Addendum No.

advertisement
Addendum No. 2
Date:
December 1, 2009
To:
Prospective Bidders
Project:
PEDESTRIAN SPINE PHASE II
From:
Bradley B. Bean, PE
419 E. Columbia Street
Colorado Springs, CO
(719) 578-9391
This addendum forms a part of the Contract documents, and modifies the following
as noted below:
1.
Original Bid documents Dated November 23, 2009
Acknowledge receipt of all addenda in the space provided on the Bid Form.
ADDENDUM CONTENT
QUESTIONS
Addendum #1 refers to project specifications. However no specs have been
1.
provided? - Specifications are posted on the project website.
2.
At the pre-bid it was mentioned that asphalt patch will be required at the tie
ins to the existing streets. Most asphalt plants are closed during the time
frame this project will need to be completed in. How should we handle this? The patch may be done in concrete or asphalt.
3.
Is the only form we need to submit for our bid the Appendix a sheet? - The
completed Bid Form (SBP-6.13) from the specifications & Bid Appendix A
need to be completed and submitted; and depending on bid total a bid bond
may or may not be required (refer to question 4).
4.
Can you clarify that no bonding is required for this project if it is less than
$100,000 and a letter from our bonding agent is sufficient if it does require a
bond given the time frame of the bid? - If the bid is less than $100,000 no bid
bond is required; if the bid is equal to or greater than $100,000 the bid bond is
required. A letter from bonding agent indicating that the bidder is bondable,
and that a completed bond can be provided if the bidder is awarded the
contract is sufficient if a completed bond cannot be provided at the time of bid
submission.
5.
Is there a soils report for this project? - no subsurface borings were conducted
for this project however information from the adjoining Event Center project
was the basis for the recommended pavement design. A combination of lean
6.
clay and sandy soils is expected.
Is the concrete testing service provided/paid for by UCCS? - As outlined in
Article 14 of the General Conditions of the Construction Contract (SC-6.23):
UCCS will contract for and pay for the testing of concrete and for soils
compaction testing through an independent laboratory; the Contractor shall
assume the responsibility of arranging, scheduling and coordinating the
concrete sample collection efforts and soils compaction efforts.
CLARIFICATIONS
1.
The project has been assigned the following project number: 10-050
END OF ADDENDUM No. 2