2 3 4 5 6 ARCHITECT 1 E E MECHANICAL LEGEND D 180 DRAIN PIPE Mechanical, Electrical & Energy Consultants DOMESTIC HOT WATER CIRCULATING VALVES & SPECIALTIES T NP NON-POTABLE WATER SHUT-OFF VALVE NG NATURAL GAS GLOBE VALVE V PLUMBING VENT PIPE CHECK VALVE CHV CHEMICAL VENT PIPE FLOW CONTROL VALVE W/ CHECK SAN SANITARY WASTE PIPE PLUG FOR DIVISION 15400 (PLUMBING SYSTEMS) CALIBRATED BALANCING SHUT-OFF VALVE FOR DIVISION 15600 (HYDRONIC SYSTEMS) GW GREASE WASTE PIPE CHW ST N.O. VALVE W/ LOCKING COVER PLUG OR BALANCING SHUT-OFF VALVE IN RISER D 7600 East Orchard Road, Suite 250-S Greenwood Village, CO 80111-2518 303.796.6000 www.mkkeng.com OVERFLOW STORM DRAIN PIPE VAC VACUUM PIPE 500 West 18th Street, Suite 200 Cheyenne, WY 82001-4368 307.634.7647 175 North 27th Street, Suite 1312 Billings, MT 59101-2048 406.256.1141 PROJECT LOCATION: FT COLLINS, COLORADO HORIZONTAL CLEANOUT PROJECT ALTITUDE: 5100 FEET ABOVE SEA LEVEL VERTICAL CLEANOUT SUMMER DESIGN TEMPERATURE: WINTER DESIGN TEMPERATURE: 85°F DRY BULB, 59°F WET BULB (PSD STANDARD) 10°F DRY BULB, 0%RH (PSD STANDARD) WINTER ROOM DESIGN TEMP: 70°F DRY BULB - NO HUMIDITY REQUIREMENT HVAC DUCTWORK FIRE DAMPER TEMPERATURE CONTROL VALVE, 2-WAY PRESSURE INDEPENDENT 2-WAY CONTROL VALVE PRESSURE REDUCING VALVE S SMOKE DAMPER FS COMBINATION FIRE / SMOKE DAMPER SAFETY OR RELIEF VALVE CONTROLS LEGEND DP AUTOMATIC AIR VENT DUCT SIZES ARE OUTSIDE SHEET METAL DIMENSIONS. 1st NO. IS SIZE OF SURFACE SHOWN. 2nd NO. IS DUCT DEPTH. LETTERS AFTER DIM. CORRESPOND TO FOLLOWING: 24/12 PRESSURE - TEMP. TAP DLV- PRESSURE GAUGE W/ PIG TAIL & COCK THERMOMETER BALL VALVE VACUUM BREAKER SIZE CFM TEMPERATURE CONTROL DAMPER (T.C.) MAIN AIR ROUND DUCTWORK DOUBLE WALL CONSTRUCTION LINED DUCTWORK OVAL DUCTWORK REMOTE BULB SENSOR/CONTROLLER RETURN AIR TAG. SEE SCHEDULE FOR TERMINAL DEVICE INFO. SECTION THRU OUTSIDE AIR INTAKE OR SUPPLY AIR DUCT PIPE UNION SECTION THRU RETURN AIR OR EXHAUST DUCT PIPE CAP PIPE ANCHOR COIL C OA, RA OR EXH DUCT DOWN MOTOR STARTER SUPPLY AIR DUCT DOWN PREMANUFACTURED PIPE EXPANSION LOOP. REQUIRED EXPANSION COMPENSATION LISTED. PROVIDE GUIDES & ANCHORS AS RECOMMENDED BY MANUFACTURER. UP H HUMIDISTAT/HUMIDITY SENSOR ICE SNOW/ICE SENSOR CO CARBON MONOXIDE SENSOR CO2 PIPE GUIDE CHANGE OF ELEVATION UP (UP) DOWN (DN) IN DIRECTION OF AIR FLOW 3-WAY BUTTERFLY VALVE FLOW SWITCH FIRE PIPE 2-WAY BUTTERFLY VALVE RETURN AIR GRILLE W/SOUND BOOT SHADING INDICATES OPEN END EXISTING FIRE SPRINKLER 9. WORK UNDER THIS CONTRACT IS IN OCCUPIED SPACES, STORAGE ROOMS AND EQUIPMENT ROOMS. CONTRACTOR IS TO SCHEDULE AND COORDINATE THE WORK AND ANY EXISTING EQUIPMENT DOWNTIME WITH POUDRE SCHOOL DISTRICT PRIOR TO BEGINNING WORK. BINARY INPUT OR OUTPUT SYMBOL 15. CONTRACTOR TO COORDINATE THE LOCATION OF ALL DUCTWORK, CEILING DEVICES, GRILLES, REGISTERS AND DIFFUSERS WITH REFLECTED CEILING PLAN AND STRUCTURE PRIOR TO BEGINNING WORK. EMERGENCY PULL SWITCH 16. DUCT DIMENSIONS GIVEN ARE OUTSIDE SHEET METAL DIMENSIONS. ES SWITCH FS FLOW SWITCH CARBON DIOXIDE SENSOR T NIGHT T-STAT/SENSOR T ROOM THERMOSTAT/SENSOR M FLEXIBLE DUCT NEW FIRE SPRINKLER M LAP TOP WORK STATION 2P 2P THERMOSTAT/SENSOR T N WATER DIFFERENTIAL PRESSURE SENSOR/CONTROLLED H FIRE DEPARTMENT CONNECTION-WALL TYPE BSD BUILDING STATIC PRESSURE SENSOR PRINTER 23. ALL TEMPERATURE CONTROLS ARE BEING UPGRADED FROM PNEUMATIC CONTROLS TO DDC CONTROLS. CONTRACTOR TO PROVIDE ALL EXISTING AND NEW UNITS WITH NEW UNIT TAG. COORDINATE UNIT TAG UPDATES WITH TEMPERATURE CONTROLS, FIRE ALARM, AND ELECTRICAL, COVER OLD UNIT TAG AS REQUIRED. B CRT LO DUCT SMOKE DETECTOR HI LT WATER TEMPERATURE SENSOR WITH WELL CPU COMPUTER UNIT LOW TEMPERATURE DETECTION THERMOSTAT PRESSURE SWITCH APS DSP DUCT STATIC PRESSURE SENSOR T STARTER PS 2 POSITION 3-WAY & 2-WAY VALVES LO F HUMIDISTAT/SENSOR MODEM 22. XX-## REFERS TO EQUIPMENT DESIGNATION. SEE SPECIFICATIONS AND EQUIPMENT SCHEDULES FOR FURTHER INFORMATION IN REFERENCE TO THAT DESIGNATED PIECE OF EQUIPMENT. HI NIGHT THERMOSTAT D 20. ALL EXTERIOR WALL AND ROOF PENETRATIONS SHALL BE SEALED WATERPROOF. LO MODULATING 3-WAY & 2-WAY VALVES CONTROLS (IN PLAN) T 19. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE STATE CODES, LOCAL CODES AND OWNER'S STANDARDS INDICATED BY THE CONSTRUCTION DOCUMENTS. 21. ALL MECHANICAL WORK UNDER THIS CONTRACT IS TO FIVE (5) FEET OUTSIDE THE BUILDING. LU PS HI C 18. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR TO MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM HIS WORK. HAND HELD OPERATORS TERMINAL DUCT AVERAGING TEMPERATURE SENSOR PROJECT #: 2011.01.0143 DIFFERENTIAL AIR PRESSURE SENSOR S FM SWITCH DRAWN BY: BRE FLOW METER CHECKED BY: EJS ABBREVIATIONS LT LOW LIMIT THERMOSTAT ISSUE DATE: 2.9.12 SMOKE DETECTOR (DUCT) PDS PRESSURE DIFFERENTIAL SENSOR MISCELLANEOUS POINT OF CONNECTION NEW TO EXISTING A 1 A SECTION CUT: (A) SECTION I.D. (1) SHEET NO. WHERE SHOWN. POINT OF PIPE CONNECTION NEW TO EXISTING U.C. 1" X 1 2 UNDERCUT DOOR, 1". REFERENCE DESIGNATION FOR PLUMBING ISOMETRIC 3 ABOVE FINISHED FLOOR ABOVE FINISHED GRADE ALTITUDE BRAKE HORSEPOWER BRITISH THERMAL UNIT COMMON PORT CUBIC FEET PER MINUTE CFM, STANDARD CONDITIONS CUBIC FEET CUBIC INCH COEFFICIENT, VALVE FLOW DECIBEL DRY BULB DOMESTIC COLD WATER DEGREE DOMESTIC HOT WATER DIAMETER DOWN EXISTING ENTERING AIR TEMP. EFFICIENCY ELEVATION EXTERNAL STATIC PRESSURE ENTERING WATER TEMP. EXHAUST FAHRENHEIT FLA FPM FPS FT FU GA GAL GPH GPM HD HG HGT HORZ HP HR HWC HZ ID IE IJS IN IN W.C. KW KWH LAT LBS OR # 4 FULL LOAD AMPS FEET PER MINUTE FEET PER SECOND FOOT, FEET, FEET WATER COLUMN FIXTURE UNITS GAUGE GALLONS GALLONS PER HOUR GALLONS PER MINUTE HEAD MERCURY HEIGHT HORIZONTAL HORSEPOWER HOUR(S) HOT WATER CIRCULATING (DOMESTIC) HERTZ INSIDE DIAMETER INVERT ELEVATION IN JOIST SPACE INCHES INCHES IN INCHES WATER COLUMN KILOWATT KILOWATT HOUR LEAVING AIR TEMPERATURE POUNDS LF LRA LWT MAX MBH MCA MIN N/A N.C. N.O. NC NIC NO OR # NTS OA OD % PH OR PPM PRESS PSF PSI PSIA PSIG RA RECIRC LINEAR FEET LOCKED ROTOR AMPS LEAVING WATER TEMPERATURE MAXIMUM BTU PER HOUR (THOUSAND) MINIMUM CIRCUIT AMPS MINIMUM NOT APPLICABLE NORMALLY CLOSED NORMALLY OPEN NOISE CRITERIA NOT IN CONTRACT NUMBER NOT TO SCALE OUTSIDE AIR OUTSIDE DIAMETER PERCENT PHASE (ELECTRICAL) PARTS PER MILLION PRESSURE POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH PSI ABSOLUTE PSI GAUGE RETURN AIR RECIRCULATE 5 RH RLA RPM SA SENS SL SP SPEC SQ STD TD TEMP THRU TJO TONS TSP TSTAT TYP V VAV VEL VERT VOL W WB WPD WT RELATIVE HUMIDITY RUNNING LOAD AMPS REVOLUTIONS PER MINUTE SUPPLY AIR SENSIBLE SEA LEVEL STATIC PRESSURE SPECIFICATION SQUARE STANDARD TEMPERATURE DIFFERENCE TEMPERATURE THROUGH THROUGH JOIST OPENINGS TONS OF REFRIGERATION TOTAL STATIC PRESSURE THERMOSTAT TYPICAL VOLT VARIABLE AIR VOLUME VELOCITY VERTICAL VOLUME WATT WET-BULB WATER PRESSURE DROP WEIGHT REVISIONS NO DESCRIPTION DATE A 6 SHEET INFORMATION AFF AFG ALT BHP BTU C CFM SCFM CU FT CU IN Cv dB DB DCW DEG OR ° DHW DIA DN (E) EAT EFF ELEV ESP EWT EXH F TEMPERATURE CONTROL (T.C.) DAMPER SD 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 D 17. MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK, VERIFY ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND INSTALL THE SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO POUDRE SCHOOL DISTRICT. END SWITCH S MOD SHUT-OFF VALVE W/TAMPER SWITCH ALL PIPING AND DUCTS INDICATED TO BE REMOVED UNDER THIS CONTRACT SHALL BE REMOVED COMPLETELY TO POINTS OF CONNECTION AT THE MAINS OR BRANCHES AND CAPPED. XXX XXX EMER EXISTING FIRE SPRINKLER TO BE RELOCATED B 8. ANALOG INPUT OR OUTPUT SYMBOL T BFV O.S. & Y VALVE CONTRACTOR IS TO PROVIDE COMPLETE CONNECTIONS TO ALL NEW AND RELOCATED OWNER FURNISHED EQUIPMENT. XXX XXX BACKDRAFT DAMPER EXISTING FIRE SPRINKLER TO BE REMOVED 7. 14. ALL CUTTING, PATCHING AND CORE DRILLING FOR THE INSTALLATION OF NEW EQUIPMENT, DUCTS, HANGERS, ETC. SHALL BE HELD TO A MINIMUM AND BE ACCOMPLISHED IN A CAREFUL MANNER. ALL PATCHING SHALL MATCH EXISTING CONSTRUCTION, TEXTURE AND FINISH AND BE DONE BY SKILLED CRAFTSMAN OF THE TRADES INVOLVED AT THE CONTRACTOR'S EXPENSE. N BFV FLEXIBLE CONNECTION FIRE ALARM F CONTRACTOR TO SEAL ALL AUDIBLE AND VISIBLE LEAKS ON ALL REUSED SUPPLY DUCTWORK. 13. ALL EXISTING EQUIPMENT AND MATERIALS CALLED TO BE REMOVED UNDER THIS CONTRACT SHALL BE REMOVED FROM OCCUPIED SPACES DAILY. FIRE PROTECTION F.A. 6. CURRENT TRANSFORMER T FILTER FLEXIBLE EQUIPMENT CONNECTOR FS INFORMATION ON THE DRAWINGS HAS BEEN ASCERTAINED FROM EXISTING DRAWINGS AND FIELD OBSERVATIONS. THIS INFORMATION IS AS ACCURATE AS CONDITIONS WOULD ALLOW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE, PRIOR TO BID, AND BECOME FAMILIAR WITH THE EXTENT OF THE REMODEL WORK REQUIRED. NO EXTRAS WILL BE ALLOWED FOR ALTERATIONS OF A FORESEEABLE NATURE REQUIRED TO ACHIEVE THE END RESULT AS INDICATED BY CONTRACT DOCUMENTS. 12. CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING BID, AND VERIFY DIMENSIONS AND EXISTING CONDITIONS RELATED TO THE WORK. CT DAMPER ACTUATOR DA FAN FLEXIBLE PIPE CONNECTOR LOW GAUGE PUMP SUPPLY DIFFUSER. ALL DIFFUSERS FOUR-WAY THROW UNLESS NOTED OR THROWS SHOW IN PLAN. SEE SCHEDULE FOR TYPE. SIZE CFM HI CONTROL AIR PIPING M DIFFERENTIAL PRESSURE SENSOR REFRIGERENT DETECTOR REF OPPOSED BLADE DAMPER ( O.B.D. ) CONTROL WIRING 1.5" 5. 11. THE DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF THE EXISTING EQUIPMENT LOCATIONS, EXISTING PIPE ROUTING AND EXISTING DUCT ROUTING. CONTRACTOR IS TO INSTALL NEW EQUIPMENT, DUCTS, AND PIPING IN LOCATIONS REQUIRED TO AVOID INTERFERENCE WITH EXISTING FACILITIES, EQUIPMENT, DUCTS AND PIPING. CONTRACTOR IS RESPONSIBLE FOR RAISING AND LOWERING EXISTING EQUIPMENT AND MAKING PROPER OFFSETS IN DUCTS AND PIPING TO AVOID CONFLICTS. (SYMBOLS LOCATED IN TC SCHEMATICS) FLOW PIPE EXPANSION JOINT PATCH OPENINGS (AIR TIGHT) IN DUCTS WHICH ARE TO REMAIN ACTIVE AND HAVE HAD A SECTION REMOVED. ALSO REPAIR DUCT INSULATION SO THAT IT IS CONTINUOUS. 10. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING, COORDINATE ANY EQUIPMENT DOWNTIME, AND COORDINATE GENERAL WORK SCHEDULE WITH POUDRE SCHOOL DISTRICT. TURNING VANES SHOWN IN 90° ELBOW. MANUAL AIR VENT C 4. PROJECT INFORMATION COMPRESSED AIR PIPE STRAINER W/ BLOW-OFF VALVE S ALL FIXTURES AND EQUIPMENT REMOVED, AND NOT REUSED, ARE TO BE RETURNED TO POUDRE SCHOOL DISTRICT. CHEMICAL WASTE PIPE OST DRAIN VALVE W/ HOSE END TEMPERATURE CONTROL VALVE, 3-WAY 3. STORM DRAIN/ BUILDING STORM SEWER PIPE CA SHUT OFF VALVE IN RISER THE INSTALLATION OR REMOVAL OF DUCTS, PIPES AND EQUIPMENT MAY REQUIRE THE REMOVAL OF EXISTING WALLS AND CEILINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPAIRING THESE WALLS AND/OR CEILINGS SO THEY MATCH THE EXISTING WHERE NOT REPLACED UNDER ARCHITECTURAL DIVISION. TEMPERED WATER FLOW INDICATOR PRESSURE INDEPENDENT AUTOMATIC BALANCING VALVE 2. DOMESTIC HOT WATER ( TEMP. SHOWN ) 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 DOMESTIC HOT WATER POUDRE SCHOOL DISTRICT HEATING WATER RETURN ON DEMOLITION PLANS EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HEAVY LINE WEIGHT, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER PLANS NEW MECHANICAL SYSTEMS ARE SHOWN HEAVY LINE WEIGHT. CONSTRUCTION DOCUMENTS HWR 1. WERNER ELEMENTARY RENOVATION PROJECT DOMESTIC COLD WATER CONSULTANT HEATING WATER SUPPLY PROJECT PHASE HWS SEAL GENERAL NOTES (FOR ALL MECHANICAL DRAWINGS) PLUMBING PROJECT INFORMATION PIPING 2/8/2012 2:12:37 PM - PLOT DATE Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com MECHANICAL COVER SHEET M0.0 2 3 4 5 6 ARCHITECT 1 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com CONFERENCE 501 CONFERENCE 302 VALVE 10 1 1/2" 1 1/2" 1/2"1/2" 1/2" 1/2" CORRIDOR 002 SEE 1 / MD101B 3/4" 3/4" 1. EXISTING WALL MOUNTED UNIT VENTILATOR, ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR PATCHING OF WALL, TYPICAL. AIR LOCK 024 2. EXISTING CEILING MOUNTED UNIT VENTILATOR, OUTSIDE AIR DUCTWORK, ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. EXISTING DOWNSTREAM DUCTWORK AND DIFFUSERS TO REMAIN FOR RECONNECTION. REFER TO NEW PLANS FOR RECONNECTION. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING. T T AIR LOCK 001 12/8 T SEE 1 / MD101B FLAG NOTES: MATCHLINE T MATCHLINE 12/8 6 20/8 STORAGE 006 EF-8 3. EXISTING CEILING MOUNTED UNIT VENTILATOR, OUTSIDE AIR DUCTWORK, ASSOCIATED VALVES, CONTROLS, DOWNSTREAM DUCTWORK AND DIFFUSERS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING. 9 5 UV-12 7 UV-11 MECHANICAL 11 4. EXISTING EXHAUST FAN, DUCTWORK AND ASSOCIATED COMPONENTS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING. 1 1/4" D CLASSROOM 103 20/8 2 BOYS 004 3 CORRIDOR 023 CLASSROOM 108 WORKROOM/ CONFERENCE 109 GIRLS 005 D 5. EXISTING HEATER TO REMAIN, TYPICAL. 6. EXISTING THERMOSTAT TO REMAIN, TYPICAL. T 1 1/4" CORRIDOR 003 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 CONSTRUCTION DOCUMENTS WORKROOM 301 CONSULTANT PRINCIPAL 502 SEAL E 7. EXISTING EXHAUST SYSTEM TO REMAIN, TYPICAL. 8. EXISTING HWS AND HWR PIPING TO BE DEMOLISHED TO EXTENT SHOWN, TYPICAL. 4 EF-6 CORRIDOR 007 PROJECT PHASE 9. EXISTING HWS AND HWR RUN OUT TO REMAIN FOR RECONNECTION. REFER TO NEW PLANS FOR RECONNECTION INFORMATION, TYPICAL. T T T 3/4" 3/4" T CLASSROOM 107 T CLASSROOM 104 CLASSROOM 105 CORRIDOR 008 8 CLASSROOM 106 1" 1" C AIR LOCK 011 T STORAGE 012 EF-7 T 014 AIR LOCK 022 T STORAGE 015 T 016 T 017 T 018 T 019 STORAGE 021 CLASSROOM 100 CLASSROOM 102 CLASSROOM 101 B B 1 1" 1" 1 1/4" 1 1/4" PROJECT INFORMATION T T T T 013 CORRIDOR 009 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 4 POUDRE SCHOOL DISTRICT 38/38 EF-5 WERNER ELEMENTARY RENOVATION PROJECT C PROJECT #: 2011.01.0143 DRAWN BY: BRE CHECKED BY: EJS ISSUE DATE: 2.9.12 REVISIONS NO DESCRIPTION DATE N 1 MECHANICAL DEMO FLOOR PLAN - AREA "A" A A 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 2:12:52 PM - PLOT DATE 1/8" = 1'-0" MECHANICAL DEMO FLOOR PLAN - AREA "A" MD101A 1 2 3 3 4 TOILET 033 5 6 ARCHITECT WATER HEATER 032 3 Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com STORAGE 034 E E KITCHEN 402 1" 1" 16 SEAL 17 FLAG NOTES: 18 EXISTING WALL MOUNTED UNIT VENTILATOR, ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR PATCHING OF WALL, TYPICAL. 2. EXISTING CEILING MOUNTED UNIT VENTILATOR, OUTSIDE AIR DUCTWORK, ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. EXISTING DOWNSTREAM DUCTWORK AND DIFFUSERS TO REMAIN FOR RECONNECTION. REFER TO NEW PLANS FOR RECONNECTION. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING. EF-11 DISTRICT-WIDE 406 4 TIME OUT 037 036 RESOURCE 405 SPEECH 404 1 FLEX ROOM 401 2 STORAGE 42 1 1/4" 1 1/4" 5 T CUSTODIAL/ STORAGE 40 OFFICE 408 GYM STORAGE 41 TOILET 027 UP 2" 2" CORRIDOR 031 14 1 1/2" 1 1/2" AIR LOCK 026 SEE 1 / MD101C COUNSELOR 403 CONFERENCE 407A MATCHLINE ITIN 407B T T EXISTING EXHAUST FAN, DUCTWORK AND ASSOCIATED COMPONENTS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING, TYPICAL. 5. EXISTING HEATER TO REMAIN, TYPICAL. 6. EXISTING THERMOSTAT TO REMAIN, TYPICAL. 7. EXISTING PUMP TO BE DEMOLISHED. REFER TO PUMP DETAIL FOR EXTENT OF PIPING DEMO, TYPICAL. 8. EXISTING EXHAUST SYSTEM TO REMAIN, TYPICAL. 9. DISCONNECT AND CAP DUCT BACK AT ACTIVE MAIN. 10. DEMOLISH EXISTING AIR DEVICE. 11. REMOVE EXISTING AIR COMPRESSOR AND ASSOCIATED COMPONENTS. REMOVE ALL ACCESSIBLE PNEUMATIC TUBING. 12. EXISTING CEILING MOUNTED UNIT VENTILATOR, ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR PATCHING OF WALL, TYPICAL. 13. REMOVE EXISTING DUCTWORK TO EXTENT SHOWN. 14. EXISTING HWS AND HWR PIPING TO BE DEMOLISHED TO EXTENT SHOWN, TYPICAL. 15. EXISTING HWS AND HWR RUN OUT TO REMAIN FOR RECONNECTION. REFER TO NEW PLANS FOR RECONNECTION INFORMATION, TYPICAL. 16. DEMOLISH EXISTING HORIZONTAL EXPANSION TANK. REMOVE AND CAP EXISTING SYSTEM CONNECTION BACK AT ACTIVE HEATING WATER SYSTEM. REFER TO NEW PLANS FOR INSTALLATION OF NEW EXPANSION TANK. 17. EXISTING CABINET UNIT HEATER, ASSOCIATED CONTROLS AND HOT WATER PIPING RUN OUT TO BE DEMOLISHED. D 6 T 2" WOMEN 041 MEN 042 1 1/2" 1 1/2" C T 1 1/2" ELECTRICAL 30 1 1/2" UP COMPUTER LAB 303 PHONE 044 EF-19 28/28 AV STORAGE/ IT ROOM 304 10 EF-5 AV AREA 043 8/8 T T 12 4 UP CLINIC 503 WOMEN 047 UP T T WORKROOM 049 10 9 MEN 046 ART 215 CORRIDOR 052 TOILET 048 36/6 13 T CORRIDOR 051 T CORRIDOR 025 MUSIC 200 B CONFERENCE 501 UP 1/2" T T 15 WORKROOM 301 17 1/2" 3/4" 1 1/2" 1 1/2" 3/4" MATCHLINE T MATCHLINE SEE 1 / MD101A VALVE 10 CORRIDOR 002 MATCHLINE SEE 1 / MD101A CONFERENCE 302 B AIR LOCK 024 AIR LOCK 001 PROJECT #: 2011.01.0143 SEE 1 / MD101C PRINCIPAL 502 PROJECT INFORMATION RECEPTION 500 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 TEACHER'S LOUNGE 504 POUDRE SCHOOL DISTRICT C WERNER ELEMENTARY RENOVATION PROJECT 2" 4. GYMNASIUM 400 TOILET 035 D AIR LOCK 039 EXISTING BASEBOARD TO REMAIN. T 8 3 3. 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 CONSTRUCTION DOCUMENTS 1" CONSULTANT 1" PROJECT PHASE 1" 1" 1. DRAWN BY: BRE CHECKED BY: EJS N ISSUE DATE: 2.9.12 1 MECHANICAL DEMO FLOOR PLAN - AREA "B" REVISIONS 1/8" = 1'-0" NO UP BOILER ROOM 29 MECHANICAL ROOM 28 7 A A 16 N 2 MEZZANINE MECHANICAL DEMO PLAN 1/8" = 1'-0" 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 2:12:55 PM - PLOT DATE DATE P-1 P-2 11 DESCRIPTION MECHANICAL DEMO FLOOR PLAN - AREA B MD101B 2 3 4 5 6 ARCHITECT 1 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com SEAL E 9 7 EXISTING WALL MOUNTED UNIT VENTILATOR, ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR PATCHING OF WALL, TYPICAL. 