FGS Guider Critical Design Review Pierre Chayer (HIA/STScI) March 14th & 15th 2007 COM DEV Ottawa 303 Terry Fox Drive Kanata, ON, K2K 3J1 FGS Guider CDR – April 19, 2007 © Copyright 2007 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 1 FGS-Guider CDR • The Critical Design Review (CDR) is a presentation of the detailed instrument system design. • CDR allows for the final FGS requirements, resource allocations, verification plans, and detailed designs to be presented, discussed, modified (if necessary) and approved. • CDR discloses the complete system design in full detail. • CDR ascertains that technical problems and design anomalies have been resolved. • CDR ensures that the design maturity justifies the decision to initiate Flight Unit fabrication, integration and verification of mission hardware and software. FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 2 FGS-Guider CDR Agenda (Day 1) E1 E2 E3 01 02 03 04 05 06 06 GUIDER CDR AGENDA TOPIC Arrival Introduction FGS Science background Guider Operations & Constraints CDR Agenda & Programmatic Baseline & Assumptions for CDR Non-compliance statement PA PA Presentation 04A Requirements, Reliability, Parts, M&P, Contamination 04B Guider Radiation Analysis BREAK Guider Architecture Region 2 Electronics 06A Region 2 Electronics - Electrical Design Overview 06D 06E 06F 06G 07 N/A DAY2 TIME DAY 3 D. Provencal J. Hutchings P. Chayer M. Lihou I. Barnard G. Richardson P. Woods 7:45 8:00 8:10 8:20 8:40 9:00 9:20 9:35 10 10 20 20 20 15 45 P. Woods 9:35 30 H. Rufenacht / K. Man N. Rowlands A. Csizmar/D. Henry D. Henry 10:05 10:20 10:30 11:30 11:30 15 10 60 8236 45 8237 Csizmar/D. Henry Henry Kenyon Henry 12:15 13:00 13:00 13:15 13:55 45 A. D. P. D. BREAK Region 2 Electronics (Cont'd) Focus Housekeeping Board SIDECAR Control Electronics Board Power Control Unit System Level EMC Analysis 14:40 14:50 14:50 15:35 16:20 16:50 10 A. Csizmar/D. Henry D. Henry E. Hartwig J. Metcalf K. Man 45 45 30 30 8240 8241 8242 8243 BREAK Assembly, Integration & Test Status CDR Board Meeting G. Reis D. Provencal 17:20 17:30 18:15 10 45 15 8244 LUNCH Region 2 Electronics Cont'd 06A Region 2 Electronics - Electrical Design Overview (Cont.) 06B Structural & Thermal Analysis 06C SpaceWire Board 06 DAY 1 PRESENTER FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 15 40 45 8228 8229 8230 8231 8232 8233 8234 8239 3 FGS-Guider CDR Agenda (Day 2) 08 08A 08B 08C 08D 08E 08 08F 08G 08H 08 08K 08J 08L 08M 08N E4 09 9A 9B 10 11 12 13 14 N/A Guider Optical Assembly Overview / OA Layout Optical Design and Analysis Stray Light Control Design & Analysis Structural Analysis Thermal Analysis BREAK Guider Optical Assembly (Cont'd) STOP Analysis Optical Bench Assembly Relay TMA (Design & Analysis) LUNCH Guider Optical Assembly (Cont'd) Fine Focus Mechanism Guider Detector Assembly FPA and SIDECAR Status Guider Calibration Source FGS Alignment (AIT) Unit Level Cryogenic Facilities at DFL BREAK Guider Performance (NEA) Guider Performance (NEA) Guider Performance (ID/ACQ) Margin Summary Verification Software Status Harness Design Status TFI Design Status CDR Board Meeting FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada A. A. C. E. A. D. McColgan McColgan Evans Greenberg McColgan Aldridge A. A. P. D. McColgan McColgan Cameron Aldridge A. McColgan L. Richards D. Aldridge D. Gulbransen N. Rowlands C. Evans R. Leblanc N. Rowlands N. Rowlands H. Rufenacht G. Richardson H. Rufenacht J. Zhou W. Lunscher N. Rowlands D. Provencal 8:00 8:00 8:25 8:50 9:05 10:05 10:25 10:35 10:35 11:05 11:25 11:45 13:00 13:00 13:45 14:00 14:20 14:35 14:50 15:05 15:15 15:15 16:05 16:45 17:05 17:20 17:30 17:40 17:50 n/a 25 25 15 60 20 10 8246 8247 8248 8249 8250 30 20 20 8251 8252 8253 n/a 45 15 20 15 15 15 10 8255 8254 8256 8257 8258 8245 50 40 20 15 10 10 10 TBD 8259 8260 8261 8262 8263 8264 8265 4 FGS-Guider Operations ID Cmd TFI ID Config H/W Config H/W Obtain Full Image Process Image Pattern Recognition Obtain Images ACQ Cmd ACQ Obtain Window Image Config H/W Idle Clocking Activity Descriptor Scripts 128x128, 32x32 Win Size & Location Centroid Track Track Cmd Config H/W (ISIM FSW) Obtain 16 x 16 