City of Cape Town 2009/2010 - 2011/2012 Capital Budget ANNEXURE 1

advertisement
ANNEXURE 1
City of Cape Town
2009/2010 - 2011/2012 Capital Budget
Projects per Directorate per Department
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
Office of the City Manager
Office of the City Manager
C0921002F1
Office Equipment
EFF
1 EFF
C0921003F1
Office Equipment
EFF
1 EFF
C1000029F1
Furniture, Fittings, Tools & Equipment
REVENUE
2 REVENUE
C1000031F1
Office Equipment
EFF
C1000032F1
Office Equipment
EFF
40 000
0
0
40 000
Corp Inf
New
0
50 000
0
50 000
Corp Inf
New
72 360
0
0
72 360
65
New
1 EFF
0
0
80 000
80 000
Corp Inf
New
1 EFF
0
0
100 000
100 000
Corp Inf
New
112 360
50 000
180 000
Total for Office of the City Manager
Executive Support
C0924002F1
Office Equipment
EFF
1 EFF
188 402
0
0
188 402
Corp Inf
New
C0924003F1
Office Equipment
EFF
1 EFF
0
100 000
0
100 000
Corp Inf
New
C1000027F1
Furniture, Fittings, Tools & Equipment
REVENUE
2 REVENUE
324 000
0
0
324 000
Corp Inf
New
C1000033F1
Office Equipment
EFF
1 EFF
0
0
100 000
100 000
Corp Inf
New
C1024001F1
Office Equipment
EFF
1 EFF
0
0
230 000
230 000
Corp Inf
New
512 402
100 000
330 000
Total for Executive Support
Governance & Interface
C0500208F1
Ward Allocations
CRR
3 AFF:WardAllocation
3 413 545
0
0
3 413 545
Multi
New
C0925003F1
Improvement to Subcouncil Offices & Equi
EFF
1 EFF
1 800 000
0
0
1 800 000
Corp Inf
Renewal
C0925004F1
Improvement to Subcouncil Offices & Equi
EFF
1 EFF
0
1 000 000
0
1 000 000
Corp Inf
Renewal
C1000030F1
Furniture, Fittings, Tools & Equipment
REVENUE
2 REVENUE
1 457 621
0
0
1 457 621
Corp Inf
New
C1000034F1
Ward Forum Project
EFF
1 EFF
0
0
450 000
450 000
Corp Inf
New
200 000
0
200 000
Corp Inf
New
0
0
200 000
Corp Inf
New
C1000035F1
Ward Forum Project
EFF
1 EFF
0
C1000036F1
Ward Forum Project
EFF
1 EFF
200 000
Office of the City Manager
1
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Ward
New/Renewal
0
0
8 000
100
New
10 608 765
0
0
10 608 765
Multi
New
31 500 000
0
31 500 000
Multi
New
31 500 000
Multi
New
Corp Inf
New
C1000049F1
Loud hailer
CRR
3 AFF:WardAllocation
8 000
C1025010F1
Ward Allocations
CRR
3 AFF:WardAllocation
C1025011F1
Ward Allocations
CRR
3 AFF:WardAllocation
0
C1025012F1
Ward Allocations
CRR
3 AFF:WardAllocation
0
0
31 500 000
17 487 931
32 700 000
31 950 000
50 000
0
Total for Governance & Interface
Total Project
Cost
Ombudsperson
50 000
C0926002F1
Furniture & Equipment
EFF
1 EFF
0
C0926003F1
Computers & Equipment
EFF
1 EFF
90 000
0
0
90 000
Corp Inf
New
0
50 000
0
50 000
Corp Inf
New
52 868
0
0
52 868
Corp Inf
New
C0926004F1
Computers & Equipment
EFF
1 EFF
C1000028F1
Furniture, Fittings, Tools & Equipment
REVENUE
2 REVENUE
C1026001F1
Office Furniture
EFF
1 EFF
0
0
100 000
100 000
Corp Inf
New
C1026002F1
Furniture and Equipment
EFF
1 EFF
0
0
60 000
60 000
Corp Inf
New
C1026003F1
Computers & Equipment
EFF
1 EFF
0
0
80 000
80 000
Corp Inf
New
142 868
100 000
240 000
0
700 000
Corp Inf
New
Total for Ombudsperson
Forensic Services
C0900513F1
Furniture
CGD
4 NT RESTRUCTURING
350 000
0
C0900514F1
Computer Equipment
CGD
4 NT RESTRUCTURING
100 000
0
0
200 000
Corp Inf
New
C0921005F1
Office Equipment
EFF
1 EFF
0
0
100 000
100 000
Corp Inf
New
C0921006F1
Office Equipment
EFF
1 EFF
0
50 000
0
50 000
Corp Inf
New
C1000006F1
Computer Equipment
EFF
1 EFF
0
0
100 000
100 000
Corp Inf
New
C1027001F1
Office Equipment
EFF
1 EFF
0
0
100 000
100 000
Corp Inf
New
450 000
50 000
300 000
18 705 561
33 000 000
33 000 000
Total for Forensic Services
Total for Office of the City Manager
Internal Audit
Internal Audit
C0831005F1
Computer hardware
EFF
1 EFF
111 600
0
0
111 600
Corp Inf
Renewal
C0831006F1
Internal Audit Automation
EFF
1 EFF
60 000
60 000
60 000
180 000
Corp Inf
New
C0931001F1
Furniture and Equipment
EFF
1 EFF
206 527
0
0
368 500
Corp Inf
Renewal
Internal Audit
2
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
0
0
60 000
0
60 000
Corp Inf
Renewal
140 000
0
140 000
Corp Inf
Renewal
Furniture and Equipment
EFF
1 EFF
47 600
C0931003F1
Furniture and Equipment
EFF
1 EFF
Corp Inf
New/Renewal
0
C0931002F1
47 600
Ward
Renewal
C0931004F1
Computer hardware
EFF
1 EFF
0
C1031014F1
Furniture and Equipment
EFF
1 EFF
0
0
60 000
60 000
Corp Inf
Renewal
C1031015F1
Computer Hardware
EFF
1 EFF
0
0
140 000
140 000
Corp Inf
Renewal
Total for Internal Audit
425 727
260 000
260 000
Total for Internal Audit
425 727
260 000
260 000
0
0
150 000
Corp Inf
New
Utility Services
Utility Services Support
C0982003F1
Computer Equipment
EFF
1 EFF
150 000
C0982004F1
Furniture Fittings and Equipment
EFF
1 EFF
150 000
0
0
150 000
Corp Inf
New
C0982005F1
Computer Equipment
EFF
1 EFF
0
150 000
0
150 000
Corp Inf
New
C0982006F1
Furniture Fittings and Equipment
EFF
1 EFF
0
150 000
0
150 000
Corp Inf
New
150 000
150 000
Corp Inf
New
150 000
150 000
Corp Inf
New
C0982008F1
Computer Equipment
EFF
1 EFF
0
0
C0982009F1
Furniture Fittings and Equipment
EFF
1 EFF
0
0
C0982010F1
Furniture, Fittings, Tools & Equipm
REVENUE
2 REVENUE
40 000
0
0
40 000
Corp Inf
New
50 000
0
50 000
Corp Inf
New
50 000
Corp Inf
New
63
New
C0982011F1
Furniture, Fittings, Tools & Equipm
REVENUE
2 REVENUE
0
C0982012F1
Furniture, Fittings, Tools & Equipm
REVENUE
2 REVENUE
0
0
50 000
340 000
350 000
350 000
76 736 800
13 576 900
141 858 300
Total for Utility Services Support
Electricity Services
C0700617F1
Loch Road Reinforcement
EFF
1 EFF
39 989 600
C0700618F1
Boston - Transformer Replacement
EFF
1 EFF
1 343 120
0
0
2 204 500
2
New
C0701225F1
SCADA System RTUs
EFF
1 EFF
1 675 000
1 675 000
1 675 000
9 034 383
Multi
New
C0701384F1
Weatherproof Transformer Bays: West
EFF
1 EFF
1 900 000
0
0
2 164 388
Multi
Renewal
C0701390F1
SCADA W integration (RTU)
EFF
1 EFF
1 840 000
1 840 000
1 840 000
10 264 836
Multi
Renewal
C0701593F1
SCADA W Masterstatn Replacemt (HW & Eng)
EFF
1 EFF
2 250 000
0
1 300 000
26 002 471
Multi
Renewal
C0741934F1
Roggebaai Upgrade
EFF
1 EFF
25 334 300
0
0
167 515 530
Multi
Renewal
C0741944F1
Sea Point Ph2 Transformer Replacement
EFF
1 EFF
5 217 800
0
0
17 853 488
Multi
Renewal
Utility Services
3
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
C0884002F1
HV-cable fault/condition assessment Syst
EFF
1 EFF
C0884003F1
66kV OH Line Refurb (Insulators)
EFF
1 EFF
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
0
0
1 333 283
0
30 000 000
2 650 000
Total Project
Cost
Ward
New/Renewal
2 650 000
Multi
Renewal
0
1 780 000
Multi
Renewal
0
58 000 000
Multi
Renewal
10
Renewal
C0884005F1
SPS Unit new generator transformer
EFF
1 EFF
20 206 728
C0884006F1
HV-cable oil syst Refurbishm-Tygerb Hosp
EFF
1 EFF
500 000
0
0
500 000
C0884007F1
HV Switchgear Replacement
EFF
1 EFF
10 674 100
1 437 500
1 581 300
15 432 400
Multi
Renewal
C0884009F1
MV Circuit Breaker Replacement
EFF
1 EFF
2 596 600
899 800
989 800
5 575 000
Multi
Renewal
C0884024F1
Scada Engineering WAN
EFF
1 EFF
300 000
380 000
380 000
1 995 532
Multi
Renewal
C0884033F1
HV-Switch/Stat emergency lighting Refurb
EFF
1 EFF
563 840
0
0
999 965
Multi
Renewal
C0884035F1
HV-Substation ventilation pressure Syst
EFF
1 EFF
150 000
100 000
0
416 850
Multi
Renewal
C0884036F1
132kV OHlinerefurbish Suspension Hrdware
EFF
1 EFF
1 900 000
0
0
1 900 000
Multi
Renewal
C0884039F1
APS transformer cooling Modifications
EFF
1 EFF
500 000
0
0
500 000
Multi
Renewal
C0884040F1
APS switsh/stat Battry&charger Replacem
EFF
1 EFF
158 418
0
0
577 325
Multi
Renewal
C0884041F1
RGT New CRRs
EFF
1 EFF
2 000 000
0
0
2 000 000
Multi
Renewal
Multi
Renewal
C0884043F1
Main Subst MV Switchgear Replacement
EFF
1 EFF
500 000
9 317 000
10 248 700
30 764 400
C0884047F1
Retreat Reinforcement
EFF
1 EFF
59 785 500
350 000
0
64 707 500
67
Renewal
C0884048F1
132kV Interlock Replacement
EFF
1 EFF
3 754 600
10 899 500
0
16 675 800
Multi
Renewal
C0884049F1
Retreat Area Office
EFF
1 EFF
13 000 000
13 000 000
0
27 700 000
67
New
C0884051F1
66kV OH Line Refurb (shield/earth wires)
EFF
1 EFF
1 350 000
0
0
1 350 000
Multi
Renewal
C0884053F1
RGT New CRRs Install
EFF
1 EFF
2 000 000
0
0
2 000 000
Multi
Renewal
C0884055F1
132kV line Refurb (shield/earth wires)
EFF
1 EFF
0
0
10 646 000
10 646 000
Multi
Renewal
C0884058F1
Century City
EFF
1 EFF
5 324 580
30 472 920
500 000
36 297 500
4
New
C0884060F1
2010: CBD Elect Infrastr Re-inforcement
EFF
1 EFF
12 648 200
0
0
126 139 499
Multi
Renewal
C0884067F1
HV Cable Pressure alarm syst replacemen
EFF
1 EFF
1 200 000
1 000 000
1 000 000
4 200 000
Multi
New
C0984008F1
Parow South Upgrade
EFF
1 EFF
20 782 000
0
0
22 944 800
Multi
Renewal
0
0
47 944 990
Multi
Renewal
C0984009F1
Strand Upgrade
EFF
1 EFF
42 109 990
C0984011F1
132kv OH Line Refurbish Structure
EFF
1 EFF
2 000 000
0
0
2 000 000
Multi
Renewal
C0984012F1
HV Substation ground surfacing
EFF
1 EFF
900 000
0
0
3 487 000
Multi
Renewal
0
0
400 000
Multi
Renewal
C0984013F1
Athlone - M Gardens link box replacement
EFF
1 EFF
400 000
C0984014F1
HV Cable tunnels refurbish -Century City
EFF
1 EFF
750 000
0
0
750 000
Multi
Renewal
C0984015F1
HV Substation LV board replacement
EFF
1 EFF
553 000
0
0
1 650 000
Multi
Renewal
C0984016F1
132kv OH Line Refurbish (ground earth)
EFF
1 EFF
600 000
0
0
600 000
Multi
Renewal
Utility Services
4
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0984018F1
Gordons Bay NER
EFF
1 EFF
487 800
0
0
487 800
Multi
Renewal
C0984021F1
HV OH line life Assessment System
EFF
1 EFF
400 000
0
0
400 000
Multi
Renewal
0
0
80 000
Multi
Renewal
C0984024F1
Replace recorder MLCP Lybrith temperatur
EFF
1 EFF
41 169
C0984027F1
Langeberg : Transformer Replacement
EFF
1 EFF
18 354 870
0
0
20 793 370
Multi
Renewal
C0984029F1
M Gardens Woodstock 1&2 link box replace
EFF
1 EFF
1 000 000
0
0
1 000 000
Multi
Renewal
C0984030F1
A&B Shaft Add vent, fans, intake ducts
EFF
1 EFF
1 000 000
0
0
1 000 000
Multi
Renewal
C0984031F1
66kv OH Line Refurbish (ground earth)
EFF
1 EFF
600 000
0
0
600 000
Multi
Renewal
C0984032F1
Koeberg - Roggebaai link box replacement
EFF
1 EFF
500 000
0
0
500 000
Multi
Renewal
C0984033F1
AGT New Fuel offloading pump & pipes
EFF
1 EFF
50 000
0
0
50 000
Multi
Renewal
C0984034F1
Consol Glass Main Substation
EFF
1 EFF
0
250 000
7 256 600
7 506 600
Multi
New
C0984040F1
Oakdale - Boston: Replace 33 kV Cables
EFF
1 EFF
0
14 714 750
48 785 650
63 500 400
Multi
Renewal
C0984042F1
132kv OH line refurbish(strain Hardware)
EFF
1 EFF
0
0
3 500 000
3 500 000
Multi
Renewal
C0984043F1
Stikland Main Substation
EFF
1 EFF
0
0
2 765 500
2 765 500
Multi
New
1 000 000
1 000 000
Multi
Renewal
750 000
750 000
Multi
Renewal
C0984044F1
Philippi- Lansdowne 1&2 link box replace
EFF
1 EFF
0
0
C0984045F1
Grassy Park-Pelican Park linkbox replace
EFF
1 EFF
0
0
C0984065F1
New Building Complex Bloemhof
EFF
1 EFF
35 000 000
35 000 000
0
77 296 065
3
New
C0984066F1
Asbestos Roofing Replacement
EFF
1 EFF
5 000 000
5 000 000
5 000 000
28 683 160
Multi
Renewal
C0984067F1
City Depot - Shed Restoration
EFF
1 EFF
2 956 452
0
0
3 423 750
77
Renewal
C0984201F1
Street Lighting: Peerless Park & N1
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
101
New
C0984205F1
Install High Mast :MetropolitanSP Vygerb
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
50
New
C0984206F1
Install High Mast: Jungle Zone 1 opp. 13
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
51
New
C0984207F1
Install High Mast: Vokwana & Ndlwana Way
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
51
New
C0984208F1
Instal High Mast:Mandela Prk & Sir Lowry
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
100
New
C0984209F1
Instal High Mast: Mission Grd/ Sir Lowry
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
100
New
0
0
50 000
43
New
0
0
50 000
75
New
C0984213F1
Street Lights:Frigate, Weltevrede&Volstr
CRR
3 AFF:WardAllocation
32 333
C0984214F1
Street Lights: Colorado - Open space
CRR
3 AFF:WardAllocation
50 000
C0984216F1
Install Street Light:Botterblom,Orchard
CRR
3 AFF:WardAllocation
32 333
0
0
50 000
76
New
0
0
100 000
79
New
C0984217F1
Install Street Light:Boabab& Buffalo Str
CRR
3 AFF:WardAllocation
100 000
C0984222F1
Install High Mast: Zone18 & Ulwazi Langa
CRR
3 AFF:WardAllocation
120 000
0
0
120 000
52
New
C0984232F1
Inst Streetlights:Parks Hughes St Belhar
CRR
3 AFF:WardAllocation
22 113
0
0
25 000
12
New
C0984233F1
Streetlights:Eric Playgrounds Belhar
CRR
3 AFF:WardAllocation
25 000
0
0
25 000
12
New
Utility Services
5
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
50 000
Proposed Provision Proposed Provision
2010/2011
2011/2012
0
0
Total Project
Cost
50 000
Ward
13
New/Renewal
New
C0984234F1
Streetlight:Lithaba,Mvoti- AllPark Delft
CRR
3 AFF:WardAllocation
C0984236F1
New Lights in Parks throughout Wards
CRR
3 AFF:WardAllocation
47 831
0
0
60 000
5
New
0
0
500 000
45
New
C0984245F1
Construct High Mast & Floodlight Ward 45
CRR
3 AFF:WardAllocation
483 701
C0984250F1
Inst Streetlight:SonwabileDr,OldCross Rd
CRR
3 AFF:WardAllocation
135 000
0
0
135 000
36
New
C0984251F1
Inst Streetlights: Gwayi Str OldCross Rd
CRR
3 AFF:WardAllocation
135 000
0
0
135 000
36
New
C0984252F1
Inst Streetlight:Terminus Rd Nyanga East
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
37
New
C0984253F1
Inst Streetlight:Welile Dakuse St Nyanga
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
37
New
C0984254F1
Inst Streetlight:Steve KanoretzSt Nyanga
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
37
New
C0984255F1
Inst Streetlight:Tom Str New Cross Roads
CRR
3 AFF:WardAllocation
52 106
0
0
100 000
38
New
C0984257F1
Install Streetlights : Ward 93
CRR
3 AFF:WardAllocation
90 000
0
0
90 000
93
New
C0984258F1
Informal Settlements: Area Lighting
CRR
3 AFF: Electricity
812 748
0
0
1 812 748
Multi
New
C0984262F1
High Mast Light, Cathedral Rd Manenberg
CRR
3 AFF:WardAllocation
125 000
0
0
125 000
46
New
C0984264F1
Constr High Mast Lights Ward 42
CRR
3 AFF:WardAllocation
293 741
0
0
300 000
42
New
0
270 000
40
New
C0984265F1
Constr High Mast & Floodlights Ward40
CRR
3 AFF:WardAllocation
167 964
0
C0984266F1
Streetlighting : Malibongwe Park
CGD
4 MIG
462 900
0
0
462 900
67
New
C0984267F1
Streetlight: Akasia Str , Silveroaks
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
14
New
C0984268F1
Instal High Mast -Klipfontein Mission St
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
35
New
C0984269F1
Prov of Lights: Donkin str Parks
CRR
3 AFF:WardAllocation
12 000
0
0
12 000
12
New
C0984270F1
High Mast: Westbank Crossing Ward19
CRR
3 AFF:WardAllocation
13 734
0
0
13 734
19
New
C0984271F1
Flood Lights : Siyanyanzela
CRR
3 AFF:WardAllocation
25 000
0
0
25 000
33
New
C0984274F1
Construction of Flood Lights: Ward 42
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
42
New
C0984276F1
Prov of Streetlighting : SLP Village
CRR
3 AFF: Electricity
440 000
0
0
440 000
100
New
C0984278F1
Upgrade Streetlights : Throughout Ward35
CRR
3 AFF:WardAllocation
22 218
0
0
22 218
35
New
C0984279F1
Prov High Mast Lighting: Middestad Mall
CRR
3 AFF:WardAllocation
11 314
0
0
11 314
10
New
0
0
14 415
90
New
C0984280F1
Install High Masts : Ward 90
CRR
3 AFF:WardAllocation
14 415
C0984282F1
Streetlighting : Upper Oldenland Rd
CRR
3 AFF:WardAllocation
3 558
0
0
3 558
84
New
C0984283F1
Install additional outreach arms
CRR
3 AFF:WardAllocation
8 400
0
0
8 400
26
New
0
0
8 700
3
New
C0984284F1
Public Lights: Midmar Str, Groenvlei
CRR
3 AFF:WardAllocation
8 700
C0984285F1
Install 2 x 17m High Mast Light
CRR
3 AFF:WardAllocation
28 131
0
0
28 131
28
New
C0984288F1
Streetlights : Sagoloda Str - Village 2
CRR
3 AFF:WardAllocation
108 908
0
0
108 908
34
New
C0984289F1
Constr. Flood Lights : Ward 44
CRR
3 AFF:WardAllocation
23 952
0
0
32 928
44
New
Utility Services
6
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0984291F1
High Mast Lighting: Khayelitsha
CGD
4 STATE_NT_URP
66 944
0
0
79 620
94
New
C0984292F1
Constr & Installation of Flood Lights
CRR
3 AFF:WardAllocation
17 929
0
0
62 928
41
New
0
0
12 039
93
New
40
New
C0984294F1
High Mast lights - Green Point Phase 2
CRR
3 AFF:WardAllocation
12 039
C0984295F1
Construction/Installation - Flood Lights
CRR
3 AFF:WardAllocation
22 629
0
0
55 520
C0984296F1
Wallacedene Streetlighting
CRR
3 AFF: Electricity
1 055 000
0
0
1 210 000
6
New
C0984297F1
Prov of Street &Highmast Lights-Enkanini
CGD
4 STATE_NT_URP
480 911
0
0
571 048
Corp Inf
Renewal
C0984299F1
Replace lights at taxi rank, Lwandle
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
86
New
C0984300F1
Upgrading of street lights in Bellrai
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
10
New
C0984303F1
Instal of Park Lights:Isikhova Pk Mfulen
CRR
3 AFF:WardAllocation
25 000
0
0
25 000
16
New
C0984304F1
Instal of Park Lights: Indwe Pk Mfuleni
CRR
3 AFF:WardAllocation
25 000
0
0
25 000
16
New
C0984305F1
Area Lighting in Parks Ward 76
CRR
3 AFF:WardAllocation
49 474
0
0
100 000
76
New
C0984306F1
Area Lighting in Parks Ward 79
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
79
New
C0984307F1
Instal of HighMast & Flood Lights: Delft
CRR
3 AFF:WardAllocation
115 742
0
0
200 000
20
New
0
150 000
13
New
C0984308F1
Instal Floodlights in all Parks : Delft
CRR
3 AFF:WardAllocation
150 000
0
C0984311F1
Installation of Floodlights - Jabula I/S
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
80
New
C0984312F1
Installation of Floodlights -Monwood I/S
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
80
New
C0984313F1
Installation of Floodlights-Olieboom I/S
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
80
New
C0984314F1
Installation of Floodlights-Sweet Home
