Energy Management in FirstRand FirstRand PowerPoint Heading By William Cass

advertisement
Energy Management in FirstRand
FirstRand
PowerPoint Heading
By
William Cass
City
of Cape
Town 3 September
FirstRand
PowerPoint
Sub-heading2009
FirstRand Group Companies
Strategy of FirstRand Energy Management
1. Baseline of electricity spend (Oct 06 – Sep 07)
2. Target of 11% reduction in electricity use per building by 2012
3. Energy Dashboard for large buildings and Business Units
4. Collaborate Energy Saving initiatives using Best Practice
5. Identify and advise on new technology / initiatives
6. Buy-in from senior management
Why must we save electricity?
• Reduce load on the Eskom Grid
• Extend backup power supply
• Energy Conservation Scheme (ECS)
• Reputational Risk (Marketing)
• Environment
• Financially Viable
Energy Dashboards – Merchant Place
Baseline of Energy Usage Oct 06 - Sep 07
11% Reduction Target vs Actual Reduction
Baseline of Electricity Usage
ReductionTargets and Actual Reduction
Baseline
3,000,000
2,750,000
Baseline 06-07
2,250,000
kWh
kWh
2,500,000
Current Consumption
08-09
2,000,000
1,750,000
1,500,000
kWh
Savings
11% Target
Actual Savings
Jun
May
Apr
Mar
Feb
Month
Jan
Dec
Nov
Oct
Sep
Aug
Jul
Jun
May
Apr
Mar
Feb
Jan
Dec
Nov
Oct
Sep
Aug
Jul
Current
Consumption
700,000
600,000
500,000
400,000
300,000
200,000
100,000
-
Target
Savings`
Month
Tracking of implemented Initiatives
Initiative
Lighting and Sensor Installation
Screen onstandby after ten minutes
(+-500 computers)
Replace air-con fan motors
Install variable speed drives in fans
TOTAL
Date
Implemented
May - Sep 08
Building
Merchant Place
Implementation Cost
R 2,964,962
Annualised
Savings
Savings Dates
July 08 to June 09
Payback Period (Years)
2.26
R 1,201,195
4 Merchant Place
Merchant Place
Merchant Place
Aug-08
Oct-08
Oct-08
None
July 08 to June 09
25% saving on air-con
costs
Immediate
R 2,964,962
R 1,201,195
2.26
Planned Initiatives
Initiative
Expected Live
Date
Building
Increase settings on air-conditioner 4 Merchant Place
Implementation Cost
TBA
Projected Savings
(PA)
Payback Period (Years)
TBA
Immediate
Standby Capacity
Key Locations
UPS'
Generators
Merchant Place
Diesel Capacity
18 000 L
Standby Capacity
2 days
Diesel Price
Comments
Retail less 20c
Total diesel capacity to be
increased to 55 000 L in Jun 09.
Planning 180 000 L diesel storage
deal with Cargo Carriers.
