Engineering Biorefineries Into Reality Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt 360º Engineering & Project Delivery Solutions Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt O’Brien & Gere - A National Profile ¾ National rankings Top 500 design firms Top 100 construction management firms Top 250 design-builders ¾ Winner of national ACEC awards ¾ ISO Certified Quality Management System ¾ LEED Accreditation Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Solutions & Services Capital & Facilities Solutions Environmental Solutions Total Water Solutions Energy Air Quality Conveyance Research & Development Facilities Brownfield Redevelopment Dams & Reservoirs EHS & Due Diligence Reuse & Conservation SureCloseTM Decommissioning & Facility Closure Site Engineering Clean Manufacturing Facilities Industrial Manufacturing Facilities Integrated Process Systems & Technology Utilities & Infrastructure Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Eco-Sciences Investigation & Remediation Vaprōtect® Vapor Intrusion Wastewater Water Wet Weather Energy Markets Traditional Power Generation y Infrastructure y APC / Duct Injection y Related Environmental Control / Compliance y Central Utility Plants – Industry y Combined Heat & Power y Water Supply / Treatment Alternative / Renewable Energy y Biofuels / Biomass Ethanol (corn & cellulosic-based) Biodiesel Biogas Biomass to Energy y y y y y DG/CHP Wind – Small wind turbines Energy Storage Fuel Cells Solar / Photovoltaic Sustainability y Carbon/GHG Management y Energy Audits / Management Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt y Carbon Sequestration y Energy Efficiency 360o Engineering & Project Delivery Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Please Visit Us At: www.obg.com Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt U.S. Ethanol Biorefinery Locations Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Biorefinery Life Cycle RESEARCH & DEVELOPMENT REGULATORS CONSUMERS EPA, DEC, Etc. CELLULOSIC ETHANOL FINANCING $$$ EPC DESIGN BUILD TEAMS Subcontractors, Venders, Suppliers FEEDSTOCK Willows, Hardwoods, Switchgrass, Citrus Peels Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt POLICY Project Execution Process Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Project Execution Plan ¾ Planning is key to success Basis of design / process confirmation Design deliverables Permit strategy Procurement / pre-construction plan Cost estimate schedule Process safety / health & safety plan Stage gate process ¾ Detail design / construction ¾ Change management ¾ Start-up / commissioning / optimization Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Biorefinery in New York Implementation Approach Stage Gate Process PRESENT MARCH 2008 DEVELOPMENT STUDY / CONCEPT DESIGN MAY 2008 BOD JULY 2009 DESIGN / CONSTRUCTION 2012 OPERATIONS / OPTIMIZATION LAB TESTING GO NOGO GO NOGO BOD PROCURE PROCESS EQUIPMENT PROCUREMENT CONSTRUCTION PERMITTING GO NOGO CONSTRUCTION START UP OPERATIONS OPERATIONS / OPTIMIZATION OPTIMIZATION COMMERCIAL SCALE Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt DETAILED DESIGN GO NOGO Study/Concept Development ¾ Transition between R&D and design ¾ Integrated research/engineering team ¾ Management of team to focus on: Bench-scale testing / pilot testing Process performance System scale-up Constructability Operability ¾ Basis of Design ¾ Stage Gate Decision Step Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Design ¾ ¾ ¾ Build in flexibility Major Unit Processes Material Handling Utilities/Infrastructure Permit specific input Detailed Design Packages ¾ Major equipment procurement packages ¾ Value engineering/haz-op/ constructability reviews Stage Gate Decision Step ¾ Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Procurement & Construction ¾ Construction Sequence Planning ¾ Procurement – Competitive Bid Process – Expediting/Material tracking – Stage Gate Decision Step ¾ Construction Management – – – – Schedule & Cost Control Site/Quality Control RFI Processing Progress Reporting ¾ Health & Safety ¾ Start-up/Commissioning – Integrated Start-up And Commissioning Team ¾ System Operations Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Process Optimization ¾ Goal of Optimization Process Demonstration to Commercial Scale Facility ¾ Tie to Design and Operations Plan Utility Usage and Trending Process Yield Optimization Scale-up Factors Production Capacity Financial and Market Analysis ¾ Stage Gate Decision Step Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Execution Challenges ¾ Integration of Known Equipment Technology and New Technology Known Technology - Heat Exchange, Filtration, Utilities & Infrastructure, Distillation Development Technology - Continuous Digestion, Hydrolysis (Enzyme Vs Acid), Continuous Economical Fermentation Development of Bio-Products ¾ Freezing the “Process Design” ¾ Balance Capital/O&M with Economic Projections Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt Execution Challenges ¾ Integration of Diverse Groups Colleges/Universities Government Policy Design/Vendors/Contractors Natural Resources ¾ Product Distribution Infrastructure Cdpres 43/GAE/GI.prn/O’Brien & Gere/0307/TPM Biorefinery in NY_0307.ppt