MINUTES OF Board of Regents of Stephen F. Austin State University VOLUME NO. June 2, 45 1979 Nacogdoches, Texas INDEX MINUTES OF THE SPECIAL MEETING BOARD OF REGENTS STEPHEN F. HELD AUSTIN STATE UNIVERSITY IN NACOGDOCHES, June 2, TEXAS 1979 VOLUME NO. 45 Page 79-85 Authorizations: Dr. 1979 IEM School Dr. Franklin Billy J. Franklin to Attend at Harvard University; for Travel Funds; and Pay Reimburse Dr.. Franklin!s Registration Fees of $3,200 to Harvard University 79-86 Approval 45-2 of Contract with Temple Associates, corporated, Change Order No. 1, In and Project Budget on Student Housing Project 79-87 45-2 Approval of Preliminary Plans for Home Economics Facility and. Authority to Seek Approval of Co ordinating Board and Develop Working Drawings and Specifications for Bidding 4540 MINUTES OF THE SPECIAL MEETING BOARD OF REGENTS STEPHEN F. AUSTIN STATE UNIVERSITY HELD IN NACOGDOCHES, TEXAS June 2, 1979 The meeting was called to order by Homer Bryce, Chairman of the Board of Regents, at 12:00 Noon June 2, 1979. PRESENT: Members: Homer Bryce of Henderson Walter C. Todd of Dallas Mrs. Peggy Wright of Nacogdoches Glenn Justice of Dallas Joe Bob Golden of Jasper Absent: Ernest Powers of Carthage James I. Perkins of Rusk Robert E. Samuel, Jr. of Madisonville Mrs. George Cullum, Jr. of Dallas PRESENT: C. G. Haas, Secretary to the Board Dr. William R. Johnson, President of the University Dr. Billy Joe Franklin, Vice President for * Academic Affairs, SFASU Dr. Gordon Beasley, Vice President for Student Affairs, SFASU Robert Provan, Legal Counsel, SFASU PRESENT: Visitors: Wilbur Kent (Architectural Firm - Kent-Marsellos-Scott) Floyd Marsellos (Architectural Firm - Kent-Marsellos-Scott) Ray Scott (Architectural Firm - Kent-Marsellos-Scott) L. D. Cloud (Architectural Firm - Bernard Johnson Inc.) Jim Sartin (Architectural Firm - Bernard Johnson Inc,) 79-85 Upon motion of Regent Todd, seconded by Regent Golden, with all members voting aye, it was ordered that Dr. Billy J. Franklin, Vice President for Academic Affairs, be directed to attend the 1979 Institute of Education Management at Harvard University from June 17, 1979 through July 26, 1979 in Cambridge, Massachusetts, and that he be reimbursed by the University (from available local funds) the air transportation, and that the University be authorized to pay his registration fee of $3,200 to Harvard University. 79-86 Upon motion of Regent Todd, seconded by Regent Wright, with all members voting aye, it was ordered that the contract be approved with Temple Associates, Incorporated, in the amount of $1,150,300--Base, less Alternates 1, 2, 3, and 4 and Change Order No. 1 (as approved by the Chairman)--to construct the Student Housing Project, and that the Chairman of the Board be authorized to sign the contract and the Change Order; and the following project budget be approved: Student Housing Project Contract - Temple Associates, Requirements Inc. $ Other Contract Cost Architect Fees Testing, 1,150,300 9,000 (7.5%) 86,300 Laboratory Work 14,000 Loose and Movable Furniture 90,000 Legal and Administrative 20,000 $ 1,369,600 Resources Bond Proceeds Interest $ 1,250,000 Income 50,000 Pledged Property Surplus 69,600 $ 45-2 1,369,600 THE AMERICAN INSTITUTE OF ARCHITECTS AlA Document A101 Standard Form of Agreement Between Owner and Contractor where the basis oi payment is a STIPULATED SUM 1977 EDITION THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RISPECT TO ITS COMPLETION OR MODIFICATION Use only with the 7976 Edition oi AlA Document A201, General Conditions oi the Contract for Construction. This document has been approved and endorsed by The Associated General Contractors of America. AGREEMENT made as of the Hundred and Second day of in the year of Nineteen June Seventy-nine BETWEEN (he Owner: STEPHEN F. AUSTIN STATE UNIVERSITY NACOGODOCHES, TEXAS and the Contractor: Temple Associates, Post Office Box Diboll, Inc, 730 ' Texas The Project: STUDENT APARTMENTS The Architect: BERNARD JOHNSON INCORPORATED The Owner and the Contractor agree as set forth below Copyright 1915, 1918, 1923, 193", 1951. 