D E UNIVERSITY OF COLORADO COLORADO SPRINGS UNIVERSITY HALL BOILER REPLACEMENT 1 2 B 3 4 5 5 6 6 7 A UNIVERSITY OF COLORADO AT COLORADO SPRINGS G H 7 8 * PH. (719) 637-8850 * * FAX (719) 632-0300 * sec@secengr.com 2912 BEACON ST. COLORADO SPRINGS, CO 80907 4 C ONSULTING E NGINEERS 3 S 2 CHENDT NGINEERING E CORPORATION 1 8 REPLACE BOILERS AT UNIVERSITY HALL PROJECT NO. EM 610 C REVISIONS F DESIGNED BY TBS DRAWN BY DJS CHECKED BY TBS PROJECT NO. 10120 DATE 09/27/10 SHEET TITLE COVER SHEET G0.01 4 5 6 7 8 A S GENERAL DEMOLITION NOTES * PH. (719) 637-8850 * * FAX (719) 632-0300 * sec@secengr.com 2912 BEACON ST. COLORADO SPRINGS, CO 80907 3 C ONSULTING E NGINEERS 2 CHENDT NGINEERING E CORPORATION 1 B DEMOLITION KEYNOTES UNIVERSITY OF COLORADO COLORADO SPRINGS UNIVERSITY HALL BOILER REPLACEMENT C D E REVISIONS F DESIGNED BY TBS DRAWN BY DJS CHECKED BY MECHANICAL ROOM DEMOLITION PLAN TBS PROJECT NO. 10120 G DATE 09/27/10 SHEET TITLE MECHANICAL DEMOLITION FLOOR PLAN H SHEET MD1.01 1 2 3 4 5 6 7 8 4 5 6 7 8 GENERAL DEMOLITION NOTES S A * PH. (719) 637-8850 * * FAX (719) 632-0300 * sec@secengr.com 2912 BEACON ST. COLORADO SPRINGS, CO 80907 3 C ONSULTING E NGINEERS 2 CHENDT NGINEERING E CORPORATION 1 B KEYNOTES UNIVERSITY OF COLORADO COLORADO SPRINGS UNIVERSITY HALL BOILER REPLACEMENT C D E REVISIONS F DESIGNED BY RSB DRAWN BY DJS CHECKED BY TBS PROJECT NO. 10120 G DATE 09/27/10 SHEET TITLE PARTIAL MECHANICAL DEMOLITION ROOF PLAN PARTIAL MECHANICAL DEMOLITION ROOF PLAN H SHEET KEY PLAN 1 2 3 4 5 6 7 MD1.02 8 5 4 HEATING DUCTWORK 6 7 REFRIGERATION 8 MISCELLANEOUS PIPING S A * PH. (719) 637-8850 * * FAX (719) 632-0300 * sec@secengr.com 2912 BEACON ST. COLORADO SPRINGS, CO 80907 VALVES & FITTINGS 3 C ONSULTING E NGINEERS 2 CHENDT NGINEERING E CORPORATION 1 B GENERAL NOTES: C UNIVERSITY OF COLORADO COLORADO SPRINGS UNIVERSITY HALL BOILER REPLACEMENT PLUMBING D DRAWING INDEX DRAWING INDEX DRAWING NO. DRAWING TITLE E REVISIONS ABBREVIATIONS F DESIGNED BY TBS DRAWN BY DJS CHECKED BY TBS PROJECT NO. 10120 G DATE 09/27/10 MISCELLANEOUS SYMBOLS SHEET TITLE MECHANICAL LEGEND TEMPERATURE CONTROLS H SHEET M0.01 1 2 3 4 5 6 7 8 D E UNIVERSITY OF COLORADO COLORADO SPRINGS UNIVERSITY HALL BOILER REPLACEMENT 1 S 2 3 4 4 5 5 6 H 6 7 A GENERAL NOTES G MECHANICAL ROOM NEW WORK PLAN 7 8 * PH. (719) 637-8850 * * FAX (719) 632-0300 * sec@secengr.com 2912 BEACON ST. COLORADO SPRINGS, CO 80907 3 C ONSULTING