MECHANICAL LEGEND GENERAL NOTES (FOR ALL MECHANICAL DRAWINGS)

advertisement
2
3
4
5
6
ARCHITECT
1
E
E
MECHANICAL LEGEND
D
180
DRAIN PIPE
Mechanical, Electrical & Energy Consultants
DOMESTIC HOT WATER CIRCULATING
VALVES & SPECIALTIES
T
NP
NON-POTABLE WATER
SHUT-OFF VALVE
NG
NATURAL GAS
GLOBE VALVE
V
PLUMBING VENT PIPE
CHECK VALVE
CHV
CHEMICAL VENT PIPE
FLOW CONTROL VALVE W/ CHECK
SAN
SANITARY WASTE PIPE
PLUG FOR DIVISION 15400 (PLUMBING SYSTEMS)
CALIBRATED BALANCING SHUT-OFF VALVE FOR
DIVISION 15600 (HYDRONIC SYSTEMS)
GW
GREASE WASTE PIPE
CHW
ST
N.O. VALVE W/ LOCKING COVER
PLUG OR BALANCING SHUT-OFF VALVE IN RISER
D
7600 East Orchard Road, Suite 250-S
Greenwood Village, CO 80111-2518
303.796.6000
www.mkkeng.com
OVERFLOW STORM DRAIN PIPE
VAC
VACUUM PIPE
500 West 18th Street, Suite 200
Cheyenne, WY 82001-4368
307.634.7647
175 North 27th Street, Suite 1312
Billings, MT 59101-2048
406.256.1141
PROJECT LOCATION:
FT COLLINS, COLORADO
HORIZONTAL CLEANOUT
PROJECT ALTITUDE:
5100 FEET ABOVE SEA LEVEL
VERTICAL CLEANOUT
SUMMER DESIGN TEMPERATURE:
WINTER DESIGN TEMPERATURE:
85°F DRY BULB, 59°F WET BULB (PSD STANDARD)
10°F DRY BULB, 0%RH (PSD STANDARD)
WINTER ROOM DESIGN TEMP:
70°F DRY BULB - NO HUMIDITY REQUIREMENT
HVAC DUCTWORK
FIRE DAMPER
TEMPERATURE CONTROL VALVE, 2-WAY
PRESSURE INDEPENDENT 2-WAY CONTROL VALVE
PRESSURE REDUCING VALVE
S
SMOKE DAMPER
FS
COMBINATION FIRE / SMOKE DAMPER
SAFETY OR RELIEF VALVE
CONTROLS LEGEND
DP
AUTOMATIC AIR VENT
DUCT SIZES ARE OUTSIDE SHEET METAL DIMENSIONS. 1st
NO. IS SIZE OF SURFACE SHOWN. 2nd NO. IS DUCT DEPTH.
LETTERS AFTER DIM. CORRESPOND TO FOLLOWING:
24/12
PRESSURE - TEMP. TAP
DLV-
PRESSURE GAUGE W/ PIG TAIL & COCK
THERMOMETER
BALL VALVE
VACUUM BREAKER
SIZE
CFM
TEMPERATURE CONTROL
DAMPER (T.C.)
MAIN AIR
ROUND DUCTWORK
DOUBLE WALL CONSTRUCTION
LINED DUCTWORK
OVAL DUCTWORK
REMOTE BULB
SENSOR/CONTROLLER
RETURN AIR TAG. SEE SCHEDULE FOR TERMINAL
DEVICE INFO.
SECTION THRU OUTSIDE AIR INTAKE OR
SUPPLY AIR DUCT
PIPE UNION
SECTION THRU RETURN AIR OR
EXHAUST DUCT
PIPE CAP
PIPE ANCHOR
COIL
C
OA, RA OR EXH DUCT DOWN
MOTOR
STARTER
SUPPLY AIR DUCT DOWN
PREMANUFACTURED PIPE EXPANSION LOOP. REQUIRED
EXPANSION COMPENSATION LISTED. PROVIDE GUIDES &
ANCHORS AS RECOMMENDED BY MANUFACTURER.
UP
H
HUMIDISTAT/HUMIDITY SENSOR
ICE
SNOW/ICE SENSOR
CO
CARBON MONOXIDE SENSOR
CO2
PIPE GUIDE
CHANGE OF ELEVATION UP (UP) DOWN (DN) IN
DIRECTION OF AIR FLOW
3-WAY
BUTTERFLY
VALVE
FLOW SWITCH
FIRE PIPE
2-WAY
BUTTERFLY
VALVE
RETURN AIR GRILLE W/SOUND BOOT
SHADING INDICATES OPEN END
EXISTING FIRE SPRINKLER
9.
WORK UNDER THIS CONTRACT IS IN OCCUPIED SPACES, STORAGE ROOMS AND
EQUIPMENT ROOMS. CONTRACTOR IS TO SCHEDULE AND COORDINATE THE WORK AND
ANY EXISTING EQUIPMENT DOWNTIME WITH POUDRE SCHOOL DISTRICT PRIOR TO
BEGINNING WORK.
BINARY INPUT OR
OUTPUT SYMBOL
15. CONTRACTOR TO COORDINATE THE LOCATION OF ALL DUCTWORK, CEILING DEVICES,
GRILLES, REGISTERS AND DIFFUSERS WITH REFLECTED CEILING PLAN AND STRUCTURE
PRIOR TO BEGINNING WORK.
EMERGENCY PULL SWITCH
16. DUCT DIMENSIONS GIVEN ARE OUTSIDE SHEET METAL DIMENSIONS.
ES
SWITCH
FS
FLOW SWITCH
CARBON DIOXIDE SENSOR
T
NIGHT T-STAT/SENSOR
T
ROOM THERMOSTAT/SENSOR
M
FLEXIBLE DUCT
NEW FIRE SPRINKLER
M
LAP TOP
WORK STATION
2P
2P
THERMOSTAT/SENSOR
T N
WATER DIFFERENTIAL PRESSURE
SENSOR/CONTROLLED
H
FIRE DEPARTMENT CONNECTION-WALL TYPE
BSD
BUILDING STATIC
PRESSURE SENSOR
PRINTER
23. ALL TEMPERATURE CONTROLS ARE BEING UPGRADED FROM PNEUMATIC CONTROLS TO
DDC CONTROLS. CONTRACTOR TO PROVIDE ALL EXISTING AND NEW UNITS WITH NEW
UNIT TAG. COORDINATE UNIT TAG UPDATES WITH TEMPERATURE CONTROLS, FIRE ALARM,
AND ELECTRICAL, COVER OLD UNIT TAG AS REQUIRED.
B
CRT
LO
DUCT SMOKE DETECTOR
HI
LT
WATER TEMPERATURE SENSOR
WITH WELL
CPU
COMPUTER UNIT
LOW TEMPERATURE
DETECTION THERMOSTAT
PRESSURE SWITCH
APS
DSP
DUCT STATIC
PRESSURE SENSOR
T
STARTER
PS
2 POSITION 3-WAY &
2-WAY VALVES
LO
F
HUMIDISTAT/SENSOR
MODEM
22. XX-## REFERS TO EQUIPMENT DESIGNATION. SEE SPECIFICATIONS AND EQUIPMENT
SCHEDULES FOR FURTHER INFORMATION IN REFERENCE TO THAT DESIGNATED PIECE OF
EQUIPMENT.
HI
NIGHT THERMOSTAT
D
20. ALL EXTERIOR WALL AND ROOF PENETRATIONS SHALL BE SEALED WATERPROOF.
LO
MODULATING 3-WAY &
2-WAY VALVES
CONTROLS (IN PLAN)
T
19. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE STATE CODES,
LOCAL CODES AND OWNER'S STANDARDS INDICATED BY THE CONSTRUCTION
DOCUMENTS.
21. ALL MECHANICAL WORK UNDER THIS CONTRACT IS TO FIVE (5) FEET OUTSIDE THE
BUILDING.
LU
PS
HI
C
18. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY
PRECAUTIONS OR TO MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR
PROCEDURES REQUIRED TO PERFORM HIS WORK.
HAND HELD
OPERATORS TERMINAL
DUCT AVERAGING TEMPERATURE
SENSOR
PROJECT #: 2011.01.0143
DIFFERENTIAL AIR PRESSURE SENSOR
S
FM
SWITCH
DRAWN BY: BRE
FLOW METER
CHECKED BY: EJS
ABBREVIATIONS
LT
LOW LIMIT THERMOSTAT
ISSUE DATE: 2.9.12
SMOKE DETECTOR (DUCT)
PDS
PRESSURE DIFFERENTIAL SENSOR
MISCELLANEOUS
POINT OF CONNECTION NEW TO EXISTING
A
1
A
SECTION CUT: (A) SECTION I.D.
(1) SHEET NO. WHERE SHOWN.
POINT OF PIPE CONNECTION NEW TO EXISTING
U.C. 1"
X
1
2
UNDERCUT DOOR, 1".
REFERENCE DESIGNATION FOR PLUMBING ISOMETRIC
3
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ALTITUDE
BRAKE HORSEPOWER
BRITISH THERMAL UNIT
COMMON PORT
CUBIC FEET PER MINUTE
CFM, STANDARD CONDITIONS
CUBIC FEET
CUBIC INCH
COEFFICIENT, VALVE FLOW
DECIBEL
DRY BULB
DOMESTIC COLD WATER
DEGREE
DOMESTIC HOT WATER
DIAMETER
DOWN
EXISTING
ENTERING AIR TEMP.
EFFICIENCY
ELEVATION
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMP.
EXHAUST
FAHRENHEIT
FLA
FPM
FPS
FT
FU
GA
GAL
GPH
GPM
HD
HG
HGT
HORZ
HP
HR
HWC
HZ
ID
IE
IJS
IN
IN W.C.
KW
KWH
LAT
LBS OR #
4
FULL LOAD AMPS
FEET PER MINUTE
FEET PER SECOND
FOOT, FEET, FEET WATER COLUMN
FIXTURE UNITS
GAUGE
GALLONS
GALLONS PER HOUR
GALLONS PER MINUTE
HEAD
MERCURY
HEIGHT
HORIZONTAL
HORSEPOWER
HOUR(S)
HOT WATER CIRCULATING (DOMESTIC)
HERTZ
INSIDE DIAMETER
INVERT ELEVATION
IN JOIST SPACE
INCHES
INCHES IN INCHES WATER COLUMN
KILOWATT
KILOWATT HOUR
LEAVING AIR TEMPERATURE
POUNDS
LF
LRA
LWT
MAX
MBH
MCA
MIN
N/A
N.C.
N.O.
NC
NIC
NO OR #
NTS
OA
OD
%
PH OR
PPM
PRESS
PSF
PSI
PSIA
PSIG
RA
RECIRC
LINEAR FEET
LOCKED ROTOR AMPS
LEAVING WATER TEMPERATURE
MAXIMUM
BTU PER HOUR (THOUSAND)
MINIMUM CIRCUIT AMPS
MINIMUM
NOT APPLICABLE
NORMALLY CLOSED
NORMALLY OPEN
NOISE CRITERIA
NOT IN CONTRACT
NUMBER
NOT TO SCALE
OUTSIDE AIR
OUTSIDE DIAMETER
PERCENT
PHASE (ELECTRICAL)
PARTS PER MILLION
PRESSURE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PSI ABSOLUTE
PSI GAUGE
RETURN AIR
RECIRCULATE
5
RH
RLA
RPM
SA
SENS
SL
SP
SPEC
SQ
STD
TD
TEMP
THRU
TJO
TONS
TSP
TSTAT
TYP
V
VAV
VEL
VERT
VOL
W
WB
WPD
WT
RELATIVE HUMIDITY
RUNNING LOAD AMPS
REVOLUTIONS PER MINUTE
SUPPLY AIR
SENSIBLE
SEA LEVEL
STATIC PRESSURE
SPECIFICATION
SQUARE
STANDARD
TEMPERATURE DIFFERENCE
TEMPERATURE
THROUGH
THROUGH JOIST OPENINGS
TONS OF REFRIGERATION
TOTAL STATIC PRESSURE
THERMOSTAT
TYPICAL
VOLT
VARIABLE AIR VOLUME
VELOCITY
VERTICAL
VOLUME
WATT
WET-BULB
WATER PRESSURE DROP
WEIGHT
REVISIONS
NO
DESCRIPTION
DATE
A
6
SHEET INFORMATION
AFF
AFG
ALT
BHP
BTU
C
CFM
SCFM
CU FT
CU IN
Cv
dB
DB
DCW
DEG OR °
DHW
DIA
DN
(E)
EAT
EFF
ELEV
ESP
EWT
EXH
F
TEMPERATURE CONTROL (T.C.) DAMPER
SD
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
D
17. MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY INDICATE EVERY
REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS.
TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT
DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK, VERIFY
ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND INSTALL THE
SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO POUDRE SCHOOL
DISTRICT.
END SWITCH
S
MOD
SHUT-OFF VALVE W/TAMPER SWITCH
ALL PIPING AND DUCTS INDICATED TO BE REMOVED UNDER THIS CONTRACT SHALL BE
REMOVED COMPLETELY TO POINTS OF CONNECTION AT THE MAINS OR BRANCHES AND
CAPPED.
XXX
XXX
EMER
EXISTING FIRE SPRINKLER TO BE RELOCATED
B
8.
ANALOG INPUT OR
OUTPUT SYMBOL
T
BFV
O.S. & Y VALVE
CONTRACTOR IS TO PROVIDE COMPLETE CONNECTIONS TO ALL NEW AND RELOCATED
OWNER FURNISHED EQUIPMENT.
XXX
XXX
BACKDRAFT DAMPER
EXISTING FIRE SPRINKLER TO BE REMOVED
7.
14. ALL CUTTING, PATCHING AND CORE DRILLING FOR THE INSTALLATION OF NEW
EQUIPMENT, DUCTS, HANGERS, ETC. SHALL BE HELD TO A MINIMUM AND BE
ACCOMPLISHED IN A CAREFUL MANNER. ALL PATCHING SHALL MATCH EXISTING
CONSTRUCTION, TEXTURE AND FINISH AND BE DONE BY SKILLED CRAFTSMAN OF THE
TRADES INVOLVED AT THE CONTRACTOR'S EXPENSE.
N
BFV
FLEXIBLE CONNECTION
FIRE ALARM
F
CONTRACTOR TO SEAL ALL AUDIBLE AND VISIBLE LEAKS ON ALL REUSED SUPPLY
DUCTWORK.
13. ALL EXISTING EQUIPMENT AND MATERIALS CALLED TO BE REMOVED UNDER THIS
CONTRACT SHALL BE REMOVED FROM OCCUPIED SPACES DAILY.
FIRE PROTECTION
F.A.
6.
CURRENT TRANSFORMER
T
FILTER
FLEXIBLE EQUIPMENT CONNECTOR
FS
INFORMATION ON THE DRAWINGS HAS BEEN ASCERTAINED FROM EXISTING DRAWINGS
AND FIELD OBSERVATIONS. THIS INFORMATION IS AS ACCURATE AS CONDITIONS WOULD
ALLOW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE, PRIOR TO BID,
AND BECOME FAMILIAR WITH THE EXTENT OF THE REMODEL WORK REQUIRED. NO
EXTRAS WILL BE ALLOWED FOR ALTERATIONS OF A FORESEEABLE NATURE REQUIRED TO
ACHIEVE THE END RESULT AS INDICATED BY CONTRACT DOCUMENTS.
12. CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING BID, AND VERIFY DIMENSIONS
AND EXISTING CONDITIONS RELATED TO THE WORK.
CT
DAMPER ACTUATOR
DA
FAN
FLEXIBLE PIPE CONNECTOR
LOW
GAUGE
PUMP
SUPPLY DIFFUSER. ALL DIFFUSERS FOUR-WAY THROW
UNLESS NOTED OR THROWS SHOW IN PLAN. SEE
SCHEDULE FOR TYPE.
SIZE
CFM
HI
CONTROL AIR PIPING
M
DIFFERENTIAL PRESSURE
SENSOR
REFRIGERENT DETECTOR
REF
OPPOSED BLADE DAMPER ( O.B.D. )
CONTROL WIRING
1.5"
5.
11. THE DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF THE EXISTING EQUIPMENT
LOCATIONS, EXISTING PIPE ROUTING AND EXISTING DUCT ROUTING. CONTRACTOR IS TO
INSTALL NEW EQUIPMENT, DUCTS, AND PIPING IN LOCATIONS REQUIRED TO AVOID
INTERFERENCE WITH EXISTING FACILITIES, EQUIPMENT, DUCTS AND PIPING.
CONTRACTOR IS RESPONSIBLE FOR RAISING AND LOWERING EXISTING EQUIPMENT AND
MAKING PROPER OFFSETS IN DUCTS AND PIPING TO AVOID CONFLICTS.
(SYMBOLS LOCATED IN TC SCHEMATICS)
FLOW
PIPE EXPANSION JOINT
PATCH OPENINGS (AIR TIGHT) IN DUCTS WHICH ARE TO REMAIN ACTIVE AND HAVE HAD A
SECTION REMOVED. ALSO REPAIR DUCT INSULATION SO THAT IT IS CONTINUOUS.
10. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING, COORDINATE ANY EQUIPMENT
DOWNTIME, AND COORDINATE GENERAL WORK SCHEDULE WITH POUDRE SCHOOL
DISTRICT.
TURNING VANES SHOWN IN 90° ELBOW.
MANUAL AIR VENT
C
4.
PROJECT INFORMATION
COMPRESSED AIR PIPE
STRAINER W/ BLOW-OFF VALVE
S
ALL FIXTURES AND EQUIPMENT REMOVED, AND NOT REUSED, ARE TO BE RETURNED TO
POUDRE SCHOOL DISTRICT.
CHEMICAL WASTE PIPE
OST
DRAIN VALVE W/ HOSE END
TEMPERATURE CONTROL VALVE, 3-WAY
3.
STORM DRAIN/ BUILDING STORM SEWER PIPE
CA
SHUT OFF VALVE IN RISER
THE INSTALLATION OR REMOVAL OF DUCTS, PIPES AND EQUIPMENT MAY REQUIRE THE
REMOVAL OF EXISTING WALLS AND CEILINGS. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PATCHING AND REPAIRING THESE WALLS AND/OR CEILINGS SO THEY MATCH THE
EXISTING WHERE NOT REPLACED UNDER ARCHITECTURAL DIVISION.
TEMPERED WATER
FLOW INDICATOR
PRESSURE INDEPENDENT AUTOMATIC BALANCING VALVE
2.
DOMESTIC HOT WATER ( TEMP. SHOWN )
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
DOMESTIC HOT WATER
POUDRE SCHOOL DISTRICT
HEATING WATER RETURN
ON DEMOLITION PLANS EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN
HEAVY LINE WEIGHT, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE
WEIGHT. ON ALL OTHER PLANS NEW MECHANICAL SYSTEMS ARE SHOWN HEAVY LINE
WEIGHT.
CONSTRUCTION
DOCUMENTS
HWR
1.
WERNER ELEMENTARY
RENOVATION PROJECT
DOMESTIC COLD WATER
CONSULTANT
HEATING WATER SUPPLY
PROJECT PHASE
HWS
SEAL
GENERAL NOTES (FOR ALL MECHANICAL DRAWINGS)
PLUMBING
PROJECT INFORMATION
PIPING
2/8/2012 2:12:37 PM - PLOT DATE
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
MECHANICAL COVER
SHEET
M0.0
2
3
4
5
6
ARCHITECT
1
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
CONFERENCE
501
CONFERENCE
302
VALVE
10
1 1/2"
1 1/2"
1/2"1/2"
1/2" 1/2"
CORRIDOR
002
SEE 1 / MD101B
3/4"
3/4"
1. EXISTING WALL MOUNTED UNIT VENTILATOR, ASSOCIATED VALVES AND
CONTROLS TO BE DEMOLISHED. COORDINATE WITH GENERAL
CONTRACTOR FOR PATCHING OF WALL, TYPICAL.
AIR LOCK
024
2. EXISTING CEILING MOUNTED UNIT VENTILATOR, OUTSIDE AIR DUCTWORK,
ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. EXISTING
DOWNSTREAM DUCTWORK AND DIFFUSERS TO REMAIN FOR
RECONNECTION. REFER TO NEW PLANS FOR RECONNECTION.
COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING.
T
T
AIR LOCK
001
12/8
T
SEE 1 / MD101B
FLAG NOTES:
MATCHLINE
T
MATCHLINE
12/8
6
20/8
STORAGE
006
EF-8
3. EXISTING CEILING MOUNTED UNIT VENTILATOR, OUTSIDE AIR DUCTWORK,
ASSOCIATED VALVES, CONTROLS, DOWNSTREAM DUCTWORK AND
DIFFUSERS TO BE DEMOLISHED. COORDINATE WITH GENERAL
CONTRACTOR FOR ROOF PATCHING.
9
5
UV-12
7
UV-11
MECHANICAL
11
4. EXISTING EXHAUST FAN, DUCTWORK AND ASSOCIATED COMPONENTS TO
BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF
PATCHING.
1 1/4"
D
CLASSROOM
103
20/8
2
BOYS
004
3
CORRIDOR
023
CLASSROOM
108
WORKROOM/
CONFERENCE
109
GIRLS
005
D
5. EXISTING HEATER TO REMAIN, TYPICAL.
6. EXISTING THERMOSTAT TO REMAIN, TYPICAL.
T
1 1/4"
CORRIDOR
003
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
CONSTRUCTION
DOCUMENTS
WORKROOM
301
CONSULTANT
PRINCIPAL
502
SEAL
E
7. EXISTING EXHAUST SYSTEM TO REMAIN, TYPICAL.
8. EXISTING HWS AND HWR PIPING TO BE DEMOLISHED TO EXTENT SHOWN,
TYPICAL.
4
EF-6
CORRIDOR
007
PROJECT PHASE
9. EXISTING HWS AND HWR RUN OUT TO REMAIN FOR RECONNECTION.
REFER TO NEW PLANS FOR RECONNECTION INFORMATION, TYPICAL.
T
T
T
3/4"
3/4"
T
CLASSROOM
107
T
CLASSROOM
104
CLASSROOM
105
CORRIDOR
008
8
CLASSROOM
106
1"
1"
C
AIR LOCK
011
T
STORAGE
012
EF-7
T
014
AIR LOCK
022
T
STORAGE
015
T
016
T
017
T
018
T
019
STORAGE
021
CLASSROOM
100
CLASSROOM
102
CLASSROOM
101
B
B
1
1"
1"
1 1/4"
1 1/4"
PROJECT INFORMATION
T
T
T
T
013
CORRIDOR
009
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
4
POUDRE SCHOOL DISTRICT
38/38
EF-5
WERNER ELEMENTARY
RENOVATION PROJECT
C
PROJECT #: 2011.01.0143
DRAWN BY: BRE
CHECKED BY: EJS
ISSUE DATE: 2.9.12
REVISIONS
NO
DESCRIPTION
DATE
N
1 MECHANICAL DEMO FLOOR PLAN - AREA "A"
A
A
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 2:12:52 PM - PLOT DATE
1/8" = 1'-0"
MECHANICAL DEMO
FLOOR PLAN - AREA "A"
MD101A
1
2
3
3
4
TOILET
033
5
6
ARCHITECT
WATER
HEATER
032
3
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
STORAGE
034
E
E
KITCHEN
402
1"
1"
16
SEAL
17
FLAG NOTES:
18
EXISTING WALL MOUNTED UNIT VENTILATOR, ASSOCIATED VALVES AND
CONTROLS TO BE DEMOLISHED. COORDINATE
WITH GENERAL
CONTRACTOR FOR PATCHING OF WALL, TYPICAL.
2.
EXISTING CEILING MOUNTED UNIT VENTILATOR, OUTSIDE AIR DUCTWORK,
ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. EXISTING
DOWNSTREAM DUCTWORK AND DIFFUSERS TO REMAIN FOR
RECONNECTION. REFER TO NEW PLANS FOR RECONNECTION. COORDINATE
WITH GENERAL CONTRACTOR FOR ROOF PATCHING.
EF-11
DISTRICT-WIDE
406
4
TIME OUT
037
036
RESOURCE
405
SPEECH
404
1
FLEX ROOM
401
2
STORAGE
42
1 1/4"
1 1/4"
5
T
CUSTODIAL/
STORAGE
40
OFFICE
408
GYM
STORAGE
41
TOILET
027
UP
2"
2"
CORRIDOR
031
14
1 1/2"
1 1/2"
AIR LOCK
026
SEE 1 / MD101C
COUNSELOR
403
CONFERENCE
407A
MATCHLINE
ITIN
407B
T
T
EXISTING EXHAUST FAN, DUCTWORK AND ASSOCIATED COMPONENTS TO BE
DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF
PATCHING, TYPICAL.
5.
EXISTING HEATER TO REMAIN, TYPICAL.
6.
EXISTING THERMOSTAT TO REMAIN, TYPICAL.
7.
EXISTING PUMP TO BE DEMOLISHED. REFER TO PUMP DETAIL FOR EXTENT
OF PIPING DEMO, TYPICAL.
8.
EXISTING EXHAUST SYSTEM TO REMAIN, TYPICAL.
9.
DISCONNECT AND CAP DUCT BACK AT ACTIVE MAIN.
10.
DEMOLISH EXISTING AIR DEVICE.
11.
REMOVE EXISTING AIR COMPRESSOR AND ASSOCIATED COMPONENTS.
REMOVE ALL ACCESSIBLE PNEUMATIC TUBING.
12.
EXISTING CEILING MOUNTED UNIT VENTILATOR, ASSOCIATED VALVES AND
CONTROLS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR
FOR PATCHING OF WALL, TYPICAL.
13.
REMOVE EXISTING DUCTWORK TO EXTENT SHOWN.
14.
EXISTING HWS AND HWR PIPING TO BE DEMOLISHED TO EXTENT SHOWN,
TYPICAL.
15.
EXISTING HWS AND HWR RUN OUT TO REMAIN FOR RECONNECTION. REFER
TO NEW PLANS FOR RECONNECTION INFORMATION, TYPICAL.
16.
DEMOLISH EXISTING HORIZONTAL EXPANSION TANK. REMOVE AND CAP
EXISTING SYSTEM CONNECTION BACK AT ACTIVE HEATING WATER SYSTEM.
REFER TO NEW PLANS FOR INSTALLATION OF NEW EXPANSION TANK.
17.
EXISTING CABINET UNIT HEATER, ASSOCIATED CONTROLS AND HOT WATER
PIPING RUN OUT TO BE DEMOLISHED.
D
6
T
2"
WOMEN
041
MEN
042
1 1/2"
1 1/2"
C
T
1 1/2"
ELECTRICAL
30
1 1/2"
UP
COMPUTER
LAB
303
PHONE
044
EF-19
28/28
AV
STORAGE/
IT ROOM
304
10
EF-5
AV AREA
043
8/8
T
T
12
4
UP
CLINIC
503
WOMEN
047
UP
T T
WORKROOM
049
10
9
MEN
046
ART
215
CORRIDOR
052
TOILET
048
36/6
13
T
CORRIDOR
051
T
CORRIDOR
025
MUSIC
200
B
CONFERENCE
501
UP
1/2"
T
T
15
WORKROOM
301
17
1/2"
3/4"
1 1/2"
1 1/2"
3/4"
MATCHLINE
T
MATCHLINE
SEE 1 / MD101A
VALVE
10
CORRIDOR
002
MATCHLINE
SEE 1 / MD101A
CONFERENCE
302
B
AIR LOCK
024
AIR LOCK
001
PROJECT #: 2011.01.0143
SEE 1 / MD101C
PRINCIPAL
502
PROJECT INFORMATION
RECEPTION
500
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
TEACHER'S
LOUNGE
504
POUDRE SCHOOL DISTRICT
C
WERNER ELEMENTARY
RENOVATION PROJECT
2"
4.
GYMNASIUM
400
TOILET
035
D
AIR LOCK
039
EXISTING BASEBOARD TO REMAIN.
T
8
3
3.
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
CONSTRUCTION
DOCUMENTS
1"
CONSULTANT
1"
PROJECT PHASE
1"
1"
1.
DRAWN BY: BRE
CHECKED BY: EJS
N
ISSUE DATE: 2.9.12
1 MECHANICAL DEMO FLOOR PLAN - AREA "B"
REVISIONS
1/8" = 1'-0"
NO
UP
BOILER
ROOM
29
MECHANICAL
ROOM
28
7
A
A
16
N
2 MEZZANINE MECHANICAL DEMO PLAN
1/8" = 1'-0"
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 2:12:55 PM - PLOT DATE
DATE
P-1
P-2
11
DESCRIPTION
MECHANICAL DEMO
FLOOR PLAN - AREA B
MD101B
2
3
4
5
6
ARCHITECT
1
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
SEAL
E
9
7
EXISTING WALL MOUNTED UNIT VENTILATOR, ASSOCIATED VALVES AND
CONTROLS TO BE DEMOLISHED. COORDINATE WITH GENERAL
CONTRACTOR FOR PATCHING OF WALL, TYPICAL.
2.
EXISTING CEILING MOUNTED UNIT VENTILATOR, OUTSIDE AIR DUCTWORK,
ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. EXISTING
DOWNSTREAM DUCTWORK AND DIFFUSERS TO REMAIN FOR
RECONNECTION. REFER TO NEW PLANS FOR RECONNECTION.
COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING.
3.
EXISTING CEILING MOUNTED UNIT VENTILATOR, OUTSIDE AIR DUCTWORK,
ASSOCIATED VALVES, CONTROLS, DOWNSTREAM DUCTWORK AND
DIFFUSERS TO BE DEMOLISHED. COORDINATE WITH GENERAL
CONTRACTOR FOR ROOF PATCHING.