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
80
New
C0984315F1
Installation of Floodlights-Vukuzenzela
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
80
New
C0984316F1
Installation of Floodlights-Willison I/S
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
80
New
C0984317F1
Installation of Floodlights-Victoria Mxe
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
80
New
C1000372F1
Substation Protection Replacement
EFF
1 EFF
4 108 000
0
0
4 108 000
Multi
New
C1000373F1
Optic Fibre Installations
EFF
1 EFF
10 000 000
0
0
10 000 000
Multi
New
C1000374F1
PAX and PABX Installations
EFF
1 EFF
700 000
0
0
700 000
Corp Inf
Renewal
0
0
680 000
Multi
New
0
0
3 000 000
Multi
New
C1000375F1
Protect Comm Wide Area Network Expans
EFF
1 EFF
680 000
C1000380F1
HV Substation gate and fence replacement
EFF
1 EFF
3 000 000
C1001591F1
PQ System Expansion
EFF
1 EFF
390 000
0
0
390 000
Multi
Renewal
0
0
2 929 000
Multi
Renewal
C1041914F1
Prepayment Vending System Upgrading
EFF
1 EFF
2 929 000
C1084001F1
Computer Equipment Additional
CRR
3 AFF: Electricity
6 000 000
0
0
6 000 000
Corp Inf
New
C1084002F1
Computer Equipment Replacement
CRR
3 AFF: Electricity
4 000 000
0
0
4 000 000
Corp Inf
New
C1084003F1
Communication Equipment
CRR
3 AFF: Electricity
2 200 000
0
0
2 200 000
Corp Inf
New
Utility Services
7
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
C1084004F2
System Equipment Replacement: East
CRR
3 AFF: Electricity
26 020 000
0
0
26 020 000
C1084005F2
System Equipment Replacement: North
CRR
3 AFF: Electricity
8 480 000
0
0
8 480 000
0
0
600 000
0
0
Ward
New/Renewal
Multi
Renewal
Multi
New
Corp Inf
New
18 000 000
Multi
New
C1084006F1
Safety Equipment
CRR
3 AFF: Electricity
600 000
C1084007F2
System Equipment Replacement: South
CRR
3 AFF: Electricity
18 000 000
C1084008F1
Test Equipment
CRR
3 AFF: Electricity
13 700 000
0
0
13 700 000
Corp Inf
New
C1084010F1
Capital Metering Replacement
EFF
1 EFF
3 000 000
0
0
3 000 000
Multi
Renewal
C1084011F1
Computer Equipment
REVENUE
2 REVENUE
1 000 000
0
0
1 000 000
Corp Inf
New
C1084012F1
HV Substation Ground Surfacing
EFF
1 EFF
1 500 000
0
0
1 500 000
Multi
Renewal
C1084015F1
HV Substation LV board replacement
EFF
1 EFF
300 000
0
0
300 000
Multi
Renewal
C1084016F1
Vehicles : Replacement
CRR
3 AFF: Electricity
26 000 000
0
0
26 000 000
Corp Inf
New
C1084017F1
Additional Ground : Bloemhof Complex
EFF
1 EFF
13 000 000
0
0
13 000 000
3
New
C1084018F1
Mechanical Plant : Additional
CRR
3 AFF: Electricity
5 918 200
0
0
5 918 200
Corp Inf
New
C1084019F1
SPS Unit cooler replacement set
EFF
1 EFF
6 000 000
0
0
6 000 000
Multi
New
2 000 000
13 000 000
15 000 000
30 000 000
Multi
New
16 877 660
0
0
16 877 660
Corp Inf
New
C1084020F1
New Facilities Area North
EFF
1 EFF
C1084021F1
Vehicles : Additional
CRR
3 AFF: Electricity
C1084022F1
RGT Halon system replace
EFF
1 EFF
50 000
0
0
50 000
Multi
New
C1084023F1
RGT Ablution Amenities
EFF
1 EFF
300 000
0
0
300 000
Multi
New
C1084024F1
SPS UCW Dual Redundancy Telemetry Sys
EFF
1 EFF
200 000
0
0
200 000
Multi
New
C1084025F1
Atlantis SS 5 Transformer Replacement
EFF
1 EFF
0
0
13 818 080
16 000 000
Multi
New
C1084026F1
SPS Replacement Fire Mains
EFF
1 EFF
0
1 500 000
0
1 500 000
Multi
New
C1084027F1
Mechanical Plant : Replacement
CRR
3 AFF: Electricity
950 000
0
0
950 000
Corp Inf
New
C1084028F1
66kV OH Surge Arrestor Replacement
EFF
1 EFF
0
0
970 000
970 000
Multi
New
C1084029F1
Vanguard Transformer Replacement
EFF
1 EFF
0
0
41 000 000
47 215 000
Multi
Renewal
C1084030F1
Tamboerskloof Transformer Replacement
EFF
1 EFF
0
0
47 832 430
75 000 000
Multi
Renewal
0
47 000 000
75 000 000
Multi
Renewal
C1084031F1
Bofors Upgrade
EFF
1 EFF
0
C1084032F1
Plattekloof-N1 Reinforcement
EFF
1 EFF
0
0
16 000 000
16 000 000
Multi
New
C1084033F1
Springfield - Westhof Cable Replacemt
EFF
1 EFF
0
0
15 000 000
15 000 000
Multi
Renewal
0
12 430 000
12 430 000
Multi
New
0
5 000 000
10 000 000
Multi
Renewal
C1084034F1
Tygerberg Hospital Reinforcement
EFF
1 EFF
0
C1084035F1
132kV OH Insulator Replacement
EFF
1 EFF
0
C1084036F1
SPS Main Building External Refurbish
EFF
1 EFF
0
0
80 000
1 580 000
Multi
Renewal
C1084037F1
HV - Switch/ Stat battery replacement
EFF
1 EFF
750 000
0
0
750 000
Multi
Renewal
Utility Services
8
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1084038F1
Office Equipment & Furniture
CRR
3 AFF: Electricity
2 100 000
0
0
2 100 000
Corp Inf
New
C1084039F1
Security Equipment
CRR
3 AFF: Electricity
3 300 000
0
0
3 300 000
Corp Inf
New
0
0
9 500 000
Corp Inf
New
0
0
1 500 000
Corp Inf
New
C1084040F1
Tools & Equipment
CRR
3 AFF: Electricity
9 500 000
C1084041F1
Office Furniture
REVENUE
2 REVENUE
1 500 000
C1084042F1
Tools & Equipment
REVENUE
2 REVENUE
C1084044F1
Oakdale Upgrade
EFF
1 EFF
C1084046F1
Service Connections (Tariff): North
CGD
C1084047F1
Service Connections (Tariff): East
C1084048F1
C1084049F1
2 500 000
0
0
2 500 000
Corp Inf
New
33 984 750
21 145 250
732 000
55 862 000
Multi
New
4 PRIVATE SECTOR
FIN
3 750 000
0
0
3 750 000
Multi
New
CGD
4 PRIVATE SECTOR
FIN
2 700 000
0
0
2 700 000
Multi
New
Service Connections (Tariff): South
CGD
4 PRIVATE SECTOR
FIN
2 000 000
0
0
2 000 000
Multi
New
HV OH structures - Anti-Theft Protect
EFF
1 EFF
800 000
0
0
800 000
Multi
New
5 090 000
146 112 650
Multi
New
17 000 000
46
New
C1084050F1
Koeberg Rd Switching Station Ph 2
EFF
1 EFF
0
0
C1084051F1
Vanguard Depot - New Admin Block
EFF
1 EFF
2 000 000
15 000 000
0
C1084052F1
Electricity Demand Side Management
CGD
4 ELEC DEM SIDE MAN
4 000 000
0
0
4 000 000
Multi
Renewal
44 500 000
0
0
44 500 000
Corp Inf
New
C1084055F1
Facilities Alterations & Upgrading
CRR
3 AFF: Electricity
C1084066F1
Substation Fencing - South
EFF
1 EFF
4 000 000
0
0
4 000 000
Multi
Renewal
C1084068F1
Substation Fencing - North
EFF
1 EFF
2 000 000
0
0
2 000 000
Multi
Renewal
C1084069F1
Substation Fencing - East
EFF
1 EFF
2 500 000
0
0
2 500 000
Multi
Renewal
C1084111F1
Serv Conn (Quote): N -Private Sec Funded
CGD
4 PRIVATE SECTOR
FIN
9 400 000
0
0
9 400 000
Multi
New
C1084111F2
Conn Infr (Quote): N -DC Funded
CRR
3 BICL Elec Serv Gen
17 900 000
0
0
17 900 000
Multi
New
C1084112F1
Serv Conn (Quote): E -Private Sec Funded
CGD
4 PRIVATE SECTOR
FIN
11 000 000
0
0
11 000 000
Multi
New
C1084112F2
Conn Infr (Quote): E -DC Funded
CRR
3 BICL Elec Serv Gen
18 800 000
0
0
18 800 000
Multi
New
C1084113F1
Serv Conn (Quote): S -Private Sec Funded
CGD
4 PRIVATE SECTOR
FIN
6 400 000
0
0
6 400 000
Multi
New
C1084113F2
Conn Infr (Quote): S -DC Funded
CRR
3 BICL Elec Serv Gen
10 400 000
0
0
10 400 000
Multi
New
C1084114F1
System Infrastructure : North
EFF
1 EFF
C1084114F2
System Infrastructure : North
CRR
3 BICL Elec Serv Gen
C1084115F1
System Infrastructure : East
EFF
1 EFF
C1084115F2
System Infrastructure : East
CRR
3 BICL Elec Serv Gen
C1084116F1
System Infrastructure : South
EFF
1 EFF
Utility Services
9
6 140 000
0
0
6 140 000
Multi
New
18 800 000
0
0
18 800 000
Multi
New
5 140 000
0
0
5 140 000
Multi
New
15 900 000
0
0
15 900 000
Multi
New
5 020 000
0
0
5 020 000
Multi
New
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
C1084116F2
System Infrastructure : South
CRR
3 BICL Elec Serv Gen
17 000 000
0
0
17 000 000
C1084200F1
Christmas Lights Ward 83
CRR
3 AFF:WardAllocation
60 000
0
0
0
0
Ward
New/Renewal
Multi
New
60 000
83
New
50 000
15
New
C1084201F1
Prov of Streetlights: Musica Ave, Macass
CRR
3 AFF:WardAllocation
50 000
C1084202F1
Pella : Provision of streetlights
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
29
New
C1084203F1
Instal Floodlights nxt to Klip Rd Clinic
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
65
New
C1084204F1
Instal Floodlights:Open field LotusRiver
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
66
New
C1084205F1
Instal Floodlights:Raymond Circle,Grassy
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
66
New
C1084206F1
Instal Floodlights adj to Church, Lotus
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
66
New
C1084207F1
Instal Floodlights onfield Falcon Way,LR
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
66
New
C1084208F1
Instal artificial Christmas Trees in W63
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
66
New
C1084209F1
Lighting at Kingsway Rd, Plumstead
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
72
New
C1084210F1
Instal Floodlight : Walmer Rd , Parkwood
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
Multi
New
C1084211F1
High Mast Lights Ward 82
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
82
New
0
100 000
99
New
0
100 000
11
New
C1084212F1
High Mast Lights Ward 99
CRR
3 AFF:WardAllocation
100 000
0
C1084213F1
Street Lighting within Ward 11
CRR
3 AFF:WardAllocation
100 000
0
C1084214F1
Christmas Lights within Ward 14
CRR
3 AFF:WardAllocation
25 000
0
0
25 000
14
New
C1084215F1
Christmas Lights within Ward 17
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
17
New
C1084216F1
Fence substations in Westlake
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
71
New
C1084217F1
New lights in parks & open spaces, Ward5
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
5
New
C1084218F1
Upgrade lighting in park opp. Strand P/O
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
83
Renewal
C1084219F1
Replace overhead electricity cables-Good
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
27
Renewal
C1084220F1
Festive Season lights in Oliver Tambo
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
33
New
C1084221F1
Festive Lighs in Ingulube and Bristol
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
34
New
C1084222F1
Upgrade of lighting : Ward 53
CRR
3 AFF:WardAllocation
46 000
0
0
46 000
53
New
0
0
25 000
12
New
0
0
30 000
54
New
C1084223F1
Provision of lights on parks
CRR
3 AFF:WardAllocation
25 000
C1084224F1
Lighting of Green Point Pedestrian lane
CRR
3 AFF:WardAllocation
30 000
C1084225F1
Area Lighting in Open Public Spaces WD76
CRR
3 AFF:WardAllocation
75 000
0
0
75 000
76
New
0
0
100 000
78
New
C1084226F1
Upgrading AZ Berman Festive Lights
CRR
3 AFF:WardAllocation
100 000
C1084227F1
Area Lighting in Open Public Spaces WD81
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
81
New
C1084228F1
Flood Lights:Beaverhead Ln,Sherwood Park
CRR
3 AFF:WardAllocation
65 000
0
0
65 000
32
New
C1084230F1
Festive Lights Ward 82
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
82
New
Utility Services
10
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1084231F1
Constr. High Mast & Floodlights WD 44
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
44
New
C1084232F1
Prov of Floodlights:Paradise Pk Ln Mamre
CRR
3 AFF:WardAllocation
15 000
0
0
15 000
29
New
0
0
50 000
32
New
50 000
51
New
C1084233F1
Prov of Floodlights:Witsand -resource Ct
CRR
3 AFF:WardAllocation
50 000
C1084239F1
Instal High Mast Light-C/ONgumla&Adel St
CRR
3 AFF:WardAllocation
50 000
0
0
C1084258F1
Informal Settlements : Area Lighting
CRR
3 AFF: Electricity
500 000
0
0
500 000
Multi
New
C1084259F1
Street Lighting : City Wide
CRR
3 AFF: Electricity
20 000 000
0
0
20 000 000
Multi
New
C1084260F1
Street Lighting: City Wide MIG Funding
CGD
4 MIG
7 500 000
0
0
7 500 000
Multi
New
C1084261F2
High Mast Lighting
CGD
4 MIG
7 780 000
0
0
7 780 000
Multi
New
C1084262F1
Festive Lighting : City Wide
CRR
3 AFF: Electricity
8 000 000
0
0
8 000 000
Multi
New
C1084384F2
Electrification (INEP)
CGD
4 DME - INEP
8 771 930
0
0
8 771 930
Multi
New
C1084385F2
Electrification (AFF)
CRR
3 AFF: Electricity
25 000 000
0
0
25 000 000
Multi
New
C1100372F1
Substation Protection Replacement
EFF
1 EFF
0
4 400 000
0
4 400 000
Multi
New
C1100373F1
Optic Fibre Installations
EFF
1 EFF
0
8 000 000
0
8 000 000
Multi
New
Corp Inf
Renewal
New
C1100374F1
PAX and PABX Installations
EFF
1 EFF
0
500 000
0
500 000
C1100375F1
Protect Comm Wide Area Network Expans
EFF
1 EFF
0
737 000
0
737 000
Multi
C1100380F1
HV Substation gate and fence replacement
EFF
1 EFF
0
2 000 000
0
2 000 000
Multi
New
C1101591F1
PQ System Expansion
EFF
1 EFF
0
429 000
0
429 000
Multi
Renewal
C1141914F1
Prepayment Vending System Upgrading
EFF
1 EFF
0
3 380 000
0
3 380 000
Multi
Renewal
C1184001F1
Computer Equipment Additional
CRR
3 AFF: Electricity
0
5 100 000
0
5 100 000
Corp Inf
New
C1184002F1
Computer Equipment Replacement
CRR
3 AFF: Electricity
0
4 400 000
0
4 400 000
Corp Inf
New
C1184003F1
Communication Equipment
CRR
3 AFF: Electricity
0
2 500 000
0
2 500 000
Corp Inf
New
C1184004F2
System Equipment Replacement: East
CRR
3 AFF: Electricity
0
29 025 000
0
29 025 000
Multi
Renewal
C1184005F2
System Equipment Replacement: North
CRR
3 AFF: Electricity
0
8 750 000
0
8 750 000
Multi
New
C1184006F1
Safety Equipment
CRR
3 AFF: Electricity
0
700 000
0
700 000
Corp Inf
New
19 000 000
0
19 000 000
Multi
New
Corp Inf
New
C1184007F2
System Equipment Replacement: South
CRR
3 AFF: Electricity
0
C1184008F1
Test Equipment
CRR
3 AFF: Electricity
0
15 100 000
0
15 100 000
C1184010F1
Capital Metering Replacement
EFF
1 EFF
0
4 000 000
0
4 000 000
Multi
Renewal
1 000 000
0
1 000 000
Corp Inf
New
750 000
0
750 000
Multi
Renewal
Multi
Renewal
Corp Inf
New
C1184011F1
Computer Equipment
REVENUE
2 REVENUE
0
C1184012F1
HV Substation Ground Surfacing
EFF
1 EFF
0
C1184015F1
HV Substation LV board replacement
EFF
1 EFF
0
350 000
0
350 000
C1184016F1
Vehicles : Replacement
CRR
3 AFF: Electricity
0
22 000 000
0
22 000 000
Utility Services
11
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1184018F1
Mechanical Plant : Additional
CRR
3 AFF: Electricity
0
2 130 000
0
2 130 000
Corp Inf
New
C1184021F1
Vehicles : Additional
CRR
3 AFF: Electricity
0
6 000 000
0
6 000 000
Corp Inf
New
1 300 000
0
1 300 000
Corp Inf
New
Multi
Renewal
C1184027F1
Mechanical Plant : Replacement
CRR
3 AFF: Electricity
0
C1184037F1
HV - Switch/ Stat battery replacement
EFF
1 EFF
0
850 000
0
850 000
C1184038F1
Office Equipment & Furniture
CRR
3 AFF: Electricity
0
2 400 000
0
2 400 000
Corp Inf
New
C1184039F1
Security Equipment
CRR
3 AFF: Electricity
0
3 700 000
0
3 700 000
Corp Inf
New
C1184040F1
Tools & Equipment
CRR
3 AFF: Electricity
0
10 500 000
0
10 500 000
Corp Inf
New
C1184041F1
Office Furniture
REVENUE
2 REVENUE
0
1 500 000
0
1 500 000
Corp Inf
New
C1184042F1
Tools & Equipment
REVENUE
2 REVENUE
0
2 500 000
0
2 500 000
Corp Inf
New
C1184046F1
Service Connections (Tariff): North
CGD
4 PRIVATE SECTOR
FIN
0
4 000 000
0
4 000 000
Multi
New
C1184047F1
Service Connections (Tariff): East
CGD
4 PRIVATE SECTOR
FIN
0
2 800 000
0
2 800 000
Multi
New
C1184048F1
Service Connections (Tariff): South
CGD
4 PRIVATE SECTOR
FIN
0
2 500 000
0
2 500 000
Multi
New
C1184052F1
Electricity Demand Side Management
CGD
4 ELEC DEM SIDE MAN
0
20 000 000
0
20 000 000
Multi
Renewal
37 000 000
0
37 000 000
Corp Inf
New
C1184055F1
Facilities Alterations & Upgrading
CRR
3 AFF: Electricity
0
C1184066F1
Substation Fencing - South
EFF
1 EFF
0
4 500 000
0
4 500 000
Multi
Renewal
C1184068F1
Substation Fencing - North
EFF
1 EFF
0
2 000 000
0
2 000 000
Multi
Renewal
C1184069F1
Substation Fencing - East
EFF
1 EFF
0
2 875 000
0
2 875 000
Multi
Renewal
C1184111F1
Serv Conn (Quote): N -Private Sec Funded
CGD
4 PRIVATE SECTOR
FIN
0
10 400 000
0
10 400 000
Multi
New
C1184111F2
Conn Infr (Quote): N -DC Funded
CRR
3 BICL Elec Serv Gen
0
19 700 000
0
19 700 000
Multi
New
C1184112F1
Serv Conn (Quote): E -Private Sec Funded
CGD
4 PRIVATE SECTOR
FIN
0
12 100 000
0
12 100 000
Multi
New
C1184112F2
Conn Infr (Quote): E -DC Funded
CRR
3 BICL Elec Serv Gen
0
20 700 000
0
20 700 000
Multi
New
C1184113F1
Serv Conn (Quote): S -Private Sec Funded
CGD
4 PRIVATE SECTOR
FIN
0
7 100 000
0
7 100 000
Multi
New
C1184113F2
Conn Infr (Quote): S -DC Funded
CRR
3 BICL Elec Serv Gen
0
11 500 000
0
11 500 000
Multi
New
C1184114F1
System Infrastructure : North
EFF
1 EFF
0
30 800 000
0
30 800 000
Multi
New
C1184115F1
System Infrastructure : East
EFF
1 EFF
0
26 200 000
0
26 200 000
Multi
New
C1184116F1
System Infrastructure : South
EFF
1 EFF
0
27 100 000
0
27 100 000
Multi
New
C1184258F1
Informal Settlements : Area Lighting
CRR
3 AFF: Electricity
0
500 000
0
500 000
Multi
New
C1184259F1
Street Lighting : City Wide
CRR
3 AFF: Electricity
0
20 000 000
0
20 000 000
Multi
New
Utility Services
12
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1184260F1
Street Lighting: City Wide MIG Funding
CGD
4 MIG
0
5 000 000
0
5 000 000
Multi
New
C1184261F2
High Mast Lighting
CGD
4 MIG
0
5 000 000
0
5 000 000
Multi
New
8 000 000
0
8 000 000
Multi
New
0
36 687 720
Multi
New
C1184262F1
Festive Lighting : City Wide
CRR
3 AFF: Electricity
0
C1184384F2
Electrification (INEP)
CGD
4 DME - INEP
0
36 687 720
C1184385F2
Electrification (AFF)
CRR
3 AFF: Electricity
0
24 000 000
0
24 000 000
Multi
New
C1200372F1
Substation Protection Replacement
EFF
1 EFF
0
0
5 335 000
5 335 000
Multi
New
C1200373F1
Optic Fibre Installations
EFF
1 EFF
0
0
9 000 000
9 000 000
Multi
New
C1200374F1
PAX and PABX Installations
EFF
1 EFF
0
0
500 000
500 000
Corp Inf
Renewal
C1200375F1
Protect Comm Wide Area Network Expans
EFF
1 EFF
0
0
846 000
846 000
Multi
New
C1200380F1
HV Substation gate and fence replacement
EFF
1 EFF
0
0
1 200 000
1 200 000
Multi
New
C1201591F1
PQ System Expansion
EFF
1 EFF
0
0
471 900
471 900
Multi
Renewal
C1241914F1
Prepayment Vending System Upgrading
EFF
1 EFF
0
0
3 976 000
3 976 000
Multi
Renewal
C1284001F1
Computer Equipment Additional
CRR
3 AFF: Electricity
0
0
5 700 000
5 700 000
Corp Inf
New
4 900 000
4 900 000
Corp Inf
New
C1284002F1
