CITY OF CAPE TOWN WATER SAFETY PLAN 2010-2012 CONTENTS 1. Introduction…………………………………………………………………………… 4 1.1 Background…………………………………………………………………………... 4 1.2 City of Cape Town…………………………………………………………………… 4 1.3 What is water safety plan…………………………………………………………… 4 1.3.1 Main Objectives of a Water Safety Plan (WSP)………………………... 4 1.3.2 Benefits of Water Safety Plan to City Of Cape Town………………….. 5 1.4 City of Water Safety Plan team ……………………………………………………. 6 Module 2 . Description of City of Cape Town Water Supply System………………. 8 2.0 Bulk Water Supply Infrastructure Summary Description…………………….. 8 2.1.1 Introduction……………………………………………………………... 8 2.1.2 Reticulation…………………………………………………………….... 8 2.1.3 Water quality monitoring……………………………………………….. 8 2.2 Water Treatment Plants………………………………………………………….. 9 2.2.1 Faure Water Treatment Plant………………………………………….. 9 2.2.2 Blackheath Water Treatment Plant……………………………………. 10 2.2.3 Wemmershoek Water Treatment Plant……………………………….. 10 2.2.4 Voelvlei Water Treatment Plant………………………………………… 12 2.2.5 Steenbras Water Treatment Plant……………………………………… 12 2.2.6 Brooklands Water Treatment Plant…………………………………….. 13 2.2.7 Kloofnek Water Treatment Plant………………………………………… 15 2.2.8 Constantia Nek Water Treatment Plant………………………………… 15 2.2.9 Atlantis……………………………………………………………………… 15 2.2.10 Albion Spring……………………………………………………………… 18 2.2.11 Helderberg Water Treatment Plant…………………………………….. 18 Page 2 of 211 2.3 Bulk Service Resevoirs………………………………………………………………. 18 2.4 Pump Stations…………………………………………………………………………. 19 2.5 Reticulated potable water infrastructure summary description……………………. 21 2.5.1 Introduction and brief system description …………………………………….. 21 2.5.2 Distribution Network……………………………………………………………… 22 2.6 Network maintenance and performance……………………………………………… 22 2.7 Network operations and pressure reduction…………………………………………. 22 2.8 Resevoirs and pumps stations………………………………………………………… 27 2.9 Water Quality…………………………………………………………………………… 28 2.9.1 Background………………………………………………………………………. 28 2.9.2 Drinking Water Specifications…………………………………………………… 28 2.9.3 Water Quality Monitoring……………………………………………………… 28 Module 3 Risk Management Plan of Water and Sanitation and Branches 3.1 Utility Services Water & Sanitation Risk Register 14th October 2010………….35 Module 4 Supporting Development Programmes for Water Quality Improvement………..121 4.0 Executives Summary Page 3 of 211 WATER SAFETY PLANS 1. INTRODUCTION 1.1 Background The Constitution of South Africa states that everyone has the right to access safe drinking water. The Minister of the Department of Water Affairs (DWA) is legislated by the National Water Act (198. 2007) to be the regulator who ensures that Water Services Providers manages the provision of constant water supply and clean, safe drinking water. The Minister has the powers to intervene when the quality is not of acceptable standards. The consumers also have the right to the knowledge of their quality of their water. Therefore it is critical that the Water Service Provider to prove to the regulator that their management processes and systems are not questionable. The World Health Organisation (WHO) has developed the step by step Water Safety Plan (WSP) which is the international tool recognised for the management of safe drinking water. 1.2 City Of Cape Town 1.3 WHAT IS WATER SAFETY PLAN A Water Safety Plan is a plan to ensure the safe drinking water through the use of comprehensive risk assessment and risk management approach that encompasses all steps in water supply from the catchment to consumer. In simple terms it is the means of managing the risk to water quality and supply across the all nodes of water supply system. It envelops all operations linked to water supply including management, procedures, asset management, monitoring, credible laboratories, training, internal and external communications, reporting and incident management protocols and procedures. 1.3.1 MAIN OBJECTIVES OF A WATER SAFETY PLAN (WSP) A WSP aims to improve drinking water quality by optimizing ; Control of source-water contamination Removal, reduction, or inactivation of contaminants during treatment processes The prevention of re-contamination during distribution, storage and handling 1.3.2 BENEFITS OF WATER SAFETY PLAN TO CITY OF CAPE TOWN City of Cape Town serves a population of 3 300 000 million consumers with drinking water. The development of WSP provides our consumers and our regulator with the confidence in the drinking water quality we supply each and every day. It enables us to act pro-actively to the risks identified through our system for the future and ensure that the rate payer money is invested in the cost effective way and public health is protected. Page 4 of 211 TEN STEPS OF EFFECTIVE WATER SAFETY PLAN Table 1.1 Define monitoring and control measures- what limits define acceptable performance and how these are modified Assemble the team to prepare the water safety plan Establish procedures to verify that the water safety plan is working effectively and will meet the health based targets Document and Describe the Supply System Undertake a hazard assessment and risk characterization to identify and understand how hazards can enter into the water supply Develop supporting programmes (e.g. training, hygiene practices, standard operating procedure upgrade and improvement, research and development) Assess the existing proposed system Prepare Management procedures (including corrective actions) for normal and incident conditions Identify control measures and the means by which risk may be controlled Establish documentation and communication Procedures 1.4 CITY OF WATER SAFETY PLAN TEAM The provision of the City of Cape Town Drinking Water Supply is performed by Water and Sanitation Department which consist of 8 Branches, i.e. Bulk Water, Reticulation, Wastewater, Scientific Services, Engineering and Asset Management, Water Demand Management and Strategy, Finance and Support Services. The approach of the selection of the water safety plan Page 5 of 211 was taken from the principle of looking from catchment to consumer where all branch key members and technical specialist are members of the steering committee. The City Health Directorate also forms part of the committee for the monitoring of human health impact of the drinking water. The Table 1.2 below indicates members of the WSP team and their key functions. CITY OF CAPE TOWN WATER SAFETY PLAN COMMITTEE 1. NAME DESIGNATION ROLE PHILEMON MASHOKO DIRECTOR: WATER & SANITATION Oversee Water Quality Safety Plan 2. PETER FLOWER MANAGER: BULK WATER Chairperson, Blue Drop Committee Treatment of Bulk Water 3. PIERRE MARITZ MANAGER: RETICULATION Distribution of Drinking Water and Collection of Wastewater 4. MPHARU HLOYI MANAGER: SCIENTIFIC SERVICES Water Quality Monitoring and Quality Assurance and Blue Drop Data Management 5. JOSIAH MPOFU MANAGER: EAM Water and Sanitation Department Asset Management 6. SAREL PIETERSE SECTION HEAD: WATER LAB, Drinking Water Specialist SCIENTIFIC SERVICES 7. ALF MOLL HEAD: OPERATIONAL LOGISTICS Drinking Water Protocol development 8. MJIKISILE VULINDLU SECTION HEAD: BIOLOGICAL LAB, SCIENTIFIC SERVICES Page 6 of 211 Drinking Water Specialist 9. JACO DE BRUYN HEAD: WS DEV PLANNING Information Management 10. STEVIE DARK SPO: WATER LAB, SCIENTIFIC SERVICES Scientist 11. ASA LEKKER / CARMEN JOHNSON PROFESSIONAL OFFICER: LIMS, Information Management SCIENTIFIC SERVICES 12. DESIREE DAMON SECTION HEAD: QUALITY ASSURANCE, Quality Assurance SCIENTIFIC SERVICES 13. DOUGLAS KIEWIET ACTING AREA MANAGER: Process Operations PLATTEKLOOF WTP 14. ARNE SINGELS SPECIALIST: BULK WATER Bulk Water System specialist 15. ZAMUXOLO TUTU MANAGER: MAINTENANCE Asset registers, PROGRAMMING Maintenance plan MODULE 2 Page 7 of 211 DESCRIPTION OF CITY OF CAPE TOWN WATER SUPPLY SYSTEM 2.0 BULK WATER SUPPLY INFRASTRUCTURE SUMMARY DESCRIPTION SEPTEMBER 2010 2.1 BULK WATER SUPPLY INFRASTRUCTURE 2.1.1 INTRODUCTION The Bulk Water Branch of the Water & Sanitation Department of the City of Cape Town (CoCT) provides the bulk supply of treated water to the City’s Reticulation Branch as well as to other Water Services Authorities outside the Metropolitan Area. In order to carry out this function, it abstracts water from various water sources, purifies the water to a potable standard at its water treatment plants, and then stores or conveys the water to various points of supply within or outside the Metropolitan Area. The CoCT owns and operates the following water treatment plants (WTP): Table 1.3 NO. WATER TREATMENT PLANTS TREATMENT CAPACITY (Mℓ/day) 1 Witzands (softening plant) 14 2 Silwerstroom 3 Kloof Nek 4 Constantia Nek 5 Faure 500 6 Steenbras 150 7 8 Wemmershoek Pre-Treatment Plant (not additional capacity) Voëlvlei 250 120 230 9 Blackheath 420 10 Brooklands 5 11 Helderberg 12 12 Albion Spring 3 18 3 4 TOTAL 1609 The sustainable treatment capacity for a peak week may be less than the figures portrayed in the table due to operating circumstances and conditions (Total approx. 1500 Ml/d). Page 8 of 211 The CoCT also owns and operates numerous large storage reservoirs (dams) and pump stations as part of the bulk supply system. In addition to the above, the CoCT also owns and operates the Rockview Aqueduct. The bulk supply system consists of many large diameter pipelines. The pipelines themselves will not be described individually, but rather as elements of the WTP’s. The quantity of water leaving each WTP, Reservoir and Pump Station is monitored by flow meters. All points of supply on the bulk pipelines are metered and monitored. 2.2 WATER TREATMENT PLANTS 2.2.1 FAURE WATER TREATMENT PLANT The Faure WTP is situated just outside the Cape Metropolitan Area between the settlements of Faure and Firgrove. The WTP was designed for construction in two stages, the first stage which was completed in 1994 has a treatment capacity of 500 Mℓ/day. Raw water is conveyed to the WTP via two large diameter pipelines, namely: (A) A 12.9 km long 1 830/1 675 mm diameter pipeline from the Stellenboschberg tunnel portal supplying water from the Riviersonderend/Berg/River Government Water Scheme (RSE Scheme); and (B) A 17.8 km long 1 675 mm diameter pipeline from the Lower Reservoir of the Steenbras Pumped Storage Scheme, supplying water transferred from the Palmiet River. This water is pumped to Faure Water Treatment Plant by means of Firlands Pump Station. The distribution pipeline exiting Faure WTP is a 22.4 km long 2 400/1 830 mm diameter pipeline that links up with the existing bulk supply system. Figure 1 shows the layout of the water supply infrastructure to and from Faure WTP. The treatment process at Faure WTP has to cater for water from the Riviersonderend and Palmiet Rivers. The water treatment process consists of raising the pH of the raw water with lime to an optimum level for coagulation with ferric sulphate, taste and odour removal with powdered activated carbon (when required), horizontal flow settlement, declining rate rapid gravity sand filtration, stabilisation with lime and carbon dioxide and disinfection with chlorine. Sludge is dewatered and then thickened by means of centrifuges before being trucked off site to a landfill waste dump. 2.2.2 BLACKHEATH WATER TREATMENT PLANT Blackheath WTP is situated near Kuils River and has a maximum treatment capacity of 420 Mℓ/day. The plant was completed in 1982. Raw water from the Stellenboschberg Tunnel Outlet is conveyed to the Blackheath WTP by means of a 17,8 km long 1 500 mm diameter prestressed concrete gravity pipeline with a design capacity of 420 Mℓ/day. Water from the treatment plant flows to the nearby Blackheath Upper Service Reservoir with a capacity of 48,2 Mℓ or the Blackheath Lower Service Reservoir with a capacity of 537.6 Mℓ. From there, water is distributed through two 1 500 mm diameter prestressed concrete pipelines with Page 9 of 211 lengths of 20,5 km and 12.7 km. Figure 1 shows the layout of the water supply infrastructure around Blackheath WTP. The treatment process consists of: pH adjustment with lime, coagulation with aluminium sulphate, taste and odour control with powdered activated carbon (when required) preceding settlement in horizontal flow settling tanks, followed by rapid gravity sand filtration, stabilisation with lime and carbon dioxide and final disinfection with chlorine. 2.2.3 WEMMERSHOEK WATER TREATMENT PLANT The Wemmershoek WTP which was completed in 1958 is located at the base of Wemmershoek Dam. The maximum output from the WTP is approximately 250 Mℓ/day. A pre-treatment plant was added in 1980 to allow a supplementary supply of lesser quality raw water, up to 120 Mℓ/day, from the RSE Scheme to be treated before final treatment in the main plant. Raw water is conveyed to the Wemmershoek Water Treatment Plant from the RSE Scheme through a 18.1 km long 1100 mm diameter steel pipeline with a design capacity of 130 Mℓ/day. Treated water from Wemmershoek Water Treatment Plant is conveyed to Tygerberg Service Reservoir through a 49.6 km prestressed concrete pipeline. The first 26,3 km of the pipeline has a diameter of 1 525 mm, whilst the remaining 23,2 km has a diameter of 1 220 mm. The pipeline is designed to deliver a peak flow of 227 Mℓ/d to Tygerberg Reservoir. This pipeline also supplies an offtake to Paarl and Wellington 5 km downstream of the Water Treatment Plant. Figure 1 shows the layout of the water supply infrastructure around Wemmershoek WTP. The water treatment process at the main treatment plant comprises: coagulation, flocculation, direct sand filtration, stabilisation and disinfection. At the pre-treatment plant the water treatment processes used are: coagulation, flocculation and settlement before further treatment at the main plant. Page 10 of 211 Page 11 of 211 2.2.4 VOËLVLEI WATER TREATMENT PLANT Voëlvlei Water Treatment Plant is located near Gouda and adjacent to Voëlvlei Dam and was completed in 1971. The maximum output from Voëlvlei WTP is 230 Mℓ/d. Raw water is pumped to Voëlvlei Water Treatment Plant from the dam through a 1 525 mm diameter 1.9 km long pipeline, utilizing the Low Lift Pump Station. Treated water is pumped from the 9,1 Mℓ clearwell at Voëlvlei Water Treatment Plant by means of a high pressure pump station with variable speed motors through a 75.7 km long 1 525 mm diameter pre-stressed concrete pipeline to Plattekloof Service Reservoir. Figure 1 shows the bulk supply pipeline from Voëlvlei WTP. The water treatment process at this plant consists of: coagulation, flocculation, taste and odour control with powdered activated carbon (when required), vertical flow settling, rapid gravity sand filtration, final pH adjustment and disinfection. 2.2.5 STEENBRAS WATER TREATMENT PLANT The Steenbras Water Treatment Plant is situated on the Cape Town (West) side of the Hottentots-Holland Mountains. The water treatment plant was completed in 1946 and has a capacity of 150 Mℓ/d. The water treatment plant is supplied with raw water from Steenbras Lower Dam via a 752 m long tunnel through the Hottentots-Holland Mountains. Potable water from the Steenbras Water Treatment Plant is distributed through 3 bulk pipelines, namely: (A) the Steenbras 840 mm diameter main. This 51.6 km pipeline is a bitumen lined steel pipeline feeding Newlands Service Reservoir with a booster pump station at Garlandale. The capacity of the pipeline is 91 Mℓ/d when Garlandale pump station is utilised. The capacity is 50 Mℓ/d without the booster pump station being operational. (B) the Steenbras 810 mm diameter main. This is a cement mortar lined steel pipeline that supplies Newlands No. 1 Reservoir directly and Wynberg No. 2 Reservoir through a 915 mm diameter branch pipeline. The 810 mm pipeline is 51.2 km long and was designed to deliver 45,5 Mℓ/day. With Kildare Booster Pump Station operating, the capacity is increased to 91 Mℓ/day. (C) the Steenbras 760 mm diameter pipeline. This is a 63.5 km long cast iron pipeline from Steenbras Water Treatment Plant to the City of Cape Town’s Molteno Service Reservoir. Delivery directly to Molteno has been discontinued and the pipeline is currently in parts isolated and used as a distribution pipeline. Page 12 of 211 Figure 1 shows the layout of this water supply infrastructure. The treatment processes used at Steenbras Water Treatment Plant consists of coagulation, flocculation, horizontal flow settlement, rapid gravity sand filtration, stabilisation and disinfection. 2.2.6 BROOKLANDS WATER TREATMENT PLANT Brooklands Water Treatment Plant is situated close to Simon’s Town. The new treatment plant was completed in 1974 and has a treatment capacity of 5 Mℓ/day. The raw water is obtained from the Lewis Gay and Kleinplaas Dams and is augmented from the South African Navy’s Rawson dam. The treated water is fed into the distribution system via service reservoirs such as the Prince George and Neptune reservoirs. See Fig 2. The treatment process used is coagulation, flocculation, horizontal flow settlement, rapid gravity sand filtration, stabilisation and disinfection. Page 13 of 211 Page 14 of 211 2.2.7 KLOOF NEK WATER TREATMENT PLANT Kloof Nek Water Treatment Plant was completed in 1938 and is situated above Camps Bay. The water treatment plant has a capacity of 18 Mℓ/day. Raw water is obtained from the Hely-Hutchinson and Woodhead Dams through the Twelve Apostles Tunnel, which was constructed in 1960. It is then transported through a 450/ 375 mm raw water pipeline (3.4 km long) to the treatment plant. The treated water is delivered to the Kloof Nek Service Reservoir by means of two outlets, a 375 mm cast iron pipeline and a 300 mm steel pipeline. See Fig 3. The treatment process consists of coagulation, flocculation, horizontal settlement, rapid gravity sand filtration, stabilisation and disinfection. 2.2.8 CONSTANTIA NEK WATER TREATMENT PLANT Constantia Nek Water Treatment Plant is the smallest of the City’s water treatment plants and is situated in Oranjekloof near Constantia Nek. It was completed in 1934 and has a treatment capacity of 3 Mℓ/day. Raw water is obtained from the Victoria, Alexandra and de Villiers Dams situated on the top of Table Mountain. Treated water is fed into the reticulation system via the Constantia Nek Service Reservoir. See Fig 3. The treatment process consists of coagulation, flocculation, horizontal settling, rapid gravity sand filtration, stabilisation and disinfection. 2.2.9 ATLANTIS The Atlantis Water Undertaking consists of the following components which have been built since the start of development of Atlantis in 1975 through to 1986, and was further upgraded from 2000 to 2005. Silwerstroom wellfield, treatment plant and reservoir, Silwerstroom pumping main, 300 mm diameter and 17,8 km long with 4 pumping stations, delivering up to 8.6 Mℓ per day to the Pella Reservoirs, Witzands wellfield, water softening plant and balancing tank, Two Pella service reservoirs holding 10 Mℓ and 40 Mℓ respectively and serving Atlantis, Mamre and Pella residential areas, Two Hospital service reservoirs holding 10 Mℓ and 20 Mℓ respectively and serving the Atlantis industrial area, A pump station at Witzands dedicated to pumping to the Pella Reservoirs capable of pumping 23 Ml/day through a 13.3 km 450 mm diameter pipeline, A second pump station at Witzands pumping to the Hospital Reservoirs capable of pumping 23 Ml/day through a 8.4 km 400 mm diameter pipeline, A pump station at the Hopital Reservoirs pumping to the Pella Reservoirs and capable of pumping 9.8 Ml/day through the 5.5 km 400 mm diameter pipeline, and A gravity main 500 mm diameter (11.8 km in length) from the Melkbos pipeline to the Witzands treatment plant. The water treatment process consists of: Page 15 of 211 (A) (B) The Silwerstroom Water Treatment Plant: pressure sand filtration, pH adjustment with caustic soda and disinfection. The Witzands Water Treatment Plant: 50% of the raw borehole water flow is directed through a softening plant, this is again blended with the rest of the flow. The outgoing flow then disinfected. The balance of the demand is made up by drawing from the Voëlvlei pipeline via the Melkbos Reservoirs. Page 16 of 211 Page 17 of 211 2.2.10 ALBION SPRING Albion Spring is situated in Rondebosch. See Fig 3. It was completed in 1890, but the current treatment processes was installed in 1994 and has a capacity of 4 Mℓ/day. Raw water is obtained directly from the Albion Spring, the pH is adjusted by aeration and is disinfected and then pumped directly into the distribution system of the City at Newlands. 2.2.11 HELDERBERG WATER TREATMENT PLANT The Somerset West Water Treatment Plant is situated in Helderberg Nature Reserve above Somerset West. It has a treatment capacity of 12 Mℓ/day. Raw water can be conveyed from the Lourens River to the water treatment plant by means of: - a gravity feed from Lourensford Estate - a rising main from Radloff Park - a borehole supply Treated water is either gravity fed to the Helderberg area or pumped up to the Hillcrest Reservoir. The treatment process is slow sand filtration and disinfection. 2. 3 BULK SERVICE RESERVOIRS The main characteristics of the CoCT’s Bulk Water Service Reservoirs are listed in the table below: NO. SERVICE RESERVOIR 1 Blackheath Upper CAPACITY @ FSL (Mℓ) 48,2 FSL (m) RL 174,50 DEPTH (m) 7,28 2 Blackheath Lower 537,6 110,60 11,84 3 Constantia Nek 3,7 230,97 7,89 4 Monterey 29,0 189,06 6,39 5 Newlands Upper 132,6 138,50 7,63 6 Plattekloof 583,6 110,97 12,28 7 Tygerberg No. 1 33,4 110,57 7,64 8 Tygerberg No. 2 264,3 110,57 11,84 9 Wynberg No. 1 8,4 118,19 3,50 10 Faure 614,2 110,68 12,22 11 Glen Garry 149,6 140,20 6,68 12 Melkbos No. 1 20,0 100,00 11,75 13 Melkbos No. 2 20,0 100,00 11,75 14 Wynberg No. 2 22,2 118,19 5,08 Figure 1 shows the geographical location of the large Service Reservoirs with respect to the water treatment plants and the rest of the bulk supply system. Page 18 of 211 2.4 PUMP STATIONS The main characteristics of the pump stations are listed in Annexure “A”. ANNEXURE “A” 1 PUMP STATIONS AT ATLANTIS NO. OF PUMPS PUMP STATIONS FLOW HEAD (Mℓ/day) (m) RATED POWER (kW) EACH Hospital to Pella 1 9,8 71 160 Silwerstroom No. 2 2 5,7 110 110 Silwerstroom No. 3 2 5,7 110 110 Silwerstroom No. 4 2 5,7 110 110 Witzands “A” to Hospital 1 13,0 200 450 2 23,0 1 13,0 270 600 2 23,0 NO. OF PUMPS FLOW HEAD (Mℓ/DAY) (m) RATED POWER (kW) EACH 1 4,3 77,4 2 7,2 85,3 Wynberg No. 2 1 23,0 8,40 276 Monterey 1 19,0 80,0 250 2 21,1 86,0 250 1 85,0 104,0 970 1 77,0 104,0 1080 1 65,4 43,6 400 2 69.0 87,2 400 1 4,8 100,00 90 Witzands “B” to Pella PUMP STATIONS Wynberg No. 1 Garlandale Kildare Road Albion Spring Page 19 of 211 REMARKS REMARKS 56 Variable speed motor Variable speed motor PUMP STATIONS NO. OF PUMPS FLOW HEAD (Mℓ/DAY) (m) RATED POWER (kW) EACH Newlands 535 1 50,0 50,0 373 Voëlvlei Low Lift 3 68,1 24,0 306 2 79,5 29,0 420 5 68,1 120,0 1 212 1 22,7 125,0 429 3 300 111 1 000 1 80 1 23 90 470 2 46 90 Voëlvlei High Lift Firlands Wynberg No. 3 Page 20 of 211 REMARKS Variable speed motor Variable speed motor Variable speed motor 2. 5 RETICULATED POTABLE WATER INFRASTRUCTURE SUMMARY DESCRIPTION 2.5.1 INTRODUCTION AND BRIEF SYSTEM DESCRIPTION (POTABLE WATER RETICULATION) From up to eleven sources of potable water, water enters a distribution system of approximately 10 000 km of pipework and approximately 120 reservoirs and break pressure tanks ranging in size from a few kilolitres capacity to up to 650 Ml capacity Bulk Water Reservoirs. Thereafter a continually pressurised water distribution pipework ranges from 1,2 m diameter bulk mains to the normal 100 mm local street water main. (There are small sections where distribution mains are less than 100 mm diameter). Consumer complaints are logged via a “C3” notification system which is integral to the City’s SAP, ERP system. Consumer complaints can enter the SAP system from any Council workstation but are predominantly captured via the 24/7 Corporate Call Centre and Water and Sanitation Technical Operations Centre (TOC) before being transmitted to the relevant depots for attention. Progress on the attention to consumer complaints is monitored by reports generated from SAP. Approximately 6 000 consumer complaints and queries per month are attended to through this process. 21 2.5.2 DISTRIBUTION NETWORK Asset Register The distribution network is made up of a number of localised networks roughly based on pre 1997 Municipal boundaries. Whilst great strides have been made in producing a uniform network Asset Register based on a GIS platform, many field checks will have to and are continually being performed to verify information accuracy. A system for network checking has been introduced and this is yielding results. An approximate age analysis of the networks is as follows: 0 – 10 years 1 168 km 11 – 20 years 3 074 km 21 – 30 years 1 420 km 31 – 40 years 1 050 km 41 – 50 years 1 148 km 51 – 60 years 267 km Over 60 years 1 627 km An approximate materials analysis of the network is as follows: PVC and uPVC 589 km GRP 12 km Fibre-cement 7 429 km HDPE 42 km Steel lined and sheathed 166 km 22 Pre-stressed concrete 3 km Cast-iron 296 km Cast-iron (lined) 503 km Steel 541 km Unknown 173 km An approximate size analysis of the network is as follows: NOMINAL DIAMETER LENGTH km 50 253 75 1 223 100 4 592 125 50 150 1 727 200 242 225 538 250 149 300 422 350 71 380 71 400 86 450 118 500 109 600 58 23 NOMINAL DIAMETER LENGTH km 685 25 700 9 800 4 900 1 1 000 1 1 220 5 2.6 NETWORK MAINTENANCE AND PERFORMANCE Network performance is largely based on the age of the various components of the network and the policies and practises of the Municipal structures controlling these networks. Up until 2005 network replacement was only carried out systematically in some of the six previous Municipal structures. After a series of presentations to Council committees, tariffs were increased to account for necessary infrastructural maintenance and as a result of the income raised therefrom, accelerated infrastructural relay rates were achieved from 2008/2009 financial year onwards. Infrastructural replacement is based on the individual performances of individual pipe sections so as to achieve an accurately focused programme replacement. This programme is elaborated on in the Reticulation Branch’s Operational, Maintenance and Budget Plan for 2010/2011”. Current (2010/11) proposed network replacements are as follows: PROPOSED WATER MAINS REPLACEMENT 2010/2011 24 PER DISTRICT ESTIMATED OPERATIONAL AREA APPROXIMATE LENGTH INSTALLED RELAY LENGTH VALUE R DISTRICT South Peninsula 1 600 km 10 527 m 11 369 000,00 DISTRICT Tygerberg 1 600 km 7 580 m 6 822 000,00 DISTRICT Khayelitsha 400 km - DISTRICT Helderberg 1 500 km 10 473 m 11 393 000,00 DISTRICT Cape Town 2 500 km 5 754 m 5 179 000,00 DISTRICT Blaauwberg 2 200 km 8 847 m 7 962 000,00 - The fruits of this investment in the infrastructure are the equalising of operational --- district network performances as indicated in attached Appendix 1. In its 1996 review of World Bank Water and Wastewater Utility indicators, burst rates varied as follows: Santiago, Chile 31 breaks/100 km/year 187 “ “ Minsk, Belarus 70 “ “ Brussels, Belgium 21 “ “ Singapore 17 “ “ USA (average) 17 “ “ Bogota, Colombia In its 1998 review the Australian urban water industry reported as follows: 25 Australia (average) 35 breaks/100 km/year YarraValley Water, Melbourne 53 “ “ Sydney Water Corporation 70 “ “ With the above in mind, Cape Town’s performance of 63 bursts/100km/year could be better, but is comparable to some world cities. Current indications are that water main relay backlogs as at the 2010-07-01 are in the region of 90 000m. This is in comparison to 2010/11 financial year proposed relay of 43 181 m. It must be noted that, as infrastructure ages, additional poor sections of water mains will exhibit themselves by the end of this current financial year. 2.7 NETWORK OPERATIONS AND PRESSURE REDUCTION The Metro’s water networks comprise of approximately 175 individual water supply zones. These zones are necessitated by the following aspects: (a) Development/bulk supply considerations. (b) Topographical considerations (pressure reduction) (c) Water demand considerations (pressure reduction) 26 A summary of these zones together with consumer profile is attached as Appendix 2. The majority of the supply zones regulated by pressure reduction installations also have installation performance monitoring by way of 24/7 pressure recordings which enable the detection of faulty valve operation. The overall network performance is likewise monitored by 24/7 pressure recorders. 2.8 RESERVOIRS AND PUMP STATIONS The vast majority of the City’s water consumers consume water directly emanating from the City’s reservoirs located around the peninsula on the 110 m AMSL contour. However, there are a small number of consumers that, out of necessity, are fed by reservoirs located above this contour. These reservoirs are supplied via gravity from higher sources or via pump stations. --- A listing of reservoirs is attached as Appendix 3. reservoirs are listed in Appendix No. 4. Pump stations feeding these The City has embarked upon a three year programme to upgrade the telemetry systems monitoring and controlling these pump stations and reservoirs so as to enable closed control thereof through the 24/7 manned Technical Operations Centre. Due to the inherent storage capacity of the reservoirs, reliability of the pump stations are currently assumed adequate by way of duty and standby pump configurations. Back-up generation capacity has not been installed on the potable water reticulation reservoirs and any water supply shortages due to power outages would be averted using the Water and Sanitation fleet of mobile diesel generators. Water and Sanitation water tankers are considered another option. Water quality controls of water from these reservoirs are by way of routine water sampling and operational sampling. 27 2.9 Water Quality 2.91 Background The quality of drinking water in Cape Town is of a high standard. This is due to the fact that most of the water consumed in Cape Town is abstracted largely from unpolluted mountain catchments. The Scientific Services Branch within the Water and Sanitation Department of the City of Cape Town is largely responsible for the monitoring of various types of water, including drinking water, in the Cape Metropolitan Area (CMA). The Scientific Services Branch is not only equipped with some of the most sophisticated water testing instrumentation in the water industry, but also consists of a group of highly skilled, qualified and experienced scientists and technicians who ensure that the consumer is supplied with drinking water of acceptable quality. 