SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN 2011 – 2012 MESSAGE FROM THE EXECUTIVE MAYOR The 2011/2012 financial year is significant for the City of Cape Town as it marks the bridge between the priorities of two administrations. It also marks the final year of the implementation of the previous administration’s IDP, which was centred on infrastructure-led growth. That plan was premised on the strategy of taking the necessary steps to improving the lives of our citizens by ensuring the roll-out of basic services to all. Many of the goals of the IDP have been achieved. Indeed, Cape Town is now recognised by both independent assessments and the national government as the leading provider of basic services amongst metros in South Africa. That delivery has been based on the principle of sound, efficient and transparent financial management. The numerous directorates that serve the people of this great city need to have formal plans in place to not only strategise for delivery goals, but to enable the administration and indeed the public to monitor the rate of delivery. Only by ensuring this rigorous self-assessment across the board can we be assured that we are providing the best possible government that we can. The Service Delivery and Budget Implementation Plan (SDBIP) is a central feature of the administration’s regulations. Its processes and frameworks are used as the benchmarks of service delivery, ensuring the accountability of the administration and its officials. It is the working plan that gives life to the budget adopted by the council in June 2011. That budget assigned the financial means to City directorates to perform their mandates. The SDBIP explains how they shall do so. We have provided sufficient resources to achieve our goal of serving the people of Cape Town. Community Services received approximately R1,2 billion, an increase of 8,2%. This will enable us to provide the amenities that make our city more inclusive. Corporate Services received approximately R1,6 billion, an increase of 8,2%. This money will be used to ensure that the city is well-staffed with professional and caring public officials. Economic and Social Development received approximately R300 million, an increase of 9,8%. This will allow us to focus on the new separate Mayco portfolio of social development. This portfolio will ensure that the city has caring social services. Finance received approximately R1, 5 billion, an increase of 4,1%. This money will be spent ensuring that we have the means to finance the city’s development. Health received approximately R700 million, an increase of 12,4%. This allocation will mean that we can continue to provide our citizens with primary health care. Housing received approximately R700 million, an increase of 9,1%. Housing will be able to continue with their excellent track record of delivery, which has seen housing delivery increase four-fold under the previous administration. Safety and Security received approximately R1,2 billion, an increase of 6,1%. This money will ensure that our metro police and our community-based initiatives will help keep us safe. Strategy and Planning received approximately R389 million, an increase of 4,3%. This department will help guide the city’s new economic direction and improve planning regulations. Transport and Roads received approximately R1,8 billion, an increase of 23,1%. This will be mostly allocated to continuing the roll-out of the IRT which is becoming a world-class public transportation system for our people. And Utility Services received approximately R11, 3 billion, an increase of 16,7%. This money will ensure the continued roll-out of basic services to everyone, especially the poor and demonstrates the emphasis we place on infrastructure-led growth. In total, this is a rise in total operating revenue from R19, 442 billion in 2010/11 to R21, 913 billion this year. Our capital budget also increases mainly due to increases in state grants from R3,995 billion in 2010/11 to R5, 09 billion this year. These budgetary allocations require sufficient planning to be put into effect, which the SDBIP provides. Through the strategic direction of resources, we will be able to make these budgets work for our people, not least the approximately R1,26 billion that will be used this year to provide free basic services to poor people. This final year of the IDP, and its delivery targets, will provide the foundation upon which the new administration shall build. In addition to continuing our investment in infrastructure, we will ensure that we create the economic environment in which jobs, and thus dignity, can be provided. By using our resources effectively and engaging widely, we will ensure that we build an efficient opportunity city in which all of our citizens feel included, safe and cared for. Approved by the Executive Mayor: Alderman Patricia De Lille Date: 6 2011/2012 Service Delivery and Budget Implementation Plan TABLE OF CONTENTS 1. Introduction ........................................................................................................................ 1 2. Legislative Imperative ......................................................................................................... 2 3. Linking the IDP to the Budget ............................................................................................. 3 4. Reporting on the SDBIP ....................................................................................................... 4 4.1 Monthly Reporting ............................................................................................................................. 4.2 Quarterly Reporting .......................................................................................................................... 4.3 Mid-year Reporting ............................................................................................................................ 4 4 4 5. City Scorecards .................................................................................................................... 5 5.1 Three Year 2011/2012 Corporate Scorecard ....................................................................................... 5.2 2011/2012 Quarterly Corporate Scorecard ......................................................................................... 5.3 National Key Performance Indicators (NKPIs) ...................................................................................... 6. Three Year Capital Plan 2010/2011 - 2012/2013 ................................................................. 6 9 12 6.1 Capital Budget Spending per Strategic Focus Area .............................................................................. 14 7. Revenue and Expenditure Projections ................................................................................. 17 7.1 Monthly Projections of Revenue by Source ......................................................................................... 7.2 Monthly Projections of Operating Expenditure by Directorate (Vote) .................................................... 18 19 8. Conclusion ........................................................................................................................... 21 Annexure A – Corporate Scorecard Indicator Definitions for 2010/2011 .................................. 22 Annexure B - Capital Budget per Sub-Councils and Wards for 2011/2012 – 2013/2014 ............ 33 7 13 1. INTRODUCTION The strategic direction that the City of Cape Town (City) will undertake is set out in its five year Integrated Development Plan (IDP). The plan is being reviewed for the 2011/2012 financial year in conjunction with the community and its credibility is supported by a realistic and sound budget. The strategic direction that the five year IDP embarked on has not changed and the City continues on the path of infrastructure-led economic growth. The services that the City provides and the investment in infrastructure will make the City more attractive to investors and thus more globally competitive. Investors bring the possibility of job creation and assistance in driving development. The Service Delivery and Budget Implementation Plan (SDBIP) gives effect to the IDP and the budget of the municipality. It is an expression of the objectives of the City in quantifiable outcomes that will be implemented by the administration for the financial period from 1 July 2011 to 30 June 2012 (the City’s financial year). It includes the service delivery targets and performance indicators for each quarter which is linked to the performance agreements of senior management. It therefore facilitates oversight over financial and non-financial performance of the municipality and allows the City Manager to monitor the performance of the Executive Directors, the Mayor/ Council to monitor the performance of the City Manager, and the Community to monitor the performance of the City Government. Based on the public input, the City developed eight strategic focus areas. Corporate objectives were developed from these areas which were expanded on in Directorate and Departmental Business Plans. Resources were allocated firstly through a budget prioritisation model at a corporate level and pulled through to the Business plans, underpinned by programmes and projects. Objectives are measured through key performance indicators at every level, and continuously monitored throughout the year. The purpose of this report is to provide background into the role of the SDBIP and to guide the reader through the relationship between service delivery and budget implementation. Content wise it provides the reader with the Corporate Scorecard setting out the Corporate and Directorate objectives, with indicators and targets against which the City will be held accountable over the remaining year of the five year IDP cycle. The 2011/2012 year’s targets are elaborated on in the quarterly targets set in the Annual Corporate Scorecard. Definitions are provided to broaden understanding of the indicators. The capital budget for the next three years is broken down into the eight strategic focus areas that are identified in the IDP, providing the first level of linkage between the IDP and the budget. This linkage is further elaborated on in the Directorate and Department Business Plans, but these are too detailed to form part of this report. The projected monthly cash flow is broken down into revenue by source and expenditure by Directorate (vote). The capital budget, allocated per ward, forms an annexure to the report. More than half the budget for 2011/12 has been allocated to projects that span across wards. Wards that appear to have no allocation may well have been allocated funding under the multi-ward and corporate infrastructure projects. The content of this document is high-level and strategic and is intended for utilization by the general public and Councillors. The SDBIP is a layered plan, with the top layer of the plan dealing with consolidated service delivery targets and linking such targets to top management. Only the tip of the information pyramid is published as the Corporate SDBIP. This document therefore correlates with the Published SDBIP as required by National Treasury. 1 2. LEGISLATIVE IMPERATIVE The Local Government: Municipal Finance Management Act (MFMA), defines the SDBIP as a detailed plan approved by the mayor of a municipality for implementing the municipality’s delivery of municipal services and its annual budget, and which must indicate the following – (a) projections for each month of – (i) revenue to be collected, by source; and; (ii) operational and capital expenditure, by vote; (b) service delivery targets and performance indicators for each quarter, and (c) other matters prescribed. The SDBIP for 2011/12 is based on the IDP and budget approved by council on the 08th June 2011. In terms of Section 53 (1) (c) (ii) of the MFMA, the Executive Mayor must take reasonable steps to ensure that the SDBIP is approved within 28 days after the approval of the budget. In terms of S69(3)(a) the City Manager must by no later than 14 days of the approval of the annual budget submit the draft SDBIP to the Executive Mayor. 2 3. LINK TO THE IDP AND THE BUDGET The City identified eight strategic focus areas (SFAs) based on the inputs from the community. These are: 1. 2. 3. 4. 5. 6. 7. 8. Shared Economic Growth and Development Sustainable Urban Infrastructure and Services Energy Efficiency for a Sustainable Future Public Transport Systems Integrated Human Settlements Safety and Security Health, Social and Community Development Good Governance and Regulatory Reform These are the SFAs in the diagram below and the budget is allocated against these strategic focus areas at a corporate level. Corporate objectives with measurable key performance indicators (KPIs) and targets are identified. The business planning processes undertaken at Directorate and Department levels yields objectives with indicators, targets and resource allocation (includes the budgets) at these various levels. The Business plans have a narrative section and an SDBIP section against which the progress of initiatives are reported on. SFA Corp. Objectives Directorate Objectives Dept. objectives Corp. KPIs Dir. KPIs Dept. KPIs Corp. Targets Dir. Targets Dept. Targets Figure 1: IDP and Budget link 3 Programmes Projects Resources (budgets) 4. REPORTING ON THE SDBIP This section covers reporting on the SDBIP as a way of linking the SDBIP with the oversight and monitoring operations of the City administration. A series of reporting requirements are outlined in the MFMA. Both the Executive Mayor and the Accounting Officer have clear roles to play in preparing and presenting these reports. The SDBIP provides an excellent basis for generating the reports for which MFMA gives very clear outlines. The reports then allow the Councillors of the City of Cape Town to monitor the implementation of service delivery programs and initiatives across the City. 4.1 Monthly Reporting Section 71 of the MFMA stipulates that reporting on actual revenue targets and spending against the budget should occur on a monthly basis. This reporting must be conducted by the accounting officer of a municipality no later than 10 working days, after the end of each month. Reporting must include the following: (i) (ii) (iii) (iv) (v) actual revenue, per source; actual borrowings; actual expenditure, per vote; actual capital expenditure, per vote; the amount of any allocations received If necessary, explanation of the following must be included in the monthly reports: a. b. c. any material variances from the municipality’s projected revenue by source, and from the municipality’s expenditure projections per vote any material variances from the service delivery and budget implementation plan and; any remedial or corrective steps taken or to be taken to ensure that the projected revenue and expenditure remain within the municipalities approved budget. 4.2 Quarterly Reporting Section 52 (d) of the MFMA compels the mayor to submit a report to the council on the implementation of the budget and the financial state of affairs of the municipality within 30 days of the end of each quarter. The quarterly performance projections captured in the SDBIP form the basis for the mayor’s quarterly report. 4.3 Mid–year Reporting Section 72 (1) (a) of the MFMA outlines the requirements for midyear reporting. The Accounting Officer is required by the 25th January of each year to assess the performance of the municipality during the first half of the year taking into account – (i) (ii) (iii) (iv) the monthly statements referred to in section 71 of the first half of the year the municipalities service delivery performance during the first half of the financial year, and the service (iii) delivery targets and performance indicators set in the service delivery and budget implementation plan; the past year’s annual report, and progress on resolving problems identified in the annual report; and the performance of every municipal entity under the sole or shared control of the municipality, taking into account reports in terms of section 88 from any such entities. Based on the outcomes of the mid-year budget and performance assessment report, an adjustment budget may be tabled if actual revenue or expenditure amounts are materially different from the projections contained in the budget or the SDBIP. The SDBIP is also a living document and may be modified based on the mid-year performance review. Thus the SDBIP remains a kind of contract that holds the City accountable to the community. 4 5. CITY SCORECARDS • Three Year Corporate Scorecard (2011/12 Review) High level city wide service delivery breakdown is presented in this section. Service delivery targets and performance indicators will be cascaded into the Directorate, Departmental and Executive Director’s Scorecards, which will be used for internal monitoring of the organisation. The eight Strategic Focus Areas (SFAs) are broken down into corporate objectives for the City and each corporate objective is further broken down into directorate objectives. The following corporate objectives have been identified: 1A 2A 2B 2C 3A 4A 5A 5B 6A 7A 8A 8B 8C Create an enabling environment for the economy to grow and become globally competitive Provide access to basic service Conserve natural resources Effectively manage the City’s infrastructure and resources Develop, adopt and implement a comprehensive response to Cape Town’s energy and climate change challenges Improve public transport system and services Provide equitable community facilities and services across the City Deliver housing opportunities in accordance with the five year housing plan (reviewed annually) Foster a safe and secure environment Facilitate the development of a healthy and socially inclusive society Ensure enhanced service delivery with efficient institutional arrangements Manage key financial and governance areas such as income control, cash flow, indigent support, alternative income opportunities, asset and risk management Establish effective community engagement channels • 2011/2012 Quarterly Corporate Scorecard There are three sections to this annual scorecard, i.e. Alignment and Linkage, Objective and Indicator Detail, and Tracking and Monitoring. The scorecard provides the quarterly corporate targets against which the City will be held accountable. Service delivery targets and performance indicators will be cascaded into the Directorate, Departmental and Executive Director’s Scorecards (Section 57 employees), which will be used for internal monitoring of the organisation. • Scorecard Indicator Definitions for 2011/2012 Definitions and the Standard of the indicators are provided to clarify the measurement. These are attached as Annexure A 5 6 INDICATOR Sustainable water supply Manage maintenance of City infrastructure 80% 80% 80% 75% 2B.1 Megaliters of water consumed to meet water demand target 2A.7 Number of formal domestic customers receiving a kerbside refuse collection service 2A.8 Number of informal settlement dwellings receiving a door-todoor refuse collection and area cleaning service 2A.6 Number of additional electricity subsidised connections installed 2A.5 Number of electricity meters serving domestic customers <1,3 20% 96% 2C.3 Percentage unaccounted for water 2C.4 Percentage drinking water compliance to SANS 241 R1 799bn** 96% 18% <1,3 R1 943bn** 82% 82% 2C.2 SAIFI (System Average Interruption Frequency Index) 2C.1 Amount spent on repairs and maintenance 11,95% 360 122MI 224 001 614 962 3 000 571 416 7 200 590 947 10,95% 349 633 MI 212 042 609 495 3 000 565 311 7 000 588 007 2A.4 Number of water service points (taps) installed for informal settlement customers 2A.3 Number of formal domestic customers receiving water services 34 268 591 385 22 000 22 000 588 443 R4 766bn** PROPOSED TARGET 2012/2013 R4 835bn** PROPOSED TARGET 2011/2012 32 268 Baseline to be updated after 30 June 2010/2011* 2A.2 Number of sanitation service points (toilets) installed for informal settlement customers 2A.1 Number of formal domestic customers receiving sewerage services 2B.2 Percentage of waste diverted from Council Waste Management Minimise waste Facilities 2B.3 Percentage compliance with 4 critical DWA effluent standards Safeguard human health, protect natural aquatic environment, and (e-coli count, Ammonia content, Oxygen demanding substances, total improve and maintain recreational water quality suspended solids) 2C. Effectively manage the City’s infrastructure and resources Manage water demand 2B. Conserve natural resources Access to refuse collection services Access to electricity Acess to water Access to sanitation 1A. Create an enabling environment for the economy to grow and become globally competitive Municipal investment into the economy 1A.1 Capital budget spend Increase number of Expanded Public Works Programme (EPWP) 1A.2 Number of EPWP job opportunities created job opportunities 1A.3 Percentage of Land Use application finalised within statutory Maintain approval time for Land Use and Planning applications timeframes 1A.4 Percentage of Building plans finalised within statutory Maintain approval time for Building Plan applications timeframes 2A. Provide access to basic services LEGOTLA TOP 20 OBJECTIVE 5.1 THREE YEAR 2011/2012 CORPORATE SCORECARD 1. Shared economic growth STRATEGIC and development FOCUS AREA 2. Sustainable urban infrastructure and services 96% 16.5% <1,3 R2 124bn** 82% 12,95% 368 385MI 236 635 620 497 3 000 577 521 7 400 593 902 36 268 594 327 85% 85% 22 000 R5 049bn** PROPOSED TARGET 2013/2014 7 STRATEGIC FOCUS AREA 3. Energy efficiency for a sustainable future 5. Integrated human settlements 4. Public transport systems INDICATOR 3A.1 GWh of electricity purhcased to meet electricity consumption target 5A.4 Number of halls maintained to specified standard Total = 180 500 500 8 800 1 400 5B.1 Number of housing opportunities provided per year 5B.2 Number of housing opportunities provided through the informal settlement upgrade programme Implementation of structured programme for the upgrade of erven in informal settlements 1 500 9 000 180 68 68 180 2 820 Delivery of housing opportunities in accordance with the five year housing plan 5B. Deliver housing opportunities in accordance with the five year housing plan (reviewed annually) Maintain community facilities open for community use at required standard 5A.1 Number of Community Parks maintained according to selected service standards Total = 3 133 5A.2 Number of libraries open according to minimum planned open hours, including ad hoc Unforeseen Closing Hours Total = 98 5A.3 Number of fenced formal Sport fields compliant with the defined level grass cover standard Total = 524 95% 95% – PROPOSED TARGET 2012/2013 2 820 95% 4A.2 Percentage spend of the operating budget on road and infrastructure maintenance NEW 95% 5A. Provide equitable community facilities and services across the City Improve the regulation and service levels of the bus and taxi industry 10 936 GWh PROPOSED TARGET 2011/2012 4A.1 Percentage of capital budget spent on Phase 1a of the IRT project 4A. Improve public transport system and services (for e.g. the implementation of phase 1A of the integrated rapid transit programme) Manage energy consumption 3A. Develop, adopt and implement a comprehensive response to Cape Town’s energy and climate change challenges LEGOTLA TOP 20 OBJECTIVE Baseline to be updated after 30 June 2010/2011* 1 500 9 000 180 500 68 2 820 95% 95% – PROPOSED TARGET 2013/2014 STRATEGIC FOCUS AREA 6. Safety and security 7. Health, social and community development 6A.4 Percentage response times for fire and other emergency incidents within 14 minutes from call receipt up to arrival Improve response time of the Fire and Rescue Service NEW 6A.3 Percentage increase in arrests in drug related crimes Increase in drug related arrests 7A.3 The City’s ante-natal HIV prevalence Slow the rate of increase of the City’s ante-natal HIV prevalence 100% 8A.2 Percentage improvement of responsiveness in service delivery Improvement of responsiveness to service delivery 100% 40% bi-ennial survey 19,8% 130 20 85% 4% 189 5% 1 104 ≥2.7 PROPOSED TARGET 2012/2013 100% – bi-ennial survey 19,8% 130 20 85% 4% 183 5% 1 160 ≥2.7 PROPOSED TARGET 2013/2014 8B.2 Opninion of independent rating agency (high investment rating) 8B.3 Percentage spend of capital budget Maintain the City’s Credit Rating Create assets for public benefit Improved customer satisfaction 8C.1 Community satisfaction (Score 1-5) 8C. Establish effective community engagement channels 8B.1 Opinion of Auditor General An unqualified audit 2,8 2,8 95% A1+ (short term) AA- (long term) A1+ (short term) AA- (long term) 95% Unqualified Audit Report Unqualified Audit Report **Projected cashflows are subject to change as and when adjustment budgets are approved during a financial year. 2,8 95% A1+ (short term) AA- (long term) Unqualified Audit Report 8B. Manage key financial and governance areas such as income control, cash flow, indigent support, alternative income opportunities, asset and risk management – bi-ennial survey 8A.1 % ‘truly loyal’ employees as measured by the employee culture / climate survey Increase levels of employee morale 8A. Ensure enhanced service delivery with efficient institutional arrangements 133 7A.2 Number of days when air pollution exceeds WHO guidelines Reduce air pollution 19,8% 20 7A.1 Number of targeted development programmes Educate parents, caregivers and Early Childhood Development (ECD) forums 7A. Facilitate the development of a healthy and socially inclusive society 4% 197 5% 1 052 6A.2 Percentage reduction in accident rate at high frequency locations Reduce the occurrence of vehicle accidents 85% ≥2.7 PROPOSED TARGET 2011/2012 6A.1 Survey score on 5 point symmetric scale INDICATOR Maintain Community Survey Score in the perception of anti-social behaviour and general disorder 6A. Foster a safe and secure environment LEGOTLA TOP 20 OBJECTIVE Baseline to be updated after 30 June 2010/2011* NOTES: *The baseline figures will be finalised and updated with the actual achievements after the 30 June 2011. These figures will be available at www.capetown.gov.za/idp after September 2011. 