Computer Equipment Replacement
CRR
3 AFF: Electricity
0
0
C1284003F1
Communication Equipment
CRR
3 AFF: Electricity
0
0
2 800 000
2 800 000
Corp Inf
New
C1284004F2
System Equipment Replacement: East
CRR
3 AFF: Electricity
0
0
34 215 000
34 215 000
Multi
Renewal
C1284005F2
System Equipment Replacement: North
CRR
3 AFF: Electricity
0
0
9 000 000
9 000 000
Multi
New
C1284006F1
Safety Equipment
CRR
3 AFF: Electricity
0
0
800 000
800 000
Corp Inf
New
C1284007F2
System Equipment Replacement: South
CRR
3 AFF: Electricity
0
0
20 000 000
20 000 000
Multi
New
C1284008F1
Test Equipment
CRR
3 AFF: Electricity
0
0
16 700 000
16 700 000
Corp Inf
New
C1284010F1
Capital Metering Replacement
EFF
1 EFF
0
0
4 000 000
4 000 000
Multi
Renewal
C1284011F1
Computer Equipment
REVENUE
2 REVENUE
0
0
1 000 000
1 000 000
Corp Inf
New
C1284012F1
HV Substation Ground Surfacing
EFF
1 EFF
0
0
800 000
800 000
Multi
Renewal
C1284015F1
HV Substation LV board replacement
EFF
1 EFF
0
0
400 000
400 000
Multi
Renewal
0
23 000 000
23 000 000
Corp Inf
New
Corp Inf
New
C1284016F1
Vehicles : Replacement
CRR
3 AFF: Electricity
0
C1284018F1
Mechanical Plant : Additional
CRR
3 AFF: Electricity
0
0
1 120 000
1 120 000
C1284021F1
Vehicles : Additional
CRR
3 AFF: Electricity
0
0
6 000 000
6 000 000
Corp Inf
New
0
350 000
350 000
Corp Inf
New
Multi
Renewal
C1284027F1
Mechanical Plant : Replacement
CRR
3 AFF: Electricity
0
C1284037F1
HV - Switch/ Stat battery replacement
EFF
1 EFF
0
0
950 000
950 000
C1284038F1
Office Equipment & Furniture
CRR
3 AFF: Electricity
0
0
2 700 000
2 700 000
Corp Inf
New
C1284039F1
Security Equipment
CRR
3 AFF: Electricity
0
0
4 100 000
4 100 000
Corp Inf
New
Utility Services
13
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1284040F1
Tools & Equipment
CRR
3 AFF: Electricity
0
0
11 600 000
11 600 000
Corp Inf
New
C1284041F1
Office Furniture
REVENUE
2 REVENUE
0
0
1 500 000
1 500 000
Corp Inf
New
0
2 500 000
2 500 000
Corp Inf
New
C1284042F1
Tools & Equipment
REVENUE
2 REVENUE
0
C1284046F1
Service Connections (Tariff): North
CGD
4 PRIVATE SECTOR
FIN
0
0
4 500 000
4 500 000
Multi
New
C1284047F1
Service Connections (Tariff): East
CGD
4 PRIVATE SECTOR
FIN
0
0
2 800 000
2 800 000
Multi
New
C1284048F1
Service Connections (Tariff): South
CGD
4 PRIVATE SECTOR
FIN
0
0
2 800 000
2 800 000
Multi
New
C1284052F1
Electricity Demand Side Management
CGD
4 ELEC DEM SIDE MAN
0
0
20 000 000
20 000 000
Multi
Renewal
C1284055F1
Facilities Alterations & Upgrading
CRR
3 AFF: Electricity
0
0
39 000 000
39 000 000
Corp Inf
New
C1284066F1
Substation Fencing - South
EFF
1 EFF
0
0
4 500 000
4 500 000
Multi
Renewal
C1284068F1
Substation Fencing - North
EFF
1 EFF
0
0
2 000 000
2 000 000
Multi
Renewal
1 400 000
1 400 000
Multi
Renewal
C1284069F1
Substation Fencing - East
EFF
1 EFF
0
0
C1284111F1
Serv Conn (Quote): N -Private Sec Funded
CGD
4 PRIVATE SECTOR
FIN
0
0
11 100 000
11 100 000
Multi
New
C1284111F2
Conn Infr (Quote): N -DC Funded
CRR
3 BICL Elec Serv Gen
0
0
20 900 000
20 900 000
Multi
New
C1284112F1
Serv Conn (Quote): E -Private Sec Funded
CGD
4 PRIVATE SECTOR
FIN
0
0
12 900 000
12 900 000
Multi
New
C1284112F2
Conn Infr (Quote): E -DC Funded
CRR
3 BICL Elec Serv Gen
0
0
22 000 000
22 000 000
Multi
New
C1284113F1
Serv Conn (Quote): S -Private Sec Funded
CGD
4 PRIVATE SECTOR
FIN
0
0
7 600 000
7 600 000
Multi
New
C1284113F2
Conn Infr (Quote): S -DC Funded
CRR
3 BICL Elec Serv Gen
0
0
12 200 000
12 200 000
Multi
New
C1284114F1
System Infrastructure : North
EFF
1 EFF
0
0
32 700 000
32 700 000
Multi
New
C1284115F1
System Infrastructure : East
EFF
1 EFF
0
0
27 900 000
27 900 000
Multi
New
C1284116F1
System Infrastructure : South
EFF
1 EFF
0
0
28 800 000
28 800 000
Multi
New
C1284258F1
Informal Settlements : Area Lighting
CRR
3 AFF: Electricity
0
0
500 000
500 000
Multi
New
0
20 000 000
20 000 000
Multi
New
C1284259F1
Street Lighting : City Wide
CRR
3 AFF: Electricity
0
C1284260F1
Street Lighting: City Wide MIG Funding
CGD
4 MIG
0
0
5 000 000
5 000 000
Multi
New
C1284261F2
High Mast Lighting
CGD
4 MIG
0
0
5 000 000
5 000 000
Multi
New
C1284262F1
Festive Lighting : City Wide
CRR
3 AFF: Electricity
0
0
8 000 000
8 000 000
Multi
New
C1284384F2
Electrification (INEP)
CGD
4 DME - INEP
0
0
43 859 650
43 859 650
Multi
New
C1284385F2
Electrification (AFF)
CRR
3 AFF: Electricity
0
0
24 000 000
24 000 000
Multi
New
Utility Services
14
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Total for Electricity Services
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
884 090 258
787 182 240
867 671 510
Total Project
Cost
Ward
New/Renewal
Solid Waste Services
C0601607F1
New Specialised Area Cleaning Vehicles
EFF
1 EFF
6 536 562
0
0
98 234 897
Multi
Renewal
C0642387F1
Development of Landfill Infrastructure
EFF
1 EFF
8 133 660
0
0
157 237 788
Multi
Renewal
C0985001F1
Purchase of Fleet
CRR
3 AFF: Solid Waste
23 967 158
0
0
41 700 000
Multi
Renewal
C0985003F1
WC2010-MRF's
EFF
1 EFF
997 012
0
0
1 450 000
Multi
New
C1085001F1
Purchase of fleet and Plant
EFF
1 EFF
28 093 211
0
0
28 093 211
Multi
Renewal
C1085002F1
Purchase of fleet and Plant
EFF
1 EFF
0
26 703 000
0
26 703 000
Multi
Renewal
0
12 485 642
12 485 642
Multi
Renewal
0
79 601
Multi
New
C1085003F1
Purchase of fleet and Plant
EFF
1 EFF
0
C1085004F1
Replacement of Furniture
EFF
1 EFF
79 601
0
C1085005F1
Replacement of Furniture
EFF
1 EFF
0
100 000
0
100 000
Multi
New
C1085006F1
Replacement of Furniture
EFF
1 EFF
0
0
100 000
100 000
Multi
New
C1085007F1
Shipping Containers
EFF
1 EFF
1 000 000
0
0
1 000 000
Multi
New
C1085008F1
Shipping Containers
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
C1085009F1
Shipping Containers
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
New
C1085010F1
Purchase of fleet
CRR
3 AFF: Solid Waste
13 000 000
0
0
13 000 000
Multi
Renewal
C1085010F2
Purchase of Fleet from Sale of Assets
CRR
3 AFF: Solid Waste
5 000 000
0
0
5 000 000
Multi
Renewal
C1085013F1
Purchase of Trunk radio's
EFF
1 EFF
1 400 000
0
0
1 400 000
Multi
New
C1085014F1
Purchase of Trunk radio's
EFF
1 EFF
0
400 000
0
400 000
Multi
New
0
0
400 000
400 000
Multi
New
0
385 000
Multi
New
C1085015F1
Purchase of Trunk radio's
EFF
1 EFF
C1085016F1
Purchase of Furniture - Rates
REVENUE
2 REVENUE
385 000
0
C1085017F1
Purchase of Furniture - Rates
REVENUE
2 REVENUE
0
407 000
0
407 000
Multi
New
C1085018F1
Purchase of Furniture - Rates
REVENUE
2 REVENUE
0
0
430 500
430 500
Multi
New
C1085019F1
Purchase of Furniture - Tariffs
REVENUE
2 REVENUE
110 000
0
0
110 000
Multi
New
C1085020F1
Purchase of Furniture - Tariffs
REVENUE
2 REVENUE
0
116 300
0
116 300
Multi
New
C1085021F1
Purchase of Furniture - Tariffs
REVENUE
2 REVENUE
0
0
123 000
123 000
Multi
New
C1085022F1
Development of Landfill Infrastructure
EFF
1 EFF
219 900 000
0
0
219 900 000
Multi
Renewal
C1085022F2
Development of Landfill Infrastructure
CGD
4 MIG
50 000 000
0
0
50 000 000
Multi
Renewal
C1085023F1
Waste Info Systems & Infrastructure
EFF
1 EFF
1 250 000
0
0
1 250 000
Multi
New
C1085024F1
Reh. and Closure of L/fill Sites
REVENUE
2 REVENUE
75 000 000
0
0
75 000 000
Multi
New
3 AFF: Solid Waste
20 000 000
0
0
20 000 000
Multi
New
C1085025F2
Utility Services
Acquisition of land
CRR
15
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
43 000
0
0
43 000
1 EFF
0
250 000 000
0
50 000 000
0
0
C1085026F1
5th Ave Drop-off Fencing Ward 26
CRR
3 AFF:WardAllocation
C1185022F1
Development of Landfill Infrastructure
EFF
Ward
New/Renewal
26
Renewal
250 000 000
Multi
Renewal
50 000 000
Multi
Renewal
1 250 000
Multi
New
C1185022F2
Development of Landfill Infrastructure
CGD
4 MIG
0
C1185023F1
Waste Info Systems & Infrastructure
EFF
1 EFF
0
1 250 000
C1185024F1
Reh. and Closure of L/fill Sites
REVENUE
2 REVENUE
0
20 000 000
0
20 000 000
Multi
New
C1285022F1
Development of Landfill Infrastructure
EFF
1 EFF
0
0
232 000 000
232 000 000
Multi
Renewal
C1285022F2
Development of Landfill Infrastructure
CGD
4 MIG
0
0
50 000 000
50 000 000
Multi
Renewal
C1285023F1
Waste Info Systems & Infrastructure
EFF
1 EFF
0
0
1 250 000
1 250 000
Multi
New
C1285024F1
Reh. and Closure of L/fill Sites
REVENUE
2 REVENUE
0
0
53 000 000
53 000 000
Multi
New
454 895 204
349 976 300
350 789 142
Total for Solid Waste Services
Water Services
C0500651F2
N2 Gateway Projects
CGD
4 MIG
334 922
0
0
229 979 018
Multi
Renewal
C0501268F2
Development of Additional Infrastructure
EFF
1 EFF
0
138 500 000
409 000 000
1 862 441 232
Multi
New
C0501268F3
Development of Additional Infrastructure
CRR
3 AFF: Water
38 937 000
213 000 000
0
251 937 000
Multi
New
C0501300F1
Aandrag Supply System
CRR
3 BICL Water:Oos
0
4 000 000
0
4 000 000
102
New
C0501300F2
Aandrag Supply System
EFF
1 EFF
0
700 000
3 000 000
11 000 000
102
New
C0501320F2
Monwabisi Pumpstation
CGD
4 MIG
926 428
0
0
13 868 249
95
Renewal
C0501333F3
Durbanville Collectors Sewers
EFF
1 EFF
7 300 000
6 000 000
5 000 000
36 300 000
Multi
New
C0501348F2
Repl&Upgr Sew Pumps Citywide
EFF
1 EFF
3 000 000
0
0
81 865 866
Multi
Renewal
1 198 615
0
4 000 000
12 297 606
21
New
0
3 000 000
0
3 608 535
85
New
C0601457F1
Bellvile North Water Supply system
EFF
1 EFF
C0601476F1
SWest Bus Park Main Sewer (upper leg)
CRR
3 BICL Sewer:Hel
C0601476F2
SWest Bus Park Main Sewer (upper leg)
EFF
1 EFF
13 437 000
0
0
15 437 000
85
New
C0601488F1
Remove midblock sewer network-Bishop Lav
EFF
1 EFF
0
2 000 000
3 000 000
15 459 941
22
Renewal
C0601489F1
Fisantekraal Main Sewer
CRR
3 BICL Sewer:Tyg N
26 000 000
0
0
27 997 984
Multi
New
C0601489F2
Fisantekraal Main Sewer
EFF
1 EFF
10 000 000
0
0
30 000 000
New
C0601501F1
Fisantekraal Main Sewer
CGD
4 MIG
10 000 000
0
0
66 022 000
New
C0601540F2
Infrastructure Replace/Refurbish - WWT
EFF
1 EFF
4 000 000
0
0
32 414 576
Multi
C0601637F1
Rehab of Sewer Network (Citywide)
CGD
4 MIG
1 348 061
0
0
7 500 000
Multi
New
C0601639F1
Retreat Rising Main - Rehab
CGD
4 MIG
3 000 000
3 000 000
3 000 000
9 000 000
64
Renewal
C0601639F2
Retreat Rising Main - Rehab
EFF
1 EFF
290 800
0
0
459 000
67
Renewal
1 EFF
5 000 000
53 000 000
75 000 000
184 595 564
23
Renewal
C0630134F1
Utility Services
Melkbos Wastewater Treatm
EFF
16
Renewal
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
0
0
Total Project
Cost
Ward
33 123 035
6
New/Renewal
Renewal
C0630138F1
Scottsdene WWTW-EFF
EFF
1 EFF
500 000
C0630138F2
Scottsdene WWTW-MIG
CGD
4 MIG
27 000 000
0
0
38 000 000
6
Renewal
9 000 000
1 000 000
23 449 886
105
Renewal
C0630147F1
Kraaifontein/Fisantekraal
EFF
1 EFF
8 000 000
C0630148F1
Mitchells Plain WWTW
EFF
1 EFF
0
5 000 000
1 000 000
18 999 815
43
New
C0630170F1
Bellville WaterWasteTreatment Works
EFF
1 EFF
39 000 000
50 000 000
50 000 000
146 417 242
9
New
C0630170F2
Bellville WWTW-MIG
CGD
4 MIG
35 000 000
50 000 000
35 000 000
150 800 000
9
New
C0630185F1
Cape Flats Wastewater Tre
EFF
1 EFF
23 000 000
3 000 000
0
41 300 001
67
Renewal
C0630201F1
Athlone Wastewater Treatm
EFF
1 EFF
4 400 000
9 700 000
3 000 000
62 142 336
49
Renewal
C0630201F2
Athlone Wastewater Treatm
CGD
4 MIG
3 600 000
0
0
29 600 000
49
New
C0630220F2
Infrastructure Replace/Re
EFF
1 EFF
10 240 500
17 014 500
25 000 000
346 132 672
Multi
Renewal
C0630325F2
Voδlvlei : replace LLPS P
EFF
1 EFF
15 000
0
0
19 616 490
Multi
Renewal
C0630328F1
Potsdam Wastewater Treatm
EFF
1 EFF
3 500 000
0
0
171 707 179
4
Renewal
C0631015F2
Flood Disaster Wallacedene
EFF
1 EFF
1 213 622
394 737
0
4 666 967
6
New
0
105 685 500
105
New
C0642094F1
Fisantekraal WWTW-EFF
EFF
1 EFF
64 500 000
15 000 000
C0642094F2
Fisantekraal WWTW-MIG
CGD
4 MIG
50 500 000
0
0
77 500 000
105
New
C0642179F1
Protea Heights Water Sup
CRR
3 BICL Water:Oos
C0642179F2
Protea Heights Water Sup
EFF
C0642232F2
Install New Infrastructure D6
C0700025F1
C0700026F1
5 357 267
0
0
11 779 832
8
New
1 EFF
12 000 000
0
0
25 118 021
8
New
EFF
1 EFF
2 000 000
0
0
3 000 000
6
New
Informal Settlements : Grey Water
CGD
4 MIG
700 000
0
0
700 000
8
New
Informal Settlements : Sand & Rag Trap
CGD
4 MIG
2 591 851
0
0
2 862 000
Multi
New
C0700038F2
Replacement of Langa Sewer
EFF
1 EFF
991 971
0
0
1 499 999
53
Renewal
C0700047F2
Fish Hoek Outfall Sewer
EFF
1 EFF
1 200 000
2 000 000
2 000 000
5 300 000
69
New
C0700048F2
Blue Route Interceptor Sewer
EFF
1 EFF
1 500 000
2 000 000
2 000 000
7 000 000
Multi
New
C0700049F2
Wallacedene New Sewer Upgrade
EFF
1 EFF
1 623 114
394 737
0
3 187 851
101
New
0
0
3 927 980
Multi
Renewal
40 000 000
40 000 000
149 710 670
53
New
C0700051F1
Refurbishment of Labs
EFF
1 EFF
3 200 000
C0700407F1
Northern Area Sewer Thornton
EFF
1 EFF
20 000 000
C0700517F2
Construction of new water main Macassar
EFF
1 EFF
1 000 000
0
0
1 995 431
15
New
3 000 000
0
3 000 000
15
New
24
Renewal
C0700519F1
Macassar Wastewater Treatment Works
EFF
1 EFF
0
C0700522F1
Borcherds Quarry WTW
EFF
1 EFF
8 000 000
5 000 000
0
15 000 000
C0800214F1
De Grendel Reservior
EFF
1 EFF
2 000 000
18 000 000
35 000 000
129 000 000
1
New
C0811114F1
Trappies Sewerage System
EFF
1 EFF
0
5 000 000
5 000 000
97 935 578
100
New
Utility Services
17
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
C0886009F1
Macassar Treated Effluent
EFF
1 EFF
4 500 000
8 000 000
12 000 000
30 500 000
C0886011F1
Athlone treated effluent
EFF
1 EFF
8 000 000
10 000 000
10 000 000
52 279 577
30 000
100 000
520 310
Ward
New/Renewal
15
New
49
New
Multi
New
23 269 900
48
Renewal
C0886012F1
Consolidated Plans Filing System
EFF
1 EFF
30 000
C0886021F1
Upgrade Wood Rd / Belgravia Sewer
EFF
1 EFF
2 000 000
2 000 000
2 000 000
C0886024F1
Contermans Kloof Water mains
EFF
1 EFF
20 000 000
10 000 000
15 000 000
63 983 607
105
New
C0886025F1
Master Plan Sewer K/sha
EFF
1 EFF
0
1 000 000
1 000 000
10 066 151
89
New
C0886027F1
SWest Bus Park Main Sewer (lower leg)
EFF
1 EFF
3 023 000
0
0
3 266 759
83
New
C0886031F1
Provision of Sewerage to Croydon
EFF
1 EFF
0
2 000 000
3 000 000
5 236 953
15
New
C0886033F1
Provision of Sewer to Gordon/Strand
EFF
1 EFF
0
3 900 000
0
3 986 840
100
New
C0886038F1
Main Rd Upgrade M/Berg to Clovelly Rehab
EFF
1 EFF
21 417 000
25 973 800
27 693 900
131 051 826
64
New
C0886052F2
Rehab Liesbeeck Interceptor Sewer
EFF
1 EFF
3 000 000
3 000 000
3 000 000
9 000 000
Multi
Renewal
C0886053F2
Maitland Sewer at Valkenberg Rehab
EFF
1 EFF
3 500 000
0
0
7 000 000
Multi
Renewal
C0886054F2
Rehab Main Rd Green Point Sewer
EFF
1 EFF
0
750 000
1 000 000
2 500 000
54
Renewal
30 000 000
72 491 463
Multi
New
5 929 100
12 429 100
53
Renewal
C0986001F1
Cape Flats Collector Sewer
EFF
1 EFF
0
2 881 463
C0986008F1
Ruyterwacht Midblock Water Pipes
EFF
1 EFF
317 544
6 000 000
C0986012F1
Gugulethu/Nyanga Sewer Investigation
EFF
1 EFF
0
500 000
0
500 000
Multi
New
C0986012F2
Gugulethu/Nyanga Sewer Investigation
CGD
4 MIG
1 000 000
1 500 000
0
2 500 000
Multi
New
C0986013F1
Lansdowne Riversdale Rd - Sewer Rehab
EFF
1 EFF
0
1 000 000
500 000
8 500 000
60
Renewal
C0986014F1
Pump Station & Rising Main Du Noon
EFF
1 EFF
0
10 000 000
8 000 000
34 170 000
104
New
C0986015F1
Rehab Outfall Sewers Pentz Sandrift m/qu
EFF
1 EFF
8 000 000
6 000 000
4 000 000
25 501 772
Multi
Renewal
C0986018F1
Bellville Treated Effluent
EFF
1 EFF
6 000 000
6 000 000
6 000 000
46 000 000
9
New
C0986019F1
Capeflats Treated Effluent (eastern & we
EFF
1 EFF
10 000 000
10 000 000
10 000 000
40 000 000
Multi
New
C0986021F1
N2 Gateway Delft Pressure Management
EFF
1 EFF
2 500 000
0
0
5 000 000
Multi
New
C0986024F1
Langa Advanced Pressure Management
EFF
1 EFF
2 500 000
2 000 000
0
4 500 000
51
New
10 000 000
0
10 000 000
32
New
0
20 000 000
32
New
C0986025F1
Wesfleur WWTW-EFF
EFF
1 EFF
0
C0986025F2
Wesfleur WWTW-MIG
CGD
4 MIG
10 000 000
10 000 000
C0986026F1
Wildevoelvlei WWTW
EFF
1 EFF
0
5 000 000
0
5 000 000
69
New
0
0
1 825 000
Multi
New
0
6 000 000
Multi
Renewal
C0986034F2
Furniture, Fittings, Tools & Equipt Fin
EFF
1 EFF
100 000
C1082001F1
Cape Flats #1 Rehabilitation
EFF
1 EFF
0
1 000 000
C1082002F1
Cape Flats #2 Rehabilitation
EFF
1 EFF
0
1 000 000
0
35 999 997
Multi
Renewal
C1082003F1
Constantia Sewer Reticulation
EFF
1 EFF
0
0
2 000 000
4 000 000
62
Renewal
Utility Services
18
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
31
New/Renewal
C1086010F1
Borcherds Quarry WWTW-SCADA
EFF
1 EFF
0
0
1 000 000
18 000 000
New
C1086014F1
Cape Flats WWTW-Refurbish Structures
EFF
1 EFF
0
0
7 000 000
57 000 000
67
Renewal
0
500 000
500 000
100
Renewal
6 500 000
49
New
C1086018F1
Gordons Bay WWTW-Improvements
EFF
1 EFF
0
C1086019F1
South Peninsula Pressure Management
EFF
1 EFF
2 000 000
2 500 000
2 000 000
C1086024F1
Ravensmead & Surrounds Pressure Manage
EFF
1 EFF
0
2 500 000
2 500 000
7 000 000
10
New
C1086025F1
Llandudno WWTW-Improvements
EFF
1 EFF
0
1 000 000
0
1 000 000
74
Renewal
C1086028F1
Scottsdene WWTW-Phosphate removal
EFF
1 EFF
0
0
10 000 000
10 000 000
6
New
C1086030F1
Wildevoelvlei WWTW-Dewatering equipment
EFF
1 EFF
0
0
5 000 000
10 000 000
69
New
C1086033F1
Zandvliet WWTW-Extension
EFF
1 EFF
0
500 000
300 000
110 800 000
15
New
C1086038F1
Relocate Midblock Sewer Belhar
EFF
1 EFF
0
1 000 000
0
1 000 000
12
Renewal
C1086039F1
Relocate Midblock Sewer Bonteheuwel
EFF
1 EFF
0
3 500 000
2 000 000
40 500 000
50
Renewal
C1086040F1
Relocate Midblock Sewer Ravensmead
EFF
1 EFF
0
2 000 000
1 000 000
12 000 000
22
Renewal
C1086043F1
Khayelitsha Driftsands Bypass Site C
EFF
1 EFF
852 611
0
0
852 611
Multi
Renewal
0
9 950 000
Multi
New
C1086044F1
Additional Plant & Equipment
EFF
1 EFF
1 000 000
0
C1086047F1
Additional Vehicles
EFF
1 EFF
1 500 000
0
0
10 700 000
Multi
Renewal
C1086048F1
Replace Lourens River/Macassar Outfall
