Process Name: Building Development Plan Process Flow Parent Process Name: : Approval Process Responsible Person: Hester Hutchinson Date : 17 July 2006 Updated: May 2008 Page 1 YES If Heritage/Environment assessment is required owner to be referred to applicable department City Competent or Not Competent to accept application Approved END Verify Erf information,Notices served Heritage – follow procedure XXX XXX No CUSTOMER INTERFACE Plan Received at Counter Assess submission requirements of plan. REG A5 of NBR SABS 04001990 (FORM BDM 05 ) Check if all the required information has been provided on the Application Form (FORM BDM 02) Verify Erf information , Notices, Heritage: Competent to Env City Not Competent : Env City and HWC Can Plan be accepted Create and print a Tax Invoice/ Quotation Create Doc-in number Customer Interface CUSTOMER INTERFACE Captures owner erf number System provides an Search Fee Number. Capture Arch as per SACAP requirements Yes Assess building plan fee A Income Module No Land Use Owner referred to Land Use Management Department for assessment of application Can Application be accepted XXX NO Does City have competence to grant S34 permit No Refer applicant to Env to collect permit form and City comment sheet to take to HWC Search LIS for owners information Captures owner application YES System provides an application number . Create and print a Tax Invoice/Quotation Create Doc-in number Planning Module YES END Owner supplied with all the relevant documentation and information Yes Owner complies NO END Refer applicant to Env Planning to collect permit Permit granted Yes Plan submitted and processed by BDM and Circulated to Environment for sign off Follow Plan Approval Process END No COMPETENCE IF: Area was surveyed and 60 years old buildings identified Site is vacant Application does not trigger an HIA Section 38 (1) Request HIA from applicant Receive HIA Permit granted BDM No LUMS Refer applicant to HWC via City Env HERITAGE Yes Plan submitted and processed by BDM and Circulated to Environment for sign off EXIT BDM Follow Plan Approval Process END S38(1) OF NHRA (PLANS EXAMINER TO NOTE) Construction of a road, wall, power line, pipe line, canal or similar from of linear development or barrier exceeding 300m in length Construction of a bridge or similar structure exceeding 50m in length Development involves three or more erven Development involves properties which have been formed through the consolidation of three or more properties in the last five years Rezoning of a property of more than 10 000m² B Process Name: Building Development Plan Process Flow Parent Process Name: : Approval Process Responsible Person: Hester Hutchinson Date : 17 July 2006 Updated: May 2008 Page 2 Submission Module CUSTOMER INTERFACE Hands Tax Invoice, Four (stamped) building plan copies to applicant for payment A Customer Interface CUSTOMER INTERFACE Owner pays account YES Captures doc-out number Create unique Card/Plan/Record number Capture Date Paid as per Receipt Capture Submission date Checks plan Check if all relevant documentation is attached 30 day for <500m 60 day for >500m Clock starts Income Module NO END LUM Official LUM Official Hands Tax Invoice to owner for payment with all relevant documenation B Owner pays account YES Completed LUMS approval handed to owner Captures doc out (payment) in system Owner to hand in plan and relevant LUMS documentation to BDM / As per start of process LUMS NO END Customer Interface CUSTOMER INTERFACE Prepares plan for circulation Hands prepared documentation to Circulation Clerk C CUSTOMER INTERFACE Populate Submission Module capturing Statistical data Circulate plan to responsible official whom assesses the Circulation requireme SACAP Architect requirement as per Income Module Prepares file cover Endorses the plan/record/card number on all relevant documentation Responsible BDM Official Scrutinise and indicate plan circulation requirements on file cover as per Department drop down on Circulation Tab within Submission Module D Submission Module Key: Trigger Decision Manual Task System Task Business Event Input/ Output Documents Database Connector Interface Process Terminator Flow Arrow Responsible Bus. Unit/ Handover C Process Name: Building Development Plan Process Flow Parent Process Name: : Approval Process Responsible Person: Hester Hutchinson Date : 17 July 2006 Updated: May 2008 BDM Admin Official Plans Examiner Plans Examiner (PX) Scrutinise plan for approval (as per delegation) or recommendation of approval Captures plan circulation to/from departments/ officials as indicated D As per Section 71(b) of Act 103,1977 indicates refusal of approval. Hands plan to Circulation Clerk/or updates system YES Plans Examiner BDM Official / Plans Examiner Updates Approval date in “Date box” Activates SMS NO Can Plan be approved Submission Module BDM Official/ PX Page 3 Admin Official/ Plans Examiner A) Checks if all documentation complies and all relevant certification is received B) Checks fee assessment and payment - receipt and tracker information to correspond C) Prepares plan for approval / recommendation of approval. D) Provide applicable stamping of plan. A ) Update the Value Calculator Box for statistical information B ) Updates Circulation Tab C) Prints approval letter BDM 07 Prepares plan for: Collection Council copy for filing Building Inspectors copy Valuation copy Submission Module Submission Module BDM Official/ PX Updates tracker by populating the: Plan Circulation Tab Printing the required Letter BDM 08 Activating SMS Submission Module File Council copy after plan collection/rejection YES SMS -Approval Clock stops for: 30 day <500 m 60 day >500 m SMS Non-Approval Clock stops for: 30 day <500 m 60 day >500 m Plan collected NO Phone owner if sms unsuccessful Or post plan File Council copy after plan collection/rejection BDM Admin Official File Council copy after plan collection/rejection Follow process as from D Owner returns plan YES CUSTOMER INTERFACE Updates tracker entry from Amendment Drawer to Amendment Client Prepares plan for collection YES Plan collected Submission Module Key : Trigger Decision NO NO Plan submission to lapse after 12 months E Manual Task System Task Business Event Input Output Documents Database Connector Interface Process Terminator Flow Arrow Responsible Bus . Unit Handover Process Name: Building Development Plan Process Flow Parent Process Name: : Approval Process E System to provide a report on Plans about to Lapse triggered by Amendment date + 11 months Responsible Person: Hester Hutchinson Date : 17 July 2006 Updated: May 2008 Owner collects and resubmits plan SMS to owner : Plan to lapse within 30 days Page 4 YES D NO Building Inspector to do on site inspection to identify if any building work has been commenced or competed Customer Interface Customer Interface Update outcome of inspection Update Plans Lapsed date as per “Dates”activating preset letter to owner Activate SMS SMS to owner : Plan to lapsed and is invalid NO Work commenced/ completed Submission Module YES Update outcome of inspection Activate link to legal module As per Legal Module Submission Module Post non approval plan and relating letter to owner BDM 11 END Key: Trigger Decision Manual Task System Task Business Event Input/ Output Documents Database Connector Interface Process Terminator Flow Arrow Responsible Bus. Unit/ Handover