Smooth and flawless workflows with integrated Operations Management SPPA-T3000 Cue – success starts in the control room Control System Instrumentation, Controls & Electrical SPPA-T3000 Cue Add-on Application Operations Management optimally supports power plant operators in their daily shift operations. Fully integrated in SPPA-T3000 Cue, it enables highly efficient and effective Operations Management due to smooth and flawless workflows. Your benefits: Full integration of Operations Management in SPPA-T3000 Cue allows for smooth and flawless workflows: ◾ ◾ ◾ ◾ Easy data transfer from the DCS to the shift log with just a single mouse-click Automatic shift event creation – no handwriting, no retyping Comprehensive and complete information transfer from one shift team to the next A single integrated user interface for DCS and Operations Management The Task Power plant operators need to continually plan and coordinate shifts and tasks. Shift organization and responsibilities for work packages have to be planned, shift events documented, and detailed communication must be relayed between shifts, so all teams know the plant’s status. Our Solution The add-on application Operations Management creates entirely new shift management potentials. Due to full integration in SPPA-T3000 Cue, Operations Management simplifies work processes and enables more effective and efficient operations. A single user interface gives the operator access to the Distributed Control System (DCS) and Operations Management so that SPPA-T3000 can be operated, shift events managed, and tasks run from a single workplace. Operations Management combines daily work preparation and execution in one comprehensive application. All relevant information is then incorporated into one management system. Operators can easily configure templates and plan work packages and daily shift organization. The seamless integration of Operations Management and SPPA-T3000 Cue also lets the operator easily transfer data from the DCS to the shift log with one mouseclick. Plant incidents detected by the DCS even create shift events automatically – no handwriting or retyping required. Daily shift changes are also managed intelligently and efficiently. During shift handovers, operators get a structured, upto-date overview of the plant’s condition, any alarm messages, and shift schedules and resources. This ensures a full information transfer between shifts. Pending tasks and events are automatically transferred to the next shift, saving time, reducing errors, and promoting safety. Pending tasks like issue evaluation by diagnostic experts are added to the next shift’s task list with one mouse-click. Operations Management is the perfect tool: Fully functional and graphically integrated in SPPA-T3000 Cue, it supports operators in their daily shift operations – smoothly and flawlessly. siemens.com/sppa-t3000 Operations Management – work preparation and daily execution in one comprehensive application Work preparation Daily execution Continuous and integrated recording of events Configuration Content for each work package Planning Timing and responsibilities of executing work package Log Events Task Direct assignment and status of activities going beyond routine DCS business Automatic data flow from workbench Shift handover Ensuring a complete information transfer from one shift to the next Highlights Creating a shift event directly from the SPPA-T3000 Cue Alarm Sequence Display (ASD): Tool-supported shift handover – ensuring complete information transfer from one shift to the next: Shift KPIs With just a single mouse-click on the corresponding component in the ASD, the operator can directly transfer the data from SPPA-T3000 Cue to create a shift event – smoothly and flawlessly. Your benefit: no handwriting, no retyping Shift tasks Confirmation Guiding operators through the four-step workflow, the shift handover process ensures that no information is lost and all open shift events and uncompleted tasks are automatically transferred to the new shift (shift log). Your benefit: no loss of information Published by Siemens AG 2015 T3R72_FS_OperationsManagement_e_V1-1 Article No. PGIE-B10009-01-7600 Power and Gas Division Freyeslebenstrasse 1 91058 Erlangen, Germany Printed in Germany Dispo 05401 For more information, please contact sppa-t3000.energy@siemens.com siemens.com/energy/sppa-t3000 Shift events Subject to changes and errors. The information given in this document only contains general descriptions and/or performance features which may not always specifically reflect those described, or which may undergo modification in the course of further development of the products. The requested performance features are binding only when they are expressly agreed upon in the concluded contract.