EFF
1 EFF
0
500 000
0
500 000
Multi
Renewal
C1086049F1
Rusthof Strand Water Main
EFF
1 EFF
0
850 000
0
850 000
Multi
New
C1086064F1
Zeekoevlei Sewer Reticulation
EFF
1 EFF
0
1 000 000
0
1 000 000
67
Renewal
C1086066F1
Khayelitsha Driftsands Site C
CGD
4 MIG
6 913 382
0
0
6 913 382
90
Renewal
C1086068F1
Greenpoint 2010 Irrigation
EFF
1 EFF
11 700 000
0
0
11 700 000
54
New
C1086069F2
Repl&Upgr Sew Pumps Citywide
EFF
1 EFF
19 400 000
0
0
19 400 000
Multi
Renewal
C1086071F2
Replace & Upgrade Water Network
EFF
1 EFF
50 054 410
0
0
50 054 410
Multi
Renewal
C1086073F1
Replacement of Plant & Equipment
EFF
1 EFF
8 000 000
0
0
8 000 000
Multi
Renewal
C1086074F1
Replacement of Vehicles
EFF
1 EFF
7 500 000
0
0
7 500 000
Multi
Renewal
0
0
1 000 000
101
New
0
0
29 100 000
Multi
Renewal
C1086076F1
Mobile Generators Emergencies
EFF
1 EFF
1 000 000
C1086077F2
Infrastructure Replace/Refurbish - WWT
EFF
1 EFF
29 100 000
C1086078F2
Replacement of Plant & Equipment- BW
EFF
1 EFF
220 000
0
0
220 000
Multi
New
0
0
1 000 000
Multi
Renewal
6 000 000
Multi
New
C1086079F1
Depot Rationalisation for transformation
EFF
1 EFF
1 000 000
C1086080F2
Expansion of WWTW - EFF
EFF
1 EFF
6 000 000
0
0
C1086081F1
Rehab of Water Network (Citywide)
CGD
4 MIG
4 000 000
0
0
4 000 000
Multi
Renewal
C1086082F1
Rehab of Sewer Network (Citywide)
CGD
4 MIG
15 000 000
0
0
15 000 000
Multi
New
Utility Services
19
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1086083F1
Pump Stn Rehab ( Citywide)
CGD
4 MIG
5 000 000
0
0
5 000 000
Multi
New
C1086085F1
Informal Settlements Water
CGD
4 MIG
3 000 000
0
0
3 000 000
Multi
New
0
0
50 000
Multi
New
C1086087F1
Servitudes -EFF
EFF
1 EFF
50 000
C1086088F1
Extension of Bulk Pipelin
EFF
1 EFF
279 500
0
0
279 500
Multi
Renewal
C1086089F1
Master Planning -EFF
EFF
1 EFF
5 500 000
0
0
5 500 000
Multi
New
C1086090F1
Installation of New Infra
EFF
1 EFF
1 000 000
0
0
1 000 000
102
New
C1086091F2
TMS Aquifer Deep Borehole
EFF
1 EFF
4 000 000
0
0
4 000 000
Multi
New
C1086092F1
Replace & Upgr Sew Netw
EFF
1 EFF
41 277 833
0
0
41 277 833
Multi
Renewal
C1086095F1
Plant & Equipment Additional
EFF
1 EFF
1 210 000
0
0
1 210 000
Multi
New
C1086096F1
Informal Settlements : Sanitation
CGD
4 MIG
10 000 000
0
0
10 000 000
Multi
Renewal
C1086099F1
Informal Settlements : Sand & Rag Trap
CGD
4 MIG
6 785 056
0
0
6 785 056
Multi
New
C1086100F2
Informal Settlements : Sand & Rag Trap
EFF
1 EFF
2 000 000
0
0
2 000 000
Multi
New
C1086102F1
Furniture & Equipment
EFF
1 EFF
2 000 000
0
0
2 000 000
Multi
New
0
9 000 000
Multi
New
C1086103F1
Basic Sanitation: Informal Settlements
EFF
1 EFF
9 000 000
0
C1086105F2
IT Equipment Replacement
EFF
1 EFF
5 000 000
0
0
5 000 000
Multi
Renewal
C1086106F1
Tools & Sundry Equipment
EFF
1 EFF
200 000
0
0
200 000
Multi
New
C1086108F1
Tools & Equipment (Mech)
EFF
1 EFF
60 000
0
0
60 000
Multi
New
C1086109F1
Tools & Equipment (design & contracts)
EFF
1 EFF
50 000
0
0
50 000
Multi
New
C1086110F1
Tools & Equipment (PCS)
EFF
1 EFF
50 000
0
0
50 000
Multi
New
C1086111F1
TOC Infrastructure Development
EFF
1 EFF
1 000 000
0
0
1 000 000
Multi
Renewal
C1086112F1
Small Plant & Equipment
EFF
1 EFF
1 000 000
0
0
1 000 000
Multi
New
C1086113F1
Informal settlements water Installations
EFF
1 EFF
7 700 000
0
0
7 700 000
Multi
New
C1086118F1
Treated Effluent Inf Upgrade
EFF
1 EFF
2 500 000
0
0
2 500 000
Multi
New
C1086119F1
PVR Controllers & Upgrades
EFF
1 EFF
500 000
0
0
500 000
Multi
New
11 000 000
0
0
11 000 000
Multi
New
C1086120F1
Water Meters
CGD
4 PRIVATE SECTOR
FIN
C1086121F2
Furniture, Fittings, Tools & Equip WDM
EFF
1 EFF
200 000
0
0
200 000
Multi
New
C1086122F2
Furniture
EFF
1 EFF
1 000 000
0
0
1 000 000
Multi
New
C1086123F2
Furniture, Fittings, Tools & Equip IT
EFF
1 EFF
150 000
0
0
150 000
Multi
New
C1086124F2
Furniture, Fittings, Tools & Equipt EAMS
EFF
1 EFF
330 000
0
0
330 000
Multi
New
C1086125F2
Furniture, Fittings, Tools & Equipt Fin
EFF
1 EFF
150 000
0
0
150 000
Multi
New
C1086127F1
Additional Plant & Equipment
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
Utility Services
20
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
C1086128F1
Additional Plant & Equipment
EFF
1 EFF
C1086129F1
Pallisade fence around reservoir Botha
CRR
3 AFF:WardAllocation
Proposed Provision
2009/2010
0
Proposed Provision Proposed Provision
2010/2011
2011/2012
0
750 000
Multi
120 000
Multi
0
0
0
0
16 500 000
0
C1086130F1
Regional resources development
EFF
1 EFF
C1186001F2
Repl&Upgr Sew Pumps Citywide
EFF
1 EFF
0
C1186002F1
Incremental Upgrade Areas - Standpipes
EFF
1 EFF
0
1 000 000
C1186003F2
Replace & Upgrade Water Network
EFF
1 EFF
0
18 648 000
C1186004F1
Sewer Network Emergencies
EFF
1 EFF
0
C1186005F1
Replacement of Plant & Equipment
EFF
1 EFF
C1186006F1
Replacement of Vehicles
EFF
1 EFF
C1186008F2
Infrastructure Replace/Refurbish - WWT
EFF
C1186009F2
Replacement of Plant & Equipment- BW
C1186010F1
Depot Rationalisation for transformation
C1186011F1
Rehab of Water Network (Citywide)
Ward
750 000
120 000
4 000 000
Total Project
Cost
New/Renewal
New
New
New
16 500 000
Multi
Renewal
0
1 000 000
Multi
New
0
18 648 000
Multi
Renewal
5 000 000
0
5 000 000
Multi
Renewal
0
6 000 000
0
6 000 000
Multi
Renewal
0
7 500 000
0
7 500 000
Multi
Renewal
1 EFF
0
15 000 000
0
15 000 000
Multi
Renewal
EFF
1 EFF
0
242 000
0
242 000
Multi
New
EFF
1 EFF
0
3 000 000
0
3 000 000
Multi
Renewal
CGD
4 MIG
0
7 000 000
0
7 000 000
Multi
Renewal
0
5 000 000
Multi
New
0
5 000 000
Multi
New
C1186012F1
Rehab of Sewer Network (Citywide)
CGD
4 MIG
0
5 000 000
C1186013F1
Pump Stn Rehab ( Citywide)
CGD
4 MIG
0
5 000 000
C1186014F2
Pump Stn Rehab ( Citywide)
EFF
1 EFF
0
500 000
0
500 000
Multi
Renewal
C1186015F1
Informal Settlements Water
CGD
4 MIG
0
3 000 000
0
3 000 000
Multi
New
C1186016F2
Informal Settlements Water Incre Upgrade
EFF
1 EFF
0
500 000
0
500 000
Multi
Renewal
C1186017F1
Servitudes -EFF
EFF
1 EFF
0
50 000
0
50 000
Multi
New
C1186018F1
Extension of Bulk Pipelin
EFF
1 EFF
0
307 500
0
307 500
Multi
Renewal
C1186019F1
Master Planning -EFF
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
C1186020F2
TMS Aquifer Deep Borehole
EFF
1 EFF
0
15 000 000
0
15 000 000
Multi
New
C1186021F1
Replace & Upgr Sew Netw
EFF
1 EFF
0
15 605 263
0
15 605 263
Multi
Renewal
C1186022F1
Water Infrastructure Master Planning
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
1 331 000
0
1 331 000
Multi
New
C1186023F1
Plant & Equipment Additional
EFF
1 EFF
0
C1186024F1
Informal Settlements : Sanitation
CGD
4 MIG
0
10 000 000
0
10 000 000
Multi
Renewal
C1186025F2
Upgrade Water Network District 6
EFF
1 EFF
0
2 000 000
0
2 000 000
Multi
New
2 000 000
0
2 000 000
Multi
New
2 000 000
0
2 000 000
Multi
Renewal
C1186026F2
Pitch Fibre Sewer Replacement
EFF
1 EFF
0
C1186027F1
Refurbishment of Labs
EFF
1 EFF
0
C1186028F1
Furniture & Equipment
EFF
1 EFF
0
1 200 000
0
1 200 000
Multi
New
C1186029F1
Basic Sanitation: Informal Settlements
EFF
1 EFF
0
10 000 000
0
10 000 000
Multi
New
Utility Services
21
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
1 500 000
0
Total Project
Cost
1 500 000
Ward
Multi
New/Renewal
Renewal
C1186030F1
Informal Incremental Areas Upgrade
EFF
1 EFF
0
C1186031F1
Sundry equipment at various WWTW
EFF
1 EFF
0
300 000
0
300 000
Multi
Renewal
3 000 000
0
3 000 000
Multi
Renewal
C1186032F2
IT Equipment Replacement
EFF
1 EFF
0
C1186033F1
Tools & Sundry Equipment
EFF
1 EFF
0
40 000
0
40 000
Multi
New
C1186034F1
Risk & Safety Assessment Tools
EFF
1 EFF
0
300 000
0
300 000
Multi
New
C1186035F1
Tools & Equipment (Mech)
EFF
1 EFF
0
63 000
0
63 000
Multi
New
C1186036F1
Tools & Equipment (design & contracts)
EFF
1 EFF
0
50 000
0
50 000
Multi
New
C1186037F1
Tools & Equipment (PCS)
EFF
1 EFF
0
50 000
0
50 000
Multi
New
C1186038F1
TOC Infrastructure Development
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
C1186039F1
Small Plant & Equipment
EFF
1 EFF
0
500 000
0
500 000
Multi
New
C1186040F1
Informal settlements water Installations
EFF
1 EFF
0
3 300 000
0
3 300 000
Multi
New
C1186041F1
Master Plan Bulk Water line
EFF
1 EFF
0
1 000 000
0
1 000 000
88
New
C1186042F1
Water Upgrades for Master Plan
EFF
1 EFF
0
2 000 000
0
2 000 000
Multi
New
0
2 000 000
4
New
C1186043F1
Master Plan Sewer Upgrade
EFF
1 EFF
0
2 000 000
C1186044F1
Replace Pitch Fibre Sewers District 2
EFF
1 EFF
0
3 000 000
0
3 000 000
Multi
Renewal
C1186045F1
Treated Effluent Inf Upgrade
EFF
1 EFF
0
2 500 000
0
2 500 000
Multi
New
C1186046F1
PVR Controllers & Upgrades
EFF
1 EFF
0
500 000
0
500 000
Multi
New
C1186047F1
Water Meters
CGD
4 PRIVATE SECTOR
FIN
0
15 000 000
0
15 000 000
Multi
New
C1186048F2
Furniture, Fittings, Tools & Equip WWTW
EFF
1 EFF
0
75 000
0
75 000
Multi
New
C1186049F2
Furniture, Fittings, Tools & Equip WDM
EFF
1 EFF
0
100 000
0
100 000
Multi
New
C1186050F2
Furniture
EFF
1 EFF
0
500 000
0
500 000
Multi
New
C1186051F2
Furniture, Fittings, Tools & Equip IT
EFF
1 EFF
0
150 000
0
150 000
Multi
New
C1186052F2
Furniture, Fittings, Tools & Equipt EAMS
EFF
1 EFF
0
229 000
0
229 000
Multi
New
C1186053F2
Furniture, Fittings, Tools & Equipt Fin
EFF
1 EFF
0
120 000
0
120 000
Multi
New
C1186054F1
On-line effluent monitoring at all WWTW
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
750 000
0
750 000
Multi
New
C1186055F1
Additional Vehicles
EFF
1 EFF
0
C1286001F2
Water Demand Management
EFF
1 EFF
0
0
3 000 000
3 000 000
Multi
New
C1286002F2
Repl&Upgr Sew Pumps Citywide
EFF
1 EFF
0
0
16 500 000
16 500 000
Multi
Renewal
C1286003F1
Incremental Upgrade Areas - Standpipes
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
New
C1286004F2
Replace & Upgrade Water Network
EFF
1 EFF
0
0
16 000 000
16 000 000
Multi
Renewal
C1286005F1
Sewer Network Emergencies
EFF
1 EFF
0
0
5 000 000
5 000 000
Multi
Renewal
Utility Services
22
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1286006F1
Replacement of Plant & Equipment
EFF
1 EFF
0
0
4 300 000
4 300 000
Multi
Renewal
C1286007F1
Replacement of Vehicles
EFF
1 EFF
0
0
5 500 000
5 500 000
Multi
Renewal
0
1 000 000
1 000 000
Multi
Renewal
250 000
250 000
Multi
New
C1286008F1
Infrastructure Replace/Refurbish - WWT
CRR
3 AFF: Sanitation
0
C1286009F2
Replacement of Plant & Equipment- BW
EFF
1 EFF
0
0
C1286010F1
Depot Rationalisation for transformation
EFF
1 EFF
0
0
500 000
500 000
Multi
Renewal
C1286011F1
Rehab of Water Network (Citywide)
CGD
4 MIG
0
0
7 000 000
7 000 000
Multi
Renewal
C1286012F1
Rehab of Sewer Network (Citywide)
CGD
4 MIG
0
0
5 000 000
5 000 000
Multi
New
C1286013F1
Pump Stn Rehab ( Citywide)
CGD
4 MIG
0
0
5 000 000
5 000 000
Multi
New
C1286014F2
Pump Stn Rehab ( Citywide)
EFF
1 EFF
0
0
500 000
500 000
Multi
Renewal
C1286015F1
Informal Settlements Water
CGD
4 MIG
0
0
3 000 000
3 000 000
Multi
New
C1286016F1
Servitudes -EFF
EFF
1 EFF
0
0
50 000
50 000
Multi
New
C1286017F1
Extension of Bulk Pipelin
EFF
1 EFF
0
0
300 000
300 000
Multi
Renewal
C1286018F1
Master Planning -EFF
EFF
1 EFF
0
0
250 000
250 000
Multi
New
10 000 000
10 000 000
Multi
New
18 000 000
18 000 000
Multi
Renewal
C1286019F2
TMS Aquifer Deep Borehole
EFF
1 EFF
0
0
C1286020F1
Replace & Upgr Sew Netw
EFF
1 EFF
0
0
C1286021F1
Water Infrastructure Master Planning
EFF
1 EFF
0
0
250 000
250 000
Multi
New
C1286022F1
Plant & Equipment Additional
EFF
1 EFF
0
0
1 250 000
1 250 000
Multi
New
C1286023F1
Informal Settlements : Sanitation
CGD
4 MIG
0
0
10 000 000
10 000 000
Multi
Renewal
C1286024F2
Upgrade Water Network District 6
EFF
1 EFF
0
0
2 000 000
2 000 000
Multi
New
C1286025F2
Pitch Fibre Sewer Replacement
EFF
1 EFF
0
0
2 000 000
2 000 000
Multi
New
C1286026F1
Laboratory Equipment
EFF
1 EFF
0
0
2 500 000
2 500 000
Multi
New
C1286027F1
Furniture & Equipment
EFF
1 EFF
0
0
1 300 000
1 300 000
Multi
New
C1286028F1
Basic Sanitation: Informal Settlements
EFF
1 EFF
0
0
10 000 000
10 000 000
Multi
New
C1286029F1
Informal Incremental Areas Upgrade
EFF
1 EFF
0
0
2 000 000
2 000 000
Multi
Renewal
0
300 000
300 000
Multi
Renewal
C1286030F1
Sundry equipment at various WWTW
EFF
1 EFF
0
C1286031F2
IT Equipment Replacement
EFF
1 EFF
0
0
3 000 000
3 000 000
Multi
Renewal
C1286032F1
Tools & Sundry Equipment
EFF
1 EFF
0
0
40 000
40 000
Multi
New
0
65 000
65 000
Multi
New
53 000
53 000
Multi
New
C1286033F1
Tools & Equipment (Mech)
EFF
1 EFF
0
C1286034F1
Tools & Equipment (design & contracts)
EFF
1 EFF
0
0
C1286035F1
Tools & Equipment (PCS)
EFF
1 EFF
0
0
50 000
50 000
Multi
New
C1286036F1
TOC Infrastructure Development
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
Renewal
Utility Services
23
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1286037F1
Small Plant & Equipment
EFF
1 EFF
0
0
500 000
500 000
Multi
New
C1286038F1
Informal settlements water Installations
EFF
1 EFF
0
0
3 300 000
3 300 000
Multi
New
0
1 000 000
1 000 000
88
New
Multi
New
C1286039F1
Master Plan Bulk Water line
EFF
1 EFF
0
C1286040F1
Water Upgrades for Master Plan
EFF
1 EFF
0
0
2 000 000
2 000 000
C1286041F1
Master Plan Sewer Upgrade
EFF
1 EFF
0
0
1 000 000
1 000 000
4
New
C1286042F1
Replace Valves District 2
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
Renewal
C1286043F1
Replace Pitch Fibre Sewers District 2
EFF
1 EFF
0
0
2 500 000
2 500 000
Multi
Renewal
C1286044F1
Treated Effluent Inf Upgrade
EFF
1 EFF
0
0
3 500 000
3 500 000
Multi
New
C1286045F1
PVR Controllers & Upgrades
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
New
C1286046F1
Water Meters
CGD
4 PRIVATE SECTOR
FIN
0
0
15 000 000
15 000 000
Multi
New
C1286047F2
Furniture, Fittings, Tools & Equip WWTW
EFF
1 EFF
0
0
75 000
75 000
Multi
New
Multi
New
C1286048F2
Furniture, Fittings, Tools & Equip WDM
EFF
1 EFF
0
0
100 000
100 000
C1286049F2
Furniture
EFF
1 EFF
0
0
500 000
500 000
Multi
New
C1286050F2
Furniture, Fittings, Tools & Equip IT
EFF
1 EFF
0
0
150 000
150 000
Multi
New
0
244 000
244 000
Multi
New
New
C1286051F2
Furniture, Fittings, Tools & Equipt EAMS
EFF
1 EFF
0
C1286052F2
Furniture, Fittings, Tools & Equipt Fin
EFF
1 EFF
0
0
150 000
150 000
Multi
C1286053F1
On-line effluent monitoring at all WWTW
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
New
C1286054F1
Additional Vehicles
1 EFF
0
0
750 000
750 000
Multi
New
Total for Water Services
854 646 487
1 008 000 000
1 046 000 000
Total for Utility Services
2 193 971 949
2 145 508 540
2 264 810 652
EFF
Community Services
Community Services Support
C1092001F1
Furniture, Fittings, Tools & Equipment
EFF
1 EFF
0
0
40 000
40 000
Corp Inf
Renewal
C1092002F1
Office Equipment
EFF
1 EFF
0
0
40 000
40 000
Corp Inf
Renewal
C1092003F1
Furniture & Equipment
EFF
1 EFF
30 000
0
0
30 000
Multi
New
0
0
50 000
Multi
New
C1092004F1
Office Equipment
EFF
1 EFF
50 000
C1092005F1
Furniture & Equipment
EFF
1 EFF
0
40 000
0
40 000
Multi
New
C1092006F1
Office Equipment
EFF
1 EFF
0
40 000
0
40 000
Multi
New
Community Services
24
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Total for Community Services Support
80 000
Proposed Provision Proposed Provision
2010/2011
2011/2012
80 000
Total Project
Cost
Ward
New/Renewal
80 000
Parks
C0500464F1
Upgrade Company's Garden
EFF
1 EFF
1 000 000
0
0
4 456 074
77
Renewal
C0600280F2
Develop Cemetery: Wallacedene
CGD
4 MIG
3 700 000
3 000 000
4 000 000
13 000 000
101
New
C0600280F3
Develop Cemetery: Wallacedene
CRR
3 LS: CEMETERY DEV
1 547 617
0
0
1 547 617
Multi
New
C0600282F1
Develop Metro South-East Cemetery
EFF
1 EFF
250 000
0
0
332 050
16
New
C0600282F2
Develop Metro South-East Cemetery
CGD
4 MIG
250 000
4 000 000
5 000 000
9 250 000
16
New
C0600282F3
Develop Metro South-East Cemetery
CRR
3 LS: CEMETERY DEV
1 750 000
0
0
1 750 000
16
New
0
0
1 955 960
72
Renewal
Corp Inf
Renewal
C0600308F2
Upgrade Klip North West Cemetery
CGD
4 MIG
600 000
C0600440F1
Depot Upgrades - Bellville South
EFF
1 EFF
130 000
0
0
314 822
C0600817F1
Mausoleum - Phase 1 Maitland Cemetery
EFF
1 EFF
1 772 000
250 000
0
2 595 551
55
New
C0600817F3
Mausoleum - Phase 1 Maitland Cemetery
CRR
3 LS: CEMETERY DEV
43 750
0
0
175 000
55
New
C0601582F2
New Extension: Khayelitsha Cemetery
CGD
4 MIG
3 070 789
3 000 000
2 000 000
14 700 001
99
New
C0601582F3
New Extension: Khayelitsha Cemetery
CRR
3 LS: CEMETERY DEV
1 523 863
0
0
1 523 863
99
Renewal
C0601583F2
Develop Vaalfontein/ Outspan Cemetery
EFF
1 EFF
13 154
0
0
786 783
Multi
New
C0700284F1
Depot Upgrades - Scottsdene
EFF
1 EFF
171 684
0
0
267 386
Corp Inf
Renewal
C0700325F1
Upgrade Muizenberg Cemetery
EFF
1 EFF
100 000
0
0
605 810
64
Renewal
C0700326F1
Upgrade Plumstead Cemetery
EFF
1 EFF
100 000
0
0
527 666
73
Renewal
C0700328F1
Maynardville Park Upgrade
EFF
1 EFF
300 000
500 000
500 000
2 833 791
62
Renewal
500 000
0
787 630
86
Renewal
750 000
0
1 250 000
57
Renewal
C0700571F1
Upg & reconstr existing Lwandle Cemetery
EFF
1 EFF
200 000
C0700584F1
Upg Trafalgar Parks Depot- Searle Street
EFF
1 EFF
200 000
C0700666F2
General Upgrading of Cemeteries
CRR
3 LS: CEMETERY DEV
120 000
0
0
2 152 193
Multi
Renewal
C0700674F1
Maitland Cemetery Upgrade Roads & Infras
CGD
4 MIG
82 303
2 000 000
2 000 000
4 600 000
55
Renewal
C0700703F1
Sir Lowry's Pass Cemetery Upgrade Roads
CGD
4 MIG
500 000
500 000
0
1 500 000
100
Renewal
C0800260F1
Upgrade Playpark, Voorbrug
CRR
3 AFF:WardAllocation
95 000
0
0
134 928
19
Renewal
C0894002F1
Maitland Cemetery Upgrade
EFF
1 EFF
450 000
1 000 000
2 000 000
4 332 651
55
Renewal
C0894013F1
Upgrade Khayelitsha Parks depot
EFF
1 EFF
150 000
0
0
369 298
94
Renewal
C0894014F1
Somerset West Parks Depot Upgrade
EFF
1 EFF
150 000
0
0
350 000
84
Renewal
C0894048F1
