Water Services Development Plan of City of Cape Town Status: Comprehensive WSDP www.capetown.gov.za/water/wsdp December 2001 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN i Table of Contents TABLE OF CONTENTS ........................................................... I LIST OF TABLES ............................................................... IV LIST OF FIGURES ............................................................... V LIST OF ABBREVIATIONS .................................................... VI EXECUTIVE SUMMARY ........................................................ VII MAIN REPORT.....................................................................1 1 INTRODUCTION ..............................................................2 1.1 1.2 1.3 1.4 1.5 1.6 2 PURPOSE OF THE WSDP ........................................................................................... 2 DRAFTING TEAM ....................................................................................................... 3 STATUS OF WSDP AND PROGRAM .......................................................................... 3 PROCESS ..................................................................................................................... 3 LINK TO INTEGRATED DEVELOPMENT PLAN (IDP) ................................................ 4 ACCURACY OF INFORMATION .................................................................................. 5 SETTING THE SCENE........................................................6 2.1 PHYSICAL DESCRIPTION OF THE AREA SERVED ...................................................... 6 2.2 POLITICAL CONTEXT OF EXISTING WATER AND WASTEWATER SUPPLY SITUATION........................................................................................................................... 7 3 CUSTOMER PROFILE AND SERVICE LEVELS ............................ 11 3.1 CURRENT CUSTOMER PROFILE................................................................................. 11 3.2 3.3 FUTURE CUSTOMER PROFILE .................................................................................. 12 SERVICE LEVELS ...................................................................................................... 19 3.1.1 3.1.2 3.1.3 3.1.4 Population..........................................................................................................11 Economic Profile..............................................................................................11 Income distribution........................................................................................11 Current Number of Consumers................................................................... 12 3.3.1 3.3.2 Current Service Levels................................................................................. 19 Future Service Level Strategy................................................................... 21 3.4 CUSTOMER AND REVENUE MANAGEMENT .............................................................22 3.5 WATER BYLAWS ......................................................................................................25 3.6 OBLIGATIONS OF THE WATER SERVICES AUTHORITY TO PROVIDE WATER SERVICES ............................................................................................................................25 4 WATER BALANCE, RESOURCE PLANNING AND MANAGEMENT ...... 35 4.1 WATER BALANCE .....................................................................................................35 4.1.1 4.1.2 Water Resources ...........................................................................................35 Groundwater ...................................................................................................35 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 4.1.3 4.1.4 4.1.5 4.1.6 4.1.7 Surface Water...............................................................................................36 The Skuifraam Scheme and Other Future Water Resource Schemes 37 Current and Future Water Demands ........................................................37 Effluent Returned to Source......................................................................38 Unaccounted-for-water (UAW) Analysis .................................................38 4.2.1 4.2.2 Background...................................................................................................... 41 Discussion and results of the IWRP Study ............................................. 41 4.2 INTEGRATED WATER RESOURCE PLANNING ........................................................ 41 4.3 4.4 4.5 WATER DEMAND MANAGEMENT (WDM) .............................................................45 WATER RESTRICTIONS ..........................................................................................46 RE-USE OF TREATED WASTEWATER EFFLUENT...................................................47 DESCRIPTION OF EXISTING WATER SERVICES INFRASTRUCTURE48 5 5.1 5.2 5.3 5.4 6 ii GENERAL DESCRIPTION OF EXISTING WATER SUPPLY INFRASTRUCTURE .......49 GENERAL DESCRIPTION OF EXISTING WASTEWATER INFRASTRUCTURE ........49 ASSET MANAGEMENT .............................................................................................49 STORMWATER INGRESS INTO SEWERS................................................................50 ENVIRONMENTAL ISSUES ................................................ 54 6.1 ENVIRONMENTAL MANAGEMENT INITIATIVES ..................................................54 6.2 WATER CONSERVATION AND QUALITY ISSUES .................................................56 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 Introduction ...................................................................................................54 State of the Environment Report..............................................................54 Environmental Conservation Act ................................................................54 Environmental Management Plan ................................................................55 Integrated Metropolitan Environmental Policy ......................................56 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.2.7 Quality of Raw water resources ................................................................56 Potable Water Quality Monitoring ............................................................57 Implementation of Fluoridation Regulations ...........................................57 Treated sewage effluent released into Urban River systems ............57 Impact of Industrial Consumers and Potential Pollution Sources......58 Removal of Alien Vegetation .......................................................................58 Atlantis Aquifers...........................................................................................58 6.4.1 6.4.2 6.4.3 The Occupational Health and Safety Act................................................64 National Water Act ......................................................................................65 Water Services Act......................................................................................65 6.3 STORMWATER MANAGEMENT (INCORPORATING CATCHMENT & RIVER MANAGEMENT) ...................................................................................................................58 6.4 RELATED ACTS .........................................................................................................64 7 FUTURE INFRASTRUCTURE REQUIREMENTS........................... 66 7.1 7.2 STATUS OF EXISTING MASTER PLANS ................................................................66 OVERVIEW OF PROPOSED EXPANSION TO BULK INFRASTRUCTURE .................67 7.2.1 7.2.2 Bulk Water ......................................................................................................67 Wastewater ....................................................................................................70 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 7.3 iii OVERVIEW OF PROPOSED EXPANSION TO RETICULATION INFRASTRUCTURE .74 7.3.1 7.3.2 7.3.3 Water ...............................................................................................................74 Wastewater ....................................................................................................78 Summary of Capital Expenditure on Bulk Reticulation..........................79 FINANCIAL ASPECTS ..................................................... 82 8 8.1 8.2 8.3 8.4 INTRODUCTION .......................................................................................................82 INSTITUTIONAL REFORM .......................................................................................82 FINANCIAL PLANNING IN THE CONTEXT OF UNCERTAINTY ...............................85 FINANCIAL MODELLING – APPROACH AND OUTCOMES ........................................87 8.5 AFFORDABILITY ......................................................................................................93 8.6 SUMMARY OF STRATEGIC ISSUES .........................................................................98 8.4.1 8.4.2 8.4.3 8.4.4 8.4.5 8.4.6 8.4.7 Approach to financial modelling .................................................................87 Capital expenditure .......................................................................................87 Financing ..........................................................................................................89 Customer Debt ...............................................................................................90 Provision for depreciation ...........................................................................90 Operating costs..............................................................................................90 Tariffs .............................................................................................................92 8.5.1 8.5.2 8.5.3 8.5.4 8.5.5 groups 8.5.6 Introduction ...................................................................................................93 Package of services and affordability ......................................................93 Household income profile.............................................................................94 Water bills and affordability .....................................................................95 The view from the ground – insights from case studies and focus 96 Conclusions ......................................................................................................97 9 SUMMARY OF KEY ISSUES AFFECTING WATER SERVICES AND STRATEGIC RECOMMENDATIONS........................................... 100 10 BUSINESS PLANS AND KEY PERFORMANCE INDICATORS ........ 102 WATER SERVICES BUSINESS PLAN 2001/2002 - 8 OCTOBER 2001 ................. 102 SERVICES DEFINITION ............................................................................................................102 OUR STRATEGIC OBJECTIVES ....................................................................................................102 RESOURCES............................................................................................................................102 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN iv List of Tables Table 3.1 Informal Consumers with no access to basic water services .................20 Table 3.2 Service Level Categories ................................................................................20 Table 3.3 Service Levels of Informal Areas ................................................................26 Table 4.1 Groundwater Resources ...................................................................................35 Table 5.1 Summary of Infrastructure Inventory and Estimated Replacement Cost at September 2001 ........................................................................................... 51 Table 6.1: Performance indicators and tragets............................................................64 Table 7.1 Current Status of Master Plans ....................................................................66 Table 7.2 Example: Water Master Plan of Helderberg Administration-Proposed Projects .........................................................................................................................77 Table 7.3 Example: Sewer Master Plan of Helderberg Administration-Proposed Projects ......................................................................................................................... 81 Table 9.1 Summary of Key Strategic Issues, Strategies and Programme........... 101 Table 10.1 Water Services Business Plan ....................................................................102 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN v List of Figures Figure 2.1 Locality Plan......................................................................................................... 9 Figure 2.2 Changes in Administrative Boundaries ....................................................... 10 Figure 3.1 Population Distribution (1996 census)......................................................... 14 Figure 3.2 Income Distribution (1996 census) ............................................................. 15 Figure 3.3 Existing Land Use and Potential Future Development Areas................ 16 Figure 3.4: Population Projection..................................................................................... 17 Figure 3.5: Growth in Land Use (20 year planning period) ........................................ 18 Figure 3.6 Existing Water Service Level Distribution: 1996 Census......................28 Figure 3.7 Existing Sanitation Service Level Distribution: 1996 Census...............29 Figure 3.8 Location of Informal Areas ..........................................................................30 Figure 3.9 Location of Informal Areas Along the N2 Corridor near Cape Town International Airport (Detail) .................................................................................. 31 Figure 3.10 Service Levels of Former Helderberg MLC: Water..............................32 Figure 3.11 Service Levels of Former Helderberg MLC: Sanitation........................33 Figure 3.12: Water Services Customer Charter ..........................................................34 Figure 4.1 Existing Water Demand Distribution..........................................................39 Figure 4.2 Future Water Demand Projection based on Historic Trend .................39 Figure 4.3 Existing Water Supply Resources and Location of Potential Future Schemes ........................................................................................................................40 Figure 4.4 Impact of Packages 1+2 on Future Water Demand .................................43 Figure 4.5 Impact of Packages 1+2 on Future Water Demand (Overall) ...............44 Figure 4.6 Impact of Package 1-3 on Water Demand of Total Supply Area .........44 Figure 5.1 Main Components of Existing Water Distribution System ....................52 Figure 5.2 Wastewater Drainage Areas and Location of Treatment Works and Main Pumping Stations ...............................................................................................53 Figure 6.1 Major Stormwater Catchment Areas and Monitoring Points ................ 61 Figure 7.1a Required Works for Future Bulk Water Supply System ......................72 Figure 7.2 Example Water Master Plan: Helderberg Administration.....................76 Figure 7.3 Example Sewer Master Plan: Helderberg Administration .....................80 Figure 8.1 Forecast capital expenditure (2001 Rands)...............................................87 Figure 8.2 Operating costs - indicative scenario.........................................................92 Figure 8.3 Operating costs expressed as % .................................................................92 Figure 8.4 Household Income distribution (2001 rands) ...........................................94 Figure 8.5 Affordability of water services (current tariff) ....................................95 Figure 8.6 Affordability of water services (tariff doubled)....................................95 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN List of Abbreviations AADD AFU CCT CFA CMA CMC DM DWAF EIA GLS I&AP IDP IMEP IWRP MCDA MNF MLC PNE PDG UAW URV WC VIP WDM WSDP WTW WWTW Annual Average daily demand Automatic Flushing Urinal City of Cape Town Cape Flats Aquifer Cape Metropolitan Area Cape Metropolitan Council Demand Management Department of Water Affairs and Forestry Environmental Impact Assessment Geustyn Loubser Streicher Inc Interested and Affected Party Integrated Development Plan Integrated Metropolitan Environmental Policy Integrated Water Resource Planning Multi-Criteria Decision Analysis Minimum Night Flow Metropolitan Local Council Protected Natural Environment Palmer Development Group Unaccounted For Water Unit Reference Value Water Conservation Ventilated Improved Pit Latrine Water Demand Management Water Services Development Plan Water Treatment Works Wastewater Treatment Works vi WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN EXECUTIVE SUMMARY vii WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN viii Introduction: Purpose of the WSDP: With the publication of the Water Services Act 108 of 1997 GO TO all water services authorities (municipalities) are required to prepare a Water Services Development Plan (WSDP). In summary, the WSDP is a business plan setting out the way in which the water services authority plan and deliver services to individuals and businesses in its area of jurisdiction. It must also describe and analyse the current and future consumer profile, the type of services which are provided, the infrastructure requirements, a water balance, organisational and financial arrangements to be used, an assessment of the viability of the approach, and an overview of environmental issues. Following this analyses, important issues that may impact on the provision of effective and sustainable water and sanitation services need to be identified and strategies must be formulated to improve service provision. These strategic issues will form the basis for input into the Integrated Development Plan (IDP) process. The WSDP also serves as a monitoring tool for DWAF and provides important planning information to be included in a national database. Drafting Team and Process: The WSDP has been drafted with the assistance of Geustyn Loubser Streicher Inc (Technical Analysis), Palmer Development (Financial analysis) and various officials and managers of the City of Cape Town (CCT). A consultative process was followed to compile the plan through a series of workshops and through the circulation of the WSDP on CD, hardcopy and on the Internet at www.capetown.gov.za/water/wsdp (to be published in December 2001). Only the pertinent information and findings are included in this report. However, links have been provided to related information where applicable by “clicking” on the GO TO button, or follow the links to the internet for the latest information. Some of these links contain Adobe Acrobat (pdf) files. This free software can be downloaded from their website at: http://www.adobe.com/products/acrobat One of the requirements of the Act is to take the WSDP through a public participation process during which period the public, other stakeholders and water services authorities/providers can comment on the plan. It should thus be read in this context. Comments on this draft can be forwarded to Mr Michael Killick from CCT at mkillick@cmc.gov.za. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN ix Setting the Scene: Physical Description: The City of Cape Town which is one of the major metropolitan cities and tourist destinations in South Africa, is located in the Western Cape province and consists of an area of approximately 2 500 km2. For more information on the historical facts and physical attributes of CCT, go to http://www.cmc.gov.za/history.htm GO TO. Political Context of Existing Water and Wastewater Supply Situation: The CCT, like the rest of South Africa, has undergone significant changes in political structure over the last decade. Prior to December 2000, the area consisted of 6 Metropolitan Local Councils and the Cape Metropolitan Council (CMC) as the Bulk Water Services Provider. In December 2000, these councils were amalgamated as the CCT. The organizational and management structure of the CCT is currently in the process of transformation, but in the meantime the six former MLC’s are being managed as Administrative Units within the CCT, with the CMC still active as the administrative unit in charge of bulk services. Customer Profile and Service Levels: Demographics: The current population of the CCT is estimated at 3.2 mil with the highest population density occurring on the Cape Flats. HIV/Aids will have a significant impact on the population growth rate, i.e. it is estimated that the current growth rate of 3% will reduce to 1.2% by 2010. The economic growth rate was 2.6% during 1999-2000, which is slightly less than the current population growth rate, but greater than the national growth rate of 1,8%. Current and Future Consumer Profile: There are approximately 530 000 consumers on formal erven and approximately 90 000 consumers on informal sites. According to 1996 census approximately 67% of consumers earn less than R2500/month. For more details on the demographics, socio-economic profile including statistics on age, gender, race, migration patterns, employment etc. refer to: http://www.capetown.gov.za/reports GO TO http://www.cmc.gov.za/demographics.htm Future landuse analyses indicate that residential land (ha) will increase by 25%, business/commercial land by 125%, while vacant land will reduce by 70% over the next 20 years with the majority of development taking place in areas: WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN • • • • • x north of Tygerberg (Durbanville); north of Table View; north and south east of Oostenberg; north-east of Strand in Helderberg; west of Strand and Somerset West. Service Levels and Future Service Delivery Strategy: Service levels of existing formal developed areas (excluding rural areas and informal areas) generally meets the minimum standards as required by the Water Services Act, i.e. communal standpipe within 200 m walking distance and at least a ventilated improved pit latrine (VIP) or equivalent (container toilet, formalised black bucket, communal toilet or chemical toilet). It has been assumed that all formal consumers (households) are provided with adequate services. A recent survey (May 2001) on the informal households indicated that there are approximately 92 000 informal households of which the following do not have access to at least basic water services, mainly due to the fact that they occupy land illegally. “Ownership” Private “Council” Total No. of households % of informal households % of total no. of households No. of households % of informal households % of total no. of households No. of households % of informal households % of total no. of households Water 10 500 11.4% 1.7% 7 600 8.4% 1.2% 18 100 20% 2.9% Sanitation 16 000 17% 2.5% 37 100 41% 6% 53 100 57.7% 8.5% The CCT is committed to providing efficient, uninterrupted and affordable services, which is clean and safe to all consumers. CCT is therefore in the process of implementing the ISO 9001 Quality Management System to improve communication with consumers, revenue collection and quality management. As part of this process, the CCT has established a Customer Charter GO TO ,which have been advertised in public papers on 7 September 2001. The CCT has also identified the need to establish a “Customer Revenue Division” to improve service delivery. One of the key issues identified in the WSDP was the need to compile a service delivery strategy to address the current backlog of consumers with inadequate water services. This process has however started through preliminary discussions and workshops during which it became apparent that the most likely service level strategy would be to provide all consumers with access to standpipes and communal (container) toilets taking cognisance of land ownership, the financial and environmental constraints. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xi Water Balance, Resource Planning and Management: Current Water Balance: The current water balance, demand, unaccounted-for-water (UAW) and the effluent discharged from wastewater treatment works is summarised below: Current Water Demand of the CCT Bulk Water Consumption Total = 851 Ml/d Total = 910 Ml/d Paarl 5.1% (47 UAW Ml/d) 23% (198 Ml/d) Wellington Rural & Other 1.2% (11 Ml/d) 0.5% (0.5 Ml/d) Large Users 14% (123 Ml/d) CCT Total Other 5% (41 Ml/d) Industrial Bus./Comm. 4% (38 Ml/d) 5% (41 Ml/d) incl. Bulk Residential Losses 49% (410 Ml/d) 93% (851 Ml/d) 62% Future Water Demand: Effluent 528 Ml/d The historic trend in the water demand between 1973 and 1997 is shown in Figure 4.2. Based on this graph the estimated water demand would increase to between 1020 and 1200 Ml/d by 2006 by assuming the historic trend of 4%. The Integrated Water Resource Planning Study assumed that the future unconstrained growth rate for water demand would be 3%. This would translate to an estimated water demand of 1100 Ml/d by 2006. The implementation of the recommendations contained in the Integrated Water Resource Planning (IWRP) study, which include interalia pressure management, user education, elimination of automatic flushing urinals, leakage repair, tariffs, metering and credit control, could reduce this water demand to an estimated 940 Ml/d. The IWRP study is further discussed in section 4.2 of this report. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xii Existing Water Resources: One of the major issues facing CCT in the future is the limited water resources. This has been the cause, coupled with low rainfall figures for 1999/2000, that low-level water restrictions have been imposed in an effort to reduce the water demand. The CCT currently makes use of 5 large storage dams (Theewaterskloof, Voëlvlei, Wemmershoek, Steenbras Upper and Steenbras Lower) which has a total capacity of approximately 780 M m3 and a number of smaller dams (refer to Figure 4.3). These surface water resources are augmented from the Atlantis Aquifer borehole scheme and the Albion Spring. GO TO Integrated Water Resource Planning and Demand Management: Current resources cannot meet the 98% assurance supply level, which implies that the development of additional water resources is a matter of urgency. The CCT therefore commissioned an Integrated Water Resource Planning Study GO TO during which various alternatives to augment the water supply were investigated. Apart from the implementation of the Skuifraam Dam located in the Berg River near Franschhoek (estimated implementation date of 2006/2007), three logical “packages” have been identified including: Package 1: Pressure control, removal of automatic flushing urinals, user education, tariffs metering and credit control, leakage repair. Package 2: Private borehole, waterefficient fittings and grey water recycling. Package 3: Voëlvlei Augmentation Scheme, Table Mountain Group Aquifer pilot project. Emphasis was placed on strategies that can be implemented swiftly in order to reduce the chances of having to impose water restrictions prior to the yield from the Skuifraam Dam becomming available. This study focussed on the identification of water demand management projects to reduce the water demand. Alternative water resources were also investigated and prioritised with the results indicating that the Voëlvlei Augmentation scheme should proceed, recycling of treated wastewater for local urban irrigation and industrial use, the Cape Flats aquifer, the Eerste River Diversion, treated wastewater reclaimed to potable standard, desalination of sea water and Lourens River Diversion. The Table Mountain Group aquifer located near Franshoek, has also been identified as a potential valuable water resource. It has been recommended that the potential yield and environmental impacts should be determined through a pilot study. Based on “Package 1 & 2”, the CCT has formulated and accepted a water demand management (WDM) policy and strategy with the main objectives as summarised below: WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xiii WDM • • • • Policy GO TO Equity, Sustainability and Affordability; Reduce the projected demand for water by 20% by the year 2010; Encourage, educate and promote the optimal use of water. Maximise the use of alternative sources such as wastewater effluent, boreholes etc; • Minimise the loss of water. WDM • • • • • • • • • Strategy GO TO: Identify “Champions” for WDM amongst Politicians; Raise the profile and priority of WDM; Prepare comprehensive Business Plans for each of the Water Divisions; Develop an appropriate Water Services Bylaw for optimal water usage; Leakage and waste management; Promote the optimal use of water by consumers; Remove and prohibit all Automatic Flushing Urinals; Minimize water losses in low-income housing; Continually optimise tariff structures, ensure universal metering and billing and a rate of payment which makes financial viability certain. • Maximize the use of alternative sources of water; • Make strong representations to the SABS to draft a National Performance Standard for water fittings, appliances and devices. For the Draft 5 year WDM Programme refer to the document entitled “WDM_Prog” GO TO . Description of Existing Water Services Infrastructure: A detailed description of the water services infrastructure is not pertinent to the WSDP. Only a summary of the existing infrastructure is herewith provided (Table 1). For a full inventory of the main infrastructure refer to the infrastructure database GO TO or the related documents “Bulk Water Supply Infrastructure” GO TO and “Bulk Wastewater Infrastructure” GO TO. The main components of the water and wastewater infrastructure are indicated on Figure 5.1 and Figure 5.2. Other issues that were identified are: • Inadequacy of current preventative maintenance / pipe replacement programs including the rehabilitation of pitch fibre sewers • Stormwater / groundwater infiltration in sewers Major bulk water and wastewater infrasructure requirements WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Water Supply Infrastructure No Quantity Water Treatment Reservoirs Pump Stations Pipe Length Major Storage Dams Sub Total Wastewater Infrastructure WW treatment works Pump Stations Pipe Length Sub Total Total 13 131 367 1672 Ml/d 3539 Ml Unknown 9058 km 780 Mm3 5 20 320 xiv Replacement Value Rm 697 887 234 5459 unknown 7277 620 Ml/d 190 kW 8549 km 620 536 2498 3655 10932 Environmental and Stormwater Management Issues: Environmental Acts and Standards: The CCT have implemented a number of initiatives including the State of the Environment Report http://www.cmc.gov.za/soe GO TO to monitor the environmental status, protect the environment and set standards in accordance with the relevant Acts and Regulations including: • National Environmental Management Act; • Water Services Act and associate Regulations passed under the Act; • Environmental Conservation Act; • The Occupational Health and Safety Act; • Water Act; and • CCT’s Integrated Metropolitan Environmental Policy (IMEP) The Water and Wastewater Departments of the former CMC have developed a protocol to determine whether their proposed capital projects would have any environmental impacts. This checklist is then discussed with the CMC’s Environmental Management Department. Other water conservation initiatives include the removal of alien vegetation in the catchment areas of the dams and an Environmental Management System (EMS) to protect the Atlantis Aquifer System. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xv Water Quality Issues: Potable water quality is strictly monitored/controlled by the Water Treatment Division according to SABS 241 (1984) and other standards. The Scientific Services Department conduct weekly visits to each WTP to retrieve various samples, analyse them and complete weekly reports based on the results. One of the major challenges pertaining to potable water quality is the implementation of fluoridation as imposed by regulations in terms of the Health Act 63 of 1977, which requires that potable water needs to be fluoridated to obtain a concentration of 0.7 mg/l for the purposes of reducing dental problems. Fluoridation is complex, expensive and a potentially hazardous undertaking and requires the implementation of new infrastructure by September 2003 at an estimated cost of R11 mil, since the natural concentration of fluoride in CCT’s water resources is insufficient. The running cost of fluoridation is estimated at R10mil per annum. Skilled operators are required to manage the fluoride concentration. Training of additional staff is required, since not enough skilled operators are available. For more details on fluoridation refer to a document tabled to the Trading Services Portfolio committee GO TO. Another major issue pertaining to water quality is the implementation of new treated effluent standards as imposed by DWAF. Wastewater treatment works would require upgrading with a total estimated cost of R1.5 billion in order to comply with these standards and to accommodate future growth. Stormwater Management (Incorporating Catchment and River Management): The various water related services such as water supply, sanitation and stormwater management are inextricably linked and greater emphasis will be placed within the foreseeable future in optimising and managing their interactions in keeping with the principles of Integrated Water Resource Management. These interactions include direct connectivity between systems in the case of sewer overflows, effluent discharges to watercourses forming the bulk drainage system and abstraction of water from surface and sub-surface resources within the metropolitan area. Whilst the Stormwater Management service currently falls within the Transport, Roads and Stormwater Department of the City of Cape Town, concerted efforts are being made to ensure close cooperation with Water Services for the benefit of the city’s residents and visitors. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xvi Over the past few decades rivers have been viewed as convenient drains to convey urban waste and storm runoff. They were canalised on a large scale and many wetland areas filled-in and drained to allow for urban development, dramatically altering the natural hydrological cycle. In retrospect, this approach has inadvertently also precipitated a decline in water quality and ecological integrity of the city’s rivers and vleis. A paradigm shift in the approach to stormwater management in Cape Town has developed over the past few years, based on the philosophy of integrated catchment management. Within the metropolitan area, this was pioneered by the former Cape Metropolitan Council. A Catchment Management Department (CMD) established in 1996 was tasked with promoting ‘best practice’ in the management of urban rivers, wetlands, vleis and major stormwater infrastructure in partnership with the previous metropolitan local councils. A draft strategy has been formulated with the core functions as illustrated in the figure below. The major river systems and associated catchment areas within the metropolitan area are illustrated by Figure 6.1. DETAILED BUSINESS PLANS STRATEGY NUCLEUS SERVICE OUTCOMES Managed Flood Risks Improved Water Quality Protected River Corridors In an effort to rise to these challenges, a detailed strategy comprising various priority programmes to be implemented over the next five years has recently been formulated. A draft copy is attached GO TO. This strategy provides a comprehensive framework to guide management of stormwater systems for the sustained benefit of the city’s residents, business concerns and visitors alike. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xvii Various priority programmes comprising the strategy have been grouped under themes as follows: • Integrated Planning: • System Upgrading and Development: • Asset Management: • Regulation; and • Relationship Management For further information on the stormwater management service, refer to the website of the CDM at www.cmc.gov.za/w&w/CatchmentMgmt. Information of flood prone areas as well as associated draft development control guidelines are published at www.capetown.gov.za. Future Infrastructure Requirements: Status of Existing Master Plans: A survey on the status of existing master plans indicated that not all the former administrations have a comprehensive water and sewer master plan. Overview of Proposed Expansion to Bulk Infrastructure: Water: A detailed study on the bulk water supply system entitled “Computer Model Analysis and Master Plan for Bulk Water Supply System” (March 2001) was recently performed by GLS and Ninham Shand to determine the future infrastructure requirements, phasing and costs based on a future AADD of 1850 Ml/d which will be realised in 25 years time (double the current demand). GO TO. Three options, taking cognisance of the availability of alternative water resources have been considered, namely: 1) Option 1: Installation of 500 Ml/d additional water treatment capacity at the existing Faure WTP 2) Option 2: Installation of 140 Ml/d additional treatment capacity at Wemmershoek WTP and an additional 360 Ml/d treatment capacity at the existing Faure WTP 3) Option 3: Installation of a new 500 Ml/d WTP at a site near the proposed Skuifraam Dam Although the options still require further investigation, Option 3 at this stage is the preferred option for the following reasons: • A new WTP in the vicinity of Skuifraam Dam will reduce the reliance which the CCT currently places on the RSE Tunnel System (security of supply) • A WTP near Skuifraam Dam and associated pipework could cater for the growing water demands of Paarl and Wellington and make available currently under-utilised capacity in the existing pipeline from the Wemmershoek WTP. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN • • • • xviii The WTP could feed the areas of high growth (ie Durbanville North) directly. It would provide an alternate source of supply to Glen Garry Reservoir and enable the Wemmershoek WTP to be shut down for repairs or maintenance. Water from some of the sources could be gravitated to Glen Garry Reservoir (as opposed to Option 1 where all the water would have to be pumped to Glen Garry) Increased flexibility in the bulk supply system A summary of the anticipated costs for water resource development and bulk water supply infrastructure over the next 12 to 15 years is given in the table below: Raw water pipelines Additional WTP capacity Bulk system pipelines Additional pump capacity Additional storage capacity Miscellaneous other items Sub-Total Water Resource Development Costs (for 6 years only) Total : : : : : : R 47,4 million R 140,2 million R 648,2 million R 34,4 million R 213,0 million R 29,8 million R 1 154,3 million : R 115,0 million R 1 269,3 million The three year CCT bulk water capital expenditure program is also attached GO TO . Wastewater: The Bulk Infrastructure Program GO TO summarises the future sewer infrastructure requirements to meet the future growth, but also to adhere to DWAF’s new effluent standard requirements to be implemented by 2010. The total cost of upgrading is estimated at 1.5 billion over the next 10 years, with 66% of this capital required for upgrading of the Athlone, Milnerton and Zandvliet wastewater works. Although it is estimated that the annual expenditure required is in the order of R145 million, it is preferred that this programme be implemented over a shorter period due to the current condition of infrastructure and the requirement for increased capacity. Therefore an expenditure of more than R100 million per annum over the next four years is required. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xix Financial and Institutional Aspects: The following section deals with the financial and institutional challenges facing the CCT. For more details on the current tariffs and policies refer to the following documentation: GO TO Sanitation Tariffs GO TO Bulk Water and Reticulation Tariffs GO TO Bulk Water Tariff Policy GO TO Consumptive Water Tariff Policy GO TO Sanitation Tariff Policy GO TO 2001/2002 Capital Budget for Water Services The challenges of institutional reform: The City of Cape Town faces significant challenges to transform water services into a world class water services provider which is customer friendly, efficient and sustainable. These challenges include the formation of a single operational entity, providing adequate services to informal settlements, undertaking a very significant capital investment programme, and improving operational efficiencies, customer relations, revenue management and the management of assets. In a short space of time significant progress has been made, including the successful implementation of free basic water for all, the establishment of a customer charter and a recent decision to form a ring-fenced business unit. Nevertheless much remains to be done. In view of this context, the institutional and financial plan should be viewed more as a strategic document mapping the way ahead rather than a detailed plan with specific financial and tariff commitments. It is the intention of the city to separate the roles and responsibilities of the service authority and service provider more clearly as provided for in the Water Services Act (Act 108 of 1997). The details of this relationship still need to be worked out. An assessment carried out in terms of section 78 of the Municipal Systems Act indicated that “the best internal mechanism … is for the provider to be structured into an Autonomous Ring-fenced Business Unit.” In the context of the proposed restructuring of water services, the concept of a ring-fenced business unit is understood to mean the following: clearly defined and separate cost and income centres, clearly defined and substantiated cost allocations, full operating income statement in compliance with GAMAP, full asset register, full responsibility for long term asset management, full responsibility for income and for customer management. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xx At present, support services (such as finance, billing, information technology and human resources) are rendered by other departments in the city administration. Although ring-fencing as defined above would seem to imply that all of these support services should now be housed within the ring-fenced unit, this is not necessarily the case. The water services unit will need to embark on a process of negotiation with the “corporate centre” as to the best arrangements for the city as a whole for the allocation of these support functions. One option which will be explored is that of a “shared service centre”. The policies, strategies and details of these arrangements are being investigated by the city and it is too soon to report on likely outcomes from this process. An area delivery model is being developed for the city as a whole. The relationship between this and a ring-fenced water services unit is still in the process of being defined. The respective roles of the ring-fenced water business unit vis-à-vis other trading services, a “shared service centre” and the “corporate centre” for the interface between the Council and citizens/customers are still in the process of being defined. To enhance the world class status of the water services unit, it is the plan that bulk water and reticulation will achieve ISO 9002 accreditation by 30 June 2002 with the wastewater treatment plants following by 30 June 2003. Financial planning in the context of uncertainty: The water services development plan has identified the capital expenditure requirements over the next five to ten years. Detailed financial modelling has been undertaken to ascertain the implications of this capital expenditure for the sustainability and viability of the service. It is important to understand that any financing forecasts in the present context are subject to significant levels of uncertainty for the following reasons: There is considerable uncertainty related to the data requirements for financial modelling and forecasting in the following areas: the value of the assets, the true operating costs, water sales for the base year. There is uncertainty in the policy arena in the following key areas: sanitation tariff policy and the detailed implications of the introduction of GAMAP as well as the practical issues of moving from the present system of municipal accounting to GAMAP. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xxi The water services is in the process of fundamental transformation. Many of the broad issues related to this reform still need to be defined and strategies chosen. Key uncertainties relate to the future of support services and the management of the customer interface, including revenue collection and debt management. Investment requirements: The capital expenditure needs is in excess of R2 billion over the next 5 years. This is likely to require significant increases in tariffs in real terms in order to ensure the financial viability and sustainability of the service. The following strategic issues have been identified: All existing formal houses have adequate water and sanitation services but the planned provision of formal houses is inadequate to reduce the housing backlog. Provision of basic services to households living in informal housing is expected to require an expenditure of about R5 million per annum. (There are approximately 18 100 households without adequate water services and 53 100 households without adequate sanitation services at present.) The City intends to provide at least basic water and sanitation services to all households within the City subject to legal constraints (many informal settlements are situated on private land). The actual investment requirement is subject to change due to the dynamic nature of informal settlements – with changes in location and anticipated growth in informal settlements due to the housing backlog. A realist programme for the renewal of existing assets needs to be investigated and developed. The bulk wastewater capital expenditure estimates are subject to a strategic review which is currently in progress, addressing the impact of the DWAF 2010 standards, stormwater ingress and growth in wastewater effluent. Financing of the investment programme: The current average cost of existing capital debt is estimated to be 15.5% per annum, which is high relative to the current market interest rates (one could expect the cost of borrowing for a well run and financially viable metropolitan water utility to be in the region of prime to prime less 2). Total outstanding debt is estimated to be R1.2 billion representing a debt to equity ratio of 0.14 (assuming a revalued asset value of R10 billion). This indicates that water services is considerable under-geared at present. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xxii The ring-fencing of the water service operations creates an opportunity for the business to develop a new financing strategy. This strategy should comprise the following: re-negotiation of outstanding loan conditions with the city to realise a more market-related interest rate, raising loans from banks at competitive interest rates, consideration of the placement of bonds for the raising of finance and consideration of private financing arrangements through, for example, build-operate-transfer contracts for lumpy investments such as new wastewater treatment plants. Financial implications of investment programme: Given the uncertainty in the base data, the policy uncertainty and institutional uncertainty, the detailed financial modelling undertaken should not be used to make commitments to financial and tariff targets. The financial analysis has revealed the following strategic issues: operating costs are likely to increase in future in real terms (though not significantly), the practical implications of GAMAP need to be investigated in more detail, the sanitation tariff policy needs to be finalised and implemented, tariffs will need to increase in real terms in the next few years though it is not possible to say by how much until many of the significant uncertainties identified above have been resolved. The affordability analysis shows that overall household affordability is constrained, that there are limits to the extent to which cross-subsidies are sustainable, and that it is not possible to increase tariffs significantly without addressing the issue of affordability, indigent policy and subsidies (including the equitable share) in a more systematic and considered manner than has been possible to date in the current context of institutional uncertainty. Tariffs: Future water and wastewater tariffs are dependent on a number of factors, including: sanitation tariff policy, level of capital expenditure, sources of finance and cost of capital, value of assets and depreciation policy, rate of collections and provision for bad debts and actual water sales. For the reasons already identified, a significant degree of uncertainty is attached to all of these factors. Therefore, it would be unwise to predict future water and wastewater tariffs into the future at this stage. Nevertheless, based on the detailed financial analysis undertaken to date using both “business as usual” and “strategic” financial models, and subject to the limitations already expressed, it may be concluded that it is highly likely that tariffs will need to increase in real terms significantly during the next three to five years in order to ensure that the water services unit is financial viable and sustainable. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN xxiii Improving customer and revenue management: Current water customer debt is about R460 million, representing 8 months of sales. Revenue collection needs to be improved and non-payment reduced. The following strategies have been identified: implementation of credit control policy, implementation of indigent policy, resolution of customer management responsibilities within Council, implementation of universal metering and billing, implementation of informative billing, improved customer education and improved accessibility of payment facilities. Summary of Key Issues Affecting Water Services and Strategic Recommendations A summary of the “issues” that influence the provision of water and sanitation services in the City of Cape Town area is herewith provided (refer to attached Table A). Strategic recommendations and a program are also proposed. Key Performance Indicators Affecting Water Services and Service Delivery City of Cape Town is in the process of implementing a number of important Key Performance Indicators (KPI’s) to improve and monitor service delivery in its area of jurisdiction (refer to attached Table B). WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN i Table A: Strategic Issues Affecting Water Services Delivery and Proposed Strategies WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN ii Table B: Provisional List of Key Performance Indicators (where available, base data still need to be inserted) WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Main Report 1 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 2 1 Introduction 1.1 Purpose of the WSDP With the publication of the Water Services Act 108 of 1997 all water services authorities are required to prepare a Water Services Development Plan (WSDP). The main objectives of the Act, as stated in Chapter 1, Section 2, ( http://www.gov.za/acts/97index.html ) are to provide for: GO TO (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) The right of access to basic water supply and the right to basic sanitation necessary to secure sufficient water and an environment not harmful to human health or well-being; The setting of national standards and norms and standards for tariffs in respect to water services; The preparation and adoption of water services development plans by water services authorities; A regulatory framework for water services institutions and water services intermediaries; The establishment and disestablishment of water boards and water services committees and their duties and powers; The monitoring of water services and intervention by the Minister or by the relevant Province; Financial assistance to water services institutions; The gathering of information in a national information system and distribution of that information; The accountability of water services providers; and The promotion of effective resource management and conservation. In summary, the WSDP is a business plan setting out the way in which the water services authority must plan and deliver services to individuals and businesses in its area of jurisdiction. It must also describe the current and future consumer profile, the type of services which are provided, the infrastructure requirements, a water balance, organisational and financial arrangements to be used, an assessment of the viability of the approach, and an overview of environmental issues. Following this analyses, important issues that may impact on the provision of effective and sustainable water and sanitation services need to be identified and strategies must be formulated to improve service provision. Apart from the above service provision objectives, the WSDP also serves as a monitoring tool for DWAF and provides important planning information to be included in a national database. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 3 1.2 Drafting Team The integrated WSDP was compiled by: Consultants Geustyn Loubser Streicher Inc: PO Box 814 Stellenbosch 7600 Tel no (021) 8800388 Dr Leon Geustyn, Mr Cobus Compion Palmer Development Group: PO Box 53123 Kenilworth 7745 Tel no. (021) 797 3660 Mr Ian Palmer; Mr Rolfe Eberhard Water Services Authority/Provider City of Cape Town (CCT) P.O. Box 16548 Vlaeberg 8018 Tel no (021) 487 2590 Mr Arne Singels, Mr Mike Killick 1.3 Status of WSDP and Program The WSDP’s of the 6 former Metropolitan Local Councils (MLC) and former bulk water services provider, the Cape Metropolitan Council (CMC), is integrated in a single WSDP to form the Comprehensive WSDP of the CCT. The program followed for the WSDP process is: December 1998 June 2000 December 2000 December 2001 to March 2002 March 2002 Interim WSDP CMC/MLC Advanced WSDP CMC 6x Draft WSDP MLC Draft Comprehensive WSDP to Council, DWAF & Public CCT Final Comprehensive WSDP to DWAF CCT 1.4 Process The process to compile a WSDP was based on Section 14 to 18 of the Water Services Act (Act 108 of 1997). The methodology adopted for the compilation of the WSDP was to consolidate the contents of the WSDP’s of the individual MLC’s previously submitted to DWAF, updating old information and making interpretations pertaining to the issues effecting the provision of water and sanitation services within the new CCT boundaries. A series of workshops held with various officials of the CCT formed the basis for the identification of issues and the formulation of future strategies. This WSDP, as submitted to the DWAF, consists of two components: i. A summary report with links to related studies, policies and data bases; ii. A WSDP website for presentation of report for purposes of the public participation process ( http://www.capetown.gov.za/water/wsdp ) The data spreadsheets as published by DWAF in a document entitled “Guidelines for Water Services Authorities – Draft July 2001” will be completed once the format and contents thereof have been finalised. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 4 The 2 components together represent the first phase of the comprehensive WSDP and will form the basis for further discussions and the public participation process. Proposals are made relating to many of the issues put forward here. These proposals may be accepted, modified or rejected, but consensus must ultimately be reached so that the plan can be finalised. A technical analysis has been performed by Geustyn Loubser Streicher Inc, which included an overview of infrastructure planning as based on the best available information contained in the water and sewer master plans. Financial planning has been based on a water services supply model (WSSM) and a sanitation services supply model (SSSM) as compiled by the Palmer Development Group. Information presented in this report has been included with the emphasis on the identification of issues effecting water and sanitation services provision. 1.5 Link to Integrated Development Plan (IDP) Issues and the relevant strategies identified in the WSDP would also form the input to the IDP, a collateral process that needs to be completed by March 2002. An Interim IDP has been compiled for the 2001/2002 financial year and provides information on the Vision, Priorities and Pledges of the CCT GO TO. • • • • • Vision of the City of Cape Town The City of Cape Town will build a partnership with its entire people to create a world-class city, which strives to improve the quality of life for all citizens. We will nurture our unique qualities and assets, such as our natural beauty of our region, our rich heritage and our exiting mix of cultures. To have a safe city that is clean, attractive to investors, welcoming to visitors and underpinned by a vibrant, growing economy. A well run democratic city, fully accountable to the people, that is corruption free, transparent in its activities and prudent in the management of its finances. To have a city where everyone has access to opportunity and feels at home in an open, tolerant environment. The City will be responsible to the needs of the citizen as a customer, and will deliver efficient and affordable services to all. Vision and Mission of Water Services Vision: “ your world class water services provider” Mission: “providing customers with quality, affordable and sustainable water services” WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 5 1.6 Accuracy of Information The data and information included in this report has been consolidated from various sources, which reports in detail on many of the issues required by the Act. For the purposes of this report not all details will be repeated, but references to these sources have been provided for further reading. Some of these sources are: • WSDP’s of the former MLC’s and the former CMC; • GIS Spatial database from the Information Services Department, CMC Administration; • Various Reports, including a report by GLS, “Alternative Options to meet the demand for Water in the CMA”; which formed part of the former CMC’s Integrated Water Resource Planning Study”’; • Master Plans of all administrations; • Central Statistics (1996 Census); • Information obtained from the 6 Administrations and the CMC Administration; • Various websites including the City of Cape Town’s (CCT) official website ( http://www.capetown.gov.za/ .) • Interim Integrated Development Plan (2001/2002) As expected, there are obvious differences in the accuracy and format of available information. Consolidating this data into a single compatible database requires a certain degree of interpolation and estimation. Therefore, the level of information contained in the WSDP should thus be read in this context. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 6 2 Setting the Scene Issues: • Impact of new municipal boundaries (16 sub councils) on water services 2.1 Physical Description of the area served The CCT is located in the Western Cape Province on the southeastern corner of South Africa as indicated on Figure 2.1. The total area is approximately 2474 km2 and its coastline is 371 km long. The area consists of varying topography which includes flat plains, hills and mountains. High mountains are located fairly close to the sea; e.g. Table Mountain which exceeds 1 000 m in elevation. Other high mountains on the perimeter include the Hottentots-Holland, Helderberg, Stellenbosch, Jonkershoek, Franschhoek, Wemmershoek, Du Toits, Paarl, Slanghoek, Limiet and Elandskloof mountains. These mountains form an eastern perimeter of mountains around the CCT, as shown on Figure 4.3. A major portion of the CCT consists of the area known as the Cape Flats, which has an elevation of between 20 and 45 m above sea level. Significant portions of the Administrations of Tygerberg, Helderberg, Cape Town and South Peninsula, are located on The Cape Flats. These areas are relatively low-lying and can be supplied from a portion of the bulk supply network which is linked to large reservoirs with top water levels at 110 m above sea level (a.s.l.). The mountainside developments in Helderberg, Cape Town and South Peninsula, the hilly development in the north of Oostenberg and Tygerberg, and the Atlantis area in the north of Blaauwberg are at elevations which are too high to be supplied from the 110 m a.s.l. reservoirs. Very few areas with water demand are located at elevations higher than 200 m asl. The rivers in the CCT are relatively small. Some rivers worth mentioning are the Salt-, the Diep-, the Black-, the Eerste-, Kuils-, Moddergat- and Lourens rivers. The rivers which are utilised as water sources lie mostly outside of the CCT. These are the Berg- (including its Wolwekloof and Banhoek tributaries), Sonderend-, Eerste-, Palmiet-, Klein Berg- and Leeu rivers. Of these, the Berg river which flows in a northerly and later westerly direction, is by far the largest. The major dams from which the CCT is supplied are situated outside (except for the Steenbras Upper and the Steenbras Lower Dams) the mountainous eastern perimeter of the area. The Theewaterskloof dam near Villiersdorp is the major water source of the CCT and forms part of a large inter-basin water transfer scheme that regulates the flow from the Sonderend-, Berg- and Eerste rivers. The Voëlvlei dam is the furthest north near Gouda and relies on diversion works WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 7 in the Klein Berg, Leeu and 24 rivers for its water supply. The Wemmershoek dam is situated in the mountains near Franschhoek and is supplied from various small rivers in the Wemmershoek mountains (e.g. Tierkloof- and Olifants rivers). The Steenbras Upper dam and Steenbras Lower dam are situated in the Hottentots-Holland mountain range near Gordon’s Bay, and serve a dual purpose of providing an upper reservoir for the Steenbras Pumped Storage Scheme and for supplying water for domestic/industrial use to the CMA. Other smaller dams include the dams on Table Mountain (Woodhead, De Villiers, Hely Hutchinson, Victoria and Alexandra) which are used to supply water to Cape Town and South Peninsula, and the dams at Simons Town (Kleinplaas and Lewis Gay) which provide water to South Peninsula. Cape Town has a mean annual rainfall of 515mm/annum and an average temperature of 16.7 °C. The CMA is a winter rainfall area. The meteorological depressions that typically bring rain to this area during winter move past to the south of the area (and the land mass) during summer; resulting in long dry spells. It is during the dry summer that the water demands are highest, due to the higher temperatures and the fact that watering of gardens is the norm in almost all residential areas. This contrast complicates the management of a bulk water supply system, as sufficient run-off needs to be stored during winter in order to meet the increased water demand in the hot and dry summer months. Further information on the physical attributes of the area, the history, main features and attractions are presented on the CCT’s website at: http://www.cmc.gov.za/history.htm. GO TO 2.2 Political Context of Existing Water and Wastewater Supply Situation The CCT, like the rest of South Africa, has undergone some significant changes in political structure over the last decade. Prior to 1994, the area consisted of a large number of smaller municipalities, or councils. The dominant municipality was the Cape Town City Council (CCC), which at the time also owned and operated the bulk water supply system. Outside of the CCC area, the bulk supply system and the secondary distribution systems of the various municipalities were separated, with metered bulk off-takes used by the CCC for billing purposes. Within the CCC area however, the bulk- and secondary systems were integrated, since all the consumers were billed directly by the CCC. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 8 With the political changes in 1994, the smaller municipalities in the CMA were amalgamated into 6 Metropolitan Local Councils (MLC’s), with the Cape Metropolitan Council (CMC) as a regional local authority in charge of bulk services, such as the bulk water supply system (refer to Figure 2.2). This prompted a separation of the bulk- and secondary systems in the old CCC area. In December 2000, the unified CCT was formed, by the amalgamation of the six former MLC’s and the former CMC. The organizational and management structure of the CCT is currently in transformation, but in the meantime the six former MLC’s are being managed as Administrative Units within the City of Cape Town, with the CMC still active as the administrative unit in charge of bulk services. The relationship of a regional authority CMC selling water to MLC’s does not exist now in the CCT. The CMC Administration of the CCT now operates the bulk water supply system, and supplies water in bulk to the six Area Administrations, who distribute the water to the end users. The Boland, West Coast and Drakenstein Municipalities (incl the towns of Paarl, Wellington, Stellenbosch and some of the surrounding farms) located outside the CCT area also purchase water in bulk from the CCT. Raw water is treated at water treatment plants which are operated by the CMC Administration, from where it is distributed via a network of large diameter pipelines and reservoirs to the six area administrations. The bulk networks are operated by the CMC Administration up to the metered connection points of the area administrations. Downstream of the meters, the secondary distribution networks generally are operated by the area administrations. A model of 16 new sub-councils has been proposed for the City of Cape Town (refer to Figure 2.2). For the purposes of the WSDP, the former MLC boundaries have only been applied insofar it effects the provision of water and sanitation services. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 2.1 Locality Plan 9 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 2.2 Changes in Administrative Boundaries 10 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 11 3 Customer Profile and Service Levels Issues: • Monitor the impact of HIV/Aids and migration on population growth rate • Take cognisance of major future land development growth points • Improve Customer Management • Water Services Delivery backlog in informal areas including a service delivery strategy • Water Bylaws for the CCT 3.1 Current Customer Profile The following section briefly describes the demographic and economic profile of the CCT. For more information refer to the data spreadsheets “CITYofCAPETOWN- Data.pdf” GO TO. 3.1.1 Population The population has been estimated at 2,6 mil according to the 1996 census survey with a distribution as indicated in Figure 3.1. Current estimates according to the Draft WC Urbanisation Policy and the Metro Transport Plan varies from 2.85 mil to 3.42 mil. For more details on the socio-economic profile including statistics on age, gender, race, migration patterns, employment etc. refer to a report as compiled by the Cape Metropolitan Council (CMC): http://www.capetown.gov.za/reports GO TO 3.1.2 Economic Profile The economic growth rate was 2,6% during 1991-2000 compared to the national economic growth rate of 1,8% for the same period. Also, the City of Cape Town (CCT) contributed 11% to South Africa’s gross domestic product, which included R86 billion in goods and services produced in 2000. For more detail on the economic profile refer to: http://www.capetown.gov.za/reports GO TO 3.1.3 Income distribution Key to the affordability of any investment programme is the income profile of the consumers it is to serve. If services are provided to consumers who cannot afford (or are not willing) to pay for them, then a problem of non-payment is likely to arise and the financial viability of the service provider will be placed in jeopardy. The income distribution as based on the 1996 census data indicated on Figure 3.2. In an effort to address the affordability issue, the CCT provides the first 6 kl/month free of charge to all consumers as based on the Free Water Policy GO TO. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 12 3.1.4 Current Number of Consumers The number of consumer units in the areas that make up the CCT as assimilated from an analysis of the various Administration Unit’s treasury data records (refer to report IWRP Report: Alternative Options to meet the Demand for Water in the CMA) indicated that there are a total of 527 356 formally occupied erven with a distribution as presented in Figure 3.3 . 3.2 Future Customer Profile This section briefly reports on various studies which deal with the future consumers profiles. A report by Prof RE Dorrington “Projection of the Population of the Cape Metropolitan Area 1996-2031” estimates that the population would increase to between 3.45 and 3.65 million by 2006 taking cognisance of the effect of HIV/AIDS and migration. More details on the findings of this study can be obtained at http://www.cmc.gov.za/demographics.htm. GO TO A study entitled “Review of long term Urban Demand for Water in the Cape Town –Saldanha Area” investigated the impact of HIV/Aids on the future water demand. For more information contact the CCT or GO TO the document entitled “IWRP-study”. According to a report summarizing the economic profile of the CCT, refer to http://www.capetown.gov.za/reports GO TO, the expected population growth rate will decrease from 3% to approximately 1.2 % by 2010, mainly due to the effect of HIV/AIDS and the expected reduction in the rate of migration. The Information Services Department of the CMC performed an analysis of the new erven created in the CCT by using a deterministic approach based on the growth in the number of approved erven at the Surveyor General’s office. This investigation concluded that there are two major growth points, i.e. the areas north of Table View and Durbanville. For details of this report refer to http://www.capetown.gov.za/reports GO TO. As part of the study “Computer Model Analysis and Master Plan for the Bulk Water Supply System for the Cape Metropolitan Area ” the present land use and future development areas in the CCT area over a 20 year horizon was investigated. The present and future land use as based on the findings of this study is presented on Figure 3.3. The results of this study was analysed by comparing the present and future areas in hectare (ha) in each category as indicated on Figure 3.5. From this figure it can be concluded that residential land will increase by 25%, business/commercial land by 125%, while vacant land will reduce by 70%. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 13 Based on this analysis, the bulk of the future land developments applicable for a 20 year planning period occur in the following areas: • • • • • • northern portion of Tygerberg (Durbanville); north of Table View; north of Oostenberg; south-west of Oostenberg; north-east of Strand in Helderberg; west of Strand and Somerset West. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 3.1 Population Distribution (1996 census) 14 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 3.2 Income Distribution (1996 census) 15 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 3.3 Existing Land Use and Potential Future Development Areas 16 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 17 Figure 3.4: Population Projection CITY OF CAPE TOWN - Population Projections 6 Population (millions) 5 4 3 2 1 0 1990 1995 2000 2005 2010 2015 Year Draft WC Urbanisation Policy WESGRO Metro Transport Plan Dorrington Projection 2020 2025 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 3.5: Growth in Land Use (20 year planning period) Land Use Growth (ha) 12500 10000 7500 5000 2500 0 -2500 -5000 -7500 -10000 -12500 Nature & Agriculture Other Business/Comm. Residential Industrial Informal Vacant Land Use Growth (%) 150 125 Nature & Agriculture Other 100 75 50 25 0 -25 -50 Business/Comm. Residential Industrial Informal -75 -100 Vacant 18 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 19 3.3 Service Levels 3.3.1 Current Service Levels Service levels, as defined in Table 3.2, of existing formal developed areas (excluding rural areas) generally meets the minimum standards as required by the Water Services Act 108 (of 1997), i.e. communal standpipe within 200 m walking distance and at least a ventilated improved pit latrine (VIP) or equivalent. The general percentage distribution of households with inadequate water and sanitation services as according to the 1996 census survey are indicated on Figure 3.6 and Figure 3.7 for water and sanitation services respectively. (It should also be mentioned that Census 2001 is currently in progress, which will provide an updated status quo of the service level backlog.) These figures indicate that the majority of unserviced erven are located along the N2 corridor near the Cape Town International Airport. However, most of these areas are provided with basic water services and rudimentary sanitation services. The reasons for the lack of services in certain areas are mainly due to the following: • the illegal occupation of land designated for other purposes and cannot therefore be formally serviced, • consumers located in rural areas where there is no access of bulk water and sanitation services, • the perception that some areas are used as temporary “transit” camps, where people reside before settling on a formally serviced site, • the affordability of high levels of services. Service levels of existing formal developed areas (excluding rural areas and informal areas) generally meets the minimum standards as required by the Water Services Act, i.e. communal standpipe within 200 m walking distance and at least a ventilated improved pit latrine (VIP) or equivalent (container toilet, formalised black bucket, communal toilet or chemical toilet). It has been assumed that all formal consumers (households) are provided with adequate services. A recent survey (May 2001), of which the results are summarised in Figure 3.8, Figure 3.9 and Table 3.3, indicate that there are approximately 92 000 informal households (from a total of 622 000 consumers) of which the households as indicated in Table 3.1 do not have access to at least basic water services, mainly due to the fact that they occupy land illegally: WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 20 Table 3.1 Informal Consumers with no access to basic water services “Ownership” Private “Council” Total No. of households % of informal households % of total no. of households No. of households % of informal households % of total no. of households No. of households % of informal households % of total no. of households Water 10 500 11.4% 1.7% 7 600 8.4% 1.2% 18 100 20% 2.9% Sanitation 16 000 17% 2.5% 37 100 41% 6% 53 100 57.7% 8.5% Detail plans indicating the service levels have been prepared as part of the WSDP’s of some of the former MLC areas which generally indicates the service levels of the informal areas as indicated on Figure 3.8 and Figure 3.9, but also the service levels of the formal areas. It was not deemed important to include service levels information of the formal areas, but for the purposes of the Comprehensive WSDP updated service level plans of the former Helderberg MLC WSDP are attached as an example (refer to Figure 3.10 and Figure 3.11). Table 3.2 Service Level Categories Category Inadequate Basic Water No access to basic water supply (as defined below) a) the provision of appropriate education in respect of effective water use; and b) a minimum quantity of potable water of 25 litres per person per day: at a minimum flow rate of not less than 10 litres per minute; within 200 metres of a household; and with an effectiveness of not more than 7 days interruption supply to any consumer per year. This service is usually provided through communal taps (standpipes) Intermediate Full Inadequate Basic Yard Tap, Yard Tank House connection Sanitation No access to basic sanitation as defined below. a) the provision of appropriate health and hygiene education; and b) a toilet which is safe, reliable, environmentally sound, easy to keep clean, provides privacy and protection against the weather, well ventilated, keeps smells to a minimum and prevents the entry and exit of flies and other disease- carrying pests. This service includes VIP’s, Formal black bucket, Container and Chemical Toilet usually provided as a communal service. Intermediate Full Communal Toilet (Ablution Facilities) On-site Waterborne, Septic Tank or French Drain WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 21 3.3.2 Future Service Level Strategy The area of jurisdiction of the CCT can be categorised according to the access to services as follows: 1. Urban Areas: Characterised by the availability of bulk water and sanitation services and formal and informal nature of the urban settlements. 