Testing and Training Challenges for the Evolutionary Aircraft Carrier Strategy by Captain T. Ladson Webb, Jr. Aviation Program Officer FOR OFFICIAL USE ONLY WORKING PAPERS 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb. ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 The Technical Complexity of CVNX Design effort estimated at 45 million man-hours! Parts Parts Surfaces Surfaces Modeled Modeled Modeled Modeled CVNX CVNX NSSN NSSN F-22 F-22 777 777 Auto Auto 1024 1024KK 370 370KK 16 16KK 100 100KK 77KK 146 146MM 50 50MM 22MM 14 14MM 11MM CVNX 1 1,695 Ft. Disk Disk Storage Storage 228 228GB GB 145 145GB GB 44 44GB GB 10 10GB GB 1.6 1.6GB GB 1,500 Ft. New Attack Submarine (NSSN) 1,075 Ft. 1,250 Ft. 1,000 Ft. F-22 Fighter Aircraft 325 Ft. Automobile 12 Ft. Washington Monument 556 Ft. 750 Ft. 500 Ft. Boeing 777 75 Ft. 250 Ft. 1,150 7,150 0 Ft. 31,300 103,600 162,500 Equivalent Number of 1.4 MB Floppy Disks FOR OFFICIAL USE ONLY 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 Departmental Guidance DoDINST 5000.2R, Section 4.3 “Systems Engineering” u – “Requirements Analysis. Throughout the acquisition process the program office shall work with the user to establish and refine operational and design requirements that result in the proper balance between performance and cost within affordability constraints. Requirements analysis shall be conducted iteratively with functional analysis … to develop and refine functional and performance requirements, external interfaces and provide traceability among user requirements and design requirements.” Mission Needs Statement (MNS) Operational Requirements Document (ORD) OPNAV responsible for requirements PMS-378 develops requirements with Fleet(User) Input/Review 1996 • • • • • • High volume firepower Mobility Sustainability Survivability Joint C2 Flexibility and growth potential 2000 • Net: Affordable ORD Performance spec • • • Performance parameters – Threshold – Objective Affordability through CAIV Consistent with AOA Joint Interoperability FOR OFFICIAL USE ONLY 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 Development Strategy u Phased Approach - “Transition Ships” – CVN 77: CVN 76 + new combat system + TOC savings – CVNX 1: CVN 77 + new propulsion & electrical system + TOC savings – CVNX 2: CVNX 1 + state-of-the-art flight deck + hull improvements + TOC savings u Design for flexibility – Upgrades over 50-year life u Share development ideas, risk & cost with other programs(T&T results) – Horizontal integration of combat systems u New acquisition methods… encourage innovation – – – – u IPPD Subcontracting arrangements Performance-based specs COTS technology & procedures Link with Smart Carrier to provide backfit wherever possible FOR OFFICIAL USE ONLY 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 Evolutionary Concept CVNX 2 TOC Savings / Capability CVNX 1 CVN 77 $ R&D $ SCN $ TOC Savings 550 Sailor Reduction $ R&D $ SCN $ TOC Savings 900 Sailor Reduction $ R&D $ SCN $ TOC Savings 1200-1500 Sailor Reduction Resource Constraint New Propulsion EMALS Integrated Combat Systems Active Planar Arrays Improved Self-Defense New Electrical Power & Distribution Systems New Functional Arrangements EARS Improved Hull Survivability Improvements State-of-the-Art Flight Deck 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 FOR OFFICIAL USE ONLY 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 Integrated C4 Centers Pri-Fly Bridge Flight Deck Control Ready Rooms CATCC CDC Strike Ops TFCC Ordnance Control FOR OFFICIAL USE ONLY 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 CVIC Integrated C4 Centers SENSORS DATA • Distribution Networks • Standard Displays (2-D) INFO • Intuitive Interactive Displays • Artificial Intelligence • Voice Activation KNOWLEDGE • Experience • Judgement • Perspective WISDOM Think Aggressively…..Act Cautiously u Cost reduction initiatives include reducing manning by performing tasks better (cheaper and more reliably). – Focus is on communication systems, remote sensors, procedural improvements – Blend of onboard data bases with “Dial Up” access for support as needed. BUT….. u The Fleet is experiencing low manpower today. – How to test/validate reduced manning scenarios? – Working with the test community to use M&S that can build confidence of all parties FOR OFFICIAL USE ONLY 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 A Flexible Approach is Needed u u 07/24/2000 Obtain synergy from efforts such as Smart Carrier by involving test community with modification experiments to existing processes and systems. Early involvement with the test community may be able to identify operational training deficiencies and get the necessary steps underway to correct as the ship is being constructed. – Aircraft Carrier build period exceeds 7 years – Flexible test philosophy needed to address OFFICIAL USE ONLY changes withoutFOR “excess impact” \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 Training Challenges u Training pipeline stressed to deliver quantity and quality into a dynamic systems environment – Long pipelines lead to late arrivals, high costs – In Situ training value is high, but requires foundation to be in place. – Schoolhouse costs driving to move some foundational training to fleet units. u Training Strategy must be agile to satisfy both existing and new design platforms. – Seeking to minimize platform unique overhead FOR OFFICIAL USE ONLY 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 Training Issues Afloat u Indoctrination, Qualification, Proficiency – Which go to sea? All Three! u Visual trainers for aircrew now cheaper, smaller, with high fidelity presentations. – Re-programmable for multiple aircraft – Mission rehearsal now achievable u Reduced personnel dictate new solutions beyond NEC/MOS for all embarked systems. Cross-rate training FOR OFFICIAL USE ONLY 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 Summary u u u u Evolutionary change across Carrier Line presents an opportunity for a fresh approach Longevity of platform presents some “unknown engineering” that may not have adequate M&S tools verified and accredited. “Smart” Programs can provide single T&E target while producing results for several platforms. Validated manpower M&S Tools are needed. FOR OFFICIAL USE ONLY 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 INTEGRATED TEST PROGRAM SCHEDULE for CVNX FY 98 FY 99 FY 00 FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 CVNX 1 CVNX 1 IPPD / System Definition / Design / Ship Construction, Test and Trials / Post Delivery FCT Start Construction Milestone II Milestone I IOC Milestone III BT AT Delivery CVNX 2 IPPD / System Definition / Design / Ship Construction, Test and Trials / Post Delivery CVNX 2 FCT Start Construction CVNX 1 Integrated Product and Process, System Definition, Design & Build Contract Contracting DT&E IOC BT AT Delivery CVNX 2 Integrated Product and Process, System Definition, Design & Build Contract CVNX 1 DT - I DT - IIA DT - IIB DT - I CVNX 2 DT- IIA DT - IIC DT - IIB DT - IIC CVNX Modeling and Simulation, Studies, Analyses,Test and Trials LFT&E CVNX 2 TSST LFT&E LFT&E MGMT Vulnerability Waiver Assessment Plan Report CVNX 1 OT - I OT&E Vulnerability Assessment Reports CVNX 1 OT - II CVNX 1 OT - III CVNX 2 OT - I FY 98 FY 99 FY 00 FY 01 FY 02 FY 03 FY 04 CVNX 2 OT - III CVNX 2 OT - II FY 05 FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FOR OFFICIAL USE ONLY FIGURE II-1 07/24/2000 \\Reagan\Data\Global\PMS378\1999081199 FPT7 Capt Webb.ppt VAR, DOT&E, CVNX BLRIP Shock Trial Reports (If required) PEO Aircraft Carriers Created: 08/4/99 Revised: 08/6/99 Printed: 07/24/2000 FY 20