UCCS Program Plan For Academic Office Building September 2012 CONTENTS ACKNOWLEDGEMENTS __________________________________________________________ 3 A. EXECUTIVE SUMMARY __________________________________________________________________4 B. GOALS AND OBJECTIVES _____________________________________________________________________ 5 Academic _____________________________________________________________________ Student Life ___________________________________________________________________ Sustainability ________________________________________________________________ Business ______________________________________________________________________ Other_________________________________________________________________________ 5 5 5 5 5 C. SUPPORTING INFORMATION __________________________________________________ 6 Programmatic Description ________________________________________________________ 6 Existing Conditions and Projected Needs ____________________________________________ 6 Academic ________________________________________________________________ 6 Capacity _________________________________________________________________ 7 Facilities Condition _______________________________________________________ 10 Health/Safety _________________________________________________________________ 10 Economic Impact ______________________________________________________________ 10 Consistency with Institutional Mission _____________________________________________ 10 Consistency with Strategic Plan __________________________________________________ 10 Consistency with Master Plan _____________________________________________________________ 11 D. FACILITIES RESPONSE _______________________________________________________ 12 Project Description _____________________________________________________________ 12 Backfill Analysis ________________________________________________________ 12 Technical Issues ________________________________________________________________________ 12 Master Plan Relationship __________________________________________________ 12 Land Use Plan Relationship ________________________________________________ 12 Pedagogical Relationship __________________________________________________ 12 Site ____________________________________________________________________ 12 Utilities_________________________________________________________________ 13 Design/Construction ______________________________________________________ 13 Legal __________________________________________________________________ 15 Review Process __________________________________________________________ 18 Alternatives ________________________________________________________________________________18 Goals & Objectives Impacts ________________________________________________ 18 Fiscal Impacts ___________________________________________________________ 18 E. IMPLEMENTATION INFORMATION ________________________________________________ 20 Budget _______________________________________________________________________ 3rd Party Review__________________________________________________________ Funding Sources _______________________________________________________ Schedule and Phasing_____________________________________________________ Facilities Operating Budget ________________________________________________ 20 20 20 20 20 F. APPENDICES ________________________________________________________________ 21 Academic Office Building Program Plan 2 September 2012 ACKNOWLEDGEMENTS Pamela Shockley-Zalabak, Ph.D., Chancellor Brian Burnett, Ph.D., Vice Chancellor of Administration and Finance Gary Reynolds, P.E., Executive Director of Facilities Services Robyn Marschke, Director, Institutional Research Ayers Saint Gross Architecture and Planning Academic Office Building Program Plan 3 September 2012 A. EXECUTIVE SUMMARY In order to keep class sizes smaller, a hallmark of UCCS pedagogy and a part of the approved UCCS Strategic Plan, it is necessary to hire faculty and staff to support the enrollment increases that have been experienced and are projected. There is currently a significant shortfall in faculty and staff office space and a projected continuing office space shortfall if no additional office facilities are provided. The pending master plan being prepared by Ayers Saint Gross confirms a shortfall in office space with current shortfalls of 14,900 net square feet (nsf) for faculty and 18,700 nsf for staff for a total shortfall of 33,600 nsf. In addition, based on the approved Strategic Plan’s enrollment projections for 2020, the faculty office shortfall will grow to 73,436 nsf and the staff office shortfall will grow to 33,091 nsf if no additional office space is provided. An analysis was also completed to understand the impact of growth in on-line course delivery, and while it does reduce classroom space demand, it does not reduce the need for faculty and staff to support the on-line courses and the requisite office space needed. Also, the approved Strategic Plan calls for dynamic responsible growth of enrollment to be matched by concurrent faculty and staff increases. The Strategic Plan calls for and budgets for 101 new tenure track and non-tenure track faculty and 80 new staff for a total of 181 new faculty/staff. This project will provide generic office space for faculty and staff in support of the growth of a number of academic programs. The design will provide some enclosed offices as well as open office plan space. The facility will also include conference meeting space as well as office support spaces for such things as copy room, storage and formal and informal meeting