NISC Optimization and Review Summary of Annual Costs - All National Support Caches Note: This summary excludes Alaska (AKK) because it is assumed to maintain the same level of support in the future and therefore will remain unchanged as a result of this study. FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs $6,691,140 $214,769 $13,364,106 $55,838 $9,000 $46,838 $0 $2,212,556 $1,154,358 $157,854 $900,344 $0 $8,955,803 $60,949 $257,348 $2,570,483 $125,182 $931,114 $5,010,728 N/A $2,139,910 $1,474,874 $107,688 $557,348 $765,392 $0 $7,277,473 $218,864 $14,197,115 $50,942 $0 $50,942 $593,659 $2,173,689 $1,097,484 $157,854 $918,351 $0 $9,187,757 $62,772 $384,605 $2,550,138 $129,563 $949,736 $5,110,942 N/A $2,191,068 $1,504,371 $109,842 $576,855 $830,711 $0 $7,488,520 $223,041 $14,259,813 $86,885 $34,465 $52,420 $235,638 $2,297,553 $1,203,436 $157,399 $936,718 $0 $9,399,656 $64,593 $395,759 $2,624,092 $133,320 $968,731 $5,213,161 N/A $2,240,081 $1,534,458 $112,039 $593,584 $854,802 $0 $7,728,152 $227,302 $14,700,411 $91,586 $37,489 $54,097 $374,270 $2,316,287 $1,203,436 $157,399 $955,453 $0 $9,626,262 $66,660 $408,423 $2,708,063 $137,586 $988,105 $5,317,424 N/A $2,292,006 $1,565,148 $114,279 $612,579 $882,155 $0 $7,990,910 $231,648 $15,330,829 $285,843 $229,907 $55,936 $497,890 $2,335,396 $1,203,436 $157,399 $974,562 $0 $9,865,278 $68,926 $422,309 $2,800,138 $142,264 $1,007,867 $5,423,773 N/A $2,346,422 $1,596,451 $116,565 $633,406 $912,148 $0 Line 6 Total Cost of Cache Performance $21,035,406 $22,524,163 $22,826,175 $23,538,021 $24,465,535 3b 3c 3d 3e 3f 3g Cost Summary - All Caches Page 1 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Rocky Mountain Cache (RMK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs Line 6 Total Cost of Cache Performance 3b 3c 3d 3e 3f 3g Cost Summary - All Caches $280,575 $0 $925,077 $1,964 $0 $1,964 $0 $326,475 $301,391 $4,994 $20,090 $0 $194,535 $0 $0 $0 $0 $65,160 $129,375 N/A $402,103 $90,939 $6,000 $305,164 $33,669 $0 $380,121 $0 $885,812 $2,661 $0 $2,661 $270,003 $244,517 $4,994 $20,492 $0 $198,425 $0 $0 $0 $0 $66,463 $131,962 N/A $414,723 $92,758 $6,120 $315,845 $45,615 $0 $391,145 $0 $900,950 $2,738 $0 $2,738 $269,958 $244,517 $4,539 $20,902 $0 $202,394 $0 $0 $0 $0 $67,792 $134,602 N/A $425,860 $94,613 $6,242 $325,004 $46,937 $0 $403,661 $0 $917,920 $2,826 $0 $2,826 $270,376 $244,517 $4,539 $21,320 $0 $206,442 $0 $0 $0 $0 $69,148 $137,294 N/A $438,277 $96,505 $6,367 $335,404 $48,439 $0 $417,386 $0 $936,033 $2,922 $0 $2,922 $270,803 $244,517 $4,539 $21,746 $0 $210,571 $0 $0 $0 $0 $70,531 $140,039 N/A $451,738 $98,435 $6,495 $346,808 $50,086 $0 $1,239,321 $1,311,548 $1,339,032 $1,370,021 $1,403,505 Page 2 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Silver City Fire Cache (SFK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs $289,802 $10,000 $315,785 $2,029 $0 $2,029 $0 $2,000 $1,000 $1,000 $0 $0 $179,757 $0 $0 $15,890 $0 $2,367 $161,499 N/A $132,000 $45,000 $2,000 $85,000 $34,776 $0 $452,135 $10,200 $403,124 $3,165 $0 $3,165 $78,454 $2,000 $1,000 $1,000 $0 $0 $183,590 $0 $0 $16,447 $0 $2,414 $164,729 N/A $135,915 $45,900 $2,040 $87,975 $54,256 $0 $465,247 $10,404 $377,276 $3,257 $0 $3,257 $45,184 $2,000 $1,000 $1,000 $0 $0 $187,410 $0 $0 $16,924 $0 $2,463 $168,024 N/A $139,425 $46,818 $2,081 $90,526 $55,830 $0 $480,135 $10,612 $368,021 $6,385 $3,024 $3,361 $24,975 $2,000 $1,000 $1,000 $0 $0 $191,361 $0 $0 $17,465 $0 $2,512 $171,384 N/A $143,300 $47,754 $2,122 $93,423 $57,616 $0 $496,460 $10,824 $351,406 $6,499 $3,024 $3,475 $0 $2,000 $1,000 $1,000 $0 $0 $195,433 $0 $0 $18,059 $0 $2,562 $174,812 N/A $147,474 $48,709 $2,165 $96,600 $59,575 $0 Line 6 Total Cost of Cache Performance $650,363 $919,715 $908,757 $916,384 $918,265 3b 3c 3d 3e 3f 3g Cost Summary - All Caches Page 3 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Northeast Interagency Fire Cache (NEK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs $218,551 $11,250 $381,115 $1,530 $0 $1,530 $0 $7,568 N/A $7,568 $0 $0 $342,268 $0 $57,307 $37,786 $0 $7,560 $239,614 N/A $29,750 $7,500 $2,250 $20,000 $26,226 $0 $225,034 $11,475 $414,951 $1,575 $0 $1,575 $24,624 $7,568 N/A $7,568 $0 $0 $350,540 $0 $59,313 $39,109 $0 $7,711 $244,407 N/A $30,645 $7,650 $2,295 $20,700 $27,004 $0 $231,560 $11,705 $399,214 $1,766 $145 $1,621 $0 $7,568 N/A $7,568 $0 $0 $358,436 $0 $61,033 $40,243 $0 $7,865 $249,295 N/A $31,444 $7,803 $2,341 $21,300 $27,787 $0 $238,970 $11,939 $408,534 $1,818 $145 $1,673 $0 $7,568 N/A $7,568 $0 $0 $366,820 $0 $62,986 $41,531 $0 $8,022 $254,281 N/A $32,329 $7,959 $2,388 $21,982 $28,676 $0 $247,095 $12,177 $437,722 $1,875 $145 $1,730 $19,377 $7,568 N/A $7,568 $0 $0 $375,620 $0 $65,127 $42,943 $0 $8,183 $259,366 N/A $33,283 $8,118 $2,435 $22,729 $29,651 $0 Line 6 Total Cost of Cache Performance $637,142 $678,464 $670,265 $688,119 $726,646 3b 3c 3d 3e 3f 3g Cost Summary - All Caches Page 4 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Northwest Area Incident Support Cache (NWK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs $1,075,690 $75,432 $1,199,969 $7,530 $0 $7,530 $0 $33,601 $0 $7,200 $26,401 $0 $1,089,714 $0 $0 $328,034 $0 $341,136 $420,543 N/A $69,125 $45,800 $18,300 $5,025 $129,083 $0 $1,099,176 $76,941 $1,228,834 $7,694 $0 $7,694 $0 $34,129 $0 $7,200 $26,929 $0 $1,116,428 $0 $0 $339,515 $0 $347,959 $428,954 N/A $70,583 $46,716 $18,666 $5,201 $131,901 $0 $1,131,052 $78,479 $1,288,503 $39,981 $32,064 $7,917 $0 $34,667 $0 $7,200 $27,467 $0 $1,141,813 $0 $0 $349,361 $0 $354,918 $437,533 N/A $72,041 $47,650 $19,039 $5,352 $135,726 $0 $1,167,246 $80,049 $1,389,120 $40,235 $32,064 $8,171 $71,280 $35,217 $0 $7,200 $28,017 $0 $1,168,841 $0 $0 $360,541 $0 $362,016 $446,284 N/A $73,546 $48,603 $19,420 $5,523 $140,070 $0 $1,206,932 $81,650 $1,348,650 $40,513 $32,064 $8,449 $0 $35,777 $0 $7,200 $28,577 $0 $1,197,266 $0 $0 $372,799 $0 $369,257 $455,210 N/A $75,095 $49,575 $19,809 $5,711 $144,832 $0 Line 6 Total Cost of Cache Performance $2,480,175 $2,536,852 $2,633,761 $2,776,484 $2,782,064 3b 3c 3d 3e 3f 3g Cost Summary - All Caches Page 5 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - LaGrande Fire Cache (LFK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs $205,800 $800 $649,228 $1,441 $0 $1,441 $0 $135,000 $135,000 N/A $0 $0 $280,446 $0 $0 $79,555 $0 $0 $200,891 N/A $232,341 $229,341 $3,000 $0 $24,696 $0 $210,778 $816 $726,462 $1,475 $0 $1,475 $65,750 $135,000 $135,000 N/A $0 $0 $287,248 $0 $0 $82,339 $0 $0 $204,909 N/A $236,988 $233,928 $3,060 $0 $25,293 $0 $216,890 $832 $695,847 $1,518 $0 $1,518 $23,867 $135,000 $135,000 N/A $0 $0 $293,734 $0 $0 $84,727 $0 $0 $209,007 N/A $241,728 $238,606 $3,121 $0 $26,027 $0 $223,831 $849 $683,755 $1,567 $0 $1,567 $0 $135,000 $135,000 N/A $0 $0 $300,626 $0 $0 $87,438 $0 $0 $213,187 N/A $246,562 $243,379 $3,184 $0 $26,860 $0 $231,441 $866 $712,806 $1,620 $0 $1,620 $16,830 $135,000 $135,000 N/A $0 $0 $307,862 $0 $0 $90,411 $0 $0 $217,451 N/A $251,493 $248,246 $3,247 $0 $27,773 $0 Line 6 Total Cost of Cache Performance $880,523 $963,349 $939,596 $935,294 $972,886 3b 3c 3d 3e 3f 3g Cost Summary - All Caches Page 6 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Wenatchee Fire Cache (WFC) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs $330,751 $3,600 $510,656 $2,315 $0 $2,315 $0 $24,700 $19,000 N/A $5,700 $0 $252,641 $0 $0 $5,139 $0 $0 $247,502 N/A $231,000 $197,000 $9,000 $25,000 $39,690 $0 $338,676 $3,672 $550,651 $2,371 $0 $2,371 $29,700 $24,814 $19,000 N/A $5,814 $0 $257,771 $0 $0 $5,319 $0 $0 $252,452 N/A $235,995 $200,940 $9,180 $25,875 $40,641 $0 $348,498 $3,745 $639,500 $4,695 $2,256 $2,439 $0 $130,882 $124,952 N/A $5,930 $0 $262,974 $0 $0 $5,473 $0 $0 $257,501 N/A $240,948 $204,959 $9,364 $26,625 $41,820 $0 $359,650 $3,820 $669,806 $4,774 $2,256 $2,518 $19,646 $131,001 $124,952 N/A $6,049 $0 $268,299 $0 $0 $5,648 $0 $0 $262,651 N/A $246,086 $209,058 $9,551 $27,477 $43,158 $0 $371,878 $3,897 $661,118 $4,859 $2,256 $2,603 $0 $131,122 $124,952 N/A $6,170 $0 $273,744 $0 $0 $5,841 $0 $0 $267,904 N/A $251,393 $213,239 $9,742 $28,412 $44,625 $0 Line 6 Total Cost of Cache Performance $884,697 $933,640 $1,033,563 $1,076,434 $1,081,518 3b 3c 3d 3e 3f 3g Cost Summary - All Caches Page 7 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Southwest Area Prescott Incident Support Cache (PFK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs $446,744 $501 $494,470 $3,127 $0 $3,127 $0 $0 N/A N/A $0 $0 $294,279 $0 $0 $62,385 $0 $84,841 $147,054 N/A $197,064 $134,050 $28,014 $35,000 $53,609 $0 $457,294 $511 $505,832 $3,201 $0 $3,201 $0 $0 N/A N/A $0 $0 $301,100 $0 $0 $64,568 $0 $86,538 $149,995 N/A $201,530 $136,731 $28,574 $36,225 $54,875 $0 $470,555 $521 $516,884 $3,294 $0 $3,294 $0 $0 N/A N/A $0 $0 $307,703 $0 $0 $66,441 $0 $88,268 $152,995 N/A $205,887 $139,466 $29,146 $37,276 $56,467 $0 $485,613 $532 $528,506 $3,399 $0 $3,399 $0 $0 N/A N/A $0 $0 $314,655 $0 $0 $68,567 $0 $90,034 $156,054 N/A $210,452 $142,255 $29,729 $38,468 $58,274 $0 $502,124 $542 $540,622 $3,515 $0 $3,515 $0 $0 N/A N/A $0 $0 $321,908 $0 $0 $70,898 $0 $91,834 $159,176 N/A $215,200 $145,100 $30,323 $39,776 $60,255 $0 Line 6 Total Cost of Cache Performance $995,325 $1,018,512 $1,044,427 $1,072,924 $1,103,543 3b 3c 3d 3e 3f 3g Cost Summary - All Caches Page 8 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Southern Area Incident Support Cache (SAK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs Line 6 Total Cost of Cache Performance 3b 3c 3d 3e 3f 3g Cost Summary - All Caches $284,559 $30,449 $657,522 $1,992 $0 $1,992 $0 $111,092 $93,000 $18,092 $0 $0 $464,124 $0 $0 $44,939 $0 $5,616 $413,569 N/A $80,314 $47,475 $8,000 $24,839 $34,147 $0 $292,454 $31,058 $669,512 $2,047 $0 $2,047 $0 $111,092 $93,000 $18,092 $0 $0 $474,080 $0 $0 $46,512 $0 $5,728 $421,840 N/A $82,293 $48,425 $8,160 $25,708 $35,094 $0 $300,935 $31,679 $681,349 $2,107 $0 $2,107 $0 $111,092 $93,000 $18,092 $0 $0 $483,981 $0 $0 $47,861 $0 $5,843 $430,277 N/A $84,170 $49,393 $8,323 $26,454 $36,112 $0 $310,565 $32,313 $721,435 $2,174 $0 $2,174 $27,763 $111,092 $93,000 $18,092 $0 $0 $494,235 $0 $0 $49,392 $0 $5,960 $438,883 N/A $86,171 $50,381 $8,490 $27,300 $37,268 $0 $321,124 $32,959 $731,435 $2,248 $0 $2,248 $25,008 $111,092 $93,000 $18,092 $0 $0 $504,811 $0 $0 $51,072 $0 $6,079 $447,660 N/A $88,277 $51,388 $8,659 $28,229 $38,535 $0 $1,006,677 $1,028,118 $1,050,075 $1,101,580 $1,124,053 Page 9 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Northern Rockies Cache (NRK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs $981,694 $17,737 $1,393,337 $6,872 $0 $6,872 $0 $39,000 $0 $39,000 $0 $0 $1,049,721 $60,949 $1,748 $33,595 $125,182 $109,378 $718,869 N/A $297,745 $229,425 $11,000 $57,320 $117,803 $0 $1,141,945 $18,091 $1,554,411 $7,994 $0 $7,994 $129,131 $39,000 $0 $39,000 $0 $0 $1,073,727 $62,772 $1,809 $34,771 $129,563 $111,566 $733,246 N/A $304,560 $234,014 $11,220 $59,326 $137,033 $0 $1,175,062 $18,453 $1,496,057 $8,225 $0 $8,225 $40,385 $39,000 $0 $39,000 $0 $0 $1,097,262 $64,593 $1,862 $35,779 $133,320 $113,797 $747,911 N/A $311,185 $238,694 $11,444 $61,047 $141,007 $0 $1,212,664 $18,822 $1,565,954 $8,489 $0 $8,489 $78,290 $39,000 $0 $39,000 $0 $0 $1,122,034 $66,660 $1,921 $36,924 $137,586 $116,073 $762,869 N/A $318,141 $243,468 $11,673 $63,000 $145,520 $0 $1,253,894 $19,199 $1,877,689 $201,195 $192,418 $8,777 $164,230 $39,000 $0 $39,000 $0 $0 $1,147,878 $68,926 $1,987 $38,180 $142,264 $118,394 $778,127 N/A $325,386 $248,337 $11,907 $65,142 $150,467 $0 Line 6 Total Cost of Cache Performance $2,510,572 $2,851,481 $2,830,579 $2,942,960 $3,301,249 3b 3c 3d 3e 3f 3g Cost Summary - All Caches Page 10 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Great Basin Cache (GBK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs $933,203 $10,000 $3,809,724 $6,532 $0 $6,532 $0 $920,310 N/A $80,000 $840,310 $0 $2,683,135 $0 $0 $1,397,188 $0 $198,600 $1,087,347 N/A $199,746 $198,524 $1,222 $0 $111,984 $0 $954,021 $10,000 $3,925,091 $6,678 $0 $6,678 $19,800 $937,116 N/A $80,000 $857,116 $0 $2,757,756 $0 $0 $1,446,089 $0 $202,572 $1,109,094 N/A $203,741 $202,494 $1,246 $0 $114,483 $0 $981,688 $10,000 $4,053,351 $6,872 $0 $6,872 $58,479 $954,259 N/A $80,000 $874,259 $0 $2,825,926 $0 $0 $1,488,026 $0 $206,623 $1,131,276 N/A $207,816 $206,544 $1,271 $0 $117,803 $0 $1,013,102 $10,000 $4,170,255 $7,092 $0 $7,092 $79,147 $971,744 N/A $80,000 $891,744 $0 $2,900,300 $0 $0 $1,535,643 $0 $210,756 $1,153,902 N/A $211,972 $210,675 $1,297 $0 $121,572 $0 $1,047,547 $10,000 $4,256,033 $7,333 $0 $7,333 $63,105 $989,579 N/A $80,000 $909,579 $0 $2,979,805 $0 $0 $1,587,855 $0 $214,971 $1,176,980 N/A $216,211 $214,889 $1,323 $0 $125,706 $0 Line 6 Total Cost of Cache Performance $4,864,911 $5,003,595 $5,162,841 $5,314,929 $5,439,286 3b 3c 3d 3e 3f 3g Cost Summary - All Caches Page 11 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Billings Interagency Fire Cache (BFK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs Line 6 Total Cost of Cache Performance 3b 3c 3d 3e 3f 3g Cost Summary - All Caches $265,111 $3,000 $720,011 $1,856 $0 $1,856 $0 $56,767 $54,967 N/A $1,800 $0 $473,641 $0 $0 $37,381 $0 $74,075 $362,185 N/A $187,747 $180,845 $6,902 $0 $31,813 $0 $305,687 $3,060 $782,577 $2,140 $0 $2,140 $48,458 $56,803 $54,967 N/A $1,836 $0 $483,675 $0 $0 $38,690 $0 $75,557 $369,428 N/A $191,502 $184,462 $7,040 $0 $36,682 $0 $314,551 $3,121 $770,563 $2,202 $0 $2,202 $22,493 $56,840 $54,967 N/A $1,873 $0 $493,696 $0 $0 $39,812 $0 $77,068 $376,817 N/A $195,332 $188,151 $7,181 $0 $37,746 $0 $324,617 $3,184 $867,395 $2,272 $0 $2,272 $104,959 $56,877 $54,967 N/A $1,910 $0 $504,048 $0 $0 $41,086 $0 $78,609 $384,353 N/A $199,239 $191,914 $7,324 $0 $38,954 $0 $335,654 $3,247 $798,033 $2,350 $0 $2,350 $20,840 $56,915 $54,967 N/A $1,948 $0 $514,704 $0 $0 $42,483 $0 $80,181 $392,040 N/A $203,223 $195,752 $7,471 $0 $40,278 $0 $1,019,935 $1,128,006 $1,125,982 $1,234,150 $1,177,212 Page 12 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Ontario Interagency Support Cache (LSK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs Line 6 Total Cost of Cache Performance 3b 3c 3d 3e 3f 3g Cost Summary - All Caches $734,789 $10,000 $876,687 $5,144 $0 $5,144 $0 $550,000 $550,000 N/A $0 $0 $307,544 $0 $0 $131,343 $0 $32,050 $144,151 N/A $14,000 $6,000 $8,000 $0 $88,175 $0 $760,789 $10,200 $1,101,470 $5,326 $0 $5,326 $216,200 $550,000 $550,000 N/A $0 $0 $315,665 $0 $0 $135,939 $0 $32,691 $147,034 N/A $14,280 $6,120 $8,160 $0 $91,295 $0 $782,852 $10,404 $934,849 $5,480 $0 $5,480 $41,602 $550,000 $550,000 N/A $0 $0 $323,201 $0 $0 $139,882 $0 $33,345 $149,975 N/A $14,566 $6,242 $8,323 $0 $93,942 $0 $807,903 $10,612 $901,856 $5,655 $0 $5,655 $0 $550,000 $550,000 N/A $0 $0 $331,344 $0 $0 $144,358 $0 $34,012 $152,974 N/A $14,857 $6,367 $8,490 $0 $96,948 $0 $835,372 $10,824 $954,966 $5,848 $0 $5,848 $43,972 $550,000 $550,000 N/A $0 $0 $339,992 $0 $0 $149,266 $0 $34,692 $156,034 N/A $15,154 $6,495 $8,659 $0 $100,245 $0 $1,709,650 $1,963,754 $1,822,047 $1,817,320 $1,901,407 Page 13 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Northern California Interagency Support Cache (NCK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs Line 6 Total Cost of Cache Performance 3b 3c 3d 3e 3f 3g Cost Summary - All Caches $596,109 $42,000 $669,844 $4,173 $0 $4,173 $0 $0 N/A N/A $0 $0 $640,072 $0 $0 $290,666 $0 $7,136 $342,270 N/A $25,600 $21,600 $4,000 $0 $71,533 $0 $610,167 $42,840 $717,616 $4,271 $0 $4,271 $30,000 $0 N/A N/A $0 $0 $657,233 $0 $0 $300,839 $0 $7,278 $349,115 N/A $26,112 $22,032 $4,080 $0 $73,220 $0 $627,862 $43,697 $730,235 $4,395 $0 $4,395 $26,121 $0 N/A N/A $0 $0 $673,085 $0 $0 $309,564 $0 $7,424 $356,098 N/A $26,634 $22,473 $4,162 $0 $75,343 $0 $647,954 $44,571 $795,132 $4,536 $0 $4,536 $73,168 $0 N/A N/A $0 $0 $690,262 $0 $0 $319,470 $0 $7,572 $363,220 N/A $27,167 $22,922 $4,245 $0 $77,754 $0 $669,984 $45,462 $906,307 $4,690 $0 $4,690 $165,368 $0 N/A N/A $0 $0 $708,539 $0 $0 $330,332 $0 $7,724 $370,484 N/A $27,710 $23,381 $4,330 $0 $80,398 $0 $1,379,486 $1,443,844 $1,477,138 $1,565,411 $1,702,152 Page 14 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Alaska Fire Service (AKK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs Line 6 Total Cost of Cache Performance 3b 3c 3d 3e 3f 3g Cost Summary - All Caches $1,413,919 $0 $418,887 $9,897 $0 $9,897 $0 $10,800 N/A N/A $10,800 $0 $318,190 $0 $0 $137,730 $137,730 $42,731 Not Reported N/A $80,000 $55,000 $25,000 $0 $169,670 $0 $1,441,773 $0 $426,573 $10,092 $0 $10,092 $0 $11,016 N/A N/A $11,016 $0 $323,865 $0 $0 $137,730 $142,550 $43,585 Not Reported N/A $81,600 $56,100 $25,500 $0 $173,013 $0 $1,483,584 $0 $481,578 $10,385 $0 $10,385 $43,860 $11,236 N/A N/A $11,236 $0 $332,865 $0 $0 $141,724 $146,684 $44,457 Not Reported N/A $83,232 $57,222 $26,010 $0 $178,030 $0 $1,531,059 $0 $450,058 $10,717 $0 $10,717 $0 $11,461 N/A N/A $11,461 $0 $342,983 $0 $0 $146,259 $151,378 $45,346 Not Reported N/A $84,897 $58,366 $26,530 $0 $183,727 $0 $1,583,115 $0 $463,376 $11,082 $0 $11,082 $0 $11,690 N/A N/A $11,690 $0 $354,010 $0 $0 $151,232 $156,525 $46,253 Not Reported N/A $86,595 $59,534 $27,061 $0 $189,974 $0 $2,002,476 $2,041,359 $2,143,193 $2,164,844 $2,236,465 Page 15 of 52 3/3/2009 NISC Optimization and Review Summary of Annual Costs - Coeur D'Alene (CDK) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 10/1/2006 - 9/30/2007 10/1/2007 - 9/30/2008 10/1/2008 - 9/30/2009 10/1/2009 - 9/30/2010 10/1/2010 - 9/30/2011 Line 1 Line 2 Line 3 3a Line 4 Line 5 Personnel Costs Material and Supply Costs Other Specifically Attributable Costs Capital Equipment and Facility Assets Major Maintenance and Renovation Costs Personnel Liability Insurance Costs Equipment/Vehicle Replacement Rental and Lease Costs Main Facility Lease Supplemental Facility Lease Equipment Lease Travel Costs Subcontracts Federal Militia Employees State Employees AD Hires Subcontract Employees Refurbishment Contracts Transportation Costs Utilities (included with O&M) Other Attributable Costs O&M Costs Training Costs Cost Pools Overhead Costs Additional Costs $47,764 $0 $760,680 $9,334 $9,000 $334 $0 $6,043 N/A N/A $6,043 $0 $703,928 $0 $198,293 $106,581 $0 $3,196 $395,859 N/A $41,375 $41,375 $0 $0 $5,732 $0 $49,196 $0 $779,229 $344 $0 $344 $0 $6,164 N/A N/A $6,164 $0 $730,519 $0 $323,483 $0 $0 $3,259 $403,776 N/A $42,202 $42,202 $0 $0 $5,903 $0 $50,622 $0 $797,728 $354 $0 $354 $0 $6,287 N/A N/A $6,287 $0 $748,040 $0 $332,864 $0 $0 $3,325 $411,851 N/A $43,046 $43,046 $0 $0 $6,075 $0 $52,242 $0 $828,195 $366 $0 $366 $10,514 $6,413 N/A N/A $6,413 $0 $766,995 $0 $343,516 $0 $0 $3,391 $420,088 N/A $43,907 $43,907 $0 $0 $6,269 $0 $54,019 $0 $838,849 $378 $0 $378 $0 $6,541 N/A N/A $6,541 $0 $787,145 $0 $355,195 $0 $0 $3,459 $428,490 N/A $44,785 $44,785 $0 $0 $6,482 $0 Line 6 Total Cost of Cache Performance $814,175 $834,328 $854,425 $886,706 $899,350 3b 3c 3d 3e 3f 3g Cost Summary - All Caches Page 16 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $8,262,601 $236,081 $15,373,621 $287,745 $229,907 $57,838 $218,115 $2,354,888 $1,203,436 $157,399 $994,053 $0 $10,110,654 $71,270 $436,668 $2,895,342 $147,101 $1,028,025 $5,532,248 N/A $2,402,218 $1,628,380 $118,896 $654,942 $943,161 $0 $24,815,464 Cost Summary - All Caches Page 17 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $431,577 $0 $954,669 $3,021 $0 $3,021 $271,237 $244,517 $4,539 $22,181 $0 $214,782 $0 $0 $0 $0 $71,942 $142,840 N/A $465,628 $100,404 $6,624 $358,600 $51,789 $0 $1,438,035 Cost Summary - All Caches Page 18 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $513,339 $11,041 $359,987 $6,617 $3,024 $3,593 $0 $2,000 $1,000 $1,000 $0 $0 $199,594 $0 $0 $18,673 $0 $2,613 $178,308 N/A $151,776 $49,684 $2,208 $99,884 $61,601 $0 $945,968 Cost Summary - All Caches Page 19 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $255,496 $12,421 $444,517 $1,933 $145 $1,788 $16,104 $7,568 N/A $7,568 $0 $0 $384,645 $0 $67,342 $44,403 $0 $8,347 $264,554 N/A $34,267 $8,281 $2,484 $23,502 $30,660 $0 $743,094 Cost Summary - All Caches Page 20 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $1,247,968 $83,283 $1,382,996 $40,800 $32,064 $8,736 $2,741 $36,349 $0 $7,200 $29,149 $0 $1,226,430 $0 $0 $385,474 $0 $376,642 $464,314 N/A $76,676 $50,567 $20,205 $5,905 $149,756 $0 $2,864,003 Cost Summary - All Caches Page 21 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $239,310 $883 $708,484 $1,675 $0 $1,675 $0 $135,000 $135,000 N/A $0 $0 $315,285 $0 $0 $93,485 $0 $0 $221,800 N/A $256,523 $253,211 $3,312 $0 $28,717 $0 $977,394 Cost Summary - All Caches Page 22 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $384,522 $3,975 $729,295 $4,948 $2,256 $2,692 $56,983 $131,245 $124,952 N/A $6,293 $0 $279,301 $0 $0 $6,039 $0 $0 $273,262 N/A $256,818 $217,504 $9,937 $29,378 $46,143 $0 $1,163,935 Cost Summary - All Caches Page 23 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $519,196 $553 $571,752 $3,634 $0 $3,634 $18,719 $0 N/A N/A $0 $0 $329,339 $0 $0 $73,308 $0 $93,671 $162,359 N/A $220,060 $148,002 $30,930 $41,129 $62,304 $0 $1,153,805 Cost Summary - All Caches Page 24 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $332,042 $33,618 $745,029 $2,324 $0 $2,324 $25,554 $111,092 $93,000 $18,092 $0 $0 $515,622 $0 $0 $52,808 $0 $6,200 $456,613 N/A $90,437 $52,416 $8,833 $29,188 $39,845 $0 $1,150,534 Cost Summary - All Caches Page 25 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $1,296,526 $19,583 $1,782,664 $201,494 $192,418 $9,076 $35,010 $39,000 $0 $39,000 $0 $0 $1,174,354 $71,270 $2,054 $39,478 $147,101 $120,762 $793,689 N/A $332,806 $253,304 $12,145 $67,357 $155,583 $0 $3,254,356 Cost Summary - All Caches Page 26 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $1,083,164 $10,000 $4,338,922 $7,582 $0 $7,582 $41,402 $1,007,770 N/A $80,000 $927,770 $0 $3,061,631 $0 $0 $1,641,842 $0 $219,270 $1,200,519 N/A $220,536 $219,187 $1,349 $0 $129,980 $0 $5,562,065 Cost Summary - All Caches Page 27 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $347,066 $3,312 $792,265 $2,429 $0 $2,429 $0 $56,954 $54,967 N/A $1,987 $0 $525,593 $0 $0 $43,927 $0 $81,785 $399,881 N/A $207,288 $199,667 $7,620 $0 $41,648 $0 $1,184,291 Cost Summary - All Caches Page 28 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $863,775 $11,041 $920,385 $6,046 $0 $6,046 $0 $550,000 $550,000 N/A $0 $0 $348,881 $0 $0 $154,341 $0 $35,386 $159,154 N/A $15,457 $6,624 $8,833 $0 $103,653 $0 $1,898,853 Cost Summary - All Caches Page 29 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $692,764 $46,371 $782,051 $4,849 $0 $4,849 $21,603 $0 N/A N/A $0 $0 $727,335 $0 $0 $341,563 $0 $7,878 $377,894 N/A $28,264 $23,848 $4,416 $0 $83,132 $0 $1,604,318 Cost Summary - All Caches Page 30 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $1,636,941 $0 $477,108 $11,459 $0 $11,459 $0 $11,924 N/A N/A $11,924 $0 $365,398 $0 $0 $156,374 $161,847 $47,178 Not Reported N/A $88,326 $60,724 $27,602 $0 $196,433 $0 $2,310,481 Cost Summary - All Caches Page 31 of 52 3/3/2009 NISC Optimization and Review FY 2012 10/1/2011 - 9/30/2012 $55,855 $0 $860,604 $391 $0 $391 $0 $6,672 N/A N/A $6,672 $0 $807,860 $0 $367,272 $0 $0 $3,528 $437,060 N/A $45,681 $45,681 $0 $0 $6,703 $0 $923,162 Cost Summary - All Caches Page 32 of 52 3/3/2009 NISC Optimization and Review Includes Gov't Transportation Federal Government Personnel Summary - FY 2007 - Without Transportation Hours The following table is a summary of the total personnel costs for Federal Government positions at the cache locations. This table includes all positions reported by the cache as permanent, seasonal, and temporary government positions. *The cost of each position was calculated by using FY 2007 pay schedules for the corresponding locations and applying a standard 36.45% fringe factor for permanent and seasonal positions