UCCS Campus VOIP Project Narrative
MAIN HALL
Tele/Data Room 136: 1S-4
Install 50A, 208V single phase dedicated circuit for new 60A/2P, 240V disconnect switch. Install new disconnect switch on South wall of Tele/Data Room 136. New disconnect switch will feed hard wired
8kVA UPS.
New 50A, 208V single phase circuit to be fed from existing panel “L1B” located in Electrical Room 137
1S-4A . Install a pull-box at new disconnect switch and extend new circuit through pullbox to facilitate future re-feeding of 50A circuit from Generator backed up emergency power source.
CRAGMOR HALL
Data Room OS-1:
Install a new L630 receptacle located 12” above finished floor on North wall. Receptacle is to be fed by a new dedicated 30A, 208V single phase circuit.
New 30A, 208V single phase circuit to be fed from new 30A/1P circuit breaker in existing panel “LG” located in Electrical Room OS-2. Extend circuit through pull box located above ceiling above new receptacle to facilitate future re-feeding of 30A circuit from Generator backed up emergency power source.
CAMPUS SERVICE BUILDING
Electrical Room 222: 248
Install a new L520 receptacle located 12” above finished floor on East wall. Receptacle is to be fed by a new dedicated 20A, 120V circuit.
New 20A, 120V circuit to be fed from new 20A/1P circuit breaker in existing panel “2D” located in same room. Extend circuit through pull box located above ceiling above new receptacle to facilitate future refeeding of 30A circuit from Generator backed up emergency power source.
ENGINEERING BUILDING
Tele/Data Room 261:
Install a new L530 receptacle located 12” above finished floor on West wall. Receptacle is to be fed by a new dedicated 30A, 120V circuit.
New 30A, 120V circuit to be fed from new 30A/1P circuit breaker in existing panel “401” located in Room
256. Extend circuit through pull box located above ceiling above new receptacle to facilitate future refeeding of 30A circuit from Generator backed up emergency power source.
Tele/Data Room 235:
Install a new L530 receptacle located 12” above finished floor on North wall. Receptacle is to be fed by a new dedicated 30A, 120V circuit.
New 30A, 120V circuit to be fed from new 30A/1P circuit breaker in existing panel “LW” located in Room
225A. Extend circuit through pull box located above ceiling above new receptacle to facilitate future refeeding of 30A circuit from Generator backed up emergency power source.
UNIVERSITY HALL
Elec/Data Room 3S-4:
Install a new L530 receptacle located 12” above finished floor on South wall. Receptacle is to be fed by a new dedicated 30A, 120V circuit.
1
UCCS Campus VOIP Project Narrative
New 30A, 120V circuit to be fed from new 30A/1P circuit breaker in existing panel “R1B” located in same room. Extend circuit through pull box located above ceiling above new receptacle to facilitate future refeeding of 30A circuit from Generator backed up emergency power source.
Elec/Data 1S-11:
Install a new L530 receptacle located 12” above finished floor on South wall. Receptacle is to be fed by a new dedicated 30A, 120V circuit.
New 30A, 120V circuit to be fed from new 30A/1P circuit breaker in existing panel “R6” located in same room. Extend circuit through pull box located above ceiling above new receptacle to facilitate future refeeding of 30A circuit from Generator backed up emergency power source.
Tele Room 1S-6A:
Install a new L530 receptacle located 12” above finished floor on South wall. Receptacle is to be fed by a new dedicated 30A, 120V circuit. New 30A, 120V circuit to be fed from new 30A/1P circuit breaker in existing panel “R4” located in Elec/Data Closet 1S-9. Extend circuit through pull box located above ceiling above new receptacle to facilitate future re-feeding of 30A circuit from Generator backed up emergency power source.
UNIVERSITY CENTER
Loft Area Room 131:
Install a new L530 receptacle located 12” above loft floor on South wall. Receptacle is to be fed by a new dedicated 30A, 120V circuit.
New 30A, 120V circuit to be fed from new 30A/1P circuit breaker in existing panel “UR” located in Main
Electrical Room. Extend circuit through pull box located in Main Electrical Room to facilitate future refeeding of 30A circuit from Generator backed up emergency power source.
Data Room B257:
Install a new L530 receptacle located 12” above finished floor on North wall. Receptacle is to be fed by a new dedicated 30A, 120V circuit.
New 30A, 120V circuit to be fed from new 30A/1P circuit breaker in existing panel “UR” located in Main
Electrical Room. Extend circuit through pull box located in Main Electrical Room to facilitate future refeeding of 30A circuit from Generator backed up emergency power source.
KEYSTONE HALL
Room 3111:
Install a new L530 receptacle located 12” above finished floor on South wall. Receptacle is to be fed by a new dedicated 30A, 120V circuit.
New 30A, 120V circuit to be fed from new 30A/1P circuit breaker in existing emergency panel “ERC” located in Main Elec Room 3113.
COLUMBINE HALL
Media Retrieval Center Data Room 215B:
Install a new 75kVA transformer, and feed a new 225A, 120/208V, 3 phase, 4 wire, 42 circuit panel board with a 225A main circuit breaker. Feed new transformer and panel from a new 100A, 277/480V, 3 phase automatic transfer switch to be located adjacent to transformer and panel board. The normal power leg of the transfer switch is to be fed from a new 100A/3P circuit breaker in existing Main Distribution Center
“MDCC” located in Elec Room 112. The emergency power leg of the transfer switch will be a future project.
Install a new 100A/2P circuit breaker in new panel and feed new hard wired 16kVA, 120/208V, single phase, 3 wire UPS provided by others.
2
UCCS Campus VOIP Project Narrative
Tele Room 2006:
Install a new L630 receptacle located 12” above finished floor on North wall. Receptacle is to be fed by a new dedicated 30A, 208V single phase circuit.
New 30A, 208V single phase circuit to be fed from a new 30A/2P circuit breaker in new panel to be located in Media Retrieval Center Data Room 215B.
3