8. Good governance and regulatory reform 8 9 CONTRIBUTING OBJECTIVE INDICATOR Access to electriicty Access to refuse collection services – – Access to water Access to sanitation Utility Services – – – Manage water demand 80% 75% 80% 75% 2A.8 Number of informal settlement dwellings receiving a door-to-door refuse collection and area cleaning service 2A.7 Number of formal domestic customers receiving a kerbside refuse collection service Annual Target 10,15% 341 996MI Bi-annual 605 418 750 560 732 2A.5 Number of electricity meters serving domestic customers 2A.6 Number of additional electricity subsidised connections installed 6 850 2A.4 Number of water service points (taps) installed for informal settlement customers 585 956 2A.3 Number of formal domestic customers receiving water services Annual Target 10,35% 344 542MI 206 382 606 777 1 500 562 259 6 900 586 545 31 750 586 979 11 000 4 000 586 247 R1,812bn** 2nd @ 31 Dec. 2011 Annual Target 10,55% 347 088MI Bi-annual 608 136 2 250 563 785 6 950 587 276 32 000 587 711 75% 80% 16 500 R2,938bn** 3rd @ 31 Mar. 2012 QUARTERLY TARGETS R,818bn** 1st @ 30 Sept. 2011 31 500 Baseline to be updated after 30 June 2010/2011* 2A.2 Number of sanitation service points (toilets) installed for informal settlement customers 2B.1 Megaliters of water consumed to meet water demand target 2B.2 Percentage of waste diverted from Minimise waste Council Waste Management Facilities 2B.3 Percentage compliance with 4 critical Safeguard human helath, protect natural DWA effluent standards (e-coli count, aquatic environment, and improve and Ammonia content, Oxygen demanding maintain recreational water quality substances, total suspended solids) 2B. Conserve natural resources Utility Services – – 2A.1 Number of formal domestic customers receiving sewerage services 1A. Create an enabling environment for the economy to grow and become globally competitive Finance All Municipal investment into the economy 1A.1 Capital budget spend Increase number of Expanded Public Works 1A.2 Number of EPWP job opportunities Housing ** Programme (EPWP) job opportunities created Maintain approval time for Land Use and 1A.3 Percentage of Land Use applications – Planning applications finalised within statutory timeframes Strategy & Planning Maintain approval time for Building Plan 1A.4 Percentage of Building plans finalised – applications within statutory timeframes 2A. Provide universal access to basic services LEAD DIRECTORATE/S 5.2 2011/2012 QUARTERLY CORPORATE SCORECARD STRATEGIC FOCUS AREA 1. Shared economic growth and development 2. Sustainable urban infrastructure and services 82% 10,95% 349 633MI 212 042 609 495 3 000 565 311 7 000 588 007 32 268 588 443 75% 80% 22 000 R4,835bn** 4th @ 30 June 2012 10 STRATEGIC FOCUS AREA 2. Sustainable urban infrastructure and services 3. Energy efficiency for a sustainable future 4. Public transport system 5. Integrated human settlements CONTRIBUTING OBJECTIVE INDICATOR Baseline to be updated after 30 June 2010/2011* 1st @ 30 Sept. 2011 – Manage energy consumption 3A.1 GWh of electricity purchased to meet electricity consumption target 2 879 GWh – – Maintain community facilities open for community use at required standard 180 5A.4 Number of halls maintained to specified standard Total = 180 TR&MP &Utility Serv. Implementation of structured 5B.2 Number of housing opportunities programme for the upgrade of erven provided through the informal settlement in informal settlements upgrade programme 200 1 500 360 68 5A.3 Number of fenced formal Sport fields compliant with the defined level grass cover standard Total = 524 5A.2 Number of libraries open according to minimum planned open hours, including ad hoc Unforeseen Closing Hours Total = 98 5B. Deliver housing opportunities in accordance with the five year housing plan (reviewed annually) Utility Serv., Strat Delivery of housing opportunities 5B.1 Number of housing opportunities per & Plan, in accordance with the five year year Hsg Fin & housing plan Housing TR&MP Community Services – 4A. Improve public transport system and services (for e.g. the implementation of phase 1A of the integrated rapid transit programme) 4A.1 Percentage of capital budget spent on – 15,66% Phase 1a of the IRT project Improve the regulation and service TR&MP levels of the bus and tax industry 4A.2 Percentage spent of the operating – 11% budget on road and infrastructure maintenance 5A. Provide equitable community facilities and services across the City 5A.1 Number of Community Parks maintained 2 663 – according to selected service standards (85%) Total = 3 133 Utility Services 2C. Effectively manage the City’s infrastructure and resources Finance – 2C.1 Amount spent on repairs and maintenance Annual Target Manage maintenance of city 2C.2 System Average Interruption Frequency – ≤1,3 infrastructure Index (SAIFI) Utility – 2C.3 Percentage unaccounted for water 22% Services 2C.4 Percentage drinking water compliance to – Sustainable water supply 96% SANS 241 3A. Develop, adopt and implement a comprehensive response to Cape Town’s energy and climate change challenges LEAD DIRECTORATE/S 20% 96% 20% 96% 450 3 000 180 400 68 700 5 000 180 450 68 2 726 (87%) 57% 31% 2 444 (78%) 58,35% 34,04% 8 128 GWh ≤1,3 ≤1,3 5 545 GWh Annual Target 3rd @ 31 Mar. 2012 Annual Target 2nd @ 31 Dec. 2011 QUARTERLY TARGETS 1 400 8 800 180 500 68 2 820 (90%) 95% 95% 10 936 GWh 96% 20% ≤1,3 R1 799bn** 4th @ 30 June 2012 STRATEGIC FOCUS AREA 6. Safety and security 7. Health, social and community development CONTRIBUTING OBJECTIVE Increase in drug related arrests Improve response time of the Fire and Rescue Service – – – Increase Community Suvey Score in the perception of anti-social behaviour and general disorder Reduce the occurrence vehicle accidents – – Health Health 33 7A.2 Number of days when air pllution exceeds WHO guidelines 7A.3 The City’s ante-natal HIV prevalence Reduce air pllution Slow the rate of increase of the city’s ante-natal HIV prevalence 8A.2 Percentage improvement of responsiveness in service delivery Improvement of responsiveness to service delivery All 100% – 100% – 19,8% 67 8 85% 2% 201 accidents 2,5% 501 ≥2,7 2nd @ 31 Dec. 2011 100% – 19,8% 100 15 85% 3% 199 accidents 3,75% 751 ≥2,7 3rd @ 31 Mar. 2012 QUARTERLY TARGETS Maintain the City’s Credit Rating Create assets for public benefit – All an unqualified audit Strategy & Planning All Improved customer satisfaction 8C. Establish effective community engagement channels Finance – – 16% 8B.3 Percentage spend of capital budget 8C.1 Community satisfaction (Score 1-5) – – 8B.2 Opinion of independent rating agency (high investment rating) 8B.1 Opinion of Auditor General – 36% – Unqualified Audit Report – 58% – Unqualified Audit Report 8B. Manage key financial and governance areas such as income control, cash flow, indigent support, alternative income opportunities, asset and risk management Corporate Services 8A.1 % ‘truly loyal’ employees as measured by the employee culture / climate survey Improvement of responsiveness to service delivery All 19,8% 0 7A.1 Number of targeted development programmes Educate parents, caregivers and ECD forums 8A. Ensure enhanced service delivery with efficient institutional arrangements – Econ, Social Dev & Tourism 85% 1% 203 accidents 1,25% 250 6A.2 Percentage reduction in accident rate at high frequency locations 6A.3 Percentage increase in arrest in drug related crimes 6A.4 Percentage response times for fire and other emergency incidents within 14 minutes from call receipt up to arrival 1st @ 30 Sept. 2011 ≥2,7 Baseline to be updated after 30 June 2010/2011* 6A.1 Survey score on 5 point symmetric scale INDICATOR 7A. Facilitate the development of a healthy and socially inclusive society Safety & Security – 6A. Foster a safe and secure environment LEAD DIRECTORATE/S 2,8 95% Unqualified Audit Report A1 + (short term) AA - (long term) 100% 34% (note: survey conducted biennially) 19,8% 133 20 85% 4% 197 accidents 5% 1052 ≥2,7 4th @ 30 June 2012 NOTE: * The baseline figures will be finalised and updated with the actual achievements after the 30 June 2011. These figures will be available www.capetown.gov.za/idp after September 2011. 8. Good governance and regulatory reform 11 12 Table: National Key Performance Indicators (g) Financial ratios (f) The percentage of a municipality’s budget actually spent on implementing its workplace skills plan; and (e) The number of people from employment equity target groups employed in the three highest levels of management in compliance with a municipality’s approved employment equity plan; (d) The number of jobs created through municipality’s local economic development initiatives including capital projects; (c) The percentage of a municipality’s capital budget actually spent on capital projects identified for a particular financial year in terms of the municipality’s integrated development plan; (b) The percentage of households earning less than R1100 per month with access to free basic services; (a) The percentage of households with access to basic level of water, sanitation, electricity and solid waste removal; 5.3 NATIONAL KEY PERFORMANCE INDICATORS On the Corporate Scorecard and at Directorate level Indicator measured at Directorate level. Measured on the Directorate Scorecard Measured on the Corporate Scorecard Measured on the Corporate Scorecard Replaced with proxy measures on Corporate Scorecard (informal) Replaced with proxy measures on Corporate Scorecard (formal) 13 Energy effeciency for a sustainable future 0% (rounded from 0.26) Sustainable Urban Infrastructure and Services 43% Shared Economic Growth and Development 2% The major portion of the capital budget will be spent on upgrading the City’s infrastructure, Public Transport Systems and Integrated Human Settlements. Public Transport Systems 31% Safety and Integrated Human Security 1% Settlements 16% Health, Social & Good Governance and Community Regulatory Reform Development 5% 2% 6.1 Capital budget spending per IDP Strategic Focus Area (SFA) 6. THREE YEAR CAPITAL PLAN (CAPITAL BUDGET 2011/2012 – 2013/14) 14 Sustainable Urban Infrastructure and Services Sustainable Urban Infrastructure and Services Shared Economic Growth & Development Shared Economic Growth & Development STRATEGIC FOCUS AREA 30 650 000 Safeguard health, protect natural aquatic etc. 192 320 000 22 000 000 138 373 894 50 800 000 Access to sanitation Access to water Manage maintenance of City Infrastructure Sustainable water supply 2 191 571 659 194 635 611 Integration in infrastrastructure., service plans and budget 5 500 000 21 859 688 Conserve biodiversity & improve living environment Manage and maintain the City’s beach nodes 20 100 000 77 150 000 1 438 182 466 84 320 852 30 000 000 450 000 Reduce impact of floods on community livelihood Demand management programs (utilities,transport) Prioritise large bulk infrastructure programs Maintain approval time for building and land use applications Develop new & strengthen existing partnerships 50 251 480 2 521 024 Develop and grow LED & SMME opportunities Municipal investment into the economy 1 098 348 BUDGET 2011_2012 Grow & strengthen the City’s tourism capability DIRECTORATE OBJECTIVE THREE YEAR CAPITAL BUDGET BY IDP STRATEGIC FOCUS AREA AND DIRECTORATE OBJECTIVE 2 144 341 599 500 000 67 609 073 0 188 300 000 182 880 760 21 000 000 57 200 000 950 000 7 800 000 142 973 860 1 475 127 906 35 145 262 15 000 000 430 000 19 715 262 0 0 BUDGET 2012_2013 2 398 260 482 7 000 000 10 200 000 0 124 250 000 398 526 393 15 000 000 45 181 000 945 000 4 000 000 61 600 000 1 731 558 089 24 810 262 0 430 000 24 380 262 0 0 BUDGET 2013_2014 15 Safety and Security Safety and Security Integrated Human Settlements Integrated Human Settlements Public Transport Systems Public Transport Systems 41 569 978 Implementation of structural programme for the upgrade of erven in informal settlements. Reduce the occurrence of vehicle accidents Develop single emergency number 42 387 128 0 126 194 19 223 492 18 227 442 Increase the effectiveness of the City’s Law Enforcement Services Improve response time of the Fire and Rescue Service 4 360 000 450 000 Develop CCTV network for adequate cover Improve urban design to reduce crime & emergency 316 102 401 Delivery of housing opportunities in accordance with the five year housing plan 796 368 700 18 900 000 1 400 000 418 396 321 Maintain community facilities open for community use at required standard Establish policy & spatial planning frameworks Transform dormitory suburbs 42 534 173 Increase commuters using public transport 1 570 562 880 72 575 905 8 543 860 1 446 908 942 13 000 000 13 000 000 BUDGET 2011_2012 Promote non-motorised transport (NMT) Reduce average peak period travel time Improve public transport & secure new investment Manage energy consumption Energy Efficiency for a Sustainable Future Energy Efficiency for a Sustainable Future DIRECTORATE OBJECTIVE STRATEGIC FOCUS AREA 18 562 867 0 0 6 485 090 11 577 777 500 000 0 841 746 157 78 831 579 293 814 501 20 750 000 1 400 000 446 950 077 1 334 412 182 0 42 000 000 27 000 000 1 265 412 182 0 0 BUDGET 2012_2013 16 762 867 2 286 142 0 6 383 465 8 093 260 0 0 739 286 767 119 717 000 244 365 801 17 800 000 1 400 000 356 003 966 1 509 230 474 0 60 000 000 0 1 449 230 474 0 0 BUDGET 2013_2014 16 2 700 000 74 218 674 Provide developmental programs & events Promote sustainable community & healthy lifestyles 1 716 960 Improve service culture and workplace ethics 53 073 545 Create new assets for public benefit 5 089 866 927 280 939 265 58 336 630 540 000 93 874 367 Improved customer satisfaction Establish representative Ward Mechanisms Improve organisation & regulatory environment 27 607 613 16 674 578 Enhance service delivery via alternate mechanisms Management of key financial areas 29 115 572 Optimise staff structure/strategy/policy/skills 110 716 443 9 100 000 23 547 769 Provide effect primary health care with Province Educate parents, caregivers and ECD forums 1 150 000 BUDGET 2011_2012 Provide effective environmental health services DIRECTORATE OBJECTIVE Table: Three Year Capital Budget by IDP Strategic Focus Area and Directorate Objective Grand Total Good Governance and Regulatory Reform Good Governance and Regulatory Reform Health,Social & Community Development Health,Social & Community Development STRATEGIC FOCUS AREA 4 765 896 828 281 241 221 3 000 000 73 803 402 250 000 77 911 657 54 260 613 1 399 989 13 358 489 57 257 071 110 447 540 89 551 074 3 000 000 0 17 496 466 400 000 BUDGET 2012_2013 5 049 164 982 239 375 788 8 000 000 35 600 000 250 000 77 907 499 50 093 156 5 500 415 5 557 647 56 467 071 121 438 342 110 041 876 0 0 10 796 466 600 000 BUDGET 2013_2014 17 Interest earned 2% Other revenue 21 % 7.1 Monthly Projections of Revenue by source Service charges 56% Revenue by Major Source This section contains the financial information as required of the SDBIP 7. REVENUE AND EXPENDITURE PROJECTIONS Property rates 21% •• •• •• •• •• •• Rental of facilities and equipment Fines Licences and permits Agency services Transfers recognised operational Gains on disposal of Property, Plant & Equipment (PPE) Other revenue includes: 18 1 671 160 1 800 617 208 157 717 131 251 8 916 2 923 14 233 18 195 15 911 22 076 52 840 68 125 72 414 119 740 703 723 7 147 405 199 Aug-11 1 853 676 1 753 157 719 135 736 9 666 2 819 11 113 18 195 15 911 21 989 53 302 70 340 74 384 128 608 762 224 7 147 382 770 Sep-11 1 753 157 717 155 440 9 666 2 507 15 574 18 195 15 911 21 989 48 814 70 340 82 265 137 728 570 674 7 147 391 862 Oct-11 1 707 582 Table: Monthly Projections of Revenue by Source – Rand in Thousands Total Revenue (excluding capital transfers and contributions) 1 524 158 057 Other revenue Gains on disposal of PPE 127 826 Transfers recognised - operational 7 616 15 911 Interest earned - external investments Agency services 22 076 Rental of facilities and equipment 2 819 50 254 Service charges - other Licences and permits 58 540 Service charges - refuse revenue 15 273 72 414 Service charges - sanitation revenue Fines 112 646 Service charges - water revenue 18 195 683 722 Service charges - electricity revenue Interest earned - outstanding debtors 7 147 317 141 Jul-11 Property rates - penalties & collection charges Property rates CATEGORY DESCRIPTION 1 838 533 1 753 157 728 163 009 9 666 2 507 15 574 18 195 15 911 21 989 51 091 69 180 89 161 155 311 689 352 7 147 370 960 Nov-11 MONTHLY PROJECTIONS OF REVENUE BY SOURCE – RAND IN THOUSANDS 1 794 450 9 977 160 207 155 039 9 666 2 507 15 574 18 195 16 661 21 989 50 374 69 180 79 309 155 311 622 071 7 147 401 244 Dec-11 1 896 848 833 160 205 155 814 9 666 2 507 15 574 18 195 15 911 21 989 57 416 69 180 97 041 196 102 662 534 7 147 406 734 Jan-12 1 855 769 11 330 160 205 157 854 9 666 2 403 15 574 18 195 15 911 21 989 53 646 69 180 88 175 181 914 673 075 7 147 369 505 Feb-12 1 830 986 6 269 160 207 163 514 9 666 2 403 15 574 18 195 15 911 21 989 50 478 69 180 88 175 171 273 677 718 7 147 353 288 Mar-12 1 853 760 5 769 160 205 168 444 9 666 2 299 15 574 18 195 15 911 21 989 52 366 69 180 98 027 174 820 617 913 7 147 416 255 Apr-12 1 869 154 31 103 160 205 175 424 9 666 2 177 15 574 18 195 15 911 21 989 52 496 69 149 85 220 157 084 660 227 7 147 387 587 May-12 2 008 700 32 728 162 110 208 465 12 467 2 175 21 681 18 190 16 655 21 990 52 294 68 836 64 533 137 558 802 431 7 147 379 440 Jun-12 21 981 235 105 000 1 912 282 1 897 816 115 993 30 046 186 892 218 335 192 426 264 043 625 371 820 410 991 118 1 828 095 8 125 664 85 759 4 581 985 TOTAL 19 Office of the City Manager 2% Rates & Others 3% Finance Services 7% Health 3% Housing 3% Internal Audit 0% (rounded from 0.15%) Economic and Social Development 2% Projects 8% Safety and Security 6% Strategy and Planning 2% Transport, Roads and Major Corporate Services 7% The City’s structure is broken down into Directorates with a further breakdown into departments. The MFMA requires that the SDBIP includes a breakdown of the monthly expenditure by vote, which equates to a Directorate in the City. Utility Services 51% Community Services 6% 7.2 MONTHLY OPERATING EXPENDITURE BY DIRECTORATE (VOTE) - RAND IN THOUSANDS 20 1 300 945 462 805 Utility Services Total Expenditure by Vote 119 006 26 463 Office of the City Manager Transport , Roads and Major Projects 2 683 Internal Audit 30 423 49 341 Housing Strategy and Planning 58 972 Health 98 278 127 305 Finance Services Safety & Security 26 127 Economic and Social Development 55 254 144 131 Corporate Services Rates & Other 100 159 Jul-11 Community Services DIRECTORATE 2 034 858 1 201 036 123 298 31 492 102 778 55 254 26 456 2 683 50 417 59 066 127 435 26 411 127 764 100 769 Aug-11 2 029 850 1 177 302 132 250 32 119 103 156 55 254 26 716 2 800 53 235 58 967 128 928 27 248 129 519 102 357 Sep-11 1 748 994 870 720 149 513 31 706 106 548 55 254 26 769 2 736 55 753 58 942 131 392 27 898 130 125 101 639 Oct-11 1 772 952 879 633 151 202 32 305 107 669 55 254 26 784 2 702 61 444 58 968 127 365 27 810 135 777 106 041 Nov-11 1 758 325 863 542 153 413 31 550 106 589 55 254 26 705 2 847 53 842 58 826 142 771 28 510 131 452 103 025 Dec-11 842 875 157 559 31 744 106 876 55 254 26 270 2 737 52 510 58 930 128 444 28 210 126 531 102 623 Jan-12 1 720 562 MONTHLY OPERATING EXPENDITURE BY DIRECTORATE (VOTE) - RAND IN THOUSANDS 1 762 323 858 254 158 145 33 009 108 323 55 254 26 254 2 703 57 287 59 155 128 065 28 055 144 673 103 147 Feb-12 1 769 454 847 790 163 002 33 559 106 286 55 254 26 262 2 820 62 840 58 985 128 129 28 557 149 262 106 708 Mar-12 1 778 736 878 665 162 999 33 366 104 232 55 254 26 267 2 703 67 921 58 995 128 076 28 045 129 276 102 939 Apr-12 1 775 699 867 923 162 882 33 507 104 234 55 254 26 297 2 703 75 516 58 816 128 034 28 563 128 984 102 987 May-12 11 369 576 1 855 942 389 297 1 260 296 679 090 325 441 32 964 754 811 707 404 1 567 385 333 458 1 626 753 1 239 456 Budget Year 2011/12 2 689 177 22 141 875 1 619 031 222 675 34 517 105 328 71 300 34 201 2 850 114 706 58 783 141 442 28 024 149 258 107 062 Jun-12 8. CONCLUSION The City of Cape Town’s Final 2011/2012 Corporate SDBIP has been prepared in accordance with the requirements of the Municipal Finance Management Act. 21 22 1A.4 Percentage of Building plans finalised within statutory timeframes 1A.3 Percentage of Land Use applications finalised within statutory timeframes 1A.2 Number of EPWP jobs opportunities created 1A.1 Capital budget spend INDICATOR INDICATOR DEFINITION Indicator standard/norm/benchmark: 96% Number of applications finalised within statutory timeframes (30-60 days) expressed as a percentage to number of new and resubmitted building plan applications received. The objective is to improve the approval time of the application. This improvement is in the trend over the course of the five year term for the Integrated Development plan, but targeted annually as the percentage achieved for the specific year. Indicator standard/norm/benchmark: 80% Number of applications finalised within legislative framework of 4 or 7 months. The objective is to improve the approval time of the application. This improvement will be in the trend over the course of the five year term for the Integrated Development plan, but targeted annually as the percentage achieved for the specific year. All EPWP compliant projects must have or display the elements of employment and EPWP projects should either be labour intensive or labour enhanced (activity based) • They are highly labour intensive: a large percentage of the overall projects cost is paid out in wages to the target group. • They employ large number of EPWP target group. • The EPWP target group is paid wages between R50 and R100 per day. • The EPWP target groups are employed under the working conditions of Special Public Works Programme (SPWP). 