4.
EXISTING EXHAUST FAN, DUCTWORK AND ASSOCIATED COMPONENTS TO
BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR
ROOF PATCHING, TYPICAL.
T
CLASSROOM
211
CLASSROOM
210
CLASSROOM
209
T
T
EF-2
EF-4
CORRIDOR
067
EXISTING HOT WATER SUPPLY AND RETURN RUN OUT TO BE
DEMOLISHED. CAP BACK AT ACTIVE MAIN, TYPICAL.
5
8.
GROUP
064
EXISTING EXHAUST FAN TO BE RELOCATED. REFER TO NEW PLANS FOR
MORE INFO.
9.
EXISTING BASEBOARD TO REMAIN.
10.
REMOVE EXISTING AIR DEVICE AND DUCTWORK TO EXTENT SHOWN.
11.
EXISTING CEILING MOUNTED UNIT VENTILATOR, ASSOCIATED VALVES
AND CONTROLS TO BE DEMOLISHED. COORDINATE WITH GENERAL
CONTRACTOR FOR PATCHING OF WALL, TYPICAL.
12.
EXISTING HWS AND HWR PIPING TO BE DEMOLISHED TO EXTENT SHOWN,
TYPICAL.
13.
EXISTING HWS AND HWR RUN OUT TO REMAIN FOR RECONNECTION.
REFER TO NEW PLANS FOR RECONNECTION INFORMATION, TYPICAL.
CLASSROOM
208
GIRLS
066
T
CONFERENCE/
WORKROOM
214
10
16/8
UV-33
3
ART &
MUSIC
48/8STORAGE/
IT ROOM
21
3
36/8
11
BOYS
065
18/15
3/4"
8/6
12/6
3/4"
12/12
12/8
CORRIDOR
052
EF-1
12/8
UV-34
20/8
UV-31
15/8
STORAGE
062
8
AIR LOCK
063
UV-32
CUST/
MECH
20
C
1"
1"
2
BOYS
055
GIRLS
056
CORRIDOR
061
WORKROOM/
CONFERENCE
207
CLASSROOM
206
T
9
1/2"
9
38/38
38/38
EF-23
EF-3
CORRIDOR
057
GROUP
054
GROUP
059
T
T
T
B
T
SEE 1 / MD101B
MATCHLINE
T
12
CLASSROOM
202
CLASSROOM
203
CLASSROOM
204
B
CLASSROOM
205
T
1/2"
1/2"
3/4"
3/4"
3/4"
3/4"
1"
1"
GROUP
058
PROJECT INFORMATION
CLASSROOM
201
T
1/2"
21/8
T
CORRIDOR
053
1
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
COMPUTER
LAB
213
C
7.
4
T
1 1/2"
1 1/2"
EXISTING THERMOSTAT TO REMAIN, TYPICAL.
T
38/38
6.
T
38/38
GROUP
069
EXISTING TRANSFER FAN TO REMAIN, TYPICAL.
POUDRE SCHOOL DISTRICT
T
5.
D
WERNER ELEMENTARY
RENOVATION PROJECT
D
SEE 1 / MD101B
MATCHLINE
6
PROJECT PHASE
CLASSROOM
212
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
CONSTRUCTION
DOCUMENTS
GROUP
068
1.
CONSULTANT
FLAG NOTES:
PROJECT #: 2011.01.0143
DRAWN BY: BRE
9
13
CHECKED BY: EJS
ISSUE DATE: 2.9.12
REVISIONS
NO
DESCRIPTION
DATE
N
1 MECHANICAL DEMO FLOOR PLAN - AREA "C"
A
A
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 2:12:56 PM - PLOT DATE
1/8" = 1'-0"
MECHANICAL DEMO
FLOOR PLAN - AREA C
MD101C
2
3
4
5
6
ARCHITECT
1
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
SEAL
E
MATCHLINE
MATCHLINE
32/18 (22/18)
60/8 60/8
6
2. BALANCE OUTSIDE AIR DUCT TO VALUE SHOWN IN SCHEDULE. PROVIDE
MANUAL BALANCING DAMPER ON RETURN AIR DUCTWORK.
FCU-4
34/13
BOYS
004
19
GIRLS
005
CORRIDOR
023
12
(R)
200
STORAGE
006
WORKROOM/
CONFERENCE
(R)
200
3. FCU-#, NEW FAN COIL UNIT. REFER TO SCHEDULE FOR HOT WATER RUN OUT
SIZE. REFER TO TWO WAY HEATING WATER COIL DETAIL, TYPICAL.
20
4. S-1, NEW DISPLACEMENT VENTILATION DIFFUSER. MOUNT AT FLOOR LEVEL.
CONNECT WITH EXPOSED, HARD DUCT. DO NOT USE A FLEXIBLE
CONNECTOR. BALANCE TO PRIMARY AIRFLOW POSITION AS SHOWN ON
PLAN. SECONDARY BALANCE POSITION SHALL BE 600 CFM. FINAL BALANCE
POSITION SHALL REFLECT PRIMARY AIRFLOW. DUCT CONNECTION SIZE TO
MATCH RUN OUT SIZE. REFER TO SCHEDULE, TYPICAL.
CLASSROOM
108
12"ø
260
HWR
HWS
CORRIDOR
003
20x12
17
17
WFR-1
14 LF
2.0 GPM
4
109
HWR
HWS
T
12"ø
250
1. WFR-#, NEW WALL FIN RADIATION. REFER TO SCHEDULE. REFER TO PLANS
FOR WFR-# LENGTH AND GPM. REFER TO WALL FIN RADIATION SCHEMATIC
DETAIL, TYPICAL.
T
20x12
D
5. S-2, NEW LOUVER FACED CEILING DIFFUSER. DUCT CONNECTION SIZE TO
MATCH RUN OUT SIZE. REFER TO SCHEDULE, TYPICAL.
6. RELOCATE 4 SPRINKLER HEADS IN THIS CORRIDOR TO MAKE ROOM FOR
NEW DUCT MAIN.
16
7
20x12
CORRIDOR
007
6"ø
75
7. REFER TO ROUND DUCT TAKEOFF DETAIL, TYPICAL.
20x12
6"ø
75
T
9. LOCATE RTU-# FILL AND DRAIN VALVES IN THIS ROOM. REFER TO CONTROLS
PLANS FOR PIPING DETAIL. ROUTE 1-1/2" DRAIN LINE FROM RTU-# TO
JANITOR' SINK. ROUTE 3/4" NP WATER FROM NEAREST MAIN OF EQUAL SIZE
OR LARGER TO RTU-#. PROVIDE WITH RPBFP-1, REFER TO SCHEDULE.
1"
T
20x12
T
12"ø
270
8. OFFSET EXISTING 4" STORM DRAIN ABOVE NEW DUCT MAIN.
1"
12"ø
270
12"ø
260
12"ø
260
10. THERMOSTAT SHALL CONTROL BOTH CONTROL VALVES IN THIS ROOM.
WFR-1
20 LF
2.9 GPM
CLASSROOM
107
1 1/4"
1 1/4"
T
T
CLASSROOM
104
WFR-1
20 LF
2.9 GPM
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
CLASSROOM
105
12. NEW FIRE DAMPER, TYPICAL.
CLASSROOM
106
HWR
13. CUH-#, NEW CABINET UNIT HEATER. REFER TO TWO WAY HEATING WATER
COIL DETAIL. REFER TO SCHEDULE FOR RUN OUT SIZE.
CORRIDOR
008
HWS
11
11. RECONNECT EXISTING HEATING HOT WATER LINES TO NEW WFR-#. EXTEND
AND OR MODIFY EXISTING PIPING TO CONNECT NEW WFR-# TO EXISTING
DROPS. NEW PIPING SHALL BE 3/4". CONTRACTOR TO FIELD VERIFY,
TYPICAL.
14. PROVIDE DUCT OFFSET WITHIN RTU-# ROOF CURB.
15. DIFFERENTIAL PRESSURE SENSOR FOR PUMPS P-1 AND P-2.
5
16. NEW TRANSFER AIR OPENING ABOVE CEILING, TYPICAL.
C
WFR-1
10 LF
2.0 GPM
18
WFR-1
10 LF
2.0 GPM
21
T
013
T
014
STORAGE
015
21. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR INSTALLATION OF VAV
BOXES. BOXES WILL BE LOCATED ON ALL DUCT RUNS TO CLASSROOMS,
TYPICAL.
T
T
016
T
017
T
018
T
019
STORAGE
021
T
T
EF-1
20. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR SIZING CONVENTION,
TYPICAL.
AIR LOCK
022
20x12
T
19. REBALANCE EXISTING HEATING DEVICE TO 1.5 GPM.
15 PDS
6"ø
100
CORRIDOR
009
20x12
20x12
18. REBALANCE EXISTING HEATING DEVICE TO 1 GPM.
CUH-3
AIR LOCK
011
STORAGE
012
17. EXISTING AIR DEVICE TO BE REBALANCED TO AIRFLOW SHOWN.
18
CUH-2
C
12"ø
380
CLASSROOM
102
12"ø
330
340
B
CLASSROOM
101
HWR
HWS
T
10
B
2"
2"
1 1/4"
1 1/2"
1
HWR
HWS
WFR-1
23 LF
3.3 GPM
1 1/2"
1 1/2"
1 1/2"
PROJECT INFORMATION
CLASSROOM
100
12"ø
WFR-1
23 LF
3.3 GPM
WERNER ELEMENTARY
RENOVATION PROJECT
CLASSROOM
103
WFR-1
12 LF
2.0 GPM
16"ø
3
54/12
FCU-3
(10"ø)
16"ø (10"ø)
52/8
D
MECHANICAL
11
FLAG NOTES:
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
14"ø
680
9
RETURN AIR FOR CLASSROOMS WHERE GRILLES ARE NOT SHOWN ARE THROUGH
LIGHT MONITORS THAT ARE OPEN TO THE CEILING PLENUM.
POUDRE SCHOOL DISTRICT
1 1/4"
1 1/4"
RTU-2
2.
PROJECT PHASE
2"
2
16x10
2"
CUH-1
8"ø
SEE 1 / M101B
CUH-4
T
12
EF-2
T
28/18(16/16)
16"ø (10"ø)
13
AIR LOCK
024
16"ø (10"ø)
3"
CORRIDOR
002
32/18 (22/18)
8
1"
1"
14
PROVIDE ISOLATION VALVES ON HOT WATER SUPPLY AND RETURN LINES WHERE
BRANCHES TAKE OFF FROM A MAIN.
CONSTRUCTION
DOCUMENTS
6"ø
100
3"
VALVE
10
20x12
SEE 1 / M101B
1.
CONSULTANT
GENERAL NOTES:
PROJECT #: 2011.01.0143
DRAWN BY: BRE
WFR-1
10 LF
2.0 GPM
WFR-1
10 LF
2.0 GPM
CHECKED BY: EJS
ISSUE DATE: 2.9.12
REVISIONS
NO
DESCRIPTION
DATE
N
1 MECHANICAL NEW FLOOR PLAN - AREA "A"
A
A
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 2:12:40 PM - PLOT DATE
1/8" = 1'-0"
MECHANICAL NEW
FLOOR PLAN - AREA A
M101A
1
2
3
4
5
6
26
29
EF-13
TOILET
033
1/2"
1/2"
KITCHEN
402
STORAGE
034
E
CUH-6
26
HWS
HWR
EF-12
ARCHITECT
26
EF-11
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
E
1"
1"
EF-10
GENERAL NOTES:
18
1. PROVIDE ISOLATION VALVES ON HOT WATER SUPPLY AND RETURN LINES WHERE BRANCHES TAKE
OFF FROM A MAIN.
KMUA-1
2. RETURN AIR FOR CLASSROOMS WHERE GRILLES ARE NOT SHOWN ARE THROUGH LIGHT MONITORS
THAT ARE OPEN TO THE CEILING PLENUM.
FLAG NOTES:
20
1
WFR-#, NEW WALL FIN RADIATION. REFER TO SCHEDULE. REFER TO PLANS FOR
WFR-# LENGTH AND GPM. REFER TO WALL FIN RADIATION SCHEMATIC DETAIL,
TYPICAL.
2.
BALANCE OUTSIDE AIR DUCT TO VALUE SHOWN IN SCHEDULE. PROVIDE MANUAL
BALANCING DAMPER ON RETURN AIR DUCTWORK.
3.
FCU-#, NEW FAN COIL UNIT. REFER TO SCHEDULE FOR HOT WATER RUN OUT SIZE.
REFER TO TWO WAY HEATING WATER COIL DETAIL, TYPICAL.
4.
S-1, NEW DISPLACEMENT VENTILATION DIFFUSER. MOUNT AT FLOOR LEVEL.
CONNECT WITH EXPOSED, HARD DUCT. DO NOT USE A FLEXIBLE CONNECTOR.
BALANCE TO PRIMARY AIRFLOW POSITION AS SHOWN ON PLAN. SECONDARY
BALANCE POSITION SHALL BE 600 CFM. FINAL BALANCE POSITION SHALL REFLECT
PRIMARY AIRFLOW. DUCT CONNECTION SIZE TO MATCH RUN OUT SIZE. REFER TO
SCHEDULE, TYPICAL.
5.
S-2, NEW LOUVER FACED CEILING DIFFUSER. DUCT CONNECTION SIZE TO MATCH
RUN OUT SIZE. REFER TO SCHEDULE, TYPICAL.
26
CONSULTANT
300
300
2"
UV-4
UV-2
12"ø
310
EF-14
26
DISTRICT-WIDE
406
GYMNASIUM
400
8
D
EF-8
TIME OUT
037
SPEECH
404
31
12"ø
200
HWR
26
34/13
26
COUNSELOR
403
3"HWS &
HWR UP
CUSTODIAL/ STORAGE
40
OFFICE
408
HWR
HWS
CORRIDOR
031
19. NOT USED.
2"
T
MEN
042
WOMEN
041
27. REBALANCE (E) AHU-1 TO 15 GPM.
T
UP
18/16
AV STORAGE/ IT ROOM
304
TOILET
048
CORRIDOR
052
30
WFR-1
7 LF
2.0 GPM
T
6
6"ø
50
UP
HWR
T
MUSIC
200
12"ø
300
B
HWS
CONFERENCE
302
WORKROOM
301
(R)
150
SECRETARY
501
31. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR INSTALLATION OF VAV BOXES.
BOXES WILL BE LOCATED ON ALL DUCT RUNS TO DISPLACEMENT DIFFUSERS THAT
HAVE TWO BALANCING POSITIONS, TYPICAL.
HWS
14
CORRIDOR
025
22/14 (14/12)
HWS
HWR
(R)
50
30. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR SIZING CONVENTION, TYPICAL.
HWR
12/12
T
WFR-1
11 LF
2.0 GPM
3/4" 3/4"
3"
3"
MATCHLINE
MATCHLINE
SEE 1 / M101A
SEE 1 / M101A
WFR-1
3 LF
1.5 GPM
N
PROJECT #: 2011.01.0143
DRAWN BY: BRE
SEE 1 / M101C
MATCHLINE
B
T
T T
(12/10)
MEDIA CENTER
300
6x6
60
PRINCIPAL
502
29. LOCATE KMUA-# FILL AND DRAIN VALVES IN THIS ROOM. REFER TO CONTROLS
PLANS FOR PIPING DETAIL. ROUTE 1-1/2" DRAIN LINE FROM KMUA-# TO JANITOR'
SINK. ROUTE 1" NP WATER FROM NEAREST MAIN OF EQUAL SIZE OR LARGER TO
KMUA-#. PROVIDE WITH RPBFP-1, REFER TO SCHEDULE.
UP
2
CONFERENCE
505
28. REBALANCE (E) AHU-2 TO 5 GPM.
EF-4
T
CORRIDOR
051
WFR-1
7 LF
2.0 GPM
25. ET-1, NEW EXPANSION TANK. PROVIDE 1" SYSTEM CONNECTION BETWEEN THE
TANK AND THE HEATING WATER SYSTEM. REFER TO SCHEDULE.
6
AV AREA
043
2000
RTU-4
ART
215
12"ø
300
26. REBALANCE EXISTING HEATING DEVICE TO 1 GPM.
21
10"ø
24. PROVIDE 3-WAY VALVE. REFER TO ZONE HEATING COIL ASSEMBLY DETAIL.
20x12
15x15
1000
15x15
1000
22
PHONE
044
23. EXISTING AIR DEVICE TO BE REBALANCED TO AIRFLOW SHOWN, TYPICAL.
11
COMPUTER LAB
303
C
22. S4, NEW PERFORATED FACE DIFFUSER, SEE SCHEDULE.
1
2"
UP
EF-6
T
WORK ROOM
049
21. R1, NEW RETURN GRILLE, SEE SCHEDULE.
HWR
HWS
20x12
HWS
HWR
5
20. CONNECT EXISTING DUCTWORK TO NEW 18/18 UP TO KMUA-1.
2"
FCU-2
36/6
18. HC-1, NEW HEATING COIL AND P-3 CIRCULATION PUMP. REFER TO TWO WAY
HEATING WATER COIL DETAIL. REFER TO SCHEDULE.
2"
12"ø
100
WOMEN
047
17. EXISTING EVAPORATIVE COOLER, EC-1, TO BE DEMOLISHED. COORDINATE WITH
GENERAL CONTRACTOR FOR ROOF PATCHING.
RTU-3
ELECTRICAL
30
CLINIC
503
(R)
28/13 50
16. EXISTING SUPPLY FAN SF-1, TO BE DEMOLISHED. COORDINATE WITH GENERAL
CONTRACTOR FOR ROOF PATCHING.
HWS
HWR
7
12
PHONE
045
WFR-2
12 LF
2.0 GPM
AIR LOCK
026
3"
8x6
C
EF-5
P-#, NEW BASE MOUNTED PUMP. RECONNECT TO EXISTING PIPING. REFER TO
SINGLE SUCTION PUMP DETAIL, TYPICAL.
15. EXISTING AIR COIL AND CIRC PUMP TO BE DEMOLISHED.
UP
26
3"
6"ø
75
T
WFR-2
9 LF
2.0 GPM
TOILET
027
3"
AIR LOCK
039
6"ø
50
9.
14. NEW TRANSFER AIR OPENING ABOVE CEILING, TYPICAL.
GYM STORAGE
41
2"
2
3"
3"
STORAGE
42
3"
HWR
HWS
MEN
046
EXISTING GYP CEILING TO REMAIN.
12. SECONDARY BALANCE POSITION NOT REQUIRED.
2"
CUH-5
WFR-1
13 LF
2.0 GPM
8.
11. RECONNECT EXISTING HEATING HOT WATER LINES TO NEW WFR-#. EXTEND AND OR
MODIFY EXISTING PIPING TO CONNECT NEW WFR-# TO EXISTING DROPS. NEW
PIPING SHALL BE 3/4". CONTRACTOR TO FIELD VERIFY, TYPICAL.
SEE 1 / M101C
(R)
50
T
3/4"
UV-1
MATCHLINE
14 48/6
8"ø
T
CONFERENCE
407A
(R)
80
3/4"
REFER TO ROUND DUCT TAKEOFF DETAIL, TYPICAL.
13. EMERGENCY POWER OFF FOR THE BOILERS.
18/16 (14/12)
(R)
190
ITIN
407B
26
23
42x12
T
UV-3
HWS
(R)
50
FCU-1
7.
10. THERMOSTAT SHALL CONTROL BOTH CONTROL VALVES IN THIS ROOM.
HWR
RESOURCE
405
3
RELOCATED EXISTING SPRINKLER HEADS AS REQUIRED TO INSTALL NEW
DUCTWORK.
HWS
1/2" 1/2"
WFR-2
9 LF
2.0 GPM
6.
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
EF-7
10
D
FLEX ROOM
401
WERNER ELEMENTARY
RENOVATION PROJECT
T
TOILET
035
PROJECT PHASE
4
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
POUDRE SCHOOL DISTRICT
2"
CONSTRUCTION
DOCUMENTS
300
24
PROJECT INFORMATION
WFR-1
7 LF
2.0 GPM
20/10
WFR-1
16 LF
2.4 GPM
SEAL
P-7
EF-9
CHECKED BY: EJS
ISSUE DATE: 2.9.12
1 MECHANICAL NEW FLOOR PLAN - AREA "B"
REVISIONS
1/8" = 1'-0"
ET-1
NO
P-1
DESCRIPTION
DATE
28
9
EF-16
UP
EPO
25
27
MECHANICAL
ROOM
28
EF-15
P-2
AHU-2 W/P-6
13
EPO
BOILER
ROOM
29
13
B-2 W/P-4
B-1 W/P-3
A
A
N
2 MEZZANINE MECHANICAL PLAN
1/8" = 1'-0"
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 2:12:43 PM - PLOT DATE
AHU-1 W/P-5
MECHANICAL NEW
FLOOR PLAN - AREA B
M101B
2
3
4
5
6
ARCHITECT
1
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
SEAL
E
GENERAL NOTES:
1
1. PROVIDE ISOLATION VALVES ON HOT WATER SUPPLY AND RETURN LINES WHERE BRANCHES
TAKE OFF FROM A MAIN.
1 1/4"
1 1/4"
HWR
T
WFR-1
11 LF
2.7 GPM
6"ø
50
CLASSROOM
211
CLASSROOM
212
D
11
1 1/2" 1 1/2"
WFR-1
11 LF
2.7GPM
CLASSROOM
210
CLASSROOM
209
1.
WFR-#, NEW WALL FIN RADIATION. REFER TO SCHEDULE. REFER TO PLANS FOR WFR-#
LENGTH AND GPM. REFER TO WALL FIN RADIATION SCHEMATIC DETAIL, TYPICAL.
2.
BALANCE OUTSIDE AIR DUCT TO VALUE SHOWN IN SCHEDULE. PROVIDE MANUAL
BALANCING DAMPER ON RETURN AIR DUCTWORK.
3.
FCU-#, NEW FAN COIL UNIT. REFER TO SCHEDULE FOR HOT WATER RUN OUT SIZE,
TYPICAL.
4.
S-1, NEW DISPLACEMENT VENTILATION DIFFUSER. MOUNT AT FLOOR LEVEL. CONNECT
WITH EXPOSED, HARD DUCT. DO NOT USE A FLEXIBLE CONNECTOR. BALANCE TO
PRIMARY AIRFLOW POSITION AS SHOWN ON PLAN. SECONDARY BALANCE POSITION
SHALL BE 600 CFM. FINAL BALANCE POSITION SHALL REFLECT PRIMARY AIRFLOW. DUCT
CONNECTION SIZE TO MATCH RUN OUT SIZE. REFER TO SCHEDULE, TYPICAL.
5.
S-2, NEW LOUVER FACED CEILING DIFFUSER. DUCT CONNECTION SIZE TO MATCH RUN OUT
SIZE. REFER TO SCHEDULE, TYPICAL.
6.
OFFSET 2" SPRINKLER MAIN TO MAKE ROOM FOR NEW DUCT.
7.
REFER TO ROUND DUCT TAKEOFF DETAIL, TYPICAL.
8.
EXISTING AIR DEVICE TO BE REBALANCED TO AIRFLOW SHOWN, TYPICAL.
9.
NO VALVES ASSOCIATED WITH WFR-#.
9
15
4
T
T
12"ø
250
T
GROUP
069
6"ø
50
CORRIDOR
067
T
GROUP
064
6"ø
100
20x12
T
COMPUTER LAB 6
213
42/26
(R)
400
52/8
HWS
34"ø
18. REFER TO TWO WAY HEATING WATER COIL DETAIL.
17 DPS
10
FCU-5
C
20. REBALANCE EXISTING HEATING DEVICE TO 1 GPM.
WFR-1
12 LF
2.0 GPM
14"ø
770
21. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR SIZING CONVENTION, TYPICAL.
HWR
22. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR INSTALLATION OF VAV BOXES. BOXES
WILL BE LOCATED ON ALL DUCT RUNS TO CLASSROOMS, TYPICAL.
HWS
GIRLS 13
056
13
(R)
200
(R)
200
8
8"ø
CLASSROOM
206
WORKROOM/
CONFERENCE
T
T
207
20x12
6"ø
50
7
6"ø
50
22
CORRIDOR
057
6"ø
100
T
GROUP
059
12"ø
240
T
T
12"ø
250
20x12
12"ø
250
20x12
T
20x12
GROUP
054
20x12
SEE 1 / M101B
MATCHLINE
B
17. NEW DIFFERENTIAL PRESSURE SENSOR FOR PUMPS P-1 AND P-2.
19. RELOCATE EXISTING EXHAUST FAN. REROUTE EXISTING 16/16 EXHAUST DUCT SUCH THAT
NEW IS 3' MINIMUM AWAY FROM NEW RTU AND ALL MAINTENANCE CLEARANCES ARE
MAINTAINED.
20x12
12"ø
240
1 1/4"
AIR LOCK
063
34/13
18
2
12"ø
230
16. NEW TRANSFER AIR OPENING ABOVE CEILING WITH FIRE DAMPER. INSTALL T-1 TRANSFER
GRILLE ON BOTH SIDES OF WALL.
1 1/4"
CUST/ MECH
20
3/4"
3/4"
(R)
(R)
360 360
BOYS
055
13. NEW FIRE DAMPER.
60/8
T
WFR-2
8 LF
2.0 GPM
21
14
FCU-7
STORAGE
062
WFR-1
15 LF
2.1 GPM
15. NEW TRANSFER AIR OPENING ABOVE CEILING, TYPICAL.
54/13
30/8
3/4"
3/4"
12. RECONNECT EXISTING HEATING HOT WATER LINES TO NEW WFR-#. EXTEND AND OR
MODIFY EXISTING PIPING TO CONNECT NEW WFR-# TO EXISTING DROPS. NEW PIPING SHALL
BE 3/4". CONTRACTOR TO FIELD VERIFY, TYPICAL.
14. PROVIDE 3-WAY VALVE. REFER TO ZONE HEATING COIL ASSEMBLY DETAIL.
5
16"ø (14"ø)
T 16"ø (12"ø)
CORRIDOR
053
BOYS
065
19
34/13
14"ø
640
52/8
CLASSROOM
208
CORRIDOR
061
11. ROUTE INSULATED HWS/R THRU BACK OF CASEWORK AND CONNECT TO WFR-#.
(R)
360
HWS
FCU-8
HWR
(R)
30
FCU-6
RTU-1
(R)
360
EF-3
HWR
18
CLASSROOM
201
(R)
30
8"ø
54/13
14
GIRLS
066
T
8
48/8
(26/22)
6"ø
34"ø
3
2"
21
16x10
2"
214
2
42/22
2
18
16
18/16 (12/10)
ART & MUSIC STORAGE/
IT ROOM
16x10
16"ø (12"ø)
WFR-2
8 LF
2.0 GPM
16"ø (14"ø)
CONFERENCE/
WORKROOM
C
10. LOCATE RTU-# FILL AND DRAIN VALVES IN THIS ROOM. REFER TO CONTROLS PLANS FOR
PIPING DETAIL. ROUTE 1-1/2" DRAIN LINE FROM RTU-# TO JANITOR' SINK. ROUTE 3/4" NP
WATER FROM NEAREST MAIN OF EQUAL SIZE OR LARGER TO RTU-#. PROVIDE WITH
RPBFP-1, REFER TO SCHEDULE.
6"ø
50
20x12
T
2"
12"ø
230
HWS
12"ø
230
12"ø
250
HWR
2"
20x12
12"ø
250
12"ø
250
20x12
20x12
1 1/2"
20x12
1 1/2"
HWS
HWR
SEE 1 / M101B
MATCHLINE
9
T
12"ø
240
CLASSROOM
202
B
9
9
CLASSROOM
203
WFR-1
11 LF
2.7 GPM
GROUP
058
3/4"
3/4"
11
CLASSROOM
204
T
1"
1"
1"
6"ø
50
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
D
1"
WFR-1
11 LF
2.7 GPM
CLASSROOM
205
1 1/4"
1 1/4"
PROJECT INFORMATION
HWS
11
FLAG NOTES:
PROJECT PHASE
GROUP
068
CONSULTANT
2. RETURN AIR FOR CLASSROOMS WHERE GRILLES ARE NOT SHOWN ARE THROUGH LIGHT
MONITORS THAT ARE OPEN TO THE CEILING PLENUM.
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
20
WFR-1
8 LF
2.7 GPM
POUDRE SCHOOL DISTRICT
12
WFR-1
13 LF
2.0 GPM
CONSTRUCTION
DOCUMENTS
WFR-1
13 LF
2.0 GPM
WERNER ELEMENTARY
RENOVATION PROJECT
WFR-1
8 LF
2.7 GPM
11
HWS
HWR
PROJECT #: 2011.01.0143
HWS
HWR
DRAWN BY: BRE
CHECKED BY: EJS
20
14
ISSUE DATE: 2.9.12
WFR-1
8 LF
2.7 GPM
WFR-1
13 LF
2.0 GPM
WFR-1
13 LF
2.0 GPM
WFR-1
8 LF
2.7 GPM
REVISIONS
NO
DESCRIPTION
DATE
N
1 MECHANICAL NEW FLOOR PLAN - AREA "C"
A
A
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 2:12:46 PM - PLOT DATE
1/8" = 1'-0"
MECHANICAL NEW
FLOOR PLAN - AREA C
M101C
2
3
4
5
6
ARCHITECT
1
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
18/18
E
E
KMUA-1
CONSULTANT
SEAL
4
D
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
PROJECT PHASE
CONSTRUCTION
DOCUMENTS
D
RTU-4
1
3
1
34"ø
RTU-1
2
34"ø
C
32/36
RTU-2
54/22
B
B
FLAG NOTES:
1.
