CHP plants based on advanced biomass gasification January, 2006

advertisement
1
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
CHP plants based on
advanced biomass gasification
- EU BiGPower project 2005 - 2008
Esa Kurkela
VTT – Technical Research Centre of Finland
January, 2006
Esa.Kurkela@vtt.fi
24.1.2006
2
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
CHP plants based on biomass gasification
- most potential gasification technologies
z
Smallest size range: < 500 kWe + 1 MWheat
z
z
z
Medium size range: 0.5 – 15 MWe + 1 – 15 MWheat
z
z
z
z
z
z
Different gasification systems available: Modified updrafts, fluidised-bed, staged proceses
Turbo-charged gas engines
Gas cleaning is most critical process step
Fuel cell plants or small gas turbines also possible in future
Competition with fluidised-bed combustion with steam turbine cycle at > 3-5 MWe
Large-scale biomass power plants: 15–150 MWe + 15-150 MWheat
z
z
z
z
downdraft gasifiers and gas engines (naturally aspirating)
new types of downdrafr gasifier?
Pressurised fluidised-bed gasification with hot filtration
Combined Gas and Steam Turbine Cycle or engine-steam turbine cycle?
Competition with CFB and BFB boilers with steam cycles
Co-firing in coal or natural gas power plants, gasifiers > 50 MWfuel
z
z
z
Esa.Kurkela@vtt.fi
Fluidised-bed gasification
No gas cleaning with clean biomass in PC boilers
Filtration and chlorine removal with waste fuels
24.1.2006
3
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
GE Jenbacher, Itävalta
VTT:n kaasutustutkimus v. 2006
aihe: Korkean hyötysuhteen CHP-tekniikat
 EU-BiGpower
– Advanced Biomass Gasification for High-Efficiency
Power
– VTT:n koordinoima EU/Tekes-projekti 1.10.2005 – 30.9.2008
– 13 partneria, Suomesta VTT, TKK, Carbona ja Condens
– VTT:n volyymi v. 2006 noin 330 k€
– kaasutukseeen perustuvat moottorivoimalat, polttokennovoimalat ja kombivoimalat
– kaasun puhdistus em. käyttökohteisiin (katalyytit ja suodatus)
– koetoimintaa: Otaniemen prosessikoesali, Kokemäki, UCG-PDU
– kaasutus CHP:n systeemitarkastelut

CATDEMO- Katalyyttisen kaasunpuhdituksen tuotteistaminen ja
demonstrointi
–
–
–
–
Esa.Kurkela@vtt.fi
Volyymi v. 2006 noin 300-400 k€
Kokemäen demonstraatioprojekti ja tutkimusasema
Skiven demonstraatiohanke
Katalyyttivalmistuksen tuotteistaminen ja IPR:n vahvistaminen
24.1.2006
MTU FCS, Saksa
4
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
Requirements for real success stories in
medium-to-large-scale gasification
•
Fuel flexibility with respect to particle size,
ash composition and moisture content
• Elimination of tars without waste water problems
• Effective final gas cleaning to protect gas engines,
turbines or other downstream equipment
• Automatic operation, good reliability and
low service costs
• High power production efficiency of 30 – 50 %
in order to be competitive with boilers and steam cycles
5
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
UPDRAFT GASIFIER
“BIONEER”
-
developed in 1980’s, 10 plants
for boilers and kilns, 5 MW scale
tar containing gas
high carbon conversion
robust, flexible, fully automated
Hot gas District heating Fuel silo
Electricity
Ash
5 MW district heating plant, Jalasjärvi, Finland,
in operation since 1987; 145 000 operating hours
Gas boiler
6
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
Novel – an improved updraft gasifier
PRODUCT GAS
FORCED FUEL FEEDING
-high temperature & low tars
- use of low density fuels
possible
-700-850 oC, 1-4 g/m3n tars
TWO-STAGE OPERATION
- counter-current bottom bed
- tars decomposed above the
bed by additional air feeding
OXIDISING ZONE
- complete carbon conversion
humidifier
and fully oxidised bottom ash
gasification air
cooling
7
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
Novel power plant: 1.8 MWe + 3.3 MW heat
-
Kokemäki, Finland
plant under comissioning
total investment 4.8 M€
electric efficiency 30 %
Tar
reformer
Optimal plant:
-
biomass moisture 50 %
drying to 15 % by waste heat
power efficiency up to 35 %
suitable to 0.5 - 5 MWe
power production cost < 5 c/kWh
Scrubber
Novel
gasifier
Gas cooler
and Filter
3 Gas engines
8
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
Time table of the Kokemäki Novel CHP plant
ƒ Construction work: completed in April 2005
ƒ Commissioning and Testing periods
ƒ Gasifier and the gas boiler: April - May
ƒ Gas cleaning and heat recovery: May – August
ƒ Start-up with one JMS 316 engine (520 kW): November
ƒ Operation with one gas engine and gas boiler: 2006
ƒ performance and emission measurements
ƒ tests with different fuels & plant optimisation
ƒ 2nd and 3rd gas engines: 1.8 MWe: end 2006
ƒ Further R&D activities
ƒ EC BiGPower: slip stream testing of 2nd generation catalytic
gas clean-up and scrubbing water recycling (Oct. 2005 … Sept
2008)
ƒ Testing with waste-derived fuels and agrobiofuels within other
projects
SKIVE PROJECT, DENMARK
(by Carbona Oy, Salo, Patel & Horvath)
PRODUCT GAS FILTER
TO STACK
GAS COOLER
TAR CRACKER
BOILER
BIOMASS
FLY ASH
PRODUCT GAS COOLING
(Heat Recovery)
DISTRICT
HEATING
11.5 MWth
FLUE GAS
HEAT RECOVERY
PRODUCT GAS
BUFFER TANK
GASIFIER
PRODUCT GAS SCRUBBING
(Heat Recovery)
AIR
STEAM
POWER
5.4 MWe
ASH
WATER TREATMENT
GAS ENGINES
Biomass-CHP-Plant-Güssing
CHP-Plant Güssing
Start up in November 2001
•
•
•
•
•
•
Fuel
Fuel Power
Electrical Power
Thermal Power
Electrical Efficiency
Total Efficiency
Wood chips
8
MW
2
MW
4,5
MW
25
%
80
%
•
•
Investment
Optimisation
9
1
Mill. EURO
Mill. EURO
12
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
Large-scale Power with Integrated Gasification
Combined-Cycle - IGCC
¾ Fluidised-Bed Gasification at 20 bar, 800-950 oC
¾ Gas filtration at 400 - 600 oC
¾ Combined Gas Turbine and Steam Turbine Process
• Developed and demonstrated in 1990’s
•
•
•
•
•
Electric efficiency 40 - 50 %
Requires large-scale > 15 MWe
Best global potential for CO2 reduction
New R&D activities 2005 ->
New demonstration projects will come
– when and by which companies?