2. Characteristics of EPWP projects and how it differs from a normal job: • Job opportunity refers to paid work created for an individual on an EPWP job. The same person can be employed on different projects and each period of employment will be counted. •• This involves short term and ongoing work opportunities with an average duration of 100 days. • The EPWP specifically targets the creation of employment for the poor unemployed people who are unskilled or poorly skilled. Through this employment opportunity, the programme provides basic income for these people on a temporary basis. 1. An EPWP job opportunity: •• The indicator measures the number of job opportunities created through the expanded of Public Works Programme (EPWP). The objective is to increase the number of EPWP job opportunities measured by the number of jobs. The increase is indicated by the increase trend over the course of the five year term for the Integrated Development plan, but targeted annually as the number of planned jobs created for that specific year. Capital budget spend as per the SAP report. ANNEXURE A – CORPORATE SCORECARD INDICATOR DEFINITIONS FOR 2011/2012 23 2A.7 Number of formal domestic customers receiving a kerbside refuse collection service 2A.6 Number of additional electricity subsidised connections installed 2A.5 Number of electricity meters serving domestic customers 2A.4 Number of water service points (taps) installed for informal settlement customers 2A.3 Number of formal domestic customers receiving water services 2A.2 Number of sanitation service points (toilets) installed for informal settlement customers 2A.1 Number of formal domestic customers receiving sewerage services INDICATOR Proxy measure for NKPI. This indicator reflects the number of formal domestic contract accounts with access to a basic refuse collection service. This is based on a SAP listing of domestic user accounts. This is a tracked record as changes to the database are triggered by applications for the service. The targeted figure includes the baseline. This indicator reflects the additional subsidised connections (for low cost housing and informal settlements) installed per annum. This has been included in the calculation above. Basic Service delivery refers to an electricity connection of at least 1.46kVA. Proxy measure for NKPI. Proxy measure for NKPI. The targeted figure includes the baseline. This indicators reflects the number of active meters (pre-paid and credit) as extracted from the City of Cape Town’s SAP database, covering the Cape Town supply area. The target is based on subsided additional meters in terms of the electrification plan/budget. The additional subsided connections is reflected separately in the indicator below. Proxy measure for NKPI. This indicator reflects the number taps installed in Informal Settlements. Certain installed taps may however have been vandalised or removed after installation.The targeted figure includes the baseline. Proxy measure for NKPI. This indicator reflects the number of active contract accounts for domestic customers making use of the water reticulation system. This includes the number of sectional title units with active domestic contract accounts.This is a tracked record as changes to the database is triggered by applications for the service. The targeted figure includes the baseline. Proxy measure for NKPI This indicator reflects the number of toilets installed in Informal Settlements. Certain installed toilets may have been vandalised or removed after installation. The targeted figure includes the baseline. Proxy measure for NKPI. This indicator reflects the number of active contract accounts for domestic customers making use of the sewerage reticulation system. This includes the number of sectional title units with active domestic contract accounts. All data is extracted from the SAP system. This is a tracked record as changes to the database are triggered by applications for the service. The targeted figure includes the baseline. INDICATOR DEFINITION 24 This indicator reflects the treated potable water consumed in Megaliters measured as the Bulk Water Treated Volume. The upward trend in the targeted figures is indicative of increased consumption due to the population growth. It is estimated that the Actual Demand (measured as the Bulk Water Treated Volume) is 27% below the historically-predicted Unconstrained Water Demand Curve (UWD). Labourers are also responsible for street sweeping, litter picking and illegal dumping removal within and up to a 100 m around their assigned area of responsibility. To ensure that the required cleaning and collections services are efficient, the areas are measured and judged according to predetermined standard of cleanliness. If an area does not comply with the minimum standard of cleanliness, penalties for non-achievement apply. Proxy measure for NKPI The main contractor appoints a local labourer for approximately 400 dwellings. For every six labourers, one supervisor is appointed. The local labourers are changed annually to give employment opportunities to more residents in the community. Each dwelling is provided with sufficient black bags. Full bags are collected on a weekly door-to-door basis and are taken to a container at a centralised collection point where after waste is transported for disposal. The cleaning and collection of domestic refuse in informal settlements is done through contract services, employing local labour. Three-year contracts are awarded to a legitimate main contractor through the procurement tender process. This indicator reflects the number of informal dwellings receiving a weekly door-to-door refuse removal collection service and ongoing area cleaning (litter picking and illegal dumping removal). INDICATOR DEFINITION 2C.1 Amount spent on repairs and maintenance This indicator measures the amount of the operating budget spent on repairs and maintenance. The objective is to improve the maintenance of the city’s infrastructure. Spending on repairs and maintenace is assumed to increase the lifespan of the asset. 2B.3 Percentage compliance with 4 critical DWA effluent standards The overall average of percentage samples passing tests for four critical parameters at each works: TSS 25mg/I, COD 75mg/l, NH3 10 mg/l, E Coli 1 (e-coli count, Ammonia content, Oxygen demanding substances, total 000/100ml. A Spreadsheet calculates the average compliance for four parameters at each works and yields the overall average for the quarter. suspended solids) 2B.2 Percentage of waste diverted from Council Waste Management This indicator reflects the % of waste reduced, through the City’s own initiatives, by diverting recyclables from the waste stream in relation to the mass of Facilities waste disposed at council waste management facilities. 2B.1 Megaliters of water consumed to meet water demand target 2A.8 Number of informal settlement dwellings receiving a door-todoor refuse collection and area cleaning service. INDICATOR 25 This indicator measures progress in the implementation of infrastrucrure required for Phase 1A of the IRT project. The measurement is the actual capital budget spend expressed as a % of capital budget allocated to the project for the financial year. This indicator measures the primary operating budget spend on maintaining the road infrastructure. 3A.1 GWh of electricity purchased to meet electricity consumption target 4A.1 Percentage of capital budget spent on Phase 1a of the IRT project 4A.2 Percentage spend of the operating budget on road and infrastructure maintenance 5A.1 Number of Community parks maintained according to selected service standards This indicator reflects the amount of electricity purchased in GWh. The upward trend in the targeted figures is indicative of increased consumption due to the population growth. The targeted consumption is 10% below the estimated natural growth rate calculated by Eskom. 2C.4 Percentage drinking water compliance to SANS 241 Formula Description: Number of community parks maintained according to selected service standards Selected service standards refers to: Mowing: A minimum of 9 cuts per year, at the discretion of the Managers planning to accommodate seasonal requirements, to a length of less than 50 mm after mowing. The work will be signed off by the Superintendent. The total number of Community parks is 31 33 Measure of potable water sample pass rate according to the SANS 241 standard. 2C.3 Percentage unaccounted for water An interruption is defined as a loss of supply for more than 5 minutes. SAIFI= System Average Interuption Frequency Index Total number of customer interruptions per annum/Total number of customers served or Note that major events such as load shedding by Eskom are excluded in the SAIFI indicator as it would distort the Electricity Services performance and it would make it less useful when comparing performance over a number of years. The indicator reflects the number of interruptions that a customer in the City of Cape Town Electricity supply area would typically experience in the year (excluding major events) in other words how often the average customer connected experiences a sustained interruption per annum (Ratio). Measured against the Medium Voltage (MV) network and in terms of NERSA standard NRS 048-06. INDICATOR DEFINITION The percentage of the total volume of water not billed for, as the difference between the total volume treated for the city and the total volume sold on to end consumers, divided by the total volume treated. It is calculated on a 12-month rolling basis in order to smooth out monthly variations and more clearly show the trend. The growth in total volume treated is estimated forward with the same assumption as used for the water saving indicator (reduction below unconstrained water demand). 2C.2 SAIFI ( System Average Interruption Frequency Index) INDICATOR 26 5A.4 Number of halls maintained to specified standard 5A.3 Number of fenced formal Sport fields compliant with the defined level grass cover standard 5A.2 Number of libraries open according to minimum planned open hours, including ad hoc Unforeseen Closing Hours INDICATOR Formula Description: Number of halls meeting the specified standard for the quarterly period reviewed out of the total number of halls maintained. Total number of halls = 180 The base-line has been reduced from 181 because the Vangate hall has been removed as it is not hired out to the public Specified standards covers three areas namely, the Hall section, the kitchen and the ablution facility.These areas are assessed and rated by the Facility Officer/ Senior/ Principal on a monthly bases and signed off. The assessment is done in terms of cleanliness and the extent to which repairs and maintenance work is required. An overall rating of at least 80% is needed for a facility to qualify as meeting the standard. Formula Description: Number of formal sport fields meeting standard over the quarterly period reviewed Total number of sports fields = 524 The grass cover standard for each sport field is met when the visible sand patches on the field amounts to no more than one square meter. This will be determined by a visual inspection of the sport field conducted on a monthly bases which is recorded and signed off by the relevant manager. Formula Description: The total number of libraries meeting minimum planned open hours recorded for the quarter. Open hours targets are not met when closed for 1 or more scheduled days. Points 2 and 3 are defined as ad hoc unforeseen closing hours. Open hours targets are met in the following instances: 1. Library open for the full scheduled open hours (service hours) on the particular day, Monday-Saturday 2.Library intermittently closed for less than a scheduled working day . 3. Closure for any period due to the migration to a new automated library management system. Total number of libraries = 98 The number of libraries that meet the planned minimum open hour standards Library open hours minimum standards per category: Community libraries (74 Libraries) : 35 hours/per week; Regional libraries (22 Libraries): 45 hours/per week; City wide libraries (2 Libraries): 63 hours/per week. Planned Open Hours INDICATOR DEFINITION 27 The indicator will be measured by the number of households provided with shelter, municipal services or secure tenure in terms of the Upgrading of Informal Settlements Programme (UISP) and the Emergency Housing Programme (EHP). *Definition of a housing opportunity : A housing opportunity reflects access to and delivery of one of the following housing programmes with a defined product and therefore consists of; (a) Subsidy Housing (BNG), which provides a minimum 40m² house; (b) Incremental Housing, which provides access to a serviced site with or without tenure option; (c) Land Restitution Claims, approved by Council or Court decisions; (d) Social and Rental Housing (Social; Institutional and Community Residential Units) , by providing new rental stock, as well as the upgrading and redevelopment of existing rental units; (e) GAP Housing, catering for people earning between R3501-00 and R 10 000-00. Formula: A + B + C + D + E = total A Subsidy Housing (BNG) Provide a minimum 40m² house to families on the waiting list, earning between R 0 and R 3 500 per month, with subsidy amount as provided by the National Housing Department. B Incremental Housing • Provide only a serviced site (roads, water, sewer & electricity), or; • Provide only essential services (shared basic services) with the potential of upgrading, or; • Provide emergency housing (24 m² temporary structure). C Land Restitution Resolved land claims as determined by Council or Court decisions. D Social and Rental Housing • Provide higher density Social rental stock to people earning between R 3 501- R 7 000 or; • Provide higher density rental stock to people on the waiting list earning between R 0 and R 3 500, or; • Upgrading of existing rental units, or; • Redevelopment of existing rental unit. E Gap Housing Cater for families earning between R 3 501 and R 10 000 per month. A) Subsidy Housing (BNG), B) Incremental Housing, C) Land Restitution, D) Social and Rental Housing E) GAP Housing The indicator will measure the number of housing opportunities* created which include; INDICATOR DEFINITION Attached the Position (Description) document regarding UISP & EHP. These are: National Housing Programmes that allow provision of shelter, municipal services and secure tenure. The standards applied for EHP and UISP 5B.2 Number of housing opportunities provided through the informal comprise the provision of gravel or tarred roads, water and waterborne sanitation. These standards are higher than those applied for essential services, which settlement upgrade programme are Council funded. The output (total) for this indicator is included in the total for indicator 5B.1 Formula: A + B = C A Upgrade of Informal Settlements (UISP) The incremental upgrading of Informal Settlements after the provision of municipal services working towards security of tenure. (Land, EIA and Zoning requirements must be met first) B Emergency Housing Programme (EHP) Emergency provision of shelter to residents that are victims of disasters. (may be the first step of the UISP). 5B.1 Number of housing opportunities per year INDICATOR 28 6A.2 Percentage reduction in accident rate at high frequency locations 6A.1 Survey score on 5 point symmetric scale INDICATOR Formula Component - B Component Name - Accidents recorded at the five identified high risk accident locations in the current financial year. Component Definition - represents the sum of the accidents at the five locations for the current. Action Schedule in respect of High Accident Frequency Locations reflects all accidents that occurred at the 5 identified locations. Action Schedules are compiled on a daily basis. In addition, statistics are obtained from the relevant SAPS Stations where all accidents have to be reported. Formula: ((B-A)/A )*100 Formula Component - A Component Name - Accidents recorded at the five identified high risk accident locations as reflected in the baseline Component Definition - represents the sum of the accidents at the five locations. The Road Accident Report represents an accurate account of the occurrence of accidents. It is based on the accident data base kept by the City’s Transport and Roads Dept. • R300, Stock Road and AZ Berman Drive • N7 and Potsdam Road • Kuils River Freeway North and Stellenbosch Arterial • Stellenbosch Arterial and Belhar Drive • Prince George Drive, Wetton and Rosemead Avenue • Traffic Enforcement • Illegal land invasion • Illegal dumping • Noise and disturbances • General enforcement of the City’s By-Laws. This indicator measures the decrease of vehicle accidents in 5 identified high accident frequency locations. These locations are: Formula : A Formula Component Total score in respect of the section in the survey that relates to anti-social behaviour and general disorder. Questionnaires completed by residents as part of the City’s Community Survey which inter alia measures public perception around the following: • Visible presence of traffic enforcement • Action taken against illegal land invasions • Action taken against illegal dumping • Acting on complaints relating to noise and other disturbances • By-Laws being enforced. This indicator measures community perception in respect of the prevailing levels of general disorder in the City. “Anti-social behaviour and Disorder” are concepts frequently used in the law enforcement environment to describe the prevailing sense of lawlessness in a particular area and refers to minor crimes, by-law offences, nuisances and traffic offences which impacts directly on the quality of life of residents. The City’s Community Satisfaction Survey measures public perception around a number of these issues i.e. INDICATOR DEFINITION 29 6A.4 Percentage response times for fire and other emergency incidents within 14 minutes from call receipt up to arrival 6A.3 Percentage increase in arrests in drug related crimes INDICATOR Numerator:- Response times within 14 minutes Denominator:- Total number of calls requiring a response This indicator measures the response times for fire and other emergency incidents within 14 minutes from call receipt up to arrival. The response times is based on the industry norm or standard by which the response times to different types of call outs depending on the risk profile of the area in which the incident occurs. This standard is found in SANS 090 it used to be the old SABS 090 community protection against fire. The aim with this indicator is to ensure that we meet the industry norm or standard set for the specific category or type of incident. The indicator measures the efficiency of Fire and Rescue services. FORMULA Percentage response times within targeted range MEASURE Formula Component- B Component Name - Sum of Arrest Reports in respect of arrests for dealing in drugs Component Definition - Arrest Reports in respect of cases where dealing in all types of illegal drugs is suspected. It mainly relates to the execution of search warrants and the conducting of trap operations. Arrest Reports are completed on a daily basis. • Person/s • vehicles • premises (residential & business) • Arrest Reports are completed on a daily basis Formula Component - A Component Name- Sum of the Arrest Reports in respect of arrests for possession of drugs Component Definition - Arrest Reports in respect of all types of illegal drugs found in the possession of: ((A+B 200910) - (A+B 200809)/ (A+B 200809))*100 “Dealing” in relation to drugs refers to performing any act in connection with the transhipment, importation, cultivation, collection, manufacture, supply, prescription, administration, sale, transmission or exportation of the drug. This indicator measures the increase/decrease in the arrests effected by the Metro Police in respect of drug related crime. The indicator refers to arrests for both “possession of drugs” and “dealing in drugs” with the understanding that: “Possession” in relation to drugs refers to instances where any drug was found in the immediate vicinity of a suspect. INDICATOR DEFINITION 30 7A.3 The City’s ante-natal HIV prevalence 7A.2 Number of days when air pollution exceeds WHO guidelines 7A.1 Number of targeted development programmes INDICATOR Component name B - Total Number of Antenatal Women tested (number) Component Definition- Total number of women attending public health services who have an HIV test Component name A - Number of Antenatal Women tested HIV +ve (number) Component Definition- Number of newly HIV tested women attending public health services Formula: A/Bx100 Prevalence in HIV tested Antenatal Women (Excluding known HIV +ve women (used to measure the change on Antenatal HIV prevalence over time). Layman Description: This measures the number newly HIV tested pregnant women that are HIV +ve. It is calculated to give the number of HIV +ve pregnant women in every 100 pregnant women in the community. This indicator excludes the already known HIV +ve women. Air polution report is compiled every quarter. * Only the active quality monitoring station’s records will be used. Component name - Any day when any one of the criteria pollutants at any one of up to a maximum of 13* air quality monitoring stations in the City exceeds WHO guidelines (days) Component DefinitionPollutants measured: • SO2, NO2, CO, PM-10, O3,H2S, VOC Formula: A Any day when any one of the criteria pollutants at any one of up to a maximum of 13* air quality monitoring stations in the City exceeds WHO guidelines. Layman Description: The number of days where one of the identified air pollution particles is above the levels set by the World Health Organisation. These programmes are provided in accordance to clear specifications which are contained in the Tender Documentation that provides clear specifications together with clear objectives and outcomes for each programme. Monitoring and evaluation mechanisms will be employed to gauge the effectiveness of each programme. The object of the ECD Support Programmes are to support children in their formative years ( between the ages of 1 and 6 years) when it is vital that their needs are adequately met. The City’s ECD Policy requires that training programmes be given to support ECD practitioners, caregivers, parents and ECD governing bodies on the following matters: • Children’s Rights • Effective Parenting • Child Safety • Health and Nutrition • Organisational Development Training for ECD forums • Awareness raising and education on Foetal Alcohol Syndrome (FAS) INDICATOR DEFINITION 31 INDICATOR DEFINITION 8B.1 Opinion of Auditor General 8A.2 Percentage improvement of responsiveness in service delivery Indicator standard/Norm/Benchmark Benchmark – 2007 Unqualified audit report for City Alternatively in relation to a qualified audit opinion the auditor would issue this opinion in whole, or in part, over the financial statements if these are not prepared in accordance with General Recognised Accounting Practices or could not audit one or more areas of the financial statements. This indicator measures good governance and accounting practices and will be evaluated and considered by the Auditor General in determining his opinion. An unqualified audit opinion refers to the position where the auditor having completed his audit has no reservation as to the fairness of presentation of financial statements and their conformity with General Recognised Accounting Practices. This is referred to as “clean opinion”. 