RTU-#, NEW ROOFTOP UNIT. REFER TO SCHEDULE FOR HOT WATER RUN OUT SIZE.
2.
REFER TO DUCTWORK ROOF SUPPORT DETAIL.
3.
REFER TO TWO WAY HEATING WATER COIL DETAIL. REFER TO SCHEDULE FOR RUN OUT
SIZE.
4.
KMUA-1, NEW KITCHEN MAKEUP AIR UNIT. LOCATE INTAKE 10' MINIMUM AWAY FROM
EXHAUST FANS. REFER TO DUCTWORK ROOF SUPPORT DETAIL.
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
1
PROJECT INFORMATION
3
POUDRE SCHOOL DISTRICT
UP
WERNER ELEMENTARY
RENOVATION PROJECT
C
PROJECT #: 2011.01.0143
DRAWN BY: BRE
CHECKED BY: EJS
ISSUE DATE: 2.9.12
REVISIONS
N
NO
DESCRIPTION
DATE
1 MECHANICAL ROOF PLAN
A
A
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 2:12:48 PM - PLOT DATE
3/32" = 1'-0"
MECHANICAL ROOF
PLAN
M102
2
3
4
5
6
ARCHITECT
1
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
C
1-1/2" x 1-1/2" x 1/8"
ANGLE IRON SUPPORT
TYPICAL
ANCHOR ANGLE IRON
TO SUPPORT, TYPICAL
B-LINE RUBBER
SUPPORT
APPLY A MASTIC BED
TO ROOF FOR SUPPORT
EXISTING
ROOF
DUCTWORK ROOF SUPPORT DETAIL
NO SCALE
FLEXIBLE EQUIPMENT
CONNECTOR, TYP.
PROVIDE MINIMUM 5 PIPE
DIAMETERS LENGTH OF
STRAIGHT PIPE PRIOR
TO CHECK VALVE.
ECCENTRIC INCREASER
PRESSURE GAUGE
SUCTION
DIFFUSER.
PUMP
FRAME
4" CONC. BASE
CONTINUE AS
PER PLANS
VALVE AND PIPING
CONFIGURATION
UNLESS NOTED
OTHERWISE ON THE
PLANS. IF NOTED REFER
TO ZONE HEATING COIL
DETAIL ASSEMBLY.
AIR VENT
AIR VENT
PRESS.-TEMP. TAP, TYP.
(PRIOR TO ELLS)
PRESS.-TEMP.
TAP, TYP.
CONTROL VALVE
SOME PIPING DROPS ARE
EXISTING. CONTRACTOR TO
FIELD COORDINATE DROP
ROUTING TO NEW WFR.
RETURN
CONTROL VALVE
RETURN
CONTROL VALVE IN
ENCLOSURE (18" MAXIMUM
SPACE "DEAD SPACE"
ALLOWED WITHIN
ENCLOSURE, AS APPLICABLE)
SUPPLY
C N.C.
LENGTH AS PER
PLANS
MOUNTING HEIGHT AS
PER
MANUFACTURER'S
RECOMMENDATIONS
SINGLE SUCTION PUMP ASS'Y.
WALL FIN RADIATION SCHEMATIC
FOR DOWNFEED APPLICATIONS
NO SCALE
NO SCALE
COIL
COIL
N.O.
PROJECT #: 2011.01.0143
RISE IN DIRECTION OF FLOW
TO FLOOR DRAIN.
B
SUPPLY
ALTERNATE ROUTING FOR
SAME END CONNECTIONS.
PROJECT INFORMATION
B
MANUAL AIR VENT AT
HIGH POINTS.
~
PROVIDE MINIMUM 5 PIPE
DIAMETERS LENGTH OF
STRAIGHT PIPE BETWEEN CHECK
VALVE AND BALANCING VALVE
~~
CONTINUE AS PER PLANS
WERNER ELEMENTARY
RENOVATION PROJECT
SHEET METAL SCREW,
TYP. SEAL HEAD TO
DUCT WITH MASTIC.
DUCT
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
C
POUDRE SCHOOL DISTRICT
D
PROJECT PHASE
D
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
CONSTRUCTION
DOCUMENTS
CONSULTANT
SEAL
E
ZONE HEATING
TWO WAY HEATING
COIL DETAIL ASSEMBLY WATER COIL DETAIL
NO SCALE
DRAWN BY: BRE
NO SCALE
CHECKED BY: EJS
ISSUE DATE: 2.9.12
USE GASKETED FITTING.
ATTACH PER MANUFACTURER'S
RECOMMENDATIONS.
EXISTING
ROOF
EXISTING
ROOF SURFACE AND
APPLY A MASTIC BED
FOR B-LINE SUPPORT
SEE VAV
SCHEDULE FOR
INLET SIZE
REFER TO ARCHITECTURAL
DRAWINGS FOR ANCHOR OF
B-LINE SUPPORT TO
STRUCTURE.
A
1
2
FLEX DUCT
VAV-#
PROVIDE MINIMUM
(4) DUCT
DIAMETERS OF
STRAIGHT DUCT
A
SPIN-IN FITTING
LATERAL TAKE-OFF FITTING
DUCTWORK ROOF SUPPORT DETAIL
ALTERNATE M1 - VAV BOX DETAIL
ROUND DUCT TAKE-OFF FITTINGS
NO SCALE
NO SCALE
NO SCALE
3
4
5
DATE
WORM DRIVE S.S.
CLAMP (ON INNER
LINER).
WORM DRIVE S.S.
CLAMP (ON INNER
LINER)
(#/#)
DESCRIPTION
FLEX DUCT
ALTERNATE DUCT
SIZE
#/#
NO
6
SHEET INFORMATION
2/8/2012 2:12:49 PM - PLOT DATE
B-LINE OR EQUIV.
SUPPORT
ANCHOR ANGLE IRON
TO B-LINE SUPPORT, TYP
REVISIONS
ROUND TWIST-IN FITTING
W/ MANUAL DAMPER,
HANDLE, & LOCK NUT.
LATERAL TAKE-OFF FITTING
W/ MANUAL DAMPER,
HANDLE, & LOCK NUT.
AIR FLOW
1-1/2" x 1-1/2" x 1/8"
ANGLE IRON SUPPORT
TYPICAL
METAL BAND,
TYP. BOLTED TO ANGLE
SUPPORT
AIR FLOW
DUCT
USE DUCT SEALANT OR
GASKETED FITTING.
MECHANICAL DETAILS
M301
2
3
4
5
6
AIR HANDLING UNIT SCHEDULE
ITEM
SERVICE
SUPPLY AIR FAN DATA
FAN
ESP
RPM
CFM
TYPE
MOTOR DATA
IN. WC
HP
V-PH
EXHAUST FAN DATA
FAN
ESP
RPM
CFM
STRTR
TYPE
IN. WC
@ ALT
MOTOR DATA
HP
V-PH
TOTAL
STRTR
@ ALT
COOLING CAPACITY (FUTURE)
EAT
LAT
COND.
MBH
DB/WB
DB
(SENS)
°F
°F
°F
2/8/2012
MIN.
CAP.
EAT
LAT
SEER
MBH
°F
°F
HEATING COIL DATA
GPM
RUN
EWT
OUT
LWT
GLYC
°F
%
°F
OP
WGT
MAX dP
(IN)
WATER
AIR
FT
IN
MANUFACTURER
& MODEL NO.
NOTES
CONTROLS
LBS
RTU-1
CLASSROOMS
9,210
AF
1.5
1800
15
208/3
VFD
9,350
AF
1.0
1800
10
208/3
VFD
50
70.8/63.0
65.0
95.0
13.0
164
52
72
20
1-1/2
180
160
30
8.0
0.2
9,000
ENGINEERED AIR
1,2
6
RTU-2
CLASSROOMS
7,740
AF
1.5
1800
10
208/3
VFD
8,000
AF
1.0
1800
7.5
208/3
VFD
42
70.4/63.1
65.0
95.0
13.0
138
52
72
16
1-1/2
180
160
30
8.0
0.2
9,000
ENGINEERED AIR
1,3,4
6
NOTES:
ARCHITECT
1
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
1. FUTURE COOLING SELECTION IS BASED ON TEMPERING THE SUPPLY AIR ONLY. FULL SPACE COOLING CANNOT BE ACHIEVED BY THE PROPOSED FUTURE COOLING COIL.
2. ALTERNATE SUPPLY FAN ESP SHALL BE 2.4"
E
E
3. ALTERNATE SUPPLY FAN ESP SHALL BE 2.8"
4. IF ALTERNATE 1 IS ACCEPTED AND FUTURE COOLING IS ADDED. THE SUPPLY FAN MOTOR WILL LIKELY NEED TO BE REPLACED DUE TO THE ADDED STATIC PRESSURE DROP ACROSS THE COOLING COIL.
AIR HANDLING UNIT SCHEDULE CONTINUED
SERVICE
EDB
EWB
LDB
F
F
F
INDIRECT EVAPROTIVE COOLING SECTION (EXHAUST)
EVAP.
MAX. FACE
PUMP
MEDIA
EFF. %
VELOCITY
V-PH
HP
2/7/2012
ENERGY WHEEL
WINTER
SUMMER
MOTOR DATA
DEPTH
EAT (DB/WB)
LAT (DB/WB)
EFF. TOTAL
EAT (DB/WB)
LAT (DB/WB)
EFF. TOTAL
IN.
F
F
%
F
F
%
FPM
ELECTRICAL
MCOP
MCA
HP
V-PH
STRTR
OP
WGT
V-PH
MANUFACTURER
& MODEL NO.
NOTES
CONTROLS
LBS
RTU-1
CLASSROOMS
78.5
64.7
66.0
90
500
--
1/4
12
85/59
71/63
71
10
53
73.0
--
--
--
98.2
125
208/3
9,000
ENGINEERED AIR
1
6
RTU-2
CLASSROOMS
78.5
64.7
66.0
90
500
--
1/4
12
85/59
71/63
73
10
54
75.0
--
--
--
71.0
100
208/3
9,000
ENGINEERED AIR
1
6
NOTES:
SEAL
ITEM
1. EVAPORTIVE PUMP AND HEAT WHEEL MOTOR INTERNALLY WIRED.
PLUMBING FIXTURE AND EQUIPMENT SCHEDULE
FIXTURE
RPBFP-1
REDUCED PRESSURE BACKFLOW
ICC/ANSI A117.1
COMPLIANT #
MANUFACTURER
SERIES
WATTS
TRIM
SERIES
SUPPLIES
919
TRAP /
WASTE
DRAIN
--
---
---
CW
HW /
TEPID
WASTE
1" (NP)
VENT
---
WATER
CONSUMPTION
NOTES / REMARKS
---
NON POTABLE WATER
---
CONSULTANT
PLAN
CODE
2/8/2012
PREVENTER
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
GENERAL NOTES:
1. WHERE FIXTURE/EQUIPMENT MODEL NUMBERS ARE GIVEN THESE ARE FOR REFERENCE ONLY. WRITTEN SPECIFICATION REQUIREMENTS AND SCHEDULE NOTES HOLD PRESIDENCE. MORE STRINGENT SHALL APPLY
2. SEE ARCHITECTURAL DWGS FOR MOUNTING HEIGHTS ON ALL WALL MOUNTED FIXTURES
D
KITCHEN MAKE-UP AIR UNIT
SERVICE
CFM
FAN
TYPE
KMUA-1
NOTES:
SUPPLY AIR FAN DATA
E.S.P.
RPM
MOTOR DATA
IN. W.C.
MAX.
HP
V-PH
AT ALT.
KITCHEN
2250
FC
1.07
1725
DISCHARGE DAMPERS, DISCONNECT SWITCH, HORZ DISCHARGE
1.5
208-3
STRTR
EDB
F
CONDITIONS
EWB
F
LDB
F
MAG-HOA
93.0
60.0
65.0
2/8/2012
EVAPORATIVE COOLING SECTION
EVAP
MAX. FACE
PUMP
EFF
VELOCITY
HP
%
FPM
90.0
500.0
1/20
V-PH
MEDIA
DEPTH
IN
MAX AIR
PD
IN. WC
120-1
12.0
0.6
OP
WGT
LBS
765
MANUFACTURER
& MODEL NO.
GREENHECK MSX-109-H12
NOTES
CONTROLS
SEE BELOW
6
ROOFTOP HVAC UNIT (DX - COOLING ONLY)
ITEM
SERVICE
SUPPLY AIR FAN DATA
CFM
ELECTRICAL DATA
MIN.
FAN
ESP
FAN
OSA
TYPE
IN W.C.
HP
BHP
FC
0.75
2
1.17
V-PH
6/1/2008
COOLING CAPACITY
MCA
MBH
EAT °F
PROJECT PHASE
ITEM
OP
COND
MIN.
WGT
DB
WB
°F
SEER
LBS
80.0
50.0
--
--
900
MANUFACTURER
NOTES
CON-
& MODEL NO.
TROLS
CFM
RTU-4
IT ROOM
2000
200
208-3
--
49.4
CONSTRUCTION
DOCUMENTS
D
TRANE TSC 060
1,2
6
NOTES:
1. PROVIDE WITH POWER EXHAUST.
2. PROVIDE WITH 0-100% MODULATING ECONOMIZER, HINGED ACCESS DOORS, COIL GAURDS, 2" THROWAWAY FILTERS, AND FACTORY ROOF CURB.
CABINET UNIT HEATER SCHEDULE
MBH
EWT
°F
C
CUH-1
NOTES:
HOT WATER COIL SCHEDULE
CFM
HC-1
NOTES:
MAX FACE
VELOCITY
FPM
MBH
500
172.0
2250
EAT
F
LAT
F
-4
70
GPM
18.0
HEATING WATER
EWT
LWT
PIPE
CONN.
180
160
% GLY
1-1/4
MAX PRESS DROP
AIR
WPD
IN W.C.
FT
30
0.13
7.6
BTUH/LF
EWT
°F
AWT
°F
GLY
%
HEATING ELEMENT
TUBE
FPF
SIZE IN
ROWS
RUNOUT
SIZE
IN
FIN SIZE
LxW
IN
WPD
FT
HORZ
335
21.0
180
160
30
2.2
5.0
1. PROVIDE UNIT DISCONNECT, 2. PROVIDE INTEGRAL MANUAL STARTER
60
2/7/2012
MOTOR DATA
HP
V-PH
LAT
F
130
1/15
PIPE
SIZE
IN
115
MANUFACTURER &
MODEL #
3/4
NOTES
STERLING RC-1200-03
CONTROLS
1,2
C
6
2/7/2012
OP
WGT
LBS
Size
(LxH)
IN
ROWS
54
36x18
2
MANUFACTURER &
MODEL
NOTES
CONTROLS
PUMP SCHEDULE
ITEM
TEMTROL 5WC-6-18x36x2-7 AL
--
MANUFACTURER &
MODEL NO.
NOTES
TYPE
SERVICE
GPM
6
WALL FIN RADIATION SCHEDULE
ITEM
GPM
AIR
EAT
F
CONTROLS
GLY.
%
TOTAL
HEAD
FT. W.C.
NPSH
FT. W.C.
EFF
%
HP
2/7/2012
MOTOR DATA
RPM
V-PH
OP
WGT
LBS
STRTR
MANUFACTURER
& MODEL NO.
NOTES
CONTROLS
P-1
BASEMOUNT
HTG PLT
171
30
75.0
--
70
7.5
1750
208-3
VFD
B&G 1510 2BC
6
P-2
BASEMOUNT
HTG PLT
171
30
75.0
--
70
7.5
1750
208-3
VFD
B&G 1510 2BC
6
P-7
IN-LINE
HC-1
18
30
13.0
--
70
1/6
3300
120-1
B&G PL-36
6
NOTES:
WFR-1
1,540
180
170
30
3/4
50
2
3/4
4-1/4 x 3-5/8"
STERLING VERSALINE MODEL JVB-S
1,2,3,4
6
WFR-2
1,820
180
170
30
3/4
50
3
3/4
4-1/4 x 3-5/8"
STERLING VERSALINE MODEL JVB-S
1,2,3,4
6
EXPANSION TANK SCHEDULE
NOTES:
ITEM
SERVICE
1. MOUNT 4" AFF. TOTAL HEIGHT IS 28".
2. INSTALL PER BASEBOARD RADIATION DETAIL UNLESS OTHERWISE NOTED.
ET-1
3. BTUH/LF VALUE IS MINIMUM REQUIRED AFTER DERATE FOR SITE CONDITIONS AND PLANT PARAMETERS.
HTG PLT
2/7/2012
TANK
ACCEPTANCE
VOL GAL
BRANCH
PIPE SIZE
IN
%
GLYCOL
FILL
PRESS.
OP
WGT
LBS
MANUFACTURER &
MODEL
NOTES
89.8
1
30%
14.8
1200
AMTROL 400-L
ASME TANK
GRILLES, REGISTERS, & DIFFUSERS SCHEDULE
4. WALL FIN VALVES SHALL BE CONCEALED BY 18" DEAD SPACE WITH IN CABINET, UNLESS OTHERWISE NOTED ON PLANS.
2/8/2012
2/7/2012
EQUIP
TAG
HOT WATER FAN COIL UNIT SCHEDULE
ITEM
B
FCU-1
FCU-2
FCU-3
FCU-4
FCU-5
FCU-6
FCU-7
FCU-8
NOTES:
TYPE
HORIZ
HORIZ
HORIZ
HORIZ
HORIZ
HORIZ
HORIZ
HORIZ
SUPPLY FAN
CFM
OSA ESP
IN
CFM
0.3
200
370
0.3
300
300
0.3
0
680
0.3
120
400
0.3
120
400
0.3
140
460
0.3
0
770
0.3
100
640
MOTOR DATA
V-PH
QTY
HP
EACH
1/8
115-1
1
1/8
115-1
1
1/8
115-1
2
1/8
115-1
1
1/8
115-1
1
1/8
115-1
1
1/5
115-1
1
1/8
115-1
2
MBH
5
5
9
6
6
6
11
9
EAT
°F
70
70
70
70
70
70
70
70
HEATING CAPACITY
LAT GPM EWT LWT
°F
°F
°F
160
180
85
1.0
160
180
85
1.0
160
180
85
1.5
160
180
85
1.0
160
180
85
1.0
160
180
85
1.0
160
180
85
1.5
160
180
85
1.5
GLY
%
30
30
30
30
30
30
30
30
WPD
FT
5
5
5
5
5
5
5
5
TYPE
FACE
SIZE
IN.
MOUNTING
TYPE
DAMPER
REQUIRED
MATERIAL
MANUFACTURER &
MODEL
PLAN INFO
XXXX
XXXX
SPECIFIC
NOTES
02/07/12
RUN OUT
SIZE (IN)
3/4
3/4
3/4
3/4
3/4
3/4
3/4
3/4
OP
WGT
LBS
200
200
200
200
200
200
200
200
MANUFACTURER &
MODEL #
NOTES
IEC BPY 06
IEC BPY 06
IEC BPY 10
IEC BPY 06
IEC BPY 06
IEC BPY 06
IEC HPY 08
IEC BPY 10
CONTROLS
6
6
6
6
6
6
6
6
S1
DISPLACEMENT DIFFUSER
36" x 60"
---
YES
STEEL
PRICE DF1
NECK / CFM
5
S2
LOUVER FACE CEILING DIFFUSER
24" x 24"
TILE CLG
YES
STEEL
PRICE SCD
NECK / CFM
---
S3
SUPPLY REGISTER
---
---
YES
STL/ALUM
PRICE 520
NECK / CFM
2
S4
PERFORATED FACE CEILING DIFFUSER
24" x 24"
GYP
YES
STEEL
PRICE PDN
NECK / CFM
---
R1
PERFORATED FACE CEILING RETURN GRILLE
---
---
NO
STEEL
PRICE PDDR
NECK / CFM*
1, 3, 4
T1
TRANSFER GRILLE
---
---
NO
STEEL
PRICE 530
NECK / CFM*
2
B
PROJECT INFORMATION
ITEM
HEATING WATER
LWT
%
°F
GLY
PROJECT #: 2011.01.0143
GENERAL NOTES:
1. SEE PLANS FOR NECK SIZE
DRAWN BY: BRE
2. ALL GRDs REQUIRING DAMPERS SHALL BE EQUIPPED WITH A REMOTE BALANCING DAMPER THAT IS ADJUSTABLE THROUGH THE GRD FACE OR
MECHANICAL/ELECTRICAL EQUIPMENT SCHEDULE
ANOTHER APPROVED LOCATION UNLESS SUPPLIED FROM AN ACCESSIBLE TAKE-OFF WITH LOCKING DAMPER.
CHECKED BY: EJS
3. VERIFY GRD FINISH AND CLG/WALL/SILL/FLOOR MOUNTING TYPE WITH ARCHITECT FOR EACH APPLICATION PRIOR TO ORDERING.
CONTROLS (NOTE B. BELOW) REFERENCES THE "CONTROLS" COLUMN OF THE EQUIPMENT SCHEDULES. SCHEDULE ALSO TO BE USED FOR
DRAWING M6.1
4. PROVIDE 4-WAY THROW FOR DIFFUSERS UNLESS OTHERWISE SHOWN ON PLANS.
ISSUE DATE: 2.9.12
5. PROVIDE MANUFACTURERS ROUND TO RECTANGULAR ADAPTIVE COLLAR FOR DIFFUSERS AND GRILLES AS REQUIRED, MATCH DUCT SIZE AND TYPE
NOTES:
REVISIONS
6. MATERIAL SHALL BE STEEL UNLESS OTHERWISE INDICATED OR SPECIFIED. MATERIAL SHALL BE SUITABLE FOR INSTALLED ENVIRONMENT. FOR WET
A.
See Specifications Division 26 "Electrical Equipment and Wiring for Mechanical Division" for further information.
B.
Controls: (1) From light switch (2) separate wall switch (3) switch with pilot light (4) runs continuously
(5) interlock to run with other equipment (6) controlled by Division 23
(7) cycle from remote thermostat (8) intergral to unit (9) fire alarm (10) other; see REMARKS
* Carries full current. Wiring done by Division 24 for control. See specifications.
Also see "Temperature Control" specifications.
C.
Magnetic starters to have maintain contact unless noted. All starters by Mechanical unless noted to be by Electrical.
D.
Motors 1/2 HP and less to be 1750 rpm, 115/60/1, motors 3/4 HP and above to be as noted below.
E.
Three phase starters on motors 5 HP or greater to have Phase Monitor Control Relay, see specification.
NO
LOCATIONS SUCH AS KITCHENS, PROVIDE ALUMINUM.
DESCRIPTION
DATE
* WHERE CFM IS INDICATED ON PLANS FOR RETURN AND TRANSFERS, BALANCE TO AIRFLOW INDICATED.
SPECIFIC NOTES:
1. PROVIDE BACKPAN WHERE CONNECTED TO DUCT OR SOUND BOOT; WHERE NO DUCT OR SOUND BOOT IS PRESENT PROVIDE PERFORATED PANEL ONLY.
2. PROVIDE SMALLEST FACE AVAILABLE FOR NECK LISTED IN PLANS
3. PROVIDE DAMPER FOR A DUCTED RETURN/TRANSFER AIR SYSTEM THAT REQUIRES AIR BALANCE AT RETURN/TRANSFER OPENINGS AS INDICATED BY
AIRFLOW (CFMs) ON DRAWINGS.