195b, 1%1. 1903, 1967, 197-1, © 1977 by the American Institute of Architects, 173r> New York Avenue, N.W., Washington, D. C. 20006. Reproduction of the material herein or substantial quotation of its'provisions wiihoul permission oi the AlA violates the copyright laws ni the United States and will be subject to legal prosecution AlA DOCUMENT A101 £1977 • • OWNER-CONTRACTOR AGREEMENT • ELEVENTH EDITION • JUNE 1977 • AIA« THE AMERICAS INSTITUTE OF ARCHITECTS. 1735 NIU YORK AVL: N.W., WASH I NCI ON, D. C. 20000 " "•■... "" " 45-3 ".:"... . " ■ A101-1977 1 ARTICLE. THF The Contract Documents Conditions. consist CONTRACT of DOCUMENTS this Agreement, These form the Contract, as if attached to 1 and and all are as as defined in the General fully a part of the Contract this Agreement or repeated herein. » ARTICLE THE 2 WORK The Conirackir ^!,al! piviorrh jl! the- Wurk icquireci by the Contract Documents tor {hen /'iw t\ ihi construction of a Student car>:ioi> 0".\;///-'Im-c oi r /. - - \\\>i, .;• j/v-H un nihi-r Cvnttan Doi-timcnt! ) Apartment Complex for Stephen F. Austin State University. ARTICLE 3 TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION The Work to be performed under this Contract shall be commenced within ten days after receipt of written notice to proceed and, subject to authorized adjustments, Substantial Completion shall be achieved not later than 270 calendar days. i '•. nOClMINT A1(i*( • O'.VM <;•;■ Oknk ATI OK AC.RL ! v.'. v~ • LiLY-NlH •-" ' 7Hi A-.'.:?:.f/'. ':;:.T;i^7j C: ^ r :i \1 f C 15 ••:'•■ M'.VVOn. A\! 45-4 L;");7!f>\ .\.\\ • JL'\ir "\h~~ • ^iA* W« SHI.'VcTO:. DC 2000- A101-1977 2 ARTICLE- 4 CONTRACT SUM The Owner shall pay the Contractor in current funds foi the performance of the VVoik, subject to nddmons and deductions by Change Order as provided in the Contract Documents, the Contract Sum of $1,150,300 One Million One Hundred Fifty Thousand Three Hundred Dollars The Contract Sum is determined as'foliow?(S'aiv heic l!x oau bid or otimi lump sun. amc.un:. .KcrptoJ aln*inate... anc unit /.;/<. c.v as ar.p\ir?.b'n..i Base Bid $1,509,000 Alternate No. 1 Alternate No. • Deduct 44,400 2 Deduct 171,100 Alternate No. 3 Deduct 83,000 Alternate No. 4 Deduct Change Order No. 1 8,400 (See Attached) Deduct 51,800 Total Contract$l,150,300 ARTICLE 5 PROGRESS PAYMENTS Based upon Applications for Payment submitted to the Architect/Engineer by the Contractor Sum to the Owner shall make progress the Contractor as provided payments on account of in the Contract, the Contract General and Supplementary Conditions. Payments due and unpaid under the Contract Documents shall bear interest uom the date pavment is due at the rate entered below, or in the absence thereof, a; the legal rale prevailing at the place of the Protect. (lien- insert anv ran- o! imcrcsl bvhtO upon ) (■sl". /*»•.' cn;< •t'uum'tr,rr.: unor' ihv trct-r^i Truth r. Lmdmi. A;:, sin/..?* y.,v j.nc /o:.*" ic-i.<umr ncc',; jj•.•.•> jit; o:hrr /f£i;l«»i>o-: a: lin C>.\:u".» inr ro.ii.-jcii'' ! p'.nc -pi1 fiU'.v o; bu^ir.:-^. :/ic turaimn c! «/»" f-roirct 2nd risn^nc nj. j.'fc.1 .