2409.19_20 Page 1 of 3 FOREST SERVICE HANDBOOK BOISE NATIONAL FOREST (REGION 4) BOISE, ID FSH 2409.19 – RENEWABLE RESOURCE USES FOR KNUTSEN-VANDENBERG (K-V) FUND HANDBOOK CHAPTER 20 – COSTS, COLLECTIONS, AND ACCOUNTING Supplement No.: r4_boise_2409.19-2001-1 Effective Date: July 23, 2001 Duration: Effective until superseded or removed Approved: DAVID D. RITTENHOUSE Forest Supervisor Date Approved: 07/21/2001 Posting Instructions: Supplements are numbered consecutively by Handbook number and calendar year. Post by document name. Remove entire document and replace with this supplement. Retain this transmittal as the first page of this document. New Document(s): 2409.19_20 3 Pages Superseded Document(s): 2409.19-96-1 Effective 05/24/96 3 Pages Digest: 20 This is a technical supplement issuing Forest material in new format with updated references. Supplements procedures to be followed for K-V activities. BOISE SUPPLEMENT 2409.19-2001-1 EFFECTIVE DATE: 07/23/2001 DURATION: Effective until superseded or removed 2409.19_20 Page 2 of 3 FSH 2409.19 – RENEWABLE RESOURCE USES FOR KNUTSEN-VANDENBERG (K-V) FUND HANDBOOK CHAPTER 20 - COSTS, COLLECTIONS, AND ACCOUNTING 21.12 – Indirect Costs Use collection percents calculated from the assessment percentages as stated in the most recent edition of the Forest Program Budget and Management Information guide (PBMI). 1. Assessment Percentages. Assessment Percents Overhead ---------------CWKV GA PM* RO/WO 10.50 5.72 14.10 Activity by Percent CWFS 10.50 0.00 2.37 ----------------BDBD 10.50 9.69 16.60 SSSS 10.50 29.95 18.50 2. Collections for Overhead Assessments. Because assessments of Cooperative funds are calculated on allocated dollars, a collection rate must be calculated from the published assessment percentage. Use the following formula to calculate the percentage of total allocated dollars, which need to be collected: Collection rate = Assessment rate 1 – assessment rate Using this formula for the Forest assessments results in the following collection rates which must be used on the cooperative fund plans: Collection Percents Overhead ---------------CWKV GA PM* RO/WO 11.73 6.07 16.41 Activity by Percent CWFS 11.73 0.00 2.43 ----------------BDBD 11.73 10.73 19.90 SSSS 11.73 42.76 22.70 BOISE SUPPLEMENT 2409.19-2001-1 EFFECTIVE DATE: 07/23/2001 DURATION: Effective until superseded or removed 2409.19_20 Page 3 of 3 FSH 2409.19 – RENEWABLE RESOURCE USES FOR KNUTSEN-VANDENBERG (K-V) FUND HANDBOOK CHAPTER 20 - COSTS, COLLECTIONS, AND ACCOUNTING 21.21 - Form FS-2400-50 Submitted K-V plans are required to be typed form R4-2400-50 (7/98) or on the Region 6 K-V database report form. Preparation and display of all backup materials should be presented in an orderly manner, but need not be typed. 21.22a - Cost Computations The standard costs for silvicultural treatments in K-V plans are not all-inclusive. Special or infrequent costs will have to be developed on a project-by-project basis. Attach these costs to the submitted K-V Plan. The base cost per unit in standard costs for treatments was calculated in 1992. The time of project implementation must be estimated and standard costs adjusted to the estimated period using an inflation factor of 4 percent (FSH 2409.19, R-4 Supplement 93-1, section 21.22b). Use form BNF 2400-47 (3/00), Exhibit 02 of BNF Supplement 2409.19-2001-1, to calculate future costs used in the K-V plan. Round all treatment costs per acre to the nearest cent; the treatment total cost to the nearest whole dollar. 22.21 - Format for Annual Forest Review During the annual fund balance review it is required to analyze each active K-V plan for sufficient funding. Each sale plan analysis will be documented on BNF-2400-16 (3/00), Exhibit 04 of BNF Supplement 2409.19-2001-1, or a computer generated report, which shows the same data. 22.4 - Timeframes In addition to the projects stated in the handbook, the following activities are permitted after the 5-year time period after sale closure: 1. Fence maintenance and removal associated with stand protection.