Smooth and flawless workflows with Control System Instrumentation, Controls & Electrical

advertisement
Smooth and flawless workflows with
integrated Operations Management
SPPA-T3000 Cue – success starts in the control room
Control System
Instrumentation, Controls & Electrical
SPPA-T3000 Cue Add-on Application
Operations Management
optimally supports power plant operators
in their daily shift operations. Fully
integrated in SPPA-T3000 Cue, it enables
highly efficient and effective Operations
Management due to smooth and flawless
workflows.
Your benefits:
Full integration of
Operations Management
in SPPA-T3000 Cue allows
for smooth and flawless
workflows:
◾
◾
◾
◾
Easy data transfer from
the DCS to the shift
log with just a single
mouse-click
Automatic shift
event creation –
no handwriting,
no retyping
Comprehensive and
complete information
transfer from one shift
team to the next
A single integrated user
interface for DCS and
Operations Management
The Task
Power plant operators need to continually
plan and coordinate shifts and tasks.
Shift organization and responsibilities
for work packages have to be planned,
shift events documented, and detailed
communication must be relayed between
shifts, so all teams know the plant’s status.
Our Solution
The add-on application Operations
Management creates entirely new shift
management potentials. Due to full
integration in SPPA-T3000 Cue, Operations
Management simplifies work processes
and enables more effective and efficient
operations.
A single user interface gives the operator
access to the Distributed Control System
(DCS) and Operations Management so
that SPPA-T3000 can be operated, shift
events managed, and tasks run from a
single workplace. Operations Management
combines daily work preparation and
execution in one comprehensive
application. All relevant information is
then incorporated into one management
system. Operators can easily configure
templates and plan work packages and
daily shift organization.
The seamless integration of Operations
Management and SPPA-T3000 Cue also
lets the operator easily transfer data from
the DCS to the shift log with one mouseclick. Plant incidents detected by the DCS
even create shift events automatically –
no handwriting or retyping required.
Daily shift changes are also managed
intelligently and efficiently. During shift
handovers, operators get a structured, upto-date overview of the plant’s condition,
any alarm messages, and shift schedules
and resources. This ensures a full
information transfer between shifts.
Pending tasks and events are automatically
transferred to the next shift, saving time,
reducing errors, and promoting safety.
Pending tasks like issue evaluation by
diagnostic experts are added to the next
shift’s task list with one mouse-click.
Operations Management is the perfect
tool: Fully functional and graphically
integrated in SPPA-T3000 Cue, it supports
operators in their daily shift operations –
smoothly and flawlessly.
siemens.com/sppa-t3000
Operations Management –
work preparation and daily execution in one comprehensive application
Work preparation
Daily execution
Continuous and
integrated recording
of events
Configuration
Content for each
work package
Planning
Timing and
responsibilities
of executing
work package
Log
Events
Task
Direct assignment and
status of activities
going beyond routine
DCS business
Automatic data flow
from workbench
Shift handover
Ensuring a complete
information transfer from
one shift to the next
Highlights
Creating a shift event directly from the
SPPA-T3000 Cue Alarm Sequence Display (ASD):
Tool-supported shift handover – ensuring complete
information transfer from one shift to the next:
Shift KPIs
With just a single mouse-click on the corresponding
component in the ASD, the operator can directly
transfer the data from SPPA-T3000 Cue to create
a shift event – smoothly and flawlessly.
Your benefit: no handwriting, no retyping
Shift tasks
Confirmation
Guiding operators through the four-step workflow, the
shift handover process ensures that no information is
lost and all open shift events and uncompleted tasks
are automatically transferred to the new shift (shift log).
Your benefit: no loss of information
Published by
Siemens AG 2015
T3R72_FS_OperationsManagement_e_V1-1
Article No. PGIE-B10009-01-7600
Power and Gas Division
Freyeslebenstrasse 1
91058 Erlangen, Germany
Printed in Germany
Dispo 05401
For more information, please contact
sppa-t3000.energy@siemens.com
siemens.com/energy/sppa-t3000
Shift events
Subject to changes and errors.
The information given in this document only contains
general descriptions and/or performance features
which may not always specifically reflect those
described, or which may undergo modification in the
course of further development of the products.
The requested performance features are binding
only when they are expressly agreed upon in the
concluded contract.
Download