2.9.2 Drinking Water Specifications Access to safe drinking water is essential to health and considered to be a basic human right. The City of Cape Town is committed to providing quality tap water to its consumers by ensuring that the drinking water supplied by its various water treatment plants does comply with the recommended guidelines as stipulated in the South African National Standards (SANS 241:2006) for Drinking Water. Every effort is made to meet the highest national and international standards for drinking water. 2.9.3 Water Quality Monitoring The Scientific Services Branch performs numerous tests on water samples which are taken from the water treatment plants, service reservoirs and from various points within the distribution system. Over 320 000 chemical and biological tests are performed each year on the raw water entering the water treatment plants and also on the treated water leaving the plants into the reservoirs and distribution network. Frequency of monitoring Water Treatment Plants – Raw, Treated and Intermediate composite water samples are taken weekly at 11 water treatment plants and submitted to the Scientific Services Branch for chemical and biological testing. Unlike the other water treatment plants, Atlantis WTP treats groundwater by first passing it through a softening plant after which it is blended with the treated water from the 28 Voelvlei pipeline via the Melkbos Reservoir. This blended treated water is then disinfected before release into the distribution network. Even though the raw borehole blended water entering the softening plant is sampled and analysed weekly, the individual boreholes (approximately 42 boreholes in operation) are sampled and analysed monthly for chemical and biological monitoring. Reservoirs – Treated water samples are taken weekly at 14 reservoirs of various capacities and submitted to the Scientific Services Branch for chemical and biological testing. Distribution – Treated water samples are taken weekly at approximately 120 sampling points situated across the entire distribution network and submitted to the Scientific Services Branch for chemical and biological testing. These sampling points include those situated in the various informal settlements. On-site monitoring Water Treatment Plants – All raw, treated and intermediate samples are sampled every 2 hours at the water treatment plants and tested for various chemical parameters e.g. pH, Alkalinity, Turbidity, UV Absorbance, Residual Chlorine, Hardness, etc. These results are used to optimize plant operations and to monitor the quality of the water throughout the treatment process. The Bulk Water Branch recently acquired 9 ProcessLab (ATLab) analyzers for each of the water treatment plants to perform the above-mentioned analyses. The ProcessLab is a modular and fully customizable analyzer for automated process analysis (at-line analysis). Its operation is based on the same methods that are already used for several MATi (Metrohm Automated Titration) systems at the Scientific Services’ Water Laboratory. The methods feature fully automated electrode calibration as well as record keeping of calibration data. The ProcessLab analyzes samples within minutes with a much higher repeatability and accuracy compared to the previous manual determination methods. The ProcessLab is easy to operate with the process controller/operator bringing the sample to the analyzer, enters his/her user name and password, simply selects the appropriate method and then starts the determination. All the systems are equipped with Uninterrupted Power Supplies (UPS) to guarantee all-time availability of the analyzers. All the analytical results, which are stored in the system’s database, are immediately transferred to a central server where it can be viewed by the Bulk Water Management, Area and Plant Managers and the Water Laboratory staff at Scientific Services. Data transmission to the central server is achieved via the technical network of the City of Cape Town with Ethernet and wireless point to point connections being used over distances greater than 80 km. These automatic ProcessLab analyzers play an important 29 part in maintaining the high quality of drinking water leaving the water treatment plants. Distribution Network - Treated water samples are taken every week at approximately 120 sampling points situated across the entire distribution network. The residual chlorine is also tested at these sampling points at the time of sampling to monitor the concentration of free chlorine present in the drinking water distribution network. The Reticulation Branch acquired approximately 20 on-line Chlorine Analyzers that have been strategically placed within the distribution network where it is expected that the residual chlorine concentration will be low (e.g. the furthest point from the reservoir, the outer perimeter of the distribution network, etc.). These on-line analyzers constantly monitor the free chlorine in the drinking water and send the results to a central server and website where it can be accessed by the Reticulation Branch management who will then authorize the necessary operational changes accordingly. These on-line analyzers play an important part in maintaining the desired residual chlorine concentration in the drinking water in all areas of the distribution network. Biological monitoring The Water and Biological Sciences Laboratories at Scientific Services also perform weekly toxin and algal analysis on the raw and treated water entering and leaving the water treatment plants. The Water Laboratory performs weekly analysis on the raw and treated water to determine the Geosmin concentration which, if present in high concentrations, gives an earthy taste and odour to the water. The Biological Sciences Laboratory also performs regular tests for Protozoan Parasites (e.g. Cryptosporidium, Giardia, etc.) and other biological microorganisms which may be present in the raw water entering the water treatment plants. Toxin and Algal analyses are also performed weekly on the raw and treated water samples. All these results are sent to the respective clients (e.g. Bulk Water and Reticulation Management, etc.) for the necessary corrective action, if required. Water Treatment Plant Optimization The Scientific Services Branch plays an important role in assisting the water treatment plants with the optimization of its various water treatment processes. Analytical Chemists from the Scientific Services’ Water Laboratory perform weekly water treatment plant inspections to monitor the quality of water 30 throughout the water treatment process and to give scientific guidance where needed. Research projects are also conducted at the various water treatment plants to monitor the quality of the water as it passes through the various water treatment processes, to monitor the efficiency of each process and to further optimize each process and the treatment as a whole. An example of such a research project was the 24 hour monitoring of each of the 20 filters at the Steenbras water treatment plant (which included backwashing) to determine if there was any breakthrough of Aluminium and Turbidity through the filters as there was a slight increase of these two parameters in the treated water. This monitoring project concluded that these elevated levels were due to improper coagulation control and not filter breakthrough as originally thought. With the assistance of auto-samplers, the Scientific Services’ Water Laboratory also conducts regular monitoring projects at the smaller water treatment plants to assist with process control and optimization. Water Quality Results The Bulk Water Branch, in conjunction with the Reticulation Branch, regularly publishes the drinking water quality results in the local newspapers and these results are also available, upon request, to any member of the public. This water quality report indicates an average (or typical) result for a specific determinant in the water over a period of time (normally 3 years). Example: The water quality report below indicates the analytical data and approximate distribution for Cape Town drinking water for the period 1 June 2007 to 31 May 2010. The South African National Standards (SANS 241:2006) Specification for a Class I and II water is also stipulated on this report. This report indicates the quality of the drinking water leaving each of the major water treatment plants and the approximate distribution areas they service. 31 Water Quality Challenges There are some water quality challenges facing the City of Cape Town and its water treatment plants that need to be addressed. For example, in some instances there are some slight increases in the Aluminium and Turbidity results leaving some the water treatment plants and this can also be detected in the distribution network. It must be noted that even though these results do not comply with the SANS 241:2006 Class I Specification, they do comply with the Class II Specification. Although these results do not impose an immediate threat to the overall water quality, their elevated levels in the treated water are reason 32 for concern. The Bulk Water Branch has therefore acquired new UV/Visible Spectrophotometers for each of its water treatment plants which are able to measure the Aluminium concentration in the raw and treated water entering and leaving the water treatment plant. Unlike the past where the water treatment plant had to wait for the Aluminium result from the Scientific Services Water Laboratory, which could take days, the Aluminium result is now available (onsite) within minutes allowing the water treatment plant staff to take immediate corrective action. This will provide better and more efficient process control thereby minimizing the incidents of elevated levels of Aluminium in the treated water. Future Requirements of Water Quality The Bulk Water, Reticulation and Scientific Services Branches of the City of Cape Town will have to take note of any future water quality requirements and then, as a result, put the necessary steps in place to meet these requirements. The international and national specifications for drinking water are changing all the time with specifications becoming more stringent and with new ones being added e.g. possible future water analysis for radioactivity, viruses, EDC’s, etc. The City of Cape Town will have to put measures in place to meet these future requirements, e.g. purchase of new specialized analytical equipment to perform these measurements, stricter process control at the water treatment plants, etc. With proper planning between the above-mentioned Branches of the City of Cape Town, these future water quality requirements can be met. 33 MODULE 3 RISK MANGEMENT PLANS OF WATER AND SANITATION DEPARTMENT AND BRANCHES 34 Root Causes and Actions 21 Security of Water Supply • Insufficient supply to meet demand • Increased pressure on infrastructure • Revenue loss • Lack of economic growth / investment • Reputational risk • Wastage • Inefficiencies • Riots / Service delivery protests • Adverse affect on relations with other municipalities • Provincial and City are not moving in unison e.g. Water Reconciliation of City vs. regional DWA (desalination focus) Root Cause Jeopardised by ageing or failing infrastructure Current Controls • Legislation • Budget • Asset Policy and CE 80 Development and implementation of Integrated Asset Management Plan Budget alignment to Integrated Asset Management Plan Materials Procurment • Upgrading, rehabilitation and replacement (CAPEX) Water and sewer network replacement program (CAPEX), Replacement of water and sewer infrastructure assets (CAPEX)) • Operational and Maintenance Implementation plans • Condition monitoring of assets • EMT task team • IAMP Task Team within utility services (integrated asset management plan) Limited by extent and capacity of existing infrastructure network to service • Effective water reconciliation strategy (e.g. Aquifer - pilot and desalination investigation) 35 Actions Action Increase skilled and experienced maintenance staff compliment Improve condition monitoring of equipment 70 Motivate additional budget for existing infrastructure maintenance (adequate/decent budget) Improve quality and workmanship, and quality of materials used Action Continue with capacity upgrading, driven by Capex plan Owner Peter and Pierre: 30 June 2011 with milestones for a long term project Peter and Pierre: 30 June 2011 with milestones for a long term project Peter and Pierre: 30 June 2011 with milestones for a long term project Peter and Pierre: 30 June 2011 with milestones for a long term project Josiah Josiah 8 Due Date 2015-0630 2015-0630 2015-0630 2015-0630 2011-0630 2011-0630 Owner Pierre and Peter Due Date 2011-0630 5 40 V@R Consequence Impact Risk Likelihoo d Rating Utility Services> Water and sanitation>Risk Register>14th October 2010 Id ## Root Causes and Actions growing demand Vulnerable to Natural disasters (EQ & Drought) and climate change (global warming, rainfall patterns) or human induced events (sabotage & vandalism) affecting infrastructure or raw water supply • High level planning with other directorates (Housing, Planning etc) • Forward planning Water and Sanitation Master Plan • National and Provincial measurements and reporting demands to ensure that water supply demands are being met • Partnerships • Optimise usage of current resources and infrastructure • Informal settlement master plan • IAMP Task Team within Utility services • Physical security and perimeter fencing • Physical inspections systems • Emergency Response Plan • Disaster risk Management plan • Water safety plan • Loss Control Officers • Dam Safety Plan and regulations • Water Demand Managment Strategy • Inherent engineering standards of built infrustructure • Reconciliation strategy (Research on future resourcesdesalination, TableMt 36 Annually update Water and Sanitation master plan, consult with all stakeholders (eg. Housing) 80 Zolile Action 2011-0630 Owner Due Date 2011-0630 Maintenance and update of DRM plan ManCo Develop and implementation of a Water Safety Plan Implement increased security measures e.g. fencing and CCTV (Molteno and Pump stations) Implementation of Loss Control Policy Mpharu 2010-1231 Peter and Pierre: Ongoing Unknown Josiah: Ongoing Unknown V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions Aquifer) • OHS advisors appointed Environmental Compliance restricting development for Water Supply infrastructure Vulnerability to failure in energy supply, source of supply or/and cost of available supply • EIAs • City Policy • Proactive planning 40 Action All Managers: Ongoing 80 Appropriate Forward Planning and feasiblilty studies to be completed ito Environmental Management requirements Appointment of qualified Project Managers Formalise Communication with relevant departments e.g. ERM and Housing and Property Management wrt land availability and EIA, through master planning forums Investigate efficiency processes e.g. service servitude vs. water servitude Action Investigate alternative power sources Peter and Josiah: Ongoing Continue communication with Eskom Improvement of fuel reserves and route optimisation Director W%S with Director ES: Ongoing Unknown Josiah 2011-0630 such as Informal settlement master plan • Inter departmental communication wrt new developments • Land forum • Legal forums • Cost recovery tariffs • Own plant generation (Turbines) • Backup generators (not everywhere) • Reserve Fuel stock • Supply agreement with Eskom • City policies and 37 Owner Due Date Unknown All Managers 2010-0831 Zolile Basholo, in conjunction with all Manager: As the need arises Unknown All Managers: Ongoing Unknown Owner Due Date Unknown V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions 28 Unable to service Sanitation demands • Production of non compliant effluent • Potential litigation • Outdated Sanitation services cause health and environmental risk to communities • Sewearge overflow results in Health and Environmental Hazards Root Cause Jeopardised by ageing or failing infrastructure Limited by extent and capacity of existing infrastructure network to service procedures • Fragmented UPS implementation Current Controls • • • • Risk Abatement Plan Legislation Budget Upgrading of the Waste water treatment plant (WWTP) • 10 yr plan • Monitoring Data • On going assessment of future capacity requirements • Upgrading, rehabilitation and replacement (CAPEX) Water and sewer network replacement program (CAPEX), Replacement of water and sewer infrastructure assets (CAPEX)) • Operational and Maintenance Implementation plans • Condition monitoring of assets • EMT task team • IAMP Task Team within utility services (integrated asset management plan) • Risk Abatement Plan High level planning with other directorates (Housing, Planning etc) 38 Investigate standby generators at strategic facilities CE 80 70 Josiah: Ongoing Unknown Actions Action Owner 8 Due Date 2015-0630 Development and implementation of Integrated Asset Management Plan Budget alignment to Integrated Asset Management Plan Kevin: 30 June 2011 with milestones for a long term project Kevin: 30 June 2011 with milestones for a long term project 2015-0630 Increase skilled and experienced maintenance staff compliment Kevin: 30 June 2011 with milestones for a long term project 2015-0630 Improve condition monitoring of equipment Kevin: 30 June 2011 with milestones for a long term project 2015-0630 Motivate additional budget for existing infrastructure maintenance (adequate/decent budget) Improve quality and workmanship, and quality of materials used Josiah 2011-0630 Josiah 2011-0630 Action Continue with capacity upgrading, driven by Capex plan Owner Kevin V@R Consequence Likelihoo d Rating Risk Impact Id Due Date 2011-0630 5 40 ## Root Causes and Actions growing demand Vulnerable to Natural disasters (EQ & Drought) and climate change (global warming, rainfall patterns) or human induced events (sabotage & vandalism) affecting sanitation infrastructure or treatment Environmental Compliance • Forward planning Water and Sanitation Master Plan • Partnerships • Optimise usage of current resources and infrastructure • Informal settlement master plan • IAMP Task Team within Utility services • Physical security and perimeter fencing • Physical inspections systems • Emergency Response Plan • Disaster risk Management plan • Water safety plan • Loss Control Officers • Dam Safety Plan and regulations • Water Demand Managment Strategy • Inherent engineering standards of built infrustructure • Reconciliation strategy (Research on future resourcesdesalination, TableMt Aquifer) • OHS advisors appointed • EIAs 39 Annually update Water and Sanitation master plan, consult with all stakeholders (eg. Housing) 80 40 Zolile Action 2011-0630 Owner Due Date 2011-0630 Maintenance and update of DRM plan ManCo Develop and implementation of a Water Safety Plan Implement increased security measures e.g. fencing and CCTV (Molteno and Pump stations) Implementation of Loss Control Policy Mpharu 2010-1231 Kevin: Ongoing Unknown Josiah: Ongoing Unknown Action Owner Due Date V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions restricting development for Sanitation infrastructure Vulnerability to failure in energy supply, source of supply or/and cost of available supply Non compliant industrial effluent entering sanitation treatment system • City Policy • Proactive planning such as Informal settlement master plan • Inter departmental communication wrt new developments • Land forum • Legal forums • Risk Abatement Plan Cost recovery tariffs • Own plant generation (Turbines) • Backup generators (not everywhere) • Reserve Fuel stock • Supply agreement with Eskom • City policies and procedures • Fragmented UPS implementation • Inspectors • WPC inspectors • Industrial Effluent By law 40 80 70 Appropriate Forward Planning and feasiblilty studies to be completed ito Environmental Management requirements Appointment of qualified Project Managers Formalise Communication with relevant departments e.g. ERM and Housing and Property Management wrt land availability and EIA, through master planning forums Investigate efficiency processes e.g. service servitude vs. water servitude Action All Managers: Ongoing Unknown All Managers 2010-0831 Zolile Basholo, in conjunction with all Manager: As the need arises Unknown All Managers: Ongoing Unknown Investigate alternative power sources Kevin and Josiah: Ongoing Continue communication with Eskom Improvement of fuel reserves and route optimisation Director W&S with Director ES: Ongoing Unknown Josiah 2011-0630 Investigate standby generators at strategic facilities Josiah: Ongoing Unknown Action Continue to implement Upgrading of Works projects as per 10 year master Owner Owner Kevin Samson and Michael Arkley Due Date Unknown Due Date 2011-0630 V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions V@R Consequence Likelihoo d Rating Risk Impact Id plan Develop a plan to Manage Ingress of Stormwater 4 Human Resource Capacity constraints and instabilty • Adverse effect on service delivery • Increased absenteesim • Staff turn over • Competency and staff skill lacking • Institutional knowledge/memory loss Root Cause Current Controls CE Lack of local Education and training courses for water and sanitation specific skills e.g. Process controllers at treatment plants, and general avaialbility in of experienced staff in the SA Market • Work Place Skills Plan (WPSP) • Training and development (admin & technical e.g. learnerships) CE 70 • Apprenticeship programme - low Control • In-service training • Organisational Structures • SAP Post Organograms appropriately funded • Approved JD and mentoring • Scarce skills allowance • Retention policy 40 41 Kevin Samson, Richard Ballard and Roland Moollan 2010-1231 Actions Action Finalise the appointment of HR and training staff within W&S. Ensure training is to an accredited level Resolve findings from Skills Gap analysis. Identification of specialised training for the City's engineering and technical services (CPD) and ECSA registration, implementation and application (corporate dependency on CHEC) Owner 4 Josiah in conjunction with all managers Due Date 2011-0630 Josiah in conjunction with all managers 2011-0630 8 32 ## Root Causes and Actions Stability in the workplace is jeopadised by low morale, frustraiton, overworked staff, atrrition Limited skilled labour availability/market to support water and sanitation needs • Managment and supervision • Conditions of working environment • Posts Filled, alleviates pressure Budget • Organisational Structures • SAP Post Organograms appropriately funded • Recruitment and selection processes • Work ethic • Work Place Skills Plan (WPSP) • Approved JD and mentoring • Scarce skills allowance • Retention policy • Training and development (admin & technical e.g. learnerships) • Apprenticeship programme • In-service training • Weekly meetings b/w Director and Managers on all staff amtters • Budget • Organisational Structures • SAP Post Organograms appropriately funded • Recruitment and 42 70 40 Action Finalise the appointment of HR and training staff within W&S. Ensure training is to an accredited level Owner Josiah in conjunction with all managers Due Date 2011-0630 V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions selection processes • Work ethic • Work Place Skills Plan (WPSP) • Approved JD and mentoring • Scarce skills allowance • Retention policy • Training and development (admin & technical e.g. learnerships) • Apprenticeship programme • In-service training Resolve findings from Skills Gap analysis. Identification of specialised training for the City's engineering and technical services (CPD) and ECSA registration, implementation and application (corporate dependency on CHEC) Enhance apprenticeship scheme Extend scarce skills implementation and persue scarce skills allowance (competive renumeration) Revisit the 3-year Departmental Staffing Strategy (subject to funding availability), including structures that where inappropriate Communicate with Corporate HR on Process weakness experienced Closer management of line management wrt filling posts Key staff may be lost to other • Scarce skills 43 60 Action Josiah in conjunction with all managers 2011-0630 Josiah in conjunction with all managers 2011-0630 Charmaine Meyer in conjunction with all managers and corporate HR - date linked to SDBIP Charmaine Meyer in conjunction with all managers and corporate HR - date linked to SDBIP 2010-0630 Charmaine Meyer in conjunction with all managers and corporate HR - date linked to SDBIP Charmaine Meyer in conjunction with all managers and corporate HR - date linked to SDBIP Owner 2010-0630 2010-0630 2010-0630 Due Date V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions sectors due to renumeration or other inticements, and natural attririon 20 Poor quality service • Increase customer Root Cause allowance • Talent Management (W&S City Pilot) • Dependency on current 'slow' job market to create stability within CoCT • Budget • Organisational Structures • SAP Post Organograms appropriately funded • Recruitment and selection processes • Work ethic • Work Place Skills Plan (WPSP) • Approved JD and mentoring • Scarce skills allowance • Retention policy • Training and development (admin & technical e.g. learnerships) • Apprenticeship programme • In-service training Current Controls 44 Implement Talent Management Model/Strategy CE Ntoza/Corporate Actions V@R Consequence Likelihoo d Rating Risk Impact Id 2011-0630 4 7 28 ## to customers (consurmers, other departments, stakeholders(DWA)) complaints • Services delivery protests / Increased conflict with Communities • Reputational risk • Health Hazards • Business efficiency and Return on investment not achieved • Rework • Service delivery delays • Delayed project completion / Adverse impact on infrastructure upgrades • Wastage / inefficiencies • Non compliance with legislation and City policy • Reliability and integrity of information in question • Misrepresentation of data by external users • Delay in obtaining data • Non compliance with Environmental Legislation • Adverse impact on water quality • Lost revenue • Unrealised revenue • Failure to meet budget • Increase financial costing • Increased virementing • Operating budget reduction • Continuous pressure to reduce resources Root Causes and Actions Insufficient/ageing infrastructure to support required service level or quality Shortage of human resources (skills and numbers) to deliver on services or requests • Legislation • Budget • Asset Policy and Materials Procurment • Upgrading, rehabilitation and replacement (CAPEX) Water and sewer network replacement program (CAPEX), Replacement of water and sewer infrastructure assets (CAPEX)) • Operational and Maintenance Implementation plans • Condition monitoring of assets • EMT task team • IAMP Task Team within utility services (integrated asset management plan)" • Satellite depots (36 Depots) • Engineering directives • Standards and norms • Shared number for customer complaints reporting • Current Staffed Organogram • Labour Relations Act • BCEA • ISO (partial implementation) 45 80 70 Actions as per Risk 21 Action: Jeopardised by ageing or failing infrastructure (above) Action Owner Due Date 2013-0630 Complete implementation of EAM regional depots to enhance service delivery to branches Determine resource capacity requirements to address the gaps identified Josiah All Managers: Dec and ongoing 2010-1231 3 regional depots to be implemented, in phases. Phase 1: Sign off of report by City manager Pierre Maritz 2010-1130 V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions • Customer Satidfaciton surveys (annual) Inadequate systems in place wrt to information and reporting • Fragmented document management system and record keeping • MIS & GIS • Collation of information from Legacy Systems • SAP: Business warehouse • Dynamic Integrated Management System (DIMS) e.g. Technical Operations Centre (TOC) Information Centre and Laboratory Information Management Systems (LIMS) • ZiZo • SharePoint • Directorate KPA's/SDBIP • City Delegations and sub delegations 46 70 Improve communication with other departments and communities Pierre, Zolile Basholo, Bertus, Kevin: Ongoing 2010-1231 Implement a toll free number for informal settlement customers, dependency on Corporate - due process must be followed Action Pierre Maritz: dependency on corporate 2010-1231 Streamline communication Philemon Mashoko and Zolile Basholo in conjunction with All Managers: Ongoing Fully implement and operationalise DIMS (Operations) and SAP BI (SCM, etc.) Central repository of information Corporate revisiting reporting processes ito Sub Councils Philemon Mashoko and Zolile Basholo in conjunction with All Managers: Ongoing Unknown Philemon Mashoko and Zolile Basholo in conjunction with All Managers: Ongoing Unknown Investigation of centralised document management system Philemon Mashoko and Zolile Basholo in conjunction with All Managers: Ongoing Unknown Owner Due Date Unknown V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions • Quarterly Reporting • Weekly Director Access to servitudes is often limited Challenging economic environment constraining the quality of output i.e. fuel price, increased operating costs, politcal pressure on low tarrifs, meetings with ED • Monthly portfolio committee meetings • Weekly Mayco member meetings • Fortnightly Mancos meetings • DIMS • PCER • Mayors Dashboard • Legislation • National Guidelines • City Policy • Community Engagement • Law Enforcement • Informal settlement master plan • Inter departmental communication wrt new developments • Land forum • EIA • Legal forums • Forward cover (foreign exchange cover) • Annual budget parameters • Alternative energy sources • Energy savings plan • Investigation into CDM (Cleaner Development Mechanisms) 47 Implement Outage Management System 40 60 Philemon Mashoko and Zolile Basholo in conjunction with All Managers: Ongoing Action Owner Formalise Communication with relevant departments e.g. ERM and Housing and Property Management wrt land availability and EIA, through master planning forums Investigate efficiency processes e.g. service servitude vs. water servitude Zolile Basholo, in conjunction with all Manager: As the need arises Action Owner Develop metering strategy Improving metering readability Improving metering management Enforcement of bylaws through enforcement and fines All Managers: Ongoing Director W&S Bertus Pierre Zolile and Pierre: Ongoing Unknown Due Date Unknown Unknown Due Date 2010-1130 2011-0630 2011-0630 Unknown V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions • Continuous improvement of controls • Water demand management systems • Review staffing structure continuously • Metering Inferior products and works received from suppliers (includes workmanship) ISO systems not fully implemented • Tender specifications • Tresting and evaluating of samples • Infrastrucutre standards • ISO certificate of compliancefronm supplier • City polices and procedures • Standard Operating Procedures • Legislation • Audits • Peer reviews • Benchmarking • Gap analysis assessment - consultant appointed • Blue drop and green drop system (status assessment) • Committee related to ISO • ISO partially implemented in some branches 48 70 Installation of vehicle tracking system Josiah and Pierre: Ongoing Unknown Investigation into Life cycle costing Maintain / optimise opex Write-off bad debt Bertus and Josiah 2011-0630 Unknown Insallation of WDM devices Action Zolile: Ongoing Unknown Owner Complete 'Rejections and Acceptance' procedure for materials (covered in ISO processes) Complete inspection of plumbing of housing projects before handover to water and sanitation Action All Managers: Ongoing Due Date Unknown Maintain quality systems Implement additional ISO 9001 and 14000 standards Implement ISO 17025 in scientific services All Managers: Ongoing All Managers All Managers 2015-0630 Implementation of ISO 18000 standards (OHS) All Managers 2015-0630 All Managers: Ongoing Bertus: Ongoing Pierre and Zolile: Ongoing Owner Unknown Unknown Due Date Unknown 2015-0630 V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions 30 Business Financial Risk • Jeopardises the efficiency of W&S business and sustainability of service delivery • Failure to provide additional services • Service levels adjusted to compensate for decreased revenue • City credit rating jeopardised • Potential Litigation • Liquidity / Cashflow • Non compliance with legislation Root Cause Non revenue water Poor project management Debt management Fragmentation in cost centre control Tariff structure and sensitivity for price elasticity Increase in Indgident households 29 Pollution • Increased costs in Financial sustainability of supply due to increased free basic services needs, tariff limitations and increased pressure on operating costs Root Cause Current Controls CE • Items contained in the "Unaccounted for Water Strategy" • Qualified Project managers • Project Plans and expenditure/Service provider contracts 50 • Debt Actions (restitions / disconnections) • Implementaiton of Water Management Devices • Branch Manager Monitoring • Reporting and Information management • Tariff Modelling • Benchmarking (with other municipalities) • Tariff Policy • • Tariff Policy (corss subsidizaiton) • Indigent Policy (levels of service, min stds) • Indigent grant / Equitable share 60 Current Controls CE 49 80 Actions Action Improve Project Management Owner Unknown 6 4 24 V@R Consequence Likelihoo d Rating Risk Impact Id ## Due Date Unknown 60 70 40 Actions ## Root Causes and Actions water treatment and waste water treatment • Non compliant Waste water effluent • Environmental Risk • Non compliance with legislation • Potential litigation Uncoordinated growth leading to unserviced communities pollutes catchment systems Non compliant industry and residential waste water into sewage system Construction projects • Legislation • National Guidelines • City Policy • By-laws • Law Enforcement • Informal settlement master plan • Inter departmental communication wrt new developments • Land forum • EIA • Legal forums • Catchment Mangement Forums • Inland and Coastal Water Managment Forumn • • • WPC inspectors / enforcemet • Industrial Effluent By law • OH&S on site 50 50 Action ?? 