areas. The facility may include some consolidated programs. The program plan proposes that the facility will be designed with enough flexibility to be adaptable to additional academic uses. This project is consistent with the university’s mission, approved Strategic Plan and both the approved master plan (Facilities Strategic Plan Update) and the pending Master Plan. The building will be approximately 35,000 gross square feet (gsf) and located on a master plan proposed site. A facility of this size will provide 150 to 180 office spaces, depending upon configuration. The project budget is $12 million with an estimated operating budget of $140,000 per year. If approved, design will start this fall with construction completion scheduled for fall 2014. Academic Office Building Program Plan 4 September 2012 B. GOALS AND OBJECTIVES Academic In order to keep class sizes smaller, a hallmark of UCCS pedagogy and a part of the approved UCCS Strategic Plan, it is necessary to hire faculty and staff to support the enrollment increases that have been experienced and are projected. As is noted in the Capacity section of this program plan, and the approved UCCS Strategic Plan, there is currently a significant shortfall in faculty and staff office space and a projected continuing office space shortfall if no additional office facilities are provided. The objective of this program plan is to provide generic and flexible office space that is located in close proximity to the classroom space on campus. The program plan proposes that the facility will be designed with enough flexibility to be adaptable to additional academic uses. Student Life This program plan is meant to address academic needs and is not part of auxiliary/student life plans. Sustainable Design This facility will be designed to meet LEED Gold standard. Business An important part of the UCCS budget strategy is increased enrollments as outlined in the approved UCCS Strategic Plan. Increased enrollments will require additional faculty and staff in order to ensure the class size pedagogy is maintained. Other The location of the proposed facility in this program plan is in accordance with the current Facilities Strategic Plan Update approved by the Board of Regents in December 2006 and also the pending, new Campus Master Plan, which will be presented to the Board of Regents at the September 2012 meeting. Academic Office Building Program Plan 5 September 2012 C. SUPPORTING INFORMATION Programmatic Description This project will provide generic office space for faculty and staff in support of the growth of a number of academic programs. The design will provide some enclosed offices as well as open office plan space. The facility will also include conference meeting space as well as office support spaces for such things as copy room, storage and formal and informal meeting areas. The facility may include some consolidated programs. The program plan proposes that the facility will be designed with enough flexibility to be adaptable to additional academic uses. The building will be approximately 35,000 gross square feet (gsf) and located on a master plan proposed site. A facility of this size will provide 150 to 180 office spaces, depending upon configuration. The project budget is $12 million. Existing Conditions and Projected Needs Academic The College of Letters, Arts, and Sciences (LAS) is the largest college on the UCCS campus with over half of the campus’ students majoring in departments within LAS and about 2/3 of the student credit hours on campus offered through LAS. The College’s 350 full and part time faculty support 24 undergraduate degrees, 9 graduate degrees and over 25 academic minors. They are also active as scholars in their fields and in working with our community. The College has departments spread throughout the campus with faculty, offices or laboratories housed in University Hall, Campus Services (maintenance) Building, Dwire Hall, Centennial Hall, Osborne Center for Science and Engineering, Engineering Building, Columbine Hall, and the Eagle Rock Fine Arts modular building. In the last ten years the College has grown substantially. Student credit hours have increased 52% from 91,599 in 2000-01 to a 2010-11 level of 139,086. The number of degrees awarded to LAS students has increased about 55% from 489 in 2000 to 758 in 2010. While the science programs in LAS have benefited from recent construction, the Social Science programs including Communication, Economics, Geography, Political Science, Psychology and Sociology and Women’s & Ethnic Studies have not. The Social Science departments include Geography which was recognized by the CCHE as a “program of excellence”, Psychology with an internationally recognized Ph.D. program with an emphasis in Aging, and Political Science and Sociology which are strongly contributing to the new and growing bachelor degree program in Criminal Justice. The Social Science programs have seen steady growth with a 27% increase in degrees awarded over the last 10 years. The Humanities programs include English, History, Languages and Cultures, and Philosophy. These programs have seen a huge increase in student demand in recent years. Degrees awarded in the Humanities are up 182% over the last 10 years. The Rhetoric and Writing Program within the English Department is particularly noted for the strength of their student assessment which has resulted in significant improvements in the program. The History department has a strong Masters degree program. Languages and Cultures have expanded language offerings with a very popular program on Japanese as well as