Drip Irrig, Plattekloof Road
EFF
1 EFF
200 000
0
0
200 000
1
Renewal
C0894050F1
Regional Park Upg:Durbanville Rose Garde
EFF
1 EFF
350 000
500 000
500 000
1 410 000
21
Renewal
1 EFF
200 000
120 000
0
320 000
7
Renewal
C0894054F1
Roads & stormwater system: Kraaifontein
Community Services
EFF
25
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0894061F1
Depot Upgrades: Elsies River
EFF
1 EFF
60 000
0
0
60 000
Corp Inf
Renewal
C0894072F1
Upgrade Hout Bay Cemetery
EFF
1 EFF
100 000
0
0
509 582
74
Renewal
0
0
30 000
9
Renewal
0
0
150 000
33
Renewal
C0900209F1
Upgrade Park Industry Rd Bellville South
CRR
3 AFF:WardAllocation
30 000
C0900211F1
Fence park: Samora Michel
CRR
3 AFF:WardAllocation
50 000
C0900552F1
Upgrade of Parks in Ward 12
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
12
Renewal
C0994001F1
Welmoed Cemetery Development
EFF
1 EFF
0
877 300
0
877 300
14
Renewal
C0994001F2
Welmoed Cemetery Development
CGD
4 MIG
2 350 000
2 000 000
1 000 000
5 350 000
14
Renewal
C0994001F3
Welmoed Cemetery Development
CRR
3 LS: CEMETERY DEV
200 000
0
0
395 800
Multi
Renewal
C0994002F1
Vissershok Cemetery Development
EFF
1 EFF
240 000
0
0
240 000
23
Renewal
C0994003F1
Delft Cemetery Development
CGD
4 MIG
1 726 035
0
0
1 944 040
13
Renewal
C0994004F1
Develop District Park: Zoo Park Kraaifon
EFF
1 EFF
0
350 000
0
350 000
103
Renewal
C0994005F1
Upgrade Elizabeth Park, Bellville
EFF
1 EFF
0
150 000
0
150 000
9
Renewal
C0994006F1
Develop Kuils River Corridor to Dist. Pk
EFF
1 EFF
100 000
200 000
0
400 000
8
Renewal
9
Renewal
C0994007F1
Develop Districtpark: Jack Muller,Bellvi
EFF
1 EFF
1 000 000
1 000 000
1 000 000
3 170 000
C0994007F2
Develop Districtpark: Jack Muller,Bellvi
CGD
4 MIG
0
2 000 000
1 000 000
3 000 000
9
Renewal
C0994008F1
Khayelitsha Wetlands Park Upgrade
EFF
1 EFF
3 855 658
0
0
4 100 000
97
Renewal
C0994008F2
Khayelitsha Wetlands Park Upgrade
CGD
4 MIG
0
1 000 000
0
1 000 000
97
Renewal
C0994009F1
Athlone Nantes Upgrade
EFF
1 EFF
220 428
1 000 000
500 000
2 186 000
49
Renewal
C0994009F2
Athlone Nantes Upgrade
CGD
4 MIG
0
2 500 000
2 000 000
4 500 000
49
Renewal
C0994010F1
Westridge Park Upgrade
EFF
1 EFF
400 000
400 000
0
1 150 000
78
Renewal
C0994011F1
Modderdam Cem: Upgrade Roads
EFF
1 EFF
100 000
200 000
0
300 000
22
Renewal
C0994012F1
Bellville Cemetery: Upgrade Roads
EFF
1 EFF
150 000
200 000
100 000
450 000
9
Renewal
C0994013F1
Rusthof Cemetery Upgrade
EFF
1 EFF
200 000
500 000
500 000
1 200 000
83
Renewal
C0994014F1
Atlantis Cemetery Upgrade
EFF
1 EFF
0
0
200 000
200 000
29
Renewal
0
500 000
700 000
41
Renewal
C0994018F1
Gugulethu Cem: Implement Lscape Plans
EFF
1 EFF
200 000
C0994021F1
Upgrade Weltevreden Area Office
EFF
1 EFF
50 000
0
0
450 000
Corp Inf
Renewal
C0994025F1
Borehole- Section St POS, Paarden Eiland
EFF
1 EFF
250 000
0
0
250 000
55
Renewal
0
0
330 000
8
Renewal
C0994029F1
Landscaping: Okavango Drive, Brackenfell
EFF
1 EFF
150 000
C0994030F1
Development of Vanguard Drive, Goodwood
EFF
1 EFF
90 000
0
0
210 000
27
Renewal
C0994032F1
Landscape Centre Island: Halt Road
EFF
1 EFF
140 000
0
0
140 000
25
Renewal
C0994033F1
Landscaping 35th Street, Elsies River
EFF
1 EFF
120 000
0
0
320 000
25
Renewal
Community Services
26
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
0
0
0
5 000 000
5 000 000
15
Renewal
1 000 000
0
1 000 000
Multi
Renewal
0
286 384
Multi
Renewal
Vaalfontein Cemetery Development
EFF
1 EFF
0
C1094001F2
Vaalfontein Cemetery Development
CGD
4 MIG
Multi
New/Renewal
240 000
C1094001F1
240 000
Ward
Renewal
C1094002F1
Upgrade of Biodiversity Areas
EFF
1 EFF
0
C1094003F1
Implementation of Climate Change Initiat
EFF
1 EFF
0
286 384
C1094004F1
Furniture, Fittings, Tools & Equipment
REVENUE
2 REVENUE
800 000
0
0
800 000
Corp Inf
Renewal
C1094005F1
Upgrade LScaped Centre Isles & Rd Reserv
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
Renewal
C1094006F1
Community Parks Upgrade
EFF
1 EFF
0
0
2 000 000
2 000 000
Multi
Renewal
C1094008F1
Water saving initiatives - Eastern Dist
EFF
1 EFF
150 000
0
0
150 000
Multi
Renewal
C1094051F1
Water saving initiatives - Eastern Dist
EFF
1 EFF
0
200 000
0
200 000
Multi
Renewal
C1094076F1
Corridor Development
EFF
1 EFF
500 000
0
0
500 000
Multi
Renewal
C1094077F1
Upgrade of Biodiversity Areas
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
Renewal
C1094078F1
Implementation of Climate Change Initiat
EFF
1 EFF
0
0
423 684
423 684
Multi
Renewal
C1094079F1
Upgrade Greenbelt Pathway in Kirstenhof
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
71
Renewal
0
50 000
69
Renewal
C1094080F1
Upgrade Parks in Ward 69 - Masiphumelele
CRR
3 AFF:WardAllocation
50 000
0
C1094081F1
Upgrade Parks in Ward 68
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
68
Renewal
C1094082F1
Upgrade Blode Street POS
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
68
Renewal
C1094083F1
Upgrade Parks in Ocean View
CRR
3 AFF:WardAllocation
80 000
0
0
80 000
61
Renewal
C1094084F1
Upgrade Parks in Ward 17
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
17
Renewal
C1094085F1
Upgrade Parks & Play Equip in Ward 14
CRR
3 AFF:WardAllocation
125 000
0
0
125 000
14
Renewal
C1094086F1
Upgrade Parks in Ward 11
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
11
Renewal
C1094087F1
Play Equipment in Ward 99
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
99
Renewal
C1094088F1
Upgrade Parks in Ward 99
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
99
Renewal
C1094089F1
Upgrade Parks in Ward 98
CRR
3 AFF:WardAllocation
150 000
0
0
150 000
98
Renewal
C1094090F1
Hard Surfacing at Dyamala Park, Philippi
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
80
Renewal
0
0
70 000
80
Renewal
C1094091F1
Develop Park Victoria Mxenge Erf 60423
CRR
3 AFF:WardAllocation
70 000
C1094092F1
Bollards for 35th Street, Elsies River
CRR
3 AFF:WardAllocation
116 000
0
0
116 000
25
Renewal
C1094093F1
Play Park Equipment
CRR
3 AFF:WardAllocation
182 000
0
0
182 000
100
Renewal
0
0
224 575
63
Renewal
C1094094F1
Upgrade of various parks in Ward 63
CRR
3 AFF:WardAllocation
224 575
C1094095F1
Signage to various parks in Ward 65
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
65
Renewal
C1094096F1
Upgrade of various parks in Ward 65
CRR
3 AFF:WardAllocation
80 000
0
0
80 000
65
Renewal
C1094097F1
Develop Play Park c/o Dove Rd & Blackbir
CRR
3 AFF:WardAllocation
80 000
0
0
80 000
66
Renewal
Community Services
27
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1094098F1
Upgrade of various parks in Ward 67
CRR
3 AFF:WardAllocation
92 160
0
0
92 160
67
Renewal
C1094099F1
Upgrade POS in Ward 72
CRR
3 AFF:WardAllocation
90 000
0
0
90 000
72
Renewal
0
0
70 000
80
Renewal
C1094100F1
Develop Park Mpozolo Rd, Browns Farm
CRR
3 AFF:WardAllocation
70 000
C1094101F1
Develop Park XilinxaRd, Browns Farm
CRR
3 AFF:WardAllocation
70 000
0
0
70 000
80
Renewal
C1094102F1
Develop Park SweetHome Erf 609-2,Philipi
CRR
3 AFF:WardAllocation
70 000
0
0
70 000
80
Renewal
C1094103F1
New Trees Ward27
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
27
Renewal
C1094104F1
New Landscaping at Jip De Jager Rd
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
70
Renewal
C1094105F1
Replacement of Trees
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
27
Renewal
C1094106F1
New Landscaping of POS Van Riebeeckshof
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
70
Renewal
C1094107F1
New Bollards Angelier St, Doordekraaldam
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
70
Renewal
C1094108F1
New Bollards POS Witboom & Salisbury Rd
CRR
3 AFF:WardAllocation
5 000
0
0
5 000
70
Renewal
C1094109F1
Paving of Bellville Cemetery: Phase 3
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
3
Renewal
C1094110F1
Upgrade Median Island:VoortrekkerRd,Bvl
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
3
Renewal
0
40 000
6
Renewal
0
140 000
7
Renewal
C1094111F1
Park Upgrade: Ward 6
CRR
3 AFF:WardAllocation
40 000
0
C1094112F1
Park Development: Joseph Ave Park
CRR
3 AFF:WardAllocation
140 000
0
C1094113F1
Park Development: Groenhof Close, Northp
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
7
Renewal
C1094114F1
Upgrade of Parks: Brackenfell: Ward 8
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
8
Renewal
C1094115F1
Upgrade of Parks: Kuilsriver: Ward 8
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
8
Renewal
C1094116F1
Upgrade of Parks: Ward 101
CRR
3 AFF:WardAllocation
80 000
0
0
80 000
101
Renewal
C1094117F1
Park Development: Hoff Park
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
101
Renewal
C1094118F1
Upgrade of Parks: Ward102
CRR
3 AFF:WardAllocation
105 000
0
0
105 000
102
Renewal
C1094119F1
Upgrade of Park: Sagoloda St, Philippi
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
34
Renewal
C1094120F1
Upgrade of Parks: Ward 35
CRR
3 AFF:WardAllocation
300 000
0
0
300 000
35
Renewal
C1094121F1
Upgrade of Parks: Rondebosch&Keurboom
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
58
Renewal
0
0
20 000
59
Renewal
C1094122F1
Upgrade of Parks: Ward 59
CRR
3 AFF:WardAllocation
20 000
C1094123F1
Upgrading of Parks throughout Ward 1
CRR
3 AFF:WardAllocation
66 000
0
0
66 000
1
Renewal
C1094124F1
New Footpath at Doordekraal Dam
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
70
Renewal
0
0
40 000
27
Renewal
5
Renewal
C1094125F1
New Fencing at Combrink Park
CRR
3 AFF:WardAllocation
40 000
C1094126F1
Upgrading of Parks throughout Ward 5
CRR
3 AFF:WardAllocation
80 000
0
0
80 000
C1094127F1
Landscaping focal points & entrances W5
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
5
Renewal
C1094128F1
Upgrade wooden walkway at Strand Beach
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
83
Renewal
Community Services
28
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1094129F1
Purchasing of Tree Pots
CRR
3 AFF:WardAllocation
25 000
0
0
25 000
59
Renewal
C1094130F1
Landscaping & Install Irrigation Sys W53
CRR
3 AFF:WardAllocation
84 000
0
0
84 000
53
Renewal
0
0
50 000
57
Renewal
0
0
100 000
57
Renewal
C1094131F1
Upgrade of parks in Woodstock
CRR
3 AFF:WardAllocation
50 000
C1094132F1
Install Adult Exercise Equip - Woodstock
CRR
3 AFF:WardAllocation
100 000
C1094133F1
Upgrade Upper Searle Street Park
CRR
3 AFF:WardAllocation
75 000
0
0
75 000
57
Renewal
C1094134F1
Construction of Playground Delft
CRR
3 AFF:WardAllocation
230 000
0
0
230 000
13
Renewal
C1094135F1
Upgrade of Parks in Ward 20
CRR
3 AFF:WardAllocation
150 000
0
0
150 000
20
Renewal
C1094136F1
Upgrade Meadowridge Common Path
CRR
3 AFF:WardAllocation
13 000
0
0
13 000
73
Renewal
C1094137F1
Completion of broadwalk Green Belt
CRR
3 AFF:WardAllocation
70 000
0
0
70 000
62
Renewal
C1094138F1
Hard Landscaping in Ward 87
CRR
3 AFF:WardAllocation
300 000
0
0
300 000
87
Renewal
C1094139F1
Hard Surfacing c/o Atholl Rd & Geneva Dr
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
74
Renewal
C1094140F1
Upgrading of Promenade
CRR
3 AFF:WardAllocation
45 000
0
0
45 000
54
Renewal
C1094141F1
New Benches & Litter Bins at Mckenzie St
CRR
3 AFF:WardAllocation
35 000
0
0
35 000
77
Renewal
0
50 000
77
Renewal
0
30 000
77
Renewal
C1094142F1
New Benches & Litter Bins DeWaal Park
CRR
3 AFF:WardAllocation
50 000
0
C1094143F1
New Wooden Play Eq at Pypies Plein Park
CRR
3 AFF:WardAllocation
30 000
0
C1094144F1
New Wooden Play Eq at Homestead Park
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
77
Renewal
C1094145F1
Upgrade Bryant Street Park
CRR
3 AFF:WardAllocation
115 000
0
0
115 000
77
Renewal
C1094146F1
Benches & LitterBins CampsBay Beachfront
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
74
Renewal
C1094147F1
Replace Broken Benches at Sea Point
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
54
Renewal
C1094148F1
Landscaping POS East of High Level Rd GP
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
54
Renewal
C1094149F1
Install Rubber Playground Bases SeaPoint
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
54
Renewal
C1094150F1
Upgrading of Parks in Ward 82
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
82
Renewal
C1094151F1
Upgrading of Parks in Ward 43
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
43
Renewal
C1094152F1
Upgrading of Parks in Ward 81
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
81
Renewal
0
0
30 000
29
Renewal
C1094153F1
Upgrade Park in Main Rd - Mamre
CRR
3 AFF:WardAllocation
30 000
C1094154F1
Upgrading of Parks in Ward 79
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
79
Renewal
C1094155F1
Upgrading of Parks in Ward 78
CRR
3 AFF:WardAllocation
150 000
0
0
150 000
78
Renewal
0
0
50 000
76
Renewal
0
0
50 000
75
Renewal
C1094156F1
Upgrading of Parks in Ward 76
CRR
3 AFF:WardAllocation
50 000
C1094157F1
Upgrade of Parks: Ward (Area 16)
CRR
3 AFF:WardAllocation
50 000
C1094158F1
Upgrade of Parks: Ward (Area 17)
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
75
Renewal
C1094159F1
Upgrade of Parks: Ward (Area 16)
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
76
Renewal
Community Services
29
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
9 215
0
0
3 AFF:WardAllocation
7 646
0
0
C1094160F1
Install Play Baracuda Cresc,Nooitgedacht
CRR
3 AFF:WardAllocation
C1094161F1
Install Play Equip BaracudaCresc,Nooitge
CRR
Total Project
Cost
Ward
New/Renewal
9 215
31
Renewal
0
7 646
31
Renewal
0
14 969
31
Renewal
31
Renewal
C1094162F1
Install Play Equip BaracudaCresc,Nooitge
CRR
3 AFF:WardAllocation
14 969
C1094163F1
Install Play Equip BaracudaCresc,Nooitge
CRR
3 AFF:WardAllocation
11 170
0
0
11 170
C1094164F1
New Playpark Equipment throughout Ward 1
CRR
3 AFF:WardAllocation
66 000
0
0
66 000
1
Renewal
C1094165F1
Upgrade Community Park at Allison Crt
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
44
Renewal
C1094166F1
Upgrade Community Park Zuurberg Rd, HV
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
44
Renewal
C1094167F1
Upgrade NY110/128 Park in Gugulethu
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
40
Renewal
C1094168F1
Upgrade NY135/136 Park in Gugulethu
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
40
Renewal
C1094169F1
Upgrade of Hex Cresc Community Park
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
45
Renewal
C1094170F1
Ugrade & Development of NY10 Park, Gugul
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
45
Renewal
C1094171F1
Upgrade Centre Island: MainRd toStanhope
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
59
Renewal
C1094172F1
Upgrade of Parks: Ward 59
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
59
Renewal
0
48 000
103
Renewal
C1094173F1
Upgrade Zoo Park POS - Kraaifontein
CRR
3 AFF:WardAllocation
48 000
0
C1094174F1
Install PEq Netball Tarmac Bosberg Park
CRR
3 AFF:WardAllocation
80 000
0
0
80 000
24
Renewal
C1094175F1
Upgrade/Replace Play Eq at Richwood Park
CRR
3 AFF:WardAllocation
25 000
0
0
25 000
105
Renewal
C1094176F1
Upgrade Park (Dulah Omar) Fisantekraal
CRR
3 AFF:WardAllocation
22 000
0
0
22 000
105
Renewal
C1094177F1
Upgrade Irrigation at Durbanville Ave
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
21
Renewal
C1094178F1
Install PlayEq & PFurn in Parks Ward 21
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
21
Renewal
C1094179F1
Provision of Bridal Gardens Avondale
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
29
Renewal
C1094180F1
Provision Informal PlayArea Sherwood Par
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
32
Renewal
C1094181F1
Additional Improvements: Ivy Park, Goede
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
103
Renewal
39 834 016
30 223 684
32 223 684
681 435
0
0
3 447 714
82
New
Total for Parks
Sport , Recreation and Amenities
C0500300F2
MPlain Youth & Family Centre
CGD
4 PAWC - SOCIAL
SERV
C0600484F1
Swartklip Soccer Development 2010
EFF
1 EFF
4 412 611
0
0
4 763 158
99
Renewal
C0601662F1
N2 Gateway Project
EFF
1 EFF
1 904 040
0
0
3 355 263
Multi
New
C0601662F2
N2 Gateway Project
CGD
4 MIG
7 091 943
0
0
7 750 000
Multi
New
0
1 228 071
72
Renewal
0
11 882 000
72
Renewal
C0601675F1
Parkwood Sports Complex: Develop
EFF
1 EFF
398 449
0
C0601675F2
Parkwood Sports Complex: Develop
CGD
4 MIG
1 449 057
0
Community Services
30
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
2 127 144
0
0
9 812 068
97
New
286 884
0
0
2 645 561
100
Renewal
4 MIG
5 312 000
0
0
6 500 000
18
New
4 MIG
6 915 694
0
0
7 499 999
16
New
CGD
4 MIG
0
6 408 945
0
6 408 945
67
New
Rehabilitation of Sports Complex
CGD
4 MIG
701 165
0
0
3 000 000
Multi
Renewal
C0800010F1
Strand Pool: Upgrade
EFF
1 EFF
C0895017F1
Upgrade of Langa Sports Complex
CGD
4 PAWC - SPORT &
REC
C0895018F1
D2Pelican Park New Sports Complex: Hou
EFF
C0895036F1
Kraaifontein SC Develop Parking Area
EFF
C0642546F2
Khayelitsha CBD:New Multi-Purpose Centre
CGD
4 PAWC - SOCIAL
SERV
C0700161F1
Harmony Park Resort: Upgrade
CGD
4 PAWC - SPORT &
REC
C0700641F1
Bardale: Develop MPC
CGD
C0700683F1
Eerste River New MPC : Housing Project
CGD
C0700684F1
Pelican Park New Sports Complex : Housi
C0700691F1
637 876
0
0
3 377 416
83
Renewal
1 221 282
0
0
1 499 999
53
Renewal
1 EFF
0
1 228 070
0
1 228 070
67
New
1 EFF
263 158
0
0
263 158
103
Renewal
0
877 193
31
Renewal
C0895037F1
Valhalla Park SC: Develop & Upgrade
EFF
1 EFF
877 193
0
C0895038F1
Kogel bay Resort: Upgrade
EFF
1 EFF
877 193
0
0
877 193
100
Renewal
C0895039F1
Macassar Resort Upgrade
EFF
1 EFF
438 596
0
0
438 596
15
Renewal
0
0
877 193
86
Renewal
877 193
86
Renewal
C0895040F1
Lwandle SC Upgrade
EFF
1 EFF
877 193
