Financial Structure and Operations meeting minutes 09/15/2015 Strategic Planning Financial Structure and Operations September 15, 2015 3:00 p.m. RPL 300N Members Present: Sandy Cheffer, Pat Chronister, Skylar Combs, Linda Johnson, Stephen Jones, Brian Lasey, Jim Musser, Donna Rankin, Niki Schwartz, Jeff Woods Guests: I. Brian Lasey of Facilities Management addressed the group concerning building and maintenance issues on campus. He discussed in detail the data he passed out to all group members in attendance, including the ADHE Facilities Audit Program. The facilities audit program is completed biennially with the ADHE and generates a listing of prioritized maintenance needs around campus A critical needs column is generated based upon our direct input of prioritized maintenance needs Critical or imminent failure is a high priority factor in determining which needs across campus are addressed in any fiscal year We spend about $500K to $600K annually on high priority maintenance needs from our list of $3.3 million critical needs We also put aside another $600K or so each year to deal with critical failures which we have not budgeted for; balance in this account is probably $1 million or so UALR and UCA have much higher budgets and staff counts than we do for similar student populations (currently 124 staff members) We spend about $76,000 annually to haul off trash and $2.3 million annually on utility bills on all non-auxiliary buildings II. Major Concerns: We need to increase the staff size of Facilities Management to be able to deal with the maintenance projects on hold on campus We need to budget for and plan for maintenance on an ongoing basis rather than on a “what is going to fail first?” basis Adjourned @ 5:00 p.m. Next meeting: September 22, 2015, 2:00 p.m. Arkansas Tech Career Center (ATCC); Subject: 1 Russellville Physical Plant Fall 2015 557 Acres in Russellville 129 Mainthined Acres, 12 acres at Lakepoint and CLL f t2FT WID-06-ft-D iv(1-6-9AZW6--C-re) 128 Buildings, Includes Russellville, Ozark, and Lakepoint. Does not include rental property.41IZATO—C • z.) rio 116 Buildings in Russellville; 1,653,417 square feet NOT ATC-C" 24 Residence Halls and other housing facilities; 564,363 square feet 12 Major academic buildings Ross Pendergraft Library; 92,424 square feet, 3419 light bulbs Facilities Management Fall 2015 Motor Pool Carpentry Electro/Mech nical Custodial Housing Main enance Grounds Maintenance 1 3 Plumbers 3 Electricians 3 HVAC Technicians 6 technicians Date: 03/28/14 Page: 1 Facilities Audit Program Building Maintenance Priority Report Institution: Arkansas Tech University Building Name _ Hull Roush Hall McEver Science Building Brown Dormitory Jones Hall Old Art Building Crabaugh Corley Doc Bryan Building Caraway Hall Wilson Hall Chambers Cafeteria Tucker Hall Turner Hall Stroupe Tucker Coliseum Morton Hall Williamson Dean Hall Administration Critz Hall Hughes Hall South Hall Techionary Tomlinson Red Hill Residence Heating Plant McEver Annex 900 N El Paso 918 N. El Paso 1609 Heiberg Lane A/C And Refrigeiation Technology and Academic Suppor Alumni House Animal Science Lab Baswell Hall Baswell Mechanical Buerkle Fieldhouse Bull Barn Calf Barn Center For Energy Studies Chambers Cafeter