70 Unknown Action Continue to implement Upgrading of Works projects as per 10 year master plan Continue to implement Industrial Effluent programme 80 Owner Action Owner Kevin Samson and Michael Arkley Kevin Samson, Richard Ballard;Roland Moollan: Ongoing Owner Due Date Unknown Due Date 2011-0630 Unknown Due Date V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions Non compliant effluent/byproducts released into natural environment by W&S Services Recieving water bodies standards conflicting with treated waste water standards 31 Constraints to effective internal administration Root Cause Excessive inter and intra- • EIA requires Environmental Control Officer or committee • By-laws and naitonal legislations (NEMA, NWA) • Rectification processes (Action plans) • Training • Implementation of ISO system • Quality Management System • Monitoring Data • sampling and testing of all by products • On going assessment of future capacity requirements • Upgrading of the Waste water treatment plant (WWTP) • 10 yr plan • • Standards and Ensure tightened monitoring on contractors and ensure close out reports 70 Current Controls • Directorate 51 Action Upgrading sewage retic network - as per Annual Upgrade plan Regular inspection of manholes Shorten reaction time to sewage spillage incidents Raising manholes (increasing retention time) Action guidelines from DWA (Legislation) • Permits All Managers: Ongoing ?? Due Date 2010-0630 Pierre: ongoing Unknown Pierre: ongoing Unknown Pierre: ongoing Unknown Owner Due Date Unknown Unknown CE Unknown Owner Pierre Actions Action Owner V@R Consequence Likelihoo d Rating Risk Impact Id ## Due Date Root Causes and Actions departmental reporting Unpredictable Political Environment at micro and macro level Highly regulated KPA's/SDBIP • City Delegations and sub delegations • Quarterly Reporting • Weekly Director meetings with ED • Monthly portfolio committee meetings • Weekly Mayco member meetings • Fortnightly Mancos meetings • DIMS • PCER • Mayors Dashboard • City Delegations and sub delegations • Legislative Guidelines • Code of Conduct for Councillors • Council decisions governance structures • Apolitical stance of directorate • Staff ethic • Insulate staff culture - professionalism / strong governance processes e.g. ISO • SCM Policy and 52 Streamline communication Philemon Mashoko and Zolile Basholo in conjunction with All Managers: Onging Unknown Fully implement and operationalise DIMS (Operations) and SAP BI (SCM, etc.) Central repository of information Corporate revisiting reporting processes ito Sub Councils Philemon Mashoko and Zolile Basholo in conjunction with All Managers: Onging Unknown Philemon Mashoko and Zolile Basholo in conjunction with All Managers: Onging Unknown Action Maintain Engineering Standards and apolitical / unbiased stance Appropriate PrePlanning Contingency / Continuity scenarios to be unpacked to communicate with Politicians when challenged Action Owner All Managers and staff: Immediate and ongoing All Managers: Immediate and ongoing Owner Due Date Unknown Unknown Due V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions SCM environment Inadequate Information Management procedure • SCM Oversight Committee • Legislation and regulations related to SCM • MFMA • Engaged with SCM with W&S specific needs • External contractors (contracted services, labour brokers) • Fragmented document management system and record keeping • MIS & GIS • Collation of information from Legacy Systems • SAP: Business warehouse • Dynamic Integrated Management System (DIMS) e.g. Technical Operations Centre (TOC) Information Centre and Laboratory Information Management Systems (LIMS) • ZiZo 53 Date Ongoing direct interaction with SCM to streamline processes Continue to request Director SCM to liaise with NT on revising tender threshold based on unqualified AG reports Continue to liaise with SCM to accommodate W&S business needs within the confines of legislation Action All Managers (with assistance from Bertus Saayman): as the need arises All Managers (with assistance from Bertus Saayman): as the need arises Unknown All Managers (with assistance from Bertus Saayman): as the need arises Unknown Investigation of centralised document management system Implement Outage Management System Unknown Due Date Unknown Unknown Unknown Owner Unknown V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions • SharePoint Non consolidated Registry for city records Environmental Compliance restricting development for Water and Sanitaiton infrastrucutre 54 Action Owner Due Date 2010-1231 Interact with Corporate Services on the formalisation of the SAP centralised document management system / registry / referencing processes Formalise a centralised staff archiving and retrieval document management system Charmaine Meyer in conjunction with all Managers in conjunction with Corp Services Charmaine Meyer in conjunction with all Managers in conjunction with Corp Services 2010-1231 Centralisation of OHS records Charmaine Meyer in conjunction with all Managers in conjunction with Corp Services 2010-1231 V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions Fraud, Corrruption and misconduct • Standing item on ED Meeting Agenda • Fraud Policy, Response Plan and Whistle blowing Policy • Fraud Hotline • National interventions • Departmental Loss Control Units • IR Departments Disciplinary Action • Policy on the Declaration of interest • Applications for private work ss 55 V@R Consequence Likelihoo d Rating Risk Impact Id Utility Services> Water and sanitation> Operational Bulk Water>Final Draft Risk Register>19Aug2010 Availability of competent staff Current Controls CE • Overtime • Overtime • Training and 40 Action Robbie Fortune Robbie Fortune 2011-0630 40 Accelerating the recruitment of funded vacant posts (95 post to be filled by december internal target) Complete filling of all vacancies (approx 50 posts after Dec 2010) Action Due Date 2010-1231 Robbie Fortune Robbie Fortune 2011-0630 40 Accelerating the recruitment of funded vacant posts (95 post to be filled by december internal target) Complete filling of all vacancies (approx 50 posts after Dec 2010) Action Due Date 2010-1231 Development • Recruitment Resource capacity constraints Actions System under development • Overtime 56 Owner Owner Owner Due Date BW StratGrid Ref Root Cause Lack of Appraisal systems for advancement Essential Service demands V@R • Adverse effect on service delivery • Non-compliance with legislation - overtime hours • Fatigue of stretched staff • Increase in OHS exposure • Overtime (Financial impact) • Untrained and inadequately trained staff performing essential services • Unmanned Operations • Consequential vacancies as a result of internal advancement into new posts Root Causes and Actions Rating Staff compliment does not meet operational requirements Consequence Likelihood 5 Risk Impact Id 5 9 45 R0 I6 Vacancy posts cut, past moratorium on filling of posts and unfunded posts needs 2 Skills set loss • Ineffective and inefficient service delivery • Delayed response • Poor customer satisfaction • Inadvertent damage • Drop in water quality • Loss of Institutional Knowledge • Systems knowledge limited • Age profile R & S process slow due to stretched management within Bulk Water Root Cause Unfavourable age profile Retirements, resignations, attrition, • Recruitment and Selection • Overtime 60 Accelerating the recruitment of funded vacant posts (95 post to be filled by december internal target) Complete filling of all vacancies (approx 50 posts after Dec 2010) Action Robbie Fortune 2010-1231 Robbie Fortune 2011-0630 Motivate for unfunded posts to complete Bulk Water needs, once funded vacancies are complete Robbie Fortune Owner BW StratGrid Ref • Training and Development • Recruitment V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 6 7 42 R0 O2 Due Date 2011-0630 • HR partner Current Controls • Engage corporate HR when necessary (Retention Policy) • Continuous training of staff and skills transfer (internal - coaching and mentoring) • Some external training • Engage 57 CE 50 Actions Action Complete Development of O&M manuals and SOP's Development of Succession Planning 50 Action Owner Peter Flower Due Date 2010-1030 Robbie Fortune 2010-1230 Owner Due Date O3 Limited succession planning No career pathing 3 SCM policies is not always supportive of some of Bulk Water operational needs • Water Quality non compliance • Interruption of supply • Staff frustrations • Project Delays • Unecessary unplanned Overtime • Results in increasing expenditure Root Cause Lack of capacity within SCM to deal with Emergency and urgent procedures SCM process permits one supplier selection as opposed to business' request for two suppliers - ensuring continuity, where a supplier defaults Rigid SCM Policy interpretation (Procurement) corporate HR when necessary (Retention Policy) • Continuous training of staff and skills transfer (internal - coaching and mentoring) • Some external training • No Controls Complete Development of O&M manuals and SOP's Development of Succession Planning Action • No Controls Current Controls • Engagement with SCM Management • SCM Legislation • SCM Policies • Engagement with SCM Management • SCM Legislation • SCM Policies • Engagement with SCM Management • SCM Legislation • SCM Policies 58 50 Robbie Fortune 2010-1230 Owner Robbie Fortune Development of Succession Planning Robbie Fortune Owner Action Owner Peter Flower 6 7 42 R0 I3 Due Date 2010-1230 Due Date 2010-1230 Actions Imminent engagement with SCM 50 2010-1030 Development of Succession Planning Action CE 50 Peter Flower BW StratGrid Ref etc V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Due Date 2010-1031 Root Cause Ageing of infrastructure legislation, policy, procedure and standards • Public Relations implications • Water quality • Loss of life/fatalities • Health and other Hazards • Interruption of supply • • Limited OHS compliance enforcement - HIRA (Hazard Identification Risk Assessment) Lacking skill, capacity, Current Controls • Training • Self compliance audits (machinery and staff--ISO) • Risk assessments • Safety procedures • SOP's • Continous equipment & Plant monitoring • External service provider audit reviews • Safety Committees • Site Inspector (Annual) • training • Self compliance audits (machinery and staff--ISO) • Risk assessments • Safety procedures • SOP's • Continous equipment & Plant monitoring • External service provider audit reviews • Chlorine 59 CE Actions 80 70 70 Action Owner Due BW StratGrid Ref • Potential Litigation • 3rd party liability • Non compliance with V@R Major Hazard Installations Risk Exposures e.g.various chemicals Root Causes and Actions Rating 10 Consequence Likelihood Risk Impact Id 10 4 40 R0 I4 Lack of support for maintenance (internal) Shifts not adequately staffed resulting in legislation non compliance 4 Pipe Bursts • Flooding and consequential damage • Interruption of supply • Asset stripping • Financial liability Root Cause Natural events (e.g. Earthquake) training • Appropriate staff appointments • Overtime 50 Current Controls CE • Emergency 60 60 6 6 36 R0 F5 Date • Continous equipment & Plant monitoring • Works Orders • Safe working permits • PJO'sPlanned job observations • Appropriate staff appointments • Overtime • BCOE • Legislation response team • Spares Store • Pressure monitoring quipment • CRR • Engage with other branches • Bulk water financial strategy • Asset BW StratGrid Ref training of staff V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 20 Complete the filling of vancies and subsequent training required for new appointess Action Robbie in conjunction with HR 2011-0630 Owner Complete the filling of vancies and subsequent training required for new appointess Robbie in conjunction with HR Due Date 2011-0630 Action Owner Complete the filling of vancies and subsequent training required for new appointess Robbie in conjunction with HR Actions Due Date 2011-0630 Infrastructure Management Plan (being developed) Age of infrastructure Inadequate Capital Budget to meet replacement demands • Emergency response team • Spares Store • Pressure monitoring quipment • CRR • Engage with other branches • Bulk water financial strategy • Asset Infrastructure Management Plan (being developed) • Asset Infrastructure Management Plan (being developed) • Spares Store • CRR • Bulk water financial strategy 61 60 50 BW StratGrid Ref V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 7 HR processes impact negativley on staff morale • • • • • Decrease in staff morale Reduced productivity Stress overload High absenteeism Loss of skills/experience(institutional knowledge) Root Cause Slow HR Corporate Processes i.e. R&S • Emergency response team • Spares Store • Pressure monitoring quipment • CRR • Engage with other branches • Bulk water financial strategy • Asset Infrastructure Management Plan (being developed) Current Controls • Engage with 4 9 36 R0 O3 60 CE 40 Consistency issues how rules are interpreted and implemented across directorates and branches corporate • Approved Organisational Structure (evolving) • Staff communications • R&S process • Legislative requirements • TASK • R&S process • Revising ORG structure Lack continuity in corporate administration • HR policies and procedure 50 ORP Objections at SALGBC (Bargaining Council) • Appeals process • Knock on process 50 62 BW StratGrid Ref Lack of Infrastructure maintenance due to lack of resources V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 40 Actions 8 Difficulty in procuring materials / heavy equipment • • • • Water Quality influenced Interruption of supply Health and other Hazards Adverse affect on City Credibility - Reputation • Frustration • Inferior materials used result in re work Root Cause Capacity and skills within SCM Essential Service demands Dependency on Procurement Processes outside normal operational hours Decline of internal skills in preparing specifications Regional logistics of moving stock 9 Management controls are limited • Time and money wastage • Limited influence/input causes distorted budgeting process (OPEX) • Forced and rushed planning • Unfocused prioritisation Root Cause Inadequate supervisory capacity BW StratGrid Ref TASK evaluation processes yet to be completed (benchmarking) V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Actions 6 6 36 R0 I3 Actions 4 9 36 R0 ? • TASK • Corporate processes Current Controls • Ongoing discussions with role-players, including SCM • Ongoing discussions with role-players, including SCM • SCM policy • SCM policy • R&S process • Internal Capacity • Informal knowledge transfer • Education of buyers • Tender specifications Current Controls • Improved Senior Management quality • Management reporting • Management systems (SAP Reports and Exception Reports) • Re 63 CE 40 40 40 40 40 CE 80 V@R BW StratGrid Ref Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 7 5 35 R0 F5 organization and filling of vacancies Shortage of staff Operational involvement Management required to assist with high level information request distracting line from core responsibilities 1 Finances do not • Interruption of services Root Cause • Improved Senior Management quality • Management reporting • Management systems (SAP Reports and Exception Reports) • Re organization and filling of vacancies • • Management reporting • Re organization and filling of vacancies • Org structure/ job descriptions • Legislated Classification for process control staff • Improved Senior Management numbers Current Controls 64 60 40 50 CE Actions meet existing and new Infrastrucutre needs • Reputational Risk • Non compliance with Legislation, Policy, Procedure and Standards • Reduction in security of supply Densification, developments, indiscriminant developments and informal settlement growth resulting in increase water demand in the region Resistance to increase tariff resulting in inadequate Capital and Operating Budget to meet infrastructure development and replacement demands 11 Pollution of • Water Quality influenced Root Cause • Dependency on other depts (Housing) • Security against invasion • Bulk water financial strategy • Asset Infrastructure Management Plan (being developed) • Engage corporate finance • Bulk infrastructure finance strategy • Tarrif committee • Long Term Planning • Management Information to inform budget requests • Intimate communication with councillors • Asset Infrastructure Management Plan (being developed) Current Controls 65 BW StratGrid Ref V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 40 F6 50 Action Presentation of Management Reports for decision making CE Owner Unknown Actions Due Date Unknown 5 7 35 R0 C2 catchments • Operational impacts(deviation ofsupply • finanacial impacts • increase chemical usuage • Adverse affect on City Credibility • Diminished ability to comply with treated water standards Failed catchment management (riverine and aquifer and outlying regions) Eutrophication of DWA Dams (Various catchments/ open areas) Poor control of Informal Settlements • Engage DWA • Stakeholders in catchment consulted • CSIR (Council of Scientific and Industry Research) • MLC's (Municipal Local Councils) • Water User Associations • Legislation (e.g. NEMA) • By laws • Engage DWA • Stakeholders in catchment consulted • CSIR (Council of Scientific and Industry Research) • MLC's (Municipal Local Councils) • Water User Associations • Legislation (e.g. NEMA) • By laws • Dependancy on Local Govt Housing 66 30 30 BW StratGrid Ref V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 21 Assets/ Infrastructure management constraints • • • • Failure of infrastructure Interruption of services Reputational Risk Non compliance with legislation, policy, procedure and standards • Multitasking, job scope creep Root Cause Insufficient funds EAM capacity constraints Bulk Water human capacity constraints Dependency on DWA capacity Loss of focus • Adverse affect on service • Monitor CE Actions 5 7 35 R0 F5 50 spending of repairs & maintenance (Budget) • Implementing SAP PM correctly Inadequate asset maintenance plan 22 • Dependancy on DWA driving the initiatives • Water user Associations Current Controls BW StratGrid Ref Failed / inadequate infrastructure networks V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Root Cause • • Asset Infrastructure Management Plan (in progress) • Asset Register (Phase 1 in draft) • Appointment of approriate staff • Appointments pending • Training • O&M manuals • SOPs • Good systems inherited/system redundancy • Western Cape Systems analysis Current Controls 67 I3 50 O2 60 60 CE Actions 4 8 32 R0 ? Productivity Demands ito workload requirements Capacity constraints Legal compliances Administrative demands 14 Changes in • Non compliance with Root Cause • Focused business planning • Portfolio committee • New management playing a role in handling demands • Excellence Program • Focused business planning • New management playing a role in handling demands • Pending appointments • Pending appointments • Good support from ERM and Legal • EAM support • Risk Management • Legisation guidance • Audits • Focused business planning • Portfolio committee • New management playing a role in handling demands Current Controls 68 BW StratGrid Ref Corporate and Political Demands V@R delivery • Non-compliance with legislation • Core service sacrifices • Staff frustration and morale • Effects long and short term planning, keeping eafait with new developments, industry advancements Root Causes and Actions Rating on core functions Consequence Likelihood Risk Impact Id 6 5 30 R0 I4 70 70 70 80 CE Actions HR legislative requirements Environmental compliance requirements • Regular legislative audits • Engagement with key stakeholders • Advisors (ERM and Legal ) • Participation in DWA workshops • Compliance BCOE on overtime • OHS Act • Regular legislative audit • Engagement with key stakeholders • Advisors (ERM and Legal ) • Participation in DWA workshops 70 Current Controls CE BW StratGrid Ref Chemical specification and water quality requirements / demands V@R legislation • Health hazards to staff and public(consumers) • City Credibility • OHS Act and legal compliance Root Causes and Actions Rating legislation and international standards Consequence Likelihood Risk Impact Id 6 5 30 R0 C2 40 70 Single Public Service looming / eminent 6 Development encroachment / unauthorised activities over servitudes and pipe line routes • • • • Reputational Risk Non compliance Public liability/ fatalities Inaccessibility to maintain and operate the pipline leading to interruptions Root Cause Lack of enforcement of Municipal Ordinance Lack of restricted access notices, or notices ignored Spread of informal settlements over • Land Invasion Control • Municipal Ordinances / Servitude conditions • Land Invasion control • Disaster Management • Engage political representative • Land 69 Actions 40 40 40 Action Owner Due Date Vandalism and accessibility Densification (Developments and indiscriminate developments) Lack of intergrated planning City wide 13 Electricity supply fails • • • • • Water Quality influence Security Risk Interruption of supply Health Hazards Adverse affect on City Credibility • Non compliance with water quality standards Root Cause Monopoly of supply with Eskom (dependancy) Invasion control • Disaster Management • Engage political representative • Housing Directorate • Land Invasion Control • Engage with local communities • Engagement with strategy and planning • SDF(Spatial Dev Framework) • Municipal Ordinances • Housing Directorate • Engagement with strategy and planning • SDF (Spatial Dev Framework) • Municipal Ordinances Current Controls • Generation of own electricity • Continuous liaison with ESKOM • Electricity Systems Control (Zoning Unit in Newlands) 70 Prevention of further encroachment Unknown BW StratGrid Ref servitudes V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 4 7 28 R0 C2 Unknown 40 60 60 CE 80 Actions Cable theft and vandalism Equipment failures 16 Dam infrastructure failure • • • • • • Fatalities Lost resources Water Quality influence Interruption of supply Health Hazards Adverse affect on City Credibility • Potential legal liability Negligence claims • Lost asset: financial risk Root Cause Exposure to DWA Dam failure outside of our control which will impact on our surety of supply Poor maintenance • Generation of own electricity • Continuous liaison with ESKOM • Electricity Systems Control (Zoning Unit in Newlands) • Security Services • Patrolling • Copper Heads • Comms Services • Generation of own electricity • Continuous liaison with ESKOM • Electricity Systems Control (Zoning Unit in Newlands) • Pro-active replacement and upgrade Current Controls BW StratGrid Ref Failure of back up systems V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 10 2 20 R0 C2 80 40 80 CE Actions • Dependency on DWA • Dam safety program • Updating of O&M • External evaluation by 71 I4 90 F5 BW StratGrid Ref V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id approved professional persons • Resident Dam Safety Team Natural events ,eg earthquakes and flooding Sabotage 15 Natural Events • Adverse affect on service Root Cause • Early warning detection: Geoscience, Weather Report • Dam safety program • Dependency construciton standards at the time built • Updating of O&M • External evaluation by approved professional persons • Resident Dam Safety Team • Conservative design to seicsimic activity • Security 60 Current Controls CE 72 I4 90 Actions 9 2 18 R0 C3 delivery • Severe restrictions • Legal claims • Infrastructure threats • Long-term risk of reduced yields and increase in demand • Slow Recovery /repair of infrastructure( not geared for major repairs such as earthquakes) Intermittent rainfall /drought • Pray • Continuous assessment and integrated management of system • Engagement with DWA, etc • Climate change monitoring • Fire risk management programmes • Liaison with other stakeholders e.g. DRMC • Rigorous sampling regime • Training • Committed Services support • Process automation • 73 BW StratGrid Ref V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 70 I4 Biodiversity impact • Pray • Continuous assessment and integrated management of system • Engagement with DWA, etc • Climate change monitoring • Fire risk management programmes • Liaison with other stakeholders e.g. DRMC • Rigorous sampling regime • Training • Committed Services support • Process automation • Alien Vegetation Control 74 BW StratGrid Ref V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 70 C5 Flood events • Pray • Continuous assessment and integrated management of system • Engagement with DWA, etc • Climate change monitoring • Fire risk management programmes • Liaison with other stakeholders e.g. DRMC • Rigorous sampling regime • Training • Committed Services support • Process automation • 75 70 BW StratGrid Ref V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 18 Security of • Interruption of supply/no Root Cause • Inherent design and engineering accommodate sceismic activity (except Voelvlei) expsoure due to year built • Pray • Continuous assessment and integrated management of system • Engagement with DWA, etc • Climate change monitoring • Fire risk management programmes • Liaison with other stakeholders e.g. DRMC • Rigorous sampling regime • Training • Committed Services support • Process automation • early warning systems: Geosicence Data Current Controls 76 BW StratGrid Ref Earthquakes V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 6 3 18 R0 C3 70 CE Actions supply supply Borehole failure • water restictions/rationing • Financial income: reduced income • Health Hazards • Adverse affect on City Credibility • Non compliance with water quality standards (dam levels drop, results in bad water quality sedimentation/sludge) Insufficient maintenance on ageing infrastructure Reduced Treatment Capacity (VV and WHTP) • Cable replacement programmes • Wellfield management program • CSIR • O&M manual • System management • Alternate Supply • Pipeline replacement program (scheduled relays and reactive relays) • Asset Infrastructure Management Plan (being developed) • Cable replacement programmes • O&M manual • System management • Alternate Supply: integrated system • Dosing optimization • Filter refurbishing and modifications • Centrifuge/sludge handling • Staff 77 40 50 70 BW StratGrid Ref V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id V@R BW StratGrid Ref Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 4 3 12 R0 ? competencies Restrictions on Sludge Handling (Faure) City tunnel supply failure (see also TWK tunnel risk) Unequal dam levels 17 Contractual • Unacceptable liability Root Cause • Optimising water resources • Tenders (skips for sludge handling) • Design capacity (i.e. of centrifuge) • Identified future