4. Calculate the performance against the target of 100% as follows : (% of achievement for Ave days to close) + (% of achievement for closure rate) ÷2 = % Data source is SAP Business Intelligence (BI) 3. Measure the actual performance against the improvement target using the following formula: % of achievement =[(actual-target)/target]*100 Target Q1 = 3% improvement against baseline Target Q2 = 6% improvement against baseline Target Q3 = 9% improvement against baseline Target Q4 = 12% improvement against baseline 1. A Baseline is determined for each of the components using a rolling average. The source of information for this is the SAP Notification system. 2. The Target for improvement is calculated based on the baseline. The targets for improvement are as follows: The indicator is calculated as follows: • The time to close notifications • The closure rate of notifications The indicator measure, the % achievement against a set improvement target, as an average of the following two components: The notification system is an electronic recording system to capture service requests received from customers (internal and external). This indicator reflects the percentage of staff determined to be truly loyal to the City of Cape Town. They are “employees who are truly motivated and will go above and beyond the call of duty to delight your customers” - Ipsos -Markinor. 8A.1 % ‘truly loyal’ employees as measured by the employee culture The unit of measure is the percentage as determined in a staff satisfaction survey. The frequency of measurement is two yearly. / climate survey Formula: The formula is the proprietary copyright of the Independent Service Provider, Ipsos-Markinor. It is based on the responses to the survey which they have undertaken. INDICATOR 32 % reflecting year to date spend/ Total budget – SAP Report 8B.3 Percentage spend of capital budget Indicator standard/Norm/Benchmark The only other comparative would be City of Johannesburg 60%-70% (or 3 – 3.5 on Likert scale). The current baseline lies at 2.6 on the Likert scale of 1 - 5. The objective is to improve the current customer satisfaction level measured through a community satisfaction survey (Score 1 -5) from the 2,4 baseline set for 2008, to a 2,8 in 2012/13. The improvement is calculated by taking the difference between the different financial years. The measure is given against the non-symmetrical Likert scale ranging from : 1 being Poor; 2 being Fair; 3 being Good; 4 being Very Good and 5 Excellent A statistically valid, scientifically defensible score from the annual survey of residents of perceptions of the overall performance of the services provided by the City of Cape Town. This is measured by responses to the survey question “Thinking about all the different services provided by the City of Cape Town municipality, how would you rate the overall performance of the City of Cape Town?” Indicator standard/Norm/Benchmark Benchmark - 2007 A1 + (short term) AA- (long term) 8C.1 Community satisfaction (Score 1-5) INDICATOR DEFINITION A report which reflects credit worthiness of an institution to repay long-term and short-term liabilities. Credit rating is an analysis of the City’s key financial data performed by an independent agency to assess its ability to meet short- and long-term financial obligations. 8B.2 Opinion of independent rating agency INDICATOR 33 Parks Parks Community Services Community Services Parks Parks Parks Sport , Recreation and Amenities Roads and Stormwater Water Services Community Services Community Services Community Services Community Services Transport, Roads & Major Projects Utility Services WARD 2 Parks DEPARTMENT Community Services WARD 1 DIRECTORATE Bellville North Water Supply system Traffic calming: Ward 2: Olive Schreine Jan Burger SG - Upgrading Fencing of POS at Davies Street Boston Ward 2 Total Develop District park: Jack Muller, Bellville Construction of Foot Path: Boshoff Park Upgrading of Parks Upgrade Parks & Landscaped Areas Ward 1 Total WBS ELEMENT DESCRIPTION New Play Park Equipment *Information subject to amendment based on the finalization of the sub council and ward structures ANNEXURE B: CAPITAL BUDGET FOR 2011/2012 TO 2013/2014 BY WARD 3 028 000 500 000 140 000 100 000 60 000 2 216 000 12 000 200 000 60 000 100 000 40 000 ORIGINAL BUDGET 2011_2012 4 000 000 2 000 000 0 0 0 2 000 000 0 0 0 0 0 APPROVED BUDGET 2012_2013 2 000 000 0 0 0 0 2 000 000 0 0 0 0 0 APPROVED BUDGET 2013_2014 34 Parks Sport , Recreation and Amenities Roads and Stormwater Roads and Stormwater Roads and Stormwater Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Community Services Community Services Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Roads and Stormwater Roads and Stormwater Roads and Stormwater Transport Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects WARD 4 Parks DEPARTMENT Community Services WARD 3 DIRECTORATE Joe Slovo Park Traffic calming in Circle road Sidewalks in Koeberg road Milnerton Footways Milnerton drive Stikland Main Substation Oakdale Upgrade New Building Complex Bloemhof Installation of Park Lights: Runkle Rd Installation of Park Lights: Ridgeworth Installation of Park Lights: De La Haye Asbestos Roofing Replacement Traffic calming Ward 3 South Ward 4 Total Ward 3 Total Premix sidewalk Meerlust & Cherry Ward 3 Gravel Ford Street Loumar Ward 3 Jukskei Clubhouse Ward 3 - Upgrade Upgrade of Park Furniture: Ward 3 South Installation of Palisade Fencing WBS ELEMENT DESCRIPTION 4 800 000 4 500 000 80 000 170 000 50 000 79 054 650 0 1 278 800 71 505 850 30 000 30 000 30 000 6 000 000 30 000 50 000 15 000 40 000 10 000 35 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 0 119 083 220 0 0 117 083 220 0 0 0 2 000 000 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 34 654 160 15 055 800 0 17 598 360 0 0 0 2 000 000 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 35 Sport, Recreation and Amenities Roads and Stormwater Roads and Stormwater Community Services Transport, Roads & Major Projects Transport, Roads & Major Projects Sport, Recreation and Amenities Sport, Recreation and Amenities Sport, Recreation and Amenities Existing Settlements Existing Settlements Existing Settlements Housing Land & Forward Planning New Settlements New Settlements Roads and Stormwater Roads and Stormwater Community Services Community Services Housing Housing Housing Housing Housing Housing Transport, Roads & Major Projects Transport, Roads & Major Projects Sport, Recreation and Amenities Community Services Community Services Parks Community Services Sport, Recreation and Amenities Parks Community Services Community Services Parks Community Services WARD 6 Sport, Recreation and Amenities DEPARTMENT Community Services WARD 5 DIRECTORATE Ward 5 Total Okavango Road : Link :Brackenfell Construct Rds:Bottelary/R300 Wallacedene Phase 10B (UISP) Wallacedene Phase 10A (PLS) Scottsdene Housing Project Scottsdene SEFP Project Phase 1 Scottsdene MIG Project Phase 1 Scottsdene CRU Project Phase 1 Wallacedene Hall - Upgrade Ward 6 Total Scottsdene YC - Landscaping: Garden Project. Scottsdene SC (Phase 1) - Upgrade Purchase of S&R Equipment Ward 6 D6 Construct Sports Complex Wallacedene Upgrade of Park: Sydow and Buitesingel Park Upgrade: Suikerbos, Protea Village Develop Cemetery: Wallacedene Sidewalks at Focal Points Edgemead Directional Signs Main Rd Bothasig Edgemead Edgemead SG - Upgrade of Facilities Bothasig/Aber Sher SG - Upgrade WBS ELEMENT DESCRIPTION 60 044 355 0 0 0 17 000 000 8 000 000 1 946 795 0 25 207 560 12 000 20 000 100 000 48 000 3 900 000 120 000 90 000 3 600 000 200 000 50 000 30 000 60 000 60 000 ORIGINAL BUDGET 2011_2012 19 538 715 1 000 000 0 6 000 000 7 000 000 1 000 000 0 4 538 715 0 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 2 000 000 1 000 000 1 000 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 36 Parks Parks Parks Parks Sport , Recreation and Amenities New Settlements Community Services Community Services Community Services Community Services Community Services Housing Transport Electricity Services Transport, Roads & Major Projects Utility Services Parks Parks Health Services Roads and Stormwater Roads and Stormwater Water Services Water Services Water Services Water Services Water Services Community Services Community Services Health Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Utility Services Utility Services Utility Services Utility Services WARD 9 Roads and Stormwater Transport, Roads & Major Projects WARD 8 Library Services DEPARTMENT Community Services WARD 7 DIRECTORATE Ward 8 Total Ward 7 Total Bellville WWTW-USDG Bellville WWTW -Upgrade clarifirs Bellville WWTW -Replacement MCC Bellville WWTW -Replacement blowers Bellville WWTW - EFF Upgrading of sidewalks in Greenlands Ward 9 Total Traffic Calming Alleyne & Labiance Street Kasselsvlei clinic - extensions Palisade Fencing Hendrik & Oop Str. B/S Bellville Cemetery: Upgrade Roads Install of Park Light: Alberta Street Traffic Calming: Ferndale and Helling Upgrading Street Names Ward 8 Scottsdene New CRU Project - 200 unit Purchasing of Sports Equipment Ward 7 Upgrading of Public Open Spaces S/Dene Upgrading of Parks Upgrade Eikendal Memorial Park Installation of Barriers: Midas Park Purchase of Furniture and Equipment WBS ELEMENT DESCRIPTION 102 300 000 90 000 000 0 0 0 12 000 000 95 000 120 000 0 85 000 0 210 000 30 000 100 000 80 000 5 530 800 5 230 800 30 000 63 000 50 000 100 000 30 000 27 000 ORIGINAL BUDGET 2011_2012 89 100 000 58 000 000 0 0 0 31 000 000 0 0 0 0 100 000 0 0 0 0 18 000 000 18 000 000 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 22 300 000 3 000 000 1 000 000 6 000 000 6 000 000 5 000 000 0 0 1 000 000 0 300 000 0 0 0 0 10 000 000 10 000 000 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 37 Parks Parks Parks Parks Economic and Human Development Existing Settlements Existing Settlements Community Services Community Services Community Services Community Services Economic and Social Development Housing Housing Health Services New Settlements Health Housing WARD 11 Parks DEPARTMENT Community Services WARD 10 DIRECTORATE Kalkfontein Phase 3 Housing Project Sarepta Clinic - upgrade of TB area Ward 11 Total Ward 10 Total Workbenches & Machines Skills Centre Ravensmead Computers & printers Read Room Ravensmead Business Support SMME - Ravensmead Business Upgrading of Parks in Ravensmead Upgrading of Median Island, Bellville Upgrade Elizabeth Park, Bellville Develop District park: Jack Muller, Bellville Closing of Cave Elizabeth Park WBS ELEMENT DESCRIPTION 0 0 0 1 150 000 80 000 40 000 200 000 40 000 80 000 150 000 500 000 60 000 ORIGINAL BUDGET 2011_2012 0 0 0 700 000 0 0 0 0 0 200 000 500 000 0 APPROVED BUDGET 2012_2013 9 200 000 9 000 000 200 000 650 000 0 0 0 0 0 150 000 500 000 0 APPROVED BUDGET 2013_2014 38 Sport , Recreation and Amenities Sport , Recreation and Amenities Health Services Roads and Stormwater Community Services Community Services Health Transport, Roads & Major Projects Social Development , Arts & Culture New Settlements Economic and Social Development Housing WARD 13 Water Services Sport , Recreation and Amenities Community Services Utility Services Sport , Recreation and Amenities Community Services Roads and Stormwater Sport , Recreation and Amenities Community Services Transport, Roads & Major Projects Parks DEPARTMENT Community Services WARD 12 DIRECTORATE Belhar/Pentech Strip: 350 Units Construct ECD Centres-Delft Regional resources development Construction Tarring of parking area Construction of raised intersection St Vincent Clinic - Extensions Huguenot Hall - Purchase of Fridge D4 Huguenot Square Hall Belhar Minor Hall - Upgrade Belhar Minor Hall - Purchase of Fridge Ward 13 Total Ward 12 Total Belhar Minor Hall - Purchase Equipment Upgrade of Parks in Belhar WBS ELEMENT DESCRIPTION 5 619 900 5 619 900 0 9 210 000 7 000 000 80 000 65 000 0 4 000 1 920 000 50 000 4 000 12 000 75 000 ORIGINAL BUDGET 2011_2012 5 043 600 2 043 600 3 000 000 5 000 000 4 000 000 0 0 1 000 000 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 1 500 000 0 0 0 1 500 000 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 39 Parks Parks Health Services New Settlements Roads and Stormwater Water Services Water Services Community Services Community Services Health Housing Transport, Roads & Major Projects Utility Services Utility Services Parks Parks Roads and Stormwater Roads and Stormwater Roads and Stormwater Electricity Services Water Services Water Services Water Services Water Services Water Services Community Services Community Services Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services WARD 15 Parks DEPARTMENT Community Services WARD 14 DIRECTORATE Zandvliet WWTW-Extension (USDG) Zandvliet WWTW-Extension Ward 15 Total SWest Bus Park Main Sewer (lower leg) Remove midblock water network-Bishop Lavis Provision of Sewerage to Croydon Street lights Sandvlei and Kramat Tarring sidewalk Hospital to SAPS CSRM: Somerset West 10HA: SW Croydon - Roads & Stormwater Vaalfontein Cemetery Development Upgrading of Parks Ward 14 Total Zevenwacht Reservior & appurtenant works Penhill Sewer Installation Buttskop Rd upgrading Happy Valley Phase 2 - 1000 Units Bluedowns Clinic - Upgrade of Security Welmoed Cemetery Development Upgrade Kuils River Cemetery Develop Kuils River Corridor to District Park WBS ELEMENT DESCRIPTION 29 530 000 12 660 000 0 5 000 000 3 000 000 500 000 150 000 125 000 2 000 000 1 700 000 4 370 000 25 000 39 631 846 0 0 0 35 000 000 500 000 3 301 846 830 000 0 ORIGINAL BUDGET 2011_2012 69 300 000 38 300 000 22 000 000 0 2 000 000 2 000 000 0 0 0 2 000 000 3 000 000 0 17 820 000 500 000 0 0 15 000 000 300 000 1 920 000 0 100 000 APPROVED BUDGET 2012_2013 41 450 000 34 950 000 0 0 2 000 000 0 0 0 0 1 500 000 3 000 000 0 10 600 000 4 000 000 2 000 000 500 000 0 500 000 2 400 000 900 000 300 000 APPROVED BUDGET 2013_2014 40 Health Services Electricity Services Health Utility Services Economic and Human Development Economic and Social Development Parks Specialised Technical Services New Settlements Community Services Corporate Services Housing WARD 18 Parks Community Services Community Services Parks Parks Community Services WARD 17 Parks DEPARTMENT Community Services WARD 16 DIRECTORATE Ward 17 Total Ward 16 Total Bardale / Fairdale:Develop4000Units Ward 18 Total MP Khayelitsha Building Improvement Upgrade of Play Parks in Ward 18 Business Support SMME - Wesbank Upgrade of Watsonia Park Upgrade of Kleinvlei Cemetery Lights along the canal Eersteriver New facility Eerste River Upgrade of Parks in Ward 16 Develop Metro South-East Cemetery WBS ELEMENT DESCRIPTION 50 300 000 50 000 000 200 000 100 000 300 000 300 000 0 0 14 710 000 150 000 9 410 000 150 000 5 000 000 ORIGINAL BUDGET 2011_2012 12 000 000 12 000 000 0 0 0 0 0 0 9 542 240 0 6 000 000 0 3 542 240 APPROVED BUDGET 2012_2013 0 0 0 0 2 500 000 0 500 000 2 000 000 6 500 000 0 4 500 000 0 2 000 000 APPROVED BUDGET 2013_2014 41 Parks Parks Electricity Services Community Services Community Services Utility Services Parks Parks Community Services Community Services Parks Parks Parks Parks Sport , Recreation and Amenities Sport , Recreation and Amenities Roads and Stormwater Electricity Services Water Services Community Services Community Services Community Services Community Services Community Services Community Services Transport, Roads & Major Projects Utility Services Utility Services WARD 21 Parks Community Services WARD 20 Parks DEPARTMENT Community Services WARD 19 DIRECTORATE Ward 20 Total Ward 19 Total Durbanville Collectors Sewers Ward 21 Total Prov. Pillar Lamps, Erf 4795, Oxford Street Traffic Calming Ward 21 Eversdal Tennis facility upgrade phase 2 Durbanville Tennis Club facility upgrade Ward 21: Durbanville Ave , Upgrade Ward 21: Park Equipment, Signs, Bins Regional Park Upgrade: Durbanville Rose Garden Construction of Foot Path: Vergesig Upgrade/Construction of parks Upgrade of Parks in Delft Delft Cemetery Development Provision of Security Lights Wesbank POS system development Upgrade of Park (Highbury Educare) Development of Play Park - Bardale WBS ELEMENT DESCRIPTION 20 788 000 20 000 000 20 000 80 000 20 000 50 000 30 000 28 000 500 000 60 000 1 200 000 300 000 300 000 600 000 500 000 100 000 0 200 000 200 000 ORIGINAL BUDGET 2011_2012 6 350 000 6 000 000 0 0 0 0 0 0 350 000 0 6 000 000 0 0 6 000 000 100 000 0 100 000 0 0 APPROVED BUDGET 2012_2013 150 000 0 0 0 0 0 0 0 150 000 0 4 000 000 0 0 4 000 000 500 000 0 500 000 0 0 APPROVED BUDGET 2013_2014 42 Parks Parks Existing Settlements Existing Settlements Existing Settlements Existing Settlements New Settlements Community Services Community Services Housing Housing Housing Housing Housing Sport , Recreation and Amenities Health Services Emergency Services Emergency Services Environmental Resource Management Environmental Resource Management Roads and Stormwater Roads and Stormwater Water Services Community Services Health Safety & Security Safety & Security Strategy and Planning Strategy and Planning Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services WARD 23 Parks DEPARTMENT Community Services WARD 22 DIRECTORATE Ward 22 Total Rising Main to Melkbos (New Works) Speed humps Curlewis street Construction of footways in ward 23 Blaauwberg Conservation Area Acquisition of Land Upgrade Melkbosstrand Fire Station Fire Stations : Refurbishment Melkbos Clinic - New security fencing Ward 23 Total White Water Ablution PT6-High mast light Driftsands Housing Project Uitsig MIG Project 25 834 803 0 35 000 100 000 1 700 000 17 260 000 5 074 803 1 500 000 0 165 000 42 777 995 0 10 375 920 32 147 075 50 000 Sewing Machines, Skills Development Programme Belhar Uitsig CRU Project (790 units) 75 000 50 000 40 000 40 000 Installation of toilet Belhar Reading Upgrading of Park, Verbena Str. Belhar Upgrade Park Corner Uitsig & Jupiter Avenue Upgrade Park at Chestnut Place Belhar WBS ELEMENT DESCRIPTION ORIGINAL BUDGET 2011_2012 550 000 0 0 0 550 000 0 0 0 0 0 9 538 145 0 0 9 538 145 0 0 0 0 0 APPROVED BUDGET 2012_2013 950 000 200 000 0 0 550 000 0 0 0 200 000 0 2 000 000 2 000 000 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 43 Parks Sport , Recreation and Amenities Existing Settlements Existing Settlements Roads and Stormwater Electricity Services Community Services Community Services Housing Housing Transport, Roads & Major Projects Utility Services Sport , Recreation and Amenities Economic and Human Development Health Services Existing Settlements Existing Settlements Existing Settlements Existing Settlements New Settlements Roads and Stormwater Community Services Economic and Social Development Health Housing Housing Housing Housing Housing Transport, Roads & Major Projects WARD 25 Parks DEPARTMENT Community Services WARD 24 DIRECTORATE Traffic Calming measures: Ward 25 Eureka & Leonsdale Housing Project Ward 25 Total Upgrade & Construct Reading Room Eureka Flats Connaught SEFP Project Connaught MIG Project Connaught CRU Project (304 units) Ravensmead Clinic - upgrade of TB area Business Support SMME - Tygerberg Entrepreneur Uitsig CC - Upgrade of Ward Office Ward 24 Total Install Streetlights-16th St-Bishop Lavis Tarring of Sidewalk Hester Street Upgrade Reading Room, White Street Office Equipment, Reading Room, White St Lavis Dr Civic Centre - Palisade Fencing Park equipment, Hester Park Install Footway, Hester Park WBS ELEMENT DESCRIPTION 32 358 165 60 000 500 000 240 000 778 720 0 29 884 445 500 000 350 000 45 000 300 000 70 000 52 000 50 000 30 000 60 000 18 000 20 000 ORIGINAL BUDGET 2011_2012 15 553 595 0 5 000 000 0 1 687 220 1 395 260 7 471 115 0 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 3 500 000 0 3 000 000 0 0 0 0 500 000 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 44 Sport , Recreation and Amenities Roads and Stormwater Community Services Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects Economic and Human Development Economic and Human Development Environmental Resource Management Electricity Services Electricity Services Economic and Social Development Economic and Social Development Strategy and Planning Utility Services Utility Services WARD 29 Social Development , Arts & Culture Economic and Social Development WARD 28 Parks Social Development , Arts & Culture DEPARTMENT Community Services WARD 27 Economic and Social Development WARD 26 DIRECTORATE Ward 28 Total Ward 29 Total Pella: Prov.Street Lights (Bluegum & Sprue) Ext. 13: Prov. High Mast Lighting Mamre Heritage Resources Mamre Trust Fund-Fencing of New Cemetery Mamre Trust Fund - Basic Infrastructure Traffic Calming Measure: Elsies River Upgrade Shawco Hall: Elsies River Ward 27 Total Realignment Road kerbs and Footways Upgrading of Civic Hall in Goodwood Upgrade Landscape & New Play Equipment Ward 26 Total Construction of ECD Centre - Leonsdale WBS ELEMENT DESCRIPTION 428 596 60 000 40 000 238 596 40 000 50 000 300 000 50 000 250 000 230 000 180 000 20 000 30 000 4 100 000 4 100 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 45 Existing Settlements Existing Settlements Existing Settlements New Settlements Roads and Stormwater Roads and Stormwater Housing Housing Housing Housing Transport, Roads & Major Projects Transport, Roads & Major Projects Parks Parks Sport , Recreation and Amenities Existing Settlements Existing Settlements Existing Settlements Community Services Community Services Community Services Housing Housing Housing WARD 31 Existing Settlements DEPARTMENT Housing WARD 30 DIRECTORATE Ward 31 Total Upgrade Reading Room-8th Ave Inform Sett