BOILER REPLACEMENT
1
2
B
3
4
5
5
6
6
7
A
UNIVERSITY OF COLORADO
AT COLORADO SPRINGS
G
H
7
8
* PH. (719) 637-8850 * * FAX (719) 632-0300 *
sec@secengr.com
2912 BEACON ST. COLORADO SPRINGS, CO 80907
4
C ONSULTING E NGINEERS
3
S
2
CHENDT
NGINEERING
E
CORPORATION
1
8
REPLACE BOILERS AT UNIVERSITY HALL
PROJECT NO. EM 610
C
REVISIONS
F
DESIGNED BY
TBS
DRAWN BY
DJS
CHECKED BY
TBS
PROJECT NO.
10120
DATE
09/27/10
SHEET TITLE
COVER
SHEET
G0.01
4
5
6
7
8
A
S
GENERAL DEMOLITION NOTES
* PH. (719) 637-8850 * * FAX (719) 632-0300 *
sec@secengr.com
2912 BEACON ST. COLORADO SPRINGS, CO 80907
3
C ONSULTING E NGINEERS
2
CHENDT
NGINEERING
E
CORPORATION
1
B
DEMOLITION KEYNOTES
UNIVERSITY OF COLORADO
COLORADO SPRINGS
UNIVERSITY HALL
BOILER REPLACEMENT
C
D
E
REVISIONS
F
DESIGNED BY
TBS
DRAWN BY
DJS
CHECKED BY
MECHANICAL ROOM DEMOLITION PLAN
TBS
PROJECT NO.
10120
G
DATE
09/27/10
SHEET TITLE
MECHANICAL
DEMOLITION
FLOOR
PLAN
H
SHEET
MD1.01
1
2
3
4
5
6
7
8
4
5
6
7
8
GENERAL DEMOLITION NOTES
S
A
* PH. (719) 637-8850 * * FAX (719) 632-0300 *
sec@secengr.com
2912 BEACON ST. COLORADO SPRINGS, CO 80907
3
C ONSULTING E NGINEERS
2
CHENDT
NGINEERING
E
CORPORATION
1
B
KEYNOTES
UNIVERSITY OF COLORADO
COLORADO SPRINGS
UNIVERSITY HALL
BOILER REPLACEMENT
C
D
E
REVISIONS
F
DESIGNED BY
RSB
DRAWN BY
DJS
CHECKED BY
TBS
PROJECT NO.
10120
G
DATE
09/27/10
SHEET TITLE
PARTIAL MECHANICAL
DEMOLITION
ROOF PLAN
PARTIAL MECHANICAL
DEMOLITION ROOF PLAN
H
SHEET
KEY PLAN
1
2
3
4
5
6
7
MD1.02
8
5
4
HEATING
DUCTWORK
6
7
REFRIGERATION
8
MISCELLANEOUS PIPING
S
A
* PH. (719) 637-8850 * * FAX (719) 632-0300 *
sec@secengr.com
2912 BEACON ST. COLORADO SPRINGS, CO 80907
VALVES & FITTINGS
3
C ONSULTING E NGINEERS
2
CHENDT
NGINEERING
E
CORPORATION
1
B
GENERAL NOTES:
C
UNIVERSITY OF COLORADO
COLORADO SPRINGS
UNIVERSITY HALL
BOILER REPLACEMENT
PLUMBING
D
DRAWING INDEX
DRAWING INDEX
DRAWING NO.
DRAWING TITLE
E
REVISIONS
ABBREVIATIONS
F
DESIGNED BY
TBS
DRAWN BY
DJS
CHECKED BY
TBS
PROJECT NO.
10120
G
DATE
09/27/10
MISCELLANEOUS SYMBOLS
SHEET TITLE
MECHANICAL
LEGEND
TEMPERATURE CONTROLS
H
SHEET
M0.01
1
2
3
4
5
6
7
8
D
E
UNIVERSITY OF COLORADO
COLORADO SPRINGS
UNIVERSITY HALL
BOILER REPLACEMENT
1
S
2
3
4
4
5
5
6
H
6
7
A
GENERAL NOTES
G
MECHANICAL ROOM NEW WORK PLAN
7
8
* PH. (719) 637-8850 * * FAX (719) 632-0300 *
sec@secengr.com
2912 BEACON ST. COLORADO SPRINGS, CO 80907
3
C ONSULTING E NGINEERS
2
CHENDT
NGINEERING
E
CORPORATION
1
8
B
C
KEYNOTES
REVISIONS
F
DESIGNED BY
TBS
DRAWN BY
DJS
CHECKED BY
TBS
PROJECT NO.
