FOREST SERVICE MANUAL MARK TWAIN NF (REGION 9) ROLLA, MO

advertisement
7730
Page 1 of 2
FOREST SERVICE MANUAL
MARK TWAIN NF (REGION 9)
ROLLA, MO
FSM 7700 – TRAVEL MANAGEMENT
CHAPTER 30 – ROAD OPERATION AND MAINTENANCE
Supplement No.: 7730-2009-1
Effective Date: April 29, 2009
Duration: This supplement is effective until superseded or removed.
Approved: DAVID C. WHITTEKIEND
FOREST SUPERVISOR
Date Approved: 04/29/2009
Posting Instructions: Supplements are numbered consecutively by Handbook number and
calendar year. Post by document; remove the entire document and replace it with this
supplement. Retain this transmittal as the first page(s) of this document.
New Document
7730-2009-1
2 Pages
Superseded Document(s)
(Supplement Number and
Effective Date)
R9 Mark Twain 7700-2008-1
2 Pages
Digest
7732.22 - Currency Review – No changes in contents
R9 MARK TWAIN SUPPLEMENT
EFFECTIVE DATE: April 29, 2009
DURATION: Effective until superseded or removed
7730
Page 2 of 2
FSM 7700 – TRANSPORTATION SYSTEM
CHAPTER 30 – ROAD OPERATION AND MAINTENANCE
7732.22 – MAINTENANCE CONDUCTED BY COMMERCIAL HAULERS
RECURRENT AND DEFERRED MAINTENANCE COSTS
Road maintenance can be divided into three general areas with specific work items associated
with each.
The following rates are to be charged only one way. Rates shown are to be used when the
Purchaser or Permittee pay in lieu of performing the maintenance. Minimum road maintenance
deposit to be collected is $100.00. Collecting road maintenance deposits on sales valued less
than $3000.00 is at the discretion of the timber sale appraiser.
2008
Crushed Aggregate
$/mi.
$/mbf
$/ccf
(1) Administrative costs
Inspections
259
0.43
0.26
(2) Recurrent maintenance costs
Blading
Brushing
300
150
0.50
0.25
0.30
0.16
1.18
0.72
0.54
0.25
0.32
0.16
0.79
0.48
1.97
1.20
Subtotal recurrent and admin costs
(3) Deferred maintenance costs
Rock replacement
Limbing
Subtotal deferred costs
420
150
Total recurrent/deferred costs
w/admin.costs
Download