Upgrade Reading Room, Makriel Street Office Equipment, Reading Room, Makriel Nooitgedacht CC - Upgrade Upgrade: Nooitgedacht Sportsfield Modderdam Cemetery: Upgrade Roads Ward 30 Total Installation of speed hump Matroosfontein Continuation of pavement installation Valhalla Park infill 500 units The Range SEFP Project The Range MIG Project The Range CRU Project Erect Reading Room: The Range WBS ELEMENT DESCRIPTION 300 000 80 000 90 000 30 000 80 000 20 000 0 34 887 480 30 000 140 000 5 600 000 1 701 380 1 479 365 25 806 735 130 000 ORIGINAL BUDGET 2011_2012 120 000 0 0 0 0 0 120 000 18 511 395 0 0 14 000 000 141 785 2 219 045 2 150 565 0 APPROVED BUDGET 2012_2013 400 000 0 0 0 0 0 400 000 0 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 46 Roads and Stormwater Electricity Services Electricity Services Utility Services Utility Services New Settlements Housing Transport, Roads & Major Projects New Settlements Housing Roads and Stormwater Existing Settlements Housing Transport, Roads & Major Projects Economic and Human Development Economic and Social Development Roads and Stormwater Sport , Recreation and Amenities Community Services Transport, Roads & Major Projects Sport , Recreation and Amenities Community Services Roads and Stormwater Sport , Recreation and Amenities Community Services Transport, Roads & Major Projects Parks DEPARTMENT Community Services WARD 32 DIRECTORATE Ward 32 Total Prov. Flood Lights (Witsand & Robinvale) Atlantis SS 5 Transformer Replacement Traffic calming - Malgas and Fiskaal sidewalk tarring Reygersdal road Atlantis Development Corridor - M12: Atlantis Development Corridor Witsand Housing Project Ph2 Atlantis Kanonkop (Atlantis Ext12)Housing Project Ward 32: Rental Stock Upgrade Ariesfontein - Establishment of facility Sherwood Park Atlantis-Complete Roof Protea Park - Prov. of pavilions/stands Construct Sport Complex-Witsands Atlantis Atlantis Cemetery Upgrade WBS ELEMENT DESCRIPTION 46 715 868 45 000 13 132 530 80 000 80 000 3 400 000 0 13 509 300 11 043 000 40 000 700 000 200 000 55 000 4 431 038 0 ORIGINAL BUDGET 2011_2012 6 656 300 0 1 156 300 0 0 0 5 000 000 0 0 0 0 0 0 0 500 000 APPROVED BUDGET 2012_2013 3 500 000 0 0 0 0 0 2 000 000 0 0 0 0 0 0 0 1 500 000 APPROVED BUDGET 2013_2014 47 Transport Electricity Services Water Services Transport, Roads & Major Projects Utility Services Utility Services Metro Police Metro Police Electricity Services Safety & Security Safety & Security Utility Services Roads and Stormwater Transport Electricity Services Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services WARD 35 Health Services Health Community Services Sport , Recreation and Amenities Roads and Stormwater Transport, Roads & Major Projects WARD 34 Economic and Human Development DEPARTMENT Economic and Social Development WARD 33 DIRECTORATE Ward 33 Total Upgrade of Streetlights in Ward 35 Retreat PTI Sheffield Rd Philippi:Plan and Design Streetlights installation in Ntsikizi St Ward 35 Total Ward 34 Total Property Improvement-Shooting range Property Improvement - Shooting range Mzamomhle Clinic upgrade & extension TB/ARV Village 3 SF/Browns Farm - Upgrade Philippi Collector Sewer High Mast Light in Phase 6 Samora Machel Taxi Rank Philippi Widening of Stock Road Phillipi Urban Agriculture Project: Philippi WBS ELEMENT DESCRIPTION 4 800 000 300 000 4 500 000 0 900 000 100 000 100 000 0 500 000 200 000 7 301 024 3 500 000 200 000 1 000 000 1 500 000 1 101 024 ORIGINAL BUDGET 2011_2012 0 0 0 0 100 000 0 0 100 000 0 0 20 500 000 15 000 000 0 5 500 000 0 0 APPROVED BUDGET 2012_2013 1 000 000 0 0 1 000 000 300 000 0 0 300 000 0 0 10 000 000 10 000 000 0 0 0 0 APPROVED BUDGET 2013_2014 48 Roads and Stormwater Transport Electricity Services Electricity Services Electricity Services Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Utility Services Utility Services Electricity Services Electricity Services Utility Services Utility Services New Settlements Roads and Stormwater Housing Transport, Roads & Major Projects WARD 38 Economic and Human Development Economic and Social Development WARD 37 Sport , Recreation and Amenities DEPARTMENT Community Services WARD 36 DIRECTORATE Ward 36 Total Ward 37 Total Sidewalks in NY69 Guguletu Ward 38 Total Gugulethu Infill Project Erf 8448/MauMau Streetlights at Zolile Gerd Streetlights at Welile Dakuse KTC Business Support SMME - Nyanga Job Centre Streetlights at Umanyano street Streetlights at Hani street Streetlights at Gwayi street Nyanga Main Taxi Rank Sidewalks in Unathi Village Synthetic Pitch-NY 111 WBS ELEMENT DESCRIPTION 6 200 000 200 000 6 000 000 700 000 150 000 150 000 400 000 9 300 000 60 000 70 000 70 000 9 000 000 100 000 0 ORIGINAL BUDGET 2011_2012 18 000 000 0 18 000 000 0 0 0 0 14 000 000 0 0 0 9 000 000 0 5 000 000 APPROVED BUDGET 2012_2013 2 000 000 0 2 000 000 0 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 49 New Settlements Housing Parks Sport , Recreation and Amenities Roads and Stormwater Community Services Community Services Transport, Roads & Major Projects WARD 41 Electricity Services Sport , Recreation and Amenities Community Services Utility Services Sport , Recreation and Amenities Community Services Economic and Human Development Parks Community Services Economic and Social Development Parks Community Services WARD 40 Sport , Recreation and Amenities DEPARTMENT Community Services WARD 39 DIRECTORATE Ward 40 Total Ward 39 Total Construct sidewalks in Ward 41 Synthetic Pitch-NY 49 Ward 41 Total Gugulethu Cemetery: Implement Landscape Plans High mast in NY 135/6 Playpark Business Support SMME - Nomzamo Synthetic Pitch Gugulethu NY 49 Sports Complex Upgrading of NY 135/6 Playpark Upgrading of NY 133/4 Playpark Nyanga Upgrading Project(PLF&UISP) Synthetic Pitch-Nyanga WBS ELEMENT DESCRIPTION 150 000 150 000 0 0 710 000 160 000 150 000 0 260 000 90 000 50 000 3 000 000 3 000 000 0 ORIGINAL BUDGET 2011_2012 5 500 000 0 5 000 000 500 000 5 000 000 0 0 5 000 000 0 0 0 11 500 000 6 500 000 5 000 000 APPROVED BUDGET 2012_2013 500 000 0 0 500 000 0 0 0 0 0 0 0 7 000 000 7 000 000 0 APPROVED BUDGET 2013_2014 50 Existing Settlements Existing Settlements Electricity Services Housing Housing Utility Services Sport , Recreation and Amenities Roads and Stormwater Electricity Services Water Services Water Services Community Services Transport, Roads & Major Projects Utility Services Utility Services Utility Services Community Services Parks Existing Settlements Housing WARD 43 Parks DEPARTMENT Community Services WARD 42 DIRECTORATE Ward 42 Total Mitchells Plain WWTW Blue Route Interceptor Sewer Area Lighting in Parks Traffic Calming within Ward 43 Blue Waters Resort : Upgrade Ward 43 Total Upgrading of Parks (Area 16) Ward 43 Construction of high mast in ward 42 Manenberg SEFP Project Manenberg MIG Project Manenberg CRU Project (1584 units) Upgrading NY 61/62/54 Play Park WBS ELEMENT DESCRIPTION 3 800 000 0 1 000 000 80 000 100 000 2 500 000 120 000 2 374 105 250 000 574 105 0 1 500 000 50 000 ORIGINAL BUDGET 2011_2012 7 500 000 500 000 2 000 000 0 0 5 000 000 0 58 903 490 0 1 148 205 0 57 755 285 0 APPROVED BUDGET 2012_2013 11 100 000 9 100 000 0 0 0 2 000 000 0 68 826 535 0 4 879 870 6 191 380 57 755 285 0 APPROVED BUDGET 2013_2014 51 Existing Settlements Existing Settlements New Settlements Roads and Stormwater Housing Housing Housing Transport, Roads & Major Projects Parks Parks Economic and Human Development Economic and Human Development New Settlements Community Services Community Services Economic and Social Development Economic and Social Development Housing WARD 45 Electricity Services Existing Settlements Housing Utility Services Existing Settlements Housing Electricity Services Economic and Human Development Economic and Social Development Utility Services Parks DEPARTMENT Community Services WARD 44 DIRECTORATE Ward 44 Total The Downs : Housing Project Ward 45 Total Business Support SMME - Gugulethu Meat Business Support SMME - Gugulethu Gateway Upgrading of POS in Ward 45 Upgrading of Hex Crescent Playpark Vanguard Transformer Replacement Construction of Highmasts in ward 44 IM:Project Vukuhmbe Concrete Roads Heideveld Duinefontein Housing Project Securitylights HDVL MultiFlats Heideveld Heideveld SEFP Project Heideveld MIG Project Heideveld CRU Project (864 units) Business Support SMME - Heideveld Station Upgrading of parks in ward 44 WBS ELEMENT DESCRIPTION 9 050 000 8 000 000 550 000 200 000 220 000 80 000 78 005 425 41 000 000 150 000 0 7 000 000 30 000 1 526 880 2 759 790 25 258 755 160 000 120 000 ORIGINAL BUDGET 2011_2012 12 000 000 12 000 000 0 0 0 0 103 370 580 38 549 750 0 2 000 000 11 000 000 0 2 672 035 6 360 715 42 788 080 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 30 107 825 0 0 0 0 0 1 526 880 4 102 710 24 478 235 0 0 APPROVED BUDGET 2013_2014 52 Existing Settlements Existing Settlements Existing Settlements New Settlements Housing Housing Housing Housing Parks Sport , Recreation and Amenities Roads and Stormwater Community Services Community Services Transport, Roads & Major Projects WARD 48 Parks Parks DEPARTMENT Community Services WARD 47 Community Services WARD 46 DIRECTORATE Ward 46 Total Traffic Calming in Ward 48 Turfhall Stadium Upgrade Upgrade of Parks in Ward 48 Ward 48 Total Ward 47 Total Hanover Park Housing Project - 700 Units Hanover Park SEFP Project Hanover Park MIG Project Hanover Park CRU Project (1680 units) Skate board Park, Hanover Park Upgrade of Parks Ward 46 WBS ELEMENT DESCRIPTION 3 352 744 100 000 3 052 744 200 000 39 771 138 500 000 1 416 145 4 297 163 33 257 830 300 000 300 000 300 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 65 816 500 0 2 124 650 8 214 185 55 477 665 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 87 396 445 12 500 000 2 518 170 7 996 465 64 381 810 0 0 0 APPROVED BUDGET 2013_2014 53 Roads and Stormwater Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Sport , Recreation and Amenities Existing Settlements Existing Settlements Community Services Housing Housing WARD 50 Water Services New Settlements Housing Utility Services New Settlements Housing Water Services Existing Settlements Housing Utility Services Existing Settlements Housing Water Services Existing Settlements Housing Utility Services Parks DEPARTMENT Community Services WARD 49 DIRECTORATE Ward 49 Total Ward 50 Total Upgrade: Apricot Place, Old Age Home Install Reading Room: Bluegum Centre Metropolitan SG Construct Brick Wall Contermans Kloof Water Mains Athlone WWTW (USDG) Athlone WWTW - EFF Walk Way Appledene Road Traffic Calming in Ward 49 Hazendal Housing Project Fencing behind Statice Heights Kewtown SEFP Project Kewtown MIG Project Kewtown CRU Project Athlone Nantes Upgrade WBS ELEMENT DESCRIPTION 300 000 25 000 175 000 100 000 46 173 755 15 000 000 4 500 000 7 000 000 100 000 100 000 2 650 000 100 000 1 302 275 3 930 170 9 029 310 2 462 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 4 500 000 0 0 0 0 0 0 0 0 0 0 4 500 000 APPROVED BUDGET 2012_2013 0 0 0 0 3 500 000 0 0 0 0 0 0 0 0 0 0 3 500 000 APPROVED BUDGET 2013_2014 54 Roads and Stormwater Roads and Stormwater Water Services Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Roads and Stormwater Transport, Roads & Major Projects Sport , Recreation and Amenities IRT Implementation Roads and Stormwater Roads and Stormwater Roads and Stormwater Electricity Services Electricity Services Water Services Community Services Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Utility Services Utility Services WARD 53 Existing Settlements Existing Settlements Housing Housing Existing Settlements Housing WARD 52 Social Development , Arts & Culture DEPARTMENT Economic and Social Development WARD 51 DIRECTORATE Ward 51 Total Ward 52 Total Northern Area Sewer Thornton Lighting in River Reserve Ward 53 Total Athlone Gas Turbine Group 400V supply Installation of signage Installation of Bollards Construction of pavements IRT:Depot Infrastructure: Potsdam Depot:PTIF Upgrade of Langa Swimming Pool Speed hump Zone 18 Langa Hostels CRU Project (579 units) Brick Paving, Zone 26 Langa Brick Paving, Zone 25 Langa Completion of Langa Collector Sewer One Speed Hump Malamba Street Construct Sidewalk Adelaide Mtiya St Guga s’thebe Arts Centre 2nd Phase WBS ELEMENT DESCRIPTION 128 389 383 45 000 000 50 000 1 400 000 10 000 40 000 100 000 81 689 383 100 000 20 200 000 20 000 20 000 000 80 000 100 000 835 000 200 000 30 000 105 000 500 000 ORIGINAL BUDGET 2011_2012 37 000 000 37 000 000 0 0 0 0 0 0 0 30 000 000 0 30 000 000 0 0 2 000 000 2 000 000 0 0 0 APPROVED BUDGET 2012_2013 22 000 000 22 000 000 0 0 0 0 0 0 0 50 000 000 0 50 000 000 0 0 1 000 000 1 000 000 0 0 0 APPROVED BUDGET 2013_2014 55 Parks Parks New Settlements 2010 World Cup Operational 2010 World Cup Technical Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Electricity Services Community Services Community Services Housing Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Parks Parks Health Services Roads and Stormwater Roads and Stormwater Roads and Stormwater Electricity Services Community Services Community Services Health Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services WARD 55 Parks DEPARTMENT Community Services WARD 54 DIRECTORATE Ward 54 Total Ward 55 Total Koeberg Rd Switching Station Phase 2 Traffic calming in Da Gama street Traffic Calming in Alamien Road Bosmansdam Rd Improvements Albow Gardens\Goodhope CHC extensions Upgrading of Maisels Cottage, Brooklyn Landscaping at Intersection Lighting of Lanes - Green Point WC:Ped Improvements to Somerset Rd:PTIF WC:Green Point Precinct Ifra Related Upgrade WC:Grade separated Ped Facilities:PTIF Green Point Promenade Upgrade 2010 Reconfiguration of Common Labyrinth in Urban Park - Green Point Green Point Phase 3 Housing Project Rubber Surfaces - Various playgrounds Paving/Artificial Grass - Pavillion Park Gym & Playground Equipment - Promenade WBS ELEMENT DESCRIPTION 1 020 000 0 35 000 35 000 490 000 230 000 160 000 70 000 72 114 450 30 000 2 000 000 9 775 905 6 000 000 2 000 000 52 038 545 40 000 0 100 000 30 000 100 000 ORIGINAL BUDGET 2011_2012 12 400 612 12 161 700 0 0 0 238 912 0 0 2 000 000 0 0 0 0 2 000 000 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 90 042 750 90 042 750 0 0 0 0 0 0 8 000 000 0 0 0 0 2 000 000 0 0 6 000 000 0 0 0 APPROVED BUDGET 2013_2014 56 Library Services Parks Parks Sport , Recreation and Amenities Operational Coordination Community Services Community Services Community Services Community Services Safety & Security Library Services Parks Parks Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Community Services Community Services Community Services Community Services Community Services Community Services Community Services Community Services WARD 57 Library Services DEPARTMENT Community Services WARD 56 DIRECTORATE Ward 57 Total Woodstock Town Hall - Upgrade Ablution Woodstock Town Hall - Industrial Stove Woodstock T/Hall - Visual photo display Village Green - Install drink fountains Upgrade entrance: Shelley Street SF Upgrade Parks: Mowbray Upgrade Beyers Rd Park Erect x4 Murals - Woodstock Lib Ward 56 Total Establish the Maitland Impound Facility Kensington Civic - Palisade fencing Maitland Cemetery Upgrade Roads & Infrastructure Maitland Cemetery Upgrade Fencing around Kensington Library Chairs for Library Hall - Kensington WBS ELEMENT DESCRIPTION 300 000 25 000 25 000 10 300 9 700 90 000 50 000 80 000 10 000 6 816 000 3 300 000 200 000 2 216 000 1 000 000 85 000 15 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 0 0 0 0 0 3 000 000 0 0 3 000 000 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 0 0 0 2 500 000 0 0 2 500 000 0 0 0 APPROVED BUDGET 2013_2014 57 Parks Roads and Stormwater Community Services Transport, Roads & Major Projects Parks Parks Metro Police Roads and Stormwater Roads and Stormwater Community Services Community Services Safety & Security Transport, Roads & Major Projects Transport, Roads & Major Projects Parks Parks Sport , Recreation and Amenities Roads and Stormwater Community Services Community Services Community Services Transport, Roads & Major Projects WARD 60 Parks Community Services WARD 59 Parks DEPARTMENT Community Services WARD 58 DIRECTORATE Ward 58 Total Traffic Calming in Ward 60 Ward 60 Total Chucker Rd SC - Upgrade Security Lights Upgrade of Parks in Ward 60 Play Park Equipment in ward 60 Ward 59 Total Upgrade parking area, Kenilworth Station Upgrade area around Kenilworth Road CCTV cameras for Wynberg & Claremont Upgrade of parks in Ward 59 Upgrade of Paradise Park Equipment and upgrading of parks Upgrade of roads in Ward 58 Upgrade of parks in Ward 58 Landscaping in Ward 58 WBS ELEMENT DESCRIPTION 300 000 100 000 10 000 180 000 10 000 4 580 000 35 000 50 000 4 360 000 100 000 15 000 20 000 300 000 80 000 160 000 60 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 58 Sport , Recreation and Amenities Social Development , Arts & Culture Supply Chain Management New Settlements New Settlements New Settlements Emergency Services Roads and Stormwater Water Services Community Services Economic and Social Development Finance Services Housing Housing Housing Safety & Security Transport, Roads & Major Projects Utility Services Parks Parks Parks Parks Parks Parks Roads and Stormwater Roads and Stormwater Roads and Stormwater Transport Community Services Community Services Community Services Community Services Community Services Community Services Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects WARD 62 Parks DEPARTMENT Community Services WARD 61 DIRECTORATE Ward 61 Total Wynberg TI Holding Facility Ward 62 Total Upgrade of footpath, Greenbelt Newlands Riverside Road pathway Parking upgrade Riverside Road Upgrade of Maynardville Park Purchase 15 tree pot plants Provision of play equipment, Constantia Planting of mature trees Maynardville Park Upgrade Greenbelt Constantia Fish Hoek Outfall Sewer Install Cats Eyes in Kommetjie Road Simon’s Town/Fish Hoek Fire Structure Upgrade Ocean View Infill Housing Project Ocean View - Mountain View Housing Project Dido Valley Housing Development Sand and Stone Bins - Vishoek Construct ECD Centres-Scorpio Soetwater Resort: Upgrade Fence along POS Franks Bay & Fisherman’s WBS ELEMENT DESCRIPTION 2 332 500 2 000 000 70 000 60 000 30 000 40 000 22 500 50 000 10 000 0 50 000 15 077 108 1 000 000 50 000 7 500 000 1 000 000 3 675 000 0 300 000 0 1 502 108 50 000 ORIGINAL BUDGET 2011_2012 13 300 000 13 000 000 0 0 0 0 0 0 0 300 000 0 22 200 000 2 000 000 0 0 9 000 000 0 10 000 000 0 1 200 000 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 0 0 0 0 0 5 000 000 0 0 0 0 0 5 000 000 0 0 0 0 APPROVED BUDGET 2013_2014 59 Parks Sport , Recreation and Amenities Sport , Recreation and Amenities Supply Chain Management Roads and Stormwater Community Services Community Services Community Services Finance Services Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects Existing Settlements Existing Settlements Existing Settlements Roads and Stormwater Roads and Stormwater Housing Housing Housing Transport, Roads & Major Projects Transport, Roads & Major Projects WARD 66 Sport , Recreation and Amenities Community Services WARD 65 Parks DEPARTMENT Community Services WARD 63 DIRECTORATE Ward 66 Total Pelican Park: Strandfontein Rd Upgrade_USDG Construct kerb & channelling Ward 66 Marble Flats SEFP Project Marble Flats MIG Project Marble Flats CRU Project (688 units) Ward 65 Total Construct kerb & channelling Ward 65 Grassy Park CC - Supply Electrical Equip Ward 63 Total Kerb & channelling Old Strandfontein Rd Floor Cover for Hillstar Store William Herbert Hall - Upgrade De Wet Rd,Hall - Upgrade Ablutions Upgrade Trenance Road Park, Ottery Upgrade Epsom Drive Park, Ottery WBS ELEMENT DESCRIPTION 54 433 970 24 000 000 300 000 3 296 330 1 842 575 24 995 065 349 000 300 000 49 000 306 000 200 000 6 000 25 000 25 000 20 000 30 000 ORIGINAL BUDGET 2011_2012 54 731 245 20 000 000 0 3 228 830 7 914 710 23 587 705 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 61 908 090 30 000 000 0 3 874 595 737 030 27 296 465 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 60 Sport , Recreation and Amenities Health Services New Settlements New Settlements Environmental Resource Management Spatial Planning and Urban Design Electricity Services Water Services Water Services Community Services Health Housing Housing Strategy and Planning Strategy and Planning Utility Services Utility Services Utility Services Parks Sport , Recreation and Amenities Roads and Stormwater Community Services Community Services Transport, Roads & Major Projects WARD 68 Sport , Recreation and Amenities DEPARTMENT Community Services WARD 67 DIRECTORATE Traffic Calming Measures: Ward 68 Sea Winds Sports Complex Phase 3 Upgrade parks in Ward 68 Trappies Sewerage System Cape Flats WWTW Street lighting Iris Rd, Lotus River Ward 68 Total Ward 67 Total Quality Public Spaces:False Bay Ecology False Bay Ecology Park: Various Projects Rondevlei Housing Project Pelican Park Phase 1 Housing Project Seawinds Clinic-upgrade and extensions ARV Purchase stove Grassy Park Hall Fridge & stove - Pelican Park Hall WBS ELEMENT DESCRIPTION 4 124 190 50 000 4 024 190 50 000 39 182 422 500 000 10 000 000 20 000 98 348 2 704 074 4 625 000 20 000 000 1 200 000 25 000 10 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 22 250 000 2 000 000 0 0 0 250 000 0 20 000 000 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 12 250 000 2 000 000 0 0 0 250 000 0 10 000 000 0 0 0 APPROVED BUDGET 2013_2014 61 Sport , Recreation and Amenities New Settlements Roads and Stormwater Transport Water Services Water Services Community Services Housing Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Utility Services Parks Parks Parks Parks Parks Roads and Stormwater Roads and Stormwater Transport Community Services Community Services Community Services Community Services Community Services Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects WARD 70 Parks DEPARTMENT Community Services WARD 69 DIRECTORATE Ward 70 Total New Taxi Lay Bays in Van Riebeeckhof Rd Tarring of sidewalks in v. Riebeeckshof Footpath Retchia road Hoheizen Water Points on Parks throughout Ward 70 Landscape Lindcoln Rd Welgemoed Landscape H Verwoerd Rd Lovenstein Fencing in Majik Forest Protea Valley Bollards at Doordekraal Street Kenridge Ward 69 Total Wildevoelvlei WWTW-Upgrade dewatering SWest Bus Park Main Sewer (lower leg) Masiphumelele (Site 5) Taxi Rank Traffic Calming Measures: Ward 69 Masiphumelele Housing Project - Phase 4 Masiphumilele - Develop Sports Complex Upgrade Promenade Road, Muizenberg WBS ELEMENT DESCRIPTION 300 000 50 000 60 000 40 000 60 000 10 000 15 000 60 000 5 000 11 765 000 0 6 500 000 0 100 000 0 5 100 000 65 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 0 0 0 0 0 18 800 000 0 7 000 000 5 500 000 0 6 300 000 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 0 0 0 500 000 500 000 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 62 Health Services Health Roads and Stormwater Electricity Services Transport, Roads & Major Projects Utility Services Library Services Parks Sport , Recreation and Amenities Roads and Stormwater Electricity Services Community Services Community Services Community Services Transport, Roads & Major Projects Utility Services WARD 73 Water Services Roads and Stormwater