2. EXISTING CEILING MOUNTED UNIT VENTILATOR, OUTSIDE AIR DUCTWORK, ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. EXISTING DOWNSTREAM DUCTWORK AND DIFFUSERS TO REMAIN FOR RECONNECTION. REFER TO NEW PLANS FOR RECONNECTION. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING. 3. EXISTING CEILING MOUNTED UNIT VENTILATOR, OUTSIDE AIR DUCTWORK, ASSOCIATED VALVES, CONTROLS, DOWNSTREAM DUCTWORK AND DIFFUSERS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING. 4. EXISTING EXHAUST FAN, DUCTWORK AND ASSOCIATED COMPONENTS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING, TYPICAL. T CLASSROOM 211 CLASSROOM 210 CLASSROOM 209 T T EF-2 EF-4 CORRIDOR 067 EXISTING HOT WATER SUPPLY AND RETURN RUN OUT TO BE DEMOLISHED. CAP BACK AT ACTIVE MAIN, TYPICAL. 5 8. GROUP 064 EXISTING EXHAUST FAN TO BE RELOCATED. REFER TO NEW PLANS FOR MORE INFO. 9. EXISTING BASEBOARD TO REMAIN. 10. REMOVE EXISTING AIR DEVICE AND DUCTWORK TO EXTENT SHOWN. 11. EXISTING CEILING MOUNTED UNIT VENTILATOR, ASSOCIATED VALVES AND CONTROLS TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR PATCHING OF WALL, TYPICAL. 12. EXISTING HWS AND HWR PIPING TO BE DEMOLISHED TO EXTENT SHOWN, TYPICAL. 13. EXISTING HWS AND HWR RUN OUT TO REMAIN FOR RECONNECTION. REFER TO NEW PLANS FOR RECONNECTION INFORMATION, TYPICAL. CLASSROOM 208 GIRLS 066 T CONFERENCE/ WORKROOM 214 10 16/8 UV-33 3 ART & MUSIC 48/8STORAGE/ IT ROOM 21 3 36/8 11 BOYS 065 18/15 3/4" 8/6 12/6 3/4" 12/12 12/8 CORRIDOR 052 EF-1 12/8 UV-34 20/8 UV-31 15/8 STORAGE 062 8 AIR LOCK 063 UV-32 CUST/ MECH 20 C 1" 1" 2 BOYS 055 GIRLS 056 CORRIDOR 061 WORKROOM/ CONFERENCE 207 CLASSROOM 206 T 9 1/2" 9 38/38 38/38 EF-23 EF-3 CORRIDOR 057 GROUP 054 GROUP 059 T T T B T SEE 1 / MD101B MATCHLINE T 12 CLASSROOM 202 CLASSROOM 203 CLASSROOM 204 B CLASSROOM 205 T 1/2" 1/2" 3/4" 3/4" 3/4" 3/4" 1" 1" GROUP 058 PROJECT INFORMATION CLASSROOM 201 T 1/2" 21/8 T CORRIDOR 053 1 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 COMPUTER LAB 213 C 7. 4 T 1 1/2" 1 1/2" EXISTING THERMOSTAT TO REMAIN, TYPICAL. T 38/38 6. T 38/38 GROUP 069 EXISTING TRANSFER FAN TO REMAIN, TYPICAL. POUDRE SCHOOL DISTRICT T 5. D WERNER ELEMENTARY RENOVATION PROJECT D SEE 1 / MD101B MATCHLINE 6 PROJECT PHASE CLASSROOM 212 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 CONSTRUCTION DOCUMENTS GROUP 068 1. CONSULTANT FLAG NOTES: PROJECT #: 2011.01.0143 DRAWN BY: BRE 9 13 CHECKED BY: EJS ISSUE DATE: 2.9.12 REVISIONS NO DESCRIPTION DATE N 1 MECHANICAL DEMO FLOOR PLAN - AREA "C" A A 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 2:12:56 PM - PLOT DATE 1/8" = 1'-0" MECHANICAL DEMO FLOOR PLAN - AREA C MD101C 2 3 4 5 6 ARCHITECT 1 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com SEAL E MATCHLINE MATCHLINE 32/18 (22/18) 60/8 60/8 6 2. BALANCE OUTSIDE AIR DUCT TO VALUE SHOWN IN SCHEDULE. PROVIDE MANUAL BALANCING DAMPER ON RETURN AIR DUCTWORK. FCU-4 34/13 BOYS 004 19 GIRLS 005 CORRIDOR 023 12 (R) 200 STORAGE 006 WORKROOM/ CONFERENCE (R) 200 3. FCU-#, NEW FAN COIL UNIT. REFER TO SCHEDULE FOR HOT WATER RUN OUT SIZE. REFER TO TWO WAY HEATING WATER COIL DETAIL, TYPICAL. 20 4. S-1, NEW DISPLACEMENT VENTILATION DIFFUSER. MOUNT AT FLOOR LEVEL. CONNECT WITH EXPOSED, HARD DUCT. DO NOT USE A FLEXIBLE CONNECTOR. BALANCE TO PRIMARY AIRFLOW POSITION AS SHOWN ON PLAN. SECONDARY BALANCE POSITION SHALL BE 600 CFM. FINAL BALANCE POSITION SHALL REFLECT PRIMARY AIRFLOW. DUCT CONNECTION SIZE TO MATCH RUN OUT SIZE. REFER TO SCHEDULE, TYPICAL. CLASSROOM 108 12"ø 260 HWR HWS CORRIDOR 003 20x12 17 17 WFR-1 14 LF 2.0 GPM 4 109 HWR HWS T 12"ø 250 1. WFR-#, NEW WALL FIN RADIATION. REFER TO SCHEDULE. REFER TO PLANS FOR WFR-# LENGTH AND GPM. REFER TO WALL FIN RADIATION SCHEMATIC DETAIL, TYPICAL. T 20x12 D 5. S-2, NEW LOUVER FACED CEILING DIFFUSER. DUCT CONNECTION SIZE TO MATCH RUN OUT SIZE. REFER TO SCHEDULE, TYPICAL. 6. RELOCATE 4 SPRINKLER HEADS IN THIS CORRIDOR TO MAKE ROOM FOR NEW DUCT MAIN. 16 7 20x12 CORRIDOR 007 6"ø 75 7. REFER TO ROUND DUCT TAKEOFF DETAIL, TYPICAL. 20x12 6"ø 75 T 9. LOCATE RTU-# FILL AND DRAIN VALVES IN THIS ROOM. REFER TO CONTROLS PLANS FOR PIPING DETAIL. ROUTE 1-1/2" DRAIN LINE FROM RTU-# TO JANITOR' SINK. ROUTE 3/4" NP WATER FROM NEAREST MAIN OF EQUAL SIZE OR LARGER TO RTU-#. PROVIDE WITH RPBFP-1, REFER TO SCHEDULE. 1" T 20x12 T 12"ø 270 8. OFFSET EXISTING 4" STORM DRAIN ABOVE NEW DUCT MAIN. 1" 12"ø 270 12"ø 260 12"ø 260 10. THERMOSTAT SHALL CONTROL BOTH CONTROL VALVES IN THIS ROOM. WFR-1 20 LF 2.9 GPM CLASSROOM 107 1 1/4" 1 1/4" T T CLASSROOM 104 WFR-1 20 LF 2.9 GPM 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 CLASSROOM 105 12. NEW FIRE DAMPER, TYPICAL. CLASSROOM 106 HWR 13. CUH-#, NEW CABINET UNIT HEATER. REFER TO TWO WAY HEATING WATER COIL DETAIL. REFER TO SCHEDULE FOR RUN OUT SIZE. CORRIDOR 008 HWS 11 11. RECONNECT EXISTING HEATING HOT WATER LINES TO NEW WFR-#. EXTEND AND OR MODIFY EXISTING PIPING TO CONNECT NEW WFR-# TO EXISTING DROPS. NEW PIPING SHALL BE 3/4". CONTRACTOR TO FIELD VERIFY, TYPICAL. 14. PROVIDE DUCT OFFSET WITHIN RTU-# ROOF CURB. 15. DIFFERENTIAL PRESSURE SENSOR FOR PUMPS P-1 AND P-2. 5 16. NEW TRANSFER AIR OPENING ABOVE CEILING, TYPICAL. C WFR-1 10 LF 2.0 GPM 18 WFR-1 10 LF 2.0 GPM 21 T 013 T 014 STORAGE 015 21. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR INSTALLATION OF VAV BOXES. BOXES WILL BE LOCATED ON ALL DUCT RUNS TO CLASSROOMS, TYPICAL. T T 016 T 017 T 018 T 019 STORAGE 021 T T EF-1 20. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR SIZING CONVENTION, TYPICAL. AIR LOCK 022 20x12 T 19. REBALANCE EXISTING HEATING DEVICE TO 1.5 GPM. 15 PDS 6"ø 100 CORRIDOR 009 20x12 20x12 18. REBALANCE EXISTING HEATING DEVICE TO 1 GPM. CUH-3 AIR LOCK 011 STORAGE 012 17. EXISTING AIR DEVICE TO BE REBALANCED TO AIRFLOW SHOWN. 18 CUH-2 C 12"ø 380 CLASSROOM 102 12"ø 330 340 B CLASSROOM 101 HWR HWS T 10 B 2" 2" 1 1/4" 1 1/2" 1 HWR HWS WFR-1 23 LF 3.3 GPM 1 1/2" 1 1/2" 1 1/2" PROJECT INFORMATION CLASSROOM 100 12"ø WFR-1 23 LF 3.3 GPM WERNER ELEMENTARY RENOVATION PROJECT CLASSROOM 103 WFR-1 12 LF 2.0 GPM 16"ø 3 54/12 FCU-3 (10"ø) 16"ø (10"ø) 52/8 D MECHANICAL 11 FLAG NOTES: 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 14"ø 680 9 RETURN AIR FOR CLASSROOMS WHERE GRILLES ARE NOT SHOWN ARE THROUGH LIGHT MONITORS THAT ARE OPEN TO THE CEILING PLENUM. POUDRE SCHOOL DISTRICT 1 1/4" 1 1/4" RTU-2 2. PROJECT PHASE 2" 2 16x10 2" CUH-1 8"ø SEE 1 / M101B CUH-4 T 12 EF-2 T 28/18(16/16) 16"ø (10"ø) 13 AIR LOCK 024 16"ø (10"ø) 3" CORRIDOR 002 32/18 (22/18) 8 1" 1" 14 PROVIDE ISOLATION VALVES ON HOT WATER SUPPLY AND RETURN LINES WHERE BRANCHES TAKE OFF FROM A MAIN. CONSTRUCTION DOCUMENTS 6"ø 100 3" VALVE 10 20x12 SEE 1 / M101B 1. CONSULTANT GENERAL NOTES: PROJECT #: 2011.01.0143 DRAWN BY: BRE WFR-1 10 LF 2.0 GPM WFR-1 10 LF 2.0 GPM CHECKED BY: EJS ISSUE DATE: 2.9.12 REVISIONS NO DESCRIPTION DATE N 1 MECHANICAL NEW FLOOR PLAN - AREA "A" A A 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 2:12:40 PM - PLOT DATE 1/8" = 1'-0" MECHANICAL NEW FLOOR PLAN - AREA A M101A 1 2 3 4 5 6 26 29 EF-13 TOILET 033 1/2" 1/2" KITCHEN 402 STORAGE 034 E CUH-6 26 HWS HWR EF-12 ARCHITECT 26 EF-11 Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com E 1" 1" EF-10 GENERAL NOTES: 18 1. PROVIDE ISOLATION VALVES ON HOT WATER SUPPLY AND RETURN LINES WHERE BRANCHES TAKE OFF FROM A MAIN. KMUA-1 2. RETURN AIR FOR CLASSROOMS WHERE GRILLES ARE NOT SHOWN ARE THROUGH LIGHT MONITORS THAT ARE OPEN TO THE CEILING PLENUM. FLAG NOTES: 20 1 WFR-#, NEW WALL FIN RADIATION. REFER TO SCHEDULE. REFER TO PLANS FOR WFR-# LENGTH AND GPM. REFER TO WALL FIN RADIATION SCHEMATIC DETAIL, TYPICAL. 2. BALANCE OUTSIDE AIR DUCT TO VALUE SHOWN IN SCHEDULE. PROVIDE MANUAL BALANCING DAMPER ON RETURN AIR DUCTWORK. 3. FCU-#, NEW FAN COIL UNIT. REFER TO SCHEDULE FOR HOT WATER RUN OUT SIZE. REFER TO TWO WAY HEATING WATER COIL DETAIL, TYPICAL. 4. S-1, NEW DISPLACEMENT VENTILATION DIFFUSER. MOUNT AT FLOOR LEVEL. CONNECT WITH EXPOSED, HARD DUCT. DO NOT USE A FLEXIBLE CONNECTOR. BALANCE TO PRIMARY AIRFLOW POSITION AS SHOWN ON PLAN. SECONDARY BALANCE POSITION SHALL BE 600 CFM. FINAL BALANCE POSITION SHALL REFLECT PRIMARY AIRFLOW. DUCT CONNECTION SIZE TO MATCH RUN OUT SIZE. REFER TO SCHEDULE, TYPICAL. 5. S-2, NEW LOUVER FACED CEILING DIFFUSER. DUCT CONNECTION SIZE TO MATCH RUN OUT SIZE. REFER TO SCHEDULE, TYPICAL. 26 CONSULTANT 300 300 2" UV-4 UV-2 12"ø 310 EF-14 26 DISTRICT-WIDE 406 GYMNASIUM 400 8 D EF-8 TIME OUT 037 SPEECH 404 31 12"ø 200 HWR 26 34/13 26 COUNSELOR 403 3"HWS & HWR UP CUSTODIAL/ STORAGE 40 OFFICE 408 HWR HWS CORRIDOR 031 19. NOT USED. 2" T MEN 042 WOMEN 041 27. REBALANCE (E) AHU-1 TO 15 GPM. T UP 18/16 AV STORAGE/ IT ROOM 304 TOILET 048 CORRIDOR 052 30 WFR-1 7 LF 2.0 GPM T 6 6"ø 50 UP HWR T MUSIC 200 12"ø 300 B HWS CONFERENCE 302 WORKROOM 301 (R) 150 SECRETARY 501 31. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR INSTALLATION OF VAV BOXES. BOXES WILL BE LOCATED ON ALL DUCT RUNS TO DISPLACEMENT DIFFUSERS THAT HAVE TWO BALANCING POSITIONS, TYPICAL. HWS 14 CORRIDOR 025 22/14 (14/12) HWS HWR (R) 50 30. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR SIZING CONVENTION, TYPICAL. HWR 12/12 T WFR-1 11 LF 2.0 GPM 3/4" 3/4" 3" 3" MATCHLINE MATCHLINE SEE 1 / M101A SEE 1 / M101A WFR-1 3 LF 1.5 GPM N PROJECT #: 2011.01.0143 DRAWN BY: BRE SEE 1 / M101C MATCHLINE B T T T (12/10) MEDIA CENTER 300 6x6 60 PRINCIPAL 502 29. LOCATE KMUA-# FILL AND DRAIN VALVES IN THIS ROOM. REFER TO CONTROLS PLANS FOR PIPING DETAIL. ROUTE 1-1/2" DRAIN LINE FROM KMUA-# TO JANITOR' SINK. ROUTE 1" NP WATER FROM NEAREST MAIN OF EQUAL SIZE OR LARGER TO KMUA-#. PROVIDE WITH RPBFP-1, REFER TO SCHEDULE. UP 2 CONFERENCE 505 28. REBALANCE (E) AHU-2 TO 5 GPM. EF-4 T CORRIDOR 051 WFR-1 7 LF 2.0 GPM 25. ET-1, NEW EXPANSION TANK. PROVIDE 1" SYSTEM CONNECTION BETWEEN THE TANK AND THE HEATING WATER SYSTEM. REFER TO SCHEDULE. 6 AV AREA 043 2000 RTU-4 ART 215 12"ø 300 26. REBALANCE EXISTING HEATING DEVICE TO 1 GPM. 21 10"ø 24. PROVIDE 3-WAY VALVE. REFER TO ZONE HEATING COIL ASSEMBLY DETAIL. 20x12 15x15 1000 15x15 1000 22 PHONE 044 23. EXISTING AIR DEVICE TO BE REBALANCED TO AIRFLOW SHOWN, TYPICAL. 11 COMPUTER LAB 303 C 22. S4, NEW PERFORATED FACE DIFFUSER, SEE SCHEDULE. 1 2" UP EF-6 T WORK ROOM 049 21. R1, NEW RETURN GRILLE, SEE SCHEDULE. HWR HWS 20x12 HWS HWR 5 20. CONNECT EXISTING DUCTWORK TO NEW 18/18 UP TO KMUA-1. 2" FCU-2 36/6 18. HC-1, NEW HEATING COIL AND P-3 CIRCULATION PUMP. REFER TO TWO WAY HEATING WATER COIL DETAIL. REFER TO SCHEDULE. 2" 12"ø 100 WOMEN 047 17. EXISTING EVAPORATIVE COOLER, EC-1, TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING. RTU-3 ELECTRICAL 30 CLINIC 503 (R) 28/13 50 16. EXISTING SUPPLY FAN SF-1, TO BE DEMOLISHED. COORDINATE WITH GENERAL CONTRACTOR FOR ROOF PATCHING. HWS HWR 7 12 PHONE 045 WFR-2 12 LF 2.0 GPM AIR LOCK 026 3" 8x6 C EF-5 P-#, NEW BASE MOUNTED PUMP. RECONNECT TO EXISTING PIPING. REFER TO SINGLE SUCTION PUMP DETAIL, TYPICAL. 15. EXISTING AIR COIL AND CIRC PUMP TO BE DEMOLISHED. UP 26 3" 6"ø 75 T WFR-2 9 LF 2.0 GPM TOILET 027 3" AIR LOCK 039 6"ø 50 9. 14. NEW TRANSFER AIR OPENING ABOVE CEILING, TYPICAL. GYM STORAGE 41 2" 2 3" 3" STORAGE 42 3" HWR HWS MEN 046 EXISTING GYP CEILING TO REMAIN. 12. SECONDARY BALANCE POSITION NOT REQUIRED. 2" CUH-5 WFR-1 13 LF 2.0 GPM 8. 11. RECONNECT EXISTING HEATING HOT WATER LINES TO NEW WFR-#. EXTEND AND OR MODIFY EXISTING PIPING TO CONNECT NEW WFR-# TO EXISTING DROPS. NEW PIPING SHALL BE 3/4". CONTRACTOR TO FIELD VERIFY, TYPICAL. SEE 1 / M101C (R) 50 T 3/4" UV-1 MATCHLINE 14 48/6 8"ø T CONFERENCE 407A (R) 80 3/4" REFER TO ROUND DUCT TAKEOFF DETAIL, TYPICAL. 13. EMERGENCY POWER OFF FOR THE BOILERS. 18/16 (14/12) (R) 190 ITIN 407B 26 23 42x12 T UV-3 HWS (R) 50 FCU-1 7. 10. THERMOSTAT SHALL CONTROL BOTH CONTROL VALVES IN THIS ROOM. HWR RESOURCE 405 3 RELOCATED EXISTING SPRINKLER HEADS AS REQUIRED TO INSTALL NEW DUCTWORK. HWS 1/2" 1/2" WFR-2 9 LF 2.0 GPM 6. 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 EF-7 10 D FLEX ROOM 401 WERNER ELEMENTARY RENOVATION PROJECT T TOILET 035 PROJECT PHASE 4 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 POUDRE SCHOOL DISTRICT 2" CONSTRUCTION DOCUMENTS 300 24 PROJECT INFORMATION WFR-1 7 LF 2.0 GPM 20/10 WFR-1 16 LF 2.4 GPM SEAL P-7 EF-9 CHECKED BY: EJS ISSUE DATE: 2.9.12 1 MECHANICAL NEW FLOOR PLAN - AREA "B" REVISIONS 1/8" = 1'-0" ET-1 NO P-1 DESCRIPTION DATE 28 9 EF-16 UP EPO 25 27 MECHANICAL ROOM 28 EF-15 P-2 AHU-2 W/P-6 13 EPO BOILER ROOM 29 13 B-2 W/P-4 B-1 W/P-3 A A N 2 MEZZANINE MECHANICAL PLAN 1/8" = 1'-0" 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 2:12:43 PM - PLOT DATE AHU-1 W/P-5 MECHANICAL NEW FLOOR PLAN - AREA B M101B 2 3 4 5 6 ARCHITECT 1 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com SEAL E GENERAL NOTES: 1 1. PROVIDE ISOLATION VALVES ON HOT WATER SUPPLY AND RETURN LINES WHERE BRANCHES TAKE OFF FROM A MAIN. 1 1/4" 1 1/4" HWR T WFR-1 11 LF 2.7 GPM 6"ø 50 CLASSROOM 211 CLASSROOM 212 D 11 1 1/2" 1 1/2" WFR-1 11 LF 2.7GPM CLASSROOM 210 CLASSROOM 209 1. WFR-#, NEW WALL FIN RADIATION. REFER TO SCHEDULE. REFER TO PLANS FOR WFR-# LENGTH AND GPM. REFER TO WALL FIN RADIATION SCHEMATIC DETAIL, TYPICAL. 2. BALANCE OUTSIDE AIR DUCT TO VALUE SHOWN IN SCHEDULE. PROVIDE MANUAL BALANCING DAMPER ON RETURN AIR DUCTWORK. 3. FCU-#, NEW FAN COIL UNIT. REFER TO SCHEDULE FOR HOT WATER RUN OUT SIZE, TYPICAL. 4. S-1, NEW DISPLACEMENT VENTILATION DIFFUSER. MOUNT AT FLOOR LEVEL. CONNECT WITH EXPOSED, HARD DUCT. DO NOT USE A FLEXIBLE CONNECTOR. BALANCE TO PRIMARY AIRFLOW POSITION AS SHOWN ON PLAN. SECONDARY BALANCE POSITION SHALL BE 600 CFM. FINAL BALANCE POSITION SHALL REFLECT PRIMARY AIRFLOW. DUCT CONNECTION SIZE TO MATCH RUN OUT SIZE. REFER TO SCHEDULE, TYPICAL. 5. S-2, NEW LOUVER FACED CEILING DIFFUSER. DUCT CONNECTION SIZE TO MATCH RUN OUT SIZE. REFER TO SCHEDULE, TYPICAL. 6. OFFSET 2" SPRINKLER MAIN TO MAKE ROOM FOR NEW DUCT. 7. REFER TO ROUND DUCT TAKEOFF DETAIL, TYPICAL. 8. EXISTING AIR DEVICE TO BE REBALANCED TO AIRFLOW SHOWN, TYPICAL. 9. NO VALVES ASSOCIATED WITH WFR-#. 9 15 4 T T 12"ø 250 T GROUP 069 6"ø 50 CORRIDOR 067 T GROUP 064 6"ø 100 20x12 T COMPUTER LAB 6 213 42/26 (R) 400 52/8 HWS 34"ø 18. REFER TO TWO WAY HEATING WATER COIL DETAIL. 17 DPS 10 FCU-5 C 20. REBALANCE EXISTING HEATING DEVICE TO 1 GPM. WFR-1 12 LF 2.0 GPM 14"ø 770 21. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR SIZING CONVENTION, TYPICAL. HWR 22. REFER TO ALTERNATE 1 - VAV BOX DETAIL FOR INSTALLATION OF VAV BOXES. BOXES WILL BE LOCATED ON ALL DUCT RUNS TO CLASSROOMS, TYPICAL. HWS GIRLS 13 056 13 (R) 200 (R) 200 8 8"ø CLASSROOM 206 WORKROOM/ CONFERENCE T T 207 20x12 6"ø 50 7 6"ø 50 22 CORRIDOR 057 6"ø 100 T GROUP 059 12"ø 240 T T 12"ø 250 20x12 12"ø 250 20x12 T 20x12 GROUP 054 20x12 SEE 1 / M101B MATCHLINE B 17. NEW DIFFERENTIAL PRESSURE SENSOR FOR PUMPS P-1 AND P-2. 19. RELOCATE EXISTING EXHAUST FAN. REROUTE EXISTING 16/16 EXHAUST DUCT SUCH THAT NEW IS 3' MINIMUM AWAY FROM NEW RTU AND ALL MAINTENANCE CLEARANCES ARE MAINTAINED. 20x12 12"ø 240 1 1/4" AIR LOCK 063 34/13 18 2 12"ø 230 16. NEW TRANSFER AIR OPENING ABOVE CEILING WITH FIRE DAMPER. INSTALL T-1 TRANSFER GRILLE ON BOTH SIDES OF WALL. 1 1/4" CUST/ MECH 20 3/4" 3/4" (R) (R) 360 360 BOYS 055 13. NEW FIRE DAMPER. 60/8 T WFR-2 8 LF 2.0 GPM 21 14 FCU-7 STORAGE 062 WFR-1 15 LF 2.1 GPM 15. NEW TRANSFER AIR OPENING ABOVE CEILING, TYPICAL. 54/13 30/8 3/4" 3/4" 12. RECONNECT EXISTING HEATING HOT WATER LINES TO NEW WFR-#. EXTEND AND OR MODIFY EXISTING PIPING TO CONNECT NEW WFR-# TO EXISTING DROPS. NEW PIPING SHALL BE 3/4". CONTRACTOR TO FIELD VERIFY, TYPICAL. 14. PROVIDE 3-WAY VALVE. REFER TO ZONE HEATING COIL ASSEMBLY DETAIL. 5 16"ø (14"ø) T 16"ø (12"ø) CORRIDOR 053 BOYS 065 19 34/13 14"ø 640 52/8 CLASSROOM 208 CORRIDOR 061 11. ROUTE INSULATED HWS/R THRU BACK OF CASEWORK AND CONNECT TO WFR-#. (R) 360 HWS FCU-8 HWR (R) 30 FCU-6 RTU-1 (R) 360 EF-3 HWR 18 CLASSROOM 201 (R) 30 8"ø 54/13 14 GIRLS 066 T 8 48/8 (26/22) 6"ø 34"ø 3 2" 21 16x10 2" 214 2 42/22 2 18 16 18/16 (12/10) ART & MUSIC STORAGE/ IT ROOM 16x10 16"ø (12"ø) WFR-2 8 LF 2.0 GPM 16"ø (14"ø) CONFERENCE/ WORKROOM C 10. LOCATE RTU-# FILL AND DRAIN VALVES IN THIS ROOM. REFER TO CONTROLS PLANS FOR PIPING DETAIL. ROUTE 1-1/2" DRAIN LINE FROM RTU-# TO JANITOR' SINK. ROUTE 3/4" NP WATER FROM NEAREST MAIN OF EQUAL SIZE OR LARGER TO RTU-#. PROVIDE WITH RPBFP-1, REFER TO SCHEDULE. 6"ø 50 20x12 T 2" 12"ø 230 HWS 12"ø 230 12"ø 250 HWR 2" 20x12 12"ø 250 12"ø 250 20x12 20x12 1 1/2" 20x12 1 1/2" HWS HWR SEE 1 / M101B MATCHLINE 9 T 12"ø 240 CLASSROOM 202 B 9 9 CLASSROOM 203 WFR-1 11 LF 2.7 GPM GROUP 058 3/4" 3/4" 11 CLASSROOM 204 T 1" 1" 1" 6"ø 50 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 D 1" WFR-1 11 LF 2.7 GPM CLASSROOM 205 1 1/4" 1 1/4" PROJECT INFORMATION HWS 11 FLAG NOTES: PROJECT PHASE GROUP 068 CONSULTANT 2. RETURN AIR FOR CLASSROOMS WHERE GRILLES ARE NOT SHOWN ARE THROUGH LIGHT MONITORS THAT ARE OPEN TO THE CEILING PLENUM. 