restructuring the Spanish language major. Philosophy has incorporated Religious Studies which has been a popular area of study for many students. Academic Office Building Program Plan 6 September 2012 The College of Education (COE) consists of four academic departments and maintains licensure programs in all departments. Moreover, initial teacher licensure is offered at both the undergraduate and graduate levels. Certification programs for school principals, counselors, reading specialists, and linguistically diverse education teachers are offered at the graduate level. The College of Education’s (COE) 66 full and part time faculty support five degree programs (4 Masters; 1 Ph.D.), 12 licensure and certification programs. They are also active as scholars in their fields and are organically linked to the community by teaching at 14 Professional Development Schools (PDS) in the Pikes Peak area while supervising student internships and field experiences. Since the construction of Columbine Hall in August 1997, enrollment in COE has increased by 40%, largely due to the increased number of students in licensure programs at both initial and advanced levels. In 2001, COE was organized into two departments and effective March 2004; COE revised its organizational structure resulting in the establishment of four departments: the Department of Curriculum and Instruction, the Department of Counseling and Human Services, the Department of Special Education, and the Department of Leadership, Research, and Foundations. During the past five years, COE has significantly increased grants and contracts and added new programs including the United States Air Force Academy counseling program and a proposed Bachelor’s in Inclusionary Early Childhood Education, all of which require additional space for research assistants, graduate assistants, and on campus support staff,. Capacity Several of the potentially impacted programs have seen particularly large growth. Over the past 10 years, student credit hour production in English is up 69%, History and Communication are both up 44% and Women’s and Ethnic Studies is up 53% over this same time period. This growth in student demand requires increased staffing and an increase in office space for faculty and staff, particularly in Columbine Hall. Projections can be determined by looking at historical data and recognizing that the number of high school graduates in Colorado is projected to continue to increase over the next several years. The combined student credit hour production of the College of Letters, Arts and Sciences and the College of Education is provided in Graph A. It is evident that substantial growth in enrollment occurred over time with a leveling off during the major tuition increases of several ago, and then renewed growth in recent years. The growth of the College of Business and the School of Public Affairs is shown in the second graph. The College of Business and the School of Public Affairs, which occupy Dwire Hall, have seen a dramatic increase in credit hour production (Graph B). The College of Business has increased 43% and the School of Public Affairs has increased 511% in the last 10 years. This growth in student demand requires increased staffing and an increase in office space for faculty and staff, particularly in Dwire Hall. Academic Office Building Program Plan 7 September 2012 University credit hour production has increased 43% in the last ten years as shown in Graph C. Graph A LAS and Education (Columbine Hall) Student Credit Hour Production (FTE) 5,000 4,500 4,000 3,500 3,000 2,500 1995 2000 2005 2010 2015 Graph B College of Business & Public Affairs (Dwire) Student Credit Hour Production (FTE) 1,500 1,000 500 11-12 10-11 09-10 08-09 07-08 06-07 05-06 04-05 03-04 02-03 01-02 00-01 99-00 98-99 97-98 96-97 95-96 0 Graph C University of Colorado Colorado Springs Student Credit Hour Production (FTE) Academic Office Building Program Plan 8 11-12 10-11 09-10 08-09 07-08 06-07 05-06 04-05 03-04 02-03 01-02 00-01 99-00 98-99 97-98 96-97 95-96 10,000 8,000 6,000 4,000 2,000 0 September 2012 While total student credit hour production is important, it is also useful to consider the awarding of degrees as well. The table below shows the considerable growth in degrees awarded by the College of Education, the LAS Humanities Departments, the LAS Social Science Departments and the College of Business. College of Education LAS: Humanities LAS: Social Sciences College of Business TOTAL AY 1997 108 85 327 220 740 AY 2002 125 82 386 351 944 AY 2011 170 161 432 445 1,208 The number of degrees awarded by the Education and LAS have increased over 56% since 1997, when Columbine opened. The number of degrees awarded by the College of Business has increased by 63% in the same time frame. Based on the historical data, it is projected that there will be an increase in student credit hours and degrees awarded of another 20% between now and 2020. This is consistent with campus projections in the Strategic Plan. During the 2007-08 academic year the College of Education added a new doctorate program in the Department of Leadership, Research, and Foundations. The College of Letters, Arts, and Sciences added a new B.A. degree in Women’s and Ethnic Studies in 2008. We have also developed new interdisciplinary minors in Sustainable Development and Pre-Law. In the next few years, we will be exploring a new M.A. degree in Humanities and one in Spanish. All of these programs are in departments that will be impacted by this building project. As a result of the academic growth there is considerable strain on office facilities with many