DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2001 BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES FEBRUARY 2000 PROCUREMENT, MARINE CORPS BUDGET ACTIVITY 6 UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2001 PROCUREMENT PROGRAM SUMMARY ($ IN MILLIONS) APPROPRIATION: PROCUREMENT, MARINE CORPS ------------------------------------ACTIVITY -------- February 2000 FY 1999 ------- FY 2000 ------- FY 2001 ------- 103.7 172.6 176.6 86.8 96.4 87.6 04. COMMUNICATIONS AND ELECTRONICS EQUIPMENT 395.5 544.9 272.3 05. SUPPORT VEHICLES 166.6 282.7 487.5 06. ENGINEER AND OTHER EQUIPMENT 78.2 166.4 122.6 07. SPARES AND REPAIR PARTS 26.7 31.2 25.4 857.5 1,294.2 1,171.9 02. WEAPONS AND COMBAT VEHICLES 03. GUIDED MISSILES AND EQUIPMENT TOTAL PROCUREMENT, MARINE CORPS P-1: 35 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2001 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1109N PROCUREMENT, MARINE CORPS DATE: February 2000 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- BUDGET ACTIVITY 02: ------------------- IDENT FY 1999 CODE QUANTITY COST ----- -------- ------- FY 2000 QUANTITY COST -------- ------- FY 2001 QUANTITY COST -------- ------- S E C - WEAPONS AND COMBAT VEHICLES TRACKED COMBAT VEHICLES 1 AAV7A1 PIP A 170 89.6 2 RAPID ACQUISITION PROGRAM A 3 LAV PIP A 4 IMPROVED RECOVERY VEHICLE (IRV) A 5 MODIFICATION KITS (TRKD VEH) A 7.7 6 ITEMS UNDER $2M (TRKD VEH) A .1 7 MOD KITS (ARTILLERY) B 2.8 8 ITEMS UNDER $2M (ALL OTHER) B .1 9 MARINE ENHANCEMENT PROGRAM B 2.1 1.4 170 80.1 170 1.7 16 82.8 83.4 U 4.9 U 1.7 U 42.6 U 20.8 U U ARTILLERY AND OTHER WEAPONS 10 WEAPONS AND COMBAT VEHICLES UNDER $5 M A 3.3 3.9 U U 2.9 6.4 U .3 .4 U 11.1 U 1.3 ------176.6 U WEAPONS 11 155MM LIGHTWEIGHT TOWED HOWITZER B OTHER SUPPORT 12 OPERATIONS OTHER THAN WAR A ------103.7 TOTAL WEAPONS AND COMBAT VEHICLES BUDGET ACTIVITY 03: ------------------- 1.5 ------172.6 GUIDED MISSILES AND EQUIPMENT GUIDED MISSILES 13 EADS MOD A 1.0 P-1: 36 UNCLASSIFIED U UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2001 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1109N PROCUREMENT, MARINE CORPS DATE: February 2000 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 1999 CODE QUANTITY COST ----- -------- ------- 14 JAVELIN (MYP) LESS: ADVANCE PROCUREMENT (PY) A 15 PEDESTAL MOUNTED STINGER (PMS) A 16 ITEMS UNDER $5 MILLION A 17 PREDATOR (SRAW) A 741 (90.7) (-8.0) ------82.7 FY 2000 QUANTITY COST -------- ------998 (92.7) FY 2001 QUANTITY COST -------- ------293 ------92.7 3.2 S E C - (29.1) U U ------29.1 10.6 U .9 U 43.4 U 3.6 ------87.6 U ------96.4 3.7 698 OTHER SUPPORT 18 MODIFICATION KITS A ------86.8 TOTAL GUIDED MISSILES AND EQUIPMENT BUDGET ACTIVITY 04: ------------------- COMMUNICATIONS AND ELECTRONICS EQUIPMENT REPAIR AND TEST EQUIPMENT 19 AUTO TEST EQUIP SYS B 29.2 28.9 4.7 U 20 GENERAL PURPOSE ELECTRONIC TEST EQUIP. A 9.1 10.6 8.2 U 21 AN/TPQ-36 FIRE FINDER RADAR UPGRADE A .6 22 INTELLIGENCE SUPPORT EQUIPMENT B 10.1 19.0 12.0 U 23 MOD KITS (INTEL) A 5.2 18.4 5.0 U 24 ITEMS UNDER $5 MILLION (INTELL) A 2.1 .4 U 25 ITEMS LESS THAN $2M (INTELL) A 3.1 A 4.5 4.7 4.7 U B 23.6 17.4 14.4 U INTELL/COMM EQUIPMENT (NON-TEL) U U REPAIR AND TEST EQUIPMENT (NON-TEL) 26 GENERAL PURPOSE MECHANICAL TMDE OTHER COMM/ELEC EQUIPMENT (NON-TEL) 27 NIGHT VISION EQUIPMENT P-1: 37 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2001 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1109N PROCUREMENT, MARINE CORPS DATE: February 2000 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 1999 CODE QUANTITY COST ----- -------- ------- FY 2000 QUANTITY COST -------- ------- FY 2001 QUANTITY COST -------- ------- S E C - OTHER SUPPORT (NON-TEL) 28 ITEMS UNDER $5 MILLION (COMM & ELEC) A 11.1 8.3 U 29 COMMON COMPUTER RESOURCES A 104.1 80.7 U 30 COMMAND POST SYSTEMS A 24.1 4.4 9.5 U 31 MANEUVER C2 SYSTEMS B 9.5 6.8 32 RADIO SYSTEMS B 45.9 96.2 3.1 U 33 COMM SWITCHING & CONTROL SYSTEMS B 62.0 62.0 3.2 U 34 COMM & ELEC INFRASTRUCTURE SUPPORT A 114.2 123.5 80.6 U 35 MOD KITS MAGTF C41 B 33.1 18.5 7.5 U 36 ITEMS < $2M MAGTF C41 A 8.6 U 37 ITEMS < $2M (OTHER) A 4.8 U 38 AIR OPERATIONS C2 SYSTEMS A 7.8 39 INTELLIGENCE C2 SYSTEMS A 40 FIRE SUPPORT SYSTEM A ------395.5 TOTAL COMMUNICATIONS AND ELECTRONICS EQUIPMENT BUDGET ACTIVITY 05: ------------------- U 4.1 3.2 U 8.2 14.7 U 5.0 ------544.9 12.3 ------272.3 U 1.4 U 23.4 U SUPPORT VEHICLES ADMINISTRATIVE VEHICLES 41 COMMERCIAL PASSENGER VEHICLES A 42 COMMERCIAL CARGO VEHICLES A 31 .9 43 17.8 1.3 33 8.8 TACTICAL VEHICLES 43 5/4T TRUCK HMMWV (MYP) A 15 2.2 1918 124.4 1859 124.4 U 44 MEDIUM TACTICAL VEHICLE REPLACEMENT (M B 240 69.5 788 138.3 2027 325.6 U P-1: 38 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2001 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1109N PROCUREMENT, MARINE CORPS DATE: February 2000 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 1999 CODE QUANTITY COST ----- -------- ------- 45 LT TACTICAL VEHICLE REPLACEMENT(LTVR) A 46 LOGISTICS VEHICLE SYSTEM REP 1122 FY 2000 QUANTITY COST -------- ------- FY 2001 QUANTITY COST -------- ------- S E C - 68.8 U A 3.8 U 47 ITEMS LESS THAN $2 MIL A 3.6 U 48 ITEMS LESS THAN $5 MILLION A OTHER SUPPORT TOTAL SUPPORT VEHICLES BUDGET ACTIVITY 06: ------------------- 9.9 ------282.7 12.7 ------487.5 U ------166.6 3.0 3.6 3.8 U ENGINEER AND OTHER EQUIPMENT ENGINEER AND OTHER EQUIPMENT 49 ENVIRONMENTAL CONTROL EQUIP ASSORT A 50 BULK LIQUID EQUIPMENT A 3.2 2.7 U 51 TACTICAL FUEL SYSTEMS A 9.7 7.7 U 52 DEMOLITION SUPPORT SYSTEMS A 2.9 3.4 .7 U 53 POWER EQUIPMENT ASSORTED A 9.0 10.8 9.3 U 54 SHOP EQ CONTACT MAINTENANCE (SECM) A 8.4 3.3 55 CANCELLED ACCOUNT ADJUSTMENT (M) A 8.2 56 COMMAND SUPPORT EQUIPMENT A 4.9 57 AMPHIBIOUS RAID EQUIPMENT A 2.8 58 PHYSICAL SECURITY EQUIPMENT A 1.9 5.6 5.3 U 59 GARRISON MOBILE ENGR EQUIP A 5.5 6.9 5.7 U 60 WAREHOUSE MODERNIZATION A 1.5 61 MATERIAL HANDLING EQUIP A 11.9 U U MATERIALS HANDLING EQUIPMENT P-1: 39 UNCLASSIFIED 2.0 U U U 66.0 36.3 U UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2001 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1109N PROCUREMENT, MARINE CORPS DATE: February 2000 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- 62 FIRST DESTINATION TRANSPORTATION IDENT FY 1999 CODE QUANTITY COST ----- -------- ------- FY 2000 QUANTITY COST -------- ------- FY 2001 QUANTITY COST -------- ------- S E C - A 3.1 4.1 5.8 U 63 FIELD MEDICAL EQUIPMENT A 2.2 7.9 1.9 U 64 TRAINING DEVICES B 3.3 13.8 30.8 U 65 CONTAINER FAMILY A 6.4 5.7 6.9 U 66 MODIFICATION KITS A 1.3 1.0 67 ITEMS LESS THAN $2 MIL A 2.0 68 ITEMS LESS THAN $5 MILLION A 69 CANCELLED ACCOUNT ADJUSTMENT (M) A GENERAL PROPERTY OTHER SUPPORT TOTAL ENGINEER AND OTHER EQUIPMENT BUDGET ACTIVITY 07: ------------------- U U 12.0 5.6 ------78.2 7.5 ------166.4 ------122.6 26.7 ------26.7 ------857.5 31.2 ------31.2 ------1,294.2 25.4 ------25.4 ------1,171.9 U U SPARES AND REPAIR PARTS SPARES AND REPAIR PARTS 70 SPARES AND REPAIR PARTS TOTAL SPARES AND REPAIR PARTS TOTAL PROCUREMENT, MARINE CORPS A P-1: 40 UNCLASSIFIED U Procurement, Marine Corps Program and Financing (in Thousands of dollars) -----------------------------------------------------------------------------------------------------------------------------------Budget Plan (amounts for PROCUREMENT Obligations actions programed) ------------------------------------- ------------------------------------Identification code 17-1109-0-1-051 1999 actual 2000 est. 2001 est. 1999 actual 2000 est. 2001 est. -----------------------------------------------------------------------------------------------------------------------------------Program by activities: Direct program: 00.0201 Weapons and combat vehicles 103,115* 172,571 176,620 104,236 150,001 188,304 00.0301 Guided missiles and equipment 86,335* 96,442 87,571 85,911 79,092 81,754 00.0401 Communications and electronics equipment 405,790* 544,905 272,326 367,641 534,854 313,946 00.0501 Support vehicles 156,134* 282,685 487,479 161,259 234,044 419,714 00.0601 Engineer and other equipment 69,759* 166,424 122,557 130,465 136,231 114,010 00.0701 Spares and repair parts 36,337* 31,192 25,382 24,598 37,768 27,823 ----------- ----------- ----------- ----------- ----------- ----------00.9101 Total direct program 857,470 1,294,219 1,171,935 874,110 1,171,990 1,145,551 01.0101 10.0001 Reimbursable program Total Financing: Offsetting collections from: 11.0001 Federal funds(-) 17.0001 Recovery of prior year obligations Unobligated balance available, start of year: 21.4002 For completion of prior year budget plans 21.4003 Available to finance new budget plans 21.4009 Reprograming from/to prior year budget plan Unobligated balance available, end of year: 24.4002 For completion of prior year budget plans 24.4003 Available to finance subsequent year budget 25.0001 Unobligated balance expiring 249# 9,400 ----------- ----------857,719 1,303,619 -249 -9,400 -5,000 9,400 ----------1,181,335 250 ----------874,360 9,400 ----------1,181,390 9,400 ----------1,154,951 -9,400 10,004 -21,999 -9,400 -9,400 -164,794 -155,280 -5,000 -277,509 -4,619 155,280 277,509 303,893 5,000 5,000 4,619 4,619 ----------- ----------- ----------- ----------- ----------- ----------39.0001 Budget authority 862,470 1,289,219 1,171,935 862,470 1,289,219 1,171,935 -----------------------------------------------------------------------------------------------------------------------------------Budget authority: 40.0001 Appropriation 872,216 1,300,920 1,171,935 872,216 1,300,920 1,171,935 40.3601 Unobligated Balance Rescinded -5,000 -5,000 40.7601 Reduction pursuant to P.L. 106-113(-), Titl -6,701 -6,701 40.7701 Reduction pursuant to P.L. 105-262 (-), 813 -15,700 -15,700 41.0001 Transferred to other accounts (-) -9,977 -9,977 42.0001 Transferred from other accounts 15,931 15,931 ----------- ----------- ----------- ----------- ----------- ----------43.0001 Appropriation (adjusted) 862,470 1,289,219 1,171,935 862,470 1,289,219 1,171,935 ------------------------------------------------------------------------------------------------------------------------------------ Notes: (*) For FY 1999, differences between authorized amounts cited for budget activities in the budget and the Program and Financing exhibit are the result of minor reprogrammings not reflected in the official 30 September 1999 accounting reports. (#) For FY 1999, differences between authorized reimbursable amounts in the budget and this Program and Financing exhibit are the result of updates which were not reflected in the official 30 September 1999 accounting reports. Procurement, Marine Corps Program and Financing (in Thousands of dollars) -----------------------------------------------------------------------------------------------------------------------------------Budget Plan (amounts for PROCUREMENT Obligations actions programed) ------------------------------------- ------------------------------------Identification code 17-1109-0-1-051 1999 actual 2000 est. 2001 est. 1999 actual 2000 est. 2001 est. -----------------------------------------------------------------------------------------------------------------------------------Relation of obligations to outlays: 71.0001 Obligations incurred 884,364 1,171,990 1,145,551 72.4001 Obligated balance, start of year 583,057 852,557 1,207,987 74.4001 Obligated balance, end of year -852,557 -1,207,987 -1,336,913 77.0001 Adjustments in expired accounts (net) -420 78.0001 Adjustments in unexpired accounts -21,999 ----------- ----------- ----------90.0001 Outlays (net) 592,445 816,560 1,016,625 ------------------------------------------------------------------------------------------------------------------------------------ Procurement, Marine Corps Object Classification (in Thousands of dollars) -----------------------------------------------------------------------------------------------------------------------------------Identification code 17-1109-0-1-051 1999 actual 2000 est. 2001 est. -----------------------------------------------------------------------------------------------------------------------------------Direct obligations: 125.101 Advisory and assistance services 6,049 8,297 7,549 Purchases goods/services from Government accounts 125.303 Purchases from revolving funds 46,816 75,733 74,456 126.001 Supplies and materials 23,521 131.001 Equipment 797,724 1,087,960 1,063,546 ----------- ----------- ----------199.001 Total Direct obligations 874,110 1,171,990 1,145,551 Reimbursable obligations: 231.001 Equipment 299.001 Total Reimbursable obligations 250 ----------250 999.901 Total obligations ----------874,360 9,400 ----------9,400 9,400 ----------9,400 ----------1,181,390 ----------1,154,951 Comparison of FY 2000 Program Requirements as Reflected in the FY 2000 Budget with the FY 2000 Requirements as shown in the FY 2001 Budget DATE: February 2000 Summary of Requirements (In Millions of Dollars) Total Program Requirements per FY 2000 Budget Total Program Requirements per FY 2001 Budget Increase or Decrease (-) 113.3 172.6 59.3 96.5 96.4 -0.1 BA 4: COMMUNICATIONS & ELECTRONICS EQUIPMENT 470.1 544.9 74.8 BA 5: SUPPORT VEHICLES 282.8 282.7 -0.1 BA 6: ENGINEER & OTHER EQUIPMENT 137.0 166.4 29.4 37.5 31.2 -6.3 1137.2 1294.2 157.0 9.4 9.4 0.0 1146.6 1303.6 157.0 NOMENCLATURE BA 2: WEAPONS & TRACKED COMBAT VEHICLES BA 3: GUIDED MISSILES & EQUIPMENT BA 7: SPARES & REPAIR PARTS Subtotal Direct Program Reimbursable Total Fiscal Year UNCLASSFIED Comparison of FY 2000 Program Requirements as Reflected in the FY 2000 Budget with the FY 2000 Requirements as shown in the FY 2001 Budget Summary of Requirements (In Millions of Dollars) BA 2: Weapons and Tracked Combat Vehicles +$59.3 Changes reflect