Water Services Development Plan Chapter 7 Future Infrastructure Requirements of City of Cape Town Status: Comprehensive WSDP www.capetown.gov.za/water/wsdp December 2001 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 2 Table of Contents TABLE OF CONTENTS ...........................................................2 LIST OF TABLES .................................................................3 LIST OF FIGURES ................................................................4 LIST OF ABBREVIATIONS ......................................................5 CHAPTER 7 ........................................................................6 7 FUTURE INFRASTRUCTURE REQUIREMENTS.............................7 7.1 7.2 STATUS OF EXISTING MASTER PLANS .................................................................. 7 OVERVIEW OF PROPOSED EXPANSION TO BULK INFRASTRUCTURE ................... 8 7.3 OVERVIEW OF PROPOSED EXPANSION TO RETICULATION INFRASTRUCTURE . 15 7.2.1 7.2.2 Bulk Water ........................................................................................................ 8 Wastewater ..................................................................................................... 11 7.3.1 7.3.2 7.3.3 Water ............................................................................................................... 15 Wastewater .................................................................................................... 19 Summary of Capital Expenditure on Bulk Reticulation..........................20 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 3 List of Tables Table 7.1 Current Status of Master Plans ...................................................................... 7 Table 7.2 Example: Water Master Plan of Helderberg Administration-Proposed Projects ......................................................................................................................... 18 Table 7.3 Example: Sewer Master Plan of Helderberg Administration-Proposed Projects .........................................................................................................................22 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 4 List of Figures Figure 7.1a Required Works for Future Bulk Water Supply System ...................... 13 Figure 7.2 Example Water Master Plan: Helderberg Administration..................... 17 Figure 7.3 Example Sewer Master Plan: Helderberg Administration ..................... 21 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN List of Abbreviations AADD AFU CCT CFA CMA CMC DM DWAF EIA GLS I&AP IDP IMEP IWRP MCDA MNF MLC PNE PDG UAW URV WC VIP WDM WSDP WTW WWTW Annual Average daily demand Automatic Flushing Urinal City of Cape Town Cape Flats Aquifer Cape Metropolitan Area Cape Metropolitan Council Demand Management Department of Water Affairs and Forestry Environmental Impact Assessment Geustyn Loubser Streicher Inc Interested and Affected Party Integrated Development Plan Integrated Metropolitan Environmental Policy Integrated Water Resource Planning Multi-Criteria Decision Analysis Minimum Night Flow Metropolitan Local Council Protected Natural Environment Palmer Development Group Unaccounted For Water Unit Reference Value Water Conservation Ventilated Improved Pit Latrine Water Demand Management Water Services Development Plan Water Treatment Works Wastewater Treatment Works 5 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Chapter 7 Future Infrastructure Requirements 6 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 7 7 Future Infrastructure Requirements Issues: • Not all administrations have comprehensive master plans (both water and sewer); • Inadequacy of current preventative maintenance / pipe replacement programs • Stormwater / groundwater infiltration in sewers • Major bulk water and wastewater infrastructure requirements • Siting of future Water Treatment Plants dependant on water resource availability. 7.1 Status of Existing Master Plans Table 7.1 indicate the status of existing Water and Sewer Master Plans as based on the former MLC boundaries. A link to the treasury system and an accurate unaccounted-for-water analysis was done for the areas as indicated. Table 7.1 Current Status of Master Plans * Does not include a future infrastructure 15 yr horizon master plan; ** Interface does exist with the bulk meter record database. *** Moddelling and planning has been done, but no formal master plan exists. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 7.2 8 Overview of Proposed Expansion to Bulk Infrastructure This section is currently under review and will be revised in December 2001, since alternative options (Table Mountain Group Aquifer) for water supply are being investigated which will impact on the location of the future water treatment works. 