full and part time instructional faculty sharing offices, which are often only about 80 to 90 square feet in size. This makes it very difficult to provide confidentiality when meeting with students during normal office hours or to schedule office usage. Also it does not provide even minimal space for files, bookshelves, etc. which contain materials useful in teaching and in reference. A survey in late Spring of 2012 showed that 86 full and part time LAS faculty were sharing offices on campus, for an average of only 50 nsf per person. All the colleges and the School of Public Affairs continue to hire additional faculty to meet increases in student demand, which is making the need for office space more critical. The pending master plan prepared by Ayers Saint Gross confirms the shortfall in office space with current shortfalls of 14,900 net square feet (nsf) for faculty and 18,700 nsf for staff for a total shortfall of 33,600 nsf. In addition, based on the approved Strategic Plan’s enrollment projections for 2020, the faculty office shortfall will grow to 73,436 nsf and the staff office shortfall will grow to 33,091 nsf if no additional office space is provided. An analysis was also completed to understand the impact of growth in on-line course delivery, and while it does reduce classroom space demand, it does not reduce the need for faculty and staff to support the on-line courses and the requisite office space needed. Academic Office Building Program Plan 9 September 2012 Facilities Conditions The goal of this program plan is to provide additional space for the expanding student body and the subsequent required faculty and support staff. While, in some cases, the poor condition of a facility may a play a role in moving programs to new locations, in this case the driving goal is to provide the required space for faculty and staff due to an increasing enrollment and pedagogical design. Health/Safety There are no health or life safety issues being addressed by this Program Plan. Economic Impact One of the keys to the UCCS budget is enrollment growth. In light of past and continued reductions in State financial support it is an important part of UCCS’ strategy to grow enrollment. This growth is outlined in the approved Strategic Plan’s Values of Excellence, Dynamic Responsible Growth, “We value dynamic growth while continuing to be financially responsible, academically sound and environmentally sustainable. We meet the future with energy, enthusiasm and a commitment to retaining a close, interconnected campus community.” It is also found in Goal #8 of the Strategic Plan, “Actively build responsible enrollment growth that helps achieve the UCCS mission and values and contributes to the University’s financial viability.” In addition, the project will employ up to 100 workers during the design and construction of the project. Consistency with Institutional Mission As discussed in the section Capacity, the university continues to remain substantially short of office space as recommended by CCHE. The future quality of the educational experience at UCCS will depend upon “staying ahead of the curve” in order to ensure that student crowding and faculty constraints do not diminish the ability of the university to meet its role and mission as set forth in Colorado Revised Statutes Section 2. 23-20-101 (1) (c) revised, Senate Bill 11-204, approved June 10, 2011. The Colorado Springs campus of the University of Colorado shall be a comprehensive baccalaureate and specialized graduate research university with selective admission standards. The Colorado Springs campus shall offer liberal arts and sciences, business, engineering, health sciences, and teacher preparation undergraduate degree programs, and a selected number of master’s and doctoral degree programs. Consistency with Strategic Plan In addition to those items noted in the Economic Impact section, the new Strategic Plan entitled, “2020 – Our Commitment to the Future”, which was approved by the Board of Regents in June 2012 has the following goals: Foster academic programs that serve diverse communities and develop intellectually curious graduates who are globally and culturally competent. Academic Office Building Program Plan 10 September 2012 Cultivate an environment that sustains and extends quality research, scholarship and creative work. Provide a transformative educational experience that engages students both in and out of the classroom. Actively build responsible enrollment growth that helps achieve the UCCS mission and values and contributes to the University’s financial viability. Provide an infrastructure of innovative technology, effective facilities and collaborative learning spaces, blending virtual and physical resources to enhance and advance the educational experience. One of the “Values for Excellence” in the Strategic Plan is Dynamic Responsible Growth – “We value dynamic growth while continuing to be financially responsible, academically sound and environmentally sustainable, We meet the future with energy, enthusiasm and a commitment to retaining a close, interconnected campus community.” This program plan is also in alignment with the Guiding Principle, “Maintain a Commitment to Excellence.” The Strategic Plan also calls for additions to faculty and staff with a proposed increase of 101 tenure and non-tenure track faculty and 80 staff for a total of 181 new fulltime faculty/staff. In reviewing several past Strategic Plans, it is clear that there are several themes in the current Strategic Plan that have a thread of commonality throughout the history of past strategic plans and remain valid today: 1. The University of Colorado at Colorado Springs is to be a comprehensive research university that uses a selective enrollment process and with selected and targeted graduate programs. 