infrustructure developments to handle increased capacity • Western cape systems analysis (source identification) • Planned Maintenance and inspection • Pipeline replacement program (scheduled relays and reactive relays) • Asset Infrastructure Management Plan (being developed) • Western cape systems analysis (source identificaiton) Current Controls 78 70 70 80 CE Actions Insufficient capacity to enforce agreement conditions Shortage of Capacity (Project Managers) Strict contractual conditions impose penalities • Contracts • Specifications • Project and Contract Managers • Contracts BW StratGrid Ref Potential litigation Non compliance penalties Reputational risk Loss of funding for identified projects • Requires manhours to manage V@R • • • • Root Causes and Actions Rating agreements' shortcomings related to Bulk Water Project and Operations Consequence Likelihood Risk Impact Id 6 2 12 R0 I5 40 40 • Specifications • Project and Contract Managers • Pending appointments (+/- 5 or 6) • Contracts 60 • Inabilty to role over funds relating to contractual agreements Specifications • Project and Contract Managers • Legal support (SMC unit) • Finance Policy • Verimenting Root Cause Current Controls 60 • 19 Water quality • Non compliance with water quality standards (e.g.Blue Drop) • Interruption of supply • Health Hazards • Adverse affect on City Credibility • Consequential damage to infrastructure • Financial Cost • Claims from industry and Poor raw water quality • Rigorous sampling regime • Committed Scientific Services Support • Process automation • Catchment management (see risk above) 79 CE Actions 70 I4 public Ageing infrastructure Sabotage Insufficient Scientific Services staff capacity Bulk water operational staff capacity constraints Treatment Capacity at plant Availability of treatment chemicals Energy supply • Dredging of in-let areas • Scouring of pipes • Security • Proactivly appointing good staff • Appointments pending • Inherent BW StratGrid Ref V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 80 C2 90 F5 80 I6 50 I3 80 design • Western Cape Systems analysis • Systems integration (optimizing resources) • Contract management • Interaction with suppliers • Alternative supply • Electricity Systems Control (Zoning Unit in Newlands) 70 80 • 20 Security of • Water Quality influenced Root Cause Current Controls 80 CE Actions 10 1 10 R0 C2 Natural event: Earthqake Sabotage 23 Essential • Interruption of services Root Cause • System management • DWA regular engagement • DWA infrastructure to monitor water supply flow management • DWA tunnel inspections • Design and engineering accomodate sceismic activity • Pray • Continuous assessment and integrated management of system • Engagement with DWA, etc • Liaison with other stakeholders e.g. DRMC • Security 70 Current Controls CE 81 BW StratGrid Ref Insufficient Maintenance on ageing infrastructure V@R • Interruption of supply resulting in Pressure on alternative sources, water restrictions /rationing • Loss of 65% of peak capacity • Health Hazards • Adverse affect on City Credibility • Loss of revenue Root Causes and Actions Rating supply - TWK Tunnel Consequence Likelihood Risk Impact Id 4 2 8 R0 I3 70 90 Actions • Interruption of services • Reputational risk Root Cause Vandalism of data communication infrastructure Power failure Lack of technical staff and timeous repairs • Engage with corporate HR/IR • Agreement / Arrangements with staff • LLF - Local Labour Forums 40 Current Controls CE • Telephone 50 lines • Security Services • Patrolling (Pipelines) • Copper Heads • Notification of Comms failure • cellphones receives notification/alarms • Generators (Hydro and Machine) • UPS • Security Services • Patrolling (Pipelines) • Copper Heads • Services of EAM 82 60 70 Actions BW StratGrid Ref Breaks in data communication Union interference/intervention and Strikes V@R 12 • Unacceptable undefined liability • Potential litigation • Non compliance penalties • Reputational risk • Staff morale • Loss of skills • Unrealistic expectations from both sides (staff and management) Root Causes and Actions Rating Service Agreements interruptions Consequence Likelihood Risk Impact Id 2 2 4 R0 ? Obsolete hardware and software Constraints on repairs and replacement of equipment due to SCM /IS&T policy and procedure Budget constraints (CAPEX and OPEX for replacement and repair) • Audits • Forward planning for CAPEX • SCM policy • IS&T Policy • EAM motivations • Audits • Forward planning for CAPEX 83 80 80 80 BW StratGrid Ref V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Root Causes and Actions 6 Costs of providing full services to informal settlements is prohibitive • Health hazards • Social unrest • Reluctance of Root Cause Vandalism of facilities service providers to work in certain areas • Safety risks Inappropriate facilities Socio economic impacts Current Controls • Service providers - CE Garnet Jefferies Garnet Jefferies 201106-30 40 Enhanced Service delivery to Informal settlements has a dependancy on Corporate strategy (Informal Settlement Master plan) and support from all departments Continue with planned maintenance and re active maintenance Action Due Date 201106-30 Enhanced Service delivery to Informal settlements has a dependancy on Corporate strategy (Informal Settlement Master plan) and support from all departments Garnet Jefferies 84 40 Action Owner 7 Action annual tenders • Regular inspections,Monitoring and Evaluation • Community leaders / councillors • Community Liaison officers • 20 million increase (CAPEX) for informal settlements • Service providers annual tenders • Regular inspections,Monitoring and Evaluation • Community leaders / councillors • Community Liaison officers • 20 million increase (CAPEX) for informal settlements • Service providers - Actions 40 Owner Owner Due Date 201106-30 Due Date Rating Consequence Likelihood Risk Impact Id 9 63 V@R Utility Services> Water and sanitation> Operational Reticulation>Draft Risk Register>16Aug2010 R0 Interference of service delivery Density of inhabitants restricts access to service infrastructure Result of inadequate co annual tenders • Regular inspections,Monitoring and Evaluation • Community leaders / councillors • Community Liaison officers • 20 million increase (CAPEX) for informal settlements • Service providers annual tenders • Regular inspections,Monitoring and Evaluation • Community leaders / councillors • Community Liaison officers • 20 million increase (CAPEX) for informal settlements • Service providers annual tenders • Regular inspections,Monitoring and Evaluation • Community leaders / councillors • Community Liaison officers • 20 million increase (CAPEX) for informal settlements EMT level , a city wide drive to focus on informal settlements 85 Enhanced Service delivery to Informal settlements has a dependancy on Corporate strategy (Informal Settlement Master plan) and support from all departments 40 Action Continue with planned maintenance and re active maintenance 40 Action Continue with planned maintenance and re active maintenance 40 Action Garnet Jefferies Owner Garnet Jefferies Owner Garnet Jefferies Owner 201106-30 Due Date 201106-30 Due Date 201106-30 Due Date V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id ordiantion towards planning by City departments 3 Burst water mains • Reputation risk • Associated peripheral damages • Loss of resources • Increased maintenance • Increased operational cost / wasteful expenditure • Public liability claims • Inability to carry out constitutional obligations Root Cause Insufficient replacement programs and funding End of pipe design life span Incorrect pipe material / quality - SCM intervention ito cheapest price as a Major project Current Controls CE • Replacement program / refurbishment programs and associated budget • Maintenance team (inspections) • Annual tenders • Consultants • Pipe burst Register (monthly reports) • Replacement program / refurbishment programs and associated budget • Maintenance team (inspections) • Annual tenders • Consultants • Pipe burst Register (monthly reports) 40 • Replacement program / refurbishment programs and associated budget • Maintenance team (inspections) • Annual tenders • Consultants • Pipe burst Register (monthly reports) 40 86 Enhanced Service Garnet delivery to Informal Jefferies settlements has a dependancy on Corporate strategy (Informal Settlement Master plan) and support from all departments Actions Action Correct prioritisation of funding for replacement 40 Action Correct prioritisation of funding for replacement Alf 201106-30 6 Owner Due Date 201102-28 Owner Due Date 201102-28 Alf V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 9 54 R0 Lack of CO2 at treatment plants Aging and/or deteriorating infrastructure Lack of skills and competency to address proactive maintenance 1 Sewer Pipe collapse • Reputation risk • Public liability Root Cause Insufficient replacement • Replacement program / refurbishment programs and associated budget • Maintenance team (inspections) • Annual tenders • Consultants • Pipe burst Register (monthly reports) 40 • Replacement program / refurbishment programs and associated budget • Maintenance team (inspections) • Annual tenders • Consultants • Pipe burst Register (monthly reports) • Replacement program / refurbishment programs and associated budget • Maintenance team (inspections) • Annual tenders • Consultants • Pipe burst Register (monthly reports) Current Controls 40 • Replacement program / 30 87 Action Correct prioritisation of funding for replacement 40 Action Drive further staff training (critical skills identified) CE Due Date 201102-28 Owner Due Date 201102-28 Owner Due Date 201010-30 Alf Action Correct prioritisation of funding for replacement Owner Alf Charmaine Meyer and all district managers Actions Action Owner 5 Due Date 9 45 V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id R0 claims / litigation • Health hazard/sewerage spillage • Increased replacement costs • Inability to carry out constitutional obligations programs and funding End of pipe design life span 2 Lack of knowledge • Inability to make refurbishment programs and associated budget • Maintenance team (inspections) • Annual tenders • Consultants • Partially implemented Roger byrne spreadsheet/SAP (Pump stations) • Replacement program / refurbishment programs and associated budget • Maintenance team (inspections) • Annual tenders • Consultants • Partially implemented Roger byrne spreadsheet/SAP (Pump stations) Correct prioritisation of funding for replacement 30 • Capacity being built inhouse (Promotion of ECSA registration) 30 Aging and/or deteriorating infrastructure • Replacement program / refurbishment programs and associated budget • Maintenance team (inspections) • Annual tenders • Consultants • Partially implemented Roger byrne spreadsheet/SAP (Pump stations) Current Controls 30 Root Cause 88 Action Correct prioritisation of funding for replacement Lack of skills and competency to address proactive maintenance 201102-28 Owner Due Date 201102-28 Owner Due Date 201010-30 Alf Action Drive further staff training (critical skills identified) Charmaine Meyer and all district managers Action Owner Correct prioritisation of funding for replacement CE Alf V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Alf Actions Due Date 201102-28 5 9 45 R0 timeous sound critical decisions • Poor service delivery • Health risks • Reputational risks • Wasteful expenditure • Public liabilities 5 Malfunctioning / unreliable telemetry • Reputation risk • Public liability claims • Environmental consequences • Health hazards • Contaminated Lack of institutional knowledge (local government sector) Over focus on external senior appointments as opposed to career paths for internal staff High staff turnover/ retention • Inhouse Training • Senior staff at districts, 50 • Legislation • HR processes Owner Charmaine and Pierre 30 Appoint staff to get trained up as a replacement for those lost Action Charmaine and Pierre 30 Appoint staff to get trained up as a replacement for those lost Action Charmaine and Pierre knowledge sharing and training with new staff • Inhouse Training Action Owner Owner Insufficient experienced staff • In house Capacity (Driving ECSA Registrations) • Training School 30 Appoint staff to get trained up as a replacement for those lost Action Charmaine and Pierre Ineffective training • In house Capacity (Driving ECSA Registrations) • Training School • WPSP • Senior staff at districts, knowledge sharing and training with new staff 50 Appoint staff to get trained up as a replacement for those lost Action Appoint staff to get trained up as a replacement for those lost Charmaine and Pierre Current Controls CE Root Cause Variety of Obsolete systems / equipment • Tender partially 40 completed (Total 10 million) • Maintenance and inspection crews • Public complaints (serves as an inspection mechanism) 89 Owner Owner Actions V@R for decision making Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Due Date 201006-30 Due Date 201006-30 Due Date 201006-30 Due Date 201006-30 Due Date 201006-30 4 9 36 R0 data Incompatibility with other operating systems Theft / vandalism 7 Vandalism / Theft of City assets (manhole covers, meters) • Reputation risk • Public liability claims • Health hazards • Increased costs (blockages and asset replacements) Root Cause Scrap metal market • Tender partially completed (Total 10 million) • Maintenance and inspection crews • Public complaints (serves as an inspection mechanism) • Tender partially completed (Total 10 million) • Maintenance and inspection crews • Public complaints (serves as an inspection mechanism) Current Controls 40 • Copper heads / scrap mtal control • Annual tenders • Replacement processes • Use of non ferrous metal • Consultant (mitigation of theft project) • Water meters have serial number s = data base for verification • Positive outcomes from SA metals bust (court case of past) 70 90 V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 40 CE Actions 4 9 36 R0 Random vandalism Socio economic situation • Copper heads / scrap metal control • Annual tenders • Replacement processes • Use of non ferrous metal • Consultant (mitigation of theft project) • Water meters have serial number s = data base for verification • Positive outcomes from SA metals bust (court case of past) • Copper heads / scrap metal control • Annual tenders • Replacement processes • Use of non ferrous metal • Consultant (mitigation of theft project) • Water meters have serial number s = data base for verification • Positive outcomes from SA metals bust (court case of past) V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 70 70 • 8 Vandalism / Theft of • Reputation risk Root Cause Current Controls 91 CE Actions 4 8 32 R0 cables, and electrical and mechanical equipment • Public liability claims Scrap metal market • Health hazards • Increased costs (asset replacements) • Environmental impact Random vandalism • Alarms / guards (pump stations) • Copper heads / scrap metal control • Annual tenders • Replacement processes • Use of non ferrous metal • Consultant (mitigation of theft) • Separate Data base to verify data metres/serial numbers • Positive outcomes from SA metals bust • Alarms / guards (pump stations) • Copper heads / scrap metal control • Annual tenders • Replacement processes • Use of non ferrous metal • Consultant (mitigation of theft) • Separate Data base to verify data metres/serial numbers • Positive outcomes from SA metals bust 92 70 70 V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Socio economic situation 9 14 Deteriorating infrastructure: mechanical equipment Deteriorating water quality • Reputation risk • Public liability claims • Increased maintenance costs • Health • Blockages • Non compliance • Environmental risks exposures • Reputation risk • Health risks • Public liability claims Root Cause Insufficient replacement programs and funding End of equipment design life span Rigid SCM processes (inconsistency) Root Cause Lack of pipe cleaning • Alarms / guards (pump stations) • Copper heads / scrap metal control • Annual tenders • Replacement processes • Use of non ferrous metal • Consultant (mitigation of theft) • Separate Data base to verify data metres/serial numbers • Positive outcomes from SA metals bust Current Controls 70 • Replacement program / refurbishment programs • Maintenance team • Annual tenders • Consultants 70 • Asset Management 80 CE V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Actions 4 8 32 R0 Actions 5 6 30 R0 Plan • Replacement program / refurbishment programs • SCM Policy 70 Current Controls CE • • • • Standards Monitoring programs Public complaints Process on implementing ISO standards 93 80 10 11 Electricity outages to pump stations Inappropriate • Reputation risk • Public liability • • • • Lack of reservoir cleaning Standards Monitoring programs Public complaints Process on implementing ISO standards 80 Incorrect meter connection • By law dealing with non potable water sources (Bore holes) • Inspectors • Tenders on metres mitigating backflow specificed type Current Controls 80 Root Cause CE Dependency on Eskom and City • Environmental consequences • Health hazards • Public complaints • Generators at strategic pump stations • Mobile generators • Telemetry warnings • UPS 70 claims Cable theft • Alarms / guards (pump stations) • Copper heads / scrap metal control • Annual tenders • Replacement processes • Use of non ferrous metal • Consultant (mitigation of theft) • Separate Data base to verify data metres/serial numbers • Positive outcomes from SA metals bust Current Controls 70 • Reputation risk Root Cause 94 CE V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Actions 4 7 28 R0 Actions 2 9 18 R0 materials disposed into sewers • Public liability claims • Increased maintenance costs • Health • Blockages • Non compliance • Environmental risks exposures Education programs By laws / inspectorate Maintenance teams Annual tenders for routine cleaning 40 Socio economic situation • Awareness - Press releases 40 Lack of education of citizens Discharge of inappropriate substances by industry • Awareness - Press releases 40 Lack of enforcement and controls 13 Consumer • Reputational • • • • Random and deliberate vandalism • • • • • 40 • • • • • 40 • • • • • Water pollution officers Education programs By laws / inspectorate Maintenance teams Annual tenders for routine cleaning Water pollution officers Education programs By laws / inspectorate Maintenance teams Annual tenders for routine cleaning" Difficulty in controlling all of Metro area geographic spread Water pollution officers Education programs By laws / inspectorate Maintenance teams Annual tenders for routine cleaning" 40 Root Cause Current Controls CE 95 Actions 2 9 18 V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id R0 complaints not resolved risks • Delayed service Capacity constraints delivery Insufficiently experienced call centre agents C3 notifications not responded to timeously, if at all Lack of communication Centralised corporate call centre 4 Decentralisation / • Time wastage Root Cause • Workflow • Staff training / V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 70 experience • Single complaints number / bulk SMS service • Following other complaints lodging routes (eg Mayors Office) • Workflow • Staff training / experience • Single complaints number / bulk SMS service • Following other complaints lodging routes (eg Mayors Office) • Increased staff capacity • Better management at Depot level • Workflow • Staff training / 70 80 70 experience • Single complaints number / bulk SMS service • Following other complaints lodging routes (eg Mayors Office) • Workflow • Staff training / experience • Single complaints number / bulk SMS service • Following other complaints lodging routes (eg Mayors Office) Current Controls 96 70 CE Actions 2 3 6 R0 for consultancy /'approvals/ sign offs • Inefficiencies • Loss of institutional knowledge • Logistical implications incl costs • Wastage • Excess capacity Lack of co ordination of new initiatives Geographically dispersed Silo approach / district approach • Director to co ordinate (previously no Director) 60 • Weekly Management meeting • Fortnightly interbranch meetings • Weekly Management meeting • Fortnightly interbranch meetings • Director to co ordinate (previously no Director) 60 97 60 V@R devolved water and sanitation service Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Loss of Institutional knowledge • Fail on business Mandate • Fruitless and wasteful expenditure • staff frustrations and low morale • High staff turnover (domino effect/critical mass) • High vacancies • Slow speed of service delivery • Risk and safety exposure increase • Asset stripping • Increased Gaps • Increased outsourcing Root Causes and Actions 12 Root Cause Lack of investment in employees internships, bursaries and lack support with professional registration Salary scales inappropriate to attract/retain technical skills and experience Lack of motivation factors corporate culture Lack of career path and recognition Current Controls CE • Bursary/ internship/ apprenticeships • Training • Continual professional development (CPDdriven by individual ) • WPSP and associated budget • Industry benchmarks • Individual's experience • Scarce skills allowances • Advancement policy (limited disciplines) • Competive interview process / R&S • Training • Ensure benefits as per policies 98 30 Actions Action Implement the Character First training initiative for motivating employees Implement coaching approach identified by MANCO for technical staff. List of junior staff to be submitted to managers. Senior staff to carry out coaching 30 30 Owner 8 Due Date Josiah 2010-09-30 Bruce 2010-10-31 Rating Consequence Likelihood Risk Impact Id 9 72 V@R Utility Services> Water and sanitation> Operational Engineering and Asset Management>Risk Register>31st August 2010 R0 10 Fragmented Project Management function ( CAPEX projects) • Non compliance (plant and equipment) • Extended / Over expenditure • Under expenditure of CAPEX • Scope,cost and time creep • Inadequate management of PM Lack of mentorship and coaching • Limited inhouse training,mainly technical • CPD 30 Retiring employees • Standard operating procedures in place in some sections, but not driven by a strategy • Extended contracts 20 No central record management to access institutional knowledge • Some SOP's documented (to be loaded on sharepoint) Failure to attract or retain staff based on Employment Equity demands (verify the stats) Root Cause • Employment Equity Statistics • City policy on EE Lack of centralised project management function • EAM input to PM processes • JD's of EAM (mandatory) • General specifications • Project meetings • Contractual agreements (Legislative) Branches are Action Complete the first phase implementation of ISO 9001 Attain ISO accreditation 20 Action Complete the first phase implementation of ISO 9001 Attain ISO accreditation Action Track EE targets Current Controls CE • Steering Committee 99 40 Due Date Alwyn (with support from Kobus Van Schoor) Alwyn (with support from Kobus Van Schoor ) Owner 2011-06-30 Alwyn (with support from Kobus Van Schoor) Alwyn (with support from Kobus Van Schoor ) Owner 2011-06-30 Josiah Unknown 2015-06-30 Due Date 2015-06-30 Due Date Actions Action Complete Project Data Bases for categories 1,2,3 . Appoint Project Managers per project 50 Owner Action Owner 7 Due Date Donovan 2010-09-30 Josiah (Coordinated by Ntoza) 2010-10-30 Owner V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Due Date 9 63 R0 process • Risk and safety exposure increases • Lack of buying power ( Negotiating power) • Lack of feedback (no database or close out reviews) • Fragmented project engineering function (design) 4 Aging and deteriorating assets/infrastructur e base • Assets exceeding life span • Obsolescence • Sweating assets • No compliance with standards (DWA,SANS,ISO,OH SA etc) • Risk and safety managing Project Management as a functional style as opposed to a matrix management style (decentralise) Lack of project managment competencies (PM creeps into JD) Root Cause Unprioritised/lac k of Asset Replacement ( CAPEX/OPEX expenditure) Limited budgetry meetings • Outsourcing of control to Consultants • Previous project management experience • Predefined project teams (MANCO) • Project Manager- key control • Project Data Base (covers only one client Bulk Water) • Reliance on Consultants Current Controls • Maintenance plans • Replacement Plan (MFMA driven) • Capital budget • OPEX • Asset Registers(not updated) • EAM Meetings 100 30 Complete Project Data Bases for categories 1,2,3 . Develop value chains / process flows for the PM KPA's Appoint Project Managers per project Action Donovan 2010-09-30 Donovan 2010-10-30 Josiah (Coordinated by Ntoza) Owner 2010-10-30 Complete the Project Management maturity level Assessments Design competency training interventions based on PM maturity level assessments Complete accreditations and certifications Josiah (Coordinated by Ntoza) 2010-09-30 Josiah (Coordinated by Ntoza) 2011-06-30 Josiah (Coordinated by Ntoza) Actions 2011-06-30 CE 30 Action Completion of Roger Byrne asset management plan 30 Action Owner Themba/Josiah Owner V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Due Date 6 Due Date 2010-08-30 Due Date 9 54 R0 exposure increase • Increased breakdowns • Higher maintenance costs(Increased finance needs) • Pollution/ Environmental impact • Adverse impact on service delivery • Reputational risk • Unrealiable Plant machinery control and coordination • Branch Meetings • MFMA/PFMA • SCM Lack of Replacement and upgrade planning (eg Obsolescence Management) • Maintenance plans • Replacement Plan 30 (MFMA driven) • Capital budget • OPEX • Asset Registers(not updated) Lack of appropriately technically skilled staff for changing /specialised equipment (old and new technology) • Training • Seminars • Conferences • WSDP • Busaries/Apprentiships • OEM Manuals 30 Expanding Infrastructure demands on EAM resources (Manpower and infrastructure Workshops,Tool s, fleet) Mal-operation of equipment • CAPEX/OPEX Plan 30 Completion of Roger Byrne asset management plan Action Themba/Josiah Milestones in place for completion of updating the Asset Register Unknown Action Finance and execute training needs more effectively Action See actions on creation of Budget Forumn and Trainin needs • Operator and Maintenance Checks • OEM Manuals 30 101 Owner Owner Alwyn Tredoux Owner Unknown 2010-08-30 Due Date Unknown Due Date 2010-08-30 Due Date Unknown Action Owner Due Date Identification of Internal Training needs Ian,Cillia,Bruce,( Themba) 2010-08-30 V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id • Servicing • On going Coaching to Implement Internal Training/Coachin g of Operators plant operaters by artisans • Training • Seminars • Conferences • WSDP Ian, Cillia, Bruce, Themba V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 2011-06-30 • Bursaries/apprenticeships 6 Infrequent and inadequate training of staff • Low Morale and Inability to retain Staff -- frustrated employees • Non-Compliance - legislative training not on time or not happening at all • Unproductive and Increased Opex -poor workmanship • Unreliable Plant & Machinery -- poor workmanship • Increased Risk and Safety Exposure -- increased probability for loss, damage, liability, injury or death Root Cause Inadequate Planning and Input Training Plan not Flexible Current Controls • WSDP process CE 40 annually(functional) • Training budget(allocated) • Legislation • EAM units checking up on Training Section • • WSDP process annually Implement WSDP once finalised Implementation demands of • Total fleet operation Owner Alwyn 40 Action Owner Alwyn Poor Management of Training needs • EAM units checking up on Training Section 40 Implement WSDP once finalised Action Alwyn Budget Prioritization without input • EAM units checking up on Training Section 40 Implement WSDP once finalised Action Implement WSDP once finalised Action Alwyn Implement WSDP once finalised Alwyn Insufficient Budget 11 Actions Action Root Cause Compliance Current Controls • Manage/monitor traffic 102 CE 40 Owner Owner Owner Owner 9 54 R0 7 7 49 R0 2010-09-30 Due Date 2010-09-30 Due Date 2010-09-30 Due Date 2010-09-30 Due Date 2010-09-30 Actions Action 6 Due Date Due Date AARTO immobilised • Staff prevented from performing operational duties • Penalties for both employee and operator's accounts (money) demands and increase administration burden Lack of verification exercises to validate demerit points Lack of software to monitor and manage penalty process Poor line Management controls in terms of drivers/vehicles violations • Driving assessments underway (line managers to submit Driver names for training) • Operational policy formalised for traffic violation (not been implemented) • Licence renewal process • Quality assurance (roadworthy condition) • Maintenance processes to ensure RWC • Audits (licence ,disk validity ) • Driving assessments underway (line managers to submit Driver names for training) • Operational policy formalised for traffic violation (not been implemented) • Manage/monitor traffic violations • Manage/monitor traffic violations • Info from Natis • Driver delcarations • Quality assurance (roadworthy condition) • Implementation of Operating policy • Implementation of Fleet managment policy (need approval) 103 Prepared AARTO implementation and driver awareness plan. Develop staffing needs 40 Bert Action Put reporting Sytem in place (draw info from assessments) Unknown Owner Bert Action Owner Implement employee declaration form. Link E Natis to SAP. Action Bert Implement Fleet management policy (responsibilities of drivers explained) Bert Due Date Unknown Due Date Unknown Owner Due Date Unknown V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Existing training not carried out 2 EAM failure to identify and source CAPEX needs • Poor asset repair / replacement decisions • Plant/equipment failure • Poor equipment performance • Increase on OPEX costs • Staff despondency • Increased in scope and responsibility (Staff Duties creep) • Increased health, safety, security and operating risks Root Cause Improper planning (prioritisation of needs) Lack of documented internal processes Lack of consultation with branches in deciding what to put on the Capex Plan Lack of Management Information Current Controls • Asset Registers (not 'Provision for Professional services' (SCM guidelines) • Internal Processes (life cyscle costing) • IDP • CIDB • Government Gazettes • ECSA fees • EAM Meetings • Branch Meetings • SAP Reports • Works Orders • Asset Registers (not updated) • Asset Replacement Plan (Outdated or non 104 Owner Due Date Implement Driver training Bert in conjunction with Line Managers Actions 2011-02-28 Action Owner Due Date CE 30 updated) • Asset Replacement Plan(Outdated or non existentent) • Work flow programs • Contract Documents for Action 50 30 Define milestones for completion of updating the Asset Register Completion of Roger Byrne spreadsheets: Asset Management Plan Action Themba/Josiah 2010-10-01 Themba/Josiah 2010-08-30 Document internal processess (Budgeting Process) Themba/Josiah Action Formalise a Budget Forum with defined out puts 40 8 Action Improve our Works Order Prrocess flow (Data). Initial project outline and gathering Owner Owner Themba Owner Themba. Roleplayers: Elec/Mech Due Date 2010-09-30 Due Date 2010-09-30 Due Date 2010-08-31 5 40 V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id R0 existentent) 7 Procurment obstacles/constrain ts • Sub-standard work • Increased downtime / costs • Demotivated staff • Service delivery impact • Increased supervision • non compliance • deviation reports, audit findings Root Cause Lack of in-house capacity to evaluate quality of goods and services Inadequate technical specification (SABS) supplied to the SCM department V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id intel, further phaes and work to be determined Current Controls • EAM staff • SANS, product CE Insufficient internal stock (stock levels in SAP stores and own stores) 105 Owner 4 50 Action Donovan 50 Build capacity and controls within EAM to enhance specification documentation Introduce process where Design and Contract sign off specifications Action Donovan 2010-10-30 Lwandiso 2010-09-30 50 Build capacity and controls within EAM to enhance specification documentation Introduce process where Design and Contract sign off specifications EAM to investigate the possibility of access to SANS database Action Identify and confirm optimal stock levels in internal stores Alwyn specifications • Tender contract • SANS specs • EAM staff Actions Owner Owner Due Date 2010-10-30 Due Date Due Date 2010-08-30 9 36 R0 (All stock) Indequate liason between EAM and SCM Rigid SCM processes • Good interaction with SCM 50 Action Alwyn • Legislation • City SCM policy and 50 Introduce a Right of Recall (process within EAM) to ensure correct technical goods and services supplied Action Explore, agree and apply defined standard specifications with SCM, rather that continual submissions for same specs Alwyn procedure • SAP workflows • Tenders /quotations • Good interaction with SCM • SCM ISO accredited Lengthy procurement and delivery time Rotation and availability of buyers • • Legislation • City SCM policy and 106 Owner 50 Action Alwyn 50 Explore, agree and apply defined standard specifications with SCM, rather that continual submissions for same specs Action Explore, agree and apply defined standard specifications with SCM, rather that continual submissions for same specs Alwyn procedure • SAP workflows • Tenders /quotations • Good interaction with SCM • SCM ISO accredited • City SCM policy and procedure • Good interaction with SCM Owner Owner Owner Due Date 2010-10-30 Due Date 2010-10-30 Due Date 2010-10-30 Due Date 2010-10-30 V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id Rotation of vendors Incorrect supplier screening criteria Lack of technically preapproved service providers including consultation with line • City SCM policy and procedure • Warranties, certified service providers • City SCM policy and procedure • Tenders /quotations 50 50 Action Alwyn • City SCM policy and procedure • Tenders /quotations 50 Introduce a Right of Recall (process within EAM) to ensure correct technical goods and services supplied Action Build capacity and controls within EAM to enhance specification documentation Introduce process where Design and Contract sign off specifications Introduce a Right of Recall (process within EAM) to ensure correct technical goods and services supplied Donovan 2010-10-30 Alwyn 2010-10-30 Owner Owner Due Date 2010-10-30 Due Date Utility Services> Water and sanitation> Operational Scientific Services>22 July>Risk register draft 107 V@R Root Causes and Actions Rating Consequence Likelihood Risk Impact Id 8 The Absence of a Scientific Services Specialised Software Policy (LIMS,AQMS,Network,Software) • No integration with corporate IT • Ineffective maintenance and backup situation • Slow turnaround from IS&T on some elements • Absence of software regulation • Accreditation jeopardised • Limited contract management with software providers • Data Integrity issues • Data Corruption/Vulnerability/Access to • Reporting of results/water quality/air quality jeopardised • Information dissemination to relevant stakeholders (blue and green drop) jeopardised • Downtime of systems Root Causes and Actions Root Cause Corporate IT does not support the Clients / Department system (Standalone Development unsupported) Insufficient managment of various software provider contracts IT administration rights retracted from line Corporate IS&T staff lack skills and competences to address Laboratory 108 Current Controls CE • Basic IT 40 infrstructure: ie Network and city applications ◦ Helpdesk ◦ IS&T logging system (CR number) ◦ Project Scope Request • Contracts with service providers • Appointed SS System Administrators • Contracts with service providers • Helpdesk • IS&T logging Develop and implement the Internal Specialised Software policy Host an IT information sharing session Initiate negotiations on SLA with IT&S system (CR number) Owner Shadley 10 Due Date 2011-0630 Shadley 2010-1030 Shadley 2011-0630 40 Action Shadley 10 Develop and implement the Internal Specialised Software policy Action Shadley 10 Develop and implement the Internal Specialised Software policy Action Host an IT information sharing session Shadley system (CR number) • Helpdesk • IS&T logging Actions Action Owner Owner Owner Due Date 2011-0630 Due Date 2011-0630 Due Date 2010-1030 9 90 V@R Consequence Likelihoo d Rating Risk Impact Id R0 Root Causes and Actions Information Management Systems (LIMS) The IS needs of Scientific Services are not seen as corporate priority 1 Scientific Services (SS) Operations fail to detect water/waste water /air quality non compliance • Non compliance with water standards - National Standards for Sewerage and By Laws / European Food Standards / ISO 17025 / SANS 241 / SA water and air quality guidelines • Public health at risk • Reputational risk • Adverse effect on ecosystems and environment • Litigation • Accreditation in jeopardy • Knock on cost to retify state of water/air by line Root Cause Dependency on other Departments (Samples) no controls Current Controls • Annual Training of Sampling staff • Workflow processes (Manuals and procedures) 10 Initiate negotiations on SLA with IT&S Action Shadley Host an IT information sharing session Shadley CE 70 Failed to act in advisory capacity to client Action Maintain current controls Outdated Technology 109 80 Action Maintain current controls 70 2011-0630 Due Date 2010-1030 Actions • Schedule/programme for sample collections • Accreditation system /controls(chain of custody) • SLA's with clients • SS Reports and records • SS Science equipment output • Laboratory results • City Policy • Workflow processes • Customer Survey • SS Reports and Owner Action Owner Mpharu Hloyi and Managment Team Owner Mpharu Hloyi and Managment Team Owner V@R Consequence Likelihoo d Rating Risk Impact Id 10 Due Date Unknown Due Date Unknown Due Date 6 60 R0 Root Causes and Actions Non implementation of Legislative requirements. Dependancy on staff competence 110 records • SS Science equipment output • Laboratory results • 5 Year Budget • Asset Management Plan • Maintenance Plans • Legislative Requirements • Customer Surveys • Legislation • Regular Assessment of legislation • Client Needs assessment • Staged Implementation Plans • SS are members on External Committes and Forums with National and Provincial Government (DWA,WRC,SABS,DEA) • Current skilled staff compliment • Inter lab comparison • Annual Competency Assessments as per accreditation requirement Prioritise technology replacement, based on 3 year budget implementation plan 90 Action Maintain current controls 50 David Epstein Owner Mpharu Hloyi and Managment Team Action Owner Schedule Specialised training and Short Courses Continue to run Busary Scheme (Waste water) Mpharu Hloyi and Managment Team Mpharu Hloyi and Managment Team Unknown Due Date Unknown Due Date 2011-0630 Unknown V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions 9 Total failure of Dependancy Sytems • Operations come to a halt • Lose Data • No reporting ability • Unable to meet Root Cause LIMS offline deadlines 111 Unknown Owner Due Date 2010-1030 CE • Informal Back up system (Internal procedure) • Consultant Services and contract 40 Action Shadley 40 Host an IT information sharing session Initiate negotiations on SLA with IT&S Develop and implement the Internal Specialised Software policy Action Shadley 40 Host an IT information sharing session Initiate negotiations on SLA with IT&S Develop and implement the Internal Specialised Software policy Action Host an IT information sharing session Shadley • Informal Back up system (Internal procedure) • Consultant Services and contract Internal System (No corporate IT support) Mpharu Hloyi and Managment Team Actions Current Controls • No redundancy Encourage Publications and 'tech talks' • Informal Back up system (Internal procedure) • Consultant Services and contract 10 Shadley 2011-0630 Shadley 2011-0630 Owner Due Date 2010-1030 Shadley 2011-0630 Shadley 2011-0630 Owner Due Date 2010-1030 5 50 V@R Consequence Likelihoo d Rating Risk Impact Id R0 Root Causes and Actions Initiate negotiations on SLA with IT&S Develop and implement the Internal Specialised Software policy Scientifc Services key product is information 4 Lab technology unable to/does not allow Scientific Services to keep abreast of changing requirements • Absence of early warning signs • Potential health exposures • Adverse effect on results (quality and accuracy) • Ependiture on Replacement • Expenditure on Outsourcing • Reputation Root Cause Insufficient priority given to SS replacement processes • Informal Back up system (Internal procedure) • Consultant Services and contract Current Controls • Asset Register • Asset 112 2011-0630 Shadley 2011-0630 Actions 60 Action 60 Interact with Directors Water and Sanitation and customers to discuss and make known SS needs (Implement acquistions as per 3 year budget) Include technology needs in 5 year budget plan Conclude the Asset Management Plan Action Managment Plan • 5 year Budget • GAMAP and GRAP - Asset lifespan criteria • Planned Capital Changing legislation CE Shadley Owner Mpharu Hloyi 8 Due Date Unknown Mpharu Hloyi Unknown David Epstein 2010-1130 Owner Due Date 6 48 V@R Consequence Likelihoo d Rating Risk Impact Id R0 Root Causes and Actions requirements (new ananylsis standards: SANS 241) Budget - Prioritisation of expediture on: ◦ TOC- Total organic carbon ◦ ICPMS ◦ Radio activity ◦ Viruses ◦ EDC's ◦ PCR ◦ GC'sVOC's ◦ Ecotoxicity Include technology needs in 5 year budget plan Conclude the Asset Management Plan Mpharu Hloyi Unknown David Epstein 2010-1130 ◦ Shortage of technical skills - scientists age profile Insufficient Budget to 113 Greenhouse Gas Analysers ◦ Air Quality and Climate Change modelling packages • Continual assesment and execution of planned implementation • Knowledge and experience of Scientists • Informal Training and Mentoring • Information Sharing-Technicle Talks (internal) • Busaries • Budget from 60 Action Maintain existing controls 40 Action Owner Unknown Owner Due Date Unknown Due Date V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions acquire required technology Slippage • Budget from roll over (09/10 to 10/11) Equipment exceeds their life-span 2 Current training insufficient to maintain specialist service • Adverse effect on service delivery • Poor client services Internally and Externally • Non compliance with ISO standards • Inability to meet deadlines • Staff knowledge base becomes outdated • Limited focus on employee growth • Decrease in staff moral • Increase staff Root Cause Limited opportunities to attend external conferences and courses Ineffective and inefficient 114 Interact with Directors Water and Sanitation and customers to discuss and make known SS needs (Implement acquistions as per 3 year budget) Mpharu Hloyi V@R Consequence Likelihoo d Rating Risk Impact Id Unknown • Asset Register • Asset Managment Plan • 5 year Budget • GAMAP and GRAP - Asset lifespan criteria Current Controls • WPSP10 • Training budget • Training CE Actions 4 40 Curriculum • Informal Training and Mentoring • Information Sharing-Technicle Talks (internal) • Busaries • WPSP10 40 Action Owner Due Date 9 36 R0 Root Causes and Actions turnover/Limited ability to retain and attract specialised skills • Knowledge silos within older staff • Reputation Risk • Training budget • Training training Curriculum • Informal Training and Mentoring • Information Sharing-Technicle Talks (internal) • Busaries Absence of mentoring and coaching processes • • WPSP10 • Training budget • Training Mpharu Hloyi and Managment Team 2011-0630 Action Owner Due Date 40 Curriculum • Informal Training and Mentoring • Information Sharing-Technicle Talks (internal) • Busaries • WPSP10 • Training budget • Training Insufficient budget for training purposes Schedule Specialised training and Short Courses 40 Curriculum • Informal Training and Mentoring • Information Sharing-Technicle Talks (internal) • Busaries Training does not happen 115 • • WPSP10 40 V@R Consequence Likelihoo d Rating Risk Impact Id Root Causes and Actions • Training budget • Training frequently enough Curriculum • Informal Training and Mentoring • Information Sharing-Technicle Talks (internal) • Busaries • • WPSP10 • Training budget • Training lack of formalised succession planning Schedule Specialised training and Short Courses Mpharu Hloyi and Managment Team 2011-0630 Action Owner Due Date Unknown V@R Consequence Likelihoo d Rating Risk Impact Id 40 Curriculum No means to measure productivity of staff Develop Productivity index • WPSP10 • Training budget • Training Insufficient exposure to external training Mpharu Hloyi 40 Curriculum • Informal Training and Mentoring • Information Sharing-Technicle Talks (internal) • Busaries • 13 Registry Root Cause ??? Current Controls CE ??? Actions Action ???? 15 Scientific Services unable to Root Cause 116 Current Controls CE Owner Unknown Actions R0 Due Date Unknown R0 Root Causes and Actions respond to a disaster scenario Unable to deploy a large enough work force to gather samples No continuity plan to erect a central office if current office was inaccessible 3 key individuals exsist No LIMS support from corporate IT if urgent reinstatement of system is required 117 • Fish Kill Reponse plan V@R Consequence Likelihoo d Rating Risk Impact Id MODULE 4 SUPPORTING PROGRAMMES FOR THE IMPROVEMENT OF WATER QUALITY 118 CITY OF CAPE TOWN WATER AND SANITATION BULK WATER BRANCH 119 “FIRST CUT” INFRASTRUCTURAL ASSET MANAGEMENT PLAN 120 4.0 Executive Summary: Using the terminology of the International Infrastructure Management Manual: 2006, this is a “first cut” Bulk Water Infrastructural Asset Management Plan. It entails a relatively high level view of the assets utilized by the Bulk Water Branch to fulfil the primary function of supplying a secure supply of bulk drinking water to the City and adjacent local authorities. For the preparation of this plan, the Roger Byrne Spreadsheet has been used to capture the data, do a first order assessment of the asset condition, assess the operational and business risks associated with the specific assets in the context of the larger systems. A picture was derived of the ongoing Planned Maintenance budget requirements to maintain the assets in good working order. The tool further helped to assess the long-term Rehabilitation Strategy for replacing, repairing or refurbishing the assets timeously, to ensure continued efficients service delivery in the future. This aspect in particular needs significantly more thought and improved input before the plan can inform the Operational and Capital Budgets intelligently. The timing of the rehabilitation measures is paramount to prevent the “bunching up” of asset replacements which would precipitate a capital budget crises. The bulk water infrastructure, entailing dams, catchment areas, pipelines, service reservoir and water treatment plants, has been assessed as having an estimated replacement value of R 11.5 billion. From the assessment it has been identified that the Branch needs in the order of R 56.5 million per annum for maintaining its assets in good working order. The current 2010/11 Operating Budget makes provision for R41.9 million. As mentioned above, the current budget does not make provision for the Rehabilitation Strategy, which would impact on the Capital Budget and a further requirement on the Operating Budget. Finally, it must be emphasized that this high level first assessment cannot replace a full blown Asset Management Plan informed by a lower level asset management platform, such as the Planned Maintenance Module in SAP. 121 Contents: EXECUTIVE SUMMARY 2 1. INTRODUCTION 1.1 Vision 1.2 Bulk Water Supply System 4 4 4 2. BULK WATER SUPPLY SERVICES 2.1 Security of Supply 2.2 Risks Associated with the Service 2.3 Quality of Service 5 5 5 5 3. BULK WATER INFRASTRUCTURAL ASSETS 3.1 Description of Asset Types 3.1.1 Pipelines 3.1.2 The Bulk Supply System 3.1.3 Water Treatment Plants 3.1.4 Service Reservoir 3.1.5 Dams 3.1.6 Water Meters 3.1.7 Asset Management Tool 3.1.8 Critical Assets 3.2 Summary Condition/Remaining Life 3.3 Asset Valuations 4. BUDGETS AND PROGRAMMES 4.1 Summary 4.2 Operating Budget 4.3 Capital Budget 16 16 17 17 5. QUALITY MANAGEMENT 17 6. CONCLUSION 18 ANNEXURES: Annexure 1: Bulk Water: Operating Budget 2010/11 Annexure 2: Bulk Water: Maintenance Budgets 2010/11 Annexure 3: Bulk Water: Asset Management: Asset – Specific Policies Annexure 4: The Voëlvlei Pipeline Annexure 5: Roger Byrne Spreadsheet for Bulk Water (Separate) Annexure 6: Bulk Water: Capital Budget (2010/11) 122 6 6 6 7 9 9 10 11 12 13 14 15 19 22 23 27 31 1. Introduction: 1.1. Vision: It is the vision of the Water & Sanitation Services Department of the City of Cape Town: “To be a beacon for the provision of water and sanitation services in Africa”. In support of this vision, the Bulk Water Branch provides quality treated water in bulk to the City of Cape Town, as well as the Municipalities of Drakenstein and Stellenbosch outside the Cape Metropolitan Area. In order to carry out this function, it abstracts water from various water sources, treats the water to the South African National Standard (SANS) 241 for potable water at its 12 water treatment plants, stores and then conveys the water to points of supply within or outside the Cape Metropolitan Area. Raw water is extracted from both the City’s own dams and those of the Department of Water Affairs (DWA). The total bulk water supply system is referred to as the “Western Cape Water Supply System” and is described in the Raw Water Supply Agreement between the City and the DWA. This agreement sets out the operating rules and the roles of both parties to the agreement. 1.2. Bulk Water Supply System To fulfil its role of regional bulk water service provider, the Branch takes a leading role in the planning and management of water resources in the Berg Water Management Area in partnership with the Department of Water Affairs (DWA). This role is reinforced by the fact that the City of Cape Town’s (CoCT) bulk water conveyance infrastructure is the enabling element for the integration of the components of the Western Cape System. Through this integrated system approach the level of assurance of the whole system is improved for all the main stakeholders and users thereof. 2. Bulk Water Supply Services: 2.1. Security of supply: In order to supply what is a life-critical essential service, a high level of security of supply is required. The City has used the number of water resources that are geographically spread out to its utmost advantage, by integrating backwards with the DWA raw water supply system. This step optimizes both the water resource itself, but the additional 123 redundancy significantly spreads the risk of outages and the possible effect on the end users. 2.2. Risks associated with the service: Underlying the historical development of the current bulk water supply system of the City, is a philosophy of ensuring a bulk water supply with an absolute minimum interruption thereof. To achieve this most of the system is integrated, thus spreading the risk through the availability of alternative sources of supply. Secondly, infrastructure at the various installations is backed up by sufficient redundancy to ensure continued supply in case of infrastructural elements malfunctioning. Thirdly, sufficient emergency storage is provided in the bulk water service reservoirs to enable continued supply to the City during failures, enabling the branch to effect repairs to its system. 2.3. Quality of service In order to supply the communities with a top quality of water supply, the City has invested significant resources to choose and procure the right infrastructure for its bulk system that will give the maximum longservice. This is reflected in some of the piplines that are still giving perfectly good service after more than a century in use. It also embarked on treating water to standards beyond what was being required for potable standards, in order to protect the billions of Rands invested in its infrastructure whilst initially protecting the public against the plumbo-solvency problem. This has been done since the first full water treatment plant was introduced in 1936. 3. Bulk Water Infrastructural Assets: 3.1. Description of asset types: The assets under the control of the Bulk Water Branch comprise the following: catchment areas, storage dams, wellfields and springs, raw water pipelines, water treatment plants, service reservoirs, and a conveyance system, comprising pipelines, tunnels and canals, linking the other components together. The various assets types are listed in the paragraphs below: 124 3.1.1. Pipelines: By far the biggest asset type of the branch is the pipelines. These range from 2400 mm to 75 mm in diameter. The Pipelines form 62 % of the Total Estimated Replacement Value of the assets, but is often the forgotten hidden portion of the assets that does not attract enough care with respect to proper asset management, particularly from a life cycle approach – starting from the best choice of pipeline material. The oldest pipeline in the City’s system, is the pipe along the Pipetrack from the Twelve Apostles tunnel portal to Kloof Nek Reservoir. This pipe was laid in 1890 and is a cast iron pipe and still in good working condition. The lengths of various pipeline types are tabulated below: Pipeline Type Length Treated water 665 062 km Raw water 99 871 km Total 764 933 km Table 1: Length of Pipeline Types The most critical pipeline from an identified risk point of view is the Voëlvlei Pipeline conveying treated water from the Voëlvlei Water Treatment Plant to the Plattekloof Reservoir. Annexure 4: The Voëlvlei Pipeline, reflects the history of this pipeline, the current condition of this asset and the management policy adopted by the City. 3.1.2. The Bulk Supply System: The assets sub-systems are spread over the Western Cape region eg. the Voëlvlei Scheme and the Wemmershoek Scheme are situated far outside the boundaries of the Cape Town Council’s normal area of jurisdiction. This has a significant impact on the asset maintenance approach and management of these assets. The Diagram below gives an impression of the extent of the bulk water system with respect to the City’s metropolitan boundaries. 125 Diagram 1: Bulk Water Supply System 126 3.1.3. Water Treatment Plants: The City treats the raw from its own and the Department of Water Affair’s dams to potable standards (SANS 241), to supply the City and some adjacent Water Service Authorities. It utilizes 12 water treatment plants as listed below, with the various treatement capacities in Megaliters per day. Table 2: List of Water Treatment Plants Water Treatment Plant Capacity in Ml/day Constructed Faure WTP 500 1994 Blackheath WTP 420 1982 Voëlvlei WTP 230 1971 Wemmershoek WTP 250 1958 Steenbras WTP 150 1946 Brooklands WTP 5 1974 Witzands WTP 14 1986 3 1975 18 1938 3 1934 Silwerstroom WTP Kloof Nek WTP Constantia Nek WTP Helderberg WTP 12 Albion Spring 5 Total 1890 1610 The above list clearly indicates a wide spread in size of treatment plants i.e. from a large 500 Ml/day at Faure to the small 3 Ml/day at Constantia Nek. The smaller water treatment plants are generally at the end of the supply system and thus play a very strategic role in supply during peak periods and during treatment outages. 127 3.1.4. Service Reservoirs: A total of 25 service reservoirs are managed by the bulk water branch. These again range from the second largest service reservoir in South Africa i.e. the Faure Reservoir with over 640 Ml capacity to the small 3.7 Ml Constantia Nek Reservoir. Two of these reservoirs, namely the older Molteno and Newlands Reservoirs are unroofed and therefore require special maintenance procedures. Table 3: List of Bulk Service Reservoirs Service Reservoir Capacity at Top Water Level (Ml) Constructed Blackheath Upper 48.2 1980 Blackheath Lower 537.6 1983 Constantia Nek 3.7 1953 Eastern High Level 4.3 1932 Kloof Nek 13.6 1908 Molteno 188.1 1886 Monterey 29.0 1972 Newlands Upper 132.6 1905 Newlands Lower 46.0 1950 Oranjezicht 16.3 1988 Plattekloof 583.6 1974 Tygerberg No. 1 33.4 1952 Tygerberg No. 2 264.3 1962 Wynberg No. 1 8.4 1897 Wynberg No. 2 22.2 1949 Faure 614.2 1996 128 Service Reservoir Capacity at Top Water Level (Ml) Constructed Glen Garry 149.6 1991 Pella 40 40.0 1981 Pella 10 10.0 1975 Hospital 20 20.0 1990 Hospital 10 10.0 1970 Melkbos A 20.0 1976 Melkbos B 20.0 1987 Midlands 10.0 1995 Hout Bay 20.0 2000 Total 3.1.5. 2845.1 Dams: By far the most valuable single (non-pipeline) asset in terms of replacement value is the Wemmershoek Dam. This is situated in a mountainous catchment area on the Wemmers River, between the towns of Paarl and Franschhoek. These dams are strictly regulated by the dam safety regulations under the Water Act. The regulations include regular internal and external inspections and maintenance to be executed resulting from these inspections. The process is further described in the asset –specific policies contained in Annexure 3. 3.1.6. Water Meters: There are 350 meters that form part of the bulk water system. They are divided into ten different categories all with different clients or purposes. The diagram below clearly shows that most of the meters are situated at the interface with the Reticulation Branch. Water balancing is an important resource management issue and meter information is being captured on a proper meter management base. 129 All the revenue meters are currently on SAP, but not the balance of the meters. This is being addressed also to enable meter maintenance and asset management Diagram 2: Bulk Water Meters: Categories Balance, 28 URO, 23 HIB, 19 Transfer, 32 Local Authority, 18 Other External, 31 Other Internal, 16 Own use, 3 Raw Water, 11 Balance HIB Local Authority Other External Other Internal Own use Raw Water Retic Transfer URO Retic, 169 The size of the bulk water meters range from 12 mm to large bulk meter up to 2000 mm. The largest number of meters falls in the 300 mm group. The profile below shows the number of meters in each class and whether these are Internal (I) to the Metropolitan Area or Outside (O). Diagram 4:Bulk Water: Meter Size Profile 60 50 40 30 20 10 0 12 15 20 22 25 32 40 50 80 100 150 200 250 300 380 400 450 500 535 600 760 800 900 915 1000120012201500152518002000 Size (mm) I 130 O 3.1.7. Asset Management Tool: The Bulk Water assets were captured on the Roger Byrne Spreadsheet using the information captured from the asset register drawn up by the Water Asset Consultants in May 2003. The summary report is titled “Review of the Infrastructural Fixed Assets of the Water and Sanitation Services”. Any known asset that was not captured in 2003 has been added, but this process is not complete and will be improved upon by consultation of district staff and field visits. The register goes down to the level of a process system i.e. the mechanical equipment or electrical equipment at a pump station. For detail asset management it is important that the assets are to be captured on SAP down to a lower level, such as a pump or a motor in the example used. This process is being attended to by a task team set up in the Water & Sanitation Department. Without this further step, Integrated Asset Management and concepts like life cycle management would not be possible. The Roger Byrne Spreadsheet, however, forms a good tool to start thinking strategically about managing the infrastructural assets in a planned long-term manner. It gives a good overview of the risks attached to various assets and an indication of what budgets are needed to sustainably maintain and replace/refurbish the asset at the end of its useful life. It answers the question, whether one can afford not to manage the infrastructural assets any other way, but through an Integrated Asset Management Process. The spreadsheet is, however, only as good as the information captured therein. This first round is the view of a few individuals and further consulation needs to take place with the operating personnel in order to improve the quality of the input. Similarly, further work is required with respect to the estimated replacement values by comparing the estimates with new tender prices etc. In short, this is a “first cut” Asset Management Plan for Bulk Water and should be seen as work in progress. 