and a 7.65% fringe factor for temporary employees. *The full time equivalent (FTE) for each position was calculated using the reported number of annual hours worked. The calculated annual salary was then prorated according to the calculated FTE (i.e. if an employee is 1 FTE, the calculated salary will be the annual salary plus any fringe benefits. If an employee is less than 1 FTE, the calculated salary will be a percentage of the salary plus fringe benefits.) *Vacant positions are listed in the personnel details on the Government personnel tab of this file, but have no costs associated with the position. *Three caches reported hours for employees who were detailed from other caches. The costs associated with these positions has been included with the total Government personnel cost below. It was assumed that the home center only reported the hours in which these individuals actually worked at their center, and that the Cache where the individuals were detailed correctly reported the number of hours that they worked at that location. t Coeur D'Alene is a state-run cache that is partially funded by the local forest. The costs shown below are for the one federal position located at this cache and reflect the costs paid for federal work. The remainder of the costs for this position are assumed to be paid by the state of Idaho for state workload that is outside the scope of this study. Cache 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK Government FTE Reported 4.403 4.959 3.280 17.612 3.619 4.929 7.579 3.959 15.485 16.609 4.341 12.142 9.111 18.677 0.706 127.411 Line 1 - 2007 Gov't Personnel Total Personnel Cost $ 280,575 $ 289,802 $ 218,551 $ 1,075,690 $ 205,800 $ 330,751 $ 446,744 $ 284,559 $ 981,694 $ 933,203 $ 265,111 $ 734,789 $ 596,109 $ 1,413,919 $ 47,764 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,964 2,029 1,530 7,530 1,441 2,315 3,127 1,992 6,872 6,532 1,856 5,144 4,173 9,897 334 $ $ 56,735 8,105,058 Page 33 of 52 Liability Insurance (Line 3 Insurance Reports) Total Personnel Cost for Cache $ 282,539 $ 291,830 $ 220,080 $ 1,083,220 $ 207,240 $ 333,066 $ 449,871 $ 286,551 $ 988,566 $ 939,736 $ 266,966 $ 739,932 $ 600,282 $ 1,423,816 $ 48,098 $ 8,161,794 3/3/2009 NISC Optimization and Review Includes Gov't Transportation Federal Government Personnel Summary - Forecasted Outyears The following table is a summary of the forecasted personnel costs for Federal Government positions at the cache locations for the next five years. This table includes all positions reported by the cache as permanent, seasonal, and temporary government positions. Forecasted costs have been calculated based on the following: *The inflation rates used to forecast costs below were indentified in OMB Memoranda M-08-13 *Costs have been calculated assuming all vacancies in 2007 would be filled for FY 2008 and all staffing levels would remain constant for subsequent years. *All Overtime, Holiday Hours, and Sunday hours were assumed to remain the same as FY 2007 in all calculations. t Coeur D'Alene is a state-run cache that is partially funded by the local forest. The costs shown below are for the one federal position located at this cache and reflect the costs paid for federal work. The remainder of the costs for this position are assumed to be paid by the state of Idaho for state workload that is outside the scope of this study. The workload for this position is assumed to remain the same as FY 2007 for all calculations. Cache 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 280,575 289,802 218,551 1,075,690 205,800 330,751 446,744 284,559 981,694 933,203 265,111 734,789 596,109 1,413,919 47,764 Calculated FY 2008 Forecasted FY 2009 Government Government Personnel Cost Personnel Cost (filled FY 2007 (2.9% inflation rate) vacancies) $ 380,121 $ 391,145 $ 452,135 $ 465,247 $ 225,034 $ 231,560 $ 1,099,176 $ 1,131,052 $ 210,778 $ 216,890 $ 338,676 $ 348,498 $ 457,294 $ 470,555 $ 292,454 $ 300,935 $ 1,141,945 $ 1,175,062 $ 954,021 $ 981,688 $ 305,687 $ 314,551 $ 760,789 $ 782,852 $ 610,167 $ 627,862 $ 1,441,773 $ 1,483,584 $ 49,196 $ 50,622 $ 8,105,058 $ Calculated FY 2007 Government Personnel Cost Line 1 -Outyear Gov't Personnel 8,719,246 $ 8,972,104 Page 34 of 52 Forecasted FY 2010 Forecasted FY 2011 Forecasted FY 2012 Government Government Government Personnel Cost Personnel Cost Personnel Cost (3.2% inflation rate) (3.4% inflation rate) (3.4% inflation rate) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 403,661 480,135 238,970 1,167,246 223,831 359,650 485,613 310,565 1,212,664 1,013,102 324,617 807,903 647,954 1,531,059 52,242 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 417,386 496,460 247,095 1,206,932 231,441 371,878 502,124 321,124 1,253,894 1,047,547 335,654 835,372 669,984 1,583,115 54,019 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 431,577 513,339 255,496 1,247,968 239,310 384,522 519,196 332,042 1,296,526 1,083,164 347,066 863,775 692,764 1,636,941 55,855 $ 9,259,211 $ 9,574,025 $ 9,899,541 3/3/2009 NISC Optimization and Review Summary of Supply Costs Reported in Data Call Cache Reported Supply Costs Notes 1 2 3 4 5 6 7 8 RMK SFK NEK* NWK LFK WFC PFK SAK $0.00 $10,000.00 $22,500.00 $75,432.00 $800.00 $3,600.00 $501.00 $30,449.00 Included in O&M 9 NRK $17,736.60 10 GBK $10,000.00 11 12 13 14 15 BFK LSK NCK AKK CDK $3,000.00 $10,000.00 $42,000.00 $0.00 $0.00 $226,018.60 2009 Budget Figure Estimation from Paul reported in email on 9/22/08 Included in O&M Summary of Forecasted Supply Costs *Supply costs are assumed to remain constant for 5 years, but are inflated based on the published OMB inflation rates identified below. Line 2 - Supply Costs FY 2008 Forecasted Supply Costs Over 5 Years FY 2009 FY 2010 FY 2011 FY 2012 (2.0% Inflation) (2.0% Inflation) (2.0% Inflation) (2.0% Inflation) (2.0% Inflation) (Current) Cache 1 RMK $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 2 SFK $10,000.00 $10,200.00 $10,404.00 $10,612.08 $10,824.32 $11,040.81 3 NEK* $11,250.00 $11,475.00 $11,704.50 $11,938.59 $12,177.36 $12,420.91 4 NWK $75,432.00 $76,940.64 $78,479.45 $80,049.04 $81,650.02 $83,283.02 5 LFK $800.00 $816.00 $832.32 $848.97 $865.95 $883.26 6 WFC $3,600.00 $3,672.00 $3,745.44 $3,820.35 $3,896.76 $3,974.69 7 PFK $501.00 $511.02 $521.24 $531.67 $542.30 $553.14 8 SAK $30,449.00 $31,057.98 $31,679.14 $32,312.72 $32,958.98 $33,618.16 9 NRK $17,736.60 $18,091.33 $18,453.16 $18,822.22 $19,198.67 $19,582.64 10 GBK $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 11 BFK $3,000.00 $3,060.00 $3,121.20 $3,183.62 $3,247.30 $3,312.24 12 LSK $10,000.00 $10,200.00 $10,404.00 $10,612.08 $10,824.32 $11,040.81 13 NCK $42,000.00 $42,840.00 $43,696.80 $44,570.74 $45,462.15 $46,371.39 14 AKK $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 15 CDK $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Costs $214,768.60 $218,863.97 $223,041.25 $227,302.08 $231,648.12 $236,081.08 * NEK is co-located with DNR and costs are shared between the state of Minnesota and the Forest Service. The costs shown above reflect the estimated workload split of 50%. FY 2007 Page 35 of 52 3/3/2009 NISC Optimization and Review elow. Total Supply Costs $0.00 $53,081.21 $59,716.36 $400,402.18 $4,246.50 $19,109.24 $2,659.37 $161,626.98 $94,148.02 $50,000.00 $15,924.36 $53,081.21 $222,941.08 $0.00 $0.00 $1,136,936.50 split of 50%. Line 2 - Supply Costs Page 36 of 52 3/3/2009 NISC Optimization and Review Summary of Major Maintenance and Renovation Requirements Reported in Data Call *The following tables provides a summary of the cost of capital and insurance for major maintenance and renovation requirements at each cache by the planned year. Cache FY 2007 FY 2008 Planned Renovation Costs FY 2009 FY 2010 FY 2011 FY 2012 (Current) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK* NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDKt $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $145.00 $32,064.00 $0.00 $2,256.