A
A
4. AS IDENTIFIED ON THE PLANS PROVIDE 12"x24" FACE FOR 10"x22" NECKS, PROVIDE 24"x24" FACE FOR 22"x22" NECKS
5. PROVIDE WITH FLOOR BASE.
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 2:12:49 PM - PLOT DATE
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
CFM
POUDRE SCHOOL DISTRICT
TYPE
WERNER ELEMENTARY
RENOVATION PROJECT
ITEM
MECHANICAL
SCHEDULES
M401
2
3
4
5
6
ARCHITECT
1
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
CONSULTANT
SEAL
E
D
MANUFACTURER &
MODEL #
CONTROLS
UNIT
VAV-1
DISTRICT-WIDE 406
SHUTOFF
310
600
7
PRICE SDV
6
VAV-2
RESOURCE 405
SHUTOFF
200
600
7
PRICE SDV
6
VAV-3
CLASSROOM 103
SHUTOFF
250
600
7
PRICE SDV
6
VAV-4
CLASSROOM 104
SHUTOFF
260
600
7
PRICE SDV
6
VAV-5
CLASSROOM 105
SHUTOFF
270
600
7
PRICE SDV
6
VAV-6
CLASSROOM 100
SHUTOFF
340
600
7
PRICE SDV
6
VAV-7
CLASSROOM 101
SHUTOFF
380
600
7
PRICE SDV
6
VAV-8
CLASSROOM 102
SHUTOFF
330
600
7
PRICE SDV
6
VAV-9
CLASSROOM 106
SHUTOFF
260
600
7
PRICE SDV
6
VAV-10
CLASSROOM 107
SHUTOFF
270
600
7
PRICE SDV
6
VAV-11
CLASSROOM 108
SHUTOFF
260
600
7
PRICE SDV
6
VAV-12
MUSIC 200
SHUTOFF
300
600
7
PRICE SDV
6
VAV-13
CLASSROOM 201
SHUTOFF
230
600
7
PRICE SDV
6
VAV-14
CLASSROOM 202
SHUTOFF
240
600
7
PRICE SDV
6
VAV-15
CLASSROOM 203
SHUTOFF
250
600
7
PRICE SDV
6
VAV-16
CLASSROOM 204
SHUTOFF
250
600
7
PRICE SDV
6
VAV-17
CLASSROOM 205
SHUTOFF
240
600
7
PRICE SDV
6
VAV-18
CLASSROOM 206
SHUTOFF
240
600
7
PRICE SDV
6
VAV-19
ART 215
SHUTOFF
300
600
7
PRICE SDV
6
VAV-20
COMPUTER LAB 213
SHUTOFF
230
600
7
PRICE SDV
6
VAV-21
CLASSROOM 212
SHUTOFF
250
600
7
PRICE SDV
6
VAV-22
CLASSROOM 211
SHUTOFF
250
600
7
PRICE SDV
6
VAV-23
CLASSROOM 210
SHUTOFF
250
600
7
PRICE SDV
6
VAV-24
CLASSROOM 209
SHUTOFF
250
600
7
PRICE SDV
6
VAV-25
NOTES:
CLASSROOM 208
SHUTOFF
230
600
7
PRICE SDV
6
RTU-1
RTU-2
B
A
OCCUPANT
OUTDOOR
AIRFLOW
RATE
CFM/PER
OCCUPANT
DENSITY
PEOPLE
PER 1000
SQ FT
AREA
OUTDOOR
AIRFLOW
RATE
CFM/SQ FT
ZONE
AIRFLOW
DISTRIBUTION
EFFECTIVENESS
EZ
REQUIRED OSA CFM
DELIVERED TO
SPACE
BALANCE POS #1
TOTAL DESIGN
SUPPPLY AIR
TO ZONE
@100% OSA
BALANCE POS #2
TOTAL DESIGN
SUPPPLY AIR
TO ZONE
@100% OSA
IEBC
COMPIANT
ROOM
NUMBER
ROOM NAME
ZONE TYPE
AREA
SQ FT
201
CLASSROOM
CLASSROOM
735
10.0
25
18
0.12
1.2
227
230
600
YES
202
CLASSROOM
CLASSROOM
774
10.0
25
19
0.12
1.2
239
240
600
YES
203
CLASSROOM
CLASSROOM
789
10.0
25
20
0.12
1.2
243
250
600
YES
204
CLASSROOM
CLASSROOM
789
10.0
25
20
0.12
1.2
243
250
600
YES
205
CLASSROOM
CLASSROOM
774
10.0
25
19
0.12
1.2
239
240
600
YES
206
CLASSROOM
CLASSROOM
747
10.0
25
19
0.12
1.2
230
240
600
YES
207
CONFERENCE/WORKROOM
CONFERENCE
360
5.0
50
18
0.06
1.0
112
120
120
YES
208
CLASSROOM
CLASSROOM
738
10.0
25
18
0.12
1.2
228
230
600
YES
209
CLASSROOM
CLASSROOM
784
10.0
25
20
0.12
1.2
242
250
600
YES
210
CLASSROOM
CLASSROOM
789
10.0
25
20
0.12
1.2
243
250
600
YES
211
CLASSROOM
CLASSROOM
790
10.0
25
20
0.12
1.2
244
250
600
YES
212
CLASSROOM
CLASSROOM
784
10.0
25
20
0.12
1.2
242
250
600
YES
213
COMPUTER LAB
CLASSROOM
741
10.0
25
19
0.12
1.2
228
230
600
YES
214
CONFERENCE/WORKROOM
CONFERENCE
360
5.0
50
18
0.12
1.0
133
140
140
YES
54
GROUP
CONFERENCE
89
5.0
50
4
0.06
1.0
28
50
50
YES
58
GROUP
CONFERENCE
92
5.0
50
5
0.06
1.0
29
50
50
YES
59
GROUP
CONFERENCE
89
5.0
50
4
0.06
1.0
28
50
50
YES
64
GROUP
CONFERENCE
89
5.0
50
4
0.06
1.0
28
50
50
YES
68
GROUP
CONFERENCE
92
5.0
50
5
0.06
1.0
29
50
50
YES
69
GROUP
CONFERENCE
89
5.0
50
4
0.06
1.0
28
50
50
YES
200
MUSIC
CLASSROOM
943
10.0
25
24
0.12
1.2
291
300
600
YES
215
ART
CLASSROOM
962
10.0
25
24
0.12
1.2
297
300
600
YES
61
CORRIDOR
CORRIDOR
600
0
0
0
0.06
1.0
36
50
50
YES
67
CORRIDOR
CORRIDOR
600
0
0
0
0.06
1.0
36
50
50
YES
53
CORRIDOR
CORRIDOR
600
0
0
0
0.06
1.0
36
50
50
YES
57
CORRIDOR
CORRIDOR
600
0
0
0
0.06
1.0
36
50
50
YES
52
CORRIDOR
CORRIDOR
727
0
0
0
0.06
1.0
44
50
50
YES
4320
9210
OCCUPANT
QUANTITY
100
CLASSROOM
CLASSROOM
1086
10.0
25
27
0.12
1.2
335
340
600
YES
101
CLASSROOM
CLASSROOM
1201
10.0
25
30
0.12
1.2
370
380
600
YES
102
CLASSROOM
CLASSROOM
1044
10.0
25
26
0.12
1.2
322
330
600
YES
103
CLASSROOM
CLASSROOM
787
10.0
25
20
0.12
1.2
243
250
600
YES
104
CLASSROOM
CLASSROOM
819
10.0
25
20
0.12
1.2
253
260
600
YES
105
CLASSROOM
CLASSROOM
859
10.0
25
21
0.12
1.2
265
270
600
YES
106
CLASSROOM
CLASSROOM
804
10.0
25
20
0.12
1.2
248
260
600
YES
107
CLASSROOM
CLASSROOM
859
10.0
25
21
0.12
1.2
265
270
600
YES
108
CLASSROOM
CLASSROOM
819
10.0
25
20
0.12
1.2
253
260
600
YES
109
CONFERENCE/WORKROOM
CONFERENCE
360
5.0
50
18
0.06
1.0
112
120
120
YES
405
RESOURCE
CLASSROOM
513
10.0
25
13
0.12
1.0
190
200
600
YES
406
DISTRICT WIDE
CLASSROOM
822
10.0
25
21
0.12
1.0
304
310
600
YES
404
SPEECH
OFFICE
103
5.0
7
1
0.06
1.0
10
50
50
YES
403
COUNSELOR
OFFICE
125
5.0
7
1
0.06
1.0
12
50
50
YES
407A
CONFERENCE
CONFERENCE
120
5.0
50
6
0.06
1.0
37
50
50
YES
407B
ITIN
STORAGE
120
5.0
0
0
0.06
1.0
7
50
50
YES
501
SECRETARY
RECEPTION
623
5.0
30
19
0.06
1.0
131
140
140
YES
502
PRINCIPAL
OFFICE
178
5.0
7
1
0.06
1.0
17
50
50
YES
503
CLIINIC
OFFICE
216
5.0
7
2
0.06
1.0
21
50
50
YES
504
TEACHER'S LOUNGE
OFFICE
617
5.0
7
4
0.06
1.0
59
100
100
YES
505
CONFERENCE
CONFERENCE
171
5.0
50
9
0.06
1.0
53
60
60
YES
25
CORRIDOR
CORRIDOR
600
0
0
0
0.06
1.0
36
50
50
YES
23
CORRIDOR
CORRIDOR
400
0
0
0
0.06
1.0
24
50
50
YES
7
CORRIDOR
CORRIDOR
400
0
0
0
0.06
1.0
24
50
50
YES
8
CORRIDOR
CORRIDOR
310
0
0
0
0.06
1.0
19
50
50
YES
9
CORRIDOR
CORRIDOR
310
0
0
0
0.06
1.0
19
50
50
YES
3
CORRIDOR
CORRIDOR
400
0
0
0
0.06
1.0
24
50
50
YES
2
CORRIDOR
CORRIDOR
600
0
0
0
0.06
1.0
36
50
50
YES
31
CORRIDOR
CORRIDOR
1134
0
0
0
0.06
1.0
68
70
70
YES
4270
7740
NOTES:
1
2
3
4
5
6
C
B
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
DUCT
INLET
SIZE IN
POUDRE SCHOOL DISTRICT
MAX
CFM
WERNER ELEMENTARY
RENOVATION PROJECT
MIN
CFM
PROJECT PHASE
TYPE
PROJECT INFORMATION
C
SERVICE
PROJECT #: 2011.01.0143
DRAWN BY: BRE
CHECKED BY: EJS
ISSUE DATE: 2.9.12
REVISIONS
NO
DESCRIPTION
DATE
A
SHEET INFORMATION
ITEM
2009 IEBC VENTILAION RATE PROCEDURE
CONSTRUCTION
DOCUMENTS
D
ALTERNATE 1 VAV BOX SCHEDULE
2/8/2012 2:12:49 PM - PLOT DATE
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
MECHANICAL
SCHEDULES
M402
DA
T
T
BOP3SS
BIP3ST
CT
T
DA
T
HWS
(E) PUMP
N.O. P-3
FS
FS
(E) PUMP
N.O. P-4
B0B2V
T
BIB2AL
BIP4ST
CT
DPS
LO
EPO
BOB1SS
BOB2SS
AOB1IT
AOB2IT
BOP4SS
AOP1MOD
AOP2MOD
VFD
B-2
(E) BOILER
B-1
(E) BOILER
HI
SEE PLAN FOR
# & LOCATION
BIP2ST
BIP1ST
P-1 NEW
HEATING
WATER PUMP
BOP1SS
BOP2SS
P-2 NEW
HEATING
WATER PUMP
D
Point Name
Digital
Outputs
Digital
Inputs
Point Description
P1ST
P2ST
B1AL
B2AL
P3ST
P4ST
P1SS
P2SS
B1SS
B2SS
B1V
B2V
P3SS
P4SS
OAD
HWST
HWRT
DPS
OAT
SPT
B1T
B2T
P1MOD
PUMP #1 STATUS
PUMP #2 STATUS
BOILER #1 ALARM
BOILER #2 ALARM
BOILER CIRC PUMP STATUS
BOILER CIRC PUMP STATUS
PUMP #1 START/STOP
PUMP #2 START/STOP
BOILER #1 START/STOP
BOILER #2 START/STOP
BOILER #1 ISOLATION VALVE
BOILER #2 ISOLATION VALVE
BOILER CIRC PUMP START/STOP
BOILER CIRC PUMP START/STOP
OUTSIDE AIR DAMPER
HOT WATER SUPPLY TEMP
HOT WATER RETURN TEMP
DIFFERENTIAL PRESSURE SENSOR
OUTSIDE AIR TEMP.
SPACE TEMP.
BOILER 1 TEMP. SETTING
BOILER 2 TEMP. SETTING
PUMP #1 MODULATE
P2MOD
PUMP #2 MODULATE
Analog Analog Analog
Inputs Outputs Virtual
Digital
Virtual
Schedule
Trend
(duration)*
X
X
X
X
X
X
Alarm
(hi/lo)
Show on
Graphic
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AFTER PROOF OF WATER FLOW, THE DDC SYSTEM SHALL ENABLE THE BOILERS AND THEIR CORRESPONDING
CIRCULATING PUMPS P-3 AND P-4 WHEN THE OAT < 65 DEG. F (ADJ). THE DDC SYSTEM SHALL DISABLE THE BOILER
PLANT WHEN THE OAT > 68 DEG. F (ADJ.). AS 2 OR MORE HEATING VALVES START TO OPEN BOILER START
SEQUENCE SHALL COMMENCE.
BACnet
E
BACnet
EXISTING AHU-1
EXISTING GYM UNIT
NEW MAKE UP AIR UNIT
BACnet
NEW BASEBOARD EXISTING BASEBOARD
TYPICAL OF
TYPICAL OF
MANY
5
BACnet
NEW FAN COILS
TYPICAL OF
MANY
BACnet
BACnet
BACnet
EXISTING CUH
TYPICAL OF
5
NEW VAV BOXES
TYPICAL OF
MANY
(ALTERNATE 1)
BACnet
EXISTING AHU-2
EXISTING MEDIA
CENTER UNIT
BACnet
BACnet
NEW CUH-1
EXISTING UNIT
VENTILATORS
TYPICAL OF
4
BACnet
PUMPS
TYPICAL OF
6
BOILERS
TYPICAL OF
2
TC PANELS
TYPICAL OF
2
D
PC
HEATING WATER TEMPERATURE RESET:
TEMPERATURE CONTROLS SYSTEM
SYSTEM ARCHITECTURE
TEMPERATURE CONTROLS SYSTEM ARCHITECTURE
THE HEATING WATER NOMINAL SUPPLY TEMPERATURE SHALL BE BASED UPON THE FOLLOWING:
1 DEG. F OSA 180 DEG. F HWS
65 DEG. F OSA 150 DEG. F HWS
NO SCALE
UNIT CONTROLLERS AND SYSTEM LEVEL CONTROLLERS SHALL BE
PROVIDED WITH A COMMUNICATIONS NETWORK THAT SHALL OPERATE
ON BACNET IP PLATFORM.
HEATING WATER TEMPERATURE SHALL ALSO BE RESET BASED ON DEMAND. THE DDC SYSTEM SHALL MONITOR ALL
HEATING CONTROL VALVES. WHEN ONE OR MORE VALVES ARE FULLY OPEN FOR MORE THEN 5 MINUTES (ADJ.) AND
RESPECTIVE ZONE IS NOT MEETING SPACE TEMPERATURE SET POINT, HEATING WATER SYSTEM TO RESET
TEMPERATURE. HEATING WATER SUPPLY TEMPERATURE RESET SHALL OCCUR BY INCREASING TEMPERATURE BY 2
DEGREES F EVERY 10 MINUTES (ADJ.) UNTIL ALL HEATING CONTROL VALVES AND RESPECTIVE ZONES ARE
SATISFIED. MAXIMUM SUPPLY TEMPERATURE SHALL NOT RISE ABOVE 180 DEGREES F (ADJ.).
NOTE: EXISTING CONTROL SEQUENCE TO REMAIN.
WHEN ALL HEATING CONTROL VALVES ARE NO LONGER 100% FULLY OPEN FOR 30 MINUTES (ADJ.) THE HEATING
WATER SYSTEM TEMPERATURE SHALL BE RESET DOWN AT A RATE OF 2 DEGREES F EVERY 10 MINUTES (ADJ.) UNTIL
ONE OR MORE VALVES ARE FULLY OPEN FOR MORE THAN 5 MINUTES (ADJ.). MINIMUM RETURN TEMPERATURE
SHALL NOT DROP BELOW 150 DEGREES F (ADJ.).
EF-1 THROUGH EF-16
TEMPERATURE CONTROLS CONTRACTOR TO INCLUDE UPDATING ALL
ASSOCIATED DAMPERS FOR THE EXISTING EXHAUST FANS TO DDC
CONTROLS.
EA
WHEN HEATING WATER SYSTEM DIFFERENTIAL TEMPERATURE DROPS BELOW 5 DEGREES F (ADJ.) AND NO VALVES
ARE GREATER THEN 25% OPEN (ADJ.), THEN BOILER PLANT SHALL SHUT DOWN. AS 2 OR MORE HEATING VALVES
START TO OPEN BOILER START SEQUENCE SHALL COMMENCE.
Point Name
CT
X
X
X
BOFSS
BOILER ROOM - HEATING WATER PLANT
X
FST
FSS
Point Description
Digital
Inputs
FAN STATUS
FAN START/STOP
Analog
Inputs
Digital
Outputs
Analog
Outputs
Analog
Virtual
Digital Schedule
Virtual
Trend
(duration)
Alarm
(hi/lo)
Show on
Graphic
X
X
X
X
X
X
BIFST
EXISTING EXHAUST FANS
NO SCALE
C
NO SCALE
AIRAT
DX
OA
AISPT
T
F
NO
D
T
EXISTING AIR HANDLING UNITS
SA
DA
ROOFTOP UNIT
RA
EXISTING CONTROL SEQUENCE TO REMAIN
EXISTING CONTROL SEQUENCE TO REMAIN
NC
C
D
DA
DA
DA
AIDAT
BILTDA
T
FILTER
Point Name
SFST
PST
LTDA
PSS
SFSS
RAT
DAT
MAT
ST
MAD
HVLV
T
LT
H
OA
C
AOHWVLV
CT
B
BOSFSS
P-5,6
BOPSS
BIPST
BISFST
Point Description
Digital
Inputs
SUPPLY FAN STATUS
PUMP STATUS
LOW TEMP ALARM
PUMP START/STOP
SUPPLY FAN START/STOP
RETURN AIR TEMP
DISCHARGE AIR TEMP
MIXED AIR TEMP
SPACE TEMP
MIXED AIR DAMPER
HEATING WATER VALVE
Digital
Outputs
Analog
Inputs
Analog
Outputs
Analog
Virtual
Digital
Virtual
Schedule
Trend
(duration)*
Alarm
(hi/lo)
Show on
Graphic
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AOMAD
CONTROLS
T
AIDAT
BIUST
T
BOUSS
AISPT
RA
AIRAT
Point Name
UST
USS
RAT
DAT
SPT
MAD
*SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS
Point Description
UNIT STATUS
UNIT START/STOP
RETURN AIR TEMP
DISCHARGE AIR TEMP
SPACE TEMP
MIXED AIR DAMPER
Digital
Outputs
Digital
Inputs
Analog Analog Analog
Inputs Outputs Virtual
Digital Schedule Trend
Virtual
(duration)*
Alarm
(hi/lo)
Show on
Graphic
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
B
CT
*SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS
PROJECT INFORMATION
AIMAT
T
F
AOMAD
EXISTING ROOF TOP UNIT (RTU-3)
EXISTING AIR HANDLING UNITS (AHU-1, AHU-2)
PROJECT #: 2011.01.0143
NO SCALE
DRAWN BY: BRE
NO SCALE
CHECKED BY: EJS
SEE FLOOR PLANS FOR VALVE TYPE
AISPT
2/8/2012 2:12:50 PM - PLOT DATE
AOHVLV
BOFSS
HWR
A
HWS
Point Name
FST
FSS
SPT
HVLV
H
T
FAN STATUS
FAN START/STOP
SPACE TEMP
HEATING WATER VALVE
Digital
Inputs
X
Digital
Outputs
Analog Analog Analog
Inputs Outputs Virtual
Digital
Virtual
Schedule
Trend
(duration)*
Alarm
(hi/lo)
X
X
X
X
X
X
NEW CABINET UNIT HEATERS:
AN INTEGRAL THERMOSTAT SHALL CYCLE THE VALVE AND FAN
TO MAINTAIN THERMOSTAT SETPOINT OF 68 DEG. F. (ADJ).
Show on
Graphic
X
X
X
X
SEE FLOOR PLANS FOR NEW
HEATING SHALL BE LOCKED OUT WHEN RTU-1,2 IS IN
TEMPERING MODE OF OPERATION.
Point Name
HWS
SPT
HVLV
Point Description
Digital
Inputs
Digital
Outputs
SPACE TEMP
HEATING WATER VALVE
Analog Analog Analog
Inputs Outputs Virtual
Digital Schedule Trend
Virtual
(duration)*
X
X
X
*SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS
EXISTING UNIT VENTILATOR UV-#
NEW AND EXISTING BASEBOARD
NO SCALE
NO SCALE
2
3
DATE
THE SPACE TEMPERATURE SENSOR SHALL MODULATE THE
BASEBOARD HEATING WATER CONTROL VALVE TO MAINTAIN
THE SPACE HEATING SETPOINT OF 70 DEG. F. (ADJ)
TYPICAL OF 5 EXISTING
NO SCALE
1
DESCRIPTION
HWR
CABINET UNIT HEATER CUH-#
*SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS
NO
EXISTING CONTROL SEQUENCE TO REMAIN FOR EXISTING
BASEBOARD UNITS
T
BASEBOARD
EXISTING CONTROL SEQUENCE TO REMAIN FOR EXISTING
CABINET UNIT HEATERS.
N
Point Description
REVISIONS
4
5
6
Alarm
(hi/lo)
Show on
Graphic
X
X
A
SHEET INFORMATION
TYPICAL OF 4
CT
C
TEMPERATURE CONTROLS CONTRACTOR TO INCLUDE
UPDATING ALL ASSOCIATE DAMPERS FOR THE EXISTING UNIT
VENTILATOS TO DDC CONTROLS.
SEQUENCE OF OPERATION
SEQUENCE OF OPERATION
HWS
C
ISSUE DATE: 2.9.12
AISPT
M
H
EXISTING CONTROL SEQUENCE TO REMAIN
T
HWR
H
AOHVLV
TYPICAL OF 5 EXISTING
TYPICAL OF 1 NEW
SEQUENCE OF OPERATION
BIFST
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
WORLD WIDE WEB
NETWORK
INTERFACE
PROVIDE SUPPLY AND RETURN HEATING WATER TEMPERATURE SENSORS LOCATED WHERE SHOWN
SCHEMATICALLY FOR DDC MONITORING.
*SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS
C
BACnet
BOILER CONTROL:
DDC SYSTEM SHALL PROVIDE THE BOILERS WITH THE REQUIRED SUPPLY WATER TEMPERATURE AS DETERMINED
FROM THE TEMPERATURE RESET SEQUENCE SHOWN BELOW. THE DDC SYSTEM WILL MODULATE B-1 AND B-2 IN
TANDEM TO MAINTAIN HIGHEST PLANT EFFICIENCY THAT WILL PROVIDE REQUIRED SUPPLY WATER TEMPERATURE
AS CALLED FOR BY DDC SYSTEM. BOILER ISOLATION VALVES SHALL BE OPENED 1 MINUTE (ADJ.) BEFORE BOILER IS
FIRED. PROOF OF FLOW THROUGH THE BOILER SHALL BE ESTABLISHED BEFORE BOILER IS FIRED. BOILER
ISOLATION VALVES SHALL CLOSE 5 MINUTES (ADJ.) AFTER BOILER IS DISABLED.
VFD
EXISTING RTU-3
EXISTING COMPUTER ROOM
BACnet
EXISTING
EXHAUST FANS
TYPICAL OF
16
PUMP VFD SHALL MODULATE TO MAINTAIN DIFFERENTIAL PRESSURE IN THE SYSTEM AT A MINIMUM OF 10 PSIG (ADJ.,
CONTROL CONTRACTOR TO COORDINATE WITH BALANCER TO DETERMINE ACTUAL SET POINT) AT ALL DIFFERENTIAL
PRESSURE TRANSMITTERS.
T
BIB1AL
EPO
AIDPS
(E) AIR SEPARATOR
BACnet
SYSTEM PUMPING:
THE DDC SYSTEM SHALL START THE HEATING WATER PUMP P-1 OR P-2 WHEN OAT < 65 DEG. F (ADJ.). THE DDC
SYSTEM SHALL STOP THE HEATING WATER PUMP WHEN OAT > 68 DEG. F (ADJ.). PUMPS SHALL DUTY CYCLE ON A
PRIMARY/STANDBY SEVEN DAY CYCLE (INITIALLY 7:00 AM ON MONDAYS). ON FAILURE AS INDICATED VIA THE VFD
INTERFACE, THE LAG PUMP SHALL START AND AN ALARM SHALL BE DISPLAYED AT THE DISTRICT OPERATOR'S
WORKSTATION.
HWS
NEW RTU-2
HARDWIRE RTU START/STOP AND STATUS
THE DDC SYSTEM SHALL BE CAPABLE OF MONITORING THE STATUS OF ALL ALARMS INCLUDING THOSE FROM THE
BOILERS. AS A MINIMUM THE DDC WILL PULL THE FOLLOWING BOILER ALARMS TO THE DISTRICT WORKSTATION:
FLAME FAILURE, LOW WATER, HIGH TEMPERATURE LIMIT, INDIVIDUAL BOILER SUPPLY TEMPERATURE.
AIHWST
HWR
B0B1V
NEW RTU-1
GENERAL SECTION:
SYSTEM PUMPS P-1 AND P-2 TO BE CONTROLLED BY THE DDC SYSTEM. BOILERS B-1 AND B-2 TO BE CONTROLLED BY
THE DDC SYSTEM. THE DDC SYSTEM WILL PROVIDE THE BOILERS WITH ALL REQUIRED INPUTS TO INCLUDE BUT ARE
NOT LIMITED TO THE FOLLOWING: REQUIRED WATER SUPPLY TEMPERATURE, ENABLE/DISABLE COMMAND.
ES
BOOAD
NEW RTU-4
IT
ROOM
ALL SAFETIES SPECIFIED WITH BOILER SHALL BE LEFT IN OPERATION AS RECOMMENDED BY THE BOILER
MANUFACTURER.
OSA
AIHWRT
BACnet
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
E
BACnet
LIFE SAFETY SECTION:
AN EMERGENCY POWER OFF (EPO) SHALL BE PROVIDED THAT DISABLES THE TWO HEATING WATER BOILERS. EPO(S)
TO BE LOCATED PER CODE AT EACH BOILER ROOM EXIT DOOR.
ES
- FLAME FAILURE
- LOW WATER
- HIGH LIMIT
- BOILER SUPPLY TEMP
BACnet
BACnet
POUDRE SCHOOL DISTRICT
- FLAME FAILURE
- LOW WATER
- HIGH LIMIT
- BOILER SUPPLY TEMP
HOT WATER HEATING SYSTEM
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
SEAL
DDC SYSTEM
ALARMS
6
CONSULTANT
DDC SYSTEM
ALARMS
AISPT
5
WERNER ELEMENTARY
RENOVATION PROJECT
AIOAT
OSA
4
CONSTRUCTION
DOCUMENTS
3
ARCHITECT
2
PROJECT PHASE
1
MECHANICAL CONTROLS
M501
4
5
6
ARCHITECT
3
BOPSS
BIPST
1"
NP
BIHWST
E
DRAIN VALVE
T
AIWLVL
BOFLV
BODV
1"
A0EBD
EXHAUST
AIR
T
DP
T
BIHDSA
DA
DP
S
NC
EXISTING MOP SERVICE BASIN
D
LOCATE IN CUSTODIAN CLOSET ON WALL
HI
AORAD
VARIABLE AIR VOLUME BOXES
RETURN
AIR
FAN
DOOR
SWITCH
EVAP COOLER
DP
BIRFDP
AIDSP
AIBDP
DP
DP
FILTER
LO
OUTSIDE
AIR
DA
BISFDP
BOSSS
T
DA
BISFST
BIHSDP
AOSBD
AIUT
LT
T
H
BILTDA
AIDAT
AISHUM
HI
LO
AOHVLV
SEE FLOOR PLANS FOR VALVE
CONFIGURATION
M
OCCUPIED CYCLE HEATING
WHEN DUCT PRESSURE IS SENSED, INDICATING THAT THE PRIMARY SYSTEM AIR IS
OPERATING, THE PRIMARY AIR VOLUME DAMPER SHALL OPEN AND MODULATE TO PROVIDE
MINIMUM VENTILATION AIR AS LISTED ON THE FLOOR PLANS.
OCCUPIED CYCLE TEMPERING
WHEN DUCT PRESSURE IS SENSED, INDICATING THAT THE PRIMARY SYSTEM AIR IS
OPERATING, THE PRIMARY AIR VOLUME DAMPER SHALL OPEN AND MODULATE THE
PRIMARY AIR TO SATISFY THE OCCUPIED SPACE TEMPERING SETPOINT. AS THE ROOM
THERMOSTAT SENSES A NEED FOR NO TEMPERING, THE CONTROL SYSTEM SHALL CLOSE
THE PRIMARY AIR VOLUME DAMPER DOWN TO THE MINIMUM PRIMARY AIR POSITION.
BEFORE HEATING IS INITIATED, THE CONTROLS SHALL ENTER A NO LOAD BAND, DURING
WHICH MINIMUM PRIMARY AIR IS CIRCULATED. ON SENSING FURTHER NEED FOR HEAT,
THE BASEBOARD HEATING WATER CONTROL VALVE IS MODULATED OPEN AS REQUIRED TO
SATISFY THE SPACE HEATING SETPOINT.
UNOCCUPIED CYCLE
THE PRIMARY AIR VOLUME DAMPER SHALL POSITIVELY CLOSE. THE SPACE THERMOSTAT
SHALL MODULATE THE BASEBOARD HEATING WATER CONTROL VALVE TO MAINTAIN THE
UNOCCUPIED SPACE HEATING SETPOINT.
Point Name
LOCATE HIGH LIMIT
HUMIDISTAT A SUITABLE
DISTANCE
DOWNSTREAM FROM
EVAP COIL TO PREVENT
NUISANCE TRIPPING
HWS
AOFMOD
SUPPLY
AIR
(FUTURE)
DP
VFD
HI
C
C
DP
LO
Dx
H
HI
HWR
NO SCALE
•
•
GENERAL SECTION
1. OUTSIDE AIR, RETURN AIR, EXHAUST AIR AND WHEEL BYPASS DAMPERS ARE
PROVIDED WITH THE AIR HANDLING UNIT.
2. ALL SET POINTS NOTED BELOW SHALL BE FULLY ADJUSTABLE BY THE END USER
THROUGH A USER-ADJUSTABLE, GRAPHICAL DDC FRONT END.
C
•
4. THE EXHAUST AIR FILTER AND OUTSIDE AIR FILTER SHALL BE PROVIDED WITH
DIFFERENTIAL PRESSURE MONITORS THAT PROVIDE AN ALARM SIGNAL TO THE DDC
CONTROL PANEL. MAGNEHELIC GAUGES WILL BE PROVIDED WITH THE AIR HANDLING
UNIT.
•
1. SHOULD THE SMOKE DETECTOR ACTIVATE, THE DETECTOR SHALL STOP THE
SUPPLY AND EXHAUST FANS IN BOTH THE MANUAL OR AUTOMATIC MODE,
INDEPENDENT OF THE CONTROL SYSTEM. AN ALARM SIGNAL SHALL BE INDICATED
AT THE DDC CONTROL PANEL.
2. PROVIDE A LOW TEMPERATURE DETECTION THERMOSTATS IMMEDIATELY
DOWNSTREAM OF THE HEATING COIL. UPON TRIPPING (35 DEG F.), THE LOW
TEMPERATURE DETECTION THERMOSTAT SHALL STOP THE SUPPLY AND EXHAUST
FANS INDEPENDENT OF THE CONTROL SYSTEM. AN ALARM SIGNAL SHALL BE SENT
TO THE DDC CONTROL PANEL. THE OUTSIDE AIR AND ECONOMIZER AIR DAMPERS
SHALL BE SLOW OPENING TO PREVENT NUISANCE TRIPPING OF THE LOW
TEMPERATURE DETECTION THERMOSTAT.
3. PROVIDE HIGH LIMIT DUCT STATIC PRESSURE SENSORS IMMEDIATELY
DOWNSTREAM OF THE SUPPLY AND EXHAUST FANS. UPON TRIPPING (0.5 IN.W.C .
ABOVE FAN SELECTION POINT), THE HIGH LIMIT DUCT STATIC PRESSURE
CONTROLLER SHALL STOP THE SUPPLY OR EXHAUST FANS IN BOTH THE MANUAL OR
AUTOMATIC MODE INDEPENDENT OF THE CONTROL SYSTEM. AN ALARM SIGNAL
SHALL BE SENT TO THE DDC CONTROL PANEL.
4. PROVIDE A FAN COMPARTMENT DOOR SWITCH ON THE SUPPLY AND EXHAUST
FANS. UPON THE DOOR OPENING THE SWITCH SHALL STOP THE SUPPLY OR
EXHAUST FANS IN BOTH THE MANUAL OR AUTOMATIC MODE INDEPENDENT OF THE
CONTROL SYSTEM. AN ALARM SIGNAL SHALL BE SENT TO THE DDC CONTROL PANEL.
5. WHENEVER THE SUPPLY AND EXHAUST FANS ARE DE-ENERGIZED, AS SENSED BY
THE STATUS SWITCH, THE OUTSIDE, AND EXHAUST AIR DAMPERS SHALL BE CLOSED
AND THE RETURN AIR DAMPER SHALL BE OPEN, THE EVAPORATIVE COOLER PUMPS
SHALL BE DE-ENERGIZED AND THE HEAT WHEEL SHALL BE DE-ENERGIZED.
6. IF THE OUTSIDE AIR TEMPERATURE IS BELOW 14 DEG. F AND THE DP ACROSS THE
HEAT WHEEL INCREASES TO 1.5 TIMES THE DRY DP AS DETERMINED BY
CONSULTATION WITH THE BALANCING CONTRACTOR, INDICATING A FROST
CONDITION, INITIATE AN ALARM.
OCCUPIED CYCLE
1. SUPPLY FAN CONTROL:
•
•
2/8/2012 2:12:50 PM - PLOT DATE
•
A
1
THE SUPPLY FAN SHALL BE ENERGIZED. THE SUPPLY SHALL BE SLOWLY
RAMPED FROM ZERO TO THE FINAL SETPOINT VALUE AFTER THE SUPPLY
FAN IS STARTED.
NORMAL HEATING OCCUPIED MODE: THE AIR HANDLING UNIT SUPPLY FAN
SPEED SHALL MODULATE TO MAINTAIN THE MINIMUM VENTILATION AIR
REQUIREMENTS AS LISTED ON THE FLOOR PLANS.(TEMPERATURE
CONTROLS CONTRACTOR TO COORDINATE WITH BALANCING CONTRACTOR
ON STATIC PRESSURE SETTING)
NORMAL TEMPERING OCCUPIED MODE: THE AIR HANDLING UNIT SUPPLY FAN
SPEED SHALL MODULATE TO MAINTAIN 600 CFM PER CLASSROOM IN THE
NORMAL TEMPERING OCCUPIED MODE. (TEMPERATURE CONTROLS
CONTRACTOR TO COORDINATE WITH BALANCING CONTRACTOR ON STATIC
PRESSURE SETTING, SCHOOL DISTRICT WILL MANUALLY ADJUST DAMPERS
AFTER BALANCING CONTRACTOR INITIALLY NOTES TEMPERING POSITION
MANUAL BALANCING DAMPER)
ALTERNATE 1 . THE AIR HANDLING UNIT
SUPPLY FAN SPEED SHALL MODULATE TO MAINTAIN DUCT STATIC
PRESSURE SETPOINT IN THE NORMAL TEMPERING OCCUPIED MODE.