2. UCCS is to provide an excellent educational experience as a regional university serving metropolitan, southern Colorado region needs, as well as State wide needs. 3. The campus is to continue to grow in support of the growing population of the region and the State and as “… the number-one comprehensive regional university in the United States…” 4. Recent strategic and facilities plans acknowledge and include strategies and plans for facilities to accommodate increasing enrollments, expanding and increasing academic programs, and increasing research and community service. This Program Plan directly supports these vision, mission, goals and master plans of the University. Consistency with Master Plan The site use and location of the facility is consistent with the current Master Plan (Facilities Strategic Plan Update) approved by the Board of Regents in December 2006 and is consistent with the pending Master Plan. See a further description in the section Facilities Response. Academic Office Building Program Plan 11 September 2012 D. FACILITIES RESPONSE Project Description This project will provide generic office space for faculty and staff in support of the growth of a number of academic programs. The design will provide some enclosed offices as well as open office plan space. The facility will also include conference meeting space as well as office support spaces for such things as copy room, storage and informal meeting areas. The facility may include some consolidated programs. The program plan proposes that the facility will be designed with enough flexibility to be adaptable to additional academic uses. The building will be approximately 35,000 gross square feet (gsf) and located on a master plan proposed site. A facility of this size will provide 150 to 180 office spaces, depending upon configuration. An example floor plan is shown in Appendix A. Backfill Analysis A small facility is currently located on the proposed site of the Academic Office Building. The facility houses a small component of research but its main occupant is the Small Business Development Center (SBDC). It is proposed that the research component be relocated into the Osborne Center of Science and Engineering and that SBDC be relocated into office park space, where the university is currently renting space. Since the Academic Office Building is meant to relieve over crowded office space, there will be minimal backfill with current office occupants. Technical Issues Master Plan Relationship The facility is proposed to be located on a site that is consistent with both the current master plan and the pending master plan. The site is currently occupied by a small residential scale building that houses a small research project in the basement and the Small Business Bureau program. The relocation of these two programs is consistent with both master plans. Land Use Plan Relationship As noted above the land use is conformance with the current Facilities Strategic Plan Update and the pending Master Plan. Pedagogical Relationship The direct correlation of pedagogy, class size, enrollment growth and faculty and staff office needs supports this program plan. With faculty offices already over-crowded, the ability of the faculty to serve their students with excellence is compromised. As enrollment continues to grow it will be imperative that faculty is hired and space is provided to meet the pedagogical values of the university. Site The proposed site is shown in Appendix B1 and B2. The site is currently partially developed with a small facility located on the site. Academic Office Building Program Plan 12 September 2012 Utilities The campus uses Colorado Springs Utilities (CSU) as its source of electricity, natural gas, water and sanitary sewer. The individual utilities are discussed below: Electricity - CSU provides the distribution system and transformer for each building. The Owner provides the secondary metered connection. There is currently an overhead line that will be abandoned. Power will be provided from a current location on campus near the site. Natural Gas - Medium pressure natural gas (5 psia) is available in the street next to the site and will provide primary energy to fire hot water generators for heat and for domestic hot water. Water - Two water connections will be required; one for domestic water and one for fire service. Two CSU water lines are located just to the west of the proposed site. Sanitary Sewer - A CSU 8” sanitary sewer system is located in Austin Bluffs Parkway. The impact on this line will be determined during the design process. Design/Construction In order to meet the immediate needs for office space the university will explore using the Design/Build process. If it is decided that the Design/Build process is not appropriate, the more traditional CM/GC process will be used. The following are general guidelines for academic facilities on the UCCS campus: Structural Systems Soil conditions at UCCS are challenging and often dictate the design of the foundation systems. Appropriate geotechnical studies will be completed to provide the necessary data for proper design. Superstructure systems that may be considered include: Braced steel frame Load Bearing Masonry with structural steel roof and floor structure Mechanical Systems The proposed mechanical systems are designed to balance the requirements of building function, first cost, sustainability, operating