Congressional add ($60.5) for upgrade of M88A1 Recovery Vehicles to the M88A2 Improved Recovery Vehicle variant and Congressional across-the-board reduction (-$1.2). BA 3: Guided Missiles and Equipment -$0.1 Change reflects Congressional across-the-board reduction (-$0.1). BA 4: Communications and Electronics Equipment +$74.8 Changes reflect Congressional adds for K-Band Test Obscuration Pairing System ($2.8), Night Vision Equipment ($8.5), Next Generation EPLRS ($10.9), upgrade and replacement of key information transfer components at located inside buildings on Marine Corps bases and stations ($45.0), modification of the Ground Based Common Sensor for integration into the Mobile Electronic Warfare Support System (MEWSS) Light Armored Vehicle ($3.0), Shortstop Electronic Protection System ($5.0), and below threshhold reprogrammings ($3.4). Reductions reflect the Congressional across-the-board reduction (-$3.9 BA 5: Support Vehicles -$0.1 Change reflects Congressional across-the-board reduction (-$0.1). BA 6: Engineer and Other Equipment +$29.4 Changes reflect Congressional adds for Ultimate Building Machine ($2.0), remanufacture of D-7G Bulldozers ($16.5), Chemical Biological Incident Respon Team ($3.0), Small Unit Biological Detector ($2.5), Laser Levelinig Equipment ($1.0), Distance Learning ($3.0), and below threshhold reprogrammings ($2 Reductions reflect the Congressional across-the-board reduction (-$1.2). BA 7: Spares and Repair Parts -$6.3 Changes reflect below threshhold reprogrammings (-$6.0) and Congressional across-the-board reduction (-$0.3). UNCLASSFIED Comparison of FY 2000 Program Requirements as Reflected in the FY 2000 Budget with the FY 2000 Requirements as shown in the FY 2001 Budget Summary of Requirements (In Millions of Dollars) Description Program Requirements (Total) (Total Direct) (Total Reimbursable) Less: Anticipated Reimbursements Financing per FY 2000 Budget Financing per FY 2001 Budget 1146.6 (1137.2) (9.4) 1303.6 (1294.2) (9.4) 9.4 9.4 Increase or Decrease (-) 157.0 (157.0) 0.0 0.0 Explanation of Changes in Financing: The $157.0 million increase in program requirements is the result of Congressional adds ($163.7), below threshhold reprogrammings (net zero), and Congressional across-the-board adjustments (-$6.7). UNCLASSFIED Comparison of FY 1999 Program Requirements as Reflected in the FY 2000 Budget with the FY 1999 Requirements as shown in the FY 2001 Budget DATE: February 2000 Summary of Requirements (In Millions of Dollars) Total Program Requirements per FY 2000 Budget Total Program Requirements per FY 2001 Budget Increase or Decrease (-) 103.7 103.7 0.0 86.8 86.8 0.0 BA 4: COMMUNICATIONS & ELECTRONICS EQUIPMENT 386.7 395.5 8.7 BA 5: SUPPORT VEHICLES 156.1 166.6 10.5 BA 6: ENGINEER & OTHER EQUIPMENT 74.2 78.2 4.0 BA 7: SPARES & REPAIR PARTS 38.9 26.7 -12.2 846.5 857.5 10.9 9.4 9.4 0.0 855.9 866.9 10.9 NOMENCLATURE BA 2: WEAPONS & TRACKED COMBAT VEHICLES BA 3: GUIDED MISSILES & EQUIPMENT Subtotal Direct Program Reimbursable Total Fiscal Year UNCLASSFIED Comparison of FY 1999 Program Requirements as Reflected in the FY 2000 Budget with the FY 1999 Requirements as shown in the FY 2001 Budget Summary of Requirements (In Millions of Dollars) BA 2: Weapons and Tracked Combat Vehicles $0.0 BA 3: Guided Missiles and Equipment $0.0 BA 4: Communications and Electronics Equipment +$8.7 Changes reflect below threshhold reprogramming for Y2K Switches ($15.7), various other minor below threshhold reprogrammings (-$2.0), and Section 8090 Inflation Reduction (-$5.0). BA 5: Support Vehicles +$10.5 Changes reflect various below threshhold reprogrammings for Commercial Cargo Vehicles ($9.0), Commercial Passenger Vehicles (-$0.4), 5/4 Ton Truck HMMWV ($0.5), Light Tactical Vehicle Replacement ($0.7), and Logistics Vehicle System Replacement ($0.7). BA 6: Engineer and Other Equipment +$4.0 Changes reflect below threshhold adjustments for Assorted Power Equipment (-$0.6), Amphibious Raid Equipment (-$0.9), Material Handling Equipment ($0.5), First Destination Transportation (-$2.8), Containers (-$0.7), other assorted items ($0.2), and Cancelled Account Adjustments ($8.2). BA 7: Spares and Repair Parts -$12.2 Changes reflect below threshhold reprogramming (-$12.2). UNCLASSFIED Comparison of FY 1999 Financing as Reflected in the FY 2000 Budget with the FY 1999 Financing as shown in the FY 2001 Budget Summary of requirements (In millions of Dollars) Description Program Requirements (Total) (Total Direct) (Total Reimbursable) Less: Anticipated Reimbursements Financing per FY 2000 Budget Financing per FY 2001 Budget 855.9 (846.5) (9.4) 866.9 (857.5) (9.4) (9.4) (9.4) Explanation of Changes in Financing: Changes reflect various reprogrammings ($15.9) and Section 8090 Inflation Reduction (-$5.0). UNCLASSFIED Increase or Decrease (-) 10.9 (10.9) 0.0 0.0 Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: ENVIRONMENTAL CONTROL EQUIPMENT, ASSORT (P66456) Code: Other Related Program Elements: Prior Years FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 9.2 3.0 3.6 3.8 3.6 3.8 4.1 4.2 CONT CONT 9.2 3.0 3.6 3.8 3.6 3.8 4.1 4.2 CONT CONT 0.1 0.06 3.1 CONT CONT Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares Total Proc Cost 9.2 3.6 3.8 3.6 3.8 4.1 4.2 Flyaway U/C Wpn Sys Proc U/C The Environmental Control Equipment Program includes funds for military standard air conditioners which are required for cooling, dehumidifying, heating, filtering, and circulating air within tactical equipment. Electronic maintenance shops, radar systems, communications centers, and data computer systems are examples of tactical equipment requiring environmental control. Six to eight various contractors produce environmental control units. Bli No. 605400 Item No. 49 Page 1 of 10 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: ID CD TotalCost $OOO Qty Each UnitCost $ TotalCost $OOO FY 99 Qty Each UnitCost $ A/C VERTICAL 36000 BTU/MPI (B0013) SMALL MOBILE WATER CHILLER ENHANCED REFRIGERATION UNIT(B1645) RECYCLING UNIT Weapon System Type: Date: Procurement, Marine Corps (1109) / Engineer and Other Equipment ENVIRONMENTAL CONTROL EQUIPMENT, ASSORT (6) (P66456) 996 107 9308 1238 225 5500 52 12 4333 February 2000 TotalCost $OOO 469 FY 00 Qty Each 50 UnitCost $ 9380 407 74 5500 A/C HORIZONTAL 9000 BTU (B0001) A/C VERTICAL 54000 BTU (B0011) TotalCost $OOO 938 FY 01 Qty Each 100 UnitCost $ 9380 157 30 5243 873 91 9593 1839 188 9784 SKID ASSEMBLY (B2004) 1037 250 4148 635 150 4230 SKID ASSEMBLY (B2006) 652 150 4347 102 23 4433 TRAVEL ILS SUPPORT 16 13 12 708 123 99 29 27 3603 3349 254 3809 3524 285 NEW EQUIPMENT TRAINING NON RECURRING COST TOTAL Active Reserve Bli No. 605400 3010 2776 234 Item No. 49 Page 2 of 10 Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-5a, Budget Procurement History and Planning February 2000 Weapon System Type: Appropriation / Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) ENVIRONMENTAL CONTROL EQUIPMENT, ASSORT (P66456) WBS Cost Elements: Contract Method Contractor and Location Fiscal Years Location of PCO Award Date Date of First and Type Delivery QTY Unit Cost Each $ Specs Avail? Date Revsn RFP Issue Date Avail A/C VERTICAL 36000 BTU/MPI (B0013) ENV. SYS. INC, JACKSONVILLE,FL MIPR MIPR CECOM, MONMUTH, NJ CECOM, MONMUTH, NJ Apr-00 Oct-00 Jan-02 Jul-01 50 100 9380 YES 9380 YES NO NO N/A N/A SMALL MOBILE WATER CHILLER FY 99 WARRIOR, XENIA, OH MIPR TACOM, WARREN, MI Mar-99 Jun-00 107 9308 YES NO N/A ENHANCED REFRIGERATION UNIT(B1645) FY 99 FY 00 THERMO KING CORP, MINN, MN THERMO KING CORP, MINN, MN MIPR MIPR USASSC, NATICK, MA USASSC, NATICK, MA Sep-99 Apr-00 Apr-00 Jun-00 225 74 5500 YES 5500 YES NO NO N/A N/A R&R ENTERPRISES, MANOS, CO MIPR USASSC, NATICK, MA Feb-99 May-99 12 4333 YES NO N/A TBD MIPR CECOM, MONMOUTH, NJ Oct-00 May-02 30 5243 YES NO N/A FY 00 FY 01 RECYCLING UNIT FY 99 ENV. SYS. INC, JACKSONVILLE,FL A/C HORIZONTAL 9000 BTU (B0001) FY 01 REMARKS: Bli No. 605400 Item No. 49 Page 3 of 10 Exhibit P5-A, Procurement History and Planning Date: Exhibit P-5a, Budget Procurement History and Planning Weapon System Type: Appropriation / Budget Activity/Serial No: February 2000 P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) ENVIRONMENTAL CONTROL EQUIPMENT, ASSORT (P66456) WBS Cost Elements: Contractor and Location Fiscal Years Contract Method Location of PCO and Type Award Date Date of First Delivery QTY Unit Cost Each $ Specs Avail? Date Revsn RFP Issue Date Avail A/C VERTICAL 54000 BTU (B0011) FY00 FY 01 TBD TBD MIPR MIPR CECOM, MONMOUTH, NJ CECOM, MONMOUTH, NJ Apr-00 Aug-01 Oct-00 Dec-01 91 188 9593 YES 9784 YES NO NO N/A N/A SKID ASSEMBLY (B2004) FY 00 FY 01 UNICOR, WASHINGTON, DC UNICOR, WASHINGTON, DC MIPR MIPR UNICOR, WASH, DC UNICOR, WASH, DC Oct-99 May-00 Oct-00 May-01 250 150 4148 YES 4230 YES NO NO N/A N/A UNICOR, WASHINGTON, DC UNICOR, WASHINGTON, DC MIPR MIPR UNICOR, WASH, DC UNICOR, WASH, DC Feb-00 Aug-00 Oct-00 Apr-01 150 23 4347 YES 4433 YES NO NO N/A N/A SKID ASSEMBLY (B2006) FY 00 FY 01 REMARKS: Bli No. 605400 Item No. 49 Page 4 of 10 Exhibit P5-A, Procurement History and Planning P-1 Item Nomenclature: ENVIRONMENTAL CONTROL EQUIPMENT, ASSORT (P66456) FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS A/C VERTICAL 36000 BTU/MPI (B0013) SMALL MOBILE WATER CHILLER ENHANCED REFRIGERATION UNIT (B1645) S PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT M F R FY E R V 1 1 FY 00 FY 01 MC MC 50 100 0 0 50 100 2 FY 99 MC 107 0 107 3 3 FY 99 FY 00 MC MC 225 74 0 0 225 74 4 FY 99 MC 12 0 12 Date: February 2000 Fiscal Year 98 Calendar Year 98 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 99 Calendar Year 99 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L L A U G S E P A T E R 50 100 A 107 A 225 74 RECYCLING UNIT A O C T PRODUCTION RATES M F R 1 2 3 4 5 6 NAME / LOCATION ENVIRONMENTAL SYS INC, JACKSONVILLE, FL WARRIOR, XENIA, OH (SMWC) THERMO KING CORP, MINNEAPOLIS, MN R&R ENTERPRISES, MANOS, CO UNICOR, WASHINGTON, DC TBD (B0001, B0011) MIN. 50 20 100 50 50 1-8-5 200 40 100 200 200 MAX. 250 40 200 250 250 N O V MFR REACHED Number D+ 1 2 3 4 5 Bli No. 605400 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 49 Page 5 of 10 O C T N O V D E C J A N F E B 12 M A R MFR After 1 Oct. TOTAL After 1 Oct. 5 19 24 4 19 23 10 19 29 10 19 29 0 19 19 A P R M A Y J U N J U L A U G S E P REMARKS Exhibit P-21, Production Schedule P-1 Item Nomenclature: ENVIRONMENTAL CONTROL EQUIPMENT, ASSORT (P66456) FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS S PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT Date: February 2000 Fiscal Year 98 Calendar Year 98 Fiscal Year 99 Calendar Year 99 L A T E R M F R FY E R V 6 FY01 MC 30 0 30 30 5 5 FY00 FY01 MC MC 250 150 0 0 250 150 250 5 5 FY00 FY01 MC MC 150 23 0 0 150 23 150 6 6 FY00 FY01 MC MC 91 188 0 0 91 188 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A/C HORIZONTAL 9000 BTU (B0001) SKID ASSEMBLY (B2004) 150 SKID ASSEMBLY (B2006) 23 A/C VERTICAL 54000 BTU (B0011) 91 188 O C T PRODUCTION RATES M F R 1 2 3 4 5 6 NAME / LOCATION ENVIRONMENTAL SYS INC, JACKSONVILLE, FL WARRIOR, XENIA, OH (SMWC) THERMO KING CORP, MINNEAPOLIS, MN R&R ENTERPRISES, MANOS, CO UNICOR, WASHINGTON, DC TBD (B0001, B0011) MIN. 50 20 100 50 50 1-8-5 200 40 100 200 200 MAX. 250 40 200 250 250 N O V MFR REACHED Number D+ 1 2 3 4 5 Bli No. 605400 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 49 Page 6 of 10 O C T N O V D E C J A N F E B M A R MFR After 1 Oct. TOTAL After 1 Oct. 5 19 24 4 19 23 10 19 29 10 19 29 0 19 19 A P R M A Y J U N J U L A U G S E P REMARKS Exhibit P-21, Production Schedule P-1 Item Nomenclature: ENVIRONMENTAL CONTROL EQUIPMENT, ASSORT (P66456) FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS A/C VERTICAL 36000 BTU/MPI (B0013) SMALL MOBILE WATER CHILLER S PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT M F R FY E R V 1 1 FY 00 FY 01 MC MC 50 100 0 0 50 100 2 FY99 MC 107 0 107 3 3 FY 99 FY 00 MC MC 225 74 0 0 225 74 Date: February 2000 Fiscal Year 00 Calendar Year 00 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 01 Calendar Year 01 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N L J U L A U G 50 50 J U L A U G S E P A A T E R 50 A 30 30 30 17 J U L A U G S E P ENHANCED REFRIGERATION UNIT 100 N O V O C T PRODUCTION RATES M F R 1 2 3 4 5 6 NAME / LOCATION ENVIRONMENTAL SYS INC, JACKSONVILLE, FL WARRIOR, XENIA, OH (SMWC) THERMO KING CORP, MINNEAPOLIS, MN R&R ENTERPRISES, MANOS, CO UNICOR, WASHINGTON, DC TBD (B0001, B0011) MIN. 50 20 100 50 50 1-8-5 200 40 100 200 200 MAX. 250 40 200 250 250 MFR REACHED Number D+ 1 2 3 4 5 Bli No. 605400 100 A D E C J A N F E B M A R A P R 25 74 M A Y J U N ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 49 Page 7 of 10 O C T N O V D E C J A N F E B M A R MFR After 1 Oct. TOTAL After 1 Oct. 5 19 24 4 19 23 10 19 29 10 19 29 0 19 19 A P R M A Y J U N S E P REMARKS Exhibit P-21, Production Schedule P-1 Item Nomenclature: ENVIRONMENTAL CONTROL EQUIPMENT, ASSORT (P66456) FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS S PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT M F R FY E R V 6 FY 01 MC 30 0 30 5 5 FY 00 FY 01 MC MC 250 150 0 0 250 150 5 5 FY00 FY01 MC MC 150 23 0 0 150 23 6 6 FY00 FY01 MC MC 91 188 0 0 91 188 Date: February 2000 Fiscal Year 00 Calendar Year 00 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 01 Calendar Year 01 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L L A U G S E P A T E R A/C HORIZONTAL 9000 BTU (B0001) A 30 SKID ASSEMBLY (B2004) A 70 70 70 40 A 70 70 10 SKID ASSEMBLY (B2006) A 50 50 50 A 23 A/C VERTICAL 54000 BTU (B0011) A O C T PRODUCTION RATES M F R 1 2 3 4 5 6 NAME / LOCATION ENVIRONMENTAL SYS INC, JACKSONVILLE, FL