Energy Consumption breakdown
4%
8%
Air conditioning
40%
20%
Lighting
Office equipment
Water heating
Other
28%
Energy Saving Initiatives
Payback Period
Financially Viable
10 %
Deep Retrofits
% Savings of total
Electricity
8%
Chiller Upgrade
Lighting Retrofit
6%
Motion Sensors
Computer Energy
Saving Settings
4%
Purchase Energy
Efficient Equipment
Adjust Aircon Settings
& BMS to control lights
Boiler
Upgrade
Variable Speed Drives &
Power Factor Correction
2%
Solar Geysers
Window Film /
Louvers
1
2
3
4
Payback
(years)
5
10
15
20
Implemented Energy Saving Initiatives
Commodity
Actions
Date Implemented
Implementation
Cost
Branch Banking
Momentum 268 West Avenue
Momentum 268 West Avenue
Momentum 268 West Avenue
Momentum 268 West Avenue
Increase minimum temperature on a floor from 19 to
22 degrees
Reduce after hour lighting from 40% to 10%
87 Motion sensors installed
49 Motion sensors installed
41 Motion sensors installed
25 Motion sensors installed
60 Motion sensors installed
72 Motion sensors installed
24 Motion sensors installed
17 Motion sensors installed
120 Basement lights retrofitted
90 fittings changed from 150w to 30 w
85 fittings changed from 150w to 23 w
Lighting retrofit and Sensor installation
Lighting and Sensor Installation
Screens on standby after 10 minutes. 300 screens
Replaced air-con fan motors
Install variable speed drives in fans
Four Chillers replaced
Maintenance saving od R 1 million per annum
Magnetic Ballasts replaced with electronic Ballasts
Sensors installled
Excess UPS on standby
Power Factor Correctiion
Lighting retrofit motion sensors on Bill of Quantity
for "One and Done" branches. 130 branches
implemented
Replaced Halogen globes with LED's in car park
Install Geyser timers in 20 geysers
Reduce after hour lighting on BMS
Switch one chiller off at 11:00 each day
Outsurance
Replacing non-efficient bulbs as they break
70% complete
Ongoing
Ongoing maintenance
cost
Outsurance
Air-conditioning & lights on time schedule
Aug-09
None
Outsurance
Power down one chiller on a cold day
Automated Shut Down of computers after hours
Linux 11 000 computers
Aug-09
None
Bank City
Bank City
Bank City 1 & 2 First Place
Bank City - 3 First Place
Bank City - 4 First Place
Bank City - Wesbank
Bank City Parkade
Towers Offices
Towers Parking
Call Centre- Randburg Kent Ave
Call Centre- Randburg Kent Ave
Call Centre- Randburg Kent Ave
Call Centre- Randburg Kent Ave
Branch Banking TSD
All Merchant Place buildings
Group Support, 4 Merchant Place
Merchant Place
Merchant Place
Randburg Computer Centre
Randburg Computer Centre
Randburg Computer Centre
Randburg Computer Centre
Randburg Computer Centre
Branches
Total
Aug-08
Oct-08
Mar-08
Sep-08
Sep-08
Sep-08
Sep-08
Sep-08
Sep-08
Aug-08
Aug-08
Aug-08
Aug-08
Nov-08
May - Sep 08
Aug-08
Oct-08
Oct-08
May - Aug 08
Aug-08
Aug-08
Aug-08
Aug-09
Oct-08
Jun-08
Aug-08
Sep-08
Oct-08
Mar09 to Aug09
R 126,890
R 78,150
R 67,500
R 44,250
R 114,000
R 100,800
R 43,200
R 37,405
kWh Saved
Annualised Savings
3,835,383
R 1,363,300.00
282,355
184,291
71,020
R 88,754.00
R 57,928.00
R 22,055.00
R 31,831.00
R 162,000
252,288
R 1,154,110
1,309,032
R 385,146.00
R 2,964,962
5,760,127
R 1,201,195
1,147,200
R 466,783
R 45,234.00
R 4,700,000
R 400,000
944,680
R 444,000
Ongoing maintenance
cost
TBC
R 1,440,000
83,710
R 355,000
5,658,804
R 1,454,277
None
R 9,993,267
19,528,890
R 7,355,503
Planned Energy Saving Initiatives
Building
Planned
Initiative
Implementation
Date
Randburg CC
396 Kent Str
396 Kent Str
Selby
Selby
Selby
Selby
Clinton Climate Initiative building retrofit
Lighting retrofit and Sensors to reduce electricity.
Power Factor Correctiion
Heat Pump water heater
Propose move to Max tariffs (TOU)
Power Factor Correction
Variable speed drives
Sep-09
Oct-09
Aug-09
Oct-09
Sep-09
Oct-09
Oct-09
R 200,000
R 129,014
R 64,000
R 192,000
R 180,000
R 122,000
Momentum
Lighting retrofit and Sensors to reduce electricity.