(TEMPERATURE CONTROLS CONTRACTOR TO COORDINATE WITH
BALANCING CONTRACTOR ON STATIC PRESSURE SETTING)
2
WHEN THE UNIT IS IN THE OCCUPIED MODE THE OUTSIDE DAMPER IS TO
OPEN AND THE EXHAUST DAMPER IS TO OPEN. RETURN AIR DAMPER IS TO
CLOSE.
IN NORMAL HEATING OCCUPIED MODE (OUTDOOR AIR TEMPERATURE OF
BELOW 68 DEG. F.) THERE SHALL BE A SINGLE AIR TEMPERATURE SET POINT
OF 72 DEG. F.
•
THE HEAT WHEEL, AND HOT WATER COIL SHALL ACT IN SEQUENCE TO
CONTROL THE DISCHARGE AIR TEMPERATURE SETPOINT AS NOTED BELOW.
•
WHEN THE DISCHARGE AIR TEMPERATURE IS CALLING FOR HEATING:
•
THE EXHAUST AIR EVAPORATIVE COOLER PUMPS SHALL BE DE-ENERGIZED.
•
THE HEAT WHEEL SPEED SHALL MODULATE AS NECESSARY TO MAINTAIN
THE DISCHARGE AIR TEMPERATURE SETPOINT.
•
WHEN THE HEAT WHEEL SPEED REACHES 100% AND AN ADDITIONAL NEED
FOR HEATING IS REQUIRED, THE HOT WATER COIL VALVE SHALL MODULATE
AS REQUIRED.
•
WHEN THE OUTSIDE TEMPERATURE IS BELOW 14 DEG F; DIFFERENTIAL
PRESSURE SHALL BE MONITORED ACROSS THE HEAT WHEEL. WHEN THE
WHEEL PRESSURE DROP EQUALS THE DESIGN STATIC PRESSURE
MULTIPLIED BY 1.5 AS SUBMITTED FOR THE APPLICABLE AIRFLOW RATE
(COORDINATE WITH MECHANICAL CONTRACTOR FOR ACTUAL UNIT
SUBMITTALS), THE HEAT WHEEL SPEED SHALL BE SLOWED TO MAINTAIN AN
EXHAUST AIR TEMPERATURE OF 22 DEG F. DURING THIS CONDITION THE
HEATING COIL SHALL SUPPLEMENT THE HEATING REQUIREMENT. WHEN THE
PRESSURE DROPS BELOW 80% OF THE DESIGN VALUE FOR THE APPLICABLE
AIRFLOW RATE, OR THE OAT RISES ABOVE 14 DEG F, RE-INITIATE THE
SEQUENCE.
IN NORMAL TEMPERING OCCUPIED MODE (OUTDOOR AIR TEMPERATURE OF ABOVE 68
DEG. F. AND 30% OF THE CLASSROOMS ARE ABOVE 77 DEG. F.) THERE SHALL BE A
SINGLE AIR TEMPERATURE SET POINT OF 62 DEG. F. AND THE SUPPLY FAN SHALL
MODULATE TO 600 CFM PER CLASSROOM.
•
FIRST STAGE: THE HEAT WHEEL BYPASS DAMPER SHALL OPEN FULLY. THE
HEAT WHEEL SHALL BE OFF.
•
SECOND STAGE: THE EXHAUST AIR EVAPORATIVE COOLER PUMP IS
ENERGIZED. THE HEAT WHEEL SHALL BE ENERGIZED AND ITS SPEED SHALL
BE MODULATED TO MAINTAIN TEMPERING SETPOINT. THE WHEEL SPEED
SHALL BE DECREASED TO PROVIDE LESS TEMPERING AND INCREASED TO
PROVIDE MORE TEMPERING.
•
LESS TEMPERING SHALL BE THE OPPOSITE OF THE ABOVE.
•
THE DISCHARGE AIR HUMIDITY SHALL NOT EXCEED 80% RH EVEN IN THE EVENT THAT
THE DESIRED DISCHARGE AIR TEMPERATURES ARE NOT ACHIEVED. THIS SHALL BE
ACHIEVED BY DE-ENERGIZING THE EVAPORATIVE COOLER PUMP AND THE UNIT SHALL
RETURN TO PROVIDE MINIMUM VENTILATION.
THE EVAPORATIVE COOLER SPRAY PUMP SHALL HAVE SOFTWARE
INTERLOCKS TO PERMIT OPERATION ONLY WHEN THE SUPPLY AIR FAN IS
RUNNING, THE SUMP HAS BEEN FILLED, AND THE OUTSIDE AIR DAMPERS ARE
OPEN 100%. THERE SHALL BE A MINIMUM ON AND OFF TIMERS FOR THE PUMP
(ALL INDEPENDENTLY ADJUSTABLE) TO PREVENT SHORT CYCLING.
•
PURGE CYCLE: THERE SHALL BE A DAILY DRY-OUT CYCLE OF 60 MINUTES
DURING WHICH TIME THE EVAPORATIVE COOLER PUMPS ARE DE-ENERGIZED.
EXHAUST EVAPORATIVE COOLER DRY-OUT SHALL OCCUR DAILY FOR ONE HOUR
AFTER OCCUPIED HOURS IF THE EVAPORATIVE COOLER HAS NOT BEEN OFF FOR
AT LEAST ONE HOUR DURING THE PREVIOUS 24 HOURS.
•
PUMP SHALL BE INTERLOCKED WITH THE ULTRA SONIC SUMP LEVEL SENSOR
TO DE-ENERGIZE THE PUMPS WHEN THE SUMP WATER LEVEL IS LOW. A LOW
WATER SIGNAL SHALL GENERATE AN ALARM THAT SHALL BE SENT TO THE DC
CONTROL PANEL.
•
AVD
AIR VOLUMN DAMPER
Analog
Inputs
Analog
Outputs
Analog
Virtual
Digital
Virtual
Schedule
x
x
x
Trend
(duration)*
Alarm
(hi/lo)
Show on
Graphic
x
x
x
x
x
x
UNOCCUPIED CYCLE
1.
•
2.
THE EVAPORATIVE COOLER PUMP SHALL OPERATE CONTINUOUSLY WHEN
THERE IS A CALL FOR TEMPERING.
THE EXHAUST EVAPORATIVE COOLER SUMP SHALL DRAIN WHEN THE
OUTSIDE AIR TEMPERATURE DROPS BELOW 45 DEG. F FOR A PERIOD OF 60
MINUTES. THE EXHAUST EVAPORATIVE COOLER SUMP SHALL FILL ONLY
WHEN THE OUTSIDE TEMPERATURE EXCEEDS 55 DEG. F AND THE SPRAY
PUMP IS CALLED FOR ON A CALL FOR COOLING. PROVIDE AN ULTRA SONIC
WATER LEVEL SENSOR TO ENSURE THE SUMP IS FILLED BEFORE THE PUMP
IS ENABLED. PROGRAM A WEEKLY SUMP DRAINAGE CYCLE TO COINCIDE
WITH THE EVAPORATIVE COOLER PAD DRY-OUT PERIOD ON FRIDAY
EVENING. DRAIN THE SUMP ONLY IF IT HAS NOT BEEN DRAINED IN THE
PRECEDING FOUR DAYS.
THE SUPPLY AND EXHAUST FANS SHALL BE DE-ENERGIZED EXCEPT WHEN
OPERATION IS CALLED FOR AS DESCRIBED BELOW. OUTSIDE AIR, AND EXHAUST
DAMPERS SHALL BE CLOSED. THE RETURN AIR DAMPER SHALL BE OPEN.
WHEN THE SUPPLY FAN IS DE-ENERGIZED AND THE OUTSIDE AIR
TEMPERATURE IS BELOW THE OUTSIDE AIR LOW TEMPERATURE PROTECTION
SET POINT OF 35 DEG. F AND THE UNIT TEMPERATURE IS LESS THAN 45 DEG. F
THEN THE SUPPLY FAN SHALL START FOR 10 MINUTES WITH THE
EXHAUST/OUTSIDE AIR DAMPERS CLOSED AND THE RETURN DAMPER OPEN TO
MAINTAIN MIXED AIR TEMPERATURE PROTECTION SET POINT OF 45 DEG. F. IF
AFTER 10 MINUTES THE CONDITION IS NOT CLEARED THE HEATING COIL SHALL
BE ENERGIZED AND WILL MODULATE AS REQUIRED.
UNOCCUPIED TEMPERING MODE
•
IN UNOCCUPIED TEMPERING OCCUPIED MODE (OUTDOOR AIR TEMPERATURE
OF ABOVE 68 DEG. F. AND 50% OF THE CLASSROOMS ARE ABOVE 80 DEG. F.)
THERE SHALL BE A SINGLE AIR TEMPERATURE SET POINT OF 62 DEG. F. AND THE
SUPPLY FAN SHALL MODULATE TO 600 CM PER CLASSROOM.
•
FIRST STAGE: THE HEAT WHEEL BYPASS DAMPER SHALL OPEN FULLY. THE
HEAT WHEEL SHALL BE OFF.
•
SECOND STAGE: THE EXHAUST AIR EVAPORATIVE COOLER PUMP IS
ENERGIZED. THE HEAT WHEEL SHALL BE ENERGIZED AND ITS SPEED SHALL BE
MODULATED TO MAINTAIN THE UNOCCUPIED TEMPERING SETON. THE WHEEL
SPEED SHALL BE DECREASED TO PROVIDE LESS TEMPERING AND INCREASED
TO PROVIDE MORE TEMPERING.
•
THIRD STAGE: THE RETURN AIR DAMPER SHALL OPEN AND THE EXHAUST AIR
AND OUTSIDE AIR DAMPERS ARE TO CLOSE AND THE SECOND STAGE ABOVE
SHALL OCCUR.
•
4.
Point Name
UNOCCUPIED COIL PROTECTION:
•
3.
C
UNOCCUPIED:
LESS TEMPERING SHALL BE THE OPPOSITE OF THE ABOVE.
MORNING WARM-UP:
•
5. EVAPORATIVE COOLER SECTION CONTROL:
•
DISCHARGE AIR TEMP
SPACE TEMP.
AIR FLOW VOLUMN
Digital
Outputs
NO SCALE
•
4. DISCHARGE AIR TEMPERATURE CONTROL TEMPERING
•
7. INDIRECT EVAPORATIVE COOLING SHALL BE LOCKED OUT DURING THE
UNOCCUPIED MODE.
THE EXHAUST DAMPER SHALL OPEN AND EXHAUST FAN SHALL BE ENABLED
WHEN THE SUPPLY FAN IS ENERGIZED IN THE OCCUPIED MODE. THE
EXHAUST FAN SHALL START AND THE SPEED SHALL MODULATE TO MAINTAIN
THE SPACE STATIC PRESSURE SETPOINT. AS THE SPACE STATIC PRESSURE
SETPOINT DROPS BELOW SETPOINT, THE EXHAUST FAN SHALL FIRST
MODULATE DOWN AND ON FURTHER DROP THE DAMPER SHALL CLOSE. THE
SPACE STATIC PRESSURE SETPOINT SHALL BE 0.05 INCH OF WATER
REFERENCED TO OUTSIDE AIR STATIC PRESSURE.
3. DISCHARGE AIR TEMPERATURE CONTROL HEATING:
OPERATIONAL SAFETY AND INTERLOCKS SECTION
B
THE SUPPLY FAN SPEED SHALL NOT DROP BELOW 30% TO ASSURE
ADEQUATE FAN MOTOR COOLING. CONFIRM MINIMUM SETTING WITH VFD
MANUFACTURER
2. EXHAUST AND OUTDOOR AIR CONTROL:
3. THE OCCUPANCY MODE (OCCUPIED OR UNOCCUPIED) SHALL BE DETERMINED
THROUGH A USER-ADJUSTABLE, GRAPHICAL, SEVEN-DAY SCHEDULE WITH A HOLIDAY
SCHEDULE.
DAT
ST
AFV
Digital
Inputs
SHUTOFF VAV CONTROL DRAWING - ALTERNATE 1
1. EXHAUST FAN CONTROL:
NOTE: ALL SETPOINTS SHALL BE ADJUSTABLE.
Point Description
•
•
•
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
D
*SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS
RTU-1,2 CONTROL DIAGRAM
RTU-1,2,
HOT WATER HEAT INDIRECT COOLED HEAT RECOVERY- VAV ROOFTOP DEDICATED
OUTDOOR AIR HANDLING UNIT
ROOM
SENSOR
DRAIN VALVE
F
LO
S
AOFMOD
T
H
T
1"
BISDA
FILTER
NC
D
AIRAT2
AIRHUM
D
MORNING WARM-UP SHALL BE COVERED BY THE PERIMETER SYSTEM EXCEPT
AS NOTED HERE. IF HOWEVER THE AVERAGE SPACE TEMPERATURE IS BELOW
THE OCCUPIED SPACE TEMPERATURE SET POINT AND THE OUTSIDE AIR
TEMPERATURE IS BELOW 15 DEG. F, MORNING WARM-UP SHALL BE
SUPPLEMENTED BY THIS UNIT AND THEREFORE SHALL BE INITIATED BY THE
OPTIMUM START PROGRAM. THE OUTSIDE AIR AND EXHAUST DAMPERS SHALL
BE CLOSED AND THE RETURN AIR DAMPER OPEN DURING THE MORNING
WARM-UP CYCLE. THE UNIT SHALL HEAT THE SPACE TO SET POINT BY
INCREASING THE UNIT SUPPLY AIR TEMPERATURE SET POINT TO 80 DEG. F AND
OPERATING UNTIL THE SPACE TEMPERATURE EQUALS THE OCCUPIED SPACE
TEMPERATURE SET POINT. IF THE SPACE REACHES THE OCCUPIED SPACE
TEMPERATURE SET POINT BEFORE OCCUPANCY, THE SYSTEM SHUTS OFF. IF
OCCUPANCY OCCURS BEFORE THE SPACE TEMPERATURE REACHES THE
OCCUPIED SPACE TEMPERATURE SET POINT, THE SYSTEM SHALL CONTINUE TO
HAVE A HIGH DISCHARGE AIR TEMPERATURE SET POINT UNTIL THE SPACE
TEMPERATURE SET POINT IS ACHIEVED. MORNING WARM-UP SHALL OCCUR
ONLY ONCE PER DAY.
EST
HWST
PST
SDA
HDSA
RFDP
LTDA
HWDP
SFST
SFDP
ESS
HWSS
PSS
FLV
DV
SSS
EAT
RAT1
RAT2
RHUM
WLVL
BDP
DSP
SHUM
DAT
UT
EAD
FMOD
WMOD
EBD
HVLV
SBD
FMOD
OAD
RAD
Digital
Inputs
Point Description
EXHAUST FAN STATUS
HEAT WHEEL STATUS
PUMP STATUS
SMOKE DETECTOR ALARM
HIGH DUCT STATIC ALARM
RETURN FILTER DIFF PRESSURE
LOW TEMP ALARM
HEAT WHEEL DIFF PRESSURE
SUPPLY FAN STATUS
SUPPLY FILTER DIFF PRESSURE
EXHAUST FAN START/STOP
HEAT WHEEL START/STOP
PUMP START/STOP
FILL VALVE
DRAIN VALVE
SUPPLY FAN START/STOP
EXHAUST AIR TEMP
RETURN AIR TEMP 1
RETURN AIR TEMP 2
RETURN AIR HUMIDITY
WATER LEVEL
BUILDING DIFF PRESSURE
DUCT DIFF PRESSURE
SUPPLY AIR HUMIDITY
DISCHARGE AIR TEMPERATURE
UNIT TEMPERATURE
EXHAUST AIR DAMPER
EXHAUST FAN MODULATE
WHEEL MODULATE
EXHAUST BYPASS DAMPER
HEATING WATER VALVE
SUPPLY BYPASS DAMPER
SUPPLY FAN MODULATE
OUTSIDE AIR DAMPER
RETURN AIR DAMPER
Digital
Outputs
Analog
Inputs
Analog
Outputs
Analog
Virtual
Digital Schedule
Virtual
Trend
(duration)*
X
X
X
X
X
X
X
X
X
X
Alarm
(hi/lo)
Show on
Graphic
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
B
X
X
X
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
DA
AIEAT
DA
AIRAT1
AIST
POUDRE SCHOOL DISTRICT
VFD
HEAT WHEEL
A0EAD
REDUCED
PRESSURE
BACKFLOW
PREVENTER
1-1/2"
VFD
COMMUNICATIONS
LINK
D
BIHDSA
AOWMOD
TO SYSTEM
ELECTRICAL
POWER
CONSTRUCTION
DOCUMENTS
B0HWSS
B0ESS
DDC
CONTROL
WERNER ELEMENTARY
RENOVATION PROJECT
BIEST
AIDAT
CONSULTANT
AOFMOD
TO SPACE
PROJECT PHASE
VFD CONTROLS FOR HEAT
WHEEL, SUPPLY FAN, AND
EXHAUST FAN SHALL BE
PACKAGED WITH THE UNIT
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
SEAL
E
NEW VAV BOX
SA
FILL VALVE
PROJECT INFORMATION
2
PROJECT #: 2011.01.0143
X
X
DRAWN BY: BRE
CHECKED BY: EJS
*SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS
THE EXHAUST AIR EVAPORATIVE COOLER PUMPS SHALL BE DE-ENERGIZED.
ISSUE DATE: 2.9.12
THE HEAT WHEEL SPEED SHALL MODULATE AS NECESSARY TO MAINTAIN THE
DISCHARGE AIR TEMPERATURE SETPOINT.
REVISIONS
NO
WHEN THE HEAT WHEEL SPEED REACHES 100% AND AN ADDITIONAL NEED
FOR HEATING IS REQUIRED, THE HOT WATER COIL VALVE SHALL MODULATE AS
REQUIRED.
DESCRIPTION
DATE
A
3
4
5
6
SHEET INFORMATION
1
MECHANICAL CONTROLS
M502
2
3
4
5
6
ARCHITECT
1
Analog
Outputs
Analog
Virtual
Digital Schedule
Virtual
Trend
(duration)*
Alarm
(hi/lo)
Show on
Graphic
BOPSS
LOCATE IN WATER HEATER CLOSET WALL
X
X
X
X
X
X
X
X
x
x
x
x
x
x
x
BIPST
FILL VALVE
DRAIN VALVE
x
x
X
X
X
X
X
x
x
x
X
X
X
X
X
X
BISLS
BOFLV
SLS
EVAP COOLER
EVAP SUMP
DRAIN VALVE
x
x
x
x
x
x
x
x
EVAP
PUMP
NP
BODV
X
X
x
x
X
X
E
SEAL
SUMP LEVEL SWITCH
PUMP STATUS
SMOKE DETECTOR ALARM
SUPPLY FAN STATUS
FILTER DIFF PRESSURE
HOOD FIRE
CIRC PUMP STATUS
LOW TEMP ALARM
PUMP START/STOP
CIRC PUMP START/STOP
FILL VALVE
DRAIN VALVE
SUPPLY FAN START/STOP
AIR TEMP 1
AIR TEMP 2
DISCHARGE AIR TEMPERATURE
AIR HUMIDITY
OUTSIDE AIR DAMPER
HEATING WATER VALVE
Analog
Inputs
NC
REDUCED
PRESSURE
BACKFLOW
PREVENTER
AIAT1
AIAH
AIAT2
T
H
T
BISDA
F
D
FILTER
SUPPLY
AIR
OUTSIDE
AIR
CONSULTANT
SLS
PST
SDA
FST
FDP
HF
CPST
LTA
PSS
CPSS
FLV
DV
SSS
AT1
AT2
DAT
AH
OAD
HVLV
Digital
Outputs
.15
E
Digital
Inputs
Point Description
.15
Point Name
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
DP
PROVIDE
FUNNEL ON
EXISTING
FLOOR DRAIN
BIFDP
*SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS
AOOAD
BOSSS
DA
BIHF
S
(E) HOOD
BIFST
MAKE UP AIR UNIT KMUA-1
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
P-8
KITCHEN MAKEUP AIR UNITS 1
KITCHEN MAU UNIT 1: THIS UNIT IS INTENDED TO PROVIDE MAKEUP AIR FOR THE MAIN KITCHEN HOOD.
WHENEVER THE EXISTING EXHAUST FANS FOR THE HOOD ARE TURNED ON KMUA UNIT 1 IS TO START. UPON
STARTUP SIGNAL THE OUTSIDE AIR DAMPER
IS TO OPEN AND THE SUPPLY FAN IS TO START . FILTER
NO SCALE
DIFFERENTIAL PRESSURE IS MEASURED, ENTERING AIR TEMPERATURE IS MEASURED, AND ENTERING AIR
HUMIDITY IS MEASURED AND SENT TO BAS. IF THE ENTERING AIR TEMPERATURE IS ABOVE 50ËšF AND THE
ENTERING HUMIDITY IS BELOW 70ËšF THE EVAPORATIVE COOLER FILL VALVE IS TO OPEN AND FILL THE
EVAPORATIVE COOLER SUMP. IF THE ENTERING AIR TEMPERATURE DROPS BELOW 45ËšF THE FILL VALVE IS TO
CLOSE AND THE DRAIN VALVES ARE TO OPEN. ALSO UPON UNIT SHUT DOWN THE FILL VALVES ARE TO CLOSE
AND THE DRAIN VALVES ARE TO OPEN. IF THE DISCHARGE AIR TEMPERATURE IS ABOVE 75ËšF THE EVAPORATIVE
COOLER PUMP IS TO START AND CYCLE TO MAINTAIN 75ËšF SUPPLY AIR TEMPERATURE. THE REMOTE HEATING
WATER COIL AND CIRCULATING PUMP ARE TO BE CONTROLLED TO MAINTAIN 70 ËšDAT. IF THE SPACE
TEMPERATURE RISES ABOVE 78 °F THE DISCHARGE AIR TEMPERATURE SHALL BE CONTROLLED DOWN TO 65°F
THROUGH CONTROL OF THE EVAPORATIVE COOLER UNTIL THE SPACE TEMPERATURE DROPS BELOW 75 °F. THE
EXISTING CABINET UNIT HEATER SHALL BE DISABLED AT SPACE TEMPERATURES ABOVE 72 °. OUTSIDE AIR
DAMPER SHALL BE SLOW OPENING TO PREVENT NUISANCE TRIPPING OF THE LOW TEMPERATURE ALARM. DDC
SYSTEM TO ENABLE CIRCULATING PUMP WHEN THE OAT IS LESS THAN 40 DEF. F AND THE HOOD SWITCH IS
ACTIVATED. PROVIDE A DELAY OF THE MAKE UP AIR UNIT SUPPLY FAN WHEN THE HOOD SWITCH IS ENABLED
OF 2 MINUTES (ADJ). A SMOKE DETECTOR IN THE UNIT DISCHARGE DUCT IS TO SHUT DOWN UNIT, CLOSE
OUTSIDE AIR DAMPER AND SOUND ALARM. THE COOKING HOOD FIRE SUPPRESSION SYSTEM SHALL ALSO
PROVIDE THIS CONTROL. UPON SHUT DOWN TO THE HOOD THE MUA UNIT IS TO STOP, EVAPORATIVE COOLER
IS TO DRAIN AND OUTSIDE AIR DAMPER IS TO CLOSE.
NO SCALE
ROOFTOP UNIT
ENABLE PUMP DURING OCCUPIED HOURS.
Point Name
PST
PSS
Point Description
Digital
Inputs
PUMP STATUS
PUMP START/STOP
Digital
Outputs
Analog
Inputs
Analog
Outputs
Analog
Virtual
Digital Schedule
Virtual
Trend
(duration)
X
X
Alarm
(hi/lo)
Show on
Graphic
X
X
X
X
AIDAT
LT
T
HC-1
H
C
AOHVLV
P-7
M
BOCPSS
CT
BICPST
BIFDP
C
CONSTRUCTION
DOCUMENTS
KITCHEN WATER HEATER PUMP
BILTA
PROJECT PHASE
BIPST
CT
D
HWS
BOPSS
HWR
D
C
HARDWIRE SHUT
DOWN FROM
ASSOCIATED RTU
SMOKE DETECTOR
HEATING COIL TWO-WAY CONTROL VALVE SHALL BE 100% CLOSED WHENEVER THE
SUPPLY FAN IS OFF.
Point Name
FST
FSS
DAT
SPT
HVLV
Point Description
FAN STATUS
FAN START/STOP
DISCHARGE AIR TEMP
SPACE TEMP
HEATING WATER VALVE
Digital
Inputs
Analog
Inputs
Digital
Outputs
BOFSS
CT
HWS
AOMAD
SF
C
D
BIFST
T
CONTROLS
AIDAT
BIUST
T
AISPT
HWR
NC
DA
M
BOUSS
T
RA
T
AISPT
AIRAT
FAN COIL: FC-1 THROUGH FC-8
BASED ON TEMPERATURE SENSOR INPUT, THE SUPPLY FAN SHALL START AND RUN
WHEN THE TEMPERATURE SENSED BY THE DDC SYSTEM DROPS BELOW 68 DEG F. THE
HEATING COIL SHALL VALVE MODULATE TO MAINTAIN THE UNOCCUPIED SETPOINT.
WHEN THE SPACE TEMPERATURE REACHES 72 DEG F., THE SUPPLY FAN SHALL STOP
AND THE HEATING COIL TWO-WAY CONTROL VALVE SHALL CLOSE 100%.
SA
DA
F
OCCUPIED CYCLE
THE SUPPLY FAN SHALL START AND RUN CONTINUOUSLY. SHOULD THE SUPPLY FAN
FAIL TO START OR FAIL DURING OPERATION FOR ANY REASON, AN ALARM SHALL BE
INDICATED AT THE DDC CONTROL PANEL.
B
EF
AOHVLV
UNOCCUPIED CYCLE
THE SUPPLY FAN SHALL BE OFF. THE HEATING COIL TWO-WAY CONTROL VALVES SHALL
BE 100% CLOSED.
GENERAL
DIRECT EXPANSION PACKAGED AC UNIT WITH FACTORY CONTROLS
T
C
THE DDC SYSTEM TIME AND OPTIMUM START/STOP PROGRAMS SHALL CONTROL THE
SYSTEM. COORDINATE CONTROL CYCLES WITH OWNER.
THE DISCHARGE AIR TEMPERATURE SHALL BE LIMITED TO A MINIMUM OF 53 DEG F. AND
A MAXIMUM OF 100 DEG F. THE HEATING COIL SHALL VALVE MODULATE TO MAINTAIN
THE OCCUPIED SETPOINT
NO
H
RETURN
AIR
UNIT START / STOP CONTROL
OA
NEW IT ROOFTOP UNIT (RTU-4)
NO SCALE
NO SCALE
Analog
Outputs
Analog
Virtual
Digital
Virtual
Schedule
Trend
(duration)*
X
X
X
X
X
X
X
X
Alarm
(hi/lo)
Show on
Graphic
X
X
X
X
X
X
AIR CONDITIONING UNIT WILL BE A FACTORY PACKAGED COOLING ONLY
UNIT, COMPLETE WITH FACTORY INSTALLED REFRIGERATION CONTROLS
AND O.A. AND R.A. DAMPERS. COORDINATE WITH UNIT MANUFACTURER
TO INTERFACE WITH UNIT CONTROLS TO ACHIEVE THE FOLLOWING
FUNCTIONS.
UNIT START/STOP
SUPPLY FAN STATUS
DAMPER CONTROL
PROVIDE A DIFFERENTIAL PRESSURE SENSOR ACROSS THE FILTER
SECTION TO MONITOR FILTER PRESSURE DROP. AN ALARM SIGNAL
SHALL BE SENT TO THE CONTROL PANEL INDICATING A DIRTY FILTER
WHENEVER THE FILTER PRESSURE DROP EXCEEDS THE
MANUFACTURERS RECOMMENDED LIMIT.
LIFE SAFETY
SHOULD THE SMOKE DETECTOR ACTIVATE, THE DETECTOR SHALL STOP
THE SUPPLY FAN IN BOTH THE MANUAL AND AUTOMATIC MODES,
INDEPENDENT OF THE CONTROL SYSTEM. AN ALARM SIGNAL SHALL BE
INDICATED AT THE DDC CONTROL PANEL.
OCCUPIED MODE
THE UNIT SHALL START AND OPERATE CONTINUOUSLY TO MAINTAIN
SPACE TEMPERATURE SETPOINT. SHOULD THE UNIT FAIL TO START OR
FAIL DURING OPERATION FOR ANY REASON, AN ALARM SHALL BE
INDICATED AT THE DDC PANEL.
B
FIRST STAGE OF COOLING TO BE PROVIDED BY THE UNITS ECONOMIZER
CYCLE BY MODULATING THE RETURN AIR DAMPER AND OUTDOOR AIR
DAMPER. SECOND STAGE OF COOLING TO BE BY THE FACTORY
REFRIGERATION SYSTEM.
PROJECT INFORMATION
GENERAL SECTION
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
ROOF TOP UNIT RTU-4
DX
AIDAT
POUDRE SCHOOL DISTRICT
OUTDOOR
AIR
HOT WATER - FC-1 THROUGH FC-8
WERNER ELEMENTARY
RENOVATION PROJECT
DP
PROJECT #: 2011.01.0143
THE AIR CONDITIONING UNIT WILL BE EQUIPPED WITH A FACTORY
INSTALLED CONTROLLER TO CONTROL THE REFRIGERATION SYSTEM. A
SPACE TEMPERATURE SENSOR SHALL CONTROL THE REFRIGERATION
TO MAINTAIN TEMPERATURE SETTING. THE CONTROLLER WILL HAVE A
TERMINAL INTERFACE TO WHICH THIS CONTRACTOR WILL MAKE THE
NECESSARY CONNECTION FOR SCHEDULE AND SETPOINT ADJUSTMENT
AND MONITORING.