WARRIOR, XENIA, OH (SMWC) THERMO KING CORP, MINNEAPOLIS, MN R&R ENTERPRISES, MANOS, CO UNICOR, WASHINGTON, DC TBD (B0001, B0011) MIN. 50 20 100 50 50 1-8-5 200 40 100 200 200 MAX. 250 40 200 250 250 N O V MFR REACHED Number D+ 1 2 3 4 5 Bli No. 605400 22 22 A D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 49 Page 8 of 10 O C T 47 188 N O V D E C J A N F E B M A R MFR After 1 Oct. TOTAL After 1 Oct. 5 19 24 4 19 23 10 19 29 10 19 29 0 19 19 A P R M A Y J U N J U L A U G S E P REMARKS Exhibit P-21, Production Schedule P-1 Item Nomenclature: ENVIRONMENTAL CONTROL EQUIPMENT, ASSORT (P66456) FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS A/C VERTICAL 36000 BTU/MPI (B0013) S M F R FY E R V 1 1 FY 00 FY 01 MC MC PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT 50 100 0 100 50 PRODUCTION RATES R 1 2 3 4 5 6 NAME / LOCATION ENVIRONMENTAL SYS INC, JACKSONVILLE, FL WARRIOR, XENIA, OH (SMWC) THERMO KING CORP, MINNEAPOLIS, MN R&R ENTERPRISES, MANOS, CO UNICOR, WASHINGTON, DC TBD (B0001, B0011) MIN. 50 20 100 50 50 1-8-5 200 40 100 200 200 MAX. 250 40 200 250 250 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 03 Calendar Year 03 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L L A U G S E P A T E R 50 25 -25 N O V MFR REACHED Number D+ 1 2 3 4 5 Bli No. 605400 February 2000 Fiscal Year 02 Calendar Year 02 O C T M F Date: D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 49 Page 9 of 10 O C T N O V D E C J A N F E B M A R MFR After 1 Oct. TOTAL After 1 Oct. 5 19 24 4 19 23 10 19 29 10 19 29 0 19 19 A P R M A Y J U N J U L A U G S E P REMARKS Exhibit P-21, Production Schedule P-1 Item Nomenclature: ENVIRONMENTAL CONTROL EQUIPMENT, ASSORT (P66456) FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS S PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT M F R FY E R V 6 FY 01 MC 30 0 30 6 6 FY00 FY01 MC MC 91 188 44 0 47 188 Date: February 2000 Fiscal Year 02 Calendar Year 02 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 03 Calendar Year 03 L S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A T E R A/C HORIZONTAL 9000 BTU (B0001) 30 A/C VERTICAL 54000 BTU (B0011) 22 22 N O V O C T PRODUCTION RATES M F R 1 2 3 4 5 6 NAME / LOCATION ENVIRONMENTAL SYS INC, JACKSONVILLE, FL WARRIOR, XENIA, OH (SMWC) THERMO KING CORP, MINNEAPOLIS, MN R&R ENTERPRISES, MANOS, CO UNICOR, WASHINGTON, DC TBD (B0001, B0011) MIN. 50 20 100 50 50 1-8-5 200 40 100 200 200 MAX. 250 40 200 250 250 MFR REACHED Number D+ 1 2 3 4 5 Bli No. 605400 3 19 22 22 22 22 22 22 22 15 D E C J A N F E B M A R A P R M A Y J U N J U L A U G ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 49 Page 10 of 10 MFR After 1 Oct. TOTAL After 1 Oct. 5 19 24 4 19 23 10 19 29 10 19 29 0 19 19 REMARKS Exhibit P-21, Production Schedule Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: BULK LIQUID EQUIPMENT (P66665) Code: Prior Years Other Related Program Elements: FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 3.2 2.7 10.1 14.5 18.1 9.8 Cont Cont 3.2 2.7 10.1 14.5 18.1 9.8 Cont Cont 3.2 2.7 10.1 14.5 18.1 9.8 Cont Cont Proc Qty Gross Cost 9.2 Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) 9.2 0.0 Initial Spares Total Proc Cost 9.2 Flyaway U/C Wpn Sys Proc U/C Hose Reel System: Capability to rapidly lay Petroleum Hose in support of the Amphibious Assault Fuel System. This system is the catalyst which enables the Force Service Support Group (FSSG) to expeditiously provide bulk fuel support to the Marine Air Ground Task Force (MAGTF) up to 20 miles inland. The components include Hose Reels with 6 inch diameter light weight hose, Hose Reel bases, and a portable power unit. This Lightweight Hose can be laid by reel from an LVS, 900 series truck or forklift. Family of Water Supply Support Equipment (WSSE) FY2000-FY2005: A roll up line of 24 different items on a continous buy. It includes all water assets associated with storage and distribution of potable water. Each Maritime Prepositioned Squadron (MPS) rates one complete system. Fleet Marine Force (FMF)/Wing Engineer units rate selective portions of the system. Increase in FY2002 funding addresses critical Wing and Maritime Prepositioning Ship deficiencies along with sustaining requirements. Ramp down in FY2003 and out addresses sustaining requirements only. 1500 ROWPU FY2002-FY2005: Provides MAGTF with an enhanced capability to produce potable water from salt, brackish, fresh, and nuclear, biological, and chemical (NBC) contaminated water sources in both amphibious and expeditionary environment. A single 1500 ROWPU will produce more than twice the quantities of potable water within the same footprint, thereby permitting an outstanding replacement ratio of one 1500 ROWPU for two ROWPUs reducing deployment footprint and lift requirements. Bli No. 627400 Item No. 50 Page 1 of 6 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) ID CD TotalCost $OOO Qty Each UnitCost $ TotalCost $OOO FY 99 Qty Each FAMILY WATER SUPPLY SUPPORT EQUIP UnitCost $ TotalCost $OOO 3065 ILS/TRAVEL TOTAL Active Reserve Bli No. 627400 Weapon System Type: Date: BULK LIQUID EQUIPMENT (P66665) Item No. 50 Page 2 of 6 February 2000 FY 00 Qty Each * UnitCost $ VAR TotalCost $OOO 2564 140 140 3205 3205 2704 2704 FY 01 Qty Each * UnitCost $ VAR Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-5a, Budget Procurement History and Planning Weapon System Type: Appropriation / Budget Activity/Serial No: February 2000 P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) WBS Cost Elements: BULK LIQUID EQUIPMENT (P66665) Contractor and Location Fiscal Years FAMILY WATER SUPPLY SUPPORT EQUIP FY 00 FY 01 Contract Method Location of PCO and Type TACOM, WARREN, MI TACOM, WARREN, MI MIPR MIPR Award Date Date of First Delivery WARREN, MI WARREN, MI Feb-00 Dec-00 Feb-01 Dec-01 QTY Unit Cost Each $ VAR VAR Specs Avail? Date Revsn RFP Issue Date Avail VAR VAR N/A N/A N/A N/A N/A N/A REMARKS: Bli No. 627400 Item No. 50 Page 3 of 6 Exhibit P5-A, Procurement History and Planning Exhibit P-20, Requirements Study Approriation/Budget Activity/Serial No: Date: P-1 Line Item Nomenclature (Include DODIC for Ammunition Items): FY 1999 FY 2000 8 Months FY 2001 FY 2002 22 FY 1999 Disposals/Retirements/Attritions End of Year Asset Position Inventory Objective or Current Authorized Allowance Actual Training Expenditures thru FY XXXX FY XXXX FY XXXX FY XXXX FY 2003 FY 2004 FY 2005 29 29 29 29 Funding Deliveries from: FY 2000 Funding Deliveries from: FY 2001 Funding Deliveries from Subsequent Years Funds Other Gains FY98 Deliveries Combat Losses Training Losses Test Losses Other Losses Inventory Objective 34 Assets Rqd for Combat Loads: WRM Rqmt: Pipeline: Other: Total: Prod Leadtime: 1 Months BULK LIQUID EQUIPMENT (P66665) Line Descriptions Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from: Feb 2000 Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Admin Leadtime (after Oct 1): 34 Other than Training Usage thru FY XXXX FY XXXX FY XXXX FY XXXX 22 7 22 29 29 29 29 29 34 34 34 34 34 34 Disposals (Vehicles/Other) thru FY XXXX FY XXXX FY XXXX FY XXXX Vehicles Eligible for Replacement FY 2000 FY 2001 Augment Aircraft: TOAI PAA: TAI Attrition Res BAI Inactive Inv Storage Remarks: Hose Reel System Bli No. 627400 Item No. 50 Page 4 of 6 Exhibit P-20, Requirements Study P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS S M F R FY E R V 1 FY 98 MC BULK LIQUID EQUIPMENT (P66665) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT 29 0 29 February 2000 Fiscal Year 98 Calendar Year 98 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 99 Calendar Year 99 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L L A U G S E P A T E R HOSE REEL SYSTEM (HRS) A O C T PRODUCTION RATES M F R NAME / LOCATION 1 La Barge Products, Inc. Bli No. 627400 MIN. 2 1-8-5 3 MAX. 3 N O V MFR REACHED Number D+ 1 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. INITIAL 13 O C T N O V 29 D E C J A N F E B M A R MFR After 1 Oct. TOTAL After 1 Oct. 14 27 A P R M A Y J U N J U L A U G S E P REMARKS REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 50 Page 5 of 6 Exhibit P-21, Production Schedule P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS S M F R FY E R V 1 FY 98 MC BULK LIQUID EQUIPMENT (P66665) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT 29 0 29 February 2000 Fiscal Year 00 Calendar Year 00 O C T N O V D E C Fiscal Year 01 Calendar Year 01 J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N 3 3 3 3 2 2 2 2 2 2 2 1 2 J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N L F E B M A R A P R M A Y J U N J U L A U G S E P F E B M A R A P R M A Y J U N J U L A U G S E P A T E R HOSE REEL SYSTEM (HRS) O C T PRODUCTION RATES M F R NAME / LOCATION 1 La Barge Products, Inc. Bli No. 627400 MIN. 2 1-8-5 3 MAX. 3 N O V MFR REACHED Number D+ 1 D E C ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. INITIAL 13 MFR After 1 Oct. TOTAL After 1 Oct. 14 27 REMARKS REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 50 Page 6 of 6 Exhibit P-21, Production Schedule Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: TACTICAL FUEL SYSTEM (P6XXXX) Code: Prior Years Other Related Program Elements: FY 1999 FY 2000 FY 2001 9.7 7.7 9.7 7.7 9.7 7.7 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog Proc Qty Gross Cost 17.4 Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) 0.0 0.0 0.0 0.0 17.4 0.0 Initial Spares Total Proc Cost 17.4 Flyaway U/C Wpn Sys Proc U/C Tactical Fuel Systems are highly versatile fuel systems designed to receive, store, transfer and dispense fuel in support of MAGTF operations ashore. This program provides upgraded elastomeric components to Tactical Fuel Systems (B0685 Amphibious Assault Fuel System, B1135 Helicopter Expedient Refueling System, B1570 Expedient Refueling System, B0570 500 Gallon Collapsible Fabric Drum, B0675 Tactical Airfield Fuel Dispensing System) which have met or exceeded the limited shelf life. The upgraded components include hoses, bladders, pumps and tanks. Bli No. 627700 Item No.51 Page 1 of 3 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) ID CD TotalCost $OOO FY 99 Qty Each Tactical Fuel Systems UnitCost $ TotalCost $OOO 9538 ILS/TRAVEL TOTAL ACTIVE RESERVE Bli No. 627700 Weapon System Type: Date: TACTICAL FUEL SYSTEM (P627700) Item No.51 Page 2 of 3 February 2000 FY 00 Qty Each Var UnitCost $ VAR TotalCost $OOO 7531 120 120 9658 8199 1459 7651 6207 1444 FY 01 Qty Each Var UnitCost $ VAR Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-5a, Budget Procurement History and Planning February 2000 Weapon System Type: Appropriation / Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) TACTICAL FUEL SYSTEM (P6XXXX) WBS Cost Elements: Contractor and Location Fiscal Years Tactical Fuel Systems FY 00 FY 01 Contract Method Location of PCO Award Date Date of First and Type TBD TBD MIPR MIPR Delivery TACOM TACOM Var Var Var Var QTY Unit Cost Each $ VAR VAR Specs Avail? Date Revsn RFP Issue Date Avail VAR VAR Yes Yes No No N/A N/A REMARKS: Bli No. 627700 Item No.51 Page 3 of 3 Exhibit P5-A, Procurement History and Planning Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: DEMOLITIONS SUPPORT SYSTEMS (P66041) Code: Prior Years Other Related Program Elements: FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 2.9 3.4 0.7 7.0 2.9 3.4 0.7 7.0 2.9 3.4 0.7 7.0 Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares Total Proc Cost Flyaway U/C Wpn Sys Proc U/C Demolitions Support Systems is a roll up line for the following programs: Advanced Demolitions Kit (ADK) FY 1999-FY 2001: Provides Remote Demolition Firing System to enhance current capability. It is field programmable, fast firing, and has the ability to perform multiple demolitions simultaneously, or in rapid succession. The system also gives the operator the ability to set land charges and detonate them from an undetectable position. The long range of the system allows the operator to explode large volumes of explosives from safe standoff distances. The Remote Demolition Firing System enhances the current Engineering Demolition Kit which becomes the Advanced Demolitions Kit. Advanced Radiographic System (ARS) FY 2000: Light weight filmless radiographic system utilizing the present X-ray equipment which is able to produce a computerized electronic enhanced image. It is two person portable, field worthy and capable of image transmissions from the field control unit to a data base center via phone lines. The ARS will obtain, enhance, and record image of internal structures of improvised explosive devices and unexploded ordnance for identification. Bli No. 632500 Item No. 52 Page 1 of 7 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) ID CD Advanced Demolitions Kit A Advanced Radiographic System A TotalCost $OOO Qty Each UnitCost $ TotalCost $OOO FY 99 Qty Each 2620 ILS Support/Travel Engr Supt/Technical Manuals TOTAL Active Reserve Bli No. 632500 Weapon System Type: Date: DEMOLITIONS SUPPORT SYSTEMS (P66041) 131 UnitCost $ 20000 TotalCost $OOO February 2000 FY 00 Qty Each UnitCost $ 2360 118 20000 961 61 15754 TotalCost $OOO 620 63 35 3384 3013 371 655 556 99 FY 01 Qty Each 31 UnitCost $ 20000 311 2931 2491 440 Item No. 52 Page 2 of 7 Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-5a, Budget Procurement History and Planning February 2000 Weapon System Type: Appropriation / Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) WBS Cost Elements: DEMOLITIONS SUPPORT SYSTEMS (P66041) Contractor and Location Fiscal Years Contract Method Location of PCO Award Date Date of First and Type Advanced Demolitions Kit FY 99 FY 00 FY 01 Raytheon AWC Indianapolis IN Raytheon AWC Indianapolis IN Raytheon AWC Indianapolis IN Advanced Radiographic System