costs and system reliability. High efficiency hot water generators will be used for the primary heat source. Energy efficient chillers will be used for the primary cooling source, with consideration for heat rejection recovery for reheat box coil input. Typical of simple classroom/office building systems, air handling systems will be variable air volume (VAV), providing efficient and flexible heating, cooling and ventilation. Direct digital controls (DDC) will provide control of the primary and secondary systems allowing the implementation of many energy conservation strategies. Plumbing Systems Water service will be sized per code requirements. Backflow prevention, water metering, and a circulating domestic hot water system will be provided. A sanitary waste line will be sized per code requirements and connected to CSU’s main line. Fire Protection The building will be serviced by a fire service line. Appropriate pressure analysis will be completed to determine if a fire pump is needed. A standard wet-pipe fire protection system will be designed to provide coverage per NFPA 13 based on the occupancy designations. Academic Office Building Program Plan 13 September 2012 Electrical & Lighting Systems Power requirements will be determined upon completion of the design. 10 V-A/sf is a typical load for a classroom/office building resulting in an estimated demand of 350 kVa. Service equipment will be rated 480Y/277 V, 3-phase, 4-wire with properly sized service. Colorado Springs Utilities will provide the transformer sized for the project. General lighting will be a 277 V, electronic ballast, T8 or T5 lamp fluorescent system. Day lighting control and setback control will be considered. Specialty lighting will use compact fluorescent where feasible and LED lighting will be used for exit signs. Lighting dimming and switchology will be used where appropriate to support A/V technology. Architectural Design Features From UCCS Campus Design Guidelines – 2007 From the earliest days of UCCS’s existence on the Central Campus (Cragmor Campus), the designs for its buildings have followed the traditions set by two buildings. The brick of Dwire Hall, the first UCCS building to be built on the campus, began the use of reddish brick on all of its academic buildings and become the “brick style.” The stucco and more romantic forms of the old Cragmor Sanatorium, now beautifully restored and renamed Main Hall, have been inspirations for the Summit and Alpine Villages and the recently completed UCCS Recreation Center. This is the “stucco style.” Recently, a third style has emerged in the glass enclosed pavilion which connects the brick of the University Center and the Kraemer Family Library. This style was – “the glass style” – was created in response to the request from students that a special image emerged for this building. This was followed by Cragmor Hall, which carries on that style. Now, the addition of Dwire Hall is a mix of the “glass style” and the “brick style.” The guidelines recommend that academic buildings built on the Central Campus should continue in the “brick style.” It recommends that pre-cast concrete with integral color may be used as a second material on brick buildings. Window frames should be bronze or black anodized aluminum. The use of flat roofs should be continued on academic buildings. The “glass style” may be used occasionally to provide accents and visual interest on future buildings. The type and location of the Academic Office Building suggests that as an academic building it should have a brick exterior with accents that complement Columbine Hall, which is nearby. The use of glass as an accent would provide cross campus connection and integration into the fabric of the campus and create a relationship to nearby Osborne Center. This exterior design will be in concert with the recommendations of the UCCS Campus Design Guidelines. The final size and massing of the building will be in concert with the site and configured to take advantage of the site shape and other design guideline recommendations. The location of the Academic Office Building places it in an urban landscape environment. This suggests that the landscape needs to be carefully considered to “create visual impact and continuity” to set the building in the context of UCCS. The urban landscape will consider plant materials that will survive in the micro-climate of the UCCS location including ground cover, tree and shrub species and traffic impact. The landscape environment will be used to frame and enhance both distant and near views and to create exterior spaces at various scales. Landscape elements will include natural and local materials to control grades, erosion and create exterior Academic Office Building Program Plan 14 September 2012 areas. Furnishings such as benches, tables, umbrellas, bollards, trash receptacles, etc. will be consistent with the vocabulary of existing site accessories. Legal The project will comply with the following codes and all related codes and standards, which by reference and mention are incorporated herein. Standards: The following approved building codes and standards have been adopted by State Buildings Programs (SBP) as the minimum requirements to be applied to all state-owned buildings and physical facilities including capital construction and controlled maintenance construction projects. The 2009 edition of the International Building Code (IBC) (as adopted by the Colorado State Buildings Program as follows: Chapter 1 as amended, Chapters 2-35 and Appendices C and I) The 2009 edition of the International Mechanical Code (IMC) (as