Energy Management in FirstRand FirstRand PowerPoint Heading By William Cass City of Cape Town 3 September FirstRand PowerPoint Sub-heading2009 FirstRand Group Companies Strategy of FirstRand Energy Management 1. Baseline of electricity spend (Oct 06 – Sep 07) 2. Target of 11% reduction in electricity use per building by 2012 3. Energy Dashboard for large buildings and Business Units 4. Collaborate Energy Saving initiatives using Best Practice 5. Identify and advise on new technology / initiatives 6. Buy-in from senior management Why must we save electricity? • Reduce load on the Eskom Grid • Extend backup power supply • Energy Conservation Scheme (ECS) • Reputational Risk (Marketing) • Environment • Financially Viable Energy Dashboards – Merchant Place Baseline of Energy Usage Oct 06 - Sep 07 11% Reduction Target vs Actual Reduction Baseline of Electricity Usage ReductionTargets and Actual Reduction Baseline 3,000,000 2,750,000 Baseline 06-07 2,250,000 kWh kWh 2,500,000 Current Consumption 08-09 2,000,000 1,750,000 1,500,000 kWh Savings 11% Target Actual Savings Jun May Apr Mar Feb Month Jan Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan Dec Nov Oct Sep Aug Jul Current Consumption 700,000 600,000 500,000 400,000 300,000 200,000 100,000 - Target Savings` Month Tracking of implemented Initiatives Initiative Lighting and Sensor Installation Screen onstandby after ten minutes (+-500 computers) Replace air-con fan motors Install variable speed drives in fans TOTAL Date Implemented May - Sep 08 Building Merchant Place Implementation Cost R 2,964,962 Annualised Savings Savings Dates July 08 to June 09 Payback Period (Years) 2.26 R 1,201,195 4 Merchant Place Merchant Place Merchant Place Aug-08 Oct-08 Oct-08 None July 08 to June 09 25% saving on air-con costs Immediate R 2,964,962 R 1,201,195 2.26 Planned Initiatives Initiative Expected Live Date Building Increase settings on air-conditioner 4 Merchant Place Implementation Cost TBA Projected Savings (PA) Payback Period (Years) TBA Immediate Standby Capacity Key Locations UPS' Generators Merchant Place Diesel Capacity 18 000 L Standby Capacity 2 days Diesel Price Comments Retail less 20c Total diesel capacity to be increased to 55 000 L in Jun 09. Planning 180 000 L diesel storage deal with Cargo Carriers. Energy Consumption breakdown 4% 8% Air conditioning 40% 20% Lighting Office equipment Water heating Other 28% Energy Saving Initiatives Payback Period Financially Viable 10 % Deep Retrofits % Savings of total Electricity 8% Chiller Upgrade Lighting Retrofit 6% Motion Sensors Computer Energy Saving Settings 4% Purchase Energy Efficient Equipment Adjust Aircon Settings & BMS to control lights Boiler Upgrade Variable Speed Drives & Power Factor Correction 2% Solar Geysers Window Film / Louvers 1 2 3 4 Payback (years) 5 10 15 20 Implemented Energy Saving Initiatives Commodity Actions Date Implemented Implementation Cost Branch Banking Momentum 268 West Avenue Momentum 268 West Avenue Momentum 268 West Avenue Momentum 268 West Avenue Increase minimum temperature on a floor from 19 to 22 degrees Reduce after hour lighting from 40% to 10% 87 Motion sensors installed 49 Motion sensors installed 41 Motion sensors installed 25 Motion sensors installed 60 Motion sensors installed 72 Motion sensors installed 24 Motion sensors installed 17 Motion sensors installed 120 Basement lights retrofitted 90 fittings changed from 150w to 30 w 85 fittings changed from 150w to 23 w Lighting retrofit and Sensor installation Lighting and Sensor Installation Screens on standby after 10 minutes. 300 screens Replaced air-con fan motors Install variable speed drives in fans Four Chillers replaced Maintenance saving od R 1 million per annum Magnetic Ballasts replaced with electronic Ballasts Sensors installled Excess UPS on standby Power Factor Correctiion Lighting retrofit motion sensors on Bill of Quantity for "One and Done" branches. 130 branches implemented Replaced Halogen globes with LED's in car park Install Geyser timers in 20 geysers Reduce after hour lighting on BMS Switch one chiller off at 11:00 each day Outsurance Replacing non-efficient bulbs as they break 70% complete Ongoing Ongoing maintenance cost Outsurance Air-conditioning & lights on time schedule Aug-09 None Outsurance Power down one chiller on a cold day Automated Shut Down of computers after hours Linux 11 000 computers Aug-09 None Bank City Bank City Bank City 1 & 2 First Place Bank City - 3 First Place Bank City - 4 First Place Bank City - Wesbank Bank City Parkade Towers Offices Towers Parking Call Centre- Randburg Kent Ave Call Centre- Randburg Kent Ave Call Centre- Randburg Kent Ave Call Centre- Randburg Kent Ave Branch Banking TSD All Merchant Place buildings Group Support, 4 Merchant Place Merchant Place Merchant Place Randburg Computer Centre Randburg Computer Centre Randburg Computer Centre Randburg Computer Centre Randburg Computer Centre Branches Total Aug-08 