FOREST SERVICE MANUAL MARK TWAIN NF (REGION 9) ROLLA, MO

advertisement
7730
Page 1 of 2
FOREST SERVICE MANUAL
MARK TWAIN NF (REGION 9)
ROLLA, MO
FSM 7700 – TRANSPORTATION SYSTEM
CHAPTER 30 – OPERATION AND MAINTENANCE
Supplement No.:
R9 Mark Twain 7700-2008-1
Effective Date:
Duration: This supplement is effective until superseded or removed.
Approved: PAUL STRONG
Forest Supervisor
Date Approved:
Posting Instructions: Supplements are numbered consecutively by Manual number and
calendar year. Post by document; remove the entire document and replace it with this
supplement. Retain this transmittal as the first page(s) of this document. The last supplement to
this Manual was R9 Mark Twain 7700-2003-2.
New Document
R9 Mark Twain 7700-2008-1
Superseded Document(s)
(Supplement Number and
Effective Date)
R9 Mark Twain 7700-2003-2
2 Pages
Digest: In order by code, summarize the main additions, revisions, or removal of direction
incorporated in this supplement.
7732.22 – To establish amounts for road maintenance deposits by commercial users.
R9 MARK TWAIN SUPPLEMENT R9 MARK TWAINB 7700-2008-1
EFFECTIVE DATE:
DURATION: Effective until superseded or removed
7730
Page 2 of 2
FSM 7700 – TRANSPORTATION SYSTEM
CHAPTER 30 – OPERATION AND MAINTENANCE
7732.22 – MAINTENANCE BY COMMERCIAL USERS
RECURRENT AND DEFERRED MAINTENANCE COSTS
Road maintenance can be divided into three general areas with specific work items associated
with each.
The following rates are to be charged only one way. Rates shown are to be used when the
Purchaser or Permittee pay in lieu of performing the maintenance. Minimum road maintenance
deposit to be collected is $100.00. Collecting road maintenance deposits on sales valued less
than $3000.00 is at the discretion of the timber sale appraiser.
2008
Crushed Aggregate
$/mi.
$/mbf
$/ccf
(1) Administrative costs
Inspections
259
0.43
0.26
(2) Recurrent maintenance costs
Blading
Brushing
300
150
0.50
0.25
0.30
0.16
1.18
0.72
0.54
0.25
0.32
0.16
0.79
0.48
1.97
1.20
Subtotal recurrent and admin costs
(3) Deferred maintenance costs
Rock replacement
Limbing
Subtotal deferred costs
420
150
Total recurrent/deferred costs
w/admin.costs
Download