adopted by the Colorado State Buildings Program as follows: Chapters 2-15 and Appendix A) The 2009 edition of the International Energy Conservation Code (IECC) (as adopted by the Colorado State Buildings Program) The 2011 edition of the National Electrical Code (NEC) (National Fire Protection Association Standard 70) (as adopted by the Colorado State Electrical Board) The 2009 edition of the International Plumbing Code (IPC) (as adopted by the Colorado Examining Board of Plumbers as follows: Chapter 1 Section 101.2,102, 105, 107, Chapters 2-13 and Appendices B, D, E, F and G) The 2009 edition of the International Fuel Gas Code (IFGC) (as adopted by the Colorado Examining Board of Plumbers as follows: Chapter 1 Section 101,102, 105, 107, Chapters 2-8 and Appendices A, B, and C) The National Fire Protection Association Standards (NFPA) (as adopted by the Department of Public Safety/Division of Fire Safety as follows with editions shown in parentheses: NFPA-1 (2006), 11 (2005), 12 (2005), 12A (2004), 13 (2002), 13D (2002), 13R (2002), 14 (2003), 15 (2001), 16 (2003), 17 (2002), 17A (2002), 20 (2003), 22 (2003), 24 (2002), 25 (2002), 72 (2002), 409 (2004), 423 (2004), 750 (2003) and 2001 (2004)) The 2010 edition of the ASME Boiler and Pressure Vessel Code (as adopted by the Department of Labor and Employment/Boiler Inspection Section as follows: sections I, IV, V, VIII-Divisions 1 and 2 and 3, 1X, X including the 2011 addenda and B31.1, 2010 edition.) The 2011 edition of the National Boiler Inspection Code (NBIC) (as adopted by the Department of Labor and Employment/Boiler Inspection Section) The 2009 edition of the Controls and Safety Devices for Automatically Fired Boilers CSD-1 (as adopted by the Department of Labor and Employment/Boiler Inspection Section) The 2007 edition of the Boiler and Combustion Systems Hazards Code, NFPA 85 Academic Office Building Program Plan 15 September 2012 (as adopted by the Department of Labor and Employment/Boiler Inspection Section) The 2007 edition of ASME A17.1 Safety Code for Elevators and Escalators (as adopted by the Department of Labor and Employment/Conveyance Section and as amended by ASME International) The 2005 edition of ASME A17.3 Safety Code for Existing Elevators and Escalators (as adopted by the Department of Labor and Employment/Conveyance Section and as amended by ASME International) The 2005 edition of ASME A18.1 Safety Standard for Platform Lifts and Stairway Chairlifts (as adopted by the Department of Labor and Employment/Conveyance Section and as amended by ASME International) The current edition of the Rules and Regulations Governing the Sanitation of Food Service Establishments (as adopted by the Department of Public Health and Environment/Colorado State Board of Health) The 2003 edition of ICC/ANSI A117.1, Accessible and Usable Buildings and Facilities (as adopted by the Colorado General Assembly as follows: CRS 9-5-101, as amended, for accessible housing) Note: Additional codes, standards and appendices may be adopted by the state agencies and institutions in addition to the minimum codes and standards herein adopted by State Buildings Programs. 1. The 2009 edition of the IBC became effective on July 1 of 2010. Consult the state electrical and plumbing boards and the state boiler inspector and conveyance administrator and the Division of Fire Safety for adoption of current editions and amendments to their codes. 2. Projects should be designed and plans and specifications should be reviewed based upon the approved codes at the time of A/E contract execution. If an agency prefers to design to a different code such as a newer edition of a code that State Buildings Programs has not yet adopted, the agency must contact SBP for approval and then amend the A/E contract with a revised Exhibit C, Approved State Building Codes. Please note that the state plumbing and electrical boards enforce the editions of their codes that are in effect at the time of permitting not design. 3. The state’s code review agents, or the State Buildings Programs approved agency building official, shall review all documents for compliance with the codes stipulated herein. Note: The Department of Public Health and Environment, Division of Consumer Protection will review drawings for food service related projects. 4. This policy does not prohibit the application of various life safety codes as established by each agency for specific building types and funding requirements. NFPA 101 and other standards notwithstanding, approved codes will supersede where their minimum requirements are the most restrictive in specific situations. If a conflict arises, contact State Buildings Programs for resolution. 5. It is anticipated that compliance with the federal Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities (ADAAG) and Colorado Revised Statutes Section 9-5-101 will be met by compliance with the 2009 International Building Code and ICC/ANSI A117.1. Academic Office Building Program Plan 16 September 2012 However, each project may have unique aspects that may require individual attention to these legislated mandates. 