Oct-08 Mar-08 Sep-08 Sep-08 Sep-08 Sep-08 Sep-08 Sep-08 Aug-08 Aug-08 Aug-08 Aug-08 Nov-08 May - Sep 08 Aug-08 Oct-08 Oct-08 May - Aug 08 Aug-08 Aug-08 Aug-08 Aug-09 Oct-08 Jun-08 Aug-08 Sep-08 Oct-08 Mar09 to Aug09 R 126,890 R 78,150 R 67,500 R 44,250 R 114,000 R 100,800 R 43,200 R 37,405 kWh Saved Annualised Savings 3,835,383 R 1,363,300.00 282,355 184,291 71,020 R 88,754.00 R 57,928.00 R 22,055.00 R 31,831.00 R 162,000 252,288 R 1,154,110 1,309,032 R 385,146.00 R 2,964,962 5,760,127 R 1,201,195 1,147,200 R 466,783 R 45,234.00 R 4,700,000 R 400,000 944,680 R 444,000 Ongoing maintenance cost TBC R 1,440,000 83,710 R 355,000 5,658,804 R 1,454,277 None R 9,993,267 19,528,890 R 7,355,503 Planned Energy Saving Initiatives Building Planned Initiative Implementation Date Randburg CC 396 Kent Str 396 Kent Str Selby Selby Selby Selby Clinton Climate Initiative building retrofit Lighting retrofit and Sensors to reduce electricity. Power Factor Correctiion Heat Pump water heater Propose move to Max tariffs (TOU) Power Factor Correction Variable speed drives Sep-09 Oct-09 Aug-09 Oct-09 Sep-09 Oct-09 Oct-09 R 200,000 R 129,014 R 64,000 R 192,000 R 180,000 R 122,000 Momentum Lighting retrofit and Sensors to reduce electricity. Aug-09 R 1,010,682 Rosebank Lighting retrofit and Sensors to reduce electricity. Sep-09 R 82,416 Proposal received, reviewing contract Sandown Mews Namibia Windhoek Lighting retrofit and Sensors to reduce electricity. Sep-09 Lighting retrofit and Sensors to reduce electricity. Sep-09 R 300,000 Co-ordinated approach from FirstRand Waiting for go-ahead for audit from ?? Namibia Branches FirstRand Red 3 291 Surrey Str Momentum "One & Done" Project (Lights, ballasts & sensors) Roll out Windows energy saving software to FIrstRand Power Factor Correctiion Power Factor Correctiion Power Factor Correctiion Annual Savings Ongoing Sep-09 Sep-09 Sep-09 Oct-09 Total ?? Update Evaluating initiatives Preparing Business Case Preparing Business Case Preparing Business Case Preparing Business Case Preparing Business Case Preparing Business Case Implementation has started R 1,500,000 140 to be completed in 09/10 Fin Year Currently being piloted in Outsurance R 4,000,000 and FNB Hogan R 204,000 R 44,632 To be measured and implemented R 8,028,744 New Energy Saving Initiatives Heat Pump Water Heaters • • • • Vapour compression cycle, opposite of a air conditioner Heats water up to 60 degrees Anticipated 67% electricity saving with a payback period of 18 – 24 months Bank City to pilot and measure Heat Pump savings, if successful, then rollout to Group Electricity Optimisation • Optimise voltage and air-conditioning Staff awareness • • A product is being piloted that creates an alert on computers when the target of 10% saving will not be achieved The objective of this, is for the staff to look for ways to reduce electricity themselves New Energy Saving Initiatives Increase Temperature of the Air Conditioner • • • • • Four Merchant Place increased the temperature by two degrees for one week Air conditioning power requirement dropped by an average of 50 kW This is equivalent to 438 000 kWh per annum Which is equivalent to approximately R226 000 saving per annum Same number of complaints IT Energy Saving Initiatives Energy Saving Settings and Remote Shutdowns on Computers •R100 to R250 electricity saving per computer per annum Computer Centres •Blade server technology consolidates servers with greater energy efficiency in relation to processing power •Virtualisation of computers LCD vs CRT: electricity consumption (kWh/year)* CRT 96 LCD 36 0 8 hours 2 hours 14 hours over 50% savings! 19 50 100 on * Energy Star on: standby: off: 34.8 standby/off 150 Energy Saving Settings and Remote Shutdown of Computers • We are piloting two Windows based programs to identify which will be the best program to implement across the FirstRand Group. • Below are initial findings from a Baseline that was created before settings were changed. • Projected Savings extrapolated from 282 computers currently being monitored – 327 562 kwh – R 163 781 – 314 metric tonnes of CO2 Fairland Office Park • • • • The furthest distance of a workstation from a perimeter window or light well is 15m Large amount of natural light The lighting system uses dimmable electronic control gear Insulation from roof to wall to window and double glazing on the windows Fairland Office Park • Sunscreens and solar reflector panels are exoskeletal prevent sun glare • Electrified fence is powered by solar panels • Solar water geysers heat up water in the bathrooms Funding Energy Saving Initiatives FNB will fund retrofits under their current “Cashflow payback” product Loan will not increase current costs. Retrofit will pay for itself between 2 – 3 years. Increase in tariffs will increase savings Interest Payment Savings Payment to Bank/ESCO Rands • • • • Electricity costs to Council / Eskom Before Initiative After Initiative (2-3 years) Time