E NGINEERS 2 CHENDT NGINEERING E CORPORATION 1 8 B C KEYNOTES REVISIONS F DESIGNED BY TBS DRAWN BY DJS CHECKED BY TBS PROJECT NO. 10120 DATE 09/27/10 SHEET TITLE MECHANICAL NEW WORK FLOOR PLAN SHEET M1.01 D E UNIVERSITY OF COLORADO COLORADO SPRINGS UNIVERSITY HALL BOILER REPLACEMENT 1 S 2 H 3 4 4 5 5 6 6 7 GENERAL NOTES A G PARTIAL MECHANICAL NEW WORK ROOF PLAN KEY PLAN 7 8 * PH. (719) 637-8850 * * FAX (719) 632-0300 * sec@secengr.com 2912 BEACON ST. COLORADO SPRINGS, CO 80907 3 C ONSULTING E NGINEERS 2 CHENDT NGINEERING E CORPORATION 1 8 B KEYNOTES C REVISIONS F DESIGNED BY RSB DRAWN BY DJS CHECKED BY TBS PROJECT NO. 10120 DATE 09/27/10 SHEET TITLE PARTIAL MECHANICAL NEW WORK ROOF PLAN SHEET M1.02 6 7 8 PUMP SCHEDULE A B BP-1 BP-2 HEAT EXCHANGER SCHEDULE CONCRETE HOUSEKEEPING PAD DETAIL C MARK MANUFACTURER MODEL NO. TUBE MATERIAL SHELL MATERIAL SERVICE HEAT TRANSFER CAPACITY (MBH) HOT SIDE DATA: FLOW (GPM) HX-1 MECHANICAL SYSTEMS TO BE INSULATED PIPING SYSTEM SMP-1 SMP-2 SMP-3 PIPE OR DUCT SIZE INSULATION MATERIAL INSULATION FORM INSULATION THICKNESS (INCHES) R-VALUE VAPOR BARRIER REQUIRED REMARKS REMARKS: BOILER SCHEDULE MARK MANUFACTURER MODEL NO. SITE ELEVATION SEA LEVEL INPUT (MBH) ACTUAL INPUT (MBH) ACTUAL OUTPUT (MBH) WH-1 RECOVERY RATE (GPH) STORAGE CAPACITY (GAL.) ELECTRICAL REQUIREMENTS VOLTS PHASE HERTZ AMPS DIMENSIONS HEIGHT (IN.) DIAMETER (IN.) OPERATING WEIGHT (LB) REMARKS REMARKS: F HWP-2 EXISTING PIPING, DUCTWORK AND EQUIPMENT INSULATION GAS WATER HEATER SCHEDULE BOILER FLUE DETAIL HWP-1 TEMPERATURE RANGE HX-2 MAX. WATER PRES. DROP (FT) PROPYLENE GLYCOL CONC. (%) FOULING FACTOR DIMENSIONS LENGTH (IN) HEIGHT (IN) WIDTH (IN) OPERATING WEIGHT (LB) REMARKS REMARKS: E BP-4 INSULATION SCHEDULE MAX. WATER PRES. DROP (FT) PROPYLENE GLYCOL CONC. (%) FOULING FACTOR COLD SIDE DATA: FLOW (GPM) D BP-3 S MARK SERVICE PUMP DATA MANUFACTURER TYPE SIZE SERIAL NO. FLOW (GPM) HEAD (FT) IMPELLER SIZE (IN) SPEED (RPM) EFFICIENCY (%) MOTOR DATA MANUFACTURER HORSEPOWER FRAME SIZE SPEED (RPM) VOLTS PHASE HERTZ FULL LOAD AMPS SERVICE FACTOR DUTY REMARKS: REMARKS: * PH. (719) 637-8850 * * FAX (719) 632-0300 * sec@secengr.com 2912 BEACON ST. COLORADO SPRINGS, CO 80907 5 4 C ONSULTING E NGINEERS 3 CHENDT NGINEERING E CORPORATION 2 MARK SERVICE MANUFACTURER MODEL NO. TYPE HEATING CAPACITY NOMINAL INPUT CAP. (MBH) NOMINAL OUTPUT CAP. (MBH) ACTUAL OUTPUT CAP. (MBH) SITE ELEVATION (FT.) BURNER