Template reference : 87202587-BID-TAS-001 TAS-I Contribution to NASA Steckler Phase II UA-CEAC LGH Project G. Boscheri presented by C. Lobascio 1 NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space Giorgio at work… now a TAS-I employee! Page 2 NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space Presentation Overview Page 3 • TAS-I Background and Interests • Contribution for Steckler I Phase • Contribution for Steckler II Phase • LGH Equivalent System Mass (ESM) Evaluation: • Introduction on ESM • ESM Evaluation for LGH • Comparison between LGH and Literature data • Conclusions NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space There’s Italy behind the ISS! Page 4 NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE Image credit: All rights reserved, 2/20/2012, Thales Alenia Space NASA The Italian Contribution Page 5 Logistics Modules Permanent Modules Node 2 Columbus Cygnus PCM PMM Node 3 MPLM Cupola ATV - ICC NASA Steckler II Mid-term Review ImageJuly credit: 19 2012 NASA th INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE 50% pressurized habitable volumes designed and realized in TAS – Italia… with their Life Support Systems All rights reserved, 2/20/2012, Thales Alenia Space NODE 2 HARMONY, October 23, 2007 Page 6 NASA Steckler II Mid-term Review July 19th 2012 Image credit: NASA INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space Humans in space… inspiring Page 7 NASA Steckler II Mid-term Review Image NASA July 19 credit: 2012 th INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space Future: Human Exploration NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE Page 8 All rights reserved, 2/20/2012, Thales Alenia Space Image credit: NASA Need recycling and food production Page 9 NASA Steckler II Mid-term Review 9July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space TAS-I Contribution To Steckler I G. Boscheri at UA-CEAC (Feb-Mar 2010) LGH HW Upgrade Build Collaborations Page 10 LGH MEC Modeling 1600 250 1400 200 1200 z [cm] PAR [umol m-2 s-1] 190-z [cm] 150 100 1000 800 50 600 0 400 -50 150 100 50 0 y [cm] -50 -100 -150 0 500 1000 200 x [cm] C. Lobascio received G. Giacomelli at TAS-I Recyclab Build Collaborations NASA Steckler II Mid-term Review July 19th 2012 EDEN HW Upgrade INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space TAS-I Contribution To Steckler I Agrospace WS 2010: Collaboration Build-up Page 11 Results Dissemination ICES 2011: Steckler I Results Advances in Space Research: paper accepted in 2012 on modified plant growth model NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space TAS-I Contribution to Steckler II Upgraded EDEN for Tests Page 12 • • • • • • Introduce space-oriented insight into LGH design LGH metric evaluations (ESM) Study liquid streams (e.g. condensate, etc.) Upgrade Phase 1 Modified MEC predictive model Tests in EDEN plant growth chamber Demonstrate tele-presence features Contribution to LGH upgraded design Modified MEC Model Upgrade to be completed NASA Steckler II Mid-term Review July 19th 2012 TAS-I TELEPRESENCE to be demonstrated INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space TAS-I Contribution to Steckler II Page 13 LGH Metric Evaluations Equivalent System Mass (ESM) NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space Equivalent System Mass (ESM) Page 14 A Tool for Comparison of Advanced Life Support (ALS) Equipment ALS Subsystem 1: Mass = 10 kg Volume = 15 L Power = 50 W NASA Steckler II Mid-term Review July 19th 2012 Which one is the best choice? INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE ALS Subsystem 2: Mass = 8 kg Volume = 30 L Power = 70 W All rights reserved, 2/20/2012, Thales Alenia Space Equivalent System Mass (ESM) Page 15 ESM: transform all parameters to an equivalent mass at launch of the equipment ESM = Mass VOLUME + MASS Volume x mass/volume factor + Power x mass/power factor + POWER Cooling x mass/cooling factor + COOLING Crew time x mass/ct factor CREW TIME NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space Plant Growth