10120
DATE
09/27/10
SHEET TITLE
MECHANICAL
NEW WORK
FLOOR
PLAN
SHEET
M1.01
D
E
UNIVERSITY OF COLORADO
COLORADO SPRINGS
UNIVERSITY HALL
BOILER REPLACEMENT
1
S
2
H
3
4
4
5
5
6
6
7
GENERAL NOTES
A
G
PARTIAL MECHANICAL NEW
WORK ROOF PLAN
KEY PLAN
7
8
* PH. (719) 637-8850 * * FAX (719) 632-0300 *
sec@secengr.com
2912 BEACON ST. COLORADO SPRINGS, CO 80907
3
C ONSULTING E NGINEERS
2
CHENDT
NGINEERING
E
CORPORATION
1
8
B
KEYNOTES
C
REVISIONS
F
DESIGNED BY
RSB
DRAWN BY
DJS
CHECKED BY
TBS
PROJECT NO.
10120
DATE
09/27/10
SHEET TITLE
PARTIAL MECHANICAL
NEW WORK
ROOF PLAN
SHEET
M1.02
6
7
8
PUMP SCHEDULE
A
B
BP-1
BP-2
HEAT EXCHANGER SCHEDULE
CONCRETE HOUSEKEEPING PAD DETAIL
C
MARK
MANUFACTURER
MODEL NO.
TUBE MATERIAL
SHELL MATERIAL
SERVICE
HEAT TRANSFER CAPACITY (MBH)
HOT SIDE DATA:
FLOW (GPM)
HX-1
MECHANICAL SYSTEMS TO BE INSULATED
PIPING SYSTEM
SMP-1
SMP-2
SMP-3
PIPE OR DUCT
SIZE
INSULATION
MATERIAL
INSULATION
FORM
INSULATION
THICKNESS
(INCHES)
R-VALUE
VAPOR
BARRIER
REQUIRED
REMARKS
REMARKS:
BOILER SCHEDULE
MARK
MANUFACTURER
MODEL NO.
SITE ELEVATION
SEA LEVEL INPUT (MBH)
ACTUAL INPUT (MBH)
ACTUAL OUTPUT (MBH)
WH-1
RECOVERY RATE (GPH)
STORAGE CAPACITY (GAL.)
ELECTRICAL REQUIREMENTS
VOLTS
PHASE
HERTZ
AMPS
DIMENSIONS
HEIGHT (IN.)
DIAMETER (IN.)
OPERATING WEIGHT (LB)
REMARKS
REMARKS:
F
HWP-2
EXISTING PIPING, DUCTWORK AND EQUIPMENT INSULATION
GAS WATER HEATER SCHEDULE
BOILER FLUE DETAIL
HWP-1
TEMPERATURE
RANGE
HX-2
MAX. WATER PRES. DROP (FT)
PROPYLENE GLYCOL CONC. (%)
FOULING FACTOR
DIMENSIONS
LENGTH (IN)
HEIGHT (IN)
WIDTH (IN)
OPERATING WEIGHT (LB)
REMARKS
REMARKS:
E
BP-4
INSULATION SCHEDULE
MAX. WATER PRES. DROP (FT)
PROPYLENE GLYCOL CONC. (%)
FOULING FACTOR
COLD SIDE DATA:
FLOW (GPM)
D
BP-3
S
MARK
SERVICE
PUMP DATA
MANUFACTURER
TYPE
SIZE
SERIAL NO.
FLOW (GPM)
HEAD (FT)
IMPELLER SIZE (IN)
SPEED (RPM)
EFFICIENCY (%)
MOTOR DATA
MANUFACTURER
HORSEPOWER
FRAME SIZE
SPEED (RPM)
VOLTS
PHASE
HERTZ
FULL LOAD AMPS
SERVICE FACTOR
DUTY
REMARKS:
REMARKS:
* PH. (719) 637-8850 * * FAX (719) 632-0300 *
sec@secengr.com
2912 BEACON ST. COLORADO SPRINGS, CO 80907
5
4
C ONSULTING E NGINEERS
3
CHENDT
NGINEERING
E
CORPORATION
2
MARK
SERVICE
MANUFACTURER
MODEL NO.
TYPE
HEATING CAPACITY
NOMINAL INPUT CAP. (MBH)
NOMINAL OUTPUT CAP. (MBH)
ACTUAL OUTPUT CAP. (MBH)
SITE ELEVATION (FT.)