DRAWN BY: BRE
CHECKED BY: EJS
ISSUE DATE: 2.9.12
*SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS
UST
FDP
USS
RAT
DAT
SPT
MAD
Point Description
UNIT STATUS
FILTER DIFF PRESSURE
UNIT START/STOP
RETURN AIR TEMP
DISCHARGE AIR TEMP
SPACE TEMP
MIXED AIR DAMPER
Digital
Inputs
Digital
Outputs
Analog Analog Analog
Inputs Outputs Virtual
Digital Schedule
Trend
Virtual
(duration)*
X
X
X
X
X
X
X
X
X
Alarm
(hi/lo)
Show on
Graphic
X
X
X
X
X
X
X
1
2
3
4
NO
DESCRIPTION
DATE
X
*SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS
A
REVISIONS
5
A
6
SHEET INFORMATION
2/8/2012 2:12:50 PM - PLOT DATE
Point Name
MECHANICAL CONTROLS
M503
1
2
3
4
5
6
GENERAL NOTES (FOR ALL ELECTRICAL SHEETS)
NOTE: ALL SYMBOLS SHOWN ON LEGEND
ARE NOT NECESSARILY USED.
1.
REFER TO THE ARCHITECTURAL PLANS, ELEVATIONS, AND DIAGRAMS FOR LOCATIONS OF THE
FLOOR AND WALL DEVICES. IF DEVICES ARE NOT NOTED OTHERWISE THEY SHALL BE
MOUNTED LONG AXIS VERTICAL AT THE FOLLOWING HEIGHTS AFF TO CENTER OF DEVICE:
SWITCHES +48", RECEPTACLES +18", VOICE/DATA JACKS +18".
2.
COORDINATE ALL EQUIPMENT LOCATIONS WITH THE OWNER PRIOR TO ROUGH-IN.
COORDINATE THE WIRING DEVICE LOCATIONS WITH THE ARCHITECTURAL ELEVATIONS,
CASEWORK SHOP DRAWINGS, AND EQUIPMENT INSTALLATION DRAWINGS. COORDINATE THE
LOCATION OF THE MECHANICAL EQUIPMENT WITH THE MECHANICAL PLANS AND THE
MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN.
LIGHTING
DOWNLIGHT
SCHEMATIC WIRING GRAPHICS
WALL MOUNTED FLUORESCENT OR INCANDESCENT
LUMINAIRE, AS NOTED
M
METER
50 years and counting!
GROUND CONNECTION AS NOTED
CEILING OR WALL MOUNTED HID LUMINAIRE
Mechanical, Electrical & Energy Consultants
DISCONNECT SWITCH
VF
POWER
SUBSCRIPTS:
SUBSCRIPTS:
AT
GFI = GROUND FAULT INTERRUPTER
AC
= 6" ABOVE COUNTER
5.
PROVIDE (1) 1"C WITH BUSHING AND PULL WIRE FROM EACH TELEPHONE, DATA,
COMMUNICATION, AND THERMOSTAT OUTLET TO ABOVE THE ACCESSIBLE CEILING, UNLESS
NOTED OTHERWISE.
6.
THE CONTRACTOR SHALL MAINTAIN FIRE-RATINGS FOR ALL CONDUIT PENETRATIONS
THROUGH FIRE-RATED CONSTRUCTION.
7.
COORDINATE THE LOCATIONS AND CONTROLS OF ALL APPLICABLE FIRE/SMOKE DAMPERS
WITH THE MECHANICAL CONTRACTOR, PRIOR TO CONSTRUCTION.
8.
ALL MOUNTING OF ELECTRICAL DEVICES (LUMINAIRES, PANELS, OUTLETS, CONDUIT RUNS,
ETC.) SHALL COMPLY WITH STATE AND LOCAL SEISMIC REQUIREMENTS. ALL LUMINAIRES
SHALL BE SUPPORTED INDEPENDENTLY OF THE CEILING SUPPORT HANGERS IN COMPLIANCE
WITH IBC AND NEC REQUIREMENTS.
= VARIABLE FREQUENCY
CIRCUIT BREAKER, MOLDED-CASE, THERMAL-MAGNETIC FIXED
STRAIGHT BLADE DUPLEX RECEPTACLE
ALL 120V BRANCH CIRCUITS SHALL BE 3-WIRE (PHASE,NEUTRAL,GROUND). PHASE, NEUTRAL,
AND GROUND CONDUCTORS SHALL BE SIZE 12 AWG UNLESS OTHERWISE NOTED. MULTI
BRANCH CIRCUITS SHALL NOT SHARE A NEUTRAL. ALL BRANCH CIRCUITS AND FEEDERS
SHALL HAVE A SEPARATE EQUIPMENT GROUNDING CONDUCTORS INSTALLED IN THE
RACEWAY.
500 West 18th Street, Suite 200
Cheyenne, WY 82001-4368
307.634.7647
175 North 27th Street, Suite 1312
Billings, MT 59101-2048
406.256.1141
= ADJUSTABLE INSTANTANEOUS TRIP
EAT = ELECTRONIC ADJUSTABLE TRIP
CL
= CURRENT LIMITING
IC
= INSULATED CASE
GFCI = GROUND FAULT CIRCUIT INTERRUPTER
STRAIGHT BLADE DOUBLE DUPLEX RECEPT. (FOURPLEX)
STRAIGHT BLADE SINGLE RECEPTACLE
STRAIGHT BLADE DUPLEX RECEPT. HALF-SWITCHED
STRAIGHT BLADE DUPLEX RECEPT. ON EMERGENCY CIRCUIT
= SHUNT TRIP
KI
= KEY INTERLOCK
ZSI
= ZONE-SELECTIVE INTERLOCKING
ABBREVIATIONS
ENCLOSED CIRCUIT BREAKER, MOLDED-CASE,
THERMAL-MAGNETIC FIXED
OUTLET WITH SPECIAL DEVICE, AS NOTED
WALL MOUNTED OUTLET WITH SPECIAL DEVICE,
AS NOTED
ENCLOSED FUSED DISCONNECT SWITCH
FLOOR MOUNTED POWER BOX, AS NOTED
POWER TRANSFORMER
FLOOR MOUNTED COMBINATION OUTLET BOX,
D
ST
NOTE: ALL ABBREVIATIONS SHOWN
ARE NOT NECESSARILY USED.
AC
AFC
AFF
AFG
AIC
AL
BFG
CB
CR
CPT
CT
CU
ELR
EM
ES
ETM
EWC
FLA
FVNR
FVR
FWE
GFI
GRC
HOA
HP
IG
LC
LOR
LS
LT
MCA
MCB
MCC
MCCB
MCP
MLO
NC
NIC
NL
NO
NTS
OC
OL
PT
RVNR
SC
SR
TTB
TVSS
UG
VFD
WG
WP
XFMR
XP
ZS
CURRENT TRANSFORMER
J
JUNCTION BOX, AS NOTED
J
OUTLET BOX
J
WALL MOUNTED OUTLET BOX
GF
GROUND FAULT PROTECTION
D
ABOVE CEILING POWER DISTRIBUTION BOX
G
GENERATOR
3
MOTOR, NUMBER INDICATES HORSEPOWER
TRANSFER SWITCH
SURFACE RACEWAY, AS NOTED
C
CLOCK HANGER OUTLET
TELE-POWER POLE
PB
PULL BOX
M
CONNECTION TO MOTOR
FACP
FIRE ALARM CONTROL PANEL
MAGNETIC MOTOR STARTER
FAGP
FIRE ALARM GRAPHIC PANEL
FAAP
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM
SUBSCRIPTS:
MS
= MULTISPEED
F
MANUAL PULL STATION
SSRV = SOLID-STATE, REDUCED VOLTAGE
VF
FIRE ALARM STROBE
= VARIABLE FREQUENCY
N
SAFETY DISCONNECT SWITCH
F
FUSED DISCONNECT SWITCH
F
GENERAL ALARM COMBINATION HORN/STROBE
H
FIRE ALARM HORN
F
F
COMBINATION DISCONNECT AND STARTER
SUBSCRIPTS:
ENCLOSED CIRCUIT BREAKER, MOLDED-CASE,
THERMAL-MAGNETIC FIXED
SUBSCRIPTS:
ST
= SHUNT TRIP
CONNECTION TO PRE-WIRED EQUIPMENT
PANELBOARD
SS
C
T
G
TRANSIENT VOLTAGE SURGE SUPPRESSOR
= PHOTOELECTRIC
I
= IONIZATION
T
= COMBINATION, 135°F
TF
= COMPENSATION, 135°F
PT
= COMBINATION PHOTOELECTRIC AND THERMAL
T165°
= COMBINATION, 165°F
T190°
ENGINE GENERATOR
= COMBINATION, 190°F
TF190° = COMPENSATION, 190°F
F
CIRCUITING
CONDUIT RUN
CIRCUIT HOMERUN TO PANEL OR CABINET,
NO. OF ARROWS INDICATE NO. OF CIRCUITS
D
SMOKE DETECTOR IN VENTILATING DUCT
FAN SHUT-DOWN CONNECTION
F
F
MAG. DOOR HOLDER
F
SPRINKLER SYSTEM FLOW SWITCH
T
SPRINKLER SYSTEM TAMPER SWITCH
CIRCUIT TURNED UP
CONDUIT STUB-OUT - CAP & MARK
P
TF165° = COMPENSATION, 165°F
TRANSFORMER
CIRCUIT TURNED DOWN
CEILING OR WALL MOUNTED DETECTOR
REMOTE PILOT LIGHT
P
REMOTE PILOT LIGHT WITH TEST SWITCH
P/T
M
M
C
M
CIRCUIT IN FLEXIBLE CONDUIT
SEALOFF
MONITOR MODULE
CONTROL MODULE
DAMPER CONNECTION
SWITCHING
WALL MOUNTED SWITCH
COMMUNICATION SYSTEM
SUBSCRIPTS:
2
= DOUBLE POLE
3
= 3-WAY
4
= 4-WAY
D
= DIMMER
K
= KEY-OPERATED
P
= PILOT LIGHT
T
= THERMAL OVERLOAD
DS = DOOR SWITCH
11. GFCI DEVICES SHALL BE PROVIDED AS NOTED AND SHALL COMPLY WITH NEC AND LOCAL
REQUIREMENTS. NO FEED-THRU GFCI PROTECTION SHALL BE PERMITTED FOR DOWNSTREAM
DEVICES. GFCI DUPLEX RECEPTACLES SHALL BE UL 943 2006 "LOCK-OUT" ACTION OR
"NOTIFICATION" COMPLIANT.
12. LUMINAIRES SHOWN SHADED SHALL BE CONNECTED TO THE LIFE SAFETY CIRCUIT AS SHOWN
ON PLANS.
13. COORDINATE THE INSTALLATION OF COMMUNICATIONS CABLING, ROUTING, MOUNTING
BOXES, AND TERMINATIONS WITH THE OWNER OR IT MANAGER, PRIOR TO CONSTRUCTION.
14. ALL LOW VOLTAGE AND SYSTEMS CABLING LOCATED ABOVE THE ACCESSIBLE CEILING SHALL
BE PROPERLY RATED FOR THE APPLICATION. WITHOUT EXCEPTION, ALL CABLING SHALL BE
HUNG FROM BRIDLE-TYPE RINGS OR PLACED IN CABLE TRAYS BY THE ELECTRICAL
CONTRACTOR. IN EXPOSED CEILING AREAS, ALL CABLING SHALL BE RUN IN CONDUIT TO THE
NEAREST ACCESSIBLE CEILING LOCATION.
15. THE INFORMATION ON THESE DRAWINGS HAS BEEN ASCERTAINED FROM EXISTING DRAWINGS
AND FIELD OBSERVATIONS. THIS INFORMATION IS AS ACCURATE AS CONDITIONS WOULD
ALLOW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE, PRIOR TO BID,
AND BECOME FAMILIAR WITH THE EXTENT OF THE WORK REQUIRED. NO EXTRAS WILL BE
ALLOWED FOR ALTERATIONS OF A FORESEEABLE NATURE THAT ARE REQUIRED TO ACHIEVE
THE END RESULT AS INDICATED BY THE CONTRACT DOCUMENTS.
16. ON DEMOLITION PLANS: ALL ITEMS SHOWN IN LIGHT LINE WEIGHT ARE EXISTING TO REMAIN,
UNLESS NOTED OTHERWISE. ALL ITEMS SHOWN IN HEAVY LINE WEIGHT SHALL BE REMOVED,
UNLESS NOTED OTHERWISE.
17. ON NEW FLOOR PLANS: ALL ITEMS SHOWN IN LIGHT LINE WEIGHT ARE EXISTING TO REMAIN,
UNLESS NOTED OTHERWISE. ALL ITEMS SHOWN IN HEAVY LINE WEIGHT ARE NEW OR
RELOCATED AS NOTED.
18. THE NEW WIRING REQUIRED IN REMODELED AREAS SHALL BE FISHED THROUGH EXISTING
WALLS OR CONCEALED IN NEW WALLS OR ABOVE CEILINGS. SURFACE MOUNTED CONDUIT
SHALL NOT BE USED IN ANY FINISHED AREAS.
19. ITEMS THAT ARE SHOWN TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY INCLUDING
ALL ASSOCIATED ELECTRICAL DEVICES AND WIRE BACK TO THE POINT OF ORIGIN OR THE
NEAREST EXISTING ITEM THAT IS REMAINING, UNLESS NOTED OTHERWISE. CONDUIT TO BE
ABANDONED IN PLACE, CAPPED AND MARKED FOR FUTURE USE. WHERE EXISTING DEVICES,
SWITCHES, MOTOR CONNECTIONS, ETC. ARE TO BE REMOVED FROM WALLS WHICH ARE
REMAINING, WALLS SHALL BE PATCHED TO MATCH ORIGINAL FINISH, AFTER CONDUCTORS
HAVE BEEN REMOVED. BLANK COVERPLATES OVER EXISTING BOXES ARE NOT ACCEPTABLE.
IF EXISTING CONDUITS ARE ROUTED IN CONCRETE FLOOR SLABS, WALLS OR CEILINGS, THEY
SHALL BE CUT BACK TO WITHIN CONCRETE AND FILLED WITH GROUT TO ACHIEVE A SMOOTH
AND EVEN FINISH FLUSH WITH CONCRETE SURFACE AFTER CONDUCTORS HAVE BEEN
REMOVED. IF CONDUITS PENETRATE THE ROOF DECK, THEY SHALL BE CUT BACK TO BELOW
THE DECK, CAPPED AND MARKED FOR FUTURE USE.
C
20. MAINTAIN CIRCUIT CONTINUITY FOR EXISTING ITEMS THAT ARE REMAINING OR BEING
RELOCATED.
21. PROVIDE TYPED UPDATED PANEL DIRECTORIES FOR ALL EXISTING PANELS AFFECTED BY
REMODEL WORK. PROVIDE NEW CIRCUIT BREAKER NUMBER IDENTIFICATION AS REQUIRED.
22. ALL RECEPTACLES AND SWITCH COVERS SHALL BE NEATLY LABELED WITH PERMANENT
MARKER OR LABEL MAKER WITH PANELBOARD AND CIRCUIT NUMBER.
23. J-BOXES AND PULL BOXES SHALL BE NEATLY LABELED WITH BLACK PERMANENT MARKER
WITH PANELBOARD AND BRANCH CIRCUIT NUMBERS OR SYSTEM IDENTIFICATION.
WALL MOUNTED COMBINATION TELEPHONE/DATA
OUTLET BOX
W
GENERAL NOTES-FIRE ALARM SYSTEMS
WALL MOUNTED TELEPHONE OUTLET, +48" AFF
TELEPHONE TERMINAL BOARD - TTB
S
S
CEILING OR WALL MOUNTED SPEAKER
1.
VERIFY THAT THE EXISTING FIRE ALARM SYSTEM IS OPERATING PROPERLY AND DOCUMENT
ALL DEFICIENCIES PRIOR TO CONSTRUCTION. CONFIRM THAT THERE IS ADEQUATE CAPACITY
ON EXISTING CIRCUITS FOR THIS WORK AND UPGRADE THE PANEL AS NECESSARY. PROVIDE
BATTERY AND CIRCUIT LOAD CALCULATIONS AS REQUIRED. COMPLETE THE FIRE ALARM
PROGRAMMING, UPDATE RELATED GRAPHIC DISPLAYS, AND THEN TEST THE NEW CIRCUITS AT
THE END OF THE PROJECT.
2.
THE LOCATIONS OF SMOKE DETECTORS SHOWN ARE CONSIDERED TO BE SCHEMATIC ONLY.
THE ACTUAL LOCATIONS (SPACING TO ADJACENT DETECTORS, DIFFUSERS, WALLS, ETC.) ARE
REQUIRED TO MEET NFPA 72.
3.
ALL STROBES AND HORN/STROBES SHALL BE SYNCHRONIZED PER NFPA AND LOCAL
REQUIREMENTS.
CEILING OR WALL MOUNTED CLOCK
SECURITY SYSTEM
S
WALL SWITCH, WA-200
I
INTRUSION MOTION DETECTOR AS SPECIFIED
TS
TIMED SWITCH, TS-400
S
SIREN
K
KEYPAD
CEILING MOUNTED DUAL TECH, DT-305
E
CR
SCP
EGRESS BUTTON
CARD READER
4.
SECURITY CONTROL PANEL
SURVEILLANCE CAMERA
CONTROLS
CONTACT DOOR SWITCH IN JAMB OR HINGE
PUSH BUTTON CONTROL STATION, AS INDICATED
THERMOSTAT - BY OTHERS
D
WALL MOUNTED DATA OUTLET
OCCUPANCY SENSORS
T
10. BACK TO BACK MOUNTING OF RECEPTACLES OR COMMUNICATION OUTLETS IS NOT
PERMITTED. THE MINIMUM SEPARATION BETWEEN DEVICES SHALL BE 6" O.C. IN COMMON
WALLS AND 24" O.C. IN SOUND-RATED WALLS.
WALL MOUNTED TELEPHONE OUTLET
DUAL-LEVEL SWITCHES
ALL MODEL NUMBERS SHOWN ARE
WATTSTOPPER.
- ABOVE COUNTER
- ABOVE FINISHED CEILING
- ABOVE FINISHED FLOOR
- ABOVE FINISHED GRADE
- AMPS INTERRUPTING CURRENT
- ALUMINUM
- BELOW FINISHED GRADE
- CIRCUIT BREAKER
- CORROSION RESISTANT
- CONTROL POWER TRANSFORMER
- CURRENT TRANSFORMER
- COPPER
- END OF LINE RESISTOR
- EMERGENCY
- EMERGENCY STOP
- ELAPSED TIME METER
- ELECTRIC WATER COOLER
- FULL LOAD AMPS
- FULL VOLTAGE, NON-REVERSING
- FULL VOLTAGE, REVERSING
- FURNISHED WITH EQUIPMENT
- GROUND FAULT INTERRUPTER
- GALVANIZED RIGID CONDUIT
- HAND-OFF-AUTOMATIC
- HORSEPOWER
- ISOLATED GROUND
- LIGHTING CONTACTOR
- LOCAL-OFF-REMOTE
- LEVEL SWITCH
- LET THROUGH
- MINIMUM CIRCUIT AMPS
- MAIN CIRCUIT BREAKER
- MOTOR CONTROL CENTER
- MOLDED CASE CIRCUIT BREAKER
- MOTOR CIRCUIT PROTECTION
- MAIN LUGS ONLY
- NORMALLY CLOSED
- NOT IN CONTRACT
- NIGHT LIGHT
- NORMALLY OPEN
- NOT TO SCALE
- OVER CURRENT
- OVERLOAD
- POTENTIAL TRANSFORMER
- REDUCED VOLTAGE, NON-REVERSING
- SHORT CIRCUIT
- SAFE OR STOP/RUN
- TELEPHONE TERMINAL BOARD
- TRANSIENT VOLTAGE SURGE SUPPRESSER
- UNDERGROUND
- VARIABLE FREQUENCY DRIVE
- WIREGUARD
- WEATHERPROOF
- TRANSFORMER
- EXPLOSION PROOF
- LIMIT OR POSITION SWITCH
ADA COMPLIANCE: ELECTRICAL DEVICES PROJECTING FROM THE WALLS WITH THEIR LEADING
EDGES BETWEEN 27" AND 80" AFF SHALL PROTRUDE NO MORE THAN 4" INTO WALKWAYS OR
CORRIDORS.
FLOOR MOUNTED TELEPHONE AND/OR DATA
OUTLET BOX, AS NOTED
LV = LOW VOLTAGE
B
9.
B
PROJECT #: 2011.01.0143
DRAWN BY: CW
IF REQUIRED BY THE AUTHORITY HAVING JURISDICTION, THE CONTRACTOR SHALL OBTAIN A
STATE REGISTERED ENGINEER TO REVIEW, SEAL, AND SIGN SHOP DRAWINGS FOR PLAN
REVIEW SUBMISSION. THE ENGINEER OF RECORD FOR THESE DRAWINGS SHALL NOT SEAL
THE FIRE ALARM SHOP DRAWINGS.
CHECKED BY: ETM
ISSUE DATE: 2.9.12
MAGNETIC DOOR LOCK
M
ELECTRONIC DOOR STRIKE
S
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
SSRV = SOLID-STATE, REDUCED VOLTAGE
4.
POUDRE SCHOOL DISTRICT
CEILING OR WALL MOUNTED EXIT SIGN,
INSTALL FACES AS INDICATED BY SHADING
= MULTISPEED
CONSTRUCTION
DOCUMENTS
MS
WERNER ELEMENTARY
RENOVATION PROJECT
FLUORESCENT STRIP LUMINAIRE
ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT
NO ADDITIONAL COST TO THE OWNER.
SEAL
7600 East Orchard Road, Suite 250-S
Greenwood Village, CO 80111-2518
303.796.6000
www.mkkeng.com
SUBSCRIPTS:
3.
CONSULTANT
MAGNETIC MOTOR STARTER
RECESS MOUNTED FLUORESCENT LUMINAIRE
= SURGE SUPRRESSION
E
FUSES
CEILING OR WALL MOUNTED FLUORESCENT LUMINAIRE
SS
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
PROJECT PHASE
E
CONSULTING ENGINEERS, INC.
ELECTRICAL COVER SHEET
ELECTRICAL DEMO FLOOR PLAN - AREA A
ELECTRICAL DEMO FLOOR PLAN - AREA B
ELECTRICAL DEMO FLOOR PLAN - AREA C
POWER/SYSTEMS NEW FLOOR PLAN - AREA A
POWER/SYSTEMS NEW FLOOR PLAN - AREA B
POWER/SYSTEMS NEW FLOOR PLAN - AREA C
ADMINISTRATION AREA ELECTRICAL PLANS
ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHEDULES
ELECTRICAL SCHEDULES & DETAILS
PROJECT INFORMATION
ELECTRICAL LEGEND
E0.0
ED101A
ED101B
ED101C
E101A
E101B
E101C
E201
E301
E401
ARCHITECT
DRAWING LAYOUT
REVISIONS
NO
DESCRIPTION
A
1
1-
UPPER CASE LETTER AT LUMINAIRES
(F1, I 1, ETC.) INDICATES
LUMINAIRE TYPE. F1 = TYPE F1
LUMINAIRES IN AREA INDICATED.
2-
LOWER CASE LETTER AT LUMINAIRES
AND SWITCHES (a, b, ETC.) INDICATE
ASSOCIATED UNITS FOR SWITCHING.
3-
SHADING WITHIN LUMINAIRE DENOTES
ON EMERGENCY CIRCUIT.
4-
"NL" WITHIN LUMINAIRES DENOTES
UNIT ON NIGHT LIGHT CIRCUIT.
5-
PLUS (+) SIGN WITH DIMENSION AT
OUTLET INDICATES HEIGHT ABOVE
FINISHED FLOOR OR GRADE TO
CENTERLINE OF OUTLET.
2
A
3
4
5
6
SHEET INFORMATION
2/8/2012 11:38:03 AM - PLOT DATE
NOTATIONS
ELECTRICAL COVER
SHEET
E0.0
DATE
2
3
4
5
6
ARCHITECT
1
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
E
GENERAL NOTES:
SEAL
A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING
DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY.
B. PROVIDE COVERPLATES ON ALL UNUSED JUNCTION BOXES.
MATCHLINE
3
3
AIR LOCK
001
LB
STORAGE
006
M
M
1. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT VENTILATOR TO BE
REMOVED IN ITS ENTIRETY. REMOVE BRANCH CIRCUIT WIRES BACK TO
NEAREST SOURCE.
MECHANICAL
11
2. DISCONNECT EXHAUST FAN TO BE REMOVED IN ITS ENTIRETY. REMOVE
BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE.
M
M
1
CORRIDOR
003
M
BOYS
004
1
CLASSROOM
108
WORKROOM/
CONFERENCE
109
GIRLS
005
M
4. REFER TO SHEET E201, ADMINISTRATION AREA ELECTRICAL DEMOLITION
PLAN, FOR ADDITIONAL DEMOLITION WORK IN THIS AREA.
5
5. DISCONNECT EXISTING ROOF MONITOR SHADE CONTROL MOTOR
ASSEMBLY TO BE REMOVED. REMOVE CONTROL BUTTON, CONTROL WIRES
AND BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE, CONDUIT TO
ABANDONED IN PLACE. PROVIDE COVERPLATE ON CONTROL BUTTON
BACK BOX AND ALL UNUSED J-BOXES.
5
5
5
5
1
CLASSROOM
104
CLASSROOM
107
M
M
PROJECT PHASE
2
5
1
D
T
M
EF-6
120V
1/3 HP
CORRIDOR
007
M
M
M
M
M
CLASSROOM
105
M
CORRIDOR
008
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
3. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT VENTILATOR TO BE
REPLACED WITH NEW FAN COIL UNIT. SAVE AND PROTECT BRANCH
CIRCUIT WIRES FOR REUSE.
CORRIDOR
023
CLASSROOM
103
D
FLAG NOTES THIS SHEET:
CONSTRUCTION
DOCUMENTS
4
AIR LOCK
024
CONSULTANT
CORRIDOR
002
SEE 1 / ED101C
SEE 1 / ED101B
VALVE
10
MATCHLINE
SEE 1 / ED101B
MATCHLINE
M
M
M
M
CLASSROOM
106
1
1
C
CORRIDOR
009
STORAGE
012
T
013
T
014
STORAGE
015
AIR LOCK
022
T
016
T
017
T
018
STORAGE
021
T
019
5
5
5
M
CLASSROOM
102
M
M
M
M
M
CLASSROOM
101
1
1
M
M
M
B
B
1
1
PROJECT INFORMATION
CLASSROOM
100
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
AIR LOCK
011
EF-5
120V
1/3 HP
POUDRE SCHOOL DISTRICT
T
M
2
WERNER ELEMENTARY
RENOVATION PROJECT
C
PROJECT #: 2011.01.0143
DRAWN BY: CW
CHECKED BY: ETM
ISSUE DATE: 2.9.12
N
REVISIONS
1 ELECTRICAL DEMO FLOOR PLAN - AREA "A"
NO
DESCRIPTION
DATE
A
A
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 11:38:18 AM - PLOT DATE
1/8" = 1'-0"
ELECTRICAL DEMO
FLOOR PLAN - AREA A
ED101A
2
3
4
TOILET
033
5
6
WATER
HEATER
032
ARCHITECT
1
STORAGE
034
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
E
KITCHEN
402
K
GENERAL NOTES:
10
5
F
M
4
T
M
A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING
DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY.
SEAL
P-7
M
T
B. PROVIDE COVERPLATES ON ALL UNUSED JUNCTION BOXES.
8
1
M
M
M
M
M
M
M
M
M
1. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT
VENTILATOR TO BEREMOVED IN ITS ENTIRETY. REMOVE
BRANCH CIRCUIT WIRE TO BACK TO SOURCE.
M
DISTRICT-WIDE
406
8
3. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT
VENTILATOR TO BE REPLACED WITH NEW FAN COIL UNIT.
SAVE AND PROTECT BRANCH CIRCUIT WIRES FOR REUSE.
GYMNASIUM
400
TOILET
035
4. DISCONNECT EXISTING 120V KITCHEN EVAP COOLER TO BE
REMOVED IN IT'S ENTIRETY. REMOVE BRANCH CIRCUIT WIRES
AND CONNECTION TO EXISTING KITCHEN HOOD FIRE
SUPPRESSION SYSTEM BACK TO NEAREST SOURCE.
D
M
036
M
M
M
M
M
M
M
M
M
M
M
5. DISCONNECT EXISTING 208V-3PHASE KITCHEN SUPPLY FAN TO
BE REMOVED IN IT'S ENTIREY. REMOVE BRANCH CIRCUIT
WIRES BACK TO SOURCE.
M
6. REFER TO SHEET E201, ADMINISTRATION AREA ELECTRICAL
DEMOLITION PLAN, FOR ADDITIONAL DEMOLITION WORK IN
THIS AREA.
M
RESOURCE
405
SPEECH
404
8
7. DISCONNECT 208V-3, 2HP PUMPS TO BE REPLACED WITH
NEW. REMOVE ASSOCIATED DEVICES, WIRE AND CONDUIT
BACK TO SOURCE.