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 20 WFR-1 8 LF 2.7 GPM POUDRE SCHOOL DISTRICT 12 WFR-1 13 LF 2.0 GPM CONSTRUCTION DOCUMENTS WFR-1 13 LF 2.0 GPM WERNER ELEMENTARY RENOVATION PROJECT WFR-1 8 LF 2.7 GPM 11 HWS HWR PROJECT #: 2011.01.0143 HWS HWR DRAWN BY: BRE CHECKED BY: EJS 20 14 ISSUE DATE: 2.9.12 WFR-1 8 LF 2.7 GPM WFR-1 13 LF 2.0 GPM WFR-1 13 LF 2.0 GPM WFR-1 8 LF 2.7 GPM REVISIONS NO DESCRIPTION DATE N 1 MECHANICAL NEW FLOOR PLAN - AREA "C" A A 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 2:12:46 PM - PLOT DATE 1/8" = 1'-0" MECHANICAL NEW FLOOR PLAN - AREA C M101C 2 3 4 5 6 ARCHITECT 1 Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com 18/18 E E KMUA-1 CONSULTANT SEAL 4 D 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 PROJECT PHASE CONSTRUCTION DOCUMENTS D RTU-4 1 3 1 34"ø RTU-1 2 34"ø C 32/36 RTU-2 54/22 B B FLAG NOTES: 1. RTU-#, NEW ROOFTOP UNIT. REFER TO SCHEDULE FOR HOT WATER RUN OUT SIZE. 2. REFER TO DUCTWORK ROOF SUPPORT DETAIL. 3. REFER TO TWO WAY HEATING WATER COIL DETAIL. REFER TO SCHEDULE FOR RUN OUT SIZE. 4. KMUA-1, NEW KITCHEN MAKEUP AIR UNIT. LOCATE INTAKE 10' MINIMUM AWAY FROM EXHAUST FANS. REFER TO DUCTWORK ROOF SUPPORT DETAIL. 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 1 PROJECT INFORMATION 3 POUDRE SCHOOL DISTRICT UP WERNER ELEMENTARY RENOVATION PROJECT C PROJECT #: 2011.01.0143 DRAWN BY: BRE CHECKED BY: EJS ISSUE DATE: 2.9.12 REVISIONS N NO DESCRIPTION DATE 1 MECHANICAL ROOF PLAN A A 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 2:12:48 PM - PLOT DATE 3/32" = 1'-0" MECHANICAL ROOF PLAN M102 2 3 4 5 6 ARCHITECT 1 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com C 1-1/2" x 1-1/2" x 1/8" ANGLE IRON SUPPORT TYPICAL ANCHOR ANGLE IRON TO SUPPORT, TYPICAL B-LINE RUBBER SUPPORT APPLY A MASTIC BED TO ROOF FOR SUPPORT EXISTING ROOF DUCTWORK ROOF SUPPORT DETAIL NO SCALE FLEXIBLE EQUIPMENT CONNECTOR, TYP. PROVIDE MINIMUM 5 PIPE DIAMETERS LENGTH OF STRAIGHT PIPE PRIOR TO CHECK VALVE. ECCENTRIC INCREASER PRESSURE GAUGE SUCTION DIFFUSER. PUMP FRAME 4" CONC. BASE CONTINUE AS PER PLANS VALVE AND PIPING CONFIGURATION UNLESS NOTED OTHERWISE ON THE PLANS. IF NOTED REFER TO ZONE HEATING COIL DETAIL ASSEMBLY. AIR VENT AIR VENT PRESS.-TEMP. TAP, TYP. (PRIOR TO ELLS) PRESS.-TEMP. TAP, TYP. CONTROL VALVE SOME PIPING DROPS ARE EXISTING. CONTRACTOR TO FIELD COORDINATE DROP ROUTING TO NEW WFR. RETURN CONTROL VALVE RETURN CONTROL VALVE IN ENCLOSURE (18" MAXIMUM SPACE "DEAD SPACE" ALLOWED WITHIN ENCLOSURE, AS APPLICABLE) SUPPLY C N.C. LENGTH AS PER PLANS MOUNTING HEIGHT AS PER MANUFACTURER'S RECOMMENDATIONS SINGLE SUCTION PUMP ASS'Y. WALL FIN RADIATION SCHEMATIC FOR DOWNFEED APPLICATIONS NO SCALE NO SCALE COIL COIL N.O. PROJECT #: 2011.01.0143 RISE IN DIRECTION OF FLOW TO FLOOR DRAIN. B SUPPLY ALTERNATE ROUTING FOR SAME END CONNECTIONS. PROJECT INFORMATION B MANUAL AIR VENT AT HIGH POINTS. ~ PROVIDE MINIMUM 5 PIPE DIAMETERS LENGTH OF STRAIGHT PIPE BETWEEN CHECK VALVE AND BALANCING VALVE ~~ CONTINUE AS PER PLANS WERNER ELEMENTARY RENOVATION PROJECT SHEET METAL SCREW, TYP. SEAL HEAD TO DUCT WITH MASTIC. DUCT 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 C POUDRE SCHOOL DISTRICT D PROJECT PHASE D 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 CONSTRUCTION DOCUMENTS CONSULTANT SEAL E ZONE HEATING TWO WAY HEATING COIL DETAIL ASSEMBLY WATER COIL DETAIL NO SCALE DRAWN BY: BRE NO SCALE CHECKED BY: EJS ISSUE DATE: 2.9.12 USE GASKETED FITTING. ATTACH PER MANUFACTURER'S RECOMMENDATIONS. EXISTING ROOF EXISTING ROOF SURFACE AND APPLY A MASTIC BED FOR B-LINE SUPPORT SEE VAV SCHEDULE FOR INLET SIZE REFER TO ARCHITECTURAL DRAWINGS FOR ANCHOR OF B-LINE SUPPORT TO STRUCTURE. A 1 2 FLEX DUCT VAV-# PROVIDE MINIMUM (4) DUCT DIAMETERS OF STRAIGHT DUCT A SPIN-IN FITTING LATERAL TAKE-OFF FITTING DUCTWORK ROOF SUPPORT DETAIL ALTERNATE M1 - VAV BOX DETAIL ROUND DUCT TAKE-OFF FITTINGS NO SCALE NO SCALE NO SCALE 3 4 5 DATE WORM DRIVE S.S. CLAMP (ON INNER LINER). WORM DRIVE S.S. CLAMP (ON INNER LINER) (#/#) DESCRIPTION FLEX DUCT ALTERNATE DUCT SIZE #/# NO 6 SHEET INFORMATION 2/8/2012 2:12:49 PM - PLOT DATE B-LINE OR EQUIV. SUPPORT ANCHOR ANGLE IRON TO B-LINE SUPPORT, TYP REVISIONS ROUND TWIST-IN FITTING W/ MANUAL DAMPER, HANDLE, & LOCK NUT. LATERAL TAKE-OFF FITTING W/ MANUAL DAMPER, HANDLE, & LOCK NUT. AIR FLOW 1-1/2" x 1-1/2" x 1/8" ANGLE IRON SUPPORT TYPICAL METAL BAND, TYP. BOLTED TO ANGLE SUPPORT AIR FLOW DUCT USE DUCT SEALANT OR GASKETED FITTING. MECHANICAL DETAILS M301 2 3 4 5 6 AIR HANDLING UNIT SCHEDULE ITEM SERVICE SUPPLY AIR FAN DATA FAN ESP RPM CFM TYPE MOTOR DATA IN. WC HP V-PH EXHAUST FAN DATA FAN ESP RPM CFM STRTR TYPE IN. WC @ ALT MOTOR DATA HP V-PH TOTAL STRTR @ ALT COOLING CAPACITY (FUTURE) EAT LAT COND. MBH DB/WB DB (SENS) °F °F °F 2/8/2012 MIN. CAP. EAT LAT SEER MBH °F °F HEATING COIL DATA GPM RUN EWT OUT LWT GLYC °F % °F OP WGT MAX dP (IN) WATER AIR FT IN MANUFACTURER & MODEL NO. NOTES CONTROLS LBS RTU-1 CLASSROOMS 9,210 AF 1.5 1800 15 208/3 VFD 9,350 AF 1.0 1800 10 208/3 VFD 50 70.8/63.0 65.0 95.0 13.0 164 52 72 20 1-1/2 180 160 30 8.0 0.2 9,000 ENGINEERED AIR 1,2 6 RTU-2 CLASSROOMS 7,740 AF 1.5 1800 10 208/3 VFD 8,000 AF 1.0 1800 7.5 208/3 VFD 42 70.4/63.1 65.0 95.0 13.0 138 52 72 16 1-1/2 180 160 30 8.0 0.2 9,000 ENGINEERED AIR 1,3,4 6 NOTES: ARCHITECT 1 Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com 1. FUTURE COOLING SELECTION IS BASED ON TEMPERING THE SUPPLY AIR ONLY. FULL SPACE COOLING CANNOT BE ACHIEVED BY THE PROPOSED FUTURE COOLING COIL. 2. ALTERNATE SUPPLY FAN ESP SHALL BE 2.4" E E 3. ALTERNATE SUPPLY FAN ESP SHALL BE 2.8" 4. IF ALTERNATE 1 IS ACCEPTED AND FUTURE COOLING IS ADDED. THE SUPPLY FAN MOTOR WILL LIKELY NEED TO BE REPLACED DUE TO THE ADDED STATIC PRESSURE DROP ACROSS THE COOLING COIL. AIR HANDLING UNIT SCHEDULE CONTINUED SERVICE EDB EWB LDB F F F INDIRECT EVAPROTIVE COOLING SECTION (EXHAUST) EVAP. MAX. FACE PUMP MEDIA EFF. % VELOCITY V-PH HP 2/7/2012 ENERGY WHEEL WINTER SUMMER MOTOR DATA DEPTH EAT (DB/WB) LAT (DB/WB) EFF. TOTAL EAT (DB/WB) LAT (DB/WB) EFF. TOTAL IN. F F % F F % FPM ELECTRICAL MCOP MCA HP V-PH STRTR OP WGT V-PH MANUFACTURER & MODEL NO. NOTES CONTROLS LBS RTU-1 CLASSROOMS 78.5 64.7 66.0 90 500 -- 1/4 12 85/59 71/63 71 10 53 73.0 -- -- -- 98.2 125 208/3 9,000 ENGINEERED AIR 1 6 RTU-2 CLASSROOMS 78.5 64.7 66.0 90 500 -- 1/4 12 85/59 71/63 73 10 54 75.0 -- -- -- 71.0 100 208/3 9,000 ENGINEERED AIR 1 6 NOTES: SEAL ITEM 1. EVAPORTIVE PUMP AND HEAT WHEEL MOTOR INTERNALLY WIRED. PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FIXTURE RPBFP-1 REDUCED PRESSURE BACKFLOW ICC/ANSI A117.1 COMPLIANT # MANUFACTURER SERIES WATTS TRIM SERIES SUPPLIES 919 TRAP / WASTE DRAIN -- --- --- CW HW / TEPID WASTE 1" (NP) VENT --- WATER CONSUMPTION NOTES / REMARKS --- NON POTABLE WATER --- CONSULTANT PLAN CODE 2/8/2012 PREVENTER 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 GENERAL NOTES: 1. WHERE FIXTURE/EQUIPMENT MODEL NUMBERS ARE GIVEN THESE ARE FOR REFERENCE ONLY. WRITTEN SPECIFICATION REQUIREMENTS AND SCHEDULE NOTES HOLD PRESIDENCE. MORE STRINGENT SHALL APPLY 2. SEE ARCHITECTURAL DWGS FOR MOUNTING HEIGHTS ON ALL WALL MOUNTED FIXTURES D KITCHEN MAKE-UP AIR UNIT SERVICE CFM FAN TYPE KMUA-1 NOTES: SUPPLY AIR FAN DATA E.S.P. RPM MOTOR DATA IN. W.C. MAX. HP V-PH AT ALT. KITCHEN 2250 FC 1.07 1725 DISCHARGE DAMPERS, DISCONNECT SWITCH, HORZ DISCHARGE 1.5 208-3 STRTR EDB F CONDITIONS EWB F LDB F MAG-HOA 93.0 60.0 65.0 2/8/2012 EVAPORATIVE COOLING SECTION EVAP MAX. FACE PUMP EFF VELOCITY HP % FPM 90.0 500.0 1/20 V-PH MEDIA DEPTH IN MAX AIR PD IN. WC 120-1 12.0 0.6 OP WGT LBS 765 MANUFACTURER & MODEL NO. GREENHECK MSX-109-H12 NOTES CONTROLS SEE BELOW 6 ROOFTOP HVAC UNIT (DX - COOLING ONLY) ITEM SERVICE SUPPLY AIR FAN DATA CFM ELECTRICAL DATA MIN. FAN ESP FAN OSA TYPE IN W.C. HP BHP FC 0.75 2 1.17 V-PH 6/1/2008 COOLING CAPACITY MCA MBH EAT °F PROJECT PHASE ITEM OP COND MIN. WGT DB WB °F SEER LBS 80.0 50.0 -- -- 900 MANUFACTURER NOTES CON- & MODEL NO. TROLS CFM RTU-4 IT ROOM 2000 200 208-3 -- 49.4 CONSTRUCTION DOCUMENTS D TRANE TSC 060 1,2 6 NOTES: 1. PROVIDE WITH POWER EXHAUST. 2. PROVIDE WITH 0-100% MODULATING ECONOMIZER, HINGED ACCESS DOORS, COIL GAURDS, 2" THROWAWAY FILTERS, AND FACTORY ROOF CURB. CABINET UNIT HEATER SCHEDULE MBH EWT °F C CUH-1 NOTES: HOT WATER COIL SCHEDULE CFM HC-1 NOTES: MAX FACE VELOCITY FPM MBH 500 172.0 2250 EAT F LAT F -4 70 GPM 18.0 HEATING WATER EWT LWT PIPE CONN. 180 160 % GLY 1-1/4 MAX PRESS DROP AIR WPD IN W.C. FT 30 0.13 7.6 BTUH/LF EWT °F AWT °F GLY % HEATING ELEMENT TUBE FPF SIZE IN ROWS RUNOUT SIZE IN FIN SIZE LxW IN WPD FT HORZ 335 21.0 180 160 30 2.2 5.0 1. PROVIDE UNIT DISCONNECT, 2. PROVIDE INTEGRAL MANUAL STARTER 60 2/7/2012 MOTOR DATA HP V-PH LAT F 130 1/15 PIPE SIZE IN 115 MANUFACTURER & MODEL # 3/4 NOTES STERLING RC-1200-03 CONTROLS 1,2 C 6 2/7/2012 OP WGT LBS Size (LxH) IN ROWS 54 36x18 2 MANUFACTURER & MODEL NOTES CONTROLS PUMP SCHEDULE ITEM TEMTROL 5WC-6-18x36x2-7 AL -- MANUFACTURER & MODEL NO. NOTES TYPE SERVICE GPM 6 WALL FIN RADIATION SCHEDULE ITEM GPM AIR EAT F CONTROLS GLY. % TOTAL HEAD FT. W.C. NPSH FT. W.C. EFF % HP 2/7/2012 MOTOR DATA RPM V-PH OP WGT LBS STRTR MANUFACTURER & MODEL NO. NOTES CONTROLS P-1 BASEMOUNT HTG PLT 171 30 75.0 -- 70 7.5 1750 208-3 VFD B&G 1510 2BC 6 P-2 BASEMOUNT HTG PLT 171 30 75.0 -- 70 7.5 1750 208-3 VFD B&G 1510 2BC 6 P-7 IN-LINE HC-1 18 30 13.0 -- 70 1/6 3300 120-1 B&G PL-36 6 NOTES: WFR-1 1,540 180 170 30 3/4 50 2 3/4 4-1/4 x 3-5/8" STERLING VERSALINE MODEL JVB-S 1,2,3,4 6 WFR-2 1,820 180 170 30 3/4 50 3 3/4 4-1/4 x 3-5/8" STERLING VERSALINE MODEL JVB-S 1,2,3,4 6 EXPANSION TANK SCHEDULE NOTES: ITEM SERVICE 1. MOUNT 4" AFF. TOTAL HEIGHT IS 28". 2. INSTALL PER BASEBOARD RADIATION DETAIL UNLESS OTHERWISE NOTED. ET-1 3. BTUH/LF VALUE IS MINIMUM REQUIRED AFTER DERATE FOR SITE CONDITIONS AND PLANT PARAMETERS. HTG PLT 2/7/2012 TANK ACCEPTANCE VOL GAL BRANCH PIPE SIZE IN % GLYCOL FILL PRESS. OP WGT LBS MANUFACTURER & MODEL NOTES 89.8 1 30% 14.8 1200 AMTROL 400-L ASME TANK GRILLES, REGISTERS, & DIFFUSERS SCHEDULE 4. WALL FIN VALVES SHALL BE CONCEALED BY 18" DEAD SPACE WITH IN CABINET, UNLESS OTHERWISE NOTED ON PLANS. 2/8/2012 2/7/2012 EQUIP TAG HOT WATER FAN COIL UNIT SCHEDULE ITEM B FCU-1 FCU-2 FCU-3 FCU-4 FCU-5 FCU-6 FCU-7 FCU-8 NOTES: TYPE HORIZ HORIZ HORIZ HORIZ HORIZ HORIZ HORIZ HORIZ SUPPLY FAN CFM OSA ESP IN CFM 0.3 200 370 0.3 300 300 0.3 0 680 0.3 120 400 0.3 120 400 0.3 140 460 0.3 0 770 0.3 100 640 MOTOR DATA V-PH QTY HP EACH 1/8 115-1 1 1/8 115-1 1 1/8 115-1 2 1/8 115-1 1 1/8 115-1 1 1/8 115-1 1 1/5 115-1 1 1/8 115-1 2 MBH 5 5 9 6 6 6 11 9 EAT °F 70 70 70 70 70 70 70 70 HEATING CAPACITY LAT GPM EWT LWT °F °F °F 160 180 85 1.0 160 180 85 1.0 160 180 85 1.5 160 180 85 1.0 160 180 85 1.0 160 180 85 1.0 160 180 85 1.5 160 180 85 1.5 GLY % 30 30 30 30 30 30 30 30 WPD FT 5 5 5 5 5 5 5 5 TYPE FACE SIZE IN. MOUNTING TYPE DAMPER REQUIRED MATERIAL MANUFACTURER & MODEL PLAN INFO XXXX XXXX SPECIFIC NOTES 02/07/12 RUN OUT SIZE (IN) 3/4 3/4 3/4 3/4 3/4 3/4 3/4 3/4 OP WGT LBS 200 200 200 200 200 200 200 200 MANUFACTURER & MODEL # NOTES IEC BPY 06 IEC BPY 06 IEC BPY 10 IEC BPY 06 IEC BPY 06 IEC BPY 06 IEC HPY 08 IEC BPY 10 CONTROLS 6 6 6 6 6 6 6 6 S1 DISPLACEMENT DIFFUSER 36" x 60" --- YES STEEL PRICE DF1 NECK / CFM 5 S2 LOUVER FACE CEILING DIFFUSER 24" x 24" TILE CLG YES STEEL PRICE SCD NECK / CFM --- S3 SUPPLY REGISTER --- --- YES STL/ALUM PRICE 520 NECK / CFM 2 S4 PERFORATED FACE CEILING DIFFUSER 24" x 24" GYP YES STEEL PRICE PDN NECK / CFM --- R1 PERFORATED FACE CEILING RETURN GRILLE --- --- NO STEEL PRICE PDDR NECK / CFM* 1, 3, 4 T1 TRANSFER GRILLE --- --- NO STEEL PRICE 530 NECK / CFM* 2 B PROJECT INFORMATION ITEM HEATING WATER LWT % °F GLY PROJECT #: 2011.01.0143 GENERAL NOTES: 1. SEE PLANS FOR NECK SIZE DRAWN BY: BRE 2. ALL GRDs REQUIRING DAMPERS SHALL BE EQUIPPED WITH A REMOTE BALANCING DAMPER THAT IS ADJUSTABLE THROUGH THE GRD FACE OR MECHANICAL/ELECTRICAL EQUIPMENT SCHEDULE ANOTHER APPROVED LOCATION UNLESS SUPPLIED FROM AN ACCESSIBLE TAKE-OFF WITH LOCKING DAMPER. CHECKED BY: EJS 3. VERIFY GRD FINISH AND CLG/WALL/SILL/FLOOR MOUNTING TYPE WITH ARCHITECT FOR EACH APPLICATION PRIOR TO ORDERING. CONTROLS (NOTE B. BELOW) REFERENCES THE "CONTROLS" COLUMN OF THE EQUIPMENT SCHEDULES. SCHEDULE ALSO TO BE USED FOR DRAWING M6.1 4. PROVIDE 4-WAY THROW FOR DIFFUSERS UNLESS OTHERWISE SHOWN ON PLANS. ISSUE DATE: 2.9.12 5. PROVIDE MANUFACTURERS ROUND TO RECTANGULAR ADAPTIVE COLLAR FOR DIFFUSERS AND GRILLES AS REQUIRED, MATCH DUCT SIZE AND TYPE NOTES: REVISIONS 6. MATERIAL SHALL BE STEEL UNLESS OTHERWISE INDICATED OR SPECIFIED. MATERIAL SHALL BE SUITABLE FOR INSTALLED ENVIRONMENT. FOR WET A. See Specifications Division 26 "Electrical Equipment and Wiring for Mechanical Division" for further information. B. Controls: (1) From light switch (2) separate wall switch (3) switch with pilot light (4) runs continuously (5) interlock to run with other equipment (6) controlled by Division 23 (7) cycle from remote thermostat (8) intergral to unit (9) fire alarm (10) other; see REMARKS * Carries full current. Wiring done by Division 24 for control. See specifications. Also see "Temperature Control" specifications. C. Magnetic starters to have maintain contact unless noted. All starters by Mechanical unless noted to be by Electrical. D. Motors 1/2 HP and less to be 1750 rpm, 115/60/1, motors 3/4 HP and above to be as noted below. E. Three phase starters on motors 5 HP or greater to have Phase Monitor Control Relay, see specification. NO LOCATIONS SUCH AS KITCHENS, PROVIDE ALUMINUM. DESCRIPTION DATE * WHERE CFM IS INDICATED ON PLANS FOR RETURN AND TRANSFERS, BALANCE TO AIRFLOW INDICATED. SPECIFIC NOTES: 1. PROVIDE BACKPAN WHERE CONNECTED TO DUCT OR SOUND BOOT; WHERE NO DUCT OR SOUND BOOT IS PRESENT PROVIDE PERFORATED PANEL ONLY. 2. PROVIDE SMALLEST FACE AVAILABLE FOR NECK LISTED IN PLANS 3. PROVIDE DAMPER FOR A DUCTED RETURN/TRANSFER AIR SYSTEM THAT REQUIRES AIR BALANCE AT RETURN/TRANSFER OPENINGS AS INDICATED BY AIRFLOW (CFMs) ON DRAWINGS. A A 4. AS IDENTIFIED ON THE PLANS PROVIDE 12"x24" FACE FOR 10"x22" NECKS, PROVIDE 24"x24" FACE FOR 22"x22" NECKS 5. PROVIDE WITH FLOOR BASE. 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 2:12:49 PM - PLOT DATE 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 CFM POUDRE SCHOOL DISTRICT TYPE WERNER ELEMENTARY RENOVATION PROJECT ITEM MECHANICAL SCHEDULES M401 2 3 4 5 6 ARCHITECT 1 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com CONSULTANT SEAL E D MANUFACTURER & MODEL # CONTROLS UNIT VAV-1 DISTRICT-WIDE 406 SHUTOFF 310 600 7 PRICE SDV 6 VAV-2 RESOURCE 405 SHUTOFF 200 600 7 PRICE SDV 6 VAV-3 CLASSROOM 103 SHUTOFF 250 600 7 PRICE SDV 6 VAV-4 CLASSROOM 104 SHUTOFF 260 600 7 PRICE SDV 6 VAV-5 CLASSROOM 105 SHUTOFF 270 600 7 PRICE SDV 6 VAV-6 CLASSROOM 100 SHUTOFF 340 600 7 PRICE SDV 6 VAV-7 CLASSROOM 101 SHUTOFF 380 600 7 PRICE SDV 6 VAV-8 CLASSROOM 102 SHUTOFF 330 600 7 PRICE SDV 6 VAV-9 CLASSROOM 106 SHUTOFF 260 600 7 PRICE SDV 6 VAV-10 CLASSROOM 107 SHUTOFF 270 600 7 PRICE SDV 6 VAV-11 CLASSROOM 108 SHUTOFF 260 600 7 PRICE SDV 6 VAV-12 MUSIC 200 SHUTOFF 300 600 7 PRICE SDV 6 VAV-13 CLASSROOM 201 SHUTOFF 230 600 7 PRICE SDV 6 VAV-14 CLASSROOM 202 SHUTOFF 240 600 7 PRICE SDV 6 VAV-15 CLASSROOM 203 SHUTOFF 250 600 7 PRICE SDV 6 VAV-16 CLASSROOM 204 SHUTOFF 250 600 7 PRICE SDV 6 VAV-17 CLASSROOM 205 SHUTOFF 240 600 7 PRICE SDV 6 VAV-18 CLASSROOM 206 SHUTOFF 240 600 7 PRICE SDV 6 VAV-19 ART 215 SHUTOFF 300 600 7 PRICE SDV 6 VAV-20 COMPUTER LAB 213 SHUTOFF 230 600 7 PRICE SDV 6 VAV-21 CLASSROOM 212 SHUTOFF 250 600 7 PRICE SDV 6 VAV-22 CLASSROOM 211 SHUTOFF 250 600 7 PRICE SDV 6 VAV-23 CLASSROOM 210 SHUTOFF 250 600 7 PRICE SDV 6 VAV-24 CLASSROOM 209 SHUTOFF 250 600 7 PRICE SDV 6 VAV-25 NOTES: CLASSROOM 208 SHUTOFF 230 600 7 PRICE SDV 6 RTU-1 RTU-2 B A OCCUPANT OUTDOOR AIRFLOW RATE CFM/PER OCCUPANT DENSITY PEOPLE PER 1000 SQ FT AREA OUTDOOR AIRFLOW RATE CFM/SQ FT ZONE AIRFLOW DISTRIBUTION EFFECTIVENESS EZ REQUIRED OSA CFM DELIVERED TO SPACE BALANCE POS #1 TOTAL DESIGN SUPPPLY AIR TO ZONE @100% OSA BALANCE POS #2 TOTAL DESIGN SUPPPLY AIR TO ZONE @100% OSA IEBC COMPIANT ROOM NUMBER ROOM NAME ZONE TYPE AREA SQ FT 201 CLASSROOM CLASSROOM 735 10.0 25 18 0.12 1.2 227 230 600 YES 202 CLASSROOM CLASSROOM 774 10.0 25 19 0.12 1.2 239 240 600 YES 203 CLASSROOM CLASSROOM 789 10.0 25 20 0.12 1.2 243 250 600 YES 204 CLASSROOM CLASSROOM 789 10.0 25 20 0.12 1.2 243 250 600 YES 205 CLASSROOM CLASSROOM 774 10.0 25 19 0.12 1.2 239 240 600 YES 206 CLASSROOM CLASSROOM 747 10.0 25 19 0.12 1.2 230 240 600 YES 207 CONFERENCE/WORKROOM CONFERENCE 360 5.0 50 18 0.06 1.0 112 120 120 YES 208 CLASSROOM CLASSROOM 738 10.0 25 18 0.12 1.2 228 230 600 YES 209 CLASSROOM CLASSROOM 784 10.0 25 20 0.12 1.2 242 250 600 YES 210 CLASSROOM CLASSROOM 789 10.0 25 20 0.12 1.2 243 250 600 YES 211 CLASSROOM CLASSROOM 790 10.0 25 20 0.12 1.2 244 250 600 YES 212 CLASSROOM CLASSROOM 784 10.0 25 20 0.12 1.2 242 250 600 YES 213 COMPUTER LAB CLASSROOM 741 10.0 25 19 0.12 1.2 228 230 600 YES 214 CONFERENCE/WORKROOM CONFERENCE 360 5.0 50 18 0.12 1.0 133 140 140 YES 54 GROUP CONFERENCE 89 5.0 50 4 0.06 1.0 28 50 50 YES 58 GROUP CONFERENCE 92 5.0 50 5 0.06 1.0 29 50 50 YES 59 GROUP CONFERENCE 89 5.0 50 4 0.06 1.0 28 50 50 YES 64 GROUP CONFERENCE 89 5.0 50 4 0.06 1.0 28 50 50 YES 68 GROUP CONFERENCE 92 5.0 50 5 0.06 1.0 29 50 50 YES 69 GROUP CONFERENCE 89 5.0 50 