UCCS University Hall Fire Sprinkler System Upgrade RTA 10070.00 March 1, 2011 SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. SUMMARY A. Section Includes: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. B. Related Requirements: 1. 1.3 Project information. Work covered by Contract Documents. Phased construction. Work by Owner. Work under separate contracts. Future work. Purchase contracts. Owner-furnished products. Contractor-furnished, Owner-installed products. Access to site. Coordination with occupants. Work restrictions. Specification and drawing conventions. Miscellaneous provisions. Division 01 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities. PROJECT INFORMATION A. Project Identification: University Hall Fire Sprinkler System Upgrade. 1. B. Owner: University of Colorado. 1. C. Project Location: University Hall, University of Colorado at Colorado Springs 3955 Cragwood Drive Colorado Springs, CO 80907. Owner's Representative: Carolyn Fox – University Architect. Architect: RTA Architects 19 South Tejon Suite 300 Colorado Springs, CO 80903 Att’n: Mark Pelletier 719-867-7012 SUMMARY 011000 - 1 UCCS University Hall Fire Sprinkler System Upgrade RTA 10070.00 D. 1.4 March 1, 2011 Architect's Consultants: The Architect has retained the following design professionals who have prepared designated portions of the Contract Documents: Sprinkler System Engineer: Ulteig 9777 Pyramid Court Suite 200 Englewood, CO 80112 Att’n: Noreen McMahon P.E. LEED A.P. 720-873-5721 WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: A new fire sprinkler system to be installed in the existing facility above the existing ceiling requiring some additional architectural renovation. B. Type of Contract: 1. Project will be constructed under a single prime contract. a. 1.5 University Hall Fire Sprinkler System Upgrade. ACCESS TO SITE A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project. B. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section. C. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. 1. 2. Limits: Confine construction operations to limits of construction and those areas identified for parking and material storage. Driveways, Walkways and Entrances: Keep driveways and entrances including a handicap entry to the Theaterworks area via the Beth El entryway thru the display area into Theaterworks premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. b. D. Schedule deliveries to minimize use of driveways and entrances by construction operations. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations. SUMMARY 011000 - 2 UCCS University Hall Fire Sprinkler System Upgrade RTA 10070.00 1.6 March 1, 2011 COORDINATION WITH OCCUPANTS A. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work. 1. 2. 1.7 Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied prior to Owner acceptance of the completed Work. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of Work. WORK RESTRICTIONS A. Work Restrictions, General: Comply with restrictions on construction operations. 1. B. On-Site Work Hours: No hourly limit for work in the existing building. 1. 2. 3. 4. C. Weekend Hours: No restrictions. Early Morning Hours: No restrictions. Hours for Utility Shutdowns: No restrictions but requires minimum 24 hrs. notification. Hours for Core Drilling: No restrictions. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated: 1. 2. D. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction. Notify Owner not less than one day in advance of proposed utility interruptions. Obtain Owner's written permission before proceeding with utility interruptions. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner. 1. Notify Owner not less than two days in advance of proposed disruptive operations. E. Nonsmoking Building: Smoking is not permitted within the building or on campus. F. Controlled Substances: Use of tobacco products and other controlled substances on Campus is not permitted. G. Employee Identification: Is not required for persons, vehicles will need to be identified. SUMMARY 011000 - 3 UCCS University Hall Fire Sprinkler System Upgrade RTA 10070.00 1.8 March 1, 2011 SPECIFICATION AND DRAWING CONVENTIONS A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: 1. 2. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase. Specification requirements are to be performed by Contractor unless specifically stated otherwise. B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications. C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products: 1. 2. 3. 1.9 Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual. MISCELLANEOUS PROVISIONS A. Each bidder shall make careful examination of drawings and Project Manual, visit site of proposed construction, and fully inform himself with all conditions and limitations affecting work and include in his bid proposal to cover cost of all such items. He will be held responsible for any errors in his proposal resulting from his failure to make such an examination. END OF SECTION 011000 SUMMARY 011000 - 4