C0895042F1
Nomzamo SC Upgrade
EFF
1 EFF
877 193
0
0
C0895046F1
Plant Filtration Filters Mnandi: Repl
EFF
1 EFF
701 754
0
0
701 754
43
Renewal
C0895048F1
Vygieskraal Hockey Stadium: Replace Astr
EFF
1 EFF
726 316
0
0
3 631 579
48
Renewal
C0895049F1
Vygieskraal Stadium: Upg Athletics Track
EFF
1 EFF
2 922 806
0
0
3 070 174
48
Renewal
C0895057F1
Plant Filtration Filters Westridge: Repl
EFF
1 EFF
701 754
0
0
701 754
81
Renewal
C0895058F1
Plant Filtration Filters Eastridge:Repl
EFF
1 EFF
701 754
0
0
701 754
79
Renewal
C0895060F1
Scottsdene SC: Construct Ablutions
EFF
1 EFF
307 018
0
0
307 018
6
New
C0895061F1
Eikendal SC: Construct Ablutions
EFF
1 EFF
307 018
0
0
307 018
C0895064F1
Bloekombos SC: Construct Ablutions
EFF
1 EFF
1 228 070
0
0
1 228 070
C0895065F1
Blue Waters Resort : Upgrade
EFF
1 EFF
877 193
0
0
0
0
7
New
101
Renewal
877 193
43
Renewal
877 193
Multi
Renewal
16
New
C0895066F1
Resorts: General Upgrade
EFF
1 EFF
877 193
C0895068F1
Eerste River New MPC: Housing Project
EFF
1 EFF
1 315 789
0
0
1 315 789
C0895070F1
Blue Downs Clubhouse
EFF
1 EFF
526 316
0
0
526 316
19
Renewal
C0895071F1
Lifesaving Clubhouses: Upgrade
EFF
1 EFF
438 596
0
0
438 596
Multi
Renewal
C0895073F1
Sea Winds Sports Complex Phase 3
EFF
1 EFF
700 000
5 526 315
0
6 226 315
68
Renewal
C0895076F1
Seawalls & Walkways: Structural Upgrade
EFF
1 EFF
1 315 789
0
0
1 315 789
Multi
Renewal
Community Services
31
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0895077F1
Fencing & Gates: General Upgrade
EFF
1 EFF
1 279 534
0
0
1 279 534
Multi
Renewal
C0895082F1
Bardale: Develop MPC
EFF
1 EFF
1 754 386
0
0
1 754 386
18
New
0
0
350 877
56
Renewal
C0895084F1
Royal Road Sports Complex
EFF
1 EFF
350 877
C0895085F1
Hartleyvale Stadium: Upgrade Floodlights
EFF
1 EFF
2 002 220
0
0
2 192 982
57
Renewal
C0895088F1
Ocean View Sportsfield Uograde & Fencing
EFF
1 EFF
1 315 789
0
0
1 315 789
61
Renewal
C0895089F1
14th Avenue Sportsfield: Upgrade
EFF
1 EFF
263 158
0
0
263 158
56
Renewal
C0895097F1
Pools: General Upgrade & Improvement
EFF
1 EFF
877 193
0
0
877 193
Multi
Renewal
C0895099F1
Soetwater Resort: Upgrade
EFF
1 EFF
3 000 000
2 000 000
0
6 258 596
61
Renewal
C0895100F1
Woodlands SC: Construct Ablutions
EFF
1 EFF
438 596
0
0
438 596
75
Renewal
C0895103F1
Blue Flag Beaches: Upgrade
EFF
1 EFF
438 596
0
0
438 596
Multi
Renewal
C0895109F1
Mobile Programme Equipment
EFF
1 EFF
175 439
0
0
175 439
Multi
New
C0895110F1
IT Infrastructure and Equipment
EFF
1 EFF
700 808
0
0
700 808
Multi
New
C0895111F1
Khayelitsha Athletics Spectator Stand
EFF
1 EFF
14 184 210
0
0
16 508 772
97
Renewal
31
Renewal
New
C0895120F1
Valhalla Park Com Centre:Extend to MPC
CRR
3 AFF:WardAllocation
352 484
0
0
400 000
C0895148F1
Eerste River New Sports Complex: Housing
EFF
1 EFF
1 228 070
0
0
1 228 070
16
C0895148F2
Eerste River New Sports Complex: Housing
CGD
4 MIG
7 370 214
0
0
10 770 214
16
New
C0895150F1
Mamre SF Phase1 Construct Clubhouse
CRR
3 AFF:WardAllocation
170 000
0
0
170 000
29
Renewal
C0895203F1
Huguenot Comm Hall Belhar - upgrade
CRR
3 AFF:WardAllocation
15 000
0
0
70 000
12
Renewal
C0995001F1
Lifesaving Equipment
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
C0995002F1
Fencing and Gates: General Upgrade
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
C0995003F1
Westfleur SC- install 1500 seater stand
EFF
1 EFF
384 000
7 616 000
0
8 000 000
29
Renewal
C0995004F1
Pools: General Upgrade and Improvement
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
C0995005F1
Resorts: General Upgrade
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
C0995006F1
Nodal Points: Beach Points: & Dune Man
EFF
1 EFF
0
2 000 000
0
2 000 000
Multi
Renewal
1 000 000
0
1 000 000
Multi
Renewal
C0995007F1
Recreation & Community Halls: Upgrade
EFF
1 EFF
0
C0995008F1
Lifesaving Clubhouses: Upgrade
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
C0995009F1
Irrigation: General Upgrade
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
1 000 000
0
1 000 000
Multi
New
Renewal
C0995010F1
IT Infrastructure and Equipment
EFF
1 EFF
0
C0995011F1
All Weather Surfaces - Construct
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
C0995012F1
Mobile Programme Equipment
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
C0995013F1
Blue Flag Beaches: Upgrade
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
Community Services
32
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0995014F1
Masiphumilele - Develop Sports Complex
CGD
4 MIG
2 201 910
1 896 181
0
4 300 000
69
New
C0995015F1
Masiphumilele - Develop Sports Complex
EFF
1 EFF
0
1 000 000
0
1 000 000
69
New
1 500 000
0
1 500 000
74
New
C0995016F1
Imizma Yethu - Developm Sports Complex
EFF
1 EFF
0
C0995016F2
Imizma Yethu - Developm Sports Complex
CGD
4 MIG
3 373 312
3 300 000
0
7 050 000
74
New
C0995017F1
Provision of Equipment for facilities
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
C0995018F1
Provision of Furniture for facilities
EFF
1 EFF
0
671 931
0
671 931
Multi
New
C0995019F1
Macassar Old SF Upgrade
EFF
1 EFF
0
1 500 000
0
1 500 000
15
Renewal
C0995020F1
Upgrade Gustrouw Sportsfield
EFF
1 EFF
0
2 000 000
0
2 000 000
86
Renewal
C0995021F1
Upgrade Athletic Track at Gustrouw
EFF
1 EFF
0
3 000 000
0
3 000 000
86
Renewal
C0995022F1
Sportsfield Development : URP Areas
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
C0995023F1
Booking System
EFF
1 EFF
400 000
0
0
700 000
Multi
New
C0995024F1
Athlone Sports Precinct
EFF
1 EFF
4 300 000
0
0
4 800 000
49
Renewal
C0995025F1
Phillipi Synthetic Hockey Pitch -Replace
EFF
1 EFF
0
3 000 000
0
3 000 000
35
Renewal
48
Renewal
48
Renewal
C0995026F1
Turfhall Stadium Upgrade
EFF
1 EFF
6 591 823
1 800 000
0
8 800 000
C0995027F1
Vygiekraal Roof Replacement
EFF
1 EFF
0
1 500 000
0
1 500 000
C0995032F1
New Vehicles S&R
EFF
1 EFF
800 000
0
0
800 000
Multi
New
C0995033F1
New Vehicles S&R
EFF
1 EFF
0
2 000 000
0
2 000 000
Multi
New
C0995034F1
Point of sale Equipment
EFF
1 EFF
815 790
0
0
815 790
Multi
New
C0995035F1
Provision of Equipment for facilities
EFF
1 EFF
1 000 000
0
0
1 000 000
Multi
New
C0995036F1
Blaauberg Beach Upgrade
EFF
1 EFF
2 000 000
0
0
2 890 000
Multi
Renewal
C0995038F1
Construct Sport Complex-Witsands Atlanti
CGD
4 MIG
777 307
7 222 693
0
8 000 000
32
New
C0995038F2
Construct Sport Complex-Witsands Atlanti
EFF
1 EFF
0
1 600 000
0
1 600 000
32
New
C0995039F1
Resurface Mandela Park Tartan Track
EFF
1 EFF
0
4 200 000
0
4 200 000
92
Renewal
C0995062F1
Monwabisi Coastal Node
CGD
4 NT NDPG
2 000 000
0
0
25 000 000
99
Renewal
0
0
1 500 000
45
Renewal
Multi
Renewal
12
Renewal
C0995063F1
Upgrade The Greens SF Manenberg
CGD
4 PAWC - SPORT &
REC
1 400 000
C0995064F1
2010 - Training Venues
EFF
1 EFF
1 995 000
0
0
6 700 000
C0995097F1
Huguenot Hall upgrade
CRR
3 AFF:WardAllocation
41 177
0
0
120 000
C0995131F1
Matroosfontein SG - upgrade clubhouse
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
30
Renewal
C0995144F1
Reconstruct Valhalla Park - MPC
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
31
Renewal
C0995161F1
Site C hall - Upgrade
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
89
Renewal
C0995170F1
Atlantis (Phase 1) - Provision of Hall
CRR
3 AFF:WardAllocation
205 000
0
0
205 000
29
Renewal
Community Services
33
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
200 000
Proposed Provision Proposed Provision
2010/2011
2011/2012
0
0
Total Project
Cost
200 000
C0995177F1
D4 Nyanga Rugby SG Parking
EFF
1 EFF
C0995177F2
D4 Nyanga Rugby SG Parking
CGD
4 MIG
800 000
0
0
800 000
0
0
3 300 000
Ward
New/Renewal
38
Renewal
38
Renewal
Multi
New
C0995182F1
Sport & Recreation Facilities Upgrade
CGD
4 MIG
2 643 369
C0995184F1
Nodal Points: Beach & Dune Management
EFF
1 EFF
1 700 000
0
0
1 700 000
Multi
Renewal
C0995185F1
Furniture Fittings & Equipment
REVENUE
2 REVENUE
1 627 392
0
0
1 627 392
Multi
New
C0995196F1
Purchase of soccer poles
CRR
3 AFF:WardAllocation
12 000
0
0
12 000
12
New
C0995221F1
Rehabilitation of S & R Facilities
CGD
4 MIG
3 562 361
0
0
23 667 001
Multi
Renewal
C0995223F1
Upgrade Heinz Park Hall
CGD
4 PAWC - iSLP
C0995573F1
Develop Telkom-Joe Slovo Sports Complex
CGD
4 PRIVATE SECTOR
FIN
C1095001F1
D6 Kogel Bay Resort Water Supply Upgrade
EFF
C1095002F1
D6 Audio Visual Equipment
EFF
86 960
0
0
286 960
13
Renewal
300 000
0
0
500 000
4
Renewal
1 EFF
0
0
2 000 000
2 000 000
100
Renewal
1 EFF
0
0
60 000
60 000
16
New
Multi
New
C1095003F1
Multiward Vehicles Plant & Equipment
EFF
1 EFF
0
0
2 000 000
2 000 000
C1095004F1
Multiward S&R Furniture & Equipment
EFF
1 EFF
0
0
4 578 246
4 578 246
Multi
New
C1095005F1
Multiward S&R Irrigation
EFF
1 EFF
0
0
6 000 000
6 000 000
Multi
Renewal
0
6 000 000
6 000 000
Multi
Renewal
C1095006F1
Multiward S&R Fencing
EFF
1 EFF
0
C1095007F1
Multiward S&R - IT Infrastruture & Equip
EFF
1 EFF
0
0
1 600 000
1 600 000
Multi
New
C1095008F1
Multiward S&R Public Toilets Upgrade
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
Renewal
C1095009F1
Multiward S&R Blue Flag Beach Upgrade
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
Renewal
C1095010F1
Multiward Nodal Points Beach & Dune Man
EFF
1 EFF
0
0
4 000 000
4 000 000
Multi
Renewal
C1095011F1
Multiward Rec & Comm Halls Upgrade
EFF
1 EFF
0
955 930
0
955 930
Multi
Renewal
C1095012F1
Multiward Rehab of Sports Complexes
EFF
1 EFF
0
0
3 000 000
3 000 000
Multi
Renewal
C1095013F1
D6 Happy Valley Develop Sports Complex
EFF
1 EFF
0
0
440 000
1 740 000
14
New
C1095014F1
D3 Cover Heat Lentegeur Pool
EFF
1 EFF
0
0
3 000 000
3 000 000
76
Renewal
C1095015F1
Multiward S&R Hardening of Facilities
EFF
1 EFF
0
0
4 500 000
4 500 000
Multi
Renewal
C1095016F1
D3 Construct Sports Complex MPlain HSG
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
New
0
1 000 000
1 000 000
Multi
New
5 000 000
5 000 000
Multi
New
C1095017F1
Multiward S&R Synthetic Soccer Pitches
EFF
1 EFF
0
C1095017F2
Multiward S&R Synthetic Soccer Pitches
CGD
4 MIG
0
0
C1095018F1
Sport & Recreation Facilities Upgrade
CGD
4 MIG
3 000 000
0
0
3 000 000
Multi
Renewal
C1095019F1
Multiward - Upgrade Stadia
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
Renewal
C1095020F1
Multiward - Upgrade Swimming Pools
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
Renewal
C1095021F1
D1 Upgrade Silverstroom Resort
EFF
1 EFF
0
0
1 500 000
1 500 000
32
Renewal
Community Services
34
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
0
C1095022F1
D1 Robimvale Hall Parking & Gates
EFF
1 EFF
0
120 000
C1095023F1
D1 Robinvale hall install stage
EFF
1 EFF
0
0
250 000
500 000
3 500 000
1 000 000
Total Project
Cost
120 000
Ward
New/Renewal
32
Renewal
250 000
32
Renewal
4 000 000
101
New
1 000 000
101
New
C1095024F1
D6 Construct Sports Complex Wallacedene
CGD
4 MIG
0
C1095024F2
D6 Construct Sports Complex Wallacedene
EFF
1 EFF
0
0
C1095025F1
D4 Hugenot Square Hall
EFF
1 EFF
0
0
250 000
250 000
12
Renewal
C1095025F2
D4 Hugenot Square Hall
CGD
4 MIG
0
0
1 500 000
1 500 000
12
Renewal
C1095026F1
D2 S&R Facilities
EFF
1 EFF
0
0
2 000 000
2 000 000
Multi
Renewal
C1095026F2
D2 S&R Facilities
CGD
4 MIG
0
0
6 000 000
6 000 000
Multi
Renewal
C1095027F1
Refurbishment of City Hall
EFF
1 EFF
1 000 000
1 000 000
1 000 000
3 000 000
77
Renewal
C1095028F1
Furniture Fittings & Equipment
REVENUE
2 REVENUE
0
1 627 392
0
1 627 392
Multi
New
C1095029F1
Furniture Fittings & Equipment
REVENUE
2 REVENUE
0
0
1 627 392
1 627 392
Multi
New
C1095030F1
Multiward Rec & Comm Halls Upgrade
EFF
1 EFF
0
0
6 000 000
6 000 000
Multi
Renewal
C1095031F1
Uitsig SG - Extention to Clubhouse
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
25
Renewal
0
85 000
28
New
C1095032F1
Adriaanse CC -Front & Back stage Curtain
CRR
3 AFF:WardAllocation
85 000
0
C1095033F1
Nomzamo SF - Vibrecrete fencing
CRR
3 AFF:WardAllocation
90 000
0
0
90 000
85
Renewal
C1095034F1
Lwandle Gymnasium - Gym Equipment
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
86
New
C1095035F1
Durbanville Bowling Club - New Mower
CRR
3 AFF:WardAllocation
35 000
0
0
35 000
21
New
C1095036F1
Eversdal Tennis - Roof over braai patio
CRR
3 AFF:WardAllocation
25 000
0
0
25 000
21
Renewal
C1095037F1
Bergfliet SF - Upgrade Sport Hall
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
71
Renewal
C1095038F1
D'Oliveira SC - Replace Ceiling
CRR
3 AFF:WardAllocation
70 000
0
0
70 000
Multi
Renewal
C1095039F1
Allenby Drive SF - Install Security Ligh
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
Multi
Renewal
C1095040F1
Lotus River CC - Purchase Kitchen Furnit
CRR
3 AFF:WardAllocation
7 000
0
0
7 000
65
New
C1095041F1
Ocean View SF - Install Lights
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
61
Renewal
C1095042F1
Fish Hoek - Upgrade
CRR
3 AFF:WardAllocation
150 000
0
0
150 000
69
Renewal
0
0
160 000
68
Renewal
0
0
1 500
63
New
C1095043F1
Upgrade Clovelly - Area 2.3 Offices
CRR
3 AFF:WardAllocation
160 000
C1095044F1
Ottery MPC (De wet Road) -Microwave Oven
CRR
3 AFF:WardAllocation
1 500
C1095045F1
Ottery MPC (De wet Road) -Chest Freezer
CRR
3 AFF:WardAllocation
3 500
0
0
3 500
63
New
0
0
150 000
64
Renewal
0
0
20 000
3
Renewal
C1095046F1
Seawinds MPC - Upgrade
CRR
3 AFF:WardAllocation
150 000
C1095047F1
PP Smit SF - Upgrade of Cloakrooms
CRR
3 AFF:WardAllocation
20 000
C1095048F1
Chrisma Tennis Clubhouse - Upgrade
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
3
Renewal
C1095049F1
Wallecedene Hall - Fencing Phase 2
CRR
3 AFF:WardAllocation
120 000
0
0
120 000
6
Renewal
Community Services
35
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1095050F1
Scottsdene Youth Centre - Catering Equip
CRR
3 AFF:WardAllocation
34 000
0
0
34 000
6
New
C1095051F1
Wallecedene Hall - Catering equipment
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
6
New
0
0
40 000
7
Renewal
0
0
40 000
7
New
C1095052F1
Northpine Hall - Fencing Phase 3
CRR
3 AFF:WardAllocation
40 000
C1095053F1
Northpine Hall - Tiling & Curt
CRR
3 AFF:WardAllocation
40 000
C1095054F1
Bloekombos Hall - Industrial Sink
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
101
New
C1095055F1
Bloekombos SC - Upgrade
CRR
3 AFF:WardAllocation
160 000
0
0
160 000
101
Renewal
C1095056F1
Kraaifontein CC-Install Industrial Sinks
CRR
3 AFF:WardAllocation
15 000
0
0
15 000
102
New
C1095057F1
Kraaifontein CC - Industrial Fridge
CRR
3 AFF:WardAllocation
25 000
0
0
25 000
102
New
C1095058F1
FF Erasmus Hall - Industrial Equipment
CRR
3 AFF:WardAllocation
21 000
0
0
21 000
102
New
C1095059F1
Kraaifontein CC - Tiling: Wall & Floor
CRR
3 AFF:WardAllocation
70 000
0
0
70 000
102
Renewal
C1095060F1
Salt River (Shelley Road SF) - Fencing
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
57
Renewal
C1095061F1
Belhar Minor Hall - Upgrade
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
12
Renewal
C1095062F1
Hugenot Hall - Upgrade
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
12
Renewal
0
50 000
89
New
C1095063F1
Solomon Shuku - Equipment
CRR
3 AFF:WardAllocation
50 000
0
C1095064F1
Blue Hall - Sport Equipment
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
89
New
C1095065F1
Solomon Shuku Hall - Upgrade
CRR
3 AFF:WardAllocation
120 000
0
0
120 000
89
Renewal
C1095066F1
Blue Hall - Eqipment
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
89
Renewal
C1095067F1
Durbanville Bowling Club - Kitchen Equip
CRR
3 AFF:WardAllocation
8 000
0
0
8 000
21
New
C1095068F1
Lotus River Ablution Block - Upgrade
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
65
Renewal
C1095069F1
Sea Point Promenade - Misting Spray
CRR
3 AFF:WardAllocation
95 000
0
0
95 000
54
Renewal
C1095070F1
Bergvliet SF - Install Floodlights
CRR
3 AFF:WardAllocation
170 000
0
0
170 000
71
New
C1095074F1
Rocklands SF - Install Floodlights
CRR
3 AFF:WardAllocation
25 000
0
0
25 000
43
New
C1095075F1
Upgrading - Stephen Reagan SF
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
78
Renewal
C1095076F1
Upgrading - Strandfontein Pavillion
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
43
Renewal
0
0
42 000
32
Renewal
C1095077F1
Witsands Hall - Upgrade
CRR
3 AFF:WardAllocation
42 000
C1095078F1
Metropolitan SF -Extention of Brick Wall
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
50
Renewal
C1095079F1
Bonteheuwel CC - Revamp Toilets
CRR
3 AFF:WardAllocation
35 000
0
0
35 000
50
Renewal
0
0
25 000
43
Renewal
C1095080F1
Strandfontein SF - Install Floodlights
CRR
3 AFF:WardAllocation
25 000
C1095081F1
The Downs Hall - Upgrade
CRR
3 AFF:WardAllocation
75 000
0
0
75 000
42
Renewal
C1095082F1
Sherwood Park Hall - Upgrade
CRR
3 AFF:WardAllocation
75 000
0
0
75 000
42
Renewal
C1095083F1
Erf 267 -Upgrade and Development
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
40
Renewal
Community Services
36
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
C1095084F1
Ikhwezi Community Hall - Gym Equip
CRR
3 AFF:WardAllocation
80 000
0
0
80 000
C1095085F1
Bishop Lavis SG - Upgrade
CRR
3 AFF:WardAllocation
100 000
0
0
0
0
Ward
New/Renewal
40
New
100 000
24
Renewal
100 000
103
Renewal
C1095086F1
Durbanville Baseball - Upgrade facilitie
CRR
3 AFF:WardAllocation
100 000
C1095087F1
Philadelphia SF: Provision of toilet fac
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
105
Renewal
C1095088F1
Klipheuwel SF: Provision of fencing
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
105
Renewal
C1095089F1
Durbanville Bowling club: irrigation
3 AFF:WardAllocation
25 000
0
0
25 000
21
Renewal
134 038 447
78 053 457
72 925 638
CRR
Total for Sport , Recreation and Amenities
Library Services