4 0.06 1.0 28 50 50 YES 200 MUSIC CLASSROOM 943 10.0 25 24 0.12 1.2 291 300 600 YES 215 ART CLASSROOM 962 10.0 25 24 0.12 1.2 297 300 600 YES 61 CORRIDOR CORRIDOR 600 0 0 0 0.06 1.0 36 50 50 YES 67 CORRIDOR CORRIDOR 600 0 0 0 0.06 1.0 36 50 50 YES 53 CORRIDOR CORRIDOR 600 0 0 0 0.06 1.0 36 50 50 YES 57 CORRIDOR CORRIDOR 600 0 0 0 0.06 1.0 36 50 50 YES 52 CORRIDOR CORRIDOR 727 0 0 0 0.06 1.0 44 50 50 YES 4320 9210 OCCUPANT QUANTITY 100 CLASSROOM CLASSROOM 1086 10.0 25 27 0.12 1.2 335 340 600 YES 101 CLASSROOM CLASSROOM 1201 10.0 25 30 0.12 1.2 370 380 600 YES 102 CLASSROOM CLASSROOM 1044 10.0 25 26 0.12 1.2 322 330 600 YES 103 CLASSROOM CLASSROOM 787 10.0 25 20 0.12 1.2 243 250 600 YES 104 CLASSROOM CLASSROOM 819 10.0 25 20 0.12 1.2 253 260 600 YES 105 CLASSROOM CLASSROOM 859 10.0 25 21 0.12 1.2 265 270 600 YES 106 CLASSROOM CLASSROOM 804 10.0 25 20 0.12 1.2 248 260 600 YES 107 CLASSROOM CLASSROOM 859 10.0 25 21 0.12 1.2 265 270 600 YES 108 CLASSROOM CLASSROOM 819 10.0 25 20 0.12 1.2 253 260 600 YES 109 CONFERENCE/WORKROOM CONFERENCE 360 5.0 50 18 0.06 1.0 112 120 120 YES 405 RESOURCE CLASSROOM 513 10.0 25 13 0.12 1.0 190 200 600 YES 406 DISTRICT WIDE CLASSROOM 822 10.0 25 21 0.12 1.0 304 310 600 YES 404 SPEECH OFFICE 103 5.0 7 1 0.06 1.0 10 50 50 YES 403 COUNSELOR OFFICE 125 5.0 7 1 0.06 1.0 12 50 50 YES 407A CONFERENCE CONFERENCE 120 5.0 50 6 0.06 1.0 37 50 50 YES 407B ITIN STORAGE 120 5.0 0 0 0.06 1.0 7 50 50 YES 501 SECRETARY RECEPTION 623 5.0 30 19 0.06 1.0 131 140 140 YES 502 PRINCIPAL OFFICE 178 5.0 7 1 0.06 1.0 17 50 50 YES 503 CLIINIC OFFICE 216 5.0 7 2 0.06 1.0 21 50 50 YES 504 TEACHER'S LOUNGE OFFICE 617 5.0 7 4 0.06 1.0 59 100 100 YES 505 CONFERENCE CONFERENCE 171 5.0 50 9 0.06 1.0 53 60 60 YES 25 CORRIDOR CORRIDOR 600 0 0 0 0.06 1.0 36 50 50 YES 23 CORRIDOR CORRIDOR 400 0 0 0 0.06 1.0 24 50 50 YES 7 CORRIDOR CORRIDOR 400 0 0 0 0.06 1.0 24 50 50 YES 8 CORRIDOR CORRIDOR 310 0 0 0 0.06 1.0 19 50 50 YES 9 CORRIDOR CORRIDOR 310 0 0 0 0.06 1.0 19 50 50 YES 3 CORRIDOR CORRIDOR 400 0 0 0 0.06 1.0 24 50 50 YES 2 CORRIDOR CORRIDOR 600 0 0 0 0.06 1.0 36 50 50 YES 31 CORRIDOR CORRIDOR 1134 0 0 0 0.06 1.0 68 70 70 YES 4270 7740 NOTES: 1 2 3 4 5 6 C B 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 DUCT INLET SIZE IN POUDRE SCHOOL DISTRICT MAX CFM WERNER ELEMENTARY RENOVATION PROJECT MIN CFM PROJECT PHASE TYPE PROJECT INFORMATION C SERVICE PROJECT #: 2011.01.0143 DRAWN BY: BRE CHECKED BY: EJS ISSUE DATE: 2.9.12 REVISIONS NO DESCRIPTION DATE A SHEET INFORMATION ITEM 2009 IEBC VENTILAION RATE PROCEDURE CONSTRUCTION DOCUMENTS D ALTERNATE 1 VAV BOX SCHEDULE 2/8/2012 2:12:49 PM - PLOT DATE 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 MECHANICAL SCHEDULES M402 DA T T BOP3SS BIP3ST CT T DA T HWS (E) PUMP N.O. P-3 FS FS (E) PUMP N.O. P-4 B0B2V T BIB2AL BIP4ST CT DPS LO EPO BOB1SS BOB2SS AOB1IT AOB2IT BOP4SS AOP1MOD AOP2MOD VFD B-2 (E) BOILER B-1 (E) BOILER HI SEE PLAN FOR # & LOCATION BIP2ST BIP1ST P-1 NEW HEATING WATER PUMP BOP1SS BOP2SS P-2 NEW HEATING WATER PUMP D Point Name Digital Outputs Digital Inputs Point Description P1ST P2ST B1AL B2AL P3ST P4ST P1SS P2SS B1SS B2SS B1V B2V P3SS P4SS OAD HWST HWRT DPS OAT SPT B1T B2T P1MOD PUMP #1 STATUS PUMP #2 STATUS BOILER #1 ALARM BOILER #2 ALARM BOILER CIRC PUMP STATUS BOILER CIRC PUMP STATUS PUMP #1 START/STOP PUMP #2 START/STOP BOILER #1 START/STOP BOILER #2 START/STOP BOILER #1 ISOLATION VALVE BOILER #2 ISOLATION VALVE BOILER CIRC PUMP START/STOP BOILER CIRC PUMP START/STOP OUTSIDE AIR DAMPER HOT WATER SUPPLY TEMP HOT WATER RETURN TEMP DIFFERENTIAL PRESSURE SENSOR OUTSIDE AIR TEMP. SPACE TEMP. BOILER 1 TEMP. SETTING BOILER 2 TEMP. SETTING PUMP #1 MODULATE P2MOD PUMP #2 MODULATE Analog Analog Analog Inputs Outputs Virtual Digital Virtual Schedule Trend (duration)* X X X X X X Alarm (hi/lo) Show on Graphic X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AFTER PROOF OF WATER FLOW, THE DDC SYSTEM SHALL ENABLE THE BOILERS AND THEIR CORRESPONDING CIRCULATING PUMPS P-3 AND P-4 WHEN THE OAT < 65 DEG. F (ADJ). THE DDC SYSTEM SHALL DISABLE THE BOILER PLANT WHEN THE OAT > 68 DEG. F (ADJ.). AS 2 OR MORE HEATING VALVES START TO OPEN BOILER START SEQUENCE SHALL COMMENCE. BACnet E BACnet EXISTING AHU-1 EXISTING GYM UNIT NEW MAKE UP AIR UNIT BACnet NEW BASEBOARD EXISTING BASEBOARD TYPICAL OF TYPICAL OF MANY 5 BACnet NEW FAN COILS TYPICAL OF MANY BACnet BACnet BACnet EXISTING CUH TYPICAL OF 5 NEW VAV BOXES TYPICAL OF MANY (ALTERNATE 1) BACnet EXISTING AHU-2 EXISTING MEDIA CENTER UNIT BACnet BACnet NEW CUH-1 EXISTING UNIT VENTILATORS TYPICAL OF 4 BACnet PUMPS TYPICAL OF 6 BOILERS TYPICAL OF 2 TC PANELS TYPICAL OF 2 D PC HEATING WATER TEMPERATURE RESET: TEMPERATURE CONTROLS SYSTEM SYSTEM ARCHITECTURE TEMPERATURE CONTROLS SYSTEM ARCHITECTURE THE HEATING WATER NOMINAL SUPPLY TEMPERATURE SHALL BE BASED UPON THE FOLLOWING: 1 DEG. F OSA 180 DEG. F HWS 65 DEG. F OSA 150 DEG. F HWS NO SCALE UNIT CONTROLLERS AND SYSTEM LEVEL CONTROLLERS SHALL BE PROVIDED WITH A COMMUNICATIONS NETWORK THAT SHALL OPERATE ON BACNET IP PLATFORM. HEATING WATER TEMPERATURE SHALL ALSO BE RESET BASED ON DEMAND. THE DDC SYSTEM SHALL MONITOR ALL HEATING CONTROL VALVES. WHEN ONE OR MORE VALVES ARE FULLY OPEN FOR MORE THEN 5 MINUTES (ADJ.) AND RESPECTIVE ZONE IS NOT MEETING SPACE TEMPERATURE SET POINT, HEATING WATER SYSTEM TO RESET TEMPERATURE. HEATING WATER SUPPLY TEMPERATURE RESET SHALL OCCUR BY INCREASING TEMPERATURE BY 2 DEGREES F EVERY 10 MINUTES (ADJ.) UNTIL ALL HEATING CONTROL VALVES AND RESPECTIVE ZONES ARE SATISFIED. MAXIMUM SUPPLY TEMPERATURE SHALL NOT RISE ABOVE 180 DEGREES F (ADJ.). NOTE: EXISTING CONTROL SEQUENCE TO REMAIN. WHEN ALL HEATING CONTROL VALVES ARE NO LONGER 100% FULLY OPEN FOR 30 MINUTES (ADJ.) THE HEATING WATER SYSTEM TEMPERATURE SHALL BE RESET DOWN AT A RATE OF 2 DEGREES F EVERY 10 MINUTES (ADJ.) UNTIL ONE OR MORE VALVES ARE FULLY OPEN FOR MORE THAN 5 MINUTES (ADJ.). MINIMUM RETURN TEMPERATURE SHALL NOT DROP BELOW 150 DEGREES F (ADJ.). EF-1 THROUGH EF-16 TEMPERATURE CONTROLS CONTRACTOR TO INCLUDE UPDATING ALL ASSOCIATED DAMPERS FOR THE EXISTING EXHAUST FANS TO DDC CONTROLS. EA WHEN HEATING WATER SYSTEM DIFFERENTIAL TEMPERATURE DROPS BELOW 5 DEGREES F (ADJ.) AND NO VALVES ARE GREATER THEN 25% OPEN (ADJ.), THEN BOILER PLANT SHALL SHUT DOWN. AS 2 OR MORE HEATING VALVES START TO OPEN BOILER START SEQUENCE SHALL COMMENCE. Point Name CT X X X BOFSS BOILER ROOM - HEATING WATER PLANT X FST FSS Point Description Digital Inputs FAN STATUS FAN START/STOP Analog Inputs Digital Outputs Analog Outputs Analog Virtual Digital Schedule Virtual Trend (duration) Alarm (hi/lo) Show on Graphic X X X X X X BIFST EXISTING EXHAUST FANS NO SCALE C NO SCALE AIRAT DX OA AISPT T F NO D T EXISTING AIR HANDLING UNITS SA DA ROOFTOP UNIT RA EXISTING CONTROL SEQUENCE TO REMAIN EXISTING CONTROL SEQUENCE TO REMAIN NC C D DA DA DA AIDAT BILTDA T FILTER Point Name SFST PST LTDA PSS SFSS RAT DAT MAT ST MAD HVLV T LT H OA C AOHWVLV CT B BOSFSS P-5,6 BOPSS BIPST BISFST Point Description Digital Inputs SUPPLY FAN STATUS PUMP STATUS LOW TEMP ALARM PUMP START/STOP SUPPLY FAN START/STOP RETURN AIR TEMP DISCHARGE AIR TEMP MIXED AIR TEMP SPACE TEMP MIXED AIR DAMPER HEATING WATER VALVE Digital Outputs Analog Inputs Analog Outputs Analog Virtual Digital Virtual Schedule Trend (duration)* Alarm (hi/lo) Show on Graphic X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AOMAD CONTROLS T AIDAT BIUST T BOUSS AISPT RA AIRAT Point Name UST USS RAT DAT SPT MAD *SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS Point Description UNIT STATUS UNIT START/STOP RETURN AIR TEMP DISCHARGE AIR TEMP SPACE TEMP MIXED AIR DAMPER Digital Outputs Digital Inputs Analog Analog Analog Inputs Outputs Virtual Digital Schedule Trend Virtual (duration)* Alarm (hi/lo) Show on Graphic X X X X X X X X X X X X X X X X X B CT *SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS PROJECT INFORMATION AIMAT T F AOMAD EXISTING ROOF TOP UNIT (RTU-3) EXISTING AIR HANDLING UNITS (AHU-1, AHU-2) PROJECT #: 2011.01.0143 NO SCALE DRAWN BY: BRE NO SCALE CHECKED BY: EJS SEE FLOOR PLANS FOR VALVE TYPE AISPT 2/8/2012 2:12:50 PM - PLOT DATE AOHVLV BOFSS HWR A HWS Point Name FST FSS SPT HVLV H T FAN STATUS FAN START/STOP SPACE TEMP HEATING WATER VALVE Digital Inputs X Digital Outputs Analog Analog Analog Inputs Outputs Virtual Digital Virtual Schedule Trend (duration)* Alarm (hi/lo) X X X X X X NEW CABINET UNIT HEATERS: AN INTEGRAL THERMOSTAT SHALL CYCLE THE VALVE AND FAN TO MAINTAIN THERMOSTAT SETPOINT OF 68 DEG. F. (ADJ). Show on Graphic X X X X SEE FLOOR PLANS FOR NEW HEATING SHALL BE LOCKED OUT WHEN RTU-1,2 IS IN TEMPERING MODE OF OPERATION. Point Name HWS SPT HVLV Point Description Digital Inputs Digital Outputs SPACE TEMP HEATING WATER VALVE Analog Analog Analog Inputs Outputs Virtual Digital Schedule Trend Virtual (duration)* X X X *SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS EXISTING UNIT VENTILATOR UV-# NEW AND EXISTING BASEBOARD NO SCALE NO SCALE 2 3 DATE THE SPACE TEMPERATURE SENSOR SHALL MODULATE THE BASEBOARD HEATING WATER CONTROL VALVE TO MAINTAIN THE SPACE HEATING SETPOINT OF 70 DEG. F. (ADJ) TYPICAL OF 5 EXISTING NO SCALE 1 DESCRIPTION HWR CABINET UNIT HEATER CUH-# *SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS NO EXISTING CONTROL SEQUENCE TO REMAIN FOR EXISTING BASEBOARD UNITS T BASEBOARD EXISTING CONTROL SEQUENCE TO REMAIN FOR EXISTING CABINET UNIT HEATERS. N Point Description REVISIONS 4 5 6 Alarm (hi/lo) Show on Graphic X X A SHEET INFORMATION TYPICAL OF 4 CT C TEMPERATURE CONTROLS CONTRACTOR TO INCLUDE UPDATING ALL ASSOCIATE DAMPERS FOR THE EXISTING UNIT VENTILATOS TO DDC CONTROLS. SEQUENCE OF OPERATION SEQUENCE OF OPERATION HWS C ISSUE DATE: 2.9.12 AISPT M H EXISTING CONTROL SEQUENCE TO REMAIN T HWR H AOHVLV TYPICAL OF 5 EXISTING TYPICAL OF 1 NEW SEQUENCE OF OPERATION BIFST 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 WORLD WIDE WEB NETWORK INTERFACE PROVIDE SUPPLY AND RETURN HEATING WATER TEMPERATURE SENSORS LOCATED WHERE SHOWN SCHEMATICALLY FOR DDC MONITORING. *SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS C BACnet BOILER CONTROL: DDC SYSTEM SHALL PROVIDE THE BOILERS WITH THE REQUIRED SUPPLY WATER TEMPERATURE AS DETERMINED FROM THE TEMPERATURE RESET SEQUENCE SHOWN BELOW. THE DDC SYSTEM WILL MODULATE B-1 AND B-2 IN TANDEM TO MAINTAIN HIGHEST PLANT EFFICIENCY THAT WILL PROVIDE REQUIRED SUPPLY WATER TEMPERATURE AS CALLED FOR BY DDC SYSTEM. BOILER ISOLATION VALVES SHALL BE OPENED 1 MINUTE (ADJ.) BEFORE BOILER IS FIRED. PROOF OF FLOW THROUGH THE BOILER SHALL BE ESTABLISHED BEFORE BOILER IS FIRED. BOILER ISOLATION VALVES SHALL CLOSE 5 MINUTES (ADJ.) AFTER BOILER IS DISABLED. VFD EXISTING RTU-3 EXISTING COMPUTER ROOM BACnet EXISTING EXHAUST FANS TYPICAL OF 16 PUMP VFD SHALL MODULATE TO MAINTAIN DIFFERENTIAL PRESSURE IN THE SYSTEM AT A MINIMUM OF 10 PSIG (ADJ., CONTROL CONTRACTOR TO COORDINATE WITH BALANCER TO DETERMINE ACTUAL SET POINT) AT ALL DIFFERENTIAL PRESSURE TRANSMITTERS. T BIB1AL EPO AIDPS (E) AIR SEPARATOR BACnet SYSTEM PUMPING: THE DDC SYSTEM SHALL START THE HEATING WATER PUMP P-1 OR P-2 WHEN OAT < 65 DEG. F (ADJ.). THE DDC SYSTEM SHALL STOP THE HEATING WATER PUMP WHEN OAT > 68 DEG. F (ADJ.). PUMPS SHALL DUTY CYCLE ON A PRIMARY/STANDBY SEVEN DAY CYCLE (INITIALLY 7:00 AM ON MONDAYS). ON FAILURE AS INDICATED VIA THE VFD INTERFACE, THE LAG PUMP SHALL START AND AN ALARM SHALL BE DISPLAYED AT THE DISTRICT OPERATOR'S WORKSTATION. HWS NEW RTU-2 HARDWIRE RTU START/STOP AND STATUS THE DDC SYSTEM SHALL BE CAPABLE OF MONITORING THE STATUS OF ALL ALARMS INCLUDING THOSE FROM THE BOILERS. AS A MINIMUM THE DDC WILL PULL THE FOLLOWING BOILER ALARMS TO THE DISTRICT WORKSTATION: FLAME FAILURE, LOW WATER, HIGH TEMPERATURE LIMIT, INDIVIDUAL BOILER SUPPLY TEMPERATURE. AIHWST HWR B0B1V NEW RTU-1 GENERAL SECTION: SYSTEM PUMPS P-1 AND P-2 TO BE CONTROLLED BY THE DDC SYSTEM. BOILERS B-1 AND B-2 TO BE CONTROLLED BY THE DDC SYSTEM. THE DDC SYSTEM WILL PROVIDE THE BOILERS WITH ALL REQUIRED INPUTS TO INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: REQUIRED WATER SUPPLY TEMPERATURE, ENABLE/DISABLE COMMAND. ES BOOAD NEW RTU-4 IT ROOM ALL SAFETIES SPECIFIED WITH BOILER SHALL BE LEFT IN OPERATION AS RECOMMENDED BY THE BOILER MANUFACTURER. OSA AIHWRT BACnet 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 E BACnet LIFE SAFETY SECTION: AN EMERGENCY POWER OFF (EPO) SHALL BE PROVIDED THAT DISABLES THE TWO HEATING WATER BOILERS. EPO(S) TO BE LOCATED PER CODE AT EACH BOILER ROOM EXIT DOOR. ES - FLAME FAILURE - LOW WATER - HIGH LIMIT - BOILER SUPPLY TEMP BACnet BACnet POUDRE SCHOOL DISTRICT - FLAME FAILURE - LOW WATER - HIGH LIMIT - BOILER SUPPLY TEMP HOT WATER HEATING SYSTEM Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com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oint Name LOCATE HIGH LIMIT HUMIDISTAT A SUITABLE DISTANCE DOWNSTREAM FROM EVAP COIL TO PREVENT NUISANCE TRIPPING HWS AOFMOD SUPPLY AIR (FUTURE) DP VFD HI C C DP LO Dx H HI HWR NO SCALE • • GENERAL SECTION 1. OUTSIDE AIR, RETURN AIR, EXHAUST AIR AND WHEEL BYPASS DAMPERS ARE PROVIDED WITH THE AIR HANDLING UNIT. 2. ALL SET POINTS NOTED BELOW SHALL BE FULLY ADJUSTABLE BY THE END USER THROUGH A USER-ADJUSTABLE, GRAPHICAL DDC FRONT END. C • 4. THE EXHAUST AIR FILTER AND OUTSIDE AIR FILTER SHALL BE PROVIDED WITH DIFFERENTIAL PRESSURE MONITORS THAT PROVIDE AN ALARM SIGNAL TO THE DDC CONTROL PANEL. MAGNEHELIC GAUGES WILL BE PROVIDED WITH THE AIR HANDLING UNIT. • 1. SHOULD THE SMOKE DETECTOR ACTIVATE, THE DETECTOR SHALL STOP THE SUPPLY AND EXHAUST FANS IN BOTH THE MANUAL OR AUTOMATIC MODE, INDEPENDENT OF THE CONTROL SYSTEM. AN ALARM SIGNAL SHALL BE INDICATED AT THE DDC CONTROL PANEL. 2. PROVIDE A LOW TEMPERATURE DETECTION THERMOSTATS IMMEDIATELY DOWNSTREAM OF THE HEATING COIL. UPON TRIPPING (35 DEG F.), THE LOW TEMPERATURE DETECTION THERMOSTAT SHALL STOP THE SUPPLY AND EXHAUST FANS INDEPENDENT OF THE CONTROL SYSTEM. AN ALARM SIGNAL SHALL BE SENT TO THE DDC CONTROL PANEL. THE OUTSIDE AIR AND ECONOMIZER AIR DAMPERS SHALL BE SLOW OPENING TO PREVENT NUISANCE TRIPPING OF THE LOW TEMPERATURE DETECTION THERMOSTAT. 3. PROVIDE HIGH LIMIT DUCT STATIC PRESSURE SENSORS IMMEDIATELY DOWNSTREAM OF THE SUPPLY AND EXHAUST FANS. UPON TRIPPING (0.5 IN.W.C . ABOVE FAN SELECTION POINT), THE HIGH LIMIT DUCT STATIC PRESSURE CONTROLLER SHALL STOP THE SUPPLY OR EXHAUST FANS IN BOTH THE MANUAL OR AUTOMATIC MODE INDEPENDENT OF THE CONTROL SYSTEM. AN ALARM SIGNAL SHALL BE SENT TO THE DDC CONTROL PANEL. 4. PROVIDE A FAN COMPARTMENT DOOR SWITCH ON THE SUPPLY AND EXHAUST FANS. UPON THE DOOR OPENING THE SWITCH SHALL STOP THE SUPPLY OR EXHAUST FANS IN BOTH THE MANUAL OR AUTOMATIC MODE INDEPENDENT OF THE CONTROL SYSTEM. AN ALARM SIGNAL SHALL BE SENT TO THE DDC CONTROL PANEL. 5. WHENEVER THE SUPPLY AND EXHAUST FANS ARE DE-ENERGIZED, AS SENSED BY THE STATUS SWITCH, THE OUTSIDE, AND EXHAUST AIR DAMPERS SHALL BE CLOSED AND THE RETURN AIR DAMPER SHALL BE OPEN, THE EVAPORATIVE COOLER PUMPS SHALL BE DE-ENERGIZED AND THE HEAT WHEEL SHALL BE DE-ENERGIZED. 6. IF THE OUTSIDE AIR TEMPERATURE IS BELOW 14 DEG. F AND THE DP ACROSS THE HEAT WHEEL INCREASES TO 1.5 TIMES THE DRY DP AS DETERMINED BY CONSULTATION WITH THE BALANCING CONTRACTOR, INDICATING A FROST CONDITION, INITIATE AN ALARM. OCCUPIED CYCLE 1. SUPPLY FAN CONTROL: • • 2/8/2012 2:12:50 PM - PLOT DATE • A 1 THE SUPPLY FAN SHALL BE ENERGIZED. THE SUPPLY SHALL BE SLOWLY RAMPED FROM ZERO TO THE FINAL SETPOINT VALUE AFTER THE SUPPLY FAN IS STARTED. NORMAL HEATING OCCUPIED MODE: THE AIR HANDLING UNIT SUPPLY FAN SPEED SHALL MODULATE TO MAINTAIN THE MINIMUM VENTILATION AIR REQUIREMENTS AS LISTED ON THE FLOOR PLANS.