2. Urban Periphery: By far the minority, these areas are characterised by scattered communities on agricultural holdings or farm portions with none or limited access to water and sanitation services. These consumers located mainly in the areas north of Table View and Durbanville generally make use of on-site water and sanitation services usually provided through own incentives. Section 3 of the Water Services Act ( http://www.gov.za/acts/97index.html ) GO TO states that “Everyone has a right of access to basic water supply and basic sanitation”, subject to certain limitations as set out in the Act including “the availability of resources” as indicated in section 11.2. The CCT is in the process of drafting a Service Delivery Strategy, for the provision of basic services. The overall objective is to extend water services as rapidly as possible to all potential customers. Service levels are likely to include the following: • • • Provide on-site water and waterborne sanitation to all formal sites; Provide a free basic level of water to all households within 200 m; Within informal areas, provide access to either communal toilet blocks or some form of shared toilet, depending on local conditions. The long-term financial implications of the sanitation options need to be assessed. Among the issues to be considered are the following: • Affordability of monthly bills to consumers, • Consumers are willing to pay for the service levels provided and accept the tariff increases that may be necessary, • Non-payment levels do not increase significantly, • Consumption is modest so as to minimise non-payment due to lack of affordability, and to delay the need for bulk capacity expansion, • Unaccounted-for-water losses are kept to a reasonable level, WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 22 The provision of waterborne sanitation increases water consumption, raising the bills of low-income consumers. The basic service typically costs in the region of R14 per household per month for a low-income household, excluding capital charges. Some poor households may not be in a position to pay this in addition to their water bills, and there are limits to the extent to which other consumers can cross-subsidise the service. To provide waterborne sanitation, for both internal and connector infrastructure, large up-front expenditure is required, which implies the need for external financing and associated capital charges. Furthermore, wastewater treatment works (WWTW), pump stations and outfall sewers are expensive, and the required capacity expansion will inevitably lead to the service provider passing on these higher costs to the consumers. The provision of basic services to informal settlements on private land is currently under investigation with the view to producing a policy early in the new year. Legal advice at this stage discourages the supply of any form of services to such areas. Policy development: In terms of the Water Services Act, By-laws are required to regulate the service and in this regard a Water Services By-law is currently in preparation, which will incorporate all current (Water Consumption Tariff Policy and Water Demand Management Policy) and proposed policies (Sanitation Tariffs, Basic Service Levels, Credit Control, etc.). The Draft Tariff Regulations for Water Services Tariffs suggests that Sanitation tariffs should be volumetric based. This option is under investigation and will be developed in conjunction with the General Valuation process which is also currently under way. 3.4 Customer and Revenue Management The CCT is committed to providing efficient, uninterrupted and affordable services, which are clean and safe to all consumers. The CCT is committed to implement the ISO 9001 Quality Management System to ensure effective service delivery (refer to presentation) GO TO. The key action areas identified are: • Communication including Customer Charter and Climate Surveys • Revenue collection including data rectification, informative and accurate billing. • Quality management, which includes the improvement of service levels and the implementation of benchmarking, procedures and Audits. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 23 The ISO 9001 Quality Management System will: • assist integration of administrations; • help ensure better customer service; • improve safety; • improve efficiency/production- lower costs; • facilitate performance management. As part of this process, the CCT has established a Customer Charter (refer to Figure 3.12) GO TO, which was advertised in public papers on 7 September 2001, and has been adopted for water services of the City of Cape Town. In terms of Chapter 9 Section 95 of the Local Government Municipal Systems Act 2000 the City of Cape Town is required to establish a Sound Customer and Revenue Management System. Over the years Local Government has had a wide variety of service policies, service practices and levels of resources in the previous seven Administrations. Water Services is committed to addressing these aspects within an integrated comprehensive Customer and Revenue Management Strategy for Water Services to ensure a focussed, effective and efficient service delivery on an equitable basis to all our communities across the City of Cape Town. The strategic issues, policies, objectives and initiatives of the Customer Revenue Management Section are herewith briefly discussed: Key Strategic Issues: The are six key strategic issues on which a sound Customer and Revenue Management System should be based for Water Services; • An Effective Credit Control Policy • Sustained meter accuracy • Universal Meter Reading and Billing • An effective 24hr Emergency Service • Effective customer education, communication and Liaison • Effective and efficient call centre Credit Control Policy: The main objective of the recently approved policy is to promote a culture of good payment habits and instil a sense of responsibility towards the payment of Water Services and reducing debt. This policy makes adequate provision for credit control and the indigent and can be found on the City’s Web Site. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 24 Meter Accuracy: The City of Cape Town is committed to ensure through its accredited Meter Verification Laboratory that each metered customer has the right and recourse to challenge the accuracy of its meter through a process as provided for in terms of the Trade Metrology Act and the SABS 1529-1:1994 Universal Meter Reading and Billing: The City of Cape Town is committed to reading and billing all consumers monthly and has provided a line of communication for customers to lodge any queries in respect of their accounts. The City is also committed to informative billing. 24hr Emergency Service and Call Centre: This • • • area deals mainly with technical complaints such as: Burst, leaking and damaged water and mains/leadings and meters; Water taste and discoloration problems; Low water pressure and no water. These complaints are responded to under 4 levels. The first level of response is almost immediate and is resolved within less than one hour. The second level of response is dealt with by a small team who attend to minor fault repairs such as defective meter installations, fire hydrant, valve servicing and mains cleaning. The third level of response is dealt with by a team who is equipped to carry out water installations and repair/burst mains and leadings. The fourth level of response is dealt with by a skilled team of individuals who deals with all aspects of the application of statutory requirements in terms water conservation, water wastage and water pollution. Customer Education, Communication and Liaison: This area deals purely by engaging the public and educating them in the awareness of Water Conservation, Water Pollution and Water Demand Management. Customer education, communication and liaison is accepted as a key strategic issue and will be afforded a high priority in the future structure of Water Services. Water conservation, water pollution, water ingress and payment habits, among others, will all be addressed in a comprehensive and sustainable fashion. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 25 Effective and Efficient Call Centre: A Call Centre is proposed, either as a stand-alone entity or as part of the City Call Centre, which will receive all calls in respect of service interruptions, complaints and account queries. 3.5 Water Bylaws In terms of the Water Services Act, every Water Services Authority has to promulgate Water Bylaws which set out conditions for the provision of water services. There is a need to draft consolidated Water Bylaws for the CCT. These Bylaws must contain the following (as per Section 21 of the Act) GO TO: 21. (1) Every water services authority must make bylaws which contain conditions for the provision of water services, and which must provide for at least: (a) the standard of the services; (b) the technical conditions of supply. including quality standards, units or standards of measurement, the verification of meters, acceptable limits of error and procedures for the arbitration of disputes relating to the measurement of water services provided; (c) the installation, alteration, operation, protection and inspection of water services works and consumer installations; (d) the determination and structure of tariffs in accordance with section 10; (e) the payment and collection of money due for the water services; (f) the circumstances under which water services may be limited or discontinued and the procedure for such limitation or discontinuation; and (g) the prevention of unlawful connections to water services works and the unlawful or wasteful use of water. 3.6 Obligations of the Water Services Authority to provide Water Services Every Water Service Authority has a duty to all consumers or potential consumers in its area of jurisdiction to progressively ensure efficient, affordable, economical and sustainable access to water services. This is set out in Section 11(1) of the Water Services Act. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Table 3.3 Service Levels of Informal Areas 26 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 27 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 3.6 Existing Water Service Level Distribution: 1996 Census 28 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 3.7 Existing Sanitation Service Level Distribution: 1996 Census 29 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 3.8 Location of Informal Areas 30 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 31 Figure 3.9 Location of Informal Areas Along the N2 Corridor near Cape Town International Airport (Detail) WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 3.10 Service Levels of Former Helderberg MLC: Water 32 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 3.11 Service Levels of Former Helderberg MLC: Sanitation 33 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 3.12: Water Services Customer Charter 34 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 35 4 Water Balance, Resource Planning and Management Issues: • Development of additional water resources; • Importance of implementing a water demand and conservation management strategy to optimise the use of existing water resources and reduce high unaccounted-for-water; • Unaccounted-for-water needs to be monitored on a distribution zone basis; • High stormwater infiltration in sewers to be addressed. 4.1 Water Balance 4.1.1 Water Resources One of the major issues facing Water Services in the CCT is the limited water resources. The current shortage of raw water storage capacity has markedly increased the risk of water shortages occurring in the Cape Metropolitan Area from the year 2001 onwards. The lack of storage capacity coupled with 3 years of below average rainfall between 1998 and 2000 led to DWAF imposing low level (10% reduction in water demand required) water restrictions upon the users of water from the Western Cape Water Supply System. In order to understand the limitations of existing water resources a description of the existing water resources are herewith provided, where after details on future schemes/options will be discussed. For a more detailed description of the available existing water resources, possible future water resources as well as water resource planning issues, GO TO the document entitled “Water Resources and Water Resource Planning”. 4.1.2 Groundwater The 4 groundwater resources in the City of Cape Town (CCT) are summarised in Table 4.1 below. The volume of groundwater abstracted by consumers residing in the urban peripheral areas that do not have access to bulk water services is unknown. Table 4.1 Groundwater Resources Aquifer Albion Spring Atlantis Cape Flats Newlands Total No. of Boreholes Not applicable 44 Not yet developed Not yet developed Firm Yield (1:50 yr) Mm3/year <1 4.4 18 10 Approx: 33.4 % of Total Requirements 1.8% of total resources WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 36 4.1.3 Surface Water Most of the water resources serving the CCT are stored in dams during the wet winter months in order to ensure a continuous water supply during the dry summer months. The CCT utilises water from various dams within the CMA and also from dams outside the CMA. Some of the dams are operated and controlled by the CCT, whilst the other dams are operated and controlled by the Department of Water Affairs and Forestry (DWAF). The CCT currently obtains approximately 70 to 75% of its raw water requirements from DWAF and the remainder from its own sources. Approximately 15% of the raw water requirements are obtained from sources within the CMA. The following dams and rivers are utilised as shown on Figure 4.3. DAMS/RIVERS OWNED AND OPERATED BY APPROXIMATE% OF TOTAL SUPPLY REQUIREMENTS FIRM YIELD (1:50 YEAR) M m3 Theewaterskloof Dam/ Kleinplaas Dam DWAF DWAF 43% 219 Voëlvlei Dam DWAF 20% 105 Palmiet River DWAF 7% 22,5 Wemmershoek Dam CMC 15% 54 Steenbras Upper and Steenbras Lower Dam TOTAL CMC 10,7% 40 Major Sources 440.5 Minor Sources Simon’s Town: Lewis Gay Dam Kleinplaas Land en Zeezicht Dam (From Lourens River) Table Mountain: Woodhead Hely-Hutchinson De Villiers Dam Victoria Dam Alexandra Dam GRAND TOTAL CMC 0,4% 1,85 CMC 0,6% 0,5 CMC 1,5% 5** 98.2%* 447.85 *The balance of the total supply requirements is made up from the Atlantis Aquifer (1,5%) and Albion Springs (0,3%). ** This figure includes Albion Spring. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 37 4.1.4 The Skuifraam Scheme and Other Future Water Resource Schemes The Skuifraam Dam and the Skuifraam Supplement Scheme are the next major water resource schemes to be constructed in the Western Cape. DWAF is responsible for the implementation of the two schemes. The Department of Water Affairs and Forestry have stated that they are satisfied that sufficient progress has been made by the CCT with respect to the implementation of water demand management and that the implementation of the Skuifraam Dam should proceed as a parallel process. Further water augmentation schemes that could possibly be implemented in the short to medium term include the Voëlvlei/Augmentation Scheme Phase I, the Table Mountain Group Aquifer, the Cape Flats Aquifer, the Lourens River Diversion Scheme and the Eerste River Diversion Scheme. 4.1.5 Current and Future Water Demands The water demand of the CCT for the hydrological year ending October 2000 was 851 Ml/day (including UAW and bulk losses in bulk pipelines) with a distribution as indicated in Figure 4.1. These figures will be updated as soon as the latest water demand readings have been verified. The City is also responsible for the supply of a further 59 Ml/d to Paarl and Wellington situated in the Drakenstein Municipality. The total bulk water supplied by CCT in within and outside the Cape Metropolitan Area (CMA) for the hydrological year ending October 2000 was 910 Ml/d as also indicated on in Figure 4.1. The historic trend of the total bulk water supplied by the CCT between 1973 and 1997 is shown in Figure 4.2. Based on this graph the estimated water demand would increase to between 1020 and 1200 Ml/d by 2006 by assuming the historic trend of 4%. The Integrated Water Resource Planning Study assumed that the future unconstrained growth rate for water demand would be 3%. This would translate to an estimated water demand of 1100 Ml/d by 2006. The implementation of the recommendations contained in the Integrated Water Resource Planning (IWRP) study, which include interalia pressure management, user education, elimination of automatic flushing urinals, leakage repair, tariffs, metering and credit control, could reduce this water demand to an estimated 940 Ml/d. The IWRP study is further discussed in section 4.2 of this report. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 38 4.1.6 Effluent Returned to Source The total wastewater flow generated within the CCT amounted to 528 Ml/d, including stormwater infiltration, for the year ending June 2000 or approximately 66% of the total bulk water demand. Other statistics concerning wastewater are: Approximately 33.5 Ml/d (6.5%) of wastewater is discharged directly via marine outfall sewers; • 52 992 tonnes/annum of dry sludge is produced; • Approximately 9% of treated effluent is re-used. As for water demand, the same factors mentioned would also impact on the future wastewater flow but also the provision of on-site sanitation, which would result in a reduction of the future sewer flows, and maintenance to reduce stormwater infiltration. • 4.1.7 Unaccounted-for-water (UAW) Analysis UAW is the total amount of water losses or unmetered water. It varies geographically with the highest UAW figures generally recorded in the lowincome areas. The UAW is dependent on the following indirect and direct factors: Indirectly: Pressure in the distribution system, Age of the distribution system, Density of connections and length of pipelines, Management and operation of the system, Infrastructure Land use % service connections metered Directly: Mains leaks Service connection leaks Reservoir overflows Metering inaccuracies Illegal connections Unbilled consumption Limited information was available to accurately calculate the UAW. The Integrated Water Resource Planning Study estimated that the CCT UAW is approximately 198 Ml/d or 23% of the total bulk water consumption. Further investigation is required to accurately determine the UAW which can only be performed on a suburb or bulk distribution zone basis. This entails the comparison of bulk water meter records with the water sales in each zone based on individual meter records. Such detailed investigations have been performed for the Blaauwberg, Helderberg, Oostenberg, Tygerberg (Central, West and South) and South Peninsula, but need to be expanded to the other areas, i.e Cape Town and Tygerberg Coastal, North and East. The UAW for all areas per distribution zone needs to be monitored on a continuous basis. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 39 Figure 4.1 Existing Water Demand Distribution Current Water Demand of the CCT Current Water Demand of the CMA Total = 851 Ml/d Total = 910 Ml/d Paarl 5.1% (47 UAW Ml/d) Wellington Rural & Other 1.2% (11 Ml/d) 0.5% (0.5 Ml/d) 23% (198 Ml/d) Large Users 14% (123 Ml/d) CCT Total Other 5% (41 Ml/d) Industrial incl. Bulk Residential Bus./Comm. 4% (38 Ml/d) 5% (41 Ml/d) Losses 49% (410 Ml/d) 93% (851 Ml/d) Figure 4.2 Future Water Demand Projection based on Historic Trend Bulk Water Consumption Projection Based on Historical AADD* 1200 1100 1000 AADD (Ml/d) 900 800 700 600 500 Result of Water Restrictions 400 300 200 100 0 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 Date Historical Linear Trend Current Trend at 4 % p.a. * This graph includes the bulk water supplied to areas outside the CMA IWRP Study WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 4.3 Existing Water Supply Resources and Location of Potential Future Schemes 40 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 41 4.2 Integrated Water Resource Planning 4.2.1 Background Towards the end of 1999 the former Cape Metropolitan Council (CMC) identified to the need to adopt an integrated water resource planning approach to manage the future water demand in the Cape Metropolitan Area (CMA). In order to achieve this objective, the CMC appointed a consortium of Ninham Shand and Arcus Gibb in December 1999 to carry out an “ Integrated Water Resource Planning” (IWRP) study GO TO. The aim of the IWRP Study was to investigate at pre-feasibility level various water demand management initiatives along with 3 small water supply augmentation schemes. The study considered the technical, institutional, socio-economic, environmental and financial aspects of the options using a multi-criteria decision making analysis. Recommendations to the CMC on where to focus their resources and attentions with the aim of meeting and managing the water demand within the CMA were made. During the course of the IWRP Study it became apparent that further planning integration should take place with potential water supply schemes outside the CMA. The schemes considered that were outside the CMA are: the Voëlvlei Augmentation Scheme and the Table Mountain Group Aquifer. A study of these schemes together with the potential for desalination paints a more holistic picture of the water resources which could potentially be available to the CMA over the medium term. 4.2.2 Discussion and results of the IWRP Study The total water demand of the CCT, West Coast Municipality and Agriculture is currently in excess of the available supply by approximately 8 %. This situation would progressively deteriorate if the growth in water demand were allowed to continue unabated. Water restrictions of increasing severity would become the norm and the restrictions would eventually detrimentally affect the economy of the Western Cape. There exists three ways to balance the water demand figure to the water supply figures, namely to implement measures to: 1) 2) 3) reduce the demand over a period of time; increase the water supply available; reduce the demand and increase the supply simultaneously. The long term planning and implementation of water demand management initiatives and water supply schemes should be based on achieving a balance between projected growth in water demand and the available supply in order to ensure a 98 % level of supply assurance in the long term. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 42 The option of imposing restrictions is a short-term management tool and would be unacceptable in the long term. Given the current level of risk, restrictions may however have to be implemented prior to the completion of Skuifraam Dam, dependent on the amount of winter rainfall received. The results of the IWRP study indicate that a significant saving in water demand could be achieved through the implementation of water demand management initiatives. In comparison to the water supply options, the water demand management initiatives would have a significantly lower implementation cost, could be implemented in a shorter time frame and were generally more environmentally and socially acceptable. Based on the IWRP Study, three “packages” have been identified for implementation, namely: • • • water demand management options that can be implemented by the CCT (Package 1); water demand management options to be implemented by individual consumers (Package 2); and supply augmentation options to be implemented by the CCT (Package 3). Package 1 comprises of the following initiatives: • Pressure Management • User Education • The elimination of all Automatic Flushing Urinals • Leakage repair and • Tariffs, Metering and Credit Control Package 2 consists of the following initiatives: • Promotion of Private Boreholes • Introduction of Water Efficient Fittings • Promotion of Grey-water use It is anticipated that Package 3 would consist of the implementation of the Voelvlei Augmentation Scheme as the next water supply augmentation scheme. In parallel to this it is recommended that a further feasibility study be carried out on the Table Mountain Group Aquifer, including exploratory boreholes (a pilot Scheme) in order to determine the possible yield and environmental impacts associated with this potentially valuable water resource. Detailed monitoring and evaluation would have to be carried out to determine the effects of exploitation. In order to alleviate the pressure on the current available water supply sources and reduce the risk of imposing ever increasingly severe water restrictions, the implementation of all of the water demand management initiatives in both packages 1 and 2 will have to be accelerated/initiated. In addition to this, the planning and implementation of additional water supply schemes (Package 3) will have to commence. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 43 The implementation of Packages 1 & 2 have been accepted by Council as part of the Water Demand Management Strategy. Future Packages: Alternative Water Supply Schemes • The Table Mountain Group Aquifer (exploitation is dependent on both the potential yield and the environmental impacts indicated by the pilot study) • The Lourens River • use of Treated Wastewater for Local Urban Irrigation and Industrial; • the Cape Flats Aquifer; • the Eerste River Diversion; • use of Treated Wastewater for Commercial Irrigation Farmers; • Treated Wastewater Reclaimed to Potable Standard • Desalination of Sea Water The impact of Package 1 and 2 on the total water consumed within the CMA, as well as the areas supplied by the CCT outside the CMA, is indicated in Figure 4.4 below. Figure 4.4 Impact of Packages 1+2 on Future Water Demand Urban water demand for CCT - Package 1 + 2 550 Million m3/a 500 450 No savings scenario @ 3% 400 350 300 Packages 1 & 2 250 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 Year Figure 4.5 shows the effect of implementing Packages 1 and 2 on the overall demand for water from both the urban and agricultural sectors against the water availability for supply at a 98% level of assurance. In this figure it has been assumed that the yield from the proposed Skuifraam Dam will be available from the year 2006. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 44 Figure 4.5 Impact of Packages 1+2 on Future Water Demand (Overall) Overall water demand - Package 1+2 650 No Savings Package 1+2 Yield 600 Million m3/a 550 500 450 400 350 1994 1996 1998 2000 2002 2004 2006 2008 2010 Year Figure 4.6 Impact of Package 1-3 on Water Demand of Total Supply Area Overall demand - Package 1+2+3 850 No Savings Package 1+2+3 Yield Million m3/a 750 650 550 450 350 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 Year Please note that all graphs reflect the supply and demand from major sources only and not from the minor sources. The growth rate in water demand assumed for West Coast District Municipality (WCDM) was 3% per annum. The latest demand projection obtained from WCDM indicates that their future growth rate in water demand could be as much as 10% per annum. This will impact on the abovementioned analysis and further increase the disparity between the water demand and the available supply at a 98% level of supply assurance. 2020 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 45 Figure 4.6 above shows the total water demand (urban and agriculture) from the main water resources supplying the Cape Metropolitan Area and the assured supply of those resources. The available supply before 2006 assumes that Skuifraam Dam and the Voëlvlei Augmentation schemes have been implemented. The graph shows that the actual water demand exceeded available supply (at a 98 % level of assurance) in 1999. Should water demand in the urban and agricultural sectors be allowed to grow unrestricted, it would not be possible to supply future water needs in an affordable and sustainable manner and water demand would far exceed assured supply (with no addition of augmentation schemes). With the implementation of effective Water Demand Management initiatives, it is anticipated that a significant reduction in water demand can be achieved. In order to alleviate the pressure on the current available water supply sources and reduce the risk of imposing ever increasingly severe water restrictions, it is crucial that the implementation of all of the water demand management initiatives be accelerated, whilst implementing construction of the Skuifraam Dam. 4.3 Water Demand Management (WDM) A WDM Policy GO TO and WDM Strategy GO TO have been accepted by the CCT, which has the main objective of reducing the projected demand for water by at least 20% by the year 2010. Some of the key objectives identified in the WDM Policy are: • Equity. Universal access to quality water supplies, with a guaranteed minimum level of service, through a metered connection. • Sustainability. To ensure an acceptable level of assured water supply for future generations. • Affordability. To ensure that water services remain affordable. • Reduce the projected demand for water by 20% (or more) by the year 2010. • Encourage, educate, promote and where appropriate, legislate the optimal use of water. • Maximise the use of alternative sources such as wastewater effluent, boreholes etc. • Minimise the loss of water. The Policy contained the following principles to inform the development of this policy and future implementation plans: • Water is a strategic, precious and scarce resource. • The waste of water shall not be tolerated. • All consumptive water use shall be measured and accounted for. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 46 Based on these principles the WDM Strategy was formulated which identified the following strategies: • Identify “Champions” for Water Demand Management amongst Politicians and define their role of promoting WDM within the community and within the Municipality; • Raise the profile and priority of WDM in the organization in order to achieve the objectives set out in the Policy and in this Strategy; • Prepare comprehensive Business Plans for each of the Water Divisions in respect of allocated Water Demand Management initiatives; • Draft a municipal policy to ensure wise water use within the Municipality; • Develop an appropriate Water Services Bylaw to legislate the optimal use of water, incorporating the essential water demand management requirements to limit the inefficient and wasteful use of water; • Leakage and waste minimization through the planning, design, construction, operation and monitoring of suitably located District Metering Areas and pressure management systems; • Promote the optimal use of water by consumers through education awareness programmes and projects; • The removal and prohibition of all Automatic Flushing Urinals (AFUs); • . Minimize water losses in low-income housing through targeted plumbing repairs and education programmes; • Continually optimise tariff structures, ensure universal metering and billing and a rate of payment that makes financial viability certain; • Maximize the use of alternative sources of water; • Make strong representations to the SABS to draft a National Performance Standard for water fittings, appliances and devices. For the Draft 5 year WDM Programme refer to the document entitled “WDM_Prog” GO TO. 4.4 Water Restrictions Water resources in the Western Cape are normally assessed at the end of the hydrological year, after the normal winter rainfall period (end October) and at the onset of the winter rainfall period (end May). The assessment is done by means of a sophisticated stochastic computer model, jointly set up by the Department of Water Affairs and Forestry and the City of Cape Town. The model assesses the total demand for water in the region i.e. urban and agriculture over a number of years against the expected inflow into the various dams during drought years at various risks of occurrence. On the basis of the planning model results informed decisions are made in order to optimise existing resources and on the need for water restrictions and the required severity thereof in order to avoid failure of supply for the next successive years. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 47 The need for water restrictions is determined not only by the level of the water in the dams, but also by factors such as the projected growth in water demand, and the implementation date of future water resource augmentation schemes. Level 1 water restrictions (10% saving required), such as the restrictions that were recently enforced, are applied earlier rather than later, in order to ensure that the City of Cape Town would have sufficient water to last through a drought cycle (a number of very dry winters). Level 2 restrictions that would require a 25% saving and also negative impact on industry, would only be applied if Level 1 restrictions were not having the desired affect or under severe draught conditions. It is better to introduce Level 1 restrictions at an early stage than reach a situation where it may be necessary to implement Level 2 water restriction which could negatively affect the economy of the Western Cape. The make up of the restrictions imposed from 1 November 2000 to 30 September 2001 was part punitive and part good water demand practice. The City of Cape Town has lifted the punitive portion of the restrictions (i.e. limited 1 hour watering on alternate days), but has maintained the restricted watering hours component (i.e. before 10:00 and after 16:00) as this is deemed to be good water practice. The fact that restrictions have been lifted, does not guarantee that water restrictions will not be imposed again at the end of next winter. The need for future restrictions will depend on both the amount of rainfall which falls next winter, the predicted water demand in both the urban and agricultural sectors as well as the impact of water demand management. One must not confuse water restrictions with water demand management. Water restrictions are punitive measures to reduce water demand and should be applied judiciously when circumstances such as droughts necessitate the implementation thereof. Water demand management on the other hand comprises good water demand practices and is the responsibility of all the authorities and water users. Good water demand practices, which will be contained in the proposed City of Cape Town Water By-laws, will also lead to a reduction in water consumption. 4.5 Re-use of Treated Wastewater Effluent At the Water and Waste Committee meeting of the former Cape Metropolitan Council, held in February 2000, the Committee resolved that "a principal policy objective to move towards the long-term goal of achieving zero effluent discharge during summer months for all wastewater treatment works in the CMA be adopted and actively supported". WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 48 The "Integrated Water Resource Planning Study" determined the potential for effluent re-use at a pre-feasibility level. The CCT has appointed consultants to refine the work carried out in the IWRP Study, focusing on potential treated effluent re-use from the Athlone WWTW, Borcherds Quarry WWTW and the Belville WWTW. 5 Description of Existing Water Services Infrastructure Issues: • Updating of infrastructure database required; • Limited information on internal wastewater systems; • Asset Management Program (Inadequacy of current preventative maintenance/pipe replacement programs, including the rehabilitation of pitch fibre sewers.) A summary of the existing water supply and wastewater infrastructure as well as the estimated replacement cost is provided in Table 5.1 (excl. consumer connections). For a full inventory of the main infrastructure refer to the infrastructure database GO TO. A detailed description of the bulk system and internal systems is not pertinent to the identification of issues and performance indicators and is therefore not described in detail. For further information refer to the various Master Plans and the studies on the bulk systems: Bulk Water: “Computer Analysis and Master Plan for Bulk Water Supply System” Bulk Wastewater: “Strategic Evaluation of Bulk Wastewater” (contact the former CMC Administration .) Figure 5.1 and Figure 5.2 shows the main components of existing bulk water and bulk wastewater infrastructure in the City of Cape Town (CCT). The implementation of an Infrastructure Management Query Station (IMQS) is currently under consideration and will provide a basis for viewing details on the infrastructure as well as graphs and reports available from the master plans and related studies. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 49 5.1 General Description of Existing Water Supply Infrastructure The water supply infrastructure can be categorised into two groups, i.e. internal distribution systems, as previously administered by the former Metropolitan Local Councils, and bulk system as previously administrated by the Cape Metropolitan Council. The bulk water supply system is generally in good order with sufficient capacity to meet the required demand. Water gravitates from the majority of the dams, located mainly outside of the Cape Metropolitan area, via a number of large diameter pipelines to the water treatment works and bulk storage reservoirs from where water is distributed directly, but also via internal service reservoirs to consumers via bulk connections. A number of pumping stations are also required to boost supply in the higher lying areas. For a more detailed description of the bulk water supply infrastructure refer to a document entitled “Bulk Water Supply Infrastructure” GO TO. 5.2 General Description of Existing Wastewater Infrastructure The wastewater system, similar to the water system, consists of a bulk system and an internal system. Tygerberg Hill forms the watershed with wastewater draining towards the wastewater works many of which are located next to the coast. The drainage areas and the location of pumping stations and wastewater works are indicated on Figure 5.2. The Strategic Bulk Wastewater Study completed in June 1999, assessed performance of existing wastewater equipment, processes and management systems and identified where improvements are necessary for more effective performance. For a more detailed description of the bulk wastewater infrastructure refer to a document entitled “Bulk Wastewater Infrastructure” GO TO. 5.3 Asset Management One of the important issues identified, as part of the WSDP is the lack of proper asset management programs, which could inevitably lead to the deterioration of infrastructure and service provision. It is therefore important that each department should draft an Asset Management Program and Plan. The overall condition of the water distribution pipe network has not yet been quantified on a Metro basis. This quantification is considered to be a task of immediate urgency. In some former MLC areas, conditions of networks are known and these records need to be amalgamated in order to focus expenditure. Some networks are showing signs of weakness that require addressing. Condition records of other networks are non-existent. It is proposed that meticulous records of burst mains, on a Metro basis, be introduced and maintained. Burst main incidents are proposed to be reported under the following topics: WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN • • • • 50 Street address of burst locality including locality sketch Pipe details (size, type, lining, sheathing etc.) Ground conditions Details of fracture 5.4 Stormwater Ingress into Sewers Stormwater ingress into sewers is a major problem facing Water Services in the CCT. It reduces the conveyance capacity of sewer pipelines, as well as the capacity of the wastewater works to handle sewage flows. A distinction needs to be made between the following two types of stormwater ingress, namely: • Stormwater Infiltration: This happens through cracks in the existing sewer pipes and require sealing or replacement. (The opposite to infiltration, namely exfiltration leads to pollution) • Stormwater Influx: This is the illegal connection of stormwater pipes to the sewer systems. The solution to this problem is frequent inspections. It is the intention of the CCT to initiate a study to determine the extent of the problem. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 51 Table 5.1 Summary of Infrastructure Inventory and Estimated Replacement Cost at September 2001 Infrastructure Internal Systems No Quantity Bulk Systems* Replacement Value No Quantity Rxmil Total Replacement Value No Quantity Rxmil Replacement Value Rxmil Water Supply Infrastructure Water Treatment (Ml/d) 13 1672 697 13 1672 697 372 22 2555 515 131 3539 887 18 10940 144 367 unknown 234 629 3461 9058 5459 780 unknown 780 unknown Reservoirs (Ml) 109 984 Pump Stations (kW) 349 unknown 90 8429 1998 Pipe Length (km) Major Storage Dams (mil m3) 5 Sub Total 2461 5 4119 7277 Waste Water Infrastructure Water Care Works (Ml/d) Pump Stations (kW) 293 Pipe Length (km) Sub Total Total * previously administered by the CMC 190 293 8429 1998 2291 20 620 620 20 27 unknown 243 320 120 500 1363 620 620 190 536 8549 2498 3655 10932 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 5.1 Main Components of Existing Water Distribution System 52 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 53 Figure 5.2 Wastewater Drainage Areas and Location of Treatment Works and Main Pumping Stations WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 54 6 Environmental Issues Issues: • Fluoridation Regulations; • Compliance with special standards for discharging of treated effluent into a river system; • Water quality 6.1 Environmental Management Initiatives 6.1.1 Introduction Management of the environment of the City of Cape Town (CCT) is guided by emerging national as well as international law and legislation. All initiatives must conform to these higher order statutes and directives, such as the International Convention on Biodiversity and the National Environmental Management Act (NEMA). The CCT through the former Cape Metropolitan Council (CMC) has implemented a number of initiatives to monitor the environmental status, protect the environment and set standards in accordance with the relevant Acts. 6.1.2 State of the Environment Report The former CMC has initiated a comprehensive process called the “State of Environment Report” (http://www.cmc.gov.za/soe) GO TO to report on the current status of the environment and many issues relating to the WSDP that may impact on the environment taking cognisance of the relevant Acts. The CCT has continued this process, which is now in its third cycle. 6.1.3 Environmental Conservation Act In order to safeguard the environment against activities that could have a detrimental effect on the environment, regulations in terms of Sections 21, 22 and 26 of the Environmental Conservation Act (ECA) (No. 73 of 1980) were promulgated on 1997-09-05. According to these regulations an environmental Impact Assessment (EIA) is a legal requirement for certain scheduled construction activities. The CMC Administration subscribes to a philosophy of Integrated Environmental Management (IEM) and has adopted an Integrated Metropolitan Environmental Policy (IMEP) GO TO and is initiating Environmental Management Systems (EMS) for its operations. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 55 As an integral component of the IEM guidelines, the former CMC commissioned the development of procedures to ensure compliance with the environmental regulations for all the CMC river maintenance / upgrading activities as well as their bulk wastewater activities. These procedures which are supported by the delegated authority (viz. the Environmental Impact Management Unit of the Provincial Department of Environmental and Cultural Affairs and Sport (DECAS)), aim to ensure compliance with the regulations and the spirit of the environmental regulations and the IMEP, without unduly compromising efficient and cost effective service delivery with the CMA. The former CMC’s IEM guidelines subscribe to the “cradle to grave” approach, requiring environmental input from conceptualisation to decommissioning for all its operations. Accordingly, the IEM guidelines aim to ensure upfront environmental input during planning and construction and subsequent input during operation and maintenance (via the implementation of the appropriate EMS). Bulk Water Department: The Bulk Water Department of the former CMC is currently using a modified version of the protocol developed for the Wastewater Department in order to determine whether their proposed capital projects would have any environmental impacts. This checklist is then discussed with the CMC Administration’s Environmental Management Department. Bulk Wastewater Department: A protocol for capital development works was developed by the former CMC’s Wastewater Department, the environmental unit of the CMC Administration’s Planning, Environmental and Housing Directorate in conjunction with consulting engineers Ninham Shand and approved by DECAS. A checklist answer sheet and description form applicable to the capital works is completed to identify the category of the proposed works relative to the environmental requirements. Thereafter the necessary environmental procedures are followed, if necessary by appointing environmental consultants. 6.1.4 Environmental Management Plan Environmental Management Programmes (EMPs) is a tool that would facilitate appropriate environmental input during the construction phase of civil engineering projects, and thus form a crucial component of the IEM process and the ultimate attainment of sound environmental practice. Accordingly, the CMC Environmental Management Department appointed a team of consultants under the leadership of Ninham Shand to develop a state-of-the-art, Environmental Management Programme, including Standard Environmental Specifications, Detailed Environmental Specifications and a range of supporting tools to facilitate the implementation of civil projects. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 56 The vision is for this EMP to be included as an integral component of the Contract Documentation of all construction contracts, initiated by the City’s line function that oversee construction activities, where there is a risk of environmental degradation or there is uncertainty regarding the environmentally sensitivity of the activity. Ultimately this approach will ensure the practical and effective implementation of environmental controls for these activities. 6.1.5 Integrated Metropolitan Environmental Policy The CCT has embarked upon a process of developing an integrated metropolitan environmental management strategy (IMEMS). This Integrated Metropolitan Environmental Policy (IMEP) will form the basis for a series of strategies and programmes to ensure that the principles of sustainability are adhered to. This will enable the meeting of current needs as well as the maintenance of our resources for the benefit of future generations. The IMEP and the IMEMS were adopted by the CCT in October 2001. The sectoral strategy for water services based on the IMEP is given below: A commitment to ensuring that the quality of coastal, marine and inland waters of the CCT is suitable for the maintenance of biodiversity, the protection of human health and a commitment to the principle that all CCT inhabitants have the right to clean, potable and adequate water sources. This commitment includes: • Recognising that water is a scarce and valuable resource, which sustains communities, ecosystems and economic development. • Recognising the importance of groundwater as a water resource. • Management of water demand to ensure the long term sustainability and affordability of water resources and the environment. • Ensuring water quality, at a minimum, meets national standards as established by the Department of Water Affairs and Forestry. • The effective management of all wastewater systems. 6.2 Water Conservation and Quality Issues 6.2.1 Quality of Raw water resources Tastes and odours in drinking water, produced by algae, out of the Voëlvlei Dam caused considerable consumer response during December 2000 and January 2001. During November 2001 consumers complained about tastes and odours in water from Theewaterskloof Dam, because of an algae not encountered previously. The removal of tastes and odours from drinking water costs several million Rand per annum. Algal blooms are caused by inputs of nutrients into dams. This situation could escalate in the future if it is not addressed. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 57 In order to at least stabilise and hopefully reduce the influx of nutrients and subsequent algal blooms, serious and urgent catchment management is required by the responsible authorities. 6.2.2 Potable Water Quality Monitoring The quality of treated water is strictly monitored/controlled by the water treatment division and complies to SABS 241 (1984) and other guidelines. The Scientific Services Department conduct weekly visits to each WTP to test the water, inspect the process, retrieve various samples and analyse them. The results are then scrutinised, evaluated and compiled as a weekly report with comments. The WTP manager is given a copy of the results, one copy is sent to the Head of Bulk Water Operations and one is kept by Scientific Services. Composite sampling is carried out by the WTP on a weekly basis and these samples are also analysed by the Scientific Services Branch and a monthly report is generated. Immediate response to operational problems and consumer complaints is effected by suitable experienced and qualified staff from Water Services. For details on raw water quality and treated water quality refer to table entitled “Water Treatment Data” GO TO. 6.2.3 Implementation of Fluoridation Regulations In terms of Regulations No. R823, dated 8 September 2001, promulgated under Health Act 63 of 1977, all water services providers are required to ensure a fluoride concentration of 0.7 mg/l in potable water for the purposes of reducing dental caries. Fluoridation is complex, expensive and a potentially hazardous undertaking and requires the implementation of new infrastructure by September 2003 at an estimated cost of R11 mil, since the natural concentration of fluoride in CCT’s water resources is insufficient. The running cost of fluoridation is estimated at R10mil per annum. Skilled operators required to manage the fluoride concentration are currently inadequate, and requires the training of additional staff. CCT have embarked on a public participation process. A report as tabled to the Trading Services Portfolio Committee gives more background. GO TO 6.2.4 Treated sewage effluent released into Urban River systems In recognition of the special effluent standards which are to be imposed by DWAF, the Wastewater Department took the policy decision to implement special standards with respect to nutrient removal in wastewater treatment at treatment works where discharge of treated effluent is into a river system. This is in line with environmental considerations and is an earnest intention to improve water quality, minimise health risks and protect the environment. Effluent permit standards have been determined for each wastewater treatment plant. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 58 6.2.5 Impact of Industrial Consumers and Potential Pollution Sources Effluent from industrial consumers generally is discharged into the sewage system and treated at the wastewater treatment works and is therefore not considered as a pollution treat. 6.2.6 Removal of Alien Vegetation The CCT has an ongoing programme for the removal of alien vegetation in the catchment areas of their dams. This programme will have the effect of increasing available run-off. The CCT also make a substantial contribution (R20 million) for the removal of alien vegetation in DWAF catchments, through a catchment management charge. 6.2.7 Atlantis Aquifers An Environmental Management System (EMS) has been completed for the Atlantis Aquifer System. An environmental consultant audits the EMS on an annual basis. In addition an environmental officer for the area was appointed in July 1999, to safeguard the environment, water supply infrastructure and to educate the public. The Council for Scientific and Industrial Research (CSIR) assist in monitoring water quality and aquifer levels on a regular basis. In terms of the National Water Act (1998), aquifers are protected by law. 6.3 Stormwater Management Management) (Incorporating Catchment & River The various water related services such as water supply, sanitation and stormwater management are inextricably linked and greater emphasis will be placed within the foreseeable future in optimising and managing their interactions in keeping with the principles of Integrated Water Resource Management. These interactions include direct connectivity between systems in the case of sewer overflows, effluent discharges to watercourses forming the bulk drainage system and abstraction of water from surface and sub-surface resources within the metropolitan area. Whilst the Stormwater Management service currently falls within the Transport, Roads and Stormwater Department of the City of Cape Town, concerted efforts are being made to ensure close cooperation of Water Services for the benefit of the city’s residents and visitors. Over the past few decades rivers have been viewed as convenient drains to convey urban waste and storm runoff. They were canalised on a large scale and many wetland areas in-filled and drained to allow for urban development, dramatically altering the natural hydrological cycle. In retrospect, this approach has inadvertently also precipitated a decline in water quality and ecological integrity of the city’s rivers and vleis. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 59 A paradigm shift in approach to stormwater management in Cape Town has developed over the past few years, based on the philosophy of integrated catchment management. Within the metropolitan area, this was pioneered by the former Cape Metropolitan Council. A Catchment Management Department (CMD) established in 1996 was tasked with promoting ‘best practice’ in the management of urban rivers, wetlands, vleis and major stormwater infrastructure in partnership with the previous metropolitan local councils. The following stormwater management principles are now widely recognised and rapidly gaining acceptance: • • • • The need to adopt an integrated and co-ordinated approach, based on a good understanding of local needs / values, statutory requirements and practical / financial constraints. The need to minimise the impacts of flooding with an emphasis placed on reducing peak flows at source either through flood attenuation ponds or infiltration. Protection of urban water resources; including rivers, wetlands, vleis, subsurface and coastal waters from the potentially harmful impacts of polluted runoff or altered hydrological response. Involvement of communities and other stakeholders in the management of river systems through catchment forums. The stormwater service involves the management of urban catchment areas in respect of their hydrological functioning for drainage, flood control, ecological and social needs and as an important urban water resource. It includes the management of reticulation systems, open watercourses, wetlands, groundwater, vleis and estuaries, and engagement with communities living within the various catchment areas. The major river systems and associated catchment areas within the metropolitan area are illustrated by Figure 6.1. The stormwater network comprises approximately: • 1200 km of rivers and streams • 200 km of lined canals • 5000 km of underground pipes and culverts • 300 stormwater detention ponds • 10 automatic pumping stations Functional areas within the service include: • Strategy and policy development • Planning, development control and project management • System upgrading and development • Asset management (reticulation, watercourse maintenance, pollution control etc) WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN • • 60 River flow, rainfall and water quality monitoring rivers, vleis and coastal waters). Education and capacity building The 2001 / 2002 capital and operating budgets for the service totalled R66.5m and R87.3m respectively. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 6.1 Major Stormwater Catchment Areas and Monitoring Points 61 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 62 Due to the all-encompassing spatial nature of drainage catchments and the water related bias of this service, it is inextricably linked to various other functions and bodies within Council and outside, from both planning and operational viewpoints, including but not limited to: • • • • • • Transport and Roads Water and Sanitation Services Waste Management Community Services Planning & Environment Housing There is a growing movement at local, regional and national level to ensure improved and integrated management of urban stormwater systems in a manner that balances competing and often divergent needs of the community, such as: • Flood protection • Ecological enhancement and protection of aquatic systems • Cultural, recreational and economic opportunities In an effort to rise to these challenges, a detailed strategy comprising various priority programmes to be implemented over the next five years has recently been formulated. A draft copy is attached GO TO. This strategy provides a comprehensive framework to guide management of stormwater systems for the sustained benefit of the city’s residents, business concerns and visitors alike. Underpinning the strategy are the following guiding principles: • • • • • • • • Customer Focus Holistic Planning & Management Duty of Care Sustainability Management Excellence Co-operative governance Participation and Partnership Transparency The guiding vision and mission of the service are as follows: Vision: Effective Stormwater Management with Safe and Healthy Rivers Mission: Minimise flooding of property and improving and maintaining the health of our rivers, wetlands and vleis through integrated catchment management for the benefit of the people of the CCT. Various priority programmes comprising the strategy have been grouped under themes as follows: WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 63 Integrated Planning: • Preparation of Catchment and River Management Plans (CRMP) • Preparation of Stormwater Master Plans (SMP) • Preparation of Local Stormwater Management Plans (LSMP) • Formulation of Stormwater Management Guidelines and Design Criteria for New Developments • Promotion of Integrated Urban Water Resource Management System Upgrading and Development: • Formulation of a Risk Based Approach to System Upgrading • Flood Disaster Management Programme • Provision of Stormwater Services to Informal Areas Asset • • • Management: Investigation into System of Charges and Levies Guidelines for Environmentally Sensitive River Maintenance Development of Management Information Systems and Data Bureau Services • Development of an Integrated Asset Management System Regulation • Development of Policy for Development near Watercourses • Promulgation of Stormwater Management By-Laws Relationship Management • Customer Care Programme • Staff Development Programmes • General Education Programmes • Partnership Development Programmes • Provision of Consultancy Services The strategy will also form the nucleus of detailed business plans prepared for the service over the next few years as illustrated below. DETAILED BUSINESS PLANS STRATEGY NUCLEUS SERVICE OUTCOMES Managed Flood Risks Improved Water Quality Protected River Corridors WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 64 The following mechanisms will be utilised to monitor and report on the impact of the strategy. This overall approach, philosophy and management principles will be reviewed and amended as required every 5 years: • Annual reporting on key indicators as outlined in Table 6.1. • Biennial review of progress in implementing the various programmes. For further information on the stormwater management service, refer to the website of the CMD at www.cmc.gov.za/w&w/CatchmentMgmt. Information of flood prone areas as well as associated draft development control guidelines are published at www.capetown.gov.za under the following icons: Table 6.1: Performance indicators and tragets Outcomes Targets Managed Flood Risks Less than 5 multiple property flooding incidents per year (provided rainfall is within 10 yearly maximum severity) Improved Water Quality Location Percentage Compliance with Accepted Targets Public Health Aquatic System Rivers Under development Under Development Vleis Under development Under development 90% N/A 75% N/A Beaches: Bay Beaches: Atlantic False 6.4 Related Acts 6.4.1 The Occupational Health and Safety Act All sections of the Bulk Water Department abide by the Occupational Health and Safety Act 85 of 1993. All designations in terms of responsibility are made in accordance with the OHS Act. It is every employee’s responsibility to abide by the Act. Every section, in the department, is encouraged to adopt the NOSA MBO (management by objective) system. Some sections have done so with distinction and have been awarded the NOSA 5 star grading. A recent addition to the NOSA audit is environmental considerations. This requires all infrastructures audited to have an environmental audit and risk management system in place. To achieve this goal, the Bulk Water Department appointed Ecobe EMS to conduct the environmental audit. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 65 The implementation of the audit programme will assist in identifying noncompliance, risk and best practice environmental issues and enable these to be prioritised and addressed on an annual basis by the Bulk Water Department. This will not only enable compliance with South African environmental legislation and NOSA’s environmental requirements, but also ensure that environmental benefits are maximised and risk to employees, surrounding communities and the natural environment are reduced and cost savings achieved. It is imperative that such a protocol takes account of all relevant legislation and related environmental requirements. In this regard, as most of CMC Water’s infrastructure in the peninsula area falls within or adjacent to the Cape Peninsula National Park (CPNP), the protocol must comply with the requirements of the Infrastructure Management Plan of the CPNP. Section 7 of the Act covers the Environmental Regulations for Workplace. It is the responsibility of each manager to minimise/eliminate pollution and to ensure good environmental conditions for employees. Water treatment plants do no pose too much of a threat to the environmental. Sludge, the by-product of the treatment process is harmless and is disposed of in landfill sites. There is little chance of air pollution with regards to hazardous chemicals as the water treatment plants have been designed to contain spillages and minimise releases. 6.4.2 National Water Act The CCT has registered its bulk water use in terms of Section 4 (Use of Water) of the National Water Act (1998). The registration application includes the registration of bulk water supplied to consumers outside the Cape Metropolitan Area. The Cape Metropolitan Area falls within the Berg River Water Management Area. Approximately half of the CCT’s raw water supply requirements originates from water sources within an adjacent Water Management Area (i.e. the Breede River Water Management Area). It is important that the CCT is represented on both these Catchment Management Agencies when they are created in terms of the National Water Act. 6.4.3 Water Services Act In terms of the Water Services Act, every Water Services Authority has to: • promulgate Water Bylaws, which set out conditions for the provision of water services. There is a need to draft consolidated Water Bylaws for the CCT as discussed in section 3.5. • draft a Water Demand Management Strategy and Policy. CCT complies with this requirement, i.e. a Water Demand Strategy GO TO and Policy GO TO has been accepted as discussed in Section 4.3. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 66 7 Future Infrastructure Requirements Issues: • Not all administrations have comprehensive master plans (both water and sewer); • Inadequacy of current preventative maintenance / pipe replacement programs • Stormwater / groundwater infiltration in sewers • Major bulk water and wastewater infrastructure requirements • Siting of future Water Treatment Plants dependant on water resource availability. 7.1 Status of Existing Master Plans Table 7.1 indicate the status of existing Water and Sewer Master Plans as based on the former MLC boundaries. A link to the treasury system and an accurate unaccounted-for-water analysis was done for the areas as indicated. Table 7.1 Current Status of Master Plans * Does not include a future infrastructure 15 yr horizon master plan; ** Interface does exist with the bulk meter record database. *** Moddelling and planning has been done, but no formal master plan exists. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 7.2 67 Overview of Proposed Expansion to Bulk Infrastructure This section is currently under review and will be revised in December 2001, since alternative options (Table Mountain Group Aquifer) for water supply are being investigated which will impact on the location of the future water treatment works. 7.2.1 Bulk Water Planning Horizon: Planning on the bulk water distribution (refer to Computer Model Analysis and Master Plan for Bulk Water Supply System, March 2001) system has been based on a future AADD of 1350 Ml/d which will be realised in approximately 12 to 15 years time. Conceptual planning of bulk water supply infrastructure has however been carried out up to an AADD of 1850 Ml/d. This AADD will only be realised in approximately 25 years time. Raw water sources: There is much uncertainty with regards to future raw water sources for the Western Cape. For this reason, the CCT as part of their Master Plan for the Bulk Water Supply System initiated a study looking at the integration of the raw water sources supplying the CMA, and the effect the development of these raw water resources would have on the associated bulk water supply infrastructure. (Refer to the report entitled “ Integration of Raw Water Resources Supplying the CMA”). A key strategic issue which has been identified is the availability and timing of future water resources. The availability of future water resources affects the siting and sizing of future water treatment plants, bulk distribution pipelines and bulk storage reservoirs. Long term infrastructure planning by the CCT and DWAF has to happen concurrently and timeously so that the two process can inform each other. It is imperative that an indication and commitment is obtained from DWAF as to potential yield and timing of implementation of the Brandvlei Scheme as well as the Molenaars River Diversion. The CCT is currently investigating the feasibility of the Table Mountain Group Aquifer as a source of water for Cape Town. Information pertaining to the above mentioned schemes will inform the location and sizing of a new WTP and associated pipe infrastructure. In addition to the TMG Aquifer, it is anticipated that the CCT will proceed with the implementation of the Voelvlei Augmentation Scheme as was described under the Section of the WSDP entitled "Integrated Water Resource Planning" WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 68 Additional WTP capacity: For full utilisation of an additional yield of 345 Ml/d (AADD planning horizon of 1350 Ml/d), additional WTP capacity of 500 Ml/d is required. (The full 500 Ml/d is used in summer peaks, but less than 345 Ml/d is used in low demand winter months. The average utilisation equals the yield of 345 Ml/d). Provision of the 500 Ml/d capacity was investigated at Faure-, Blackheath- and Wemmershoek WTP’s (close to the proposed Skuifraam Dam), which are all linked to the RSE raw water system. The following options along with the associated bulk pipeline and bulk storage reservoir infrastructure were investigated and costed: 4) Option 1: Installation of 500 Ml/d additional water treatment capacity at the existing Faure WTP 5) Option 2: Installation of 140 Ml/d additional treatment capacity at Wemmershoek WTP and an additional 360 Ml/d treatment capacity at the existing Faure WTP 6) Option 3: Installation of a new 500 Ml/d WTP at a site near the proposed Skuifraam Dam Although the options still require further investigation, Option 3 at this stage is the preferred option for the following reasons: • A new WTP in the vicinity of Skuifraam Dam will reduce the reliance which the CCT currently places on the RSE Tunnel System (security of supply) • A WTP near Skuifraam Dam and associated pipework could cater for the growing water demands of Paarl and Wellington and make available currently under-utilised capacity in the existing pipeline from the Wemmershoek WTP. • The WTP could feed the areas of high growth (ie Durbanville North) directly. • It would provide an alternate source of supply to Glen Garry Reservoir and enable the Wemmershoek WTP to be shut down for repairs or maintenance. • Water from some of the sources could be gravitated to Glen Garry Reservoir (as opposed to Option 1 where all the water would have to be pumped to Glen Garry) • Increased flexibility in the bulk supply system The proposed schematic layout for option 3 is depicted in Figure 7.1a and Figure 7.b. Schematic layouts and a detailed description and costing of the other options are contained in the Master Plan of the Bulk Water Supply System. Due to the uncertainity associated with the availability of raw water resources, it is anticipated that any new water treatment plant capacity which is required will initially be implemented in increments of 250Ml/d. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 69 The siting (and possible future sizing) of future water treatment works will be decided upon when greater clarity concerning future raw water resources comes to hand. Refer to the report entitled “ Integration of Raw Water Resources Supplying the CMA”. A more detailed study examining the suitability of potential sites identified for a possible new water treatment plant in the vicinity of the proposed Skuifraam Dam will be undertaken 2002. Cost estimates and phasing in of works: The preliminary cost of Option 3, with associated bulk water supply infrastructure and bulk storage reservoirs is in the region of R 1154,3 million. For a detailed breakdown of the future bulk infrastructure requirements (excluding water resource development costs and water treatment plant upgrades and repairs), as based on the Computer Model Analysis and Master Plan for Bulk Water Supply System, March 2001, refer to the Bulk Infrastructure Program GO TO. The timing of the infrastructure requirements assumes that the bulk water supplied by the CCT will follow Package 1 and 2 curve as detailed under "Integrated Water Resource Planning" section of the WSDP. The total cost (year 2001 value) for all the required works within the 1350 Ml/d planning horizon is estimated at R1154,3 million (including P&G’s, contingencies and fees, excluding VAT). A summary of the anticipated costs for water resource development and bulk water supply infrastructure over the next 12 to 15 years is given in the table below: Raw water pipelines Additional WTP capacity Bulk system pipelines Additional pump capacity Additional storage capacity Miscellaneous other items Sub-Total Water Resource Development Costs (for 6 years only) Total : : : : : : R 47,4 million R 140,2 million R 648,2 million R 34,4 million R 213,0 million R 29,8 million R 1 154,3 million : R 115,0 million R 1 269,3 million The three year CCT bulk water capital expenditure program is also attached GO TO. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 70 7.2.2 Wastewater The Bulk Infrastructure Program GO TO summarises the future sewer infrastructure requirements to meet the future growth, but also to adhere to DWAF’s new effluent standard requirements to be implemented by 2010. The total cost of upgrading is estimated at 1.5 billion over the next 10 years, with 66% of this capital required for upgrading of the Athlone, Milnerton and Zandvliet wastewater works. Although it is estimated that the annual expenditure required is in the order of R145 million, it is preferred that this programme be implemented over a shorter period due to the current condition of infrastructure and the requirement for increased capacity. Therefore an expenditure of more than R100 million per annum over the next four years is required. For more information refer to the 3 year capex program GO TO. Strategic Bulk Wastewater Study: The Strategic Bulk Wastewater Study (1999) assessed the performance of existing wastewater equipment, processes and management systems and identified where improvements were necessary for more effective performance. In addition the development predicted to take place in the CMA over the next 20 years, identified the need for facilities to be extended or new ones to be put in place. The comprehensive (37 volumes) Strategic Report on Bulk Wastewater requirements over the next 20 years forms the basis of guidance for effective planning of conveyance and treatment of wastewater in the CMA. The basis of the study included the following issues: • Catchment analysis • Performance of existing facilities • Expected growth in the CMA over the next 20 years • Strategic planning and prioritisation • Environmental impacts • Effluent re-use • Sludge management • Rationalisation of wastewater facilities • Odour control • Tariff calculation and funding requirements For more information concerning the study refer to the synopsis of the strategic study in the document entitled “Strategic Evaluation of Bulk Wastewater” (Contact the CMC Administration ) WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 71 Cape Wastewater Consultants were appointed on 27/9/2001 to undertake additional investigations into various factors that could influence the recommendations contained in the Bulk Wastewater Study completed in 1999. The following aspects are going to be considered in greater detail: • Water Demand Management • HIV/Aids • Effluent Standards on design approach • Rationalisation • Evaluation of capital requirements • Estimated Planning Horizon • Infiltration For more detailed description of the above-mentioned issues refer to the document entitled “Bulk Wastewater Infrastructure”. GO TO. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 7.1a Required Works for Future Bulk Water Supply System 72 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 7.1b Required Works for Future Bulk Water Supply System (Detail) 73 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 74 7.3 Overview of Proposed Expansion to Reticulation Infrastructure 7.3.1 Water The works required to ameliorate existing problems and to cater for growth in demand have been investigated in detail in the various master plans (refer to Table 7.1). Where no detail master plans were available the required works were based on the Capital Infrastructure Programs of the applicable Administrative Units. Only a brief summary of the required works is herewith provided based on the former MLC boundaries. More detailed information is available in the relevant master plans. An example of a water master plan as compiled for Helderberg (2001) is included in to indicate the available information. Blaauwberg: Apart from general upgrading required in the Milnerton-, Melkbos- and Atlantis zones, most of the future bulk infrastructure will be required to accommodate the large areas earmarked for residential development to the north of Table View. Bulk supply to this area is already limited and these future areas would not only require major upgrading of the CMC bulk water system, but would also require a new bulk connection, feeder main and proposed reservoir at Contermanskloof (2 x 25 Ml) and an extension of the water network to provide water to small holdings. Cape Town: Most of the available land in the former Cape Town area has already been developed, which implies that no major bulk infrastructure will be required in future. However, since many of the pipelines are more than a 100 years old, most of the capital expenditure is required for the replacement of aging infrastructure. Currently approximately 12km of pipeline is replaced each year, which is inadequate when considering that there are more than 2000 km of pipeline in this area which equates to a replacement period of more than 150 years. Helderberg: Most of the future works are required to accommodate the large areas earmarked for future development in the Sir Lowry’s Pass and Gordons Bay areas. Works include new reservoirs and pumping stations for the high lying areas in Sir Lowry’s Pass and Sweetwaters. Other works include reinforcements to the bulk supply system in Somerset West and Gordons Bay and four new CMC connections. (Refer to Figure 7.2 and Table 7.2 under Helderberg heading). WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 75 Tygerberg: Apart from the capital projects required to replace and upgrade existing infrastructure, a number of additional projects have been identified for the short term and medium term including the upgrading of the Eksteen and Old Oak pumping stations, the removal of mid-block pipes in Bishop Lavis, provision of water to small holdings (Westerdale), Silverboom rising main, a new 400 mm main in Avonwood Road. The high growth in and around Durbanville demand a new bulk connection, bulk pipelines, a new pumpstation and a reservoir. Additional bulk connections and pipelines are installed for developments in Delft and Mfuleni. Oostenberg: The Oostenberg water supply system is generally sufficient to meet the current water demand. Large areas have been earmarked for development mainly north of Kraaifontein (Langeberg), east of Kuils River (Zevenwacht, Hazendal) and in the open areas surrounding Blue Downs. Apart from the bulk facilities to service these areas, a number of existing pumping stations and feeder mains would require upgrading including the Bloekombos, De Novo, Langeberg and Kuils River systems. Various pumpstations require upgradings to supply high growth areas. Storage requirements are generally sufficient to meet the future water demand, but needs to be confirmed through the Water Master Plan currently being compiled. It is anticipated that additional storage will be required at the Andrag reservoirs as well as a new reservoir site to serve future areas north of Blackheath near the Stellenbosch Arterial. South Peninsula: Apart from general renovations no significant upgrading of the pumping stations are required. Additional storage is required at a number of reservoir locations of which the most significant are Houtbay (6.5 Ml), Wynberg (40 Ml) and Brakkloof (14.5 Ml). New bulk supply pipelines are also required in a number of places including Pelikan Park, Vrygrond and Westlake. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 7.2 Example Water Master Plan: Helderberg Administration 76 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 77 Table 7.2 Example: Water Master Plan of Helderberg AdministrationProposed Projects WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 78 7.3.2 Wastewater The works required to ameliorate existing problems and to cater for growth in demand have been investigated in detail in the various master plans (refer to Table 7.1). Where no detail master plans were available the required works were based on the Capital Infrastructure Programs of the applicable Administrative Units. Only a brief summary of the required works is herewith provided based on the former MLC boundaries. More detailed information is available in the relevant master plans. An example of a sewer master plan as compiled for Helderberg (2001) is included in to indicate the available information. Blaauwberg: As previously discussed, the almost 3000 ha residential land earmarked for development north of Table View west of the N7 will require major bulk sanitation infrastructure. Apart from the 5 new sewage pumping stations required at Doornbach, Dunoon, Railway Bridge, Blaauwberg Bridge and Witzands, the existing Sandown pumping station will also require upgrading. A new outfall sewer is required for the Parklands development, while new collector mains would be required in a number of places including Beach Boulevard, Du Noon, Surringdale, Diep River and Witzand. The Postdam wastewater works would also require upgrading. Cape Town: The available land in the Cape Town area is almost fully developed, which implies that no major new bulk sewerage infrastructure is required. However, since many of the systems are older than 100 years, most of the capital investment is required for the replacement of old collapsing sewers, especially pitch fibre pipes. Ad hoc Closed Circuit Television (CCTV) inspections are important to determine the condition of sewers. A network will be installed in industrial areas where septic tanks are still in operation. Helderberg: The capacity of the sewer reticulation system is generally adequate to accommodate the future developments. The Gordons Bay drainage area requires new outfall sewers to accommodate the future development areas to the northeast. The Strand/Sir Lowry’s Pass drainage area requires a new “cut-off” outfall along the N2-route to link up with the rehabilitated Gants sewer line. The Somerset West A- and B- Stream drainage areas require new outfall sewers to eliminate existing pumping stations. The Macassar drainage area requires two new outfall sewers, pumping stations and rising mains to enhance the level of service in the Sandvlei and Kramat area. (Refer to Figure 7.3and Table 7.3). WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 79 Tygerberg: Apart from the replacement and upgrading of existing sewerage infrastructure a number of short term projects have been identified including new outfall sewers for Durbanville (Trunk sewer - Phase 4), Bishop Lavis and Parow. A number of Vitro/Glaze sewers will also be upgraded in Bishop Lavis and Ravensmead. A comprehensive project to replace approximately 400Km of pitch fibre pipe over a 10 year period, started recently. Oostenberg: There are a few areas in Oostenberg where the bulk sewer reticulation systems require upgrading including a new outfall sewer along Saxdowne Road and the upgrading of the Kuilsriver Outfall to accommodate areas earmarked for development in the Hazendal/Zevenwacht areas, while an the Brackenfell outfall sewer (along Old Paarl Rd) also requires upgrading. The high stormwater infiltration in Kraaifontein also needs to be addressed. South Peninsula: There are approximately 3000 septic tanks in operation in the South Peninsula area. These systems, such as in Scarborough, was initially planned for smaller developments, but as the density of septic tanks increased so did the potential for groundwater pollution. Plans are in place to upgrade the Scarborough and Noordhoek septic tank systems to smallbore or waterborne systems. Bulk sanitation services are also required in Westlake, Pelican Park and Vrygrond, while many of the existing pumping stations will require upgrading including Raapkraal, Retreat, Rondevlei, Clifton, Glen Cairn and Fishhoek which includes the installation of telemetry systems, variable speed pumps and the installation of engine driven pumps. Reticulation is required in a number of new developments including Zeekoeivlei Phase 3, Kommetjie, Houtbay Stage 2 and in the informal areas of Imizamo Yethu. The rehabilitation of pitch fibre pipes is also required in a number of places. 7.3.3 Summary of Capital Expenditure on Bulk Reticulation It is difficult to determine the future long-term capital requirements for water and wastewater reticulation infrastructure. This is partly because not all the areas have master plans (refer to Table 7.1), which makes it difficult to determine the impact of growth and future developments on existing water and sewerage systems. For the purposes of the WSDP only the short-term capital requirements are herewith reflected as based on the recent budget exercise for 2002/2003, i.e. R80 mil on the Water Account GO TO and R101 mil on the Sewerage Account GO TO. Figures for the 2003/2004 and 2004/2005 financial years have also been calculated, but only reflects the additional capital requirement of currently identified (for 2002/2003) projects. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Figure 7.3 Example Sewer Master Plan: Helderberg Administration 80 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 81 Table 7.3 Example: Sewer Master Plan of Helderberg AdministrationProposed Projects WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 8 82 Financial Aspects Refer to strategic financial analysis section for discussion of issues 8.1 Introduction The City of Cape Town faces significant challenges to transform water and sanitation services into a world class water services provider which is customer friendly, efficient and sustainable. These challenges include: • Formation of a single operational entity from seven different administrations • Providing services to households living in informal settlements • Undertaking a very significant capital investment programme • Improving operational efficiencies • Improving customer relations • Improving revenue management • Improving asset management In a short space of time significant progress has been made, including: • Successful implementation of free basic water for all • Establishment of a customer charter • A decision to form a ring-fenced business unit Nevertheless much remains to be done. Progress to date and the challenges lying ahead are reported on in more detail below. In view of this context, the institutional and financial plan should be viewed more as a strategic document mapping the way ahead rather than a detailed plan with specific financial and tariff commitments. Until certain strategic decisions have been made and the accounting foundation for a new water services entity has been laid, it is not possible to make commitments in this plan to specific financial targets. 8.2 Institutional reform Vision: The vision of the City’s Water Services Unit is to become a world class provider of quality and affordable water services whilst ensuring that water resources are conserved and managed for future generations. Separation of service authority and service provider: It is the intention of the city to separate the roles and responsibilities of the service authority and service provider more clearly as provided for in the Water Services Act (Act 108 of 1997). The details of this relationship still need to be worked out. This will form part of the organisational restructuring process reported on below. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 83 It is likely that the service provider will have contract or “service delivery agreement” (SDA) with the Water Service Authority (WSA). The Water Service Development Plan (WSDP) will form a key basis for the development of this contract. The SDA will outline the level and quality of service to be provided to the community, the program for upgrading and extending the level of service to cater for growth, as well as plans to deal with key strategic issues that have been identified. Section 78(1) assessment: The City of Cape Town is in the process of restructuring as a result of the amalgamation of the previously separate administrations into one metropolitan council after the local government elections in December 2000. This restructuring provided the trigger to review service delivery arrangements for water in terms of Section 78 of the Municipal Systems Act (Act 32 of 2000). An assessment carried out in terms of section 78 of the Municipal Systems Act indicated that “the best internal mechanism to achieve this vision is for the provider to be structured into an Autonomous Ring-fenced Business Unit.” Consequently, the Executive Committee made a decision in November 2001 to establish an autonomous ring-fenced business unit by November 2002. The Section 78(1) assessment further recommended that the water and sanitation services unit: • increase its control over its inputs, including staffing and remuneration • make itself more accountable for its outputs • implement a performance management framework, including best-practice benchmarking • develop a set of water and sanitation policies and strategies • link the service strategies to the performance management framework • become more customer focussed • improve its business practices • assume greater responsibility for billing and debt collection Meaning of a ring-fenced business unit: In the context of the proposed restructuring of water services, the concept in financial terms of a ring-fenced business unit is understood to mean the following: • a separate chart of accounts • clearly defined and separate cost and income centres • clearly defined and substantiated cost allocations • full operating income statement in compliance with GAMAP • full asset register in compliance with GAMAP • full responsibility for long term asset management • full responsibility for income • full responsibility for customer management WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 84 Allocation of support functions and shared service centres: At present, support services (such as finance, billing, information technology and human resources) are rendered by other departments in the city administration. Although ring-fencing as defined above would seem to imply that all of these support services should now be housed within the ring-fenced unit, this is not necessarily the case. The water services unit will need to embark on a process of negotiation with the “corporate centre” as to the best arrangements for the city as a whole for the allocation of these support functions. One option which will be explored is that of a “shared service centre” which would provide core support functions to a number of trading services. In this scenario, service level agreements can be struck between the water service unit and the shared service centre (or any other agency – whether internal or external – providing a service to the unit). The motivation for a shared service centre is that this can achieve economies of scale and avoid possible duplication. The policies, strategies and details of these arrangements are being investigated by the city and it is too soon to report on likely outcomes from this process. Area delivery model: An area delivery model is being developed for the city as a whole. The relationship between this and a ring-fenced water services unit is still in the process of being defined. Customer interface: The respective roles of the ring-fenced water business unit vis-à-vis other trading services, a “shared service centre” and the “corporate centre” for the interface between the Council and citizens/customers are still in the process of being defined. Current institutional arrangements: At present, and until the institutional reforms are implemented, the structure of the water and wastewater department is as follows: • A member of the Executive Committee is responsible for trading services (another member is responsible for finance). • The Council has a portfolio committee for trading services and a separate portfolio committee for finance. • An executive director for trading services has been appointed. • There is an acting director for water services (a permanent appointment is to be made shortly). • There are permanent, acting or interim managers for the following main functional area: bulk water, bulk wastewater, water and wastewater reticulation. The staff are operating within the previous administrations and the final organisational design and staff placements will be completed by 1 January 2003. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 85 Current performance: The Section 78(1) investigation included an assessment of current performance. For details of this assessment, refer to the report “Assessment of Internal Mechanisms for the Provision of Solid Waste, Water and Sanitation, and Electricity Services” (City of Cape Town, November 2001). Principles of organisational design: The intention is to have a ‘flat’ structure with a maximum of five reporting levels, with full delegation of authority and accountability to each cost centre manager who will be accountable for their outputs based on the resources allocated to them. In order to hold managers accountable for outputs, adequate management information is required. Progressive and considered implementation of the Enterprise Resource Planning (ERP) system and the setting up of a Water Information Bureau will support this initiative. Crucial to the success of the ERP system is the implementation of a maintenance management module which will, inter alia, enable managers to manage assets optimally, track expenditure against assets, compare the productivity of work teams, plan and balance resource allocation. The control over inputs and the measurement of outputs will lay the foundation for a solid performance management framework and system. It is anticipated that the balanced scorecard will be adopted by the Council and Water Services. ISO 9002: To enhance the world class status of the water services unit, it is the plan that bulk water and reticulation will achieve ISO 9002 accreditation by 30 June 2002 with the wastewater treatment plants following by 30 June 2003. As part of achieving accreditation, a Customer Charter has been developed and will be updated on an annual basis with input from the customers. Compliance with the Charter will be tracked through monitoring key outputs as well as by undertaking regular customer satisfaction surveys. The process to achieve accreditation involves business process mapping and re-engineering which is being linked to the ERP implementation. Extensive staff training in Competency Based Performance Management (CPM) and other training is being embarked upon and change interventions undertaken to ensure business processes are optimised. ISO audits will be done annually. 8.3 Financial planning in the context of uncertainty The water services development plan has identified the capital expenditure requirements over the next five to ten years. Detailed financial modelling has been undertaken to ascertain the implications of this capital expenditure for the sustainability and viability of the service. Before reporting on the outcomes of this modelling, it is important to understand that any financing forecasts in the present context are subject to significant levels of uncertainty for the following reasons: WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 86 Data uncertainty: There is considerable uncertainty related to the data requirements for financial modelling and forecasting in the following areas: • The value of the assets. No comprehensive asset register exists and estimates of the condition and value of current assets are highly uncertain. This uncertainty affects the depreciation charge required with the introduction of GAMAP. • True operating costs. The real costs of operating water and wastewater services are not know at this point in time. This situation exists because water services costs, particularly those of support services, are recorded in seven different accounting systems with different recharge systems in place. The true operating costs will only be known once the business has been ring-fenced and audited. • Water sales for the base year. The volume of water sales for the base year (the current year) is uncertain as a result of the impact of water restrictions during the previous year (now lifted) and the complications arising from need to assemble billing data from seven municipal billing systems, making real time analysis of comprehensive city wide billing data difficult. Policy uncertainty: There is uncertainty in the policy arena in the following key areas: • Sanitation tariff policy. There is uncertainty related to the way in which sanitation will be charged for in the future. At present, different charging methods are used in different areas in the city, the two methods being a combination of volumetric and fixed charges on the one hand and rates based charges on the other. A draft sanitation policy has been prepared which favours fixed charges combined with volumetricbased charges (in rather than rates funding and in accordance with national guidelines), however, a final policy decision on this must still be made. • GAMAP. Generally Acceptable Municipal Accounting Practice (GAMAP) is due to be implemented in July 2003. At this stage there is uncertainty with respect to many of the detailed implications of the introduction of GAMAP as well as the practical issues of moving from the present system of municipal accounting to GAMAP. This uncertainty affects both the format and content of financial forecasting. Institutional uncertainty: The water services is in the process of fundamental transformation. Many of the broad issues related to this reform still need to be defined and strategies chosen. Key uncertainties relate to the future of support services and the management of the customer interface, including revenue collection and debt management. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 87 8.4 Financial modelling – approach and outcomes 8.4.1 Approach to financial modelling In view of the uncertainty identified above, a dual approach to financial modelling was adopted. The first approach was based on a “business as usual” approach, in which current practices are projected into the future. The second approach was based on a strategic approach to modelling, the key intention being for the modelling to help identify key strategic issues and choices faced by water services and to provide a tool to explore the financial implications of different choices. The base data and technical assumptions (such as the growth in water sales, for example) used in each model is the same and the models give similar results when converged to the same overall set of assumptions. 8.4.2 Capital expenditure The capital expenditure current forecast is presented in Figure 8.1 below. This compares to historical capital expenditure in the region of R250 million per annum. Hence a significant increase in capital commitments is expected in the future. GO TO 2001/2002 Capital Budget for Water Services Figure 8.1 Forecast capital expenditure (2001 Rands) WSDP Capital investments 600 500 R million 400 wastewater retic bulk wastewater water retic Bulk water 300 200 100 - 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 The strategic financial model highlighted the following issues: WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 88 Services to formal low-income housing: The provision for formal low-income housing is modest, about 13 000 units per annum compared to a backlog of 240 000 units. The costs of the internal (neighbourhood) reticulation related to this housing provision is not provided for in the capital estimates shown at it is assumed that these costs will be financed through housing related subsidies. It is assumed that all households living in formal housing units have access to an adequate level of water and sanitation services. Services to informal housing: The Council is committed to providing services to all households within its municipal area subject to any relevant legal constraints. It is difficult to accurately estimate the cost of providing basic services to households living in informal settlements due to the fact that settlements are dynamic – some may not be permanent, some may move and the number of households living in informal settlements is likely to grow in future given the relatively low rate of provision of formal housing opportunities. At present it is estimated that there are 18 100 households without adequate water services and 53 100 households without adequate sanitation services. The cost of providing a very basic (RDP) standard of service to these households could be as little as R30 per household for water and R110 per household for sanitation. This would provide for a communal standpipe within 200m and communal waterborne sanitation facilities. A three year programme to provide all existing households in informal settlements with a very basic RDP standard services would thus cost about R7 million. The City intendes to put aside R5 million per annum to provide services to households living in informal settlements and aim to supply all existing households living in legalised informal settlements with adequate water services by the end of 2002 and with adequate sanitation services by the end of 2004. A more detailed programme is in the process of being developed. At this stage informal settlements situated on private land (unauthorised settlements) are precluded from being supplied with basic services. Provision for renewals: In order for the water and sanitation service to be sustainable over time it is necessary to implement an ongoing asset renewal programme. Available evidence suggests that the current asset renewal programme is inadequate. For example, it is estimated that at the current rate, it would take more than 300 years to replace the water pipe network. Clearly this is not sustainable given the assumption that the life of the water network is estimated to be about 50 years. The WSDP capital estimates do not include an asset renewal programme which would result in a sustainable service over time. This is an area that needs further investigation. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 89 Bulk wastewater estimates: The bulk wastewater capital estimates are largely based on a 1997 strategic review of the bulk wastewater network. A number of strategic issues have arisen subsequently and this work is in the process of being revised. One important area of investigation is the extent of stormwater infiltration and mechanisms to reduce this. Another important area of investigation is the estimated growth in treatment capacity required. This investigation is still in its early stages (it commenced in November 2001) and its outcomes may have important implications for future capital cost estimates for bulk wastewater. 8.4.3 Financing Current cost of capital: The current average cost of existing capital debt is estimated to be 15.5% per annum. This is a rough estimate as a consolidated portfolio of water and sanitation loans is not available for the city as a whole. Clearly this cost is very high relative to the market interest rates. One could expect the cost of borrowing for a well run and financially viable metropolitan water utility to be in the region of prime to prime less 2, that is, in the region of about 11% to 13%. Gearing: Total outstanding debt is estimated to be R1.2 billion. Assuming an asset value of R10 billion (revalued), then the debt to equity ratio is about 0.14. This indicates that the water services operation is considerably under-geared at present and significant scope exists to raise loans to finance future capital spending. Sources and cost of finance: The ring-fencing of the water service operations creates an opportunity for the business to develop a new financing strategy. This strategy should comprise the following: • Re-negotiation of outstanding loan conditions with the city to realise a more market-related interest rate. • Raising loans from banks at competitive interest rates. • Consideration of the placement of bond for the raising of finance. • Consideration of private financing arrangements through, for example, build-operate-transfer contracts for lumpy investments such as new wastewater treatment plants. For first such an opportunity is being explored for the Zandvliet Wastewater Treatment Works. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 90 8.4.4 Customer Debt The outstanding customer debt for water is estimated to be about R460 million at present. This is equivalent to eight months of water sales. An estimate of the customer debt for wastewater is not available. Arguably, it is likely to be of a similar magnitude to the water debt. The water customer debt balance is increasing at a rate of about R50 million per annum. If the rate of collection of wastewater rates and service charges is the same as that for water, then the average revenue collection rate is estimated to be about 90%. This is low compared to international best practise of 98% and African best-practice of 95%. Improving revenue collection is of critical importance to the sustainability of water services. This will require a multi-pronged strategy comprising: • Improved customer interface • Customer education • Improved billing (both simpler and more informative) • Improved accessibility to payment facilities • Affordable tariffs incorporating a pro-poor element (as currently provided for through free basic water) • Improved credit control and debt collection These strategies are integral to the restructuring process reported on above. 8.4.5 Provision for depreciation GAMAP will require that assets are depreciated over their useful life and that the cost is included on the income statement. This could have a significant impact on the income statement. Assuming an asset value of R10 billion (the WSDP estimates a replacement cost of R16 billion) and a depreciation rate of 2% straight-line (in other words, the assets are “used up”, on average, over 50 years), then the annual depreciation charge will be of the order of R200 million per annum. 8.4.6 Operating costs The strategic financial model investigated future operating costs for water services (water and wastewater) in some detail. The following cost drivers were identified: staff, maintenance, bulk water purchases from DWAF, electricity, chemicals and “other expenses” (a grouping of the remaining expenses). One possible scenario for future costs is presented below. The costs are expressed as c/kl of water sold (in 2001 Rands) as well an in percentage terms. The results of the analysis should be regarded as indicative only given the uncertainty of the base data as already discussed above. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 91 On the basis of this analysis the following comments may be made: Overall operating costs (expressed as c/kl of water sold) are expected to increase in real terms in future, though not very significantly (the indicative scenario shows an increase of 14% over 5 years). The primary reasons for this are the increase in maintenance costs and bulk purchase costs. Staff costs (expressed as c/kl of water sold) are forecast as staying constant in future. This means that as proportion of total costs, they will decline. Given that staff costs account for 30% of operating costs at present, it seems reasonable to expect that this ratio should drop over time, down to 25% or lower in the medium term. Until a detailed organisational design exercise has been undertaken and a more detailed business plan for the ring-fenced business developed, it is not possible to accurately forecast staff costs. Maintenance costs currently account for about 10% of operating costs. These costs are forecast to rise in real terms in future as it is believed that expenditure on maintenance at present is not adequate to maintain the assets in good working order. Bulk water purchase costs from DWAF will increase in real terms in future. This is primarily as a result of Skuifraam Dam. Electricity and chemicals together make up about 15% of operating costs. Chemical costs are forecast to increase in real terms as a result of a depreciating Rand. In this scenario, electricity costs were forecast to remain constant in real terms. Other costs make up 38% of total costs. This is very high by international best practice standards. In this scenario, these costs are forecast to decrease by 3% per annum (in real terms). This would result in the “other costs” accounting for 18% of operating costs in year 10. This forecast is highly speculative and is contingent on the outcomes of the restructuring and business reengineering processes. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 92 Figure 8.2 Operating costs - indicative scenario Operating costs ("pure") - real 450 400 350 c/kl sold 300 250 200 150 100 50 2002 2003 2004 staff chem 2005 2006 maint elec 2007 bulk dwaf other 2008 2009 2010 2011 2012 bulk skuif Figure 8.3 Operating costs expressed as % Cape Town Water Services: Contributions to operating costs 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 2002 Staff costs 2003 2004 Maintenance 2005 2006 2007 Bulk purchases (incl Skuif) 2008 Electricity 2009 2010 Chemicals 2011 2012 Other costs 8.4.7 Tariffs For details on the current tariffs and policies refer to the following documentation: GO TO GO TO GO TO GO TO GO TO Sanitation Tariffs Bulk Water and Reticulation Tariffs Bulk Water Tariff Policy Consumptive Water Tariff Policy Sanitation Tariff Policy WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 93 Future water and wastewater tariffs are dependent on a number of factors, including: • Sanitation tariff policy • Level of capital expenditure • Sources of finance and cost of capital • Value of assets and depreciation policy • Rate of collections and provision for bad debts • Actual water sales For the reasons already identified and discussed above, a significant degree of uncertainty is attached to all of these factors. Therefore, it would be unwise to predict future water and wastewater tariffs into the future at this stage. Nevertheless, based on the detailed financial analysis undertaken to date using both the “business as usual” and “strategic” financial models, and subject to the limitations already expressed, it may be concluded that it is highly likely that tariffs will need to increase in real terms significantly during the next three to five years in order to ensure that the water services unit is financially viable and sustainable. 8.5 Affordability 8.5.1 Introduction The broad issue of affordability of basic services including water services is key to the development of any successful and sustainable Water Services Development Plan (WSDP). A number of key strategic issues are imbedded in this broad area including: • The realistic establishment of sustainable tariffs, • Determining appropriate service levels across different consumer types, • The nature and scope of any indigent policy, • The development of a customer care/management facility to improve the interface with customers, • The implementation of an affective credit control policy, • The development of an effective metering and billing system to span all categories of customers, • Without an accurate understanding of the affordability of services, the strategic interventions required in the areas outlined above will be severely undermined. 8.5.2 Package of services and affordability Affordability of services and housing is directly linked to what people are willing to pay for the services they receive. Willingness to pay depends largely on the value each household attaches to a particular service. This is highly dependent on local conditions and there are not universally applicable figures which can be applied. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 94 Ideally willingness to pay studies should be carried out before a service is provided. However, this is often not possible and reliance needs to be made on ‘rules of thumb’ in order to take planning decisions. The following represents a ‘rule of thumb’ approach based on work which Palmer Development Group has done nationally. It illustrates households’ willingness to pay for various services. It is notable that, in most instances, 10% of the income is regarded as the maximum amount a household would be prepared to allocate to service payments. The assumption is made that households are willing to pay more, in relative terms, for water and electricity than the other services. 8.5.3 Household income profile An analysis of household incomes in the metro indicates that there is a significant portion of the population that currently are at risk of not being able to afford the services they are currently receiving. The graph below illustrates that approximately one third of the households in the metro earn less that R1100 per month (this is presently the poverty threshold used to calculate equitable share allocations). Using established and accepted norms, this suggests that this group of households will be able to afford to pay no more that R110 per month in total for services they receive (10% of gross income), and R33 per month for water (3% of gross income). Figure 8.4 Household Income distribution (2001 rands) HH income distribution 25.0 % HH 20.0 15.0 10.0 5.0 Over R36750 R1960136750 R1347619600 R980113475 R73519800 R44927350 R42884491 R30634287 R18383062 R12261837 R613-1225 R246-612 R1-245 None 0.0 R/m This picture is exacerbated when one considers that over 25% of the households earn less than R612 per month, implying that these households would be able to pay no more than R61.20 per month for their total package of services and no more than R18.36 for water. Most of these households however report no income at all and would not be able to afford any level of service. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 95 8.5.4 Water bills and affordability The following graphs indicate the extent to which water bills match the affordability profile of households in the metro. The solid line in the graph below illustrates actual water bills generated using current tariffs and consumption profiles. The dotted line illustrates that amount that households are able to pay for water. The area where the dotted line falls below the solid line represents the affordability gap, i.e. where households are not able to afford their water bills. Figure 8.5 Affordability of water services (current tariff) HH n Water Bills vs affordability (current tariffs, 3% HH income) R/m Water bills Affordability Figure 8.6 Affordability of water services (tariff doubled) HH n Water bills vs affordability (2x tariffs, 3% HH income) R/m Water bills Affordability WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 96 The affordability gap in the first scenario (based on current tariffs and consumption levels) represents approximately 25 of households in the metro. The second graph is based on a scenario where current tariffs are doubled and water consumption is held constant. In this scenario, the affordability gap extends to all customers in the metro indicating that these tariffs would be completely unsustainable from an affordability point of view. 8.5.5 The view from the ground – insights from case studies and focus groups In late 2000 and early 2001, Palmer Development Group, in association with Markinor conducted a number of focus group discussions with household heads from a number of communities across the metro. The anecdotal responses adds texture to other quantitative analyses of affordability of services in the metro. Some of these responses are sketched out below. On payment for services: • It is the “right thing to do”, • “I feel that we should not be paying for water because it is natural and it • • • is for free anyway”, “Nobody manufactures water, they can make us pay for electricity, but not for water”, “We are getting water free of charge from God and he does not make us pay”. Unemployment was sited as a key reason for non-payment, although a range of other contributory factors were identified. Irregular and Inadequate Services: Residents also expressed their unwillingness to pay for irregular and inadequate services. They expressed particular concern about inadequate sanitation and refuse removal services. For example, in Brown Farm eight toilets were serving seven hundred people. Many residents also complained of blocked toilets. In Wesbank residents complained about the inadequate garbage removal services. • "I have raw sewage in my backyard. Why should I pay (for services) when I clean the mess myself and it is not even my mess but I have to clean it. To pay just does not make sense to me." Inadequate Billing and Revenue Collection Residents stated that non-billing, inaccurate and incomprehensible statements made payment difficult. Payment offices were seen as inaccessible and residents did not want to pay for transport to get there. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 97 Unresponsive Service Provision Residents complained about a lack of response from municipal servants. • “When I moved in there, I wrote the council a letter saying that they • • must send me a bill for the rates and sewerage, because I was getting worried, and I waited 5 years for an answer. Then I went to someone from the council, Mr Meysenheymer, and I had to go to him 4 times to get a response about my rates and taxes” (Markinor, 2000:28) “The one day my toilet was blocked, so I phoned them and asked them to repair it. They told me they would be there shortly. Late that night when my husband got home, I had to ask him to do it.” (Markinor, 2000:26) "What makes me cross is that we are always the ones bringing these problems to the council’s attention. Why don’t they send someone out to see to all these things and see what's going on and what's wrong in the areas." (Markinor, 2000:40) 8.5.6 Conclusions From the quantitative and qualitative analyses outlined above, a number of conclusions can be made regarding affordability and the non-payment for services, including: • Communication. Clearly there is a need to communicate with customers on a variety of issues including; explaining what drives services charges, responding to customer queries, etc. • Billing systems. From anecdotal observations raised in the focus groups, it is clear that the current billing system needs to be improved to cover households currently not billed. • Improved service quality. A significant contribution to non-payment appears to be dissatisfaction with the current quality of services. • Indigents policy. With almost 20 % of households in the metro reporting no monthly income, an indigent policy is key to avoiding a social and economic disaster in certain areas. • Water Demand Management. An effective way of reducing household bills for services is to reduce consumer demand on a sustainable basis. This, if effective, will essentially reduce the affordability gap. • Access to equitable share. The affordability analysis shows that the potential extent of cross-subsidisation within the water sector is limited. Therefore it is important that water services motivate for an appropriate share of the equitable share subsidy received by the City of Cape Town in order to provide adequate services to all. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 98 8.6 Summary of strategic issues The institutional and financial analysis undertaken for the water services development plan has highlighted the following strategic issues: Organisation transformation: The water services are currently in the process of being restructured into an autonomous ring-fenced business unit. The following strategies are being pursued: • Organisational design • Establishing a ring-fenced accounting entity • Resolve the question of shared service centres and role of support services • Separate the roles of the service authority and service provider and develop a contractual relationship between the two. • Implement performance management and get ISO accreditation • Implement ERP • Resolve area delivery model and implications for business unit Customer and Revenue Management: Current water customer debt is about R460 million, representing 8 months of sales. Revenue collection needs to be improved and non-payment reduced. The following strategies have been identified: • implementation of credit control policy, • implementation of indigent policy, • resolution of customer management responsibilities within Council, • implement universal metering and billing, • implement informative billing. • Customer education • Improved accessibility of payment facilities Future infrastructure requirements: The capital expenditure needs is in excess of R2 billion over the next 5 years. This is likely to require significant increases in tariffs in real terms in order to ensure the financial viability and sustainability of the service. The following strategic issues have been identified: • Planned provision of formal houses is inadequate to reduce the housing backlog • Provision of basic services to households living in informal housing is expected to require an expenditure of R114 million. Actual investments are subject to legal constraints as many informal settlements are situated on private land. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN • • 99 A realist programme for the renewal of existing assets needs to be investigated and developed. The bulk wastewater capital expenditure estimated are subject to a strategic review which is currently in progress. This addresses the impact of the DWAF 2010 standards, stormwater ingress and growth in wastewater effluent requiring treatment. Financing: The current average cost of capital is high. The following strategies need to be pursued: • Re-negotiate loan portfolio with the city • Investigate alternative financing options including bank finance, bonds and private financing. Financial modelling and tariffs: Given the uncertainty in the base data, the policy uncertainty and institutional uncertainty, the financial modelling undertaken cannot be used to make commitments to financial and tariff targets. The financial analysis has revealed the following strategic issues: • Operating costs are likely to increase in future in real terms, though not significantly • The practical implications of GAMAP still need to be investigated in more detail. • The sanitation tariff policy needs to be finalised and implemented. • Tariffs will need to increase in real terms in the next few years though it is not possible to say by how much until many of the significant uncertainties identified above have been resolved. Affordability: The affordability analysis shows that overall household affordability is constrained, that there are limits to the extent to which cross-subsidies are sustainable, and that it is not possible to increase tariffs significantly without addressing the issue of affordability, indigent policy and subsidies (including the equitable share) in a systematic and considered manner. Management Issues: Apart from the bulk system model compiled for this study, detailed network models exist for most areas which links to the CMC bulk system models. Existing modelling technology allows the following: • Easy updating of computer models from “as-built” plans. • Linking of models to bulk meter and revenue meter data for: • Updating of model demands • Calculation of UAW • Merging of bulk system and secondary models. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 100 Against this background, there is a good opportunity for the City of Cape Town to establish a water services information “bureau”, which will be assigned to continuously update all models and their demands/UAW’s. With the information and technology at hand, such a bureau can also do integrated system planning, and handle ad-hoc queries regarding the individual systems. The bureau function could be outsourced to and managed by a consultant, with seconded staff from the various local authorities. This will ensure a concentration of expertise, and continuity, which is difficult to achieve in a typical local authority structure. Another option would be to form some sort of public-private partnership to run the bureau function. The bureau could “post” the information to a GIS based viewer, in the form of graphs, reports and maps, which are accessible by all management levels in the various local authorities, without the need for computer literacy. 9 Summary of Key Issues Affecting Water Services and Strategic Recommendations A summary of the “issues” that influence the provision of water and sanitation services in the City of Cape Town area is herewith provided in the attached table. Strategic recommendations and a program are also proposed. WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Table 9.1 Summary of Key Strategic Issues, Strategies and Programme 101 WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 102 10 Business Plans and Key Performance Indicators The Business Plan of Water Services is herewith included (Table 10.1) or view the full document entitled “Business Plan.pdf ” GO TO. A provisional list of Key Performance Indicators (KPI’s), which will be implemented to improve and monitor the delivery of water services are summarised in Table 10.1 Water Services Business Plan WATER SERVICES BUSINESS PLAN 2001/2002 - 8 OCTOBER 2001 • Bulk water supply, water distribution, sanitation, wastewater treatment. • Approximately 99% of residents have access to at least basic water services • Approximately 90% of residents have access to full services Our Proposed Vision. The picture of the future we seek to create… • Your world class water services provider Our Proposed Mission. Our sense of purpose ... • Providing our customers with quality, affordable and sustainable Water Services in Cape Town and surrounding areas while carefully managing our scarce water resources and the impact on the environment Our Proposed Values. • • • • • Build Respect: Show respect for people, property, water and the environment Staff Empowerment: Maximise empowerment opportunities Trust through integrity: Build trust by telling it like it is Innovation: A learning organisation innovates and changes continuously for better value Build partnerships and teams: The whole is greater that the sum of the parts • Free allocation of basic water • Transformation into a world class water services provider • Financial accountability and sustainability • The establishment of a comprehensive customer care and management strategy • Ensure quality, sustainable and affordable services to all • The establishment of a comprehensive water management strategy • Operating budget R1,1b, Capital Budget R410m. To be finalised • Staff of 3400 Services Definition The way we want to act, consistent with our mission, along the path toward achieving our vision ... Our strategic objectives Short and Medium term objectives… Resources WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN 103 Table 10.2 Provisional List of Key Performance Indicators Affecting Water Services Delivery WATER SERVICES DEVELOPMENT PLAN OF THE CITY OF CAPE TOWN Comments: 104