3.1.8. Critical Assets: The most critical assets identified through the Roger Byrne Spreadsheet from a Business Risk Exposure point of view are listed below: 131 Asset Name Provisional Business Risk Exposure Molteno Reservoir 86 Kloof Nek Reservoir 84 Steenbras Raw Water Pipeline 51 Newlands Upper Reservoir 46 Wynberg Reservoir No. 1 44 Wemmershoek Dam 44 Steenbras Dam 37 Steenbras Upper Dam 33 Tygerberg Reservoir No. 1 36 Table 4: Business Risk Exposure Ratings 132 3.2. Wynberg Reservoir No. 2 31 Voëlvlei Pipeline 30 Newlands Lower Reservoir 31 Tygerberg Reservoir No. 2 30 Monterey Reservoir 30 Plattekloof Reservoir 45 Electrical Supply to Brooklands 52 Turbines at Steenbras 43 Voëlvlei Raw Water 36 Steenbras Tunnel 60 Asset condition / remaining life The remaining useful life of the various components of the bulk water system was assessed in the Roger Byrne spreadsheet. It can be seen that, although some of the infrastructure is old and aging, due to longterm asset management practices, the life expectancy of these assets are still considered to be good in general. The shortcoming of the assessments of the “available life” can be seen in the “bunching” of refurbishment or replacements into the future. This will be improved upon with the next round. This spreadsheet makes this problem visable and manageable. 3.3. Asset valuations The Water Asset Consultants (WAC) comprising a joint venture between Ninham Shand, Africon and ASCH compiled a Fixed Asset Register (FAR) in terms of the General Accepted Municipal Accounting Practice (GAMAP) in 2003. These assets were assessed and inter alia an Estimated Replacement Value (ERV) was arrived at which were based on prices as at January 2003. These valuations have been used in this compilation of a “first cut” Bulk Water Asset Management Plan. Values have been adjusted to present day using the Producer Price Index. From January 2003 to March 2010 a factor of 1,496 was applied. Table 5: Estimated Replacement Values Asset Type Estimated Replacement Values 133 Percentage of (Mar 2010) Total ERV Dams R 1 354 510 564 12% Catchment Areas R Service Reservoirs R 1 292 890 378 11% Pump Stations R 275 600 078 2% Water Treatment Plants R 1 528 967 573 13% Pipelines R 6 996 838 859 62% R 11 490 376 637 100% Total 25 526 340 - This is best reflected in a pie diagram as shown below. Diagram 4: ASSET TYPE: ESTIMATED REPLACEMENT VALUE Service Reservoirs, 1,292,890,378 R Pump Stations, 275,600,078 R Water Treatment Plants & Well fields, Catchment Areas, 25,526,340 R Dams, R 1,354,510,564 R Pipelines, R 6,996,838,859 134 1,528,967,573 4. Budgets & Programmes: 4.1. Summary: The Roger Byrne Spreadsheet shows that with the first assessment an amount of about R56.5 million per annum is required for Planned Maintenance. This is derived from assessments of the type of asset, an estimate of an appropriate% of the ERV required to maintain the asset in good working order, but excludes the funds needed to replace/ refurbish /repair the asset at the end of its useful life. A substantial amount of further work is to be done to improve on the rehabilitation strategy for this to be able to inform the operating and capital budget properly. 4.2. Operating Budget: The current Operating maintenance budget is attached in Annexure 2. A summary of the full operating budget is attached as Annexure 1. From the assessment it has been identified that the Branch needs in the order of R 56.5 million per annum for maintaining its assets in good working order. The current 2010/11 Operating Budget makes provision for R41.9 million. 4.3. Capital Budget: The Roger Byrne Spreadsheet further helped to assess the long-term Rehabilitation Strategy for replacing, repairing or refurbishing the assets timeously, to ensure continued efficients service delivery in the future. This aspect in particular needs significantly more thought and improved input before the plan can inform the Operational and Capital Budgets intelligently. The timing of the rehabilitation measures is paramount to prevent the “bunching up” of asset replacements which would precipitate a capital budget crises. The current budget does not make provision for the Rehabilitation Strategy, which would impact on the Capital Budget and a further requirement on the Operating Budget. The Bulk Water Capital Budget for 2010/11 is attached as Annexure 6. 135 5. Quality Management: The Bulk Water Branch has been committed to Integrated Quality Management for many years. This was borne out by being the first bulk water provider in the country to achieve ISO 9001:2000 certification in 2003. With the impacts of the restructuring of the City into one Metropolitan Council, the Branch has not been able to retain the certification, but is maintaining the integrated quality management approach and is hoping to re-establish itself at the same high level. The City has also been highly rated in the DWA’s Blue Drop Initiative over the last two years. It achieved a 100% rating in the first year (together with only two other authorities) and was rated second in the country in the 2010 assessment. Asset Management has played an increasing role in DWA evaluation of quality management and has accelerated the need for improving the Asset Management Record on SAP and the need for asset management plans in the various branches. 6. Conclusion: For the preparation of this plan, the Roger Byrne Spreadsheet has been used to capture the data, do a first order assessment of the asset condition, assess the operational and business risks associated with the specific assets in the context of the larger systems. A picture was derived of the ongoing Planned Maintenance budget requirements to maintain the assets in good working order. The tool further helped to assess the long-term Rehabilitation Strategy for replacing, repairing or refurbishing the assets timeously, to ensure continued efficients service delivery in the future. This aspect in particular needs significantly more thought and improved input before the plan can inform the Operational and Capital Budgets intelligently. The timing of the rehabilitation measures is paramount to prevent the “bunching up” of asset replacements which would precipitate a capital budget crises. As mentioned above, the current budget does not make provision for the Rehabilitation Strategy, which would impact on the Capital Budget and a further requirement on the Operating Budget. Finally, it must be emphasized that this high level first assessment cannot replace a full blown Asset Management Plan informed by a lower level asset management platform, such as the Planned Maintenance Module in SAP. 136 ANNEXURE 1: BULK WATER: OPERATING BUDGET SUMMARY Cost Elements 401100 Salaries and Wages Act. Costs 5,554,357.73 Plan Costs 86,017,348.85 Var.(Abs.) 80,462,991.12- 401200 Non Permanent Staff 7,600.17 401300 Bonuses 2,994.91 4,916,778.72 4,913,783.81- 92,503.47 2,063,163.42 1,970,659.95- 5,000.00 874,554.73 869,554.73- 401500 Non Struct Overtime 5,781,537.61 5,781,537.61- 401510 Structured Overtime 857,804.55 857,804.55- 401400 Leave Pay 401410 Long Service Award 7,600.17 401600 Allowances: Housing 50,855.00 963,655.20 912,800.20- 401700 Allowances: Locomo 162,267.90 1,775,066.28 1,612,798.38- 401710 Allowances: Ess Use 12,079.90 141,302.40 129,222.50- 401720 Allowances: Cell 13,540.00 187,680.00 174,140.00- 401800 Allowances: Other 336,480.27 5,172,320.04 4,835,839.77- 402100 Group Life Insuranc 114,138.35 1,468,523.35 1,354,385.00- 402200 Medical Aid Contrib 698,847.57 9,970,109.28 9,271,261.71- 402400 Pensio Schem Contr 975,386.38 19,479,375.77 18,503,989.39- 58,442.38 673,891.08 615,448.70- 3,704.43 136,472.72 132,768.29- 217,029.50 217,029.50- 23,237.16 23,174.80- 96,107.36 96,107.36- 3,039,138.75 77,726,483.78 74,687,345.03- 3,681.87 191,274.83 187,592.96- 10,176.34 433,765.28 423,588.94- 402500 Unemployment Insure 411100 Advertising 411150 Auditing Services 411300 Books Perio & Subsc 62.36 411330 Brokers Fees 411350 Chemicals 411500 Catering Services 411550 Cleaning Costs 137 Cost Elements 411600 Cleansing Related C Act. Costs 6,250.37 Plan Costs Var.(Abs.) 33,731.52 27,481.15- 3,698.26 3,698.26- 411700 Comp Serv & Soft 104,728.08 104,728.08- 411750 Conf & Sem - Nat 37,312.80 37,312.80- 5,074,210.18 5,074,210.18- 16,951,448.38 15,719,141.06- 171,871.04 171,871.04- 21,649.76 21,649.76- 707,640.24 685,252.57- 411650 Comm Publi & Mat 411800 Consultants 412050 Electricity 1,232,307.32 412200 Fire Services 412220 Food & Beverages 412250 Fuel 412300 Furnit Fittings Too 412350 Hire Charges 22,387.67 866.2287,224.55 412355 Hire : Wet Fuel 412360 Hire of LDV - VAT 85,627.70 412370 Hire of Cars-Non Cl 412800 Levies & Fees 866.221,191,790.15 1,104,565.60- 972.00 972.00- 2,875,560.52 2,789,932.82- 1,214,703.58 1,214,703.58- 6,945.08 6,945.08- 412850 Levy: Barg Council 2,178.75 27,218.40 25,039.65- 412900 Levy: Skills Develo 70,354.16 744,065.64 673,711.48- 412950 Licenses & Permits 2,356.55 86,287.06 83,930.51- 412970 Material Automotive 146.67 191.28 44.61- 412980 Mat Building & Infr 26,510.87 760,906.24 734,395.37- 412990 Material Electrical 1,110.75 261,270.96 260,160.21- 413000 Materials Gen & Con 83,454.10 1,594,245.13 1,510,791.03- 413050 Med Hea Serv & Sup 772.51 1,316,574.65 1,315,802.14- 49,504.76 49,504.76- 594,009.96 561,642.75- 605.52 605.52- 413100 Memb Fees: Prof 413150 Tools , Equip &Othe 32,367.21 413170 Misc Non-Vat Expens 413200 Occ Health & Safety 18,624.12 570,340.95 551,716.83- 413220 Oil, Gas, Lub & Coa 5,916.45 114,235.68 108,319.23- 138 Cost Elements 413240 Plant/Eqm (Capex) Act. Costs Plan Costs 2,790.00 413300 Pest Control Var.(Abs.) 2,790.00 245,428.29 245,428.29- 6,856.20 826,251.69 819,395.49- 34,142.83 582,229.29 548,086.46- 300,145.28 300,145.28- 29,748.60 5,740.22- 89,748.48 89,748.48- 80,086.16 4,338,302.96 4,258,216.80- 413900 Sewerage Services 6,387.69 631,930.90 625,543.21- 413950 Signage 2,409.90 4,979.28 2,569.38- 414100 Telecommunication 54,088.45 1,310,149.71 1,256,061.26- 414105 Telecomm: Cell Phon 22,154.17 1,207.08 20,947.09 414110 Telecomm Equip Rent 62,994.04 560,944.80 497,950.76- 570.70 188,988.72 188,418.02- 285,693.78 285,693.78- 829,786.68 769,186.51- 19,303.56 19,303.56- 43,855.66 705,636.36 661,780.70- 8,284.95 289,467.00 281,182.05- 100,006,086.22 100,006,086.22- 190,922,647.88 187,904,845.28- 14,937,448.10 14,937,448.10- 104,987.99 7,760,354.75 7,655,366.76- 6,355.34 21,119.96 14,764.62- 413350 Plants & Gardening 413450 Print Stat & Photo 413600 Rates 413670 Refreshments & Teas 24,008.38 413750 Rental 413800 Security Services 414115 Tele:Cell Phone Sub 414150 Test,Sample&Monitor 414350 Travel & Subsis: Va 60,600.17 414360 Travel&Subsis:NonVa 414400 Unif & Protec Cloth 414550 Water Purchases 450200 Bulk Raw Water 450205 Bulk Water :Levy BW 3,017,802.60 450210 Water Research Levy 455100 Contracted Services 455200 Labour Brokers 460100 R&M - Land & Build 460300 R&M - Electrical 460500 R&M - Equipment 460700 R&M - General 38,166.54 38,166.54 371.28- 371.28- 9,681.00 9,681.00 61,655.25 61,655.25 139 Cost Elements Act. Costs Plan Costs Var.(Abs.) 470100 Depreciation PPE 30,344,340.26 30,344,340.26- 480000 Capital Replace Res 10,000,000.00 10,000,000.00- 480100 Capital Replace :PP 47,640,000.00- 47,640,000.00 3,898,090.79- 3,898,090.79 480520 Trf FDR - GGRN 120,688.03- 120,688.03 480550 Trf FDR - PCDR 144,643.58- 144,643.58 260,216.18 3,653,301.38 3,393,085.20- 335.58 161,057.38 160,721.80- 500120 Refuse Removal 4,215.25 50,411.00 46,195.75- 500130 Sewerage Charge 5,047.41 77,480.65 72,433.24- 500140 Water Consumption 6,282.75 83,872.25 77,589.50- 26,515,259.92 26,515,259.92- 480500 Trf FDR - CR 500010 Electricity Consump 500110 Rates Charges 500200 Interest Int Loans 500300 Fire / Emergency 1,358.32 1,358.32 500320 Dumping Cost 208,720.24 2,085,871.00 1,877,150.76- 506100 Insure Dept Prem Ex 351,241.32 3,846,752.00 3,495,510.68- 506110 COIDA Dept Prem Exp 30,640.81 363,661.56 333,020.75- 506120 Pub Liability Dept 37,599.81 363,661.56 326,061.75- 506130 Mngt Liability Dept 1,110.29 506140 Fidelity Guar Dept 5,640.75 68,186.53 62,545.78- 529,537.59 11,550,013.03 11,020,475.44- 22,086.70 265,040.40 242,953.70- 600150 Printing/Reprod 115,546.80 115,546.80- 600160 Radio Maintenance 288,288.00 288,288.00- 600170 Radio Trunking 783,510.00 783,510.00- 134,800.47 126,970.08- 281,880.00 281,880.00- 6,203,772.00 5,686,791.00- 600070 Fleet & Equip Renta 600120 Office Rental 600200 Telephone Costs 7,830.39 600290 CCTV Maintenance 600340 Scientific Services 610110 R&M: Secondary Cost 516,981.00 333.43 140 1,110.29 333.43 Cost Elements Act. Costs Plan Costs Var.(Abs.) 671350 R&M Chemicals 1,570.00 7,097.76 5,527.76- 671550 R&M Cleaning Costs 8,600.00 30,667.21 22,067.21- 56,575.56 56,575.56- 125,998.50 2,831,487.09 2,705,488.59- 672990 R&M Mat Electrical 62,752.13 1,650,820.30 1,588,068.17- 673000 R&M Mat Gen & Cons 43,739.13 609,992.07 566,252.94- 673150 R&M Tls, Eqp & Othr 16,373.92 1,931,543.52 1,915,169.60- 361.67 13,056.48 12,694.81- 13,220.00 61,056.71 47,836.71- 1,048.80 1,048.80- 672970 R&M Mat Automotive 672980 R&M Mat Bldng & Inf 673220 R&M Oil Gas Lub&Coa 673350 R&M Plants 673950 R&M Signage 675110 R&M Cntrctd Serv Rp 534,070.24 23,659,798.50 23,125,728.26- 679110 R&M Lbr to Operatin 599,961.73 9,947,370.04 9,347,408.31- 679140 R&M Plnt& Eqp to Op 20,237.71 383,164.32 362,926.61- 679240 R&M Vehicles to Ops 71,336.35 742,595.76 671,259.41- 700030 Budgets 441,285.22 441,285.22- 700065 Communication 508,898.04 508,898.04- 700150 Employment Equity 169,086.14 169,086.14- 700155 Enterprise Res Plan 1,817,490.54 1,817,490.54- 700165 Expenditure 1,030,474.91 1,030,474.91- 67,277.90 67,277.90- 700215 Governance Support 271,844.72 271,844.72- 700275 IIK Management 218,473.23 218,473.23- 4,383,781.23 4,383,781.23- 700290 Inter Serv Liaison 221,077.36 221,077.36- 700360 Legal Services 442,226.40 442,226.40- 700395 Mayor & Council Fun 855,187.20 855,187.20- 700400 Mayoral Committee 1,712,519.20 1,712,519.20- 700480 Personnel Services 6,626,256.06 6,626,256.06- 700210 Gen Administration 700280 Info Syst & Tech Ma 141 Cost Elements Act. Costs 700540 Record Man Admin Plan Costs Var.(Abs.) 254,541.84 254,541.84- 700575 Strategic HR 1,756,052.28 1,756,052.28- 700580 Subcouncils 1,530,947.60 1,530,947.60- 816,648.13 816,648.13- 11,752,565.49 11,752,565.49- 700600 Treasury 1,155,337.70 1,155,337.70- 700630 Utilities Serv Man 3,241,453.04 3,241,453.04- 19,952,887.25 705,203,781.24 685,250,893.99- 254,536.68- 6,582,574.44- 6,328,037.76 4,137.72- 49,893.48- 45,755.76 258,674.40- 6,632,467.92- 6,373,793.52 19,694,212.85 698,571,313.32 678,877,100.47- 700585 Supply Chain Man 700586 SuppCharges in Dept * Debit 600110 Labour to Operating 600240 Vehicles to Ops * Credit ** Over/Underabsorption 142 ANNEXURE 2: BULK WATER: MAINTENANCE BUDGET 2010/11 REPAIRS AND MAINTENANCE - 2010/2011 BUDGET 610010 R&M: Primary Cost 0 610110 R&M: Secondary Cost 0 671350 R&M Chemicals 7,097.76 671550 R&M Cleaning Costs 30,667.21 672970 R&M Mat Automotive 56,575.56 672980 R&M Mat Bldng & Inf 2,831,487.09 672990 R&M Mat Electrical 1,650,820.30 673000 R&M Mat Gen & Cons 609,992.07 673150 R&M Tls, Eqp & Othr 1,931,543.52 673220 R&M Oil Gas Lub&Coa 13,056.48 673350 R&M Plants 61,056.71 673950 R&M Signage 1,048.80 675110 R&M Cntrctd Serv Rp 23,659,798.50 679110 R&M Lbr to Operatin 9,947,370.04 679140 R&M Plnt& Eqp to Op 383,164.32 679240 R&M Vehicles to Ops 742,595.76 41,926,274.12 143 ANNEXURE 3: BULK WATER: ASSET MANAGEMENT: ASSET-SPECIFIC POLICIES 1. Introduction: Due to the nature of the bulk water service i.e. a life-essential service, it has been built up over the years with this importance in mind. The result is a very flexible bulk water supply that aims to not have any area of its service delivery to be dependent on any particular source only. This was achieved through the integration of the various sources through the conveyance system and building redundancy into the pipe network itself. Furthermore, important steps towards asset management have been taken since 1936 when the potable water was stabilized by treatment to solve the plumbo-solvency problem with the typical soft waters of the Western Cape. The effect of this has been that the pipelines have been protected for many decades against attack from the water supply itself. 2. Specific Asset Management Policies: 2.1. All regular maintenance must be planned and recorded as and when completed. 2.2. Water Treatment: Water shall, where it is possible, be treated to a stabilized point in order to ensure a positive Langelier’s Index for the protection of its most valuable water supply infrastructure, i.e. the distribution network. 2.3. Dams: 2.3.1. The Operation and Maintenance of Dams are regulated in terms of Regulations No. R. 1559 under the National Water Act, Act 36 of 1998. 2.3.2. All Dams with a safety risk are inspected every 5 years by an Approved Professional Person. 2.3.3. Three monthly inspections are conducted by; the Manager on site and/or the Conveyance Specialist or one of the Conveyance Co-ordinators. 2.3.4. Bulk Water Engineer’s Inspection annually. 2.3.5. Operations & Maintenance Manuals have been drawn up in terms of the regulations and have been scrutinised by the APP and approved by the DWA Dam Safety Office. 2.3.6. All Dam Safety Records are kept at the site and at the Bulk Water Head Office 2.3.7. Any maintenance problems identified by an inspection is rectified and recorded by the local staff or forwarded to Head Office for incorporation into the Business Plan and Budget. 2.3.8. The Branch has a proud record of compliance and has been complimented by the DWA Dam Safety Office on numerous occasions. 144 2.4. Service Reservoirs: 2.4.1. All the large reservoirs are registered under the Dam Safety Regulations and the same approach is followed as with the dams in 2.2 above. 2.4.2. Smaller reservoirs that are not registered in term of the regulations are nevertheless subjected to the 3 monthly inspections as per 2.2.3 above. 2.4.3. Reservoir Cleaning: 2.4.3.1. The open service reservoirs i.e. Newlands Upper and Molteno are cleaned annually during off-peak months. 2.4.3.2. The other service reservoirs are drained every second year for inspection and are completely cleaned when required, also during the winter months. Scheduling of the operations takes place on the Shutdown Schedule. 2.5. Meters: 2.5.1. Problems with meters are identified through the following means: 2.5.1.1. comparison of meters in series ( eg. some raw water meters) 2.5.1.2. identification of problems through trending 2.5.1.3. analysis of logging information 2.5.1.4. client complaints 2.5.1.5. balancing at nodes and separable areas 2.5.2. Mechanical meters are replaced when problems are identified. 2.5.3. Electromagnetic meters are similarly replaced when problems are identified. Replacement may be the recorder or the primary element as appropriate. 2.6. Pump Stations: 2.6.1. All mechanical and electrical equipment are serviced as per advice from the Engineering and Asset Management Branch. 2.6.2. First line maintenance i.e. greasing, cleaning, painting and test runs are executed by the local staff. 2.6.3. Spares: Critical spares for identified critical pump stations (i.e. where insufficient redundancy is available) are procured and kept on site. Examples are Monterey and Kildare pump station. 2.7. Pipelines: 2.7.1. Spares: Critical stock of replacement pipe, adaptors, couplings, rubbers and keeper rings etc. are kept at the Plattekloof Pipe Yard. Such replacement parts are not generally available off the shelf and are considered strategic stock which can be viewed as an insurance. 2.7.2. Pipelines that are opened for whatever reason are inspected for condition assessment 100 m up- and down-stream of the access point. This applies to larger pipes that can be safely accessed. 2.7.3. All cathodic protection installed (including the impressed current system on the 2400 distribution main from Faure) must be 145 in a working condition. Vandalised equipment should be replaced as soon as possible and protected by whatever means is practicable. (Aside: this requires urgent attention with the assistance of EAM) 2.7.4. Pipelines are to be inspected by Pipeline Patrols on a minimum basis of once a week. 2.7.5. The Voëlvlei Pipeline is dealt with under separate section, due to its condition and criticality. (See Annexure 4: The Voëlvlei Pipeline) 2.7.6. All other pipeline appurtenances such as culverts, pipe bridges, tunnels are to be inspected annually. Any first line maintenance such as cleaning, painting etc. will be executed by the responsible staff. Other identified problems with eg. the civil structures, are escalated to the Design and Projects Office for further study and recommendation. Identified projects are then handled by the technical staff in this section. 2.8. Pipeline Valves: 2.8.1. Air Valves: All such valves must be maintained once a year. They should be disassembled and operationally checked. 2.8.2. Scour Valves: All scour valves must be inspected, cleaned, painted etc. at least once a year. 2.8.3. In-line Valves: The exterior parts of the valve should be inspected, cleaned, painted etc. annually. Gearbox operation should be checked when operationally safe and any malfunction must immediately be reported for corrective maintenance by EAM. 2.8.4. Reflux valves: As per in-line valves. 2.8.5. Valves are to be replaced as and when operational problems are identified. 2.8.6. Critical spare valves are kept at Plattekloof Pipe Yard. 2.9. Water Treatment Plants: 2.9.1. All mechanical and electrical equipment are serviced as per advice from the Engineering and Asset Management Branch. 2.9.2. Processes and Civil Works: Each treatment plant is to be inspected annually by experienced process and civil engineering staff or consultants appointed by the Manager of the Branch. Inspections are to be recorded and compiled in a form of a report. Recommendations are then to be included in the Business Plan as projects to be prioritized and budgeted for when appropriate. (Aside: This process must still be launched for Blue Drop Assessments but Raymond’s reports can be used as process assessments.) 2.10. Roads: 2.10.1. Access roads to all stations are to be inspected by xxxxx and refurbishment projects are to be prioritized in the budget process. 146 ANNEXURE 4: THE VOëLVLEI PIPELINE 1. Historical Details: The Voëlvlei Pipeline is associated with the Government Voëlvlei Water Scheme and was constructed to convey water over 77 kilometer from the Voëlvlei Dam to the Plattekloof and Tygerberg Reservoirs. The pipeline was constructed during 1968 to 1970. The pipe itself is by the now defunct American Company Interpace and is a Lockjoint SP-31 (non-cylinder) prestressed concrete pipe, with circumferential and longitudinal prestressing. It has a nominal diameter of 1525 mm. Since it commissioning in 1970, the first ten years of operation was without any major problem. The first failure occurred in 1981 and 23 failures have been recorded since i.e. over a period of 29 years. This amounts to an average of 0.8 failures per year since the first burst. This is depicted in the diagram below: 5 3 2 1 0 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Failures 4 Year Diag: Pipe failures recorded on the Voëlvlei Pipeline The initial investigations to determine the pipeline integrity centered around measuring the continuity of the prestressing wires providing the hoop strength of the pipe. Tests that were conducted included: Resistance tests Alternating Current (AC) injection tests 147 Direct Current (DC) injection tests Magnetic field tests The overall finding of these tests was that: “no could be drawn from the test results”. meaningful conclusion The first Heideveld burst and consequential extensive urban flooding on 13 July 1986, and subsequent burst on Aug 1986 and Jan 1987 occurred on the same pipe type as the Voëlvlei Pipeline and sparked an intense investigation in the cause of the failure. Three experts were appointed namely: Metallurgy: Prof. A. Ball Concrete: Dr. R.E. Oberholster Chemistry: Dr. B.G. Callaghan The investigations resulted in three opinions of primary cause of failures. The consensus of the City’s Water Engineers was that the failures were triggered by the snapping of the prestressing wires causing a catastrophic bursting of the pipes. The reaction of the Water Services Departement in order to reduce the risk of further disasters was to: Relay of Heideveld Pipeline with a temporary smaller diameter pipe, Followed with a full 1500mm diam. steel relay, and A Condition Assessment of all urban Prestressed Concrete of the Voëlvlei type Pipelines. The findings of this study and the establishment of other pipes with wire breaks prior to failures resulted in a policy decision to: Abandon all Voëlvlei type Prestressed Concrete pipe in the urban areas, Relays with steel pipeline in the urban areas where hydraulically required for the supply network. In the rural areas, the risk and the policy approach was different: Steel Relays were executed in vulnerable areas eg. River Crossings/Road Crossings etc. A total of 13 relays (total length c. 3 700 m) and 3 road crossings were completed, The critical Berg River crossing of 300m was relayed to prevent access problems during winter period to prevent an unbearable pipeline outage for long periods, Further leaks and bursts would be repaired as they present themselves or are identified by field observations. Twenty-nine repairs have been affected to date, essentially constituting a 148 replacement of the defective pre-stressed concrete pipeline with a steel pipe and couplings. In response to the latter point, the Branch has set up an emergency pipelaying response team that has been trained in the repair of various pipe emergencies. This team has done an excellent job of effecting repair in a minimum of time, including the outages on the Voëlvlei Pipeline. Given the amount of storage in the service reservoirs, these repairs are done without any impact on the urban water users. Secondly, sufficient strategic repair spares are kept in stock at the Plattekloof Reservoir Pipeyard. 2. Asset Condition Assessment: Numerous clients in the world have been exposed to a similar problem as the City with this particular pipeline. The general response has been one of abandoning the said pipelines. The estimated replacement value of the Voëlvlei Pipeline is over R 1 billion and before such a drastic step is considered, further condition assessments of the asset is the obvious step. New technology has now made it possible to do non-destructive testing of the pipeline. These methods include: Remote Thermal Sensing – this requires a helicopter and is a symptomatic method to determine leaks on the pipeline. One such determination has been executed on the Voëlvlei Pipeline by Rand Water Services without significant success. Acoustic Leak Detection (e.g. Smartball Technology) – this is an immediate condition assessment to detect exact location of leaks and is executed without interruption of the water supply service. Rand Water Services were employed to monitor the last 11 km (i.e. on the urban fringe) of the pipeline. The service was provided during July 2010 and a leaking coupling was detected and accurately located. The coupling has been tightened to seal properly. Remote Field Eddy Current Testing – is an intrusive detailed condition assessment, since the pipeline must be drained to give access to the necessary mobile sensing device. The advantage of this method is that exact condition assessment of the prestressing wires can be made and will give a zero based assessment at a specific time. Acoustic Monitoring using acoustic Fibre Optics – is ideal for monitoring of the condition of the pipe over time and detects each failure of the wire strand. This method is expensive. The latter two methods have been very successfully conjunctively employed in the “Great Man Made River” Project in Lybia. These methods are being studied by the Branch. 