(TEMPERATURE CONTROLS CONTRACTOR TO COORDINATE WITH BALANCING CONTRACTOR ON STATIC PRESSURE SETTING) NORMAL TEMPERING OCCUPIED MODE: THE AIR HANDLING UNIT SUPPLY FAN SPEED SHALL MODULATE TO MAINTAIN 600 CFM PER CLASSROOM IN THE NORMAL TEMPERING OCCUPIED MODE. (TEMPERATURE CONTROLS CONTRACTOR TO COORDINATE WITH BALANCING CONTRACTOR ON STATIC PRESSURE SETTING, SCHOOL DISTRICT WILL MANUALLY ADJUST DAMPERS AFTER BALANCING CONTRACTOR INITIALLY NOTES TEMPERING POSITION MANUAL BALANCING DAMPER) ALTERNATE 1 . THE AIR HANDLING UNIT SUPPLY FAN SPEED SHALL MODULATE TO MAINTAIN DUCT STATIC PRESSURE SETPOINT IN THE NORMAL TEMPERING OCCUPIED MODE. (TEMPERATURE CONTROLS CONTRACTOR TO COORDINATE WITH BALANCING CONTRACTOR ON STATIC PRESSURE SETTING) 2 WHEN THE UNIT IS IN THE OCCUPIED MODE THE OUTSIDE DAMPER IS TO OPEN AND THE EXHAUST DAMPER IS TO OPEN. RETURN AIR DAMPER IS TO CLOSE. IN NORMAL HEATING OCCUPIED MODE (OUTDOOR AIR TEMPERATURE OF BELOW 68 DEG. F.) THERE SHALL BE A SINGLE AIR TEMPERATURE SET POINT OF 72 DEG. F. • THE HEAT WHEEL, AND HOT WATER COIL SHALL ACT IN SEQUENCE TO CONTROL THE DISCHARGE AIR TEMPERATURE SETPOINT AS NOTED BELOW. • WHEN THE DISCHARGE AIR TEMPERATURE IS CALLING FOR HEATING: • THE EXHAUST AIR EVAPORATIVE COOLER PUMPS SHALL BE DE-ENERGIZED. • THE HEAT WHEEL SPEED SHALL MODULATE AS NECESSARY TO MAINTAIN THE DISCHARGE AIR TEMPERATURE SETPOINT. • WHEN THE HEAT WHEEL SPEED REACHES 100% AND AN ADDITIONAL NEED FOR HEATING IS REQUIRED, THE HOT WATER COIL VALVE SHALL MODULATE AS REQUIRED. • WHEN THE OUTSIDE TEMPERATURE IS BELOW 14 DEG F; DIFFERENTIAL PRESSURE SHALL BE MONITORED ACROSS THE HEAT WHEEL. WHEN THE WHEEL PRESSURE DROP EQUALS THE DESIGN STATIC PRESSURE MULTIPLIED BY 1.5 AS SUBMITTED FOR THE APPLICABLE AIRFLOW RATE (COORDINATE WITH MECHANICAL CONTRACTOR FOR ACTUAL UNIT SUBMITTALS), THE HEAT WHEEL SPEED SHALL BE SLOWED TO MAINTAIN AN EXHAUST AIR TEMPERATURE OF 22 DEG F. DURING THIS CONDITION THE HEATING COIL SHALL SUPPLEMENT THE HEATING REQUIREMENT. WHEN THE PRESSURE DROPS BELOW 80% OF THE DESIGN VALUE FOR THE APPLICABLE AIRFLOW RATE, OR THE OAT RISES ABOVE 14 DEG F, RE-INITIATE THE SEQUENCE. IN NORMAL TEMPERING OCCUPIED MODE (OUTDOOR AIR TEMPERATURE OF ABOVE 68 DEG. F. AND 30% OF THE CLASSROOMS ARE ABOVE 77 DEG. F.) THERE SHALL BE A SINGLE AIR TEMPERATURE SET POINT OF 62 DEG. F. AND THE SUPPLY FAN SHALL MODULATE TO 600 CFM PER CLASSROOM. • FIRST STAGE: THE HEAT WHEEL BYPASS DAMPER SHALL OPEN FULLY. THE HEAT WHEEL SHALL BE OFF. • SECOND STAGE: THE EXHAUST AIR EVAPORATIVE COOLER PUMP IS ENERGIZED. THE HEAT WHEEL SHALL BE ENERGIZED AND ITS SPEED SHALL BE MODULATED TO MAINTAIN TEMPERING SETPOINT. THE WHEEL SPEED SHALL BE DECREASED TO PROVIDE LESS TEMPERING AND INCREASED TO PROVIDE MORE TEMPERING. • LESS TEMPERING SHALL BE THE OPPOSITE OF THE ABOVE. • THE DISCHARGE AIR HUMIDITY SHALL NOT EXCEED 80% RH EVEN IN THE EVENT THAT THE DESIRED DISCHARGE AIR TEMPERATURES ARE NOT ACHIEVED. THIS SHALL BE ACHIEVED BY DE-ENERGIZING THE EVAPORATIVE COOLER PUMP AND THE UNIT SHALL RETURN TO PROVIDE MINIMUM VENTILATION. THE EVAPORATIVE COOLER SPRAY PUMP SHALL HAVE SOFTWARE INTERLOCKS TO PERMIT OPERATION ONLY WHEN THE SUPPLY AIR FAN IS RUNNING, THE SUMP HAS BEEN FILLED, AND THE OUTSIDE AIR DAMPERS ARE OPEN 100%. THERE SHALL BE A MINIMUM ON AND OFF TIMERS FOR THE PUMP (ALL INDEPENDENTLY ADJUSTABLE) TO PREVENT SHORT CYCLING. • PURGE CYCLE: THERE SHALL BE A DAILY DRY-OUT CYCLE OF 60 MINUTES DURING WHICH TIME THE EVAPORATIVE COOLER PUMPS ARE DE-ENERGIZED. EXHAUST EVAPORATIVE COOLER DRY-OUT SHALL OCCUR DAILY FOR ONE HOUR AFTER OCCUPIED HOURS IF THE EVAPORATIVE COOLER HAS NOT BEEN OFF FOR AT LEAST ONE HOUR DURING THE PREVIOUS 24 HOURS. • PUMP SHALL BE INTERLOCKED WITH THE ULTRA SONIC SUMP LEVEL SENSOR TO DE-ENERGIZE THE PUMPS WHEN THE SUMP WATER LEVEL IS LOW. A LOW WATER SIGNAL SHALL GENERATE AN ALARM THAT SHALL BE SENT TO THE DC CONTROL PANEL. • AVD AIR VOLUMN DAMPER Analog Inputs Analog Outputs Analog Virtual Digital Virtual Schedule x x x Trend (duration)* Alarm (hi/lo) Show on Graphic x x x x x x UNOCCUPIED CYCLE 1. • 2. THE EVAPORATIVE COOLER PUMP SHALL OPERATE CONTINUOUSLY WHEN THERE IS A CALL FOR TEMPERING. THE EXHAUST EVAPORATIVE COOLER SUMP SHALL DRAIN WHEN THE OUTSIDE AIR TEMPERATURE DROPS BELOW 45 DEG. F FOR A PERIOD OF 60 MINUTES. THE EXHAUST EVAPORATIVE COOLER SUMP SHALL FILL ONLY WHEN THE OUTSIDE TEMPERATURE EXCEEDS 55 DEG. F AND THE SPRAY PUMP IS CALLED FOR ON A CALL FOR COOLING. PROVIDE AN ULTRA SONIC WATER LEVEL SENSOR TO ENSURE THE SUMP IS FILLED BEFORE THE PUMP IS ENABLED. PROGRAM A WEEKLY SUMP DRAINAGE CYCLE TO COINCIDE WITH THE EVAPORATIVE COOLER PAD DRY-OUT PERIOD ON FRIDAY EVENING. DRAIN THE SUMP ONLY IF IT HAS NOT BEEN DRAINED IN THE PRECEDING FOUR DAYS. THE SUPPLY AND EXHAUST FANS SHALL BE DE-ENERGIZED EXCEPT WHEN OPERATION IS CALLED FOR AS DESCRIBED BELOW. OUTSIDE AIR, AND EXHAUST DAMPERS SHALL BE CLOSED. THE RETURN AIR DAMPER SHALL BE OPEN. WHEN THE SUPPLY FAN IS DE-ENERGIZED AND THE OUTSIDE AIR TEMPERATURE IS BELOW THE OUTSIDE AIR LOW TEMPERATURE PROTECTION SET POINT OF 35 DEG. F AND THE UNIT TEMPERATURE IS LESS THAN 45 DEG. F THEN THE SUPPLY FAN SHALL START FOR 10 MINUTES WITH THE EXHAUST/OUTSIDE AIR DAMPERS CLOSED AND THE RETURN DAMPER OPEN TO MAINTAIN MIXED AIR TEMPERATURE PROTECTION SET POINT OF 45 DEG. F. IF AFTER 10 MINUTES THE CONDITION IS NOT CLEARED THE HEATING COIL SHALL BE ENERGIZED AND WILL MODULATE AS REQUIRED. UNOCCUPIED TEMPERING MODE • IN UNOCCUPIED TEMPERING OCCUPIED MODE (OUTDOOR AIR TEMPERATURE OF ABOVE 68 DEG. F. AND 50% OF THE CLASSROOMS ARE ABOVE 80 DEG. F.) THERE SHALL BE A SINGLE AIR TEMPERATURE SET POINT OF 62 DEG. F. AND THE SUPPLY FAN SHALL MODULATE TO 600 CM PER CLASSROOM. • FIRST STAGE: THE HEAT WHEEL BYPASS DAMPER SHALL OPEN FULLY. THE HEAT WHEEL SHALL BE OFF. • SECOND STAGE: THE EXHAUST AIR EVAPORATIVE COOLER PUMP IS ENERGIZED. THE HEAT WHEEL SHALL BE ENERGIZED AND ITS SPEED SHALL BE MODULATED TO MAINTAIN THE UNOCCUPIED TEMPERING SETON. THE WHEEL SPEED SHALL BE DECREASED TO PROVIDE LESS TEMPERING AND INCREASED TO PROVIDE MORE TEMPERING. • THIRD STAGE: THE RETURN AIR DAMPER SHALL OPEN AND THE EXHAUST AIR AND OUTSIDE AIR DAMPERS ARE TO CLOSE AND THE SECOND STAGE ABOVE SHALL OCCUR. • 4. Point Name UNOCCUPIED COIL PROTECTION: • 3. C UNOCCUPIED: LESS TEMPERING SHALL BE THE OPPOSITE OF THE ABOVE. MORNING WARM-UP: • 5. EVAPORATIVE COOLER SECTION CONTROL: • DISCHARGE AIR TEMP SPACE TEMP. AIR FLOW VOLUMN Digital Outputs NO SCALE • 4. DISCHARGE AIR TEMPERATURE CONTROL TEMPERING • 7. INDIRECT EVAPORATIVE COOLING SHALL BE LOCKED OUT DURING THE UNOCCUPIED MODE. THE EXHAUST DAMPER SHALL OPEN AND EXHAUST FAN SHALL BE ENABLED WHEN THE SUPPLY FAN IS ENERGIZED IN THE OCCUPIED MODE. THE EXHAUST FAN SHALL START AND THE SPEED SHALL MODULATE TO MAINTAIN THE SPACE STATIC PRESSURE SETPOINT. AS THE SPACE STATIC PRESSURE SETPOINT DROPS BELOW SETPOINT, THE EXHAUST FAN SHALL FIRST MODULATE DOWN AND ON FURTHER DROP THE DAMPER SHALL CLOSE. THE SPACE STATIC PRESSURE SETPOINT SHALL BE 0.05 INCH OF WATER REFERENCED TO OUTSIDE AIR STATIC PRESSURE. 3. DISCHARGE AIR TEMPERATURE CONTROL HEATING: OPERATIONAL SAFETY AND INTERLOCKS SECTION B THE SUPPLY FAN SPEED SHALL NOT DROP BELOW 30% TO ASSURE ADEQUATE FAN MOTOR COOLING. CONFIRM MINIMUM SETTING WITH VFD MANUFACTURER 2. EXHAUST AND OUTDOOR AIR CONTROL: 3. THE OCCUPANCY MODE (OCCUPIED OR UNOCCUPIED) SHALL BE DETERMINED THROUGH A USER-ADJUSTABLE, GRAPHICAL, SEVEN-DAY SCHEDULE WITH A HOLIDAY SCHEDULE. DAT ST AFV Digital Inputs SHUTOFF VAV CONTROL DRAWING - ALTERNATE 1 1. EXHAUST FAN CONTROL: NOTE: ALL SETPOINTS SHALL BE ADJUSTABLE. Point Description • • • 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 D *SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS RTU-1,2 CONTROL DIAGRAM RTU-1,2, HOT WATER HEAT INDIRECT COOLED HEAT RECOVERY- VAV ROOFTOP DEDICATED OUTDOOR AIR HANDLING UNIT ROOM SENSOR DRAIN VALVE F LO S AOFMOD T H T 1" BISDA FILTER NC D AIRAT2 AIRHUM D MORNING WARM-UP SHALL BE COVERED BY THE PERIMETER SYSTEM EXCEPT AS NOTED HERE. IF HOWEVER THE AVERAGE SPACE TEMPERATURE IS BELOW THE OCCUPIED SPACE TEMPERATURE SET POINT AND THE OUTSIDE AIR TEMPERATURE IS BELOW 15 DEG. F, MORNING WARM-UP SHALL BE SUPPLEMENTED BY THIS UNIT AND THEREFORE SHALL BE INITIATED BY THE OPTIMUM START PROGRAM. THE OUTSIDE AIR AND EXHAUST DAMPERS SHALL BE CLOSED AND THE RETURN AIR DAMPER OPEN DURING THE MORNING WARM-UP CYCLE. THE UNIT SHALL HEAT THE SPACE TO SET POINT BY INCREASING THE UNIT SUPPLY AIR TEMPERATURE SET POINT TO 80 DEG. F AND OPERATING UNTIL THE SPACE TEMPERATURE EQUALS THE OCCUPIED SPACE TEMPERATURE SET POINT. IF THE SPACE REACHES THE OCCUPIED SPACE TEMPERATURE SET POINT BEFORE OCCUPANCY, THE SYSTEM SHUTS OFF. IF OCCUPANCY OCCURS BEFORE THE SPACE TEMPERATURE REACHES THE OCCUPIED SPACE TEMPERATURE SET POINT, THE SYSTEM SHALL CONTINUE TO HAVE A HIGH DISCHARGE AIR TEMPERATURE SET POINT UNTIL THE SPACE TEMPERATURE SET POINT IS ACHIEVED. MORNING WARM-UP SHALL OCCUR ONLY ONCE PER DAY. EST HWST PST SDA HDSA RFDP LTDA HWDP SFST SFDP ESS HWSS PSS FLV DV SSS EAT RAT1 RAT2 RHUM WLVL BDP DSP SHUM DAT UT EAD FMOD WMOD EBD HVLV SBD FMOD OAD RAD Digital Inputs Point Description EXHAUST FAN STATUS HEAT WHEEL STATUS PUMP STATUS SMOKE DETECTOR ALARM HIGH DUCT STATIC ALARM RETURN FILTER DIFF PRESSURE LOW TEMP ALARM HEAT WHEEL DIFF PRESSURE SUPPLY FAN STATUS SUPPLY FILTER DIFF PRESSURE EXHAUST FAN START/STOP HEAT WHEEL START/STOP PUMP START/STOP FILL VALVE DRAIN VALVE SUPPLY FAN START/STOP EXHAUST AIR TEMP RETURN AIR TEMP 1 RETURN AIR TEMP 2 RETURN AIR HUMIDITY WATER LEVEL BUILDING DIFF PRESSURE DUCT DIFF PRESSURE SUPPLY AIR HUMIDITY DISCHARGE AIR TEMPERATURE UNIT TEMPERATURE EXHAUST AIR DAMPER EXHAUST FAN MODULATE WHEEL MODULATE EXHAUST BYPASS DAMPER HEATING WATER VALVE SUPPLY BYPASS DAMPER SUPPLY FAN MODULATE OUTSIDE AIR DAMPER RETURN AIR DAMPER Digital Outputs Analog Inputs Analog Outputs Analog Virtual Digital Schedule Virtual Trend (duration)* X X X X X X X X X X Alarm (hi/lo) Show on Graphic X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X B X X X 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 DA AIEAT DA AIRAT1 AIST POUDRE SCHOOL DISTRICT VFD HEAT WHEEL A0EAD REDUCED PRESSURE BACKFLOW PREVENTER 1-1/2" VFD COMMUNICATIONS LINK D BIHDSA AOWMOD TO SYSTEM ELECTRICAL POWER CONSTRUCTION DOCUMENTS B0HWSS B0ESS DDC CONTROL WERNER ELEMENTARY RENOVATION PROJECT BIEST AIDAT CONSULTANT AOFMOD TO SPACE PROJECT PHASE VFD CONTROLS FOR HEAT WHEEL, SUPPLY FAN, AND EXHAUST FAN SHALL BE PACKAGED WITH THE UNIT Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com SEAL E NEW VAV BOX SA FILL VALVE PROJECT INFORMATION 2 PROJECT #: 2011.01.0143 X X DRAWN BY: BRE CHECKED BY: EJS *SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS THE EXHAUST AIR EVAPORATIVE COOLER PUMPS SHALL BE DE-ENERGIZED. ISSUE DATE: 2.9.12 THE HEAT WHEEL SPEED SHALL MODULATE AS NECESSARY TO MAINTAIN THE DISCHARGE AIR TEMPERATURE SETPOINT. REVISIONS NO WHEN THE HEAT WHEEL SPEED REACHES 100% AND AN ADDITIONAL NEED FOR HEATING IS REQUIRED, THE HOT WATER COIL VALVE SHALL MODULATE AS REQUIRED. DESCRIPTION DATE A 3 4 5 6 SHEET INFORMATION 1 MECHANICAL CONTROLS M502 2 3 4 5 6 ARCHITECT 1 Analog Outputs Analog Virtual Digital Schedule Virtual Trend (duration)* Alarm (hi/lo) Show on Graphic BOPSS LOCATE IN WATER HEATER CLOSET WALL X X X X X X X X x x x x x x x BIPST FILL VALVE DRAIN VALVE x x X X X X X x x x X X X X X X BISLS BOFLV SLS EVAP COOLER EVAP SUMP DRAIN VALVE x x x x x x x x EVAP PUMP NP BODV X X x x X X E SEAL SUMP LEVEL SWITCH PUMP STATUS SMOKE DETECTOR ALARM SUPPLY FAN STATUS FILTER DIFF PRESSURE HOOD FIRE CIRC PUMP STATUS LOW TEMP ALARM PUMP START/STOP CIRC PUMP START/STOP FILL VALVE DRAIN VALVE SUPPLY FAN START/STOP AIR TEMP 1 AIR TEMP 2 DISCHARGE AIR TEMPERATURE AIR HUMIDITY OUTSIDE AIR DAMPER HEATING WATER VALVE Analog Inputs NC REDUCED PRESSURE BACKFLOW PREVENTER AIAT1 AIAH AIAT2 T H T BISDA F D FILTER SUPPLY AIR OUTSIDE AIR CONSULTANT SLS PST SDA FST FDP HF CPST LTA PSS CPSS FLV DV SSS AT1 AT2 DAT AH OAD HVLV Digital Outputs .15 E Digital Inputs Point Description .15 Point Name Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com DP PROVIDE FUNNEL ON EXISTING FLOOR DRAIN BIFDP *SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS AOOAD BOSSS DA BIHF S (E) HOOD BIFST MAKE UP AIR UNIT KMUA-1 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 P-8 KITCHEN MAKEUP AIR UNITS 1 KITCHEN MAU UNIT 1: THIS UNIT IS INTENDED TO PROVIDE MAKEUP AIR FOR THE MAIN KITCHEN HOOD. WHENEVER THE EXISTING EXHAUST FANS FOR THE HOOD ARE TURNED ON KMUA UNIT 1 IS TO START. UPON STARTUP SIGNAL THE OUTSIDE AIR DAMPER IS TO OPEN AND THE SUPPLY FAN IS TO START . FILTER NO SCALE DIFFERENTIAL PRESSURE IS MEASURED, ENTERING AIR TEMPERATURE IS MEASURED, AND ENTERING AIR HUMIDITY IS MEASURED AND SENT TO BAS. IF THE ENTERING AIR TEMPERATURE IS ABOVE 50ËšF AND THE ENTERING HUMIDITY IS BELOW 70ËšF THE EVAPORATIVE COOLER FILL VALVE IS TO OPEN AND FILL THE EVAPORATIVE COOLER SUMP. IF THE ENTERING AIR TEMPERATURE DROPS BELOW 45ËšF THE FILL VALVE IS TO CLOSE AND THE DRAIN VALVES ARE TO OPEN. ALSO UPON UNIT SHUT DOWN THE FILL VALVES ARE TO CLOSE AND THE DRAIN VALVES ARE TO OPEN. IF THE DISCHARGE AIR TEMPERATURE IS ABOVE 75ËšF THE EVAPORATIVE COOLER PUMP IS TO START AND CYCLE TO MAINTAIN 75ËšF SUPPLY AIR TEMPERATURE. THE REMOTE HEATING WATER COIL AND CIRCULATING PUMP ARE TO BE CONTROLLED TO MAINTAIN 70 ËšDAT. IF THE SPACE TEMPERATURE RISES ABOVE 78 °F THE DISCHARGE AIR TEMPERATURE SHALL BE CONTROLLED DOWN TO 65°F THROUGH CONTROL OF THE EVAPORATIVE COOLER UNTIL THE SPACE TEMPERATURE DROPS BELOW 75 °F. THE EXISTING CABINET UNIT HEATER SHALL BE DISABLED AT SPACE TEMPERATURES ABOVE 72 °. OUTSIDE AIR DAMPER SHALL BE SLOW OPENING TO PREVENT NUISANCE TRIPPING OF THE LOW TEMPERATURE ALARM. DDC SYSTEM TO ENABLE CIRCULATING PUMP WHEN THE OAT IS LESS THAN 40 DEF. F AND THE HOOD SWITCH IS ACTIVATED. PROVIDE A DELAY OF THE MAKE UP AIR UNIT SUPPLY FAN WHEN THE HOOD SWITCH IS ENABLED OF 2 MINUTES (ADJ). A SMOKE DETECTOR IN THE UNIT DISCHARGE DUCT IS TO SHUT DOWN UNIT, CLOSE OUTSIDE AIR DAMPER AND SOUND ALARM. THE COOKING HOOD FIRE SUPPRESSION SYSTEM SHALL ALSO PROVIDE THIS CONTROL. UPON SHUT DOWN TO THE HOOD THE MUA UNIT IS TO STOP, EVAPORATIVE COOLER IS TO DRAIN AND OUTSIDE AIR DAMPER IS TO CLOSE. NO SCALE ROOFTOP UNIT ENABLE PUMP DURING OCCUPIED HOURS. Point Name PST PSS Point Description Digital Inputs PUMP STATUS PUMP START/STOP Digital Outputs Analog Inputs Analog Outputs Analog Virtual Digital Schedule Virtual Trend (duration) X X Alarm (hi/lo) Show on Graphic X X X X AIDAT LT T HC-1 H C AOHVLV P-7 M BOCPSS CT BICPST BIFDP C CONSTRUCTION DOCUMENTS KITCHEN WATER HEATER PUMP BILTA PROJECT PHASE BIPST CT D HWS BOPSS HWR D C HARDWIRE SHUT DOWN FROM ASSOCIATED RTU SMOKE DETECTOR HEATING COIL TWO-WAY CONTROL VALVE SHALL BE 100% CLOSED WHENEVER THE SUPPLY FAN IS OFF. Point Name FST FSS DAT SPT HVLV Point Description FAN STATUS FAN START/STOP DISCHARGE AIR TEMP SPACE TEMP HEATING WATER VALVE Digital Inputs Analog Inputs Digital Outputs BOFSS CT HWS AOMAD SF C D BIFST T CONTROLS AIDAT BIUST T AISPT HWR NC DA M BOUSS T RA T AISPT AIRAT FAN COIL: FC-1 THROUGH FC-8 BASED ON TEMPERATURE SENSOR INPUT, THE SUPPLY FAN SHALL START AND RUN WHEN THE TEMPERATURE SENSED BY THE DDC SYSTEM DROPS BELOW 68 DEG F. THE HEATING COIL SHALL VALVE MODULATE TO MAINTAIN THE UNOCCUPIED SETPOINT. WHEN THE SPACE TEMPERATURE REACHES 72 DEG F., THE SUPPLY FAN SHALL STOP AND THE HEATING COIL TWO-WAY CONTROL VALVE SHALL CLOSE 100%. SA DA F OCCUPIED CYCLE THE SUPPLY FAN SHALL START AND RUN CONTINUOUSLY. SHOULD THE SUPPLY FAN FAIL TO START OR FAIL DURING OPERATION FOR ANY REASON, AN ALARM SHALL BE INDICATED AT THE DDC CONTROL PANEL. B EF AOHVLV UNOCCUPIED CYCLE THE SUPPLY FAN SHALL BE OFF. THE HEATING COIL TWO-WAY CONTROL VALVES SHALL BE 100% CLOSED. GENERAL DIRECT EXPANSION PACKAGED AC UNIT WITH FACTORY CONTROLS T C THE DDC SYSTEM TIME AND OPTIMUM START/STOP PROGRAMS SHALL CONTROL THE SYSTEM. COORDINATE CONTROL CYCLES WITH OWNER. THE DISCHARGE AIR TEMPERATURE SHALL BE LIMITED TO A MINIMUM OF 53 DEG F. AND A MAXIMUM OF 100 DEG F. THE HEATING COIL SHALL VALVE MODULATE TO MAINTAIN THE OCCUPIED SETPOINT NO H RETURN AIR UNIT START / STOP CONTROL OA NEW IT ROOFTOP UNIT (RTU-4) NO SCALE NO SCALE Analog Outputs Analog Virtual Digital Virtual Schedule Trend (duration)* X X X X X X X X Alarm (hi/lo) Show on Graphic X X X X X X AIR CONDITIONING UNIT WILL BE A FACTORY PACKAGED COOLING ONLY UNIT, COMPLETE WITH FACTORY INSTALLED REFRIGERATION CONTROLS AND O.A. AND R.A. DAMPERS. COORDINATE WITH UNIT MANUFACTURER TO INTERFACE WITH UNIT CONTROLS TO ACHIEVE THE FOLLOWING FUNCTIONS. UNIT START/STOP SUPPLY FAN STATUS DAMPER CONTROL PROVIDE A DIFFERENTIAL PRESSURE SENSOR ACROSS THE FILTER SECTION TO MONITOR FILTER PRESSURE DROP. AN ALARM SIGNAL SHALL BE SENT TO THE CONTROL PANEL INDICATING A DIRTY FILTER WHENEVER THE FILTER PRESSURE DROP EXCEEDS THE MANUFACTURERS RECOMMENDED LIMIT. LIFE SAFETY SHOULD THE SMOKE DETECTOR ACTIVATE, THE DETECTOR SHALL STOP THE SUPPLY FAN IN BOTH THE MANUAL AND AUTOMATIC MODES, INDEPENDENT OF THE CONTROL SYSTEM. AN ALARM SIGNAL SHALL BE INDICATED AT THE DDC CONTROL PANEL. OCCUPIED MODE THE UNIT SHALL START AND OPERATE CONTINUOUSLY TO MAINTAIN SPACE TEMPERATURE SETPOINT. SHOULD THE UNIT FAIL TO START OR FAIL DURING OPERATION FOR ANY REASON, AN ALARM SHALL BE INDICATED AT THE DDC PANEL. B FIRST STAGE OF COOLING TO BE PROVIDED BY THE UNITS ECONOMIZER CYCLE BY MODULATING THE RETURN AIR DAMPER AND OUTDOOR AIR DAMPER. SECOND STAGE OF COOLING TO BE BY THE FACTORY REFRIGERATION SYSTEM. PROJECT INFORMATION GENERAL SECTION 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 ROOF TOP UNIT RTU-4 DX AIDAT POUDRE SCHOOL DISTRICT OUTDOOR AIR HOT WATER - FC-1 THROUGH FC-8 WERNER ELEMENTARY RENOVATION PROJECT DP PROJECT #: 2011.01.0143 THE AIR CONDITIONING UNIT WILL BE EQUIPPED WITH A FACTORY INSTALLED CONTROLLER TO CONTROL THE REFRIGERATION SYSTEM. A SPACE TEMPERATURE SENSOR SHALL CONTROL THE REFRIGERATION TO MAINTAIN TEMPERATURE SETTING. THE CONTROLLER WILL HAVE A TERMINAL INTERFACE TO WHICH THIS CONTRACTOR WILL MAKE THE NECESSARY CONNECTION FOR SCHEDULE AND SETPOINT ADJUSTMENT AND MONITORING. DRAWN BY: BRE CHECKED BY: EJS ISSUE DATE: 2.9.12 *SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS UST FDP USS RAT DAT SPT MAD Point Description UNIT STATUS FILTER DIFF PRESSURE UNIT START/STOP RETURN AIR TEMP DISCHARGE AIR TEMP SPACE TEMP MIXED AIR DAMPER Digital Inputs Digital Outputs Analog Analog Analog Inputs Outputs Virtual Digital Schedule Trend Virtual (duration)* X X X X X X X X X Alarm (hi/lo) Show on Graphic X X X X X X X 1 2 3 4 NO DESCRIPTION DATE X *SCHOOL DISTRICT TO CONFIRM FREQUENCY AND DURATION OF TRENDING REQUIREMENTS A REVISIONS 5 A 6 SHEET INFORMATION 2/8/2012 2:12:50 PM - PLOT DATE Point Name MECHANICAL CONTROLS M503 1 2 3 4 5 6 GENERAL NOTES (FOR ALL ELECTRICAL SHEETS) NOTE: ALL SYMBOLS SHOWN ON LEGEND ARE NOT NECESSARILY USED. 1. REFER TO THE ARCHITECTURAL PLANS, ELEVATIONS, AND DIAGRAMS FOR LOCATIONS OF THE FLOOR AND WALL DEVICES. IF DEVICES ARE NOT NOTED OTHERWISE THEY SHALL BE MOUNTED LONG AXIS VERTICAL AT THE FOLLOWING HEIGHTS AFF TO CENTER OF DEVICE: SWITCHES +48", RECEPTACLES +18", VOICE/DATA JACKS +18". 