C0701076F1
Fencing & Gates :General Upgrade
CGD
4 PAWC - SPORT &
REC
46 000
0
0
619 372
Multi
Renewal
C0900366F1
Furniture Carnegie 2nd grant
CGD
4 PRIVATE SECTOR
FIN
128 530
0
0
390 030
59
New
C0900368F1
IT Equipment&Software-Carnegie2ndGrant
CGD
4 PRIVATE SECTOR
FIN
2 212 950
0
0
3 217 950
59
New
C1000037F2
Furniture,Fittings,Tools&Equipment LIS 2
REVENUE
2 REVENUE
1 175 507
1 269 600
0
2 445 107
101
New
C1000039F1
Furniture,Fittings,Tools&Equipment LIS 4
REVENUE
2 REVENUE
0
0
1 371 100
1 371 100
101
New
C1000040F1
Furniture-Carnegie 2nd Grant
CGD
4 PRIVATE SECTOR
FIN
463 000
0
0
463 000
59
New
C1000048F1
LotusRiverLibrary-DoubledrFridge/Freezer
CRR
3 AFF:WardAllocation
4 500
0
0
4 500
65
New
C1096001F1
ICT Library Management System
CGD
4 PAWC - LIBRARIES
2 500 000
4 646 051
0
7 146 051
Multi
New
C1096009F1
New MPC incl Library, Harare Khayelitsha
CGD
4 NT NDPG
C1096009F2
New MPC incl Library, Harare Khayelitsha
CGD
4 MIG
C1096010F1
New Regional Library Kuyasa Khayalitsha
CGD
4 NT NDPG
0
12 000 000
8 000 000
20 000 000
98
New
16 000 000
0
0
16 000 000
98
New
0
0
10 000 000
10 000 000
95
New
22 530 487
17 915 651
19 371 100
196 482 950
126 272 792
124 600 422
0
2 687 000
0
38 892 142
Multi
New
1 000 000
0
0
18 766 083
102
New
0
3 000 000
6 000 000
13 750 001
103
New
Total for Library Services
Total for Community Services
Transport , Roads & Stormwater
Roads and Stormwater
C0500658F1
N2 Gateway:TR&S Services:EFF
EFF
1 EFF
C0500956F1
Brackenfell Blvd
CRR
3 BICL T&Roads:Oos
C0500956F2
Brackenfell Blvd - De Bron - Lang
EFF
1 EFF
Transport , Roads & Stormwater
37
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
C0500973F1
Construct Rds:De Villiers Rd
CRR
3 BICL T&Roads:Oos
C0500981F1
Construct Rds:Bottelary/R300
CRR
3 BICL T&Roads:Oos
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
4 500 000
2 000 000
0
Total Project
Cost
12 500 000
Ward
New/Renewal
102
New
500 000
1 000 000
0
2 547 023
6
New
0
0
12 599 852
100
New
0
0
11 800 000
85
New
C0500986F1
Construct Rds:Broadway Extension
CRR
3 BICL T&Roads:Hel
4 400 000
C0500995F1
Construct Rds:Onverwacht Rd
EFF
1 EFF
2 650 000
C0500995F2
Construct Rds:Onverwacht Rd
CGD
4 MIG
3 000 000
0
0
6 000 000
85
New
C0501092F1
CSRM: Lotus Canal Widening:Gugulethu
EFF
1 EFF
3 500 000
3 000 000
2 000 000
25 320 729
Multi
New
C0501101F1
Morkels Cottage
CGD
4 MIG
0
1 000 000
500 000
1 500 000
86
New
C0501101F2
Morkels Cottage
EFF
1 EFF
0
1 000 000
1 500 000
2 500 000
86
New
C0501111F2
CSRM: Morkels Cottage: Stormwater: EFF
EFF
1 EFF
1 300 000
0
0
14 953 014
86
New
C0501114F1
CSRM: Somerset West 10HA: SW
EFF
1 EFF
2 800 000
0
0
3 000 000
83
New
C0501123F1
CSRM: Sunnydale: Stormwater System
EFF
1 EFF
338 883
0
0
7 558 401
61
Renewal
C0501364F1
CSRM General Stormwater projects
EFF
1 EFF
400 000
0
0
12 976 429
Multi
New
C0501503F1
Flood Alleviation - Lourens River
EFF
1 EFF
4 000 000
3 500 000
5 000 000
13 699 764
83
Renewal
0
5 187 155
Corp Inf
Renewal
0
1 578 507
Multi
Renewal
C0601144F1
OPS Small Plant and Equipment
EFF
1 EFF
255 000
0
C0601145F1
OPS Upgrading of depot facilities
EFF
1 EFF
300 000
0
C0601149F1
Bulk Stormwater Table View North - BICL
CRR
3 BICL SWater: Blg
C0601149F2
CSRM:Bulk SW Table View North-EFF
EFF
C0601191F1
Bardale (erf 451): Bulk SW (MIG)
C0601194F1
C0601198F1
500 000
2 500 000
0
3 500 000
104
Renewal
1 EFF
1 000 000
1 500 000
1 000 000
3 500 000
104
Renewal
CGD
4 MIG
1 593 836
0
0
15 430 001
18
New
Bardale (erf 451): Bulk Roads (MIG)
CGD
4 MIG
4 000 000
0
0
10 393 172
18
New
Melton Rd - Design & construct/Upgrade
CRR
3 CMC INFR. FUND
4 163 339
0
0
7 011 655
17
Renewal
C0601200F1
Albert Philander Rd - Design/Upgrade
CRR
3 CMC INFR. FUND
600 000
0
0
4 149 195
14
Renewal
C0601201F1
Sunbird Park - Design&construct Rds&sw
CRR
3 CMC INFR. FUND
1 000 000
0
0
2 094 672
19
New
C0601201F2
Sunbird Park - Design&construct Rds&sw
EFF
1 EFF
300 000
0
0
4 160 175
19
New
C0601205F1
Blackheath SW - Design&Construct bulk SW
CRR
3 CMC INFR. FUND
1 295 047
0
0
4 499 946
14
New
1 000 000
2 000 000
1 000 000
4 000 000
14
New
C0601205F2
CSRM:Blackheath SW -D&C bulk SW
EFF
1 EFF
C0601218F2
ICS/Powerstation site
CGD
4 PRIVATE SECTOR
FIN
0
59 000
0
499 941
77
Renewal
C0601354F1
CSRM: Schaapkraal Stormwater
EFF
1 EFF
0
3 000 000
6 000 000
10 741 243
43
Renewal
C0601676F1
Somerset West erf 10490: Roads and Storm
CGD
4 MIG
700 000
0
0
700 000
83
New
C0601676F2
Somerset West erf 10490: Roads and Storm
EFF
1 EFF
100 000
1 300 000
0
1 400 000
83
New
C0601677F1
Somerset West erf 10490: Bulk Stormwater
CGD
4 MIG
500 000
0
0
500 000
83
New
C0601679F1
Lwandle- Strand Stormwater
CGD
4 MIG
1 269 000
0
0
1 269 000
86
New
Transport , Roads & Stormwater
38
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0602001F1
Bayside Canal
EFF
1 EFF
6 046 000
500 000
0
8 600 001
4
Renewal
C0602008F1
Erf 17654 Strand:Roads
EFF
1 EFF
1 350 000
0
0
2 280 000
85
Renewal
0
0
700 000
85
Renewal
1 000 000
30 818 930
77
Renewal
C0602008F2
Erf 17654 Strand:Roads
CGD
4 MIG
700 000
C0631107F1
Foreshore Freeway: Bearing Replacement
EFF
1 EFF
5 000 000
5 000 000
C0641911F1
Sheffield Rd Philippi:Plan and Design
CGD
4 STATE DEPT: OTHER
C0642294F2
Ped Footways/Bicycle Path: Ktsha/Mplain
CGD
C0700008F2
WC:Granger Bay Boulevard:CMTF
C0700074F1
0
6 000 000
0
6 000 000
35
New
4 CMTF PG:WC
DOT&PW
1 406 482
0
0
4 102 277
95
New
CGD
4 CMTF OTHER
6 000 000
0
0
6 000 000
54
Renewal
Diep River Main Rd Culvert
EFF
1 EFF
50 000
0
0
8 924 772
73
Renewal
C0700413F1
Construct Road Signs - City Wide
EFF
1 EFF
C0700500F1
Atlantis Dev Corr - M12:
CRR
3 BICL T&Roads:Blg
C0700500F2
Atlantis Dev Corr
EFF
1 EFF
560 802
1 500 000
1 500 000
5 366 911
Multi
Renewal
13 000 000
1 000 000
0
15 500 001
104
New
7 000 000
10 000 000
10 000 000
29 500 000
104
Renewal
0
500 000
3 000 000
3 500 000
14
Renewal
4 100 000
0
0
4 572 810
4
New
C0700507F2
Buttskop Rd upgrading
EFF
1 EFF
C0701047F1
Construct of Roads: Dualling Plattekloof
CRR
3 BICL T&Roads:Blg
C0701048F1
Land Acq: Broadway Blvd,Strand Erf 33427
EFF
1 EFF
350 000
0
0
350 000
83
New
0
0
999 300
85
New
C0701051F1
Land Acq: SLP Village Rd: Somerset West
EFF
1 EFF
213 000
C0701052F1
Imizamo Yethu: Roads and Stormwater
EFF
1 EFF
1 500 000
5 000 000
2 000 000
11 000 001
74
New
C0701053F1
WC:N2:HospB:Psl:Eb:PTIF
CGD
4 NG DOT PTI&SG
50 000 000
0
0
100 000 000
Multi
Renewal
C0701053F2
WC:N2:HospB:Psl:Eb:EFF
EFF
1 EFF
35 310 000
0
0
103 500 000
Multi
Renewal
C0701053F3
WC:N2:HospB:Psl:PGWC
CGD
4 CMTF PG:WC
DOT&PW
3 690 000
0
0
21 192 942
Multi
Renewal
C0702743F2
SWater: Upgr: Jakkalsvlei Box Culvert
CGD
4 MIG
3 000 000
6 000 000
0
9 000 000
49
Renewal
C0702743F3
SWater: Upgr: Jakkalsvlei Box Culvert
CGD
4 PROV HOUSE DEV
BRD
15 000 000
12 000 000
0
27 000 000
49
Renewal
C0702743F4
SWater: Upgr: Jakkalsvlei Box Culvert
CRR
3 BICL T&Roads:Tyg E
1 500 000
1 500 000
0
3 000 000
49
Renewal
C0702744F1
SWater: Lansdowne Corridor Development
CGD
4 PRIVATE SECTOR
FIN
0
1 589 600
0
1 589 600
60
Renewal
C0710501F1
WC:Klipfontein PT NMT Scheme:EFF
EFF
1 EFF
7 000 000
0
0
18 392 472
Multi
New
C0710501F2
WC:Klipfontein PT NMT Scheme:PTIF
CGD
4 NG DOT PTI&SG
4 000 000
0
0
12 211 277
Multi
New
C0710501F3
WC:Klipfontein PT NMT Scheme:PGWC
CGD
4 CMTF PG:WC
DOT&PW
8 800 000
5 000 000
0
19 800 000
Multi
New
C0710502F1
WC:City-wide NMT Plan:EFF
EFF
1 EFF
10 000 000
0
0
10 000 000
Multi
New
C0710502F2
WC:City-wide NMT Plan:PTIF
CGD
4 NG DOT PTI&SG
10 000 000
5 000 000
0
20 000 001
Multi
New
Transport , Roads & Stormwater
39
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
5 000 000
5 000 000
0
10 000 000
Multi
New
10 000 000
0
0
10 000 000
Multi
Renewal
1 EFF
4 000 000
2 000 000
0
6 000 000
Multi
Renewal
9 000 000
0
18 000 000
Multi
Renewal
C0710502F3
WC:City-wide NMT Plan:PGWC
CGD
4 CMTF PG:WC
DOT&PW
C0800191F1
WC:Klipfontein BRT Scheme:PTIF
CGD
4 NG DOT PTI&SG
C0800191F2
WC:Klipfontein BRT Scheme:EFF
EFF
C0800191F3
WC:Klipfontein BRT Scheme:PGWC
CGD
4 CMTF PG:WC
DOT&PW
9 000 000
C0800192F3
WC:PT & Bus upgrade on Corridors:PGWC
CGD
4 CMTF PG:WC
DOT&PW
5 000 000
5 000 000
0
10 000 000
Multi
New
C0800194F1
WC:Loc Rds On GP Common Precinct:PTIF
CGD
4 NG DOT PTI&SG
6 500 000
0
0
8 800 000
54
New
C0800194F3
WC:Loc Rds On GP Common Precinct:PGWC
CGD
4 CMTF PG:WC
DOT&PW
1 900 000
0
0
1 900 000
54
New
C0800457F1
Proposed surfacing:Emerald Crt,Gatesvill
CRR
3 AFF:WardAllocation
20 000
0
0
20 000
48
Renewal
C0800541F1
Traffic Calming in Ward 44
CRR
3 AFF:WardAllocation
45 000
0
0
45 000
44
New
C0804406F1
SLP Village Rd upgrading
EFF
1 EFF
9 350 000
0
0
9 350 000
85
Renewal
C0804407F1
Vlakteplaas Bulk Roads & S/water
EFF
1 EFF
0
1 000 000
1 000 000
2 000 000
100
New
6 000 000
5 000 000
11 000 000
100
New
C0804407F2
Vlakteplaas Bulk Roads & S/water
CGD
4 MIG
0
C0804408F1
Onverwacht Rd: Bulk Stormwater
EFF
1 EFF
500 000
2 500 000
2 000 000
5 000 000
85
New
C0810283F1
Upgr: Gravel St's: Mission Grounds, SLP
EFF
1 EFF
900 000
0
0
1 472 613
100
New
C0810284F1
Constr: Walkway:R44,Whale Look-out Point
EFF
1 EFF
500 000
0
0
550 000
100
New
C0810285F1
Dualling:Broadway Blvd:Beach Rd:MR27
EFF
1 EFF
0
2 000 000
4 000 000
6 000 000
83
Renewal
C0810286F1
Widening: Lourensford Rd: MR9 Parel Vall
EFF
1 EFF
0
0
200 000
200 000
84
Renewal
C0810287F1
Widening MR27:Strand:Piet Retief,Newton
EFF
1 EFF
0
0
100 000
100 000
83
Renewal
C0810288F1
Upgr:Faure Marine Dr:Gordon's Bay
EFF
1 EFF
0
400 000
1 000 000
1 400 000
100
Renewal
C0810289F1
Widening:Andries Pretorius St,Bright,Cor
EFF
1 EFF
0
0
100 000
100 000
84
Renewal
C0810308F1
Westlake River Pedestrian Bridge, Land
EFF
1 EFF
1 796 015
0
0
1 900 000
71
New
C0810313F1
IM: Rehabilitation: Metro Ro (CMTF)
CGD
4 CMTF PG:WC
DOT&PW
1 000 000
0
0
8 700 001
Multi
Renewal
C0810316F1
Pelican Park: Link Road (MIG)
CGD
4 MIG
0
7 000 000
5 000 000
12 000 000
67
New
3 000 000
3 000 000
6 000 000
67
New
C0810317F1
SW:Pelican Park:Housing:Swales,Ponds,MIG
CGD
4 MIG
0
C0810318F1
Constr: Onverwacht Rd: Broadway to Faure
EFF
1 EFF
0
3 000 000
1 000 000
4 000 000
86
New
C0810325F1
Pelican Park: Strandfontein Rd Upgr_EFF
EFF
1 EFF
30 687 000
17 313 000
15 000 000
69 483 009
66
Renewal
C0810325F2
Pelican Park: Strandfontein Rd Upgr_MIG
CGD
4 MIG
10 000 000
20 000 000
25 000 000
57 000 000
66
Renewal
C0810502F2
Khayelitsha Rail Extention TI
CGD
4 NT NDPG
20 800 000
6 600 000
12 000 000
65 495 283
95
Renewal
Transport , Roads & Stormwater
40
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0810508F1
WC:Embayments Green Point Stadium:PTIF
CGD
4 NG DOT PTI&SG
9 550 000
0
0
11 550 000
54
New
C0810508F3
WC:Embayments Green Point Stadium-PGWC
CGD
4 CMTF PG:WC
DOT&PW
2 475 000
0
0
2 475 000
54
New
C0810509F1
WC:Grade seperated Ped Cross(BG):PTIF
CGD
4 NG DOT PTI&SG
26 100 000
5 000 000
0
37 700 000
Multi
Renewal
3 000 000
0
0
3 000 000
Multi
New
C0810509F3
WC:Grade seperated Ped Cross(BG):PGWC
CGD
4 CMTF PG:WC
DOT&PW
C0810510F1
WC:Ped Imprments to Somerset Rd:PTIF
CGD
4 NG DOT PTI&SG
43 563 286
20 000 000
0
71 000 001
54
Renewal
C0810511F1
WC:Grade seperated Ped Facilities:PTIF
CGD
4 NG DOT PTI&SG
0
7 000 000
0
27 500 000
Multi
New
C0810511F2
WC:Grade sep Ped Facilities(WestBlv):EFF
EFF
1 EFF
3 200 000
0
0
14 700 000
Multi
Renewal
C0810513F1
WC:Stadium Precinct Ped&Cycle Facil:PTIF
CGD
4 NG DOT PTI&SG
1 500 000
2 000 000
0
4 200 000
54
Renewal
C0810513F2
WC:Stadium Precinct Ped&Cycle Facil:EFF
EFF
1 EFF
900 000
0
0
900 000
54
New
C0810513F3
WC:Stadium Precinct Ped&Cycle Facil:PGWC
CGD
4 CMTF PG:WC
DOT&PW
900 000
0
0
900 000
54
New
C0810514F1
WC:City Centre Pedestr Improvmnts:PTIF
CGD
4 NG DOT PTI&SG
14 000 000
10 000 000
0
25 600 000
77
Renewal
C0810514F3
WC:City Centre Pedestrian Impovem:PGWC
CGD
4 CMTF PG:WC
DOT&PW
1 200 000
0
0
1 200 000
77
Renewal
C0810515F3
WC:Inner City Transport System-PGWC
CGD
4 CMTF PG:WC
DOT&PW
1 000 000
0
0
1 000 000
77
New
C0810517F1
WC:PT and related Infrastr Upgrade:PTIF
CGD
4 NG DOT PTI&SG
2 000 000
6 000 000
0
10 000 001
Multi
Renewal
C0810517F3
WC:PT and related Infrastr Upgrade:PGWC
CGD
4 CMTF PG:WC
DOT&PW
10 000 000
5 900 000
0
15 900 000
Multi
Renewal
C0810521F1
WC:NMT Bridge: Bhunga Avenue Langa:PTIF
CGD
4 NG DOT PTI&SG
5 500 000
2 000 000
0
16 000 000
49
New
C0810521F2
WC:NMT Bridge: Bhunga Avenue Langa:EFF
EFF
1 EFF
1 500 000
0
0
4 500 000
49
Renewal
C0810521F3
WC:NMT Bridge: Bhunga Avenue Langa:PGWC
CGD
4 CMTF PG:WC
DOT&PW
2 000 000
0
0
2 000 000
49
New
C0810522F1
WC:Road Signage Upgrade:PTIF
CGD
4 NG DOT PTI&SG
9 437 300
0
0
21 000 000
Multi
Renewal
0
4 500 000
Multi
Renewal
C0810522F2
WC:Road signage upgrade:EFF
EFF
1 EFF
4 500 000
0
C0810522F3
WC:Road Signage Upgrade:PGWC
CGD
4 CMTF PG:WC
DOT&PW
4 400 000
0
0
4 400 000
Multi
Renewal
C0900021F1
Extension of Broadway Blvd : Broadlands
EFF
1 EFF
0
5 000 000
6 000 000
11 000 000
100
Renewal
C0900023F1
Steynsrus Rd/R44 on-ramp
EFF
1 EFF
C0900222F1
Greenmarket Square Roadworks Infrastruc
CRR
C0900290F1
Traffic Calming Erica Drive, Belhar
CRR
C0900301F1
Traffic Calming Measures : Ward 85
CRR
Transport , Roads & Stormwater
0
0
500 000
500 000
84
Renewal
3 AFF:WardAllocation
145 000
0
0
145 000
77
Renewal
3 AFF:WardAllocation
50 000
0
0
50 000
22
Renewal
3 AFF:WardAllocation
50 000
0
0
50 000
85
Renewal
41
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
532 556 292
722 056 292
Multi
Corp Inf
New
86
Renewal
C0900313F1
IRT:Integr Rapid Transit Syst(Ph1A):PTIF
CGD
4 NG DOT PTI&SG
23 500 000
166 000 000
C0900313F2
IRT:Integr Rapid Transit Syst(Ph1A):CRR
CRR
3 CRR: BRT System
25 000 000
35 000 000
0
60 000 000
0
0
100 000
Ward
New/Renewal
New
C0900383F1
Speed Humps in 6th/7th Streets, Rusthof
CRR
3 AFF:WardAllocation
100 000
C0900391F1
Rondevlei Subcouncil: road improv & infr
CRR
3 AFF:WardAllocation
294 561
0
0
1 000 000
Multi
Renewal
C0900452F1
WC:Green Point Precinct Stormwater Upgra
EFF
1 EFF
16 000 000
0
0
16 000 000
54
Renewal
C0900453F1
WC:Green Point Precinct Ifra Relat Upgra
EFF
1 EFF
80 000 000
0
0
80 000 000
54
Renewal
C0900487F1
IRT:Klipfontein Corridor:PTIF
CGD
4 NG DOT PTI&SG
14 000 000
56 000 000
0
70 000 000
Multi
New
C0900497F2
IRT:PropertyAcquisition:CRR
CRR
3 CRR: BRT System
75 010 000
0
0
75 010 000
Multi
New
C0900500F1
IRT:InnerCityService:PTIF
CGD
4 NG DOT PTI&SG
4 519 180
0
0
6 519 180
Multi
New
C0900509F1
Reconstruct Clifton footpaths and handra
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
74
Renewal
C0910312F1
Saxdown Road : Land Acq (Bottelary)
CRR
3 BICL T&Roads:Hel
1 500 000
0
0
3 800 000
Multi
Renewal
C0960023F1
Traffic Calming:Athlone:Ward48-speedhump
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
48
Renewal
C0960032F1
Footway Construction:Elsjieskraal Rd & a
CRR
3 AFF:WardAllocation
110 000
0
0
200 000
46
Renewal
0
110 000
48
Renewal
0
28 000
59
Renewal
C0960033F1
Parking embaym: St. Athans & Kromboom Rd
CRR
3 AFF:WardAllocation
60 000
0
C0980022F1
Upgrade Bicycle Lanes at Local Schools
CRR
3 AFF:WardAllocation
28 000
0
C0980023F1
Construct Pavement:Klaasens Rd,Bishopsct
CRR
3 AFF:WardAllocation
800 000
0
0
800 000
62
Renewal
C0991030F1
Croydon - roads & storm water
EFF
1 EFF
500 000
500 000
1 500 000
2 500 000
15
Renewal
C0991031F1
South Fork, Strand - roads & storm water
EFF
1 EFF
0
0
300 000
300 000
100
Renewal
C0991033F1
Upgrading of Silverboomkloof Rd in So
EFF
1 EFF
0
0
250 000
250 000
84
Renewal
C1000007F1
Acquisition of computer hardware:Roads &
EFF
1 EFF
500 000
0
0
500 000
Corp Inf
New
C1000050F1
Traffic calming Consta rd H/Field
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
72
Renewal
C1000051F1
Upgrade verge Rosmead ave@W/Herbert s/f
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
18
Renewal
C1000052F1
Traffic calming Alduwa Rd Southfield
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
72
Renewal
C1000053F1
Traffic calming Roscommon Rd Heathfield
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
72
Renewal
0
0
100 000
64
Renewal
C1000054F1
Road names installed on street kerbs
CRR
3 AFF:WardAllocation
100 000
C1000056F1
Pavement curbstone cnr.Irene-helderb str
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
84
Renewal
C1000057F1
Tarring sidewalks- Ward 100
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
100
Renewal
0
0
180 000
83
Renewal
C1000058F1
Replace asphalt with brickpaving-Ward 83
CRR
3 AFF:WardAllocation
180 000
C1000060F1
Speed Humps - Ward 85
CRR
3 AFF:WardAllocation
110 000
0
0
110 000
85
Renewal
C1000061F1
Speed humps - Ward 15(EikeSalvoRingFirgr
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
15
Renewal
C1000062F1
Erect Street name boards ward 61
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
61
Renewal
Transport , Roads & Stormwater
42
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1000063F1
Raised Intersection-Firgrove way -M/ridg
CRR
3 AFF:WardAllocation
90 000
0
0
90 000
73
Renewal
C1000064F1
Construct footpath:Stephen Rd
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
66
Renewal
0
0
140 000
58
Renewal
C1000066F1
Upgrade of Roads in Ward 58
CRR
3 AFF:WardAllocation
140 000
C1000067F1
Install: Pallisade fence-block Robor Cre
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
58
Renewal
C1000068F1
Extension of parking bays at Plums Stati
CRR
3 AFF:WardAllocation
120 000
0
0
120 000
73
Renewal
C1000069F1
Fencing around Richmond Cntr parking
CRR
3 AFF:WardAllocation
77 000
0
0
77 000
73
Renewal
C1000070F1
Upgrade Alphen Common Walkways
WC2062311
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
62
Renewal
C1000071F1
Speedhumps-Valley road.
