STIS Status: Topics
• STIS SMOV & Calibration Overview
• STIS CCD status summary
• NUV Dark current update
STIS SMOV Status
• All STIS SMOV observations complete as of September 6, 2009
• Most STIS SMOV analysis complete
– Final superbias & super-dark reference files for SMOV period have
been delivered
– New CCD reference file delivered
• Readnoise, gain, and CTE parameters
– CCD TDS reference files delivered
• Time-dependent sensitivity corrections to flux calibration
• Open issues in STIS SMOV analysis
– Waiting for additional Cycle 17 calibration observations to finalize
MAMA TDS updates
• Changes from pre-repair predictions appear to be small (< 3%)
– Monitoring of NUV MAMA dark is being continued by cycle 17
calibration program 11857
– Detailed writeups still pending for most activities
STIS Activity
PropID
STIS SMOV Program Title
Analysis
Lead
Visits
Done
Total
Visits
STIS02
11347
STIS03
Status
Memory Load and Dump
BS
1
1
Complete
11348
Science Data Buffer Check
BS
3
3
Complete
STIS04
11349
Mechanism Mini-Functional
TW
1
1
Complete
STIS05
11399
CCD Anneal (two anneal iterations)
MW
6
6
Complete
STIS06
11382
CCD Functional
DL
4
4
Complete
STIS07
11404
CCD Dark & Bias Monitor
MW
90
105
Complete
STIS08
11383
Aperture Wheel & Lamp Functional
WZ
2
2
Complete
STIS09
11384
STIS-to-FGS Alignment
CP
1
1
Complete
STIS10
11385
CCD Spectral Format Verification
WZ
1
1
Complete
STIS11
11386
External Focus Check
CP
4
3+1
Complete
STIS12
11387
Corrector and Focus Alignment
CP
-
8
Contingency
STIS13
11388
CCD External Spectroscopic Quality
TG
1
1
Complete
STIS14
11400
CCD CTI Check
PG
1
1
Complete
STIS15
11401
CCD Spectroscopic Throughputs
DL
3
3
Complete
STIS16
11389
CCD Image and Pointing Stability
TG
1
1
Complete
STIS17
11350
FUV MAMA HV Recovery
TW
4
4
Complete
STIS18
11351
NUV MAMA HV Recovery
TW
4 (+2F)
4 (+2F)
Complete
STIS19
11390
FUV MAMA Dark Measure
CP
10
10
Complete
STIS20
11402
NUV Dark Monitor
CP
42(+3F)
20+52
Complete
STIS21
11391
FUV Optical Format Verification
WZ
2
2
Complete
STIS22
11392
NUV Optical Format Verification
WZ
2 (+2F)
2 (+2F)
Complete
STIS23
11393
FUV MAMA Spectroscopic Quality
TG
1
1
Complete
STIS24
11394
NUV MAMA Spectroscopic Quality
TG
1
1
Complete
STIS25
11403
MAMA Spectroscopic Throughputs
DL
3
3
Analysis being finalized
STIS26
11395
MAMA Image Stability
TG
2
2
Complete
STIS Cycle 17 Calibration
• Analysis leads assigned for all programs
– New leads will also track execution
• Most Calibration Programs have started
– Routine dark monitors have begun
• Routine delivery of weekly bias and dark reference files
– Automated Bias & Dark Pipeline still under work
– P-flat data collection has begun
• SMOV plan deferred this calibration to cycle 17
– Data being combined with SMOV results to
improve calibration
• Cycle 17 data especially important for CTE calibration
STIS Calibration Plan
PropID
STIS SMOV Program Title
Analysis Lead
Start Date
11843
CCD Performance Monitor
VD
01-Sep-2009
11844/11845
CCD Dark Monitor (part 1 & 2)
MW
03-Aug-2009
11846/11847
CCD Bias Monitor (part 1 & 2)
MW
03-Aug-2009
11848
CCD Read-noise Monitor
VD
10-Sep-2009
11849
CCD Hot-pixel Annealing
MW
23-Jul-2009
11852
CCD Spectroscopic Flats
SN
10-Aug-2009
11853
CCD Imaging Flats
SN
27-Aug-2009
11858
CCD Spectroscopic Dispersion
IP
20-Aug-2009
11850
CCD Sparse Field CTE Internal
VD
03-Jul-2009
11854
CCD Full Field Sensitivity
VD
Jan-Mar, 2010
11851
Slit Wheel Repeatability
WZ
17-Aug-2009
11855
CCD Spectroscopic Sensitivity Monitor
RO
10-Aug-2009
11859
MAMA Dispersion Solutions
IP
20-Aug-2009
11856
MAMA Full Field Sensitivity
VD
May, 2010
11860
MAMA Sensitivity and Focus Monitor
RO
03-Sep-2009
11857
MAMA Dark Monitor
WZ
09-Sep-2009
11863
MAMA Fold Distribution
TW
Nov, 2009
11861
MAMA FUV Flats
TA
17-Aug-2009
11862
MAMA NUV Flats
TA
17-Aug-2009
11864
MAMA Anomalous Recovery
TW
contingency
11865
COS Flux Standard
RB
Oct, 2009
11866
Echelle Grating Blaze Function Zero Points
PG
Nov, 2009
11999
JWST Calibration from a Consistent
Absolute Calibration of Spitzer & Hubble
RB
Oct, 2009 - Sep
2010
STIS CCD Status
•
•
Dark current, read-noise, and
CTE measured
Read noise slightly greater
than pre-repair
– Gain = 1 was 5.3 now 5.8 e– Gain = 4 was 7.8 now 8.3 e-
•
Observed charge Transfer
Efficiency (CTE) in 2009
close to extrapolation of old
trend (CTI = 1 - CTE).
– CTE losses becoming very
large for faint sources
STIS CCD Status - cont
• Current pipeline CTE algorithm assumes constant “spurious
charge” over detector at a given time
– Can get better CTE correction if this allowed to vary over detector
– This will require modest changes to CALSTIS
– For now will use compromise value with old algorithm
CCD Dark Current Behavior
• Median CCD dark current in 2009 slightly above extrapolated
trend from 2004
• CCD Dark shows increasing spatial dependence over time
– about 40% lower near row 900 as compared to center of chip!
CCD Sensitivity Changes
Advantages of E1 position
• For many years, we have had defined “E1” positions for CCD
near row 900 of STIS long slit
–
–
–
–
Closer to default readout amplifier
Reduced CTI losses
Reduced effective dark current
Less contamination by CTE tails of CR & hot pixels
• While we have advertised advantages of E1 position for years in
IHB and other documentation, ETC does not distinguish
between center and E1 posistion
– GO need to manually estimate CTE losses
• Re-emphasize importance of using E1 position to GOs
• For cycle 19 ETC, should include variations in dark current &
CTE as function of slit position
NUV dark update
•
Post SM4 NUV dark current (black dots) much higher than expected
– model as “expected dark” + “something extra”
• Model as the “expected dark” (orange curve below) declining according to old
behavior + an extra component Ae-(E/T) e-t/
• “extra” term appears to have stronger T dependence (E ≈ 1.8 eV vs 1.5 eV)
• Plot below compares different e-folding times for extra component

 =100 d (red) &  = ∞ (blue)