•/»» \uiidn\ o' s.S.". ji:i»vti-cr Spt-cili: icci jc?»/cr s*k)j;c AIA DOCUMFM A101 • O'.V'siK.COMRAriOK 'vCRt!v.[NT • ELtVI.'sTH LDnif.^N • W^'t 19": • AIA* .1977 • 1H: '\'.UK!CAl. IN'SIITJT! Of Ar-'Cr-i II t Cl .c, 173:- MW VOrK A\'[., N V. .. WASH! NCI ON DC. 'JOOOL 45-5 A101-1977 3 AkIICLL (, FINAL PAYMt'M Final payment, constituting the entire unpaid balance of the Contract Sum, shall be paid by the Owner to the Contractor when the Work has been completed, the Contract fully performed, and as defined in the General Conditions. ARTICLE 7 MISCELLANEOUS PROVISIONS ?'1 1crfn* U'ed. in ''"' ^'femeni which are defined in the Conditions 01 the Contact shall have the meaning OL'Si^ruicu ir: tMosr Conditions 7/\ lne(:()n!f:"U"i D^umenis. which constitute the ent.re agreement between the Owner and the Contractor ar r are in AM.cie , .inc. e.xceo: tor Moon.cat,ons. issued after execution of this Agreement, are enumeuied as follows and accopiu; ^.c-rr.jfw. yunv^ n:.^ cv thro: numbv,* m a!i <*>?> and caics u.-c aPP!,csblc ' General Conditions of " ' " Contract Supplementary Conditions Drawings - CIA, C2, C3 (Revised June 7, 1979), C4, A2, A3, A4, A5, A6, A7, A8, A9, A10 SI, MP1, MP2, El, C5, C6, C7, C8 E2 Specifications - Divisions 1 thru Division 16 - dated February 1979 Alternates 1, 2, 3 & 4 Change Order Addendum No. Addendum No. Addendum No. Addendum No. No. 1 - dated June 2, 1979 1, dated March 23, 1979 Revision No. 1, dated June 6, 1979 2, 3, 4, dated March 28, 1979 dated April 13,1979 dated May 18, 1979 This Agreement entered into as of the day and year him wntten above. OWNER . COMKACfOR Jl^stl^^ Nacogodoches, Chairman, Texas Diboll, Texas Board o£ Regents AIA DOCl'MLST A101 • O\V\ •'■■..<: C;W-'AC K.)'. AC .Kl i '.'.I \ 1 • i;;v»\-H [_;)I"IIOv • ••'" 10-- ~ ^19" . in: AMEkK.A\ JN'STIH.-l: O! AKC H !1 i Cl £ . Vj ;■ r, L .".. v( >r. r. A\L . N v. . wash I r;ci O^'u. C 45-6 ' CHANGE ORDER 1 ISSUED TO: Temple Associates, PROJECT: _ Stephen F. Inc. _ Austin - Student Hou_s_ing_ date June 2, BJU.O. 78017-01 1979 DESCRIPTION OF CHANGE IN WORK: Substitute Paint Grade Birch Veneer on Interior Door Facings In Lieu of Stain Grade Red Oak, Deduct $ 3,800 Substitute Rough Sawn Finish in Lieu of Smooth Finish on Exterior Wood Trim and Siding. Revised Drive and Parking. Dated June 7, Deduct 1,490 Deduct 40,960 Deduct 17,300 Add 16,400 See Revised Drawing C-3, 1979. Substitute Cabinets Manufactured by Brandon, Belmont Model, Solid Core Flush Birch, Paint Grade Veneer In Lieu of Custom Cabinets. Contractor Credit for Owner Selection of Alternate No."2 (Construct 8 Buildings In Lieu of 10). Substitute PVC, Schedule 40 Sanitary Sewer Pipe In Lieu of Service Weight Cast Iron 5f-0n Outside Building (as per Revision No.l) Substitute Type !IK" Copper Water Pipe In Lieu of PVC (as per Revision No. 1) . CONTRACT AMOUNT PRIOR TO THIS CHANGE $ ADtXR^l&R DEDUCT FROM) THE CONTRACT SUM, THE AMOUNT OF $ CONTRACT AMOUNT INCLUDING THIS CHANGE ADD TO (OR DEDUCT FROM) THE CONTRACT TIME.. _DAYS REVISED CONTRACT COMPLETION DATE APPROVED DATE OWNE Stephen F.