6. The 2006 edition of the International Building Code (IBC) is to be applied to factory-built nonresidential structures as established by the Division of Housing within the Department of Local Affairs. A. Appendices Appendices are provided to supplement the basic provisions of the codes. Approved IBC Appendices are as follows: 1. Mandatory IBC Appendix Chapter C - Agricultural Buildings IBC Appendix Chapter I - Patio Covers 2. Optional Any non-mandatory appendix published in the International Building Code may be utilized at the discretion of the agency. Use of an appendix shall be indicated in the project code approach. B. Amendments 1. International Building Code, Chapter 1 as amended Referenced Codes 1. While not adopted in entirety, portions of the following codes are referenced in the International Building Code (IBC), the International Mechanical Code (IMC), the International Energy Conservation Code (IECC) the International Plumbing Code (IPC), and the International Fuel Gas Code (IFGC). These following codes would be applied as reference standards. 2009 International Fire Code (IFC) 2009 International Existing Building Code (IEBC) Referenced Standards The IBC, IMC, IECC, IPC and IFGC standards shall be utilized to provide specific, or prescriptive, requirements on how to achieve the requirements established in the code. These standards may be unique to the code or may be derived from other established industry standards. Recognized standards may also be used to show compliance with the standard of duty established by the code. Academic Office Building Program Plan 17 September 2012 Review Processes This program plan has been reviewed by the Chancellor and Vice Chancellor of Administration and Finance. Alternatives Goals and Objectives Impacts of Alternatives Alternative #1 – Rent Office Space There is minimal office space available to rent in an office park located across Austin Bluffs Parkway from the university. Some relief could be obtained through rental of office space. There are two disadvantages to this alternative. First, while it is across the parkway, access is extremely difficult with only right-in/right-out vehicle access and with no pedestrian crossing in the vicinity of the office park. It is for that reason that the university has rented space for those functions not needing frequent access to the main campus. Second, there is minimal office space available and thus the demand for office space could not be met by renting in the office park alone. Since this alternative could not accommodate all the need, the result would be continued over-crowding in on-campus offices with continued difficult access for students. There is no other office space available for rent in the vicinity of the university. Alternative #2 – Continue with Current Situation An alternative would be to not accommodate continued enrollment growth and subsequent faculty hiring by continuing to take over space from closets, conference rooms and other support spaces. The impact would be continued over-crowding and loss of support space that is an important part of the academic program. While the loss of some support space can be tolerated, the university has reached a point where additional loss of support space will have negative impacts on the academic programs. Alternative #3 – Grow Class Sizes by not Hiring Additional Faculty This alternative proposes that additional faculty and staff would not be hired to accommodate the enrollment growth of the university. This alternative would not relieve the current overcrowding situation and would have a significant impact on the quality of the academic programs. In addition, the current mix of existing classroom sizes would not be able to accommodate larger classes. Also it is not economically feasible to re-construct classroom facilities given state capital construction constraints and funding availability. Fiscal Impact Normally an academic office building at a public institution would be eligible for state capital construction funds however, given current funding limitations at the State level, other sources must be developed and utilized. The campus has approached this issue of funding and financing with a two-pronged strategy. The main source of funding for the building will come from incremental student tuition revenues that will be used to service a long term bond issuance expected to be issued in October 2012. The amount financed is expected to be $10 to $12 million with a 30 year payback. Additionally, a budget item set aside to service this debt will enable current funds to be used to supplement the bond issue. The budget item set aside for the building debt service, operations and maintenance is $1.0 million annually. Thus, the project will utilize a combination of budgeted funds from the current budget as well as bond proceeds to provide the necessary financing. The campus may also utilize campus reserves if necessary to support the construction costs of the building. Academic Office Building Program Plan 19 September 2012 E. IMPLEMENTATION INFORMATION Budget Design and Construction Budget The project budget has been set at $12 million in 2012 dollars. 3rd Party Review This project has not received a 3rd party review. However, costs are based on recent experience with design and construction costs for the Lane Center for Academic Health Sciences. Funding Sources This project will be cash funded using internal funds and bonds. Schedule and Phasing Upon approval of the program plan, the design will start in the fall with construction completed in time for move in and fall semester 2014 classes. The project will be built in one phase. Facilities Operating Budget It is estimated that the operating budget will be approximately $140,000/year in 2012 dollars. Academic Office Building Program Plan 20 September 2012 F. APPENDICES Appendix A – Example Floor Layout Academic Office Building Program Plan 21 September 2012 Appendix B1 – 15 Year Facilities Strategic Plan Update Academic Office Building Appendix B2 – Pending Master Plan Academic Office Building Academic Office Building Program Plan 22 September 2012