FOR357/557 – ’07 Exercise 10 Estimating Erosion Potential See Schedule Letter from the Town of Martinsburg. Town of Martinsburg, Lewis County, NY Environmental Quality Committee 123 River Road, Lowville, NY 12345 Extraordinary GIS and Storm Door, Inc 147 Rt 28 Lowville, NY 123245 Attention: Eustis B. Nifkin Dear Mr. Nifkin: Eustis November 20, 2007 As you are aware we have noticed an increase in the sediment in the Town’s streams and have concluded that this increased load is due to erosion somewhere in the town. Therefore we are contracting with EGSD to locate possible sources of the sediment. We believe that slopes of 15% or more are the most probable sources of the sediment. Your charge then is to find Residential and Agricultural tax parcels that have anay slopes of 15% or more and are near the streams draining the eastern parts of the Tug Hill. Any parcel that has any part within 500 of a stream or river meters is suspect. When we have your report and map of such parcels we will then have our inspectors visit those sites to see if any erosion is taking place. Please provide us with a letter summarizing your findings, a map showing the possible source parcels, and an attachment outlining the method you used to find them. Sincerely; Peter Peter Moss, Chair Martinsburg Environmental Committee CC: Dewy, Cheatum, and How, LLP, 12 Euclid Ave, Syracuse, NY 1. Notes from Sally Forth (Your supervisor --she gets around!) 1.1. You are to write the report for the EQC for my signature. 1.2. Remember that in working with Grids you want to smooth the Grid before computing slope (as you did in EX9). You can either smooth the DEM or the percent slope GRID. 1.3. You want to end up with set of polygons that have slopes >=15%. In the conversion from Raster to Vector be sure to UNCHECK THE SIMPLIFY POLYGONS radio button. In addition, when you RECLASS the Grid of areas with slopes >=15% be sure to make the slope areas in which we have no interest “NO DATA” so that the produced polys are only those areas with the target slopes. 1.4. Since this is our first job with the EQC make the map as professional as possible remembering that the map user has to be able to find the parcels (meets the standard in the course details.) 1.5. Use the GDB provided in the data for Ex9 on esf-academic5. The DEM there works! D:\282214549.doc 5/28/2016 Page 1 of 1