7.2.1 Bulk Water Planning Horizon: Planning on the bulk water distribution (refer to Computer Model Analysis and Master Plan for Bulk Water Supply System, March 2001) system has been based on a future AADD of 1350 Ml/d which will be realised in approximately 12 to 15 years time. Conceptual planning of bulk water supply infrastructure has however been carried out up to an AADD of 1850 Ml/d. This AADD will only be realised in approximately 25 years time. Raw water sources: There is much uncertainty with regards to future raw water sources for the Western Cape. For this reason, the CCT as part of their Master Plan for the Bulk Water Supply System initiated a study looking at the integration of the raw water sources supplying the CMA, and the effect the development of these raw water resources would have on the associated bulk water supply infrastructure. (Refer to the report entitled “ Integration of Raw Water Resources Supplying the CMA”). A key strategic issue which has been identified is the availability and timing of future water resources. The availability of future water resources affects the siting and sizing of future water treatment plants, bulk distribution pipelines and bulk storage reservoirs. Long term infrastructure planning by the CCT and DWAF has to happen concurrently and timeously so that the two process can inform each other. It is imperative that an indication and commitment is obtained from DWAF as to potential yield and timing of implementation of the Brandvlei Scheme as well as the Molenaars River Diversion. The CCT is currently investigating the feasibility of the Table Mountain Group Aquifer as a source of water for Cape Town. Information pertaining to the above mentioned schemes will inform the location and sizing of a new WTP and associated pipe infrastructure. In addition to the TMG Aquifer, it is anticipated that the CCT will proceed with the implementation of the Voelvlei Augmentation Scheme as was described under the Section of the WSDP entitled "Integrated Water Resource Planning" WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 9 Additional WTP capacity: For full utilisation of an additional yield of 345 Ml/d (AADD planning horizon of 1350 Ml/d), additional WTP capacity of 500 Ml/d is required. (The full 500 Ml/d is used in summer peaks, but less than 345 Ml/d is used in low demand winter months. The average utilisation equals the yield of 345 Ml/d). Provision of the 500 Ml/d capacity was investigated at Faure-, Blackheath- and Wemmershoek WTP’s (close to the proposed Skuifraam Dam), which are all linked to the RSE raw water system. The following options along with the associated bulk pipeline and bulk storage reservoir infrastructure were investigated and costed: 1) Option 1: Installation of 500 Ml/d additional water treatment capacity at the existing Faure WTP 2) Option 2: Installation of 140 Ml/d additional treatment capacity at Wemmershoek WTP and an additional 360 Ml/d treatment capacity at the existing Faure WTP 3) Option 3: Installation of a new 500 Ml/d WTP at a site near the proposed Skuifraam Dam Although the options still require further investigation, Option 3 at this stage is the preferred option for the following reasons: • A new WTP in the vicinity of Skuifraam Dam will reduce the reliance which the CCT currently places on the RSE Tunnel System (security of supply) • A WTP near Skuifraam Dam and associated pipework could cater for the growing water demands of Paarl and Wellington and make available currently under-utilised capacity in the existing pipeline from the Wemmershoek WTP. • The WTP could feed the areas of high growth (ie Durbanville North) directly. • It would provide an alternate source of supply to Glen Garry Reservoir and enable the Wemmershoek WTP to be shut down for repairs or maintenance. • Water from some of the sources could be gravitated to Glen Garry Reservoir (as opposed to Option 1 where all the water would have to be pumped to Glen Garry) • Increased flexibility in the bulk supply system The proposed schematic layout for option 3 is depicted in Figure 7.1a and Figure 7.b. Schematic layouts and a detailed description and costing of the other options are contained in the Master Plan of the Bulk Water Supply System. Due to the uncertainity associated with the availability of raw water resources, it is anticipated that any new water treatment plant capacity which is required will initially be implemented in increments of 250Ml/d. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 10 The siting (and possible future sizing) of future water treatment works will be decided upon when greater clarity concerning future raw water resources comes to hand. Refer to the report entitled “ Integration of Raw Water Resources Supplying the CMA”. A more detailed study examining the suitability of potential sites identified for a possible new water treatment plant in the vicinity of the proposed Skuifraam Dam will be undertaken 2002. Cost estimates and phasing in of works: The preliminary cost of Option 3, with associated bulk water supply infrastructure and bulk storage reservoirs is in the region of R 1154,3 million. For a detailed breakdown of the future bulk infrastructure requirements (excluding water resource development costs and water treatment plant upgrades and repairs), as based on the Computer Model Analysis and Master Plan for Bulk Water Supply System, March 2001, refer to the Bulk Infrastructure Program GO TO. The timing of the infrastructure requirements assumes that the bulk water supplied by the CCT will follow Package 1 and 2 curve as detailed under "Integrated Water Resource Planning" section of the WSDP. The total cost (year 2001 value) for all the required works within the 1350 Ml/d planning horizon is estimated at R1154,3 million (including P&G’s, contingencies and fees, excluding VAT). A summary of the anticipated costs for water resource development and bulk water supply infrastructure over the next 12 to 15 years is given in the table below: Raw water pipelines Additional WTP capacity Bulk system pipelines Additional pump capacity Additional storage capacity Miscellaneous other items Sub-Total Water Resource Development Costs (for 6 years only) Total : : : : : : R 47,4 million R 140,2 million R 648,2 million R 34,4 million R 213,0 million R 29,8 million R 1 154,3 million : R 115,0 million R 1 269,3 million The three year CCT bulk water capital expenditure program is also attached GO TO. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 11 7.2.2 Wastewater The Bulk Infrastructure Program GO TO summarises the future sewer infrastructure requirements to meet the future growth, but also to adhere to DWAF’s new effluent standard requirements to be implemented by 2010. The total cost of upgrading is estimated at 1.5 billion over the next 10 years, with 66% of this capital required for upgrading of the Athlone, Milnerton and Zandvliet wastewater works. Although it is estimated that the annual expenditure required is in the order of R145 million, it is preferred that this programme be implemented over a shorter period due to the current condition of infrastructure and the requirement for increased capacity. Therefore an expenditure of more than R100 million per annum over the next four years is required. For more information refer to the 3 year capex program GO TO. Strategic Bulk Wastewater Study: The Strategic Bulk Wastewater Study (1999) assessed the performance of existing wastewater equipment, processes and management systems and identified where improvements were necessary for more effective performance. In addition the development predicted to take place in the CMA over the next 20 years, identified the need for facilities to be extended or new ones to be put in place. The comprehensive (37 volumes) Strategic Report on Bulk Wastewater requirements over the next 20 years forms the basis of guidance for effective planning of conveyance and treatment of wastewater in the CMA. The basis of the study included the following issues: • Catchment analysis • Performance of existing facilities • Expected growth in the CMA over the next 20 years • Strategic planning and prioritisation • Environmental impacts • Effluent re-use • Sludge management • Rationalisation of wastewater facilities • Odour control • Tariff calculation and funding requirements For more information concerning the study refer to the synopsis of the strategic study in the document entitled “Strategic Evaluation of Bulk Wastewater” (Contact the CMC Administration ) WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 12 Cape Wastewater Consultants were appointed on 27/9/2001 to undertake additional investigations into various factors that could influence the recommendations contained in the Bulk Wastewater Study completed in 1999. The following aspects are going to be considered in greater detail: • Water Demand Management • HIV/Aids • Effluent Standards on design approach • Rationalisation • Evaluation of capital requirements • Estimated Planning Horizon • Infiltration For more detailed description of the above-mentioned issues refer to the document entitled “Bulk Wastewater Infrastructure”. GO TO. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 7.1a Required Works for Future Bulk Water Supply System 13 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 7.1b Required Works for Future Bulk Water Supply System (Detail) 14 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 15 7.3 Overview of Proposed Expansion to Reticulation Infrastructure 7.3.1 Water The works required to ameliorate existing problems and to cater for growth in demand have been investigated in detail in the various master plans (refer to Table 7.1). Where no detail master plans were available the required works were based on the Capital Infrastructure Programs of the applicable Administrative Units. Only a brief summary of the required works is herewith provided based on the former MLC boundaries. More detailed information is available in the relevant master plans. An example of a water master plan as compiled for Helderberg (2001) is included in to indicate the available information. Blaauwberg: Apart from general upgrading required in the Milnerton-, Melkbos- and Atlantis zones, most of the future bulk infrastructure will be required to accommodate the large areas earmarked for residential development to the north of Table View. Bulk supply to this area is already limited and these future areas would not only require major upgrading of the CMC bulk water system, but would also require a new bulk connection, feeder main and proposed reservoir at Contermanskloof (2 x 25 Ml) and an extension of the water network to provide water to small holdings. Cape Town: Most of the available land in the former Cape Town area has already been developed, which implies that no major bulk infrastructure will be required in future. However, since many of the pipelines are more than a 100 years old, most of the capital expenditure is required for the replacement of aging infrastructure. Currently approximately 12km of pipeline is replaced each year, which is inadequate when considering that there are more than 2000 km of pipeline in this area which equates to a replacement period of more than 150 years. Helderberg: Most of the future works are required to accommodate the large areas earmarked for future development in the Sir Lowry’s Pass and Gordons Bay areas. Works include new reservoirs and pumping stations for the high lying areas in Sir Lowry’s Pass and Sweetwaters. Other works include reinforcements to the bulk supply system in Somerset West and Gordons Bay and four new CMC connections. (Refer to Figure 7.2 and Table 7.2 under Helderberg heading). WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 16 Tygerberg: Apart from the capital projects required to replace and upgrade existing infrastructure, a number of additional projects have been identified for the short term and medium term including the upgrading of the Eksteen and Old Oak pumping stations, the removal of mid-block pipes in Bishop Lavis, provision of water to small holdings (Westerdale), Silverboom rising main, a new 400 mm main in Avonwood Road. The high growth in and around Durbanville demand a new bulk connection, bulk pipelines, a new pumpstation and a reservoir. Additional bulk connections and pipelines are installed for developments in Delft and Mfuleni. Oostenberg: The Oostenberg water supply system is generally sufficient to meet the current water demand. Large areas have been earmarked for development mainly north of Kraaifontein (Langeberg), east of Kuils River (Zevenwacht, Hazendal) and in the open areas surrounding Blue Downs. Apart from the bulk facilities to service these areas, a number of existing pumping stations and feeder mains would require upgrading including the Bloekombos, De Novo, Langeberg and Kuils River systems. Various pumpstations require upgradings to supply high growth areas. Storage requirements are generally sufficient to meet the future water demand, but needs to be confirmed through the Water Master Plan currently being compiled. It is anticipated that additional storage will be required at the Andrag reservoirs as well as a new reservoir site to serve future areas north of Blackheath near the Stellenbosch Arterial. South Peninsula: Apart from general renovations no significant upgrading of the pumping stations are required. Additional storage is required at a number of reservoir locations of which the most significant are Houtbay (6.5 Ml), Wynberg (40 Ml) and Brakkloof (14.5 Ml). New bulk supply pipelines are also required in a number of places including Pelikan Park, Vrygrond and Westlake. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 7.2 Example Water Master Plan: Helderberg Administration 17 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 18 Table 7.2 Example: Water Master Plan of Helderberg AdministrationProposed Projects WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 19 7.3.2 Wastewater The works required to ameliorate existing problems and to cater for growth in demand have been investigated in detail in the various master plans (refer to Table 7.1). Where no detail master plans were available the required works were based on the Capital Infrastructure Programs of the applicable Administrative Units. Only a brief summary of the required works is herewith provided based on the former MLC boundaries. More detailed information is available in the relevant master plans. An example of a sewer master plan as compiled for Helderberg (2001) is included in