149 It is the ultimate goal of the Branch to: Find and employ an assessment tool to reliably determine the integrity of the Voëlvlei pipeline in order to, determine an expected life and thus enable the management of this critical asset as part of an Integrated Asset Management Plan. Annexure 6: Bulk Water: Capital Budget 2010/11 WBS Element WBS Element Description 1011 1011 Original Approved 1011 Budget Budget Approved Budget 2012_2013 May 2010_2011 2011_2012 May May GAMAP Fund Source Desc IM_Dir IM_Dep A08 A0806 C11.86009-F2 Replacement of Plant & Equipment- BW 150,000 0 0 EFF 1 EFF A08 A0806 C11.86018-F1 Extension of Bulk Water Pipeline 200,000 0 0 EFF 1 EFF A08 A0806 C11.86023-F1 Plant & Equipment Additional 500,000 0 0 EFF 1 EFF A08 A0806 C11.86020-F2 TMS Aquifer Deep Borehole 10,000,000 0 0 EFF 1 EFF 15,100,000 0 0 EFF 1 EFF A08 A0806 C11.86068-F1 Bulk Water Infrastructure Replacement A08 A0806 C12.86016-F1 Servitudes -EFF 0 50,000 0 EFF 1 EFF A08 A0806 C12.86009-F2 Replacement of Plant & Equipment- BW 0 150,000 0 EFF 1 EFF A08 A0806 C12.86017-F1 Extension of Bulk Water Pipeline 0 150,000 0 EFF 1 EFF A08 A0806 C12.86022-F1 Plant & Equipment Additional 0 500,000 0 EFF 1 EFF A08 A0806 C12.86019-F2 TMS Aquifer Deep Borehole 0 15,000,000 0 EFF 1 EFF 150 WBS Element WBS Element Description IM_Dir IM_Dep A08 A0806 C12.86141-F1 A08 A0806 C06.30224-F1 A08 A0806 C11.86074-F1 A08 A0806 A08 A0806 1011 1011 Original Approved 1011 Budget Budget Approved Budget 2012_2013 May 2010_2011 2011_2012 May May Bulk Water Infrastructure Replacement Extension of Bulk Pipelin GAMAP Fund Source Desc 0 16,000,000 0 EFF 1 EFF 0 0 150,000 EFF 1 EFF Replacement of Plant & Equipment- BW 0 0 150,000 EFF 1 EFF C11.86075-F1 Plant & Equipment 0 0 500,000 EFF 1 EFF C13.86049-F1 TMS Aquifer Deep Borehole 0 0 5,000,000 EFF 1 EFF Bulk Water Infrastructure Replacement 0 0 10,000,000 EFF 1 EFF 47,640,000 121,600,000 93,274,000 CRR 3 AFF: Water 0 0 300,000,000 EFF 1 EFF A08 A0806 C13.86041-F1 A08 A0806 C05.01268-F3 A08 A0806 C11.86077-F1 Development of Additional Infrastructure Bulk Water Augmentation Scheme (EFF) CITY OF CAPE TOWN WATER AND SANITATION RETICULATION BRANCH OPERATIONAL, MAINTENANCE AND BUDGET PLAN 151 For the Water Network, Sewer Network and Furniture 2010 -2011 VISION The Vision of the Reticulation Branch is to deliver efficient, reliable, cost effective Water and Sanitation Services, which are customer focused and based on international best practice. June 2010 152 CONTENTS Page Executive Summary 3 1. Introduction 4 2. Scope of Work 4 3. Performance 4 Integrated Development Plan : 2005/2006 Equitable and Effective Service Delivery (5) 4. Scope of Infrastructure: Water Network, Sewerage Network and Furniture 5. ISO 9001:2000 - Quality Management System Within Water and Sanitation: Reticulation Branch 5 6 5.1 Management Responsibility 5.2 Management Review 5.3 Resource Management 6. ISO 9001:2000 - Procedures 18 7. Operational Plan 19 8. Maintenance Plan 24 9. Budget 30 9.1 Operational Budget 9.2 Maintenance Budget Annexure A: Operating Budget 2010/11 Annexure B: Maintenance Budget 2010/11 Annexure C: Period Maintenance Tenders Annexure D: Effective Design Life 153 EXECUTIVE SUMMARY The Reticulation Branch is the Primary Service Delivery arm of the Department: Water and Sanitation and is thus required to develop, implement and maintain tools and business processes which promote a smooth, seamless and unrestricted experience for the consumer. The Department: Water and Sanitation, with the Reticulation Branch as interface, provides the public with water and sewerage services. These services accommodate approximately 847 000 households, industry, businesses and a wide range of other customers, such as hospitals, universities and sports clubs, within an area of 2 487 square kilometres. The Water Network of 10 113.5 kilometre of pipe and the Sewerage Network with 8 414.6 kilometre of pipe, place the Reticulation Branch on Par with the other Metro Cities in South Africa, e.g. Johannesburg, eThekwini and Ekurhulanie. The Reticulation Branch has over 1 500 employees (300 vacant posts ±) and the Budget for the Financial Year 2008/09, were approximately R 2 704 million. At this point of time, the Technical Operation Centre has identified more than 138 reported activities to which the various Districts and/or Depots has to responded on a 24/7/365 basis to provide an efficient service to the public. However, the total number of Operational Activities that is necessary to attends too, manages and executes by the Districts and/or the various Depots, is listed in the Tables 1 to 5. The funds required for the 2010/11 Budget to sustain these Operational Activities at Districts level and at the various Depots, will be an amount of R 353 934 299.00. See Annexure A. The funds required for the 2010/11 Budget for the maintenance of the Water Network, Sewer Network and Furniture, is an estimated amount of R 904 143 824.00. However, the approved maintenance budget for this financial year is the amount of See Annexure B. 154 R 275,535,609.98. According to the Blue Drop Requirements for 2011, the approved maintenance budget must be more than 5 % of the operating Costs. However, the maintenance budget it is actually 77.8 % of the operating costs. The Reticulation Branch is in the process to implement ISO 9001:2000 and this Quality Management System will not only support the policy of the Reticulation Branch to provide an efficient, effective, sustainable and an affordable Water and Sanitation Service to all, but will also generating maintenance schedules for the Water Network, Sewerage Network and Furniture. To assist the Reticulation Branch in maintaining Council’s assets, and to supplement the capacity of the workforce, several Period Maintenance Tenders were approved by Council. See Annexure C. 155 1. INTRODUCTION The Reticulation Branch is a diverse set of functions which cover the entire spectrum of Water supply. The City of Cape Town is unique nationally, in that the Department: Water and Sanitation, covers the entire water service cycle, from Bulk raw water storage and purification, through Reticulation distribution networks and control, the conveyance of sewerage from the consumer to the Wastewater Treatment Plants and discharge the treated water back into the environment. Customer Relationship Management, Meter Management, Billing, Debt Control and Water Demand Management are all performed in-house, and form a critical function in the delivering of the services to the consumer. The Reticulation Branch is the Primary Service Delivery arm of the Department and is thus required to develop, implement and maintain tools and business processes to promote a smooth, seamless and unrestricted experience for the consumer. 2. SCOPE OF WORK The Department: Water and Sanitation, with the Reticulation Branch as interface, provides the public with water and sewerage services. These services accommodate approximately 847 000 households, industry, businesses and a wide range of other customers, such as hospitals, universities and sports clubs, within an area of 2 487 square kilometres. These services contribute towards sustainable development by helping to safeguard public health and the environment and by supporting social and economic development. Council considers that in the interests of public health and social inclusion, require that household charges are affordable for low-income groups and accept the principle that the objective of affordability should be a key factor in the arrangements for charging households. Council adopted a stepped water tariff for domestic households, with the first 6 000 litres free and a single, but different, tariff structure to other customers. 156 However, the lack of revenue worsens the cities' financial position and limits its ability to provide safe, continual water services. 3. PERFORMANCE Integrated Development Plan : 2005/2006 The strategic priorities for the City of Cape Town are set out in the Integrated Development Plan (IDP), which is reviewed on an annual basis and substantially revised every five years as prescribed by legislation. The IDP is the core document against which the City’s performance is measured in this Annual Report. Equitable and Effective Service Delivery (5) The aim of this theme is to ensure that high levels of service are maintained and extended across the City. The City of Cape Town has major water and sewerage infrastructure in place which provides the public with clean and safe potable water, and an efficient sanitation services. Key programmes include e.g.: Managing water supply and demand to meet future need Upgrading and expanding wastewater treatment Making Cape Town a cleaner city Maintain and improve a healthy city Emergency services 4. SCOPE OF INFRASTRUCTURE: WATER NETWORK, SEWERAGE NETWORK AND FURNITURE The Department: Water and Sanitation operates two (2) Regional Water Treatment Plants and wastewater is treated at seven (7) Regional facilities. However, the Reticulation Branch operates and maintains a water distribution system which includes: 157 Pressure Pipes (>75 mm dia.) : 10 113.5 km Ground Reservoirs :128 Pump stations : 82 Fire Hydrants : 56 440 Valves : 75 628 Air Valves : 1 115 Large Pressure Reducing Valve Installations : 12 + Potential Automatic Chlorine Sampler Sites: 54 Water meters : 604 274 Water meter Leadings : 604 274 For wastewater collection, the Reticulation Branch operates and maintains a sewer network of: Gravity sewers and force mains : 8 414.6 km Pump stations : 357 Manholes : 183 452 There are thirty nine (39) depots from which the Reticulation Branch operated from and more than 600 vehicles are used to provide a service to the communities. The Reticulation Branch has over 1 500 employees (300 vacant posts ±) and the Budget for the Financial Year 2008/09, was R 2 704 million. 5. ISO 9001:2000 - QUALITY MANAGEMENT SYSTEM WITHIN WATER AND SANITATION: RETICULATION BRANCH The International Standards Organisation (ISO) lays down standards in ISO 9000 to provide organisations with a useful customer focussed quality management system to manage progress towards achieving their strategic goals. The system includes: A Quality Policy Statement or customer charter Documented procedures aimed at achieving the objectives or customer pledges A performance monitoring system 158 Continuous improvement is integral to the system. A certificate indicating compliance will be issued by an independent ISO approved assessor. This confirms conformance to the particular ISO standard requirements. This is followed by 6-monthly audits. The implementation of ISO 9001:2000 in the Reticulation Branch will be in two Phases: Phase 1: All the existing ISO 9001:2000 Procedures and Working Instructions will be perused by the work teams, consists of members from each Region. The new identified ISO 9001:2000 Procedures will only be developed when these teams became more experienced in writing and compiling procedures and working instructions. If there is no consensus on the Working Instructions in a particular ISO 9001:2000 Procedure, each Region/Depot will compiled their own Working Instructions and it will be such recorded in the relevant ISO 9001:2000 Procedure. Phase 2: The ISO 9001:2000 Procedures, with different Working Instructions, will then be re-evaluated and the most cost effective, service delivery oriented Working Instruction will then be implemented through-out the Reticulation Branch. The time frame for implementing ISO 9001:2000 in the Reticulation Branch will be at least one year as the ‘final’ number of processes is still an unknown. 159 5.1 MANAGEMENT RESPONSIBILITY 5.1.1. PURPOSE To provide evidence of management’s commitment to the development and improvement of the quality management system To ensure that top management determines customer needs and expectations, converted into requirements and fulfilled with the aim of achieving customer satisfaction To establish a quality policy To ensure that quality objectives are established and applied and consistent with the quality policy To ensure that the responsibilities, authorities and their interrelation are defined and communicated within the organisation. To ensure that the quality management system is reviewed at planned intervals to ensure its continuing suitability, adequacy and effectiveness. 5.1.2. SCOPE This procedure applies to all processes at Water and Waste Water Reticulation which specifically have an effect on meeting customer requirements. 5.1.3. REFERENCES ISO 9001:2000 5.1.4. DEFINITIONS None 5.1.5. RESPONSIBILITIES 160 The Manager: Reticulation has overall responsibility for quality at Water and Waste Water Reticulation. The Management Representative (MR) is responsible for internal audits ensuring ISO 9001 compliance. Management supports the organisational freedom and authority to: Identify and record any product quality problems Initiate, recommend or provide solutions through designated channels Verify the implementation of solutions Control further processing, delivery or installation of nonconforming product until the deficiency or unsatisfactory condition has been corrected Management defines the responsibility, authority and interrelation of all personnel who manage, perform and verify work effecting quality. Management identifies in-house verification requirements, provides adequate resources and assigns trained personnel for verification activities. Management provides Work Instructions that describes the process of assembling, verifying and documenting product performance. 5.1.6. PROCEDURE 5.1.6.1 Management commitment Top management provides evidence of its commitment to the development and improvement of the quality management system by: Communicating to Water and Waste Water Reticulation the importance of meeting customer as well as regulatory and legal requirements Establishing the quality policy and quality objectives Conducting management reviews Ensuring the availability of necessary resources 161 5.1.6.2 Customer focus (Refer to Customer-related processes) Top management ensures that customer needs and expectations are determined and converted into requirements with the aim of achieving customer satisfaction. Customer requirements are to be fully understood and met. 5.1.6.3 Quality policy Top management is responsible for defining the quality policy. The policy ensures that it: is appropriate to the purpose of Water and Wastewater Reticulation and its customers. includes commitment to meeting requirements and continual improvement provides a framework for establishing and reviewing quality objectives is communicated, understood and implemented throughout Water and Wastewater Reticulation is reviewed for continuing suitability. 5.1.6.4 PLANNING 5.1.6.4.1 Quality Objectives Top management ensures that the quality objectives are established at each relevant function and level within Water and Waste Water Reticulation. These objectives are consistent with the quality policy and the commitment to continual improvement. The relevant objectives are outlined in the procedures related to product and services and should include safety, health, potential liabilities and means to minimize risks. 5.1.6.4.2 Quality Planning 162 Quality Objectives Top management ensures that quality objectives as outlined in the quality policy are those needed to meet requirements of Water and Wastewater Reticulation. These objectives are established at relevant functions and levels within Water and Wastewater Reticulation and are measurable. Quality System Management Planning Top management ensures that the planning of the management system meets all objectives as outlined by ISO 9001:2000, particularly the quality related objectives, and that any changes made to the management system does not affect the integrity of the system. At the beginning of each year Management completes the Quality Planning Schedule which identifies the various products supplied by Water and Wastewater Reticulation and the quality input requirements. Where necessary these schedules are reviewed and revised if changes to the management system or product are made. 5.1.6.5 Responsibility, Authority and Communication 5.1.6.5.1 General Requirements Water and Wastewater Reticulation shall establish a quality management system as a means of meeting its quality policy, achieving its quality objectives and ensuring that the product and service conform to customer requirements. 5.1.6.5.2 Responsibilities and Authorities The organizational chart shows the roles of staff at Water and Wastewater Reticulation, their interrelationships, responsibilities and authorities. 163 Top management ensures that each staff member has a job description outlining their immediate superior, tasks and activities, experience required, qualifications, and procedures and work instructions applicable to their work area. Each procedure and work instruction list the persons responsible for undertaking the specific task as described in the documents and has the freedom to perform the tasks that affect quality. 5.1.6.5.3 Management Representative (MR) The Policy Statement outlines the appointment, responsibilities and lines of communication of the MR. The MR, irrespective of other responsibilities: ensure that the quality management system is implemented and maintained in accordance with the requirements of ISO 9001:2000 report to top management on the performance of the quality management system, including needs for improvement ensuring awareness of customer requirements throughout the organisation. The responsibilities and authority of the MR are defined in the job description issued. 5.1.6.5.4 Internal Communication Water and Wastewater Reticulation ensures communication between various levels and functions regarding the processes of the quality management system and its effectiveness. 5.1.6.6 MANAGEMENT REVIEWS. Top management at planned intervals reviews the quality management system to ensure its continuing suitability, adequacy and effectiveness. The review evaluates the need for changes to the organization’s quality management system, including policy and objectives. 164 Inputs to management review include periodic review of current performance and improvement opportunities related to: results of audits customer feedback process performance and product conformance analyses status of preventive and corrective actions follow-up actions from earlier management reviews planned changes that could effect the quality management system recommendations for improvement The outputs from the management reviews include actions related to: improvement of the effectiveness of the quality management system and its processes improvement of product, related to customer requirements Resource needs. Results of management reviews are recorded and maintained. 5.2 MANAGEMENT REVIEW 5.2.1. PURPOSE To ensure effective review of the management system at least twice a year To evaluate the continuing suitability, adequacy and effectiveness of the management system To evaluate the need for changes to the management system, including policy and objectives To record the results of the management review meetings 5.2.2. SCOPE This procedure applies to Water and Wastewater Reticulation quality management system. 5.2.3. REFERENCES ISO 9001:2000 165 5.2.4. DEFINITIONS None 5.2.5. RESPONSIBILITIES The Manager: Reticulation is responsible for calling the management review meeting, setting the agenda and for ensuring all management and related staff affected are present at the meeting, The Manager: Reticulation is also responsible for ensuring that the objectives of the meeting are fully met and are recorded. Minutes of the meeting are to be kept and distributed by the MR. The MR is responsible for reporting to the meeting on the performance of the quality management system, including needs for improvement. 5.2.6. PROCEDURE 5.2.6.1 Scheduling of meetings Management review meetings shall be held at least twice a year or at any other regular intervals as agreed upon during the review meetings. The minutes of these meetings shall indicate the time intervals. 5.2.6.2 Agenda – Input Requirements A standard agenda shall apply to all review meeting. The agenda shall cover the following activities: 166 follow-up actions from earlier management reviews review of strategic planning cycle and management reviews review of quality policy and objectives in relation to performed daily processes results from audits including internal, customer and third party’s self-assessment of Water and Wastewater Reticulation market place evaluation including the performance of competitors results of benchmarking activities customer satisfaction measurements performance of suppliers process performance and service conformity status of preventive and corrective actions changing in original assumptions arising from new technologies, outputs of research and development, quality concepts, financial, social, environmental conditions and legislative or regulatory changes needs or opportunities for improvement 5.2.6.3 Output requirements The review process should lead to: checking the relevance and the achievement of the existing policy and quality objectives updating policies and objectives when necessary overall effectiveness and efficiency of the quality management system measures to increase satisfaction of interested parties concerned updating the quality management system definition, provision and allocation of the necessary resources for improvement plans to improve utilization of resources 5.2.6.4 Minutes of meetings Observations, recommendations and conclusions issued as a result of the review meetings shall be recorded to facilitate necessary actions. These minutes shall be distributed to all present at the meeting and the original to be kept by the Manager: Reticulation. 5.2.6.5 Evaluation of management review process 167 At the first review meeting held in each year, the management review process shall be evaluated for effectiveness. Any improvements shall be applied when necessary. These actions shall be recorded in the meetings minutes. 5.2.7. DOCUMENTATION STANDARD AGENDA 1. Apologies 2. Follow-up on actions from previous management review 3. Review of strategic planning cycle and management reviews 4. Review of quality policy and objectives in relation to performed daily processes 5. Results from audits, including internal, customer and third party’s 6. Self-assessment of Water and Wastewater Reticulation 7. Market place evaluation including the performance of competitors 8. Results of benchmarking activities 9. Customer satisfaction measurements 10. Performance of process performance and service conformity 11. Performance of suppliers 12. Status of preventive and corrective actions 13. Changing in original assumptions arising from new technologies, outputs of research and development, quality concepts, financial, social, environmental conditions and legislative or regulatory changes 14. Needs or opportunities for improvement 15. First meeting of each year: Evaluate management review meeting 16. Date of next meeting 5.3 RESOURCE MANAGEMENT (WI-6.1.RT-001) 168 5.3.1. PURPOSE To ensure resources are determined and provided timeously: To ensure staff who are assigned responsibilities are competent To ensure training needs are identified, and that effective training is provided and adequately monitored To ensure that Water and Wastewater Reticulation identifies, provides and maintains the facilities needed to achieve conformity of service To identify and manage the human and physical factors of the work environment needed to achieve conformity of service 5.3.2. SCOPE This procedure refers to all resources required to implement and improve the processes of the quality management system, to address customer satisfaction. 5.3.3. REFERENCES ISO 9001:2000 5.3.4. DEFINITIONS Resources may include people, suppliers, information, infrastructure, knowledge, work environment and financial. 169 5.3.5. RESPONSIBILITIES The Managers: Reticulation is responsible for creating and implementing plans for the development of resources based on its vision of the future and for ensuring that these plans are implemented. Each Manager is responsible for implementing the above plans effectively. The MR is responsible for ensuring that this procedure is adhered to. 5.3.6. PROCEDURES 5.3.6.1 Provision of Resources Water and Wastewater Reticulation at each management review meeting ensures that the resources needed to implement and improve the quality management process and to address customer satisfaction, are determined and provided. Point 3 and 13 of the management review standard agenda shall apply. 5.3.6.2 Human Resources 5.3.6.2.1 General All management completes a job description of each of their staff members. This is discussed and agreed on with the respective staff member. The job description includes job titles, numbers, grades, departments, reporting to, main responsibilities, required attributes, level of authority, required experience, training required, education, name and year of experience. The organogram outlines the personnel assigned responsibilities in the quality management system. These personnel shall be competent on the basis of applicable education, training, skills and experience. 170 5.3.6.2.2, Competence, Awareness and Training a) Identify Competency Needs The required training is provided in order for all staff to understand the quality system, together with the tools and techniques needed for full participation in the operation of the system. Employees are made aware of the relevance and importance of their activities and how they contribute to the achievement of the quality objectives outlined in the quality policy. Management and Administration staff’s initial training requirements are identified in relation to their job descriptions. Technical and operational staff’s initial training requirements are identified in relation to their skills required. Staff performing inspection and testing activities may require specialised training. The training could be formal training or on-the-job training provided by the person or organization appointed by the Manager Water. New staff members undergo informal familiarisation training when starting, which covers: the nature of the business the health and safety regulations the quality policy the role of a new employee Any change to employees work environment or skills or methodology used shall require provision for training. The Manager Water shall evaluate these changes and provide the required training. Internal auditors shall receive the required training. Persons appointed to assist in internal auditing shall be provided with auditing guidelines, however, the responsibility for the audit remains with the trained auditor. 171 b) Scheduling and Monitoring of Training Records (REC-6.0.RT-002) The Manager Water identifies and schedules training in relation to personal job descriptions once a year or when required. They provide and monitor the training or nominate a manager to monitor the training. When the training has been completed the necessary schedules and the job descriptions shall be updated. Where the training has not been completed, it shall be re-scheduled. The schedule defines the following: the names of the employees the job activity scheduled training (type of training) successful completion of scheduled training objectives of training evaluation of training c) Evaluate the Effectiveness of the Training Provided On completion of training, the performance of the personnel is evaluated by the Manager Water or the nominated manager, against the objectives outlined on the training schedule. At least once a year personnel’s performance is appraised and measured against their job description. Any inefficiency's identified are addressed and training planned where relevant. d) Personnel Awareness Regular yearly performance appraisals are undertaken by personnel’s respective senior manager to ensure staff is aware of the relevance and importance of their activities and how they contribute to the achievements of the quality objectives. Further areas of improvement are identified and addressed. 172 e) Maintaining of Training Records All training records which include schedules, training certificates, attendance records etc are kept by the Managers Water and departmental managers for a period of 5 years. A multi-skills chart is maintained for all staff and kept by the respective Managers. 5.3.6.3 Infrastructure Water and Wastewater Reticulation identifies, provides and maintains all its facilities needed to achieve the conformity of product. The Inventory kept by Financial Services identifies the infrastructure in terms of their objective, function, performance, availability, cost, safety, security and the effect it has on the environment. All equipment, machinery, tools, furniture, computers, office equipment and vehicles are coded and listed. Maintenance schedules are maintained by each area and identify the equipment requiring regular maintenance. All facilities are evaluated at least once a year against the requirements of their intended function, and reported on at the management review meeting. The facilities as discussed above include: 5.3.6.3.1 Workspace and associated facilities. Desks, chairs, cupboards in relation to their workspace. Associated factors include ergonomics, noise, heat, light, hygiene, humidity, cleanliness, vibration and pollution. 173 5.3.6.3.2 Equipment, hardware and software. Plant machinery, tools and equipment, telephones, cellphones, switchboards, fax machines, computers, software 5.3.6.3.3 Supporting services. Transport and facilities, forklifts, hoists, waste and recycling equipment and safety equipment. 5.3.6.4 Work Environment Water and Wastewater Reticulation ensures that the human and physical factors of the work environment needed to achieve conformity of product and service are defined and implemented. This includes: 5.3.6.4.1 Health and safety conditions and ambient working conditions. The implementation of point 6.3 ensures that health, safety and the working conditions are suitable and safe. 5.3.6.4.2 Work methods. Procedures are only being issued if all parties concerned agree that it is a true reflection of the activities that actually take place, in the most efficient manner. 5.3.6.4.3 Work ethics. 174 During to introductory training of employees ethics are discussed are monitored and handled appropriately. 5.3.6.5 Nonconformities Any non-conformities identified are addressed as outlined in procedure WI-8.0.RT-004. 175 6. ISO 9001:2000 - Procedures The various ISO procedures to be implemented in the Reticulation Branch can be grouped into the following categories: Operations Maintenance Risk and Safety Environmental Emergency Response Water Quality Compliance Technical Operations Safety Working Instructions Recruitment and Selection Record Keeping and Filing The ISO Procedures for the Operations and Maintenance of the Water and Sewer networks and Furniture will assist with: the compiling of the annual budget requirements, the programming of maintenance schedules, the staffing at the various Sections and Depots and service excellence. 176 177 7. Operational Plan Operational maintenance encompasses on-going activities to identify, prevent, and correct conditions that, left untreated, result in a reduction or elimination of serviceable component systems. Unlike capital renewal projects, the costs of which are generally for outside contractors, operational maintenance costs include salaries for permanent maintenance personnel; expenses for consumable parts, supplies, and materials; funds for contracted Service Providers and technicians; and short-term improvements that enable presently functioning components to operate with better efficiency. Active operational maintenance programs will properly maintain current and anticipated capital assets. In order to provide an efficient, sustainable and an affordable service to the residents of the City of Cape Town, the performance of the operational activities as listed in the following Tables, are of utmost of importance. 