FY 00 SAIC, San Diego, CA MIPR MIPR MIPR Delivery Picatinny Arsenal, NJ Picatinny Arsenal, NJ Picatinny Arsenal, NJ C/Option Indian Head MD Feb-99 Sep-99 Feb-00 Sep-00 Nov-00 Jun-01 Feb-00 Jul-00 QTY Unit Cost Each $ Specs Avail? Date Revsn RFP Issue Date Avail 131 118 31 20000 20000 20000 Yes Yes Yes No No No N/A N/A N/A 61 15754 Yes No N/A REMARKS: Bli No. 632500 Item No. 52 Page 3 of 7 Exhibit P5-A, Procurement History and Planning Exhibit P-20, Requirements Study Approriation/Budget Activity/Serial No: Date: P-1 Line Item Nomenclature (Include DODIC for Ammunition Items): FY 1999 FY 2000 118 20.0 2620.0 20.0 2360.0 20.0 620.0 30 101 161 30 30 88 31 30 161 280 283 283 283 Funding Disposals/Retirements/Attritions End of Year Asset Position Inventory Objective or Current Authorized Allowance Remarks: Bli No. 632500 Actual Training Expenditures thru FY XXXX FY XXXX FY XXXX FY XXXX Other than Training Usage thru FY XXXX FY XXXX FY XXXX FY XXXX 7 Months FY 1999 131 Deliveries from: FY 2000 Funding Deliveries from: FY 2001 Funding Deliveries from Subsequent Years Funds Other Gains Combat Losses Training Losses Test Losses Other Losses Inventory Objective 283 Assets Rqd for Combat Loads: WRM Rqmt: Pipeline: Other: Total: Prod Leadtime: 4 Months DEMOLITIONS SUPPORT SYSTEMS (P66041) Line Descriptions Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from: Feb 2000 Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Admin Leadtime (after Oct 1): FY 2001 Disposals (Vehicles/Other) thru FY XXXX FY XXXX FY XXXX FY XXXX FY 2002 FY 2003 FY 2004 FY 2005 31 283 Vehicles Eligible for Replacement FY 2000 FY 2001 Augment 283 283 283 Aircraft: TOAI PAA: TAI Attrition Res BAI Inactive Inv Storage Advance Demolitions Kit Item No. 52 Page 4 of 7 Exhibit P-20, Requirements Study Exhibit P-20, Requirements Study Approriation/Budget Activity/Serial No: Date: P-1 Line Item Nomenclature (Include DODIC for Ammunition Items): FY 1999 FY 2000 2 Months FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 61 Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from: 15.8 961.0 0 FY 1999 0 Funding Deliveries from: FY 2000 Funding Deliveries from: FY 2001 Funding Deliveries from Subsequent Years Funds Other Gains Combat Losses Training Losses Test Losses Other Losses 61 Disposals/Retirements/Attritions End of Year Asset Position 61 Inventory Objective or Current Authorized Allowance Inventory Objective 61 Assets Rqd for Combat Loads: WRM Rqmt: Pipeline: Other: Total: Bli No. 632500 Prod Leadtime: 1 Months DEMOLITIONS SUPPORT SYSTEMS (P66041) Line Descriptions Buy Summary Remarks: Feb 2000 Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Admin Leadtime (after Oct 1): Actual Training Expenditures thru FY XXXX FY XXXX FY XXXX FY XXXX 61 Other than Training Usage thru FY XXXX FY XXXX FY XXXX FY XXXX Disposals (Vehicles/Other) thru FY XXXX FY XXXX FY XXXX FY XXXX 61 61 Vehicles Eligible for Replacement FY 2000 FY 2001 Augment 61 61 61 Aircraft: TOAI PAA: TAI Attrition Res BAI Inactive Inv Storage Advance Radiographic System Item No. 52 Page 5 of 7 Exhibit P-20, Requirements Study P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS M F R S FY E R V DEMOLITIONS SUPPORT SYSTEMS (P66041) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT Feb 2000 Fiscal Year 98 Fiscal Year 99 Calendar Year 98 N O V O C T D E C J A N F E B M A R A P R M A Y J U N J U L A U G L Calendar Year 99 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A T E R Advanced Demolitions Kit 1 FY 99 1 FY-00 1 FY 01 MC MC MC 131 118 31 0 0 0 131 118 31 2 FY 00 MC 61 0 61 A 30 101 118 31 Advanced Radiographic System PRODUCTION RATES M F R NAME / LOCATION 1 Raytheon Air Warfare Center 2 SAIC, San Diego, CA MIN. 16 12 1-8-5 24 20 MAX. 30 50 61 N O O C V T MFR REACHED Number D+ 1 2 Bli No. 632500 D E C J A N F E B M A R S A J J M E U U U A P G L N Y ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. A P R D N E O C V MFR After 1 Oct. O C T M F A E R B TOTAL After 1 Oct. J A N INITIAL 4 7 11 REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER 1 1 7 2 8 3 Item No. 52 Page 6 of 7 J M A U A P N Y R REMARKS J U L A U G S E P Exhibit P-21, Production Schedule P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS S DEMOLITIONS SUPPORT SYSTEMS (P66041) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT M F R FY E R V 1 1 1 FY 99 FY 00 FY 01 MC MC MC 131 118 31 30 0 0 105 118 31 2 FY 00 MC 61 0 61 Feb 2000 Fiscal Year 00 Calendar Year 00 O C T N O V D E C J A N 30 30 30 11 F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 01 Calendar Year 01 S E P O C T N O V D E C 30 30 30 28 J A N F E B M A R A P R M A Y J U N J U L 30 1 J U N J U L L A U G S E P A U G S E P A T E R Advanced Demolitions Kit A A Advanced Radiographic System A N O V O C T PRODUCTION RATES M F R NAME / LOCATION 1 Raytheon Air Warfare Center 2 SAIC, San Diego, CA MIN. 16 12 1-8-5 24 20 MAX. 30 50 MFR REACHED Number D+ 1 2 Bli No. 632500 D E C J A N F E B M A R A P R M A Y J U N 45 16 J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. O C T N O V D E C J A N F E B MFR After 1 Oct. TOTAL After 1 Oct. INITIAL 4 7 11 REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER 1 1 7 2 8 3 Item No. 52 Page 7 of 7 M A R A P R M A Y REMARKS Exhibit P-21, Production Schedule Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: POWER EQUIPMENT, ASSORTED (P66900) Code: Other Related Program Elements: Prior Years FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 17.9 9.0 10.8 9.3 9.6 8.9 9.6 9.7 CONT CONT Net Proc (P-1) 17.9 9.0 10.8 9.3 9.6 8.9 9.6 9.7 CONT CONT Initial Spares 1.3 1.3 19.2 CONT CONT Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Total Proc Cost 9.0 10.8 9.3 9.6 8.9 9.6 9.7 Flyaway U/C Wpn Sys Proc U/C This program includes all mobile electric power generators used by Fleet Marine Forces. Generator sizes and types range from 3KW to 100KW in both 60HZ and 400HZ. All generators are selected from the standard family of DoD mobile electric power sources and will be from the new series of "Tactical Quiet Generators (TQGs)". Bli No. 636600 Item No. 53 Page 1 of 12 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements Appropriation/ Budget Activity/Serial No: ID CD Generator Set 10KW/60HZ, MEP-803A, TAMCN B0891 A Generator Set 30KW/60HZ, MEP-805A, TAMCN B0953 A Generator Set 60KW/60HZ MEP-806A, TAMCN B1021 A Generator Set 60KW/400HZ, MEP-816A, TAMCN B1016 A Electric Power Distribution Systems Mobile Electric Power Distribution System (MEPDS) 15/30/100Kw Generators A Generator Set 3KW/60HZ, MEP-021, TAMCN B0730 A 10KW/400HZ, MEP-813A, TAMCN B0921 30KW/400HZ, MEP-815A TAMCN B0971 Travel Integrated Logistics Support New Equipment Tech Training TOTAL Active Reserve Bli No. 636600 P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) TotalCost $OOO Weapon System Type: Date: POWER EQUIPMENT, ASSORTED (P66900) FY 99 Qty Each UnitCost $ TotalCost $OOO February 2000 FY 00 Qty Each UnitCost $ TotalCost $OOO FY 01 Qty Each UnitCost $ 121 10 12100 4037 186 21704 2087 92 22685 3262 141 23139 3992 162 24642 3144 122 25770 3443 131 26285 276 10 27600 1077 37 29108 390 110 3545 748 207 3614 748 202 3688 694 80 8675 1724 195 8841 A 977 63 15508 A 1927 77 25026 30 16 16 131 122 120 16 18 12 8993 8577 416 10810 10390 420 9325 9000 325 Item No. 53 Page 2 of 12 Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-5a, Budget Procurement History and Planning February 2000 Weapon System Type: Appropriation / Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) WBS Cost Elements: POWER EQUIPMENT, ASSORTED (P66900) Contractor and Location Fiscal Years Contract Method Location of PCO Award Date Date of First and Type Delivery QTY Unit Cost Each $ Specs Avail? Date Revsn RFP Issue Date Avail Generator Set 10KW/60HZ, MEP-803A, TAMCN B0891 FY 98 FY 99 Fermont, Bridgeport, CT Fermont, Bridgeport, CT MIPR MIPR CECOM CECOM Mar-98 Feb-00 Jan-99 Feb-01 MC II, Dallas, TX MC II, Dallas, TX MC II, Dallas, TX MC II, Dallas, TX MIPR MIPR MIPR MIPR CECOM CECOM CECOM CECOM Sep-98 Jan-99 Jan-00 Jan-01 Sep-00 Sep-01 Sep-02 Sep-03 MC II, Dallas, TX MC II, Dallas, TX MC II, Dallas, TX MC II, Dallas, TX MIPR MIPR MIPR MIPR CECOM CECOM CECOM CECOM Sep-98 Jan-99 Jan-00 Jan-01 Sep-00 Sep-01 Sep-02 Sep-03 11479 YES 12100 YES NO NO N/A N/A 40 186 92 141 20988 21704 22685 23139 YES YES YES YES NO NO NO NO N/A N/A N/A N/A 30 162 122 131 23898 24642 25770 26285 YES YES YES YES NO NO NO NO N/A N/A N/A N/A 49 10 Generator Set 30KW/60HZ, MEP-805A, TAMCN B0953 FY 98 FY 99 FY 00 FY 01 Generator Set 60KW/60HZ MEP-806A, TAMCN B1021 FY 98 FY 99 FY 00 FY 01 REMARKS: Bli No. 636600 Item No. 53 Page 3 of 12 Exhibit P5-A, Procurement History and Planning Date: Exhibit P-5a, Budget Procurement History and Planning Weapon System Type: Appropriation / Budget Activity/Serial No: February 2000 P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) WBS Cost Elements: POWER EQUIPMENT, ASSORTED (P66900) Contractor and Location Fiscal Years Contract Method Location of PCO and Type Award Date Date of First Delivery QTY Unit Cost Each $ Specs Avail? Date Revsn RFP Issue Date Avail Generator Set 60KW/400HZ, MEP-816A, TAMCN B1016 MC II, Dallas, TX MC II, Dallas, TX MC II, Dallas, TX MIPR MIPR MIPR CECOM CECOM CECOM Sep-98 Sep-00 Jan-99 Sep-01 Jan-00 Sep-02 23 10 37 27094 YES 27600 YES 29108 YES NO NO NO N/A N/A N/A Unicor, Washington, DC Unicor, Washington, DC Unicor, Washington, DC MIPR MIPR MIPR Washington, DC Washington, DC Washington, DC Mar-99 Feb-01 Mar-00 Feb-02 Mar-01 Feb-03 110 207 202 3545 YES 3614 YES 3688 YES NO NO NO N/A N/A N/A FY00 FY01 Fermont, Bridgeport, CT Fermont, Bridgeport, CT MIPR MIPR CECOM CECOM Jan-00 Feb-02 Jan-01 Feb-03 80 195 8675 YES 8841 YES NO NO N/A N/A Generator Set 10KW/400HZ, MEP-813A,TAMCN B0921 Fermont, Bridgeport, CT MIPR CECOM Jan-00 Feb-02 63 15508 YES NO N/A Generator Set 30KW/400HZ, MEP-815A, TAMCN B0971 MCII, Dallas, TX MIPR CECOM Jan-00 Feb-02 77 25026 YES NO N/A FY98 FY99 FY00 Electric Power Distribution Systems Mobile Electric Power Distribution System (MEPDS) 15/30/100Kw Generators FY99 FY00 FY01 Generator Set 3KW/60HZ, MEP-021, TAMCN B0730 REMARKS: Bli No. 636600 Item No. 53 Page 4 of 12 Exhibit P5-A, Procurement History and Planning P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS Generator Set 10KW/60HZ, MEP-803A, TAMCN B0891 S POWER EQUIPMENT, ASSORTED (P66900) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT February 2000 Fiscal Year 98 Calendar Year 98 Fiscal Year 99 Calendar Year 99 M F R FY E R V 1 1 FY98 FY99 MC MC 49 10 0 0 49 10 2 2 2 2 FY98 FY99 FY00 FY01 MC MC MC MC 40 186 92 141 0 0 0 0 40 186 92 141 A 3 3 3 3 FY98 FY99 FY00 FY01 MC MC MC MC 30 162 122 131 0 0 0 0 30 162 122 131 A O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L L A U G S E P A A T E R 49 A 10 A 186 Generator Set 30KW/60HZ, MEP-805A, TAMCN B0953 40 92 141 Generator Set 60KW/60HZ MEP-806A, TAMCN B1021 PRODUCTION RATES R 1 2 3 4 5 6 7 8 NAME / LOCATION Fermont, Bridgeport, CT MC II Dallas, TX MC II Dallas, TX MC II Dallas, TX Unicor, Washington, DC Fermont, Bridgeport, CT Fermont, Bridgeport, CT MC II Dallas, TX MIN. 100 35 35 35 25 100 100 35 1-8-5 375 400 400 400 200 375 375 400 MAX. 750 750 750 750 1000 750 750 750 122 N O V MFR REACHED Number D+ 1 2 3 4 5 Bli No. 636600 162 131 O C T M F 30 A D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. O C T N O V D E C J A N F E B M A R MFR After 1 Oct. TOTAL After 1 Oct. 5 23 28 3 32 35 3 32 35 3 25 28 5 23 28 A P R M A Y J U N J U L A U G S E P REMARKS INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 53 Page 5 of 12 Exhibit P-21, Production Schedule P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE S POWER EQUIPMENT, ASSORTED (P66900) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT M F R FY E R V 4 4 4 FY98 FY99 FY00 MC MC MC 23 10 37 0 0 0 23 10 37 5 5 5 FY 99 FY 00 FY 01 MC MC MC 110 207 202 0 0 0 110 207 202 10KW/400HZ, MEP-813A, TAMCN B0921 6 6 7 FY00 FY01 FY00 MC MC MC 80 195 63 0 0 0 80 195 63 30KW/400HZ, MEP-815A, TAMCN B0971 8 FY00 MC 77 0 77 COST ELEMENTS February 2000 Fiscal Year 98 Calendar Year 98 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 99 Calendar Year 99 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L L A U G S E P A T E R Generator Set 60KW/400HZ, MEP-816A, TAMCN B1016 A 23 A 10 37 Electric Power Distribution Systems Mobile Electric Power Distribu (MEPDS) 15/30/100Kw Generators A 110 207 202 Generator Set 3KW/60HZ, MEP-021, TAMCN B0730 A 63 77 O C T PRODUCTION RATES M F R 1 2 3 4 5 6 7 8 NAME / LOCATION Fermont, Bridgeport, CT MC II Dallas, TX MC II Dallas, TX MC II Dallas, TX Unicor, Washington, DC Fermont, Bridgeport, CT Fermont, Bridgeport, CT MC II Dallas, TX MIN. 100 35 35 35 25 100 100 35 1-8-5 375 400 400 400 200 375 375 400 MAX. 750 750 750 750 1000 750 750 750 N O V MFR REACHED Number D+ 1 2 3 4 5 Bli No. 636600 80 195 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. O C T N O V D E C J A N F E B M A R MFR After 1 Oct. TOTAL After 1 Oct. 5 23 28 3 32 35 3 32 35 3 25 28 5 23 28 A P R M A Y J U N J U L A U G S E P REMARKS INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 53 Page 6 of 12 Exhibit P-21, Production Schedule P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS S POWER EQUIPMENT, ASSORTED (P66900) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT M F R FY E R V 1 1 FY 98 FY 99 MC MC 49 10 0 0 49 10 2 2 2 2 FY 98 FY 99 FY 00 FY 01 MC MC MC MC 40 186 92 141 0 0 0 0 40 186 92 141 3 3 3 3 FY 98 FY 99 FY 00 FY 01 MC MC MC MC 30 162 122 131 0 0 0 0 30 162 122 131 February 2000 Fiscal Year 00 Calendar Year 00 O C T N O V D E C J A N F E B M A R A P R M A Y J U N 10 10 10 10 9 J U L A U G Fiscal Year 01 Calendar Year 01 S