Summary of the JWST Integrated Science Instrument Module (ISIM) Systems Requirements Reviews (SRRs) for Flight Software (FSW) and Command & Data Handling (ICDH) Sub-Systems Jerry Kriss 06/17/2004 TIPS/JIMS 6/17/04 TIPS/JIM 1/15 ISIM Overview ISIM is: • The JWST Science Instruments • Associated Infrastructure: Structure, C&DH, & FSW Region 1 Science Instrument Optics Assemblies Near Infrared Camera (NIRCam) Near Infrared Spectrometer (NIRSpec) Mid Infrared Instrument (MIRI), & Dewar Fine Guidance Sensor and Tunable Filter (FGS/TF) Optical Bench Structure Radiators and support structure (NGST supplied) Region 2 Focal Plane Electronics (FPE) Instrument Control Electronics (ICE, MCE, DCE) Region 3 ISIM Command & Data Handling (ICDH) Electronics (FSW runs on the Single-Board Computer in this system) FGS C&DH Electronics 06/17/2004 TIPS/JIM 2/15 JWST System Constituents System System Segment Segment Element Element JWST System Observatory Ground Launch Optical Telescope Element (OTE) Science and Operations Center Launch Vehicle Spacecraft (SC) Institutional Systems Payload Adapter Integrated Science Instrument Module (ISIM) Common Systems Launch Site Services NIRCam Subsystem Subsystem (within (within ISIM) ISIM) Structure 06/17/2004 NIRSpec MIRI FGS/TF Thermal IC&DH Flight SW TIPS/JIM Harnessing 3/15 ISIM Requirements Flow Environmental Req’s for the JWST Observatory JWST-SPEC-003149 EV Segment Element JWST Observatory Specification JWST-SPEC-002020 OBS ¸ Fault Protection Requirements Allocation Document JWST-RQMT-002450 FP ¸ Mission Assurance Requirements For the JWST Instruments JWST-RQMT-002363 ¸ ISIM Requirements Document JWST-RQMT-000835 MAR ISIM ESA JWST Product Assurance Requirements Document ESA-JWST-RQ-64 ¸ ISIM to OTE and Spacecraft IRD JWST-IRD-000640 ISIM to OTE and IOS-IR JWST-ICD-001831 ¸ JWST-ICD-000728 ¸ ¸ NIRSpec IRD JWST-IRD-000781 ISIM to OTE and INSU INCC JWST-ICD-000729 •EMC Control Plan; JWST-PLAN-002449. •Flight Observatory to Ground Segment IRD; JWST-CCR-000106. •The Radiation Environment for the JWST; (JWST-RPT-000453). •ISIM FSW Requirement Document; JWSTRQMT-002101. •ISIM 1553B Data Bus Specification; JWSTSPEC-002093. CSA Performance Assurance Requirements CSA-TBD NIRCam IRD JWST-IRD-003272 ISIM to OTE and INCU IOSC Other related documents reviewed: MIRI IRD JWST-IRD-000782 ISIM to OTE and IMU INSC JWST-ICD-000730 IMC FGS IRD JWST-IRD-000783 ISIM to OTE and JWST-ICD-000727 IF IFC Subsystem NIRCam Functional Requirements Document JWST-SPEC-002049 NRC NIRSpec Functional Requirements Document JWST-SPEC-002060 NRS ISIM Structure Requirements JWST-RQMT-002087 IS 06/17/2004 MIRI Functional Requirements Document JWST-SPEC-002063 MIR ISIM Thermal Control Subsystem Requirements JWST-RQMT-003274 ISIM Flight Software Requirements JWST-RQMT-002101 IFSW ITCS TIPS/JIM FGS Instrument Performance and Functional Requirements JWST-SPEC-002069 FGS ICDH Requirements JWST-RQMT-000743 ICDH 4/15 ICDH & FSW SRR Objectives & Scope ´ Objectives: • Confirm that sub-system-level requirements meet the mission objectives • Validate that the architecture concepts can support the performance, interface, environmental, and product assurance requirements • Confirm that the preliminary designs are ready to proceed ´ Scope • Reviews are at the ICDH and FSW Sub-system Level • Code 560 Peer Review for ICDH • Code 582 Peer Review for FSW 06/17/2004 TIPS/JIM 5/15 ICDH Subsystem