COMPACFLT N4 OIF Lessons Learned & Fleet Quick Hits RDML Michael S. Roesner OIF Lessons Learned Fleet Quick Hits Quick Hits Lessons Learned ASDOF Expediting Bandwidth / ADP Vision Transportation / Material Pipeline Ownership Time Phased Force Deployment Data (TPFDD) Full Spectrum Logistics Support Numbers Matter FRP Surge / Remote Sustainment ASDOF Quick Hits Lessons Learned ASDOF initiatives alive and well… PAPA Postal Navy Cash Recent initiatives include Cleaning Consolidation and Medical Prime Vendor. Need to increase attention on Supply OPS. Need to Refocus on ASDOF! Expediting Quick Hits Lessons Learned Fragmented Ownership Functionally – few steps in process. Operationally – Pass through various support, transportation and Tycoms/Fleets. Ground Truth Too many fingers in the pie, at time’s hard to tell what the answer is. Need Single Umbrella across Functional/Operational Boundaries. Desired End State…Streamlined process, manned appropriately, TYCOM controlled Bandwidth/ADP Quick Hits Lessons Learned Ensure LOG bandwidth requirements have adequate prioritization and representation. Factor available bandwidth into effective capability and labor savings of new systems. ADP Way Ahead Proceed with ENTCSS implementation with ERP as the ultimate desired end state. ENTCSS will eliminate afloat legacy systems. Need Sponsorship for Bandwidth Quick Hits Lessons Learned Transportation Transportation Chain Integration Synchronize Airlift with CLF TARAWA Thur Fri Sat Sun Mon Tues Wed Thur Fri Sat Sun Mon Tue Wed Thur 13Mar 14Mar 15Mar 16Mar 17Mar 18Mar 19Mar 20Mar 21Mar 22Mar 23Mar 24Mar 25Mar 26Mar 27Mar 72 hour time period Met 72 hour Pallets Pallets Pallets Pallets Pallets Pallets Pallets Pallets Pallets Fm 13th Waiting Waiting Waiting Waiting Finally goal, but OH: 60 OH: 60 Fm 13th Arrived Next Next Next Next Got on missed CLF 13th MAR Fm 13th Shipped “on time” CLF CLF CLF CLF CLF load date! CLF Load Dates 14 Days BAH to Ship Right stuff, in Missed the right Opportunity CLF Delivery Dates place, at the wrong time. LINCOLN Pallets FM 13th Arrive 72 hour time period Met 72 hour Pallets Pallets Pallets Palletsth Pallets Pallets Pallets Pallets Pallets Fm 13 Early for Early for Waiting Finally Loaded goal and was OH: 60 OH: 60 Fm 13th Arrived Next Next Next Got on th th On CLF early for load 13 MAR Fm 13 Shipped Early CLF CLF CLF CLF date! CLF Load Date 9 Days BAH Pallets to Ship FM 13th Arrive Align Metric to CLF Load Dates! CLF Delivery Date Material Pipeline Ownership Depot Overhaul Quick Hits Lessons Learned Storage MPC ATAC Ship Supply/Maintenance The only piece of the repair cycle that is Fleet controlled! TPFDD FLOW Quick Hits Lessons Learned OIF TPFDD force flow was not executed as planned. Long lead time to deploy forces provided components best sourcing opportunity. Future conflicts may not provide us with the luxury of time to deploy forces as we experienced during OIF. Access to Battle Space not Guaranteed. Full Spectrum Logistics Support Quick Hits Lessons Learned Full Spectrum Logistics Support should be applied in future conflicts/non-traditional areas….establish “off the shelf” Log Plans. Planning cell inclusive of DLA, NAVSUP, FLEETS and TYCOMS to provide: Mobile NOACTs ATACs MPCs Establish Inventories w/out footprint…HULL Prime Vendor CNAP’s aviation logistics support strategy for OIF was an overwhelming success! Numbers Matter Quick Hits Lessons Learned Mission Area Synergies from multiple ARG/CVBG. Fully develop/exploit this technology to enable rapid logistics reconfiguration of future CSG’s/ESG’s. F/A-18C/D APG 65/73 Radar AVDLR Range & Depth FRP Surge/Remote Sustainment Quick Hits Lessons Learned DLA Partnership Guam … DDC signed Letter of Intent to assume physical distribution / MPC operations in CY-04. Sigonella positioning being enhanced. Singapore … looking for DSCP to stand up HULL Prime Vendor, eliminate footprint Looking for future opportunities NAVSUP Traditional Support in Non-Traditional Areas to include LSC, ATAC, NOACT etc. Guam Sigonella Singapore Mobile Capability…Potential to team with ELSF Other Blue/Green Opportunities FRP Surge/Remote Sustainment GET READY…STAY READY Quick Hits Lessons Learned FRP Surge/Remote Sustainment Quick Hits Lessons Learned Stock Positioning Need to make sure material is positioned properly to enhance readiness and is maintained during IDTC. During both surge (IDRC) and sustainment operations. Don’t Apply Lesson Learned to Yesterday’s Conflict…Apply them to our Future Vision.