E P O C T N O V D E C J A N F E B M A R A P R 4 4 2 3 3 3 L M A Y J U N J U L A U G 3 3 3 3 S E P A T E R 16 170 Generator Set 10KW/60HZ, MEP-803A, TAMCN B0891 Generator Set 30KW/60HZ, MEP-805A, TAMCN B0953 4 4 4 4 3 A 92 A 141 Generator Set 60KW/60HZ MEP-806A, TAMCN B1021 3 PRODUCTION RATES R 1 2 3 4 5 6 7 8 NAME / LOCATION Fermont, Bridgeport, CT MC II Dallas, TX MC II Dallas, TX MC II Dallas, TX Unicor, Washington, DC Fermont, Bridgeport, CT Fermont, Bridgeport, CT MC II Dallas, TX MIN. 100 35 35 35 25 100 100 35 1-8-5 375 400 400 400 200 375 375 400 MAX. 750 750 750 750 1000 750 750 750 3 3 3 2 2 2 2 2 2 14 MFR REACHED Number D+ 1 2 3 4 D E C J A N 148 122 A N O V 5 Bli No. 636600 3 A O C T M F 3 F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. O C T N O V D E C J A N 131 F E B M A R MFR After 1 Oct. TOTAL After 1 Oct. 5 23 28 3 32 35 3 32 35 3 25 28 5 23 28 A P R M A Y J U N J U L A U G S E P REMARKS INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 53 Page 7 of 12 Exhibit P-21, Production Schedule P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE S POWER EQUIPMENT, ASSORTED (P66900) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT February 2000 Fiscal Year 00 Calendar Year 00 Fiscal Year 01 Calendar Year 01 L A T E R M F R FY E R V 4 4 4 FY98 FY99 FY00 MC MC MC 23 10 37 0 0 0 23 10 37 5 5 5 FY 99 FY 00 FY 01 MC MC MC 110 207 202 0 0 0 110 207 202 6 6 FY00 FY 01 MC MC 80 195 0 0 80 195 A 10KW/400HZ, MEP-813A, TAMCN B0921 7 FY00 MC 63 0 63 A 63 30KW/400HZ, MEP-815A, TAMCN B0971 8 FY00 MC 77 0 77 A 77 COST ELEMENTS O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G 2 2 2 2 2 2 2 2 2 2 2 1 S E P Generator Set 60KW/400HZ, MEP-816A, TAMCN B1016 1 A 9 37 Electric Power Distribution Systems Mobile Electric Power Distribution (MEPDS) 15/30/100Kw Generators 9 9 9 9 9 9 9 9 A 38 207 A 202 Generator Set 3KW/60HZ, MEP-021, TAMCN B0730 N O V O C T PRODUCTION RATES M F R 1 2 3 4 5 6 7 8 NAME / LOCATION Fermont, Bridgeport, CT MC II Dallas, TX MC II Dallas, TX MC II Dallas, TX Unicor, Washington, DC Fermont, Bridgeport, CT Fermont, Bridgeport, CT MC II Dallas, TX MIN. 100 35 35 35 25 100 100 35 1-8-5 375 400 400 400 200 375 375 400 MAX. 750 750 750 750 1000 750 750 750 MFR REACHED Number D+ 1 2 3 4 5 Bli No. 636600 80 A D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. O C T N O V D E C J A N 195 F E B M A R MFR After 1 Oct. TOTAL After 1 Oct. 5 23 28 3 32 35 3 32 35 3 25 28 5 23 28 A P R M A Y J U N J U L A U G S E P REMARKS INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 53 Page 8 of 12 Exhibit P-21, Production Schedule P-1 Item Nomenclature: 4 FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT S Date: POWER EQUIPMENT, ASSORTED (P66900) M F R FY E R V 2 2 2 FY 99 FY 00 FY 01 MC MC MC 186 92 141 16 0 0 3 3 3 FY 99 FY 00 FY 01 MC MC MC 162 122 131 14 0 0 February 2000 Fiscal Year 02 Calendar Year 02 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G 170 92 141 16 16 16 16 16 15 15 15 15 15 15 148 122 131 14 Fiscal Year 03 Calendar Year 03 S E P O C T N O V D E C J A N 18 18 18 18 20 F E B M A R A P R M A Y J U N J U L L A U G S E P A T E R 12 129 11 120 Generator Set 10KW/60HZ, MEP-803A, TAMCN B0891 Generator Set 30KW/60HZ, MEP-805A, TAMCN B0953 Generator Set 60KW/60HZ MEP-806A TAMCN B1021 F R PRODUCTION RATES NAME / LOCATION 1 Fermont, Bridgeport, CT MC II Dallas, TX MC II Dallas, TX MC II Dallas, TX Unicor, Washington, DC Fermont, Bridgeport, CT Fermont, Bridgeport, CT MC II Dallas, TX MIN. 100 1-8-5 375 MAX. 35 35 35 25 100 100 35 400 400 400 200 375 375 400 750 750 750 1000 750 750 750 750 N O V MFR REACHED Number D+ 1 2 3 4 5 Bli No. 636600 14 14 14 13 13 13 13 13 13 15 O C T M 2 3 4 5 6 7 8 14 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. 15 O C T 15 N O V 15 D E C 15 J A N 15 F E B 15 M A R MFR After 1 Oct. TOTAL After 1 Oct. 5 23 28 3 32 35 3 32 35 3 25 28 5 23 28 6 A P R 11 M A Y J U N J U L A U G S E P REMARKS INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 53 Page 9 of 12 Exhibit P-21, Production Schedule P-1 Item Nomenclature: 4 FY 00 / 01 BUDGET PRODUCTION SCHEDULE PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT S M F R FY E R V 4 4 FY99 FY00 MC MC 10 37 1 0 5 5 5 FY 99 FY 00 FY 01 MC MC MC 110 207 202 6 6 FY 00 FY 01 MC MC Generator Set 10KW/400HZ, MEP-813A, TAMCN B0921 7 FY00 Generator Set 30KW/400HZ, MEP-815A, TAMCN B0971 8 FY00 COST ELEMENTS Date: POWER EQUIPMENT, ASSORTED (P66900) February 2000 Fiscal Year 02 Calendar Year 02 J U L A U G Fiscal Year 03 Calendar Year 03 O C T N O V D E C J A N F E B M A R A P R M A Y J U N 9 37 1 1 1 1 1 1 1 1 1 72 0 0 38 207 202 9 80 195 0 0 80 195 10 MC 63 0 63 10 10 10 10 10 13 MC 77 0 77 10 10 10 10 10 10 10 7 F E B M A R A P R M A Y J U N J U L A U G S E P L S E P A T E R 17 17 64 18 18 18 51 J U L A U G S E P S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G 3 3 3 3 3 3 3 3 3 3 3 4 17 17 17 17 17 18 18 17 17 17 17 18 18 18 18 18 F E B M A R A P R M A Y J U N Generator Set 60KW/400HZ, MEP-816A, TAMCN B1016 Electric Power Distribution Systems Mobile Electric Power Distribution (MEPDS) 15/30/100Kw Generators 9 10 10 18 18 18 17 17 17 17 Generator Set 3KW/60HZ, MEP-021, TAMCN B0730 F PRODUCTION RATES NAME / LOCATION R 1 2 3 4 5 6 7 8 N O V O C T M REACHED Fermont, Bridgeport, CT MC II Dallas, TX MC II Dallas, TX MC II Dallas, TX Unicor, Washington, DC Fermont, Bridgeport, CT Fermont, Bridgeport, CT MC II Dallas, TX MIN. 1-8-5 MAX. 100 35 35 35 25 100 100 35 375 400 400 400 200 375 375 400 750 750 750 750 1000 750 750 750 J A N MFR Number D+ 10 10 10 10 10 10 ADMIN LEAD TIME Prior 1 Oct. O C T N O V D E C J A N After 1 Oct. MFR After 1 Oct. TOTAL After 1 Oct. 5 23 28 3 32 35 3 32 35 3 25 28 5 23 28 REMARKS INITIAL 1 2 3 4 5 Bli No. 636600 D E C 10 REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 53 Page 10 of 12 Exhibit P-21, Production Schedule P-1 Item Nomenclature: FY 00 / 01 BUDGET PRODUCTION SCHEDULE PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT S M F R FY E R V 2 FY 01 MC 141 12 Generator Set 60KW60HZ, MEP-805A,TAMCN B0953 3 FY 01 MC 131 11 COST ELEMENTS Date: POWER EQUIPMENT, ASSORTED (P66900) February 2000 Fiscal Year 04 Calendar Year 04 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G 129 12 12 12 12 12 12 12 12 17 16 120 11 11 11 11 11 11 11 11 11 11 10 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 05 Calendar Year 05 L S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A T E R Generator Set 30KW/60HZ, MEP-805A, TAMCN B0953 PRODUCTION RATES M F R NAME / LOCATION 1 Fermont, Bridgeport, CT 2 3 4 5 6 7 8 MC II Dallas, TX MC II Dallas, TX MC II Dallas, TX Unicor, Washington, DC Fermont, Bridgeport, CT Fermont, Bridgeport, CT MC II Dallas, TX MIN. 100 1-8-5 375 MAX. 35 35 35 25 100 100 35 400 400 400 200 375 375 400 750 750 750 1000 750 750 750 750 MFR REACHED Number D+ 1 2 3 4 5 Bli No. 636600 ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. MFR After 1 Oct. TOTAL After 1 Oct. 5 23 28 3 32 35 3 32 35 3 25 28 5 23 28 REMARKS INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 53 Page 11 of 12 Exhibit P-21, Production Schedule P-1 Item Nomenclature: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT S Date: POWER EQUIPMENT, ASSORTED (P66900) M F R FY E R V 5 5 FY 00 FY 01 MC MC 207 202 207 138 6 6 FY 00 FY 01 MC MC 80 195 80 144 February 2000 Fiscal Year 04 Calendar Year 04 O C T N O V D E C J A N 64 17 17 17 13 51 15 15 15 6 O C T N O V D E C J A N Fiscal Year 05 Calendar Year 05 L F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A T E R Electric Power Distribution Systems Mobile Electric Power Distribution (MEPDS) 15/30/100Kw Generators Generator Set 3KW/60HZ, MEP-021, TAMCN B0730 PRODUCTION RATES M F R NAME / LOCATION 1 Fermont, Bridgeport, CT 2 3 4 5 6 7 8 MC II Dallas, TX MC II Dallas, TX MC II Dallas, TX Unicor, Washington, DC Fermont, Bridgeport, CT Fermont, Bridgeport, CT MC II Dallas, TX MIN. 100 1-8-5 375 MAX. 35 35 35 25 100 100 35 400 400 400 200 375 375 400 750 750 750 1000 750 750 750 750 MFR REACHED Number D+ 1 2 3 4 5 Bli No. 636600 ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. MFR After 1 Oct. TOTAL After 1 Oct. 5 23 28 3 32 35 3 32 35 3 25 28 5 23 28 REMARKS INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 53 Page 12 of 12 Exhibit P-21, Production Schedule Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: PHYSICAL SECURITY (P66003) Code: Other Related Program Elements: Prior Years FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 12.4 1.9 5.6 5.3 4.8 4.9 1.3 1.3 Cont Cont 12.4 1.9 5.6 5.3 4.8 4.9 1.3 1.3 Cont Cont 12.4 1.9 5.6 5.3 4.8 4.9 1.3 1.3 Cont Cont Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares Total Proc Cost Flyaway U/C Wpn Sys Proc U/C This budget line provides funding to procure investment items, devices and systems necessary for Marine Corps installations and facility infrastructure to comply with Congressional, White House Military Office, DOD, DON, Marine Corps Physical Security and Antiterrorism Directives pertaining to security equipment and electronic security systems as technological solutions to manpower intensive security requirements; and, to provide a systematic, uniform capability throughout Marine Corps installations to deter, delay, and defeat espionage, sabotage, damage, theft, and terrorist acts against Marine Corps personnel, resources, installations and facilities. These systems are used at base flight lines and Arms, Ammunition and Explosive (AA&E) sites. This program funds physical security systems that include, but are not limited to, intrusion detection systems (IDS), automated entry control systems, assessment devices, closed-circuit television other surveillance equipment, and capital plant equipment specifically designed for physical security in military construction (MILCON) projects. These systems upgrade and replace antiquated systems that are costly to maintain and upgrade security in neglected areas. FY 2000 through 2003 funds will be used to procure the following: Electronic Security System. The Attended Sensor System is a non-tactical, portable intrusion detection system which provides an upgrade assessment capability to identify intruders. It allows military police to secure a large area with limited personnel. These systems allow installation commanders the ability to detect and identify intruders during periods of increased terrorist/criminal activity. Other Electronic Security Systems will be used to upgrade and install new ESS's on the east and west coasts and overseas bases. The upgrades will include CCTV installation, access control, duress alarms for gates and VIP quarters, the conversion from old IDS systems at armories, pharmacies and postal facilities. FY 2001 funds will be used to procure a security system for MARCORSYSCOM Headquarters at Hospital Point. $300K will be used for procurement and installation of an alarm system (sensors, processing unit, alarm panels etc.), and 300K for an Automated Entry Control System (card readers, scanners etc.). . Bli No. 643800 Item No. 58 Page 1 of 3 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) ID CD TotalCost $OOO FY 98 Qty Each UnitCost $ TotalCost $OOO Electronic Security Systems 1852 TOTAL Active Reserve 1852 1852 Bli No. 643800 Weapon System Type: Date: PHYSICAL SECURITY (P66003) FY 99 Qty Each Item No. 58 Page 2 of 3 3 UnitCost $ VARIOUS TotalCost $OOO 5645 5645 5645 February 2000 FY 00 Qty Each 4 UnitCost $ VARIOUS TotalCost $OOO 5317 FY 01 Qty Each 5 UnitCost $ VARIOUS 5317 5317 Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-5a, Budget Procurement History and Planning February 2000 Weapon System Type: Appropriation / Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) WBS Cost Elements: PHYSICAL SECURITY (P66003) Contractor and Location Fiscal Years Contract Method Location of PCO Award Date Date of First and Type Delivery QTY Unit Cost Each $ Specs Avail? Date Revsn RFP Issue Date Avail Electronic Security Systems FY 99 ESS Upgrades FY 00 ESS Upgrades FY 01 ESS Upgrades FY 02 ESS Upgrades REMARKS: Bli No. 643800 MARCONI, Charleston, SC C/iQTM NISE/SPAWAR Jan-99 Dec-99 3 VAR YES NO N/A MARCONI, Charleston, SC C/iQTM NISE/SPAWAR Jan-00 Dec-00 4 VAR YES NO N/A MARCONI, Charleston, SC C/iQTM NISE/SPAWAR Jan-01 5 VAR YES NO N/A MARCONI, Charleston, SC C/iQTM NISE/SPAWAR Jan-99 2 VAR YES NO N/A The quantity refers to the estimated number of installations vice number of systems. NISE EAST/SPAWAR - SPACE AND NAVAL WARFARE SYSTEMS CENTER LOCATED AT CHARLESTON, S.C. Item No. 58 Page 3 of 3 Exhibit P5-A, Procurement History and Planning Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: GARRISON MOBILE ENGINEER EQUIPMENT (P66004) Code: Other Related Program Elements: Prior Years FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 2.9 5.5 6.9 5.7 5.9 6.1 6.2 6.3 45.5 18.7 5.5 6.9 5.7 5.9 6.1 6.2 6.3 61.3 2.9 5.5 6.9 5.7 5.9 6.1 6.2 6.3 45.5 Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares Total Proc Cost Flyaway U/C Wpn Sys Proc U/C Funds in this line are intended for the procurement of centrally managed Garrison Mobile Engineer Equipment (GMEE) for Marine Corps Bases and Stations. The replacement has been developed on an as-required basis because most commercial engineer construction equipment exceeds life expectancy. The equipment types included in this category are: motor graders, crawler tractors, wheel tractors, crash cranes and generators of various sizes and capabilities. The procurement source is Defense Supply Construction Center (DSCC). Bli No. 644100 Item No. 59 Page 1 of 2 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements Excavator, Multipurpose Road Grader Scoop Loader, Tracked Scoop Loader, Wheeled, 1 1/2 CubicYards Scoop Loader, Wheeled, 5 CubicYards Roller, Vibrating Bulldozer, 105 Flywheel Horsepower Bulldozer, 140 Flywheel Horsepower Bulldozer, 195 Flywheel Horsepower Sweeper, Runway Cleaner, Catch Basin Cleaner, Septic Tank Mower, Self-Propelled Tractor, Agriculture, 30 Draw Bar Horsepower Tractor, Industrial, 70 Draw Bar Horsepower Tractor, Industrial, Backhoe Crane, Truck Mounted, 5-20T Crane, Truck Mounted 35-T Crane, Hydraulic 20-30T Crane, Crash, Fire, Rescue (CFR), Salvage Tractor, Industrial, 50 Draw Bar Horsepower TOTAL Active Reserve Bli No. 644100 Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: Weapon System Type: Date: Procurement, Marine Corps (1109) / Engineer and Other Equipment GARRISON MOBILE ENGINEER EQUIPMENT (P66004) (6) ID CD TotalCost $OOO FY 99 Qty Each UnitCost $ TotalCost $OOO FY 00 Qty Each February 2000 UnitCost $ 754 405 170 269 270 3 2 2 2 1 251333 202500 85000 134500 270000 512 1030 173 548 549 2 5 2 4 2 256000 206000 86500 137000 274500 169 102 337 178 121 1 1 1 2 1 169000 102000 337000 89000 121000 26 94 4 3 6500 31333 373 709 922 197 382 5 2 2 1 1 74600 354500 461000 197000 382000 344 104 343 272 124 93 27 93 50 362 723 939 201 388 32 2 1 1 3 1 1 4 3 1 5 2 2 1 1 3 172000 104000 343000 90667 124000 93000 6750 31000 50000 72400 361500 469500 201000 388000 10667 5478 5478 Item No. 59 Page 2 of 2 6907 6907 TotalCost $OOO FY 01 Qty Each UnitCost $ 1039 210 176 279 280 49 175 4 1 2 2 1 2 1 259750 210000 88000 139500 280000 24500 175000 349 92 250 189 27 63 50 221 736 957 204 395 1 1 2 2 4 2 1 3 2 2 1 1 349000 92000 125000 94500 6750 31500 50000 73667 368000 478500 204000 395000 5741 5741 Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: MATERIAL HANDLING EQUIPMENT (P66726) Code: Other Related Program Elements: Prior Years FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 18.0 11.9 66.0 36.3. 