Top Level Summary ´ Hosts the ISIM Flight Software • Executes the Observation Plan Executive (OPE) for the Observatory • Performs Target Acquisition • Manages Command execution, distribution, and telemetry collection ´ Performs the Command and Data Handling Functions for the NIRCam, NIRSpec, and MIRI instruments. • • • • • Command distribution Science Data Collection Telemetry Collection Performs science data processing for NIRCam, NIRSpec, and MIRI Performs science data formatting and compression for storage on the Spacecraft on the Solid State Recorder ´ Interfaces to the Spacecraft Command and Telemetry Processor (CTP) for Commanding and Telemetry ´ Interfaces to the Spacecraft Solid State Recorder (SSR) for Science Data Storage 06/17/2004 TIPS/JIM 6/15 SPACECRAFT PRIMARY POWER (SWITCHED) TOWER ISIM Electrical Interface Overview ISIM Region 3 EPU CTP SpaceWire SSR SpaceWire NIRCam SpaceWire FPE MODULE A SpaceWire FPE MODULE B ISIM MIL-STD1553B ICDH SpaceWire Region 2 SpaceWire SpaceWire ICE NIRSpec S/C MIL-STD-1553B 06/17/2004 UAz JPL/ESA ESA CSA OPTICAL ASSEMBLY MECHANISMS MCE MSA OPTICAL ASSEMBLY FPE FPA ICE MECHANISMS FPE/ICE NGST MECHANISMS ICE FGS FGS C&DH FPA MODULE A FPA MODULE B FPA DCE RS-422 (TBR) OPTICAL ASSEMBLY FPE MIRI SpaceWire Region 1 FPE/ICE FPE/ICE /TCE DEWAR OPTICAL ASSEMBLY GUIDER 1 FPA/ MECHANISMS GUIDER 2 FPA/ MECHANISMS TF FPA/ MECHANISMS GSFC TIPS/JIM 7/15 Roadmap to PDR for ICDH ´ Key Procurements • Select Single Board Computer (SBC) Vendor (Selected in early May—will be BAE, based on performance, not cost.) • Select Vendor for Spacewire ASIC (Application Specific Integrated Circuit) ´ Documentation • Develop drafts of: • ICDH Box and Card Level Specifications • Interface Control Documents • Box and Card Level Test Plans and Procedures • Complete Configuration Control Board (CCB) process for: • Verification Plan • I&T Plan ´ Key Risk Mitigation Activities • Progress toward SDRAM verification (256 Mb Hitachi dies, stacked 2x3) • Progress toward TRL5 for Spacewire ´ Complete ICDH System Concept Review – June 04 (now late July) 06/17/2004 TIPS/JIM 8/15 ICDH SRR Summary Results ´ Very good review. Panel seemed pleased with the presentation. ´ Concerns about missing/unclear higher-level requirements, primarily those on total data throughput for Spacewire. • Kriss developed science use cases that were given to GSFC in support of answering the RFA on this issue. ´ Philosophy and approach to EMI/EMC testing was discussed extensively. The panel recognized that systems-level testing was important in missions with low-noise detectors. • Note that the EMI/EMC working group being led by John McCloskey at GSFC is aware of this and is studying all the relevant issues. 06/17/2004 TIPS/JIM 9/15 ISIM Flight Software Reference Architecture Activity Descriptions Command Loads Telemetry (+Events, diagnostics) Visit Files Flight Database Visit Files ISIM Instrument SW Covered by this review Core C&DH and ISIM Hardware I/Fs Command, Telemetry, Memory Mgt, Stored Command, Tlm Monitoring, Time Mgt, Health & Safety, File Mgt, ADP 1553, SpaceWire, FPAP, BIC, ISIM H/K Interface CTP I/F 06/17/2004 SI Application specific software for NIRCam, NIRSpec, MIRI Science Exposure Set-up, Data Read-out, OPE, Acq, ISIM Housekeeping ISIM Support Development Tools Operational Interfaces & Loads Ground System Command & Tlm Database SSR I/F Simulators TIPS/JIM Lab Support (CM, Maintenance, etc.) Operating System Environment 10/15 ISIM FSW Subsystem ´ Command and Data Handling • • • • • Command Handling Telemetry collection Memory Management Computer Health and Safety File Management ´ Spacecraft Interface • Load and dump from/to ground • Mission Planning Interface (for FGS, Pointing) • Science Data transfer to the recorder ´ ISIM Support Functions • • • • • 06/17/2004 Science Exposure Set-up SI Detector Read-out Event Driven Mission Scheduling SI Target Acquisition ISIM Housekeeping TIPS/JIM 11/15 ISIM Software Roles and Responsibilities ´ GSFC ISIM Subsystem ¸ ISIM C&DH Core Flight Software (FSW) and Shared FSW applications • Science Instrument Development (SIDU) Systems for FSW ´ European Space Agency/European Consortium • NIRSpec Instrument Control Electronics FSW application ´ Canadian Space Agency • FGS Flight Software – no direct interface ´ University of Arizona • NIRCam Instrument (Lockheed Martin ATC is Prime) ICE and FPE FSW applications ´ GSFC Subsystem Software Support • NIRSpec FPE FSW application • Micro-Shutter Array (MSA) FSW application • Dewar Control Electronics (DCE) FSW application Legend ´ JPL ¸Indicates area which is covered by ISIM FSW SRR • MIRI FPE and ICE FSW applications Status of other FSW Requirements is provided later in charts 06/17/2004 TIPS/JIM 12/15 ISIM FSW Risks ´ The ISIM FSW is built by geographically diverse development teams, and there is limited system integration with flight hardware. There is no one place that the integrated FSW system (SC–ISIM–SI) is tested against high fidelity hardware. ´ There is no high fidelity Spacecraft/SRR simulation resident in the FSW Development/Test Lab. ´ The Common Command & Data Handling (CCDH) shared resource approach requires a well documented, simple interface for the SI teams. ´ Mission Operations Requirements have not been flowed down from the Operational Concept into Mission Requirements Documents. 06/17/2004 TIPS/JIM 13/15 Roadmap to PDR for ISIM FSW ´ Finalize Requirements and ingest into ReqPro • • • • ISIM FSW Requirements ISIM Core C&DH to FSW Application ICD Science Instrument Development Unit Specification (SIDU) Instrument Control Electronics (ICE) Simulator Specification (ICES) ´ Support Development ICDs • • • • • • Flight to Ground ICD Flight to Flight ICD IGSS GSE to ISIM FSW ICD S/C Simulator to ISIM ICD ICDH Hardware to IFSW ICD SI ICDs ´ Key Procurements • Science Instrument Development Unit (SIDU) Hardware - 06/04 06/17/2004 TIPS/JIM 14/15 ISIM FSW SRR Summary Results ´ Mixed review. Passed, but many unsettled concerns. A follow-up table-top review will be held later this summer. ´ Many requirements embodied in the Mission Ops Concept Document have not been properly captured in the Mission-level or ISIM-level requirements. ´ Interfaces were not clearly specified, especially to the ground system. ´ Lots of discussion of the STScI event-driven concept based on the Observation Plan Executive (OPE) and the associated scripting engine, the Activity Description Processor (ADP). • Many panel members expressed reservations about the apparent complexity of the OPE and ADP. • Much confusion on the part of the GSFC FSW team as to how this works and why it is a good idea. • Presenters, GSFC ISIM team, and reviewers all want a trade study. • 06/17/2004 This is in work, being lead by Ken Rehm, the JWST Mission Software Lead, at GSFC. TIPS/JIM 15/15