Aug-09
R 1,010,682
Rosebank
Lighting retrofit and Sensors to reduce electricity.
Sep-09
R 82,416 Proposal received, reviewing contract
Sandown Mews
Namibia Windhoek
Lighting retrofit and Sensors to reduce electricity.
Sep-09
Lighting retrofit and Sensors to reduce electricity.
Sep-09
R 300,000 Co-ordinated approach from FirstRand
Waiting for go-ahead for audit from
??
Namibia
Branches
FirstRand
Red 3
291 Surrey Str
Momentum
"One & Done" Project (Lights, ballasts &
sensors)
Roll out Windows energy saving software to
FIrstRand
Power Factor Correctiion
Power Factor Correctiion
Power Factor Correctiion
Annual Savings
Ongoing
Sep-09
Sep-09
Sep-09
Oct-09
Total
??
Update
Evaluating initiatives
Preparing Business Case
Preparing Business Case
Preparing Business Case
Preparing Business Case
Preparing Business Case
Preparing Business Case
Implementation has started
R 1,500,000 140 to be completed in 09/10 Fin Year
Currently being piloted in Outsurance
R 4,000,000
and FNB Hogan
R 204,000
R 44,632
To be measured and implemented
R 8,028,744
New Energy Saving Initiatives
Heat Pump Water Heaters
•
•
•
•
Vapour compression cycle, opposite of a air conditioner
Heats water up to 60 degrees
Anticipated 67% electricity saving with a payback period of 18 – 24 months
Bank City to pilot and measure Heat Pump savings, if successful, then
rollout to Group
Electricity Optimisation
•
Optimise voltage and air-conditioning
Staff awareness
•
•
A product is being piloted that creates an alert on computers when the target
of 10% saving will not be achieved
The objective of this, is for the staff to look for ways to reduce electricity
themselves
New Energy Saving Initiatives
Increase Temperature of the Air Conditioner
•
•
•
•
•
Four Merchant Place increased the temperature by two degrees for one week
Air conditioning power requirement dropped by an average of 50 kW
This is equivalent to 438 000 kWh per annum
Which is equivalent to approximately R226 000 saving per annum
Same number of complaints
IT Energy Saving Initiatives
Energy Saving Settings and Remote Shutdowns on Computers
•R100 to R250 electricity saving per computer per annum
Computer Centres
•Blade server technology consolidates servers with greater energy efficiency
in relation to processing power
•Virtualisation of computers
LCD vs CRT: electricity consumption (kWh/year)*
CRT
96
LCD
36
0
8 hours
2 hours
14 hours
over 50% savings!
19
50
100
on
* Energy Star
on:
standby:
off:
34.8
standby/off
150
Energy Saving Settings and Remote Shutdown of Computers
• We are piloting two Windows based programs to identify which will be the best
program to implement across the FirstRand Group.
• Below are initial findings from a Baseline that was created before settings were
changed.
• Projected Savings extrapolated from 282 computers currently being monitored
– 327 562 kwh
– R 163 781
– 314 metric tonnes of CO2
Fairland Office Park
•
•
•
•
The furthest distance of a workstation from a perimeter window or light well is 15m
Large amount of natural light
The lighting system uses dimmable electronic control gear
Insulation from roof to wall to window and double glazing on the windows
Fairland Office Park
• Sunscreens and solar reflector panels are exoskeletal prevent sun glare
• Electrified fence is powered by solar panels
• Solar water geysers heat up water in the bathrooms
Funding Energy Saving Initiatives
FNB will fund retrofits under their current “Cashflow payback” product
Loan will not increase current costs.
Retrofit will pay for itself between 2 – 3 years.
Increase in tariffs will increase savings
Interest Payment
Savings
Payment to Bank/ESCO
Rands
•
•
•
•
Electricity costs to Council / Eskom
Before Initiative
After Initiative (2-3 years)
Time
Download