24.6 21.9 29.1 20.6 Cont Cont 18.0 11.9 66.0 36.3 24.6 21.9 29.1 20.6 Cont Cont 18.0 11.9 66.0 36.3 24.6 21.9 29.1 20.6 Cont Cont Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares Total Proc Cost Flyaway U/C Wpn Sys Proc U/C The Material Handling Equipment (MHE) line is a roll-up line that funds for the replacement of centrally managed forklifts, warehouse cranes, and platform trucks. The replacement program has been developed on an as required basis since history has proven that many items of MHE have been maintained beyond the life expectancies developed and promulgated by Department of Defense (DoD) directives. This equipment is procured through Defense Construction Supply Center (DCSC), Columbus, Ohio. This roll-up line includes funding for the Rough Terrain Container Handler (RTCH). The RTCH is the only container handler that provides capability to lift and move Marine Corps family of 20-40 foot International Standards Organization (ISO) containers at port facilities and across the beach. The funding remanufactures and upgrades existing RTCH equipment to FY98 standards. Increasing DOD shift in reliance on containers for embarkation makes the RTCH more critical to mission accomplishment. Also included in this roll-up line is funding to provide the required number of units to fill deficiencies for the Extended Boom Forklift and replace the Marine Corps aging and worn-out inventory of buckets and fork attachments used with the Tractor, Rubber Tired, Articulated Steering, Multi-Purpose (TRAM). D7G tractor is a diesel engine powered, track-type hydraulic bulldozer equipped with a blade and modular cab incorporating a Rollover Protection Structure (ROPS). The D7G may also be equipped with a Winch, Ripper or Drawbar. Bli No. 646200 Item No. 61 Page 1 of 6 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) ID CD TotalCost $OOO Qty Each UnitCost $ TotalCost $OOO Weapon System Type: Date: MATERIAL HANDLING EQUIPMENT (P66726) FY 99 Qty Each UnitCost $ TotalCost $OOO February 2000 FY 00 Qty Each UnitCost $ TotalCost $0 FY 01 Qty Each UnitCost $ Material Handling Equipment (I&L) Forklift, Fuel 4000 lb Forklift, Fuel 6000 lb Forklift, Fuel 15000 lb Forklift, Fuel 10000 lb Forklift, Electric 4000 lb Forklift, Electric 6000 lb Forklift, Electric 6000 lb N/A Tractor, Warehouse Fuel 4000 lb Crane, Warehouse Fuel 10000 lb Pallet Truck, Electric Nontiering Pallet Truck, Electric Tiering Forklift, R/T 6000 lb Forklift, Fuel, 92500 lb 876 1446 317 192 60 155 384 63 71 37 38 83 SUB TOTAL 3722 40 66 7 2 3 5 6 5 1 4 2 2 21900 21909 45286 96000 20000 31000 64000 12600 71000 9250 19000 41500 1115 959 276 197 21 159 327 51 72 47 19 42 443 50 44 6 2 1 5 5 4 1 5 1 1 1 22300 21795 46000 98500 21000 31800 65400 12750 72000 9400 19000 42000 443000 3728 1409 409 188 100 21 97 399 53 73 10 20 86 902 62 18 4 1 1 3 6 4 1 1 1 2 2 22730 22722 47000 100000 21000 32333 66500 13250 73000 9500 20000 43000 451000 10 60 118 139200 124000 102000 143 78500 3767 Material Handling Equipment (SYSCOM) Rough Terrain Container Handler (RTCH) Extended Boom Forklift (EBFL) Forklift Attachment (TRAM) ILS Support Cost/TVL /P-M/SUPT Forklift 4000 lb D7 Bulldozer 7743 SUB TOTAL 8225 62310 32544 11947 66038 36311 TOTAL Bli No. 646200 482 Item No. 61 Page 2 of 6 52 148904 3226 21 153619 12850 367 29640 16227 128 100391 380 190 78000 85405 1392 7440 12036 450 11226 Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-5a, Budget Procurement History and Planning February 2000 Weapon System Type: Appropriation / Budget Activity/Serial No: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) MATERIAL HANDLING EQUIPMENT(P66727) WBS Cost Elements: Contractor and Location Fiscal Years RTCH FY 99 FY 00 FY01 Forklift (TRAM) FY00 FY01 Forklift (4,000lb) FY00 FY01 D7 BULLDOZER FY00 EBFL FY01 Contract Method Location of PCO and Type Award Date Date of First Delivery Specs Avail? Date Revsn RFP Issue Date QTY Unit Cost Each $ Avail 148904 Yes 153619 Yes 139200 YES No No No N/A N/A N/A CATERPILLAR, INC MOSSVILLE, IL TACOM MIPR MIPR MIPR TACOM TACOM TACOM Mar-99 May-99 Feb-99 May-00 Dec-00 Feb-01 52 21 10 TBD TBD MIPR MIPR MCSC MCSC Mar-00 Jun-00 Nov-00 Apr-01 128 118 100391 102000 Yes Yes No No N/A N/A TBD TBD MIPR MIPR MCSC MCSC Apr-00 Jun-00 Nov-00 Jun-01 380 143 78000 78500 Yes Yes No No N/A N/A CATERPILLAR, INC MIPR TACOM Feb-00 Mar-00 190 85405 Yes No N/A TBD TBD TBD Nov-00 Feb-01 60 124000 Yes No N/A REMARKS: Bli No. 646200 Item No. 61 Page 3 of 6 Exhibit P5-A, Procurement History and Planning P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE M COST ELEMENTS F R PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT S FY MATERIAL HANDLING EQUIPMENT (P66726) E R V February 2000 Fiscal Year 98 Fiscal Year 99 Calendar Year 98 O C T N O V D E C J A N F E B M A R A P R M A Y J U N L Calendar Year 99 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A T E R 4K FORKLIFT EBFL 1 FY 00 FY 01 MC MC 380 0 380 380 143 0 143 143 2 FY01 MC 60 0 60 60 O C T PRODUCTION RATES M REACHED NAME / LOCATION Bli No. 646200 MIN. 25 20 1-8-5 30 25 D E C J A N F E B M A R A M J J U U U A G Y N L ADMIN LEAD TIME A P R MFR F R 1 TBD 2 TBD N O V MAX. 40 30 D+ Number Prior 1 Oct. INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 61 Page 4 of 6 After 1 Oct. 6 1 1 S E P O C T N O V MFR After 1 Oct. 2 7 3 D E C J A N F M A E B R TOTAL A P R M J U A Y N REMARKS J U L A U G S E P After 1 Oct. 8 8 4 Exhibit P-21, Production Schedule P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE M COST ELEMENTS F R S FY E R V MATERIAL HANDLING EQUIPMENT (P66726) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT February 2000 Fiscal Year 00 Fiscal Year 01 Calendar Year 00 O C T N O V D E C J A N F E B M A R A P R M A Y L Calendar Year 01 J U N J U L A U G S E P A T E R 25 25 25 25 43 10 10 M J U A Y N REMARKS J U L A U G S E P J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y 33 33 33 33 33 33 33 33 33 33 33 17 4K FORKLIFT EBFL 1 FY 00 1 FY 01 MC MC 380 0 380 143 0 143 A FY01 MC 60 0 60 A 2 A O C T PRODUCTION RATES M REACHED NAME / LOCATION Bli No. 646200 MIN. 25 20 1-8-5 30 25 D E C J A N F E B M A R A M J J U U U A G Y N L ADMIN LEAD TIME A P R MFR F R 1 TBD 2 TBD N O V MAX. 40 30 D+ Number Prior 1 Oct. INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 61 Page 5 of 6 After 1 Oct. 6 1 1 S E P O C T N O V MFR After 1 Oct. 2 7 3 10 D E C J A N 10 10 F M A E B R TOTAL A P R 10 After 1 Oct. 8 8 4 Exhibit P-21, Production Schedule P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE M COST ELEMENTS F R PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT 380 380 143 100 S FY MATERIAL HANDLING EQUIPMENT (P66726) E R V February 2000 Fiscal Year 02 Fiscal Year 03 Calendar Year 02 O C T N O V 25 18 O C T N O V J U N J U L L Calendar Year 03 D E C J A N F E B M A R A P R M A Y A U G S E P O C T D E C J A N F E B M A R A P R A M J J U U U A G Y N L ADMIN LEAD TIME S E P O C T N O V D E C J A N D E C J A N F E B M A R A P R F M A E B R TOTAL A P R M A Y J U N J U L A U G S E P M J U A Y N REMARKS J U L A U G S E P A T E R 4K FORKLIFT 1 FY 00 FY 01 MC MC PRODUCTION RATES M MFR F R 1 TBD 2 TBD 43 REACHED NAME / LOCATION Bli No. 646200 MIN. 25 20 1-8-5 30 25 MAX. 40 30 D+ Number Prior 1 Oct. INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 61 Page 6 of 6 After 1 Oct. 6 1 1 N O V MFR After 1 Oct. 2 7 3 After 1 Oct. 8 8 4 Exhibit P-21, Production Schedule Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: FIRST DESTINATION TRANSPORTATION (P66992) Code: Other Related Program Elements: Prior Years FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 8.0 3.1 4.1 5.8 7.9 8.1 8.6 5.2 Cont Cont 8.0 3.1 4.1 5.8 7.9 8.1 8.6 5.2 Cont Cont 8.0 3.1 4.1 5.8 7.9 8.1 8.6 5.2 Cont Cont Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares Total Proc Cost Flyaway U/C Wpn Sys Proc U/C This program provides logistics support for planned quantities of materials and end items procured under the PMC appropriation to be shipped from manufacturers and/or suppliers to the Marine Corps users or facilities. All transportation included in this program is provided by commericial or industriallly funded DoD transportation services. Bli No. 646800 Item No. 62 Page 1 of 2 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) ID CD TotalCost $OOO Weapon System Type: Date: FIRST DESTINATION TRANSPORTATION (P66992) FY 99 Qty Each UnitCost $ TotalCost $OOO FY 00 Qty Each February 2000 UnitCost $ TotalCost $OOO First Destination Transporation 3080 4125 5846 TOTAL Active Reserve 3080 3080 4125 4125 5846 5846 Bli No. 646800 Item No. 62 Page 2 of 2 FY 01 Qty Each UnitCost $ Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: FIELD MEDICAL EQUIPMENT (P66370) Code: Prior Years FY 1998 Other Related Program Elements: FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 24.5 2.2 5.4* 1.9 2.5 5.7 7.4 5.3 Cont Cont 24.5 2.2 5.4 1.9 2.5 5.7 7.4 5.3 Cont Cont 24.5 2.2 5.4 1.9 2.5 5.7 7.4 5.3 Cont Cont Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares Total Proc Cost Flyaway U/C Wpn Sys Proc U/C FY98 - FY05: Funds will procure equipment to stand up the Chemical/Biological Incident Response Force (CBIRF) and to overcome, basic capability shortfalls in detection, monitoring, and decontamination of toxic industrial and military chemical and biological agents. The program will provide adequate protective equipment for CBIRF personnel, communications equipment, medical equipment for patient care and handling, and other necessary support equipment. FY99: CBIRF Marine Expeditionary Units (MEU's) Enhancement and Radiological Capability: Provides Nuclear Biological Chemical (NBC) defense capability for deploying MEUs. Allows for increased NBC detection and identification capabilities, increased NBC force protection to warfighters, and modular personnel decontamination capabilities. FY02 - FY04 Field Medical Equipment provides equipment for the three Marine Expeditionary Forces, the Marine prepositioned ships and the Norway geo-prepositioned ships and the Norway Airlanded Marine Expeditionary Brigade (NALM) program. The Forward Resuscitative Surgery System is a light-weight, rapidly-deployable, small-footprint (5X5X10), container that quickly expands to a 30X30 medical facility. The primary mission is to provide emergency surgery. The secondary mission is to provide a spacious structure for ancillary services (sick call, lab, pharmacy, x-ray and dental). Digital Radiography (DR) captures x-ray images in a digital format using an optic device. The digital data is collected by micro computer and transmitted to an imaging workstation. DR serves as the entry point for teleradiology by providing image store and forward capability to the next level of care via Local Area Network/Wide Area Network (LAN/WAN), radio frequency or satellite transmission. *NOTE: FY00 includes $2.5M currently being reprogrammed to the Joint Service Chem/Bio Defense Program. Bli No. 652200 Item No. 63 Page 1 of 4 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements CBIRF EQUIPMENT CBIRF MEU KITS TOTAL Active Reserve Bli No. 652200 Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) / 060 ID CD TotalCost $OOO Weapon System Type: Date: FIELD MEDICAL EQUIPMENT (P66370) FY 99 Qty Each 2179 2179 2179 Item No. 63 Page 2 of 4 VAR UnitCost $ VAR TotalCost $OOO 2389 3000 5389 5389 FY 00 Qty Each VAR VAR February 2000 UnitCost $ VAR VAR TotalCost $OOO 1914 FY 01 Qty Each VAR UnitCost $ VAR 1914 1914 Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-5a, Budget Procurement History and Planning Weapon System Type: Appropriation / Budget Activity/Serial No: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) / 060 February 2000 P-1 Line Item Nomenclature: FIELD MEDICAL EQUIPMENT (P66370) WBS Cost Elements: Contractor and Location Fiscal Years