Visiting a general practitioner for our annual checkup is an important routine for maintaining health and well-being. Occasionally, seeing a specialist is even required. However, humans aren’t the only ones who should be receiving this type of attention each year — your data center should be too! What are assessments and upholding best practices worth? A typical 5,000 square-foot data center uses approximately 10 million kWh a year.1 The Environmental Protection Agency concluded that best practices can eventually reduce data center energy consumption by 50%.1 That would save the typical data center 5 million kWh – enough to power a 2016 Ford Focus2 to drive approximately 15.6 million miles. It could drive around the earth 627 times!3 ard a proper w o t p e st 1 e Tak viewing data re y b p u k c e h c ns. Prior to ig s l a t i v r e t cen grade, work s p u r o n io s n a exp ed tec hnician in a r t ry o t c fa with t. If an issue en m s es s s a n a for ecialization. sp k e e s , s t is s per STRONG HEART SHARP BRAIN Start your checkup at the heart of the data Just as the human brain keeps each piece of the center — the power system. UPS, capacitors body working harmoniously, a comprehensive and batteries all work to sustain critical DCIM solution helps keep your data center operations and can’t afford to flatline. UPS running at peak efficiency—delivering real-time equipment failure accounted for 27% of data information allowing you to make the best center outages in 2013, and the average decisions to operate and maintain your UPS-related failure costs $687,700. infrastructure. Data center consolidation, 4 Gartner’s 2012 Data Center forecast virtualization and cloud computing seem to determined that there are approximately be driving this solution – Gartner predicts 492,000 data centers worldwide. If 27% that the market penetration for DCIM of those data centers each lost $687,700, products will grow from the current 12% that would be more than $90 billion lost to 60% by 2017.9 5 to power outages. You could buy a 16GB iPad Air for the entire population of France, Germany and Spain with that kind of money! 6 EFFICIENT AIR INTAKE & CIRCULATION Check the air pumping through your data center. Keep temperature and humidity in the ASHRAE recommended range. Cooling accounts for 40% of total energy use for the average data center (approximately $2.96 billion).7 That would buy you enough Ethernet cable to stretch from Earth to the moon and back – about 4 times.8 Prevent wasting money by ensuring proper airflow and cooling. Sources: 1: Energy Logic: Reducing Data Center Energy Consumption by Creating Savings that Cascade Across Systems (2008) http://www.cisco.com/web/partners/downloads/765/other/Energy_Logic_Reducing_Data_Ce nter_Energy_Consumption.pdf 2: 2016 Ford Focus: 99 MPGe Highway (32 kWh/100 miles) http://www.ford.com/cars/focus/trim/electric/ 3: Circumference of the Earth is 24,901 miles 4: 2013 Study on Data Center Outages http://www.emersonnetworkpower.com/documentation/en-us/brands/liebert/documents/w hite%20papers/2013_emerson_data_center_outages_sl-24679.pdf 5: Gartner’s Forecast: Data Centers, Worldwide, 2010-1016, 2012 Update DIET AND EXERCISE Proper diet and exercise are the best proactive steps to a healthy body. Similarly, a proactive approach to service and maintenance in the data center can extend the life cycle of IT equipment and delay major capital investments. To date, preventive maintenance combined with remote monitoring has resulted in zero system outages due to failed batteries, which normally account for 37% of all system outages.10 6: A 16GB Apple iPad Air retails for approximately $400 dollars http://www.apple.com/shop/buy-ipad/ipad-air 7: Energy Star’s Report to Congress on Server and Data Center Efficiency Opportunities http://www.energystar.gov/ia/partners/prod_development/downloads/EPA_Datacenter_R eport_Congress_Final1.pdf?3faa-d508 8: Average distance from the Earth to the moon is 238,857 miles. 9: Gartner Magic Quadrant (MQ) Report on Data Center Infrastructure Management http://www.datacenterknowledge.com/archives/2014/09/24/gartner-tackles-data-centermanagement-with-dcim-magic-quadrant/ 10: Protect Power System Availability with Preventative Maintenance, Liebert Services http://www.emersonnetworkpower.com/en-US/Documents/Preventive%20Maintenance%2 0Slick.pdf