^Au^pan State University ACCEPTED DAT BERNARD JOHNSON INCORPORATED CONTRACTOR . BY Temple Associates, Inc. DISTRIBUTION BERNARD JOHNSON INCORPORATED SOSOWEBTMEt^ER. HOUSTQM.TEXAB 77O36 713/B2?U OO 45-7 Deduct 6,750 Add 2,100 B_f FIREMAN'S if FUND W AMERICAN INSURANCE COMPANIES FIREMAN'S FUND INSURANCE COMPANY THE AMERICAN INSURANCE COMPANY NATIONAL SURETY CORPORATION ASSOCIATED INDEMNITY CORPORATION MAC GREGOR ACT PAYMENT BOND AMERICAN AUTOMOBILE INSURANCE .COMPANY HOME OFFICE: SAN FRANCISCO, CALIFORNIA STATUTORY PAYMENT BOND PURSUANT TO ARTICLE 5160 OF THE REVISED CIVIL STATUTES OF TEXAS AS AMENDED BY ACTS OF THE 56TH LEGISLATURE, REGULAR SESSION, 1959. KNOW ALL MEN by THESE presents, that : Temple Associates, P.. 0, Inc, Box 730 .Diboll, Texas 759^1 (hereinafter called the Principal(s)), as Principal(s), and Associated Indemnity Corporation (hereinafter called the Surety(s)), as Surety(s), are held and firmly bound unto Stephen F. Austin State University, Nacogdoches, Texas (hereinafter called the Obligee), in the amount oL _Qne million one hundred fity thousand thr^__hundrjBd_,and__no/lOO ($ ? ^ ?^ '--V-S-ZZ^^-IZ^ > for the Payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the________day nf 19 June 79 , to construct a Student Apartment Complex for Stephen F. Austin University/ Hacogdoches. Texas which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the .prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that his bond is executed pursuant to the provisions of Article 5160 of the Revised Civil Statutes of Texas as amended by Acts of the 56th Legislature, Regular Session, 1959, and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein IN WITNESS WHEREOF, the said Principal(s) and Surety(s) have signed and sealed this instrument thisJ___Lday of ____________ 19- "~ Temple Associates, Inc. (PRINCIPAL) (principal) Eddie Joiner, Vice-president (PRINCIPAL) Associated Indemnity CORPORATE SURETY BY. Wendell D. 36O24O—7-66 45-8 Wampl-er Corporation FIREMAN'S __ H I -r-"Tk I ^U I J ^~^ X_-X AMERICAN NSURANCE COMPANIES FIREMAN'S FUND INSURANCE COMPANY HE AMERICAN INSURANCE COMPANY THE INSURA NATIONAL SURETY CORRPORATION ASSOCIATED INDEMNIT Y CORPORATION MAC GREGOR ACT PERFORMANCE BOND AMERICAN AUTOMOBILE INSURANCE COMPANY home office: san francisco, California STATUTORY PERFORMANCE BOND PURSUANT TO ARTICLE 516D OF THE REVISED CIVIL STATUTES OF TEXAS AS AMENDED BY ACTS OF THE 56TH LEGISLATURE, REGULAR SESSION, 1959 KNOW ALL MEN BY THESE PRESENTS, that. Temple Associates, P. 0. Inc. Box 730 Jjiboily Texas (hereinafter called the Principal^)), as Principal(s), and Associated Indemnity Corporation (hereinafter called the Surety(s)), as Surety(s), are held and firmly bound unto Stephen F. Austin State University, Macogdoche^^Te:^ (hereinafter called the Obligee), in the amount of One million one hundred fifty thousand three hundred and no/lOO 1,150,300-00 .Dollars _) for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the 19_J2_, to Texas'^ 2nd Hrty nf . June construct a Student Apartment Complex for Stephen F. Austin University, Nacogdoches ~ which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force ana eiiect. PROVIDED HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised Civil Statutes of Texas as amended by Acts of the 56th Legislature, Regular Session, 1959, and all liabilities on this bond shall be determined in accordance with the provisions of said article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal(s) and Surety(s) have signed and sealed this instrument this5nd._day nf 19. June 79 Temple Associates, (PRINCIPAL) Inc. Eddie Joiner, Vice-President (PRINCIPAL) Associated Indemnity Corporation CORPORATE SURETY By. 360241—7-66 45-9 Wendell D," Wampler ttorney-in-Fact 10 79-87 Upon motion of Regent Golden, seconded by Regent Justice, with all members voting aye, it was ordered that the preliminary plans (based on Floor Plan B) for the Home Economics Department!s facility be approved and the University be authorized to seek the approval of the Coordinating Board and to develop working drawings and the specifi cations for bidding. 45-10