Contract Method Location of PCO and Type Award Date Date of First Delivery QTY Unit Cost Each $ Specs Avail? Date Revsn RFP Issue Date Avail CBIRF EQUIPMENT FY 00 FY 01 Various Various SS/FFP SS/FFP Various Various Various Various Various Various VAR VAR VAR VAR N/A N/A N/A N/A N/A N/A CBIRF MEU KITS FY99 FY00 Various Various SS/FFP SS/FFP Various Various Various Various Various Various VAR VAR VAR VAR N/A N/A N/A N/A N/A N/A REMARKS: The CBIRF Unit is equipped with approximately 264 medical and chemical biological items. Bli No. 652200 Item No. 63 Page 3 of 4 Exhibit P-5A, Procurement History and Planning P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS M F R FY FIELD MEDICAL EQUIPMENT (P66370) PROC ACCEP. BAL S QTY PRIOR DUE E R V Each TO 1 OCT AS OF 1 OCT February 2000 Fiscal Year 99 Calendar Year 99 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 00 Calendar Year 00 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L L A A U G S E P T E R CBIRF EQUIPMENT/MEU KITS VAR FY99 FY00 FY01 Various Various Various VAR VAR VAR O C T PRODUCTION RATES M F R NAME / LOCATION MIN. 1-8-5 MAX. N O V MFR REACHED Number D+ D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. O C T N O V D E C MFR After 1 Oct. J A N F E B M A R TOTAL After 1 Oct. A P R M A Y J U N J U L A U G REMARKS INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Bli No. 652200 Item No. 63 Page 4 of 4 Exhibit P-21, Production Schedule S E P Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: Code: TRAINING DEVICES (P66445) Other Related Program Elements: Prior Years FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 160.3 3.3 13.8 30.8 21.6 17.6 24.7 25.0 297.1 160.3 3.3 13.8 30.8 21.6 17.6 24.7 25.0 297.1 3.6 0.4 4.0 1.9 4.2 3.6 3.7 1.3 22.7 26.3 319.8 Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares Total Proc Cost 163.9 3.7 17.8 32.7 25.8 21.2 28.4 Flyaway U/C Wpn Sys Proc U/C MINOR TRAINING DEVICES/SIMULATORS: These items are commercial nondev elopmental training dev ices and other serv ice minor training dev ices for use by Marine Corps Schools, operating forces, bases and stations. AUDIOVISUAL EQUIPMENT: Prov ides equipment required by the Training and Audiov isual Support Centers (TAVSC) for audiov isual productions. Items replace worn out, unserv iceable and/or obsolete equipment. Requirements are based on a centrally managed program for 19 TAVSC's throughout the Marine Corps. Procurements are centrally managed and are nondev elopmental, off-the-shelf. In addition, equipment is prov ided to Fleet Marine Force (FMF) Public Affairs (PA) elements that hav e the requirement for dedicated audiov isual equipment to support national security strategy and DoD, Unified Command and Marine Corps objectiv es in all circumstances, peacetime, training and contingencies. MULTIPLE INTEGRATED LASER ENGAGEMENT SYSTEM (MILES): Prov ides a family of low power, eye safe lasers which simulate the direct fire characteristics of infantry assault, armor, anti-armor mechanized weapons systems and prov ides the gunner with hit or miss determination. MILES is designed to be used by the Marine Air-Ground Task Force (MAGTF) as a force-on-force engagement simulation training system. The Marine Corps Master Plan (MCMP) signed by the Commandant of the Marine Corps mandates that the lowest lev el of force-on-force training shall be at the battalion v ice company lev el. NOTE: A battalion set includes MILES Precision Gunnery System (for the Light Armored Vehicle LAV), MILES Tank Weapon Gunnery Simulator System (TWGSS) (for the tanks), and MILES 2000. Bli No. 653200 Item No. 64 Page 1 of 6 Exhibit P-40, Budget Item Justification Sheet Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) TRAINING DEVICES (P66445) DISTANCE LEARNING: Distance Learning will prov ide effectiv e training with fewer resources by using modern instructional technologies (interactiv e software/ courseware) and remote deliv ery systems (local and wide-area networks (LAN/WAN)). Distance Learning will yield sav ings in specialized skills training, TAD costs and manpower structure required to conduct this training. Funds are primarily required to procure the hardware to support an expanding distance learning structure base. COMBAT VEHICLE APPENDED TRAINER (CVAT): CVAT will be a deployable additiv e to the M1A1 tank and LAV weapon platforms that prov ides simulation in the actual v ehicle that the Marine will utilize in combat. The CVAT system will incorporate the operational weapon platform as part of the training system, thus allowing Marines to train as a full crew in their combat v ehicle. CVAT will prov ide a synthetic battlefield encompassing all facets of combat operations, (i.e. air, ground, etc). INDOOR SIMULATED MARKSMANSHIP TRAINER (ISMT): ISMT is an interactiv e v ideo weapons simulator that prov ides enhanced marksmanship training and weapons proficiency. The system consists of modified infantry weapons that use laser to engage v ideo scenarios. The scenarios realistically replicate range firing for qualification, combat and shoot/no-shoot decisionmaking situations. Funding will be used for enhancements to existing systems and additional weapons and capabilities. JOINT SIMULATION SYSTEM (JSIMS): JSIMS will prov ide readily av ailable, operationally v alid, computer-simulated env ironments for use by Commander-in-Chiefs (CINC's) , their components, other joint organizations, and Serv ices to train, educate, dev elop doctrine and tactics, formulate and assess operational plans, assess warfighting situations, and define operational requirements. Bli No. 653200 Item No. 64 Page 2 of 6 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Weapon System Cost Elements Minor Training Devices/Simulators Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) ID CD TotalCost $OOO 880 Weapon System Type: FY 99 Qty Each VAR UnitCost $ VAR Audiovisual Equipment/Public Affairs Multiple Integrated Laser Engagement System System 1179 VAR VAR Distance Learning 1238 VAR VAR February 2000 TotalCost $OOO 830 FY 00 Qty Each VAR UnitCost $ VAR TotalCost $OOO 985 FY 01 Qty Each VAR UnitCost $ VAR 2117 VAR VAR 2041 VAR VAR 2224 VAR VAR 4428 VAR VAR 22789 35 651114 548 1 548000 Combat Vehicle Appended Trainer Indoor Simulated Marksmanship Trainer 8579 Joint Simulation System TOTAL Active Reserve Bli No. 653200 Date: TRAINING DEVICES (P66445) 3297 3297 Item No. 64 Page 3 of 6 13750 13750 VAR VAR 30791 25102 5689 Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-5a, Budget Procurement History and Planning Feb 2000 Weapon System Type: Appropriation / Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) TRAINING DEVICES (P66445) WBS Cost Elements: Contractor and Location Fiscal Years Contract Method Location of PCO Award Date Date of First and Type Delivery QTY Unit Cost Each $ Specs Avail? Date Revsn RFP Issue Date Avail Minor Training Devices/Simulators FY 99 FY 00 FY 01 VARIOUS VARIOUS VARIOUS CFFP CFFP CFFP USMC USMC USMC VARIES VARIES VARIES VARIES VARIES VARIES VAR VAR VAR VAR VAR VAR Y Y Y N N N N/A N/A N/A Audiovisual Equipment FY 98 FY 00 FY 01 VARIOUS VARIOUS VARIOUS CFFP CFFP CFFP ARMY ARMY ARMY VARIES VARIES VARIES VARIES VARIES VARIES VAR VAR VAR VAR VAR VAR Y Y Y N N N N/A N/A N/A Multiple Integrated Laser Engagement System FY 99 CBS CFFP USN Jul-99 Jan-00 VAR VAR y N N/A Distance Learning FY 99 FY 00 FY 01 VARIOUS VARIOUS VARIOUS CFFP CFFP CFFP USMC USMC USMC Dec-98 Feb-99 Dec-99 Feb-00 Dec-00 Feb-01 VAR VAR VAR VAR VAR VAR Y Y Y N N N N/A N/A N/A TBD CFFP USMC Mar-01 Dec-01 35 651114 Y N N/A Indoor Simulated Marksmanship Trainer FY 00 TBD CFFP USMC Jan-00 Jul-00 VAR VAR Y N N/A Joint Simulation System FY 01 TBD CFFP USMC Jun-01 Aug-01 1 548000 Y N N/A Combat Vehicle Appended Trainer FY 01 REMARKS: Bli No. 653200 Item No. 64 Page 4 of 6 Exhibit P5-A, Procurement History and Planning Exhibit P-20, Requirements Study Approriation/Budget Activity/Serial No: Date: P-1 Line Item Nomenclature (Include DODIC for Ammunition Items): Admin Leadtime (after Oct 1): Prod Leadtime: 6 Months Train ing Devices (P66445) CVAT Line Descriptions Buy Summary Feb 2000 Procurement, Marine Corps (1109) / Engineer and Other Equipment (6 ) FY 1998 FY 1999 FY 2000 9 Months FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 35 Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from: 651114.0 22789.0 27 FY 1999 35 35 35 35 Funding Deliveries from: FY 2000 Funding Deliveries from: FY 2001 Funding Deliveries from Subsequent Years Funds Other Gains Combat Losses Training Losses Test Losses Other Losses Disposals/Retirements/Attritions End of Year Asset Position 27 8 27 8 Inventory Objective or Current Authorized Allowance Inventory Objective 142 Assets Rqd for Combat Loads: WRM Rqmt: Pipeline: Other: Total: Actual Training Expenditures 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Other than Training Usage 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Disposals (Vehicles/Other) 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Vehicles Eligible for Replacement FY 2000 FY 2001 Augment Aircraft: TOAI PAA: TAI Attrition Res BAI Inactive Inv Storage Remarks: Bli No. 653200 Item No. 64 Page 5 of 6 Exhibit P-20, Requirements Study Exhibit P-20, Requirements Study Approriation/Budget Activity/Serial No: Date: Feb 2000 Procurement, Marine Corps (1109) / Engineer and Other Equipment) (6 P-1 Line Item Nomenclature (Include DODIC for Ammunition Items): Admin Leadtime (after Oct 1): Prod Leadtime: 3 Months JSIMS Line Descriptions Buy Summary FY 1998 FY 1999 FY 2000 9 Months FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 1 Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from: 548000.0 548.0 FY 1999 1 1 1 1 1 1 1 1 Funding Deliveries from: FY 2000 Funding Deliveries from: FY 2001 Funding Deliveries from Subsequent Years Funds Other Gains Combat Losses Training Losses Test Losses Other Losses 1 Disposals/Retirements/Attritions End of Year Asset Position 1 Inventory Objective or Current Authorized Allowance Inventory Objective 6 Assets Rqd for Combat Loads: WRM Rqmt: Pipeline: Other: Total: Actual Training Expenditures 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Other than Training Usage 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Disposals (Vehicles/Other) 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Vehicles Eligible for Replacement FY 2000 FY 2001 Augment Aircraft: TOAI PAA: TAI Attrition Res BAI Inactive Inv Storage Remarks: Bli No. 653200 Item No. 64 Page 6 of 6 Exhibit P-20, Requirements Study . Date: Exhibit P-40, Budget Item Justification Sheet February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Program Elements for Code B Items: CONTAINER FAMILY (P66601) Code: Prior Years FY 1998 Other Related Program Elements: FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 18.4 6.4 5.7 6.9 5.9 6.2 6.3 6.4 Cont Cont 18.4 6.4 5.7 6.9 5.9 6.2 6.3 6.4 Cont Cont 18.4 6.4 5.7 6.9 5.9 6.2 6.3 6.4 Cont Cont Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares Total Proc Cost Flyaway U/C Wpn Sys Proc U/C The Container Family provides the Fleet Marine Force with a fully intermodal transport capability emphasizing dimensional standardization and International Organization for Standardization compatibility. Two types of containers are procured, Pallet and Quadruple. The containers are end items and assets owned by the unit, expeditionary in nature. Components for the containers such as racks, horizontal connectors and inserts are not end items and do not have Acquisition Objectives. Containers will replace locally assembled prefabricated wooden mount out boxes and flat and box pallets. The containers will be used to support storage and movement of organizational property and consumable supplies, provide field, garrison and shipboard warehousing, and facilitate ship-toshore movement. Bli No. 654300 Item No. 65 Page 1 of 9 Exhibit P-40, Budget Item Justification Sheet Exhibit P-5, Weapon WPN SYST Cost Analysis Appropriation/ Budget Activity/Serial No: P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Weapon System Type: Date: CONTAINER FAMILY (P66601) February 2000 TotalCost $OOO 2371 FY 99 Qty Each 3513 UnitCost $ 675 TotalCost $OOO 1607 FY 00 Qty Each 2381 UnitCost $ 675 TotalCost $OOO 2717 FY 01 Qty Each 3870 UnitCost $ 702 2945 1806 1631 3018 2124 1421 2951 1767 1670 Full-Length Insert 199 1749 114 135 1185 114 229 1926 119 Pallet Container Rack 154 583 264 104 395 264 177 642 276 90 172 523 124 232 534 144 265 543 Horizontal Connector 298 4201 71 306 4203 73 355 4791 74 Half-Length Insert 287 3498 82 194 2370 82 327 3852 85 Weapon System Cost Elements Pallet Container TAMCN C4431 Quadruple Container TAMCN C4433 Quadruple Container Rack ID CD TotalCost $OOO Qty Each UnitCost $ Transportation Support and Travel TOTAL Active Reserve Bli No. 654300 175 13 10 2 6357 4873 1484 5673 4510 1163 6902 5941 961 Item No. 65 Page 2 of 9 Exhibit P-5, Weapon System Cost Analysis Date: Exhibit P-5a, Budget Procurement History and Planning Weapon System Type: Appropriation / Budget Activity/Serial No: February 2000 P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) WBS Cost Elements: CONTAINER FAMILY (P66601) Contractor and Location Fiscal Years Bli No. 654300 Location of PCO and Type Pallet Container TAMCN C4431 FY 99 FY 00 FY 01 Quadruple Container TAMCN C4433 FY 99 FY 00 FY 01 Full-Length Insert TAMCN 4434 FY 99 FY 00 FY 01 Pallet Container Rack TAMCN C4437 FY 99 FY 00 FY 01 Quadruple Container Rack TAMCN C4438 FY 99 FY 00 FY 01 REMARKS: Contract Method Award Date Date of First Delivery QTY Unit Cost Each $ Specs Avail? Date Revsn RFP Issue Date Avail Plastic Research Corp Plastic Research Corp Plastic Research