Chamber ESM Page 16 • Literature on Plant Growth Chamber budgets is poor • Good reference: NASA BVAD • Mass/Volume/Power/Crew Time per m2 NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space ESM Calculation for UA-CEAC LGH Page 17 1 of the 4 LGH modules ESM calculated (LGH1) LGH1 unit 17 NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space ESM Calculation for UA-CEAC LGH Page 18 Mass/volume/power of equipment outside of LGH1 module common to all 4 modules was considered per ¼ NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space ESM Calculation for UA-CEAC LGH Page 19 A mass/power cost factor of 62 kg/kW was applied as per BVAD, assuming PV solar energy PV POWER GENERATION Data assumed for Lunar Surface Polar Site A mass/cooling cost factor of 77 kg/kW was applied as per BVAD, assuming light weight radiators NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE LIGHT WEIGHT RADIATOR COOLING All rights reserved, 2/20/2012, Thales Alenia Space ESM Calculation for UA-CEAC LGH Page 20 Volume of equipment placed inside the LGH1 module not considered as additional equivalent mass Mass/volume cost factor already covered by mass of LGH primary and secondary structures HATCH & BULKHEAD ROOF ELEMENTS STRUCTURAL METAL RINGS BLADDER LATERAL ELEMENTS CABLE CULTURE SUPPORTS FLOOR ELEMENTS NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space ESM Calculation for UA-CEAC LGH Page 21 Mass/volume cost factor of 13.4 kg/m3 applied to equipment placed outside the LGH1 module as per BVAD, assuming Lunar surface site and inflatable unshielded primary structure (to be covered with regolith) LUNAR REGOLITH UNSHIELDED INFLATABLE STRUCTURE NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space ESM Calculation for UA-CEAC LGH Page 22 Crew time equivalent mass not considered for the LGH ESM evaluation NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space ESM Comparison with literature data Page 23 NASA data from BVAD (not optimized food production unit) LGH data calculated assuming 11.2 m2 of crops (minimum from ICES 2011) NASA ref. system LGH-like system Primary Structure Mass [kg/m2] 15.3 23.5 Secondary Structure Mass [kg/m2] 5.7 0.50 Mass [kg/m2] 75.8 43.7 Volume [m3/m2] 1.03 0.105 Power [We/m2] 1.19 0.57 Cooling [Wth/m2] 1.19 0.57 ESM [kgeq/m2] 275 149 Subsystem/Component Volume shall not be compared at this level Outfitting/equipment NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE Much higher LGH power efficiency All rights reserved, 2/20/2012, Thales Alenia Space Conclusions Page 24 ESM analysis: LGH system viable concept for space applications ESM Evaluation results presented to ICES 2012 Next TAS-I Steckler II support activities to follow in agreement with UA-CEAC needs, depending on: • Composter activity status • Telepresence activity status • Plants modeling activity status We are enjoying the collaboration! NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space Page 25 NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space ESM Calculation for UA-CEAC LGH Page 26 Main Considerations Summary: • 1 of the 4 LGH modules ESM calculated (LGH1) • Mass/volume/power of equipment outside of LGH1 module common to all 4 modules considered per ¼ • Mass/power cost factor of 62 kg/kW applied as per BVAD, assuming Lunar polar site and PV solar energy • Mass/cooling cost factor of 77 kg/kW applied as per BVAD, assuming Lunar polar site and light weight radiators • Volume of equipment placed inside the LGH1 module not considered as additional equivalent mass, since mass/volume cost factor already covered by the mass of the LGH primary and secondary structures • Mass/volume cost factor of 13.4 kg/m3 applied to equipment placed outside the LGH1 module as per BVAD, assuming Lunar surface site and inflatable unshielded primary structure (to be covered with regolith) • Crew time equivalent mass not considered for the LGH ESM evaluation NASA Steckler II Mid-term Review July 19th 2012 INTERNAL THALES ALENIA SPACE COMMERCIAL IN CONFIDENCE All rights reserved, 2/20/2012, Thales Alenia Space