2400 Page 1 of 4 FOREST SERVICE MANUAL SANTA FE NATIONAL FOREST SANTA FE, NEW MEXICO FSM 2400 TIMBER MANAGEMENT CHAPTER 90 Supplement No.: 14 Effective Date: September 1974 Duration: This supplement is effective until superseded or removed. Date Approved: 09/1974 Approved: FOREST SUPERVISOR Posting Instructions: Supplements are numbered consecutively by title and calendar year. Post by document; remove the entire document and replace it with this supplement. Retain this transmittal as the first page(s) of this document. The last supplement to this title was 13 to FSM 2400. New Document Superseded Document(s) (Supplement Number and Effective Date) 2493.2 – 2493.5 3 Pages 0 Pages Digest: In order by code, summarize the main additions, revisions, or removal of direction incorporated in this supplement. SO SUPPLEMENT EFFECTIVE DATE: September 1974 DURATION: This supplement is effective until superseded or removed. 2400 Page 2 of 4 FSM 2400 TIMBER MANAGEMENT CHAPTER 90 2493.2 – Timber Sale Accounting System All monthly Timber Sale Statements of Account shall be sent to purchasers by the sixth working day of each month (Ref. R-3 Supplement No. 106, 2493.2—2). On the Santa Fe, the cut-off date for reporting timber cut will be the end of the last day of each month. To accomplish this deadline on sales with Purchaser Road Credits, the following instructions will be followed: 1. Any adjustments made on the estimated costs by construction phases for specified roads will be entered in a Revised Table of “Estimated Costs of Specified Roads” of the Contract, as instructed in Division B of the Contract and FSM 2453.52c. These revised tables will be prepared in rough draft by Engineering as soon as revisions are made and delivered to Resource for final typing, following up on approval and distribution. If there is a change in an item requiring agreement by the Purchaser, completed (signed by purchaser) Form 7700-42, “Specified Road Construction Agreement and/or Notice” will also be submitted. Ref, Division B of the Contract and FSM 2453.52c for items that need purchaser’s approval. No deviation from the contract will be made until a revised Table of Estimated Costs of Specified Roads has been completed and sent purchaser. 2. Form 2400-21 will be used for Purchaser Credit Computation Ref. B5.3 of Division B of Contract and FSM 2453.53 and FSM 2493.2—3. Cut-off date for any Purchaser Credit allowed the purchaser during a month will be the 15th. Engineering will have between the 15th to the 25th of the month to submit this information to the Ranger. The information given by Engineering to the Ranger will be that required on Line 6, all columns of Form 2400-214. The Ranger will have from the 25th until the end of the month for completing and approving this form, which will be submitted with the Timber Statement of Accounts to the Resource Section in the Supervisor’s Office in time for auditing and submitting to the purchaser within the time allowed. SO SUPPLEMENT EFFECTIVE DATE: September 1974 DURATION: This supplement is effective until superseded or removed. 2400 Page 3 of 4 FSM 2400 TIMBER MANAGEMENT CHAPTER 90 2493.4- Automated Timber Sales Statement of Account. Scaling records and monthly timber sale transaction data must be processed on a timely basis in order to process timely billing to purchasers. The only requirements relative to final, month end quarter. Therefore, reported volume scaled for the first month of volume reported may be that scaled from the 25th. Month No.2 volume reported may be that scaled from the 26th of month No.1 through the 25th of month No. 2. Month No.3 must include volume scaled through the last day of the month, therefore will include the 26th of month No. 2 through the last day of month No.3. Thus the following schedule will be followed: 1. Scale books will be totaled and audited as they are received from the mill; then forwarded to S.O. Resource Section (reference FSM 2443.61a Supplement No. 230 dated 2/83 for checking of scale records). After S.O. audit, Resource will return books to the District within two days. 2. At the end of reporting period, Districts will prepare scale summaries (R3-2400-57), complete TSA cards and transmit to arrive in the S.O. no later than the 1st day of the following month for months 1 and 2 and by the 6th day of the following month for the 3rd month. 3. Resource will audit summaries and TSA cards for accuracy and will enter data in the computer no later than the 8th day of the month. 4. Computer Systems will then furnish Resource with a preliminary run. Resource will immediately make necessary changes and/or corrections (this process could take a few days) and request month end closure by no later than the 13th day of the month. 5. Immediately Statements and Bills for Collection will be sent to purchasers and District’s. Billings are due within 15 day from billing date, and must be received by the last day of the current month. Small Sale (FS 2400-4/R3-2400-44) – Permit cards are due in Resource as often as Bills for Collection are submitted to B&F. Sales can be consolidated in one card as long as convertible products are not reported with non-convertible products. On all permit cards submitted during current month, regardless of termination date shown on 2400-4 or 2400-44, the end of the current month will be reported on the card. For example, a fuelwood permit issued July 10, 1985 has a termination date of August 10, 1985; for TSA reporting purposes, the computer card will show a termination date of 7/31/85. SO SUPPLEMENT EFFECTIVE DATE: September 1974 DURATION: This supplement is effective until superseded or removed. 2400 Page 4 of 4 FSM 2400 TIMBER MANAGEMENT CHAPTER 90 Ranger Sales (FS-2400-31) Districts are responsible for completing basic TSA cards on all Ranger sales. They are responsible for keeping up with sale activity and submitting appropriate recurring cards to Resource for data processing (reference is found in Draft FSH 6509.17 Automated Timber Sale Accounting Handbook).