1.01 SECTION INCLUDES A.

advertisement
SECTION 01635
SUBSTITUTIONS AND PRODUCT OPTIONS
PART 1
1.01
GENERAL
SECTION INCLUDES
A.
Description
1.
This section describes the procedure required by the CONTRACTOR for
product substitutions.
2.
Requests for Substitution
3.
a.
Base all bids on materials, equipment and procedures specified.
b.
Certain types of equipment and kinds of material are described in
specifications by means of trade names and catalog numbers, and/or
manufacturer’s names. Where this occurs, it is not intended to
exclude from consideration such types of equipment and kinds of
material bearing other trade names, catalog numbers and/or
manufacturer’s names, capable of accomplishing purpose of types of
equipment or kinds of material specifically indicated.
c.
Other types of equipment and kinds of material may be acceptable to
the OWNER and ENGINEER.
d.
Types of equipment, kinds of material and methods of construction,
if not specifically indicated must be approved in writing by
ENGINEER and the OWNER.
Submission of Requests for Substitution
a.
After Notice to Proceed, the OWNER/ENGINEER will consider
written requests for substitutions of products, materials, systems or
other items.
b.
The ENGINEER OWNER reserves the right to require substitute
items to comply color and pattern-wise with base specified items, if
necessary to secure “design intent”.
c.
Submit six (6) copies of request for substitution. Include in request:
1)
Complete data substantiating compliance of proposed
substitute with Contract Documents.
2)
For products:
i.
Werner Elem.
Product identification, including manufacturer’s
name.
01635-1
Substitutions and
Product Options
3)
d.
4.
Manufacturer’s literature, marked to indicate
specific model, type, size, and options to be
considered: Product description; performance and
test data; reference standards; difference in power
demand; dimensional differences for specified unit.
iii.
Name and address of similar projects on which
product was used, date of installation, and field
performance data.
For construction methods:
i.
Detailed description of proposed method.
ii.
Drawings illustrating methods.
4)
Itemized comparison of proposed substitution with product
or method specified.
5)
Data relating to changes in construction schedule.
6)
Relation to separate contracts.
7)
Accurate cost data on proposed substitution in comparison
with product or method specified.
In making request for substitution, or in using an approved substitute
item, Supplier/Manufacturer represents.
1)
He has personally investigated proposed product or method,
and has determined that it is equal or superior in all respects
to that specified and that it will perform function for which it
is intended.
2)
He will provide same guarantee for substitute item as for
product or method specified.
3)
He will coordinate installation of accepted substitution into
work, to include building modifications if necessary, making
such changes as may be required for work to be complete in
all aspects.
4)
He waives all claims for additional costs related to
substitution which subsequently become apparent.
Substitutions
a.
Werner Elem.
ii.
Request sufficiently in advance to avoid delay in construction.
01635-2
Substitutions and
Product Options
5.
6.
CONTRACTOR’s Option
a.
For products specified only by reference standards, select any
product meeting standards by any manufacturer, indicate selected
type in submission.
b.
For products specified by naming several products or manufacturers,
select any product and manufacturer named, indicate selected type in
submission.
c.
For products specified by naming one or more products, but
indicating option of selecting equivalent products by stating “or
equivalent” after specified product, CONTRACTOR must submit
request, as required for substitution, for any product not specifically
named.
Rejection of Substitution or Optional Item
a.
Substitutions and/or options will not be considered if:
1)
They are indicated or implied on shop drawings, or project
data submittals, without formal request submitted in
accordance with this section.
PART 2
PRODUCTS (Not Applicable)
PART 3
EXECUTION (Not Applicable)
END OF SECTION