2. COORDINATE ALL EQUIPMENT LOCATIONS WITH THE OWNER PRIOR TO ROUGH-IN. COORDINATE THE WIRING DEVICE LOCATIONS WITH THE ARCHITECTURAL ELEVATIONS, CASEWORK SHOP DRAWINGS, AND EQUIPMENT INSTALLATION DRAWINGS. COORDINATE THE LOCATION OF THE MECHANICAL EQUIPMENT WITH THE MECHANICAL PLANS AND THE MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN. LIGHTING DOWNLIGHT SCHEMATIC WIRING GRAPHICS WALL MOUNTED FLUORESCENT OR INCANDESCENT LUMINAIRE, AS NOTED M METER 50 years and counting! GROUND CONNECTION AS NOTED CEILING OR WALL MOUNTED HID LUMINAIRE Mechanical, Electrical & Energy Consultants DISCONNECT SWITCH VF POWER SUBSCRIPTS: SUBSCRIPTS: AT GFI = GROUND FAULT INTERRUPTER AC = 6" ABOVE COUNTER 5. PROVIDE (1) 1"C WITH BUSHING AND PULL WIRE FROM EACH TELEPHONE, DATA, COMMUNICATION, AND THERMOSTAT OUTLET TO ABOVE THE ACCESSIBLE CEILING, UNLESS NOTED OTHERWISE. 6. THE CONTRACTOR SHALL MAINTAIN FIRE-RATINGS FOR ALL CONDUIT PENETRATIONS THROUGH FIRE-RATED CONSTRUCTION. 7. COORDINATE THE LOCATIONS AND CONTROLS OF ALL APPLICABLE FIRE/SMOKE DAMPERS WITH THE MECHANICAL CONTRACTOR, PRIOR TO CONSTRUCTION. 8. ALL MOUNTING OF ELECTRICAL DEVICES (LUMINAIRES, PANELS, OUTLETS, CONDUIT RUNS, ETC.) SHALL COMPLY WITH STATE AND LOCAL SEISMIC REQUIREMENTS. ALL LUMINAIRES SHALL BE SUPPORTED INDEPENDENTLY OF THE CEILING SUPPORT HANGERS IN COMPLIANCE WITH IBC AND NEC REQUIREMENTS. = VARIABLE FREQUENCY CIRCUIT BREAKER, MOLDED-CASE, THERMAL-MAGNETIC FIXED STRAIGHT BLADE DUPLEX RECEPTACLE ALL 120V BRANCH CIRCUITS SHALL BE 3-WIRE (PHASE,NEUTRAL,GROUND). PHASE, NEUTRAL, AND GROUND CONDUCTORS SHALL BE SIZE 12 AWG UNLESS OTHERWISE NOTED. MULTI BRANCH CIRCUITS SHALL NOT SHARE A NEUTRAL. ALL BRANCH CIRCUITS AND FEEDERS SHALL HAVE A SEPARATE EQUIPMENT GROUNDING CONDUCTORS INSTALLED IN THE RACEWAY. 500 West 18th Street, Suite 200 Cheyenne, WY 82001-4368 307.634.7647 175 North 27th Street, Suite 1312 Billings, MT 59101-2048 406.256.1141 = ADJUSTABLE INSTANTANEOUS TRIP EAT = ELECTRONIC ADJUSTABLE TRIP CL = CURRENT LIMITING IC = INSULATED CASE GFCI = GROUND FAULT CIRCUIT INTERRUPTER STRAIGHT BLADE DOUBLE DUPLEX RECEPT. (FOURPLEX) STRAIGHT BLADE SINGLE RECEPTACLE STRAIGHT BLADE DUPLEX RECEPT. HALF-SWITCHED STRAIGHT BLADE DUPLEX RECEPT. ON EMERGENCY CIRCUIT = SHUNT TRIP KI = KEY INTERLOCK ZSI = ZONE-SELECTIVE INTERLOCKING ABBREVIATIONS ENCLOSED CIRCUIT BREAKER, MOLDED-CASE, THERMAL-MAGNETIC FIXED OUTLET WITH SPECIAL DEVICE, AS NOTED WALL MOUNTED OUTLET WITH SPECIAL DEVICE, AS NOTED ENCLOSED FUSED DISCONNECT SWITCH FLOOR MOUNTED POWER BOX, AS NOTED POWER TRANSFORMER FLOOR MOUNTED COMBINATION OUTLET BOX, D ST NOTE: ALL ABBREVIATIONS SHOWN ARE NOT NECESSARILY USED. AC AFC AFF AFG AIC AL BFG CB CR CPT CT CU ELR EM ES ETM EWC FLA FVNR FVR FWE GFI GRC HOA HP IG LC LOR LS LT MCA MCB MCC MCCB MCP MLO NC NIC NL NO NTS OC OL PT RVNR SC SR TTB TVSS UG VFD WG WP XFMR XP ZS CURRENT TRANSFORMER J JUNCTION BOX, AS NOTED J OUTLET BOX J WALL MOUNTED OUTLET BOX GF GROUND FAULT PROTECTION D ABOVE CEILING POWER DISTRIBUTION BOX G GENERATOR 3 MOTOR, NUMBER INDICATES HORSEPOWER TRANSFER SWITCH SURFACE RACEWAY, AS NOTED C CLOCK HANGER OUTLET TELE-POWER POLE PB PULL BOX M CONNECTION TO MOTOR FACP FIRE ALARM CONTROL PANEL MAGNETIC MOTOR STARTER FAGP FIRE ALARM GRAPHIC PANEL FAAP FIRE ALARM ANNUNCIATOR PANEL FIRE ALARM SUBSCRIPTS: MS = MULTISPEED F MANUAL PULL STATION SSRV = SOLID-STATE, REDUCED VOLTAGE VF FIRE ALARM STROBE = VARIABLE FREQUENCY N SAFETY DISCONNECT SWITCH F FUSED DISCONNECT SWITCH F GENERAL ALARM COMBINATION HORN/STROBE H FIRE ALARM HORN F F COMBINATION DISCONNECT AND STARTER SUBSCRIPTS: ENCLOSED CIRCUIT BREAKER, MOLDED-CASE, THERMAL-MAGNETIC FIXED SUBSCRIPTS: ST = SHUNT TRIP CONNECTION TO PRE-WIRED EQUIPMENT PANELBOARD SS C T G TRANSIENT VOLTAGE SURGE SUPPRESSOR = PHOTOELECTRIC I = IONIZATION T = COMBINATION, 135°F TF = COMPENSATION, 135°F PT = COMBINATION PHOTOELECTRIC AND THERMAL T165° = COMBINATION, 165°F T190° ENGINE GENERATOR = COMBINATION, 190°F TF190° = COMPENSATION, 190°F F CIRCUITING CONDUIT RUN CIRCUIT HOMERUN TO PANEL OR CABINET, NO. OF ARROWS INDICATE NO. OF CIRCUITS D SMOKE DETECTOR IN VENTILATING DUCT FAN SHUT-DOWN CONNECTION F F MAG. DOOR HOLDER F SPRINKLER SYSTEM FLOW SWITCH T SPRINKLER SYSTEM TAMPER SWITCH CIRCUIT TURNED UP CONDUIT STUB-OUT - CAP & MARK P TF165° = COMPENSATION, 165°F TRANSFORMER CIRCUIT TURNED DOWN CEILING OR WALL MOUNTED DETECTOR REMOTE PILOT LIGHT P REMOTE PILOT LIGHT WITH TEST SWITCH P/T M M C M CIRCUIT IN FLEXIBLE CONDUIT SEALOFF MONITOR MODULE CONTROL MODULE DAMPER CONNECTION SWITCHING WALL MOUNTED SWITCH COMMUNICATION SYSTEM SUBSCRIPTS: 2 = DOUBLE POLE 3 = 3-WAY 4 = 4-WAY D = DIMMER K = KEY-OPERATED P = PILOT LIGHT T = THERMAL OVERLOAD DS = DOOR SWITCH 11. GFCI DEVICES SHALL BE PROVIDED AS NOTED AND SHALL COMPLY WITH NEC AND LOCAL REQUIREMENTS. NO FEED-THRU GFCI PROTECTION SHALL BE PERMITTED FOR DOWNSTREAM DEVICES. GFCI DUPLEX RECEPTACLES SHALL BE UL 943 2006 "LOCK-OUT" ACTION OR "NOTIFICATION" COMPLIANT. 12. LUMINAIRES SHOWN SHADED SHALL BE CONNECTED TO THE LIFE SAFETY CIRCUIT AS SHOWN ON PLANS. 13. COORDINATE THE INSTALLATION OF COMMUNICATIONS CABLING, ROUTING, MOUNTING BOXES, AND TERMINATIONS WITH THE OWNER OR IT MANAGER, PRIOR TO CONSTRUCTION. 14. ALL LOW VOLTAGE AND SYSTEMS CABLING LOCATED ABOVE THE ACCESSIBLE CEILING SHALL BE PROPERLY RATED FOR THE APPLICATION. WITHOUT EXCEPTION, ALL CABLING SHALL BE HUNG FROM BRIDLE-TYPE RINGS OR PLACED IN CABLE TRAYS BY THE ELECTRICAL CONTRACTOR. IN EXPOSED CEILING AREAS, ALL CABLING SHALL BE RUN IN CONDUIT TO THE NEAREST ACCESSIBLE CEILING LOCATION. 15. THE INFORMATION ON THESE DRAWINGS HAS BEEN ASCERTAINED FROM EXISTING DRAWINGS AND FIELD OBSERVATIONS. THIS INFORMATION IS AS ACCURATE AS CONDITIONS WOULD ALLOW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE, PRIOR TO BID, AND BECOME FAMILIAR WITH THE EXTENT OF THE WORK REQUIRED. NO EXTRAS WILL BE ALLOWED FOR ALTERATIONS OF A FORESEEABLE NATURE THAT ARE REQUIRED TO ACHIEVE THE END RESULT AS INDICATED BY THE CONTRACT DOCUMENTS. 16. ON DEMOLITION PLANS: ALL ITEMS SHOWN IN LIGHT LINE WEIGHT ARE EXISTING TO REMAIN, UNLESS NOTED OTHERWISE. ALL ITEMS SHOWN IN HEAVY LINE WEIGHT SHALL BE REMOVED, UNLESS NOTED OTHERWISE. 17. ON NEW FLOOR PLANS: ALL ITEMS SHOWN IN LIGHT LINE WEIGHT ARE EXISTING TO REMAIN, UNLESS NOTED OTHERWISE. ALL ITEMS SHOWN IN HEAVY LINE WEIGHT ARE NEW OR RELOCATED AS NOTED. 18. THE NEW WIRING REQUIRED IN REMODELED AREAS SHALL BE FISHED THROUGH EXISTING WALLS OR CONCEALED IN NEW WALLS OR ABOVE CEILINGS. SURFACE MOUNTED CONDUIT SHALL NOT BE USED IN ANY FINISHED AREAS. 19. ITEMS THAT ARE SHOWN TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY INCLUDING ALL ASSOCIATED ELECTRICAL DEVICES AND WIRE BACK TO THE POINT OF ORIGIN OR THE NEAREST EXISTING ITEM THAT IS REMAINING, UNLESS NOTED OTHERWISE. CONDUIT TO BE ABANDONED IN PLACE, CAPPED AND MARKED FOR FUTURE USE. WHERE EXISTING DEVICES, SWITCHES, MOTOR CONNECTIONS, ETC. ARE TO BE REMOVED FROM WALLS WHICH ARE REMAINING, WALLS SHALL BE PATCHED TO MATCH ORIGINAL FINISH, AFTER CONDUCTORS HAVE BEEN REMOVED. BLANK COVERPLATES OVER EXISTING BOXES ARE NOT ACCEPTABLE. IF EXISTING CONDUITS ARE ROUTED IN CONCRETE FLOOR SLABS, WALLS OR CEILINGS, THEY SHALL BE CUT BACK TO WITHIN CONCRETE AND FILLED WITH GROUT TO ACHIEVE A SMOOTH AND EVEN FINISH FLUSH WITH CONCRETE SURFACE AFTER CONDUCTORS HAVE BEEN REMOVED. IF CONDUITS PENETRATE THE ROOF DECK, THEY SHALL BE CUT BACK TO BELOW THE DECK, CAPPED AND MARKED FOR FUTURE USE. C 20. MAINTAIN CIRCUIT CONTINUITY FOR EXISTING ITEMS THAT ARE REMAINING OR BEING RELOCATED. 21. PROVIDE TYPED UPDATED PANEL DIRECTORIES FOR ALL EXISTING PANELS AFFECTED BY REMODEL WORK. PROVIDE NEW CIRCUIT BREAKER NUMBER IDENTIFICATION AS REQUIRED. 22. ALL RECEPTACLES AND SWITCH COVERS SHALL BE NEATLY LABELED WITH PERMANENT MARKER OR LABEL MAKER WITH PANELBOARD AND CIRCUIT NUMBER. 23. J-BOXES AND PULL BOXES SHALL BE NEATLY LABELED WITH BLACK PERMANENT MARKER WITH PANELBOARD AND BRANCH CIRCUIT NUMBERS OR SYSTEM IDENTIFICATION. WALL MOUNTED COMBINATION TELEPHONE/DATA OUTLET BOX W GENERAL NOTES-FIRE ALARM SYSTEMS WALL MOUNTED TELEPHONE OUTLET, +48" AFF TELEPHONE TERMINAL BOARD - TTB S S CEILING OR WALL MOUNTED SPEAKER 1. VERIFY THAT THE EXISTING FIRE ALARM SYSTEM IS OPERATING PROPERLY AND DOCUMENT ALL DEFICIENCIES PRIOR TO CONSTRUCTION. CONFIRM THAT THERE IS ADEQUATE CAPACITY ON EXISTING CIRCUITS FOR THIS WORK AND UPGRADE THE PANEL AS NECESSARY. PROVIDE BATTERY AND CIRCUIT LOAD CALCULATIONS AS REQUIRED. COMPLETE THE FIRE ALARM PROGRAMMING, UPDATE RELATED GRAPHIC DISPLAYS, AND THEN TEST THE NEW CIRCUITS AT THE END OF THE PROJECT. 2. THE LOCATIONS OF SMOKE DETECTORS SHOWN ARE CONSIDERED TO BE SCHEMATIC ONLY. THE ACTUAL LOCATIONS (SPACING TO ADJACENT DETECTORS, DIFFUSERS, WALLS, ETC.) ARE REQUIRED TO MEET NFPA 72. 3. ALL STROBES AND HORN/STROBES SHALL BE SYNCHRONIZED PER NFPA AND LOCAL REQUIREMENTS. CEILING OR WALL MOUNTED CLOCK SECURITY SYSTEM S WALL SWITCH, WA-200 I INTRUSION MOTION DETECTOR AS SPECIFIED TS TIMED SWITCH, TS-400 S SIREN K KEYPAD CEILING MOUNTED DUAL TECH, DT-305 E CR SCP EGRESS BUTTON CARD READER 4. SECURITY CONTROL PANEL SURVEILLANCE CAMERA CONTROLS CONTACT DOOR SWITCH IN JAMB OR HINGE PUSH BUTTON CONTROL STATION, AS INDICATED THERMOSTAT - BY OTHERS D WALL MOUNTED DATA OUTLET OCCUPANCY SENSORS T 10. BACK TO BACK MOUNTING OF RECEPTACLES OR COMMUNICATION OUTLETS IS NOT PERMITTED. THE MINIMUM SEPARATION BETWEEN DEVICES SHALL BE 6" O.C. IN COMMON WALLS AND 24" O.C. IN SOUND-RATED WALLS. WALL MOUNTED TELEPHONE OUTLET DUAL-LEVEL SWITCHES ALL MODEL NUMBERS SHOWN ARE WATTSTOPPER. - ABOVE COUNTER - ABOVE FINISHED CEILING - ABOVE FINISHED FLOOR - ABOVE FINISHED GRADE - AMPS INTERRUPTING CURRENT - ALUMINUM - BELOW FINISHED GRADE - CIRCUIT BREAKER - CORROSION RESISTANT - CONTROL POWER TRANSFORMER - CURRENT TRANSFORMER - COPPER - END OF LINE RESISTOR - EMERGENCY - EMERGENCY STOP - ELAPSED TIME METER - ELECTRIC WATER COOLER - FULL LOAD AMPS - FULL VOLTAGE, NON-REVERSING - FULL VOLTAGE, REVERSING - FURNISHED WITH EQUIPMENT - GROUND FAULT INTERRUPTER - GALVANIZED RIGID CONDUIT - HAND-OFF-AUTOMATIC - HORSEPOWER - ISOLATED GROUND - LIGHTING CONTACTOR - LOCAL-OFF-REMOTE - LEVEL SWITCH - LET THROUGH - MINIMUM CIRCUIT AMPS - MAIN CIRCUIT BREAKER - MOTOR CONTROL CENTER - MOLDED CASE CIRCUIT BREAKER - MOTOR CIRCUIT PROTECTION - MAIN LUGS ONLY - NORMALLY CLOSED - NOT IN CONTRACT - NIGHT LIGHT - NORMALLY OPEN - NOT TO SCALE - OVER CURRENT - OVERLOAD - POTENTIAL TRANSFORMER - REDUCED VOLTAGE, NON-REVERSING - SHORT CIRCUIT - SAFE OR STOP/RUN - TELEPHONE TERMINAL BOARD - TRANSIENT VOLTAGE SURGE SUPPRESSER - UNDERGROUND - VARIABLE FREQUENCY DRIVE - WIREGUARD - WEATHERPROOF - TRANSFORMER - EXPLOSION PROOF - LIMIT OR POSITION SWITCH ADA COMPLIANCE: ELECTRICAL DEVICES PROJECTING FROM THE WALLS WITH THEIR LEADING EDGES BETWEEN 27" AND 80" AFF SHALL PROTRUDE NO MORE THAN 4" INTO WALKWAYS OR CORRIDORS. FLOOR MOUNTED TELEPHONE AND/OR DATA OUTLET BOX, AS NOTED LV = LOW VOLTAGE B 9. B PROJECT #: 2011.01.0143 DRAWN BY: CW IF REQUIRED BY THE AUTHORITY HAVING JURISDICTION, THE CONTRACTOR SHALL OBTAIN A STATE REGISTERED ENGINEER TO REVIEW, SEAL, AND SIGN SHOP DRAWINGS FOR PLAN REVIEW SUBMISSION. THE ENGINEER OF RECORD FOR THESE DRAWINGS SHALL NOT SEAL THE FIRE ALARM SHOP DRAWINGS. CHECKED BY: ETM ISSUE DATE: 2.9.12 MAGNETIC DOOR LOCK M ELECTRONIC DOOR STRIKE S 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 SSRV = SOLID-STATE, REDUCED VOLTAGE 4. POUDRE SCHOOL DISTRICT CEILING OR WALL MOUNTED EXIT SIGN, INSTALL FACES AS INDICATED BY SHADING = MULTISPEED CONSTRUCTION DOCUMENTS MS WERNER ELEMENTARY RENOVATION PROJECT FLUORESCENT STRIP LUMINAIRE ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL COST TO THE OWNER. SEAL 7600 East Orchard Road, Suite 250-S Greenwood Village, CO 80111-2518 303.796.6000 www.mkkeng.com SUBSCRIPTS: 3. CONSULTANT MAGNETIC MOTOR STARTER RECESS MOUNTED FLUORESCENT LUMINAIRE = SURGE SUPRRESSION E FUSES CEILING OR WALL MOUNTED FLUORESCENT LUMINAIRE SS Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com PROJECT PHASE E CONSULTING ENGINEERS, INC. ELECTRICAL COVER SHEET ELECTRICAL DEMO FLOOR PLAN - AREA A ELECTRICAL DEMO FLOOR PLAN - AREA B ELECTRICAL DEMO FLOOR PLAN - AREA C POWER/SYSTEMS NEW FLOOR PLAN - AREA A POWER/SYSTEMS NEW FLOOR PLAN - AREA B POWER/SYSTEMS NEW FLOOR PLAN - AREA C ADMINISTRATION AREA ELECTRICAL PLANS ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHEDULES ELECTRICAL SCHEDULES & DETAILS PROJECT INFORMATION ELECTRICAL LEGEND E0.0 ED101A ED101B ED101C E101A E101B E101C E201 E301 E401 ARCHITECT DRAWING LAYOUT REVISIONS NO DESCRIPTION A 1 1- UPPER CASE LETTER AT LUMINAIRES (F1, I 1, ETC.) INDICATES LUMINAIRE TYPE. F1 = TYPE F1 LUMINAIRES IN AREA INDICATED. 2- LOWER CASE LETTER AT LUMINAIRES AND SWITCHES (a, b, ETC.) INDICATE ASSOCIATED UNITS FOR SWITCHING. 3- SHADING WITHIN LUMINAIRE DENOTES ON EMERGENCY CIRCUIT. 4- "NL" WITHIN LUMINAIRES DENOTES UNIT ON NIGHT LIGHT CIRCUIT. 5- PLUS (+) SIGN WITH DIMENSION AT OUTLET INDICATES HEIGHT ABOVE FINISHED FLOOR OR GRADE TO CENTERLINE OF OUTLET. 2 A 3 4 5 6 SHEET INFORMATION 2/8/2012 11:38:03 AM - PLOT DATE NOTATIONS ELECTRICAL COVER SHEET E0.0 DATE 2 3 4 5 6 ARCHITECT 1 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com E GENERAL NOTES: SEAL A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY. B. PROVIDE COVERPLATES ON ALL UNUSED JUNCTION BOXES. MATCHLINE 3 3 AIR LOCK 001 LB STORAGE 006 M M 1. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT VENTILATOR TO BE REMOVED IN ITS ENTIRETY. REMOVE BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE. MECHANICAL 11 2. DISCONNECT EXHAUST FAN TO BE REMOVED IN ITS ENTIRETY. REMOVE BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE. M M 1 CORRIDOR 003 M BOYS 004 1 CLASSROOM 108 WORKROOM/ CONFERENCE 109 GIRLS 005 M 4. REFER TO SHEET E201, ADMINISTRATION AREA ELECTRICAL DEMOLITION PLAN, FOR ADDITIONAL DEMOLITION WORK IN THIS AREA. 5 5. DISCONNECT EXISTING ROOF MONITOR SHADE CONTROL MOTOR ASSEMBLY TO BE REMOVED. REMOVE CONTROL BUTTON, CONTROL WIRES AND BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE, CONDUIT TO ABANDONED IN PLACE. PROVIDE COVERPLATE ON CONTROL BUTTON BACK BOX AND ALL UNUSED J-BOXES. 5 5 5 5 1 CLASSROOM 104 CLASSROOM 107 M M PROJECT PHASE 2 5 1 D T M EF-6 120V 1/3 HP CORRIDOR 007 M M M M M CLASSROOM 105 M CORRIDOR 008 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 3. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT VENTILATOR TO BE REPLACED WITH NEW FAN COIL UNIT. SAVE AND PROTECT BRANCH CIRCUIT WIRES FOR REUSE. CORRIDOR 023 CLASSROOM 103 D FLAG NOTES THIS SHEET: CONSTRUCTION DOCUMENTS 4 AIR LOCK 024 CONSULTANT CORRIDOR 002 SEE 1 / ED101C SEE 1 / ED101B VALVE 10 MATCHLINE SEE 1 / ED101B MATCHLINE M M M M CLASSROOM 106 1 1 C CORRIDOR 009 STORAGE 012 T 013 T 014 STORAGE 015 AIR LOCK 022 T 016 T 017 T 018 STORAGE 021 T 019 5 5 5 M CLASSROOM 102 M M M M M CLASSROOM 101 1 1 M M M B B 1 1 PROJECT INFORMATION CLASSROOM 100 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 AIR LOCK 011 EF-5 120V 1/3 HP POUDRE SCHOOL DISTRICT T M 2 WERNER ELEMENTARY RENOVATION PROJECT C PROJECT #: 2011.01.0143 DRAWN BY: CW CHECKED BY: ETM ISSUE DATE: 2.9.12 N REVISIONS 1 ELECTRICAL DEMO FLOOR PLAN - AREA "A" NO DESCRIPTION DATE A A 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 11:38:18 AM - PLOT DATE 1/8" = 1'-0" ELECTRICAL DEMO FLOOR PLAN - AREA A ED101A 2 3 4 TOILET 033 5 6 WATER HEATER 032 ARCHITECT 1 STORAGE 034 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com E KITCHEN 402 K GENERAL NOTES: 10 5 F M 4 T M A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY. SEAL P-7 M T B. PROVIDE COVERPLATES ON ALL UNUSED JUNCTION BOXES. 8 1 M M M M M M M M M 1. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT VENTILATOR TO BEREMOVED IN ITS ENTIRETY. REMOVE BRANCH CIRCUIT WIRE TO BACK TO SOURCE. M DISTRICT-WIDE 406 8 3. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT VENTILATOR TO BE REPLACED WITH NEW FAN COIL UNIT. SAVE AND PROTECT BRANCH CIRCUIT WIRES FOR REUSE. GYMNASIUM 400 TOILET 035 4. DISCONNECT EXISTING 120V KITCHEN EVAP COOLER TO BE REMOVED IN IT'S ENTIRETY. REMOVE BRANCH CIRCUIT WIRES AND CONNECTION TO EXISTING KITCHEN HOOD FIRE SUPPRESSION SYSTEM BACK TO NEAREST SOURCE. D M 036 M M M M M M M M M M M 5. DISCONNECT EXISTING 208V-3PHASE KITCHEN SUPPLY FAN TO BE REMOVED IN IT'S ENTIREY. REMOVE BRANCH CIRCUIT WIRES BACK TO SOURCE. M 6. REFER TO SHEET E201, ADMINISTRATION AREA ELECTRICAL DEMOLITION PLAN, FOR ADDITIONAL DEMOLITION WORK IN THIS AREA. M RESOURCE 405 SPEECH 404 8 7. DISCONNECT 208V-3, 2HP PUMPS TO BE REPLACED WITH NEW. REMOVE ASSOCIATED DEVICES, WIRE AND CONDUIT BACK TO SOURCE. FLEX ROOM 401 1 M M 8. DISCONNECT EXISTING ROOF MONITOR SHADE CONTROL MOTOR ASSEMBLY TO BE REMOVED. REMOVE CONTROL BUTTON, CONTROL WIRES AND BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE, CONDUIT TO ABANDONED IN PLACE. PROVIDE COVERPLATE ON CONTROL BUTTON BACK BOX AND ALL UNUSED J-BOXES. REFER TO MEZZANINE ELECTRICAL DEMOLITION PLAN ON THIS SHEET. T 3 CONFERENCE 407A 6 AIR LOCK 039 8 M ELECTRICAL 30 M PHONE 044 WORKROOM 049 1 UP M COMPUTER LAB 303 AV STORAGE/ IT ROOM 304 T M 10. DISCONNECT 120V, 1/25HP PUMP TO BE REPLACED. SAVE AND PROTECT BRANCH CIRCUIT WIRES FOR REUSE. C MDP EF-19 120V 1/4 HP MEN 046 UP EM LA 2 TOILET 027 9. DISCONNECT 208V-3PHASE AIR COMPRESSOR AND 120V AIR DRYER TO BE REMOVED IN THEIR ENTIRETY. REMOVE BRANCH CIRCUIT WIRES BACK TO SOURCE. AIR LOCK 026 FACP M GYM STORAGE 41 WOMEN 041 MEN 042 1 OFFICE 408 CORRIDOR 031 C TEACHER'S LOUNGE 504 CUSTODIAL/ STORAGE 40 STORAGE 42 MATCHLINE COUNSELOR 403 SEE 1 / ED101C ITIN 407B M M ART 215 8 AV AREA 043 3 UP CLINIC 503 WOMEN 047 UP CORRIDOR 052 TOILET 048 8 RECEPTION 500 M M M CORRIDOR 051 M M M M M M M M M 8 CORRIDOR 025 B B 8 M PRINCIPAL 502 CONFERENCE 501 MUSIC 200 M M UP 1 WORKROOM 301 CONFERENCE 302 MATCHLINE SEE 1 / ED101A PROJECT INFORMATION 1 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 TIME OUT 037 D POUDRE SCHOOL DISTRICT 2 WERNER ELEMENTARY RENOVATION PROJECT EF-11 120V 1/4 HP M 2. DISCONNECT EXHAUST FAN TO BE REMOVED IN ITS ENTIRETY. REMOVE BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE. 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 CONSTRUCTION DOCUMENTS M M CONSULTANT M PROJECT PHASE M FLAG NOTES THIS SHEET: PROJECT #: 2011.01.0143 MATCHLINE SEE 1 / ED101A VALVE 10 DRAWN BY: CW CORRIDOR 002 AIR LOCK 024 CHECKED BY: ETM ISSUE DATE: 2.9.12 N REVISIONS 1 ELECTRICAL DEMO FLOOR PLAN - AREA "B" NO DESCRIPTION DATE BOILER ROOM 29 F M F M AD MECHANICAL ROOM 28 M M AC T F 7 A 9 UP A M N 2 MEZZANINE ELECTRICAL DEMOLITION PLAN 1/8" = 1'-0" 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 11:38:19 AM - PLOT DATE 1/8" = 1'-0" ELECTRICAL DEMO FLOOR PLAN - AREA B ED101B 2 3 4 5 6 ARCHITECT 1 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com E GENERAL NOTES: SEAL A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY. B. PROVIDE COVERPLATES ON ALL UNUSED JUNCTION BOXES. 1 1 GROUP 068 1. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT VENTILATOR TO BE REMOVED IN ITS ENTIRETY. REMOVE BRANCH WIRES BACK TO SOURCE. 1 2. DISCONNECT EXHAUST FAN TO BE REMOVED IN ITS ENTIRETY. REMOVE BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE. CLASSROOM 211 M M M CLASSROOM 210 M 4 T M M M EF-4 120V 1/4 HP T M 2 4 M M D GROUP 064 4 CONFERENCE/ WORKROOM 214 4. DISCONNECT EXISTING ROOF MONITOR SHADE CONTROL MOTOR ASSEMBLY TO BE REMOVED. REMOVE CONTROL BUTTON, CONTROL WIRES AND BRANCH CIRCUIT WIRES BACK TO NEAREST SOURCE, CONDUIT TO ABANDONED IN PLACE. PROVIDE COVERPLATE ON CONTROL BUTTON BACK BOX AND ALL UNUSED J-BOXES. M 4 CORRIDOR 067 1 M M 4 EF-2 120V 1/2 HP 2 CLASSROOM 209 M 4 GROUP 069 COMPUTER LAB 213 M M 3. DISCONNECT 120V, FRACTIONAL HORSEPOWER UNIT VENTILATOR TO BE REPLACED WITH NEW FAN COIL UNIT. SAVE AND PROTECT BRANCH CIRCUIT WIRES FOR REUSE. GIRLS 066 M BOYS 065 PROJECT PHASE D M SEE 1 / ED101B MATCHLINE CLASSROOM 212 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 CONSTRUCTION DOCUMENTS 1 CONSULTANT FLAG NOTES THIS SHEET: CLASSROOM 208 M M ART & MUSIC STORAGE/ IT ROOM 21 1 3 1 CORRIDOR 053 M M CORRIDOR 061 M CLASSROOM 201 BOYS 055 GIRLS 056 EF-23 120V 1/3 HP 2 SEE 1 / ED101B MATCHLINE M 4 EF-3 120V 1/3 HP CORRIDOR 057 GROUP 054 M CLASSROOM 206 1 2 T M GROUP 059 4 M M WORKROOM/ CONFERENCE 207 4 T M B 3 LC 4 M M M CLASSROOM 202 M 4 M M CLASSROOM 203 1 1 4 M M M M CLASSROOM 204 GROUP 058 M B CLASSROOM 205 1 1 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 CUST/ MECH 20 STORAGE 062 C POUDRE SCHOOL DISTRICT 3 PROJECT INFORMATION C AIR LOCK 063 3 WERNER ELEMENTARY RENOVATION PROJECT CORRIDOR 052 PROJECT #: 2011.01.0143 DRAWN BY: CW CHECKED BY: ETM ISSUE DATE: 2.9.12 REVISIONS NO DESCRIPTION DATE N 1 ELECTRICAL DEMO FLOOR PLAN - AREA "C" A A 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 11:38:20 AM - PLOT DATE 1/8" = 1'-0" ELECTRICAL DEMO FLOOR PLAN - AREA C ED101C 2 3 4 5 6 ARCHITECT 1 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com E GENERAL NOTES: SEAL A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY. B. CONTRACTOR TO TEMPORARILY REMOVE EXISTING LUMINAIRES, SPEAKERS AND FIRE ALARM DEVICES AT THE EXISTING CEILINGS AND STRUCTURE AFFECTED BY NEW MECHANICAL WORK AND REINSTALL AFTER WORK HAS BEEN COMPLETED. COORDINATE EXACT REQUIREMENTS WITH ARCHITECT AND MECHANICAL CONTRACTOR. VESTIBULE 001 FCU-3 TO MDP RTU-2 WP CORRIDOR 002 2 J SEE 1 / E101B D AIR LOCK 024 4 WP FCU-4 J 3 J CORRIDOR 003 D CLASSROOM 103 BOYS 004 2 3. REFER TO SHEET E201, ADMINISTRATION AREA POWER AND SYSTEMS PLAN, FOR WORK IN THIS AREA. MECHANICAL 11 STORAGE 006 1. ALTERNATE #1: PROVIDE J-BOX ABOVE CEILING WITH 120V CONNECTION FOR VAV CONTROL. 2. CONNECT NEW FAN COIL TO EXISTING BRANCH CIRCUIT SAVED DURING DEMOLITION OF EXISTING UV UNIT. LB CUH-1 FLAG NOTES THIS SHEET: 4. PROVIDE NEW FIRE ALARM DUCT SMOKE DETECTOR IN RETURN DUCTWORK TO MATCH EXISTING SIMPLEX FIRE ALARM SYSTEM. PROVIDE ALL NECESSARY COMPONENTS AND CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION. CORRIDOR 023 GIRLS 005 CLASSROOM 108 WORKROOM/ CONFERENCE D 5. CONTRACTOR TO RELOCATE EXISTING ELECTRICAL DEVICES WHERE THE NEW BASEBOARD HEATER AND DIFFUSER DROPS ARE TO BE INSTALLED. COORDINATE NEW LOCATION OF EXISTING DEVICES WITH ARCHITECT AND MECHANICAL CONTRACTOR PRIOR TO WORK. PROJECT PHASE 109 CORRIDOR 007 5 CLASSROOM 104 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 CONSTRUCTION DOCUMENTS LB-16 F CONSULTANT J 5 CLASSROOM 107 LOCATION OF NEW BASEBOARD HEATER (TYPICAL) CLASSROOM 105 5 CORRIDOR 008 CLASSROOM 106 5 LB-2 1 AIR LOCK 022 CORRIDOR 009 T 013 STORAGE 012 T 014 T 016 STORAGE 015 T 017 T 018 T 019 STORAGE 021 CLASSROOM 101 B B 5 5 PROJECT INFORMATION CLASSROOM 102 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 J AIR LOCK 011 C POUDRE SCHOOL DISTRICT C WERNER ELEMENTARY RENOVATION PROJECT VALVE 10 F SEE 1 / E101B SEE 1 / E101C MATCHLINE MATCHLINE MATCHLINE PROJECT #: 2011.01.0143 DRAWN BY: CW CHECKED BY: ETM ISSUE DATE: 2.9.12 REVISIONS NO DESCRIPTION DATE N 1 POWER/SYSTEMS NEW FLOOR PLAN - AREA "A" A A 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 11:38:06 AM - PLOT DATE 1/8" = 1'-0" POWER/SYSTEMS NEW FLOOR PLAN - AREA A E101A 1 2 3 4 5 6 Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com E STORAGE 034 KITCHEN 402 GENERAL NOTES: P-7 M T A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY. 9 B. ELECTRICAL CONTRACTOR TO TEMPORARILY REMOVE EXISTING LUMINAIRES, SPEAKERS AND FIRE ALARM DEVICES AT THE EXISTING CEILINGS AND STRUCTURE AFFECTED BY NEW MECHANICAL WORK AND REINSTALL AFTER WORK HAS BEEN COMPLETED. COORDINATE EXACT REQUIREMENTS WITH ARCHITECT AND MECHANICAL CONTRACTOR. KMAU F K SEAL E ARCHITECT TOILET 033 WP WP,GFI 5 4 M-(29,31,33) CONSULTANT FLAG NOTES THIS SHEET: 8 1. ALTERNATE #M1: PROVIDE J-BOX ABOVE CEILING WITH 120V CONNECTION FOR VAV CONTROL. 2. CONNECT NEW FAN COIL TO EXISTING BRANCH CIRCUIT SAVED DURING DEMOLITION OF EXISTING UV UNIT. DISTRICT-WIDE 406 3. REFER TO SHEET E201, ADMINISTRATION AREA POWER AND SYSTEMS PLAN, FOR WORK IN THIS AREA. 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 4. CONNECT TO NEAREST RECEPTACLE CIRCUIT IN AREA. GYMNASIUM 400 FLEX ROOM 401 TIME OUT 037 6. PROVIDE NEW FIRE ALARM DUCT SMOKE DETECTOR IN RETURN DUCTWORK TO MATCH EXISTING SIMPLEX FIRE ALARM SYSTEM. PROVIDE ALL NECESSARY COMPONENTS AND CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION. 7. PROVIDE EMERGENCY SHUT-DOWN OF BOILERS. REFER TO BOILER EMERGENCY POWER OFF DETAIL ON DRAWING E401. SPEECH 404 FCU-1 2 STORAGE 42 CUSTODIAL/ STORAGE 40 OFFICE 408 GYM STORAGE 41 TOILET 027 UP 3 AIR LOCK 039 9. CONNECT NEW 120V, 1/6HP PUMP TO EXISTING BRANCH CIRCUIT WIRES SAVED DURING DEMOLITION. MATCHLINE COUNSELOR 403 CONFERENCE 407A REFER TO MEZZANINE POWER AND SYSTEMS PLAN ON THIS SHEET. SEE 1 / E101C J 8. CONTRACTOR TO RELOCATE EXISTING ELECTRICAL DEVICES WHERE THE NEW BASEBOARD HEATER AND DIFFUSER DROPS ARE TO BE INSTALLED. COORDINATE NEW LOCATION OF EXISTING DEVICES WITH ARCHITECT AND MECHANICAL CONTRACTOR PRIOR TO WORK. PROJECT PHASE RESOURCE 405 ITIN 407B D CONSTRUCTION DOCUMENTS TOILET 035 D 5. PROVIDE NEW CONNECTION TO EXISTING KITCHEN HOOD FIRE SUPPRESION SYSTEM FOR SHUT DOWN OF KMUA. WHEN FIRE SUPPRESSION SYSTEM ACTIVATES MAKE-UP AIR SUPPLIED TO HOOD SHALL BE SHUT OFF. PROVIDE ALL NECESSARY COMPONENTS AND CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION. AIR LOCK 026 EXISTING NOTIFIER FIRE ALARM CONTROL PANEL CORRIDOR 031 C C 8 UP COMPUTER LAB 303 ART 215 MDP RTU-4 PHONE 044 AV STORAGE/ IT ROOM D 304 F F WP WP,GFI MEN 046 WOMEN RECEPTION 047 WORK ROOM 049 J 500 UP CLINIC 503 AV AREA 043 6 UP 4 2 TOILET 048 FCU-2 M-(32,34,36) CORRIDOR 051 CORRIDOR 052 MEDIA CENTER 300 CORRIDOR 025 B B MUSIC 200 3 UP VAV WORKROOM 301 CONFERENCE 302 J PROJECT INFORMATION PHONE 045 1 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 WOMEN 041 POUDRE SCHOOL DISTRICT LA MEN 042 FACP ELECTRICAL 30 TEACHER'S LOUNGE 504 LOCATION OF NEW BASEBOARD HEATER (TYPICAL) WERNER ELEMENTARY RENOVATION PROJECT EM PROJECT #: 2011.01.0143 LB-12 DRAWN BY: CW CHECKED BY: ETM ISSUE DATE: 2.9.12 N 1 POWER/SYSTEMS NEW FLOOR PLAN - AREA "B" REVISIONS 1/8" = 1'-0" NO DESCRIPTION DATE 7 J TCP BOILER ROOM 29 2/8/2012 11:38:10 AM - PLOT DATE M-23 M-7 M (20,22,24) P-2 M P-1 M 7 M (14,16,18) MECHANICAL ROOM 28 UP M A A N 2 MEZZANINE POWER AND SYSTEMS PLAN 1/8" = 1'-0" 1 2 3 4 5 6 SHEET INFORMATION TCP J POWER/SYSTEMS NEW FLOOR PLAN - AREA B E101B 2 3 4 5 6 ARCHITECT 1 E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com E GENERAL NOTES: SEAL A. DEVICES SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING DEVICES TO REMAIN, SHOWN FOR REFERENCE ONLY. B. ELECTRICAL CONTRACTOR TO TEMPORARILY REMOVE EXISTING LUMINAIRES, SPEAKERS AND FIRE ALARM DEVICES AT THE EXISTING CEILINGS AND STRUCTURE AFFECTED BY NEW MECHANICAL WORK AND REINSTALL AFTER WORK HAS BEEN COMPLETED. COORDINATE EXACT REQUIREMENTS WITH ARCHITECT AND MECHANICAL CONTRACTOR. CONSULTANT FLAG NOTES THIS SHEET: 1. ALTERNATE M1: PROVIDE J-BOX ABOVE CEILING WITH 120V CONNECTION FOR VAV CONTROL. 2. CONNECT NEW FAN COIL TO EXISTING BRANCH CIRCUIT SAVED DURING DEMOLITION OF EXISTING UV UNIT. 4 CLASSROOM 211 SEE 1 / E101B MATCHLINE CLASSROOM 210 4 4. CONTRACTOR TO RELOCATE EXISTING ELECTRICAL DEVICES WHERE THE NEW BASEBOARD HEATER AND DIFFUSER DROPS ARE TO BE INSTALLED. COORDINATE NEW LOCATION OF EXISTING DEVICES WITH ARCHITECT AND MECHANICAL CONTRACTOR PRIOR TO WORK. CLASSROOM 209 D 4 TV TV GROUP 069 GROUP 064 CORRIDOR 067 PROJECT PHASE CLASSROOM 212 D 3. PROVIDE NEW FIRE ALARM DUCT SMOKE DETECTOR IN RETURN DUCTWORK TO MATCH EXISTING SIMPLEX FIRE ALARM SYSTEM. PROVIDE ALL NECESSARY COMPONENTS AND CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION. 4 1 COMPUTER LAB 213 CLASSROOM 208 CONFERENCE/ WORKROOM J CONSTRUCTION DOCUMENTS GROUP 068 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 214 LC-8 GIRLS 066 FCU-6 BOYS 065 ART & MUSIC STORAGE/ IT ROOM 21 RTU-1 J J F WP J WP FCU-5 TO MDP WORKROOM/ CONFERENCE 207 CLASSROOM 201 SEE 1 / E101B GROUP 059 TV 4 4 MATCHLINE CLASSROOM 206 CORRIDOR 057 TV B 2 CUST/ MECH 20 LC LC-10 GIRLS 056 GROUP 054 AIR LOCK 063 2 J BOYS 055 C FCU-7 CORRIDOR 053 4 4 B CLASSROOM 203 CLASSROOM 202 CLASSROOM 204 CLASSROOM 205 4 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 2 CORRIDOR 052 3 CORRIDOR 061 STORAGE 062 POUDRE SCHOOL DISTRICT F FCU-8 C D WERNER ELEMENTARY RENOVATION PROJECT J PROJECT INFORMATION 2 4 GROUP 058 PROJECT #: 2011.01.0143 DRAWN BY: CW CHECKED BY: ETM ISSUE DATE: 2.9.12 REVISIONS NO DESCRIPTION DATE N 1 POWER/SYSTEMS NEW FLOOR PLAN - AREA "C" A A 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 11:38:12 AM - PLOT DATE 1/8" = 1'-0" POWER/SYSTEMS NEW FLOOR PLAN - AREA C E101C 1 2 3 4 5 ITIN 407B 6 COUNSELOR 403 CONFERENCE 407A ARCHITECT GENERAL NOTES: A. ITEMS SHOWN IN LIGHT LINE WEIGHT INDICATES EXISTING DEVICES TO REMAIN, SHOWN FOR REFERENCE. B. CONTRACTOR TO PROVIDE RACEWAY, J-BOXES AND 120V CONNECTIONS FOR SECURITY SYSTEM WORK. DISTRICT SECURITY DEPARTMENT TO PROVIDE DEVICES AND CONNECTIONS. AIR LOCK 039 CR 13 E MEN 042 14 ELECTRICAL 30 LA PHONE 044 FACP EM TEACHER'S LOUNGE 504 C. ELECTRICAL CONTRACTOR TO PROVIDE RACEWAY AND BACK-BOXES FOR DATA/TELE. OWNER TO PROVIDE DEVICES AND CONNECTIONS. E D. ELECTRICAL CONTRACTOR TO TEMPORARILY REMOVE EXISTING LUMINAIRES, SPEAKERS AND FIRE ALARM DEVICES AT THE EXISTING CEILINGS AND STRUCTURE AFFECTED BY NEW MECHANICAL WORK AND REINSTALL AFTER WORK HAS BEEN COMPLETED. COORDINATE EXACT REQUIREMENTS WITH ARCHITECT AND MECHANICAL CONTRACTOR. SEAL M FLAG NOTES THIS PLAN: MDP AV STORAGE/ IT ROOM 304 Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com 1. DISCONNECT AND REMOVE CEILING MOUNTED LUMINAIRE. SAVE AND PROTECT DEVICES AND BRANCH CIRCUIT WIRES FOR INSTALLATION IN NEW LOCATION. 2. EXISTING SURFACE MOUNTED LUMINAIRE TO REMAIN. UP CLINIC 503 4. DISCONNECT AND REMOVE CEILING FAN, CONTROL SWITCH AND WIRES. RETURN FAN TO OWNER. 5. DISCONNECT EXISTING RAULAND INTERCOM PBX TO BE RELOCATED. SAVE AND PROTECT INTERCOM WIRES FOR EXTENSION TO NEW LOCATION. TOILET 048 10 15 CR 2 RECEPTION 500 M 5 6. DISCONNECT AND REMOVE, EXIT SIGN, SPEAKERS AND MOTION SENSORS IN THIS AREA. SAVE AND PROTECT DEVICES AND WIRES FOR INSTALLATION IN NEW LOCATION. 16 M 7. DISCONNECT AND REMOVE RECESSED LUMINAIRE. SAVE AND PROTECT BRANCH CIRCUIT WIRES. CORRIDOR 051 D 8. FIRE ALARM ANNUNCIATOR PANEL TO REMAIN. D 9. SECURITY KEYPAD TO REMAIN. 4 4 I 3 PRINCIPAL 502 12 2 11 10. DISCONNECT AND REMOVE SURFACE MOUNTED RECEPTACLE AT EXISTING COPY MACHINE LOCATED AT END OF CABINET. SAVE AND PROTECT BRANCH CIRCUIT WIRES. CONFERENCE 501 1 11. VISITOR COMPUTER WORK STATION TO BE RELOCATED. SAVE AND PROTECT BRANCH CIRCUIT WIRES FOR REUSE. UP M M 12. DISCONNECT AND REMOVE SECURITY ALARM SENSOR. SAVE AND PROTECT FOR INSTALLATION IN NEW LOCATION BY DISTRICT SECURITY DEPT. 6 +72" 4 4 13. DISCONNECT PNEUMATIC ADA OPERATOR COMPRESSOR AND CONTROLS TO BE REPLACED WITH NEW ELECTRIC TYPE. SAVE AND PROTECT BRANCH CIRCUIT WIRES AND CONDUIT FOR REUSE. VERIFY EXACT LOCATION OF COMPRESSOR IN FIELD. 12 VALVE 10 K I 9 14. DISCONNECT EXISTING SECURITY SYSTEM DEVICES AT EXISTING DOORS TO BE REPLACED. SAVE AND PROTECT WIRES AND DEVICES FOR CONNECT OF NEW SECURED DOORS BY DISTRICT. I 7 LB-3 M AIR LOCK 001 15. REMOVE EXISTING MASTER TIME CONTROL PANEL THAT IS NOT LONGER IN USE. REMOVE BRANCH WIRES BACK TO NEAREST SOURCE. 16. DISCONNECT AND REMOVE EXISTING LIGHT SWITCH. SAVE AND PROTECT BACKBOX FOR REUSE. FA AP 8 14 CR 13 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 CONSTRUCTION DOCUMENTS WOMEN 047 CONSULTANT WORKROOM 049 3. DISCONNECT AND REMOVE LUMINAIRE MOUNTED ON BOTTOM OF TRUSS. SAVE AND PROTECT LUMINAIRE AND BRANCH CIRCUIT WIRES FOR INSTALLATION IN NEW LOCATION. PROJECT PHASE AC AC AC MEN 046 CLASSROOM 103 ITIN 407B COUNSELOR 403 CONFERENCE 407A 1 ADMINISTRATION AREA ELECTRICAL DEMOLITION PLAN C C PS ADA 1. CONNECT TO EXISTING BRANCH CIRCUIT SAVED DURING DEMOLITION. BRANCH CIRCUIT LOAD ADDED IS SAME AS LOAD REMOVED. 3 ADA FACP EM ELECTRICAL 30 TEACHER'S LOUNGE 504 LA MEN 042 PHONE 045 7. NEW LOCATION OF EXISTING INTERCOM PBX. PROVIDE DUPLEX RECEPTACLE AND CONNECT AS SHOWN. CONFERENCE 505 CR 2 4 1 11. INSTALL NEW 20A DUPLEX RECEPTACLE ON SIDE OF EXISTING COUNTER FOR CONNECTION OF COPY MACHINE. CONNECT TO EXISTING BRANCH CIRCUIT SAVED DURING DEMOLITION. 6 12. PROVIDE NEW FIRE ALARM HORN/STROBE TO MATCH EXISTING MANUFACTURER. CONNECT TO EXISTING NOTIFIER FIRE ALARM CONTROL PANEL AS REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION. 5 12 8 F PRINCIPAL 502 108' - 4 1/2" 2 2. INSTALL EXISTING SURFACE MOUNTED WRAP-AROUND LUMINAIRES SAVED DURING DEMOLITION AND CONNECT TO EXISTING BRANCH CIRCUIT. 6 CONFERENCE 505 PRINCIPAL 502 B 3. PROVIDE NEW RECESSED LENSED 2'X4' LUMINAIRE TO MATCH EXISTING, LITHONIA #GT8-232-32-A12125-MVOLT-GEB10IS. CONNECT AS SHOWN. . 4. INSTALL EXISTING EXIT SIGN SAVED DURING DEMOLITION AND CONNECT TO EXISTING EMERGENCY BRANCH CIRCUIT. 5 5. PROVIDE NEW CEILING MOUNTED OCCUPANCY SENSOR WITH WALL MOUNTED OVERRIDE SWITCH FOR AUTOMATIC CONTROL OF LIGHTS. 1 6 PROJECT #: 2011.01.0143 6. PROVIDE NEW 3-WAY LIGHT SWITCH AND CONNECT TO NEW OCUPANCY SENSOR FOR LOCAL OVER-RIDE CONTROL. DRAWN BY: CW 4 1 UP 9 1. INSTALL EXISTING 2X4 LENSED LUMINAIRES SAVED DURING DEMOLITION AND CONNECT TO EXISTING BRANCH CIRCUIT. CORRIDOR 051 3 CORRIDOR 051 I EM-2 FLAG NOTES THIS PLAN: TOILET 048 O 7 10 500 9. REFER TO SECURITY DOOR DETAIL ON DRAWING E401. 10. EXTEND EXISTING INTERCOM WIRES AS REQUIRED IN EXISTING GYP BOARD WALL FROM NEW ENCLOSURE TO NEW LOCATION OF INTERCOM PBX. EXTEND EXISTING INTERCOM WIRES AS REQUIRED. CONTRACTOR TO PROVIDE ALL NECESSARY COMPONENTS AND CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM. CLINIC 503 WOMEN RECEPTION 047 WORK ROOM 049 A.. ELECTRICAL CONTRACTOR TO TEMPORARILY REMOVE EXISTING LUMINAIRES FOR INSTALLATION OF NEW MECHANICAL EQUIPMENT AND DUCTWORK. REINSTALL IN EXISTING LOCATION AFTER COMPLETION OF WORK. COORDINATE EXACT REQUIREMENTS WITH MECHANICAL CONTRACTOR. O B TOILET 048 AV STORAGE/ IT ROOM 304 MEN 046 8. PROVIDE NEW SURFACE MOUNTED 30"X30"X6" HOFFMAN ENCLOSURE AT EXISTING LOCATION OF INTERCOM PBX. INSTALL EXISTING BACKBOARD AND PUNCH DOWN BLOCKS IN NEW ENCLOSURE. 