Corp C/FFP/0 USMC C/FFP/0 USMC C/FFP/0 USMC Aug-99 Oct-99 Oct-99 Feb-00 Oct-00 Feb-01 3513 2381 3870 675 675 702 Yes Yes Yes No No No Jun-98 N/A N/A Charleston Marine Containers Charleston Marine Containers Charleston Marine Containers C/FFP/0 USMC C/FFP/0 USMC C/FFP/0 USMC May-99 Feb-00 Oct-99 Feb-00 Oct-00 Feb-01 1806 2124 1767 1631 1421 1670 Yes Yes Yes No No No Jun-98 N/A N/A Plastic Research Corp Plastic Research Corp Plastic Research Corp C/FFP/0 USMC C/FFP/0 USMC C/FFP/0 USMC Aug-99 Oct-99 Oct-99 Feb-00 Oct-00 Feb-01 1749 1185 1926 114 114 119 Yes Yes Yes No No No Jun-98 N/A N/A Plastic Research Corp Plastic Research Corp Plastic Research Corp C/FFP/0 USMC C/FFP/0 USMC C/FFP/0 USMC Aug-99 Oct-99 Oct-99 Feb-00 Oct-00 Feb-01 583 395 642 264 264 275 Yes Yes Yes No No No Jun-98 N/A N/A Charleston Marine Containers Charleston Marine Containers Charleston Marine Containers C/FFP/0 USMC C/FFP/0 USMC C/FFP/0 USMC May-99 Feb-00 Oct-99 Feb-00 Oct-00 Feb-01 172 232 265 523 534 544 Yes Yes Yes No No No Jun-98 N/A N/A Decreased production lead time attributed to change in requirements in RFP. Contractors must have Certified Containers in order to bid. Previously this was not a requirement and the production lead time included time for production and certification. Contracts are Indefinite Delivery Order Indefinite Quantity (IDIQ) with step ladder pricing. Item No. 65 Page 3 of 9 Exhibit P5-A, Procurement History and Planning Date: Exhibit P-5a, Budget Procurement History and Planning Weapon System Type: Appropriation / Budget Activity/Serial No: February 2000 P-1 Line Item Nomenclature: Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) WBS Cost Elements: CONTAINER FAMILY (P66601) Contractor and Location Fiscal Years Bli No. 654300 Location of PCO and Type Horizontal Connector FY 99 FY 00 FY 01 Half-Length Insert FY 99 FY 00 FY 01 REMARKS: Contract Method Award Date Date of First Delivery QTY Unit Cost Each $ Specs Avail? Date Revsn RFP Issue Date Avail Charleston Marine Containers Charleston Marine Containers Charleston Marine Containers C/FFP/0 USMC C/FFP/0 USMC C/FFP/0 USMC May-99 Feb-00 Oct-99 Feb-00 Oct-00 Feb-01 4201 4203 4791 71 73 74 Yes Yes Yes No No No Jun-98 N/A N/A Plastic Research Corp Plastic Research Corp Plastic Research Corp C/FFP/0 USMC C/FFP/0 USMC C/FFP/0 USMC Aug-99 Oct-99 Oct-99 Feb-00 Oct-00 Feb-01 3498 2370 3852 82 82 85 Yes Yes Yes No No No Jun-98 N/A N/A Decreased production lead time atttributed to change in requirements in RFP. Contractors must have Certified Containers in order to bid. Previously this was not a requirements and the production lead time included time for production and certification. Contracts are indefinite Delivery Order Indefinite Quantity (IDIQ) with step ladder pricing. Item No. 65 Page 4 of 9 Exhibit P5-A, Procurement History and Planning Exhibit P-20, Requirements Study Approriation/Budget Activity/Serial No: Date: P-1 Line Item Nomenclature (Include DODIC for Ammunition Items): Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from: FY 1998 FY 2000 2381 FY 2001 3870 FY 2002 4041 FY 2003 4084 FY 2004 3992 FY 2005 4000 0.7 2371.0 0.7 1607.0 0.7 2717.0 0.7 2949.0 0.8 3099.0 0.8 3149.0 0.8 3200.0 19827 19827 3513 24924 28297 32293 36368 40390 1584 797 2576 1294 2702 4075 4022 3998 32293 36368 40390 44388 Funding Deliveries from: FY 2000 Funding Deliveries from: FY 2001 Funding Deliveries from Subsequent Years Funds Other Gains FY97 Funding Combat Losses Training Losses Test Losses Other Losses Disposals/Retirements/Attritions End of Year Asset Position 6 Months FY 1999 3513 17403 FY 1999 Prod Leadtime: 9 Months CONTAINER FAMILY (P66601) Line Descriptions Buy Summary Feb 2000 Procurement, Marine Corps (1109) / Engineer and Other Equipment (6) Admin Leadtime (after Oct 1): 2424 19827 19827 24924 28297 Inventory Objective or Current Authorized Allowance Inventory Objective 59447 Assets Rqd for Combat Loads: WRM Rqmt: Pipeline: Other: Total: Actual Training Expenditures 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Other than Training Usage 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Disposals (Vehicles/Other) 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Vehicles Eligible for Replacement FY 2000 FY 2001 Augment Aircraft: TOAI PAA: TAI Attrition Res BAI Inactive Inv Storage Remarks: Pallet Container. This only depicts container cost, not rack and insert. Bli No. 654300 Item No. 65 Page 5 of 9 Exhibit P-20, Requirements Study Exhibit P-20, Requirements Study Approriation/Budget Activity/Serial No: Date: P-1 Line Item Nomenclature (Include DODIC for Ammunition Items): Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from: FY 1998 FY 1999 Prod Leadtime: 5 Months CONTAINER FAMILY (P66601) Line Descriptions Buy Summary Feb 2000 Procurement, Marine Corps (1109) / Engineer and Other Equipment (6 ) Admin Leadtime (after Oct 1): 6 Months FY 1999 1806 FY 2000 2124 FY 2001 1767 FY 2002 1697 FY 2003 1740 FY 2004 1750 FY 2005 1748 1.6 2945.0 1.4 3018.0 1.7 2951.0 1.7 2949.0 1.8 3098.0 1.8 3150.0 1.8 3198.0 7250 1552 9549 254 11219 13103 14830 16556 18303 1416 708 1176 591 1136 1726 1747 1749 14830 16556 18303 20052 Funding Deliveries from: FY 2000 Funding Deliveries from: FY 2001 Funding Deliveries from Subsequent Years Funds Other Gains FY97 Funding Combat Losses Training Losses Test Losses Other Losses 747 Disposals/Retirements/Attritions End of Year Asset Position 9549 11219 13103 Inventory Objective or Current Authorized Allowance Inventory Objective 20152 Assets Rqd for Combat Loads: WRM Rqmt: Pipeline: Other: Total: Actual Training Expenditures 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Other than Training Usage 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Disposals (Vehicles/Other) 98 thru FY XXXX FY XXXX FY XXXX FY XXXX Vehicles Eligible for Replacement FY 2000 FY 2001 Augment Aircraft: TOAI PAA: TAI Attrition Res BAI Inactive Inv Storage Remarks: Quadruple Container. This only depicts container cost, not rack and insert. Bli No. 654300 Item No. 65 Page 6 of 9 Exhibit P-20, Requirements Study P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS Pallet Container TAMCN C4431 Quadruple Container TAMCN C4433 S CONTAINER FAMILY (P66601) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT M F R FY E R V 1 1 1 FY 99 FY 00 FY 01 MC MC MC 3513 2381 3870 0 0 0 3513 2381 3870 2 2 2 FY 99 FY 00 FY 01 MC MC MC 1806 2124 1767 0 0 0 1806 2124 1767 O C T PRODUCTION RATES R NAME / LOCATION 1 Plastic Research Corp 2 Charleston Marine Containers Bli No. 654300 MIN. 25 12 MAX. 1-8-5 100 160 325 160 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Fiscal Year 99 Calendar Year 99 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L L A U G S E P A A T E R 3513 2381 3870 A 1806 2124 1767 O C T M F Feb 2000 Fiscal Year 98 Calendar Year 98 N O V MFR REACHED Number D+ 1 1 2 2 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. O C T N O V D E C J A N F E B MFR After 1 Oct. TOTAL After 1 Oct. INITIAL 9 6 15 REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER 0 5 0 3 6 3 3 11 3 Item No. 65 Page 7 of 9 M A R A P R M A Y J U N J U L A U G S E P REMARKS Exhibit P-21, Production Schedule P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS S CONTAINER FAMILY (P66601) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT M F R FY E R V 1 1 1 FY 99 FY 00 FY 01 MC MC MC 3513 2381 3870 0 0 0 3513 2381 3870 2 2 2 FY 99 FY 00 FY 01 MC MC MC 1806 2124 1767 0 0 0 1806 2124 1767 Feb 2000 Fiscal Year 00 Calendar Year 00 Fiscal Year 01 Calendar Year 01 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 292 292 292 292 292 292 292 292 292 292 292 301 198 198 198 198 198 198 198 198 O C T N O V D E C J A N 198 198 198 203 L F E B M A R A P R M A Y J U N J U L A U G S E P A T E R 322 322 322 322 322 322 322 322 1294 116 116 116 116 116 152 147 147 147 147 147 147 147 147 591 F E B M A R A P R M A Y J U N J U L A U G S E P Pallet Container TAMCN C4431 A A Quadruple Container TAMCN C4433 A PRODUCTION RATES R NAME / LOCATION 1 Plastic Research Corp 2 Charleston Marine Containers Bli No. 654300 MIN. 25 12 MAX. 1-8-5 100 160 325 160 194 194 194 194 194 194 194 194 60 116 116 116 116 116 116 116 116 116 116 116 A O C T M F 194 116 N O V MFR REACHED Number D+ D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. O C T N O V D E C J A N MFR After 1 Oct. TOTAL After 1 Oct. INITIAL 1 9 6 15 REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER 1 2 2 0 5 0 3 6 3 3 11 3 Item No. 65 Page 8 of 9 REMARKS Exhibit P-21, Production Schedule P-1 Item Nomenclature: Date: FY 00 / 01 BUDGET PRODUCTION SCHEDULE COST ELEMENTS S CONTAINER FAMILY (P66601) PROC ACCEP. BAL QTY Each PRIOR TO 1 OCT DUE AS OF 1 OCT M F R FY E R V 1 1 1 FY 99 FY 00 FY 01 MC MC MC 3513 2381 3870 3513 2381 2676 2 2 2 FY 99 FY 00 FY 01 MC MC MC 1806 2124 1767 1806 2124 1176 Feb 2000 Fiscal Year 02 Calendar Year 02 O C T N O V D E C J A N 1194 322 322 322 228 591 147 147 147 150 O C T N O V D E C J A N Fiscal Year 03 Calendar Year 03 L F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A T E R Pallet Container TAMCN C4431 Quadruple Container TAMCN C4433 PRODUCTION RATES M F R NAME / LOCATION 1 Plastic Research Corp 2 Charleston Marine Containers Bli No. 654300 MIN. 25 12 MAX. 1-8-5 100 160 325 160 MFR REACHED Number D+ ADMIN LEAD TIME Prior 1 Oct. After 1 Oct. INITIAL 0 MFR After 1 Oct. TOTAL After 1 Oct. 3 3 REMARKS REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER INITIAL REORDER Item No. 65 Page 9 of 9 Exhibit P-21, Production Schedule Date: Exhibit P-40, Budget Item Justification Sheet Appropriation / Budget Activity/Serial No: February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109)/ Engineer and Other Equipment (6) Program Elements for Code B Items: ITEMS UNDER $5 MILLION Code: Prior Years FY 1999 Other Related Program Elements: FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 To Complete Total Prog 12.0 5.6 7.9 8.1 9.3 6.3 49.2 12.0 5.6 7.9 8.1 9.3 6.3 49.2 12.0 5.6 7.9 8.1 9.3 6.3 49.2 Proc Qty Gross Cost Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares Total Proc Cost Flyaway U/C Wpn Sys Proc U/C This is a roll-up line which contains many different engineering and other equipment related items for which the annual procurement is less than $5 Million each. The funds included in this budget line allow procurement of the following items. In FY 1998 and FY 1999, the programs below are budgeted in the Items Less Than $2 Million and/or are FY 2000 new start programs. Small Unit Riverine Craft (SURC) (637300) - will provide tactical mobility and a weapons platform for elements of a Marine Air Ground Task Force (MAGTF) Ground Combat Element (GCE) in the Riverine Environment. Command Support Equipment (643200) - covers the procurement of plant investment items for the support of ground bases, air stations and Marine Corps Districts. Underwater Breathing Apparatus (643400) - is a closed circuit (no bubbles) Oxygen Recirculator (rebreather). Combat Rubber Reconnaissance Craft (643400) - is presently the Marine Corps primary means of accomplishing Amphibious Raid and Reconnaissance missions. Operational experience has identified the need for a few modifications to the CRRC. Family of Small Craft Mods (643400) - will satisfy the safety and RAM issues associated with the Riverine Assault Craft (RAC), the Rigid Raiding Craft (RRC) and associated equipment. Warehouse Modernization (645600) - provides equipment which provides a better work flow, maximum use of storage space, upgrading of storage aids, modern perservation packaging, and packing facilities. Engineer Modfication Kits (665400) - provides for significant improvements to a variety of engineering equipment by enhancing their capabilities and/or improving readiness. Modifications correct safety deficiencies, improve reliability, maintainability and performance of various pieces of equipment. Compressed Air Foam System Mobile (666900) - is a firefighting system that uses modern foam generating technology to suppress Class A and B fires. The system is mounted into the cargo area of a HMMWV and replaces the TAU/CUCV configuration that is currently used. Distance Learning (653200) - is a USMC wide- Defense Information Infrastructure (DII) compatible distributed intranet that will enable Marines to receive training via the appropriate interactive media, when and where the learning is needed. The additional $3M allows for the upgrading of 26 Learning Resource Centers to Automated Electronic Classrooms a well as the fielding of all Quantico DL assets in FY00. Bli No. 667000 Item No. 68 Page 1 of 2 Exhibit P-40, Budget Item Justification Sheet Date: Exhibit P-40a, Budget Item Justification for Aggregated Items Appropriation / Budget Activity February 2000 P-1 Item Nomenclature: Procurement, Marine Corps (1109)/ Engineer and Other Equipment (6) Procurement Items Small Unit Riverine Craft (SURC) Code UOM A D Prior Years ITEMS UNDER $5 MILLION FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 0.0 0.0 0.0 2.2 2.3 3.2 FY 2005 To Complete Total Prog 0.0 7.7 0.0 0.6 0.6 0.6 0.7 0.6 0.6 3.7 0.0 0.4 0.4 0.4 0.4 0.4 0.4 2.4 0.0 1.1 1.1 1.1 1.1 1.3 1.3 7.0 0.0 1.0 0.8 0.8 0.7 0.7 0.8 4.8 0.0 1.4 1.4 1.5 1.6 1.7 1.7 9.3 0.0 1.2 1.2 1.3 1.3 1.4 1.4 7.8 0.0 3.4 0.0 0.0 0.0 0.0 0.0 3.4 0.0 3.0 0.0 0.0 0.0 0.0 0.0 3.0 Q Command Support Equipment A D Q Underwater Breathing Apparatus A D Q Combat Rubber Reconnaissance Craft A D Q Family of Small Craft Mods A D Q Warehouse Modernization A D Q Engineer Modfication Kits A D Q Compressed Air Foam System Mobile A D Q Distance Learning A D Q Bli No. 667000 Item No. 68 Page 2 of 2 Exhibit P-40a, Budget Item Justification for Aggregated Items