BURNER TYPE
GAS PRESSURE (INWC)
BURNER TURNDOWN RATIO
BOILER EFFICIENCY (%)
HEAT EXCHANGER MATERIAL
DESIGN PRESSURE
WATER FLOW
MINIMUM FLOW (GPM)
MAXIMUM FLOW (GPM)
DESIGN FLOW (GPM)
PRESSURE DROP (FT)
B-1
B-2
B-3
B-4
B-1
B-2
WATER VOLUME (GAL)
ELECTRICAL REQUIREMENTS
MOTOR SIZE (HP)
VOLTS
PHASE
HERTZ
FULL LOAD AMPS
MIN. CIRCUIT AMPACITY
MAX. OVERCURRENT PROT.
CONNECTION SIZES
COMBUSTION AIR (IN.)
FLUE (IN.)
GAS (IN.)
WATER INLET/OUTLET (IN.)
CONDENSATE DRAIN (IN.)
PHYSICAL DIMENSIONS
DEPTH (IN.)
WIDTH (IN.)
HEIGHT (IN.)
OPERATING WEIGHT (LB)
REMARKS:
REMARKS:
G
UNIVERSITY OF COLORADO
COLORADO SPRINGS
UNIVERSITY HALL
BOILER REPLACEMENT
1
REVISIONS
DESIGNED BY
TBS
DRAWN BY
DJS
CHECKED BY
TBS
PROJECT NO.
10120
DATE
09/27/10
SHEET TITLE
MECHANICAL
SCHEDULES
AND
DETAILS
H
SHEET
BOILER PIPING DETAIL
1
2
M5.01
3
4
5
6
7
8
G
1
2
D
E
UNIVERSITY OF COLORADO
COLORADO SPRINGS
UNIVERSITY HALL
BOILER REPLACEMENT
SYSTEM/POINT DESCRIPTION
HEATING HOT WATER SYSTEM
COMBUSTION AIR DAMPER CONTROL SCHEMATIC
3
4
ANALOG
5
6
7
SOFTWARE
LOGS
HYDRONIC SYSTEM CONTROL SCHEMATIC
H
8
* PH. (719) 637-8850 * * FAX (719) 632-0300 *
sec@secengr.com
2912 BEACON ST. COLORADO SPRINGS, CO 80907
7
C ONSULTING E NGINEERS
S
I/O SUMMARY TABLE
CHENDT
NGINEERING
E
CORPORATION
NEW (N) EXISTING (E) POINT
COMMUNICATIONS FAILURE MODE
POWER FAILURE MODE
TREND LOG
TIME EVENT LOG
APPLICATION PROGRAMS
STATUS SUMMARY LOG
ALARM SUMMARY LOG
ALL POINTS LOG
6
ALARM INSTRUCTION
FLOW CONTROL
PRESSURE CONTROL
CONDUCTIVITY CONTROL
CHILLER DEMAND LIMIT
SETPOINT TEMPERATURE RESET
HARDWARE
HUMIDITY CONTROL
VENTILATION/RECIRCULATION
ENTHALPY
ALARMS
DIGITAL ANALOG
ECONOMIZER
DAY/NIGHT SETBACK
TEMPERATURE CONTROL
EVENT
OPTIMUM START/STOP
SCHEDULED START/STOP
RUN TIME
LOW LIMIT
5
HIGH LIMIT
ANALOG
SAFETY SHUTDOWN
INPUT
CONTACT CLOSURE
CURRENT
CONDUCTIVITY
FLOW
PRESSURE
DIGITAL
CARBON DIOXIDE
HUMIDITY
TEMPERATURE
PULSE
SMOKE DETECTOR
STATUS CONTACT
AUXILIARY CONTACT
CURRENT SWITCH
THERMOSTAT
DIFFERENTIAL PRESSURE SWITCH
PROJECT:
PRESSURE SWITCH
4
ELECTRIC-PNEUMATIC TRANSDUCER
POSITION ADJUSTMENT
4-20 MILLIAMP
OPEN/CLOSE
OFF/AUTO
OUTPUT
DIGITAL
CONTROL POINT ADJUSTMENT
A
CONTROL RELAY (LATCHING)
CONTROL RELAY (INSTANTANEOUS)
3
GRAPHIC DISPLAY
2
QUANTITY REQUIRED
1
8
REMARKS
B
C
HYDRONIC SYSTEM SEQUENCE OF OPERATION
REVISIONS
F
DESIGNED BY
TBS
DRAWN BY
DJS
CHECKED BY
TBS
PROJECT NO.
10120
DATE
09/27/10
SHEET TITLE
MECHANICAL
CONTROLS
SHEET
M7.01