Transport, Roads & Major Projects Utility Services Parks Community Services WARD 72 Sport , Recreation and Amenities DEPARTMENT Community Services WARD 71 DIRECTORATE Ward 71 Total Ward 72 Total Street lighting Churchill Rd Plumstead Upgrade of roads in Ward 73 Upgrade of S & R facilities in Ward 73 Upgrade of parks in Ward 73 Ward 73 Total Furniture & Equipment Southfield Library Retreat Rising Main - Rehab Retreat Area Office Traffic Calming measures in Ward 72 Construct kerb & channelling in Ward 72 Klip Road Cemetery Extension Upgrade of Westlake clinic Bergvliet SC - Upgrade Premises WBS ELEMENT DESCRIPTION 300 000 15 000 115 000 50 000 100 000 20 000 4 300 000 3 800 000 0 150 000 150 000 200 000 100 000 50 000 50 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 0 0 26 327 760 5 200 000 20 000 000 0 0 1 127 760 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 54 500 000 1 000 000 50 000 000 0 0 3 500 000 0 0 0 APPROVED BUDGET 2013_2014 63 Water Services Water Services Utility Services New Settlements Housing Utility Services New Settlements Housing Water Services Social Development , Arts & Culture Economic and Social Development Utility Services Sport , Recreation and Amenities Community Services Transport Sport , Recreation and Amenities Community Services Transport, Roads & Major Projects Sport , Recreation and Amenities Community Services New Settlements Parks Community Services Housing Parks DEPARTMENT Community Services WARD 74 DIRECTORATE Oudekraal WWTW- Improvements Ward 74 Total Hout Bay Outfall-Refurbish equipment Cape Flats #2 Rehabilitation Imizamo Yethu Taxi Facilities, Hout Bay Imizamo Yethu - Hout Bay Housing Project Hangberg Housing Upgrading Project Hangberg CRU 70 Units Construct ECD Centres-Imizamo Yethu Pedestrian Crossing at Disa River - Hout Imizama Yethu - Develop Sports Complex Hangberg SF - Construction of artificial turf Upgrade Camps Bay Beach Front Rehab of Dontshe Yakhe - Hout Bay WBS ELEMENT DESCRIPTION 22 614 589 0 0 500 000 200 000 5 000 000 5 000 000 5 000 000 0 200 000 5 971 950 642 639 0 100 000 ORIGINAL BUDGET 2011_2012 42 400 000 100 000 0 2 000 000 1 300 000 15 000 000 0 24 000 000 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 5 300 000 0 300 000 2 500 000 0 0 0 0 2 000 000 0 0 0 500 000 0 APPROVED BUDGET 2013_2014 64 Parks Existing Settlements Existing Settlements Existing Settlements Electricity Services Community Services Housing Housing Housing Utility Services Parks Parks Sport , Recreation and Amenities Social Development , Arts & Culture Governance & Interface Roads and Stormwater Transport Transport Electricity Services Community Services Community Services Community Services Economic and Social Development Office of the City Manager Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services WARD 76 Parks DEPARTMENT Community Services WARD 75 DIRECTORATE Ward 75 Total Area Lighting in Parks Ward 76 Total Lentegeur & Mandalay StationPTI’s:Dsg Lentegeur & Mandalay Station PTI’s:Dsg Traffic calming within Ward 76 Lentegeur Pub Space & Civic Office Upgrade Construct ECD Centres-Lentegeur Ikhwezi CC - Upgrade IT Server Upgrading of Parks (Area 17) Ward 76 Upgrading of Parks (Area 16) Ward 76 Area Lighting in Parks Woodlands SEFP Project Woodlands MIG Project Woodlands CRU Project (100 units) Upgrading of Parks (Area 17) Ward 75 Upgrading of Parks (Area 16) Ward 75 WBS ELEMENT DESCRIPTION 20 450 000 50 000 0 15 000 000 90 000 5 000 000 0 150 000 50 000 110 000 47 363 610 50 000 2 243 070 5 278 345 39 542 195 200 000 50 000 ORIGINAL BUDGET 2011_2012 45 686 262 0 25 000 000 10 226 000 0 7 000 000 3 460 262 0 0 0 23 202 670 0 1 794 460 0 21 408 210 0 0 APPROVED BUDGET 2012_2013 23 000 000 0 0 23 000 000 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 65 Roads and Stormwater Electricity Services Electricity Services Electricity Services Electricity Services Utility Services Utility Services Utility Services Utility Services Specialised Technical Services Corporate Services Transport, Roads & Major Projects Sport , Recreation and Amenities Community Services Roads and Stormwater Parks Community Services Transport, Roads & Major Projects Parks Community Services Property Parks Community Services Economic and Social Development Parks Community Services Specialised Technical Services Parks Community Services Corporate Services Library Services DEPARTMENT Community Services WARD 77 DIRECTORATE Roggebaai GT basic welfare facilities Ward 77 Total Roggebaai 33kV Switchgear Replacement Replace Roggebaai GT Halon fire suppress City Depot - Shed Restoration ICS/Powerstation site Foreshore Freeway: Bearing Replacement CTICC Expansion (Land) Retro-Fit Civic Centre Lighting FM Structural Rehabilitation Upgrade of City Hall Rubber Surfaces - Homestead Park Rubber Surfaces - Bryant St Park Paving Traffic Island - Kloofnek Road Fencing & Upgrade - Homestead Park Company’s Garden Couch - Kloofstreet Library WBS ELEMENT DESCRIPTION 262 204 928 0 15 338 100 0 1 858 070 59 000 3 000 000 150 000 000 13 000 000 78 494 758 150 000 30 000 60 000 80 000 130 000 0 5 000 ORIGINAL BUDGET 2011_2012 58 109 073 400 000 0 100 000 0 0 0 0 0 57 609 073 0 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 10 700 000 0 0 0 0 0 0 0 0 10 200 000 0 0 0 0 0 500 000 0 APPROVED BUDGET 2013_2014 66 New Settlements Roads and Stormwater Transport Housing Transport, Roads & Major Projects Transport, Roads & Major Projects Electricity Services Water Services Utility Services Utility Services Economic and Human Development Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Economic and Social Development Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects WARD 80 Roads and Stormwater Operational Coordination Safety & Security Transport, Roads & Major Projects Parks Community Services WARD 79 Parks DEPARTMENT Community Services WARD 78 DIRECTORATE Ward 78 Total Raised intersection Barry & Colorado Raise intersection Ntileni, Tyhali, Raise intersection Mxixi & Ntileni R Install speed humps Ntileni Rd Install speed humps Dyamala Rd Ward 80 Total Business Support SMME - Schaapkraal Ward 79 Total Water Supply at Baden Powell Dr to Khayelitsha Area Lighting in Parks Traffic calming within Ward 79 Property Improvement: M’Plain Drive Test Upgrading of Parks (Area 16) Ward 79 Mitchell’s Plain Station TI Traffic calming within Ward 78 Beacon Valley - Mitchell’s Plain Upgrading of Parks (Area 16) Ward 78 WBS ELEMENT DESCRIPTION 700 000 60 000 80 000 80 000 40 000 40 000 400 000 2 524 000 1 000 000 50 000 80 000 1 224 000 170 000 53 320 000 53 020 000 70 000 0 230 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 0 0 0 0 0 0 0 0 0 22 220 000 22 220 000 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 0 0 0 0 0 0 0 28 400 000 14 000 000 0 14 400 000 0 APPROVED BUDGET 2013_2014 67 Social Development , Arts & Culture Roads and Stormwater Roads and Stormwater Economic and Social Development Transport, Roads & Major Projects Transport, Roads & Major Projects Parks Parks Parks Parks New Settlements Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Community Services Community Services Community Services Community Services Housing Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects WARD 83 Electricity Services Roads and Stormwater Transport, Roads & Major Projects Utility Services Parks Community Services WARD 82 Parks DEPARTMENT Community Services WARD 81 DIRECTORATE Ward 82 Total Ward 81 Total Ward 83 Total Widening MR27:Strand:Piet Retief,Newton Land Acquisition: Broadway Blvd,Strand Erf 33427 Flood Alleviation - Lourens River Dualling: Broadway Blvd:Beach Rd:MR27 10 Ha Somerset West Housing Project Upgrading of Parks in Ward 83 Upgrade of Dam Park, Strand Lourens River PNE Corridor Upgrade Fencing of Parks (Strand service Area) Lighting in Winterhoek POS, Tafelsig Traffic Calming Measures ward 82 Upgrading of Parks Traffic calming within Ward 81 Contruct:Roundabout Eisleben & Caravelle Construction of ECD Centre - Rocklands Westridge Park Upgrade WBS ELEMENT DESCRIPTION 2 361 400 0 350 000 1 100 000 0 861 400 50 000 0 0 0 300 000 40 000 110 000 150 000 3 400 000 200 000 1 300 000 1 800 000 100 000 ORIGINAL BUDGET 2011_2012 2 180 000 100 000 0 1 800 000 200 000 0 0 30 000 50 000 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 3 850 000 0 0 1 000 000 1 000 000 0 0 700 000 500 000 650 000 0 0 0 0 200 000 0 0 0 200 000 APPROVED BUDGET 2013_2014 68 Environmental Resource Management Environmental Resource Management Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Transport Water Services Strategy and Planning Strategy and Planning Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Parks Parks Sport , Recreation and Amenities Sport , Recreation and Amenities Social Development , Arts & Culture Roads and Stormwater Roads and Stormwater Transport Community Services Community Services Community Services Community Services Economic and Social Development Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects WARD 85 Parks DEPARTMENT Community Services WARD 84 DIRECTORATE Ward 84 Total Nomzamo PTI: Strand Sidewalks ward 85 Onverwacht Rd: Bulk Stormwater Ward 85 Total Construct ECD Centres-Strand(Erjaville) PA System for Nomzamo Community Hall Nomzamo SC Upgrade Playground equipment for parks, Ward 85 Dick Dent Bird Sanctuary Upgrade Dummer Rd S/west Water Main Somerset West PTI Widening: Lourensford Rd: MR9 Parel Vall Upgrading of tarmac Strand High Paving Strand Beach Front Curb stone pavement Helderberg College road Upgrade of Reserves Infrastructure New Road: Helderberg Nature Reserve Fencing around Voortrekker Monument WBS ELEMENT DESCRIPTION 9 550 000 4 500 000 150 000 4 500 000 0 30 000 250 000 120 000 0 20 111 713 10 000 000 9 500 000 0 50 000 200 000 100 000 61 713 100 000 100 000 ORIGINAL BUDGET 2011_2012 13 250 000 10 000 000 0 0 3 200 000 0 0 0 50 000 200 000 0 0 200 000 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 500 000 0 0 0 0 0 0 0 500 000 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 69 Sport , Recreation and Amenities Sport , Recreation and Amenities Economic and Human Development Health Services New Settlements Roads and Stormwater Roads and Stormwater Community Services Community Services Economic and Social Development Health Housing Transport, Roads & Major Projects Transport, Roads & Major Projects Roads and Stormwater Transport Transport, Roads & Major Projects Water Services Transport, Roads & Major Projects WARD 90 Utility Services WARD 87 Roads and Stormwater Parks Community Services Transport, Roads & Major Projects Library Services DEPARTMENT Community Services WARD 86 DIRECTORATE Ward 87 Total Ward 86 Total Site C Transport Infrastructure D Ward 90 Total Construction of Side Walks in Ward 90 Khayelitsha Driftsands Site C Sidewalks Rusthof Ward 86 Morkels Cottage Constr: Onverwacht Rd: Broadway to Faure Morkel’s Cottage Strand Housing Project Ikhwezi Clinic extensions Business Support SMME - Masincedane Skil Paving of Parking Area-Lwandle Com Hall Lwandle Spectator Stand Rusthof Cemetery Upgrade Construction parking: Suider Strand Lib WBS ELEMENT DESCRIPTION 21 600 000 21 300 000 300 000 6 000 000 6 000 000 13 174 000 120 000 4 200 000 3 500 000 4 000 000 20 000 600 000 80 000 0 554 000 100 000 ORIGINAL BUDGET 2011_2012 17 000 000 17 000 000 0 0 0 13 318 100 0 1 500 000 0 9 018 100 2 000 000 0 0 300 000 500 000 0 APPROVED BUDGET 2012_2013 35 000 000 35 000 000 0 0 0 8 500 000 0 0 0 0 0 0 0 7 500 000 1 000 000 0 APPROVED BUDGET 2013_2014 70 Parks Economic and Human Development Health Services Community Services Economic and Social Development Health Parks Roads and Stormwater Transport Community Services Transport, Roads & Major Projects Transport, Roads & Major Projects WARD 94 Utility Services Electricity Services Parks Community Services WARD 93 Parks Roads and Stormwater DEPARTMENT Community Services WARD 92 Transport, Roads & Major Projects WARD 91 DIRECTORATE Ward 93 Total Ward 92 Total Khayelitsha CBD PTI Ward 94 Total Construction of Side Walks in Ward 94 Upgrading of Play Park at F-Section High Mast Lights - N Section Khayelitsha EHO and Health Facilities Business Support SMME - Khayelitsha Training Upgrading of Play Park at D-Section Khayelitsha Wetlands Park Upgrade Greening of Cwayi Street Ward 91 Total Construction of Side Walks in Ward 91 WBS ELEMENT DESCRIPTION 3 100 000 2 800 000 200 000 100 000 200 000 200 000 7 654 000 6 400 000 400 000 60 000 554 000 240 000 300 000 300 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 0 0 7 500 000 7 000 000 0 0 500 000 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 1 500 000 0 0 0 1 500 000 0 0 0 APPROVED BUDGET 2013_2014 71 Roads and Stormwater Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Sport , Recreation and Amenities Sport , Recreation and Amenities Roads and Stormwater Community Services Community Services Transport, Roads & Major Projects WARD 97 Health Health Services Parks Community Services WARD 96 Library Services DEPARTMENT Community Services WARD 95 DIRECTORATE Ward 95 Total Nonkqubela Minor Rds Phase 2 Khayelitsha Sports Complex Upgrade Ward 97 Total Khayelitsha - Upgrading of Cricket Oval Ward 96 Total Luvuyo clinic extensions for ARV service Khayelitsha Rail Extention TI Khayelitsha Rail Extension TI Establishment of New Play Park New Regional Library Kuyasa Khayalitsha WBS ELEMENT DESCRIPTION 2 550 000 2 100 000 150 000 300 000 2 230 215 2 230 215 30 800 000 17 500 000 5 000 000 300 000 8 000 000 ORIGINAL BUDGET 2011_2012 0 0 0 0 0 0 34 000 000 10 000 000 5 000 000 0 19 000 000 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 62 500 000 23 800 000 32 000 000 0 6 700 000 APPROVED BUDGET 2013_2014 72 Library Services Parks Sport , Recreation and Amenities Sport , Recreation and Amenities Tourism Development Governance & Interface Community Services Community Services Community Services Community Services Economic and Social Development Office of the City Manager Parks Parks Sport , Recreation and Amenities Sport , Recreation and Amenities New Settlements Community Services Community Services Community Services Community Services Housing WARD 99 Library Services DEPARTMENT Community Services WARD 98 DIRECTORATE Mitchells Plain Infill Project Westgate Monwabisi Coastal Node Monwabisi Chalets Development Upgrading of Parks Landscaping and Upgrading of Parks Harare Square Business Hub URP Upgrade of Lookout Hill Facility Ward 99 Total Ward 98 Total Masibambane Hall Additions & Alterations Khayelitsha Golf Driving Range Upgrading of Parks ICT - Carnegie Kuyasa, Khayelitsha Furniture Kuyasa Lib - Carnegie III WBS ELEMENT DESCRIPTION 2 800 000 0 0 2 500 000 200 000 100 000 13 900 000 8 000 000 1 000 000 3 600 000 1 000 000 300 000 0 0 ORIGINAL BUDGET 2011_2012 19 000 000 0 15 000 000 4 000 000 0 0 8 480 900 0 3 000 000 0 2 000 000 0 1 460 000 2 020 900 APPROVED BUDGET 2012_2013 21 000 000 6 000 000 15 000 000 0 0 0 0 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 73 Electricity Services Electricity Services Water Services Water Services Utility Services Utility Services Utility Services Roads and Stormwater Transport, Roads & Major Projects Utility Services New Settlements Housing Roads and Stormwater New Settlements Housing Transport, Roads & Major Projects Health Services Health Roads and Stormwater Sport , Recreation and Amenities Community Services Transport, Roads & Major Projects Parks Community Services Roads and Stormwater Parks Community Services Transport, Roads & Major Projects Parks DEPARTMENT Community Services WARD 100 DIRECTORATE Gordons Bay WWTW-Improvements Contermans Kloof Water Mains Ward 100 Total Steenbras Rehabilitation of existing street SPS Replacement Fire Mains Upgr: Gravel St’s: Mission Grounds, SLP South Fork, Strand - roads & storm water Sidewalks Broadlands Park Extension of Broadway Blvd : Broadlands Vlakteplaas Strand Housing Project Sir Lowrys Pass (Pinetown & Balestra) Gordons Bay Clinic - new security fence Replacement of benches - Gordon’s Bay Sir Lowry’s Pass Cemetery Upgrade Roads Parks Ward 100 Adventure playground Gordons Bay beach WBS ELEMENT DESCRIPTION 18 550 000 0 15 000 000 500 000 750 000 2 000 000 0 140 000 0 0 0 0 20 000 0 140 000 0 ORIGINAL BUDGET 2011_2012 8 292 400 500 000 0 2 000 000 0 1 000 000 300 000 0 0 1 400 400 3 092 000 0 0 0 0 0 APPROVED BUDGET 2012_2013 22 093 000 1 000 000 0 3 000 000 0 0 0 0 300 000 11 043 000 5 000 000 500 000 0 750 000 0 500 000 APPROVED BUDGET 2013_2014 74 Parks Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Water Services Community Services Community Services Community Services Community Services Community Services Community Services Utility Services Library Services Parks Sport , Recreation and Amenities Existing Settlements Roads and Stormwater Roads and Stormwater Transport Community Services Community Services Community Services Housing Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects WARD 102 Parks DEPARTMENT Community Services WARD 101 DIRECTORATE Ward 101 Total Traffic Calming: Galtonia, Potgieter Construct Rds:De Villiers Rd : EFF Brackenfell Blvd - De Bron - Lang Scottsville MIG Project Phase 1 Brackenfell SC - Upgrade Ward 102 Total Upgrade and Development of Rds and Reserves Purchase of Furniture and Equipment Water Pressure System New Swimming Pool Bloekombos Community/Recreation Centr Bloekombos Blueridge SC -Install Spectator/Palisade Bloekombos Hall -Ind. Cleaning Equipment Bloekombos Hall - Upgrade Park Upgrade: Ward 101 Park Upgrade: Mtyobile Park WBS ELEMENT DESCRIPTION 5 393 490 40 000 0 4 000 000 1 099 490 25 000 224 000 5 000 400 000 100 000 0 0 70 000 14 000 12 000 150 000 54 000 ORIGINAL BUDGET 2011_2012 4 100 000 0 100 000 4 000 000 0 0 0 0 5 300 000 0 500 000 4 800 000 0 0 0 0 0 APPROVED BUDGET 2012_2013 5 000 000 0 2 000 000 3 000 000 0 0 0 0 25 500 000 0 24 500 000 1 000 000 0 0 0 0 0 APPROVED BUDGET 2013_2014 75 Electricity Services Electricity Services Water Services Utility Services Utility Services Sport , Recreation and Amenities Community Services Utility Services Sport , Recreation and Amenities Community Services Roads and Stormwater Parks Community Services Transport, Roads & Major Projects Parks Community Services Roads and Stormwater Parks Community Services Transport, Roads & Major Projects Parks Community Services New Settlements Parks Community Services Housing Parks DEPARTMENT Community Services WARD 103 DIRECTORATE Kraaifontein WWTW Morningstar: Prov of Lights (POS) Kraaifontein Reinforcement Traffic Calming Ward 103 Sidewalks Sonstraal Heights Ward 103 Total Morningstar Durbanville Housing Project Kraaifontein SG - Upgrade Kraaifontein CC - Ornamental Pots Roads & stormwater system: Kraaifontein Kraaifontein: Zoo Park Upgrade Kraaifontein: Play Park Equipment Hard Surfacing: Edward Street Develop District Park: Zoo Park Kraaifon Additional Improvements: Ivy Park, Goede WBS ELEMENT DESCRIPTION 15 730 000 15 000 000 30 000 50 000 45 000 40 000 224 000 35 000 6 000 120 000 50 000 50 000 30 000 0 50 000 ORIGINAL BUDGET 2011_2012 32 255 300 0 0 30 378 700 0 0 1 766 600 0 0 60 000 0 0 0 50 000 0 APPROVED BUDGET 2012_2013 23 438 460 0 0 23 138 460 0 0 0 0 0 50 000 0 0 0 250 000 0 APPROVED BUDGET 2013_2014 76 Water Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Transport Transport, Roads & Major Projects Utility Services Transport Transport, Roads & Major Projects Water Services Health Services Health Utility Services Social Development , Arts & Culture Economic and Social Development Water Services Sport , Recreation and Amenities Community Services Utility Services Parks DEPARTMENT Community Services WARD 104 DIRECTORATE Ward 104 Total Pumpstation and Rising Main Du Noon Pump Station & Rising Main Du Noon Potsdam WWTW - Extension (USDG) Potsdam WWTW - Extension (EFF) Design of Sand Trap Philipi sewer Browns Cape Flats Collector Sewer Provision of embayments in DuNoon Dunoon Taxi Terminus Du Noon Clinic - upgrade of ventilation Construct ECD Centres-Du Noon Upgrading of Sportsfield in Du Noon - ne Upgrade of park in DuNoon WBS ELEMENT DESCRIPTION 12 177 391 0 500 000 4 700 000 177 391 500 000 500 000 20 000 4 500 000 1 000 000 0 200 000 80 000 ORIGINAL BUDGET 2011_2012 37 000 000 2 000 000 2 000 000 4 000 000 17 000 000 2 000 000 4 000 000 0 6 000 000 0 0 0 0 APPROVED BUDGET 2012_2013 113 210 262 5 000 000 5 000 000 48 300 000 30 000 000 5 000 000 14 500 000 0 0 500 000 4 910 262 0 0 APPROVED BUDGET 2013_2014 77 Roads and Stormwater Roads and Stormwater Roads and Stormwater Water Services Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Strategy and Planning WARD 107 Housing WARD 106 Environmental Resource Management New Settlements Water Services Roads and Stormwater Transport, Roads & Major Projects Utility Services Roads and Stormwater Transport, Roads & Major Projects Water Services Social Development , Arts & Culture Economic and Social Development Utility Services Parks DEPARTMENT Community Services WARD 105 DIRECTORATE Upgrade of Reserves Infrastructure Delft - The Hague Housing Project Klipheuwel WWTW - Upgrade De Grendel Reservior De Gendel Reservior Link Traffic Calming Ward 105 Signage Mikpunt / Klipheuwel Sidewalks Fisantekraal Ward 107 Total Ward 106 Total Ward 105 Total Philadelphia: Van Schoor Rd Upgrade Entrance Wall: Philadelphia Construct ECD Centres-Atlantis(Philadelp Philadelphia: Play Park Equipment WBS ELEMENT DESCRIPTION 2 766 061 2 766 061 16 000 000 16 000 000 24 300 000 0 12 000 000 12 000 000 100 000 10 000 80 000 40 000 20 000 0 50 000 ORIGINAL BUDGET 2011_2012 0 0 22 000 000 22 000 000 27 000 000 0 23 000 000 4 000 000 0 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 0 0 24 000 000 24 000 000 10 300 000 300 000 6 000 000 0 0 0 0 0 0 4 000 000 0 APPROVED BUDGET 2013_2014 78 Economic and Human Development Health Services New Settlements Economic and Social Development Health Housing Water Services Water Services Utility Services Utility Services New Settlements Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Housing Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects WARD 110 Roads and Stormwater New Settlements Housing Transport, Roads & Major Projects Parks Community Services WARD 109 Parks DEPARTMENT Community Services WARD 108 DIRECTORATE Ward 109 Total Ward 108 Total Ward 110 Total Install speed humps Chopin St Retreat Install speed hump Heron Rd Grassy P Install one speed hump Grassy Park Install footway Atkins Rd Grassy Park Edward Street: Grassy Park Development Macassar WWTW-extension Macassar WWTW Extention (MIG) Macasssar Housing: Roads & SW Macassar Housing Project Macassar POS system development Mfuleni Ext 2 Housing Project Dr Ivan Toms Clinic - Upgrade Pharmacy Business Support SMME - Mfuleni Upgrade Upgrade of Parks in Mfuleni WBS ELEMENT DESCRIPTION 2 696 000 40 000 36 000 20 000 100 000 2 500 000 2 700 000 0 0 2 700 000 0 0 2 570 262 500 000 500 000 1 570 262 0 ORIGINAL BUDGET 2011_2012 0 0 0 0 0 0 600 000 500 000 0 0 0 100 000 0 0 0 0 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 34 745 500 0 15 500 000 0 18 245 500 1 000 000 13 383 500 12 883 500 0 0 500 000 APPROVED BUDGET 2013_2014 79 Parks Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Community Services Community Services Community Services Community Services Community Services Community Services Community Services Community Services