Image Win Location Note: FGS FSW telemetry monitoring of FGS hardware at all times Centroid To CTP (telemetry) Fine Guide Cmd Key FGS -Guider Function FGS -TFI Function FGS FSW FGS H/W Standby Cmd © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada Obtain 8x8 Image Fine Guide Centroid Standby FGS Guider CDR – April 19th, 2007 Update H/W To CTP 5 Identification: Guide Star Recognition 2048 pixels (2.3 ') FGS FOV 2048 pixels (2.3 ') guide star full frame readout, pattern match of observed stars to uplinked reference stars to identify guide star. FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 6 FGS-Guider Optical Layout Pick-off mirror Focus mirror TMA Detector 2m 100 mm FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 7 FGS Optical Assembly - Guider Side Guider POM Guider Relay TMA Guider ICP-1 Optical Alignment Cube (1 of 2) Fine Focus Mechanism with fold mirror Guider SIDECar ASICs (2) Detector Assembly With 2 FPAs Kinematic Mounts (2 of 3) FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 8 FGS Optical Assembly - With Baffles Guider Plan View FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 9 FGS in the ISIM Structural Context MIRI NIRCam FGS-TFI FGS-Guider NIRSpec FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 10 Main Bench Design Features 2 mm thick ribs, 90mm deep 4 mm thick sidewalls, 110mm deep Higher density rib pattern Hardpoints added for MGSE Thermal strap wall 6mm thick KM mounting pad thickness increased to 21mm Guider POM deck raised Structure added to bolster KM2 – KM3 span FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 11 Thermal Analysis: Cold Steady State Cold Case: Requirement Tested: •Detector absolute temperature below 41 K Boundary Conditions: •ISIM Conductive temperature = 30.0 K •Radiative Environment = 32K, ε =0.01 •Heat strap interface temperature = 30.0 K •Steady State Heat Loads Results •Maximum detector temperatures (30.440 K) are well below the requirement. •Gradient in the optical bench is 0. 225 K FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 12 FGS Identification Timing Budget • • • • Identification duration is dominated by the readout time for the double read • Double read = reset-read-reset-read, allows Cosmic Ray hits to be filtered out. As per agreement post-ISIM PDR, FGS allocation of 45 sec applies to readout time only FGS & ISIM collaborate on overall timing estimate for ISIM allocation of 60 seconds ID duration estimate is compliant at the ISIM level (< 60 secs per ID attempt, ISIM-266) Contributor FGS FSW Command Item Duration (seconds) Total Duration (seconds) SP / ICDH ID & SCE Setup Commands 3.648 3.648 Includes first start exposure command FGS Strip Readout Duration 1.357 46.33 Double Read: 34 strips (4 pixel overlap assumed) FGS Requirement (SRD154) FGS/ ICDH Strip Data Transfer Time 0.95 FGS FSW Last Strip Image Processing 0.775 0.775 Only the last strip image processing time adds to the total FGS FSW Identification Algorithm 7.198 7.198 Algorithm assumes 50 bright objects & 30 triads SP / ICDH FGS & ICDH Clean up commands 0.512 0.512 Total FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada Note Does not contribute – shorter than readout 58.46 Requirement at ISIM level is < 60 seconds 13 Non-Compliance Statement • SRD154 • Requirement text - The total time for an identification image to be collected, plus execution of the identification algorithm shall be 45 seconds or less (per attempt) • Traced from – IPFR requirement FGS237 • Status – The estimated duration is 46.33 s • Discussion – Excess duration is due to need for double detector read to mitigate SEU. See Section 09B of this package for further details. It has been agreed that the requirement should be against the readout time only • Proposed resolution – Raise Class 1 ECN to remove algorithm execution time from requirement. Discuss with CSA and NASA and come to a consensus on path forward on residual non-compliance. Likely acceptable as is FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 14 Pack and Ship June 2009 FGS Guider CDR – April 19th, 2007 © Copyright 2006 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada 15