: R6 7709.57,5.3 Ex..01 Page 1 of 2 FOREST SERVICE HANDBOOK PORTLAND, OREGON FSH 7709.57 – ROAD CONSTRUCTION HANDBOOK CHAPTER 5 – MEASUREMENT AND PAYMENT Supplement No.: R6/PNW-7709.57-2000-1. Effective Date: September 15, 2000 Duration: Effective until superseded or removed Approved: MIKE EDDRINGTON Date Approved: 9/12/2000 For Regional Forester Posting Instructions: Supplements are numbered consecutively by Handbook number and calendar year. Post by document name. Remove entire document and replace with this supplement. Retain this transmittal as the first page of this document. New Document(s): Superseded Document(s): (Last supplement was R6 FSH 7709.57-98-1) R6 Supplement 7709.57,5.3 Exhibit 1 (R6 FSH 7709.57-98-1) R6 Supplement 7709.57,5.3 Exhibit 1 (R6 FSH 7709.57-2000-1) 2 Pages 2 Pages Digest: This supplement shows the significant figures for rounding of pay items in the metric (SI) system. R6/PNW SUPPLEMENT 7709.57-2000-1 EFFECTIVE DATE: DURATION: Effective until superseded or removed 7709.57,5.3 Exhibit 01 Page 2 of 2 FSH 7709.57 – ROAD CONSTRUCTION HANDBOOK CHAPTER 5 – MEASUREMENT AND PAYMENT 5.3 - Exhibit 01 Accuracy for Final Payment The following tabulation indicates the accuracy required for quantities of the various pay units using the Metric (SI) system in the Schedule of Items. Use this guide to determine the decimal placement in the final payment. Carry field computations to one more decimal and then round the figure to the decimal indicated below. Pay Unit Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.10 Kilometer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.01 Square Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.10 Each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.00 Hectare . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.01 Liter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.00 K Liters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.10 Cubic Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.00 Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.10 Exception--Concrete; Masonry . . . . . . . . . . . . . . . . . . . . . . . . . 0.01 Kilogram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.00 Ton . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.10 Exception--calcium Chloride; Magnesium Chloride; Calcium Chloride Flakes; Sodium Chloride; Hydrated Lime; Lignin Sulfonate; Pavements; Fly Ash; Portland Cement; Bed Course Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.01 Hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.10 MBF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.01 Cubic Meter Kilometer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.00 Ton Kilometer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.00