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,024.00 $145.00 $32,064.00 $0.00 $2,256.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,024.00 $145.00 $32,064.00 $0.00 $2,256.00 $0.00 $0.00 $192,418.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,024.00 $145.00 $32,064.00 $0.00 $2,256.00 $0.00 $0.00 $192,418.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,000.00 $0.00 $34,465.00 $37,489.00 $229,907.00 $229,907.00 Total Planned Costs $0.00 $9,072.00 $580.00 $128,256.00 $0.00 $9,024.00 $0.00 $0.00 $384,836.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,000.00 $540,768.00 t CDK is a state-run cache, but is partially funded by the local forest. The costs shown above reflects the estimated federal cost based on the reported 2006 Fair Share (1/3 USFS, 2/3 Idaho Dept. of Lands). * NEK is co-located with DNR and costs are shared between the state of Minnesota and the Forest Service. 3a -Major Maint_Renov Cost Summ The costs shown above reflect the estimated workload split of 50%. Page 37 of 52 3/3/2009 NISC Optimization and Review Equipment Cost Summary Summary of Costs for Leased/Rented Equipment *Lease costs are assumed to remain constant for 5 years, but are inflated based on the published OMB inflation rates identified below. Cache 1 RMK 2 SFK 3 NEK 4 NWK 5 LFK 6 WFC 7 PFK 8 SAK 9 NRK 10 GBK 11 BFK 12 LSK 13 NCK 14 AKK t 15 CDK Total Costs t FY 2007 (Current) $20,090.00 $0.00 $0.00 $26,400.90 $0.00 $5,700.00 $0.00 $0.00 $0.00 $840,310.00 $1,800.00 $0.00 $0.00 $10,800.00 $6,043.33 $911,144.23 FY 2008 (2.0% Inflation) $20,491.80 $0.00 $0.00 $26,928.92 $0.00 $5,814.00 $0.00 $0.00 $0.00 $857,116.20 $1,836.00 $0.00 $0.00 $11,016.00 $6,164.20 $929,367.12 Annual Equipment Leasing Costs FY 2009 FY 2010 (2.0% Inflation) (2.0% Inflation) $20,901.64 $0.00 $0.00 $27,467.50 $0.00 $5,930.28 $0.00 $0.00 $0.00 $874,258.52 $1,872.72 $0.00 $0.00 $11,236.32 $6,287.48 $947,954.46 $21,319.67 $0.00 $0.00 $28,016.85 $0.00 $6,048.89 $0.00 $0.00 $0.00 $891,743.69 $1,910.17 $0.00 $0.00 $11,461.05 $6,413.23 $966,913.55 FY 2011 FY 2012 (2.0% Inflation) (2.0% Inflation) $21,746.06 $0.00 $0.00 $28,577.18 $0.00 $6,169.86 $0.00 $0.00 $0.00 $909,578.57 $1,948.38 $0.00 $0.00 $11,690.27 $6,541.50 $986,251.82 $22,180.98 $0.00 $0.00 $29,148.73 $0.00 $6,293.26 $0.00 $0.00 $0.00 $927,770.14 $1,987.35 $0.00 $0.00 $11,924.07 $6,672.33 $1,005,976.86 Total Leasing Costs $106,640.15 $0.00 $0.00 $140,139.17 $0.00 $30,256.29 $0.00 $0.00 $0.00 $4,460,467.13 $9,554.62 $0.00 $0.00 $57,327.71 $32,078.74 $4,836,463.81 CDK is a state-run cache, but is partially funded by the local forest. The costs shown above reflects the estimated federal cost based on the reported 2006 Fair Share (1/3 USFS, 2/3 Idaho Dept. of Lands). Line 3b-Equipment Cost Summary Page 38 of 52 3/3/2009 NISC Optimization and Review Summary of Planned Investment Costs for Owned Equipment *Costs for equipment at each cache are summarized here. Cache equipment that would normally be considered capital (i.e. investment more than $25K) are vehicles and are therefore moveable to another facility in the future. As a result, the only cost incurred to the system would be transportation costs in the event of this move. If recommendations result in the closing of a facility, tranportation costs will be calculated for the removal of the equipment. *If a cache reported that a piece of equipment was to be replaced prior to 2008, it was assumed that this piece of equipment would be replaced in 2008. It was assumed that the equipment would be replaced for relatively the same cost as the initial investment. This cost was then inflated based on the published OMB inflation rates identified below. *Maintenance costs for each cache's equipment was assumed to have been reported with their O&M costs, which have been included in another cost summary. FY 2008 Planned Investments Over 5 Years FY 2009 FY 2010 FY 2011 FY 2012 Total Planned Investments Over 5 Years $0.00 $148,612.50 $60,104.95 $74,021.40 $106,447.52 $106,329.01 $18,718.72 $78,324.97 $447,046.05 $261,933.32 $196,749.83 $301,774.40 $316,259.10 $43,860.00 $10,513.75 $2,170,695.51 FY 2007 (0% Inflation) (0% Inflation) (4.1% Inflation) (4.2% Inflation) (4.3% Inflation) (Current) Cache 1 RMK $0.00 2 SFK $0.00 $78,453.54 $45,184.44 $24,974.52 $0.00 $0.00 3 NEK* $0.00 $24,624.00 $0.00 $0.00 $19,377.03 $16,103.92 4 NWK $0.00 $0.00 $0.00 $71,280.39 $0.00 $2,741.00 5 LFK $0.00 $65,750.48 $23,866.74 $0.00 $16,830.30 $0.00 6 WFC $0.00 $29,700.00 $0.00 $19,645.75 $0.00 $56,983.26 7 PFK $0.00 $0.00 $0.00 $0.00 $0.00 $18,718.72 8 SAK $0.00 $0.00 $0.00 $27,763.47 $25,008.00 $25,553.50 9 NRK $0.00 $129,130.87 $40,384.69 $78,290.49 $164,229.62 $35,010.38 10 GBK $0.00 $19,800.00 $58,479.34 $79,147.21 $63,104.69 $41,402.08 11 BFK $0.00 $48,458.00 $22,493.00 $104,958.83 $20,840.00 $0.00 12 LSK $0.00 $216,200.00 $41,602.00 $0.00 $43,972.40 $0.00 13 NCK $0.00 $30,000.00 $26,121.00 $73,167.73 $165,367.75 $21,602.62 14 AKK $0.00 $0.00 $43,860.00 $0.00 $0.00 $0.00 t 15 CDK $0.00 $0.00 $0.00 $10,513.75 $0.00 $0.00 Total Costs $0.00 $642,116.89 $301,991.21 $489,742.13 $518,729.79 $218,115.49 * NEK is co-located with DNR and costs are shared between the state of Minnesota and the Forest Service. The costs shown above reflect the estimated workload split of 50%. t CDK is a state-run cache, but is partially funded by the local forest. The costs shown above reflects the estimated federal cost based on the reported 2006 Fair Share (1/3 USFS, 2/3 Idaho Dept. of Lands). Line 3b-Equipment Cost Summary Page 39 of 52 3/3/2009 NISC Optimization and Review Summary of Main Facility Lease Costs *The following cost calculations assume all lease rates remain the same for all performance periods. Cache FY 2007 FY 2008 Annual Lease Costs for Main Facility FY 2009 FY 2010 FY 2011 (Current) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK $301,391.00 $1,000.00 N/A $0.00 $135,000.00 $19,000.00 N/A $93,000.00 $0.00 N/A $54,967.00 $550,000.00 N/A N/A N/A $1,154,358.00 $244,517.46 $1,000.00 N/A $0.00 $135,000.00 $19,000.00 N/A $93,000.00 $0.00 N/A $54,967.00 $550,000.00 N/A N/A N/A $1,097,484.46 $244,517.46 $1,000.00 N/A $0.00 $135,000.00 $124,951.84 N/A $93,000.00 $0.00 N/A $54,967.00 $550,000.00 N/A N/A N/A $1,323,582.30 $244,517.46 $1,000.00 N/A $0.00 $135,000.00 $124,951.84 N/A $93,000.00 $0.00 N/A $54,967.00 $550,000.00 N/A N/A N/A $1,323,582.30 $244,517.46 $1,000.00 N/A $0.00 $135,000.00 $124,951.84 N/A $93,000.00 $0.00 N/A $54,967.00 $550,000.00 N/A N/A N/A $1,323,582.30 Summary of Supplemental Property Lease Costs *The following cost calculations assume all lease rates remain the same for all performance periods. Cache FY 2007 Annual Lease Costs for Supplemental Property FY 2008 FY 2009 FY 2010 FY 2011 (Current) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK* NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK $4,994.00 $1,000.00 $7,567.50 $7,200.00 N/A N/A N/A $18,092.00 $39,000.00 $80,000.00 N/A N/A N/A N/A N/A $157,853.50 $4,994.00 $1,000.00 $7,567.50 $7,200.00 N/A N/A N/A $18,092.00 $39,000.00 $80,000.00 N/A N/A N/A N/A N/A $157,853.50 $4,539.00 $1,000.00 $7,567.50 $7,200.00 N/A N/A N/A $18,092.00 $39,000.00 $80,000.00 N/A N/A N/A N/A N/A $157,398.50 * NEK is co-located with DNR and costs are shared between the state of Minnesota and the Forest Service. $4,539.00 $1,000.00 $7,567.50 $7,200.00 N/A N/A N/A $18,092.00 $39,000.00 $80,000.00 N/A N/A N/A N/A N/A $157,398.50 $4,539.00 $1,000.00 $7,567.50 $7,200.00 N/A N/A N/A $18,092.00 $39,000.00 $80,000.00 N/A N/A N/A N/A N/A $157,398.50 The costs shown above reflect the estimated workload split of 50%. Line 3c - Facility Lease Costs Page 40 of 52 3/3/2009 NISC Optimization and Review FY 2012 $244,517.46 $1,000.00 N/A $0.00 $135,000.00 $124,951.84 N/A $93,000.00 $0.00 N/A $54,967.00 $550,000.00 N/A N/A N/A $1,323,582.30 FY 2012 $4,539.00 $1,000.00 $7,567.50 $7,200.00 N/A N/A N/A $18,092.00 $39,000.00 $80,000.00 N/A N/A N/A N/A N/A $157,398.50 imated workload split of Line 3c - Facility Lease Costs Page 41 of 52 3/3/2009 NISC Optimization and Review Summary of Refurbishment Subcontracts Reported in Center Manager Data Call *The following cost calculations assume all contract rates remain the same for all performance periods and are inflated based on published OMB rates. Cache FY 2007 (Current) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK* NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDKt $65,159.99 $2,366.97 $7,559.70 $341,136.08 $0.00 $0.00 $84,840.80 $5,615.84 $109,378.04 $198,600.00 $74,075.00 $32,050.00 $7,135.55 $42,730.77 $3,195.55 $973,844.30 FY 2008 Total Refurbishment Contract Costs FY 2009 FY 2010 (2.0% Inflation) $66,463.19 $2,414.31 $7,710.89 $347,958.80 $0.00 $0.00 $86,537.62 $5,728.16 $111,565.60 $202,572.00 $75,556.50 $32,691.00 $7,278.26 $43,585.39 $3,259.46 $993,321.18 FY 2011 FY 2012 (2.0% Inflation) (2.0% Inflation) (2.0% Inflation) (2.0% Inflation) $67,792.45 $2,462.60 $7,865.11 $354,917.98 $0.00 $0.00 $88,268.37 $5,842.72 $113,796.91 $206,623.44 $77,067.63 $33,344.82 $7,423.83 $44,457.09 $3,324.65 $1,013,187.61 $69,148.30 $2,511.85 $8,022.41 $362,016.34 $0.00 $0.00 $90,033.74 $5,959.57 $116,072.85 $210,755.91 $78,608.98 $34,011.72 $7,572.30 $45,346.23 $3,391.15 $1,033,451.36 $70,531.27 $2,562.08 $8,182.86 $369,256.67 $0.00 $0.00 $91,834.41 $6,078.77 $118,394.31 $214,971.03 $80,181.16 $34,691.95 $7,723.75 $46,253.16 $3,458.97 $1,054,120.39 $71,941.89 $2,613.33 $8,346.52 $376,641.80 $0.00 $0.00 $93,671.10 $6,200.34 $120,762.20 $219,270.45 $81,784.79 $35,385.79 $7,878.22 $47,178.22 $3,528.15 $1,075,202.79 t CDK is a state-run cache, but is partially funded by the local forest. The costs shown above reflects the estimated federal cost based on the reported 2006 Fair Share (1/3 USFS, 2/3 Idaho Dept. of Lands). * NEK is co-located with DNR and costs are shared between the state of Minnesota and the Forest Service. The costs shown above reflect the estimated workload split of 50%. Line 3e - Refurb Cost Summary Page 42 of 52 3/3/2009 NISC Optimization and Review Transportation Cost Summary *The following costs are the transportation costs for each cache and include the cost for all shipments, the per diem costs incurred for any shipments driven by cache employees (AD, Temp, PFT, etc.), incurred vehicle use rates, and the total transportation cost incurred by the Government for issues that were picked up at the cache. *The transportation costs below assume that the workload level for FY 2007 will remain constant for the other performance periods, but inflates the cost based on the OMB inflation rates identified below. Cache 1 RMK 2 SFK 3 NEK 4 NWK 5 LFK 6 WFC 7 PFK 8 SAK 9 NRK 10 GBK 11 BFK 12 LSK 13 NCK 14 AKK 15 CDK Total Costs FY 2007 (Current) $129,374.78 $161,499.18 $239,614.48 $420,543.40 $200,891.15 $247,501.82 $147,053.60 $413,568.78 $718,868.82 $1,087,347.22 $362,184.73 $144,151.13 $342,270.02 Not Reported $395,858.75 $5,010,727.87 Line 3e - Transportation Cost FY 2008 (2.0% Inflation) $131,962.28 $164,729.16 $244,406.77 $428,954.27 $204,908.98 $252,451.86 $149,994.67 $421,840.16 $733,246.20 $1,109,094.16 $369,428.43 $147,034.15 $349,115.42 Not Reported $403,775.92 $5,110,942.42 Annual Transportation Costs FY 2009 FY 2010 (2.0% Inflation) (2.0% Inflation) $134,601.53 $168,023.74 $249,294.91 $437,533.35 $209,007.16 $257,500.89 $152,994.56 $430,276.96 $747,911.12 $1,131,276.05 $376,817.00 $149,974.83 $356,097.73 Not Reported $411,851.44 $5,213,161.27 $137,293.56 $171,384.22 $254,280.81 $446,284.02 $213,187.30 $262,650.91 $156,054.46 $438,882.50 $762,869.35 $1,153,901.57 $384,353.34 $152,974.33 $363,219.68 Not Reported $420,088.47 $5,317,424.50 Page 43 of 52 FY 2011 FY 2012 (2.0% Inflation) (2.0% Inflation) $140,039.43 $174,811.90 $259,366.42 $455,209.70 $217,451.04 $267,903.93 $159,175.55 $447,660.15 $778,126.73 $1,176,979.60 $392,040.40 $156,033.82 $370,484.07 Not Reported $428,490.24 $5,423,772.99 $142,840.22 $178,308.14 $264,553.75 $464,313.90 $221,800.07 $273,262.01 $162,359.06 $456,613.36 $793,689.27 $1,200,519.19 $399,881.21 $159,154.49 $377,893.76 Not Reported $437,060.04 $5,532,248.45 Total Costs $816,111.79 $1,018,756.34 $1,511,517.15 $2,652,838.65 $1,267,245.69 $1,561,271.41 $927,631.89 $2,608,841.92 $4,534,711.49 $6,859,117.78 $2,284,705.11 $909,322.76 $2,159,080.67 $0.00 $2,497,124.86 $31,608,277.50 3/3/2009 NISC Optimization and Review Other Personnel Costs - FY 2007 - Without Transportation Hours The following table summarizes non-Government personnel costs incurred by each cache in FY 2007. Detailed data for each cost type can be found on other tabs in this file. Assumptions and notes for each cost type are identified below. Cache 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK $0.00 $0.00 $57,307.09 $0.00 $0.00 $0.00 $0.00 $0.00 $1,748.06 $0.00 $0.00 $0.00 $0.00 $0.00 $198,292.91 Federal Militia Employees $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $60,948.97 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15,890.44 $37,786.48 $328,034.17 $79,554.87 $5,139.20 $62,384.60 $44,939.21 $33,595.12 $1,397,187.89 $37,381.43 $131,342.51 $290,666.00 $137,729.57 $106,580.77 Subcontract Employees $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $125,181.57 $0.00 $0.00 $0.00 $0.00 $137,729.57 $0.00 $257,348.06 $60,948.97 $2,708,212.25 $262,911.14 State Employees AD Hires Cache Total $0.00 $15,890.44 $95,093.56 $328,034.17 $79,554.87 $5,139.20 $62,384.60 $44,939.21 $221,473.72 $1,397,187.89 $37,381.43 $131,342.51 $290,666.00 $275,459.14 $304,873.68 $3,289,420.42 State Employees *CDK is a state-run facility where the majority of staff are state employees. The facility operation costs are shared with the federal government and there is one federal Assistant Cache Manager position. The percentage of time that the employees spend performing federal work was estimated using issue data provided. The costs for these positions are prorated based upon the calculated percentages. (52.3% of workload is Federal, 47.7% State) *NEK is co-located with Minnesota's Department of Natural Resources (DNR). These employees primarily work on state incidents, but help with federal incidents during peak activity. DNR provided an estimation of the percentage of time that the employees spend performing federal work. The costs for these positions are prorated based upon the reported percentages. *NRK reported that one individual was detailed to their cache from Coeur D'Alene. Coeur D'Alene is a state run cache, therefore this individual's time was included as a cost item separate from the Federal Government personnel at NRK. Federal Militia Employees *Federal employees who do not work in the Cache System on a regular basis, but are detailed to the facilities during periods of high incident activity are considered to be Federal Militia. *These positions are costed identically to federal government cache personnel. These positions are similar to contract temporary employees that are employed on an "as needed" basis, and the costs should be quantified separately from dedicated cache personnel. AD Hires *Administratively Determined (AD) emergency workers are hired by the caches during periods of high incident activity. AD hires are also similar to contract employees and are hired on an "as needed" basis. *The AD pay scale is determined for the Agency in March of each year which ensures consistent hiring practices. The pay rate is based on the position the individual is hired to perform. As noted in the March 2007 USFS Memorandum, AD employees do not receive fringe benefits. Therefore, no fringe factors have been applied to the AD costs reported by each cache. *Beginning in 2008, CDK is no longer hiring AD workers. Temporary State workers will be hired in their place. *NEK's AD costs were assumed to be 50% federal workload and 50% DNR state workload. Subcontract Employees *NRK reported the use of two types of subcontract positions in FY 2007 and the calculated cost is shown in the table above. Line 3e - 2007 Other Personnel Page 44 of 52 3/3/2009 NISC Optimization and Review Other Personnel Costs - FY 2008 and Forecasted Outyears - Without Transportation Hours The following tables summarize non-Government personnel costs incurred by each cache in FY 2008 and for the forecasted outyears. Detailed data for each cost type can be found on other tabs in this file. Assumptions and notes for each cost type are identified below. Forecasted costs have been calculated based on the following: *The inflation rates used to forecast costs below were indentified in OMB Memoranda M-08-13 *Costs have been calculated assuming all staffing levels would remain constant for subsequent years. *2008 Federal Militia costs were calculated using 2008 OPM Pay Schedules due to their availability. FY 2008 - 3.5% inflation rate Cache 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK State Federal Militia Employees Employees $0.00 $0.00 $0.00 $0.00 $59,312.