TYPE GAS PRESSURE (INWC) BURNER TURNDOWN RATIO BOILER EFFICIENCY (%) HEAT EXCHANGER MATERIAL DESIGN PRESSURE WATER FLOW MINIMUM FLOW (GPM) MAXIMUM FLOW (GPM) DESIGN FLOW (GPM) PRESSURE DROP (FT) B-1 B-2 B-3 B-4 B-1 B-2 WATER VOLUME (GAL) ELECTRICAL REQUIREMENTS MOTOR SIZE (HP) VOLTS PHASE HERTZ FULL LOAD AMPS MIN. CIRCUIT AMPACITY MAX. OVERCURRENT PROT. CONNECTION SIZES COMBUSTION AIR (IN.) FLUE (IN.) GAS (IN.) WATER INLET/OUTLET (IN.) CONDENSATE DRAIN (IN.) PHYSICAL DIMENSIONS DEPTH (IN.) WIDTH (IN.) HEIGHT (IN.) OPERATING WEIGHT (LB) REMARKS: REMARKS: G UNIVERSITY OF COLORADO COLORADO SPRINGS UNIVERSITY HALL BOILER REPLACEMENT 1 REVISIONS DESIGNED BY TBS DRAWN BY DJS CHECKED BY TBS PROJECT NO. 10120 DATE 09/27/10 SHEET TITLE MECHANICAL SCHEDULES AND DETAILS H SHEET BOILER PIPING DETAIL 1 2 M5.01 3 4 5 6 7 8 G 1 2 D E UNIVERSITY OF COLORADO COLORADO SPRINGS UNIVERSITY HALL BOILER REPLACEMENT SYSTEM/POINT DESCRIPTION HEATING HOT WATER SYSTEM COMBUSTION AIR DAMPER CONTROL SCHEMATIC 3 4 ANALOG 5 6 7 SOFTWARE LOGS HYDRONIC SYSTEM CONTROL SCHEMATIC H 8 * PH. (719) 637-8850 * * FAX (719) 632-0300 * sec@secengr.com 2912 BEACON ST. COLORADO SPRINGS, CO 80907 7 C ONSULTING E NGINEERS S I/O SUMMARY TABLE CHENDT NGINEERING E CORPORATION NEW (N) EXISTING (E) POINT COMMUNICATIONS FAILURE MODE POWER FAILURE MODE TREND LOG TIME EVENT LOG APPLICATION PROGRAMS STATUS SUMMARY LOG ALARM SUMMARY LOG ALL POINTS LOG 6 ALARM INSTRUCTION FLOW CONTROL PRESSURE CONTROL CONDUCTIVITY CONTROL CHILLER DEMAND LIMIT SETPOINT TEMPERATURE RESET HARDWARE HUMIDITY CONTROL VENTILATION/RECIRCULATION ENTHALPY ALARMS DIGITAL ANALOG ECONOMIZER DAY/NIGHT SETBACK TEMPERATURE CONTROL EVENT OPTIMUM START/STOP SCHEDULED START/STOP RUN TIME LOW LIMIT 5 HIGH LIMIT ANALOG SAFETY SHUTDOWN INPUT CONTACT CLOSURE CURRENT CONDUCTIVITY FLOW PRESSURE DIGITAL CARBON DIOXIDE HUMIDITY TEMPERATURE PULSE SMOKE DETECTOR STATUS CONTACT AUXILIARY CONTACT CURRENT SWITCH THERMOSTAT DIFFERENTIAL PRESSURE SWITCH PROJECT: PRESSURE SWITCH 4 ELECTRIC-PNEUMATIC TRANSDUCER POSITION ADJUSTMENT 4-20 MILLIAMP OPEN/CLOSE OFF/AUTO OUTPUT DIGITAL CONTROL POINT ADJUSTMENT A CONTROL RELAY (LATCHING) CONTROL RELAY (INSTANTANEOUS) 3 GRAPHIC DISPLAY 2 QUANTITY REQUIRED 1 8 REMARKS B C HYDRONIC SYSTEM SEQUENCE OF OPERATION REVISIONS F DESIGNED BY TBS DRAWN BY DJS CHECKED BY TBS PROJECT NO. 10120 DATE 09/27/10 SHEET TITLE MECHANICAL CONTROLS SHEET M7.01