7.1 District Level The following operational activities are performed at the Districts level: Table 1: Finance, Administration and HR Activities Procurement Access control (id) Accident reports Capital and operating budget formulation Accident reports Acting allowances Activity based costing Accommodation management Communications Billing queries local Application of misc. Tarriff Contract labour Budget expenditure (monthly) Archiving Customer interface front and back office Budget management Building maintenance Disciplinary procedures Capital & operating Complaints handling & customer liaison Grievances Cost centres Conference booking HR 300 Debt management Correspondence tracking HR, Data and Staff management Diligent enforcement and collection of fees owed; Courier/messenger/driver Iod's 178 Expenditure monitoring Customer liaison Job description preparation Income Enquiries Leave applications Master data Interdepartmental liaison Organogram preparation Procurement of office requirements Internal asset management Overtime Recoveries Meter applications Pay queries Refunds Minutes Pension queries Reporting Monitoring telephone accounts Performance management SAP processing, including PS Office management Sap profiling SlA’s PC coordination Staff management, HR funcions Virementing Permits Staff records GRN's Photocopying Terminations Plant Time & Attendance records & reporting Public liability claims Training coordination Radio's 24 hour, 7 days, on demand availability of potable water service; Reception Budget co-ordination Records files Business Development and workflow Records plans CCTV analysis and co-ordination Reporting to Management & Subcouncil Centralized data Reports EPWP Co-ordination Safety Establish tariffs Sap capturing cic0 & notif. Technical services Service orders HR, Admin and reporting Site inspections (depot) Informal Settlements co-ordination Staff management Mapping and plans Stationery control Master planning Sub Council (Every month) Modelling and analysis Switchboard 179 Monitor water quality Theft and loss insurance Operational co-ordination and statistics Transport management Policy, Specifications and Standards Typing Project management, Capital expenditure, design and tenders Waste disposal cards Pump station ordination; management co- Risk and Safety Co-ordination Work scheduling Works orders SLA development and monitoring Water quality controls; WDM co-ordination and implementation Table 2: Technical Services Activities Flow instrumentation Records files maintaining Flow measurement / monitoring Relay/upgrade of mains Informal tenders Technical Services at local level Reservoir and telemetry operations Quotations Infiltration management Reticulation (fortnightly) Tender administration Informal Settlement servicing Risk & safety committee (weekly) Capital and operating projects Informal tenders Scrutinizing building plans Arrange for field checking Inspectorate Service information provision As-built info Leakage management and rebate assessment Small capital works programs Building plan approvals Local planning and design Spatial & non-spatial data By-law policy enforcement Manage data from consultants Standpipes Capture as built information Manage development data from consultants Supervising township development CCTV operations local; Management information systems Tariffs : expenditure Check & verify data Manipulation of data Technical back-office Checking development plans Master planning Town planning applications Borehole applications 180 Compilation and printing of maps Monitor asset management Trench reinstatements Compliance monitoring and enforcement Monitor quality control Consumer education programs/content Monitor Risk and Safety Water exemptions Contract management Network analysis Wayleaves, internal and external Create layers & technical services links Operations statistics (monthly) WDM operational implementation local Development facilitation (T/P applications, sub-divisions, network analysis, DC’s ); Plans examination Zone / Watershed monitoring Editing Platform management Zone management Ensure water quality Private Plumbing Control and registration Zone Meter reading EPWP implementation; Produce reports for management EPWP monitor Project management Establish leak detection programs Record plans maintaining Water connection applications 181 7.2 Depot Level These activities are listed to provide the total scope of the Operation side of the Reticulation Branch at Depot Level. Table 3: Finance and HR Activities Accident reports Capital and operating budget formulation Acting allowances Activity based costing Communications Billing queries local Contract labour Budget expenditure (monthly) Customer interface front and back office Budget management Disciplinary procedures Capital & operating Grievances Cost centres Hr 300 Debt management HR, Data and Staff management Diligent enforcement and collection of fees owed; Iod's Expenditure monitoring Job description preparation Income Leave applications Master data Organogram preparation Procurement of office requirements Overtime Recoveries Pay queries Refunds Pension queries Reporting Performance management SAP processing, including PS Sap profiling Sla"s Staff management, HR funcions Virementing Staff records Grn's Terminations Procurement Time & Attendance records & reporting Training coordination 182 24 hour, 7 days, on demand availability of potable water service; Modelling and analysis Budget co-ordination Monitor water quality Business Development and workflow Operational co-ordination and statistics CCTV analysis and co-ordination Policy, Specifications and Standards Centralized data Project management, Capital expenditure, design and tenders EPWP Co-ordination Pump station management co-ordination; Establish tariffs Risk and Safety Co-ordination Technical services SLA development and monitoring HR, Admin and reporting Water quality controls; Informal Settlements co-ordination WDM co-ordination and implementation Mapping and plans Master planning Table 4: Administration Activities Access control (id) Applied Risk and Safety Principles Pumpstations operations Accident reports Asset management Pumpstations operations Accommodation management Boreholes Quality control Application of misc. Tariff Budget : Compile and Control Records, statistics and reporting Archiving By-law policy enforcement Registry Building maintenance Capital works Repairs Complaints handling & customer liaison Compliance monitoring and enforcement Report statistics Conference booking Consumer education Sap processing Correspondence tracking Contract connections Staff management Courier/messenger/driver Contract management Stand-by and overtime 183 Customer liaison Contract management Stationery control Enquiries Customer interaction Stores Interdepartmental liaison Daily leak detection observation Telemetery operations Internal asset management Depot management Telephones and radois Meter applications Design local Trench re-instatements Minutes Development facilitation Upgrades Monitoring telephone accounts Enquiries and complaints Water quality controls Office management EPWP implementation Way-leaves Pc coordination Feedback for Plans Examination WDM : Maintenance of Fittings etc. Permits Feedback for Tariffs Zone / Watershed monitoring Photocopying Feedback for Town Planning Applications Administrative duties Plant Fleet coordination Interdepartmental liaison Public liability claims Fleet management Internal assets Radio's GIS confirmation Reception Informal settlements services maintenance Records files Leakage management and rebate assessment Records plans Maintenace of Flow Measurement / Monitoring Reporting to Management & Subcouncil Maintenance of infrastructure Reports Maintenance of Zone Equipment Safety Management information systems Sap capturing cic0 & notif. Meter testing and calibration Service orders Network analysis Site inspections (depot) New connections Staff management On site consumer education Stationery control Operational systems Sub Council (Every month) Overtime monitoring 184 Switchboard Performance management Theft and loss insurance Personnel management Transport management Plumbing Typing Private plumbing control Waste disposal cards Procurement Work scheduling Project management Works orders Projects Acquisition 0f materials Public enquiries / complaints Proactive maintainance Public liability claims Maintenance of Flow Instrumentation Public Liability processes Table 5: Water and Sewerage Activities Water Sewerage Connections & meters Basic sanitation Cut-off / reconnections Blockages Fittings CCTV systems and programs Hydrants Clearing of blocked sewers Install Meters (domestic and bulk) Industrial effluent assessment and monitoring Mains Manhole maint. (eg cover repl.) Mains cleaning Night-soil / Sewarage removal Mains upgrades Odour control Meter maintenance Pest control Meter reading / billing Recycled water reticulation Network Repairing/replacing collapsed sewers New meter connections Rising main maintenance Repair burst mains Safety Repairs Sewer cleaning Reservoir and mains cleaning Sewer connections Reservoirs (service and balance) Spillage clean-up 185 Shifting of meters Storm-water infiltration Stand-pipe rentals Systems inspections Trunk main maintenance Vacuum tanker services Valves Zone maintenance 186 8. Maintenance Plan To provide a continuous safe water supply service, calls for ample and reliable water sources and adequate capacity for treatment, transmission, and distribution, as well as properly functioning pumps, reservoirs, and networks. The way these facilities are operated and maintained can greatly affect the health of the population, the quality of the environment, the benefits to the poor, and the resources available for investment in expansion. The pressure to provide services to more people is particularly intense in the water supply sector. As a result, new facilities receive higher priority, in terms of budgets and staffing, than operation and maintenance. And, in a financial crisis, operation and maintenance budgets are the first to be cut, with consequent deterioration of pipes, machinery, and service. Maintenance equipment, vehicles, and spare parts are often in short supply and requests for their acquisition are often "postponed". However motivated the operation and maintenance staff may be, they cannot react promptly to emergencies without the right equipment. 8.1 Water Network and Furniture The scope of the annual maintenance of the Water Network and Furniture assets is based on a 2.91 % of the asset quantities and not on the relevant asset value. This value was derived at the Water and Sanitation Strategy workshops where it was establish that the annual pipe line replacement should be in the order of 300 km per year. Table 6: Water Infrastructure and Furniture ACTIVITY BLAAUWBERG CAPE TOWN HELDERBERG KHAYELITSHA SOUTH PENINSULA TYGERBERG 2008/09 Kilometre Pipe 2,337 2,631 1,646 410 1,613 1,687 10,324 Service Points 121,586 185,021 45,120 36,140 79,800 136,607 604,274 Valves 13,116 24,587 6,842 2,286 16,989 11,808 75,628 Fire Hydrants 8,974 19,593 5,112 858 14,934 6,505 55,976 8.1.1 Maintenance Programmes 187 Gantt Diagram’s can be generated from the tables below for the various pro-active or preventive maintenance activities in the various Districts for the 2010/11 financial year. Water Mains Replaced Total (km) 2008/09 (km) % Done % Planned Planned Number BLAAUWBERG 2,337 5 0 2.91 68 CAPE TOWN 2,631 16 1 2.91 77 HELDERBERG 1,646 1 0 2.91 48 KHAYELITSHA 410 0 0 2.91 12 SOUTH PENINSULA 1,613 17 1 2.91 47 TYGERBERG 1,687 6 0 2.91 49 Total 2008/09 % Done % Planned Planned Number District Blaauwberg Item Valves Marked / Plated 13,116 218 1.66 2.91 382 Valves Replaced / Renewed 13,116 91 0.69 2.91 382 Valves Repacked 13,116 162 1.24 2.91 382 Fire Hydrants Replaced / Renewed 8,974 83 0.92 2.91 261 Fire Hydrants Repacked 8,974 82 0.91 2.91 261 Fire Hydrant Nozzles Replaced 8,974 3805 42.40 2.91 261 Water Mains Replaced (km) Total 2,337 5 0.23 2.91 68 Water Mains Cleaned (km) 2,337 3 0.11 2.91 68 Cape Town Item Valves Marked / Plated Total 24,587 2008/09 % Done 1012 4.12 188 % Planned 2.91 Planned Number 715 Valves Replaced / Renewed 24,587 377 1.53 2.91 715 Valves Repacked 24,587 175 0.71 2.91 715 Fire Hydrants Replaced / Renewed 19,593 66 0.34 2.91 570 Fire Hydrants Repacked 19,593 202 1.03 2.91 570 Fire Hydrant Nozzles Replaced 19,593 4402 22.47 2.91 570 Water Mains Replaced (km) Total 2,631 16 0.60 2.91 77 Water Mains Cleaned (km) 2,631 0 0.00 2.91 77 Helderberg Item Total 2008/09 % Done % Planned Planned Number Valves Marked / Plated 6,842 118 1.72 2.91 199 Valves Replaced / Renewed 6,842 98 1.43 2.91 199 Valves Repacked 6,842 418 6.11 2.91 199 Fire Hydrants Replaced / Renewed 5,112 169 3.31 2.91 149 Fire Hydrants Repacked 5,112 91 1.78 2.91 149 Fire Hydrant Nozzles Replaced 5,112 27 0.53 2.91 149 Water Mains Replaced (km) Total 1,646 1 0.09 2.91 48 Water Mains Cleaned (km) 1,646 0 0.00 2.91 48 Khayelitsha Item Total 2008/09 % Done % Planned Planned Number Valves Marked / Plated 2,286 1 0.04 2.91 67 Valves Replaced / Renewed 2,286 14 0.61 2.91 67 Valves Repacked 2,286 6 0.26 2.91 67 Fire Hydrants Replaced / Renewed 858 32 3.73 2.91 25 Fire Hydrants Repacked 858 2 0.23 2.91 25 Fire Hydrant Nozzles Replaced 858 0 0.00 2.91 25 Water Mains Replaced (km) Total 410 0 0.00 2.91 12 Water Mains Cleaned (km) 410 0 0.00 2.91 12 189 South Peninsula Item Total 2008/09 % Done % Planned Planned Number Valves Marked / Plated 16,989 6 0.04 2.91 494 Valves Replaced / Renewed 16,989 43 0.25 2.91 494 Valves Repacked 16,989 401 2.36 2.91 494 Fire Hydrants Replaced / Renewed 14,934 90 0.60 2.91 435 Fire Hydrants Repacked 14,934 271 1.81 2.91 435 Fire Hydrant Nozzles Replaced 14,934 4055 27.15 2.91 435 Water Mains Replaced (km) Total 1,613 17 1.06 2.91 47 Water Mains Cleaned (km) 1,613 0 0.00 2.91 47 Tygerberg Item Total 2008/09 % Done % Planned Planned Number Valves Marked / Plated 11,808 40 0.34 2.91 344 Valves Replaced / Renewed 11,808 213 1.80 2.91 344 Valves Repacked 11,808 142 1.20 2.91 344 Fire Hydrants Replaced / Renewed 6,505 78 1.20 2.91 189 Fire Hydrants Repacked 6,505 216 3.32 2.91 189 Fire Hydrant Nozzles Replaced 6,505 5741 88.26 2.91 189 Water Mains Replaced (km) Total 1,687 6 0.37 2.91 49 Water Mains Cleaned (km) 1,687 0 0.00 2.91 49 190 8.2 Sewerage Network and Furniture The scope of the annual maintenance of the Sewerage Network and Furniture, is based on a 1.81 % of the asset quantities and not on the relevant asset value. This value was derived at the Water and Sanitation Strategy workshops where it was establish that the annual pipe line replacement should be in the order of 150 km per year. Table 7: Sewer Infrastructure and Furniture ACTIVITY Kilometre Pipe Service Points Manholes BLAAUWBERG CAPE TOWN HELDERBERG KHAYELITSHA SOUTH PENINSULA TYGERBERG 2008/09 1917 1987 1253 368 1369 1422 8317 121,586 185,021 83,000 43,000 79,800 113,509 625916 37717 46839 24197 5768 32714 32138 179373 8.2.1 Maintenance Programmes Gantt Diagram’s can be generated for the various pro-active or preventive maintenance activities in the various Districts for the 2010/11 financial year. Sewer Mains - Replacement Districts Total (km) 2008/09 (km) % Done % Planned Planned Number BLAAUWBERG 1917 4 0 1.81 35 CAPE TOWN 1987 5 0 1.81 36 HELDERBERG 1253 2 0 1.81 23 KHAYELITSHA 368 0 0 1.81 7 SOUTH PENINSULA 1369 1 0 1.81 25 TYGERBERG 1422 0 0 1.81 26 191 Blaauwberg Item % Done % Planned Planned Number Total 2008/09 Sewer Mains - Replacement (km) 1917 4.412 0.23 1.8 35 Manholes Rehabilitation 37717 139 0.37 1.8 683 Programmed CCTV Inspections (km) 1917 0.053 0.00 1.8 35 Programmed Sewer Cleaning (km) 1917 19.97 1.04 1.8 35 Total 2008/09 Sewer Mains - Replacement (km) 1987 4.513 0.23 1.8 36 Manholes Rehabilitation 46839 15 0.03 1.8 848 Programmed CCTV Inspections (km) 1987 0 0.00 1.8 36 Programmed Sewer Cleaning (km) 1987 23.526 1.18 1.8 36 Total 2008/09 Sewer Mains - Replacement (km) 1253 1.808 0.14 1.8 23 Manholes Rehabilitation 24197 364 1.50 1.8 438 Cape Town Item % Done % Planned Planned Number Helderberg Item % Done 192 % Planned Planned Number Programmed CCTV Inspections (km) 1253 2.131 0.17 1.8 23 Programmed Sewer Cleaning (km) 1253 75.671 6.04 1.8 23 Total 2008/09 Sewer Mains - Replacement (km) 368 0.2 0.05 1.8 7 Manholes Rehabilitation 5768 0 0.00 1.8 104 Programmed CCTV Inspections (km) 368 0 0.00 1.8 7 Programmed Sewer Cleaning (km) 368 1.332 0.36 1.8 7 Total 2008/09 Sewer Mains - Replacement (km) 1369 0.511 0.04 1.8 25 Manholes Rehabilitation 32714 63 0.19 1.8 592 Programmed CCTV Inspections (km) 1369 0 0.00 1.8 25 Programmed Sewer Cleaning (km) 1369 16.5 1.20 1.8 25 Total 2008/09 Sewer Mains - Replacement (km) 1422 0.429 0.03 1.8 26 Manholes Rehabilitation 32138 106 0.33 1.8 582 Khayelitsha Item % Done % Planned Planned Number SOUTH PENINSULA Item % Done % Planned Planned Number TYGERBERG Item % Done 193 % Planned Planned Number Programmed CCTV Inspections (km) 1422 0.054 0.00 1.8 26 Programmed Sewer Cleaning (km) 1422 165 11.60 1.8 26 194 9. Budget: Operational and Maintenance The reason that the Reticulation Operating and Maintenance Budget is often targeted for reduction, is that Reticulation Operations and Maintenance may be viewed as a total expense branch rather than a revenue generator. However, the reality is that the Reticulation Operating and Maintenance Budget maintain the Council’s greatest asset, the Water Networks, Sewerage Networks and Furniture of these networks. The quality, conditioning, aesthetics and operational aspects of the water and sewer networks are tied directly to revenue generation for the Council. 9.1 Operational Budget: Water Network, Sewer Network and Furniture Operation includes the planning and control of the extraction/collection, treatment, conveyance, and delivery of water, and/or the collection, treatment, and disposal of effluent. It also covers the management of client and public relations, legal, personnel, commercial, and accounting functions. To provide an efficient, reliable, sustainable and an affordable service to the consumer, several activities are executed in and from either at District level and/or at Depot level. These activities are listed in Table 1 to 5. Table 8: Total Operational Expenditure Budget Year Expenditure 05/06 R 162,829,678.03 06/07 07/08 R 143,427,863.97 195 R 154,895,439.99 08/09 R 208,791,376.80 9.2 Maintenance Budget: Water Network, Sewerage Network and Furniture. Maintenance may be preventive or reactive. Preventive maintenance (including inspection, cleaning, and lubrication) consists of the systematic routine actions needed to keep the networks in good condition. It sometimes also includes minor repairs and replacement as dictated by the routine examination. Reactive maintenance normally occurs as a result of reported pipe breaks and the malfunctioning or breakdown of equipment. For the compilation of an annual estimate maintenance budget for the water network, sewerage network and furniture, the activities are roughly split between those identified as pro-active and those defined as re-active. The maintenance of the pro-active activities is those that can be planned, budget for and maintained according to a schedule. The number of re-active activities is either consumer related, e.g. requests for water meters, or an indication that the water/sewer network and/or the furniture is in need of rehabilitation. Table 9: Total Maintenance Expenditure for: 05/06 Budget Year Expenditure 06/07 R 191,497,263.69 07/08 R 218,683,149.98 R 234,714,441.49 08/09 R 273,268,685.89 9.2.1 Water Network Repairs and Maintenance The unit costs used in the compiling of an Maintenance Budget, are purely a mixed of estimates, rates supplied by contractors and gut feeling. However, with the implementation of the maintenance ISO Procedures, the calculation of these unit costs will be came more realistic and market related. Table 10: Pro-Active Item Total 2008/09 % Done % Planned Planned Number Costs R.c. Valves Marked / Plated 75628 1395 1.84 3.2 2420 R300 R 726 028.80 Valves Replaced / Renewed 75628 836 1.11 3.2 2420 R301 R 728 448.90 Valves Repacked 75628 1304 1.72 3.2 2420 R300 R 726 028.80 196 Item Total 2008/09 % Done % Planned Planned Number Costs R.c. Fire Hydrants Replaced / Renewed 55976 518 0.93 3.2 1791 R301 R 539 160.83 Fire Hydrants Repacked 55976 864 1.54 3.2 1791 R300 R 537 369.60 Fire Hydrant Nozzles Replaced 55976 18030 32.21 3.2 1791 R301 R 539 160.83 Water Mains Replaced (m) Total 10324000 45845 0.44 3.2 330368 R301 R 99 440 768.00 Water Mains Cleaned (m) 10324000 2743 0.03 3.2 330368 R301 R 99 440 768.00 R 202 677 733.76 Table 11: New Services Item 2008/09 Costs R.c. New Mains Installed (m) Total 23562 R4500 R 106 029 000 Fire Hydrants Installed 542 R3500 R 1 897 000 R 107 926 000 Table 12: Re-Active 2008/09 Costs R.c. Discolored Water complaints 1072 R200 R 214 400.00 Repair to Burst Water Mains 4897 R6000 R 29 382 000.00 R 29 596 400.00 197 Table 13: New Water Meter Installations Item 2008/09 Costs R.c. Installed WDM Device R0 Installed Meter Connections 15 mm 1404 R291 R 408 564 Installed Meter Connections 20 mm 1886 R306 R 577 116 Installed Meter Connections 25 mm 243 R341 R 82 863 Installed Meter Connections 32 mm 7 R410 R 2870 Installed Meter Connections 40 mm 148 R510 R 75480 Installed Meter Connections 50 mm 52 R3281 R 170612 Installed Meter Connections 80 mm 18 R3147 R 56 646 Installed Meter Connections 100 mm 43 R6882 R 295 926 Installed Meter Connections 150 mm 16 R10 517 R 168 272 R 1 838 349.00 Table 14: Water Meter Issues Item 2008/09 Costs R.c. Water Meters Replaced 8726 R220 R 1 919 720 Relocate / Refix Meters 9945 R220 R 2 187 900 Water Meters Stolen 905 R220 R 199 100 198 Remove Water Meter Connections 1784 R220 R 392 480 Locate Water Meters 2433 R220 R 535 260 Repair Leaks on Water Connections 31192 R229 R 686 240 R 12 096 700.00 Table 15: Manhole Cover Replacement Item 2008/09 Meter Box Cover Costs R.c. 1349 R 300.00 R 404 700.00 Hydrant Cover 398 R 300.00 R 119 400.00 Valve Cover 345 R 300.00 R 103 500.00 R 627 600.00 Table 16: Finance Statistics Item 2008/09 Warning Letters Delivered 51474 R200 R 10 294 800.00 28961 R200 R 5 792 200.00 Disconnections / Commercial Industrials 756 R200 R 151 200.00 Restrictions / Disconnections on Owner's Request 0 R200 R 0.00 Non-payment Reconnections 22263 R200 R 4 452 600.00 Restrictions Domestic / Costs R.c. R 20 690 800.00 199 Table 17: Informal Settlements: Infrastructure NEW INSTALLATIONS / GPS SURVEY Item 2008/09 Costs R.c. Standpipes Installed 375 R 3 000.00 R 1 125 000 GPS Survey Standpipes 3697 R 450.00 R 1 663 650 R 2 788 650.00 Table 18: Informal Settlements: Maintenance OPERATIONAL STATISTICS Item 2008/09 Costs R.c. Defective Taps 4961 R 200.00 R 992 200.00 Defective Standpipe Leadings 209 R 300.00 R 62 700.00 Burst Pipes 698 R 200.00 R 139 600.00 Vandalized Taps 210 R 300.00 R 63 000.00 R 1 257 500.00 Total for the Maintenance of Water Services 200 R 302 923 233.00 9.2.2 Sewer Network Repair and Maintenance The unit costs used in the compiling of an Maintenance Budget, are purely a mixed of estimates, rates supplied by contractors and gut feeling. However, with the implementation of the maintenance ISO Procedures, the calculation of these unit costs will be came more realistic and market related. Table 19: Pro-Active Item Sewer Mains -Replacement (m) Sewer Cleaning (m) Total 2008/09 8317000 11873 % Done 0.14 % Planned Planned Number Costs 3.2 266144 R300 2495500 3.2 79843 R176 2495500 3.2 79843 R187 R.c. R 79 843 200.00 R 14 052 403 Bucket Mach. Sewer Cleaning (m) R 14 930 678 Jet Mach. R 348 355 881 Table 20: Re-Active Item 2008/09 Costs R.c. Sewer Pipe Breakage Repair (No.) 763 R7000 R 5 341 000.00 Sewer Manhole Repair (No.) 687 R6000 R 4 122 000.00 Disinfection Applications (No.) 1263 R500 R 631 500.00 R 10 094 500.00 201 Table 21: New Services Item New Sewer Mains Installed (m) Total New Connections to Sewer Network (No.) 2008/09 Costs R.c. 26300 R1200 R 31 560 000.00 358 R2500 R 895 000.00 R 32 455 000.00 Table 22: Sewer Blockages Incidents Item 2008/09 Costs R.c. Building Material 3774 R300 R 1 132 200.00 Collapses 1031 R500 R 515 500.00 Fats 20729 R300 R 6 218 700.00 Other foreign objects 35897 R300 R 10 769 100.00 Roots 15344 R500 R 7 672 000.00 Sand 10311 R60 R 618 660.00 R 26 926 160.00 Table 23: Manhole Cover Replacement Pro-Active Item 2008/09 Costs R.c. Install Lockable Covers R 0.00 Re-Active Sewer 1228 R500 R 614 000.00 R 614 000.00 202 Table 24: CCTV Sewer Inspections Pro-Active Item 2008/09 Costs Programmed Inspections (m) 8317000 R2238 0.03 3.2 266144 300 R 79 843 200.00 Programmed Sewer Cleaning (m) 8317000 R302054 3.63 3.2 266144 300 R 79 843 200.00 R.c. R 159 686 400.00 Table 25: Informal Settlements: Infrastructure NEW INSTALLATIONS / GPS SURVEY Item Toilets Installed GPS Survey Toilets 2008/09 Costs R.c. 5291 R3500 R 18 518 500.00 21 072 R75 R 1 580 400.00 R 20 098 900.00 Table 26: Informal Settlements: Maintenance Item 2008/09 Costs R.c. 691 R2000 R 1 382 000.00 Defective Cisterns 1 002 R250 R 250 500.00 Blocked Toilets 1333 R300 R 399 900.00 Defective Sewer Lines 466 R350 R 163 100.00 Vandalized Toilets 189 R500 R 94 500.00 Other 1555 R450 R 699 750.00 Toilets Upgrade R 2 989 750.00 Total for the Maintenance of Sanitation Services 203 R 601 220 591.00 TITLE NAME SURNAME SIGNATURE Manager: Reticulation Pierre Maritz …../…../2010 Head of Department Philemon Mashoko …../…../2010 204 DATE Annexure A Table 27: Operating Budget 2010/11 Cost Elements 401100 Salaries and Wages Plan Available 220,970,039.98 220,970,039.98 13,780,659.48 13,780,659.48 401400 Leave Pay 5,246,497.39 5,246,497.39 401410 Long Service Award 2,274,619.10 2,274,619.10 401500 Non Struct Overtime 22,808,459.89 22,808,459.89 401510 Structured Overtime 313,711.04 313,711.04 401600 Allowances: Housing 2,258,889.60 2,258,889.60 401700 Allowances: Locomo 3,147,275.88 3,147,275.88 401710 Allowances: Ess User 2,252,987.16 2,252,987.16 453,120.00 453,120.00 401800 Allowances: Other 8,215,839.36 8,215,839.36 402100 Group Life Insurance 3,136,773.13 3,136,773.13 402200 Medical Aid Contrib 21,777,343.68 21,777,343.68 402400 Pensio Schem Contr 45,579,178.92 45,579,178.92 1,718,904.72 1,718,904.72 353,934,299.33 353,934,299.33 401300 Bonuses 401720 Allowances: Cell 402500 Unemployment Insure * Over/Underabsorption 205 Annexure B Table 28: Maintenance Budget 2010/11 Cost Elements 411100 Advertising Plan Available 146,900.92 146,900.92 8,892.84 8,892.84 411350 Chemicals 68,410.40 68,410.40 411500 Catering Services 59,092.40 59,092.40 1,787,738.80 1,787,738.80 878.84 878.84 411700 Comp Serv & Soft 579,389.99 579,389.99 411750 Conf & Sem - Nat 126,456.93 126,456.93 411800 Consultants 156,795.08 156,795.08 411810 CSP ex Payroll 63,827.92 63,827.92 411840 Cutlery Non Vat 11,008.36 11,008.36 1,350.84 1,350.84 227,622.72 227,622.72 5,728,821.43 5,728,821.43 522,271.58 522,271.58 412250 Fuel 3,378,134.13 3,378,134.13 412350 Hire Charges 1,265,674.76 1,265,674.76 11,318,707.84 11,318,707.84 1,043,780.32 1,043,780.32 1,517.52 1,517.52 1,205,891.62 1,205,891.62 99,742.63 99,742.63 171,222.88 171,222.88 412750 Legal Fees & Expense 25,291.40 25,291.40 412850 Levy: Barg Council 70,470.00 70,470.00 411300 Books Perio & Subsc 411550 Cleaning Costs 411600 Cleansing Related Co 411850 Deeds and Transfers 411950 Dis(re)connections 412050 Electricity 412220 Food & Beverages 412360 Hire of LDV - VAT 412370 Hire of Cars-Non Clm 412400 Hygiene Services 412450 Informal Settlements 412500 Inspections 412650 Laundry 206 Cost Elements 412900 Levy: Skills Develop Plan Available 1,720,262.28 1,720,262.28 412950 Licenses & Permits 514,233.29 514,233.29 412970 Material Automotive 63,857.40 63,857.40 412980 Mat Building & Infra 17,945,399.37 17,945,399.37 534,306.57 534,306.57 16,023,583.05 16,023,583.05 312,840.13 312,579.13 6,505.44 6,505.44 413150 Tools , Equip &Other 3,123,009.67 3,123,009.67 413200 Occ Health & Safety 97,603.32 97,603.32 413220 Oil, Gas, Lub & Coal 119,415.19 119,415.19 12,645.64 12,645.64 413300 Pest Control 147,113.78 147,113.78 413350 Plants 262,936.99 262,936.99 413400 Postage & Courier 2,280.92 2,280.92 413450 Print Stat & Photo 1,173,634.47 1,173,634.47 26.64 26.64 391,689.03 391,689.03 6,322.88 6,322.88 629,624.17 629,624.17 139.04 139.04 15,612,480.60 15,612,480.60 1,296,558.28 1,296,558.28 106,284.66 106,284.66 38,173.66 38,173.66 2,360,246.67 2,360,246.67 414105 Telecomm: Cell Phone 64,793.56 64,793.56 414110 Telecomm Equip Rent 112,499.48 112,499.48 414115 Tele:Cell Phone Subs 146,835.18 146,835.18 412990 Material Electrical 413000 Materials Gen & Cons 413050 Med Hea Serv & Sup 413100 Memb Fees: Prof 413250 Pers/Recr Costs 413600 Rates 413670 Refreshments & Teas 413700 Relocation Costs 413750 Rental 413760 Reward Incentives 413800 Security Services 413850 Service Connections 413900 Sewerage Services 413950 Signage 414100 Telecommunication 207 Cost Elements Plan Available 414150 Test,Sample&Monitor 18,701.42 18,701.42 414350 Travel & Subsis: Vat 636,012.73 636,012.73 414360 Travel&Subsis:NonVat 142,643.44 142,643.44 414400 Unif & Protec Cloth 2,354,862.68 2,354,862.68 415190 Public Liab Claims 21,863.04 21,863.04 455100 Contracted Services 98,769,452.71 98,769,452.71 455110 Contracted Serv Rep 82,696,880.45 82,696,880.45 275,535,609.98 275,535,348.98 610010 R&M: Primary Cost 610110 R&M: Secondary Cost 208 Annexure C Table 29: Period Maintenance Tenders Tender No. Service Area Description 209Q/2009/10 Period Tender for the Construction of New Sewer Lines District 3 297Q/2009/10 Period Tender for the Supply and Installation of Lockable Covers for Sewer District 3 211Q/2009/10 Period Tender for the Construction of New Sewer Manholes District 3 289Q/2009/10 Period Tender for the Supply and Installation of Leak-Free Toilet Cisterns District 3 223Q/2009/10 Period Tender for the Installation of New Sewer Connections District 3 227Q/2009/10 Period Tender for the Repair of Sewer Lines District 3 288Q/2009/10 Period Tender for the Maintenance of Sewer Manholes District 3 292Q/2009/10 Period Tender for the Installation of Water and Sewer Pipes by Horizontal Directional Drilling District 3 294Q/2009/10 Period Tender for the Maintenance of Pressure Reducing Valves District 3 299Q/2009/10 Period Tender for the Maintenance of Water Meters District 3 276S/2009/10 Period Tender for the Cleaning of Sewer Lines District 3 24Q/2008/09 Period Tender for the Rehabilitation of Fire Hydrants District 3 25Q/2008/09 Period Tender for the Rehabilitation of Valves District 3 509S/2009/10 Period Tender for Data loggers District 3 Supply & placement of Concrete Toilet Structures Informal Settlements 242 209 Tender No. Service Area Description 133 Supply, Delivery, Installation, Servicing and Collection of Chemical Toilets Informal Settlements 307 Servicing Container Toilets and Porta Potti Toilets Informal Settlements 546 Cleaning of Informal Settlement Sanitation Infrastructure Informal Settlements 281 Supply & Placement of Concrete Toilet Structures Informal Settlements 282 Supply and Delivery of 100 litre Polyethylene Containers, Detachable seat with Flap Informal Settlements 315 Annual Tender for the Supply and Installation of Waterborne Sanitation in Concrete Toilet Structure Informal Settlements 418 Rental, Delivery, Placement and Servicing of Portable nonflushing Chemical Toilet Units Informal Settlements 88 Cleaning of Sewer City Wide 469 Periodic Tender for Trenchless Rehabilitation of Water Mains City Wide 468 Periodic Tender for Trenchless Rehabilitation of Sewers City Wide 335 Provision of Water Meter Reading Services City Wide 90 Maintenance of Sewer Pipelines City Wide 250 Periodic Tender for the Repair Existing and Installation of New Sewers City Wide 251 Periodic Tender for Repairing Existing and Laying of New Water Mains City Wide 210 Annexure D Table 30: Effective Life (Design Life) Effective Life Class Asset Type (Years) 1 Civil 75 2 Pressure Pipe work 60 3 Sewers 100 4 Pumps 40 5 Valves 30 6 Motors 35 7 Electrical 30 8 Controls 25 9 Building assets 30 10 Land N/A 211