FLEX ROOM
401
1
M
M
8. DISCONNECT EXISTING ROOF MONITOR SHADE CONTROL
MOTOR ASSEMBLY TO BE REMOVED. REMOVE CONTROL
BUTTON, CONTROL WIRES AND BRANCH CIRCUIT WIRES BACK
TO NEAREST SOURCE, CONDUIT TO ABANDONED IN PLACE.
PROVIDE COVERPLATE ON CONTROL BUTTON BACK BOX AND
ALL UNUSED J-BOXES.
REFER TO MEZZANINE
ELECTRICAL DEMOLITION
PLAN ON THIS SHEET.
T
3
CONFERENCE
407A
6
AIR LOCK
039
8
M
ELECTRICAL
30
M
PHONE
044
WORKROOM
049
1
UP
M
COMPUTER
LAB
303
AV
STORAGE/
IT ROOM
304
T
M
10. DISCONNECT 120V, 1/25HP PUMP TO BE REPLACED. SAVE
AND PROTECT BRANCH CIRCUIT WIRES FOR REUSE.
C
MDP
EF-19
120V
1/4 HP
MEN
046
UP
EM
LA
2
TOILET
027
9. DISCONNECT 208V-3PHASE AIR COMPRESSOR AND 120V AIR
DRYER TO BE REMOVED IN THEIR ENTIRETY. REMOVE
BRANCH CIRCUIT WIRES BACK TO SOURCE.
AIR LOCK
026
FACP
M
GYM
STORAGE
41
WOMEN
041
MEN
042
1
OFFICE
408
CORRIDOR
031
C
TEACHER'S
LOUNGE
504
CUSTODIAL/
STORAGE
40
STORAGE
42
MATCHLINE
COUNSELOR
403
SEE 1 / ED101C
ITIN
407B
M
M
ART
215
8
AV AREA
043
3
UP
CLINIC
503
WOMEN
047
UP
CORRIDOR
052
TOILET
048
8
RECEPTION
500
M
M
M
CORRIDOR
051
M
M
M
M
M
M
M
M
M
8
CORRIDOR
025
B
B
8
M
PRINCIPAL
502
CONFERENCE
501
MUSIC
200
M
M
UP
1
WORKROOM
301
CONFERENCE
302
MATCHLINE
SEE 1 / ED101A
PROJECT INFORMATION
1
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
TIME OUT
037
D
POUDRE SCHOOL DISTRICT
2
WERNER ELEMENTARY
RENOVATION PROJECT
EF-11
120V
1/4 HP
M
2. DISCONNECT EXHAUST FAN TO BE REMOVED IN ITS ENTIRETY.
REMOVE BRANCH CIRCUIT WIRES BACK TO NEAREST
SOURCE.
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
CONSTRUCTION
DOCUMENTS
M
M
CONSULTANT
M
PROJECT PHASE
M
FLAG NOTES THIS SHEET:
PROJECT #: 2011.01.0143
MATCHLINE
SEE 1 / ED101A
VALVE
10
DRAWN BY: CW
CORRIDOR
002
AIR LOCK
024
CHECKED BY: ETM
ISSUE DATE: 2.9.12
N
REVISIONS
1 ELECTRICAL DEMO FLOOR PLAN - AREA "B"
NO
DESCRIPTION
DATE
BOILER
ROOM
29
F
M
F
M
AD
MECHANICAL
ROOM
28
M
M
AC
T
F
7
A
9
UP
A
M
N
2 MEZZANINE ELECTRICAL DEMOLITION PLAN
1/8" = 1'-0"
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 11:38:19 AM - PLOT DATE
1/8" = 1'-0"
ELECTRICAL DEMO
FLOOR PLAN - AREA B
ED101B
2
3
4
5
6
ARCHITECT
1
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
E
GENERAL NOTES:
SEAL
A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING
DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY.
B. PROVIDE COVERPLATES ON ALL UNUSED JUNCTION BOXES.
1
1
GROUP
068
1. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT VENTILATOR
TO BE REMOVED IN ITS ENTIRETY. REMOVE BRANCH WIRES BACK
TO SOURCE.
1
2. DISCONNECT EXHAUST FAN TO BE REMOVED IN ITS ENTIRETY.
REMOVE BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE.
CLASSROOM
211
M
M
M
CLASSROOM
210
M
4
T
M
M
M
EF-4
120V
1/4 HP
T
M
2
4
M
M
D
GROUP
064
4
CONFERENCE/
WORKROOM
214
4. DISCONNECT EXISTING ROOF MONITOR SHADE CONTROL MOTOR
ASSEMBLY TO BE REMOVED. REMOVE CONTROL BUTTON, CONTROL
WIRES AND BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE,
CONDUIT TO ABANDONED IN PLACE. PROVIDE COVERPLATE ON
CONTROL BUTTON BACK BOX AND ALL UNUSED J-BOXES.
M
4
CORRIDOR
067
1
M
M
4
EF-2
120V
1/2 HP
2
CLASSROOM
209
M
4
GROUP
069
COMPUTER
LAB
213
M
M
3. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT VENTILATOR
TO BE REPLACED WITH NEW FAN COIL UNIT. SAVE AND PROTECT
BRANCH CIRCUIT WIRES FOR REUSE.
GIRLS
066
M
BOYS
065
PROJECT PHASE
D
M
SEE 1 / ED101B
MATCHLINE
CLASSROOM
212
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
CONSTRUCTION
DOCUMENTS
1
CONSULTANT
FLAG NOTES THIS SHEET:
CLASSROOM
208
M
M
ART &
MUSIC
STORAGE/
IT ROOM
21
1
3
1
CORRIDOR
053
M
M
CORRIDOR
061
M
CLASSROOM
201
BOYS
055
GIRLS
056
EF-23
120V
1/3 HP
2
SEE 1 / ED101B
MATCHLINE
M
4
EF-3
120V
1/3 HP
CORRIDOR
057
GROUP
054
M
CLASSROOM
206
1
2
T
M
GROUP
059
4
M
M
WORKROOM/
CONFERENCE
207
4
T
M
B
3
LC
4
M
M
M
CLASSROOM
202
M
4
M
M
CLASSROOM
203
1
1
4
M
M
M
M
CLASSROOM
204
GROUP
058
M
B
CLASSROOM
205
1
1
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
CUST/
MECH
20
STORAGE
062
C
POUDRE SCHOOL DISTRICT
3
PROJECT INFORMATION
C
AIR LOCK
063
3
WERNER ELEMENTARY
RENOVATION PROJECT
CORRIDOR
052
PROJECT #: 2011.01.0143
DRAWN BY: CW
CHECKED BY: ETM
ISSUE DATE: 2.9.12
REVISIONS
NO
DESCRIPTION
DATE
N
1 ELECTRICAL DEMO FLOOR PLAN - AREA "C"
A
A
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 11:38:20 AM - PLOT DATE
1/8" = 1'-0"
ELECTRICAL DEMO
FLOOR PLAN - AREA C
ED101C
2
3
4
5
6
ARCHITECT
1
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
E
GENERAL NOTES:
SEAL
A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING
DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY.
B. CONTRACTOR TO TEMPORARILY REMOVE EXISTING
LUMINAIRES, SPEAKERS AND FIRE ALARM DEVICES AT THE
EXISTING CEILINGS AND STRUCTURE AFFECTED BY NEW
MECHANICAL WORK AND REINSTALL AFTER WORK HAS BEEN
COMPLETED. COORDINATE EXACT REQUIREMENTS WITH
ARCHITECT AND MECHANICAL CONTRACTOR.
VESTIBULE
001
FCU-3
TO MDP
RTU-2
WP
CORRIDOR
002
2
J
SEE 1 / E101B
D
AIR LOCK
024
4
WP
FCU-4
J
3
J
CORRIDOR
003
D
CLASSROOM
103
BOYS
004
2
3. REFER TO SHEET E201, ADMINISTRATION AREA POWER AND
SYSTEMS PLAN, FOR WORK IN THIS AREA.
MECHANICAL
11
STORAGE
006
1. ALTERNATE #1: PROVIDE J-BOX ABOVE CEILING WITH 120V
CONNECTION FOR VAV CONTROL.
2. CONNECT NEW FAN COIL TO EXISTING BRANCH CIRCUIT
SAVED DURING DEMOLITION OF EXISTING UV UNIT.
LB
CUH-1
FLAG NOTES THIS SHEET:
4. PROVIDE NEW FIRE ALARM DUCT SMOKE DETECTOR IN
RETURN DUCTWORK TO MATCH EXISTING SIMPLEX FIRE
ALARM SYSTEM. PROVIDE ALL NECESSARY COMPONENTS AND
CONNECTIONS AS REQUIRED FOR A COMPLETE AND
OPERATIONAL INSTALLATION.
CORRIDOR
023
GIRLS
005
CLASSROOM
108
WORKROOM/
CONFERENCE
D
5. CONTRACTOR TO RELOCATE EXISTING ELECTRICAL DEVICES
WHERE THE NEW BASEBOARD HEATER AND DIFFUSER
DROPS ARE TO BE INSTALLED. COORDINATE NEW LOCATION
OF EXISTING DEVICES WITH ARCHITECT AND MECHANICAL
CONTRACTOR PRIOR TO WORK.
PROJECT PHASE
109
CORRIDOR
007
5
CLASSROOM
104
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
CONSTRUCTION
DOCUMENTS
LB-16
F
CONSULTANT
J
5
CLASSROOM
107
LOCATION OF NEW
BASEBOARD HEATER
(TYPICAL)
CLASSROOM
105
5
CORRIDOR
008
CLASSROOM
106
5
LB-2
1
AIR LOCK
022
CORRIDOR
009
T
013
STORAGE
012
T
014
T
016
STORAGE
015
T
017
T
018
T
019
STORAGE
021
CLASSROOM
101
B
B
5
5
PROJECT INFORMATION
CLASSROOM
102
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
J
AIR LOCK
011
C
POUDRE SCHOOL DISTRICT
C
WERNER ELEMENTARY
RENOVATION PROJECT
VALVE
10
F
SEE 1 / E101B
SEE 1 / E101C
MATCHLINE
MATCHLINE
MATCHLINE
PROJECT #: 2011.01.0143
DRAWN BY: CW
CHECKED BY: ETM
ISSUE DATE: 2.9.12
REVISIONS
NO
DESCRIPTION
DATE
N
1 POWER/SYSTEMS NEW FLOOR PLAN - AREA "A"
A
A
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 11:38:06 AM - PLOT DATE
1/8" = 1'-0"
POWER/SYSTEMS NEW
FLOOR PLAN - AREA A
E101A
1
2
3
4
5
6
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
E
STORAGE
034
KITCHEN
402
GENERAL NOTES:
P-7
M
T
A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING
DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY.
9
B. ELECTRICAL CONTRACTOR TO TEMPORARILY REMOVE
EXISTING LUMINAIRES, SPEAKERS AND FIRE ALARM DEVICES
AT THE EXISTING CEILINGS AND STRUCTURE AFFECTED BY
NEW MECHANICAL WORK AND REINSTALL AFTER WORK HAS
BEEN COMPLETED. COORDINATE EXACT REQUIREMENTS WITH
ARCHITECT AND MECHANICAL CONTRACTOR.
KMAU
F
K
SEAL
E
ARCHITECT
TOILET
033
WP
WP,GFI
5
4
M-(29,31,33)
CONSULTANT
FLAG NOTES THIS SHEET:
8
1. ALTERNATE #M1: PROVIDE J-BOX ABOVE CEILING WITH 120V
CONNECTION FOR VAV CONTROL.
2. CONNECT NEW FAN COIL TO EXISTING BRANCH CIRCUIT SAVED
DURING DEMOLITION OF EXISTING UV UNIT.
DISTRICT-WIDE
406
3. REFER TO SHEET E201, ADMINISTRATION AREA POWER AND
SYSTEMS PLAN, FOR WORK IN THIS AREA.
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
4. CONNECT TO NEAREST RECEPTACLE CIRCUIT IN AREA.
GYMNASIUM
400
FLEX ROOM
401
TIME OUT
037
6. PROVIDE NEW FIRE ALARM DUCT SMOKE DETECTOR IN RETURN
DUCTWORK TO MATCH EXISTING SIMPLEX FIRE ALARM SYSTEM.
PROVIDE ALL NECESSARY COMPONENTS AND CONNECTIONS AS
REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION.
7. PROVIDE EMERGENCY SHUT-DOWN OF BOILERS. REFER TO
BOILER EMERGENCY POWER OFF DETAIL ON DRAWING E401.
SPEECH
404
FCU-1
2
STORAGE
42
CUSTODIAL/ STORAGE
40
OFFICE
408
GYM STORAGE
41
TOILET
027
UP
3
AIR LOCK
039
9. CONNECT NEW 120V, 1/6HP PUMP TO EXISTING BRANCH CIRCUIT
WIRES SAVED DURING DEMOLITION.
MATCHLINE
COUNSELOR
403
CONFERENCE
407A
REFER TO MEZZANINE
POWER AND SYSTEMS
PLAN ON THIS SHEET.
SEE 1 / E101C
J
8. CONTRACTOR TO RELOCATE EXISTING ELECTRICAL DEVICES
WHERE THE NEW BASEBOARD HEATER AND DIFFUSER DROPS
ARE TO BE INSTALLED. COORDINATE NEW LOCATION OF EXISTING
DEVICES WITH ARCHITECT AND MECHANICAL CONTRACTOR
PRIOR TO WORK.
PROJECT PHASE
RESOURCE
405
ITIN
407B
D
CONSTRUCTION
DOCUMENTS
TOILET
035
D
5. PROVIDE NEW CONNECTION TO EXISTING KITCHEN HOOD FIRE
SUPPRESION SYSTEM FOR SHUT DOWN OF KMUA. WHEN FIRE
SUPPRESSION SYSTEM ACTIVATES MAKE-UP AIR SUPPLIED TO
HOOD SHALL BE SHUT OFF. PROVIDE ALL NECESSARY
COMPONENTS AND CONNECTIONS AS REQUIRED FOR A
COMPLETE AND OPERATIONAL INSTALLATION.
AIR LOCK
026
EXISTING NOTIFIER FIRE
ALARM CONTROL PANEL
CORRIDOR
031
C
C
8
UP
COMPUTER LAB
303
ART
215
MDP
RTU-4
PHONE
044
AV STORAGE/ IT ROOM
D
304
F
F WP
WP,GFI
MEN
046
WOMEN
RECEPTION 047
WORK ROOM
049
J
500
UP
CLINIC
503
AV AREA
043
6
UP
4
2
TOILET
048
FCU-2
M-(32,34,36)
CORRIDOR
051
CORRIDOR
052
MEDIA CENTER
300
CORRIDOR
025
B
B
MUSIC
200
3
UP
VAV
WORKROOM
301
CONFERENCE
302
J
PROJECT INFORMATION
PHONE
045
1
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
WOMEN
041
POUDRE SCHOOL DISTRICT
LA
MEN
042
FACP
ELECTRICAL
30
TEACHER'S LOUNGE
504
LOCATION OF NEW
BASEBOARD HEATER
(TYPICAL)
WERNER ELEMENTARY
RENOVATION PROJECT
EM
PROJECT #: 2011.01.0143
LB-12
DRAWN BY: CW
CHECKED BY: ETM
ISSUE DATE: 2.9.12
N
1 POWER/SYSTEMS NEW FLOOR PLAN - AREA "B"
REVISIONS
1/8" = 1'-0"
NO
DESCRIPTION
DATE
7
J
TCP
BOILER
ROOM
29
2/8/2012 11:38:10 AM - PLOT DATE
M-23
M-7
M (20,22,24)
P-2
M
P-1
M
7
M (14,16,18)
MECHANICAL
ROOM
28
UP
M
A
A
N
2 MEZZANINE POWER AND SYSTEMS PLAN
1/8" = 1'-0"
1
2
3
4
5
6
SHEET INFORMATION
TCP J
POWER/SYSTEMS NEW
FLOOR PLAN - AREA B
E101B
2
3
4
5
6
ARCHITECT
1
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
E
GENERAL NOTES:
SEAL
A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES
EXISTING DEVICES TO REMAIN, SHOWN FOR REFERENCE
ONLY.
B. ELECTRICAL CONTRACTOR TO TEMPORARILY REMOVE
EXISTING LUMINAIRES, SPEAKERS AND FIRE ALARM
DEVICES AT THE EXISTING CEILINGS AND STRUCTURE
AFFECTED BY NEW MECHANICAL WORK AND REINSTALL
AFTER WORK HAS BEEN COMPLETED. COORDINATE
EXACT REQUIREMENTS WITH ARCHITECT AND
MECHANICAL CONTRACTOR.
CONSULTANT
FLAG NOTES THIS SHEET:
1. ALTERNATE M1: PROVIDE J-BOX ABOVE CEILING WITH 120V
CONNECTION FOR VAV CONTROL.
2. CONNECT NEW FAN COIL TO EXISTING BRANCH CIRCUIT
SAVED DURING DEMOLITION OF EXISTING UV UNIT.
4
CLASSROOM
211
SEE 1 / E101B
MATCHLINE
CLASSROOM
210
4
4. CONTRACTOR TO RELOCATE EXISTING ELECTRICAL DEVICES
WHERE THE NEW BASEBOARD HEATER AND DIFFUSER DROPS
ARE TO BE INSTALLED. COORDINATE NEW LOCATION OF
EXISTING DEVICES WITH ARCHITECT AND MECHANICAL
CONTRACTOR PRIOR TO WORK.
CLASSROOM
209
D
4
TV
TV
GROUP
069
GROUP
064
CORRIDOR
067
PROJECT PHASE
CLASSROOM
212
D
3. PROVIDE NEW FIRE ALARM DUCT SMOKE DETECTOR IN
RETURN DUCTWORK TO MATCH EXISTING SIMPLEX FIRE
ALARM SYSTEM. PROVIDE ALL NECESSARY COMPONENTS AND
CONNECTIONS AS REQUIRED FOR A COMPLETE AND
OPERATIONAL INSTALLATION.
4
1
COMPUTER LAB
213
CLASSROOM
208
CONFERENCE/
WORKROOM
J
CONSTRUCTION
DOCUMENTS
GROUP
068
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
214
LC-8
GIRLS
066
FCU-6
BOYS
065
ART & MUSIC STORAGE/
IT ROOM
21
RTU-1
J
J
F
WP
J
WP
FCU-5
TO MDP
WORKROOM/
CONFERENCE
207
CLASSROOM
201
SEE 1 / E101B
GROUP
059
TV
4
4
MATCHLINE
CLASSROOM
206
CORRIDOR
057
TV
B
2
CUST/ MECH
20
LC
LC-10
GIRLS
056
GROUP
054
AIR LOCK
063
2
J
BOYS
055
C
FCU-7
CORRIDOR
053
4
4
B
CLASSROOM
203
CLASSROOM
202
CLASSROOM
204
CLASSROOM
205
4
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
2
CORRIDOR
052
3
CORRIDOR
061
STORAGE
062
POUDRE SCHOOL DISTRICT
F
FCU-8
C
D
WERNER ELEMENTARY
RENOVATION PROJECT
J
PROJECT INFORMATION
2
4
GROUP
058
PROJECT #: 2011.01.0143
DRAWN BY: CW
CHECKED BY: ETM
ISSUE DATE: 2.9.12
REVISIONS
NO
DESCRIPTION
DATE
N
1 POWER/SYSTEMS NEW FLOOR PLAN - AREA "C"
A
A
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 11:38:12 AM - PLOT DATE
1/8" = 1'-0"
POWER/SYSTEMS NEW
FLOOR PLAN - AREA C
E101C
1
2
3
4
5
ITIN
407B
6
COUNSELOR
403
CONFERENCE
407A
ARCHITECT
GENERAL NOTES:
A. ITEMS SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING
DEVICES TO REMAIN, SHOWN FOR REFERENCE.
B. CONTRACTOR TO PROVIDE RACEWAY, J-BOXES AND 120V
CONNECTIONS FOR SECURITY SYSTEM WORK. DISTRICT
SECURITY DEPARTMENT TO PROVIDE DEVICES AND
CONNECTIONS.
AIR LOCK
039
CR
13
E
MEN
042
14
ELECTRICAL
30
LA
PHONE
044
FACP
EM
TEACHER'S
LOUNGE
504
C. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY AND
BACK-BOXES FOR DATA/TELE. OWNER TO PROVIDE
DEVICES AND CONNECTIONS.
E
D. ELECTRICAL CONTRACTOR TO TEMPORARILY REMOVE
EXISTING LUMINAIRES, SPEAKERS AND FIRE ALARM
DEVICES AT THE EXISTING CEILINGS AND STRUCTURE
AFFECTED BY NEW MECHANICAL WORK AND REINSTALL
AFTER WORK HAS BEEN COMPLETED. COORDINATE EXACT
REQUIREMENTS WITH ARCHITECT AND MECHANICAL
CONTRACTOR.
SEAL
M
FLAG NOTES THIS PLAN:
MDP
AV
STORAGE/
IT ROOM
304
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
1. DISCONNECT AND REMOVE CEILING MOUNTED LUMINAIRE. SAVE
AND PROTECT DEVICES AND BRANCH CIRCUIT WIRES FOR
INSTALLATION IN NEW LOCATION.
2. EXISTING SURFACE MOUNTED LUMINAIRE TO REMAIN.
UP
CLINIC
503
4. DISCONNECT AND REMOVE CEILING FAN, CONTROL SWITCH AND
WIRES. RETURN FAN TO OWNER.
5. DISCONNECT EXISTING RAULAND INTERCOM PBX TO BE
RELOCATED. SAVE AND PROTECT INTERCOM WIRES FOR
EXTENSION TO NEW LOCATION.
TOILET
048
10
15
CR
2
RECEPTION
500
M
5
6. DISCONNECT AND REMOVE, EXIT SIGN, SPEAKERS AND MOTION
SENSORS IN THIS AREA. SAVE AND PROTECT DEVICES AND
WIRES FOR INSTALLATION IN NEW LOCATION.
16
M
7. DISCONNECT AND REMOVE RECESSED LUMINAIRE. SAVE AND
PROTECT BRANCH CIRCUIT WIRES.
CORRIDOR
051
D
8. FIRE ALARM ANNUNCIATOR PANEL TO REMAIN.
D
9. SECURITY KEYPAD TO REMAIN.
4
4
I
3
PRINCIPAL
502
12
2
11
10. DISCONNECT AND REMOVE SURFACE MOUNTED RECEPTACLE AT
EXISTING COPY MACHINE LOCATED AT END OF CABINET. SAVE
AND PROTECT BRANCH CIRCUIT WIRES.
CONFERENCE
501
1
11. VISITOR COMPUTER WORK STATION TO BE RELOCATED. SAVE
AND PROTECT BRANCH CIRCUIT WIRES FOR REUSE.
UP
M
M
12. DISCONNECT AND REMOVE SECURITY ALARM SENSOR. SAVE AND
PROTECT FOR INSTALLATION IN NEW LOCATION BY DISTRICT
SECURITY DEPT.
6
+72"
4
4
13. DISCONNECT PNEUMATIC ADA OPERATOR COMPRESSOR AND
CONTROLS TO BE REPLACED WITH NEW ELECTRIC TYPE. SAVE
AND PROTECT BRANCH CIRCUIT WIRES AND CONDUIT FOR REUSE.
VERIFY EXACT LOCATION OF COMPRESSOR IN FIELD.
12
VALVE
10
K
I
9
14. DISCONNECT EXISTING SECURITY SYSTEM DEVICES AT EXISTING
DOORS TO BE REPLACED. SAVE AND PROTECT WIRES AND
DEVICES FOR CONNECT OF NEW SECURED DOORS BY DISTRICT.
I
7
LB-3
M
AIR LOCK
001
15. REMOVE EXISTING MASTER TIME CONTROL PANEL THAT IS NOT
LONGER IN USE. REMOVE BRANCH WIRES BACK TO NEAREST
SOURCE.
16.
DISCONNECT AND REMOVE EXISTING LIGHT SWITCH. SAVE AND
PROTECT BACKBOX FOR REUSE.
FA
AP
8
14
CR
13
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
CONSTRUCTION
DOCUMENTS
WOMEN
047
CONSULTANT
WORKROOM
049
3. DISCONNECT AND REMOVE LUMINAIRE MOUNTED ON BOTTOM OF
TRUSS. SAVE AND PROTECT LUMINAIRE AND BRANCH CIRCUIT
WIRES FOR INSTALLATION IN NEW LOCATION.
PROJECT PHASE
AC
AC
AC
MEN
046
CLASSROOM
103
ITIN
407B
COUNSELOR
403
CONFERENCE
407A
1 ADMINISTRATION AREA ELECTRICAL DEMOLITION PLAN
C
C
PS
ADA
1. CONNECT TO EXISTING BRANCH CIRCUIT SAVED DURING
DEMOLITION. BRANCH CIRCUIT LOAD ADDED IS SAME AS LOAD
REMOVED.
3
ADA
FACP
EM
ELECTRICAL
30
TEACHER'S LOUNGE
504
LA
MEN
042
PHONE
045
7. NEW LOCATION OF EXISTING INTERCOM PBX. PROVIDE DUPLEX
RECEPTACLE AND CONNECT AS SHOWN.
CONFERENCE
505
CR
2
4
1
11. INSTALL NEW 20A DUPLEX RECEPTACLE ON SIDE OF EXISTING
COUNTER FOR CONNECTION OF COPY MACHINE. CONNECT TO
EXISTING BRANCH CIRCUIT SAVED DURING DEMOLITION.
6
12. PROVIDE NEW FIRE ALARM HORN/STROBE TO MATCH EXISTING
MANUFACTURER. CONNECT TO EXISTING NOTIFIER FIRE ALARM
CONTROL PANEL AS REQUIRED FOR A COMPLETE AND
OPERATIONAL INSTALLATION.
5
12
8
F
PRINCIPAL
502
108' - 4 1/2"
2
2. INSTALL EXISTING SURFACE MOUNTED WRAP-AROUND
LUMINAIRES SAVED DURING DEMOLITION AND CONNECT TO
EXISTING BRANCH CIRCUIT.
6
CONFERENCE
505
PRINCIPAL
502
B
3. PROVIDE NEW RECESSED LENSED 2'X4' LUMINAIRE TO MATCH
EXISTING, LITHONIA #GT8-232-32-A12125-MVOLT-GEB10IS.
CONNECT AS SHOWN. .
4. INSTALL EXISTING EXIT SIGN SAVED DURING DEMOLITION AND
CONNECT TO EXISTING EMERGENCY BRANCH CIRCUIT.
5
5. PROVIDE NEW CEILING MOUNTED OCCUPANCY SENSOR WITH
WALL MOUNTED OVERRIDE SWITCH FOR AUTOMATIC
CONTROL OF LIGHTS.
1
6
PROJECT #: 2011.01.0143
6. PROVIDE NEW 3-WAY LIGHT SWITCH AND CONNECT TO NEW
OCUPANCY SENSOR FOR LOCAL OVER-RIDE CONTROL.
DRAWN BY: CW
4
1
UP
9
1. INSTALL EXISTING 2X4 LENSED LUMINAIRES SAVED DURING
DEMOLITION AND CONNECT TO EXISTING BRANCH CIRCUIT.
CORRIDOR
051
3
CORRIDOR
051
I
EM-2
FLAG NOTES THIS PLAN:
TOILET
048
O
7
10
500
9. REFER TO SECURITY DOOR DETAIL ON DRAWING E401.
10. EXTEND EXISTING INTERCOM WIRES AS REQUIRED IN EXISTING GYP
BOARD WALL FROM NEW ENCLOSURE TO NEW LOCATION OF
INTERCOM PBX. EXTEND EXISTING INTERCOM WIRES AS REQUIRED.
CONTRACTOR TO PROVIDE ALL NECESSARY COMPONENTS AND
CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATIONAL
SYSTEM.
CLINIC
503
WOMEN
RECEPTION 047
WORK ROOM
049
A.. ELECTRICAL CONTRACTOR TO TEMPORARILY REMOVE EXISTING
LUMINAIRES FOR INSTALLATION OF NEW MECHANICAL
EQUIPMENT AND DUCTWORK. REINSTALL IN EXISTING LOCATION
AFTER COMPLETION OF WORK. COORDINATE EXACT
REQUIREMENTS WITH MECHANICAL CONTRACTOR.
O
B
TOILET
048
AV STORAGE/ IT ROOM
304
MEN
046
8. PROVIDE NEW SURFACE MOUNTED 30"X30"X6" HOFFMAN
ENCLOSURE AT EXISTING LOCATION OF INTERCOM PBX. INSTALL
EXISTING BACKBOARD AND PUNCH DOWN BLOCKS IN NEW
ENCLOSURE.
500
GENERAL NOTES:
PHONE
044
O
WORK ROOM
049
UP
CLINIC
503
WOMEN
RECEPTION 047
PHONE
045
6. PROVIDE A 20A DUPLEX RECEPTACLE AND DATA OUTLET FOR
CONNECTION OF VISITORS COMPUTER WORK STATION. CONNECT TO
EXISTING BRANCH CIRCUIT SAVED DURING DEMOLITION.
AV STORAGE/ IT ROOM
304
MEN
046
AC
AC
AC
PHONE
044
4. PROVIDE FLUSH MOUNTED 2-GANG FLOOR BOX WITH (1) 20A DUPLEX
RECEPTACLE AND (4) DATA PORTS. HUBBELL #B4214 CAST IRON
FLOOR BOX WITH (1) #S3825, (1) #S3826 BRASS COVER PLATES AND
#SB3684 CARPET FLANGE. PROVIDE ALL NECESSARY COMPONENTS
FOR A COMPLETE AND OPERATIONAL INSTALLATION.