to indicate the available information. Blaauwberg: As previously discussed, the almost 3000 ha residential land earmarked for development north of Table View west of the N7 will require major bulk sanitation infrastructure. Apart from the 5 new sewage pumping stations required at Doornbach, Dunoon, Railway Bridge, Blaauwberg Bridge and Witzands, the existing Sandown pumping station will also require upgrading. A new outfall sewer is required for the Parklands development, while new collector mains would be required in a number of places including Beach Boulevard, Du Noon, Surringdale, Diep River and Witzand. The Postdam wastewater works would also require upgrading. Cape Town: The available land in the Cape Town area is almost fully developed, which implies that no major new bulk sewerage infrastructure is required. However, since many of the systems are older than 100 years, most of the capital investment is required for the replacement of old collapsing sewers, especially pitch fibre pipes. Ad hoc Closed Circuit Television (CCTV) inspections are important to determine the condition of sewers. A network will be installed in industrial areas where septic tanks are still in operation. Helderberg: The capacity of the sewer reticulation system is generally adequate to accommodate the future developments. The Gordons Bay drainage area requires new outfall sewers to accommodate the future development areas to the northeast. The Strand/Sir Lowry’s Pass drainage area requires a new “cut-off” outfall along the N2-route to link up with the rehabilitated Gants sewer line. The Somerset West A- and B- Stream drainage areas require new outfall sewers to eliminate existing pumping stations. The Macassar drainage area requires two new outfall sewers, pumping stations and rising mains to enhance the level of service in the Sandvlei and Kramat area. (Refer to Figure 7.3and Table 7.3). WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 20 Tygerberg: Apart from the replacement and upgrading of existing sewerage infrastructure a number of short term projects have been identified including new outfall sewers for Durbanville (Trunk sewer - Phase 4), Bishop Lavis and Parow. A number of Vitro/Glaze sewers will also be upgraded in Bishop Lavis and Ravensmead. A comprehensive project to replace approximately 400Km of pitch fibre pipe over a 10 year period, started recently. Oostenberg: There are a few areas in Oostenberg where the bulk sewer reticulation systems require upgrading including a new outfall sewer along Saxdowne Road and the upgrading of the Kuilsriver Outfall to accommodate areas earmarked for development in the Hazendal/Zevenwacht areas, while an the Brackenfell outfall sewer (along Old Paarl Rd) also requires upgrading. The high stormwater infiltration in Kraaifontein also needs to be addressed. South Peninsula: There are approximately 3000 septic tanks in operation in the South Peninsula area. These systems, such as in Scarborough, was initially planned for smaller developments, but as the density of septic tanks increased so did the potential for groundwater pollution. Plans are in place to upgrade the Scarborough and Noordhoek septic tank systems to smallbore or waterborne systems. Bulk sanitation services are also required in Westlake, Pelican Park and Vrygrond, while many of the existing pumping stations will require upgrading including Raapkraal, Retreat, Rondevlei, Clifton, Glen Cairn and Fishhoek which includes the installation of telemetry systems, variable speed pumps and the installation of engine driven pumps. Reticulation is required in a number of new developments including Zeekoeivlei Phase 3, Kommetjie, Houtbay Stage 2 and in the informal areas of Imizamo Yethu. The rehabilitation of pitch fibre pipes is also required in a number of places. 7.3.3 Summary of Capital Expenditure on Bulk Reticulation It is difficult to determine the future long-term capital requirements for water and wastewater reticulation infrastructure. This is partly because not all the areas have master plans (refer to Table 7.1), which makes it difficult to determine the impact of growth and future developments on existing water and sewerage systems. For the purposes of the WSDP only the short-term capital requirements are herewith reflected as based on the recent budget exercise for 2002/2003, i.e. R80 mil on the Water Account GO TO and R101 mil on the Sewerage Account GO TO. Figures for the 2003/2004 and 2004/2005 financial years have also been calculated, but only reflects the additional capital requirement of currently identified (for 2002/2003) projects. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 7.3 Example Sewer Master Plan: Helderberg Administration 21 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 22 Table 7.3 Example: Sewer Master Plan of Helderberg AdministrationProposed Projects