500 GENERAL NOTES: PHONE 044 O WORK ROOM 049 UP CLINIC 503 WOMEN RECEPTION 047 PHONE 045 6. PROVIDE A 20A DUPLEX RECEPTACLE AND DATA OUTLET FOR CONNECTION OF VISITORS COMPUTER WORK STATION. CONNECT TO EXISTING BRANCH CIRCUIT SAVED DURING DEMOLITION. AV STORAGE/ IT ROOM 304 MEN 046 AC AC AC PHONE 044 4. PROVIDE FLUSH MOUNTED 2-GANG FLOOR BOX WITH (1) 20A DUPLEX RECEPTACLE AND (4) DATA PORTS. HUBBELL #B4214 CAST IRON FLOOR BOX WITH (1) #S3825, (1) #S3826 BRASS COVER PLATES AND #SB3684 CARPET FLANGE. PROVIDE ALL NECESSARY COMPONENTS FOR A COMPLETE AND OPERATIONAL INSTALLATION. 5. PROVIDE (1) 1" EMPTY CONDUIT WITH PULL WIRE FOR CONNECTION OF DATA/TELEPHONE & (1) 3/4"C FOR POWER. SAW CUT EXISTING FLOOR AND PATCH TO MATCH EXISTING FINISH. MDP 11 TEACHER'S LOUNGE 504 3. PROVIDE 120V CONNECTION TO NEW ELECTRIC ADA DOOR OPERATOR. PROJECT INFORMATION 1 3 CR 2. PROVIDE J-BOX FOR INSTALLATION AND CONNECTION OF EXISTING SECURITY ALARM SENSOR TO BE INSTALLED BY AND CONNECTED BY DISTRICT. SECRETARY 501 CHECKED BY: ETM J 1 SECRETARY 501 VALVE 10 J 500-B 2 CR I VALVE 10 K VESTIBULE 001 REVISIONS NO 001-A DATE 6 I C R PS DESCRIPTION 3 1 1 ISSUE DATE: 2.9.12 ADA VESTIBULE 001 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 AIR LOCK 039 PS FLAG NOTES THIS PLAN: 039-A POUDRE SCHOOL DISTRICT 3 039-B WERNER ELEMENTARY RENOVATION PROJECT 1/8" = 1'-0" ? CLASSROOM 103 A 2 ADMINISTRATION AREA LIGHTING PLAN 1/8" = 1'-0" CLASSROOM 103 3 ADMINISTRATION AREA POWER AND SYSTEMS PLAN 1/8" = 1'-0" 1 2 3 4 5 6 SHEET INFORMATION A 001-B ADA CR 2/8/2012 11:38:16 AM - PLOT DATE EXISTING SECURITY POWER SUPPLY FA AP J 3 ADMINISTRATION AREA ELECTRICAL PLANS E201 DEMAND 0.0 0.0 0.0 0.7 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 8.4 100.0 91.6 KVA AMPS AMPS AMPS 120 / 208 225 AMP 10K AIC [2] [3] C LIGHTING RECEPT. (FIRST 10 KW) RECEPT. (REMAINDER) MOTORS LARGEST MOTOR APPLIANCES EQUIPMENT HEATING TRANSFORMER OTHER KVA KVA KVA KVA 0.4 KVA 0.9 KVA 1.3 KVA L = LIGHTING S = SUBFEED ALL CIRCUIT BREAKERS ARE 20 AMP, 1 POLE UNLESS NOTED OTHERWISE SP = SPACE SPR = SPARE T= TRANSFORMER O = OTHER 0 0 0 DEMAND 0.1 0.2 0.0 0.0 1.4 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 3.7 10.2 100.0 89.8 D.F. 1.25 1.00 0.50 1.00 1.25 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 KVA AMPS 3.4 9.4 TOTAL LOAD DESIGN SPARE 39.1% 71.9% 28.1% A TO B B TO C C TO A PANEL [2] 2.6 36.0 3.0 33.0 [2] M E 117 M 180 A E 117 [1] [1] KVA KVA KVA KVA 3.4 36.0 3.7 32.4 CONNECTED DESIGN DEMAND SPARE CONNECTED PHASE A PHASE B PHASE C DESCRIPTION EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING [1,2] EF-1 & FCU-6 SP 14.3% 29.7% 48.1% TOTAL LOAD DESIGN SPARE [1] REVISED FOR THIS PROJECT. A. (12) 1/6 & 1/4HP UV UNITS AND (2) 1/3HP FANS REMOVED. LOAD ADDED TO PANELBOARD IS LESS THAN LOAD REMOVED. NOTES: L = LIGHTING S = SUBFEED H = HEATING NOTES: 100 E 1000 E 1000 797 797 797 M M M 15 | | 30 | | TOTAL 2391 M 0 0 A 2100 E D.F. CONNECTED 1.25 0.0 1.00 0.0 0.50 0.0 1.00 19.9 1.25 9.0 1.00 0.0 1.00 2.1 1.00 0.0 1.00 0.0 1.00 0.0 0.00 0.00 0.00 KVA 31.0 AMPS 86.1 0 LIGHTING RECEPT. (FIRST 10 KW) RECEPT. (REMAINDER) MOTORS LARGEST MOTOR APPLIANCES EQUIPMENT HEATING TRANSFORMER OTHER TOTAL LOAD DESIGN SPARE L = LIGHTING S = SUBFEED NOTES: E 4 WIRE SERVICE L PHASE 2 A 4 B 6 C 8 A 10 B 12 C 14 A 16 B 18 C 20 A 22 B 24 C 26 A 28 B 30 C 32 A 34 B 36 C 38 A 40 B 42 C LOADS IN VOLT-AMPERES DEMAND 0.0 0.0 0.0 19.9 11.3 0.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 33.3 92.3 150.0 57.7 R 20 | | 20 | | 60 | | 60 | | 20 | | 45 | | 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 M M M M M M M M M M 0 A E 0 120 / 208 31.0 54.0 33.3 20.8 [3] [3] TOTAL 5760 [4] LIGHTING RECEPT. (FIRST 10 KW) RECEPT. (REMAINDER) MOTORS LARGEST MOTOR APPLIANCES EQUIPMENT HEATING TRANSFORMER OTHER [3] KVA KVA KVA KVA TOTAL LOAD DESIGN SPARE DEMAND 7.2 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 8.2 22.8 60.0 37.2 R E M 0 A E 0 SURFACE MOUNTED T|S|O DESCRIPTION M|A|E|H 1000 INTERCOM SYS. SP SP SP SP SP SP SP SP 0 0 TOTAL 1000 6.8 21.6 8.2 13.4 CONNECTED DESIGN DEMAND SPARE CONNECTED PHASE A PHASE B PHASE C KVA KVA KVA KVA 1.7 KVA 0.6 KVA 0.4 KVA 32.4% 64.6% 20.9% A TO B B TO C C TO A ALL CIRCUIT BREAKERS ARE 20 AMP, 1 POLE UNLESS NOTED OTHERWISE SP = SPACE SPR = SPARE KVA AMPS AMPS AMPS T= TRANSFORMER O = OTHER D H = HEATING [2] KVA KVA KVA KVA C 65.8% 100.0% 65.8% ALL CIRCUIT BREAKERS ARE 20 AMP, 1 POLE UNLESS NOTED OTHERWISE SP = SPACE SPR = SPARE KVA AMPS AMPS AMPS T= TRANSFORMER O = OTHER GENERAL NOTES: H = HEATING A. LIGHT LINE WEIGHT INDICATES EXISTING SHOWN FOR REFERENCE ONLY. FLAG NOTES THIS SHEET: 1. PROVIDE NEW CIRCUIT BREAKER IN EXISTING SPACE TO MATCH EXISTING MANUFACTURE AND AIC RATING. 2. DISCONNECT FEEDERS FROM EXISTING IRRIGATION PUMP AND REMOVE CIRCUIT BREAKER. EXTEND EXISTING WIRES AND CONNECT TO EXISTING PANELBOARD "LA" THAT IS LOCATED IN SAME ROOM AS THE "MDP". 3. REPLACE EXISTING CIRCUIT BREAKER WITH NEW TO MATCH EXISTING MANUFACTURER. 4. REPLACE EXISTING PANELBOARD FEED WITH NEW SIZE AS SHOWN. H = HEATING [1] EXISTING LOADS BASED ON RECORD DRAWING, FIELD VERIFICATION OR 80% OF CIRCUIT BREAKER SIZE. [2] EXISTING SPARE CIRCUIT BREAKER. [3] REPLACE EXISTING CIRCUIT BREAKER WITH NEW SIZE TO MATCH EXISTING MANUFACTURER. [4] REVISED FOR THIS PROJECT. B B LOAD SUMMARY EXISTING PANEL LA EXISTING LOADS DELETED (8) UNIT VENTILATORS (1) EXHAUST FAN = = TOTAL = 4.72 .67 KVA KVA 5.39 KVA LOAD SUMMARY EXISTING "MDP"- 600A CONTRACTOR SHALL PROVIDE 30 DAY METERING FOR EXISTING LOADS PRIOR TO ANY WORK AND WHILE SCHOOL IS IN SESSION. SUBMIT RESULTS TO PROJECT ENGINEER. RTU-4 M NEW LOADS ADDED (2) FAN COILS EXISTING IRRIGATION PUMP = = TOTAL = + .52 +1.84 KVA KVA WP F (3#10+#10G)3/4"C 716A LB LC K 45A3P M LF DA BOOSTER HEATER 20A2P M 2/8/2012 11:38:17 AM - PLOT DATE SPD 600A3P 600A (4#1/0 XHHW AL +#8GCU)2"C 600A3P MCB (4#1/0 XHHW AL +#8GCU)2"C 100A 3P 100A 3P (4#1/0 XHHW AL +#8GCU)2"C 100A 3P (4#1/0 XHHW AL +#8GCU)2"C 100A 3P 4 (4#1/0+#6G) EXISTING 1-1/2"C 150A 3P3 DB DC 50A 3P 100A 3P 100A 2P 80A 3P (4#1 XHHW +#8GCU)2"C 80A 3P (4#1 XHHW +#8GCU)2"C (4#6 THW +#8GCU)1-1/2"C 80A 3P 200A 3P (3#3+#8G) 1-1/4"C (3#1+#6G) 1-1/2"C SO. MODULAR (4#1 XHHW +#8GCU)2"C 2,277A EM J (4#1/0 XHHW AL +#8GCU)2"C F M CU NO. MODULAR WP 112.5KVA 60A 3P 60A ATS 2 20A 3P 125A 3P 1 60A 3P 100A 3P 1 DRAWN BY: CW @ 208V-3PHASE EXISTING LOADS DELETED UNIT VENTILATORS EXHAUST FANS (2) 2HP PUMPS EVAP COOLER (KITCHEN) SUPPLY FAN (KITCHEN) AIR COMPRESSOR AIR DRYER TOTAL LOAD DELETED NEW LOADS ADDED RTU-1 RTU-2 RTU-4 FAN COIL UNITS (2) 7.5HP PUMPS KMUA (KITCHEN) TOTAL NEW LOAD ADDED 156.4 PROJECT #: 2011.01.0143 = 112.5 KVA = 312.5 AMPS = = = = = = = 24.80 6.25 5.40 1.00 1.28 2.70 1.66 KVA KVA KVA KVA KVA KVA KVA = 43.09 KVA = = = = = = 33.00 22.80 9.00 3.04 17.50 1.66 KVA KVA KVA KVA KVA KVA = 87.00 KVA TOTAL = N G KVA @ 208V-3PHASE 156.4 CHECKED BY: ETM ISSUE DATE: 2.9.12 REVISIONS NO #1/0CU BUILDING STEEL, CW PIPE & GRD RODS 2 = 434.5 AMPS 120/208V 3 ,4W 3 4 5 DATE KVA WERNER ES: ELECTRICAL ONE-LINE DIAGRAM NO SCALE DESCRIPTION A EXISTING MAIN DISTRIBUTION CENTER "MDP" 600A, 120/208V, 3 , 4W, 22,000 AIC SQUARE-D, HCM, I-LINE 2SETS (4-350MCM XHHW AL) 3"C 1 F EXISTING IRRIGATION PUMP LA A M G 6,263A LOAD ADDED IS LESS THAN LOAD REMOVED EXISTING LOAD UTILITY METER PEAK DEMAND: 72 KW X 125% / 0.8 pf RTU-2 M 2 EXISTING UTILITY TRANSFORMER EXISTING GENERATOR RTU-1 WP 2.36 KVA 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 [1] REVISED FOR THIS PROJECT. [2] LOAD ADDED IS LESS THAN LOAD REMOVED. A. (22) 1/6 & 1/4HP UV UNITS, (2) 1/3HP FANS REMOVED &(2) 1/2HP FANS REMOVED. LOAD ADDED TO PANELBOARD IS LESS THAN LOAD REMOVED. ALL CIRCUIT BREAKERS ARE 20 AMP, 1 POLE UNLESS NOTED OTHERWISE SP = SPACE SPR = SPARE T= TRANSFORMER O = OTHER 2.6 36.0 2.8 33.2 CONNECTED DESIGN DEMAND SPARE CONNECTED PHASE A PHASE B PHASE C 2.9 KVA 1.9 KVA 1.9 KVA A TO B B TO C C TO A M = MOTOR A = APPLIANCE R = RECEPTACLE E = EQUIPMENT L PHASE 2 A 4 B 6 C 8 A 10 B 12 C 14 A 16 B C LOADS IN VOLT-AMPERES KVA AMPS [1] SP 1080 0 TOTAL 1000 M 180 A E 117 E EXISTING SQ-D [1] 1 3 5 7 9 11 13 15 D.F. 1.25 1.00 0.50 1.00 1.25 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 117 [1] [1] [1] [1] [1] [1] 4 WIRE SERVICE GROUND BUS 100% NEUTRAL BUS 0 0 0 DEMAND 0.1 0.2 0.0 0.6 0.9 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 2.8 7.9 100.0 92.1 M = MOTOR A = APPLIANCE R = RECEPTACLE E = EQUIPMENT 60 | [1] EXISTING LOADS BASED ON 80% OF CIRCUIT BREAKER SIZE. [2] PROVIDE NEW CIRCUIT IN EXISTING SPACE TO MATCH EXISTING MANUFACTURER. NOTES: 91.5% 91.5% 100.0% M 0 A E CONNECTED 5.8 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 6.8 18.8 L = LIGHTING S = SUBFEED "EM" 3 PHASE VOLT 60 MAIN LUGS ONLY T|S|O M|A|E|H R L 1920 1920 1920 DESCRIPTION L-NO. NIGHT & EXIT L-E. NIGHT & EXIT L-SO. NIGHT & EXIT SP SP SP SP SP 10.6 KVA 9.7 KVA 10.6 KVA A TO B B TO C C TO A KVA AMPS AMPS AMPS 100 AMP 10K AIC SURFACE MOUNTED T|S|O DESCRIPTION M|A|E|H AHU-1 AHU-2 2920 P-1 2920 2920 2920 P-2 2920 2920 SPR 3000 RTU-4 3000 3000 EF-29 CONTROL PNL #2 SHADE CONTROL 26520 0 TOTAL 0 CONNECTED DESIGN DEMAND SPARE CONNECTED PHASE A PHASE B PHASE C M = MOTOR A = APPLIANCE R = RECEPTACLE E = EQUIPMENT PANEL EXISTING SQ-D [1] GROUND BUS 100% NEUTRAL BUS 150 MAIN LUGS ONLY T|S|O M|A|E|H L R DESCRIPTION EF-26 GYM EPO CONTACTOR CONTROL PNL #3 TCP P-5 P-6 BOILER #2 BOILER #1 EF-15 & EF-18 L-MEZZ. BOILER PUMPS 3&4 TCP EF-24 SHADE CONTROL KMAU EF-25-MENS RM AC COMPUTER RM - "M" 3 PHASE VOLT 0 H = HEATING T= TRANSFORMER O = OTHER 260 SURFACE MOUNTED T|S|O DESCRIPTION R M|A|E|H EXISTING 360 FCU-8 M 1000 VAV CONTROLS E L & R, RTU-1 180 SPR 720 FCU-5 &7 M EF-2 SPR EXISTING SPR CONTROL PNL TO RIGHT EXISTING EXISTING EXISTING EXISTING SP SP SP L PHASE 2 A 4 B 6 C 8 A 10 B 12 C 14 A 16 B 18 C 20 A 22 B 24 C 26 A 28 B 30 C 32 A 34 B 36 C 38 A 40 B 42 C LOADS IN VOLT-AMPERES 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 260 M 0 0 A 0 E D.F. CONNECTED 1.25 0.1 1.00 0.2 0.50 0.0 1.00 0.6 1.25 0.7 1.00 0.0 1.00 1.0 1.00 0.0 1.00 0.0 1.00 0.0 0.00 0.00 0.00 KVA 2.6 AMPS 7.3 LIGHTING RECEPT. (FIRST 10 KW) RECEPT. (REMAINDER) MOTORS LARGEST MOTOR APPLIANCES EQUIPMENT HEATING TRANSFORMER OTHER ALL CIRCUIT BREAKERS ARE 20 AMP, 1 POLE UNLESS NOTED OTHERWISE SP = SPACE SPR = SPARE KVA AMPS AMPS AMPS M TOTAL 2.1 KVA 0.3 KVA 1.0 KVA A TO B B TO C C TO A M = MOTOR A = APPLIANCE R = RECEPTACLE E = EQUIPMENT 180 [1] [1] [1] [1] ARCHITECT E [1] REVISED FOR THIS PROJECT. [2] PROVIDE NEW BRANCH CIRCUIT CIRCUIT BREAKER TO MATCH EXISTING MANUFACTURER. [3] EXISTING SPARE CIRCUIT BREAKER. [4] LOAD ADDED IS LESS THAN LOAD REMOVED. A. (8) 1/6 & 1/4HP UV UNITS AND (1) 1/4HP FAN REMOVED. LOAD ADDED TO PANELBOARD IS LESS THAN LOAD REMOVED. NOTES: [4] 0 CONNECTED DESIGN DEMAND SPARE CONNECTED PHASE A PHASE B PHASE C M = MOTOR A = APPLIANCE R = RECEPTACLE E = EQUIPMENT M M M 0 A E 20 | M 0 A E CONNECTED 0.1 0.2 0.0 0.0 1.1 0.0 2.0 0.0 0.0 0.0 0 TOTAL R L GROUND BUS 100% NEUTRAL BUS 100 MAIN LUGS ONLY T|S|O M|A|E|H L R Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 TOTAL LOAD DESIGN SPARE L = LIGHTING S = SUBFEED 360 PHASE 2 A 4 B 6 C 8 A 10 B 12 C 14 A 16 B 18 C 20 A 22 B 24 C 26 A 28 B 30 C LOADS IN VOLT-AMPERES 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 225 AMP 22K AIC SURFACE MOUNTED T|S|O M|A|E|H DESCRIPTION 1000 VAV CONTROLS EF 7 SPR 1080 FCU-3 & 4 EXISTING 1000 VAV CONTROLS EXISTING L & R, RTU-2 EXISTING EXISTING SPR SPR SPR SPR SP 1080 0 TOTAL 2000 EXISTING SQ. D 4 WIRE SERVICE POUDRE SCHOOL DISTRICT LIGHTING RECEPT. (FIRST 10 KW) RECEPT. (REMAINDER) MOTORS LARGEST MOTOR APPLIANCES EQUIPMENT HEATING TRANSFORMER OTHER D M 720 M 0 0 A 0 E D.F. CONNECTED 1.25 0.0 1.00 0.0 0.50 0.0 1.00 0.7 1.25 1.8 1.00 0.0 1.00 0.0 1.00 0.0 1.00 0.0 1.00 0.0 0.00 0.00 0.00 KVA 2.6 AMPS 7.1 0 TOTAL 360 DESCRIPTION EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING SPR SPR SP SP [1] GROUND BUS 100% NEUTRAL BUS 100 MAIN LUGS ONLY T|S|O M|A|E|H R L "LC" 3 PHASE VOLT 120 / 208 CONSTRUCTION DOCUMENTS [1,4] [1] [1] M R PANEL EXISTING SQ-D 4 WIRE SERVICE WERNER ELEMENTARY RENOVATION PROJECT [1,4] L PHASE 2 A 4 B 6 C 8 A 10 B 12 C 14 A 16 B 18 C 20 A 22 B 24 C 26 A 28 B 30 C 32 A 34 B 36 C 38 A 40 B 42 C LOADS IN VOLT-AMPERES 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 100 AMP 10K AIC SURFACE MOUNTED T|S|O DESCRIPTION M|A|E|H EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING R-N112,N113 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING SPR SPR 920 IRRIGATION PUMP 920 1840 0 TOTAL 0 "LB" 3 PHASE VOLT 120 / 208 6 SEAL E GROUND BUS 100% NEUTRAL BUS 100 MAIN LUGS ONLY T|S|O M|A|E|H L R DESCRIPTION EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EF-5 & FCU-2 EXISTING UV-42 & FCU-1 UV-31 SPARE EXISTING EXISTING EXISTING EXISTING PANEL EXISTING SQ-D 4 WIRE SERVICE 5 PROJECT PHASE 225 AMP 10K AIC "LA" 4 PROJECT INFORMATION PANEL 3 PHASE VOLT 120 / 208 3 CONSULTANT 2 6 SHEET INFORMATION 1 ELECTRICAL ONE-LINE DIAGRAM & PANEL SCHEDULES E301 2 3 4 5 6 ARCHITECT 2 2 CEILING CEILING DESCRIPTION RTU-1 MAIN AIR HANDLER 86.2FLA, 98.2MCA 15HP SUPPLY FAN, 10HP EXHAUST FAN 31 KVA 208-3 REFER TO ONE-LINE DIAGRAM 125A3P 120A FRN-R PROVIDE 120V CONNECTION FOR RECEPTACLE AND LIGHTS AND REINSTALL NEW DUCT SMOKE DETECTOR IN RETURN RTU-2 MAIN AIR HANDLER 63.2FLA, 71MCA 10HP SUPPLY FAN, 7.5HP EXHAUST FAN 22.8 KVA 208-3 REFER TO ONE-LINE DIAGRAM 100A3P 90A FRN-R PROVIDE 120V CONNECTION FOR RECEPTACLE AND LIGHTS AND REINSTALL NEW DUCT SMOKE DETECTOR IN RETURN RTU-4 ROOFTOP UNIT-IT ROOM 25FLA, 29.5MCA 9.0 KVA 208-3 REFER TO ONE-LINE DIAGRAM 45A3P 40A FRN-R INSTALL NEW DUCT SMOKE DETECTOR IN RETURN FCU-1,2,4,5 & 6 FAN COIL UNIT (1)1/8HP .360 KVA 120-1 (2#12+#12G)1/2"C 20A1P [1] EXISTING UNIT VENTILATOR TO BE REPLACED WITH NEW FAN COIL FCU-3,& 8 FAN COIL UNIT (2)1/18HP .720 KVA 120-1 (2#12+#12G)1/2"C 20A1P [1] EXISTING UNIT VENTILATOR TO BE REPLACED WITH NEW FAN COIL FCU-7 FAN COIL UNIT (1)1/5HP .26 KVA 120-1 (2#12+#12G)1/2"C 20A1P [1] EXISTING UNIT VENTILATOR TO BE REPLACED WITH NEW FAN COIL CUH-1 .26 KVA 120-1 (2#12+#12G)1/2"C 20A1P [1] STUB 3/4" CONDUIT INTO HEAD OF DOOR FRAME ON CENTER OF DOUBLE DOOR. CABINET UNIT HEATER 1/15HP P-1 HOT WATER PUMP 7.5HP 8.76 KVA 208-3 (3#8+#10G)3/4"C 60A3P - [2] PROVIDE 4"X4"X2-1/8" DEEP JUNCTION BOX SURFACE MOUNTED ABOVE DOOR, IN ACCESSIBLE CEILING SPACE, ON SECURE SIDE OF DOOR. P-2 HOT WATER PUMP 7.5HP 8.76 KVA 208-3 (3#8+#10G)3/4"C 60A3P - [2] 3. PROVIDE 4"X4"X2-1/8" DEEP BOX WITH SINGLE GANG DEVICE RING FLUSH MOUNTED AT 3'-8" AFF, FOR CARD READER. P-7 PUMP 1/6HP .51 KVA 120-1 (2#12+#12G)1/2"C 20A1P [3] 4. PROVIDE 4"X4"X2-1/8" DEEP BOX WITH SINGLE GANG DEVICE RING FLUSH MOUNTED ABOVE ACCESSIBLE CEILING SPACE AND CONNECT TO NEW ADA DOOR OPERATOR. TCP TEMPERATURE CONTROL PANEL 1.0 120-1 (2#12+#12G)1/2"C 20A1P KMAU KITCHEN MAKE-UP AIR UNIT 1-1/2HP 2.39 KVA 208-3 (3#12+#12G)1/2"C 15A3P 1 1 ADA DOUBLE DOOR SINGLE DOOR FLAG NOTES THIS SHEET: GENERAL NOTES: A. REMARKS CONSULTANT 3'-8" FLOOR 2. FEEDER 3 3'-8" 1. VOLT- D 9A FRS-R CONNECT NEW UNIT TO THE EXISTING KITCHEN HOOD FIRE SUPPRESSION SYSTEM AS REQUIRED. NOTES: 1. SAFETY DISCONNECT SWITCH PROVIDED INTEGRAL WITH UNIT. 2. VFD PROVIDED BY MECHANICAL CONTRACTOR AND INSTALLED AND CONNECTED BY THE ELECTRICAL CONTRACTOR. 3. PROVIDE MANUAL MOTOR STARTER WITH THERMAL OVERLOADS AT UNIT. 1. THE ELECTRICAL CONTRACTOR SHALL PROVIDE RACEWAY, BACKBOXES AND POWER. DISTRICT SECURITY DEPARTMENT TO PROVIDE DEVICES AND CONNECTIONS. 7600 E. Orchard Road Suite 250-S Greenwood Village, CO 80111 p.303.796.6000 f. 303.796.6099 PROJECT PHASE 3 LOAD O.C. PROTECTION C.B. FUSE KEY 1 D E MECHANICAL EQUIPMENT SCHEDULE 4 SEAL E Architects, Inc. 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 T - 970.484.0117 F - 970.484.0264 © 2009 www.rbbarchitects.com CONSTRUCTION DOCUMENTS 1 TYPICAL-SECURITY DOOR DETAIL NO SCALE ALTERNATE #1-MECHANICAL EQUIPMENT SCHEDULE KEY VAV DESCRIPTION LOAD VAV CONTROLS 1.0 KVA VOLT120-1 O.C. PROTECTION C.B. FUSE FEEDER 20A1P (2#12+#12G)1/2"C REMARKS PROVIDE J-BOX FOR CONNECTION OF CONTROL TRANSFORMERS TO BE PROVIDED AND INSTALLED BY THE MECHANICAL CONTRACTOR C M-3 C M RED "MUSHROOM" HEAD EPO SWITCH WITH MOMENTARY CONTACTS, ONE LOCATED AT EACH DOOR B C B PROJECT INFORMATION ACCESSORY CONTROL MODULE 5400 MAIL CREEK LANE FORT COLLINS, COLORADO 80525-3886 N POUDRE SCHOOL DISTRICT H WERNER ELEMENTARY RENOVATION PROJECT C BOILER #1 120V (EXISTING) BOILER #1 CONTROL CONTROL CIRCUIT (EXISTING) BOILER #1 RECIRC PUMP 120V (EXISTING) BOILER #2 120V (EXISTING) PROJECT #: 2011.01.0143 BOILER #2 CONTROL CONTROL CIRCUIT (EXISTING) DRAWN BY: CW CHECKED BY: ETM BOILER #2 RECIRC PUMP 120V (EXISTING) ISSUE DATE: 2.9.12 REVISIONS NO DESCRIPTION DATE BOILER EMERGENCY POWER-OFF BOILER ROOM #29 NO SCALE A A 1 2 3 4 5 6 SHEET INFORMATION 2/8/2012 11:38:17 AM - PLOT DATE 120V CONTACTOR WITH 120V COIL, MECHANICALLY HELD, IN LOCKABLE NEMA 1 ENCLOSURE. ELECTRICAL SCHEDULES & DETAILS E401