5. PROVIDE (1) 1" EMPTY CONDUIT WITH PULL WIRE FOR CONNECTION
OF DATA/TELEPHONE & (1) 3/4"C FOR POWER. SAW CUT EXISTING
FLOOR AND PATCH TO MATCH EXISTING FINISH.
MDP
11
TEACHER'S LOUNGE
504
3. PROVIDE 120V CONNECTION TO NEW ELECTRIC ADA DOOR
OPERATOR.
PROJECT INFORMATION
1
3
CR
2. PROVIDE J-BOX FOR INSTALLATION AND CONNECTION OF EXISTING
SECURITY ALARM SENSOR TO BE INSTALLED BY AND CONNECTED BY
DISTRICT.
SECRETARY
501
CHECKED BY: ETM
J
1
SECRETARY
501
VALVE
10
J
500-B
2
CR
I
VALVE
10
K
VESTIBULE
001
REVISIONS
NO
001-A
DATE
6
I
C
R
PS
DESCRIPTION
3
1
1
ISSUE DATE: 2.9.12
ADA
VESTIBULE
001
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
AIR LOCK
039
PS
FLAG NOTES THIS PLAN:
039-A
POUDRE SCHOOL DISTRICT
3
039-B
WERNER ELEMENTARY
RENOVATION PROJECT
1/8" = 1'-0"
?
CLASSROOM
103
A
2 ADMINISTRATION AREA LIGHTING PLAN
1/8" = 1'-0"
CLASSROOM
103
3 ADMINISTRATION AREA POWER AND SYSTEMS PLAN
1/8" = 1'-0"
1
2
3
4
5
6
SHEET INFORMATION
A
001-B ADA
CR
2/8/2012 11:38:16 AM - PLOT DATE
EXISTING SECURITY
POWER SUPPLY
FA
AP
J
3
ADMINISTRATION AREA
ELECTRICAL PLANS
E201
DEMAND
0.0
0.0
0.0
0.7
2.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.0
8.4
100.0
91.6
KVA
AMPS
AMPS
AMPS
120 / 208
225 AMP
10K AIC
[2]
[3]
C
LIGHTING
RECEPT. (FIRST 10 KW)
RECEPT. (REMAINDER)
MOTORS
LARGEST MOTOR
APPLIANCES
EQUIPMENT
HEATING
TRANSFORMER
OTHER
KVA
KVA
KVA
KVA
0.4 KVA
0.9 KVA
1.3 KVA
L = LIGHTING
S = SUBFEED
ALL CIRCUIT BREAKERS
ARE 20 AMP, 1 POLE
UNLESS NOTED OTHERWISE
SP = SPACE SPR = SPARE
T= TRANSFORMER
O = OTHER
0
0
0
DEMAND
0.1
0.2
0.0
0.0
1.4
0.0
2.0
0.0
0.0
0.0
0.0
0.0
0.0
3.7
10.2
100.0
89.8
D.F.
1.25
1.00
0.50
1.00
1.25
1.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
KVA
AMPS
3.4
9.4
TOTAL
LOAD
DESIGN
SPARE
39.1%
71.9%
28.1%
A TO B
B TO C
C TO A
PANEL
[2]
2.6
36.0
3.0
33.0
[2]
M
E
117
M
180 A
E
117
[1]
[1]
KVA
KVA
KVA
KVA
3.4
36.0
3.7
32.4
CONNECTED
DESIGN
DEMAND
SPARE
CONNECTED
PHASE A
PHASE B
PHASE C
DESCRIPTION
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
[1,2] EF-1 & FCU-6
SP
14.3%
29.7%
48.1%
TOTAL
LOAD
DESIGN
SPARE
[1] REVISED FOR THIS PROJECT.
A. (12) 1/6 & 1/4HP UV UNITS AND (2) 1/3HP FANS REMOVED.
LOAD ADDED TO PANELBOARD IS LESS THAN LOAD REMOVED.
NOTES:
L = LIGHTING
S = SUBFEED
H = HEATING
NOTES:
100
E
1000
E
1000
797
797
797
M
M
M
15
|
|
30
|
|
TOTAL
2391
M
0
0 A
2100
E
D.F.
CONNECTED
1.25
0.0
1.00
0.0
0.50
0.0
1.00
19.9
1.25
9.0
1.00
0.0
1.00
2.1
1.00
0.0
1.00
0.0
1.00
0.0
0.00
0.00
0.00
KVA
31.0
AMPS
86.1
0
LIGHTING
RECEPT. (FIRST 10 KW)
RECEPT. (REMAINDER)
MOTORS
LARGEST MOTOR
APPLIANCES
EQUIPMENT
HEATING
TRANSFORMER
OTHER
TOTAL
LOAD
DESIGN
SPARE
L = LIGHTING
S = SUBFEED
NOTES:
E
4 WIRE SERVICE
L
PHASE
2
A
4
B
6
C
8
A
10
B
12
C
14
A
16
B
18
C
20
A
22
B
24
C
26
A
28
B
30
C
32
A
34
B
36
C
38
A
40
B
42
C
LOADS IN
VOLT-AMPERES
DEMAND
0.0
0.0
0.0
19.9
11.3
0.0
2.1
0.0
0.0
0.0
0.0
0.0
0.0
33.3
92.3
150.0
57.7
R
20
|
|
20
|
|
60
|
|
60
|
|
20
|
|
45
|
|
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
M
M
M
M
M
M
M
M
M
M
0 A
E
0
120 / 208
31.0
54.0
33.3
20.8
[3]
[3]
TOTAL
5760
[4]
LIGHTING
RECEPT. (FIRST 10 KW)
RECEPT. (REMAINDER)
MOTORS
LARGEST MOTOR
APPLIANCES
EQUIPMENT
HEATING
TRANSFORMER
OTHER
[3]
KVA
KVA
KVA
KVA
TOTAL
LOAD
DESIGN
SPARE
DEMAND
7.2
0.0
0.0
0.0
0.0
0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
8.2
22.8
60.0
37.2
R
E
M
0 A
E
0
SURFACE MOUNTED
T|S|O
DESCRIPTION
M|A|E|H
1000 INTERCOM SYS.
SP
SP
SP
SP
SP
SP
SP
SP
0
0 TOTAL
1000
6.8
21.6
8.2
13.4
CONNECTED
DESIGN
DEMAND
SPARE
CONNECTED
PHASE A
PHASE B
PHASE C
KVA
KVA
KVA
KVA
1.7 KVA
0.6 KVA
0.4 KVA
32.4%
64.6%
20.9%
A TO B
B TO C
C TO A
ALL CIRCUIT BREAKERS
ARE 20 AMP, 1 POLE
UNLESS NOTED OTHERWISE
SP = SPACE SPR = SPARE
KVA
AMPS
AMPS
AMPS
T= TRANSFORMER
O = OTHER
D
H = HEATING
[2]
KVA
KVA
KVA
KVA
C
65.8%
100.0%
65.8%
ALL CIRCUIT BREAKERS
ARE 20 AMP, 1 POLE
UNLESS NOTED OTHERWISE
SP = SPACE SPR = SPARE
KVA
AMPS
AMPS
AMPS
T= TRANSFORMER
O = OTHER
GENERAL NOTES:
H = HEATING
A.
LIGHT LINE WEIGHT INDICATES EXISTING SHOWN FOR
REFERENCE ONLY.
FLAG NOTES THIS SHEET:
1.
PROVIDE NEW CIRCUIT BREAKER IN EXISTING SPACE TO
MATCH EXISTING MANUFACTURE AND AIC RATING.
2.
DISCONNECT FEEDERS FROM EXISTING IRRIGATION PUMP
AND REMOVE CIRCUIT BREAKER. EXTEND EXISTING WIRES
AND CONNECT TO EXISTING PANELBOARD "LA" THAT IS
LOCATED IN SAME ROOM AS THE "MDP".
3.
REPLACE EXISTING CIRCUIT BREAKER WITH NEW TO
MATCH EXISTING MANUFACTURER.
4.
REPLACE EXISTING PANELBOARD FEED WITH NEW SIZE AS
SHOWN.
H = HEATING
[1] EXISTING LOADS BASED ON RECORD DRAWING, FIELD VERIFICATION OR 80% OF CIRCUIT BREAKER SIZE.
[2] EXISTING SPARE CIRCUIT BREAKER.
[3] REPLACE EXISTING CIRCUIT BREAKER WITH NEW SIZE TO MATCH EXISTING MANUFACTURER.
[4] REVISED FOR THIS PROJECT.
B
B
LOAD SUMMARY
EXISTING PANEL LA
EXISTING LOADS DELETED
(8) UNIT VENTILATORS
(1) EXHAUST FAN
=
=
TOTAL =
4.72
.67
KVA
KVA
5.39
KVA
LOAD SUMMARY
EXISTING "MDP"- 600A
CONTRACTOR SHALL PROVIDE 30 DAY
METERING FOR EXISTING LOADS
PRIOR TO ANY WORK AND WHILE
SCHOOL IS IN SESSION. SUBMIT
RESULTS TO PROJECT ENGINEER.
RTU-4
M
NEW LOADS ADDED
(2) FAN COILS
EXISTING IRRIGATION PUMP
=
=
TOTAL =
+ .52
+1.84
KVA
KVA
WP
F
(3#10+#10G)3/4"C
716A
LB
LC
K
45A3P
M
LF
DA
BOOSTER
HEATER
20A2P
M
2/8/2012 11:38:17 AM - PLOT DATE
SPD
600A3P
600A
(4#1/0 XHHW AL
+#8GCU)2"C
600A3P
MCB
(4#1/0 XHHW AL
+#8GCU)2"C
100A 3P
100A 3P
(4#1/0 XHHW AL
+#8GCU)2"C
100A 3P
(4#1/0 XHHW AL
+#8GCU)2"C
100A 3P
4
(4#1/0+#6G)
EXISTING
1-1/2"C
150A 3P3
DB
DC
50A
3P
100A 3P
100A 2P
80A
3P
(4#1 XHHW
+#8GCU)2"C
80A
3P
(4#1 XHHW
+#8GCU)2"C
(4#6 THW
+#8GCU)1-1/2"C
80A
3P
200A 3P
(3#3+#8G)
1-1/4"C
(3#1+#6G)
1-1/2"C
SO.
MODULAR
(4#1 XHHW
+#8GCU)2"C
2,277A
EM
J
(4#1/0 XHHW AL
+#8GCU)2"C
F
M
CU
NO.
MODULAR
WP
112.5KVA
60A
3P
60A
ATS
2
20A
3P
125A 3P
1
60A
3P
100A 3P
1
DRAWN BY: CW
@ 208V-3PHASE
EXISTING LOADS DELETED
UNIT VENTILATORS
EXHAUST FANS
(2) 2HP PUMPS
EVAP COOLER (KITCHEN)
SUPPLY FAN (KITCHEN)
AIR COMPRESSOR
AIR DRYER
TOTAL LOAD DELETED
NEW LOADS ADDED
RTU-1
RTU-2
RTU-4
FAN COIL UNITS
(2) 7.5HP PUMPS
KMUA (KITCHEN)
TOTAL NEW LOAD ADDED
156.4
PROJECT #: 2011.01.0143
=
112.5 KVA
=
312.5 AMPS
=
=
=
=
=
=
=
24.80
6.25
5.40
1.00
1.28
2.70
1.66
KVA
KVA
KVA
KVA
KVA
KVA
KVA
=
43.09
KVA
=
=
=
=
=
=
33.00
22.80
9.00
3.04
17.50
1.66
KVA
KVA
KVA
KVA
KVA
KVA
=
87.00
KVA
TOTAL =
N
G
KVA @ 208V-3PHASE
156.4
CHECKED BY: ETM
ISSUE DATE: 2.9.12
REVISIONS
NO
#1/0CU BUILDING
STEEL, CW PIPE &
GRD RODS
2
= 434.5 AMPS
120/208V 3 ,4W
3
4
5
DATE
KVA
WERNER ES: ELECTRICAL ONE-LINE DIAGRAM
NO SCALE
DESCRIPTION
A
EXISTING MAIN DISTRIBUTION CENTER "MDP"
600A, 120/208V, 3 , 4W, 22,000 AIC
SQUARE-D, HCM, I-LINE
2SETS
(4-350MCM XHHW AL)
3"C
1
F
EXISTING
IRRIGATION
PUMP
LA
A
M
G
6,263A
LOAD ADDED IS LESS THAN LOAD REMOVED
EXISTING LOAD
UTILITY METER PEAK DEMAND:
72 KW X 125% / 0.8 pf
RTU-2
M
2
EXISTING UTILITY
TRANSFORMER
EXISTING
GENERATOR
RTU-1
WP
2.36 KVA
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
[1] REVISED FOR THIS PROJECT.
[2] LOAD ADDED IS LESS THAN LOAD REMOVED.
A. (22) 1/6 & 1/4HP UV UNITS, (2) 1/3HP FANS REMOVED &(2) 1/2HP FANS REMOVED.
LOAD ADDED TO PANELBOARD IS LESS THAN LOAD REMOVED.
ALL CIRCUIT BREAKERS
ARE 20 AMP, 1 POLE
UNLESS NOTED OTHERWISE
SP = SPACE SPR = SPARE
T= TRANSFORMER
O = OTHER
2.6
36.0
2.8
33.2
CONNECTED
DESIGN
DEMAND
SPARE
CONNECTED
PHASE A
PHASE B
PHASE C
2.9 KVA
1.9 KVA
1.9 KVA
A TO B
B TO C
C TO A
M = MOTOR
A = APPLIANCE
R = RECEPTACLE
E = EQUIPMENT
L
PHASE
2
A
4
B
6
C
8
A
10
B
12
C
14
A
16
B
C
LOADS IN
VOLT-AMPERES
KVA
AMPS
[1]
SP
1080
0 TOTAL
1000
M
180 A
E
117
E
EXISTING SQ-D [1]
1
3
5
7
9
11
13
15
D.F.
1.25
1.00
0.50
1.00
1.25
1.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
117
[1]
[1]
[1]
[1]
[1]
[1]
4 WIRE SERVICE
GROUND BUS
100% NEUTRAL BUS
0
0
0
DEMAND
0.1
0.2
0.0
0.6
0.9
0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
2.8
7.9
100.0
92.1
M = MOTOR
A = APPLIANCE
R = RECEPTACLE
E = EQUIPMENT
60
|
[1] EXISTING LOADS BASED ON 80% OF CIRCUIT BREAKER SIZE.
[2] PROVIDE NEW CIRCUIT IN EXISTING SPACE TO MATCH EXISTING MANUFACTURER.
NOTES:
91.5%
91.5%
100.0%
M
0 A
E
CONNECTED
5.8
0.0
0.0
0.0
0.0
0.0
1.0
0.0
0.0
0.0
6.8
18.8
L = LIGHTING
S = SUBFEED
"EM"
3 PHASE
VOLT
60 MAIN LUGS ONLY
T|S|O
M|A|E|H
R
L
1920
1920
1920
DESCRIPTION
L-NO. NIGHT & EXIT
L-E. NIGHT & EXIT
L-SO. NIGHT & EXIT
SP
SP
SP
SP
SP
10.6 KVA
9.7 KVA
10.6 KVA
A TO B
B TO C
C TO A
KVA
AMPS
AMPS
AMPS
100 AMP
10K AIC
SURFACE MOUNTED
T|S|O
DESCRIPTION
M|A|E|H
AHU-1
AHU-2
2920 P-1
2920 2920 2920 P-2
2920 2920 SPR
3000 RTU-4
3000 3000 EF-29
CONTROL PNL #2
SHADE CONTROL
26520
0 TOTAL
0
CONNECTED
DESIGN
DEMAND
SPARE
CONNECTED
PHASE A
PHASE B
PHASE C
M = MOTOR
A = APPLIANCE
R = RECEPTACLE
E = EQUIPMENT
PANEL
EXISTING SQ-D [1]
GROUND BUS
100% NEUTRAL BUS
150 MAIN LUGS ONLY
T|S|O
M|A|E|H
L
R
DESCRIPTION
EF-26 GYM
EPO CONTACTOR
CONTROL PNL #3
TCP
P-5
P-6
BOILER #2
BOILER #1
EF-15 & EF-18
L-MEZZ.
BOILER PUMPS 3&4
TCP
EF-24
SHADE CONTROL
KMAU
EF-25-MENS RM
AC COMPUTER RM
-
"M"
3 PHASE
VOLT
0
H = HEATING
T= TRANSFORMER
O = OTHER
260
SURFACE MOUNTED
T|S|O
DESCRIPTION
R
M|A|E|H
EXISTING
360 FCU-8
M
1000 VAV CONTROLS
E
L & R, RTU-1
180
SPR
720 FCU-5 &7
M
EF-2
SPR
EXISTING
SPR
CONTROL PNL TO RIGHT
EXISTING
EXISTING
EXISTING
EXISTING
SP
SP
SP
L
PHASE
2
A
4
B
6
C
8
A
10
B
12
C
14
A
16
B
18
C
20
A
22
B
24
C
26
A
28
B
30
C
32
A
34
B
36
C
38
A
40
B
42
C
LOADS IN
VOLT-AMPERES
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
260
M
0
0 A
0
E
D.F.
CONNECTED
1.25
0.1
1.00
0.2
0.50
0.0
1.00
0.6
1.25
0.7
1.00
0.0
1.00
1.0
1.00
0.0
1.00
0.0
1.00
0.0
0.00
0.00
0.00
KVA
2.6
AMPS
7.3
LIGHTING
RECEPT. (FIRST 10 KW)
RECEPT. (REMAINDER)
MOTORS
LARGEST MOTOR
APPLIANCES
EQUIPMENT
HEATING
TRANSFORMER
OTHER
ALL CIRCUIT BREAKERS
ARE 20 AMP, 1 POLE
UNLESS NOTED OTHERWISE
SP = SPACE SPR = SPARE
KVA
AMPS
AMPS
AMPS
M
TOTAL
2.1 KVA
0.3 KVA
1.0 KVA
A TO B
B TO C
C TO A
M = MOTOR
A = APPLIANCE
R = RECEPTACLE
E = EQUIPMENT
180
[1]
[1]
[1]
[1]
ARCHITECT
E
[1] REVISED FOR THIS PROJECT.
[2] PROVIDE NEW BRANCH CIRCUIT CIRCUIT BREAKER TO MATCH EXISTING MANUFACTURER.
[3] EXISTING SPARE CIRCUIT BREAKER.
[4] LOAD ADDED IS LESS THAN LOAD REMOVED.
A. (8) 1/6 & 1/4HP UV UNITS AND (1) 1/4HP FAN REMOVED.
LOAD ADDED TO PANELBOARD IS LESS THAN LOAD REMOVED.
NOTES:
[4]
0
CONNECTED
DESIGN
DEMAND
SPARE
CONNECTED
PHASE A
PHASE B
PHASE C
M = MOTOR
A = APPLIANCE
R = RECEPTACLE
E = EQUIPMENT
M
M
M
0 A
E
20
|
M
0 A
E
CONNECTED
0.1
0.2
0.0
0.0
1.1
0.0
2.0
0.0
0.0
0.0
0
TOTAL
R
L
GROUND BUS
100% NEUTRAL BUS
100 MAIN LUGS ONLY
T|S|O
M|A|E|H
L
R
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
TOTAL
LOAD
DESIGN
SPARE
L = LIGHTING
S = SUBFEED
360
PHASE
2
A
4
B
6
C
8
A
10
B
12
C
14
A
16
B
18
C
20
A
22
B
24
C
26
A
28
B
30
C
LOADS IN
VOLT-AMPERES
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
225 AMP
22K AIC
SURFACE MOUNTED
T|S|O
M|A|E|H
DESCRIPTION
1000 VAV CONTROLS
EF 7
SPR
1080 FCU-3 & 4
EXISTING
1000 VAV CONTROLS
EXISTING
L & R, RTU-2
EXISTING
EXISTING
SPR
SPR
SPR
SPR
SP
1080
0 TOTAL
2000
EXISTING SQ. D
4 WIRE SERVICE
POUDRE SCHOOL DISTRICT
LIGHTING
RECEPT. (FIRST 10 KW)
RECEPT. (REMAINDER)
MOTORS
LARGEST MOTOR
APPLIANCES
EQUIPMENT
HEATING
TRANSFORMER
OTHER
D
M
720
M
0
0 A
0
E
D.F.
CONNECTED
1.25
0.0
1.00
0.0
0.50
0.0
1.00
0.7
1.25
1.8
1.00
0.0
1.00
0.0
1.00
0.0
1.00
0.0
1.00
0.0
0.00
0.00
0.00
KVA
2.6
AMPS
7.1
0
TOTAL
360
DESCRIPTION
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
SPR
SPR
SP
SP
[1]
GROUND BUS
100% NEUTRAL BUS
100 MAIN LUGS ONLY
T|S|O
M|A|E|H
R
L
"LC"
3 PHASE
VOLT
120 / 208
CONSTRUCTION
DOCUMENTS
[1,4]
[1]
[1]
M
R
PANEL
EXISTING SQ-D
4 WIRE SERVICE
WERNER ELEMENTARY
RENOVATION PROJECT
[1,4]
L
PHASE
2
A
4
B
6
C
8
A
10
B
12
C
14
A
16
B
18
C
20
A
22
B
24
C
26
A
28
B
30
C
32
A
34
B
36
C
38
A
40
B
42
C
LOADS IN
VOLT-AMPERES
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
100 AMP
10K AIC
SURFACE MOUNTED
T|S|O
DESCRIPTION
M|A|E|H
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
R-N112,N113
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
SPR
SPR
920 IRRIGATION PUMP
920 1840
0 TOTAL
0
"LB"
3 PHASE
VOLT
120 / 208
6
SEAL
E
GROUND BUS
100% NEUTRAL BUS
100 MAIN LUGS ONLY
T|S|O
M|A|E|H
L
R
DESCRIPTION
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EF-5 & FCU-2
EXISTING
UV-42 & FCU-1
UV-31
SPARE
EXISTING
EXISTING
EXISTING
EXISTING
PANEL
EXISTING SQ-D
4 WIRE SERVICE
5
PROJECT PHASE
225 AMP
10K AIC
"LA"
4
PROJECT INFORMATION
PANEL
3 PHASE
VOLT
120 / 208
3
CONSULTANT
2
6
SHEET INFORMATION
1
ELECTRICAL ONE-LINE
DIAGRAM & PANEL
SCHEDULES
E301
2
3
4
5
6
ARCHITECT
2
2
CEILING
CEILING
DESCRIPTION
RTU-1
MAIN AIR HANDLER
86.2FLA, 98.2MCA
15HP SUPPLY FAN, 10HP EXHAUST FAN
31
KVA
208-3
REFER TO ONE-LINE DIAGRAM
125A3P
120A
FRN-R
PROVIDE 120V CONNECTION FOR
RECEPTACLE AND LIGHTS AND REINSTALL
NEW DUCT SMOKE DETECTOR IN RETURN
RTU-2
MAIN AIR HANDLER
63.2FLA, 71MCA
10HP SUPPLY FAN, 7.5HP EXHAUST FAN
22.8
KVA
208-3
REFER TO ONE-LINE DIAGRAM
100A3P
90A
FRN-R
PROVIDE 120V CONNECTION FOR
RECEPTACLE AND LIGHTS AND REINSTALL
NEW DUCT SMOKE DETECTOR IN RETURN
RTU-4
ROOFTOP UNIT-IT ROOM
25FLA, 29.5MCA
9.0
KVA
208-3
REFER TO ONE-LINE DIAGRAM
45A3P
40A
FRN-R
INSTALL NEW DUCT SMOKE DETECTOR IN
RETURN
FCU-1,2,4,5 & 6
FAN COIL UNIT
(1)1/8HP
.360
KVA
120-1
(2#12+#12G)1/2"C
20A1P
[1]
EXISTING UNIT VENTILATOR TO
BE REPLACED WITH NEW FAN
COIL
FCU-3,& 8
FAN COIL UNIT
(2)1/18HP
.720
KVA
120-1
(2#12+#12G)1/2"C
20A1P
[1]
EXISTING UNIT VENTILATOR TO
BE REPLACED WITH NEW FAN
COIL
FCU-7
FAN COIL UNIT
(1)1/5HP
.26
KVA
120-1
(2#12+#12G)1/2"C
20A1P
[1]
EXISTING UNIT VENTILATOR TO
BE REPLACED WITH NEW FAN
COIL
CUH-1
.26
KVA
120-1
(2#12+#12G)1/2"C
20A1P
[1]
STUB 3/4" CONDUIT INTO HEAD OF DOOR FRAME ON CENTER OF DOUBLE
DOOR.
CABINET UNIT HEATER
1/15HP
P-1
HOT WATER PUMP
7.5HP
8.76
KVA
208-3
(3#8+#10G)3/4"C
60A3P
-
[2]
PROVIDE 4"X4"X2-1/8" DEEP JUNCTION BOX SURFACE MOUNTED ABOVE
DOOR, IN ACCESSIBLE CEILING SPACE, ON SECURE SIDE OF DOOR.
P-2
HOT WATER PUMP
7.5HP
8.76
KVA
208-3
(3#8+#10G)3/4"C
60A3P
-
[2]
3.
PROVIDE 4"X4"X2-1/8" DEEP BOX WITH SINGLE GANG DEVICE RING FLUSH
MOUNTED AT 3'-8" AFF, FOR CARD READER.
P-7
PUMP
1/6HP
.51
KVA
120-1
(2#12+#12G)1/2"C
20A1P
[3]
4.
PROVIDE 4"X4"X2-1/8" DEEP BOX WITH SINGLE GANG DEVICE RING FLUSH
MOUNTED ABOVE ACCESSIBLE CEILING SPACE AND CONNECT TO NEW ADA
DOOR OPERATOR.
TCP
TEMPERATURE CONTROL PANEL
1.0
120-1
(2#12+#12G)1/2"C
20A1P
KMAU
KITCHEN MAKE-UP AIR UNIT
1-1/2HP
2.39
KVA
208-3
(3#12+#12G)1/2"C
15A3P
1
1
ADA
DOUBLE DOOR
SINGLE DOOR
FLAG NOTES THIS SHEET:
GENERAL NOTES:
A.
REMARKS
CONSULTANT
3'-8"
FLOOR
2.
FEEDER
3
3'-8"
1.
VOLT-
D
9A
FRS-R
CONNECT NEW UNIT TO THE EXISTING
KITCHEN HOOD FIRE SUPPRESSION
SYSTEM AS REQUIRED.
NOTES:
1. SAFETY DISCONNECT SWITCH PROVIDED INTEGRAL WITH UNIT.
2. VFD PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED AND CONNECTED BY THE ELECTRICAL CONTRACTOR.
3. PROVIDE MANUAL MOTOR STARTER WITH THERMAL OVERLOADS AT UNIT.
1.
THE ELECTRICAL CONTRACTOR SHALL PROVIDE RACEWAY, BACKBOXES
AND
POWER. DISTRICT SECURITY DEPARTMENT TO PROVIDE DEVICES AND
CONNECTIONS.
7600 E. Orchard Road
Suite 250-S
Greenwood Village, CO 80111
p.303.796.6000
f. 303.796.6099
PROJECT PHASE
3
LOAD
O.C. PROTECTION
C.B.
FUSE
KEY
1
D
E
MECHANICAL EQUIPMENT SCHEDULE
4
SEAL
E
Architects, Inc.
315 East Mountain Ave
Suite 100
Fort Collins, CO 80524-2913
T - 970.484.0117
F - 970.484.0264
© 2009
www.rbbarchitects.com
CONSTRUCTION
DOCUMENTS
1
TYPICAL-SECURITY DOOR DETAIL
NO SCALE
ALTERNATE #1-MECHANICAL EQUIPMENT SCHEDULE
KEY
VAV
DESCRIPTION
LOAD
VAV CONTROLS
1.0
KVA
VOLT120-1
O.C. PROTECTION
C.B.
FUSE
FEEDER
20A1P
(2#12+#12G)1/2"C
REMARKS
PROVIDE J-BOX FOR CONNECTION OF
CONTROL TRANSFORMERS TO BE
PROVIDED AND INSTALLED BY THE
MECHANICAL CONTRACTOR
C
M-3
C
M
RED "MUSHROOM"
HEAD EPO SWITCH
WITH MOMENTARY
CONTACTS, ONE
LOCATED AT EACH
DOOR
B
C
B
PROJECT INFORMATION
ACCESSORY
CONTROL MODULE
5400 MAIL CREEK LANE
FORT COLLINS, COLORADO 80525-3886
N
POUDRE SCHOOL DISTRICT
H
WERNER ELEMENTARY
RENOVATION PROJECT
C
BOILER #1
120V (EXISTING)
BOILER #1
CONTROL
CONTROL
CIRCUIT (EXISTING)
BOILER #1
RECIRC
PUMP
120V (EXISTING)
BOILER #2
120V (EXISTING)
PROJECT #: 2011.01.0143
BOILER #2
CONTROL
CONTROL
CIRCUIT (EXISTING)
DRAWN BY: CW
CHECKED BY: ETM
BOILER #2
RECIRC
PUMP
120V (EXISTING)
ISSUE DATE: 2.9.12
REVISIONS
NO
DESCRIPTION
DATE
BOILER EMERGENCY POWER-OFF
BOILER ROOM #29
NO SCALE
A
A
1
2
3
4
5
6
SHEET INFORMATION
2/8/2012 11:38:17 AM - PLOT DATE
120V CONTACTOR WITH 120V COIL,
MECHANICALLY HELD, IN
LOCKABLE NEMA 1 ENCLOSURE.
ELECTRICAL
SCHEDULES & DETAILS
E401