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,809.25 $62,772.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $323,483.15 $0.00 $384,605.23 $62,772.36 $0.00 $16,446.61 $39,109.00 $339,515.37 $82,339.29 $5,319.07 $64,568.06 $46,512.08 $34,770.95 $1,446,089.47 $38,689.78 $135,939.50 $300,839.31 $137,729.57 $0.00 Subcontract Employees $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $129,562.92 $0.00 $0.00 $0.00 $0.00 $142,550.10 $0.00 $2,687,868.05 $272,113.03 AD Hires Cache Total $0.00 $16,446.61 $98,421.84 $339,515.37 $82,339.29 $5,319.07 $64,568.06 $46,512.08 $228,915.48 $1,446,089.47 $38,689.78 $135,939.50 $300,839.31 $280,279.67 $323,483.15 $3,407,358.67 FY 2009 - 2.9% inflation rate Cache 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK State Federal Militia Employees Employees $0.00 $0.00 $0.00 $0.00 $61,032.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,861.71 $64,592.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $332,864.16 $0.00 $395,758.78 $64,592.76 Line 3e-Outyear Other Personnel AD Hires $0.00 $16,923.56 $40,243.16 $349,361.31 $84,727.13 $5,473.33 $66,440.53 $47,860.93 $35,779.31 $1,488,026.06 $39,811.78 $139,881.74 $309,563.65 $141,723.73 $0.00 $2,765,816.23 Page 45 of 52 Subcontract Employees $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $133,320.25 $0.00 $0.00 $0.00 $0.00 $146,684.06 $0.00 $280,004.31 Cache Total $0.00 $16,923.56 $101,276.07 $349,361.31 $84,727.13 $5,473.33 $66,440.53 $47,860.93 $235,554.03 $1,488,026.06 $39,811.78 $139,881.74 $309,563.65 $288,407.79 $332,864.16 $3,506,172.07 3/3/2009 NISC Optimization and Review FY 2010 - 3.2% inflation rate Cache 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK State Federal Militia Employees Employees $0.00 $0.00 $0.00 $0.00 $62,985.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,921.29 $66,659.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $343,515.81 $0.00 $408,423.06 $66,659.73 AD Hires $0.00 $17,465.11 $41,530.94 $360,540.87 $87,438.40 $5,648.47 $68,566.63 $49,392.48 $36,924.24 $1,535,642.89 $41,085.76 $144,357.96 $319,469.69 $146,258.89 $0.00 $2,854,322.34 Subcontract Employees $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $137,586.50 $0.00 $0.00 $0.00 $0.00 $151,377.95 $0.00 $288,964.45 Cache Total $0.00 $17,465.11 $104,516.90 $360,540.87 $87,438.40 $5,648.47 $68,566.63 $49,392.48 $243,091.76 $1,535,642.89 $41,085.76 $144,357.96 $319,469.69 $297,636.83 $343,515.81 $3,618,369.58 FY 2011 - 3.4% inflation rate Cache 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK State Federal Militia Employees Employees $0.00 $0.00 $0.00 $0.00 $65,127.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,986.61 $68,926.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $355,195.35 $0.00 $422,309.45 $68,926.16 Line 3e-Outyear Other Personnel AD Hires $0.00 $18,058.92 $42,943.00 $372,799.26 $90,411.30 $5,840.52 $70,897.90 $51,071.83 $38,179.67 $1,587,854.75 $42,482.68 $149,266.13 $330,331.66 $151,231.69 $0.00 $2,951,369.30 Page 46 of 52 Subcontract Employees $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $142,264.44 $0.00 $0.00 $0.00 $0.00 $156,524.80 $0.00 $298,789.24 Cache Total $0.00 $18,058.92 $108,070.48 $372,799.26 $90,411.30 $5,840.52 $70,897.90 $51,071.83 $251,356.88 $1,587,854.75 $42,482.68 $149,266.13 $330,331.66 $307,756.49 $355,195.35 $3,741,394.14 3/3/2009 NISC Optimization and Review FY 2012 - 3.4% inflation rate Cache 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK State Federal Militia Employees Employees $0.00 $0.00 $0.00 $0.00 $67,341.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,054.16 $71,269.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $367,271.99 $0.00 $436,667.97 $71,269.65 AD Hires $0.00 $18,672.93 $44,403.06 $385,474.44 $93,485.29 $6,039.10 $73,308.43 $52,808.27 $39,477.78 $1,641,841.81 $43,927.09 $154,341.18 $341,562.93 $156,373.57 $0.00 $3,051,715.86 Subcontract Employees $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $147,101.43 $0.00 $0.00 $0.00 $0.00 $161,846.64 $0.00 $308,948.07 Cache Total $0.00 $18,672.93 $111,744.87 $385,474.44 $93,485.29 $6,039.10 $73,308.43 $52,808.27 $259,903.01 $1,641,841.81 $43,927.09 $154,341.18 $341,562.93 $318,220.21 $367,271.99 $3,868,601.55 Notes and Assumptions Regarding Cost Type (As noted in FY 2007 Cost Calculation File) State Employees *CDK is a state-run facility where the majority of staff are state employees. The facility operation costs are shared with the federal government and there is one federal Assistant Cache Manager position. The percentage of time that the employees spend performing federal work was estimated using issue data provided. The costs for these positions are prorated based upon the calculated percentages. (52.3% of workload is Federal, 47.7% State) Resources (DNR). These employees primarily work on state incidents, but *NEK is co-located with Minnesota's Department of Natural help with federal incidents during peak activity. DNR provided an estimation of the percentage of time that the employees spend performing federal work. The costs for these positions are prorated based upon the reported percentages. *NRK reported that one individual was detailed to their cache from Coeur D'Alene. Coeur D'Alene is a state run cache, therefore this Federal Militia Employees *Federal employees who do not work in the Cache System on a regular basis, but are detailed to the facilities during periods of high incident activity are considered to be Federal Militia. *These positions are costed identically to federal government cache personnel. These positions are similar to contract temporary AD Hires *Administratively Determined (AD) emergency workers are hired by the caches during periods of high incident activity. AD hires are also similar to contract employees and are hired on an "as needed" basis. *The AD pay scale is determined for the Agency in March of each year which ensures consistent hiring practices. The pay rate is based *Beginning in 2008, CDK is no longer hiring AD workers. Temporary State workers will be hired in their place. *NEK's AD costs were assumed to be 50% federal workload and 50% DNR state workload. Subcontract Employees *NRK reported the use of two types of subcontract positions in FY 2007 and the calculated cost is shown in the table above. Line 3e-Outyear Other Personnel Page 47 of 52 3/3/2009 NISC Optimization and Review Summary of Operations and Maintenance (O&M) Costs Reported in Data Call Reported Operations and Maintenance Cost (O&M) Cache Includes supplies 1 2 3 RMK SFK NEK* $90,939.00 $45,000.00 $15,000.00 4 NWK $45,800.00 5 6 7 8 LFK WFC PFK SAK $229,341.00 $197,000.00 $134,050.00 $47,475.00 9 NRK Notes $229,425.00 10 11 12 13 14 GBK BFK LSK NCK AKK $198,524.00 $180,845.00 $6,000.00 $21,600.00 $55,000.00 15 CDKt $41,374.51 $1,537,373.51 Includes