Parks Community Services Community Services Parks Community Services Parks Parks Community Services Community Services Parks Community Services Parks Parks Community Services Community Services Parks Community Services Parks Parks Community Services Community Services Parks DEPARTMENT Community Services WARD 200 DIRECTORATE Sport and Recreation Facilities Upgrade Sport & Recreation Facilities Upgrade Resorts: General Upgrade Pools: General Upgrade and Improvement Nodal Points: Beach Points & Dune Manage Irrigation: General Upgrade Hardening of Facilities Fencing and Gates: General Upgrade Water saving initiatives - Eastern Dist Upgrade/Construction of parks Upgrade of Parks Area 16 Upgrade of Biodiversity Areas Sand stabilisation, Zone 16 Play Park Equipment Park Upgrades and Developments Park Upgrades Implementation of Climate Change Initiat Depot Upgrades City Parks Upgrade Cemetery Upgrades & Extensions WBS ELEMENT DESCRIPTION 7 948 049 0 1 000 000 1 000 000 2 000 000 1 000 000 500 000 3 000 000 200 000 300 000 100 000 0 100 000 100 000 0 4 000 000 100 000 1 665 000 290 000 1 450 000 ORIGINAL BUDGET 2011_2012 5 303 402 0 1 000 000 1 000 000 2 000 000 3 000 000 6 500 000 3 000 000 312 601 0 0 388 846 0 0 5 500 000 0 200 000 0 0 3 000 000 APPROVED BUDGET 2012_2013 0 20 499 094 0 0 0 0 0 0 200 000 0 0 0 0 0 0 0 0 0 0 1 500 000 APPROVED BUDGET 2013_2014 80 Informal Settlements Informal Settlements New Settlements New Settlements New Settlements New Settlements New Settlements New Settlements Housing Housing Housing Housing Housing Housing Housing Existing Settlements Housing Housing Existing Settlements Housing Existing Settlements Existing Settlements Housing Housing Tourism Development Economic and Social Development Existing Settlements Social Development , Arts & Culture Economic and Social Development Housing Social Development , Arts & Culture Economic and Social Development Existing Settlements Economic and Human Development Economic and Social Development Housing Economic and Human Development Economic and Social Development Existing Settlements Sport , Recreation and Amenities Community Services Housing DEPARTMENT DIRECTORATE Land Acquisition (USDG) Land Acquisition (SDF) Land Acquisition (HDF) Land Acquisition (EFF) Darwin Road Housing Project BNG: Housing Developments Informal Settlements - Basic Services Inform. Hsg - Upgrade on Council Land Major Upgrading of Offices Major Upgrading of Depots Major Upgrading - Rental Units (HDF) Major Upgrading - Rental Units (EFF) Land Acquisition - Buy Back Hostels Redevelopment CRU Programme Brick Skin Walls - Housing Flats Tourism Development Facilities Development of Initiation Sites Construction of ECD Centres Urban Agricultural Infrastructure Business Support SMME Upgrade of Sport & Recreation Facilities WBS ELEMENT DESCRIPTION 40 000 000 10 000 000 25 000 000 0 0 3 794 801 17 000 000 500 000 0 0 4 650 000 2 200 000 150 000 15 000 000 26 000 000 1 000 000 200 000 5 000 000 250 000 280 000 110 000 ORIGINAL BUDGET 2011_2012 40 000 000 10 000 000 25 000 000 7 000 000 0 4 543 801 25 000 000 500 000 0 0 5 000 000 1 000 000 150 000 40 000 000 24 000 000 0 0 0 0 0 0 APPROVED BUDGET 2012_2013 40 000 000 5 000 000 25 000 000 10 000 000 5 600 000 5 043 801 33 622 000 0 1 500 000 300 000 6 000 000 2 000 000 150 000 40 000 000 0 0 0 0 0 0 0 APPROVED BUDGET 2013_2014 81 Environmental Resource Management Environmental Resource Management Environmental Resource Management Spatial Planning and Urban Design Spatial Planning and Urban Design Spatial Planning and Urban Design Spatial Planning and Urban Design Strategy and Planning Strategy and Planning Strategy and Planning Strategy and Planning Strategy and Planning Strategy and Planning Operational Coordination Safety & Security Strategy and Planning Operational Coordination Safety & Security Environmental Resource Management Emergency Services Safety & Security Strategy and Planning Emergency Services Safety & Security Environmental Resource Management Governance & Interface Office of the City Manager Strategy and Planning Urbanisation Housing Environmental Resource Management Urban Renewal Programme Housing Strategy and Planning Urban Renewal Programme Housing Operational Coordination New Settlements Housing Safety & Security DEPARTMENT DIRECTORATE Public Spaces Informal Settlement Upgrade Public Spaces Informal Settlement Upgrade Nyanga Civic &Transport Interchange Node Local Area Priority Initiatives [LAPIs] Upgrade of Reserves Infrastructure Local Environment and Heritage Projects Local Agenda 21 Capital Projects Local Agenda 21 Capital Fencing Biodiversity : Strategic Implementation Upgrade Centre Traffic Services Property Improvement : City Wide Building improvement VOIP PABX Expansion DisMan Centre Additions/Alterations Ward Allocations Urbanisation: Informal Settlements Upgrade Upgrading of Vuyani Market Facilities Site C Meat Market Mitchell’s Plain Kapteinsklip HousingDev WBS ELEMENT DESCRIPTION 4 069 978 0 0 0 0 300 000 450 000 98 401 0 0 1 035 000 2 400 000 200 000 0 1 000 000 3 122 500 13 000 000 4 000 000 2 000 000 0 ORIGINAL BUDGET 2011_2012 0 2 631 579 2 000 000 7 000 000 1 100 000 800 000 430 000 0 500 000 150 000 0 1 901 625 500 000 315 785 0 33 300 000 50 700 000 4 000 000 1 000 000 0 APPROVED BUDGET 2012_2013 0 0 5 500 000 17 465 071 1 000 000 800 000 430 000 0 500 000 0 0 1 800 000 600 000 315 785 0 33 300 000 86 095 000 0 0 5 500 000 APPROVED BUDGET 2013_2014 82 Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects Roads and Stormwater Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects Roads and Stormwater Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Strategic Development Information & GIS Strategy and Planning Roads and Stormwater Spatial Planning and Urban Design Strategy and Planning Transport, Roads & Major Projects Spatial Planning and Urban Design Strategy and Planning Roads and Stormwater Spatial Planning and Urban Design Strategy and Planning Transport, Roads & Major Projects DEPARTMENT DIRECTORATE IM:Rehabilitation: Metro Roads (CMTF) IM:Rehabilitation Coastal Structures:EFF IM:Project Vukuhmbe Concrete Roads IM: Reconstruct Roads Metro IM: Construct Road Structures IM: Construct Footway and Verges CSRM:Bulk SW Table View North-EFF CSRM: Lotus Canal Widening:Gugulethu CSRM General Stormwater projects Construction of the Watergate access rd Construct Roads Signs City Wide Construct Rds:Broadway Extension Bulk Stormwater Table View North - BICL Bulk Roads & Stormwater for Housing Project Bicycle & Peds Facilities:PGWC Bicycle & Pedestrian Facilities:NT URP Bardale (erf 451): Bulk Roads (USDG) Aerial Photography for Informal Settlement Urban Node Regeneration-Urban Development Special Place Projects Quality Public Spaces - Citywide WBS ELEMENT DESCRIPTION 10 000 000 5 500 000 2 000 000 58 033 953 3 000 000 9 000 000 3 500 000 6 000 000 2 000 000 1 500 000 500 000 0 1 000 000 35 343 244 3 500 000 1 000 000 0 1 400 000 1 986 218 11 208 875 0 ORIGINAL BUDGET 2011_2012 7 000 000 4 000 000 0 29 243 829 4 000 000 10 000 000 2 000 000 2 000 000 2 000 000 1 500 000 500 000 3 000 000 0 40 293 381 0 0 10 000 000 1 400 000 0 7 833 492 20 000 000 APPROVED BUDGET 2012_2013 0 4 000 000 0 39 843 829 4 000 000 10 000 000 0 1 000 000 2 000 000 0 500 000 10 000 000 0 43 017 700 0 0 0 1 400 000 0 0 23 000 000 APPROVED BUDGET 2013_2014 83 Roads and Stormwater Roads and Stormwater Roads and Stormwater Roads and Stormwater Transport Transport Transport Transport Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects Roads and Stormwater Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects Roads and Stormwater Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects Roads and Stormwater Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects Roads and Stormwater Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects DEPARTMENT DIRECTORATE Electronic Access Control Electr Demand Side Mngmnt:Traffic Signal Depot: Upgrade ATC:System Upgrades(SCOOT) WC:PT and related Infrastr Upgrade:PTIF WC:PT and related Infrastr Upgrade:PGWC WC:Klipfontein PT NMT Scheme:PTIF WC:Klipfontein PT NMT Scheme:PGWC WC:City-wide NMT Plan:PTIF Vlakteplaas Bulk Roads & S/water Unmade Roads: Residential Traffic Calming City Wide Tarring of Sidwalks Sub Council 21 SW: Coastal Water Quality Control Struct Soetrivier Upgrading Roads & Stormwater Rehabilitation Rehabilitation - Minor Roads Prop. Acquis. - Hardship Palisade Fence Vanguard Dr Non Motorised Transport: City Wide Main Roads: Northern Corridor WBS ELEMENT DESCRIPTION 23 865 000 7 543 860 150 000 1 000 000 3 050 000 4 600 000 5 000 000 5 000 000 10 000 000 5 500 000 1 000 000 200 000 400 000 2 000 000 1 350 000 5 000 000 2 000 000 1 000 000 270 000 20 000 000 6 000 000 ORIGINAL BUDGET 2011_2012 0 0 150 000 0 0 0 5 000 000 0 10 000 000 16 500 000 1 000 000 200 000 0 2 000 000 0 20 000 000 1 000 000 1 000 000 0 37 000 000 0 APPROVED BUDGET 2012_2013 0 0 0 0 0 0 5 000 000 0 10 000 000 3 000 000 1 000 000 0 0 2 000 000 0 20 000 000 1 000 000 1 000 000 0 20 000 000 0 APPROVED BUDGET 2013_2014 84 Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Transport Transport, Roads & Major Projects Utility Services Transport Transport, Roads & Major Projects Transport Transport Transport, Roads & Major Projects Transport, Roads & Major Projects Transport Transport, Roads & Major Projects Transport Transport Transport, Roads & Major Projects Transport, Roads & Major Projects Transport Transport, Roads & Major Projects Transport Transport Transport, Roads & Major Projects Transport, Roads & Major Projects Transport Transport, Roads & Major Projects Transport Transport Transport, Roads & Major Projects Transport, Roads & Major Projects DEPARTMENT DIRECTORATE 66kV OH Line Refurb (shield/earth wires) 66kV OH Line Refurb (Insulators) 132kv OH line refurbish(strain Hardware) 132kV OH Insulator Replacement 132kV line Refurb (shield/earth wires) 132kv OH Line Refurbish Structure 132kv OH Line Refurbish (ground earth) WC:Rail based Park&Ride Facilties:PTIF WC:Rail Based Park& Ride Facilities:PTIF WC:Long Distance Coach Terminals:PTIF Travel Time Reduction Transport Systems Management Projects Transport Active Network Systems Traffic Signals Dev (Recoverable Works) Traffic Signal and system upgrade Traffic Safety Bureau - Projects Public Transport Systems management proj Public Transport Facilities: Sign (PTIF) Provision of Bus/Taxi shelters General PTI Improvements WBS ELEMENT DESCRIPTION 0 1 000 000 3 700 000 0 0 2 000 000 0 42 324 173 0 10 000 000 10 000 000 1 700 000 0 1 500 000 1 000 000 2 150 000 23 000 000 4 650 000 21 800 000 9 000 000 ORIGINAL BUDGET 2011_2012 1 500 000 0 0 0 0 0 500 000 0 27 000 000 0 16 813 914 2 000 000 1 000 000 1 500 000 2 286 142 0 5 000 000 0 3 000 000 0 APPROVED BUDGET 2012_2013 0 0 0 5 000 000 12 000 000 0 0 0 0 0 0 2 000 000 1 000 000 0 2 286 142 0 0 0 0 0 APPROVED BUDGET 2013_2014 85 Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services DEPARTMENT DIRECTORATE High Mast Lighting Grassy Park-Pelican Park linkbox replace Firlands Main Substation - Phase 1 Festive Lighting: City Wide Facilities Alterations & Upgrading Electrification (INEP) Electrification (AFF) Electricity Demand Side Management Dassenberg Switchgear Upgrade Conn Infr (Quote): South Conn Infr (Quote): S -DC Funded Conn Infr (Quote): North Conn Infr (Quote): N -DC Funded Conn Infr (Quote): East Conn Infr (Quote): E -DC Funded Century City Capital Metering Replacement Athlone-Epping Bonteheuwel link box repl Additional Electrification 66kV OH Surge Arrestor Replacement 66kv OH Line Refurbish (ground earth) WBS ELEMENT DESCRIPTION 4 000 000 750 000 0 2 500 000 17 350 000 4 385 965 30 000 000 10 000 000 0 0 12 700 000 0 20 800 000 0 16 000 000 1 209 000 0 0 10 000 000 0 0 ORIGINAL BUDGET 2011_2012 4 000 000 0 0 3 000 000 7 500 000 17 543 860 30 000 000 0 33 026 000 19 100 000 0 33 900 000 0 23 500 000 0 0 4 000 000 1 000 000 15 000 000 1 200 000 500 000 APPROVED BUDGET 2012_2013 4 000 000 0 400 000 3 500 000 7 500 000 17 543 860 30 000 000 0 0 15 500 000 0 23 000 000 0 18 000 000 0 0 4 000 000 0 20 000 000 0 0 APPROVED BUDGET 2013_2014 86 Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services DEPARTMENT DIRECTORATE Mechanical Plant: Replacement Mechanical Plant: Additional Mechanical Plant : Replacement Mechanical Plant : Additional Main Subst MV Switchgear Replacement M Gardens Woodstock 1&2 link box replace Koeberg - Roggebaai link box replacement Informal Settlements: Area Lighting Informal Settlements : Area Lighting HV-Switch/Stat emergency lighting Refurb HV-Substation ventilation pressure Syst HV-cable fault/condition assessment Syst HV Switchgear Replacement HV Substation Ground Surfacing HV Substation gate and fence replacement HV OH structures - Anti-Theft Protect HV OH line life Assessment System HV Cable Pressure alarm syst replacemen HV - Switch/ Stat battery replacement High Mast Lights WBS ELEMENT DESCRIPTION 0 0 350 000 1 120 000 11 000 000 1 000 000 500 000 0 500 000 0 100 000 2 500 000 8 655 000 3 500 000 4 500 000 150 000 200 000 250 000 200 000 300 000 ORIGINAL BUDGET 2011_2012 400 000 1 400 000 0 0 17 350 000 0 0 500 000 0 150 000 100 000 0 3 550 000 3 400 000 2 520 000 0 0 0 200 000 0 APPROVED BUDGET 2012_2013 1 100 000 2 600 000 0 0 13 179 000 0 0 500 000 0 0 100 000 0 3 500 000 1 000 000 0 0 0 0 200 000 0 APPROVED BUDGET 2013_2014 87 Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services DEPARTMENT DIRECTORATE SCADA System RTUs Scada Engineering WAN SANS Main Substation Upgrade Rosmead Avenue Reinforcement Protect Comm Wide Area Network Expansion Prepayment Vending System Upgrading Prepayment Meter Replacement PQ System Expansion Plattekloof - N1 Reinforcement Piers Road Substation Upgrade Philippi- Lansdowne 1&2 link box replace PAX and PABX Installations Optic Fibre Installations OH line - Servitude access road (MTCHP- Oakdale - Boston: Replace 33 kV Cables MV Switchgear Refurbishment: South MV Switchgear Refurbishment: North MV Switchgear Refurbishment: East MV Circuit Breaker Replacement Montague Gardens - Foreshore link box Metering Replacement WBS ELEMENT DESCRIPTION 2 005 000 410 000 940 000 2 109 000 737 000 1 500 000 10 000 000 430 000 0 28 944 820 1 000 000 500 000 5 000 000 2 500 000 53 900 460 24 200 000 39 200 000 19 200 000 6 735 000 0 2 000 000 ORIGINAL BUDGET 2011_2012 2 015 000 410 000 0 0 846 000 1 900 000 10 000 000 490 000 0 25 701 680 0 500 000 5 000 000 3 500 000 0 21 100 000 38 500 000 23 000 000 7 859 000 1 500 000 0 APPROVED BUDGET 2012_2013 3 000 000 500 000 0 0 500 000 0 10 000 000 540 000 46 930 220 0 0 300 000 6 000 000 0 0 13 100 000 50 000 000 16 300 000 11 002 600 0 0 APPROVED BUDGET 2013_2014 88 Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services DEPARTMENT DIRECTORATE System Equipment Replacement: North System Equipment Replacement: East Substation Protection Replacement Substation Fencing - South Substation Fencing - North Substation Fencing - East Street Lighting: City Wide MIG Funding Street Lighting: City Wide Street Lighting : City Wide Service Connections (Tariff): South Service Connections (Tariff): North Service Connections (Tariff): East Serv Conn (Quote): South Serv Conn (Quote): S -Private Sec Funded Serv Conn (Quote): North Serv Conn (Quote): N -Private Sec Funded Serv Conn (Quote): East Serv Conn (Quote): E -Private Sec Funded SCADA W Masterstatn Replacemt (HW & Eng) SCADA W integration (RTU) WBS ELEMENT DESCRIPTION 26 000 000 40 000 000 2 390 000 4 000 000 3 000 000 2 800 000 1 000 000 0 15 000 000 2 800 000 3 500 000 2 800 000 0 4 000 000 0 11 500 000 0 6 000 000 1 000 000 2 340 000 ORIGINAL BUDGET 2011_2012 0 0 3 025 000 4 000 000 4 000 000 3 150 000 5 000 000 15 000 000 0 2 800 000 4 000 000 2 800 000 0 0 0 0 0 0 1 600 000 2 340 000 APPROVED BUDGET 2012_2013 0 0 4 000 000 4 000 000 4 500 000 3 500 000 5 000 000 15 000 000 0 3 000 000 0 2 800 000 6 000 000 0 12 500 000 0 7 000 000 0 0 3 430 000 APPROVED BUDGET 2013_2014 89 Solid Waste Services Water Services Water Services Water Services Water Services Water Services Water Services Water Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Solid Waste Services Utility Services Utility Services Solid Waste Services Utility Services Solid Waste Services Solid Waste Services Utility Services Utility Services Electricity Services Utility Services Solid Waste Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Solid Waste Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Solid Waste Services Electricity Services Utility Services Utility Services DEPARTMENT DIRECTORATE Cape Flats #1 Rehabilitation Bulk Water Infrastructure Replacement Bulk Water Augmentation Scheme (EFF) Bulk Water Augmentation Scheme (CRR) Bulk Water ( housing project) Bulk Sewer (Housing Projects) Aandrag Supply System Waste Info & Infrastructure Trunk Radios Solid Waste Management Infrastructure Shipping Containers Rehabilitation of Landfill Sites Reh. and Closure of L/fill Sites Development of Spine Road Drop-off Development of Landfill Infrastructure Vehicles: Additional Tafelbaai -Foreshore link box replace System Infrastructure : South System Infrastructure : North System Infrastructure : East System Equipment Replacement: South WBS ELEMENT DESCRIPTION 500 000 12 000 000 0 14 300 000 6 000 000 7 000 000 0 1 250 000 400 000 0 1 000 000 0 32 000 000 2 500 000 78 265 264 0 0 34 000 000 31 000 000 34 100 000 30 000 000 ORIGINAL BUDGET 2011_2012 2 000 000 10 000 000 0 89 300 000 0 0 0 1 250 000 400 000 0 1 000 000 0 500 000 0 163 332 210 0 1 000 000 0 0 0 0 APPROVED BUDGET 2012_2013 2 500 000 10 000 000 300 000 000 74 000 000 0 0 500 000 1 250 000 400 000 187 832 210 1 000 000 79 000 000 0 0 0 5 000 000 0 0 0 0 0 APPROVED BUDGET 2013_2014 90 Water Services Water Services Water Services Water Services Water Services Water Services Water Services Water Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services DEPARTMENT DIRECTORATE Pump Stn Rehab ( Citywide) Pressure Management: COCT On-line effluent monitoring at all WWTW Northern Regional Sludge Facility New Rest Reticulation Rectification Mobile TX Oil purification Plant (Elec) Master Planning -EFF Main Rd Upgrade M/Berg to Clovelly Rehab Kraaifontein/Fisantekraal WWTW Infrastructure Replace/Refurbish - WWTW Infrastructure Replace/Refurbish - WWT Informal settlements water Installations Informal Incremental Areas Upgrade Gugulethu/Nyanga Sewer Investigation Furniture, Fittings, Tools & Equipt EAMS Extension of Bulk Water Pipeline Extension of Bulk Pipeline EAM Depot Realignment - 5 Nodal System Development of Additional Infrastructure Contruction of new Head Office Cape Flats III WBS ELEMENT DESCRIPTION 4 000 000 11 200 000 0 3 000 000 2 000 000 350 000 300 000 14 178 809 10 000 000 0 31 000 000 3 000 000 20 000 000 660 000 120 000 150 000 0 30 000 000 9 650 000 9 000 000 0 ORIGINAL BUDGET 2011_2012 6 000 000 9 000 000 1 000 000 30 000 000 3 000 000 0 400 000 12 588 000 0 10 000 000 11 400 000 0 30 000 000 0 0 0 150 000 15 000 000 40 700 000 40 000 000 30 000 000 APPROVED BUDGET 2012_2013 4 000 000 9 000 000 0 47 300 000 1 000 000 0 400 000 10 000 000 0 0 20 000 000 0 28 500 000 0 0 300 000 0 0 38 681 000 30 000 000 45 000 000 APPROVED BUDGET 2013_2014 91 Water Services Water Services Water Services Water Services Water Services Water Services Utility Services Utility Services Utility Services Utility Services Utility Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services DEPARTMENT DIRECTORATE Ward 200 Total WS contingency provision - Insurance Water Meters Treated Effluent:Reuse & Inf Upgrades Treated Effluent: Reuse & Inf Upgrades TOC Infrastructure Development TMS Aquifer Deep Borehole Sandtrap Bridgetown Sewer Pump Station Ruyterwacht Midblock Water Pipes Replace &Upgr Sew Pumpstns (citywide) Replace & Upgrade Water Network Replace & Upgr Water Network (citywide) Replace & Upgr Sewer Network (Citywide) Replace & Upgr Sewer Network Repl&Upgr Sew Pumps Citywide Rehab Outfall Sewers Pentz Sandrift m/qu Rehab of Water Network (Citywide) Rehab of Sewer Network (MIG Citywide) Rehab of Sewer Network (Citywide) Refurbishment of Labs WBS ELEMENT DESCRIPTION 1 652 568 506 300 000 15 000 000 6 500 000 0 3 000 000 2 000 000 3 300 000 2 000 000 0 50 800 000 0 0 29 294 136 9 000 000 500 000 250 000 0 450 000 500 000 ORIGINAL BUDGET 2011_2012 1 624 318 283 0 0 3 500 000 0 2 000 000 10 000 000 5 000 000 2 000 000 7 500 000 0 22 907 000 27 066 136 0 0 2 000 000 1 000 000 0 1 000 000 500 000 APPROVED BUDGET 2012_2013 1 972 607 312 0 0 0 3 500 000 2 000 000 10 000 000 0 5 000 000 8 400 000 0 30 000 000 30 000 000 0 0 5 000 000 7 750 000 1 000 000 5 500 000 500 000 APPROVED BUDGET 2013_2014 92 Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Sport , Recreation and Amenities Citizen Relationship Management Citizen Relationship Management Communication Corporate Services Management Community Services Community Services Community Services Corporate Services Corporate Services Corporate Services Corporate Services Library Services Community Services Community Services Library Services Community Services Sport , Recreation and Amenities Library Services Community Services Community Services Library Services Community Services Parks Library Services Community Services Community Services Library Services Community Services Parks Community Services Support Community Services Community Services Community Services Support DEPARTMENT Community Services WARD 201 DIRECTORATE Corp contingency provision - Insurance Furniture and Communication Equipment IT Equipment Furniture, Fittings and Equipment Vehicles - S&R Provision of Equipment for facilities New Vehicles S&R IT infrastructure and Equipment Furniture fittings tools and equipment Plant and Equipment Furniture, Fittings, Tools & Equipment Replace Mobile Bus Conditional grant Library Upgrades and Extensions Furniture/ICT Conditional grant Furniture,Fittings,Tools&Equipment LIS FencngUpgrdeSecurtySystms&SecurngFcilits BookDetectionSystems-CondGrant Furniture, Fittings, Tools & Equipment CSS contingency provision - Insurance WBS ELEMENT DESCRIPTION 1 000 000 380 000 450 000 40 000 0 2 000 000 2 900 000 800 000 1 627 392 635 000 312 601 3 000 000 4 500 000 1 500 000 1 741 335 1 000 000 800 000 50 000 600 000 ORIGINAL BUDGET 2011_2012 1 000 000 380 000 450 000 40 000 0 3 000 000 2 900 000 800 000 1 627 392 0 0 0 0 0 1 241 335 0 0 50 000 0 APPROVED BUDGET 2012_2013 1 000 000 380 000 450 000 40 000 2 000 000 2 000 000 0 1 000 000 2 000 000 201 447 0 0 0 0 1 241 335 0 0 50 000 0 APPROVED BUDGET 2013_2014 93 Informations Systems and Technology Informations Systems and Technology Informations Systems and Technology Informations Systems and Technology Informations Systems and Technology Informations Systems and Technology Informations Systems and Technology Informations Systems and Technology Corporate Services Corporate Services Corporate Services Corporate Services Corporate Services Corporate Services Corporate Services Informations Systems and Technology Corporate Services Corporate Services Informations Systems and Technology Corporate Services Informations Systems and Technology Informations Systems and Technology Corporate Services Corporate Services Informations Systems and Technology Corporate Services Informations Systems and Technology Informations