Stanton Roundabout Questions & Answers Question #1

advertisement

Stanton Roundabout

Questions & Answers

Question #1

The RFP language for experience requirements had me a little concerned my design/build team should even submit a proposal.

In the RFP General information I.B.2 it states “Provide Design / Build services within the last five (5) years for at least two projects in excess of $2,000,000 construction cost, utilizing the expertise available through their Colorado office.”

Question: Can the combined experience of the design/build team be used to meet this requirement, and can previous experience with past companies also be used?

Answer #1

No, we are looking for the two projects having been done by the firm that UCCS will contract with for the project.

Yes, previous experience by proposed personnel with past companies can also be used.

Question #2

Do the pages required for the Minimum Requirements, Cover letter to Gary Reynolds, and Acknowledgement and

Attestation form count towards the 20 page limit?

Answer #2

The cover letter counts in the 20 page limit. Resumes and the Acknowledgement and Attestation form can go in an appendix and will not count in 20 page limit. Section separation pages also do not count in the 20 page limit.

Question #3

I just wanted to verify that the RFPs from design build firms are still due 11/27/13 at 2pm for this project….

Answer #3

Responses are still due at 2:000 on November 27, 2103

Question #4

Are the Cover Letter and Table of Contents included in the page count?

Answer #4

The Cover Letter counts in the 20 page limit.

The Table of Contents is similar to a section separation page and is not counted in the 20 page limit.

Question #5

Would you please clarify what is included in the 20-page limit? For example, are the following excluded: a) cover letter b) Acknowledgement and Attestation Form c) Surety Bond Letter d) Examples i.e. reports, drawings specified in question 2. A, and e) resumes, f)cover of proposal.

Answer #5

Cover Letter- See Answer #2

Acknowledgement and Attestation Form- See Answer #2

Surety Bond Letter –Can be included in Appendix and will not count toward the 20 page limit.

Examples; i.e. reports, drawings specified in question 2. A, - Can be included in Appendix and will not count toward the 20 page limit.

Resumes -See Answer #2

The cover of the proposal will not count toward the 20 Page limit.

Question #6

In Appendix A—Prequalification Submittal/Evaluation Form, it defines the score as the weight multiplied by the rating. While the rating is defined on the form, the weight is noted as “assigned prior to evaluation.” Is it possible to know the value of weight?

Answer #6

This information will not be available prior to the RFP submittal deadline.

Question #7

In the directions it states to submit the electronic proposal “formatted and tabbed.” Could you please specify how you would like the submittal tabbed as part of an electronic submittal?

Answer #7

In some cases, software programs allow electronic ‘tabbing’ of sections or pages. This is not a requirement but facilitates our review of the submittals.

Question #8

Could you please clarify the following statement in IV. Evaluation Criteria, General Qualifications : “Each division and exhibit described below must be indexed, tabbed, and presented on a separate page.” My assumption is that the word “division” refers to items 1 through 5 under

A. Prequalification Submittal Evaluation Criteria.

The word

“exhibit,” then, would refer to actual attachments included as responses and not to individual paragraphs under items

1 through 5, given the 20-page limit. Correct?

Answer #8

That is correct.

Question #9

Has City Traffic indicated that a traffic report will be required for this work?

Answer #9

A traffic study was completed as part of the Stanton Parking garage project.

Question #10

Will the pedestrian spine be combined with the roadway through this section now that the parking garage has been constructed over the planned route of the pedestrian spine per the Master Plan?

Answer #10

Construction of a new section of the pedestrian spine is included in this project. This section will be adjacent to Mountain Lion Way, east of Stanton Road

Question #11

Will this project be reviewed by the DRB?

Answer #11

Yes.

Question #12

IV.A.5 Project Background/Success of Design Builder Team- Are the 3 relevant projects to be projects that the proposing Design/Build Team has performed together, or 3 relevant projects for each team member, either together or individually?

Answer #12

The three relevant projects can have been performed by either team member or together. However, preference will be given to those teams that have worked together on all three projects.