two leased vans O&M from new facility 2009 Budget Figure Excludes inventory replacement and includes Rent (9/22/08 email) Estimation based on $9.90/sq ft of office space + $2.23/sq ft warehouse space 9/22/08 email IT Position added into Overhead cost t CDK is a state-run cache, but is partially funded by the local forest. The costs shown above reflects the estimated federal cost based on the reported 2006 Fair Share (1/3 USFS, 2/3 Idaho Dept. of Lands). Summary of Forecasted O&M Costs *O&M costs are assumed to remain constant for 5 years, but are inflated based on the published OMB inflation rates identified below. Forecasted O&M Costs Over 5 Years Cache 1 RMK 2 SFK 3 NEK* 4 NWK 5 LFK 6 WFC 7 PFK 8 SAK 9 NRK 10 GBK 11 BFK 12 LSK 13 NCK 14 AKK t 15 CDK Total Costs FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 (Current) (2.0% Inflation) (2.0% Inflation) (2.0% Inflation) (2.0% Inflation) (2.0% Inflation) $90,939.00 $45,000.00 $7,500.00 $45,800.00 $229,341.00 $197,000.00 $134,050.00 $47,475.00 $229,425.00 $198,524.00 $180,845.00 $6,000.00 $21,600.00 $55,000.00 $41,374.51 $1,529,873.51 $92,757.78 $45,900.00 $7,650.00 $46,716.00 $233,927.82 $200,940.00 $136,731.00 $48,424.50 $234,013.50 $202,494.48 $184,461.90 $6,120.00 $22,032.00 $56,100.00 $42,202.00 $1,560,470.98 $94,612.94 $46,818.00 $7,803.00 $47,650.32 $238,606.38 $204,958.80 $139,465.62 $49,392.99 $238,693.77 $206,544.37 $188,151.14 $6,242.40 $22,472.64 $57,222.00 $43,046.04 $1,591,680.40 $96,505.19 $47,754.36 $7,959.06 $48,603.33 $243,378.50 $209,057.98 $142,254.93 $50,380.85 $243,467.65 $210,675.26 $191,914.16 $6,367.25 $22,922.09 $58,366.44 $43,906.96 $1,623,514.01 $98,435.30 $48,709.45 $8,118.24 $49,575.39 $248,246.07 $213,239.14 $145,100.03 $51,388.47 $248,337.00 $214,888.76 $195,752.44 $6,494.59 $23,380.53 $59,533.77 $44,785.10 $1,655,984.29 $100,404.00 $49,683.64 $8,280.61 $50,566.90 $253,211.00 $217,503.92 $148,002.03 $52,416.24 $253,303.74 $219,186.54 $199,667.49 $6,624.48 $23,848.15 $60,724.44 $45,680.80 $1,689,103.97 t CDK is a state-run cache, but is partially funded by the local forest. The costs shown above reflects the estimated federal cost based on the reported 2006 Fair Share (1/3 USFS, 2/3 Idaho Dept. of Lands). *NEK is co-located with DNR and costs are shared between the state of Minnesota and the Forest Service. The costs shown above reflect the estimated workload split of 50%. Line 3g - O&M Costs Page 48 of 52 3/3/2009 NISC Optimization and Review Share (1/3 USFS, 2/3 Idaho Dept. of low. Total O&M Costs $482,715.21 $238,865.44 $39,810.91 $243,111.94 $1,217,369.77 $1,045,699.83 $711,553.62 $252,003.04 $1,217,815.65 $1,053,789.41 $959,947.14 $31,848.73 $114,655.41 $291,946.65 $219,620.90 $8,120,753.65 Share (1/3 USFS, 2/3 Idaho Dept. of d split of 50%. Line 3g - O&M Costs Page 49 of 52 3/3/2009 NISC Optimization and Review Summary of Training Costs Reported in Data Call Cache 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RMK SFK NEK* NWK LFK WFC PFK SAK NRK GBK BFK LSK NCK AKK CDK Appointed/ Seasonal Training Costs $4,500.00 $1,000.00 $4,500.00 $18,300.00 $3,000.00 $7,000.00 $20,000.00 $0.00 $11,000.00 $1,222.00 $6,902.00 $8,000.00 $4,000.00 $15,000.00 $0.00 AD/Contract Training Costs $1,500.00 $1,000.00 $0.00 $0.00 $0.00 $2,000.00 $8,014.00 $0.00 On-Site OJT $0.00 $0.00 On-Site OJT On-Site OJT $10,000.00 $0.00 Total Training Cost Reported $6,000.00 $2,000.00 $4,500.00 $18,300.00 $3,000.00 $9,000.00 $28,014.00 $8,000.00 2009 Budget Figure $11,000.00 $1,222.00 $6,902.00 $8,000.00 $4,000.00 $25,000.00 $0.00 Included in O&M Costs $134,938.00 Summary of Forecasted Training Costs *Training costs are assumed to remain constant for 5 years, but are inflated based on the published OMB inflation rates identified below. Cache 1 RMK 2 SFK 3 NEK* 4 NWK 5 LFK 6 WFC 7 PFK 8 SAK 9 NRK 10 GBK 11 BFK 12 LSK 13 NCK 14 AKK 15 CDK Total Costs FY 2007 FY 2008 (Current) (2.0% Inflation) $6,000.00 $2,000.00 $2,250.00 $18,300.00 $3,000.00 $9,000.00 $28,014.00 $8,000.00 $11,000.00 $1,222.00 $6,902.00 $8,000.00 $4,000.00 $25,000.00 $0.00 $132,688.00 Forecasted Training Costs Over 5 Years FY 2009 FY 2010 $6,120.00 $2,040.00 $2,295.00 $18,666.00 $3,060.00 $9,180.00 $28,574.28 $8,160.00 $11,220.00 $1,246.44 $7,040.04 $8,160.00 $4,080.00 $25,500.00 $0.00 $135,341.76 (2.0% Inflation) (2.0% Inflation) $6,242.40 $2,080.80 $2,340.90 $19,039.32 $3,121.20 $9,363.60 $29,145.77 $8,323.20 $11,444.40 $1,271.37 $7,180.84 $8,323.20 $4,161.60 $26,010.00 $0.00 $138,048.60 $6,367.25 $2,122.42 $2,387.72 $19,420.11 $3,183.62 $9,550.87 $29,728.68 $8,489.66 $11,673.29 $1,296.80 $7,324.46 $8,489.66 $4,244.83 $26,530.20 $0.00 $140,809.57 FY 2011 FY 2012 (2.0% Inflation) (2.0% Inflation) $6,494.59 $2,164.86 $2,435.47 $19,808.51 $3,247.30 $9,741.89 $30,323.25 $8,659.46 $11,906.75 $1,322.73 $7,470.95 $8,659.46 $4,329.73 $27,060.80 $0.00 $143,625.76 $6,624.48 $2,208.16 $2,484.18 $20,204.68 $3,312.24 $9,936.73 $30,929.72 $8,832.65 $12,144.89 $1,349.19 $7,620.37 $8,832.65 $4,416.32 $27,602.02 $0.00 $146,498.27 Total Training Costs $31,848.73 $10,616.24 $11,943.27 $97,138.61 $15,924.36 $47,773.09 $148,701.70 $42,464.97 $58,389.33 $6,486.52 $36,636.65 $42,464.97 $21,232.48 $132,703.02 $0.00 $704,323.95 *NEK is co-located with DNR and costs are shared between the state of Minnesota and the Forest Service. The costs shown above reflect the estimated workload split of 50%. Line 3g - Training Costs Page 50 of 52 3/3/2009 NISC Optimization and Review Summary of Cost Pools Reported in Data Call Total of Cost Pools Reported $305,164.00 $85,000.00 $40,000.00 Notes Includes supplies 1 2 3 Cache RMK SFK NEK* 4 5 6 NWK LFK WFC $5,025.00 $0.00 $25,000.00 7 8 9 10 PFK SAK NRK GBK $35,000.00 $24,839.00 $57,320.00 $0.00 11 BFK $0.00 Off the top cost pool computed by state office 12 LSK $0.00 Off the top cost pool computed by for OSCC 13 14 15 NCK AKK CDK $0.00 $0.00 $0.00 $577,348.00 Off the top cost pool computed nationally From phone conversation during September meeting Off the top cost pool computed nationally None Reported Summary of Forecasted Cost Pools *Cost Poolsare assumed to remain constant for 5 years, but are inflated based on the published OMB inflation rates identified below. Cache 1 RMK 2 SFK 3 NEK* 4 NWK 5 LFK 6 WFC 7 PFK 8 SAK 9 NRK 10 GBK 11 BFK 12 LSK 13 NCK 14 AKK 15 CDK Total Costs FY 2007 (Current) $305,164.00 $85,000.00 $20,000.00 $5,025.00 $0.00 $25,000.00 $35,000.00 $24,839.00 $57,320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $557,348.00 FY 2008 (3.5% Inflation) $315,844.74 $87,975.00 $20,700.00 $5,200.88 $0.00 $25,875.00 $36,225.00 $25,708.37 $59,326.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $576,855.18 Forecasted Cost Pools Over 5 Years FY 2009 FY 2010 (2.9% Inflation) $325,004.24 $90,526.28 $21,300.30 $5,351.70 $0.00 $26,625.38 $37,275.53 $26,453.91 $61,046.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $593,583.98 (3.2% Inflation) $335,404.37 $93,423.12 $21,981.91 $5,522.95 $0.00 $27,477.39 $38,468.34 $27,300.43 $63,000.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $612,578.67 FY 2011 FY 2012 (3.4% Inflation) (3.4% Inflation) $346,808.12 $96,599.50 $22,729.29 $5,710.74 $0.00 $28,411.62 $39,776.27 $28,228.65 $65,142.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $633,406.34 $358,599.60 $99,883.88 $23,502.09 $5,904.90 $0.00 $29,377.61 $41,128.66 $29,188.42 $67,356.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $654,942.16 *NEK is co-located with DNR and costs are shared between the state of Minnesota and the Forest Service. The costs shown above reflect the estimated workload split of 50%. Line 3g - Cost Pools Page 51 of 52 3/3/2009 NISC Optimization and Review ed below. Total Cost Pools $1,681,661.07 $468,407.78 $110,213.59 $27,691.17 $0.00 $137,766.99 $192,873.79 $136,879.77 $315,872.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,071,366.33 d workload split of 50%. Line 3g - Cost Pools Page 52 of 52 3/3/2009