Systems and Technology Corporate Services Corporate Services Employment Equity Corporate Services Informations Systems and Technology Corporate Services Management Support Corporate Services Corporate Services Corporate Services Management Support Corporate Services Informations Systems and Technology Corporate Services Management Corporate Services Corporate Services DEPARTMENT DIRECTORATE Network Upgrade Underserviced Areas Microsoft Systems Microsoft Infrastructure Services Furniture and Fittings Extention of Smart City Strategy ERP Hardware Replacement ERP Business Systems ERP Annual Disaster Recovery Growth ERP Annual Capacity Growth Enterprise monitoring & mgt solution Data Storage- Security & Accessibility Data Centre Construction Dark Fibre Broadband Infrastructure Corporate Reporting System Computers and Equipment Business Continuity Broadband Connections Computer Equipment IT Equipment Furniture, Fittings and Equipment IT Equipment WBS ELEMENT DESCRIPTION 3 000 000 4 000 000 6 000 000 449 695 1 000 000 10 000 000 11 000 000 2 000 000 2 000 000 5 000 000 3 000 000 30 000 000 0 2 000 000 250 000 1 000 000 2 000 000 40 000 30 000 10 000 41 500 ORIGINAL BUDGET 2011_2012 0 5 000 000 6 000 000 449 695 1 500 000 30 000 000 12 000 000 2 000 000 2 000 000 5 000 000 3 000 000 0 30 000 000 2 000 000 250 000 2 000 000 5 000 000 40 000 30 000 10 000 41 500 APPROVED BUDGET 2012_2013 0 5 000 000 6 000 000 449 695 1 500 000 30 000 000 12 000 000 2 000 000 2 000 000 5 000 000 3 000 000 0 30 000 000 2 000 000 250 000 2 000 000 5 000 000 40 000 30 000 10 000 41 500 APPROVED BUDGET 2013_2014 94 Specialised Technical Services Specialised Technical Services Specialised Technical Services Specialised Technical Services Specialised Technical Services Specialised Technical Services Specialised Technical Services Corporate Services Corporate Services Corporate Services Corporate Services Corporate Services Corporate Services Personnel Services Corporate Services Corporate Services Personnel Services Corporate Services Specialised Technical Services Personnel Services Corporate Services Corporate Services Legal Services Corporate Services Specialised Technical Services Legal Services Corporate Services Corporate Services Legal Services Corporate Services Personnel Services Informations Systems and Technology Corporate Services Corporate Services Informations Systems and Technology Corporate Services Personnel Services Informations Systems and Technology Corporate Services Corporate Services DEPARTMENT DIRECTORATE Radio Trunking Infrastructure Plant & Equipment IT Equipment Furniture & Equipment FS Replacement Vehicles FS Replacement Plant FS Fleet Replacements AFF FM Infrastructure FM BM Equipment Replacement of Equipment IT Equipment Furniture, Fittings and Equipment Furniture and Equipment Computer Equipment Office Furniture and Equipment Municipal Court infrastructure IT Equipment Upgrade of Exchange Renewal of back-end Network Infra Renewal of back end IT Infrastructure WBS ELEMENT DESCRIPTION 1 000 000 50 000 780 622 527 747 9 790 719 1 300 000 2 000 000 2 900 000 250 000 75 000 200 000 200 000 25 000 75 000 130 000 4 100 000 205 000 2 000 000 1 500 000 2 000 000 ORIGINAL BUDGET 2011_2012 1 000 000 50 000 780 622 527 747 9 440 719 1 300 000 2 000 000 2 900 000 250 000 75 000 200 000 200 000 25 000 75 000 130 000 100 000 205 000 0 1 500 000 2 000 000 APPROVED BUDGET 2012_2013 1 000 000 50 000 806 622 571 747 9 440 719 1 300 000 2 000 000 2 800 000 250 000 75 000 200 000 200 000 25 000 75 000 130 000 100 000 205 000 0 1 500 000 2 000 000 APPROVED BUDGET 2013_2014 95 Tourism Development Budgets Expenditure Expenditure Expenditure Finance Management - FS Housing Finance & Leases Housing Finance & Leases Finance Services Finance Services Finance Services Finance Services Finance Services Finance Services Finance Services Economic and Human Development Economic and Social Development Economic and Social Development Support Services - CS Corporate Services Property Support Services - CS Corporate Services Economic and Social Development Support Services - CS Corporate Services Property Support Services - CS Corporate Services Economic and Social Development Support Services - CS Corporate Services Economic and Social Dev Management Strategic HR Corporate Services Economic and Social Development Strategic HR Corporate Services Economic and Human Development Strategic HR Corporate Services Economic and Social Development DEPARTMENT DIRECTORATE Furniture & Equipment Computer Equipment Fin contingency provision - Insurance Specialised Computer Equipment Furniture & Equipment Computer Equipment IT Equipment Furniture & Equipment IT Equipment Furniture & Equipment ES contingency provision - Insurance EHD - Furniture EHD - Computer Equipment Record Management Storage Printing Equipment IT Equipment Furniture and Equipment Fire and Security Protection IT Equipment Furniture, Fittings and Equipment e-HR WBS ELEMENT DESCRIPTION 19 000 50 000 1 000 000 63 703 108 000 112 000 40 000 50 000 100 000 100 000 150 000 50 000 50 000 520 000 0 245 000 135 000 0 375 000 60 000 1 800 000 ORIGINAL BUDGET 2011_2012 19 000 50 000 0 0 108 000 112 000 0 0 200 000 100 000 0 0 0 390 000 200 000 110 000 100 000 100 000 375 000 60 000 1 800 000 APPROVED BUDGET 2012_2013 19 000 50 000 0 0 108 000 112 000 0 0 150 000 100 000 0 0 0 390 000 200 000 110 000 100 000 100 000 405 000 60 000 1 800 000 APPROVED BUDGET 2013_2014 96 Supply Chain Management Supply Chain Management Treasury Valuations Valuations Valuations Valuations Valuations Finance Services Finance Services Finance Services Finance Services Finance Services Finance Services Finance Services Supply Chain Management Finance Services Finance Services Supply Chain Management Finance Services Supply Chain Management Shareholders Management Unit Finance Services Finance Services Risk Management Finance Services Supply Chain Management Revenue Finance Services Finance Services Revenue Finance Services Supply Chain Management Revenue Finance Services Finance Services Revenue Finance Services Supply Chain Management Inter - Service Liaison Finance Services Finance Services DEPARTMENT DIRECTORATE Specialised Computer Equipment Objection venue hardware Furniture & Equipment - Replacement Furniture & Equipment - New Computer Equipment Computer Equipment Warehouse Equipment Scale for Auction Centre Install Lighting - Stores Hyster for Auction Centre Furniture & Equipment Copier for Tender and Contracts Depart Computer Equipment Bunding for Auction Centre Furniture & Equipment Computer Equipment Security at Cash (MVR) Offices Replacement of IT Equipment Office Furniture - New Furniture & Equipment Specialised Computer Equipment WBS ELEMENT DESCRIPTION 330 000 0 150 000 75 000 73 222 0 50 000 15 000 30 000 300 000 60 000 10 000 200 000 300 000 40 000 30 000 200 000 250 000 0 1 210 370 40 000 ORIGINAL BUDGET 2011_2012 28 703 750 000 0 0 73 222 135 000 50 000 0 0 0 60 000 0 200 000 0 50 000 30 000 200 000 200 000 100 000 1 210 370 20 000 APPROVED BUDGET 2012_2013 28 703 750 000 0 0 73 222 0 50 000 0 0 0 60 000 0 200 000 0 50 000 30 000 200 000 200 000 100 000 1 210 370 20 000 APPROVED BUDGET 2013_2014 97 Support Services - HSG Support Services - HSG Urban Renewal Programme Urban Renewal Programme Urban Renewal Programme Internal Audit Internal Audit Housing Housing Housing Housing Internal Audit Internal Audit Existing Settlements Housing Housing Existing Settlements Housing Support Services - HSG Existing Settlements Housing Housing Existing Settlements Housing Support Services - HSG Existing Settlements Housing Housing Development Services Housing Support Services - HSG Health Services Health Housing Health Services Health Strategy Support & Co-Ordination Health Services Health Housing DEPARTMENT DIRECTORATE Furniture & Equipment Computer Hardware Upgrade of Training Centres Furniture and Equipment Computers and Equipment Trunking Radios Housing contingency - Insurance Housin contingency provision - Insurance Furniture & Fittings Computer Equipment Accreditation - Development Support Plant & Equipment New Manenberg Housing Admin Office(USDG) New Manenberg Housing Admin Office (EFF) Major Upgrading of Offices Major Upgrading of Depots MIG Project Management Unit HS contingency provision - insurance Furniture, fittings, tools and equipment Air Pollution control equipment WBS ELEMENT DESCRIPTION 0 91 444 4 150 000 50 000 50 000 50 000 500 000 0 613 318 1 000 000 350 000 50 000 6 281 170 6 700 000 6 500 000 200 000 330 818 150 000 1 007 554 1 150 000 ORIGINAL BUDGET 2011_2012 0 60 000 3 000 000 50 000 50 000 50 000 0 0 764 318 1 000 000 0 50 000 0 0 6 250 000 250 000 349 989 150 000 957 554 400 000 APPROVED BUDGET 2012_2013 61 444 60 000 0 0 0 50 000 0 500 000 864 318 1 100 000 0 50 000 0 0 0 0 350 415 150 000 1 396 466 600 000 APPROVED BUDGET 2013_2014 98 Office of the City Manager Office of the City Manager Office of the City Manager Office of the City Manager Ombudsperson Ombudsperson Ombudsperson Office of the City Manager Office of the City Manager Office of the City Manager Office of the City Manager Office of the City Manager Office of the City Manager Forensic Services Office of the City Manager Office of the City Manager Forensic Services Office of the City Manager IDP/OPM Forensic Services Office of the City Manager Office of the City Manager Forensic Services Office of the City Manager Governance & Interface Forensic Services Office of the City Manager Office of the City Manager Executive Support Office of the City Manager Governance & Interface Executive Support Office of the City Manager Office of the City Manager Internal Audit Internal Audit Governance & Interface Internal Audit Internal Audit Office of the City Manager DEPARTMENT DIRECTORATE Furniture and Equipment Furniture & Equipment Computers & Equipment Office Equipment OCM contingency provision - Insurance Furniture, Fittings, Tools & Equipment Furniture, Fitting, Tools & Equipment Furniture, Fittings, Tools & Equipment Ward Forum Project Sub Council offices Furniture, Fittings, Tools & Equipment Office Equipment Furniture,fittings tools and equipment Furniture and Equipment Furniture Computer Equipment Office Equipment Furniture, Fittings, Tools & Equipment IA contingency provision - Insurance Furniture and Equipment WBS ELEMENT DESCRIPTION 40 000 0 50 000 50 000 150 000 0 72 360 100 000 400 000 1 000 000 1 284 779 80 000 100 000 0 0 70 000 100 000 324 000 50 000 30 000 ORIGINAL BUDGET 2011_2012 0 22 000 0 150 000 0 72 360 0 77 158 250 000 3 000 000 1 207 621 0 100 000 0 100 000 100 000 200 000 324 000 0 61 444 APPROVED BUDGET 2012_2013 0 112 868 0 100 000 0 0 72 360 77 158 250 000 8 000 000 1 307 621 0 100 000 100 000 0 100 000 150 000 324 000 0 0 APPROVED BUDGET 2013_2014 99 Emergency Services Emergency Services Emergency Services Emergency Services Emergency Services Metro Police Metro Police Safety & Security Safety & Security Safety & Security Safety & Security Safety & Security Safety & Security Emergency Services Safety & Security Safety & Security Emergency Services Safety & Security Emergency Services Emergency Services Safety & Security Safety & Security Emergency Services Safety & Security Emergency Services Emergency Services Safety & Security Safety & Security Ombudsperson Office of the City Manager Emergency Services Ombudsperson Office of the City Manager Safety & Security Ombudsperson Office of the City Manager Emergency Services Ombudsperson Office of the City Manager Safety & Security DEPARTMENT DIRECTORATE Acquisition of firearms and equipment Acquisition of equipment Wireless IT Connectivity Upgrade Communication Systems System Enhancement - Incident Processing Response System Integration Replacement of Furniture and Fittings Replace Fire Fighting Equipment Replace communication equipment Replace communicaiton equipment Laptops for DisMan Field Officers GEMC System Enhancement Furniture Fittings Tools Furniture Fittings & Tools Furniture & Equipment DisMan Centre Additions/Alterations DisMan Centre Additions/Alteration Office Furniture Office Equipment Furniture, Fittings, Tools & Equipment WBS ELEMENT DESCRIPTION 450 000 213 400 0 0 0 320 000 120 000 0 0 750 000 0 0 63 612 495 077 126 194 0 0 58 000 0 52 868 ORIGINAL BUDGET 2011_2012 0 713 400 58 479 129 822 221 050 0 46 783 1 778 135 600 000 0 116 958 315 785 0 684 883 0 0 315 785 55 000 75 868 0 APPROVED BUDGET 2012_2013 0 613 400 58 479 129 822 221 050 0 46 783 1 778 135 600 000 0 116 958 315 785 0 684 883 0 315 785 0 0 40 000 0 APPROVED BUDGET 2013_2014 100 Operational Coordination Operational Coordination Operational Coordination Operational Coordination Strategic Support Strategic Support Environmental Resource Management Safety & Security Safety & Security Safety & Security Safety & Security Safety & Security Strategy and Planning Operational Coordination Safety & Security Safety & Security Operational Coordination Safety & Security Operational Coordination Operational Coordination Safety & Security Safety & Security Operational Coordination Safety & Security Operational Coordination Operational Coordination Safety & Security Safety & Security Operational Coordination Safety & Security Operational Coordination Metro Police Safety & Security Safety & Security Metro Police Safety & Security Operational Coordination Metro Police Safety & Security Safety & Security DEPARTMENT DIRECTORATE Biodiversity : Strategic Implementation SS contingency provision - Insurance Furniture, Fittings, Tools & Equipment Vehicles: Specialized Services Traffic Licensing Central Equipment Traffic Licencing Equipment Traffic Licencing Central Equipment Specialised IT Equipment Specialised equipment Spec Serv Public Safety Equipment Spec Serv Anti-land invasion Equipment Replacement of Vehicles-Operational Coor Radios and related equipment - Traffic Radios and related equipment - Law Enfor Furniture,fittings,tools and equipment Furniture Fittings, tools and equipment Furniture Fittings and Tools & Equipment Replacement of CCTV equipment Radio and related equipment Acquisition of IT and related equipment WBS ELEMENT DESCRIPTION 95 614 1 000 000 215 084 5 000 000 0 300 000 0 250 000 466 070 300 000 300 000 0 0 0 200 000 0 987 288 1 500 000 0 350 000 ORIGINAL BUDGET 2011_2012 0 0 1 290 947 0 0 275 000 400 000 0 800 000 400 000 0 0 600 000 400 000 275 000 439 128 598 160 1 000 000 500 000 0 APPROVED BUDGET 2012_2013 0 0 1 290 947 0 100 000 100 000 0 0 800 000 200 000 0 1 801 625 0 0 200 000 439 128 548 160 0 1 100 000 300 000 APPROVED BUDGET 2013_2014 101 Strategy & Planning Management IRT Implementation IRT Implementation IRT Implementation IRT Implementation IRT Implementation IRT Implementation IRT Implementation Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Spatial Planning and Urban Design Strategy and Planning Strategy and Planning Planning and Building Development Management Strategy and Planning Strategy & Planning Management Planning and Building Development Management Strategy and Planning Strategy and Planning Environmental Resource Management Strategy and Planning Strategic Development Information & GIS Environmental Resource Management Strategy and Planning Strategy and Planning Environmental Resource Management Strategy and Planning Strategic Development Information & GIS Environmental Resource Management Strategy and Planning Strategy and Planning Environmental Resource Management Strategy and Planning Strategic Development Information & GIS Environmental Resource Management Strategy and Planning Strategy and Planning DEPARTMENT DIRECTORATE IRT:Integr Rapid Transit Syst(Ph1A):PTIF IRT:InnerCityService:PTIF IRT:Feeder Stations:Inner City:PTIF IRT:Depot Infrastruc:Atlantis Depot:PTIF IRT: Trunk Stations:PTIF IRT: NMT:PTIF IRT: Infrastructure Scenario 1:PTIF SP contingency provision - Insurance Computer Equipment Office Furniture Office Equipment GIS and IT equipment Computer Equipment Furniture and Equipment Computer Equipment Specialised Biodiversity Equipment Plant and Equipment IT Equipment IT and Office Equipment Furniture and Fittings Furniture WBS ELEMENT DESCRIPTION 65 965 854 10 100 845 93 059 102 119 052 751 113 389 620 40 000 000 0 100 000 80 000 46 499 30 000 200 000 200 000 200 000 750 000 0 160 000 100 000 125 329 0 40 000 ORIGINAL BUDGET 2011_2012 55 438 929 0 27 516 690 0 49 290 805 15 346 800 0 0 56 828 50 000 30 000 160 000 0 200 000 750 000 0 140 000 100 000 240 000 0 45 000 APPROVED BUDGET 2012_2013 16 895 130 0 0 0 111 597 687 15 346 800 413 992 217 0 56 828 50 000 30 000 160 000 0 200 000 750 000 145 000 140 000 150 000 240 000 100 000 0 APPROVED BUDGET 2013_2014 102 Transport Transport Transport Transport Electricity Services Electricity Services Electricity Services Transport, Roads & Major Projects Transport, Roads & Major Projects Transport, Roads & Major Projects Utility Services Utility Services Utility Services Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects Roads and Stormwater Transport, Roads & Major Projects TR&MP Strategic Support Roads and Stormwater Transport, Roads & Major Projects Transport, Roads & Major Projects IRT Operations Transport, Roads & Major Projects TR&MP Office Support IRT Operations Transport, Roads & Major Projects Transport, Roads & Major Projects IRT Operations Transport, Roads & Major Projects Roads and Stormwater IRT Operations Transport, Roads & Major Projects Transport, Roads & Major Projects IRT Implementation Transport, Roads & Major Projects Roads and Stormwater IRT Implementation Transport, Roads & Major Projects Transport, Roads & Major Projects DEPARTMENT DIRECTORATE Computer Equipment Additional Computer Equipment Communication Equipment TR&S:Acquistion of computer hardware TR&S: Acquisition of computer hardware Support Services: Photocopiers Furn, Fittings, Tools & Equip -Transport Furniture & Fittings Furniture & Fittings TRS contingency provision - Insurance Plant and Equipment OPS Upgrading of depot facilities Furniture, Fittings Tools & Equipment Acquisition:Computer Hardware & Software IRT: Vehicle Acquisitions IRT: Vehicle Acquisition IRT: Fare Collection IRT: Control Centre IRT:WestCoastCorridor:PTIF IRT:Prop Acquisition:InnerCityDepot:PTIF WBS ELEMENT DESCRIPTION 2 500 000 500 000 1 000 000 0 386 142 0 700 000 81 534 43 121 200 000 1 200 000 600 000 500 000 500 000 0 200 000 000 186 360 403 44 148 261 156 586 723 91 656 000 ORIGINAL BUDGET 2011_2012 2 500 000 500 000 1 000 000 0 600 000 0 150 000 81 534 43 121 0 0 300 000 1 000 000 500 000 40 000 000 0 40 799 260 73 831 466 815 428 318 0 APPROVED BUDGET 2012_2013 2 500 000 500 000 1 000 000 600 000 0 150 000 150 000 81 534 43 121 0 0 300 000 1 000 000 500 000 0 211 745 979 7 656 753 0 576 195 908 0 APPROVED BUDGET 2013_2014 103 Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Electricity Services Solid Waste Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services Electricity Services Utility Services Electricity Services Electricity Services Utility Services Utility Services DEPARTMENT DIRECTORATE Mechanical Equipment Vehicles: Replacement Vehicles: Additional Vehicles : Replacement Vehicles : Additional Tools & Equipment Test Equipment System Infrastructure: South System Infrastructure: North System Infrastructure: East System Equipment Replacement: South System Equipment Replacement: North System Equipment Replacement: East Service Connections (Tariff): North Security Equipment Safety Equipment Prepayment Vending System Upgrading Office Furniture Office Equipment & Furniture ES contingency provision - Insurance Computer Equipment Replacement WBS ELEMENT DESCRIPTION 2 500 000 0 0 12 125 040 5 000 000 4 000 000 12 500 000 0 0 0 0 0 0 0 2 500 000 250 000 0 1 000 000 1 000 000 1 000 000 2 000 000 ORIGINAL BUDGET 2011_2012 500 000 21 694 460 7 000 000 0 0 4 000 000 8 500 000 35 000 000 33 000 000 35 000 000 30 000 000 30 000 000 40 000 000 0 2 500 000 250 000 0 1 000 000 1 000 000 1 000 000 2 000 000 APPROVED BUDGET 2012_2013 500 000 26 930 800 0 0 0 4 000 000 8 500 000 40 000 000 34 500 000 37 800 000 35 000 000 35 000 000 40 000 000 4 000 000 2 500 000 250 000 1 500 000 1 000 000 1 000 000 1 000 000 2 000 000 APPROVED BUDGET 2013_2014 104 Water Services Water Services Water Services Water Services Water Services Water Services Water Services Utility Services Utility Services Utility Services Utility Services Utility Services Utility Services Water Services Utility Services Utility Services Utility Services Support Utility Services Water Services Utility Services Support Utility Services Utility Services Utility Services Support Utility Services Water Services Utility Services Support Utility Services Utility Services Solid Waste Services Utility Services Water Services Solid Waste Services Utility Services Utility Services Solid Waste Services Utility Services Water Services Solid Waste Services Utility Services Utility Services DEPARTMENT DIRECTORATE Metering Equipment (Revenue) Laboratory Equipment - Scientific Ser Laboratory Equipment IT: Systems, Infrastructure & Equipment IT Equipment Replacement Furniture, Fittings, Tools & Equip WWTW Furniture, Fittings, Tools & Equip WDM Furniture Fittings Tools Equipment (EAMS Furniture & Equipment (IT) Furniture & Equipment (Electrical) Furniture & Equipment Additional Vehicles USS contingency provision - Insurance Furniture,Fitttings and Equipment Furniture Fittings and Equipment Computer Equipment SW contingency provision - Insurance Purchase of Furniture - Tariffs Purchase of Furniture - Rates Plant & Vehicles WBS ELEMENT DESCRIPTION 0 0 3 500 000 7 700 000 0 0 40 000 0 0 335 800 500 000 14 000 000 50 000 0 50 000 90 000 4 000 000 123 300 400 000 161 832 210 ORIGINAL BUDGET 2011_2012 0 0 3 000 000 0 5 000 000 100 000 30 000 40 000 500 000 0 0 0 0 0 50 000 90 000 0 150 000 373 300 94 300 000 APPROVED BUDGET 2012_2013 2 500 000 2 500 000 0 0 5 500 000 100 000 30 000 276 000 300 000 0 0 0 0 40 000 0 100 000 0 157 500 365 800 68 100 000 APPROVED BUDGET 2013_2014 105 Water Services Water Services Water Services Water Services Utility Services Utility Services Utility Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services Water Services Utility Services Water Services Water Services Utility Services Utility Services DEPARTMENT DIRECTORATE Tools and Equipment Tools & Sundry Equipment Tools & Equipment (PCS) Tools & Equipment (Mech) 1 584 653 090 5 089 866 927 GRAND TOTAL 0 0 220 000 1 000 000 800 000 260 000 468 000 0 500 000 0 16 000 000 0 150 000 0 7 300 000 0 500 000 Ward 201 Total Tools & Equipment (design & contracts) Sundry equipment at various WWTW Specialised Equipment electrical Specialised Equipment (Electrical) Small Plant & Equipment Replacement of Vehicles (EAMS) Replacement of Vehicles Replacement Of Plant and Equipment BW Replacement of Plant & Equipment- BW Replacement of Plant & Equipment (EAMS) Replacement of Plant & Equipment Plant and Equipment Additional Plant & Equipment additional WBS ELEMENT DESCRIPTION ORIGINAL BUDGET 2011_2012 4 765 896 828 1 695 276 443 800 000 0 253 000 2 000 000 0 300 000 0 0 500 000 25 000 000 0 150 000 0 5 060 000 0 500 000 0 APPROVED BUDGET 2012_2013 5 049 164 982 1 916 651 143 0 45 000 290 950 2 000 000 800 000 300 000 0 107 500 500 000 0 15 543 093 0 250 000 4 820 593 0 0 500 000 APPROVED BUDGET 2013_2014