a Addition Collegiate Center Corley Addition Crabaugh Home Dean Classroom Annex East Gate Apartments East Gate House Industrial Control Systems Bui Equipment Shed Farm Greenhouse #1 Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus Arkansas Tech Ozark Campus Arkansas Tech Ozark Campus Arkansas Tech Ozark Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus Arkansas Tech Ozark Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus Arkansas Tech Ozark Campus The Main Campus The Main Campus Priority Maintenance Needs Critical Needs Year Built 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 32 33 34 35 $16,895,160 $2,743,765 $9,257,176 $3,812,205 $4,766,645 $565,498 $4,290,976 $6,190,186 $6,111,841 $3,175,154 $5,043,979 $3,954,684 $1,476,172 $4,297,565 $4,414,807 $10,602,305 $1,624,690 $2,241,677 $5,875,535 $2,325,950 $1,069,109 $1,420,616 $1,135,895 $2,642,126 $4,754,229 $92,262 $4,139,363 $1,416,368 $135,003 $106,814 $31,215 36 $480,966 $0 0.5576 1985 37 $5,628,993 $520,875 0.5990 1966 38 39 40 41 42 43 44 46 47 48 $447,579 $183,328 $2,104,340 $447,289 $507,089 $22,142 $18,865 $1,471,133 $111,101 $1,006,300 $10,000 $0 $0 $0 $9,180 $0 $0 $0 $0 $20,000 0.7152 0.2875 0.2631 0.2489 0.7660 0,6362 0.4818 0.5941 0.1074 0.3959 1936 2003 2006 2006 1955 1966 1966 1993 2007 1995 49 50 51 52 53 54 $152,001 $135,593 $15,328 $833,233 $55,264 $876,405 $0 $0 $7,500 $0 $0 $25,000 0.0940 0.5377 0.0540 0.5667 0.2843 0.6350 2009 1953 2006 1984 1960 1976 55 56 $83,979 $0 $0 0.7975 0.1045 1966 2008 1 2 4 5 $24,705 $170,000 $0 $200,000 FCI $0 $237,508 $10,000 $30,000 $0 $0 $0 $2,500 0.7899 0.7970 0.8211 0.7363 0.7746 0.6530 0.8362 0.6837 0.4577 0.8011 0.6555 0.4402 0.5925 0.7201 0.8831 0.7121 0.6059 0.8171 0.6999 0.9019 0.5248 0.5418 0.6719 0.8191 0.8839 0.6314 0.8029 0.5061 0.8009 0.7785 0.0948 1970 1962 1962 1962 1966 1913 1972 1988 1998 1934 1910 1965 1955 1965 1926 1975 1966 1940 1947 1910 1950 1940 1970 1937 1936 1937 1910 1996 1950 1948 1972 $0 $130,000 $55,000 $35,000 $0 $200,000 $0 $237,508 $0 $0 $0 $72,500 $0 $0 $50,000 $55,000 $105,000 $25,000 $0 $0 Date: 03/28/14 I I Page: 2 Facilities Audit Program Building Maintenance Priority Report Institution: Arkansas Tech University Building Name Farm Greenhouse #2 Farm Greenhouse #6 Farm Greenhouse #4 Farm Storage Fish, Wildlife & Engr Flammables Storage Garden Park Residence Greenhouse Classrdom Building Hay Barn East Allied Health Education Lake Point BusinesS Services Lake Point Event Center Lake Point Grill Pavilion Lake Point Guest Heuse Lake Point Hickory lodge Lake Point Lake House Lake Point Learning Center Lake Point Learning: Center Sto Lake Point Maint. Shop Lake Point Oak Lodge Lake Point Pavilion ' Lake Point Pump House Lake point Smokingl Pavilion Lake Pt. Storage Shed West Laundromat Main Barn McEver Addition 2 Norman Art Building Nutt Hall Nutt Mechanical Paine Hall Physical Plant Administration Physical Plant Maint. Shop Ross Pendergraft Library Rothwell - 100th building Roush Mechanical Softball Press Box Stadium Suites Student Services Center Tech Police Dept Warehouse Witherspoon Witherspoon Mechanical Women's Sports Complex ' Work Barn East Work Barn West West Annex Young Building Baswell Techionary l Ozark Storage House Ozark Storage