTEM (NSSS) FY 2000 FY 2001 FY 2002 $7.6 $2.7 $4.9 FY 2003 FY 2004 FY 2005 FY 2006 SUBHEAD 52WV FY 2007 TO COMP TOTAL QUANTITY COST (in millions) Continuing Continuing The Naval Space Command has operated the Naval Space Surveillance System (NSSS), also known as "the Fence", since 1961. Headquartered at Dahlgren, Virginia, NSSS and associated mission processing systems are a critical part of the overall national space surveillance network. The only dedicated, uncued sensor in the world, NSSS provides satellite position information to the United States Naval Fleet as well as satellite manueuver detection and collision avoidance data to the National Aeronautics and Space Administration (NASA), the Russian Space Station Mir, and the International Space Station for launch protection and orbit analysis. NSSS also serves as the Alternate Space Control Center (ASCC) to Space Control Center in Cheyenne Mountain, Colorado. Aging Components impact the ability to "maintain a constant surveillance (catalog)." Procurement of computer system hardware and software is necessary to adequately manage catalog growth and increased workload caused by lack of ephemerides. Ephemerides are computerized listings of tracks and predictions of locations of both space debris (older orbital objects and other national launches which failed to properly return from orbit) and current active in-use satellites. The ongoing Service Life Extension Program (SLEP) of the NSSS is necessary to ensure continued operation of the nation’s only unalerted space sensor. The surveillance mission is accomplished by sub-systems performing four operational functions as follows: 1. Sensor: Data acquisition of satellites "radar" signals is performed by a network of three transmitting and six receiving stations located along a great circle arc across the southern United States. 2. C2 Connectivity: Each receiver station is connected to Dahlgren by a dedicated network of phone lines for data transfer. The network also links all field stations and Dahlgren for network operational and administrative coordination. 3. Command Center: Satellite detection and correlation with predictions is performed at the Dahlgren Center. 4. Processing: Storage, retrieval, and updating of orbital elements of past, present, and future paths of all known orbital objects are performed at Dahlgren. Notes: 1. Cost code structure beginning in Fiscal Year (FY) 2001 more accurately reflects the procurement of a single end item. Cost codes WV001-004 for FY 2000 have been combined into one cost code, WV006 starting FY 2001. 2. FY2000 includes a congressional add of $1.2million WV005 for the procurement of Super Span Ultimate Building machines, which enable Naval Facilities to construct rapid shelters for equipment. 3. The Fence program maximizes the use of Commercial of the Shelf (COTS) software and hardware. P-1 Shopping List - Item No. 69-1 of 69-3 Exhibit P-40, Budget Item Justification UNCLASSIFIED CLASSIFICATION UNCLASSIFIED CLASSIFICATION DATE EXHIBIT P-5 COST ANALYSIS June 2001 APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST ID CODE P-1 ITEM NOMENCLATURE SUBHEAD 52WV BLI: 2901 Naval Space Surveillance System (NSSS) TOTAL COST QTY UNIT COST TOTAL COST QTY FY 2000 UNIT COST TOTAL COST QTY TOTAL COST IN THOUSANDS OF DOLLARS FY 2001 FY 2002 FY 2003 UNIT TOTAL UNIT TOTAL UNIT COST COST QTY COST COST QTY COST TOTAL COST Naval Space Surveillance Fence: WV001 C2 Connectivity - Hardware & Software A VAR N/A WV002 Command Center - Hardware & Software A VAR N/A 367 WV003 Processing - Hardware & Software A VAR N/A 2,729 WV004 Sensor - Hardware & Software A VAR N/A 1,364 WV005 Super Span Ultimate Bldg Machine A VAR N/A 1,200 LIFE EXTENSION A WV006 WV555 1,940 2,447 4,397 C2 Connectivity - Hardware & Software VAR N/A 50 VAR N/A 187 Command Center - Hardware & Software VAR N/A 0 VAR N/A 1,400 Processing - Hardware & Software VAR N/A 2,397 VAR N/A 1,700 VAR N/A 0 VAR N/A 1,110 VAR N/A 263 VAR N/A Sensor Production Support SPAWAR TOTAL CONTROL 7,600 2,710 501 4,898 Remarks: 1. Cost code structure beginning in FY 01 more accurately reflects the procurement of a single end item. Cost codes WV001-004 for Fiscal Year 2000 have been combined into one cost code, WV006 starting FY 01. DD FORM 2446, JUN 86 P-1 Shopping List - Item No 69-2 of 69-3 Exhibit P-5, Cost Analysis UNCLASSIFIED CLASSIFICATION UNCLASSIFIED CLASSIFICATION A. DATE EXHIBIT P-5a, PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO SUBHEAD BLI: 2901 Naval Space Surveillance System (NSSS) RFP DATE ISSUE AWARD OF FIRST QTY UNIT DATE DATE Delivery COST 52WV SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE Naval Space Surveillance Fence: WV006 Life Extension 01 Various WX/FFP/CT SPAWAR Feb-01 Mar-01 Jun-01 Var Var Yes TBD WV006 Life Extension 02 Various WX/MIPR/RCP/TBD SPAWAR Jan-02 Mar-02 Jun-02 Var Var No TBD D. REMARKS 1. Cost code structure beginning in FY 01 more accurately reflects the procurement of a single end item. Cost codes WV001-004 for Fiscal Year 2000 have been combined into one cost code, WV006 starting FY 01. P-1 Shopping List - Item No 69-3 of 69-3 Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY FY 2000 FY 2001 P-1 ITEM NOMENCLATURE GCCS-M Tactical Mobile (#2906) FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 June 2001 SUBHEAD 52T4 FY 2007 TO COMP TOTAL QUANTITY COST (in millions) $13.7 NOTE: GCCS-M Tactical Mobile transfers to the GCCS-M line item (BLI 2608) beginning in FY01. Detail budget justification material for FY00 is included in the GCCS-M P-1 for budget comparability purposes. Narrative Description/Justification: The Global Command and Control System - Maritime (GCCS-M) Tactical/Mobile program provides evolutionary systems and ancillary equipment upgrades to support the Unified Commanders, Fleet Commanders, Navy Component Commanders, the Maritime Sector Commanders (Ashore), the Theater Commanders (Ashore) and the Naval Liaison Element Commanders (Ashore) with the capability to plan, direct and control the tactical operations of Joint and Naval Expeditionary Forces and other assigned units within their respective area of responsibility. These operations include littoral, open ocean, and over land all sensor (i.e. EO, IR, ISAR, etc.) surveillance, anti-surface warfare, over-the-horizon targeting, counter-drug operations, power projection, antisubmarine warfare, mining, search and rescue, and special operations. Between FY97 and FY99, this program was known as the Joint Maritime Command Information System (JMCIS) Tactical/Mobile (JTM) program. Prior to FY97, this program was part of the Navy Command and Control System (NCCS) Ashore program. GCCS-M Tactical/Mobile Systems include fixed site Tactical Support Centers (TSCs) and mobile components which are the Mobile Operations Control Centers (MOCCs), Mobile Ashore Support Terminals (MASTs) and Mobile Integrated Command Facilities (MICFACs). The Command and Control services provided include analysis and correlation of diverse sensor information; data management support, command decision aids; access to rapid data communication, mission planning and evaluation; dissemination of ocean surveillance positional data and threat alerts to operational users ashore and afloat. All Tactical/Mobile variants include C4I systems based on the GCCS-Maritime architecture which is Defense Information Infrastructure (DII) Common Operating Environment (COE) compliant. TSC’s provide C4I capability, air-ground, satellite and point-to-point communications systems; sensor analysis capabilities; avionics and weapons system interfaces and facilities equipment. MOCC is a scalable and mobile version of the TSC for contingency operations. For example, a MOCC has been deployed to Bosnia for support of P-3 operations and to provide an on-site C4I capability. MAST and MICFAC are mobile facilities designed to support a theater commander or naval liaison element ashore. MAST provides a basic deployable C4I capability for rapid deployment to remote locations. Support of the Liberian contingency operations is an example. The MICFAC is a robust deployable C4I system that can support a numbered fleet commander’s staff ashore. MICFAC Bahrain has acted as the COMUSNAVCENT C4I command center when the hard site was undergoing upgrades. This program assures that through the implementation of evolutionary acquisition, the existing TSC’s, MOCC’s, MAST’s and MICFAC’s are modernized to fulfill their operational requirements. Beginning in FY01, the MAST and MICFAC systems will begin to transition into the Joint Mobile Ashore Support terminal (JMAST) system which is a consolidation and upgrade of the MAST and MICFAC. This budget also includes funds for the MIUW Van Upgrades. P-1 Shopping List No. 70-1 of 70-2 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE GCCS-M Tactical Mobile (#2906) June 2001 SUBHEAD 52T4 Narrative Description/Justification: (continued) T4371. Upgrade Equipment. This line procures various types of C4I Equipment in order to provide a new or an increased capability to the present TSC and MOCC systems and to replace the equipment when it has reached the end of service life, assuring the existing system remains interoperable with updated aircraft, sensors, and weapons systems. T4500. Mobile Ashore Support Terminal/Mobile Integrated Command Facility (MAST/MICFAC). This line procures various types of C4I equipment in order to provide a new or increased capability to the present MAST and MICFAC systems, and to replace the equipment when it has reached the end of service life, assuring interoperability with other C4I systems. These facilities were established and will be upgraded using the evolutionary acquisition approach. T4600. MIUW Van Upgrades. This budget includes funding for the MIUW Van Upgrades. T4776. Installation of Equipment. Provides for installation of T4371 and T4500 equipment at the shore sites listed below. The FY00 Budget Request Procures: 1. TSC Upgrade Equipment; 2. MAST/MICFAC Equipment; and 3. Installation of Equipment. INSTALLATION DATA: 15 TSC systems (14 in FY 00) at 13 operational sites (12 in FY00) (located at Keflavik, Iceland; Brunswick, ME; Jacksonville, FL; Sigonella, Italy; Rota, Spain; Kaneohe Bay, HI; Whidbey Island, WA; Kadena, Japan; Misawa, Japan; North Island, CA; Diego Garcia, Indian Ocean; Roosevelt Roads, Puerto Rico, and Masirah, Oman); 1 training site at Fleet Combat Training Center (FCTC) Dam Neck, VA and 1 ISEA site at SSC CHARLESTON DET Patuxent River. 8 MOCCs (Homeported at Brunswick, ME; Jacksonville, FL; Sigonella, Italy; Barbers Point/Kaneohe Bay, HI; Misawa, Japan; Whidbey Island, WA; Willow Grove, PA; and Point Mugu, CA. C2 Engineering Development, Software Support Facility (SSC CHARLESTON). 5 MICFACs (homeported at Bahrain; Sigonella, Sicily; Pearl Harbor, HI; St. Juliens Creek, VA; and Corpus Christi, TX) 4 MASTS (homeported at Bahrain; Rota, Spain; Pearl Harbor, HI; and St. Juliens Creek, VA) P-1 Shopping List No. 70-2 of 70-2 Exhibit P-40, Budget Item Justification Unclassified Classification CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA 2/Communications and Electronics Equipment Common Imagery Ground Surface Systems (CIGSS) (J25E) Program Element for Code B Items: Other Related Program Elements (PEO (W))(BLI: 291400) Not Applicable Prior Years QUANTITY COST (In Millions) 65.2 0204229N ID Code FY 2000 FY 2001 FY 2002 40.3 46.2 58.4 *Note: All previous procurement budgets for this item were submitted in the procurement, Defense-Wide appropriation as Distributed Commmon Ground Systems (DCGS), P.E. 0305208D8Z. Runding for this family of programs was transferred to the Defense Components beginning with FY 1999. The Joint Services Imagery Processing System – Navy (JSIPS-N) is the Navy’s portion of an OSD/Defense Airborne Reconnaissance Office (DARO) effort entitled Distributed Common Ground System (DCGS). DCGS is a cooperative effort between the services, agencies, and DoD to provide systems capable of receiving, processing, exploiting, and disseminating data from airborne and national reconnaissance platforms. DCGS is further subdivided into systems which process, exploit, and disseminate Measurements Analysis and Signatures Intelligence (MASINT) data, Signals Intelligence (SIGINT) data, Multi-IntelligenceReconnaissance data, and Imagery data. Cooperative imagery processing systems are collectively identified under the general heading of Common Imagery Ground/Surface Systems (CIGSS). JSIPS-N is the Navy CIGSS component. JSIPS-N has the capability to receive, process, exploit, store, and disseminate imagery, imagery-derived products, and Imagery Intelligence (IMINT) reports based on multiple inputs from multiple sources. The primary mission of JSIPS-N is to assist strike planners, tactical aviators, and Marine Corps amphibious planners in the delivery of precision ordnance (including Tomahawk Cruise Missiles) on target. JSIPS-N includes three major components: Softcopy Exploitation Segment (SES) - consisting of the Digital Imagery Workstation Suite Afloat (DIWSA), Strike Planning Archive (SPA) and the Precision Targeting Workstation (PTW). National Input Segment (NIS) - equipment which processes imagery from national sensors Tactical Input Segment (TIS) - equipment which processes imagery from tactical sensors. JSIPS-N is onboard aircraft carriers (CV/CVN), amphibious assault ships (LHA/LHD), select fleet flag ships (AGF/LCC) and shore sites. Secondary missions of the system are to provide near-real-time imagery and support to fleet intelligence assets, Special Operations Forces, and to support primary exploitation and dissemination of tactical organic and theater IMINT products. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 71 CLASSIFICATION: PAGE NO. 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 DATE: Weapon System June 2001 APPROPRIATION/BUDGET ACTIVITY ID CODE Other Procurement, Navy P-1 ITEM NOMENCLATURE Common Imagery Ground Surface Systems (CIGSS) (J25E) (PEO (W))(BLI: 291400) BA 2/Common Imagery Ground/Surface System TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2001 FY 2000 Quantity Unit Cost FY 2002 FY 2003 Total Cost 01000 Tactical Input Segment (TIS) 16,000 01500 TIS Retrofit 4,000 02000 SPA/PTW 2,729 03000 Procurement Support 12,800 9,363 9,232 9,722 04000 Product Improvements 11,000 14,946 11,448 10,341 05000 Battle Group H/W and S/W Integration 13,042 6,366 6,089 6,216 06000 Equipment Support 5,657 6,903 5,598 5,815 65,228 40,266 46,207 58,446 TOTAL DD FORM 2446, JUN 86 P-1 SHOPPING LIST 8 336 2,688 PAGE NO. 2 2 4,000 8,000 5 4,080 20,400 16 365 5,840 16 372 5,952 CLASSIFICATION: ITEM NO. 71 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) June 2001 A. DATE: B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA 2/Communications and Electronics Equipment Common Imagery Ground Surface Systems (CIGSS) (J25E) (PEO (W))(BLI: 291400) Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE JSIPS-N Components 01000 Tactical Input Segment (TIS) FY 2001 2 $ 4,000 ESC Hanscom AFB, MA N/A SS/FFP Lockheed Martin Gaithersburg, MD May 01 Nov 01 Yes N/A FY 2002 5 $ 4,080 ESC Hanscom AFB, MA N/A SS/FFP Lockheed Martin Gaithersburg, MD May 02 Nov 02 Yes N/A FY 2000 8 $ 336 SPAWAR, San Diego, CA N/A SS/FFP Various Feb 00 May 00 Yes N/A FY 2001 16 $ 365 SPAWAR, San Diego, CA N/A SS/FFP Various Feb 01 May 01 Yes N/A FY 2002 16 $ 372 SPAWAR, San Diego, CA N/A SS/FFP Various Feb 02 May 02 Yes N/A 02000 SPA/PTW D. REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 71 PAGE NO. 3 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA 2 Production Rate Manufacturer’s Name and Location Item Tactical Input Segment (TIS) Strike Planning Archive (SPA) / June 2001 DATE Weapon System P-1 ITEM NOMENCLATURE JSIPS-N Joint Services Imagery Processing System - Navy Procurement Leadtimes Prior ALT After Initial Reorder Unit of to Oct 1 Oct 1 Mfg PLT Total Mfg PLT Measure MSR 1-8-5 MAX Gaithersburg, MD N/A N/A N/A 0 7 6 6 13 LOC Various N/A N/A N/A 0 4 3 3 7 LOC Lockheed Martin Precision Targetting Workstation (PTW) FISCAL YEAR 2001 F Y S V C Q D B T Y E L A L TIS Lockheed, Gaithersburg, MD 01 N 2 0 2 TIS Lockheed, Gaithersburg, MD 02 N 5 0 5 SPA/PTW Various 00 N 8 8 0 SPA/PTW Various 01 N 16 0 16 SPA/PTW Various 02 N 16 0 16 F Y S V C Q D B T Y E L A L 02 N 5 0 5 ITEM / MANUFACTURER 2000 O C T N O V FISCAL YEAR 2002 CALENDAR YEAR 2001 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2002 S E P O C T A N O V D E C 1 1 J A N TIS Lockheed, Gaithersburg, MD M A R A P R M A Y J U N J U L A U G S E P A A 0 A O C T 5 16 2002 D E C J A N F E B M A R 1 1 1 1 1 A P R M A Y 16 0 FISCAL YEAR 2004 CALENDAR YEAR 2003 N O V J U N J U L A U G CALENDAR YEAR 2004 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 311 / 244 Previous editions are obsolete B A L 0 LOC: Lines of Code. TIS and SPA/PTW are classified as software products. DD Form 2445, JUL 87 B A L 0 FISCAL YEAR 2003 ITEM / MANUFACTURER F E B UNCLASSIFIED P-1 SHOPPING LIST ITEM NO. 71 PAGE 4 Exhibit P-21 Production Schedule UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronics RADIAC BLI: 292000 SBHD: 82M2 Program Element for Code B Items: Other Related Program Elements Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) ID Code FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total $4.2 $8.2 $7.9 $8.2 $8.7 $8.7 $8.9 $9.1 N/A $64.0 The RADIAC Program is responsible for ensuring the availabilityof radiation monitoring instruments to support uses ranging from operation and maintenance of nuclear propulsion plants in ships and submarines to industrial radiography as well as medical applications and the radiological leg of chemical, biological and radiological defense. The program provides centrally managed acquisition of equipment to detect and measure radiation and convert these measurements into meaningful terms so that Navy personnel can adequatelycontrol radiation exposure. The instruments are used to ensure the safety of personnel and the environment. The Multifunction Radiac (MFR) and Dosimetry System replace older systems with equipment with increased capability that can be operated and maintained at a lower life cycle cost. DD Form 2454, JUN 86 P-1 SHOPPING LIST ITEM NO. 72 CLASSIFICATION: PAGE NO. 1 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy BA-2 Communications and Electronics Equipment RADIAC BLI: 292000 SBHD: 82M2 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE M2100 M2200 ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity FY 2001 Unit Cost Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost MULTIFUNCTION RADIACS MFR CONTROL UNIT A 929 1.183 1,099 593 1.284 762 434 1.318 GAMMA/BETA PROBE A 1,014 0.606 615 253 0.692 175 192 0.702 572 135 IM-260 EXTENDER A 133 1.200 160 DIR. GAMMA INTERFACE A 230 1.032 237 230 1.049 241 ALPHA PROBE A 217 4.100 890 219 4.166 912 MFR CHECKSOURCE KITS A 124 1.049 130 124 1.066 132 FRISKER STATION A 269 2.008 540 DOSIMETRY SYSTEM CP-1112 UPGRADES DOSIMETERS 10,525 0.026 277 38 27.738 1,054 SHOREBASED READER 6 94.389 566 DOSIMETER IRRADIATOR 28 7.866 220 50 4.000 200 SHIPBOARD READER 48,281 0.026 1,250 20 27.301 546 DOSIMETRY AREA MONITOR DOSIMETER CTR EQUIPMENT M2400 333 115 129 OTHER RADIAC ACCEPTANCE TESTING A 676 1,085 1,115 ITEMS UNDER 200K A 64 549 218 754 1,222 106 627 1,271 1,299 4,168 8,232 7,876 FIELD CHANGES APD ENHANCEMENTS M2830 PRODUCTION SUPPORT DD FORM 2446, JUN 86 A P-1 SHOPPING LIST ITEM NO. 72 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 Communications and Electronics Equipment RADIAC BLI: 292000 Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION SUBHEAD 82M2 AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW FY 2000 MFR CONTROL UNIT GAMMA/BETA PROBE 929 1014 1.183 SPAWARSYSCEN 0.606 SPAWARSYSCEN OPT OPT SAIC/SAN DIEGO SAIC/SAN DIEGO 1/00 1/00 10/01 4/01 YES YES 593 1.284 SPAWARSYSCEN OPT SAIC/SAN DIEGO 1/01 10/01 YES OPT C/FP C/FP C/FP C/FP C/FP SAIC/SAN DIEGO TBD TBD TBD BICRON/ST. GOBAIN, OH TBD 1/01 6/01 6/01 6/01 4/01 9/01 10/01 10/01 01/02 10/01 07/01 1/02 YES YES YES YES YES YES FY2001 MFR CONTROL UNIT GAMMA/BETA PROBE DIR GAMMA INTERFACE ALPHA PROBE MFR CHECKSOURCE KITS DOSIMETERS SHIPBOARD READER D. 253 230 217 124 48281 20 0.692 1.032 4.100 1.049 0.026 27.301 SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN 11/00 06/00 05/00 03/01 06/01 REMARKS DD Form 2446-1, JUL 87 ITEM NO. P-1 SHOPPING LIST 72 PAGE NO. 3 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2 Communications and Electronics Equipment RADIAC BLI: 292000 Cost Element/ FISCAL YEAR QUANTITY UNIT COST (000) LOCATION OF PCO SUBHEAD RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION 82M2 AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW SAIC/SAN DIEGO SAIC/SAN DIEGO TBD TBD TBD TBD 1/02 1/02 1/02 1/02 1/02 1/02 10/02 10/02 10/02 10/02 10/02 10/02 YES YES YES YES YES YES TBD TBD TBD TBD TBD TBD 1/02 1/02 1/02 1/02 1/02 1/02 10/02 10/02 10/02 10/02 10/02 10/02 YES YES YES YES YES YES FY 2002 MFR CONTROL UNIT GAMMA/BETA PROBE IM-260 EXTENDER DIR GAMMA INTERFACE ALPHA PROBE MFR CHECKSOURCE KITS FRISKER STATION DOSIMETERS SHIPBOARD READER SHOREBASED READER DOSIMETER IRRADIATOR DOSIMETER AREA MONITOR D. 434 192 133 230 219 124 1.318 0.702 1.200 1.049 4.166 1.066 SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN 9/01 11/00 6/00 5/01 OPT OPT C/FP C/FP OPT OPT 269 10525 38 6 28 50 2.008 0.026 27.738 94.389 7.866 4.000 SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN SPAWARSYSCEN 7/01 6/01 6/01 6/01 6/01 10/01 C/FP C/FP C/FP C/FP C/FP C/FP REMARKS DD Form 2446-1, JUL 87 ITEM NO. P-1 SHOPPING LIST 72 PAGE NO. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY, BA2 General Purpose Electronic Test Equipment GPETE)/2940 Other Related Program Elements Program Element for Code B Items: ID Code QUANTITY COST (In Millions) SPARES COST (In Millions) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 $7.6 $7.3 $4.7 $7.2 $7.8 $8.1 $8.3 $8.4 To Complete Total $59.4 $0.0 This program provides for the initial procurement and distribution of General Purpose Electronic Test Equipment (GPETE). This equipment is essential to the operationalreadiness of the Navy for repair, installation, and maintenance(preventiveand routine) of electronic systems and equipments, both afloat and ashore. The GPETE procured must meet rigid technical requirements, be cost effective and satisfy valid deficiencies in authorized allowance. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 73 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy, BA2 P-1 ITEM NOMENCLATURE/SUBHEAD General Purpose Electronic Test Equipment (GPETE)/2940 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code FY 2000 Total Cost Quantity Unit Cost FY 2001 Total Cost Quantity 124 63 Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost N091 TEST AND EVAL M6000 FIBER OPTICS AND DATA COMM A M6001 SIGNAL GENERATORS & ANALYZERS A M6002 OSCILLSCPS, METERS & COUNTERS A M6003 PROC ENGR AND DOCUMENTATION A 57 2,177 2,016 23 127 63 2,406 152 204 2,184 446 23 N096 OCEANOGRAPHY M6000 FIBER OPTICS AND DATA COMM A M6001 SIGNAL GENERATORS & ANALYZERS A M6002 OSCILLSCPS, METERS & COUNTERS A M6003 PROC ENGR AND DOCUMENTATION A M6000 FIBER OPTICS AND DATA COMM A 30 2,400 72 M6001 SIGNAL GENERATORS & ANALYZERS A 449 2,184 981 M6002 OSCILLSCPS, METERS & COUNTERS A M6003 PROC ENGR AND DOCUMENTATION A M6000 FIBER OPTICS AND DATA COMM A 140 5,507 771 M6001 SIGNAL GENERATORS & ANALYZERS A 816 2,135 1,742 M6002 OSCILLSCPS, METERS & COUNTERS A M6003 PROC ENGR AND DOCUMENTATION A 183 2,195 402 160 1,958 313 17 5,809 99 36 66 49 N6 SEW & C4 548 1,644 188 901 68 5,657 385 371 809 300 179 139 N86- SURFACE WARFARE 1,186 1,648 1,955 61 6,003 366 411 408 4,750 DD FORM 2446, JUN 86 4,437 P-1 SHOPPING LIST ITEM NO. 73 PAGE NO. 15 5,944 89 241 1,801 CLASSIFICATION: 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy, BA2 P-1 ITEM NOMENCLATURE/SUBHEAD General Purpose Electronic Test Equipment (GPETE)/2940 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code FY 2000 Total Cost Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost 4,750 Cont’d from P-5 FY 2002 Total Cost Quantity Unit Cost 4,437 FY 2003 Total Cost Quantity Unit Cost Total Cost 1,801 N87 -SUBMARINE WARFARE M6000 FIBER OPTICS AND DATA COMM A 20 9,600 192 M6001 SIGNAL GENERATORS & ANALYZERS A 327 2,168 709 M6002 OSCILLSCPS, METERS & COUNTERS A M6003 PROC ENGR AND DOCUMENTATION A M6000 FIBER OPTICS AND DATA COMM 15 10,600 159 M6001 SIGNAL GENERATORS & ANALYZERS 656 2,021 1,326 M6002 OSCILLSCPS, METERS & COUNTERS M6003 PROC ENGR AND DOCUMENTATION 346 1,953 676 41 5,976 245 161 41 5,706 234 373 2,051 765 148 120 N88 AIR WARFARE DD FORM 2446, JUN 86 528 1,925 1,016 82 6,037 495 267 0 P-1 SHOPPING LIST ITEM NO. 73 272 7,564 PAGE NO. 7,289 987 1,656 1,634 173 4,727 CLASSIFICATION: 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD Other Procurement, Navy, BA2 General Purpose Electronic Test Equipment (GPETE)/2940 82M6 CONTRACT Cost Element/ QUANTITY FISCAL YEAR DATE OF SPECS DATE UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE (000) FY-00 M6000 M6001 M6002 205 SEE NOTE 1 NSWC-PHD N/A RCP NSWC-PHD 11/99 2/00 YES 2,488 SEE NOTE 2 NSWC-PHD N/A RCP NSWC-PHD 11/99 2/00 YES - - - - - - M6000 M6001 M6002 - - - - - - 2,831 SEE NOTE 3 NSWC-PHD N/A RCP NSWC-PHD 11/99 2/01 YES 201 SEE NOTE 4 NSWC-PHD N/A RCP NSWC-PHD 11/99 2/01 YES M6000 M6001 M6002 109 SEE NOTE 5 NSWC-PHD N/A RCP NSWC-PHD 11/99 2/02 YES 1,998 SEE NOTE 6 NSWC-PHD N/A RCP NSWC-PHD 11/99 2/02 YES 15 SEE NOTE 7 NSWC-PHD N/A RCP NSWC-PHD 11/99 2/02 YES N/A - - - - FY-01 N/A FY-02 D. REMARKS NOTE 1: NOTE 2: NOTE 3: NOTE 4: NOTE 5: NOTE 6: NOTE 7: Unit costs are 2400/5507/9600/10,600 respectively for Resource Sponsors N6, N86, N87, and N88. Unit costs are 2177/2195/2184/2135/2168/2021 respectively for Resource Sponsors N091, N096, N6, N86, N87, and N88. Unit costs are 2016/1958/1644/1648/1953/1925 respectively for Resource Sponsors N091, N096, N6, N86, N87 and N88. Unit costs are 5809/6003/5976/6037 respectively for Resource Sponsors N096, N86, N87, and N88. Unit costs are 5657/5706 respectively for Resource Sponsors N6 and N87. Unit costs are 2406/2184/809/2051/1656 respectively for Resource Sponsors N091, N096, N6, N87, and N88. Unit costs are 5944 for Resource Sponsors N86. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification: ITEM NO. 73 PAGE NO. 4 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA-2: Communication and Electronic Equipment Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) Integrated Combat Systems Test Facility (ICSTF)/296000 Other Related Program Elements ID Code To Complete Total $4.5 Cont. $13.2 $0.5 Cont. $1.4 FY 2000 FY 2001 FY 2002 $3.7 $4.3 $4.4 $0.5 $0.5 $0.4 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 PROGRAM DESCRIPTION/JUSTIFICATION Naval Surface Warfare center, Port Hueneme Division Detachment, San Diego (NSWC PHD DET SD), formally known as ICSTF, is a Navy owned and operatedcombat system integration test site and is located in San Diego, California at the SPAWAR Systems Center. NSWC PHD DET SD performs an essential role in the readiness of surface ship combat systems. NSWC PHD DET SD’s mission is to perform certification testing of computer programs prior to delivery to the fleet and is a member of the Navy’s Distributed Engineering Plant (DEP) Alliance which is responsible for the certification of Battle Groups prior to deployment. The threat driven requirement of the inter/intra system data exchange continues to grow exponentiallysince the introduction of integrated combat systems in the late 1970’s. NSWC PHD DET SD has been used efficiently to detect combat system computer program problems and enable their correction prior to delivery to the fleet. This has significantly reduced the cost of corrective action and increase ship operation days. The cost of detecting these problems during deployment would have to be measured in harsher terms. NSWC PHD DET SD is the only permanentNavy facility responsible for testing CV/CVN, LHD, LHA, LSD, LPD-17, DD-963 and FFG ship class combat system computer networks and providing combat system in-service engineering support for Fleet identified problems. In addition, with the issuance of CNO message DTG021648Z May 98 on Battle Group Interoperability(BGI), NSWC PHD DET SD was tasked to expand its laboratory capabilities to support Battle Group Interoperability testing (BGIT). Acquisition equipment is focused on the following ar As existing combat subsystems are upgraded and/or new subsystems are introduced into the fleet, NSWC PHD DET SD must develop the test beds to support CSIT of the lead ship of the class. As new ships (LPD-17 and CVN-76) with new combat subsystems are introduced into the fleet, NSWC PHD DET SD must develop the test beds to support CSIT of the lead ship of the class. As the scope of Battle Group Interoperabilitytesting is expanded, NSWC PHD DET SD must expand its laboratorycapability. The upgrade of the ICSTF AEGIS 5.3.7 test bed to the AEGIS 6.1/3 to provide the TADIL drivers to perform CV/CVN and amphibious ship class interoperability testing is also required. The laboratorysupport equipment, specifically the High Speed Digital Switch (HSDS), represents 20+ year old technology and can not support the new tactical subsystems that use COTS equipment. An aggressive acquisition plan needs to be implementedto replace the HSDS with the Distributed Transfer Switching System (DTSS) in order for NSWC PHD DET SD to continue to support the surface Navy. The basic procurement program oultined herein is directed at expanding NSWC PHD DET SD’s capability to support the above. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 74 CLASSIFICATION: PAGE NO. 1 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 CONTINUATION DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronic Equipment Integrated Combat Systems Test Facility (ICSTF) - 296000 In addition, the basic program provides for equipment/upgradesfor the Navy’s Distributed Engineering Plant (DEP). The DEP consists of 13 land based sites networkedto certify computer programs prior to their delivery to the fleet. All procurements will be received and installed by NSWC PHD DET SD. Installations are based on CSIT and BG Interoperability schedules. The shipboard Electronics Systems Evaluation Facilities (SESEF) are Navy-owned and operated test ranges capable of action as the partner in two party operational performance testing of systems currently in the Fleet (i.e., AIMS MK XII IFF (all modes)), TACAN, conventionalradars (both search and fire control), communication systems secure voice and LINK 11/4A). The SESEF provides ship Captains and Type Commanders the capability of measuring and testing a ship’s condition of material readiness at the completion of construction, industrial availabilty,during routine ship operations and prior to deployment. Consistent with the CNO’s approval for modernizationof SESEFs, OPN funds have been provided to procure equipment to upgrade the capabilities for Ft. Story, VA., San Diego, CA., Puget Sound, WA., Pearl Harbor, HI., Yokosuka, Japan, and Mayport, FL. This equipment will provide two party capabilities to test the new and more complex ship board electronic systems (i.e., SLQ-32, AN/SPY-1, etc.) and perform antenna radiation pattern measurements. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 74 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System ID Code APPROPRIATION/BUDGET ACTIVITY DATE: JUNE 2001 P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy BA-2: COMMUNICATION AND ELECTRONIC EQUIPMENT Integrated Combat Systems Test Facility (ICSTF)/296000 Subhead: 82M8 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE M8100 ELEMENT OF COST CS ELEC EQUIP ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost A Cooperative Engagement Cap (CEC) FY 2001 Total Cost Unit Cost Total Cost 2,324 2,412 75 75 NATO REACH 1 275 275 Common Data Link Management System 1 630 630 AN/UPX-29 1 400 400 Peripheral Emulator System 1 300 300 MK-162 1 130 130 Test Bed Upgrades Quantity FY 2002 1 600 514 SSDS MK-2, MOD. 1/2 Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost 2,600 1 600 600 1 1,100 1,100 600 25 1 1,712 1,712 AIEWS FTEWA Q-70 MOD SWAN Q-70 Consoles M8200 SS ELEC EQUIP 3 A 650 Data Reduction 300 938 900 925 400 Electronic Switching System 1 250 250 Test Tools (4L42 SEATASK) 413 DTSS (32X32) Matrix 3 175 525 400 3 175 525 M8300 CS Simulation A 329 45 25 M8400 SESEF Elect. Equip A 734 702 667 145 M8900 SESEF Consulting Services A 146 145 M861N Equpment Installation A 95 139 4,278 4,381 DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. PAGE NO. 74 3 140 4,502 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-2: Communication and Electronic Equipment Integrated Combat Systems Test Facility (ICSTF)/296000 Cost Element/ FISCAL YEAR FY 2000 NATO REACH Common Data Link Mgmt System AMS/X-29 Peripheral Emulator Sys MK-162 Distributed Tactical Electronic Switching Sys FY 2001 Common Data Link Mgmt System SSDS/MK-2 Mod 1/2 System Distributed Tactical Electronic Switching Sys FY 2002 CEC NATO REACH Q-70 Control Console Distributed Tactical Electronic Switching Sys D. QUANTITY UNIT COST (000) LOCATION OF PCO CONTRACT METHOD & TYPE RFP ISSUE DATE SUBHEAD CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY 1 1 275 630 NAVSEA SPAWAR C/FP PD Raytheon, Wayland, Mass SPAWAR Mar 00 Mar 00 Sep 00 Sep 00 1 1 1 400 300 130 NAVSEA NAVSEA NAVSEA C/FP C/FP C/FP Litton Industries SAiC, CA ELMA, Oakland, CA Mar 00 Mar 00 Mar 00 Sep 00 Sep 00 Sep 00 1 250 NSWC /PHD RC SAiC, CA Jan 00 Jun 00 1 600 SPAWAR PD SPAWAR Mar 01 1 1712 NAVSEA C/FP Raytheon, Wayland, Mass Mar 01 Sep 01 3 175 NSWC PHD RC SAIC, CA Mar 01 Sep 01 1 1 3 600 1100 300 NAVSEA NAVSEA NAVSEA C/FP C/FP C/FP APL/JHU, MD Raytheon DRS, PA Mar 02 Mar 02 Mar 02 Sep 02 Sep 02 Sep 02 3 175 NSWC PHD RC SAIC, CA Mar 02 Sep 02 SPECS AVAILABLE NOW REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Item No. 74 Page No. 4 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: N/A N/A MODIFICATION TITLE: N/A FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: INSTALLATION OF TEST BED EQUIPMENT REQUIRED TO CONDUCT PLANNED COMBAT SYSTEM INTEGRATION TEST DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 2000 FY 1997 & Prior QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E 0 0.0 PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 0.0 VAR 4.1 VAR 4.2 VAR 4.3 12.6 EQUIPMENT NONRECURRING 0.0 ENGINEERING CHANGE ORDERS 0.0 DATA 0.0 TRAINING EQUIPMENT 0.0 SUPPORT EQUIPMENT 0.0 OTHER 0.1 0.1 0.1 0.3 OTHER 0.0 OTHER 0.0 INTERIM CONTRACTOR SUPPORT 0.0 INSTALL COST 0.1 0.1 TOTAL PROCUREMENT 4.3 4.4 0.1 4.5 ITEM NO. 74 0.3 0.0 PAGE 5 0.0 0.0 0.0 0.0 13.2 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued) MODELS OF SYSTEMS AFFECTED: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: MODIFICATION TITLE: N/A PRODUCTION LEADTIME: FY 2001: VARIOUS FY 2001: VARIOUS VARIOUS VARIOUS Prior Years FY 2000 Qty $ Qty $ PRIOR YEARS FY 2000 EQUIPMENT FY 2001 Qty $ VARIOUS FY 2002: FY 2002: ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ 0.0 0.0 0.0 0.0 0.095 0.0 0.0 0.0 FY 2001 EQUIPMENT Qty VARIOUS VARIOUS FY 2005 $ 0.0 FY 2006 Qty $ 0.0 FY 2007 Qty $ To Complete Total Qty $ Qty $ 0.0 0.0 0 0.0 0.0 0.0 0 0.1 0 0.1 0.139 FY 2002 EQUIPMENT 0 0.1 FY 2003 EQUIPMENT 0.140 0 0.0 FY 2004 EQUIPMENT 0 0.0 FY 2005 EQUIPMENT 0 0.0 FY 2006 EQUIPMENT 0 0.0 FY 2007 EQUIPMENT 0 0.0 TO COMPLETE INSTALLATION SCHEDULE: FY 1999 FY 2001 FY 2000 FY 2002 FY 2003 4 1 2 3 4 1 2 3 4 1 2 3 TC 1 2 3 3 4 1 2 3 4 1 2 3 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 3 FY 2006 & Prior PAGE 2 FY 2005 In ITEM NO. 74 1 FY 2004 4 P-3A CLASSIFICATION: UNCLASSIFIED TOTAL UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA-2 COMMUNICATIONS AND ELECTRONICS EQU Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) EMI CONTROL INSTRUMENTATION LI: 297000 82MA Other Related Program Elements ID Code FY 2000 FY 2001 FY 2002 $6.4 $8.3 $5.2 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total Funds will be used to procure emergency field change kits, hardware devices and sensor kits to solve Electromagnetic Interference (EMI) problems in electronic systems/equipments throughout the surface ship Navy. The fixes which include various types of filters, limiters, blankers and shielding will be installed by fleet support and maintenance personnel to eliminate EMI where it is causing unacceptabledegradationin the operationalperformance of mission-essentialsystems. EMI Control Instrumentationwill be procured for use in identifying the sources of EMI and determining the extent of EMI so that effective corrective measures can be applied. Better definition of the problems will also provide data which will be used by designers to reduce EMI problems in future systems and equipments. The instrumentation procured will include automated and special EMI test equipment (e.g. spectrum analysis, field intensity meters, AN/PSM-40 series test sets, etc.). Instrumentation, hardware and software will also be procured to upgrade the Frequency Assignment Computer Terminal Systems (FACTS) and to provide remote access capability to the Communications Area Master Station (CAMS) and other high-density users. ˝ DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 75 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA-2 Communications and Electronic Equipment P-1 ITEM NOMENCLATURE/SUBHEAD EMI CONTROL INSTRUMENTATION LI297000 82MA TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost ELECTRONICS SUPPORT (OP-N6) MA001 EMERG FIELD CHANGE KITS A 500 500 503 MA004 EMI FIXES & SENSOR KITS A 4,437 3,464 3,224 MA104 EMI CONTROL INSTRUMENTATION A 1,345 1,177 1,285 MA107 FACTS INSTRUMENTATION A 155 160 150 MAIUW MIUW SYSTEMS UPGRADES A 3,000 6,437 DD FORM 2446, JUN 86 8,301 P-1 SHOPPING LIST ITEM NO. 75 PAGE NO. 5,162 CLASSIFICATION: 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY Items under $5M (298000) Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) Other Related Program Elements ID Code FY 2000 FY 2001 FY 2002 $13.9 $11.8 $6.3 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total THIS IS A CONSOLIDATED OPN BUDGET FOR THE FOLLOWING ITEMS: ADVANCED SENSOR DISTRIBUTION SYSTEM (ASDS): ASDS IS A RADAR DISTRIBUTION SYSTEM WHICH CONVERTS NAVAL SURFACE AND AIR SEARCH RADAR INFORMATION INTO A STANDARD DIGITAL FORMAT, WHICH DISTRIBUTES THIS DATA TO RADAR NAVIGATION AND TACTICAL DISPLAYS THROUGHOUT THE PLATFORM. THE ASDS SB-4229A(V)/SP RADAR SIGNAL DISTRIBUTION SWITCHBOARD IS DESIGNED FOR FAST, EFFECTIVE SWITCHING OF ALL NAVAL RADAR VIDEO, IFF AND MIL-STD-751 DIGITAL DATA TO ALL COMBAT SYSTEM DISPLAY CONSOLES THROUGHOUT THE PLATFORM. THE ASDS RADCOR IS A RADAR RECORDER WHICH PERFORMS LIVE RADAR RECORDING OF THE RADDS DATA STREAM AND SELECTED VIDEO. THE ASDS CV-3989(V)/SP DUAL SIGNAL DATA CONVERTER ACCEPTS STANDARD RADAR POSITIONAL INTERFACES AND RECEIVES INPUTS FROM SHIPBOARD NAVIGATIONAL SENSORS. THE ASDS PORTABLE RADAR OPERATOR VIDEO TRAINER (PROVT) PROVIDES DUAL CHANNEL SIMULATED RADDS OUTPUT SIGNALS PRODUCED FROM SCENARIO GENERATED TARGET DATA. THE TACTICAL SYSTEM INTERFACE UNIT (TSIU) ALLOWS TWO-WAY COMMUNICATION BETWEEN MULTIPLE AN/SPA-25G DISPLAYS, WHICH ENABLES FILTERING AND PERFORMS TRACK FILE MANAGEMENT. THE ASDS CONTROLLER ALLOWS FOR AN/SPA-25G DISPLAYS TO SHARE COMMON TRACK NUMBERS. SHORE ELECTRONIC ITEMS (TECR): THE TACTICAL EMBEDDED COMPUTER RESOURCES (TECR) REUTILIZATION PROGRAM - REFURBISHES, RECONFIGURES AND TESTS TECR ASSETS MADE AVAILABLE THROUGH DECOMMISSIONINGS AND OTHER DOWNSIZING EFFORTS AND PROVIDES THESE ASSETS TO SATISFY CURRENT TACTICAL SYSTEMS REQUIREMENTS. TECR DEPOT AND DIMINISHING MANUFACTURING RESOURCES CAPABILITY - INCLUDES PROCUREMENT OF TEST EQUIPMENT AND POTENTIALLY OBSOLETE PARTS TO MAINTAIN BOTH ORGANIC AND ORIGINAL EQUIPMENT MANUFACTURER DEPOTS FOR OUT-OF-PRODUCTION EQUIPMENT WHICH WILL REMAIN IN THE FLEET WELL PAST FY 2010. ADDITIONAL FUNDS WERE PROVIDED IN FY 99 TO UPGRADE AND TEST THE DISPLAY CONSOLES AND ASSOCIATED EQUIPMENT ON OLDER US NAVY SHIPS AND TEST SITES, REPLACING THEM WITH EMULATORS, AN/UYQ-70 DISPLAYS AND ASSOCIATED PERIPHERAL EQUIPMENT. THESE DISPLAYS AND ASSOCIATED EQUIPMENT WOULD BE TESTED TO ASSESS IMPROVEMENTS IN THE MAN/SYSTEM INTERFACES WHICH CONTROL THE COMMAND/CONTROL/WEAPONS/COMBAT SYSTEMS REQUIRED FOR THE MISSION OF THESE NAVY SURFACE COMBATANTS. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 76 PAGE NO. CLASSIFICATION: 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY Items under $5M (298000) Program Element for Code B Items: Prior Years Other Related Program Elements ID Code FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total QUANTITY COST (In Millions) SPARES COST (In Millions) CALIBRATION STANDARDS: THESE FUNDS PROCURE CALIBRATION EQUIPMENT FOR INTERMEDIATE AND ORGANIZATIONAL MAINTENANCE LEVELS. TEST AND MONITORING SYSTEMS (TAMS), WHICH INCLUDE TEST EQUIPMENT AND GAGES, MUST BE CALIBRATED TO ENSURE THE EQUIPMENT IS OPERATIONAL, ACCURATE AND PRECISE. FUNDS ARE USED TO PROCURE CALIBRATION STANDARDS. CALIBRATION STANDARDS ARE EQUIPMENTS WHICH ENSURE THE ACCURACY OF TEST EQUIPMENT USED TO INSTALL, ALIGN, AND MAINTAIN ALL NAVY WEAPONS SYSTEMS SHORE AND AFLOAT. IMA MECHANICAL STANDARDS PROGRAMS PROVIDE VARIOUS NEW AND REPLACEMENT CALIBRATION EQUIPMENT FOR INSTRUMENT REPAIR AND CALIBRATION SHOPS ABOARD TENDERS AND SHORE BASED INTERMEDIATE MAINTENANCE ACTIVITIES. THE SHIPBOARD GAGE CALIBRATION PROGRAM PROVIDES THE ORGANIZATION MAINTENANCE LEVEL ABOARD SHIP WITH PORTABLE CALIBRATION EQUIPMENT TO PROVIDE CALIBRATION SUPPORT IN ONLY SPECIFIC AREAS OF MEASUREMENT. INTEGRATED CONDITION ASSESSMENT SYSTEM (ICAS) IS AN NDI (COTS EQUIPMENT) COMPUTER BASED SYSTEM THAT PROVIDES REALTIME, ON-LINE MACHINERY CONDITION MONITORING AND FAILURE DETECTION, DIAGNOSIS, TRENDING FOR FAILURE PROGNOSIS AND EXPERT TROUBLESHOOTING CAPABILITY. ICAS IS LINKED THROUGH DATA NETWORKS TO OTHER CRITICAL SHIP SYSTEMS, SUCH AS MACHINERY CONTROL, DAMAGE CONTROL AND BRIDGE SYSTEMS TO RECEIVE NECESSARY SENSORY INFORMATION. NAVY SIGNAL PROCESSORS: PROCURES SUPPORT AND MATERIALS INCIDENT TO SAFETY AND RELIABILITY MODIFICATIONS FOR AN/UYS-2A EQUIPMENT; PROCUREMENT OF COTS HARDWARE TO SUPPORT MODERNIZATION/REPLACEMENT OF AN/UYS-2A EQUIPMENT; PROCUREMENT/DIRECT SUPPORT COSTS TO SUPPORT MODERNIZATION ACTIVITIES. RADAR SUPPORT: AN/SPS-73(V) RADAR - PROVIDES REPLACEMENT RADAR FOR AN/SPS-64 RADAR ON ALL SHIP CLASSES AND REPLACEMENT FOR AN/SPS-55 AND AN/SPS-67(V)1 RADAR ON VARIOUS CLASS SHIPS. FFG UPGRADES (NRF) - PROVIDES WEAPON/COMBAT SYSTEM UPGRADES FOR NAVAL RESERVE FORCE FFG. AN/SPA - 25 MODS AN//SPA - 25 MODS (VARIOUS)- PROVIDES FOR IMPROVEMENTS WHICH WILL INCREASE OPERATIONAL CAPABILITY, ACCURACY AND RELIABILITY. EQUIPMENT INSTALLATION - FUNDING IS THE INSTALLATION OF EQUIPMENT INCLUDING FLEET MODERNIZATION PROGRAM INSTALLATIONS, INSTALLATION OF TRAINING EQUIPMENT, INSTALLATION OF EQUIPMENT IN OTHER SHORE FACILITIES AND INSTALLATION/CERTIFICATION/TESTING OF EQUIPMENT. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 76 PAGE NO. CLASSIFICATION: 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy Items under $5M (298000) TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST DC001 RADAR SUPPORT- N86 DC002 SHORE ELECTRONICS - TECR - N6 DC003 NAVY SIGNAL PROCESSORS - N6 DC004 ID Code Prior Years Total Cost FY2000 Quantity Unit Cost FY 2001 Total Cost Quantity 1,220 Unit Cost FY 2002 Total Cost 620 Quantity Unit Cost Total Cost 5,394 1,891 920 1,448 1,313 CALIBRATION STANDARDS - N4 2,161 4,104 1,615 DC005 ASDS - N86 1,304 DC006 AN/SPA-25 MODS - N86 DCINS EQUIPMENT INSTALLATION- N86 718 214 380 10,023 11,780 P-1 SHOPPING LIST ITEM NO.76 PAGE NO. Unit Cost Total Cost 1,133 3,700 DD FORM 2446, JUN 86 Quantity 6,332 CLASSIFICATION: 3 UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION RADAR SUPPORT (298000) TYPE MODIFICATION: N/A MODIFICATION TITLE: AN/SPS-73(V) RADAR (N86) FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: PROVIDE REPLACEMENT RADARS FOR LN-66, AN/SPS-64(V)9, AN/SPS-55 AND AN/SPS-67(V)1. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 2000 FY 1999 & Prior QTY $ QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT 129 16.9 5 0.5 5 0.5 EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT OTHER (Production Engineering) 1.2 0.2 0.2 OTHER (Consulting Services) 0.4 0.2 0.2 INSTALL COST 5.6 0.2 0.2 TOTAL PROCUREMENT 24.1 1.1 OTHER INTERIM CONTRACTOR SUPPORT 1.1 ITEM 76 PAGE 4 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: RADAR SUPPORT MODIFICATION TITLE: (298000) INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ALTERATION INSTALLATION TEAM (AIT) ADMINISTRATIVE LEADTIME: 6 MONTHS PRODUCTION LEADTIME: CONTRACT DATES: FY 1999: 7/99 FY 2000: N/A DELIVERY DATE: FY 1999: 9/99 FY 2000: N/A Cost: Prior Years FY 2000 Qty $ Qty $ PRIOR YEARS 10 FY 2001 Qty $ 0.5 5 0.2 98 2 Months FY 2001: FY 2001: ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ FY 2002 Qty $ 0.4 12 FY 2000 EQUIPMENT AN/SPS-73(V) RADAR (N86) N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Total Qty $ Qty $ 3.8 FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALLATION SCHEDULE: FY 2000 & Prior FY 2002 FY 2001 1 2 3 FY 2003 4 1 2 3 4 In 10 17 24 24 24 26 1 2 Out 10 17 24 24 24 26 ITEM 76 3 FY 2004 4 1 PAGE 2 5 3 FY 2005 4 1 2 3 FY 2006 4 1 2 3 FY 2007 4 1 2 3 TC 4 P-3A CLASSIFICATION: UNCLASSIFIED TOTAL UNCLASSIFIED CLASSIFICATION June 2001 BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY FY 2000 FY 2001 P-1 ITEM NOMENCLATURE BLI 3010 Ship Tactical Comms FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 SUBHEAD 52DN TO COMP TOTAL QUANTITY COST (in millions) $25.8 Note: Ship Tactical Comms Program transfers to the Communications Items Under $5M (BLI 3057) in FY01. Detail budget justification material is in the Communications Items Under $5M (BLI 3057) for budget comparability. PROGRAM COVERAGE: SHIP TACTICAL COMMUNICATIONS SYSTEMS ARE PROCURED UNDER THIS PROGRAM. THE EQUIPMENT PROCURED COVERS THE FREQUENCY SPECTRUM FROM MEDIUM FREQUENCY TO ULTRA HIGH FREQUENCY. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: HF TILT MECHANISMS - DEVICES TO ENABLE VERTICAL WHIP ANTENNA TO BE LOWERED TO A HORIZONTAL POSITION DURING FLIGHT OPERATIONS. HIGH FREQUENCY RADIO GROUP (HFRG BROADBAND) - WILL ALLOW FULLY AUTOMATED OPERATION OF THE HF COMMUNICATIONS SYSTEM. THIS SYSTEM WILL REDUCE THE NUMBER OF TOPSIDE ANTENNA USED, REDUCE ELECTROMAGNETIC INTERFERENCE AND REDUCE MANNING REQUIREMENTS. HIGH FREQUENCY SMALL SHIP TRANSMITTER (HFSST NARROWBAND) - HFSST IS A ONE-TO-ONE RADIO REPLACEMENT OF LEGACY NARROWBAND HF TRANSMITTERS AND ANTENNA COUPLERS, REPLACING 1960’S VACUUM TUBE TECHNOLOGY. DIGITAL WIDEBAND TRANSMISSION SYSTEM (DWTS) - UHF LINE-OF-SIGHT RADIO SYSTEM, SHIP-TO-SHIP AND SHIP-TO-SHORE COMMUNICATIONS REQUIRED TO SUPPORT LANDING FORCE SYSTEMS. THE CURRENT PROGRAM PROCURES DWTS FOR AMPHIBIOUS AND FLAG SHIPS ONLY. LRIP PROCUREMENTS OF LOW DATA RATE DWTS (DWTS LDR) BEGINS IN FY00. INSTALLING AGENTS: INSTALLATION WILL BE ACCOMPLISHED BY ALTERATION INSTALLATION TEAMS (AIT) FROM SPAWAR FIELD ACTIVITIES. P-1 Shopping List Item No 77-1 of 77-1 Exhibit P-40, Budget Item Justification Unclassified UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY P-1 ITEM NOMENCLATURE BLI: 3050 COMM AUTO FY 2000 FY 2001 FY 2002 $229.1 $184.4 $121.2 FY 2003 FY 2004 FY 2005 June 2001 SUBHEAD 52PQ FY 2006 FY 2007 TO COMP TOTAL QUANTITY COST (in millions) Continuing Continuing PROGRAM COVERAGE/JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: NAVMACS II/SMS (PQ065): The Naval Modular Automated Communication System II (NAVMACS II)/Single Message Solution (SMS) automates and increases the speed and efficiency of handling organizational message traffic aboard ships. This system was developed with an open system architecture, and is conducive to technological upgrades. NAVMACS II systems are being procured to replace the older NAVMACS systems which lack the speed and capacity to handle current message traffic loads during periods of accelerated combat operations. NAVMACS II is the Navy’s host platform for tactical (afloat) DMS. Tactical DMS satisfies Multicommand Requirements of Operational Capability (MROC) requirements to transition to IP based organizational messaging. Phased implementation reduces procurement and installation cost in out years by reusing hardware assets installed FY-00 and out. Phase 1: NAVMACS II capability with DMS H/W infrastructure. Phase 2: Add DMS GENSER capability. Phase 3: Add SCI DMS capability. Special Intelligence Communications(SI COMMS): Sensitive Compartmented (SCI) Automated Digital Network System (ADNS) (PQ068): SCI ADNS has been designated as an evolutionary program allowing for continued growth and expansion paralleling technology changes. The SI COMMS and TACINTEL programs were combined into the SI COMMS architecture to replace the outdated TACINTEL system developed in the early 1970s. It provides the mechanism for phased implementation of both planned improvements and those which surface through advancing technology. SCI ADNS provides for the real-time exchange of SCI COMMS data to Afloat operational commanders. The cornerstone of this program is the versatility and growth potential of the processing and networking equipment which will provide the network centric communications for the SI community. The premise of using Commercial off-the-shelf (COTS), Government off-the-shelf (GOTS), non developmental items (NDI) and existing systems to meet the requirements for Special Intelligence Communications will continue to be followed. To realize the ADNS architecture, FY00 and FY01 funds will procure the SCI ADNS equipment necessary to implement the IT-21 architecture to provide SI Communications to the Fleet. Impact of no ship SCI COMMS is that the ability to detect, identify and prosecute hostile threats and provide warnings of grave danger to U.S. interests will be lost. The shore terminal interface for Sensitive Compartmented Information (SCI)/Automated Digital Network System (ADNS)/Tactical Intelligence Information Exchange (TACINTEL II+) will use commercial off-the-shelf (COTS), Government off-the-shelf (GOTS), Non-developmental items (NDI) and existing systems to meet the requirements for SI COMMS. The SI COMMS and TACINTEL programs were combined into the SI COMMS architecture to replace the outdated TACINTEL system developed in the early 1970s. The equipment also began the realization of the ADNS architecture. FY00, FY01 and FY02 funds will continue to procure the SCI ADNS equipment necessary to implement the IT-21 architecture to provide SI COMMS to the Fleet. SCI ADNS provides for a real-time exchange of Tactical SCI COMMS to afloat operational commanders. Impact of no shore SCI ADNS is that ships cannot attain their network services. Automated Digital Network System (ADNS) (PQ069): Provides procurement and technology enhancements for automated routing and switching of Tactical and Strategic C4I voice, video and data via Transmission Control Protocol/Internet Protocol (TCP/IP) networks. Links deployed Battle Group units with each other and with the Defense Information Systems Network (DISN) ashore via multiple Radio Frequency (RF) paths and pier connectivity. Consists of Commercial Off-The-Shelf (COTS) non-developmental Joint Tactical Architecture (JTA) compliant hardware (routers, processors, switches) and commercial software (network management) in a standardized, scalable shock qualified rack design. Merges multiple redundant stove pipe communications circuits and efficiently manages and shares the bandwidth among multiple shipboard enclaves resulting in better throughput. Line includes Network Operation Centers (NOCs) Ashore providing a secure, managed interface to the DISN to include SIPRNET and NIPRNET . NOC provides standard Internet Service Provider functions such as email store and forward, World Wide Web access and security firewalls. Tactical Switching (PQ070): Provides the switching and bandwidth management components of high capacity interoperable communications, as the number one fleet CINC requirement in the Navy Wide C4 and Information Warfare (IW) Joint Mission Area (JMA) assessment. Provides for the shore segment interconnect of an end-to-end dynamic bandwidth management, Internet Protocol, and Channel Access Protocol capability to deploying Battle Groups/Amphibious Ready Groups and other support units. Automates the major shore nodes which allow network centric and lights-out operations. Provides afloat interoperability of tactical and strategic C4I circuits with Marine Corps Ground Mobile Forces (GMF) . Tactical Switching (which includes GMF interoperability , Automated Network Control Center (ANCC), Automated Technical Control (ATC) and the Automated Digital Multiplexer System (ADMS)) is the key enabling mechanism for the execution of the Automated Digital Network System (ADNS) strategy which is essential to meeting the Information Technology for the 21st Century (IT21) vision. P-1 SHOPPING LIST - Item No ITEM NO. 78 PAGE NO. 1 0F 21 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE BLI: 3050 COMM AUTO June 2001 SUBHEAD 52PQ Element Management System (EMS) (PQ075): Provides ships and shore sites with the capability to rapidly realign communications, and deploys essential baseline elements of IT-21 Automated Digital Network Systems (ADNS). Automates and remotely controls communications switching and quality monitoring equipment which eliminates manual operations. Provides operator controlled automated configuration of the Radio Communications System Circuits, computerized communications plan development and quality monitoring and reporting. Eliminates manual operator functions (patch panels) and provides open system architecture in accordance with Defense Information Infrastructure (DII). Naval Computer & Telecommunications Area Master Station (NCTAMS) Upgrades (PQ080): NCTAMS is the information transfer gateway joining spacebased and terrestrial networks. The Navy’s six NCTAM sites provide a point of presence for deployed and non-deployed strategic and tactical users. They provide multiple connection paths between information users and information producers integrating X, C, Ku, Civil & Military Ka, EHF, UHF and L-Band SATCOM connectivity and DISN, DSN, DRSN, SIPRNet, NIPRNet, JWICS, and VTC services. Modernization of equipment and increased capabilities are required to support Navy forces afloat and ashore activities. Increased capabilities are required to support 3 of 6 NCTAMS as part of the the DOD Teleport. Integrated Shipboard Network Systems (ISNS) (PQ007): The Integrated Shipboard Network System (ISNS) program provides every Navy ship, including submarines, with a reliable, high-speed Local Area Network (LAN) that will provide LAN and Wide Area Network (WAN) access to the DISN WAN (Secure and Nonsecure Internet Protocol Router Network -SIPRNet and NIPRNet). It provides real-time information exchange between afloat units, Component Commanders, numbered Fleet Commanders and Fleet CINCs through the migration of existing legacy systems into the IT-21 strategy and is a key factor in the implementation of the Navy’s portion of Joint Vision 2010. Under the Navy’s information modernization strategy, full synchronization of shipboard networks, mission and information applications and Radio/Satellite communications and shore data dissemination infrastructure, installations are necessary to ensure end-to-end mission capability. The ISNS program maximizes the use of both COTS software and hardware resulting in dependence on commercially supported hardware and software. Engineering and technical support is provided so that existing systems will be upgraded/modified to keep pace with hardware and software that is supported commercially. Joint Network Management System (JNMS) (PQ021): The Joint Network Management System (JNMS) is a CINC and Commander, Joint Forces (CJF), joint communications planning and management system. It provides communication planners with the capabilities to conduct high level planning (war planning); detailed planning and engineering; monitoring; control and reconfiguration; spectrum planning and management; and security of systems and networks supporting joint operations. The benefits provided by these increased capabilities include: enhanced force-level situational awareness (shared view of the network); enhanced flexibility to support the commander's intent; better utilization of scarce spectrum resources; and increased security of critical systems and networks. As an enabler for information superiority as-well-as command and control, the JNMS serves as the commander's "brain center" for the systems and networks supporting his forces. It ensures C4I unity of effort, exploitation of Total Force capabilities, proper positioning of critical information and allows for its fusion. Afloat PCs (PQ085, PQ086, PQ088): Funds procurement of PCs for Amphibious Ships, Surface Combatants, and Aircraft Carriers/Squadrons respectively. INSTALLING AGENTS: Installation will be by Alteration Installation Teams (AIT) from SPAWAR field activities. P-1 SHOPPING LIST - Item No ITEM NO. PAGE NO. 78 2 0F 21 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE COST ANALYSIS June 2001 APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE PQ065 PQ068 ELEMENT OF COST NAVMACS II/SMS ID CODE A SCI ADNS SCI ADNS Afloat SCI ADNS Ashore B ADNS ADNS Afloat ADNS Ashore / NOC B TACTICAL SWITCHING TSS ANCC Ashore ATC Ashore ADMS Ashore A PQ075 EMS EMS Ashore EMS Afloat PQ007 PYs TOTAL COST QTY 21 P-1 ITEM NOMENCLATURE BLI: 3050 COMM AUTO TOTAL COSTS IN THOUSANDS OF DOLLARS FY 2000 FY2001 UNIT TOTAL UNIT TOTAL COST COST QTY COST COST 346.8 7,282 27 346.0 9,343 SUBHEAD 52PQ QTY 37 FY 2002 UNIT COST 350.0 TOTAL COST 12,951 16 3 193.0 58.0 3,262 3,088 174 70 7 199.4 534.7 17,702 13,959 3,743 55 8 262.8 507.6 18,514 14,453 4,061 20 7 435.2 573.7 12,720 8,704 4,016 16 2 1 2 453.3 316.0 1,181.0 256.0 9,578 7,253 632 1,181 512 3 1 1 3 837.3 901.0 1,262.0 273.3 5,495 2,512 901 1,262 820 2 0 0 1 735.0 0.0 0.0 294.0 1,764 1,470 0 0 294 A 12 0 12 535.9 0.0 535.9 6,431 0 6,431 23 12 11 328.0 327.8 328.1 7,543 3,934 3,609 5 5 0 360.0 360.0 0.0 1,800 1,800 0 ISNS A 93 682.8 63,499 78 522.4 40,748 22 1,099.9 24,197 PQ021 Joint Network Management System (JNMS) B 1 537.0 537 PQ555 Production Support PQ085 Amphibious Ship PCs PQ086 Surface Combatants PCs PQ088 Aircraft Carrier PCs PQ069 PQ070 Procurement Total Note: NAVMACS, ADNS and ISNS unit cost are based on average cost of all units. Variances are due to the diverse types of ship sets being procured. EMS unit cost includes nonrecurring system eng costs and procurement of software packages. JNMS are shore installations at 20 sites with annual upgrades and major refresh events. 8,610 3,072 116,174 4,727 3,155 2,470 4,207 6,033 7,382 9,776 10,144 104,649 82,119 P-1 SHOPPING LIST - Item No ITEM NO. 78 PAGE NO. 3 OF 21 Exhibit P-5, Cost Analysis Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE COST ANALYSIS June 2001 APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE PQ777 ELEMENT OF COST INSTALLATION ID CODE P-1 ITEM NOMENCLATURE BLI: 3050 COMM AUTO PYs TOTAL COST QTY FY2000 UNIT COST TOTAL COST 112,880 SUBHEAD 52PQ QTY FY2001 UNIT COST TOTAL COST 79,771 QTY FY2002 UNIT COST TOTAL COST 39,123 FMP Install 93,827 64,387 33,452 DSA Install 16,856 10,596 2,784 Non-FMP Install 2,197 4,788 2,887 229,054 184,420 121,242 EXHIBIT TOTAL P-1 SHOPPING LIST - Item No ITEM NO. 78 PAGE NO. 4 OF 21 Exhibit P-5, Cost Analysis Unclassified Classification UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 C. P-1 ITEM NOMENCLATURE B. APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PQ065 NAVMACS II/SMS 01 02 CONTRACTOR AND LOCATION SSC CHARLESTON SSC CHARLESTON PQ068 SCI ADNS Afloat 02 SSC, San Diego, CA WX SPAWAR Nov-01 Dec-01 PQ068 SCI ADNS Ashore 02 SSC San Diego, CA WX SPAWAR Nov-01 PQ069 ADNS Afloat 01 02 Various Various IDIQ IDIQ SPAWAR SPAWAR PQ069 ADNS Ashore / NOC 01 02 Various Various IDIQ IDIQ PQ070 TSS 01 02 SAIC, SAN DIEGO SAIC, SAN DIEGO PQ070 ANCC Ashore 01 PQ070 ATC Ashore PQ070 ADMS Ashore COST CODE ELEMENT OF COST FY SUBHEAD 52PQ BLI: 3050 COMM AUTO WX WX LOCATION OF PCO SPAWAR SPAWAR RFP ISSUE DATE Oct-00 Oct-01 AWARD DATE Nov-00 Nov-01 DATE OF FIRST DELIVERY Mar-01 Mar-02 CONTRACT METHOD & TYPE QTY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE YES YES N/A N/A 27 37 UNIT COST 346.0 350.0 Mar-02 16 199.3 YES N/A Dec-01 Mar-02 3 58.0 YES N/A Jun-00 Jun-01 Oct-00 Oct-01 Jan-01 Jan-02 55 20 262.8 435.2 YES YES N/A N/A SPAWAR SPAWAR Jun-00 Jun-01 Oct-00 Oct-01 Jan-01 Jan-02 8 7 507.6 573.7 YES YES N/A N/A Option C Option C SPAWAR SPAWAR Jul-00 Jul-01 Nov-00 Nov-01 Aug-01 Nov-02 3 2 837.3 735.0 YES YES N/A N/A SSC CHARLESTON WX SPAWAR Sep-00 Dec-00 Apr-01 1 901.0 YES N/A 01 SSC CHARLESTON WX SPAWAR Sep-00 Dec-00 Apr-01 1 1,262.0 YES N/A 01 02 SSC SAN DIEGO SSC SAN DIEGO WX WX SPAWAR SPAWAR Sep-00 Sep-01 Dec-00 Dec-01 Apr-01 Apr-02 3 1 273.3 294.0 YES YES N/A N/A D. REMARKS Note: NAVMACS, ADNS and ISNS unit cost are based on average cost of all units. Variances are due to the diverse types of ship sets being procured relative to standard fleet support provided year to year. DD FORM 2446, JUN 87 P-1 SHOPPING LIST ITEM NO. 78 PAGE NO. 5 OF 21 Exhibit P-5A, Procurement History and Planning Unclassified Classification UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT LOCATION OF PCO RFP ISSUE DATE WX WX SPAWAR SPAWAR Various Various IDIQ IDIQ TBD Option FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE PQ075 EMS 01 02 SSC CHARLESTON SSC CHARLESTON PQ007 ISNS 01 02 PQ021 JNMS 02 COST CODE ELEMENT OF COST SUBHEAD 52PQ BLI: 3050 COMM AUTO AWARD DATE DATE OF FIRST DELIVERY QTY Sep-00 Sep-01 Dec-00 Dec-01 May-01 May-02 SPAWAR SPAWAR Sep-00 Sep-00 Nov-00 Nov-01 CECOM Sep-01 Nov-01 UNIT COST SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE 23 5 328.0 360.0 YES YES N/A N/A Jan-01 Jan-02 78 22 522.4 1,122.6 YES YES N/A N/A Apr-02 1 537 NO FY02 D. REMARKS Note: Between years, the composition of ISNS ships change, i.e., one year may have more larger ships such as CVs while another year may consist mainly of SSNs. As a result, the per unit costs are different. Additionally, different ships require different peripherals, which leads to per unit cost differences. DD FORM 2446, JUN 87 P-1 SHOPPING LIST ITEM NO. 78 PAGE NO. 6 OF 21 Exhibit P-5A, Procurement History and Planning Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: NAVAL MODULAR AUTOMATED COMMUNICATIONS SYSTEM II (NAVMACS II) PQ065/PQ777 NAVMACS II The Navy Modular Automated Communications system ( NAVMACS II) will automate and increase the efficiency of message handling aboard ships. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 99 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ Qty $ 59 34.8 13 8.8 21 7.3 27 9.3 37 13.0 0.393 1.684 59 59 9.9 9.9 13 1.1 13 1.1 9.9 44.6 0.725 0.853 1.7 25 2.4 30 3.3 13 1.7 8 17 2.4 10 20 3.3 1.7 11.1 AIT FY 05 FY 04 $ Qty $ Qty FY 06 $ Qty FY 07 $ Qty TC $ $ Qty $ Cont. Cont. 157 73.2 Cont. Cont. 2.4 3.3 13.3 18.2 ADMINISTRATIVE LEADTIME: 0.0 1 month 0.0 0.0 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Nov-99 FY 2001: Nov-00 FY 2002: Nov-01 DELIVERY DATES: FY 2000: Jan-00 FY 2001: Mar-01 FY 2002: Mar-02 INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 INPUT 85 8 5 5 7 10 7 7 6 OUTPUT 85 8 4 6 7 10 7 7 6 1 2 3 4 1 2 3 4 FY 01 FY 02 0.0 1 2 Cont. Cont. Cont. Cont. Cont. 0.0 0.0 1 3 4 TC TOTAL 1/ INPUT Cont. 140 OUTPUT Cont. 140 FY 06 140 59 13 21 27 20 0 0 0 0 0 0 140 FY 04 4 FY 05 2 Cont. 1.9 3.7 4 months FY 03 1 Cont. 3 INSTALLATION SCHEDULE: Total Qty 0.771 1.171 13 1.1 9.9 Qty 2 3 4 FY 07 Notes/Comments 1/ Total quantity meets inventory objective. P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 7 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification 18.4 9.9 1.1 1.7 2.4 3.3 0.0 0.0 0.0 0.0 0.0 0.0 18.4 97.1 UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: SCI ADNS (Afloat) PQ068 SCI ADNS Build Two & Three / Carrly On Build Two (AFLOAT) Provides Shipboard reception and transmission of multi-functional data using various data networks linking battlegroup commanders with intelligence databases. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: FY 99 $ Qty FY 00 $ FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ <47> <5.2> <45> <5.9> 16 3.1 Qty FY 05 FY 04 $ Qty $ Qty Qty FY 07 $ Qty TC $ Total Qty $ Qty $ 79 23.3 187 37.5 <Funded in BLI 3215> <.301> <.728> <1.066> <15> <1.2> <48> <3.7> <15> <1.2> <10> <38> <.8> <2.9> 0.108 0.315 16 1.2 16 1.2 0.4 2.1 45 5.7 45 5.7 5.7 29.0 <Funded in BLI 3215> 0.0 0.0 0.0 0.0 <.9> <3.6> <7.5> <10.6> ADMINISTRATIVE LEADTIME: 1 Month 1.2 4.7 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 3 4 1 3 4 FY 2000: Dec-99 FY 2001: Dec-00 FY 2002: Dec-01 DELIVERY DATES: FY 2000: Mar-00 FY 2001: Mar-01 FY 2002: Mar-02 INSTALLATION SCHEDULE: PY 1 2 3 4 INPUT 15 10 18 10 10 OUTPUT 15 10 14 12 12 1 2 3 4 FY 01 FY 02 1 FY 03 2 3 4 6 6 4 6 6 3 4 1 2 1 2 1 2 FY 04 2 3 4 FY 07 FY 06 FY 05 0.0 0.0 124 0 25 38 16 0 0 0 0 0 45 124 3 Months CONTRACT DATES: INSTALLATION SCHEDULE: FY 06 $ TC TOTAL INPUT 45 124 OUTPUT 49 124 Notes/Comments SCI ADNS has a carry-on variant that requires no installation. Therefore, the variation between the number of procurements vs. the number of installations. (FY00 = 22, FY01 = 7, FY02-07 = 34 fully funded Carry-on’s) P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 8 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification 11.8 0 2.0 2.9 1.2 0.0 0.0 0.0 0.0 0.0 5.7 11.8 51.8 UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: SCI ADNS (Ashore) PQ068 SI-COMMS - SCI ADNS Build 2 and Build 3 (ASHORE) Provides shore based reception and transmission of multi-functional data using various data networks linking battle group commanders with intelligence databases. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: METHOD OF IMPLEMENTATION: FY 99 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ Qty $ <20> <0.0> <4> <0.4> <3> <0.6> <1> <.3> 3 <3> <.2> <1> <.1> <3> <.2> <1> <.1> Qty FY 05 FY 04 $ Qty $ Qty FY 06 $ Qty FY 07 $ Qty TC $ Total Qty $ Qty $ 0.2 Cont. Cont. 31 2.5 3 0.4 Cont. Cont. 3 0.4 31 24 3 1 3 0 0 0 0 0 0 31 1.7 1.0 0.2 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 1.7 4.2 <Funded in BLI 3215> <20> <20> <.7> <.7> <4> <4> <.3> <.3> <Funded in BLI 3215> <.7> <.7> <.3> <.7> <.2> <.8> ADMINISTRATIVE LEADTIME: <.1> <.4> 0.4 0.6 1 Month 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 3 4 1 3 4 0.0 0.0 Cont. Cont. 3 Months FY 2000: Dec-99 FY 2001: Dec-00 FY 2002: Dec-01 FY 2000: Mar-00 FY 2001: Mar-01 FY 2002: Mar-02 PY 1 CONTRACT DATES: DELIVERY DATES: FY 01 2 FY 02 3 4 1 FY 03 2 3 4 1 2 1 2 FY 04 2 3 4 INSTALLATION SCHEDULE: 27 1 1 1 1 27 1 1 1 1 3 4 INPUT OUTPUT 1 2 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: 3 4 1 2 TC TOTAL INPUT Cont. 31 OUTPUT Cont. 31 Notes/Comments P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 9 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Automated Digital Network System (ADNS) PQ069/PQ777 Automated Digital Network System (ADNS) Afloat. Automated Digital Network System (ADNS) implements ATM multiplexing technology, and JDIICS-D compliant Integrated Network Management tools. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 99 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ Qty $ 25 11.0 28 8.1 70 14.0 55 14.5 20 8.7 0.735 2.929 25 25 8.9 8.9 27 7.0 53 15.3 27 7.0 1 52 0.3 15.0 8.9 19.8 7.0 15.1 15.3 32.9 AIT 0.858 2.906 63 13.9 18 45 4.0 9.9 Qty FY 05 FY 04 $ Qty $ Qty FY 06 $ Qty FY 07 $ Qty TC $ $ Qty $ Cont. Cont. 198 56.2 0.360 0.408 30 4.0 10 20 1.3 2.6 2.0 6.2 Cont. 13.9 4.0 32.1 13.4 ADMINISTRATIVE LEADTIME: 0.0 0.0 3 months 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Oct-99 FY 2001: Oct-00 FY 2002: Oct-01 DELIVERY DATES: FY 2000: Jan-00 FY 2001: Jan-01 FY 2002: Jan-02 FY 02 FY 01 0.0 0.0 0.0 0.0 PY 1 2 3 4 1 2 3 4 INPUT 105 18 18 18 9 10 7 7 6 OUTPUT 105 18 18 18 19 7 7 1 3 4 1 3 4 1 2 3 4 TC TOTAL INPUT Cont. 198 OUTPUT Cont. 192 FY 06 FY 05 2 198 25 28 70 55 20 0 0 0 0 0 0 198 49.0 8.9 7.3 19.0 11.3 2.6 0.0 0.0 0.0 0.0 0.0 0.0 49.0 113.4 FY 04 4 2 2 Cont. Cont. 3 1 1 Cont. 4 months FY 03 INSTALLATION SCHEDULE: INSTALLATION SCHEDULE: Total Qty 2 3 4 FY 07 Notes/Comments P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 10 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June 2001 Automated Digital Network System (ADNS). 1/ PQ0069/PQ777 Automated Digital Network System (ADNS) Ashore / Network Operations Center (NOC). Automated Digital Network System (ADNS) implements ATM multiplexing technology, and JDIICS-D compliant Integrated Network Management tools. It adds SCI ADNS Architecture, Integrated Network Management Architecture, and supports legacy system programs. Line includes Network Operation Centers (NOCs) Ashore. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 00 FY 99 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ Qty $ <4> <2.7> <4> <2.5> 7 3.7 8 4.1 7 4.0 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ TC Total Qty $ Qty $ Cont. Cont. 30.0 17.0 <Funded in BLI 3368> 0.0 0.0 <4> <4> <2.6> <2.6> <4> <2.4> <4> <2.4> 7 1.1 7 1.1 8 1.0 8 1.0 <Funded in BLI 3368> <2.6> <5.3> <2.4> <4.9> 1.1 4.9 7 1.1 7 1.1 Cont. 1.0 1.1 5.1 5.1 ADMINISTRATIVE LEADTIME: AIT 0.0 0.0 3 months 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Oct-99 FY 2001: Oct-00 FY 2002: Oct-01 DELIVERY DATES: FY 2000: Jan-00 FY 2001: Jan-01 FY 2002: Jan-02 INSTALLATION SCHEDULE: PY 1 INPUT 15 OUTPUT 15 FY 02 FY 01 2 3 4 4 4 0.0 0.0 1 3 4 TC TOTAL 2/ INPUT Cont. 38 OUTPUT Cont. 38 3 4 4 3 FY 05 INSTALLATION SCHEDULE: 1 2 4 4 3 3 4 1 2 1 2 FY 06 1 2 P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 2 3 4 FY 07 Notes/Comments 1 / Funding for PY to FY 99 for this ADNS IT-21 enabler program was provided in BLI 3368 (Subhead 52D6, Cost Code D6002). Beginning in FY 00 funding for this program was transferred to BLI 3050 Subhead 52PQ. 2/ Total quantity meets inventory objective. 8.2 <2.6> <2.4> 1.1 1.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 8.2 25.2 FY 04 4 4 3 30 <4> <4> 7 8 7 0 0 0 0 0 0 30 4 months FY 03 2 Cont. Cont. 3 4 1 0.0 0.0 Cont. 11 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Tactical Switching PQ070/PQ777 TSS Provides the switching and bandwidth management components of high capacity interoperable communications. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 99 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ Qty $ 0 0.0 20 9.0 18 7.3 3 2.5 2 1.5 0.540 0.317 0 0 0.0 0.0 20 2.4 20 2.4 0.0 0.0 0.331 0.591 0.162 0.090 3.0 3 0.5 2 0.3 16 3.0 2 1 0.3 0.2 2 0.3 3.0 11.2 AIT FY 05 FY 04 $ Qty $ Qty 0.5 0.3 3.3 2.0 ADMINISTRATIVE LEADTIME: 0.0 0.0 4 months 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: FY 2000: Nov-99 FY 2001: Nov-00 FY 2002: Nov-01 DELIVERY DATES: FY 2000: May-00 FY 2001: Aug-01 FY 2002: Nov-02 FY 02 FY 01 PY 1 INPUT 36 2 OUTPUT 36 2 3 4 1 1 2 Qty FY 07 $ Qty TC $ $ Qty $ 8 8.8 51 29.0 2 0.0 0.0 TC TOTAL 1/ INPUT 8 49 OUTPUT 8 49 2 2 3 4 1 2 FY 06 3 Notes/Comments: 1 / Total quantity meets inventory objective. Production lead time inceased to 12 months beginning in FY02 due to delays in the CECOM contract. 4 8.1 0.0 2.4 3.3 0.5 0.0 0.0 0.0 0.0 0.0 0.0 1.8 8.1 39.3 FY 04 4 1 49 0 20 18 3 0 0 0 0 0 0 8 49 12 months 3 1 FY 05 INSTALLATION SCHEDULE: 2 1.8 1.8 10.6 1 2 1 8 4 1 4 1.8 0.0 0.0 FY 03 3 8 3 2 Total Qty 1.2 1.0 CONTRACT DATES: INSTALLATION SCHEDULE: FY 06 $ 0.151 0.049 16 2.4 12.3 Qty 2 3 4 FY 07 P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 12 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Tactical Switching 1/ PQ070/PQ777 Automated Network Control Center (ANCC) Modifications to operational ADNS/ANCC/ATCs to maintain current technology, modernization of manual patch and test facilities. Quantities reflect the following five communication nodes: Med, Lant, Eastpac, Westpac and Eurcent. Costs vary by site requirements and configuration. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 00 FY 99 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ Qty $ <5> <18.5> <5> <1.3> 2 0.6 1 0.9 0 0.0 Qty Qty FY 06 FY 05 FY 04 $ $ Qty $ Qty FY 07 $ TC Qty $ $ Qty $ Cont. Cont. 13 21.3 Funded in BLI 3368 0.043 <5> <5> <2.8> <2.8> <5> <.5> <5> <.5> 2 0.2 2 0.2 1 0.4 1 0.4 Funded in BLI 3368 <2.8> <21.3> <.5> <1.8> 0.1 0.0 0.041 0.2 0.9 0 0.0 0 0.0 Cont. 0.4 0.0 1.3 0.0 ADMINISTRATIVE LEADTIME: AIT 0.0 0.0 3 months 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Dec-99 FY 2001: Dec-00 FY 2002: N/A DELIVERY DATES: FY 2000: Apr-00 FY 2001: Apr-01 FY 2002: N/A FY 01 INSTALLATION SCHEDULE: PY INPUT 11 OUTPUT 11 1 2 FY 02 3 4 1 2 1 2 0.0 0.0 0.0 0.0 FY 03 3 4 1 2 3 4 1 2 Cont. Cont. Cont. 13 <5> <5> 2 1 0 0 0 0 0 0 0 13 3.9 <2.8> <.5> 0.2 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.9 25.3 4 months FY 04 3 4 1 2 3 4 3 4 TC TOTAL 2/ INPUT Cont. 5 OUTPUT Con.t 5 1 1 FY 06 FY 05 INSTALLATION SCHEDULE: Total Qty 1 2 3 4 FY 07 Notes/Comments 1 / Funding for PY to FY 99 for this ADNS IT-21 enabler program was previously funded in BLI 3368 (Subhead 52D6, Cost Code D6001). Beginning in FY 00 funding for this program was transferred to BLI 3050 Subhead 52PQ. 2 / Total quantity meets inventory objective and is representative of the number of communication nodes visited, not the total number of visits to each site. P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 13 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Tactical Switching 1/ PQ070/PQ777 Automated Technical Control (ATC) Modifications to operational ADNS/ANCC/ATCs to maintain current technology, modernization of manual patch and test facilities. Quantities reflect the following areas of coverage: Med, Lant, Eastpac and Westpac. Costs vary by site requirements and configuration. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 00 FY 99 FY 01 FY 02 Qty $ Qty $ Qty $ Qty $ <10> <5.5> <1> <1.2> 1 1.2 1 1.3 Qty FY 03 $ Qty FY 05 FY 04 $ Qty $ Qty FY 06 $ Qty FY 07 $ Qty TC $ $ Qty $ Cont. Cont. 13 9.2 Funded in BLI 3368 0.083 <10> <10> <3.0> <3.0> <1> <.5> <1> <.5> 1 0.6 1 0.6 0.057 1 0.6 1 0.6 0.1 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 Cont. Cont. Funded in BLI 3368 <3.0> <8.5> <.5> <1.7> 0.6 1.9 0.6 0.0 1.9 0.0 ADMINISTRATIVE LEADTIME: AIT 0.0 0.0 3 months 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Dec-99 FY 2001: Dec-00 FY 2002: N/A DELIVERY DATES: FY 2000: Apr-00 FY 2001: Apr-01 FY 2002: N/A FY 01 INSTALLATION SCHEDULE: PY INPUT 12 OUTPUT 12 1 2 FY 02 3 4 1 2 1 2 0.0 0.0 0.0 0.0 FY 03 3 4 1 2 3 4 1 2 Cont. Cont. 13 <10> <1> 1 1 0 0 0 0 0 0 0 13 4.7 <3.0> <.5> 0.6 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.7 14.1 4 months FY 04 3 4 1 2 3 4 3 4 TC TOTAL 2/ INPUT Cont. 13 OUTPUT Cont. 13 1 1 FY 05 INSTALLATION SCHEDULE: Total Qty 1 2 FY 06 3 4 FY 07 Notes/Comments 1 / Funding for PY to FY 99 for this ADNS IT-21 enabler program was previously funded in BLI 3368 (Subhead 52D6, Cost Code D6001). Beginning in FY 00 funding for this program was transferred to BLI 3050 Subhead 52PQ. 2 / Total quantity meets inventory objective. P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 14 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: Tactical Switching 1/ COST CODE PQ070/PQ776 MODELS OF SYSTEMS AFFECTED: Automated Digital Multiplexer System (ADMS) DESCRIPTION/JUSTIFICATION: Automated Network management capability which is fully compatible with switching technologies and in compliance with national and international standards. Quantities reflect the units at various sites within the following areas of coverage: Med, Lant, Eastpac, and Westpac. Costs vary by site size, requirements and configuration. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY FY 99 FY 00 FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ Qty $ <83> <5.3> <2> <0.7> 2 0.5 3 0.8 1 0.3 Qty Qty FY 06 FY 05 FY 04 $ $ Qty $ Qty FY 07 $ Qty TC $ Total Qty $ Qty $ Cont. Cont. 91 7.6 RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Funded in BLI 3368 Data Training Equipment Production Support 0.033 0.038 0.020 0.1 Other (DSA) 0.0 Interm Contractor Support Installation of Hardware* 91 4.2 <83> <2> <2.5> <0.6> 2 0.3 3 0.5 1 0.2 0 0.0 FY 04 EQUIP 0 0.0 FY 05 EQUIP FY 06 EQUIP 0 0 0.0 0.0 FY 07 EQUIP 0 0.0 FY TC EQUIP 0 0.0 92 4.2 PRIOR YR EQUIP FY 99 EQUIP <83> <2.5> <83> <2.5> <2> <2> <0.6> 2 0.3 3 0.5 0.2 2 3 0.5 FY 02 EQUIP 1 0.2 Funded in BLI 3368 TOTAL INSTALLATION COST TOTAL PROCUREMENT COST <2.5> <0.6> 0.3 <7.8> <1.3> 0.8 AIT 0.5 0.2 1.4 0.5 ADMINISTRATIVE LEADTIME: 0.0 0.0 0.0 0.0 3 months FY 2000: Dec-99 FY 2001: Dec-00 FY 2002: Dec-01 DELIVERY DATES: FY 2000: Apr-00 FY 2001: Apr-01 FY 2002: Apr-02 FY 01 INSTALLATION SCHEDULE: PY INPUT 87 OUTPUT 87 1 2 FY 02 3 4 1 2 0.0 0.0 0.0 0.0 PRODUCTION LEADTIME: CONTRACT DATES: 1 2 FY 04 2 3 4 3 4 TC TOTAL 2/ INPUT Cont. 91 OUTPUT Cont. 91 1 FY 05 FY 06 3 11.8 1 3 2 2 Cont. 1 1 1 0.0 4 3 4 Cont. 4 months FY 03 3 0.0 3 INSTALLATION SCHEDULE: Cont. 0.3 FY 01 EQUIP FY 03 EQUIP Cont. <0.6> FY 00 EQUIP METHOD OF IMPLEMENTATION: 1 4 1 2 FY 07 3 4 Notes/Comments 1 / Funding for PY to FY 99 for this ADNS IT-21 enabler program was previously funded in BLI 3368 (Subhead 52D6, Cost Code D6002). Beginning in FY 00 funding for this program was transferred to BLI 3050 Subhead 52PQ. 2 / Total quantity meets inventory objective. Exhibit P-3A, Individual Modification Program P-1 SHOPPING LIST ITEM NO. 78 PAGE NO. 15 OF 21 Unclassified Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: Shore Remote Control Systems (SRCS)/Element Management System -Ashore (EMS) 1/ COST CODE PQ075/PQ776 MODELS OF SYSTEMS AFFECTED: Various transmission media. DESCRIPTION/JUSTIFICATION: Automates and remotely controls communications switching and quality monitoring equipment which eliminates manual operations. Quantities reflect installation sites in the following areas of coverage: Med, Lant, Eastpac, and Westpac. Cost vary by site size, requirements and configuration. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY FY 99 FY 00 1/ FY 01 FY 02 FY 03 Qty $ Qty $ Qty $ Qty $ Qty $ <16> <6.7> <5> <1.7> 0 0.0 12 3.9 5 1.8 Qty FY 05 FY 04 $ Qty $ Qty FY 07 FY 06 $ Qty $ Qty TC $ Total Qty $ Qty $ 29 8.5 67 22.8 RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Funded in BLI 3368 Data Training Equipment Production Support 0.000 0.280 0.322 0.6 Other (DSA) 0.0 Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 99 EQUIP <16> <3.0> <16> <3.0> <5> <5> <.7> 0 0.0 12 2.3 5 0.7 29 7.8 <.7> FY 00 EQUIP 0 0.0 FY 01 EQUIP 12 2.3 FY 02 EQUIP 5 0.7 Funded in BLI 3368 FY 03 EQUIP 67 14.5 <16> <5> <3.0> <.7> 0 0.0 12 2.3 5 0.7 0 0.0 FY 04 EQUIP 0 0.0 FY 05 EQUIP FY 06 EQUIP 0 0 0.0 0.0 0 0.0 FY 07 EQUIP FY TC EQUIP 29.0 TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: <3.0> <.7> 0.0 <9.7> <2.4> 0.0 AIT 2.3 0.7 6.5 2.8 ADMINISTRATIVE LEADTIME: 0.0 0.0 0.0 0.0 3 months FY 2000: Dec-99 FY 2001: Dec-00 FY 2002: Dec-01 DELIVERY DATES: FY 2000: May-00 FY 2001: May-01 FY 2002: May-02 PY 1 FY 01 FY 02 6 INPUT 29 67 OUTPUT 32 68 2 4 1 1 2 FY 04 TOTAL 2/ 1 2 2 FY 06 3 37.8 2 3 4 3 FY 05 INSTALLATION SCHEDULE: 3 1 16.4 TC 6 4 0.0 5 months FY 03 3 14.5 4 6 2 67 3 <21> 6 1 7.8 1 OUTPUT 4 0.0 7.8 0.0 4 <21> 3 0.0 29 3 INPUT 2 0.0 PRODUCTION LEADTIME: CONTRACT DATES: INSTALLATION SCHEDULE: 0.0 7.8 2 FY 07 3 4 Notes/Comments 1 / Funding for PY to FY 99 for this ADNS IT-21 enabler program was previously funded in BLI 3368 (Subhead 52D6, Cost Code D6002). Beginning in FY 00 funding for this program was transferred to BLI 3050 Subhead 52PQ. 2 / Total quantity meets inventory objective. P-1 SHOPPING LIST Exhibit P-3A, Individual Modification Program ITEM NO. PAGE NO. Unclassified 78 16 OF 21 Classification UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Element Management System-Afloat (EMS) 1/ PQ075/PQ777 Various transmission media. Automates and remotely controls communications switching and quality monitoring equipment which eliminates manual operations. Quantities reflect the following areas of coverage: Med, Lant, Eastpac, and Westpac. Cost vary by site size, requirements and configuration. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: FY 00 FY 99 FY 01 FY 02 Qty $ Qty $ Qty $ Qty $ <11> <12.4> <10> <5.8> 12 6.4 11 3.6 Qty FY 03 $ Qty FY 05 FY 04 $ Qty $ Qty FY 06 $ Qty FY 07 $ Qty TC $ $ Qty $ 143 35.3 187 63.4 Funded in BLI 3055 0.228 0.200 <11> <11> <2.8> <2.8> <10> <6.0> <10> <6.0> 12 2.9 12 2.9 Funded in BLI 3055 <2.8> <11.2> <6.0> <11.8> 0.261 0.425 1.9 1 0.2 10 1.9 1 0.2 2.9 9.8 FY 2000: Dec-99 DELIVERY DATES: FY 2000: May-00 PY INPUT 33 OUTPUT 33 1 2 0 1.9 0.2 6.2 0.2 ADMINISTRATIVE LEADTIME: 0.0 0 0.0 0.0 3 months 0.0 0.0 0.0 FY 2001: Dec-00 FY 2002: FY 2001: May-01 FY 2002: 3 1 3 1 0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0 0.0 0.0 0.0 143 27.2 143 27.2 27.2 62.5 0.0 0.0 N/A FY 03 4 1 2 3 4 1 2 3 4 TC TOTAL 2/ INPUT 143 187 OUTPUT 143 187 FY 06 3 4 2 3 4 1 FY 05 2 3 FY 04 1 1 187 <11> <10> 12 11 0 0 0 0 0 0 143 187 5 months 4 10 2 0.0 3 7 4 0 N/A FY 02 FY 01 INSTALLATION SCHEDULE: 0.5 0.6 0.020 10 AIT CONTRACT DATES: INSTALLATION SCHEDULE: Total Qty 1 2 FY 07 Notes/Comments 1 / Funding for PY to FY 99 for this ADNS IT-21 enabler program was previously funded in BLI 3055 (Subhead 52NG). Beginning in FY 00 funding for this program was transferred to BLI 3050 Subhead 52PQ. 2 / Total quantity meets inventory objectiv P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 17 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification 41.0 <2.8> <6.0> 2.9 2.1 0.0 0.0 0.0 0.0 0.0 0.0 27.2 0.0 105.6 UNCLASSIFIED June 2001 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: ISNS (formerly ATM LANs) PQ007/PQ777 Integrated Shipbaord netwrok System (ISNS) Provides modern, centrally managed, network systems to replace aging LAN systems for Battle Group (BG) and non-BG ships, submarines and embarking Marine Corp units. Application subsystems include/financial/inventory management, organizational and surface maintenance management, and administrative information systems support. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment FY 00 FY 99 $ FY 02 FY 03 $ Qty $ Qty $ Qty $ 55 32.8 93 63.5 78 40.7 22 24.2 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) 0.000 6.347 Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 01 Qty 55 30.1 55 30.1 2.186 11.452 2.305 6.322 83 70.9 64 45.7 83 70.9 10 54 7.1 38.5 Qty FY 05 FY 04 $ Qty $ Qty FY 06 $ Qty FY 07 $ Qty TC $ $ Qty $ 49 50.9 297 212.1 1.394 0.821 41 24.9 24 17 14.9 10.0 Total Qty 49 49.2 FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: 49 30.1 70.9 69.2 148.0 24.9 45.7 95.1 51.3 ADMINISTRATIVE LEADTIME: AIT 0.0 0.0 0.0 2 months 0.0 0.0 0.0 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Nov-99 FY 2001: Nov-00 FY 2002: Nov-01 DELIVERY DATES: FY 2000: Jan-00 FY 2001: Jan-01 FY 2002: Jan-02 INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 INPUT 138 10 21 21 12 24 8 7 2 OUTPUT 138 20 20 24 24 8 9 3 4 3 4 FY 02 FY 01 0.0 0.0 4 TC TOTAL 1/ INPUT 49 292 OUTPUT 49 292 FY 06 1 2 0 0 0 0 0.0 0.0 0.0 0.0 49 292 49.2 220.7 2 3 4 FY 07 Notes/Comments 1 / Total quantity meets inventory objective, which then initaites a period of software and hardware refresh. P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 220.7 0.0 30.1 78.0 53.4 10.0 0.0 FY 04 3 FY 05 2 105.8 1 2 1 0.0 4 1 2 49.2 49.2 292 0 55 93 78 17 0 2 months FY 03 1 0.0 3 INSTALLATION SCHEDULE: 8.6 28.0 2.677 3.032 18 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification 469.3 UNCLASSIFIED June 2001 COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Joint Network Management System (JNMS) 1 / PQ021/PQ777 Joint Network Management System (JNMS) The Joint Network Management System (JNMS) is a CINC, Commander, Joint Forces (CIF) joint communications planning and management system. Note: After the first 20 sites are completed, the remaining quantites represent payment of license fees and minor software revisions for each of the 20 sites, with a major software and hardware refresh planned in FY06. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty FY 00 FY 99 $ Qty $ Qty FY 01 $ Qty FY 02 $ FY 03 Qty $ 1 0.5 RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 98 EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP Qty FY 05 FY 04 $ Qty $ Qty FY 06 $ Qty FY 07 $ Qty TC $ Total Qty $ Qty $ Cont. Cont. 1 0.5 0.029 1 0.1 1 0.1 0.0 0.0 Cont. Cont. FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.6 ADMINISTRATIVE LEADTIME: AIT 0.0 0.0 0.0 2 months 0.0 0.0 0.0 PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: N/A FY 2001: N/A FY 2002: Nov-01 DELIVERY DATES: FY 2000: N/A FY 2001: N/A FY 2002: Apr-02 FY 02 FY 01 INSTALLATION SCHEDULE: PY 1 2 FY 03 4 1 2 1 2 0 0 0 0 0.0 0.0 0.0 0.0 0 1 0.0 0.1 FY 04 2 3 4 4 TC TOTAL 2 / INPUT Cont. 20 OUTPUT Cont. 20 1 1 FY 06 FY 05 INSTALLATION SCHEDULE: 3 Cont. 3 0 4 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.0 2 months 1 OUTPUT 3 Cont. 4 0 2 0.0 0.0 3 INPUT 1 0.0 1 0 0 0 0 0 1 0 1 2 3 4 1 2 FY 07 3 4 Notes/Comments 1 / New Start Program in FY02 2 / Total quantity meets inventory objective of 20 sites, with continuning payment of license fees, minor software revisions and 4 year refresh cycle. P-1 SHOPPING LIST ITEM NO. PAGE NO. 78 19 OF 21 Exhibit P-3A, Individual Modification Program Unclassified Classification 0.6 UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE BLI: 3050 COMM AUTO FISCAL YEAR COST ITEM/MANUFACTURER/ CODE PROCUREMENT YEAR PQ065 NAVMACS II/SMS FISCAL CARRY YEAR OVER CY00 SUBHEAD NO. 52PQ 01 FISCAL YEAR CALENDAR YEAR 01 A N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S T E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P R 5 4 5 5 5 3 8 7 7 8 7 2 2 2 2 37 PQ068 SCI ADNS Afloat 02 16 A 6 PQ068 SCI ADNS Ashore 02 3 A 1 PQ069 ADNS Afloat 01 A 0 A 55 A 20 6 02 01 8 A 2 02 7 01 78 02 22 A 02 1 A A OCT NOV 11 DEC JAN 6 2 10 FEB 6 2 8 MAR 6 6 6 6 6 1 A 2 2 3 2 1 1 0 1 0 A 2 2 2 1 5 6 2 2 2 3 2 2 0 0 2 2 7 APR 0 7 MAY 6 JUN 6 JUL 7 AUG 8 SEP MSR 0 8 OCT 0 NOV 2 1 1 1 2 0 1 DEC JAN FEB MAR APR PRODUCTION RATE Name and Location 0 7 1-8-5 0 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP PROCUREMENT LEADTIMES Manufacturer’s ITEM L 03 O 27 PQ021 JNMS 03 CALENDAR YEAR C 02 PQ007 ISNS FISCAL YEAR 02 O 01 PQ069 ADNS Ashore / NOC 02 CALENDAR YEAR MAX ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure Procurements are made from COTS inventories. NAVMAT FORM 7110/4 (REVISED 11/77) P-1 SHOPPING LIST ITEM NO. 78 PAGE NO. 20 OF 21 Exhibit P-21, Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE BLI: 3050 COMM AUTO FISCAL YEAR COST ITEM/MANUFACTURER/ CODE PROCUREMENT YEAR PQ070 TSS FISCAL CARRY YEAR OVER CY00 SUBHEAD NO. 52PQ 01 FISCAL YEAR CALENDAR YEAR 01 02 FISCAL YEAR CALENDAR YEAR 02 03 L CALENDAR YEAR 03 A O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S T C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P R 02 3 2 PQ070 ANCC Ashore 01 1 A 1 0 PQ070 ATC Ashore 01 1 A 1 0 PQ070 ADMS Ashore 01 3 A 3 02 1 01 12 02 5 01 11 PQ075 EMS Ashore PQ075 EMS Afloat 01 A 3 A 0 A A 3 3 2 2 1 OCT NOV DEC JAN FEB MAR APR 0 4 3 2 1 1 MAY JUN JUL AUG SEP 3 OCT NOV DEC JAN FEB MAR APR PRODUCTION RATE Name and Location MSR 2 0 0 1-8-5 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP PROCUREMENT LEADTIMES Manufacturer’s ITEM 0 2 A A 0 0 2 MAX ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure Procurements are made from COTS inventories. NAVMAT FORM 7110/4 (REVISED 11/77) P-1 SHOPPING LIST ITEM NO. 78 PAGE NO. 21 OF 21 Exhibit P-21A, Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE June 2001 APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY FY 2000 P-1 ITEM NOMENCLATURE BLI: 3055 Communication Items Under $5M FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 SUBHEAD 52NG TO COMP TOTAL QUANTITY COST (in millions) $26.8 NOTE: The Communications Items Under $5M budget (BLI 3055) transfers to Communications Items Under $5M (BLI 3057) in FY 01. Detail Budget justification material is in the Communications Items Under $5M (BLI 3057) for budget comparability HF Tilt Mechanisms: - Devices to enable vertical whip antenna to be lowered to a horizontal position during flight operations . HIGH FREQUENCY RADIO GROUP (HFRG BROADBAND- Will allow fully automated operation of the HF communications system. The system will reduce the number of topside antenna used, reduce electromagnetic interference and reduce manning requirements.. HIGH FREQUENCY SMALL SHIP TRANSMITTER (HFSST NARROWBAND- HFSST is a one-to-tone radio replacement of legacy arrowbank HF transmitters and antenna couplers,replacing 1960s vacuum tube technology. DIGITAL WIDEBAND TRANSMISSION SYSTEM (DWTS) - UHFline of sight radio system, ship-to-ship and ship-to-shore communications required to support landing force systems. The current program procures DWTS for amphibious and flag ships only. LRIP procurements of low data rate DWTS (DWTS LDR) Begins in FY00. INSTALLING AGENTS: Installation will be accomplished by alteration installation teams (AIT) from SPAWAR field activities. R-2368/URR HF RECEIVER: The R-2368/URR will replace all existing High Frequency (HF) receivers and will provide a capability for automated operation. When Digital Modular Radio (DMR) offers the HF receive capability, the funding will be transferred. RED/BLACK DIGITAL SWITCH/EMS: The Red and Black Digital Switches (transitioning to the Element Management System (EMS)) are essential elements of the Joint Maritime Communications System (JMCOMS)/COPERNICUS switching architecture. These switches will provide the capability for automation of the Radio Communications Suite, via automatic interconnection between the remote subscriber to cryptographic equipment/multiplexers and digital radio equipment. This program provides for the transition of JMCOMS Automated Digital Network System (ADNS) to Integrated Services Digital Network (ISDN) and Asynchronous Transfer Mode (ATM) suitability. Beginning in FY99, EMS provides operator controlled automatic configuration of the Radio Communication System (RCS) circuits, computerized communications plan development, and quality monitoring and reporting. 1 DD FORM 2446, JUN 87 P-1 Shopping List-Item No 79-1 of 79-3 Exhibit P-5a, Procurement History and Planning Unclassified UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE BLI: 3055 Communication Items Under $5M June 2001 SUBHEAD 52NG FCIP: The Field Change Improvement Plan (FCIP) upgrades Command, Control, Communications, Computers and Intelligence (C4I) equipment on over 200 ships annually by installing field changes to correct equipment and personnel safety hazards, restore reliability, update operating parameters, correct inter-operability problems, and replace obsolete components. Alteration Installation Team (AIT) coordination supports alterations that are made outside scheduled availabilities and integrates AIT installation with Type Command (TYCOM ) pier side availability schedules. 1 MCIXS: Battle Group Cellular Telephone (BG Cellular)/Maritime Cellular Information Exchange Systems (MCIXS) provides non mission-critical Intra-Battle Group real-time transfer of information using a standard telephone or cellular hand held mobile telephone. VIXS: Video Information Exchange System (VIXS) provides the Fleet with tactical video teleconferencing. The system provides multipoint secure Video Teleconferencing (VTC) between deployed carriers/large deck amphibs, Fleet Commander-in-Chief (CINCs), Chief of Naval Operations (CNO) and select Department of Defense (DOD) commands. Shipboard systems also provide connectivity to the Joint Worldwide Intelligence Communications System (JWICS) VTC system. TMIP: Theater Medical Information Program - Maritime (TMIP-M) program is charged with deployment of both infrastructure and the software to support the theater requirements for healthcare and command and control (C2) activities: clinical, resources, logistics, decision support, etc. The development and release of TMIP software will be conducted incrementally and it will be based on GOTS medical software that is currently available in the military inventory. Software components selected for TMIP are: MAT, CHCS, DBSS, DMLSS, TRAC2ES, and other developed software meets the functionality of SAMS. Subsequent TMIP Block releases will follow. The TMIP-M will leverage IT-21 and NTCSS infrastructure components, as well as installation, logistics, and fleet support components. PORTABLE RADIOS: Portable and mobile radios support the unique air, sea, and land environment of the Navy Explosive Ordnance Disposal Units, Construction Battalions, Naval Beach Groups, Tactical Air Control Units, Naval Special Warfare Units, and Shipboard requirements defined by OPNAVINST C2300.44F. Radios procured include, Single Channel Ground Air Radio System (SINCGARS) VHF FM units, both manpack and vehicular for anti-jam communications, HF radios for beyond-line-of-sight operations, Emergency lifeboat radios, Survival ground to air radios. Hierarchical Yet Dynamic Reprogrammable Architecture (HYDRA) AN/SRC-55 which will replace all stovepipe wireless shipboard systems (DCWIFCOM, MOMCOM, PVPCS, FDCS) with an integrated system on all ship classes. SINCGARS (Single Channel Ground and Airborne Radio System): Single Channel Ground and Airborne Radio System (SINCGARS) provides tactical anti-jam radios to support ship-to-shore communications during amphibious operations. This program also fills the requirements for VHF ship-to-ship and ship-to-boat communications, replacing the aging AN/VRC-46 family of radios. FY 1999 provides funding for the the buy-out of the SINCGARS requirements. FY99 PBD-290 provided funds and directed the Navy to accelerate procurement of equipment in order to conform to Joint PMO plans. Installing Agents: Installation will be accomplished by AIT from SPAWAR field activities. Shipboard SINCGARS (Single Channel Ground and Airborne Radio System): Provides tactical anti-jam radios to support ship-to-shore communications during amphibious operations. This program also fills the requirements for VHF ship-to-ship and ship-to-boat communications, replacing the aging AN/VRC-46 family of radios. FY 1999 provides funding for the the buy-out of the SINCGARS requirements. Production Support provides funding for procuring modified ILS documentation and support packages which reflect SINCGARS-SIP configurations and to integrate the products of this program with other components of the JMCOMS system, such as ADNS. FY99 PBD-290 provided funds and directed the Navy to accelerate procurement of equipment in order to conform to Joint PMO plans. EXPLANATION OF PROGRAM CHANGE: Systems are being procured in configurations which are specific to each ship class. These configurations consist of differing numbers of five standard subcomponents. The SIP version of SINCGARS is to be fielded, replacing non-SIP SINCGARS which have already been partially fielded. Standard Components: 1) Ship System (AN/SRC-54A) - A SINCGARS System Improvement Program (SIP) configuration which uses a single radio in a single mount. 2) Ship System (AN/SRC-54B) - A SINCGARS SIP configuration which uses two radios in a single mount. 3) Multicoupler (TD-1456) This multicoupler is being provided to all ships to couple up to four SINCGARS radios to a single antenna; one radio can operate in anti-jam mode. 4) SINCGARS Remote Control System (OT-637A) - A device for providing remote control of radios from the command and control spaces throughout the ship. 5) Test Set (AN/GRM-122) - A test set for testing the unique components of the SINCGARS SIP frequency-hopping radio. INSTALLING AGENTS: Alteration Installation Teams by all SPAWAR field activities. 1. FCIP will transfer to OMN beginning FY00. DD FORM 2446, JUN 87 P-1 Shopping List-Item No 79-2 of 79-3 Exhibit P-40, Budget Item Justification Unclassified UNCLASSIFIED CLASSIFICATION DATE BUDGET ITEM JUSTIFICATION SHEET June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3055 Communication Items Under $5M 52NG Hierarchical Yet Dynamic Reprogrammable Architecture (HYDRA) AN/SRC-55 - will replace all stovepipe wireless shipboard systems (DCWIFCOM, MOMCOM, PVPCS, FDCS) with an integrated system on all ship classes. HYDRA is a wireless digital voice and data communications system using COTS trunking technology. HYDRA is capable of interfacing with PBX/BG Cellular/RF systems. Unit costs vary with with the ship type and are based on the number of channels and radios in the system. Installations are performed by AITs during dockside availabilities. DD FORM 2446, JUN 87 Exhibit P-40, Budget Item Justification , Procurement History and Planning P-1 Shopping List-Item No 79-3 of 79-3 Unclassified Unclassified UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 DATE P-1 ITEM NOMENCLATURE BLI: 3057 Communication Items Under $5M FY 2000 FY 2001 FY 2002 $52.7 $43.1 $24.3 FY 2003 FY 2004 FY 2005 FY 2006 SUBHEAD 52NU FY 2007 TO COMP TOTAL QUANTITY COST (in millions) JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: This Budget line is a consolidation of several Communication Items Under $5M line items which includes Ship Tac Comms BLI 3010, Portable Radios BLI 3033 and SINCGARS BLI 3040. HF TILT MECHANISMS - Devices to enable vertical whip antenna to be lowered to a horizontal position during flight operations. HIGH FREQUENCY RADIO GROUP (HFRG) BROADBAND - Will allow fully automated operation of the HF communications system. The system will reduce the number of topside antennas used, reduce electromagnetic interference and reduce manning requirements.. HIGH FREQUENCY SMALL SHIP TRANSMITTER (HFSST) NARROWBAND - A one-to-one radio replacement of legacy Narrowband HF transmitters and antenna couplers; replacing 1960s vacuum tube technology. DIGITAL WIDEBAND TRANSMISSION SYSTEM (DWTS) - UHF line of sight radio system, ship-to-ship and ship-to-shore communications required to support landing force systems. The current program procures DWTS for amphibious and flag ships only. LRIP procurements of low data rate DWTS (DWTS LDR) begins in FY00. INSTALLING AGENTS: Installation will be accomplished by alteration installation teams (AIT) from SPAWAR field activities. BATTLE FORCE EMAIL 66 - BFEM 66 provides a basic SMPT/POP3 data transfer capability between Allied/NATO/Coalition Afloat forces utilizing the HF Spectrum. MCIXS: Battle Group Cellular Telephone (BG Cellular)/Maritime Cellular Information Exchange Systems (MCIXS) provides non mission-critical Intra-Battle Group real-time transfer of information using a standard telephone or cellular hand held mobile telephone. VIXS: Video Information Exchange System (VIXS) provides the Fleet with tactical video teleconferencing. The system provides multipoint secure Video Teleconferencing (VTC) between deployed carriers/large deck amphibs, Fleet Commander-in-Chief (CINCs), Chief of Naval Operations (CNO) and select Department of Defense (DOD) commands. Shipboard systems also provide connectivity to the Joint Worldwide Intelligence Communications System (JWICS) VTC system. P-1 Shopping List-Item No - 80 - 1 of 22 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continued) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE BLI: 3057 Communication Items Under $5M June 2001 SUBHEAD 52NU TMIP: Theater Medical Information Program - Maritime (TMIP-M) program is charged with deployment of both infrastructure and the software to support the theater requirements for healthcare and command and control (C2) activities: clinical, resources, logistics, decision support, etc. The development and release of TMIP software will be conducted incrementally and it will be based on GOTS medical software that is currently available in the military inventory. Software components selected for TMIP are: MAT, CHCS, DBSS, DMLSS, TRAC2ES, and other developed software meets the functionality of SAMS. Meanwhile, until TMIP is fully deployed in the fleet (est. FOC FY08), SAMS will be concurrently supported. Subsequent TMIP Block releases will follow. The TMIP-M will leverage IT-21 and NTCSS infrastructure components, Horizontal Integration efforts, as well as installation, logistics, and fleet support components. PORTABLE RADIOS: The Portable Radios Program supports the unique command and control needs of the Naval Explosive Ordnance Disposal Units, Naval Construction Force, Naval Beach Groups, Naval Tactical Air Control Groups, Naval Coastal Warfare Group, Naval Expeditionary Logistics Support Force, Naval Cargo Handling and Support Group, and Shipboard requirements defined by OPNAVINST C2300.44F. Man-portable, vehicular, and base station configurations are procured for VHF ECCM, HF, VHF high band (marine), UHF radios, VHF handheld. Procurement of replacement Emergency Position Indicating Radio Beacon (EPIRB) are due to five-year battery life expiration and high accountability requirements due to emergency Search and Rescue dispatch on activated devices. AN/SRC-55 Hierarchical Yet Dynamic Reprogrammable Architecture (HYDRA) - will replace all stovepipe wireless shipboard systems (DCWIFCOM, MOMCOM, PVPCS, FDCS) with an integrated system on all ship classes. AN/SRC-55 Hydra is a wireless digital voice and data communications system using COTS trunking technology, and is capable of interfacing with PBX/BG Cellular/RF systems. System and Installation costs vary with ship class and are based on the number of channels and radios in the system. Installations are performed by AITs during dockside availabilities. * Hydra became a SPAWAR funded program in FY98. FY99 and prior saw the AN/SRC-55 Hydra Program funded entirely under Claimant 39, during which time 3 HYDRA systems were procured and installed. Therefore, the total number of Hydra systems to be procured is 61; 3 by SPAWAR and 58 by NAVSEA. Funding for the AN/SRC-55 Hydra Program transitioned to NAVSEA in FY00. FY00 Budget and execution is under BLI 305500, Ship Comm Items Under $5M; FY01 and out program is budgeted and executed under BLI 305700/05, Communications Items Under $5M. P-1 Shopping List-Item No - 80 - 2 of 22 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST NU013 HF Tilt Mechanism DN013 HF Tilt Mechanism NU013 HF Tilt Mechanism NU016 HFRG Broadband DN016 HFRG Broadband NU016 HFRG Broadband NU017 HFSST Narrowband DN017 HFSST Narrowband NU017 HFSST Narrowband NG019 DWTS DN019 DWTS (IT21) DN019 DWTS Block Upgrade NU019 DWTS NU019 DWTS Block Upgrade NU022 Battle Force Email 66 (IT21) DN022 Battle Force Email 66 NU022 Battle Force Email 66 NG238 MCIXS NG238 MCIXS (FY00) NU238 MCIXS (FY01) NG239 VIXS (IT21) NG239 VIXS (FY00) NU239 VIXS (FY01/02) NG240 TMIP NG240 TMIP (SAMS NT Upgrade) NU240 TMIP (SAMS NT Upgrade) NU240 TMIP NU029 PORTABLE RADIOS NU029 Portable HF Radio NU029 Emerg Posit Indicating Radio Beacon (EPIRB) P-1 ITEM NOMENCLATURE SUBHEAD 52NU TOTAL COST IN THOUSANDS OF DOLLARS FY 2001 FY 2002 TOTAL UNIT TOTAL UNIT COST QTY COST COST QTY COST BLI: 3057 Communication Items Under $5M ID CODE A PY TOTAL COST QTY FY 2000 UNIT COST 0 2,461 TOTAL COST 0 0 31 A 79.39 4,976 1 4976.0 5,172 0 4,976 1 A 2,461 0 5172.00 0 5,172 0 0 0 0 1,848 929 0 B 4,648 8 20 331.0 100.0 2,648 2,000 2 7 A 39 35.2 1,374 1,374 35.03 0 3 A 39 46.3 266 2.0 309.33 1,806 1,806 18 B 779 1,069 6 154.8 1,366 39 A 389.50 152.71 86.28 526 526 1,366 572 16 35.8 2.08 572 928 0 928 0 1,553 996 1,553 11 90.5 554 266 929 996 761 554 24 31.7 761 104 132 24.6 0.8 2,655 2,554 101 A P-1 Shopping List-Item No 80-3 of 22 Exhibit P-5, Cost Analysis Unclassified UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ID CODE ELEMENT OF COST PY TOTAL COST P-1 ITEM NOMENCLATURE SUBHEAD BLI: 3057 Communication Items Under $5M 52NU TOTAL COST IN THOUSANDS OF DOLLARS FY 2000 FY 2001 FY 2002 UNIT TOTAL UNIT TOTAL UNIT COST COST QTY COST COST QTY COST QTY Production Support NG555 MCIXS, VIXS, SINCGARS DN555 HF, HFRG, HFSST, DWTS, Battle Force Email INSTALLATION TOTAL COST 6,537 3,354 3,183 4,699 2,777 19,549 17,466 11,692 FMP NG777 DN777 6,772 MCIXS, VIXS, TMIP, SINCGARS 10,671 HF TILT, HFRG, HFSST AND DWTS, Battle Force Email DSA NG777 MCIXS, VIXS, SINCGARS 961 DN777 HF TILT, HFRG, HFSST AND DWTS, Battle Force Email 967 NU777 FMP 14,963 9,876 NU777 DSA 2,400 1,692 103 124 3,000 0 NON-FMP NG776/NG777 178 VIXS Programmable Integrated Communications Termininal - Congressional Plus up HYDRA - SPAWAR 2150 0 0 T7777/NG777 HYDRA - FMP HYDRA - DSA 1870 280 0 T7777/NG777 0 0 0 41,566 39,047 20,382 39,047 20,382 Total Spawar Control BLI: 3055 BLI: 3010 15,745 25,821 52NG 52DN 41,566 HYDRA - NAVSEA NU245 AN/SRC-55 HYDRA NU245 FMP Installation 7 Total NAVSEA CONTROL CONSOLIDATED CONTROL 1,585.6 11,099 3 1,070.0 3,210 865 2 1,152.5 2,305 1,591 11,099 4,075 3,896 52,665 43,122 24,278 P-1 Shopping List-Item No 80-4 of 22 Exhibit P-5, Cost Analysis Unclassified UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST FY CONTRACTOR AND LOCATION CONTRACT & TYPE LOCATION OF PCO METHOD DN013 HF Tilt Mechanism 01 TBD FFP/C SPAWAR DN016 HFRG Broadband 1 NU016 00 01 HARRIS Corporation FFP/O HARRIS Corporation FFP/O NU017 DWTS 01 Canadian Marconi SUBHEAD BLI: 3057 Communication Items Under $5M RFP DATE ISSUE AWARD OF FIRST QTY DATE DATE Delevery 31 52NU SPECS DATE UNIT COST AVAILABLE REVISIONS NOW AVAILABLE 79.4 YES May-01 May-02 SPAWAR Jun-00 Jun-01 1 4,976.0 YES SPAWAR Mar-01 Jul-02 1 5,172.0 YES IDIQ SSC CHASN Nov-00 Sep-01 2 389.5 YES DN019 DWTS Block Upgrade 2 00 Various IDIQ SSC CHASN Various Various 20 100.0 YES NU017 DWTS Block Upgrade 2 01 Various IDIQ SSC CHASN Nov-00 Sep-01 7 152.7 YES DWTS Block Upgrade 2 02 Various IDIQ SSC CHASN Nov-01 Sep-02 6 154.8 YES NU022 Battle Force Email Battle Force Email 01 02 DTDI / Rockwell / Harris FFP/O SPAWAR Dec-00 Feb-01 39 35.0 YES DTDI / Rockwell / Harris FFP/O SPAWAR Dec-01 Feb-02 16 35.8 YES 5 NU238 MCIXS 01 TTK Inc FFP/OPT SPAWAR May-01 Aug-01 3 309.3 YES NU239 VIXS VIXS 01 02 SSC CHS SSC CHS WX WX SPAWAR SPAWAR Dec-00 Mar-01 18 86.3 Dec-01 Mar-02 11 90.5 YES YES 3,4 NU240 TMIP (SAMS NT) 01 SSC CHS WR SSC CHES N/A Oct-00 Nov-00 266 2.1 YES 02 SSC CHS/CHAR WX SSC CHS/CHAR N/A Oct-01 Nov-01 24 31.7 YES TMIP 3,4 D. 1/ 2/ 3/ 4/ N/A N/A REMARKS HFRG: Variable unit cost is due to differing system types. In FY01, HFRG is a 12 Kw system; In FY03, HFRG is a 12 Kw system. DWTS Block Upgrade: Variable unit cost is due to components being procured from various contractors and GSA schedule contracts. In FY01 quantities reflect SAMS-NT hardware/software procurement totals; an upgrade to the legacy system. For FY02 and out, quantities reflect number of ships receiving TMIP. Unit Cost for TMIP is an average cost for the year of total costs divided by number of ships deploying TMIP. Actual unit costs vary by ship class. P-1 Shopping List-Item No 80-5 of 22 Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING (Continued) June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST FY CONTRACTOR AND LOCATION CONTRACT & TYPE LOCATION OF PCO METHOD SUBHEAD BLI: 3057 Communication Items Under $5M RFP DATE ISSUE AWARD OF FIRST QTY DATE DATE Delevery 52NU UNIT COST SPECS DATE AVAILABLE REVISIONS NOW AVAILABLE Aug-01 PORTABLE RADIOS NU029 NU245 02 02 TBD TBD FPI MARCORSYSCOM TBD Oct-01 Apr-02 104 24.6 NO EPIRB FPI San Diego, CA N/A Oct-01 Jan-02 132 0.8 YES HYDRA - (NAVSEA) HYDRA - Carriers & Amphibs HYDRA - Carriers & Amphibs 01 02 Ericcson - Lynchburg, VA Ericcson - Lynchburg, VA C/FFP C/FFP SSC CHS SSC CHS May-01 Dec-01 Jul-01 Feb-02 3 2 1,070 1,153 YES YES Portable HF Radio D. REMARKS P-1 Shopping List-Item No 80-6 of 22 Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 13 1.0 0 0.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 13 1.2 PRIOR YR EQUIP 0 0.0 13 1.2 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 1.2 TOTAL PROCUREMENT COST 1.0 1.2 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ 0 0.0 FY 01 Qty $ 31 0.3 0.0 0 2.5 FY 02 Qty $ 0 0.1 0.0 0.0 0 0.0 0.0 0 0.0 0.0 0.3 0.0 2.6 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 31 2.5 31 2.5 5 mos PRODUCTION LEADTIME: FY 2000 N/A FY 2001 May-01 FY 2002: N/A FY 2003: DELIVERY DATES: FY 2000 N/A FY 2001 May-02 FY 2002: N/A FY 2003: 2 FY 01 3 4 1 2 FY 02 3 4 FY 03 13 18 13 OUTPUT 13 18 13 3 4 1 2 FY 05 3 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 4 Total Qty 2.5 3.1 ADMINISTRATIVE LEADTIME: 1 $ 0.1 0.5 CONTRACT DATES: PY TC Qty 0.0 INPUT INSTALLATION SCHEDULE: June 2001 SHIP TACTICAL COMMUNICATIONS DN013/NU013 HF TILT MECHANISMS Installation on ships to allow vertical whip antennas to be lowered to a horizontal position during flight operations. 1 2 2 FY 04 3 10 mos 4 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No 80-7 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 29 23.0 2 8.8 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 25 27.2 3 5.8 PRIOR YR EQUIP 25 27.2 3 5.8 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 27.2 5.8 TOTAL PROCUREMENT COST 50.2 14.6 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ 1 FY 01 Qty $ 5.0 1 0.6 0.2 2 2 5.2 FY 02 Qty $ 0 0.5 1.4 5.3 5.3 2 1 1 5.3 11.1 6.3 2.9 3.4 6.3 13.4 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 1 3.4 1 3.4 ADMINISTRATIVE LEADTIME: 1 mos PRODUCTION LEADTIME: FY 2001 Mar-01 FY 2002: N/A FY 2003: DELIVERY DATES: FY 2000 Jun-01 FY 2001 Jul-02 FY 2002: N/A FY 2003: 30 OUTPUT 30 2 FY 01 3 4 1 1 1 2 2 FY 02 3 FY 03 4 1 2 3 4 1 1 1 4 1 2 FY 07 3 4 TC FY 04 3 4 4 1 1 FY 06 3 2 12 mos 1 FY 05 1 Total Qty 3.4 4.2 Jun-00 1 $ 0.1 0.7 FY 2000 PY TC Qty 0.0 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: June 2001 SHIP TACTICAL COMMUNICATIONS DN016/NU016 HIGH FREQUENCY RADIO GROUP Provides for fully automated operation of the High Frequency Communications System. 2 3 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No 80-8 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 0.0 0 0.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 0 0.0 PRIOR YR EQUIP 0 0.0 0 0.0 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 SHIP TACTICAL COMMUNICATIONS DN017/NU017 HIGH FREQUENCY SMALL SHIP TRANSMITTER Provides for fully automated operation of the High Frequency Communications System. FY 00 Qty $ 0 FY 01 Qty $ 0.0 0 0.6 0 0.0 FY 02 Qty $ 0 0.0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ $ Total Qty 0.0 0.0 0.0 0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 ADMINISTRATIVE LEADTIME: 6 mos PRODUCTION LEADTIME: CONTRACT DATES: FY 2000 N/A FY 2001 N/A FY 2002: N/A FY 2003: DELIVERY DATES: FY 2000 N/A FY 2001 N/A FY 2002: N/A FY 2003: PY TC Qty 1 2 1 2 FY 01 3 4 1 2 4 1 2 FY 02 3 FY 03 4 1 2 3 4 1 4 1 2 FY 07 3 4 TC 2 FY 04 3 12 mos 4 INPUT OUTPUT FY 05 INSTALLATION SCHEDULE: FY 06 3 3 TOTAL INPUT OUTPUT Notes/Comments FY03: Procurement Unit Cost is higher than in out years due to Non-recurring costs associated with contract startup. P-1 Shopping List-Item No 80-9 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 11 5.6 21 10.5 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 3 1.3 11 0.9 PRIOR YR EQUIP 3 1.3 11 0.9 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 1.3 0.9 TOTAL PROCUREMENT COST 6.9 11.4 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 SHIP TACTICAL COMMUNICATIONS DN019/NU019 DWTS UHF Line-Of-Sight radio system, ship to ship and ship to shore communications. FY 00 Qty $ 8 FY 01 Qty $ 2.6 2 0.8 0.6 18 18 0.8 FY 02 Qty $ 0.0 1.5 Note 1. 4.5 4.5 8 Note 1. 8 Note 1. 4.5 8.5 Note 1. 2.3 FY 03 Qty FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 2 Note 1. 2 Note 1. 2 mos PRODUCTION LEADTIME: FY 2000 Nov-99 FY 2001 Nov-00 FY 2002: N/A FY 2003: DELIVERY DATES: FY 2000 Sep-00 FY 2001 Sep-01 FY 2002: N/A FY 2003: 2 FY 01 3 4 1 2 32 4 4 2 OUTPUT 32 4 4 2 FY 05 1 2 FY 02 3 FY 03 4 1 2 3 4 1 4 1 2 FY 07 3 4 TC FY 06 3 4 Total Qty Note 1. 0.0 ADMINISTRATIVE LEADTIME: 1 $ 0.0 Note 1. CONTRACT DATES: PY TC Qty 0.0 INPUT INSTALLATION SCHEDULE: $ 1 2 3 2 FY 04 3 10 mos 4 TOTAL INPUT OUTPUT Notes/Comments Note 1. Beginning in FY01, installation costs are included in the costs to install the DWTS Block Upgrade Alpha (next P-3a sheet). P-1 Shopping List-Item No 80-10 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 0.0 0 0.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 SHIP TACTICAL COMMUNICATIONS DN019/NU019 DWTS BLOCK UPGRADE UHF Line-Of-Sight radio system, ship to ship and ship to shore communications. FY 00 Qty $ 20 2.0 FY 01 Qty $ 7 0.6 0.6 0 0.0 1.1 FY 02 Qty $ 6 1.0 0.2 20 3.0 20 3.0 0.0 3.2 3.0 5.3 FY 03 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 7 1.3 7 1.3 2 mos PRODUCTION LEADTIME: FY 2000 Various FY 2001 Nov-00 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000 Various FY 2001 Sep-01 FY 2002: Sep-02 FY 2003: 2 FY 01 3 4 1 2 FY 02 3 0 10 10 4 3 OUTPUT 0 10 10 4 3 2 FY 05 3 1 FY 03 4 1 2 3 4 1 4 1 2 FY 07 3 4 TC FY 06 4 Total Qty 1.3 3.2 ADMINISTRATIVE LEADTIME: 1 $ 0.8 0.2 CONTRACT DATES: PY TC Qty 0.9 INPUT INSTALLATION SCHEDULE: FY 04 Qty $ 1 2 3 2 FY 04 3 10 mos 4 TOTAL INPUT OUTPUT Notes/Comments Note 1: Beginning in FY04, all DWTS system will be transitioned into the EPLRS system P-1 Shopping List-Item No 80-11 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 0.0 0 0.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 0 0.0 PRIOR YR EQUIP 0 0.0 0 0.0 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ 39 39 16 1.4 0.2 0.2 39 0.9 39 0.9 1.4 0.4 0.3 39 1.2 39 1.2 0.9 2.7 1.2 3.2 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 16 0.5 16 0.5 ADMINISTRATIVE LEADTIME: 3 mos PRODUCTION LEADTIME: FY 2001 ###### FY 2002: Dec-01 FY 2003: DELIVERY DATES: FY 2000 Jul-00 FY 2001 Feb-01 FY 2002: Feb-02 FY 2003: 2 FY 01 3 39 17 22 OUTPUT 39 17 18 4 1 4 2 FY 02 3 9 7 9 7 FY 05 1 2 FY 03 4 1 2 3 4 1 4 1 2 FY 07 3 4 TC FY 06 3 4 Total Qty 0.5 1.5 May-00 1 $ 0.3 0.1 FY 2000 PY TC Qty 0.6 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: June 2001 Battle Force Email 66 DN022/NU022 BFEM BFEM 66 provides a basic SMPT/POP3 data transfer capability between Allied/NATO/Coalition Afloat forces utilizing the HF Spectrum. 1 2 3 2 FY 04 3 2 mos 4 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No 80-12 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Technical improvment of existing MCIXS systems based on commercial system availability. REMARKS: Exhibit reflects ECP change to the MCIXS (NG238) program DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 7 1.9 0 0.1 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 7 0.4 0 0.0 PRIOR YR EQUIP 7 0.4 0 0.0 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.4 0.0 TOTAL PROCUREMENT COST 2.3 0.1 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ 0 FY 01 Qty $ 0.0 3 0.0 0.0 0 0.0 0 0.0 0.9 FY 02 Qty $ 0 0.2 0.1 3 0.3 3 0.3 0.0 0.0 0.3 1.4 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 0 0.0 0 0.0 1 mos PRODUCTION LEADTIME: N/A FY 2001 May-01 FY 2002: N/A FY 2003: DELIVERY DATES: FY 2000 N/A FY 2001 Aug-01 FY 2002: N/A FY 2003: 2 FY 01 3 4 7 3 OUTPUT 7 3 1 2 1 2 FY 05 1 2 FY 02 3 FY 03 4 1 2 3 4 1 4 1 2 FY 07 3 4 TC FY 06 3 4 Total Qty 0.0 0.0 FY 2000 1 $ 0.0 0.0 CONTRACT DATES: PY TC Qty 0.0 ADMINISTRATIVE LEADTIME: INPUT INSTALLATION SCHEDULE: June 2001 Maritime Cellular Information Exchange Systems (MCIXS) (formerly known as Battle Group Cellular Telephone/BG Cellular) NG238/NU238 3 2 FY 04 3 3 mos 4 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No 80-13 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Provides multifunctional information exchange systems capable of interactive imagery and video teleconferencing. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 3 0.2 1 0.1 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 3 0.2 1 0.1 PRIOR YR EQUIP 3 0.2 1 0.1 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.2 0.1 TOTAL PROCUREMENT COST 0.4 0.2 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 VIXS (Video Information Exchange System)-SHIP INSTALLATION NG239NU239 FY 00 Qty $ FY 01 Qty $ 36 17 1.4 0.10 0.23 36 1.43 36 1.43 1.3 FY 02 Qty $ 6 0.1 0.2 FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 7 0.52 15 0.9 2 5 0.15 0.37 ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: Dec-99 FY 2001 Dec-00 FY 2002: Dec-01 FY 2003: DELIVERY DATES: FY 2000 Feb-00 FY 2001 Mar-01 FY 2002: Mar-02 FY 2003: 40 OUTPUT 40 1 2 FY 01 3 4 1 2 FY 02 3 4 5 5 5 2 2 2 1 5 5 5 2 2 2 3 4 1 2 3 4 FY 05 1 2 $ 1 mos FY 2000 PY TC Qty Total Qty 0.5 1.4 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: FY 04 Qty $ 0.0 0.1 0.9 0.9 2.5 $ 0.8 15 1.4 3.2 FY 03 Qty FY 03 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 2 FY 04 3 3 mos 4 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No 80-14 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Provides multifunctional information exchange systems capable of interactive imagery and video teleconferencing. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 0.0 10 0.9 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 10 0.6 PRIOR YR EQUIP 0 0.0 10 0.6 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.6 TOTAL PROCUREMENT COST 0.0 1.5 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 VIXS (Video Information Exchange System)-SHORE INSTALLATION NG239NU239 FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ 3 0.41 1 0.29 5 0.222 2 0.18 2 0.1 5 0.103 2 0.18 1 1 0.03 0.07 5 0.103 0.2 0.6 0.1 0.4 FY 03 Qty $ FY 04 Qty $ FY 06 Qty $ FY 07 Qty $ 1 mos PRODUCTION LEADTIME: FY 2000 Dec-99 FY 2001 Dec-00 FY 2002: Dec-01 FY 2003: DELIVERY DATES: FY 2000 Feb-00 FY 2001 Mar-01 FY 2002: Mar-02 FY 2003: 1 2 FY 01 3 4 1 2 FY 02 3 4 FY 03 12 1 1 2 2 1 OUTPUT 12 1 1 2 2 1 1 2 3 4 FY 05 4 Total Qty 1 2 3 mos FY 04 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 3 $ ADMINISTRATIVE LEADTIME: CONTRACT DATES: PY TC Qty 0.1 0.3 INPUT INSTALLATION SCHEDULE: FY 05 Qty $ 2 3 4 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No 80-15 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: TMIP NG240/NU240 TMIP TMIP is the infrastructure and software to support Navy and Marine Corps requirements for healthcare and C2 activities: clinical resources, logistics, decision support, etc. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 0.0 0 0.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 0 0.0 PRIOR YR EQUIP 0 0.0 0 0.0 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ FY 01 Qty $ 266 0.5 266 0.6 24 0.8 266 0.2 266 0.4 24 0.2 266 0.2 266 0.4 24 0.2 0.2 0.8 0.4 0.9 FY 02 Qty $ Qty FY 03 $ FY 04 Qty $ FY 06 Qty $ FY 07 Qty $ ADMINISTRATIVE LEADTIME: 1 mos FY 2000 Feb-00 FY 2001 Oct-00 FY 2002: Oct-01 FY 2003: DELIVERY DATES: FY 2000 Apr-00 FY 2001 Nov-00 FY 2002: Nov-01 FY 2003: 1 2 FY 01 3 4 1 2 FY 02 3 FY 03 4 266 132 134 6 7 7 4 OUTPUT 266 132 134 3 7 7 7 1 2 1 2 FY 06 3 4 FY 05 3 4 $ PRODUCTION LEADTIME: CONTRACT DATES: PY TC Qty Total Qty 0.2 0.9 INPUT INSTALLATION SCHEDULE: FY 05 Qty $ June 2001 1 2 3 4 1 1 2 FY 07 3 4 TC 2 FY 04 3 2 mos 4 TOTAL INPUT OUTPUT Notes/Comments Note 1: In FY00 and FY01, quantities reflect SAMS-NT hardware/software procurement totals; an upgrade to the legacy system. For FY02 and out, quantities reflect number of ships receiving TMIP. Therefore, Total SAMS-NT units= 532 ; Total TMIP units= 319; GRAND TOTAL quantities: 851 Unit cost for TMIP is an average cost for the year of total costs divided by number of ships deploying TMIP. Actual unit costs vary by ship class. Exhibit P-3a, Individual Modification Program Unclassified P-1 Shopping List-Item No 80-16 of 22 Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs* FY 00 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 7 11.1 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 5 0.0 PRIOR YR EQUIP* FY 00 EQUIP** 5 FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 0.0 11.1 METHOD OF IMPLEMENTATION: FY 01 Qty $ 3 3.2 Qty 2 0.1 2 0.8 2 0.8 1.7 4.9 FY 02 $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ TC Qty $ 0.1 5 1.5 3 2 0.9 0.6 3.1 5.4 ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: FY 2000 Jun-00 FY 2001 May-01 FY 2002: Dec-01 FY 2003 DELIVERY DATES: FY 2000 Aug-00 FY 2001 Jul-01 FY 2002: Feb-02 FY 2003 FY 02 3 4 1 2 3 4 1 4 1 2 FY 07 3 4 TC PY INPUT 3 OUTPUT 3 1 1 2 2 FY 01 3 Total Qty 2.3 CONTRACT DATES: INSTALLATION SCHEDULE: INSTALLATION SCHEDULE: June 2001 HYDRA NU245 AN/SRC-55 HYDRA is a wireless digital voice and data communications system using COTS trunking technolog 4 1 2 2** 2 3 2 2 1 3 1 FY 05 3 4 1 2 FY 03 2 FY 04 3 4 2 FY 06 3 TOTAL INPUT OUTPUT Notes/Comments *FY 99 and prior funding provided under SPAWAR Claimant 39, with 3 HYDRA systems installed **Four FY00 Procurements (two trainers) to be installed FY01; FY01 procurements to be installed FY02 FY 01 Contract delayed due to current contract ceiling limitations. Extended contract in place May-01. P-1 Shopping List-Item No 80-17 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: June 2001 SINCGARS TD-1456 D5005/D5006/NG247 Antenna Multiplexer TD-1456 Provides ships engaged in amphibious operations and naval gunfire support missions the capability to communicate with ground forces in a VHF-FM anti-jam mode. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 FY 00 Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 49 2.9 110 8.4 0.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 0 0.0 17 ote 1. 28 Note 1. PRIOR YR EQUIP 0 0.0 17 ote 1. 28 Note 1. FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 Note 1. Note 1. TOTAL PROCUREMENT COST 2.9 8.4 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 01 Qty $ FY 02 Qty $ 0.0 49 4 45 Note 1. Note 1. Note 1. Note 1. 0.0 FY 03 Qty $ FY 04 Qty $ FY 06 Qty $ FY 07 Qty $ 39 Note 1. 39 Note 1. $ Total Qty Note 1. 0.0 ADMINISTRATIVE LEADTIME: 6 mos PRODUCTION LEADTIME: CONTRACT DATES: FY 2000 N/A FY 2001 N/A FY 2002: N/A FY 2003: DELIVERY DATES: FY 2000 N/A FY 2000 N/A FY 2002: N/A FY 2003: PY TC Qty 0.0 1 2 FY 01 3 4 1 2 FY 02 3 FY 03 4 INPUT 45 0 3 0 46 0 0 6 33 OUTPUT 45 0 3 0 46 0 0 6 33 1 2 FY 05 3 4 1 2 INSTALLATION SCHEDULE: FY 05 Qty $ 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 3 4 2 FY 04 3 18 mos 4 TOTAL INPUT OUTPUT Notes/Comments Note 1. Installation costs are included in the costs to install AN/SRC-54A/B (D5009/NG250). P-1 Shopping List-Item No 80-18 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: June 2001 SINCGARS AN-SRC-54B D5009/NG250 SINCGARS Ship System AN/SRC-54B Provides ships engaged in amphibious operations and naval gunfire support missions the capability to communicate with ground forces in a VHF-FM anti-jam mode. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 0.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware 21 2.3 PRIOR YR EQUIP 21 2.3 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 2.3 TOTAL PROCUREMENT COST 2.3 METHOD OF IMPLEMENTATION: FY 99 Qty $ FY 00 Qty $ FY 01 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ TC Qty $ Total Qty 311 11.7 3.1 0.7 94 94 2.1 2.1 65 65 5.1 5.1 0.9 0.3 136 136 5.1 8.9 2.1 13.8 2.9 2.9 2.9 4.1 1.0 0.1 54 54 1.5 1.5 1.5 2.5 ADMINISTRATIVE LEADTIME: 6 mos PRODUCTION LEADTIME: CONTRACT DATES: FY 2000 N/A FY 2001 N/A FY 2002: N/A FY 2003: DELIVERY DATES: FY 2000 N/A FY 2000 N/A FY 2002: N/A FY 2003: INSTALLATION SCHEDULE: PY 1 2 FY 01 3 INPUT 180 32 0 OUTPUT 180 32 1 INSTALLATION SCHEDULE: FY 02 Qty $ 4 1 2 FY 02 3 4 FY 03 0 104 0 0 11 43 0 0 104 0 0 11 43 2 FY 05 3 4 1 2 3 4 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 2 FY 04 3 18 mos 4 TOTAL INPUT OUTPUT Notes/Comments Note 1: The installation of the 110 units of upgrades AN/SRC-54 radios procured under cost code D5001 are installed as follows: FY98: 21 units; FY99 33 units; FY00 56 units. TOTAL 110 units The installation of the 311 units of AN/SRC-54B radios procured under cost code D5009 are installed as follows: FY99: 61 units; FY00: 9 units; FY01: 136 units; FY02: 54 units and FY03: 51 units. TOTAL 311 units. Note 2: The FY01 installation will be accomplished with equipment that was procured in FY99, but modified for shipboard use in FY01 P-1 Shopping List-Item No 80-19 of 22 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE BLI: 3057 Communication Items Under $5M ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 6 6 6 5 4 4 1 1 1 1 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY DN013 HF Tilt Mechanism 01 31 31 DN016 HFRG Broadband HFRG Broadband 00 01 1 1 1 1 NU019 DWTS 01 2 DN019 DWTS Block Upgrade NU019 DWTS Block Upgrade DWTS Block Upgrade 00 01 02 20 DN022 Battle Force Email NU022 Battle Force Email 00 01 02 39 NU238 MCIXS NG239 VIXS NU239 VIXS NG240 TMIP (SAMS NT) NU240 TMIP (SAMS NT) TMIP 01 FISCAL YEAR CALENDAR YEAR 01 2 18 7 6 6 39 39 16 16 01 3 3 00 01 02 39 03 1 2 3 2 2 3 2 2 1 1 1 1 1 1 1 A 1 1 1 1 A 00 01 02 266 A 25 14 A A A 2 1 2 1 9 7 0 18 18 11 11 266 03 CALENDAR YEAR 0 39 39 FISCAL YEAR 02 1 A A 7 02 CALENDAR YEAR A A 6 2 2 3 2 A 4 2 1 1 1 1 1 0 266 266 24 24 A OCT 66 66 NOV DEC 44 JAN 45 FEB 45 MAR APR MAY JUN JUL AUG SEP A 3 3 3 3 1 3 1 3 2 2 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG PRODUCTION RATE Name and Location MSR 1-8-5 P-1 Shopping List-Item No 80-20 of 22 SEP PROCUREMENT LEADTIMES Manufacturer’s ITEM SUBHEAD NO. 52NU MAX ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure Exhibit P-21 Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE (Continued) June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE BLI: 3057 Communication Items Under $5M S COST ITEM/MANUFACTURER CODE ACCEP 04 FISCAL YEAR 03 CALENDAR YEAR 05 04 FISCAL YEAR CALENDAR YEAR 05 06 CALENDAR YEAR 06 PROC PRIOR DUE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP FY NU013 HF Tilt Mechanism 01 31 31 0 NU016 HFRG Broadband 00 01 1 1 0 1 1 0 DN019 DWTS NU019 DWTS 00 01 8 8 0 2 2 0 DN019 DWTS Block Upgrade NU019 DWTS Block Upgrade 00 01 02 20 20 0 7 7 0 6 6 0 00 01 02 39 39 0 39 39 0 16 16 0 NU238 MCIXS 01 3 3 0 NG239 VIXS NU239 VIXS 00 01 02 39 39 0 18 18 0 11 15 0 00 01 02 266 266 0 266 266 0 24 24 0 NG240 TMIP (SAMS NT) NU240 TMIP (SAMS NT) TMIP CY E V DN022 Battle Force Email NU022 Battle Force Email FISCAL YEAR BAL SUBHEAD NO. 52NU PRODUCTION RATE PROCUREMENT LEADTIMES Manufacturer’s ITEM Name and Location HF Tilt mechanism TBD HFRG Broadband Harris MCIXS TTK Inc MSR ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of 1-8-5 MAX 3/mo 6/mo 10/mo 30 30 360 360 780 Days 1/mo 2/mo 3/mo 30 30 360 360 780 Days 1/mo 3/mo 5/mo 30 30 360 360 780 Days P-1 Shopping List-Item No 80-21 of 22 Total Measure Exhibit P-21 Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE BLI: 3057 Communication Items Under $5M ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY 01 FISCAL YEAR SUBHEAD NO. 52NU CALENDAR YEAR 01 02 FISCAL YEAR CALENDAR YEAR 02 03 CALENDAR YEAR 03 PORTABLE RADIOS NU029 NU029 Portable HF Radio EPIRB 02 02 104 104 A 132 132 A 01 02 3 3 2 2 20 30 30 24 50 50 32 HYDRA (NAVSEA) NU245 HYDRA NU245 HYDRA A 1 2 A OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2 JAN FEB MAR APR PRODUCTION RATE Name and Location MSR 1-8-5 JUN JUL PROCUREMENT LEADTIMES Manufacturer’s ITEM MAY MAX ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure N/A P-1 Shopping List-Item No 80-22 of 22 Exhibit P-21 Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 DATE P-1 ITEM NOMENCLATURE 310700 Submarine Broadcast Support FY 2000 FY 2001 FY 2002 $35.1 $31.1 $17.5 FY 2003 FY 2004 FY 2005 FY 2006 SUBHEAD 52W4 FY 2007 TO COMP TOTAL QUANTITY COST (in millions) The Submarine Broadcast System program was established to improve the reliability, efficiency and performance of the Extremely Low Frequency (ELF)/Very Low Frequency (VLF)/Low Frequency (LF) submarine broadcast system. These transmission mediums (ELF/VLF/LF) comprise the primary line of Fleet Ballistic Missile Command, Control and Communications (FBMC3). Two (2) ELF, four (4) VLF and six (6) LF shorebased transmitter sites are Emergency Action Message (EAM) relay points providing primary connectivity between National Command Authorities (NCA) and SSBNs. Tasks are planned/ongoing to improve performance of ELF/VLF/LF broadcast capabilities consistent with changing operational requirements and integrate Internet Protocol ( IP) capability in Broadcast Control Authorities (BCA’s). The ELF Communications Ashore Robustness Program (ECARP) will provide upgrades to existing ELF transmitter systems by replacing degraded, obsolete and high maintenance items that could preclude reliable operation well into the future. The Submarine LF/VLF VME Receiver (SLVR) system replaces antiquated and limited capability LF/VLF receivers on TRIDENT and SSN (688/Seawolf/New Attack) submarines and at selected shore sites. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: (1) VALUE (VLF Ashore Lifetime Upkeep Effort): (W4012) Provides upgrades to correct deficiencies in material condition and logistics support of existing VLF/LF transmitter systems at shore stations worldwide that could preclude reliable operation to the year 2025. (2) SLVR: (W4001) A mission critical piece of C3I equipment onboard submarines and procurements are planned through FY01 to change out the legacy shipboard LF/VLF systems. It replaces 20 - 30 year old technology limited VLF receiver systems and provides flexibility for change in addition to reductions in space and weight. This approach will modernize the existing systems to a standard design and eliminates the need for supporting numerous configurations of LF/VLF receiver systems, thus minimizing total cost of ownership/maintenance cost to the Fleet. To be successful the commercial components must be procured during the brief period of FY98 thru FY01 to insure a single generation of Commercial Off The Shelf (COTS) is used for SLVR. (3) Submarine Broadcast Upgrade: (W4008) Upgrades and replaces transmitters, equipment and antenna components at shore stations worldwide. The upgrades are necessary to replace obsolete and degraded equipment which will have an adverse impact on system operation, reliability and maintenance. (4) NON-Fleet Modernization Program Equipment Installation (NON-FMP): (W4776) and Fleet Modernization Program (FMP) Installation: (W4777). P-1 Shopping List-Item No - 81 - 1 of 8 Exhibit P-40, Budget Item Justification Unclassified Classification CLASSIFIED SSIFICATION DATE June-01 COST ANALYSIS ATION ACTIVITY IONS AND ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST W4011 W4012 Submarine Broadcast Systems REM **VALUE W4001 W4777 Submarine LF/VLF VME Receiver Submarine LF/VLF VME Receiver Submarine LF/VLF VME Receiver Prefaulted Modules/Upgrade Kits Installation ID CODE A A PY TOTAL COST QTY FY99 UNIT COST TOTAL COST P-1 ITEM NOMENCLATURE 310700 Submarine Broadcast Support TOTAL COST IN THOUSANDS OF DOLLARS FY 2000 FY 2001 FY 2002 UNIT TOTAL UNIT TOTAL UNIT QTY COST COST QTY COST COST QTY COST TOTAL COST QTY VAR 1 12,935 11,678 A 47 3/4 323.8 Production Support VALUE SLVR 16,318 15,219 1,099 1 44 13,166 304.84 13,166 1 13,413 13,413 *** 12,935 1,259 633 503 123 2,552 965 1,485 102 1,702 782 819 101 A 2,380 1,067 1,313 2,013 969 1,044 726 605 121 48 35,135 45 31,144 1 FY 2003 UNIT COST TOTAL COST 2,154 2,154 A Non FMP Installation Shore FMP Installation Ships DSA W4555 3,500 11,678 SUBHEAD 52W4 17,517 *This program now includes OPN P-1 Line Item Submarine LF/VLF VME Receiver (314700) beginning in FY00. Remarks: equipment configurations at each location. ***Not procuring systems, procuring ELF kits P-1 Shopping List-Item No 81-2 of 8 Exhibit P-5, Budget Item Justification RM 2446, JUN 86 Unclassified UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST W4012 **VALUE W4001 Submarine LF/VLF VME Receiver CONTRACTOR AND LOCATION CONTRACT 00 01 SUBHEAD 310700 Submarine Broadcast Support DATE AWARD OF FIRST QTY UNIT DATE Delevery COST 52W4 & TYPE LOCATION OF PCO RFP ISSUE DATE Continental Elec, Dallas TX Continental Elec, Dallas TX C/CPIF C/CPIF SSC CHSN SSC CHSN Option Option Dec-99 Dec-00 Dec-01 Dec-02 1 1 11,678 13,166 Yes Yes 02 Continental Elec, Dallas TX C/CPIF SSC CHSN Option Dec-01 Dec-03 1 12,935 Yes 00 01 Sechan Elec., Inc. Lilitz, PA FFP/OPT SSC SD N/A Dec-99 Jun-00 47 323.8 Yes Sechan Elec., Inc. Lilitz, PA FFP/OPT SSC SD N/A Dec-00 Jun-01 44 304.8 Yes FY METHOD SPECS DATE AVAILABLE REVISIONS NOW AVAILABLE D. REMARKS **Unit cost varies by site due to differing equipment configurations at each location. P-1 Shopping List-Item No 81-3 of 8 Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 1 11.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other - Production Support Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ 1 11.7 FY 01 Qty $ 1 1.1 13.2 FY 02 Qty $ 1 1.0 1 1 0.00 12.7 0.2 0.2 0.2 14.3 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 1 0.1 1 0.1 ADMINISTRATIVE LEADTIME: 8 Months PRODUCTION LEADTIME: FY 2001 Dec-00 FY 2002: Dec-01 FY 2003: DELIVERY DATES: FY 2000 Dec-01 FY 2001 Dec-02 FY 2002: Dec-03 FY 2003: 2 FY 01 3 4 1 1 2 FY 02 3 1 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 3 2 FY 04 3 4 1 FY 05 2 FY 03 4 24 Months 1 OUTPUT 1 Total Qty 0.1 13.7 Dec-99 1 $ 0.6 FY 2000 PY TC Qty 12.9 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: June 2001 VALUE W4012 VLF/LF Transmitter Systems Corrects deficiencies in material condition and logistics support of existing VLF/LF transmitter systems 4 1 2 3 4 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No 81-4 of 8 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June 2001 SLVR (W4001) W4777 FMP Ship Installations Replace the legacy shipboard VLF/LF systems DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 36 12.6 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other - Production Support Interm Contractor Support Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ FY 01 Qty $ 33 31 10.7 0.2 0.9 0.9 36 36 0.6 0.6 FY 02 Qty $ FY 03 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 33 1.6 33 1.6 0.6 13.3 1.6 11.8 31 0.9 31 0.9 3 Months PRODUCTION LEADTIME: Dec-99 FY 2001 Dec-00 FY 2002: FY 2003: DELIVERY DATES: FY 2000 Jun-00 FY 2001 Jun-01 FY 2002: FY 2003: 2 FY 01 3 4 36 14 8 11 36 14 8 8 3 4 INPUT OUTPUT 2 FY 02 3 4 10 11 10 3 10 11 10 1 2 3 4 1 FY 05 1 2 Total Qty 0.9 0.9 ADMINISTRATIVE LEADTIME: 1 $ 0.7 FY 2000 PY TC Qty 9.5 CONTRACT DATES: INSTALLATION SCHEDULE: INSTALLATION SCHEDULE: FY 04 Qty $ FY 03 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 2 FY 04 3 6 Months 4 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No 81-5 of 8 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June 2001 SLVR (W4001) W4776 NON-FMP Shore Installations Replaces legacy VLF/LF receive systems DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 FY 00 Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment *[15] [7.4] 8 2.8 14 4.5 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment 0.4 Other - Production Support Interm Contractor Support Installation of Hardware *[15] [0.6] 8 0.6 PRIOR YR EQUIP 8 0.6 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 [0.6] 0.6 TOTAL PROCUREMENT COST [7.4] 2.8 5.6 METHOD OF IMPLEMENTATION: FY 01 Qty $ 13 FY 02 Qty $ FY 03 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ TC Qty $ Total Qty 4.0 0.3 14 0.8 14 0.8 0.8 5.1 13 0.7 13 0.7 0.7 0.7 ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: CONTRACT DATES: FY 2000 Dec-99 FY 2001 Dec-00 FY 2002: FY 2003: DELIVERY DATES: FY 2000 Jun-00 FY 2001 Jun-01 FY 2002: FY 2003: INSTALLATION SCHEDULE: PY 1 2 FY 01 3 INPUT 23 2 11 OUTPUT 23 2 11 1 2 2 FY 02 3 4 1 7 5 1 1 7 5 1 3 4 4 1 FY 05 INSTALLATION SCHEDULE: FY 04 Qty $ FY 03 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 3 4 1 2 2 FY 04 3 6 Months 4 TOTAL INPUT OUTPUT Notes/Comments: * This program now includes OPN Line Item Submarine LF/VLF VME Receiver (314700) beginning in FY00. P-1 Shopping List-Item No 81-6 of 8 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 9 16.9 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other - Production Support Interm Contractor Support Installation of Hardware 9 0.8 PRIOR YR EQUIP 9 0.8 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.8 TOTAL PROCUREMENT COST 17.7 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ ADMINISTRATIVE LEADTIME: FY 07 Qty $ FY 2000 FY 2001 FY 2002: FY 2003: DELIVERY DATES: FY 2000 FY 2001 FY 2002: FY 2003: PY 9 OUTPUT 9 1 2 1 2 FY 01 3 4 1 2 4 1 2 FY 05 FY 02 3 FY 03 4 1 2 3 4 1 4 1 2 FY 07 3 4 TC FY 06 3 3 TC Qty $ Total Qty PRODUCTION LEADTIME: CONTRACT DATES: INPUT INSTALLATION SCHEDULE: June 2001 Submarine Broadcast System W4008 VARIOUS Upgrades and replaces submarine broadcast equipment and antenna components worldwide 2 FY 04 3 4 TOTAL INPUT OUTPUT P-1 Shopping List-Item No 81-7 of 8 Exhibit P-3a, Individual Modification Program Unclassified Classification $ CLASSIFICATION DATE PRODUCTION SCHEDULE Jun-01 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE *310700 Submarine Broadcast Support S COST ITEM/MANUFACTURER CODE W4001 Submarine LF/VLF VME Receiver 02 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P JAN FEB MAR APR MAY JUN JUL AUG SEP 02 00 01 47 44 00 1 1 1 12 35 CALENDAR YEAR 01 CALENDAR YEAR 02 03 1 A 1 A 6 6 NOV 6 A 4 DEC JAN 4 FEB 3 MAR 3 APR 3 MAY 3 3 3 3 4 4 3 4 4 5 4 4 JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY PRODUCTION RATE ITEM Name and Location W4012 - VALUE Continental Electric, Dallas, TX Sechan Electric, Liltz, PA MSR 1-8-5 MAX 1 4 1 80 1 200 P-1 SHOPPING LIST ITEM NO. 81 PAGE NO. 8 of JUN JUL AUG SEP OCT NOV DEC PROCUREMENT LEADTIMES Manufacturer’s NAVMAT FORM 7110/4 (REVISED 11/77) 03 DUE OCT W4001 - Submarine LF/VLF VME Receiver FISCAL YEAR CALENDAR YEAR PRIOR 1 1 1 00 01 FISCAL YEAR BAL PROC FY VALUE 01 ACCEP E V W4012 FISCAL YEAR SUBHEAD NO. 52W4 ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT 15 Mo. 12 Mo. 8 Mo. 3 Mo. 24 Mo. 6 Mo. 8 Mo. 3 Mo. Unit of Total Measure 5 150 8 CLASSIFICATION UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY P-1 ITEM NOMENCLATURE 313000 Submarine Communications FY 2000 FY 2001 FY 2002 $83.2 $77.2 $89.3 June 2001 SUBHEAD 52L0 QUANTITY COST (in millions) PROGRAM COVERAGE: The mission of the Submarine Communications Program is to create a common, automated, open system architecture radio room for all submarine classes. The program provides for the procurement and installation of systems incorporating the technical advances of network centric warfare to allow the submarine force to communicate as part of the Battle Group. The program addresses the unique demands of submarine communications, obsolesence issues and higher data rate requirements. BASEBAND DISTRIBUTION SYSTEM (BBS) (L0027) - Consists of switching hardware and controller that allows flexible distribution of baseband signals throughout the submarine Radio Room. The BBS is a NonDevelopmental Item (NDI) that automates SSN 688 class assets, provide remotely controlled switching operation, allow preset configurations for quick reaction times, reduce needed rack space, and recover fleet configuration control. ANTENNA MODIFICATIONS (L0035) - Modifications to antenna and ancilliary legacy systems in order to provide engineering changes. These modifications address Very Low Frequency (VLF) performance, Mid Frequency/High Frequency (MF/HF) effciency, UHF antenna efficiency and increased data rate capability with the UHF multifunction mast upgrade, increased reliability and maintainability, and cost effective technology insertion. Modifications are applicable to all SSN/SSBN classes and are implemented on a Fleet priority basis. TIME and FREQUENCY DISTRIBUTION SYSTEM (TFDS)/BSQ-9 (V) (L0078) - The TFDS/BSQ-9 (V) provides precision frequency and Precision Time and Time Interval (PTTI) signals that are synchronized to Universal Coordinated Time (UTC) via the Global Positioning System (GPS). The TFDS/BSQ-9 (V) amplifies and distributes external presision source signals to communications, navigation, electronic warefare, combat, and ship control systems onboard all classes of submarines. The TFDS/BSQ-9 (V) provides improved reliability and lower life cycle cost over the older Cesium Standards. Shore site variants are funded by N6. This procurement supports SSN688, SSN21,Trident and SSBN Submarine Platforms. OE-538/BRC ANTENNA GROUP (IMPROVED AN/BRA-34) (L0080) - The OE-538/BRC antenna group provides an improved multifunctional combined communications, navigation, and IFF mast mounted antenna group to replace the AN/BRA-34 and OE-207/BRC. It provides the SSN 688, SSN 21, TRIDENT, VIRGINIA and SSBN class submarines with a mast mounted, multifunction antenna with greater reliability than the current AN/BRA-34 and OE-207/BRC and supports the additional capabilities of high frequency broadband and Demand Access Multiple Access (DAMA) operation. The Radio Frequency Distribution and Control System (RFDACS) technology update brings COTS functionality and supportability to the OE-538/BRC system. The RFDACS Network Centric Architecture enables the radio room control LAN to remotely interface with the functions necessary for the user to operate the OE-538/BRC antenna group. RDT&E (N) Program Element - PE 0604503N pertains. P-1 Shopping List-Item No - 82 - 1 of 15 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continued) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT June 2001 DATE P-1 ITEM NOMENCLATURE 313000 Submarine Communications SUBHEAD 52L0 SUBMARINE COMMUNICATIONS SUPPORT SYSTEM RADIO ROOM (SCSS)(Includes TRIDENT SCSS) (L0084) - The SCSS Radio Room will consist of an open system, multimedia, circuit sharing architecture that will serve as the shipboard automated communications control system. Procurement in this line is for the radio room communications racks, chassis, common power supplies and ancillary components required to integrate submarine communication equipment. This procurement supports SSN688, SSN21 and TRIDENT submarine platforms. SUBMARINE HIGH DATA RATE SATELLITE COMMUNICATIONS ANTENNAS (HDR)(L0087) - The Submarine HDR antenna will provide submarines with antennas that have the bandwidth, gain, and flexibility to meet the stated COMSUBLANT/COMSUBPAC requirements for HDR communications in the SHF and EHF frequency. RDT&E (N) Program Element - PE 0604503N pertains. SUBMARINE TACTICAL DATA LINKS (STDL) (L0091) -The Submarine Tactical Data Links Communications system will provide a secure, high capacity, jam-resistant, lightweight, digital data and voice, communication and navigation system. (STDL will be functionally and architecturally equivalent to the Joint Tactical Information Display System (JTIDS) and will have the same required capabilities as JTIDS). RDT&E (N) Program Element - PE 0604503N pertains. SUBMARINE SHIP PC UPGRADE (L0094) - Funds the initial procurement of PCs, software, printers and scanners in concert with the fielding of the Tactical Integrated Digital System (TIDS) shipboard Information Technology (IT) network (L0097). Funds the technical refresh of this hardware and software every four years following initial installation of a boat’s TIDS network. EHF PERISCOPE MODIFICATIONS (L0095) - Funds procurement and installation of EHF periscope modification kits. The modifications will augment and enhance the communication capability of submarines originally not receiving EHF Low Data Rate (LDR). This allows the submarines to have an EHF capability from the periscope. SUBMARINE TACTICAL INTEGRATED DIGITAL SYSTEM (TIDS, formerly SubLAN) (L0097) - Funds a robust shipboard backbone IT network with multiple classification enclaves that, along with the SubHDR antenna and ADNS, provides end-to-end wideband connectivity to the global DISN networks (SIPRNet and NIPRNet). TIDS is designed in accordance with the IT for the 21st Century (IT21) fleet initiative, and thus TIDS will support greatly improved connectivity to, and interoperability with, the carrier battlegroup (CVBG) commander--thereby achieving Network-Centric Warfare--and with shore commands. The TIDS network is enhanced for missioncritical tactical applications, and as such TIDS forms the medium that will interconnect Sonar, Combat, ESM, Radio, etc. and permit the seamless exchange of warfighting tactical data between these systems and with the CVBG commander. The TIDS shipboard IT infrastructure is being designed as an all-COTS, open-system architecture such that it will permit other electronic subsystem programs to rely on TIDS for subsystem interconnectivity (rather than having each subsystem install its own IT network); the revolutionary approach of treating the shipboard network as a basic utility (like water, power and lighting) will support the efficient and economic modernization of the various electronic subsystems. The Submarine Shore PC Upgrade (L0096) was consolidated into this line. DESIGN SERVICES ALLOCATION (DSA) (L0777) - Design work and engineering associated with ship alterations. P-1 Shopping List-Item No - 82 - 2 of 15 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE L0027 L0035 L0078 L0080 L0084 L0087 L0091 L0094 L0095 L0097 ELEMENT OF COST BASEBAND SWITCH ANTENNA MODIFICATIONS TFDS/BSQ-9 (V)*** OE-538/BRC/RFDACS** SCSS RADIO ROOM HIGH DATA RATE ANTENNA SUBMARINE TACTICAL DATA LINK* SUB SHIP PC UPGRADE EHF PERISCOPE MODIFICATIONS TIDS**** L0555 PRODUCTION SUPPORT L0777 INSTALLATION EQUIPMENT ID CODE A A A A A B B A A A PY TOTAL COST FMP INSTALL DSA QTY 8 VAR 10 8 VAR 13 VAR 8 VAR VAR VAR TOTAL CONTROL FY 2000 UNIT COST 761.0 179.5 720.5 2,499.4 1,209.0 TOTAL COST QTY 6,088 3,568 VAR 1,795 6 5,764 8 3,323 VAR 32,492 13 2,687 VAR 9,672 3,911 5 P-1 ITEM NOMENCLATURE SUBHEAD 313000 Submarine Communications TOTAL COST IN THOUSANDS OF DOLLARS FY 2001 FY 2002 UNIT TOTAL UNIT TOTAL COST COST QTY COST COST 0 0 3,182 VAR 3,398 172.7 1,036 1 762.0 762 772.9 6,183 6 932.7 5,596 3,940 VAR 10,606 2,111.5 27,449 13 2126.8 27,648 2 200.0 400 1,837 VAR 1,657 2,242.0 11,210 13 992.3 12,900 3,060 3,366 13,941 19,344 22,976 13,096 VAR 845 VAR 18,426 918 22,046 930 83,241 77,241 52L0 89,309 Remarks: *STDL FY02 costs reflect NRE including updates of ILS and other engineering. **OE-538/BRC (L0080) begins RFDACS support beginning in FY00 resulting in updated ILS and other engineering, training and support costs. RFDACS backfits begin in FY01 for the SSN 21 Class and in FY02 for the TRIDENT Class. SSN 688 begins in FY05. ***TFDS FY02 cost reflects updates to ILS, testing and Land Based Evaluation Facility (LBEF) costs associated with the first two procurements years of BSQ-9(V) for the TRIDENT class. ****Formerly SubLAN (also includes Sub Shore PC Upgrade) FY00 Provides primarily for shipalt design efforts. FY01 to FY02 unit cost change results from start of Seawolf Phase II install. FY01 begins upgrades from Phase 1 to Phase 2, this results in increased unit costs in FY01 and escalates in FY02 with the number of upgrades performed. P-1 Shopping List-Item No 82 - 3 of 15 Exhibit P-5, Budget Item Justification DD FORM 2446, JUN 86 Unclassified UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE L0027 BASEBAND SWITCH 00 -3 Communications, NJ C/FFP/OPT L0078 TFDS/BSQ-9 (V)* 00 01 02 Brandywine Com, CA Brandywine Com, CA Brandywine Com, CA L0080 OE-538/BRC** 00 01 02 L0087 HIGH DATA RATE ANTENNA LOCATION OF PCO SUBHEAD 313000 Submarine Communications RFP DATE ISSUE AWARD OF FIRST QTY DATE DATE Delivery 52L0 UNIT COST SPECS AVAILABLE DATE REVISIONS NOW AVAILABLE SPAWAR Dec-99 Jul-00 8 761.0 YES N/A C/FFP/OPT C/FFP/OPT C/FFP/OPT SSC-SD SSC-SD SSC-SD Dec-99 Dec-00 Dec-01 Sep-00 Sep-01 Sep-02 10 6 1 179.5 172.7 762.0 YES YES YES N/A N/A N/A Sippican/GSM, MA Sippican/GSM, MA Sippican/GSM, MA C/FFP/OPT C/FFP/OPT C/FFP/OPT NUWC NUWC NUWC Mar-00 Dec-00 Dec-01 Apr-01 Jan-02 Jan-03 8 8 6 720.5 772.9 932.7 YES YES YES N/A N/A N/A 00 01 02 Raytheon, MA Raytheon, MA Raytheon, MA C/FFP/OPT C/FFP/OPT C/FFP/OPT SPAWAR SPAWAR SPAWAR Jun-00 Jun-01 Apr-02 Jul-01 Sep-02 Jul-03 13 13 13 2,499.4 2,111.5 2,126.8 YES YES YES N/A N/A N/A L0091 SUBMARINE TACTICAL DATA LINK 02 APC, Inc., TX FFP SPAWAR Nov-01 Mar-02 2 200.0 N/A N/A L0095 EHF PERISCOPE MODIFICATIONS 00 Raytheon, MA C/FFP/OPT SPAWAR Feb-00 Jun-01 8 1,209.0 YES N/A L0097 SUBMARINE TACTICAL INTEGRATED DIGITAL SYSTEM*** 01 02 PMS401, Wash D.C. PD NAVSEA Mar-01 Jun-01 5 2,242.0 YES PMS401, Wash D.C. PD NAVSEA Mar-02 Jun-02 13 992.3 YES N/A N/A D. REMARKS *TFDS - FY01 completed procurements for SSN class submarines. FY02 is first procurement for Trident Class submarines. FY02 cost reflects updates to ILS, testing and Land Based Evaluation Facility (LBEF) costs associated with the first two procurements years of BSQ-9(V) for the TRIDENT class. **OE-538 - FY01 is RFDAC implementation to 688 class submarines. ***Formerly SubLAN. P-1 Shopping List-Item No 82 - 4 of 15 Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June 2001 Baseband Switch (BBS) L0027 Installation of Baseband Switch DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty RDT&E PROCUREMENT: 49 31.5 Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 49 31.5 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Production Support Interm Contractor Support Installation of Hardware 32 20.0 PRIOR YR EQUIP 32 20.0 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 20.0 TOTAL PROCUREMENT COST 51.5 METHOD OF IMPLEMENTATION: $ FY 00 Qty $ 8 6.1 8 6.1 13 13 5.6 5.6 FY 01 Qty $ FY 02 Qty $ 0 0.0 0 0.0 12 4 8 4.4 1.5 3.0 0 0.0 5.6 11.7 4.4 4.4 0.0 0.0 ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: CONTRACT DATES: FY 2000: Dec-99 FY 2001: N/A FY 2002: N/A DELIVERY DATES: FY 2000: Jul-00 FY 2001: N/A FY 2002: N/A INSTALLATION SCHEDULE: PY 1 2 FY 01 3 4 INPUT 45 1 4 4 3 OUTPUT 45 0 4 4 3 1 2 FY 02 3 12 months 4 1 P-1 Shopping List-Item No 82- 5 of 15 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June 2001 Time & Frequency Distribution System (TFDS) L0078 Installation of Time & Frequency Distribution System (TFDS) DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty RDT&E PROCUREMENT: 38 6.0 Kit Quantity Installation Kits [26] (See Note 3) Installation Kits Nonrecurring Equipment 38 6.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Production Support Interm Contractor Support Installation of Hardware 26 0.8 PRIOR YR EQUIP 26 0.8 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.8 TOTAL PROCUREMENT COST 6.8 METHOD OF IMPLEMENTATION: $ FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ 10 1.8 12 0.2 6 1.1 1 0.9 10 0.2 6 0.1 10 1.6 6 0.9 1 0.7 (See Note 4) 0.1 12 12 0.4 0.4 10 0.4 10 0.4 0.4 2.2 0.4 1.5 0.1 6 0.2 6 0.2 0.2 1.1 ADMINISTRATIVE LEADTIME: 3 months CONTRACT DATES: FY 2000: Dec-99 FY 2001: Dec-00 FY 2002: Dec-01 DELIVERY DATES: FY 2000: Sep-00 FY 2001: Sep-01 FY 2002: Sep-02 INSTALLATION SCHEDULE: PY 1 2 FY 01 3 4 1 2 FY 02 3 INPUT 38 1 3 3 3 1 3 2 OUTPUT 38 1 3 3 3 1 3 2 PRODUCTION LEADTIME: 9 months 4 Notes/Comments: 1) Installation funding for TFDS in FY06-FY07 is covered by the SCSS Radio Room Installation (Cost Code L0777). Procurement quantities are represented on TFDS P-3A with associated installation cost represented on SCSS Radio Room P-3A’s for each respective class of submarine. 2) Installation kits for prior years were funded via the installation line and are not accounted for separately. 3)TFDS FY02 cost reflects updates to ILS, DT testing and Land Based Evaluation Facility (LBEF) costs associated with the first two procurements years of BSQ-9(V) for the TRIDENT class P-1 Shopping List-Item No 82- 6 of 15 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Installation of OE-538/BRC DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty RDT&E 0.1 PROCUREMENT: 10 23.2 Kit Quantity (See Note 3) Installation Kits Installation Kits Nonrecurring Equipment 10 23.2 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Production Support Other (Note 6) Interm Contractor Support Installation of Hardware 4 1.2 PRIOR YR EQUIP 4 1.2 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 1.2 TOTAL PROCUREMENT COST 24.4 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 OE-538/BRC L0080 $ FY 00 Qty FY 01 Qty FY 02 Qty $ 8 $ 0.4 5.8 8 $ 0.4 6.6 6 6.0 5 0.2 8 0.3 7 0.3 8 5.6 8 5.9 6 5.3 0.4 5 5 0.7 0.7 8 1 7 0.0 6.4 1.1 0.1 0.9 0.0 7.6 0.4 7 0.9 7 0.9 0.9 6.9 ADMINISTRATIVE LEADTIME: 6 months CONTRACT DATES: FY 2000: Mar-00 FY 2001: Dec-00 FY 2002: Dec-01 DELIVERY DATES: FY 2000: Apr-01 FY 2001: Jan-02 FY 2002: Jan-03 PY 1 2 FY 01 3 4 1 2 FY 02 3 4 INPUT 9 1 3 3 1 2 3 2 OUTPUT 9 1 2 4 1 1 3 3 PRODUCTION LEADTIME: 12 months Notes/Comments: 1) Two (2) OE-538/BRC antennas comprise one installation on TRIDENT class submarines. 2) Six (6) OE-528/BRC units are assigned to a rotatable pool to accommodate equipment refurbishment and do not require installation kits or funding. Pool assets are procured as follows: one in FY00 AND one in FY01. 3) Four (4) Installation kits for prior years were funded via the installation line and are not accounted for separately. 4) RFDACS backfits begin in FY01 and continue through TC 6)RFDAC support begins in FY00. Exhibit P-3a, Individual Modification Program Unclassified P-1 Shopping List-Item No 82-7 of 15 Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: SCSS-SSN 21,22 DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty RDT&E PROCUREMENT: 0 0.0 Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Production Support Interm Contractor Support Installation of Hardware 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 SCSS-SSN 21,22 L0084 $ FY 00 Qty $ 0 0.0 FY 01 Qty $ FY 02 Qty $ VAR 1.9 1 5.5 VAR 1.8 1 5.2 0.1 0 0.0 0 0.0 0.0 0.0 0.0 1.9 0.3 0 0.0 0.0 5.5 ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: FY 2001: FY 2002: DELIVERY DATES: FY 2000: FY 2001: FY 2002: PY 1 2 FY 01 3 4 1 2 FY 02 3 12 months PRODUCTION LEADTIME: 12 months 4 INPUT OUTPUT Notes/Comments: Procurement funding is provided to Electric Boat for a complete integration and install effort. There is no specific installation funding associated with the SSN 21 & 22 efforts. P-1 Shopping List-Item No 82-8 of 15 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: SCSS-TRIDENT DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty RDT&E PROCUREMENT: VAR 3.8 Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment VAR 3.8 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Production Support Interm Contractor Support Installation of Hardware 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 3.8 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 SCSS-TRIDENT L0084 $ FY 00 Qty $ VAR 3.3 VAR 3.3 FY 01 Qty $ FY 02 Qty $ VAR 2.3 1 5.8 VAR 2.1 1 5.4 0.1 0 0.0 0 0.0 3.3 0.0 0.0 2.3 0.3 0 0.0 0.0 5.8 ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: FY 2001: FY 2002: DELIVERY DATES: FY 2000: FY 2001: FY 2002: PY 1 2 FY 01 3 4 1 2 FY 02 3 PRODUCTION LEADTIME: 4 INPUT OUTPUT P-1 Shopping List-Item No 82-9 of 15 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: Installation of SCSS on SSN 688 Class submarines DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: 0 0.0 Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Production Support Interm Contractor Support Installation of Hardware 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 SCSS-688 L0084 FY 00 Qty $ 0 0.0 0 0.0 FY 01 Qty $ FY 02 Qty $ 0 0.0 0 0.0 0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: FY 2001: FY 2002: DELIVERY DATES: FY 2000: FY 2001: FY 2002: PY 1 2 FY 01 3 4 1 2 FY 02 3 PRODUCTION LEADTIME: 4 INPUT OUTPUT Notes/Comments: 1) Reflects installations of SCSS Radio Room equipment procured under OE-538 BSQ-9 V (L0078), and SCSS Radio Room (L0084 One (1) SCSS Raio Room installation consists of the following equipment contained within this budget : 1 OE-538 BSQ-9 V and ancilliary equipme P-1 Shopping List-Item No 82-10 of 15 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: L0087 Installation of High Data Rate Antenna (Sub HDR) DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty RDT&E 24.3 PROCUREMENT: 8 36.8 Kit Quantity Installation Kits 6 1.2 Installation Kits Nonrecurring Equipment 8 35.6 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Production Support Interm Contractor Support Installation of Hardware 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 36.8 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 High Data Rate Antenna (Sub HDR) $ FY 00 Qty FY 01 Qty $ FY 02 Qty $ 13 29.1 13 29.2 13 $ 0.4 32.5 8 1.5 12 2.2 8 1.4 13 31.0 13 25.3 13 26.2 1.6 6 6 6.5 6.5 8 1 7 0.0 39.0 7.6 1.0 6.6 0.0 36.7 1.6 8 7.7 5 3 5.0 2.7 7.7 36.9 ADMINISTRATIVE LEADTIME: 2 months CONTRACT DATES: FY 2000: Jun-00 FY 2001: Jun-01 FY 2002: Apr-02 DELIVERY DATES: FY 2000: Jul-01 FY 2001: Sep-02 FY 2002: Jul-03 FY 01 3 4 1 2 FY 02 3 4 1 1 3 3 4 1 2 1 2 3 4 2 PY 1 2 INPUT 3 3 OUTPUT 2 3 PRODUCTION LEADTIME: 15 months Notes/Comments: 1) Seven (7) HDR units are assigned to a rotatable pool to accommodate equipment refurbishment and do not require installation funding. Pool assets are procured as follows: one (1) in FY00 and one (1) in FY02. 2) Land Based System assets are procured as follows: One (1) in FY98, one (1) in FY01 and one (1) in FY02. These do not require installation funding and are not included on the P-3A installation breakout. 3) Installation kits are procured one year in advance of the installs due to Long Lead Material (LLM) requirements. 4) SubHDR is a three-phased installation consisting of sail modifications, Mast Mechanical Group (MMG) and antenna installs. Due to the complexity of the sail modifications and MMG installs, SubHDR installations commence prior to delivery of the antennas. 5) Funding for EHF Periscope Modifications (L0095) installations is included with SubHDR and matches the profile outlined on the EHF Periscope P-3a. Exhibit P-3a, Individual Modification Program Unclassified P-1 Shopping List-Item No 82-11 of 15 Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Installation of Submarine Tactical Data Link (STDL) DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty RDT&E 2.5 PROCUREMENT: 0 0.0 Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Production Support Interm Contractor Support Installation of Hardware 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: INPUT OUTPUT June 2001 Submarine Tactical Data Link (STDL) L0091 $ FY 00 Qty 0 $ 1.3 0.0 FY 01 Qty 0 $ 0.3 0.0 FY 02 Qty $ 2 0.4 2 0.4 0.0 0 0.0 0 0.0 0.0 0.0 0.0 0.0 2 0.6 2 0.6 0.6 1.0 ADMINISTRATIVE LEADTIME: 1 Month CONTRACT DATES: FY 2000: FY 2001: FY 2002: Nov-01 DELIVERY DATES: FY 2000: FY 2001: FY 2002: Mar-02 PY 1 2 FY 01 3 4 1 2 FY 02 3 1 1 PRODUCTION LEADTIME: 3 Months 4 2 P-1 Shopping List-Item No 82-12 of 15 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June 2001 EHF Periscope Modifications L0095 Installation of EHF Periscope Modifications DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty RDT&E PROCUREMENT: 0 0.0 Kit Quantity Installation Kits (See Note 1) Installation Kits Nonrecurring Equipment 0 0.0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: $ FY 00 Qty $ 8 9.7 FY 01 Qty $ FY 02 Qty $ 0 0.0 0 0.0 0 0.0 (See Note 2) 8 9.7 0 0.0 (See Note 3) 5 0.0 5 0.0 9.7 0.0 0.0 0.0 0.0 0.0 ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: Feb-00 FY 2001: N/A FY 2002: N/A DELIVERY DATES: FY 2000: Jun-01 FY 2001: N/A FY 2002: N/A 2 FY 02 3 4 INPUT 3 1 1 OUTPUT 2 2 INSTALLATION SCHEDULE: 2 months PY 1 2 FY 01 3 4 1 PRODUCTION LEADTIME: 16 months Notes/Comments: 1.) Procurement of one (1) EHF Periscope Antenna and HPA Mod. Kit was included with submarine variant FOT procured in FY99 by SubHDR (L0087) 2.) In FY00 a total of 15 assets were procured by NAVSEA and SPAWAR. The 8 units in FY00 on this P-3A represent EHF Periscope HPA Mod Kits, NAVSEA (BLI: 083100, Subhead: H1PL, Cost Code: PLXX1) procured the remaining 7 HPA Mod Kits and 15 EHF Periscope Antennas. Three (3) HPA mod kits and Periscope units will be installed in FY01 using NAVSEA installation funding (BLI: 083105, Subhead: H1PL, Cost Code: PL51N) 3.) Installation of EHF Periscope Antennas and HPA Mod Kits occur in conjunction with SubHDR (L0087) and is included in the SubHDR line. Installation funding is provided to install both HPA Mod Kits and Antenna systems 4.) Procurement of EHF Periscope HPA Mod Kits is funded under the SubHDR line (L0087). Exhibit P-3a, Individual Modification Program Unclassified P-1 Shopping List-Item No 82-13 of 15 Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: Installation of TIDS DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: 0 4.5 Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 4.5 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Production Support Interm Contractor Support Installation of Hardware 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 0.0 TOTAL PROCUREMENT COST 4.5 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 SUBMARINE TACTICAL INTEGRATED DIGITAL SYSTEM (TIDS)(Formerly SUBLAN) L0097 FY 00 Qty $ 0 3.9 0 3.9 FY 01 Qty $ FY 02 Qty $ 5 11.9 13 13.5 5 11.2 13 12.9 0.7 0 0.0 5 5.0 5 5.0 0.0 3.9 0.0 16.9 0.6 12 12.6 12 12.6 12.6 26.1 ADMINISTRATIVE LEADTIME: 3 months CONTRACT DATES: FY 2000: FY 2001: Mar-01 FY 2002: Mar-02 DELIVERY DATES: FY 2000: FY 2001: Jun-01 FY 2002: Jun-02 PY 1 2 FY 01 3 INPUT 5 OUTPUT 4 4 1 1 2 FY 02 3 4 6 6 4 6 PRODUCTION LEADTIME: 3 months Notes/Comments: 1.) Deliveries are scheduled based on Submarine availabilities 2.) FY00 provides primarily for SHIPALT design efforts P-1 Shopping List-Item No 82-14 of 15 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE 313000 Submarine Communications S COST ITEM/MANUFACTURER CODE E PROC R QTY V ACCEP BAL FISCAL YEAR PRIOR DUE CY 00 O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C N B R R Y N L G P T V C N B R R Y N L G P 1 A 1 1 1 1 1 1 1 1 1 1 A 1 1 T V 8 4 4 2 2 L0078 TFDS/BSQ-9 00 10 6 1 1 9 6 1 1 1 FY OE-538/BRC 8 8 6 8 8 6 13 13 13 13 13 13 02 0 0 2 0 0 2 00 01 02 L0087 HIGH DATA RATE ANTENNA 00 01 02 L0091 SUBMARINE TACTICAL DATA LINK 00 01 L0095 EHF PERISCOPE MODIFICATIONS 00 8 8 L0097 TIDS 01 5 13 5 13 02 02 CALENDAR YEAR 02 AS OF 00 L0080 01 TO BASEBAND SWITCH 02 FISCAL YEAR CALENDAR YEAR 1-Oct L0027 01 01 SUBHEAD NO. 52L0 1 1 1 1 1 1 1 1 1 A 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 A 2 A A A 2 2 4 1 2 1 1 2 A OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY PRODUCTION RATE ITEM L0027- Baseband Switch L0078- TFDS/BSQ-9 L0080- OE-538/BRC L0087- High Data Rate Antenna L0091- Submarine Tactical Data Link L0095- EHF Periscope Modifications L0097- TIDS 1 A Manufacturer’s Name and Location L-3 Communications, NJ Brandywine Com, CA Sippican/GSM, MA Raytheon, MA APC, Inc., TX Raytheon, MA PMS401, Wash D.C. MSR 2 1 1 1 1 1 1 1-8-5 8 10 10 13 8 15 10 P-1 Shopping List-Item No 82-15 of 15 MAX 15 15 22 28 15 25 17 ALT Prior to Oct 1 8 months 9 months 12 months 12 months 2 months 6 months 3 months 2 2 2 2 JUN JUL AUG SEP PROCUREMENT LEADTIMES ALT After Initial Oct 1 Mfg PLT 8 months 12 months 3 months 9 months 6 months 12 months 2 months 15 months 1 month 3 Months 2 months 16 months 3 months 3 months Reorder Mfg PLT 8 months 3 months 6 months 2 months 1 Month 2 months 3 months Total Unit of Measure Exhibit P-21 Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY FY 2000 $819.7 $219.4 FY 2001 P-1 ITEM NOMENCLATURE SATCOM Ship Terminals (Space) FY 2002 FY 2003 FY 2004 FY 2005 June 2001 SUBHEAD 321000 52NN FY 2006 TO COMP TOTAL QUANTITY COST (in millions) Note: SATCOM Ship Terminals transfers to the SATCOM Systems budget (BLI 3215) in FY 01. Detail budget justification material for PY through FY00 is included in the SATCOM Systems budget (BLI 3215) for budget comparability. PROGRAM COVERAGE: The Satellite Communications (SATCOM) Ship Terminals P-1 line provides funds for procurement of shipboard terminal equipment for ship-to-ship, ship-to-shore and ship-to-aircraft tactical communications via earth orbiting relay satellites in the ultra high frequency (UHF), super high frequency (SHF), and extremely high frequency (EHF) bands. This includes radio frequency (RF) equipment and baseband equipment assembled and grouped into systems and subsystems structured to address specific naval communications requirements. These systems provide processors and peripheral equipment that control the RF links for message traffic, direct data transfer and secure voice communications. They are selected and oriented by communications traffic levels, types of communications and operational missions. These procurements are scheduled to meet the satellite communications requirements established by the Chief of Naval Operations (CNO) in the Fleet Communications Planning and Programming documents. These programs are part of the Navy Satellite Communications Program (Navy SATCOM) to provide a communications architecture that will provide seamless, rapid and reliable switching and transfer of large volumes of information (voice, video, data or imagery). JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: MINI-DAMA: Demand Assigned Multiple Access (DAMA) quadruples the UHF satellite channel capacity through multiplexing, thus providing adequate satellite access to meet the present user requirements without increasing the number of satellites in the constellation. The shipboard DAMA system consists of multiplexers, control monitor groups, and radios. Equipment will be installed on all SATCOM equipped ships during regular overhaul, restricted availability and by alteration installation teams (AIT). Mini-DAMA is the second phase of the UHF DAMA program. It provides a miniaturized version of the TD-1271B/U as well as incorporating UHF SATCOM and Line of sight (LOS) transceiver capability. Mini-DAMA also uses 5 kHz or 25 kHz satellite channels and can operate in DAMA or non-DAMA modes. The Mini-DAMA configuration was transitioned from MIL-SPEC to commercial open system architecture. The production variant will be delivered with either a one or a two channel configuration. The cost is essentially the same and references to quantities in this budget represent the number of channels, whether they are in one chassis or two. The Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 83- 1 of 83- 4 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continuation) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE SATCOM Ship Terminals (Space) June 2001 SUBHEAD 321000 52NN Special Intelligence Communications(SI COMMS): Sensitive Compartmented (SCI)Automated Digital Network System (ADNS) SCI ADNS has been designated as an evolutionary program allowing for continued growth and expansion paralleling technology changes. The SI COMMS and TACINTEL programs were combined into the SI COMMS architecture to replace the outdated TACINTEL system developed in the early 1970s. It provides the mechanism for phased implementation of both planned improvements and those which surface through advancing technology. SCI ADNS provides for the real-time exchange of SCI COMMS data to Afloat operational commanders. The cornerstone of this program is the versatility and growth potential of the processing and networking equipment which will provide the network centric communications for the SI community. The premise of using Commercial off-the-shelf (COTS), Government off-the-shelf (GOTS), non developmental items (NDI) and existing systems to meet the requirements for Special Intelligence Communications will continue to be followed. To realize the ADNS architecture, FY00 and FY01 funds will procure the SCI ADNS equipment necessary to implement the IT-21 architecture to provide SI Communications to the Fleet. Impact of no ship SCI COMMS is that the ability to detect, identify and prosecute hostile threats and provide warnings of grave danger to U.S. interests will be lost. 5/25 KHz SATCOM: Numberous pieces of SATCOM terminal equipment are required to satisfy special communications needs. This line includes procurement of off-the-shlef non-developmental items (NDI) for replacement of obsolete satellite communications terminals and baseband equipment. These items meet the Joint Chief of Staff (JCS) MANDATE (CJCSI 6250.01) for fleet, DOD and allied interoperability. Current implementation of this requirement is being satisfied using the MD-1324A modem, which will be replaced with Digital Modular Radio (DMR). FY00 and FY01 funds continue the procurement of the COTS/NDI DMR as the main replacement for the non-JCS compliant AN/WSC-3 transceivers and TD-1271 multiplexer modems. EHF TERMINALS: This program provides for the acquisition of the Navy’s EHF Satellite Communications Program (NESP) terminals in four semi-concurrent phases. Phase I of the NESP program provides Low Data Rate (LDR) jam resistant, low probability of intercept EHF SATCOM terminals for submarines, surface ships, and shore stations in the electromagnetic threat environment projected into the next decade. This requirement is contained in the NESP NDCP dated Apr 89 and the JROC validated Milstar ORD of Jun 92. There is a requirement to procure a total of 280 operational ship and sub terminals (OPN and SCN), plus five life cycle support systems already bought. This requirement was recently updated per the CNO ltr, Ser N631/8U556125 dated 11 Jun 98. Phase II of the NESP program procures Navy EHF Communications Controllers (NECCs), as part of the ADNS strategy to provide for the exchange of computer-to-computer tactical communications over the survivable EHF satellite links. NECC provides for network management; multiplexing and channel sharing; resource management; communications management and planning; network control and monitoring; and communications protocols such as circuit switching and packet switching. NECC requirements are outlined in the NESP NDCP dated Apr 89 and must be fully fielded with deploying battle groups and shore sites to support tactical information exchange over EHF SATCOM. Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 83- 2 of 83- 4 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continuation) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE SATCOM Ship Terminals (Space) June 2001 SUBHEAD 321000 52NN Phase III of the NESP program provides for the procurement of Full Milstar LDR Operational Capabilities (FMLOC). FMLOC efforts include Agile Beam Management (ABM), Over-the-Air-Rekey (OTAR), and In-Band Control (IBC) capabilities required by the JROC validated Milstar ORD. Additionally, the Processor Upgrade Program (PUP) must be implemented to support the terminal throughput and memory requirements of the Phase III capabilities. All of these Phase III efforts will provide essential EHF operational communications capabilities with the current Milstar satellites. Similarly, IBCs will provide interoperable voice communications on all EHF satellites (Milstar, UHF Follow-On (UFO), and FLTSAT EHF Package (FEP)). Phase III also includes procurement of Interim Polar modification kits. An EHF polar communications capability is available using an EHF package on a classified host in the Molniya orbit. To use this polar capability, terminals will require minor modifications. In addition, shore gateways are necessary to provide connectivity from the Interim Polar satellite to other EHF satellite constellations. Phase IV of the NESP program consists of a Medium Data Rate (MDR) capability which will provide the only protected (jam resistant and low probability of intercept/detection) MDR communications from 4.8 kilobits per second (Kbps) to 1.544 megabits per second (Mbps) to all major fleet combatants with Milstar Satellites 3-6. To meet the Navy’s requirement for MDR capable terminals, MDR appliqués will be procured and retrofitted into existing LDR terminals and the balance of the requirements will be procured as part of the Follow-On Terminal contract award of 20 Mar 98. Follow-on terminals will also have Phase III FMLOC capabilities incorporated into their baseline. The requirement for MDR is outlined in the JROC validated Milstar ORD and must be fielded by FY 99 in order to support the launch schedule of the first Milstar II satellite. By OPNAV paper, Ser N631D/703-693-0024 dated 16 September, the Program Office was directed to accelerate the MDR upgrade program to meet fleet needs. Prior to receiving the MDR appliqué, existing NESP terminals must have Phase III upgrades due to the processing throughput and memory requirements of MDR. SHF SYSTEMS: The Navy has been expanding its use of SHF for communications in support of Navy Tactical and Joint Task Forge (JTF) Operating Forces Afloat through a phased implementation plan. In FY00 and FY01, the AN/WSC-6(V)2 and AN/WSC-6(V)4 are being modified to a standard AN/WSC-6(V)5 configuration to provide dual RG circuit and current technology controller capabilities to flag capable platforms and large combatants. The ultimate goal is to continue expanding the SHF SATCOM capability to other combatants, combat logistics force ships, and the mine countermeasures support ship, through a combination of modifications to existing production SATCOM terminals and provisioning of additional AN/WSC-6(V) terminal variants matched in capability to individual ship mission requirements. Also procured is ancillary hardware for the Automated Digital Multiplexing System (ADMS). Under the submarine high data rate (SUB HDR) program, the Navy is exploring the technical feasibility of DSCS support of wideband capabilities for attack submarines. Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 83- 3 of 83- 4 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continuation) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE SATCOM Ship Terminals (Space) June 2001 SUBHEAD 321000 52NN COMMERCIAL SATELLITES: Lessons learned from Desert Storm documented the necessity of an alternate commercial communications service for logistics and operational support requirements to reduce the saturation of communications on the military tactical satellites. ASD(C3I) in a letter of 8 Nov 1993, directed the use of commercial satellite (COMMERSAT) to augment current and future Military Satellite Communications (MILSATCOM) systems. This relieves the congestion on military tactical satellite communications systems while enhancing the overall Navy tactical communications capacity and reducing the competition with tactical data on the limited tactical satellite assets. The COMMERSAT program will use commercial off-the-shelf (COTS)/non-developmental item (NDI) equipment, software, and service with minimal adaptation for the naval environment. Variants of the commercially available INMARSAT terminals will be procured in the next few years. The various types are required to satisfy different requirements on flagships, aircraft carriers, amphib ships, combatants and auxiliary ships. The COMMERSAT Operational Requirements Document (ORD) mandates INMARSAT "M" terminals on Mine Counter-Measures ships. There will be INMARSAT "B" upgrades, and dual INMARSAT B upgrades to modify the earlier "A" INMARSAT terminals. FY00 and FY01 funds will continue procurement o f C and Ku wide band SATCOM terminals for carriers and large deck amphibs components, supporting ancillary hardware related to Automated Digital Multiplexing System (ADMS) and INMARSAT terminals and high speed data (HSD) kits for network centric warfare on combatants. Global Broadcast Service (GBS): This is the Navy ship portion of the joint program with the Air Force as Executive Service. The GBS will augment other Military Satellite Communications (MILSATCOM) systems and provide a continuous, high speed, one way information flow of high volume data to units ashore, afloat or special operations. GBS will support routine operations, training and military exercises, special activities, crises, situational awareness, weapons targeting, reconnaissance and the transition to and conduct of opposed operations short of nuclear war. GBS will provide the capability of quickly disseminating large information products to various joint and small combat and combat support elements. FY00 and FY01 funds are a continuation to procure receiving equipment in various configurations customized to each type of ship for Phase II of the GBS program in support of UHF follow-on satellite launches numbers 8, 9, and 10. For ship and submarine procurements, antennas and ancillary equipment such as Asynchronous Transfer Mode (ATM) in-line encryptors will be procured through a SPAWAR contract. Shipboard and receive broadcast management equipment will be procured through an Air Force contract. An Operational Requirements Document (ORD) was signed on 30 April 97. INSTALLATION OF EQUIPMENT: This sub-line provides funding to shipyards and alteration installation teams (AIT) at Navy field activities for installation of equipment procured for ships and submarines. EXPLANATION OF PROGRAM CHANGE: N/A Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 83- 4 of 83- 4 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY FY 2000 P-1 ITEM NOMENCLATURE Satellite Communications Systems FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 June-01 SUBHEAD 52NR 321500 FY 2006 FY 2007 TO COMP TOTAL QUANTITY COST (in millions) $275.4 $201.0 $198.1 Continuing Continuing PROGRAM COVERAGE: This budget line is a consolidation of the Satellite Communications (SATCOM) terminal procurement lines, SATCOM Ship Terminals (BLI 3210) and SATCOM Shore Terminals (BLI 3220). The SATCOM Systems P-1 line provides funds for procurement of shipboard terminal equipment for ship-to-ship, ship-to-shore and ship-to-aircraft tactical communications earth orbiting relay satellites in the ultra high frequency (UHF), super high frequency (SHF), and extremely high frequency (EHF) bands. This includes radio frequency (RF) equipment and baseb equipment assembled and grouped into systems and subsystems structured to address specific naval communications requirements. These systems provide processors and peripheral equipment that control the RF links for message traffic, direct data transfer and secure voice communications. They are selected and oriented by communications traffic levels, types of communications and operational missions. These procurements are scheduled to meet the satellite communications requirements established by the Chief of Naval Operations (CNO) in the Fleet Communications Planning and Programming documents. These programs are part of the Navy SATCOM Program to provide a communications architecture that will provide seamless, rapid and reliable switching and transfer of large volumes of information (voice, video, data or imagery). JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: MINI-DAMA: Demand Assigned Multiple Access (DAMA) quadruples the UHF satellite channel capacity through multiplexing, thus providing adequate satellite access to meet the present user requirements without increasing the number of satellites in the constellation. The shipboard DAMA system consists of multiplexers, control monitor groups, and radios. Equipment will be installed all SATCOM equipped ships during regular overhaul, restricted availability and by alteration installation teams (AIT). Mini-DAMA is the second phase of the UHF DAMA program. It provides a miniaturized version of the TD-1271B/U as well as incorporating UHF SATCOM and Line of sight (LOS) transceiver capability. Mini-DAMA also uses 5 kHz or 25 kHz satellite channels and can operate in DAMA or non-DAMA modes. The Mini-DAMA configuration was transitioned from MIL-SPEC to commercial open system architecture. The production variant will be delivered with either a one or a two channel configuration. The cost is essentially the same and references to quantities in this budget represent the number of channels, whether they are in one chassis or two. The standard submarine configuration requires two channels whether with one chassis or two. FY00 program procures and integrates Mini Dama Field Change Upgrade Kits aboard all SSN’s and Minesweepers and selected DDG’s and aircraft. Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 84 - 1 of 54 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continuation) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE Satellite Communications Systems June 2001 SUBHEAD 321500 52NR Special Intelligence Communications(SI COMMS): Sensitive Compartmented (SCI)Automated Digital Network System (ADNS) SCI ADNS has been designated as an evolutionary program allowing for continued growth and expansion paralleling technology changes. The SI COMMS and TACINTEL programs were combined into the SI COMMS architecture to replace the outdated TACINTEL system developed in the early 1970s. It provides the mechanism for phased implementation of both planned improvements and those which surface through advancing technology. SCI ADNS provides for the real-time exchange of SCI COMMS data to Afloat operational commanders. The cornerstone of this program is the versatility and growth potential of the processing and networking equipment which will provide the network centric communications for the SI community. The premise of using Commercial off-the-shelf (COTS), Government off-theshelf (GOTS), non developmental items (NDI) and existing systems to meet the requirements for Special Intelligence Communications will continue to be followed. To realize the ADNS architecture, FY00 and FY01 funds will procure the SCI ADNS equipment necessary to implement the IT-21 architecture to provide SI Communications to the Fleet. Impact of no ship SCI COMMS is that the ability to detect, identify and prosecute hostile threats and provide warnings of grave danger to U.S. interests will be lost. The shore terminal interface for Sensitive Compartmented Information (SCI)/Automated Digital Network System (ADNS)/Tactical Intelligence Information Exchange (TACINTEL II+) will use commercial off-the-shelf (COTS), Government off-the-shelf (GOTS), Non-developmental items (NDI) and existing systems to meet the requirements for SI COMMS. The SI COMMS and TACINTEL programs were combined into the SI COMMS architecture to replace the outdated TACINTEL system developed in the early 1970s. The equipment also began the realization of the ADNS architecture. FY00, FY01 and FY02 funds will continue to procure the SCI ADNS equipment necessary to implement the IT-21 architecture to provide SI COMMS to the Fleet. SCI ADNS provides for a real-time exchange of Tactical SCI COMMS to afloat operational commanders. Impact of no shore SCI ADNS is that ships cannot attain their network services. SCI ADNS transitions to BLI 305000 (Ship Communications Automation - 52PQ) in FY02. 5/25 KHz SATCOM: Numerous pieces of SATCOM terminal equipment are required to satisfy special communications needs. This line includes procurement of off-the-shelf non-developmental items (NDI) for replacement of obsolete satellite communications terminals and baseband equipment. These items meet the Joint Chief of Staff (JCS) MANDATE (CJCSI 6250.01) for fleet, DOD and allied interoperability. Current implementation of this requirement is being satisfied using the MD-1324A modem, which will be replaced with Digital Modular Radio (DMR). FY00 and FY01 funds continue the procurement of the COTS/NDI DMR as the main replacement for the non-JCS compliant AN/WCS-3 transceivers and TD-1271 multiplexer modems. FY02 starts the procurement of DMR automated RF distribution system, the Automated RF Distribution System Maritime (ARDSM) starting the Navy on the path to an minimum manned automated radioroom. SHF SYSTEMS: The Navy has been expanding its use of SHF for communications in support of Navy Tactical and Joint Task Force (JTF) Operating Forces Afloat through a phased implementation plan. In FY00 and FY01, the AN/WSC-6(V)2 and AN/WSC-6(V)4 are being modified to a standard AN/WSC-6(V)5 configuration to provide dual RF channel capability to flag capable platforms and large combatants. The AN/WSC-6(V)7 and the AN/WSC-6(V)9 will be utilized to accomodate expanding the SHF SATCOM capability to other combatants, combat logistics force ships, and the mine countermeasures support ships. Under the submarine high data rate (SUB HDR) program, the Navy is exploring the technical feasibility of Defense Satellite Communications Systems (DSCS) support of wideband capabilities for attack submarines. This line also provides SHF shore based modem equipment for high data rate communications with Fleet units via the DSCS. Shore based terminals have an operational requirement to support joint, theater and Navy unique command, control, communications, support and intelligence circuits voice, data, video and imagery to the extent they are required on SHF platforms. FY01 - FY05 funds procure and install N-STEP/TELEPORT modems to provide shore side compatibility with S equipped ships and to support fleet and added Battle Group capacity requirements. Funding is also provided to support ancillary hardware related to for the Automated Digital Multiplexing System (ADMS). Navy Decision Coordinating Paper (NDCP) dated Apr 89, must be fully fielded with deploying battle groups and shore sites to support tactical information exchange over EHF SATCOM. Remarks: SCI ADNS transitions to BLI 305000 (Ship Communications Automation - 52PQ) in FY02 P-1 Shopping List-Item No 84 - 2 of 54 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continuation) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE Satellite Communications Systems June 2001 SUBHEAD 321500 52NR EHF TERMINALS: This program provides for the acquisition of the Navy’s EHF Satellite Communications Program (NESP) terminals in four semi-concurrent phases. Phase I of the NESP program provides for the procurement of Low Data Rate (LDR) jam resistant, low probability of intercept EHF SATCOM terminals along with required baseband equipment, modification kits and other ancillary equipment for submarines, surface ships and shore stations in the electromagnetic threat environment projected into the next decade. This requirement is contained in the NESP NDCP dated Apr 89 and the JROC validated Milstar ORD of Jun 92. Phase II of the NESP program provides for the procurement of the Navy EHF Communications Controllers (NECCs) including required baseband equipment, production testing, quality assurance, production engineering and equipment assembly and provides for the exchange of computer-to-computer tactical communications over the survivable EHF satellite links. NECC provides for network management; multiplexing and channel sharing; resource management; communications management and planning; network control and monitoring; and communications protocols such as circuit switching and packet switching. NECC requirements are outlined in the NESP NDCP dated Apr 89 and must be fully fielded with deploying battle groups and shore sites to support tactical information exchange over EHF SATCOM. Phase III of the NESP program provides for the procurement of Full Milstar LDR Operational Capabilities (FMLOC). FMLOC efforts include Agile Beam Management (ABM), Overthe-Air-Rekey (OTAR), and In-Band Control (IBC) capabilities required by the JROC validated Milstar ORD. Additionally, the Processor Upgrade Program (PUP) must be implemented to support the terminal throughput and memory requirements of the Phase III capabilities. All of these Phase III efforts will provide essential EHF operational communications capabilities with the current Milstar satellites. Similarly, IBCs will provide interoperable voice communications on all EHF satellites (Milstar, UHF Follow-On (UFO), and FLTSAT EHF Package (FEP)). Phase III also includes procurement of Interim Polar modification kits. An EHF polar communications capability is available using an EHF package on a classified host in the Molniya orbit. To use this polar capability, terminals will require minor modifications. In addition, shore gateways are necessary to provide connectivity from the Interim Polar satellite to other EHF satellite constellations. Phase IV of the NESP program consists of a Medium Data Rate (MDR) capability which will provide the only protected (jam resistant and low probability of intercept/detection) MDR communications from 4.8 kilobits per second (Kbps) to 1.544 megabits per second (Mbps) to all major fleet combatants with Milstar Satellites 4-6. To meet the initial MDR capability requirement for the fleet, the Navy procured MDR appliqués in addition to necessary ancillary equipment, technical data, test equipment, production testing, quality assurance, production engineering and equipment assembly. The MDR appliqué is retrofitted into the existing legacy LDR terminal. The requirement for MDR is outlined in the JROC validated Milstar ORD. Prior to receiving the MDR appliqué, existing legacy LDR terminals must have Phase III upgrades due to the processing throughput and memory requirements of MDR. Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 84 - 3 of 54 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continuation) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE June 2001 P-1 ITEM NOMENCLATURE SUBHEAD Satellite Communication 321500 52NR EHF TERMINALS (cont.): Remaining MDR requirements will be satisfied through the procurement of the LDR/MDR Follow-On Terminal contract awarded 20 Mar 98. The LDR/MDR Follow-On terminal incorporates the LDR/MDR capabilities into a consolidated terminal that provides the same EHF functionality as a legacy LDR terminal with an MDR appliqué. The LDR/MDR Follow-On terminal does not change the LDR/MDR performance envelope. The first article LDR/MDR Follow-On terminal production unit was delivered to the Government in September 1999 as noted in the President's Budget of February 1999. In January 2000, a decision was made to accelerate the procurement of the LDR/MDR Follow-On terminal in lieu of MDR appliques to meet remaining Fleet MDR requirements. The LDR/MDR Follow-On terminals will have Phase III FMLOC capabilities incorporated into their baseline. The LDR/MDR Follow-On Terminal's Antenna Group will require procurement of Radar Cross Section (RCS) modification kits to meet Navy Passive Counter Measure Ships (PCMS) RCS Specifications. The LDR/MDR Follow-On terminal is being procured along with required training equipment, technical data and baseband equipment and will require funding for production testing, quality assurance, production engineering, equipment assembly, product improvement and acceptance test and evaluation to satisfy the remaining MDR capability requirement. Also, during Phase IV, a Time Division Multiple Access (TDMA) Interface Proces (TIP) will be procured and integrated into the NECC. The purpose of TIP is to provide near real-time and rapid real-time data transfer between Tactical Data Processors (TDP) together with support for ADNS data exchange using a common suite of EHF Services. This capability is necessary for effective utilization of the anti-jam/low probability of intercept (AJ/LPI) and survivable capabilities of the EHF LDR/MDR system. COMMERCIAL SATELLITES: Lessons learned from Desert Storm documented the necessity of an alternate commercial communications service for logistics and operational support requirements to reduce the saturation of communications on the military tactical satellites. ASD(C3I) in a letter of 8 Nov 1993, directed the use of commercial satellite (COMMERSAT) to augment current and future Military Satellite Communications (MILSATCOM) systems. This relieves the congestion on military tactical satellite communications systems while enhancing the overall Navy tactical communications capacity and reducing the competition with tactical data on the limited tactical satellite assets. The COMMERSAT program will use commercial off-the-shelf (COTS)/nondevelopmental item (NDI) equipment, software, and service with minimal adaptation for the naval environment. Variants of the commercially available International Maritime Satellite (INMARSAT) terminals will be procured in the next few years. The various types are required to satisfy different requirements on flagships, aircraft carriers, amphib ships, combatants and auxiliary ships. The COMMERSAT Operational Requirements Document (ORD) mandates INMARSAT M terminals on Mine Counter-Measures ships. Commencing in FY00, INMARSAT M terminals are no longer in production, therefore INMARSAT B terminals will be procured and installed for Mine Counter-Measure ships. There will be INMARSAT B upgrades, and dual INMARSAT B upgrades to modify the earlier INMARSAT A terminals. FY01 and FY02 funds will continue procurement of C and Ku wide band SATCOM terminals for carriers and large deck amphibs components, supporting ancillary hardware related to Baseband and INMARSAT terminals and high speed data (HSD) kits for network centric warfare on combatants. There will also be procurement of additional shore equipment and modifications to established INMARSAT systems for 128 kbps wideband capability. This will provide greater capability to the Fleet. The AN/WSC-8 capability aboard surface combatants will be implemented using the SHF AN/WSC-6(V)9 suite of equipment. GLOBAL BROADCAST SERVICE (GBS): This is the Navy portion of the joint program with the Air Force as Executive Service. The GBS will augment other (MILSATCOM) systems and provide continuous, high speed, one way information flow of high volume data to units ashore, afloat or special operations. GBS will support routine operations, training and military exercises, special activities, crises, situational awareness, weapons targeting, reconnaissance and the transition to and conduct of opposed operations short of nuclear war. GBS will provide the capability of quickly disseminating large information products to various joint and small combat and combat support elements. FY01 and FY02 funds are a continuation to procure receiving equipment in various configurations customized to each type of ship for Phase II of the GBS program in support of UHF follow-on (UFO) satellite flights 8, 9, and 10. For ship and submarine receive suites, antennas and ancillary equipment such as Asynchronous Transfer Mode (ATM) in-line encryptors will be procured through SPAWAR contracts. Shipboard and submarine receive broadcast manager (RB equipment will be procured through the GBS Systems Contract which is executed by the Air Force. FY01 and FY02 continues procurement of shore terminals for MOC/MAST/MICFAC/SPECWAR/TACGRU/BEACHGRU and other Navy locations. For shore receive suites, all components including antennas and RBMs will be procured through the GBS Systems (Air Force) contract . A Mission Need Statement for GBS was signed, 3 AUG 1995, and an Operational Requirements Document (ORD) was signed on 30 April 97. Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 84 - 4 of 54 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continuation) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE Satellite Communications Systems June 2001 SUBHEAD 321500 52NR JMINI Control System: The Joint UHF Military Satellite Communications Network Integrated Control System (JMINI) is a joint interest program with the Navy designated as the lead service as directed by the Military Communications Electronics Board (MCEB). The JMINI Control System will provide dynamic centralized control of joint 5-kHz and 25-kHz UHF MILSATCOM voice and data resources (channels and Time Division Multiple Access (TDMA) time slots) via a globally integrated system of four control stations to be located at each of the three Naval Computer and Telecommunications Area Master Station (NCTAMS) sites plus Naval Computer and Telecommunications Station (NCTS) Guam. The globally integrated system consists of two major subsystems. The first subsystem provides communications resource planning and management via secure Wide Area Network (WAN) connections between the control stations and remote users and is known as the Network Management System (NMS). A total of 14 NMS units are required, one at each control station plus ten remote units to be installed at ORD-defined locations. The second subsystem provides the RF connectivity (modems, radios, antennas) between the NMS and the UHF MILSATCOM user terminals worldwide and is known as the Channel Controller. There are 156 channel controllers required per control station. Funds in FY99 begin procurement of the Digital Modular Radio (DMR), which serves as the JMINI Control System Channel Controller and procures the first two control station NMS units. Funds in FY00 continue procurement of the DMR channel controller hardware and the other two control station NMS units and begin installation of the system. Funds in FY01 continue procurement and installation of the channel controller hardware for the four control station plus begin procurement of the remote NMS units. Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 84 - 5 of 54 UNCLASSIFIED CLASSIFICATION DATE COST ANALYSIS June-01 APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 TOTAL COST IN THOUSANDS OF DOLLARS 52NR FY 2000 PY COST ID CODE ELEMENT OF COST NN101 MINI DAMA NN101 MINI DAMA Field Change Upgrade Kits (FY00 Only) NR103 SCI ADNS NN103 NN103 NR103 NP103 NR103 SCI ADNS Build One/Carry On Build One SCI ADNS Build Two & Three /Carry On Build Two SCI ADNS Build Two & Three /Carry On Build Two SI-COMMS - SCI ADNS Build 2 and Build 3 SI-COMMS - SCI ADNS Build 2 and Build 3 NR105 5/25 KHz SATCOM NN105 NN105 NN105 NN105 NN105 NN105 NR105 NN105 NR105 NN105 NR105 5/25 KHz SATCOM--GFCP 5/25 KHz SATCOM--AN/USC-42 5/25 KHz SATCOM--AN/PSC-5 EMUT (Spit Fire) 5/25 KHz SATCOM --AN/WSC-3 Mod Kits 5/25 KHz SATCOM--OE-82 Mod Kits 5/25 KHz SATCOM--UHF Modems 5/25 KHz SATCOM--UHF Modems 5/25 KHz SATCOM--DMR 5/25 KHz SATCOM--DMR 5/25 KHz SATCOM--DMR Racks2/ 5/25 KHz SATCOM--DMR Racks2/ NR106/108 NN106 NR106 NP108 NR108 NN106 NN106 NR106 NP108 NR108 NN106 NR106 NP108 NR108 NR106 NP108 NR108 TOTAL CODE QTY A 63 QTY TOTAL COST COST 17,900 66.7 1,286 A B B A A 15 267 299 18 7 4 COST QTY TOTAL COST COST QTY UNIT TOTAL COST COST 10,000 5,744 47 109.8 5,160 3 194.7 584 6,201 45 131.2 5,903 1 298.0 298 16,137 3,400 10,900 14 34 11.8 56.4 165 1,916 0 104 135.2 14,056 27,400 A A A A A A A A A B B B B A COST FY 2003 UNIT 0 0 1,627 26 0 TOTAL 1,286 14,300 A A A A A A A B B QTY FY 2002 UNIT 10,000 150 SHF SATCOM SHF Terminals--AN/WSC-6(V)5 Mod kits - Ship SHF Terminals--AN/WSC-6(V)5 Mod kits - Ship SHF Terminals --AN/WSC-6(V)5 Mod Kit - Shore SHF Terminals --AN/WSC-6(V)5 Mod Kit - Shore SHF Terminals--7 Ft Antenna - Ship SHF Terminals--AN/WSC-6(V)7 - Ship SHF Terminals--AN/WSC-6(V)7 - Ship SHF Terminals --AN/WSC-6(V)7 - Shore SHF Terminals --AN/WSC-6(V)7 - Shore SHF Terminals--AN/WSC-6(V)9 - Ship SHF Terminals--AN/WSC-6(V)9 - Ship SHF Terminals--AN/WSC-6(V)9 - Shore SHF Terminals--AN/WSC-6(V)9 - Shore SHF Terminals -- SUBHDR SHF Mod Kit SHF Terminals -- (V)7 & (V)9 Modems SHF Terminals -- (V)7 & (V)9 Modems COST FY 2001 UNIT 19,200 2,000 6,200 62.6 20,266 3 690.0 233.0 555.5 233 8,333 1 546.0 546 3 1,578.0 4,734 725.0 1,627 88 108.8 9,574 44 50.0 2,198 14,571 19,083 2,070 1 15 6 11,772 5 798.4 3,992 4 923.0 3,692 3 1,132.3 3,397 5 1,018.0 5,090 12 1,015.8 12,189 16 81.1 1,298 10 239.8 2,398 19 26.3 499 30 36.6 1,099 4,350 Remarks: SCI ADNS NN103 SCI ADNS unit cost is based on average cost. Variances are due to the diverse type of ship system configurations. NP103 SCI ADNS - Unit cost is based on average cost. Variances are due to the diverse type of shore system configurations. SCI ADNS transitions to BLI 305000 (Ship Communications Automation - 52PQ) in FY02. 5/25KHz $700K included in line for installation, total congressional plus up appears in this line for visibility and tracking. DMR Racks shown seperately beginning in FY02. DMR Install includes the installation of the DMR Racks. SHF TERMINALS SHF Terminals AN/ WSC-6(V)5 Mod Kits - The cost variance is due to inclusion/ exclusion of antenna buys. DD FORM 2446, JUN 86 Exhibit P-5, Cost Analysis Unclassified Classification P-1 Shopping List-Item No 84 - 6 of 54 Comm. Satellite--C band/CWSP Comm. Satellite--INMARSAT B HSD KITS Comm. Satellite--INMARSAT B HSD KITS NR112 NN112 NR112 Global Broadcast Service - Shore Global Broadcast Service - Shore JMINI Control System JMINI Control System - NMS JMINI Control System - NMS JMINI Control System - DMR JMINI Control System - DMR NP117 NR116 NR118 NP118 NR118 NP118 NR118 QTY TOTAL A A B B B B B B B B B B A A 9,321 1,231 11,622 758 5,703 68 12 30 2 2 QTY 400 0 0 1,400 1,400 UNIT 3,356.3 106.6 4 127.0 408.3 18.2 842.6 39.3 152.9 152.9 725.2 775.1 COST 12 5 3 0 0 0 3,600 51 11 63 9 3,600 2,696 8,700 2,800 9 36 14 58 12 29 15 46 14,596 78,800 34 17 373,004 180 480,439 COST TOTAL 1,279 13,425 14,704 635 1,225 700 841 3,401 926 9,269 2,479 12,674 6,799 2,318 1,376 5,504 10,153 44,958 71,108 COST QTY 4 3 10 0 34 4 71 20 42 8 10 UNIT 1,584.8 309.3 551.5 20.6 1,275.0 40.8 122.9 122.9 1,028.9 1,707.7 COST 6,339 6,339 928 5,515 0 6,443 700 5,100 2,900 8,700 3,000 2,458 5,161 8,231 17,077 35,927 COST TOTAL 64 4 2 6 5 0 46 7 10 48 6 20 QTY 109.5 1,597.3 129.0 166.7 380.0 39.0 44.6 127.3 104.4 1,042.8 959.1 COST UNIT FY 2002 7,011 6,389 13,400 258 1,000 1,900 3,158 0 1,796 312 2,108 1,500 1,273 5,011 6,257 19,181 33,222 COST TOTAL TOTAL COST IN THOUSANDS OF DOLLARS 321500 DATE QTY 52NR SUBHEAD COST UNIT FY 2003 COST TOTAL June-01 0 DD FORM 2446, JUN 86 . NR117 - FY01 Shore unit cost for shore due to fleet required changes. P-1 Shopping List-Item No 84 - 7 of 54 NN117- GBS FY00 Single / Dual Receive Suites includes RCS Radomes and NRE costs. NN117 - The FY01 procurement of 3 shore terminals are all sub-surface receive suits (SSRS) for sub school trainers. NN117 - GBS (All) Unit cost varies due to mix of Ship, Shore, and quantity discounts afforded by other Services buys per year NN117 - GBS - (All) Unit cost include all costs for procurement; eg.,ECPs, NRE. GBS This program now includes OPN P-1 line Item SATCOM Shore Terminals (BLI 3220) beginning in FY01. FY99 & FY00 detail information is provided for budget comparability. NR107 EHF Terminals - AN/USC - 38(V) FY99 funds are provided for Follow-On Terminal (FOT) Technical Data Packages, Remote Terminal Control Units, Full MILSTAR Low Data Rate Operational Capabilities (FMLOC) NR109 EHF Terminals - AN/USC - 38(V) FY99 - Unit Cost reflects procurement of Single Channel Anti-Jam Man Portables (SCAMPS) for SPECWAR use. NR107/ NR109 EHF Terminals - MDR FY00 funds provide MDR satellite simulators, maintainer and operator trainer, field change kits, and ancillary equipment. (Ship and Shore) NR107 EHF Terminals - Fluctuations in unit price are a result of the mix between Ship and Sub procurements. NR107/ NR109 EHF Terminals - NECC Unit cost includes addition of MDR capability beginning in FY99 NR107 / NR109 EHF Terminals - The FY00 and subsequent procurements consist of the LDR/MDR Follow-On-Terminals (FOT) which incorporates the Low Data Rate (LDR)/Medium Data Rate (MDR) capabilities into a consolidated terminal that provides the same EHF functionality as an LDR terminal with an MDR applique. The FOT does not change the LDR / MDR performance envelope. The first article FOT production unit was procured in FY98 and delivered to the Government in August 1999 as noted in the President’s Budget of February. NR107/NR109 EHF Terminals - FOT FY01 funds provide Sub Variant Maintainer/Operator trainers, RCS Radome kits, field change kits, and ancillary equipment EHF Terminals Remarks: Global Broadcast System-- Single (Receive Suite) Global Broadcast System-- Single (Receive Suite) Global Broadcast System--Dual (Receive Suite) Global Broadcast System--Dual (Receive Suite) Global Broadcast System--Subs (Receive Suite) Global Broadcast System--Subs (Receive Suite) NN117 NR117 NN117 NR117 NN117 NR117 Global Broadcast System (GBS) B Comm. Satellite--C band/CWSP NN112 NR116/117 B Comm. Satellite--INMARSAT B (Ship) Comm. Satellite--INMARSAT B (Ship) Comm. Satellite--INMARSAT B (Shore) A A Comm. Satellite--INMARSAT M A A A A A A A A A A A A NN112 NR112 NR113 Commercial Satellite EHF Terminals--AN/USC-38(V) - Ship EHF Terminals--AN/USC-38(V) - Ship EHF Terminals --AN/USC-38(V) - Shore EHF Terminals --AN/USC-38(V) - Shore EHF Terminals--NECC - Ship EHF Terminals--NECC - Ship EHF Terminals --NECC - Shore EHF Terminals --NECC - Shore EHF Terminals--MDR Appliques - Ship EHF Terminals --MDR Appliques - Shore EHF Terminals --Interim Polar Gateway - Shore EHF Terminals --Polar Equipment EHF Terminals-- AEHF EHF SATCOM NN112 NR112/113 NN107 NR107 NP109 NR109 NN107 NR107 NP109 NR109 NN107 NP109 NR109 NR107 NR107 NR107/109 ID CODE ELEMENT OF COST COST CODE FY 2001 Satellite Communications Systems FY 2000 OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT PY P-1 ITEM NOMENCLATURE COST ANALYSIS APPROPRIATION ACTIVITY CLASSIFICATION UNCLASSIFIED Classification Unclassified Exhibit P-5, Cost Analysis UNCLASSIFIED CLASSIFICATION DATE COST ANALYSIS June-01 APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT PY COST ID CODE ELEMENT OF COST CODE TOTAL QTY COST QTY FY 2000 UNIT TOTAL COST COST P-1 ITEM NOMENCLATURE Satellite Communications Systems 321500 TOTAL COST IN THOUSANDS OF DOLLARS FY 2001 FY 2002 UNIT TOTAL UNIT TOTAL QTY COST COST QTY COST COST NN555 PRODUCTION SUPPORT 0 37,662 24,980 17,615 NN555 NP555 Production Support - SATCOM Ship Production Support - SATCOM Shore 0 0 27,559 10,103 21,598 3,382 15,048 2,567 NN777 INSTALLATION 269,530 83,739 96,219 97,785 NN777 FMP Installation Install - SATCOM Ship Install - NOW/MCPP DSA - SATCOM Ship 232,930 232,930 0 72,453 56,184 5,224 11,045 79,450 63,801 8,489 7,160 87,763 72,800 5,341 9,622 36,600 36,600 11,286 11,286 16,769 16,769 10,022 10,022 830,451 258,533 186,179 192,802 TOTAL 830,451 275,435 201,007 198,143 TOTAL BLI 3215 830,451 275,435 201,007 198,143 NP776 Non-FMP Installation Install - SATCOM SHORE SUBHEAD 52NR QTY FY 2003 UNIT TOTAL COST COST REMARKS: . DD FORM 2446, JUN 86 Exhibit P-5, Cost Analysis Unclassified Classification P-1 Shopping List-Item No 84 - 8 of 54 UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 C. P-1 ITEM NOMENCLATURE B. APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO NN101 MINI DAMA Field Change Upgrade Kits (FY00 Only) 00 TITAN, San Diego, CA C/FPI (OPT) SPAWAR NN103 NR103 SCI ADNS Build Two & Three /Carry On Build Two SCI ADNS Build Two & Three /Carry On Build Two 00 01 SSC San Diego, CA SSC San Diego, CA WX WX NP103 SI-COMMS - SCI ADNS Build 2 and Build 3 00 SSC, San Diego, CA NR103 SI-COMMS - SCI ADNS Build 2 and Build 3 01 SSC San Diego, CA Satellite Communications Systems RFP DATE ISSUE AWARD OF FIRST DATE DATE DELIVERY Jan-00 SUBHEAD 321500 QTY UNIT COST 52NR SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE Aug-00 Aug-01 150 66.7 YES N/A SPAWAR SPAWAR Dec-99 Dec-00 Mar-00 Mar-01 47 45 109.8 131.2 YES YES N/A N/A WX SPAWAR Dec-99 Mar-00 3 194.7 YES N/A WX SPAWAR Dec-00 Mar-01 1 298.0 YES N/A D. REMARKS The FY00 MINI DAMA Program procures Field Change Upgrade Kits. FY01 SCI ADNS Shore fielding is for the training facility equipment. One location that has 6 systems required. SCI ADNS transitions to BLI 305000 (Ship Communications Automation - 52PQ) in FY02. DD FORM 2446, JUN 87 Exhibit P-5A, Procurement History and Planning Unclassified Classification P-1 Shopping List-Item No 84 - 9 of 54 UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT SUBHEAD FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO Satellite Communications Systems RFP DATE ISSUE AWARD OF FIRST DATE DATE DELIVERY NN105 5/25 KHz SATCOM--OE-82 Mod Kits 00 SSC San Diego, CA WX SPAWAR Dec-99 May-00 14 NN105 5/25 KHz SATCOM--UHF Modems NR105 5/25 KHz SATCOM--UHF Modems 00 01 ViaSat, Carlsbad, CA ViaSat, Carlsbad, CA IDIQ (OPT) IDIQ (OPT) SPAWAR SPAWAR Jan-00 Mar-01 Jun-00 Sep-01 NN105 5/25 KHz SATCOM--DMR NR105 5/25 KHz SATCOM--DMR 99 00 02 Motorola, Scottsdale, AZ Motorola, Scottsdale, AZ Motorola, Scottsdale, AZ FFP/IDIQ FFP/IDIQ FFP/IDIQ SPAWAR SPAWAR SPAWAR Feb-00 Mar-01 Mar-02 NR105 5/25 KHz SATCOM--DMR Racks2/ 02 SSC San Diego, CA WX SPAWAR Feb-02 COST CODE ELEMENT OF COST 321500 52NR SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE 11.8 YES N/A 34 26 56.4 62.6 YES YES N/A N/A Feb-01 Mar-02 Mar-03 60 104 88 202.9 135.2 108.8 YES YES YES N/A N/A N/A Aug-02 44 50.0 YES N/A QTY UNIT COST D. REMARKS DD FORM 2446, JUN 87 Exhibit P-5A, Procurement History and Planning Unclassified Classification P-1 Shopping List-Item No 84 - 10 of 54 UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT SUBHEAD Satellite Communications Systems RFP DATE ISSUE AWARD OF FIRST DATE DATE DELIVERY 321500 52NR FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO NN106 SHF Terminals--AN/WSC-6(V)5 Mod kits - Ship NR106 SHF Terminals--AN/WSC-6(V)5 Mod kits - Ship 00 01 Raytheon, Boston, MA Raytheon, Boston, MA CPAF(OPT) CPAF(OPT) SPAWAR SPAWAR Nov-99 Feb-01 Nov-00 Feb-02 3 5 690.0 798.4 YES YES NN106 SHF Terminals--7 Ft Antenna - Ship 00 Raytheon, Boston, MA C/FFP (OPT) SPAWAR Feb-00 Nov-00 1 233.0 YES NN106 SHF Terminals--AN/WSC-6(V)7 - Ship NR106 SHF Terminals--AN/WSC-6(V)7 - Ship 00 01 02 Raytheon, Boston, MA Raytheon, Boston, MA Raytheon, Boston, MA C/FFP (OPT) C/FFP (OPT) C/FFP (OPT) SPAWAR SPAWAR SPAWAR Jan-00 Jun-01 Nov-01 Jan-01 Jun-02 Nov-02 15 4 3 555.5 923.0 1132.3 YES YES YES NP108 SHF Terminals --AN/WSC-6(V)7 - Shore 00 Raytheon, Boston, MA C/FFP (OPT) SPAWAR Jan-00 Jan-01 1 546.0 YES NN106 SHF Terminals--AN/WSC-6(V)9 - Ship NR106 SHF Terminals--AN/WSC-6(V)9 - Ship 00 01 02 Harris Corp, Melbourne, FL Harris Corp, Melbourne, FL Harris Corp, Melbourne, FL C/FFP D/FFP (OPT) D/FFP (OPT) SPAWAR SPAWAR SPAWAR Mar-00 Jun-01 Nov-01 Jun-01 Apr-02 Sep-02 3 5 12 1578.0 1018.0 1015.8 YES YES YES NN106 SHF Terminals -- SUBHDR SHF Mod Kit 01 02 Raytheon, Marlboro, MA Raytheon, Marlboro, MA C/FFP (OPT) C/FFP (OPT) SPAWAR SPAWAR Nov-00 Nov-01 Feb-02 Feb-03 16 10 81.1 239.8 YES YES NP108 SHF Terminals - Shore Modems (V)7 & (V)9 NR108 SHF Terminals - Shore Modems (V)7 & (V)9 00 01 02 Raytheon, MA & Harris, FL Raytheon, MA & Harris, FL Raytheon, MA & Harris, FL C/FFP (OPT) C/FFP (OPT) C/FFP (OPT) SPAWAR SPAWAR SPAWAR Jan-00 Jun-01 Nov-01 Jan-01 Jun-02 Nov-02 6 19 30 725.0 26.3 36.6 YES YES YES COST CODE ELEMENT OF COST QTY UNIT COST SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE D. REMARKS FY03 SHF AN/WSC - 6(V)5 Mod Kts - The cost variance is due to inclusion/ exclusion of antenna buys. DD FORM 2446, JUN 87 Exhibit P-5A, Procurement History and Planning Unclassified Classification P-1 Shopping List-Item No 84 - 11 of 54 UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST FY NN107 NR107 EHF Terminals--AN/USC-38(V) - Ship EHF Terminals--AN/USC-38(V) - Ship 00 01 02 CONTRACTOR AND LOCATION aytheon, Marlborough, MA aytheon, Marlborough, MA aytheon, Marlborough, MA NP109 EHF Terminals --AN/USC-38(V) - Shore 99 00 Rockwell, TX aytheon, Marlborough, MA C/FFP (OPT) C/FFP (OPT) SPAWAR/Army SPAWAR Sep-99 Jan-00 CONTRACT METHOD & TYPE C/FFP (OPT) C/FFP (OPT) C/FFP (OPT) LOCATION OF PCO SPAWAR SPAWAR SPAWAR SUBHEAD Satellite Communications Systems RFP DATE ISSUE AWARD OF FIRST DATE DATE DELIVERY Jan-00 Apr-01 Dec-00 Mar-02 Nov-01 Feb-03 321500 QTY 52NR SPECS AVAILABLE NOW 58 10 20 UNIT COST 775.1 1707.7 959.1 Mar-01 Apr-01 13 14 483.5 725.2 YES YES DATE REVISIONS AVAILABLE YES YES YES NR109 EHF Terminals --AN/USC-38(V) - Shore 01 02 aytheon, Marlborough, MA aytheon, Marlborough, MA C/FFP (OPT) C/FFP (OPT) SPAWAR SPAWAR Dec-00 Nov-01 Mar-02 Feb-03 8 6 1028.9 1042.8 YES YES NN107 NR107 EHF Terminals--NECC - Ship EHF Terminals--NECC - Ship 00 01 02 AP Labs, CA AP Labs, CA AP Labs, CA C/FFP (OPT) C/FFP (OPT) C/FFP (OPT) SPAWAR SPAWAR SPAWAR May-00 Jan-01 Nov-01 Aug-00 Apr-01 Feb-02 36 42 48 152.9 122.9 104.4 YES YES YES NP109 EHF Terminals --NECC - Shore 99 00 AP Labs, CA AP Labs, CA C/FFP (OPT) C/FFP (OPT) SPAWAR SPAWAR Dec-98 May-00 May-99 Aug-00 7 9 142.9 152.9 YES YES NR109 EHF Terminals --NECC - Shore 01 02 AP Labs, CA AP Labs, CA C/FFP (OPT) C/FFP (OPT) SPAWAR SPAWAR Jan-01 Nov-01 Apr-01 Feb-02 20 10 122.9 127.3 YES YES NN107 EHF Terminals--MDR Appliques - Ship 99 aytheon, Marlborough, MA SS/FFP (OPT) SPAWAR Mar-99 Aug-00 31 499.4 YES D. REMARKS NR109 EHF Terminal - AN/USC-38(V) FY99 procurement of 13 Single Channel Anti-Jam Man Portables (SCAMPS). DD FORM 2446, JUN 87 Exhibit P-5A, Procurement History and Planning Unclassified Classification P-1 Shopping List-Item No 84 - 12 of 54 UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 C. P-1 ITEM NOMENCLATURE B. APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems RFP DATE ISSUE AWARD OF FIRST DATE DATE DELIVERY FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO NN112 Comm. Satellite--INMARSAT B (Ship) NR112 Comm. Satellite--INMARSAT B (Ship) 00 01 02 Mackay Comm Edison, NJ Mackay Comm Edison, NJ Mackay Comm Edison, NJ C/FP (OPT) C/FP (OPT) C/FP (OPT) SPAWAR SPAWAR SPAWAR Nov-99 Nov-00 Nov-01 NR113 Comm. Satellite--INMARSAT B (Shore) 02 D&E Tech Wallingford, CT C/FP (OPT) SSC/CHS NN112 Comm. Satellite--C band/CWSP NR112 Comm. Satellite--C band/CWSP 00 01 Harris Corp., Melbourne FL Harris Corp., Melbourne FL C/FP C/FP (OPT) NN112 Comm. Satellite--INMARSAT B HSD KITS NR112 Comm. Satellite--INMARSAT B HSD KITS 00 01 02 D&E Tech Wallingford, CT D&E Tech Wallingford, CT D&E Tech Wallingford, CT C/FP (OPT) C/FP (OPT) C/FP (OPT) COST CODE ELEMENT OF COST SUBHEAD 321500 52NR QTY UNIT COST SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE Feb-00 Feb-01 Feb-02 63 71 46 39.3 40.8 39.0 YES YES YES N/A N/A N/A Nov-01 Feb-02 7 44.6 YES N/A SPAWAR SPAWAR Jan-00 Dec-00 Sep-00 Sep-01 11 4 842.6 1275.0 YES YES N/A N/A SSC/CHS SSC/CHS SSC/CHS Nov-99 Nov-00 Nov-01 Feb-00 Feb-01 Feb-02 51 34 0 18.2 20.6 0.0 YES YES YES N/A N/A N/A D. REMARKS DD FORM 2446, JUN 87 Exhibit P-5A, Procurement History and Planning Unclassified Classification P-1 Shopping List-Item No 84 - 13 of 54 UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST FY NN117 Global Broadcast System--Subs (Receive Suite) 00 NR117 Global Broadcast System--Subs (Receive Suite) 01 NP117 Global Broadcast System--Subs (Receive Suite) 02 NP117 Global Broadcast Service - Shore NR116 Global Broadcast Service - Shore NR116 Global Broadcast Service - Shore SUBHEAD Satellite Communications Systems RFP DATE ISSUE AWARD OF FIRST DATE DATE DELIVERY 321500 CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO Raytheon, Reston, MA C/FFP/(OPT) C/FFP/(OPT) C/FFP/(OPT) USAF USAF USAF Sep-00 Dec-00 Dec-01 Mar-01 May-01 Jun-02 3 10 6 USAF USAF USAF Sep-00 Dec-00 Dec-01 May-01 Jul-01 Jul-02 USAF Dec-01 Jul-02 Raytheon, Reston, MA Raytheon, Reston, MA 00 01 02 Raytheon, Marlborough & Reston, MA Raytheon, Marlborough & Reston, MA C/FFP/(OPT) C/FFP/(OPT) C/FFP/(OPT) NR117 Global Broadcast System--Dual (Receive Suite 02 Raytheon, Marlborough & Reston, MA C/FFP/(OPT) Raytheon, Marlborough & Reston, MA 52NR SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE 408.3 551.5 166.7 YES YES YES N/A N/A N/A 5 3 2 127.0 309.3 129.0 YES YES YES N/A N/A N/A 5 380.0 YES N/A QTY UNIT COST D. REMARKS NN117 - GBS (All) Unit cost varies due to mix of Ship, Shore, and quantity discounts afforded by other Services buys per year. DD FORM 2446, JUN 87 Exhibit P-5A, Procurement History and Planning Unclassified Classification P-1 Shopping List-Item No 84 - 14 of 54 UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 C. P-1 ITEM NOMENCLATURE B. APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems RFP DATE ISSUE AWARD OF FIRST DATE DATE DELIVERY FY CONTRACTOR AND LOCATION CONTRACT METHOD & TYPE LOCATION OF PCO NP118 JMINI Control System - NMS 00 SAIC, San Diego, CA IDIQ SPAWAR Dec-99 NR118 JMINI Control System - NMS 01 02 SAIC, San Diego, CA SAIC, San Diego, CA IDIQ IDIQ SPAWAR SPAWAR NP118 JMINI Control System - DMR 00 Motorola, Scottsdale, AZ FFP/IDIQ NR118 JMINI Control System - DMR 02 Motorola, Scottsdale, AZ FFP/IDIQ COST CODE ELEMENT OF COST SUBHEAD 321500 52NR QTY UNIT COST SPECS AVAILABLE NOW Jul-00 4 3356.3 Yes Dec-00 Dec-01 Jul-01 Jul-02 4 4 1584.8 1597.3 Yes Yes SPAWAR May-01 Dec-01 12 106.6 Yes SPAWAR Nov-01 Jul-02 64 109.5 Yes DATE REVISIONS AVAILABLE D. REMARKS: NMS unit costs for FY 99 & FY 00 are greater than FY 01 due to the fact that the bulk of NMS funding is dedicated to the complex software enhancement and integration work required to reach IOC at the four primary JMINI Control Stations in FY 00. OPN funding (and unit costs) decrease in FY 01 and out as the program focus shifts to the less complex implementation of the Remote JMINI Control Stations Exhibit P-5A, Procurement History and Planning Unclassified Classification P-1 Shopping List-Item No 84 - 15 of 54 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NN101 MINI DAMA Provides 5KHz and 25KHz UHF Communications capability for submarines and other disadvantaged users. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 63 Equipment Nonrecurring Field Change Upgrade Kits Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 63 PRIOR YR EQUIP 63 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 17.9 8.4 8.4 FY 99 Qty $ 14 FY 00 Qty 4.8 14 14 1.8 1.8 8.4 26.3 1.8 6.6 $ 0 0.0 150 10.0 0 0.0 FY 01 Qty $ 0 0.0 0 0.0 0.0 10.0 ADMINISTRATIVE LEADTIME: FY 02 Qty $ 0 0.0 150 0.0 150 Note 1 0.0 0.0 0.0 0.0 FY 03 Qty 0 0 FY 05 Qty FY 04 $ 0.0 0.0 Qty $ 0 0.0 0 0 0.0 0.0 0.0 PRODUCTION LEADTIME: FY 06 $ 0.0 0 $ 0 0.0 0.0 0.0 FY 07 Qty 0.0 0 0.0 0.0 0.0 TC Qty $ 0 0.0 0 0 0.0 0.0 0.0 0 0.0 0.0 Aug-00 FY 2001: NA FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: Aug-01 FY 2001: NA FY 2002: NA FY 2003: NA FY 01 INPUT OUTPUT 1 2 FY 02 3 4 2 3 77 50 50 50 77 50 50 50 1 2 1 2 4 1 2 4 1 2 3 4 0.0 $ 77 22.7 150 10.0 227 77 150 0 0 0 0 0 0 0 0 10.2 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.2 42.9 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: FY 03 1 0.0 Qty 10 Months FY 2000: PY $ 0.0 0.0 CONTRACT DATES: INSTALLATION SCHEDULE: Total Qty 3 TC TOTAL INPUT 227 OUTPUT 227 Notes/Comments FY00 is Congressional Plus-Up of $10M Note 1/ FY00 : ADW Mini Dama field change upgrade kit installs executed through the ECP field change process. No installation dollars required. Note 2 / Installation of FY00 ADW Mini Dama units do not occur until 2 months after delivery due to government checkout and acceptance process. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 16 of 54 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NN103/NR103 SCI ADNS Build Two & Three /Carry On Build Two Provides Shipboard reception and transmission of multi-functional data using various data networks linking battlegroup commanders with intelligence databases. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: 0 $ 0.0 FY 99 Qty $ 0 FY 00 Qty 0.0 $ 47 5.2 FY 01 Qty $ 45 5.9 0.0 0 1.1 0.0 0.0 1.1 1.1 $ FY 03 Qty FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ TC Qty $ $ SCI ADNS transitions to BLI 305000 (Ship Communications Automation - 52PQ) in FY02. Qty 92 15 1.2 48 3.7 15 1.2 10 38 0.8 2.9 1.2 7.4 ADMINISTRATIVE LEADTIME: $ 11.1 0.3 1.8 0 0.0 3.7 10.6 0.0 0.0 1 Month 0 0.0 0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 63 0 25 38 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 3 Months CONTRACT DATES: FY 2000: Dec-99 FY 2001: Dec-00 FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: Mar-00 FY 2001: Mar-01 FY 2002: NA FY 2003: NA INSTALLATION SCHEDULE: PY 1 2 3 4 INPUT 15 14 11 13 10 OUTPUT 15 12 12 12 12 1 2 3 4 FY 01 FY 02 1 2 1 2 FY 03 3 4 1 2 3 4 1 2 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: Total Qty 0.3 0.7 1.1 0 FY 02 Qty TC TOTAL INPUT 63 OUTPUT 63 Notes/Comments SCI ADNS transitions to BLI 305000 (Ship Communications Automation - 52PQ) in FY02. SCI ADNS has a carry-on variant that requires no installation. Therefore, the variation between the number of procurements vs. the number of installations. (FY00 - 22 FY01 - 7 FY02 - 0 FY02 - 07 Carry-on’s are fully funded) Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 17 of 54 5.9 0.0 1.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.9 19.1 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 3215000 NP103/NR103 SI-COMMS - SCI ADNS Build 2 and Build 3 Provides Shipboard reception and transmission of multi-functional data using various data networks linking battle group commanders with intelligence databases. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 20 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: METHOD OF IMPLEMENTATION: $ 0.0 FY 99 Qty $ 4 FY 00 Qty 0.4 $ 3 FY 01 Qty $ FY 02 Qty $ FY 03 Qty FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ TC Qty $ Total Qty $ 0.6 1 0.3 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 Qty 27 1 28 1.0 0.3 1.3 28 4 0 3 1 0 0 0 0 0 0 1.4 0.3 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 1.4 2.7 SCI ADNS transitions to BLI 305000 (Ship Communications Automation - 52PQ) in FY02. 20 0.7 4 4 0.3 0.3 0.7 0.7 0.3 0.7 3 0.2 3 0.2 1 0.1 1 0.1 0.2 0.8 ADMINISTRATIVE LEADTIME: 0 0.0 0.1 0.4 0.0 0.0 1 Month 0 0.0 0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3 Months FY 2000: Dec-99 FY 2001: Dec-00 FY 2002: NA FY 2003: NA FY 2000: Mar-00 FY 2001: Mar-01 FY 2002: NA FY 2003: NA PY 1 CONTRACT DATES: DELIVERY DATES: FY 01 2 FY 02 3 4 1 2 4 1 2 FY 03 3 4 1 2 3 4 1 2 FY 04 3 4 3 4 1 2 3 4 INSTALLATION SCHEDULE: 27 1 27 1 INPUT OUTPUT FY 05 INSTALLATION SCHEDULE: $ 1 2 FY 07 FY 06 3 TC TOTAL INPUT 28 OUTPUT 28 Notes/Comments SCI ADNS transitions to BLI 305000 (Ship Communications Automation - 52PQ) in FY02. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 18 of 54 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: Satellite Communications Systems NN105 5/25 KHz SATCOM--OE-82 Mod Kits DESCRIPTION/JUSTIFICATION: Provides OE-82 antenna systems with the capability to transmit and receive at a bandwidth of 5KHz as well as 25KHz DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 267 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 225 PRIOR YR EQUIP 225 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 321500 FY 99 Qty $ FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ FY 03 Qty FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ TC Qty $ $ Qty $ 3.4 14 0.2 14 0.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 295 3.7 3.2 3.2 42 42 0.5 0.5 28 14 14 0.1 0.1 0.1 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 295 281 14 0 0 0 0 0 0 0 0 295 3.8 3.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.8 7.6 3.2 6.6 0.5 0.7 0.1 0.3 ADMINISTRATIVE LEADTIME: 0.0 0.0 0.0 0.0 1 Month 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5 Months CONTRACT DATES: FY 2000: Dec-99 FY 2001: NA FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: May-00 FY 2001: NA FY 2002: NA FY 2003: NA INSTALLATION SCHEDULE: PY 1 2 INPUT 295 OUTPUT 295 1 2 FY 01 FY 02 3 4 1 2 3 4 1 2 FY 03 3 4 1 2 3 4 1 2 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: Total Qty TC TOTAL INPUT 295 OUTPUT 295 Notes/Comments PITCO integration and test prior to pier availability. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 19 of 54 June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems NN105/NR105 5/25 KHz SATCOM--UHF Modems Provides the modulation demodulation capability at 5 KHz bandwidth in the UHF spectrum DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 299 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 271 PRIOR YR EQUIP 271 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 10.9 FY 99 Qty $ 57 FY 00 Qty 3.3 $ 34 1.9 FY 01 Qty $ 26 1.6 0.7 0.6 7.3 7.3 60 60 3.9 3.9 7.3 18.2 3.9 7.2 59 25 34 3.7 1.6 2.1 321500 FY 02 Qty $ 0 0.0 FY 03 Qty 0 FY 05 Qty FY 04 $ 0.0 Qty $ 0 0.0 FY 06 $ 0 0.0 FY 07 Qty $ 0 0.0 TC Qty $ 0 0.0 0 20 1.3 6 0.8 20 1.3 6 0.8 1.3 3.6 0.8 0.8 6 Months 0 0.0 0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 Mar-01 FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: Jun-00 FY 2001: Sep-01 FY 2002: NA FY 2003: NA INSTALLATION SCHEDULE: PY 1 INPUT OUTPUT FY 01 FY 02 4 1 2 390 20 3 3 390 14 6 3 4 1 2 FY 03 3 4 1 2 17.7 416 356 34 26 0 0 0 0 0 0 0 4 1 2 FY 04 3 4 3 4 1 2 3 4 3 FY 07 FY 06 FY 05 3 416 6 Months FY 2001: 2 0.0 0.0 0.0 Jan-00 1 $ 0.0 0.0 0.0 FY 2000: INSTALLATION SCHEDULE: Qty 1.4 0.6 CONTRACT DATES: 3 $ 0.7 3.7 6.9 ADMINISTRATIVE LEADTIME: 2 Total Qty 3 TC TOTAL INPUT 416 OUTPUT 416 Notes/Comments Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 20 of 54 17.0 12.8 2.1 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 17.0 36.7 UNCLASSIFIED June-01 MODIFICATION TITLE: Satellite Communications Systems 321500 COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: NN105/NR105 5/25 KHz SATCOM--DMR Provides 5KHz and 25 KHz UHF bandwidth capability and will evenually replace the aging AN/WSC-3 radios DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment FY 99 Qty FY 00 Qty $ 60 12.2 104 $ 14.1 FY 01 Qty $ 0 0.0 FY 02 Qty $ 88 FY 03 Qty FY 05 FY 04 $ Qty $ FY 06 Qty $ FY 07 Qty $ TC Qty $ 9.6 Total Qty $ 1316 159.5 Qty 1,568 $ 195.3 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support 5.9 5.7 3.1 11.5 26.2 Other (DSA) 1.5 0.3 0.9 7.0 9.7 Interm Contractor Support Installation of Hardware* 0 0.0 0 0.0 0 0.0 1,532 60.9 60 2.3 104 3.9 FY 01 EQUIP 0 0.0 FY 02 EQUIP 0 0.0 FY 03 EQUIP 0 0.0 FY 04 EQUIP 0 0.0 FY 05 EQUIP 0 0.0 FY 06 EQUIP 0 0.0 FY 07 EQUIP 0 0.0 1,368 54.7 PRIOR YR EQUIP 60 2.3 60 2.3 FY 00 EQUIP 104 3.9 104 1368 3.9 FY TC EQUIP 1368 TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: 0.0 0.0 0.0 12.2 0.0 21.4 ADMINISTRATIVE LEADTIME: 2.3 8.3 3.9 17.4 2 Months 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FY 2000: Mar-01 FY 2001: NA FY 2002: Mar-02 FY 2003: DELIVERY DATES: FY 2000: Mar-02 FY 2001: NA FY 2002: Mar-03 FY 2003: FY 01 PY 1 2 FY 02 3 4 INPUT 30 OUTPUT 1 2 4 30 52 52 30 30 52 52 3 4 3 4 FY 05 INSTALLATION SCHEDULE: 1 2 FY 03 3 1 2 1 2 2 54.7 232.7 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 1 54.7 8 Months CONTRACT DATES: INSTALLATION SCHEDULE: 54.7 TC TOTAL INPUT 1368 1532 OUTPUT 1368 1532 Notes/Comments FY99 Installation quantity consists of 1 DMR (4 channels), the remaining DMR systems (channels) were procured as lab assets. No Separate P-3A established for DMR Racks. FY01 equipment procurement was zeroed at FY01 FMB Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 21 of 54 60.9 292.0 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NN106/NR106 SHF Terminals--AN/WSC-6(V)5 Mod kits - Ship High data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 18 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 2 PRIOR YR EQUIP 2 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 19.2 FY 99 Qty $ 0 FY 00 Qty 3.7 $ 3 2.1 0.5 0.4 0.5 0.5 7 7 3.1 7.7 $ 5 4.0 1.2 0.3 3.1 3.1 0.5 19.7 FY 01 Qty 9 9 5.0 5.0 FY 02 Qty $ 0 1.0 2 1.0 5.0 8.5 ADMINISTRATIVE LEADTIME: $ FY 04 Qty FY 05 Qty $ $ FY 06 Qty $ FY 07 Qty 5 2.5 5 2.5 1.0 5.9 2.5 3.7 1 Month 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Feb-01 FY 2002: NA FY 2003: DELIVERY DATES: FY 2000: Nov-00 FY 2001: Feb-02 FY 2002: NA FY 2003: INSTALLATION SCHEDULE: PY 1 INPUT 18 2 OUTPUT 18 FY 01 FY 02 2 2 1 28.9 0.0 0.0 25 18 2 5 0 0 0 0 0 0 0 25 12.0 8.6 1.0 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.0 45.4 4 1 2 4 1 2 FY 04 3 4 3 4 1 2 3 4 5 5 FY 05 INSTALLATION SCHEDULE: FY 03 3 $ 12 Months FY 2001: 1 Qty 2.2 2.2 Nov-99 4 $ 1.2 FY 2000: 3 Total Qty 26 CONTRACT DATES: 2 TC $ 0.0 0.5 0.4 2 FY 03 Qty 2 FY 07 FY 06 3 4 1 2 3 TC TOTAL INPUT 25 OUTPUT 25 Notes/Comments PY procurement - Installs spread over 3 years due to funding cuts to support Bosnia. (FY04 and FY05) The current contract that is utilized to upgrade the AN/WSC-6(V)4 to an AN/WSC-6(V)5 is an engineering, fabrication and Integration type contract. This contract has no minimum requirements for procure FY99 funds ECP to the first six boards on the (V)5 & modification to the ESI antenna for integration to the (V)5 modification to 7 Ft. Antenna for integration to (V)5 FY00 1 Procurement will be going for Shore Training (FTC Norfolk) Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 22 of 54 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NP108/NR108 SHF Terminals --AN/WSC-6(V)5 Mod Kit - Shore AN/WSC-6(V)5 terminals provide training and technical support for high data rate SHF satellite communications for inter and intra service message, data, voice and video transmission. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 0.0 FY 99 Qty $ 1 FY 00 Qty 0.4 $ 0 0.0 FY 01 Qty $ 0 0.0 FY 02 Qty $ 0 0.0 FY 03 Qty 0 FY 05 Qty FY 04 $ 0.0 Qty $ 0 0.0 FY 06 $ 0 FY 07 Qty 0.0 $ 0 0.0 TC Qty $ 0 0.0 3.4 Qty 3 $ 3.8 0.5 0.0 0.0 0 0.0 0.0 0.0 0.0 1.0 1 1 0.8 0.8 0.0 0 0.0 1 0.0 0.8 0.8 ADMINISTRATIVE LEADTIME: 0 0.0 0.0 0.0 0.0 0.0 1 Month 0 0.0 0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 FY 2001: NA FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: NA FY 2001: NA FY 2002: NA FY 2003: NA FY 01 1 INPUT 1 1 OUTPUT 1 2 FY 02 3 4 1 2 3 4 1 2 0.6 2 0.6 0.6 4.0 3 1 1 0 0 0 0 0 0 0 2 12 Months NA PY 2 0.0 0.0 FY 2000: FY 03 3 4 1 2 3 4 1 2 FY 04 3 4 3 4 1 2 3 4 1 1 2 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: $ 2 CONTRACT DATES: INSTALLATION SCHEDULE: Total Qty TC TOTAL INPUT 2 3 OUTPUT 2 3 Notes/Comments FY01 Install is from FY00 Ship Assets Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 23 of 54 1.4 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 1.4 5.2 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NN106 SHF Terminals--7 Ft Antenna - Ship High data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 7 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 7 PRIOR YR EQUIP 7 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 2.0 FY 99 Qty $ FY 00 Qty 1.0 4 $ 1 0.2 0.5 0.2 1.5 1.5 4 4 1.9 3.6 $ 0 FY 02 Qty 0.0 $ 0 0.0 FY 03 Qty 0 FY 05 Qty FY 04 $ 0.0 Qty $ 0 0.0 FY 06 $ 0 0.0 FY 07 Qty $ 0 0.0 TC Qty $ 0 0.0 $ 0 0.0 Qty 12 1 0.9 1 0.9 $ 3.2 0.7 0.5 0 0.0 0.9 1.6 ADMINISTRATIVE LEADTIME: 0 0.0 0.0 0.0 0.0 0.0 1 Month 0 0.0 0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 9 Months Feb-00 FY 2001: NA FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: Nov-00 FY 2001: NA FY 2002: NA FY 2003: NA INSTALLATION SCHEDULE: PY 1 2 INPUT 12 OUTPUT 12 1 2 FY 02 3 4 1 2 3 4 1 2 FY 05 12 11 1 0 0 0 0 0 0 0 0 0.0 0.0 FY 2000: FY 01 0.0 0.0 0.0 CONTRACT DATES: INSTALLATION SCHEDULE: Total Qty 0.2 0.3 1.9 1.9 1.5 3.5 FY 01 Qty FY 03 3 4 1 2 3 4 1 2 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 TC TOTAL INPUT 12 OUTPUT 12 Notes/Comments FY99 includes production support for the modification to the 7 Ft. Antenna for integration into the (V)5. FY00 Procurement is a new requirement due to (V)5 Shore terminal going to Ship Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 24 of 54 4.4 3.4 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.4 8.8 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NN106/NR106 SHF Terminals--AN/WSC-6(V)7 - Ship Provides high data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment RCS Backfit 4 Equipment Nonrecurring - Modems Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 6.2 FY 99 Qty $ 2 FY 00 Qty 2.8 $ 15 8.3 0.5 0.1 0.0 2 2 2.8 6.2 $ 4 3.7 4.2 0.3 2.8 2.8 0.0 6.2 FY 01 Qty 5 5 6.9 6.9 FY 02 Qty 3 9 14.5 9 16.5 14.5 5 4 5.1 11.5 14.5 19.4 16.5 21.0 1 Month FY 2000: Jan-00 FY 2001: DELIVERY DATES: FY 2000: Jan-01 FY 2001: PY 1 4 1 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 $ TC Qty $ Total Qty $ Qty 2 4 3 5 4 OUTPUT 7 3 3 3 5 4 3 4 1 1 2 1 2 0.0 0.0 0.0 0.0 FY 2002: Nov-01 FY 2003: FY 2002: Nov-02 FY 2003: FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 2 0.0 0.0 FY 03 3 3 FY 05 0.0 0.0 12 Months Jun-02 3 2 FY 07 Qty 25 7 14 4 0 0 0 0 0 0 0 FY 02 3 FY 06 $ 3 $ 24.5 6.2 1.3 7 1 $ 28 INPUT INSTALLATION SCHEDULE: Qty Jun-01 FY 01 2 FY 05 Qty FY 04 $ 0.6 0.5 9 6.9 19.7 ADMINISTRATIVE LEADTIME: FY 03 Qty 3.4 0.8 0.4 CONTRACT DATES: INSTALLATION SCHEDULE: $ 4 TC TOTAL INPUT 25 OUTPUT 25 Notes/Comments Upon delivery systems require a 30 day PITCO FY99 includes ECP for LCC and Radar Cross Sectin (RCS). One of the Procurements for FY00 is to be installed on Shore FY02 One of the Installs in FY00 is of a Shore terminal, procured FY99 Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 25 of 54 40.6 9.7 19.5 11.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.6 72.5 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NP108/NR108 SHF Terminals --AN/WSC-6(V)7 - Shore AN/WSC-6(V)X terminals provide training and technical support for high data rate SHF satellite communications for inter and intra service message, data, voice and video transmission. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ FY 99 Qty 0.0 $ 1 FY 00 Qty 1.0 $ 1 0.5 0.5 0.0 0 0.0 1.5 $ 0 0.0 FY 02 Qty $ 0 FY 03 Qty FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ TC Qty $ 0 0.0 1 0.4 1 0.4 1 0.4 1 0.4 0.0 1.2 ADMINISTRATIVE LEADTIME: 0.4 0.4 0.4 0.4 1 Month 3 0 2 0 0 0 0 0 0 0 0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12 Months FY 2001: NA FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: Jan-01 FY 2001: NA FY 2002: NA FY 2003: NA PY 1 FY 01 2 FY 02 3 4 1 1 2 1 1 FY 03 3 4 1 2 3 4 1 2 FY 04 3 4 3 4 1 2 3 4 1 1 FY 05 INSTALLATION SCHEDULE: 2 FY 07 FY 06 3 4 $ 1.5 1.2 0.0 Jan-00 OUTPUT Qty 2 FY 2000: INPUT $ 0.0 CONTRACT DATES: INSTALLATION SCHEDULE: Total Qty 0.6 0.0 0.0 0.0 FY 01 Qty 1 2 TC TOTAL INPUT 2 OUTPUT 2 Notes/Comments FY99 Procurement installed FY02 Ship per sponsors guidance FY02 Installation is from FY00 Ship Procurement FY01 Install routed from FY00 Ship Procurement per Dr. K (Feb-01). Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 26 of 54 0.8 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 3.5 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NN106/NR106 SHF Terminals--AN/WSC-6(V)9 - Ship Provides high data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 0.0 FY 99 Qty $ 0 FY 00 Qty 0.0 $ 3 4.7 FY 01 Qty $ 5 5.1 2.6 0.0 0 0.0 0.0 0.0 0.0 0.0 0 0.0 FY 02 Qty $ 12 1 1.9 1.9 0.0 7.3 ADMINISTRATIVE LEADTIME: FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ $ 3 9.2 3 9.2 1.9 8.0 9.2 22.8 1 Month 4 0 1 3 0 0 0 0 0 0 0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Jun-01 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000: Jun-01 FY 2001: Apr-02 FY 2002: Sep-02 FY 2003: FY 01 INPUT 0 OUTPUT 0 FY 02 3 4 1 2 1 1 1 2 4 1 2 0.0 0.0 11.1 0.0 1.9 9.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.1 38.1 1 2 FY 04 3 4 3 4 1 2 3 4 3 FY 07 FY 06 3 22.0 3 FY 05 INSTALLATION SCHEDULE: FY 03 3 $ 10 Months FY 2001: 2 Qty 4.1 0.9 Mar-00 1 $ 1.1 0.3 FY 2000: PY Total Qty 20 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 12.2 0.5 0.5 1 FY 03 Qty 4 1 2 3 4 TC TOTAL INPUT 4 OUTPUT 4 Notes/Comments FY00 Procurement of terminals, 2 are to be shore assets. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 27 of 54 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NP108/NR108 SHF Terminals--AN/WSC-6(V)9 - Shore Provides high data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 Installation of Modems PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 0.0 FY 99 Qty $ 0 FY 00 Qty 0.0 $ 0 0.0 FY 01 Qty $ 0 0.0 FY 02 Qty $ 0 0.0 FY 03 Qty 0 FY 05 Qty FY 04 $ 0.0 Qty $ 0 0.0 FY 06 $ 0 0.0 FY 07 Qty $ 0 0.0 TC Qty $ 0 0.0 0 0.0 0.0 0.0 0.0 0.0 0 0.0 2 0.8 2 0.8 0.0 0.0 ADMINISTRATIVE LEADTIME: 0 0.0 0.8 0.8 0.0 0.0 1 Month 0 0.0 0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 NA FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: Jan-01 FY 2001: NA FY 2002: NA FY 2003: NA PY 1 FY 01 0 2 FY 02 3 4 1 2 4 1 2 2 0.8 0 2 0 0 0 0 0 0 0 0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.8 FY 03 3 4 1 2 3 4 1 2 FY 04 3 4 3 4 1 2 3 4 2 2 1 2 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: 0.0 10 Months FY 2001: OUTPUT $ 0.0 Mar-00 0 Qty 0 FY 2000: INPUT $ 0.0 CONTRACT DATES: INSTALLATION SCHEDULE: Total Qty 3 TC TOTAL INPUT 2 OUTPUT 2 Notes/Comments FY01 Installs Procured with Ship Assets in FY00 Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 28 of 54 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NR 108 SUBHDR SHF Mod Kit Provides high data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception for submarines. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 Equipment NonRecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 0.0 FY 99 Qty $ 0 FY 00 Qty 0.0 $ 0 0.0 FY 01 Qty $ 16 1.3 FY 02 Qty $ 10 0 0.0 0.0 0.0 0.0 0.0 0 0.0 0 0.0 0.0 0.0 ADMINISTRATIVE LEADTIME: FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ $ 16 0.6 16 0.6 0.0 2.5 0.6 4.3 1 Month 16 0 0 16 0 0 0 0 0 0 0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Nov-00 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000: NA FY 2001: Feb-02 FY 2002: Feb-03 FY 2003: PY 1 FY 01 INPUT 0 OUTPUT 0 FY 02 1 3 4 4 6 6 4 6 3 4 FY 05 INSTALLATION SCHEDULE: 1 2 FY 03 2 1 2 1 2 4 1 2 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 3 0.0 0.0 15 Months FY 2001: 4 Qty $ 3.7 1.8 0.7 NA 3 $ 0.6 0.7 FY 2000: 2 Total Qty 26 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 2.4 1.2 0.0 FY 03 Qty TC TOTAL INPUT 16 OUTPUT 10 Notes/Comments Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 29 of 54 0.6 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 6.8 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NP108/NR108 SHF Terminals -- (V)7 & (V)9 Modems Shore side modems for compatibility with the AN/WSC-6(V)7 terminals to support increased SHF capacity. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 Equipment NonRecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 0.0 FY 99 Qty $ 44 FY 00 Qty 2.0 $ 6 4.4 0.5 0.0 0 0.0 2.5 $ 19 0.5 2.5 0.0 0.0 0.0 0.0 FY 01 Qty 44 44 2.7 2.7 FY 02 Qty $ 30 6 1.2 1.2 2.7 9.5 ADMINISTRATIVE LEADTIME: FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ $ 19 0.5 19 0.5 1.2 2.9 0.5 2.2 1 Month 69 44 6 19 0 0 0 0 0 0 0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Jun-01 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000: Jan-01 FY 2001: Jun-02 FY 2002: Nov-02 FY 2003: INSTALLATION SCHEDULE: PY 1 INPUT OUTPUT FY 01 FY 02 44 2 2 44 2 2 4 2 5 14 2 2 5 14 3 4 1 2 3 4 1 2 1 2 1 2 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: FY 03 3 0.0 0.0 12 Months FY 2001: 1 Qty $ 8.0 4.8 0.0 Jan-00 4 $ 0.6 FY 2000: 3 Total Qty 99 CONTRACT DATES: 2 TC Qty 1.1 1.2 0.0 6 FY 03 Qty TC TOTAL INPUT 69 OUTPUT 69 Notes/Comments FY01 and FY02 Procurement includes racks and ancillary equipment. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 30 of 54 4.4 2.7 1.2 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.4 17.1 UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June-01 Satellite Communications Systems 321500 NN107 EHF Terminals--AN/USC-38(V) - Ship Provides jam resistant, low probability of intercept satellite communications and Full Milstar LDR Operational Capabilities (FMLOC) for shore stations, submarines and surface ships in an electromagnetic threat. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 180 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 158 PRIOR YR EQUIP 158 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ FY 99 Qty 373.0 Various $ FY 00 Qty 11.1 58 $ 45.0 FY 01 Qty $ 10 17.1 5.2 1.0 188.1 188.1 17 17 188.1 561.1 16.4 16.4 16.4 27.5 4 4 4.8 4.8 FY 02 Qty $ 20 1.3 2.0 0 0 246 179 58 9 0 0 0 0 0 0 0 30 16.2 28 9 15.7 5.4 21.1 43.5 1 Month 0.0 0.0 PRODUCTION LEADTIME: $ 0.0 0.0 Qty $ 0.0 0.0 Qty $ 0.0 0.0 Qty 0.0 0.0 15 Months FY 2000: Jan-00 FY 2001: Dec-00 FY 2002: Nov-01 FY 2003: Jan-04 DELIVERY DATES: FY 2000: Apr-01 FY 2001: Mar-02 FY 2002: Feb-03 FY 2003: Jan-04 INSTALLATION SCHEDULE: PY 1 INPUT 179 OUTPUT 179 FY 01 FY 02 4 1 2 3 4 20 10 21 8 4 4 20 10 21 8 4 4 1 2 1 2 3 4 1 2 1 2 3 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: FY 03 3 $ 0.0 0.0 CONTRACT DATES: 2 Total 465.4 21.1 $ TC 268 37 Qty FY 07 19.2 16.2 $ FY 06 $ 30 16.2 36.9 FY 05 Qty FY 04 Qty 2.4 1.2 4.8 56.0 ADMINISTRATIVE LEADTIME: FY 03 Qty TC TOTAL INPUT 246 OUTPUT 242 Notes/Comments NR107 EHF Terminals - AN/USC-38(V) FY99 funds are provided for Follow-On Terminal (FOT) Technical data Packages, Remote FY00 FOT Production Year 1 award. Delta between 312 procured and 311 installed is due to a Production Representative Model procured in FY98 not to be installed, but will be used as a Test Asset. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 31 of 54 8.9 4.1 246.6 209.3 31.9 5.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 246.6 724.9 UNCLASSIFIED June-01 MODIFICATION TITLE: Satellite Communications Systems 321500 COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: NP109/NR109 EHF Terminals --AN/USC-38(V) -- Shore Provides jam resistant, low probability of intercept satellite communications and Full Milstar LDR Operational Capabilities (FMLOC) for shore stations, submarines and surface ships in an electromagnetic threat. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 34 $ $ FY 00 Qty 78.8 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Other - Equipment not requiring installation Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 99 Qty 14 13 $ 10.2 FY 01 Qty $ 8 8.2 34.7 34.7 $ 6 FY 03 Qty FY 05 FY 04 $ Qty $ FY 06 Qty $ FY 07 Qty $ TC Qty $ Total Qty $ 1 1 Qty 62 6.3 13 6.3 3.2 27 27 FY 02 Qty 0.8 0.8 3 3 3.3 3.3 0.6 11 3 8 9.3 2.8 6.5 FY 01 EQUIP FY 02 EQUIP 0.3 10 6 4.4 3.0 103.4 6.3 4.2 7.4 4 $ 52 34 14 55.5 41.6 10.9 4 0 3.0 0.0 FY 03 EQUIP 0 0.0 FY 04 EQUIP 0 0.0 FY 05 EQUIP 0 0.0 FY 06 EQUIP 0 0.0 FY 07 EQUIP 0 0.0 0 0.0 55.5 169.4 FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: 34.7 113.5 0.8 7.1 3.3 16.7 ADMINISTRATIVE LEADTIME: 9.3 18.2 7.4 14.0 1 Month 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15 Months CONTRACT DATES: FY 2000: Jan-00 FY 2001: Dec-00 FY 2002: Nov-01 FY 2003: Jan-04 DELIVERY DATES: FY 2000: Apr-01 FY 2001: Mar-02 FY 2002: Feb-03 FY 2003: Jan-04 INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 INPUT 31 2 1 3 5 3 3 2 2 OUTPUT 31 2 1 3 5 3 3 2 3 4 1 2 3 4 FY 01 FY 02 FY 05 INSTALLATION SCHEDULE: 1 2 FY 03 1 2 1 2 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 TC TOTAL INPUT 52 OUTPUT 50 Notes/Comments FY99 cost reflect procurement of 13 Single Channel Anti-Jam Man Portables (SCAMPS). Units do not require installation; however, they are included in the production schedule. FY99 - FY01 unit cost includes procurement of Full Milstar Low Data Rate Operational Capability (FMLOC). FY00 FOT Production Year 1 award. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 32 of 54 UNCLASSIFIED June-01 MODIFICATION TITLE: Satellite Communications Systems 321500 COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: NN107/NR107 EHF Terminals--NECC - Ship Provides for satellite communications connectivity between shore stations, submarines and surface ships and includes network management; multiplexing and channel sharing; resource management; communications management and planning; network control and monitoring; circuit switching and packet switching. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 68 $ 9.3 FY 99 Qty $ 31 4.9 4 0.6 FY 00 Qty $ 36 5.5 FY 01 Qty $ 42 5.2 FY 02 Qty $ 48 FY 03 Qty FY 05 FY 04 $ Qty $ FY 06 Qty $ FY 07 Qty $ TC Qty $ Total Qty $ 5.0 Qty $ 225 29.9 4 0.6 Equipment Nonrecurring Engineering Change Orders Data Other Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP 56 56 5.4 5.4 43 43 2.7 2.7 0.7 0.8 0.5 0.2 0.5 0.9 27 2.2 51 2.8 27 2.2 9 42 0.5 2.3 FY 02 EQUIP 2.0 1.6 48 2.4 225 99 36 42 15.5 8.1 2.7 2.3 48 2.4 48 2.4 FY 03 EQUIP 0 0.0 FY 04 EQUIP 0 0.0 FY 05 EQUIP 0 0.0 FY 06 EQUIP 0 0.0 FY 07 EQUIP 0 0.0 0 0.0 15.5 49.6 FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: 5.4 14.7 2.7 8.2 2.2 8.7 ADMINISTRATIVE LEADTIME: 2.8 9.2 2.4 8.8 1 Month 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3 Months CONTRACT DATES: FY 2000: May-00 FY 2001: Jan-01 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000: Aug-00 FY 2001: Apr-01 FY 2002: Feb-02 FY 2003: INSTALLATION SCHEDULE: PY 1 INPUT 126 OUTPUT 126 FY 01 2 FY 02 3 4 9 21 9 1 3 4 21 16 16 16 21 21 16 16 16 3 4 3 4 FY 05 INSTALLATION SCHEDULE: 1 2 FY 03 2 1 2 1 2 2 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 1 0.0 0.0 TC TOTAL INPUT 225 OUTPUT 225 Notes/Comments NECC unit cost includes addition of MDR capability beginning in FY99. Four test units procured in FY99 will not be installed. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 33 of 54 UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June-01 Satellite Communications Systems 321500 NP109/NR109 EHF Terminals --NECC (Shore) Provides for satellite communications connectivity between shore stations, submarines, and surface ships; includes network management, multiplexing and channel sharing, resource management, communications management and planning; network control and monitoring; circuit switching and packet switching. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 12 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Other Interm Contractor Support Installation of Hardware* 12 PRIOR YR EQUIP 12 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 1.2 FY 99 Qty $ 5 0.7 FY 00 Qty $ 9 1.4 FY 01 Qty $ 20 2.5 0.6 1.2 1.2 2 0.3 5 5 0.4 0.4 1.2 2.4 0.4 1.8 9 0.6 9 0.6 FY 02 Qty $ 10 1.0 20 1.0 0.6 2.6 ADMINISTRATIVE LEADTIME: FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ TC Qty $ 10 0.5 10 0.5 1.0 3.6 0.5 1.8 1 Months 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FY 2002: Nov-01 FY 2003: #REF! DELIVERY DATES: FY 2000: Aug-00 FY 2001: Apr-01 FY 2002: Feb-02 FY 2003: #REF! INSTALLATION SCHEDULE: PY 1 INPUT OUTPUT FY 02 26 10 26 3 10 4 6 10 10 4 6 3 4 1 2 4 1 2 4 1 2 1 2 0.3 3.7 1.6 0.6 1.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 3.7 11.9 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: FY 03 2 2 3 Months Jan-01 1 3 7.0 56 17 9 20 10 0 0 0 0 0 0 0.0 0.0 FY 2001: FY 01 $ 0.9 May-00 4 Qty 0.1 FY 2000: 3 $ 56 CONTRACT DATES: 2 Total Qty 1.3 0.2 20 FY 03 Qty TC TOTAL INPUT 56 OUTPUT 56 Notes/Comments Unit cost includes addition of MDR capability beginning in FY99. Two test units procured in FY99 will not be installed. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 34 of 54 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NN107 EHF Terminal--MDR Appliques (Ship) Provides for Applique and Antenna upgrades to the existing AN/USC-38 Low Data Rate (LDR) terminal to enable Medium Data Rate (MDR) communications capability. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 30 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Other Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 11.6 FY 99 Qty 31 $ FY 00 Qty 15.5 $ 0 0.0 FY 01 Qty $ 0 0.0 2.4 6.8 0.0 0 0.0 11.6 0.0 0.0 15.5 23 23 8.3 8.3 FY 02 Qty $ 0 0.0 1.6 21 21 7.0 7.0 8.3 17.5 ADMINISTRATIVE LEADTIME: FY 03 Qty 0 FY 05 Qty FY 04 $ 0.0 Qty $ 0 0.0 FY 06 $ 0 0.0 FY 07 Qty $ 0 0.0 TC Qty $ 0 0.0 4 4 1.3 1.3 1.3 1.6 0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 15 Months NA FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: NA FY 2001: NA FY 2002: NA FY 2003: NA INSTALLATION SCHEDULE: PY 1 2 3 INPUT 23 7 7 7 OUTPUT 23 7 7 7 1 2 FY 02 2 FY 03 3 4 1 2 1 1 2 1 3 4 1 2 1 2 4 1 2 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 48 48 0 0 0 0 0 0 0 0 0 0.0 0.0 FY 2001: FY 01 0.0 0.0 0.0 NA 3 61 $ 27.1 4.4 6.8 FY 2000: INSTALLATION SCHEDULE: 0.0 Qty 0.3 7.0 8.6 1 $ 0 CONTRACT DATES: 4 Total Qty TC TOTAL INPUT 48 OUTPUT 48 Notes/Comments FY99 satellite failure delayed installs in FY99 FY00 Procurement includes satellite simulators, maintainer and operator trainer, field change kits, IDIQ PM costs and ancillary equipment. MDR functionality incorporated in AN/USC-38(V) FY00/FY01 MDR Appliques installed reflect ten (10) transferred to shore and one (1) test asset. FY01 Procurement includes field change kits, and ancillary equipment. Quantities in FY02/ FY03 are for DD-963 class ships and are based on ship CNO availability. P-1 Shopping List-Item No 84 - 35 of 54 Exhibit P-3A, Individual Modification Unclassified Classification 16.6 16.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 16.6 54.9 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NP109 EHF Terminals --MDR Appliques - Shore Provides for Applique upgrades to the existing AN/USC-38 Low Data Rate (LDR) terminal to enable Medium Data Rate communications capability. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 2 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Other Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 0.8 FY 99 Qty $ 5 FY 00 Qty 5.2 $ 0 0.0 FY 01 Qty $ 0 0.0 FY 02 Qty $ 0 0.0 FY 03 Qty 0 FY 05 Qty FY 04 $ 0.0 Qty $ 0 0.0 FY 06 $ 0 0.0 FY 07 Qty $ 0 0.0 TC Qty $ 0 0.0 0.0 Qty 7 2.3 0.0 0 0.0 0.0 0.8 0.0 5.2 8 8 5.3 5.3 9 9 2.2 2.2 5.3 7.7 ADMINISTRATIVE LEADTIME: 0 0.0 2.2 2.2 0.0 0.0 0 0.0 0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 NA FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: NA FY 2001: NA FY 2002: NA FY 2003: NA PY 1 FY 02 3 INPUT 8 5 4 OUTPUT 8 5 4 4 1 2 4 1 2 2 4 1 2 3 4 1 2 3 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 1 FY 03 3 17 17 0 0 0 0 0 0 0 0 0 0.0 0.0 FY 2001: FY 01 0.0 0.0 0.0 NA 2 $ 6.0 2.3 FY 2000: INSTALLATION SCHEDULE: $ 0 CONTRACT DATES: INSTALLATION SCHEDULE: Total Qty TC TOTAL INPUT 17 OUTPUT 17 Notes/Comments FY98 unit cost reflects procurement of MDR Appliques only. FY99 - FY01 unit cost includes procurement of MDR upgrade antennas. FY00/FY01 MDR Appliques installed reflect ten (10) transferred from ship. MDR functionality incorporated in AN/USC-38(V). FY00 Install Cost includes MDR Upgrade Antennas Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 36 of 54 7.5 7.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.5 15.8 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NN112/NR112 Comm. Satellite--INMARSAT B (Ship) Provides upgrade to the older INMARSAT A terminals giving ships the capability for Official phones, STU III, Debit Card Crew Phones, Internet, E-Mail, PC to PC, Video Teleconferencing and Facsimile. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 46 Equipment Upgrade Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 46 PRIOR YR EQUIP 46 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 2.8 FY 99 Qty $ 63 FY 00 Qty 3.3 $ 63 2.5 60 60 3.2 3.2 4.7 7.5 3.2 6.9 $ 60 11 2.5 0.4 2.5 1.1 0.4 4.7 4.7 FY 01 Qty 51 3 48 6.0 0.3 5.7 FY 02 Qty $ 0 46 7.3 15 57 1.5 5.8 6.0 12.1 ADMINISTRATIVE LEADTIME: FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ $ 58 4.1 12 46 1.4 2.7 7.3 16.5 4.1 8.3 3 Months 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $ 232 57 11.1 2.2 Nov-00 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000: Feb-00 FY 2001: Feb-01 FY 2002: Feb-02 FY 2003: PY 1 2 3 4 1 2 3 4 INPUT 157 15 19 19 19 12 11 21 14 OUTPUT 157 15 19 19 19 12 11 21 3 4 1 2 3 4 FY 01 FY 02 FY 03 1 2 1 2 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 0.0 0.0 3 Months FY 2001: 2 Qty 287 109 63 69 46 0 0 0 0 0 0 Nov-99 1 $ 9.9 2.8 FY 2000: INSTALLATION SCHEDULE: Total Qty 1.9 0.5 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 0.0 1.8 5.5 0.8 72 FY 03 Qty TC TOTAL INPUT 287 OUTPUT 273 Notes/Comments FY01 Production Support reflects wideband startup, 11 upgrades to widebands. FY02 includes 46 upgrades to wideband capability. FY03 includes 5 upgrades to wideband capability. FY06 and FY07 have 10 upgrades to wideband capability Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 37 of 54 25.3 8.2 7.2 7.2 2.7 0.0 0.0 0.0 0.0 0.0 0.0 25.3 51.3 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems NR 113 Comm. Satellite--INMARSAT B (Shore) DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Upgrade Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 321500 FY 99 Qty $ FY 00 Qty $ FY 01 Qty $ FY 02 Qty 7 0.0 0 0.0 0.0 0.0 0.0 0.0 FY 2000: NA DELIVERY DATES: FY 2000: NA 0 0.0 0 0.0 0.0 0.0 ADMINISTRATIVE LEADTIME: 0.4 7 0.4 0.0 0.0 0.4 0.7 3 Months FY 2001: Qty $ FY 06 $ FY 07 Qty $ TC Qty $ Total Qty $ Qty 7 0 1 FY 2001: 2 0 0.0 0 0.0 0.0 0.0 PRODUCTION LEADTIME: 4 1 NA 2 0.0 0 0.0 0.0 0.0 0 0.0 0.0 4 4 3 OUTPUT 0 0.0 0.0 0.0 7 0 0 0 7 0 0 0 0 0 0 0.0 0.0 FY 2002: Nov-01 FY 2003: NA FY 2002: Feb-02 FY 2003: NA FY 03 3 0.0 3 Months FY 02 3 0 0.0 0.0 NA INPUT 1 2 1 2 FY 04 3 4 3 4 1 2 3 4 4 1 2 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: FY 05 Qty FY 04 $ 0.3 7 FY 01 PY FY 03 Qty $ 0.3 0.0 0.0 0.0 CONTRACT DATES: INSTALLATION SCHEDULE: $ 3 4 1 2 3 4 TC TOTAL INPUT 7 OUTPUT 4 Notes/Comments Contract not in place Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 38 of 54 0.4 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.7 UNCLASSIFIED June-01 MODIFICATION TITLE: Satellite Communications Systems COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: NN112/NR112 Comm. Satellite--C band/CWSP Provides C and Ku wide band SATCOM terminals supporting capabilities such as Automated Digital Multiplexing System (ADMS). Telemedicine, official and unofficial phones, public affairs officer information, imagery, Meteorology and Oceanography Command (METOC). DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 15 $ 321500 FY 99 Qty 8.7 Equipment ( Upgrade) $ FY 00 Qty $ 8 8.1 3 3.2 2 2.0 6 4.7 FY 01 Qty $ 4 5.1 FY 02 Qty $ 0 FY 03 Qty FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ TC Qty $ Total Qty $ 0.0 Qty $ 30 25.1 8 6.7 Equipment Nonrecurring Engineering Change Orders Data Training Equipment 2 1.4 1.5 0.4 0 0 5.1 1.3 30 8 23 2 3 6 4 0 0 35.3 4.1 14.3 1.0 3.8 3.1 3.4 0.0 0.0 FY 02 EQUIP (Upgrade) 0 0.0 FY 03 EQUIP 0 0.0 FY 04 EQUIP 0 FY 05 EQUIP 0 Production Support Other (DSA) Interm Contractor Support Installation of Hardware* Installation of Hardware(Upgrade)* PRIOR YR EQUIP PRIOR YR EQUIP (Upgrade) FY 00 EQUIP FY 00 EQUIP (Upgrade) FY 01 EQUIP FY 01 EQUIP (Upgrade) FY 02 EQUIP 2 1.4 2.4 0.6 9 0 9 13.8 0.0 8 0 8 6.1 0.0 6.1 6 7 6 2 8.2 3.5 8.2 1.0 5 2.5 1.2 0.3 1 1 2.2 0.6 6 0 5.0 0.0 1 1 2.2 0.6 2 1.6 4 3.4 FY 06 EQUIP 0.0 0.0 0.0 FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: 13.8 22.5 6.1 16.2 11.7 24.0 ADMINISTRATIVE LEADTIME: 2.8 9.4 5.0 6.9 3 Months 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 6-9 Months ( 4 months for upgrades) 0.0 0.0 0.0 0.0 CONTRACT DATES: FY 2000: Jan-00 FY 2001: Dec-00 FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: Sep-00 FY 2001: Sep-01 FY 2002: NA FY 2003: NA INSTALLATION SCHEDULE: PY 1 2 INPUT 30 1 1 OUTPUT 30 FY 01 FY 02 3 1 4 1 2 1 5 1 1 FY 05 INSTALLATION SCHEDULE: 1 2 FY 03 3 4 1 2 4 1 2 1 2 0.0 0 0.0 39.4 78.9 FY 04 3 4 3 4 1 2 3 4 5 FY 07 FY 06 3 0.0 0 3 4 TC TOTAL INPUT 38 OUTPUT 38 Notes/Comments FY01: Installation of 2 trainers procured in FY00, not required. FY00-01 Unit costs vary because of procurement of single/dual units FY02 $300K deducted for R&D transfer. FY02-07 Procurement costs reflect ECP’s and the related production oversight. No quantities procured in FY02 and out; contract in place for ECPs. Exhibit P-3A, Individual Modification Unclassified Classification FY01 no upgrade procured, additional Termnal procured, approved Dec 00 P-1 Shopping List-Item No 84 - 39 of 54 UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June-01 Satellite Communications Systems 321500 NN112/NR112 Comm. Satellite--INMARSAT B HSD Kits Provides upgrade to the INMARSAT B terminals giving ships the capability for simultaneous official phones, STU III, debit card crew phones, internet, e-mail, PC to PC, video teleconferencing and facsimile over a 64 kpbs channel. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 29 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 29 PRIOR YR EQUIP 29 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 2.7 FY 99 Qty $ 52 FY 00 Qty 0.8 $ 51 0.9 FY 01 Qty $ 34 0.7 0.0 1.0 0.0 52 52 3.0 3.0 0.0 2.7 3.0 3.8 51 4.9 51 4.9 FY 02 Qty $ 0 0.0 0.4 0.3 0 0.0 0.0 16 1.1 14 1.0 16 1.1 14 0 1.0 0.0 4.9 6.8 ADMINISTRATIVE LEADTIME: FY 03 Qty 1.1 2.5 1.0 1.0 3 Months FY 05 Qty FY 04 $ 0.0 Qty $ 0 0.0 FY 06 $ 0 0.0 FY 07 Qty $ 0 0.0 TC Qty $ 0 0.0 0 0.0 0 0.0 0.0 0.0 PRODUCTION LEADTIME: 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 FY 2001: Nov-00 FY 2002: Nov-01 FY 2003: NA DELIVERY DATES: FY 2000: Feb-00 FY 2001: Feb-01 FY 2002: Feb-02 FY 2003: NA INSTALLATION SCHEDULE: PY 1 INPUT 132 OUTPUT 132 FY 02 4 1 2 6 5 5 7 7 6 5 5 7 3 4 1 2 1 2 4 1 2 166 5.2 0 0 0.4 1.3 162 81 51 30 0 0 0 0 0 0 0 10.0 3.0 4.9 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.0 16.9 4 1 2 FY 04 3 4 3 4 1 2 3 4 7 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: FY 03 3 $ 3 Months Nov-99 3 Qty 0.0 0.0 FY 2000: FY 01 $ 0.0 CONTRACT DATES: 2 Total Qty 3 TC TOTAL INPUT 162 OUTPUT 162 Notes/Comments Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 40 of 54 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NN117/NR117 Global Broadcast System--Single (Receive Suite) GBS with single antenna configuration: Commercial off the shelf (COTS) receive only satellite communications terminals with a single antenna, modems and ancillary hardware and processing equipment. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 12 Equipment Nonrecurring Engineering Change Orders Other Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 4.5 FY 99 Qty $ FY 00 Qty 3.8 5 $ 0.8 0 FY 01 Qty $ 0 0.0 FY 02 Qty $ 0 FY 03 Qty FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ TC Qty $ Qty 17 $ 9.1 0.0 0.5 1.2 0.0 0.0 0 0.0 0.0 4.5 0.0 3.8 0 0.0 3 3 0.6 0.6 0.0 0.8 ADMINISTRATIVE LEADTIME: 8 8 0.5 1.3 1.0 1.0 0.6 0.7 1.0 2.8 3 Months 11 11 0 0 0 0 0 0 0 0 0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8 Months FY 2000: NA FY 2001: NA FY 2002: NA FY 2003: NA DELIVERY DATES: FY 2000: NA FY 2001: NA FY 2002: NA FY 2003: NA PY 1 FY 01 2 FY 02 3 INPUT 4 1 2 FY 03 3 3 OUTPUT 4 1 2 1 2 FY 04 3 4 3 4 1 2 3 4 8 3 1 2 FY 07 FY 06 FY 05 INSTALLATION SCHEDULE: $ 0.0 CONTRACT DATES: INSTALLATION SCHEDULE: Total Qty 3 4 1 2 3 4 TC TOTAL INPUT 11 OUTPUT 3 Notes/Comments NN117 - GBS (All) Unit cost varies due to mix of Ship, Shore, and quantity discounts afforded by other Services buys per year. NN117 - GBS - (All) Unit cost includes all costs for procurement; eg., ECPs, NRE.. NN117- GBS FY00 Single Receive Suites includes RCS Radomes and NRE costs. NN117 - GBS - Procurement quantity changes reflect N6 realignment Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 41 of 54 1.6 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 12.6 UNCLASSIFIED June-01 MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Communications Systems 321500 NN117/NR117 Global Broadcast System--Dual (Receive Suite) GBS with dual antenna configuration: Commercial off the shelf (COTS) receive only satellite communications terminals with a single antenna, modems and ancillary hardware and processing equipment. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring 9 Equipment Equipment Nonrecurring Engineering Change Orders Other Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 3.6 FY 99 Qty $ 4 FY 00 Qty 3.9 $ 0 0.7 FY 01 Qty $ 0 0.0 FY 02 Qty $ 5 FY 03 Qty FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ TC Qty $ 0.0 0.0 2 2 0.7 0.7 0.0 3.6 0.7 4.6 2.0 0.3 0.0 0 0.0 2 2 0.6 0.6 0.0 0.7 ADMINISTRATIVE LEADTIME: 8 8 2.3 2.3 0.6 0.7 2.3 6.5 3 Months 12 12 0 0 0 0 0 0 0 0 0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8 Months NA FY 2002: Dec. 01 FY 2003: #REF! DELIVERY DATES: FY 2000: NA FY 2001: NA FY 2002: Jul-01 FY 2003: #REF! PY 1 FY 01 2 2 FY 02 3 4 1 2 2 2 1 2 FY 03 3 4 1 2 4 1 2 FY 04 3 4 3 4 1 2 3 4 8 8 FY 05 INSTALLATION SCHEDULE: 10.1 2.0 0.4 FY 2001: OUTPUT $ 0.0 NA 2 Qty 18 FY 2000: INPUT $ 1.9 CONTRACT DATES: INSTALLATION SCHEDULE: Total Qty FY 07 FY 06 3 4 1 2 3 TC TOTAL INPUT 12 OUTPUT 12 Notes/Comments NN117 - GBS (All) Unit cost varies due to mix of Ship, Shore, and quantity discounts afforded by other Services buys per year. NN117 - GBS - (All) Unit cost includes all costs for procurements; eg., ECPs, NRE. NN117- GBS FY00 Dual Receive Suites includes RCS Radomes and NRE costs. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 42 of 54 3.6 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.6 16.2 UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June-01 Satellite Communications Systems 321500 NN117/NR117 Global Broadcast System--Subs (Receive Suite) GBS with submarine configuration: Commercial off the shelf (COTS) receive only satellite communications terminals with a SubHdr antenna modification, modems and ancillary hardware and processing equipment. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 0.0 FY 99 Qty $ 6 FY 00 Qty 2.9 $ 3 1.2 FY 01 Qty $ 10 5.5 3.0 0.7 0.0 0 0.0 0.0 0.0 0.0 2.9 5 5 0.6 0.6 FY 02 Qty $ 6 0.8 0.1 0.4 0.3 0.6 5.5 ADMINISTRATIVE LEADTIME: $ FY 04 Qty FY 05 Qty $ $ FY 06 Qty $ FY 07 Qty 10 1.2 8 2 1.0 0.2 0.8 7.9 1.2 4.6 3 Months 21 6 3 10 2 0 0 0 0 0 0 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Dec-00 FY 2002: Dec-00 FY 2003: DELIVERY DATES: FY 2000: Mar-01 FY 2001: May-01 FY 2002: May-01 FY 2003: INSTALLATION SCHEDULE: PY 1 INPUT 5 OUTPUT 5 FY 01 FY 02 3 3 3 3 4 1 3 5 5 FY 05 INSTALLATION SCHEDULE: 1 2 FY 03 2 4 5 5 3 4 1 2 1 2 2 10.6 0.0 0.0 2.6 0.7 0.4 1.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 2.6 20.9 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 3 $ 6 Months FY 2001: 1 Qty 6.6 1.1 Sep-00 4 $ 2.0 0.4 FY 2000: 3 Total Qty 25 CONTRACT DATES: 2 TC $ 1.0 1.6 0.0 6 1 3 2 FY 03 Qty TC TOTAL INPUT 21 OUTPUT 21 Notes/Comments NN117 - GBS (All) Unit cost varies due to mix of Ship, Shore, and quantity discounts afforded by other Services buys per year. NN117 - GBS - (All) Unit cost includes all costs for procurements; eg., ECPs, NRE. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 43 of 54 UNCLASSIFIED June-01 MODIFICATION TITLE: Satellite Communications Systems COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: NP117/NR116 Global Broadcast Service (Shore) Global Broadcast Service, commercial off-the-shelf (COTS) receive only satellite communications terminals with antennas, modems, and ancillary hardware and processing equipment Navy portion of joint services program to deliver continuous, high speed, one way information flow of high volume data to ship and shore units and special operations. 321500 DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment FY 99 Qty $ 7 FY 00 Qty 1.4 $ 5 0.6 FY 01 Qty $ 3 0.9 FY 02 Qty $ 2 FY 03 Qty FY 05 FY 04 $ Qty $ FY 06 Qty $ FY 07 Qty $ TC Qty $ Total Qty $ Qty 17 0.3 $ 3.2 Equipment Nonrecurring Engineering Change Orders Data Training Equipment 0.2 0.2 Production Support 0.3 0.3 Other (DSA) Interm Contractor Support Installation of Hardware* PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP 0 15 7 5 3 0 1.2 0.6 0.5 0.1 0.0 FY 03 EQUIP 0 0.0 FY 04 EQUIP 0 0.0 FY 05 EQUIP 0 0.0 FY 06 EQUIP 0 0.0 FY 07 EQUIP 0 0.0 0 0.0 1.2 4.8 FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: 0.0 0 0.0 0.0 0.0 0.0 1.4 3 3 0.5 0.5 10 4 5 1 0.6 0.1 0.5 0.0 0.5 1.6 ADMINISTRATIVE LEADTIME: 2 0.1 2 0.1 0.6 1.5 0.1 0.3 3 Months 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8 Months CONTRACT DATES: FY 2000: Sep-00 FY 2001: Dec-00 FY 2002: Dec-01 FY 2003: NA DELIVERY DATES: FY 2000: May-01 FY 2001: Jul-01 FY 2002: Jul-02 FY 2003: NA INSTALLATION SCHEDULE: PY 1 INPUT 3 OUTPUT 3 FY 01 FY 02 2 3 4 1 3 3 4 3 3 4 3 4 1 2 1 2 4 1 2 4 1 2 FY 04 3 4 3 4 1 2 3 4 2 2 FY 05 INSTALLATION SCHEDULE: FY 03 3 FY 07 FY 06 2 3 TC TOTAL INPUT 15 OUTPUT 15 Notes/Comments NN117 - GBS (All) Unit cost varies due to mix of Ship, Shore, and quantity discounts afforded by other Services buys per year. NN117 - GBS - (All) Unit cost includes all costs for procurement; eg.,ECPs, NRE. NN117 - GBS - The FY01 procurement of 3 shore terminals are all sub-surface receive suites (SSRS) for sub school trainers. NN117 - GBS - Procurement quantity changes reflect N6 realignment Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 44 of 54 UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June-01 Satellite Communications Systems 321500 NP118/NR118 JMINI Control System - NMS The Network Management System (NMS) component of the JMINI Control System provides communications resource planning and management via secure WAN connections between the control stations and remote user. Will provide dynamic centralized control of joint operable 5 KHz and 25 KHz ultra high frequency military satellite communications. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ FY 99 Qty $ FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ FY 03 Qty FY 05 Qty FY 04 $ Qty $ FY 06 $ FY 07 Qty $ $ $ Qty $ 2 12.3 4 13.4 4 6.3 4 6.4 14 39.9 0.0 0 0.8 0.8 6 2 4 0.4 0.1 0.3 4 0.2 4 0.3 4 0.2 4 0.3 14 2 4 4 4 0 0 0 0 0 0 1.7 0.9 0.3 0.2 0.3 0.0 0.0 0.0 0.0 0.0 0.0 1.7 41.6 0.0 1.4 0.8 13.1 0.4 13.8 ADMINISTRATIVE LEADTIME: 0.2 6.5 0.3 6.7 1 Month 0.0 0.0 PRODUCTION LEADTIME: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Dec-99 FY 2001: Dec-00 FY 2002: Dec-01 FY 2003: DELIVERY DATES: FY 2000: Jul-00 FY 2001: Jul-01 FY 2002: Jul-02 FY 2003: PY 1 FY 01 2 FY 02 3 4 1 2 FY 03 3 4 INPUT 6 4 4 OUTPUT 6 4 4 2 1 2 1 2 3 4 1 2 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 1 0.0 0.0 10 Months FY 2000: INSTALLATION SCHEDULE: Total Qty 1.4 CONTRACT DATES: INSTALLATION SCHEDULE: TC Qty 3 4 TC TOTAL INPUT 14 OUTPUT 14 Notes/Comments Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 45 of 54 UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: June-01 Satellite Communications Systems 321500 NP118/NR118 JMINI Control System - DMR Channel controller hardware (radio/modem/antenna) to meet ORD-mandated satellite channel access requirement. Will provide dynamic centralized control of joint operable 5 KHz and 25 KHz ultra high frequency military satellite communications DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) PY Qty RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 0 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other (DSA) Interm Contractor Support Installation of Hardware* 0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT METHOD OF IMPLEMENTATION: $ 0.0 FY 99 Qty 236 $ FY 00 Qty 30.6 $ 12 1.3 FY 01 Qty $ 0 0.0 1.2 0.0 0.0 0.0 0 0.0 0.0 0.9 0.9 0.9 31.5 40 40 1.0 1.0 FY 02 Qty $ 0.9 0.9 1.0 3.4 ADMINISTRATIVE LEADTIME: FY 05 Qty FY 04 38.8 1.6 0.0 0 0 4.1 0.0 76 0.5 12 0.1 64 0.4 312 236 12 0 64 0 0 0 0 0 0 3.3 2.8 0.1 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 3.3 46.2 2 Months 0.0 0.0 PRODUCTION LEADTIME: $ 0.0 0.0 Qty $ 0.0 0.0 Qty $ 0.0 0.0 May-01 FY 2001: NA FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000: Dec-01 FY 2001: NA FY 2002: Jul-02 FY 2003: INSTALLATION SCHEDULE: PY 1 2 3 4 1 INPUT 40 52 52 52 40 OUTPUT 40 52 52 52 1 2 3 FY 02 2 FY 03 3 4 12 32 32 40 12 32 32 4 1 3 4 1 2 1 2 2 0.0 0.0 FY 04 3 4 3 4 1 2 3 4 FY 07 FY 06 FY 05 $ 8 Months FY 2000: FY 01 Qty 0.0 0.0 CONTRACT DATES: INSTALLATION SCHEDULE: Total 312 0.5 9.1 $ TC 7.0 0.9 2.3 Qty FY 07 $ 64 $ FY 06 Qty 1.4 0.0 196 196 FY 03 Qty TC TOTAL INPUT 312 OUTPUT 312 Notes/Comments 1/ FY99 Installation funds spent for FY00 and out installation preparation work. Exhibit P-3A, Individual Modification Unclassified Classification P-1 Shopping List-Item No 84 - 46 of 54 UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE Satellite Communications Systems ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY 01 SUBHEAD NO. 52NR 321500 FISCAL YEAR CALENDAR YEAR NN101 MINI DAMA Field Change Upgrade Kits (FY00 Only) 00 150 150 NR103 SCI ADNS Build Two & Three /Carry On Build Two 01 45 45 A 20 NP103 SI-COMMS - SCI ADNS Build 2 and Build 3 NR103 SI-COMMS - SCI ADNS Build 2 and Build 3 00 01 3 1 1 A 1 01 02 FISCAL YEAR CALENDAR YEAR 02 03 CALENDAR YEAR 03 50 50 50 4 4 5 4 4 4 APR MAY JUN JUL AUG SEP 3 OCT NOV DEC JAN FEB MAR OCT PRODUCTION RATE PROCUREMENT LEADTIMES Manufacturer’s ITEM Name and Location MINI DAMA TITAN Linkobit MSR 150 1-8-5 MAX 150 150 ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure 30 300 N/A 360 Days 30 Unit of NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21A, Production Schedule Unclassified Classification P-1 Shopping List-Item No 84 - 47 of 54 UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE Satellite Communications Systems ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 20 6 SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY 01 FISCAL YEAR CALENDAR YEAR NR105 5/25 KHz SATCOM--UHF Modems 01 26 26 A NN105 5/25 KHz SATCOM--DMR 60 104 88 60 104 88 20 20 20 A NR105 5/25 KHz SATCOM--DMR 99 00 02 NN106 SHF Terminals--AN/WSC-6(V)5 Mod kits - Ship NR106 SHF Terminals--AN/WSC-6(V)5 Mod kits - Ship 00 01 3 5 3 5 NN106 SHF Terminals--AN/WSC-6(V)7 - Ship NR106 SHF Terminals--AN/WSC-6(V)7 - Ship 00 01 02 15 4 3 15 4 3 01 02 FISCAL YEAR CALENDAR YEAR 20 20 20 20 20 A 02 03 CALENDAR YEAR 03 4 3 A 2 2 5 2 2 2 1 A 1 1 1 1 2 2 JUN JUL A OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR PRODUCTION RATE Name and Location MAY AUG PROCUREMENT LEADTIMES Manufacturer’s ITEM SUBHEAD NO. 52NR 321500 ALT Prior ALT After Initial Reorder MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Unit of 39 321500 SHF Terminals--AN/WSC-6(V)5 Mod kits - Ship Raytheon, Boston, MA 0 3 36 1 mo. 1 mo. 12 mo. 12 mo. 321500 SHF Terminals--AN/WSC-6(V)7 - Ship Raytheon, Boston, MA 0 3 33 1 mo. 1 mo. 12 mo. 12 mo. 48 Measure DMR 5/25 kHz Motorola 1 51 240 30 30 240 N/A 300 Days OE-82 SSC SD 10 100 200 30 30 150 N/A 210 Days UHF Modems Via Sat 1 34 400 30 30 180 N/A 240 Days NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21A, Production Schedule Unclassified Classification P-1 Shopping List-Item No 84 - 48 of 54 UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE Satellite Communications Systems ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 1 A 1 1 3 2 2 2 2 2 3 3 NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V T FY NP108 SHF Terminals --AN/WSC-6(V)7 - Shore 00 1 1 NN106 SHF Terminals--AN/WSC-6(V)9 - Ship NR106 SHF Terminals--AN/WSC-6(V)9 - Ship 00 01 02 3 5 12 3 5 12 01 02 16 10 16 10 00 01 02 6 19 30 6 19 30 NR106 SHF Terminals -- SUBHDR SHF Mod Kit NP108 SHF Terminals -- (V)7 & (V)9 Modems NR108 SHF Terminals -- (V)7 & (V)9 Modems 01 FISCAL YEAR CALENDAR YEAR 01 02 FISCAL YEAR CALENDAR YEAR 02 A A A 03 2 2 2 2 2 2 2 2 5 5 5 4 A 1 1 1 1 1 1 A A NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR PRODUCTION RATE Name and Location MSR 1-8-5 MAY JUN JUL AUG SEP OCT PROCUREMENT LEADTIMES ALT Prior ALT After Initial Reorder MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Manufacturer’s Unit of Total Raytheon, Boston, MA 0 3 3 1 mo. 1 mo. 12 mo. 12 mo. 3 321500 SHF Terminals--AN/WSC-6(V)9 - Ship Harris, Melbourne, FL 3 2 24 1 mo. 1 mo. 10 mo. 10 mo. 47 321500 SHF Terminals -- (V)7 & (V)9 Modems Raytheon, MA & Harris, FL 0 6 72 1 mo. 1 mo. 12 mo. 12 mo. 190 321500 SHF Terminals --AN/WSC-6(V)7 - Shore 03 CALENDAR YEAR 1 OCT ITEM SUBHEAD NO. 52NR 321500 Measure NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21A, Production Schedule Unclassified Classification P-1 Shopping List-Item No 84 - 49 of 54 UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE Satellite Communications Systems ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 6 7 7 7 7 7 7 7 3 1 2 2 2 1 1 1 1 1 1 1 1 1 1 1 8 8 8 8 8 8 FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY NN107 NR107 EHF Terminals--AN/USC-38(V) - Ship EHF Terminals--AN/USC-38(V) - Ship 00 01 02 58 10 20 58 10 20 NP109 NP109 EHF Terminals--AN/USC-38(V) - Ship EHF Terminals --AN/USC-38(V) - Shore 99 00 13 14 13 14 NR109 EHF Terminals --AN/USC-38(V) - Shore 01 02 8 6 8 6 01 02 42 48 42 48 NR107 EHF Terminals--NECC - Ship 01 SUBHEAD NO. 52NR 321500 FISCAL YEAR CALENDAR YEAR 01 02 FISCAL YEAR CALENDAR YEAR A 02 03 CALENDAR YEAR 03 A 1 1 1 1 1 1 1 2 1 2 2 2 2 2 2 A A A 7 7 7 7 7 7 A OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN PRODUCTION RATE PROCUREMENT LEADTIMES Manufacturer’s ITEM Name and Location MSR NN107/NP109 - EHF Terminals--AN/USC-38(V) Raytheon, Marlborough, MA NN107/NP109 - EHF Terminals - NECC AP Labs, Texas 7 1-8-5 MAX 7 60 ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT 1 1 15 15 Unit of Total Measure 26 EA 58 EA NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21A, Production Schedule Unclassified Classification P-1 Shopping List-Item No 84 - 50 of 54 UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE Satellite Communications Systems ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 3 4 4 4 3 2 A 2 2 2 2 2 A 4 7 7 7 7 7 7 A 4 3 FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY NR109 EHF Terminals --NECC - Shore 01 02 20 10 NN107 EHF Terminals--MDR Appliques - Ship 99 31 NR112 Comm. Satellite--INMARSAT B (Ship) 01 02 71 46 71 46 02 7 7 NR113 Comm. Satellite--INMARSAT B (Shore) 20 10 11 20 01 5 5 5 01 02 02 03 CALENDAR YEAR 03 11 10 10 10 10 10 10 DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN PRODUCTION RATE PROCUREMENT LEADTIMES Manufacturer’s EHF Terminals--NECC-Ship FISCAL YEAR CALENDAR YEAR 5 A NOV FISCAL YEAR CALENDAR YEAR A OCT ITEM SUBHEAD NO. 52NR 321500 Name and Location MSR AP Labs, TX 10 1-8-5 MAX 10 300 ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT 1 1 3 3 Unit of Total Measure 58 NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21A, Production Schedule Unclassified Classification P-1 Shopping List-Item No 84 - 51 of 54 UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE Satellite Communications Systems ACCEPT BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 9 2 4 2 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY NN112 Comm. Satellite--C band/CWSP NR112 Comm. Satellite--C band/CWSP 00 01 11 4 NR112 Comm. Satellite--INMARSAT B HSD KITS 01 34 01 FISCAL YEAR CALENDAR YEAR 01 A 34 NOV DEC 02 JAN 6 6 6 6 5 5 FEB MAR APR MAY JUN JUL AUG SEP PRODUCTION RATE 02 03 CALENDAR YEAR 03 PROCUREMENT LEADTIMES Manufacturer’s 321500 Comm. Satellite--C band/CWSP FISCAL YEAR CALENDAR YEAR 4 A OCT ITEM SUBHEAD NO. 52NR 321500 Name and Location Harris, Melbourne, FL ALT Prior ALT After Initial Reorder MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT 1 1.34 16 3 mo. 3 mo. 6-9 mo. 6-9 mo. Unit of Total Measure NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21A, Production Schedule Unclassified Classification P-1 Shopping List-Item No 84 - 52 of 54 UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE Satellite Communications Systems ACCEPT BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 3 2 SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY NN117 Global Broadcast System--Subs (Receive Suite) 02 5 5 NN117 Global Broadcast System--Subs (Receive Suite) NR117 Global Broadcast System--Subs (Receive Suite) 00 01 02 3 10 6 3 10 6 NP117 Global Broadcast Service - Shore 00 5 5 NR116 Global Broadcast Service - Shore 01 3 3 NP116 Global Broadcast System-Dual 02 2 2 01 FISCAL YEAR CALENDAR YEAR 01 02 1 1 A 1 3 2 3 1 JAN FEB MAR APR MAY 3 3 JUN JUL AUG SEP OCT NOV DEC JUN JUL 2 JAN FEB MAR APR PRODUCTION RATE MAY AUG PROCUREMENT LEADTIMES Manufacturer’s Name and Location 03 2 A DEC 03 CALENDAR YEAR 3 A NOV 02 2 A 2 FISCAL YEAR CALENDAR YEAR A OCT ITEM SUBHEAD NO. 52NR 321500 ALT Prior ALT After Initial Reorder MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Unit of 321500 Global Broadcast System-- Single (Receive Suite) Raytheon, Marlborough, MA & Reston, VA 6 12 96 3 mo. 3 mo. 8 mo. 8 mo. 189 321500 Global Broadcast System--Dual (Receive Suite) Raytheon, Marlborough, MA & Reston, VA 6 12 96 3 mo. 3 mo. 8 mo. 8 mo. 47 321500 Global Broadcast System--Subs (Receive Suite) Raytheon, Marlborough, MA & Reston, VA 1 1 12 3 mo. 3 mo. 6 mo. 6 mo. 50 321500 Global Broadcast Service - Shore Raytheon, Marlborough, MA & Reston, VA 1 10 120 3 mo. 3 mo. 8 mo. 8 mo. 59 Measure NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21A, Production Schedule Unclassified Classification P-1 Shopping List-Item No 84 - 53 of 54 UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21A) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE Satellite Communications Systems ACCEPT BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P 1 1 2 1 1 2 AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY NR118 JMINI Control System - NMS 01 02 4 4 4 4 NP118 JMINI Control System - DMR 00 12 12 NR118 JMINI Control System - DMR 02 64 64 01 SUBHEAD NO. 52NR 321500 FISCAL YEAR CALENDAR YEAR A 01 02 A A NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR PRODUCTION RATE Name and Location JMINI NMS DMR JMINI 03 CALENDAR YEAR 03 64 MAY JUN JUL PROCUREMENT LEADTIMES Manufacturer’s ITEM 02 12 A OCT FISCAL YEAR CALENDAR YEAR MAX ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure Unit of MSR 1-8-5 SAID 1 10 20 30 30 300 N/A 360 Days Motorola 1 51 240 30 30 240 N/A 300 Days NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21A, Production Schedule Unclassified Classification P-1 Shopping List-Item No 84 - 54 of 54 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY FY 2000 $197.8 $56.1 FY 2001 DATE P-1 ITEM NOMENCLATURE SATCOM Shore Terminals (Space) FY 2002 FY 2003 FY 2004 June 2001 SUBHEAD 322000 52NP FY 2005 FY 2006 TO COMP TOTAL QUANTITY COST (in millions) Note: SATCOM Shore Terminals transfers to the SATCOM Systems budget (BLI 3215) in FY 01. Detail budget justification material for PY through FY00 is included in the SATCOM Systems budget (BLI 3215) for budget comparability. PROGRAM COVERAGE: The Satellite Communications (SATCOM) Shore Terminals P-1 line provides funds for procurement of shore based equipment for shore-toshore and shore-to-ship tactical communications via earth orbiting relay satellites operating in the Ultra High Frequency (UHF), Super High Frequency (SHF), and Extremely High Frequency (EHF) bands. This includes Radio Frequency (RF) equipment and baseband equipment assembled and grouped into systems and subsystems structured to address specific Naval communications requirements. These systems provide processors and peripheral equipment that control the RF links for message traffic, direct data transfer and secure voice communications. They are selected and oriented by communications traffic levels, types of communications and operational missions. These shore terminals provide the satellite communications interface between the at-sea fleet and the shore establishment communications network and are an integral part of the Navy Satellite Communications Program. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: Special Intelligence Communications (SI COMMS): The shore terminal interface for Sensitive Compartmented Information (SCI)/Automated Digital Network System (ADNS)/Tactical Intelligence Information Exchange (TACINTEL II+) will use commercial off-the-shelf (COTS), Government off-the-shelf (GOTS), Non-developmental items (NDI) and existing systems to meet the requirements for SI COMMS. The SI COMMS and TACINTEL programs were combined into the SI COMMS architecture to replace the outdated TACINTEL system developed in the early 1970s. The equipment also began the realization of the ADNS architecture. FY00 funds will continue to procure the SCI ADNS equipment necessary to implement the IT-21 architecture to provide SI COMMS to the Fleet. SCI ADNS provides for a real-time exchange of Tactical SCI COMMS to afloat operational commanders. Impact of no shore SCI ADNS is that ships cannot attain their network services. Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 85- 1 of 85- 3 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continuation) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE SATCOM Shore Terminals (Space) June 2001 SUBHEAD 322000 52NP SHF Terminals: This line provides SHF shore based equipment for high data rate communications with Fleet units via the Defense Satellite Communications Systems (DSCS). Shore based terminals have an operational requirement to support joint, theater and Navy unique command, control, communications, support and intelligence circuits for voice, data, video and imagery to the extent they are required on SHF platforms. FY01 - FY05 funds procure and install N-STEP/TELEPORT modems to provide shore side compatibility with SHF equipped ships and to support fleet and added Battle Group capacity requirements. Also procured is ancillary hardware for the Automated Digital Multiplexing System (ADMS). Under the submarine high data rate (SUB-HDR) program, the Navy is exploring the technical feasibility of DSCS support of wideband capabilities for attack submarines. EHF Terminals: This program provides for the acquisition of the Navy’s EHF Satellite Communications Program (NESP) terminals in four semi-concurrent phases. Phase I of the NESP program provides Low Data Rate (LDR) jam resistant, low probability of intercept EHF SATCOM terminals for submarines, surface ships, and shore stations in the electromagnetic threat environment projected into the next decade. This requirement is contained in the NESP NDCP dated Apr 89 and the JROC validated Milstar ORD of Jun 92. There is a requirement to procure a total of 43 operational shore terminals, four transportable terminals, thirteen SCAMPs (Several Channel Anti-jam Man Pack) to provide multi-channel portable communications, and ten trainers. This requirement was recently updated per the CNO ltr, Ser N631/8U556125 dated 11 Jun 98. Phase II of the NESP program procures Navy EHF Communications Controllers (NECCs), as part of the ADNS strategy to provide for the exchange of computer-to-computer tactical communications over the survivable EHF satellite links. NECC provides for network management; multiplexing and channel sharing; resource management; communications management and planning; network control and monitoring and communications protocols such as circuit switching and packet switching. NECC requirements are outlined in the NESP NDCP dated Apr 89 and must be fully fielded with deploying battle groups and shore sites to support tactical information exchange over EHF SATCOM. Phase III of the NESP program provides for the procurement of Full Milstar LDR Operational Capabilities (FMLOC). FMLOC efforts include Agile Beam Management (ABM), Over-the-Air-Rekey (OTAR), and In-Band Control (IBC) capabilities required by the JROC validated Milstar ORD. Additionally, the Processor Upgrade Program (PUP) must be implemented to support the terminal throughput and memory requirements of the Phase III capabilities. All of these Phase III efforts will provide essential EHF operational communications capabilities with the current Milstar satellites. Similarly, IBCs will provide interoperable voice communications on all EHF satellites (Milstar, UHF Follow-On (UFO), and FLTSAT EHF Package (FEP)). Phase III also includes procurement of Interim Polar modification kits. An EHF polar communications capability is available using an EHF package on a classified host in the Molniya orbit. To use this polar capability, terminals will require minor modifications. In addition, shore gateways are necessary to provide connectivity from the Interim Polar satellite to other EHF satellite constellations. Phase IV of the NESP program consists of a Medium Data Rate (MDR) capability which will provide the only protected (jam resistant and low probability of intercept/detection) MDR communications from 4.8 kilobits per second (Kbps) to 1.544 megabits per second (Mbps) to all major fleet combatants with Milstar Satellites 3-6. To meet the Navy’s requirement for MDR capable terminals, MDR appliqués will be procured and retrofitted into existing LDR terminals and the balance of the requirements will be procured as part of the Follow-On Terminal contract award of 20 Mar 98. Follow-on terminals will also have Phase III FMLOC capabilities incorporated into their baseline. The requirement for MDR is outlined in the JROC validated Milstar ORD and must be fielded by FY 99 in order to support the launch schedule of the first Milstar II satellite. By OPNAV paper, Ser N631D/703-693-0024 dated 16 September, the Program Office was directed to accelerate the MDR upgrade program to meet fleet needs. Prior to receiving the MDR appliqué, existing NESP terminals must have Phase III upgrades due to the processing throughput and memory requirements of MDR. FY 99 funds will be used to continue procurement of MDR retrofit appliqués, SCAMPS, NECCs and FMLOC equipment. The procurement of MDR retrofit appliques, NECCs, FMLOC, will continue in FY00 and FY01. FY 00 funds will also be used to begin procurement of Follow-On Terminals and continue into FY01. Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 85- 2 of 85- 3 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continuation) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE SATCOM Shore Terminals (Space) June 2001 SUBHEAD 322000 52NP Global Broadcast Service: This is the Navy shore portion of the joint program with the Air Force as Executive Service. The GBS will augment other Military Satellite Communications (MILSATCOM) systems and provide a continuous , high speed , one way information flow of high volume data to units ashore, afloat or special operations. GBS will support routine operations, training and military exercises, special activities, crises, situational awareness, weapons targeting, reconnaissance and the transition to and conduct of opposed operations short of nuclear war. GBS shore terminals will provide the capability of quick dissemination of large information products to various Navy fixed sites and small combat and combat support elements. FY00 and FY01 continues procurement of shore site terminals at NCTAMS/MOC/MAC/MICFAC, CINC, SPAWAR and other Navy locations.. In the shore GBS terminal, components will be procured from the GBS Joint Program Office (Air Force) contract and include the GBS antenna and receiver, and transportable terminals. A Mission Need Statement for GBS was signed, 3 AUG 1995, and a Joint Operational Requirements Document (JORD) was signed 7 April 1997. For shore procurements, antennas and ancillary equipment such as Asynchronous Transfer Mode (ATM) in-line encryptors will be procured. JMINI Control System: The Joint ultra high frequency (UHF) Military Satellite Communications Network Integrated Control System (JMINI) is a joint interest program with the Navy designated as the lead service as directed by the Military Communications Electronics Board (MCEB). The JMINI Control System will provide dynamic centralized control of joint 5-kHz and 25-kHz UHF military satellite communications (MILSATCOM) voice and data resources (channels and Time Division Multiple Access (TDMA) time slots) via a globally integrated system of four control stations to be located at each of the three Naval Computer and Telecommunications Area Master Station (NCTAMS) sites plus Naval Computer and Telecommunications Station (NCTS) Guam. The globally integrated system consists of two major subsystems. The first subsystem provides communications resource planning and management via secure Wide Area Network (WAN) connections between the control stations and remote users and is known as the Network Management System (NMS). A total of 14 NMS units are required, one at each control station plus ten remote units to be installed at ORD-defined locations. The second subsystem provides the RF connectivity (modems, radios, antennas) between the NMS and the UHF MILSATCOM user terminals worldwide and is known as the Channel Controller. There are 156 channel controllers required per control station. Funds in FY99 begin procurement of the Digital Modular Radio (DMR), which serves as the JMINI Control System Channel Controller and procures the first two control station NMS units. Funds in FY00 continue procurement of the DMR channel controller hardware and the other two control station NMS units and begin installation of the system. Funds in FY01 continue procurement and installation of the channel controller hardware for the four control station plus begin procurement of the remote NMS units. INSTALLATION AGENT: Various Exhibit P-40, Budget Item Justification Unclassified Classification P-1 Shopping List-Item No 85- 3 of 85- 3 UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 P-1 ITEM NOMENCLATURE Joint Communications Support Element (JCSE) 330200 FY 2000 FY 2001 FY 2002 $3.6 $2.4 $4.6 FY 2003 FY 2004 FY 2005 FY 2006 SUBHEAD 52L4 FY 2007 TO COMP QUANTITY COST (in millions) Cont PROGRAM COVERAGE: This line represents the Navy’s share of the Joint Communications Support Element (JCSE) Program. This program is jointly funded by Army, Navy, Marine Corps and Air Force. Funds procure various communications equipment including the following: Ultra High Frequency (UHF) Satellite Communications (SATCOM) Demand Assigned Multiple Access (DAMA) radios, Extremely High Frequency (EHF) Secure, Mobile, Antijam, Reliable Tactical Terminals (SMART-T), Super High Frequency (SHF) Tri-band Advanced Range Extension Terminals (STAR-T), Deployable Global Command and Control System (D-GCCS), C4 Extension Package, Integrated Digital Network Exchange (IDNX) upgrades, Asynchronous Transfer Mode (ATM) interface, Defense Message System (DMS) Tactical, Joint Worldwide Intelligence Communication System (JWICS), Communications Security (COMSEC) Secure Telephone Equipment (STE) STU-IIIs and KY-68s, Joint Defense Information Infrastructure Control System-Deployable (JDIICS-D), Personal Communications Systems (PCS) to provide seamless integration of commercial cellular service to the tactical network, manpack multi-mode multi-band radios for the quick reaction element, 20 foot quick reaction satellite antenna replacements, cellular phone systems serving between 300-400 subscribers, Contractor Off the Shelf (COTS) replacements for SB-3614AT small switchboards, next generation multimedia switches and high data rate tactical satellite terminals, assorted switches, transit cases, multiplexers and antennas. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: SPACE AND NAVAL WARFARE SYSTEMS COMMAND, SAN DIEGO, CA will act as JCSE’s Executive Agent for distribution of funds. INSTALLATION AGENT: N/A P-1 Shopping List-Item No - 86 - 1 of 2 UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT COST CODE ELEMENT OF COST ID CODE QTY 1 L4001 JCSE Modernization A L4002 Production Support A TOTAL CONTROL FY 2000 UNIT COST 3,589 TOTAL COST QTY 3,589 1 P-1 ITEM NOMENCLATURE SUBHEAD Joint Communications Support Element (JCSE) 330200 52L4 TOTAL COST IN THOUSANDS OF DOLLARS FY 2001 FY 2002 UNIT TOTAL UNIT TOTAL COST COST QTY COST COST QTY 2,438 2,438 0 3,589 1 4,623 TOTAL COST 4,623 0 2,438 FY 2003 UNIT COST 0 4,623 Remarks: P-1 Shopping List-Item No 86- 2 of 2 Exhibit P-5, Budget Item Justification DD FORM 2446, JUN 86 Unclassified BUDGET JUSTIFICATION SHEET DATE: Appropriation/Budget Activity: BA-2 OPN/COMMUNICATIONS/ELECTRONIC FY2002 June 2001 P-1 Item Nomenclature: ELECTRICIAL POWER SYSTEMS FY2003 FY2004 FY2005 FY2006 FY2007 QUANTITY COST (In Millions) 1.3 ELECTRICAL POWER SYSTEMS The Electrical Power Program is designed to provide highly reliable, continuous, high quality power subsystems to support Naval Computer and Telecommunications Systems. Basic deficiencies in current power sources, couple with recent telecommunication system trends toward sophisticated, highly reliable, high speed, continuous, accurate systems (e.g., various High Frequency, Low Frequency, Very low Frequency facilities), necessitate a continuing program to upgrade power systems. The Naval Computer and Telecommunications Systems Electrical Power Plan (NTSEPP) provides the necessary requirements. In CONUS and overseas, where commercial power is available in sufficient quantity, it is utilized as the base system, even though its overall quality may be poor. Because these commercial systems are continually susceptable to blackout and various other types of power perturbations, suitable quick-start emergency power generators must be available to support operational loads. Some of the operational load is designated as "critical" and requires Uninterruptible Power Supply Systems for instantaneous application in case of loss or disturbance of the primary power source. P-1 SHOPP LIST ITEM NO. 87 Exhibit P-40 UNCLASSIFIED PAGE NO. 1 OF 3 PROGRAM COST BREAKDOWN DATE: June 2001 Appropriation/Budget Activity: BA-2 OPN/PERSONNEL AND COMMAND SUPPORT P-1 Item Nomenclature: ELECTRICAL POWER SYSTEMS -NCTC Total Cost in Thousands of Dollars Element of Cost (1) Ident Code (2) ELECTRICAL POWER P-1 SHOPP LIST ITEM NO. 87 Quantity (3) FY2002 Total Cost Quantity (4) FY2003 1301 PAGE NO. 2 OF 3 Exhibit P-5 UNCLASSIFIED Appropriation/Budget Activity: BA-2 OPN/ELECTRICAL POWER SYSTEMS Line Item/Fiscal Year P-1 Item Nomenclature: DATE: June 2001 ELECTRICAL POWER SYSTEMS - NCTC Contract Contractor/ Method and Contracted Location Type (Option) By Award Date Date of Delivery Unit Cost ($000) Qty Specs Avail Spec Rev Reqd If Yes When Avail ELECTRICIAL POWER SYSTEMS FY 2002 Replace Supervisory Control Replace 100 Kilowatts Diesel Engine * * Competitive Competitive * * FY2003 Replace 500k VA Emerson Power Supply Replace Two 545 Kilowatts Diesel Install 21-150k VA UNINTERRUPTIBLE Power Supply * * * Competitive Competitive Competitive * * * P-1 SHOPP LIST ITEM NO. 87 PAGE NO. 3 OF 3 * * * * * * * 1 1 678 623 YES YES NO NO * * * 1 1 2 454 550 274 YES YES YES NO NO NO Exhibit P-5a UNCLASSIFIED UNCLASSIFIED CLASSIFICATION DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 P-1 ITEM NOMENCLATURE SUBHEAD Q2T0 BLI 3306 Navy Standard Integrated Personnel Systems (NSIPS) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TO COMP TOTAL 4.8 1.8 14.2 22.7 .4 .4 5.8 5.9 CONT CONT QUANTITY COST (in millions) PROGRAM COVERAGE/JUSTIFICATION FOR BUDGET YEAR REQUIREMENTS: The Navy Standard Integrated Personnel System (NSIPS) is a special-interest, major Automated Information System (AIS) to collect, process and distribute personnel and pay data within Navy and to various corporate level activities within DoD. NSIPS will achieve the integration of active, reserve, and retired military personnel systems within the Navy, improve the military personnel tracking process, consolidate processes and systems within life cycle areas of military personnel, and the functionalilty of existing Navy source data collection requirements. NSIPS will operate on shore and afloat servers, client workstations, stand-alone workstations, portable stand-alone workstations, LANs and miscellaneous hardware and will maintain regional data warehouses as well as an all-Navy archival data warehouse. FY 2000 through 2002 NSIPS funding is for hardware and software at all reserve sites and PSDs supporting reserve sites. In order to comply with the NSIPS MS III ORD, the NSIPS program must develop and deploy an electronic field service record that will automate the current paper service record maintenance process and allow commands electronic access to service record data on assigned personnel. This electronic field service record system and concept will be called NSIPS/EFSR. NSIPS/EFSR will replace the hard copy officer and enlisted personnel service record used in the field. This will enable electronic filing, processing, storing, retrieving, viewing, and routing of any service record required images and data. This will allow for more efficient documentation and display of information normally placed into the service record; increase efficiencies in the record transfers between activities; reduce lost or misplaced records and their reconstruction; reduce lost or mutilated pages; allow for bulk and group entries (e.g., pay entitlements, training documentation, unit awards, etc.); and reduce manual record maintenance workload. It will also allow for more than one authorized person to access a record simultaneously, if required (e.g., Legal and Personnel). Additionally, by having a controlled access, there will be increased security of records and the information that they contain. This is anticipated to reduce the workload levels at commands, afloat and ashore, as well as at PSDs. As a minimum, NSIPS/EFSR will interface with Electronic Military Personnel Records System (EMPRS), and will be totally integrated with NSIPS. NSIPS/EFSR is dependent upon and uses data from the local NSIPS database, eliminating duplicate entry of data. SMARTCARD will be used as a Public Key Encryption Infrastructure (PKI) device for security access control and secure access to a web-enabled version of the software. NSIPS/EFSR will allow for automated documentation of service record changes and data archiving as required and more efficient field level data availability and archiving. FY02 requirements for NSIPS/EFSR are $9.0M OPN ($3.0M for COTS licenses and $6.0M for initial hardware buy) is required. P-1 Shopping List - Item No. 88-1 of 88-3 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE COST ANALYSIS June 2001 APPROPRIATION ACTIVITY OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT PY COST CODE ID CODE ELEMENT OF COST T0010 NSIPS Equipment NSIPS Install T0020 NSIPS/EFSR NSIPS/EFSR Install QTY TOTAL COST QTY FY 1999 UNIT TOTAL COST COST QTY P-1 ITEM NOMENCLATURE BLI 3306 Navy Standard Integrated Personnel Systems (NSIPS) TOTAL COST IN THOUSANDS OF DOLLARS FY 2000 FY 2001 FY 2002 UNIT TOTAL UNIT TOTAL UNIT COST COST QTY COST COST QTY COST TOTAL CONTROL SUBHEAD Q2T0 TOTAL COST QTY 4,816 0 1,768 0 2,671 2,541 0 0 0 0 7,270 1,750 4,816 1,768 14,232 FY 2003 UNIT COST Remarks: Exhibit P-5, Cost Analysis Unclassified Classification P-1 Shopping List-Item No 88-2 of 88-3 TOTAL COST UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE COST CODE ELEMENT OF COST FY SUBHEAD BLI 3306 Navy Standard Integrated Personnel Systems (NSIPS) OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT CONTRACTOR AND LOCATION CONTRACT & TYPE LOCATION OF PCO METHOD RFP ISSUE DATE AWARD DATE DATE OF FIRST DELIVERY QTY Q2T0 UNIT COST SPECS DATE AVAILABLE REVISIONS NOW AVAILABLE NSIPS NSIPS NSIPS 00 01 02 VARIOUS VARIOUS VARIOUS IDIQ IDIQ IDIQ SPAWAR SPAWAR TBD Mar-00 Jan-01 Dec-01 Mar-00 Jun-01 Feb-02 Yes Yes Yes N/A N/A N/A NSIPS/EFSR 02 VARIOUS IDIQ TBD Dec-01 Jan-02 Yes N/A D. Remarks: DD FORM 2446, JUN 87 Exhibit P-5A, Procurement History and Planning Unclassified Classification P-1 Shopping List-Item No 88-3 of 88-3 UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE Joint Engineering Data Management OTHER PROCUREMENT, NAVY/BA2 JEDMICS Information and Control System (JEDMICS) Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) Other Related Program Elements ID Code FY 2000 FY 2001 3000 2700 100* $7.0 $16.9 $11.9 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total 5800 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $35.8 *Note: Prior Years only reflect FY99. All previous procurement budgets for this item were submitted as a Project Management Function through the Naval Supply Systems Command (NAVSUP). CNO letter dated 21 December1998 transferred the JEDMICS Project Office to the Naval Air Systems Command (NAVAIR) beginning 1 January 1999. JEDMICS is the Joint DoD system for permanently storing, managing and controlling digital engineering drawings and associated technical data. The JEDMICS System replaced labor intensive, inefficient manual and semi-automated technical repositiories with automated central respositiories for all engineering and manufacturing information on ships, aircraft and electronics. This information is used by the fleet shore establishment and industry in support of spares acquisition, equipment maintenance, and modernization and preparation of technical publications. The JEDMICS system is deployed at 29 interoperablesites that service 600 locations worldwide. JEDMICS currently manages and controls 78,500,000 engineeringimages and has 32,000 authorized users responsible for over 70,000 user sessions per month. Over 2 million digital images are retrieved each month. The effective utilization of JEDMICS by the contractor and Government communities will require secure network access and adequate security for all data stored within the repositiory. FY00 funding was used to continue to expand electronic commerce and electronic data interchange by enhancing security between JEDMICS and wide area networks which transport JEDMICS digital engineering data and to acquire a Product Data management (PDM) system with an Open Application Interface (OAI). This will result in the acquisition and installation of a JEDMICS WAN "Security Solution" with associated certification and integration of this solution, a label maker, and labeled technical data packages and hardware and software for the OAI. FY01 funding will be used to continue procurement and integration of the security solution Congressionally approved in previous years. This will result in the acqusiton and installation of COTS Hardware, Software, and associated integration of this security solution. JEDMICS enhancement funds will be used for the acquisiton and installationof COTS hardware and software for a turnkey WEB solution at 30 sites. * FY01 reflects hardware, software, and labeled data packages. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 89 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: ET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/ BA2 Procurement Items Diamond NIC Secure Network Interface System Quantity Cost JEDMICS ID Code A Prior Years 3000 5.4 FY 2000 FY 2001 2700 7.5 HW/SW test site upgrades Certification/Accreditation Open Application Interface (OAI) S/W Pkg System H/W & S/W to run OAI COTS H/W &S/W for a turnkey WEB solution Total Funding 1.5 4.5 2.5 2.4 FY 2002 100* 7.5 0.4 1.5 2.5 6.9 DD Form 2454, JUN 86 Note:*FY01 reflects h/w and s/w and labeled data packages. 16.9 11.9 ITEM NO. 0.0 P-1 SHOPPING LIST 89 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED IT SYSTEM COST ANALYSIS P-5 IT System JEDMICS ID Code P-1 ITEM NOMENCLATURE/SUBHEAD APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 Other Procurement, Navy, BA2 JEDMICS JEDMICS/42JD TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code A Prior Years Total Cost 5,471 FY 2000 Quantity * 1,061 Total Cost JE100 DiamondNIC Secure Network Interface System JE100 JE100 Test Center HW/SW upgrade Certification/Accreditation JE100 Open Application Interface (OAI) S/W Pkg 2,452 JE100 System H/W & S/W to run OAI 2,406 JE100 COTS H/W &S/W for a turnkey WEB solution 1,500 * 2700 Unit Cost FY 2001 * 7,500 Quantity Unit Cost 100** 6,971 P-1 SHOPPING LIST ITEM NO. 89 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost **7,500 390 1,500 4,500 30*** DD FORM 2446, JUN 86 75 FY 2002 16,858 83 2,500 11,890 CLASSIFICATION: PAGE NO. 3 UNCLASSIFIED Note (1)* Total Cost reflects quantity plus nonrecurring engineering resulting in a total system cost. Note (2):**Total Cost includes hardware/software plus labeled data packages resulting in a total system cost. Note (3):*** Quantity refers to number of sites. UNCLASSIFIED CLASSIFICATION: BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A IT System JEDMICS B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA2, JEDMICS JEDMICS Cost Element/ FISCAL YEAR FY00 DiamondNIC Secure Network Interface System A. DATE June 2001 SUBHEAD 42JD QUANTITY UNIT COST (000) 2700 1,061 LOCATION OF PCO CONTRACT METHOD & TYPE RFP ISSUE DATE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE 7/00 7/01 Yes N/A 7/00 7/01 N/A N/A NAVAIR,PaxR, Md 6/00 SS/FFP Existing NAVSEA Contract Existing GSA Contract Existing GSA Contract C/FP CRYPTEK Secure Communications,LLC Chantilly, Va Xeta International Corp. Indian Head, MD C/FP Litton PRC, Reston, VA 6/00 7/01 N/A N/A C/FP Lockheed Martin, Owego, NY 7/00 7/01 N/A N/A 6/01 12/01 Yes N/A 5/01 3/02 N/A N/A Certification/Accreditation Package 4.5 NAVSEA, Arlington, VA Open Application Interface (OAI) S/W pkg 24 NAVICP, Mech, PA System H/W and S/W to run OAI 2.5 NAVICP, Mech, PA 100 75 NAVAIR,PaxR, Md 6/01 SS/FFP Certification/Accreditation Package 1 1.5 NAVSEA, Arlington, VA C/FP Open Application Interface (OAI) S/W pkg 1 1 NAVICP, Mech, PA C/FP Litton PRC, Reston, VA 5/01 6/02 N/A N/A Web Access Tool Kit 1 1.3 NAVICP, Mech, PA C/FP Lockheed Martin, Owego, NY 5/01 11/02 N/A N/A TBD 0 Existing NAVSEA Contract Existing GSA Contract Existing GSA Contract N/A CRYPTEK Secure Communications,LLC Chantilly, Va Xeta International Corp. Indian Head, MD MIPR AMCOM, Huntsville, Al 5/01 5/02 N/A N/A FY01 DiamondNIC Secure Network Interface System HW/SW upgrade D. AMCOM, Huntsville, Al REMARKS: DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 89 PAGE NO. 4 Classification: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET June 2001 DATE APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE 336800 NAVAL SHORE COMMUNICATIONS FY 2000 FY 2001 FY 2002 $116.7 $163.1 $66.8 FY 2003 FY 2004 FY 2005 FY 2006 SUBHEAD 52D6 FY 2007 TO COMP TOTAL QUANTITY COST (in millions) PROGRAM COVERAGE FY 00-07: The Naval Shore Communications program procures and installs the Defense Message System and Base Level Information Infrastructure at shore stations. (1) Defense Message System(D6001)) The Defense Message System ( DMS) will replace the present Automated Digital Network (AUTODIN) message delivery architecture with a single organizational messaging system throughout the DoD, with seamless strategic (ashore) and tactical (afloat) interoperability. DMS is an integrated suite of COTS-based applications for electronic delivery of organizational messages, which is designed to run on the Defense Information System Network (DISN). The DoN DMS program provides for the planning, procurement, integration, installation, and upgrade of DMS components to provide end-to-end interoperable messaging capabilities for all Navy and USCG shore activities, as well as procurement of some DMS components for USMC activities. Implementation of the end-to-end messaging capability comprises four functional categories: (a) Messaging Control Centers (aka DMS messaging infrastructure sites): provides for site survey and design engineering, hardware procurement, hardware/software integration, installation and checkout, certification, and technical support to implement Navy and Coast Guard DMS messaging infrastructure control centers, which provide messaging, directory, and security services and network interface to the Joint DMS backbone for Navy organizational messaging user commands. Implements 4 Area Control Centers (ACCs), 9 Local Control Centers (LCCs), and 8 Remote Server Sites (RSSs) at Naval Computer and Telecommunications Area Master Stations (NCTAMS) and Naval Computer and Telecommunications Stations (NCTS) worldwide. Separate DMS enclaves are provided at each ACC/LCC/RSS for Sensitive But Unclassified (SBU) and Secret classifications of organizational messaging; separate TS/Collateral enclaves are provided at the 4 ACCs. Also provides for implementation of Sensitive Compartmented Information (SCI) ACCs/LCCs at 11 Naval Intelligence Community sites worldwide. Includes integration and phased implementation of Fleet Automated Message Information System (FAMIS) at 3 NCTAMS and 3 SCI messaging centers, which will constitute the DMS messaging tactical gateway to afloat users. Site configurations vary, depending on volume of organizational user commands serviced by each messaging control center. (b) Organizational Messaging Capabilities at User Commands: provides for hardware and software procurement, hardware/software integration, installation and checkout, and initial user training necessary to provide organizational messaging Enabling Capabilities (ECs) to approximately 3,000 designated Navy shore commands. Separate DMS ECs are provided for Sensitive But Unclassified (SBU), Secret, and Top Secret/Collateral GENSER classifications (depending on messaging requirements of individual command), as well as Sensitive Compartmented Information (SCI) messaging capabilities for Navy user commands in the Intelligence Community. Individual EC configurations vary, depending upon each command’s available means of network connectivity (i.e., dial-up or NIPRNET/SIPRNET connection, direct or through local network); EC configurations range from a workstation with DMS user agent (client) software to a DMS groupware server upgrade for existing email server. Also provides for implementation of DMS groupware servers and approximately 10,000 desktop user agents at headquarters of designated Combatant Unified Commanders (JFCOM, USPACOM) and their sub-unified commands, as well as CNO/SECNAV headquarters and Navy Fleet Commanders in Chief (FLTCINCs). (c) Upgrades: provides for hardware technical refresh of DMS messaging infrastructure components at Navy ACCs, LCCs, and RSSs necessary to integrate successive releases of DMS software upgrades and major versions. Also provides for implementation of augmented DMS components necessary to accommodate fielding of afloat tactical users. (d) Technical Refresh of Transitional Messaging Components: provides for technical refresh/upgrade of existing transitional messaging systems necessary to maintain interoperability with legacy messaging formats and interface with tactical users. Transitional messaging systems will remain operational until the transition from the AUTODIN messaging system to DMS is completed for all Navy activities, ashore and afloat. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: DMS is a DoD-mandated, Joint ACAT IAM program managed by the Defense Information Systems Agency (DISA) and executed by the individual Services/Agencies. Assistant Secretary of Defense (C3I) memorandum " Electronic Mail Policy-Implementation Guidance" (9 Mar 1995) established DMS as the "one seamless, end-to-end global electronic messaging service within the Department of Defense ... All electronic messaging (AUTODIN and legacy electronic mail) within the DoD must migrate to DMS-compliant messaging as rapidly as possible.” Assistant Secretary of Defense (C3I) memorandum "Revised Defense Message System Transition Plan" (28 Dec 1999) provides updated milestones for the phased transition from AUTODIN to DMS messaging. P-1 Shopping List-Item No - 90 - 1 of 14 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continued) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT June 2001 DATE P-1 ITEM NOMENCLATURE SUBHEAD 52D6 336800 NAVAL SHORE COMMUNICATIONS (2) Base Level Information Infrastructure(D6005): Procures shore Local Area Network, Base Area Network, Wide Area Networks and Metropolitan Area Network cable plant, switches, telephone switch and peripheral upgrades, hubs, routers, basic network and information distribution servers and workstations, network management and system operations equipment and software to provide voice, video and data connectivity and integrated networking capabilities from Defense Information Infrastructure and Public Service Delivery Points up to and including the user desktop. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: CNO/N61 message 051619Z Dec 95 established Base Level Information Infrastructure (BLII) program requirement, strategy, and POM-98 guidance. Defense Planning Guidance Program Review (PR-97) mandated services to modernize bases. The Naval Switch and Cable Modernization Program (NASCAMP), also known as BLII, was originally planned to modernize base switch and cable plants to meet increasing voice, video and data requirements. It was to upgrade analog infrastructures to digital; provide a fiber optic backbone and allow for interoperability within the Defense Information Systems Network (DISN). With the conception of the Navy Marine Corps Internet (NMCI) project, BLII will provide all Navy Service members and employees overseas end-to-end, secure, assured access to a full range of voice, video and data services. BLII will provide NMCI like services by implementing hardware, software and network management capability and server farms. (3) Equipment Installation (D6776): Installs the above procured equipment at shore stations worldwide. Installations include quality assurance, acceptance test & evaluation, and as-built drawings. JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: Defense Communication System Six Year Plan. P-1 Shopping List-Item No - 90 - 2 of 14 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT SUBHEAD 52D6 336800 NAVAL SHORE COMMUNICATIONS TOTAL COST IN THOUSANDS OF DOLLARS COST CODE D6001 ELEMENT OF COST Defense Messaging Systems (DMS)1 PY FY99 ID TOTAL UNIT TOTAL CODE COST COST COST A DMS Messaging Control Centers Organizational Messaging Capabilities at User Commands Upgrades Transitional Messaging Components Technical Refresh D6005 Base Level Information Infrastructure (BLII)2,3,4 A BLII QTY FY 2000 QTY FY 2001 UNIT TOTAL COST COST D6776 TOTAL COST COST 4 8,177 32,709 4 2,711.50 10,846 4 8,177 32,709 4 2,711.50 10,846 0 46,483 var 46,483 BLII Wide Area Network (WAN) BLII Regional Network Operating Center (RNOC) BLII Metropolitan Area Network (MAN) BLII Base Area Network (BAN) BLII Local Area Network (LAN) BLII Voice BLII Equipment - MILCON projects D6555 QTY FY 2002 UNIT QTY TOTAL COST COST Var 10,572 Var Var Var Var 4,780 1,388 1,902 2,502 80,512 12 8 3 20 580 2 468.37 2,439.73 713.44 1,105.32 33.14 1,560.00 5,620 19,518 2,140 22,106 19,233 3,120 8,775 FY 2003 UNIT 1 2 0 1 83 3 384.73 1,661.91 0.00 1,177.60 48.74 1,278.33 5,731 2,993 2,206 3,491 2,240 376 2,617 524 1,682 31,728 68,757 25,762 7,869 2,633 5,244 Base Level Information Infrastructure (BLII)2,3,4 23,859 66,124 20,518 BLII 23,859 4,316 14,987 1,643 16,975 21,798 1,680 4,725 418 3,613 163,108 66,772 163,108 66,772 A BLII Wide Area Network (WAN) BLII Regional Network Operating Center (RNOC) BLII Metropolitan Area Network (MAN) BLII Base Area Network (BAN) BLII Local Area Network (LAN) BLII Voice BLII Equipment - MILCON projects SPAWAR CONTROL 116,651 NAVSEA WNY SPACE LAN COST 385 3,324 0 1,178 4,040 3,835 15,470 Production Support Non-FMP Installation TOTAL COST 28,232 Defense Messaging Systems Base Level Information Infrastructure (BLII) Defense Messaging Systems (DMS)1 QTY UNIT 1,280 4,812 2,065 8,330 7,400 TOTAL CONTROL 124,051 Remarks: 1/ Previous exhibits showed DMS quantity of 4 to indicate number of regions being implemented worldwide. FY02-07 reflect functional categories to better depict types of capabilities being implemented. Specific configurations implemented at individual sites within each functional category vary to such a degree that aggregate quantities (and unit costs) are not applicable and would be misleading. 2/ In accordance with redirection of BLII effort, work will be focused in OCONUS regions Far East, Europe, and Gulf. 3/ Unit cost fluctuations are due to size and complexity of Navy facilities and activities being upgraded. Example: More buidlings on a Navy facility will require a more extensive and complex Base Area Network (BAN) to be installed and increased capability at the supporting NOC. Thus, unit costs depicted above are based on an average cost of each planned component installation. 4/ The preferred funding vehicle for BLII is the ViViD contract--an omnibus contract to procure and install BLII infrastructure. P-1 Shopping List-Item No - 90 - 3 of 14 Exhibit P-5, Budget Item Justification DD FORM 2446, JUN 86 Unclassified UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT SUBHEAD 336800 NAVAL SHORE COMMUNICATIONS RFP DATE ISSUE AWARD OF FIRST QTY DATE DATE Delivery 52D6 ELEMENT OF COST FY CONTRACTOR AND LOCATION D6001 Defense Messaging Systems 01 Various Various SPAWAR N/A Dec-00 Feb-01 02 Various Various SPAWAR N/A Dec-01 Feb-02 D6005 Base Level Information Infrastructure (BLI 01 VIVID IDIQ SPAWAR N/A May-01 Var Var Var Yes N/A 02 VIVID IDIQ SPAWAR N/A May-01 Var Var Var Yes N/A COST CODE CONTRACT METHOD & TYPE LOCATION OF PCO 4 UNIT COST SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE 2,712 Yes N/A 0 Yes N/A D. REMARKS 1/ BLII: For individual unit costs, see P-5. P-1 Shopping List-Item No - 90 - 4 of 14 Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Defense Messaging Systems (ASHORE)1,2,3 June 2001 D6001 Various State of the art technologies for messaging functions which will replace AUTODIN. Costs vary by site size, requirements, and configuration. Funding provides for procurement and installation of Fleet Tactical gateways at DMS messaging control centers, SCI messaging control centers, DMS organizational messaging capabilities for SCI user commands, messaging control center hardware upgrades to support software releases, and technical refresh of transitional messaging components. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 4 51.2 Messaging Control Centers User Commands Messaging Capabilities Upgrades Transitional Messaging Components Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support Other - (DSA) Interm Contractor Support Installation of Hardware 4 21.2 PRIOR YR EQUIP 4 21.2 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 21.2 TOTAL PROCUREMENT COST 72.4 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 99 Qty $ 4 26.0 FY 00 Qty $ 4 FY 01 Qty $ 32.7 4 3.5 4 4 6.7 6.7 6.7 32.7 4 7.9 4 7.9 FY 02 Qty $ 10.8 10.6 4.8 1.4 1.9 2.5 0.4 0.5 4 2.6 4 2.6 7.9 2.6 44.1 13.9 SPAWAR Sys Center Install Var 5.2 Var 5.2 FY 03 Qty FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ ADMINISTRATIVE LEADTIME: 2 Mos PRODUCTION LEADTIME: FY 2000 Dec-99 FY 2001 Dec-00 FY 2002: Dec-01 FY 2003: DELIVERY DATES: FY 2000 Feb-00 FY 2001 Feb-01 FY 2002: Feb-02 FY 2003: PY 12 OUTPUT 12 1 2 FY 01 3 4 1 2 4 FY 02 3 Total Qty $ FY 03 4 1 2 1 2 3 4 1 3 4 TC 2 2 Mos FY 04 3 4 Var FY 05 2 $ Var 4 1 TC Qty 5.2 16.3 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: $ 3 4 1 2 FY 06 3 FY 07 4 TOTAL INPUT OUTPUT Notes/Comments 1/ Total quantity meets inventory objective. Program continues indefinitely. 2/ PY-FY01 reflect regions as quantities for historical consistency (could convert to functional categories). P-1 Shopping List-Item No - 90 - 5 of 14 3/ FY02-07 reflect Equipment functional categories to better depict capabilities implemented. ] Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED June 2001 Base Level Information Infrastructure (BLII) (FY01 President’s Budget Rollup)1 D6005 All ship and shore voice, video and data requirements. Procures shore Local Area Network, Base Are Network and Metropolitan Area Network cable plant, switches, telephone switch and peripheral upgrades hubs, routers, basic network and information distribution servers and workstations network management and system operations equipment and software to provide voice video and data connectivity and integrated networking capabilities from Defense Information infrastructure and Public Service Delivery Points up to the user desktop Costs vary by site size, requirements and configuration. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) FY 06 FY 07 FY 05 Prior Yrs FY 99 FY 00 FY 01 FY 02 FY 03 FY 04 TC Total Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment var 37.9 var 30.9 var 46.5 var 115.3 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Production Support 2.2 2.2 Other - (DSA) Interm Contractor Support MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Installation of Hardware2 PRIOR YR EQUIP FY 97 EQUIP FY 98 EQUIP FY 99 EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: var 15.1 var 15.1 var 19.6 var 19.6 var var 15.1 53.0 19.6 50.6 23.9 var 58.6 23.9 var var var 15.1 19.6 23.9 23.9 72.6 58.6 176.1 ADMINISTRATIVE LEADTIME: var PRODUCTION LEADTIME: var CONTRACT DATES: FY 1999: Var FY 2000: Var FY 2001: Var DELIVERY DATES: FY 1999: Var FY 2000: Var FY 2001: Var PY INSTALLATION SCHEDULE: FY 99 1 2 1 2 FY 00 3 4 1 2 3 4 1 2 3 4 1 FY 01 2 3 4 3 4 1 FY 04 2 3 4 INPUT OUTPUT FY 02 INSTALLATION SCHEDULE: FY 03 FY 05 1 2 3 4 TC TOTAL 1 INPUT OUTPUT Notes/Comments 1/ FY01 - FY07 budget exhibits reflect a revised reporting format and immedeatly follow. For continuity, this exhibit of the prior year reporting format is summarized and included for FY99 and FY00. All reference to FY01 - FY07 has been removed since the information now appears on the new format on the following pages. P-1 Shopping List-Item No - 90 - 6 of 14 Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Gulf Region Europe Region Far East Region Other Requirements Production Support Other (DSA) Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.0 0 0.0 TOTAL PROCUREMENT COST 0 0.0 0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ 0 0 FY 01 Qty $ 0.0 0.0 FY 02 Qty $ 1 5 6 0.5 2.3 2.8 0 1 0 0.0 0.4 0.0 12 4.3 1 0.4 12 4.3 1 0.4 12 12 4.3 9.9 1 1 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ ADMINISTRATIVE LEADTIME: 1 Mo PRODUCTION LEADTIME: FY 2000 N/A FY 2001 May-01 FY 2002: May-02 FY 2003: DELIVERY DATES: FY 2000 N/A FY 2001 Var FY 2002: Var FY 2003: PY 1 2 FY 01 3 4 1 2 FY 02 3 12 FY 05 2 FY 03 4 1 2 6 6 3 4 1 2 FY 06 3 4 Total $ Qty $ 3 Mos FY 04 3 4 1 3 4 TC 2 3 4 1 OUTPUT 1 TC Qty 0.4 0.8 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: June 2001 Base Level Information Infrastructure (BLII), Wide Area Network (WAN) D6005 All ship (pierside) and shore voice, video and data requirements Procures shore Wide Area Network (WAN) equipment and installation support, to include switches, routers, and hubs, to support data connectivi and integrated networking capabilities from Defense Information Systems Network (DISN) infrastructure to the Service Delivery Points at each Navy locatio FY01-03: Initially establish WAN service delivery points in each region. FY04-07: Technical refresh and modernizatio 1 2 FY 07 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No - 90 - 7 of 14 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED 1 Base Level Information Infrastructure (BLII), Regional Network Operating Center (RNOC) June 2001 D6005 All ship (pierside) and shore voice, video and data requirements. Procures equipment (servers, workstations, switches, routers) and software to build the shore Network Operations Center and IT service Center (ITSC) in each region, which is requiredto support basic network management, network operations, information distribution, and configuration management of the entire IT infrastructure in each region. Allows distribution and management of mission-critical information to the user desktop. MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Gulf Region Europe Region Far East Region Other Requirements Production Support2 Other (DSA) Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST TOTAL PROCUREMENT COST METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ FY 01 Qty $ 1 3 4 2.3 9.1 8.1 FY 02 Qty $ 0 2 0 0 0 0.0 0.0 0 0 0.0 0.0 0 0 15.0 8 15.0 0.0 0.0 8 8 15.0 37.1 FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 2 3.6 2 3.6 2 2 ADMINISTRATIVE LEADTIME: 1 Mo PRODUCTION LEADTIME: N/A FY 2001 May-01 FY 2002: May-02 FY 2003: DELIVERY DATES: FY 2000 N/A FY 2001 Var FY 2002: Var FY 2003: 1 2 FY 01 3 4 1 2 FY 02 3 8 FY 05 2 FY 03 4 1 2 4 4 3 4 1 2 FY 06 3 4 Qty $ 3 Mos FY 04 3 4 1 3 4 TC 2 3 4 2 OUTPUT 1 Total $ 3.6 8.6 FY 2000 PY TC Qty 1.7 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: FY 04 Qty $ 0.0 3.3 0.0 2.6 8 FY 03 Qty $ 1 2 FY 07 TOTAL INPUT OUTPUT Notes/Comments 1) There are 12 total RNOCS. FY’s 01-03 - Initial establishment of the 12 RNOCS. FY’s 04-07 - modernization and technical refresh. 2) RNOCs will incur 90% of all BLII Production Support costs. P-1 Shopping List-Item No - 90 - 8 of 14 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Base Level Information Infrastructure (BLII), Metropolitan Area Network (MAN) June 2001 D6005 All ship (pieside) and shore voice, video and data requirements Procures shore Metropolitan Area Network (MAN) cable plant, switches, and software required to provide connectivity from the Defense Information Systems Netwo (DISN) Service Delivery Point (SDP) (via the WAN) to the Base Area Networks (BANs) on each Navy facility in each geographic concentration FY01-03: Initially establish MAN service delivery points in each region. FY04-07: Technical refresh and modernizatio MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Gulf Region Europe Region Far East Region Other Requirements Production Support Other (DSA) Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.0 0 0.0 TOTAL PROCUREMENT COST 0 0.0 0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ 0 0 FY 01 Qty $ FY 02 Qty $ 0 2 1 0.0 1.5 0.6 0 0 0 0.0 0.0 0.0 3 1.6 0 0.0 3 1.6 0 0.0 0.0 0.0 3 3 1.6 3.8 0 0 FY 03 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ ADMINISTRATIVE LEADTIME: 1 Mo PRODUCTION LEADTIME: FY 2000 N/A FY 2001 May-01 FY 2002: May-02 FY 2003: DELIVERY DATES: FY 2000 N/A FY 2001 Var FY 2002: Var FY 2003: PY 1 2 FY 01 3 4 TC Qty Total $ Qty $ 0.0 0.0 CONTRACT DATES: INPUT 1 2 FY 02 3 FY 03 4 1 2 4 1 2 3 Mos FY 04 3 4 1 3 4 TC 2 3 4 3 OUTPUT 3 FY 05 INSTALLATION SCHEDULE: FY 04 Qty $ 1 2 FY 06 3 4 1 2 FY 07 3 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No - 90 - 9 of 14 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Base Level Information Infrastructure (BLII), Base Area Network (BAN) June 2001 D6005 All ship (pierside) and shore voice, video and data requirements Procures shore Base Area Network (BAN) cable plant, switches, and routers required to provide Outside Cable Plant (OSP) connectivity to buildings on each Navy facility each region. Provides connectivity from each building, through the MAN and WAN, to the DISN SDP FY01-03: Initially establish BAN service delivery points in each region. FY04-07: Technical refresh and modernizatio MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Gulf Region Europe Region Far East Region Other Requirements Production Support Other (DSA) Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.0 0 0.0 TOTAL PROCUREMENT COST 0 0.0 0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ 0 0 FY 01 Qty $ 0.0 0.0 FY 02 Qty $ 1 12 7 1.2 12.7 8.2 0 1 0 0.0 1.2 0.0 20 17.0 1 1.3 20 17.0 1 1.3 20 20 17.0 39.1 1 1 FY 03 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ ADMINISTRATIVE LEADTIME: 1 Mo PRODUCTION LEADTIME: FY 2000 N/A FY 2001 May-01 FY 2002: May-02 FY 2003: DELIVERY DATES: FY 2000 N/A FY 2001 Var FY 2002: Var FY 2003: PY 1 2 FY 01 3 4 1 2 FY 02 3 20 6 FY 05 2 FY 03 4 1 2 8 6 3 4 1 2 FY 06 3 4 Total $ Qty $ 3 Mos FY 04 3 4 1 3 4 TC 2 3 4 1 OUTPUT 1 TC Qty 1.3 2.5 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: FY 04 Qty $ 1 2 FY 07 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No - 90 - 10 of 14 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Gulf Region Europe Region Far East Region Other Requirements Production Support Other (DSA) Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.0 0 0.0 TOTAL PROCUREMENT COST 0 0.0 0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ 0 0 FY 01 Qty 0.0 0.0 FY 02 Qty $ $ 77 161 342 1.3 9.5 8.5 11 23 49 0.2 2.5 1.3 580 21.8 83 4.8 580 21.8 83 4.8 580 580 21.8 41.0 83 83 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ ADMINISTRATIVE LEADTIME: 1 Mo PRODUCTION LEADTIME: FY 2000 N/A FY 2001 ###### FY 2002: May-02 FY 2003: DELIVERY DATES: FY 2000 N/A FY 2001 Var FY 2002: Var FY 2003: PY 1 2 FY 01 3 290 4 1 2 FY 05 3 1 2 FY 02 3 4 42 41 145 145 290 OUTPUT 145 145 1 2 FY 03 1 2 1 2 FY 06 4 TC Qty Total $ Qty $ 4.8 8.9 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: June 2001 Base Level Information Infrastructure (BLII), Local Area Network (LAN) D6005 All ship (pierside) and shore voice, video and data requirements Procures shore Local Area Network (LAN) Inside Cable Plant (ISP), switches, routers, servers, workstations and software required to provid basic network connectivity and information distribution capability from the user desktop to the DISN FY01-03: Initially establish LAN service delivery points in each region. FY04-07: Technical refresh and modernizatio 1 Mo FY 04 3 4 1 3 4 TC 2 3 4 FY 07 3 4 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No - 90 - 11 of 14 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Base Level Information Infrastructure (BLII), Voice June 2001 D6005 All ship (pierside) and shore voice, video and data requirements Procures shore cable plant and telephone switch and peripheral upgrades to support the Navy portion of the Defense Information Systems Network - Europe (DISN-E) a DISN-Pacific upgrades to the Defense Switched Network MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Gulf Region Europe Region Far East Region Other Requirements Production Support Other (DSA) Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.0 0 0.0 TOTAL PROCUREMENT COST 0 0.0 0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ 0 0 FY 01 Qty $ FY 02 Qty $ 1 1 2.5 0.7 2 1 3.1 0.8 2 1.7 3 2.1 2 1.7 3 2.1 0.0 0.0 2 2 1.7 4.8 3 3 FY 03 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ ADMINISTRATIVE LEADTIME: 1 Mo PRODUCTION LEADTIME: FY 2000 N/A FY 2001 ###### FY 2002: May-02 FY 2003: DELIVERY DATES: FY 2000 N/A FY 2001 Var FY 2002: Var FY 2003: PY 1 2 FY 01 3 4 1 1 1 OUTPUT 2 FY 02 3 4 2 1 1 FY 05 1 2 FY 03 1 2 4 Total $ Qty $ 1 1 2 9 Mos FY 04 3 4 1 3 4 TC 2 3 4 1 FY 06 3 TC Qty 2.1 5.9 CONTRACT DATES: INPUT INSTALLATION SCHEDULE: FY 04 Qty $ 2 FY 07 3 4 TOTAL INPUT OUTPUT Notes/Comments P-1 Shopping List-Item No - 90 - 12 of 14 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED Base Level Information Infrastructure (BLII) Equipment - MILCON projects. June 2001 D6005 All ship (pierside) and shore voice, video and data requirements Procures shore Local Area Network, Base Area Network and Metropolitan Area Network cable plant, switches, hubs, routers, basic network and information distributi servers and workstations in support of the C4I upgrades associated with Military Construction (MILCON) projects for USPACOM and NAVCEN MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED DESCRIPTION/JUSTIFICATION: DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Gulf Region Europe Region Far East Region Other Requirements Production Support Other (DSA) Installation of Hardware PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0 0.0 0 0.0 TOTAL PROCUREMENT COST 0 0.0 0 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: INPUT FY 00 Qty $ FY 01 Qty $ 0.0 0 0 1 8.8 1 4.7 1 4.7 0.0 0.0 1 1 4.7 13.5 FY 02 Qty $ 1 FY 03 Qty $ FY 04 Qty $ FY 05 Qty $ FY 06 Qty $ FY 07 Qty $ 1 8.3 1 8.3 1 1 ADMINISTRATIVE LEADTIME: 1 Mo PRODUCTION LEADTIME: FY 2001 Nov-00 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000 N/A FY 2001 Var FY 2002: Var FY 2003: FY 01 3 4 1 $ 8.3 23.8 N/A 2 Qty 12.7 FY 2000 1 Total $ 2.8 CONTRACT DATES: PY TC Qty 1 2 FY 02 3 FY 03 4 1 2 4 1 2 3 Mos FY 04 3 4 1 3 4 TC 2 3 4 1 OUTPUT FY 05 INSTALLATION SCHEDULE: 1 2 FY 06 3 4 1 2 FY 07 3 TOTAL INPUT OUTPUT Notes/Comments 1) Gulf Region: C4I upgrades to support MILCON P903/904 (NAVCENT Hq Bld). Estimated Completion Date: Third Quarter, FY04 2) Far East Region: C4I upgrades and equipment transition in support of MILCON (USPACOM Command Center). Estimated Completion Date: First Quarter, FY04 P-1 Shopping List-Item No - 90 - 13 of 14 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT P-1 ITEM NOMENCLATURE 336800 NAVAL SHORE COMMUNICATIONS ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P A A A A 42 1 1 1 14 A 2 1 MAY JUN JUL OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY D6001 1,2 Defense Messaging Systems 01 02 D6005 4 Var 4 Var 12 8 3 20 580 1 2 12 8 3 20 580 1 2 1 2 1 83 1 3 1 2 1 83 1 3 01 SUBHEAD NO. 52D6 FISCAL YEAR CALENDAR YEAR A 01 02 FISCAL YEAR CALENDAR YEAR 02 03 CALENDAR YEAR 03 4 A V BLII BLII - Wide Area Network (WAN) 01 BLII - Regional Netork Operating Center (RNOC) 01 BLII - Metropolitan Area Network (MAN) 01 BLII - Base Area Network (BAN) 01 BLII - Local Area Network (LAN) 01 BLII - Equipment - MILCON projects 01 BLII - Voice 01 BLII - Wide Area Network (WAN) 02 BLII - Regional Netork Operating Center (RNOC) 02 BLII - Base Area Network (BAN) 02 BLII - Local Area Network (LAN) 02 BLII - Equipment - MILCON projects 02 BLII - Voice 02 1/ In FY01 Quantities reflect total number of regions serviced. A 4 A 3 A 1 A 7 A 290 97 A 4 3 1 7 97 4 2 1 6 96 1 A 1 1 A OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV 1 14 13 AUG SEP 1 DEC JAN FEB MAR APR 2/ V = Various PRODUCTION RATE PROCUREMENT LEADTIMES Manufacturer’s ITEM Name and Location MSR 1-8-5 MAX P-1 Shopping List-Item No - 90 - 14 of 14 ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT Unit of Total Measure Exhibit P-21 Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT PY June 2001 DATE P-1 ITEM NOMENCLATURE 341500- ISSP (Information System Security Program) FY 2000 FY 2001 FY 2002 $61.6 $58.0 $78.2 FY 2003 FY 2004 FY 2005 FY 2006 SUBHEAD 52DA FY 2007 TO COMP TOTAL QUANTITY COST (in millions) P.E. #0303140N PROGRAM COVERAGE: The Information Systems Security Program (ISSP) provides funds for procurement of secure communications equipment for Navy Ships, shore sites, aircraft, Marine Corps, and U.S. Coast Guard to PROTECT information systems from unauthorized access or modification of information, and against the denial of service to authorized users or provision of service to unauthorized users. Information Assurance is a layered protection strategy, using COTS and GOTS hardware and software products, that collectively provides an effective Network Security Infrastructure (multiple level security mechanisms and ability to detect and react to intrusions). Information Assurance is critical in protecting our ability to wage Network Centric Warfare. The following ISSP specific efforts will be funded under this program: SECURE VOICE: The Secure Voice program procures equipment to secure voice communications. Equipment’s to be procured in FY 02 include Secure Terminal Equipment (STE), Secure Voice for the 21st Century (SV-21) Inter-Working Function (IWF), associated ancillary, production and installation support efforts. The STE is a ship and shore desktop terminal for classified voice, data, facsimile, and video conferencing and will replace the existing STU-III units via a phased approach. Various configurations of STE’s will be procured (Office, Tactical, C2, Condor (wireless), Portable UPS, PTT handsets, Data, Cellular, Direct Dial Gateway/Inter-Working Function (IWF)) along with companion Security Token cards (KOV-14’s). SECURE DATA: The Secure Data program procures equipment to secure record and data communications. Equipment’s to be procured in FY 02 include Network Firewall Security Suites (NFSS) and Cryptographic (CRYPTO)/Communication Security (COMSEC) Equipment, associated ancillary, production and installation support efforts. The NFSS program procures equipment to secure Navy network information systems. Procurements within the NFSS equipment line are: Standard Mail Guard (SMG), which allows two way flow between SECRET high Local Area Networks (LANs) and Unclassified LANs, FIREWALL components which provide protection for networks from unauthorized users, Virtual Private Networks (VPN’s) which provides encrypted "Point-to-Point" virtual communication network, IDS (Intrusion Detection Systems) , Coalition Data Servers (COD’s), Administrator Tool Kits, Network Security tools, Network Intrusion filters, and token access controllers. Equipments to be procured in FY 02 and under Crypto/COMSEC include: KG family of cryptos, Fastlanes (KG-75), Taclanes (KG-175), Sonets (KG-189), KIV-6, KIV-7’s, KIV-19’s, Programmable Embedded Infosec Product (PEIP), and Hayfield Chips. KEY MANAGEMENT INFRASTRUCTURE (KMI): The Key Management program is a COMSEC key distribution and hardware management system consisting of interoperable Joint Service and Civil Agency key management systems. NSA established the Electronic Key Management System (EKMS) program to meet multiple objectives, which includes supplying electronic key in a secure and operationally responsive manner and providing COMSEC managers with an automated system capable of ordering, generation, distribution, storage, security, accounting, and access control. The FY 02 procurements include Local Management Device (LMD)/Local COMSEC Management System (LCMS) Tier 2 Central Processing Unit (CPU) replacement upgrades, EKMS Upgrades (hardware and software), DTD CYZ-10 Upgrades, Data Transfer Devices (DTDs) 2000 (KOV-21), Defense Message System (DMS) security products, Public Key Infrastructure (PKI) security products, ancillaries, associated production and installation support efforts. The LMD is a commercial off the shelf computer that runs LCMS software which controls the Key Processor Equipment (KPE), and provides the COMSEC manager with improved security and enhanced management capabilities. CYZ-10 upgrades will convert existing DTD’s from Version 2 to Version 3 for USMC applications. For DMS security applications, procurement of Certification Authority Workstations (CAWs) , Standard Mail Guards (SMG's), and associated KOV-11 Fortezza cards which creates, initializes, programs, and distributes the Security Token card and provides certificate management infrastructure. The DTD (Tier 3) stores, manages, transfers and loads key and COMSEC data through automatic loading of ECU's (End Crypto Units). DTD-2000 (KOV-21) Tier 3 provides the next generation DTD which is based on a PCMCIA card (crypto engine) and COTS (Commercial Off-The-Shelf) commercial notebook/palmtop computer. Public Key Infrastructure (PKI) provides digital certificate management to authenticate the identity of users on networks as well as to encrypt electronic information flowing over those networks. Procurements include: Component Authority Devices (CAD), Token readers, Tokens for Classified users, Class 4 tokens, Local Registration Authority (LRA) workstations. The Security Token card provides writer to reader security for Local Area Networks (LANs). P-1 Shopping List-Item No - 91 -1 of 91 -15 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET (Continued) APPROPRIATION/BUDGET ACTIVITY OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DATE P-1 ITEM NOMENCLATURE 341500- ISSP (Information System Security Program) June 2001 SUBHEAD 52DA JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: The procurement profile has been phased in accordance with internally generated and validated requirements by N643 for Navy, Marines, and Coast Guard implementation plans and availability of NSA procured key management items. INSTALLING AGENT: The ISSP equipment will be installed by the In-Service Engineering Acti