Esa.Kurkela@vtt.fi
17.1.2006
Biomass IGCC
Demonstration Plant,
Värnamo, Sweden
Biomass – IGCC power plant design
(by Carbona Oy; K.Salo & A.Horvath)
Small CHP plant
• Power production: 7.4 MWe
• District heat: 8.5 MJ/s
• Electric efficiency: 40 %
Large IGCC power plant
• Power production: 116 MWe
• Electric efficiency: 50 %
14
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
500 kW PRESSURIZED FLUIDIZED BED GASIFIER (UCG-PDU)
PFB GASIFIER
To slip stream
testing facilities
Bed
material
Additive
CATR
Gas
cooler
Pressure
control valve
Fuel feeding
equipment
Heating
elements
FILTER
Oxygen
Ash
removal
Steam
Air
Nitrogen
Bed
removal
Heating
elements
Furnace
15
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
2nd generation BIGCC Plants
- efficiency 45-50 %
- size range 15-100 MWe
gas
gas turbine
turbine development
development
activities
activities
BIG-MCFC Plants
- efficiency 40-50 %
- size range 0.5-5 MWe
MCFC
MCFC HotModule
HotModule development
development for
for
natural
natural gas
gas applications
applications
2nd generation engine plants
- power efficiency 35-40 %
- size range 1 - 15 MWe
Pressurised
Pressurised
gasification
gasification
pilot/demo
pilot/demo
Värnamo
Värnamo
&
& Tampere
Tampere
Gas
Gas engine
engine
demonstrations
demonstrations
Bioneer
Bioneer
gasifier
gasifier
(heating
(heating appl.)
appl.)
1985
1995
Kokemäki,
Kokemäki, Skive
Skive
Gussing
Gussing
2005
Gas
Gas cleaning
cleaning R&D
R&D
Novel
Novel gasifier
gasifier
Press.
Press. FB
FB gasifier
gasifier
Bioneer
Bioneer R&D
R&D in
in Finland
Finland
gasifier
gasifier
R&D
R&D
Dual
Dual Fluid
Fluid
Bed
Bed Gasifier
Gasifier
R&D
R&D in
in Austria
Austria
Esa.Kurkela@vtt.fi
17.1.2006
MCFC
MCFC
pilot/demonstration
pilot/demonstration
Agrofuels
Agrofuels &
&
waste
demonstration
waste demonstration
2nd
2nd generation
generation
engine
engine plant
plant demos
demos
EU-BiGPower 2010
-- Advanced
Advanced catalytic
catalytic
gas
cleaning
gas cleaning
-- New
New Filters
Filters
-- 2nd
2nd generation
generation
gasifiers
gasifiers
-- Improved
Improved gas
gas
engines
engines
-- MCFC
MCFC concepts
concepts
2015
New
New R&D
R&D
activities
activities
2020
2025
16
VTT TECHNICAL RESEARCH CENTRE OF FINLAND
Advanced Biomass Gasification for high-Efficiency Power
BiGPower – project no. 019761
Targets for the gasification power plants
Technology
Present status
Target 2010 - 2015
Target 2015 - 2020
Elect.Eff.
Specif.Invest. Elect.Eff.
Specif.Invest. Elect.Eff.
Specif.Invest.
%
€/kWe
%
€/kWe
%
€/kWe
Gasifier-engine
(1-15 MWe)
20-30
3500-6000
30-35
2500-4000
35-40
2000-3000
Gasifier-MCFC
(0.5-5 MWe)
na
(> 10 000)
35-40
< 10 000
45-50
2500-3000
Biomass IGCC
(15-100 MWe)
Combustion and
steam turbine
35-40
3000-4500
40-45
2000-3500
45-50
1500-2000
Elect.Eff.
%
Specif.Invest.
€/kWe
1-5 MWe
10-50 MWe
na = not available yet
Esa.Kurkela@vtt.fi
17.1.2006
17 - 25
3000-4000
only very limited development potential
25 - 37
2000-3500
(mature technology, thermodynamic limitations)