Shed Campus Priority The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus Arkansas Tech Ozark Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus Arkansas Tech Ozark Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus Arkansas Tech Ozark Campus The Main Campus The Main Campus Arkansas Tech Ozark Campus Arkansas Tech Ozark Campus 57 58 59 60 61 62 63 64 65 66 Maintenance Needs $0 FCI Year Built $0 $0 $0 $0 $0 0.1045 0.1103 0.1051 0.5590 0.2719 0.0678 $0 $0 $0 $25,000 0.7825 0.1111 0.1757 0.3008 $232,209 $264,002 $3,700 $373,896 $492,116 $75,137 $281,316 $1,236 $55,194 $564,669 $54,352 $812 $653 $2,878 $59,624 $150,150 $189,160 $1,108,434 $5,558,174 $175,937 $5,597,097 $117,078 $203,834 $8,490,954 $1,571,155 $408,921 $4,046 $984,285 $347,005 $0 $0 $0 $40,000 $8,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $35.000 $0 $0 $0 $0 $0 $0 $0 $0 0.2527 0.1456 0.0775 0.3165 0.2423 0.1690 0.3354 0.0358 0.3410 0.4009 0.0775 0.1414 0.0348 0.2900 0.4847 0.7447 0.0872 0.2271 0.3431 0.3715 0.6248 0.1169 0.0977 0.4313 0.1246 0.6447 0.1241 0.7780 0.1428 96 97 98 99 100 101 102 103 $209,828 $117,080 $12,543,515 $776,163 $168,523 $1,540 $1,777 $70,909 $0 $0 $130,000 $80,000 $0 $0 $0 $0 0.7421 0.3164 0.7730 0.5827 0.1728 0.2545 0.1762 0.0940 1965 1989 1970 1970 2007 1988 1996 1999 104 105 106 $5,212,094 $286,900 $77,130 $800,000 $0 $0 0.7824 0.0877 0.5455 1959 2010 1968 107 $13,278 $0 0.3373 1965 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 $24,705 $26,087 $24,859 $18,887 $267,098 $2,265 $182,872 $42,014 $7,086 $551,593 Critical Needs 2008 2008 2008 1966 2004 2008 1940 2008 2001 2000 1970 1991 1991 1983 1991 1965 1992 2010 1998 1983 1991 1983 1983 1970 1960 1966 2010 2006 2002 2002 1966 2008 2008 1999 2009 1962 2007 1977 2009 Date: 03/28/14 Page: 3 Facilities Audit Program Building Maintenance Priority Report Institution: Arkansas Tech University Building Name 823 N. El Paso M Street Dorm M Street Dorm Mechanical Build 911 N Denver Ave. 901 N. Denver Storage Building (small red) Band Instrument Storage Buildi Baseball Stadium Storage 907 4th Street Offices Theater Storage Building Intramural Building Visitor Press Box Public Safety Bike Storage ROTC Storage Academic Student Services and 917 N. Denver 917 N. Denver Storace Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus Arkansas Tech Ozark Campus The Main Campus The Main Campus Arkansas Tech Ozark Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus The Main Campus Priority Maintenance Needs Critical Needs FCI Year Built 108 109 110 111 112 113 $44,891 $931,226 $7,781 $86,794 $168,457 $3,207 $0 $0 $0 $0 $0 $0 0.3343 0.0667 0.0402 0.5892 0.6185 0.1086 1950 2012 2012 1950 1960 2005 114 115 116 $2,925 $8,885 $5,572 $0 $0 $0 0.0268 0.0144 0.1415 2012 2013 117 118 119 120 121 122 123 124 125 $193,117 $34,226 $1,102 $3,079 $167 $119 $402,475 $151,973 $11,888 $0 0.5144 $0 $0 $0 $0 $0 $0 $0 $0 0.2782 0.0218 0.0825 0.0070 0.0050 0.0404 0.6229 0.4488 1950 1990 2012 2010 2013 2013 2015 1950 1970 Total: $181,266,713 $3,326,071 2000 I, Dr. Robert Brown, President of Arkansas Tech University, certify that the information provided is true and complete. Further, I verify that these are the complete and accurate priorities of the institution(s). Date