R6 7709.57,5.3 Ex..01
Page 1 of 2
FOREST SERVICE HANDBOOK
PORTLAND, OREGON
FSH 7709.57 – ROAD CONSTRUCTION HANDBOOK
CHAPTER 5 – MEASUREMENT AND PAYMENT
Supplement No.: R6/PNW-7709.57-2000-1.
Effective Date: September 15, 2000
Duration: Effective until superseded or removed
Approved: MIKE EDDRINGTON
Date Approved: 9/12/2000
For Regional Forester
Posting Instructions: Supplements are numbered consecutively by Handbook number
and calendar year. Post by document name. Remove entire document and replace with this
supplement. Retain this transmittal as the first page of this document.
New Document(s):
Superseded Document(s):
(Last supplement was R6 FSH
7709.57-98-1)
R6 Supplement 7709.57,5.3 Exhibit 1
(R6 FSH 7709.57-98-1)
R6 Supplement 7709.57,5.3 Exhibit 1
(R6 FSH 7709.57-2000-1)
2 Pages
2 Pages
Digest:
This supplement shows the significant figures for rounding of pay items in the
metric (SI) system.
R6/PNW SUPPLEMENT 7709.57-2000-1
EFFECTIVE DATE:
DURATION: Effective until superseded or removed
7709.57,5.3 Exhibit 01
Page 2 of 2
FSH 7709.57 – ROAD CONSTRUCTION HANDBOOK
CHAPTER 5 – MEASUREMENT AND PAYMENT
5.3 - Exhibit 01
Accuracy for Final Payment
The following tabulation indicates the accuracy required for quantities of the
various pay units using the Metric (SI) system in the Schedule of Items. Use this
guide to determine the decimal placement in the final payment. Carry field
computations to one more decimal and then round the figure to the decimal
indicated below.
Pay Unit
Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.10
Kilometer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.01
Square Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.10
Each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.00
Hectare . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.01
Liter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.00
K Liters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.10
Cubic Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.00
Exception--Structure Excavation; Sheathing
Materials; Bedding, Bed Course, and Backfill
Materials; Gabions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.10
Exception--Concrete; Masonry . . . . . . . . . . . . . . . . . . . . . . . . .
0.01
Kilogram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.00
Ton . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.10
Exception--calcium Chloride; Magnesium Chloride; Calcium Chloride
Flakes; Sodium Chloride; Hydrated Lime; Lignin Sulfonate;
Pavements; Fly Ash; Portland Cement;
Bed Course Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.01
Hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.10
MBF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0.01
Cubic Meter Kilometer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.00
Ton Kilometer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.00