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
74
Renewal
C1000072F1
Traffic Calming Ward 53 and 57
CRR
3 AFF:WardAllocation
145 000
0
0
145 000
53
Renewal
C1000073F1
Reconstruct Clifton footpaths,handrails
CRR
3 AFF:WardAllocation
150 000
0
0
150 000
74
Renewal
C1000074F1
Riverside Rd project pathway
CRR
3 AFF:WardAllocation
95 000
0
0
95 000
62
Renewal
0
15 000
62
Renewal
0
70 000
62
Renewal
42
C1000075F1
2 sign boards Wynberg Old Village
CRR
3 AFF:WardAllocation
15 000
0
C1000076F1
Construction of green belt pathway
CRR
3 AFF:WardAllocation
70 000
0
C1000080F1
Construction of Sidewalks in Ward 42
CRR
3 AFF:WardAllocation
150 000
0
0
150 000
0
0
1 000 000
Renewal
Renewal
C1000081F1
Traffic Calming City Wide
EFF
1 EFF
1 000 000
C1000082F1
Traffic Calming City Wide
EFF
1 EFF
0
1 000 000
0
1 000 000
C1000083F1
Traffic Calming City Wide
EFF
1 EFF
C1000084F1
Palisade fence next to old Dutch Ref Chu
CRR
C1000085F1
Gate at corner of South and East Str
C1000086F1
C1001000F1
Renewal
0
0
1 000 000
1 000 000
3 AFF:WardAllocation
50 000
0
0
50 000
84
Renewal
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
84
Renewal
Palisade fencing Lwandle Taxi Rank
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
86
Renewal
Cleveland Street Signage at Closure
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
2
Renewal
C1001002F1
Traffic Calming Subcouncil 4
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
Multi
Renewal
C1001003F1
Construct Sidewalks Subcouncil 4
CRR
3 AFF:WardAllocation
85 000
0
0
85 000
Multi
Renewal
C1001004F1
Traffic Calming Measures ward 5
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
5
Renewal
C1001005F1
Upgrade Footways/Kerbs Ward 27
CRR
3 AFF:WardAllocation
70 000
0
0
70 000
27
Renewal
0
0
112 000
1
Renewal
C1001006F1
Upgrade Parking Monte Vista Primary
CRR
3 AFF:WardAllocation
112 000
C1001007F1
Traffic Calming la Provence Welgelegen
CRR
3 AFF:WardAllocation
56 000
0
0
56 000
1
Renewal
C1001011F1
Upgrade security mesh fencng ElsiesKraal
CRR
3 AFF:WardAllocation
339 000
0
0
339 000
26
Renewal
C1001012F1
Resurfac/Reconstruct of Footways ward 27
CRR
3 AFF:WardAllocation
70 000
0
0
70 000
27
Renewal
C1001013F1
Bishop Lavis - Continuation of pavements
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
30
Renewal
C1001014F1
Traffic Calming : Ward 30
CRR
3 AFF:WardAllocation
150 000
0
0
150 000
30
Renewal
Transport , Roads & Stormwater
43
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1001015F1
Repainting of Street Names-Ward 3
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
3
Renewal
C1001016F1
Tarring of parking area in Montana
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
31
Renewal
0
0
100 000
50
Renewal
0
0
110 000
3
Renewal
C1001017F1
Re-tarring of Freedom Square, Bonteheuwe
CRR
3 AFF:WardAllocation
100 000
C1001018F1
Construct footpath with road furniture
CRR
3 AFF:WardAllocation
110 000
C1010300F1
Traffic calming measure in ward 95
CRR
3 AFF:WardAllocation
C1010301F1
Inform Settlmnts:Tracks&Drainage:IncrUpG
EFF
C1010302F1
Inform Settlmnts:Tracks&Drainage:IncrUpG
EFF
C1010303F1
Inform Settlmnts:Tracks&Drainage:IncrUpG
EFF
1 EFF
C1010304F1
IM:Rehabilitation Coastal Structures:EFF
EFF
1 EFF
C1010306F1
IM:Rehabilitation Coastal Structures:EFF
EFF
1 EFF
0
C1010308F1
IM:Rehabilitation Coastal Structures:EFF
EFF
1 EFF
C1010309F1
CSRM General Stormwater projects
EFF
1 EFF
C1010310F1
CSRM General Stormwater projects
EFF
1 EFF
180 000
0
0
180 000
95
New
1 EFF
1 400 000
0
0
1 400 000
Multi
New
1 EFF
0
2 000 000
0
2 000 000
Multi
New
0
0
2 000 000
2 000 000
Multi
New
4 929 146
0
0
4 929 146
Multi
Renewal
2 500 000
0
2 500 000
Multi
Renewal
0
0
20 000 000
20 000 000
Multi
Renewal
7 000 000
0
0
7 000 000
Multi
New
0
5 000 000
0
5 000 000
Multi
New
5 000 000
5 000 000
Multi
New
0
7 000 000
Multi
Renewal
C1010312F1
CSRM General Stormwater projects
EFF
1 EFF
0
0
C1010314F1
IM: Construct Road Structures
EFF
1 EFF
7 000 000
0
C1010316F1
IM: Construct Road Structures
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
C1010319F1
IM: Construct Road Structures
EFF
1 EFF
0
0
5 000 000
5 000 000
Multi
Renewal
C1010320F1
IRT:PropertyAcquisition:PTIF
CGD
4 NG DOT PTI&SG
50 000 000
85 000 000
49 700 000
184 700 000
Multi
New
C1010321F1
Acquisition of Vehicles: Additional
EFF
1 EFF
1 500 000
0
0
1 500 000
Corp Inf
New
C1010322F1
Acquisition of Vehicles: Additional
EFF
1 EFF
0
500 000
0
500 000
Corp Inf
New
C1010324F1
Acquisition of Vehicles: Additional
EFF
1 EFF
0
0
150 000
150 000
Corp Inf
New
C1010325F1
IM: Construct Footway and Verges
EFF
1 EFF
600 000
0
0
600 000
Multi
Renewal
C1010325F2
IM: Construct Footway and Verges
CGD
4 MIG
5 000 000
0
0
5 000 000
Multi
Renewal
C1010326F1
Upgr: Gravel St's: Mission Grounds, SLP
EFF
1 EFF
1 000 000
0
0
1 000 000
100
New
202 500 000
170 000 000
150 000 000
522 500 000
Multi
New
0
500 000
Multi
Renewal
C1010327F1
IRT:WestCoastCorridor:PTIF
CGD
4 NG DOT PTI&SG
C1010328F1
IM: Construct Footway and Verges
EFF
1 EFF
0
500 000
C1010328F2
IM: Construct Footway and Verges
CGD
4 MIG
0
15 000 000
0
15 000 000
Multi
Renewal
0
1 000 000
1 000 000
Multi
Renewal
10 000 000
10 000 000
Multi
Renewal
C1010329F1
IM: Construct Footway and Verges
EFF
1 EFF
0
C1010329F2
IM: Construct Footway and Verges
CGD
4 MIG
0
0
C1010330F1
Upgr: Gravel St's: Mission Grounds, SLP
EFF
1 EFF
0
1 000 000
0
1 000 000
100
New
C1010333F1
Upgr: Gravel St's: Mission Grounds, SLP
EFF
1 EFF
0
0
1 500 000
1 500 000
100
New
Transport , Roads & Stormwater
44
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
C1010335F1
SW: Coastal Water Quality Control Struct
EFF
1 EFF
C1010337F2
IRT:West Coast Corridor:CRR
CRR
3 CRR: BRT System
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
2 738 600
0
0
2 738 600
Multi
New
115 000 000
10 000 000
0
125 000 000
Multi
New
1 000 000
0
1 000 000
Multi
New
0
0
800 000
Corp Inf
Renewal
C1010338F1
SW: Coastal Water Quality Control Struct
EFF
1 EFF
0
C1010339F1
OPS Small Plant and Equipment
EFF
1 EFF
800 000
C1010340F1
SW: Coastal Water Quality Control Struct
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
New
C1010342F1
OPS Small Plant and Equipment
EFF
1 EFF
0
500 000
0
500 000
Corp Inf
Renewal
C1010343F1
OPS Small Plant and Equipment
EFF
1 EFF
0
0
1 000 000
1 000 000
Corp Inf
Renewal
C1010345F1
OPS Upgrading of depot facilities
EFF
1 EFF
0
0
500 000
500 000
Multi
Renewal
C1010346F1
Rehabilitation - Minor Roads
EFF
1 EFF
0
3 000 000
0
3 000 000
Multi
Renewal
C1010347F1
Rehabilitation - Minor Roads
EFF
1 EFF
0
0
3 000 000
3 000 000
Multi
Renewal
C1010348F1
Unmade Roads: Residential
EFF
1 EFF
1 600 000
0
0
1 600 000
Multi
New
C1010349F2
Sunbird Park - Design&construct Rds&sw
EFF
1 EFF
1 000 000
0
0
1 000 000
19
New
C1010350F1
IRT:InnerCityService:PTIF
CGD
4 NG DOT PTI&SG
80 000 000
0
0
80 000 000
Multi
New
0
3 000 000
Multi
New
3 000 000
3 000 000
Multi
New
C1010351F1
Unmade Roads: Residential
EFF
1 EFF
0
3 000 000
C1010352F1
Unmade Roads: Residential
EFF
1 EFF
0
0
C1010353F1
IM: Reconstruct Roads Metro
EFF
1 EFF
46 463 780
0
0
47 463 780
Multi
Renewal
C1010355F1
InfSettlements:Trcks & Drng: Incr Upg
CGD
4 MIG
5 000 000
0
0
5 000 000
Multi
New
C1010356F1
InfSettlements:Trcks & Drng: Incr Upg
CGD
4 MIG
0
10 000 000
0
10 000 000
Multi
New
C1010358F1
InfSettlements:Trcks & Drng: Incr Upg
CGD
4 MIG
0
0
10 000 000
10 000 000
Multi
New
C1010363F1
Prop. Acquis. - Hardship
EFF
1 EFF
9 591 356
0
0
9 591 356
Multi
New
C1010364F1
IM:Rehabilitation: Metro Roads (CMTF)
CGD
4 CMTF PG:WC
DOT&PW
10 000 000
0
0
10 000 000
Multi
Renewal
C1010365F1
IM:Rehabilitation: Metro Roads (CMTF)
CGD
4 CMTF PG:WC
DOT&PW
0
10 000 000
0
10 000 000
Multi
Renewal
C1010366F1
IM:Rehabilitation: Metro Roads (CMTF)
CGD
4 CMTF PG:WC
DOT&PW
0
0
10 000 000
10 000 000
Multi
Renewal
C1010368F1
Prop. Acquis. - Hardship
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
0
2 000 000
2 000 000
Multi
New
0
0
4 700 000
Multi
Renewal
C1010372F1
Prop. Acquis. - Hardship
EFF
1 EFF
0
C1010376F1
IM:Project Vukuhmbe Concrete Roads
EFF
1 EFF
4 700 000
C1010390F2
Furniture, Fittings Tools & Equipment
EFF
1 EFF
800 000
0
0
800 000
Corp Inf
Renewal
C1010391F2
Furniture, Fittings Tools & Equipment
EFF
1 EFF
0
500 000
0
500 000
Corp Inf
Renewal
C1010392F1
IM:Project Vukuhmbe Concrete Roads
EFF
1 EFF
0
4 000 000
0
4 000 000
Multi
Renewal
C1010393F2
Furniture, Fittings Tools & Equipment
EFF
1 EFF
0
0
500 000
500 000
Corp Inf
Renewal
Transport , Roads & Stormwater
45
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
0
5 000 000
4 000 000
0
14 000 000
C1010395F1
IM:Project Vukuhmbe Concrete Roads
EFF
1 EFF
0
C1010401F1
Bulk Roads & Stormwater for Housing Proj
CGD
4 MIG
Total Project
Cost
Ward
New/Renewal
5 000 000
Multi
Renewal
0
4 000 000
Multi
New
0
14 000 000
Multi
New
0
20 000 000
20 000 000
Multi
New
C1010402F1
Bulk Roads & Stormwater for Housing Proj
CGD
4 MIG
0
C1010403F1
Bulk Roads & Stormwater for Housing Proj
CGD
4 MIG
0
C1010404F1
Roads & Stormwater Rehabilitation
CGD
4 MIG
5 000 000
0
0
5 000 000
Multi
Renewal
C1010405F1
Roads & Stormwater Rehabilitation
CGD
4 MIG
0
19 000 000
0
19 000 000
Multi
Renewal
C1010406F1
Roads & Stormwater Rehabilitation
CGD
4 MIG
0
0
10 000 000
10 000 000
Multi
Renewal
C1010410F1
IM: Reconstruct Roads Metro
EFF
1 EFF
0
68 529 946
0
69 529 946
Multi
Renewal
C1010411F1
IM: Reconstruct Roads Metro
EFF
1 EFF
0
0
44 769 296
45 769 296
Multi
Renewal
C1010413F1
Acquisition of computer hardware:Roads &
EFF
1 EFF
0
400 000
0
400 000
Corp Inf
New
C1010414F1
Acquisition of computer hardware:Roads &
EFF
1 EFF
0
0
400 000
400 000
Corp Inf
New
C1010415F2
WC:Klipfontein PT NMT Scheme:EFF
CGD
4 NG DOT PTI&SG
13 788 723
0
0
13 788 723
Multi
New
C1010416F2
WC:Klipfontein PT NMT Scheme:EFF
CGD
4 NG DOT PTI&SG
0
10 000 000
0
10 000 000
Multi
New
Multi
Renewal
C1010417F1
Soetrivier Upgrading
CRR
3 BICL SWater: Hel
1 500 000
3 000 000
0
4 500 000
C1010418F1
Main Roads: Northern Corridor
CRR
3 BICL T&Roads:Oos
5 000 000
0
0
5 000 000
Multi
Renewal
C1010423F1
Witsands - Bulk Roads & S/W
CGD
4 MIG
3 500 000
0
0
3 500 000
32
Renewal
C1010424F1
Traffic calming measure in ward 96
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
96
New
C1010425F1
Traffic calming measure in ward 98
CRR
3 AFF:WardAllocation
150 000
0
0
150 000
98
New
C1010426F1
Construction of Side Walks
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
90
Renewal
C1010427F1
Traffic calming within M Plain ward 79
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
79
Renewal
C1010428F1
Traffic calming within M Plain ward 76
CRR
3 AFF:WardAllocation
75 000
0
0
75 000
76
Renewal
C1010429F1
Traffic calming within M Plain ward 81
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
81
Renewal
C1010430F1
Traffic calming within MPlain ward 75
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
75
Renewal
C1010431F1
Traffic calming within M Plain ward 43
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
43
Renewal
0
0
30 000
3
New
C1020000F1
Paving Edward Street
CRR
3 AFF:WardAllocation
30 000
C1020001F1
Off-Street Parking Nederburg Rd Welgemoe
CRR
3 AFF:WardAllocation
80 000
0
0
80 000
70
New
C1020002F1
Taxi Lay bays in Van Riebeeckshof Rd
CRR
3 AFF:WardAllocation
30 000
0
0
30 000
70
New
0
0
30 000
70
New
C1020003F1
Parking Boschendal Street
CRR
3 AFF:WardAllocation
30 000
C1020004F1
Traffic Calming:SC 2 : Various Roads
CRR
3 AFF:WardAllocation
260 000
0
0
260 000
Multi
New
C1020005F1
Fisantekraal: Dulah Omar Drive: Tarring
CRR
3 AFF:WardAllocation
80 000
0
0
80 000
105
Renewal
C1020006F1
Ward 21: Construction of Foot Paths
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
21
Renewal
Transport , Roads & Stormwater
46
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1020007F1
Sonstraal Heights: Provision of Sidewal
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
103
Renewal
C1040001F1
Sidewalks within Ward 14
CRR
3 AFF:WardAllocation
150 000
0
0
150 000
14
Renewal
0
0
100 000
17
Renewal
C1040002F1
Sidewalks within Ward 17
CRR
3 AFF:WardAllocation
100 000
C1040003F1
Sidewalks within Ward 11
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
11
Renewal
C1040004F1
Traffic Calming measures within ward 11
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
11
Renewal
1 346 862 336
939 778 546
1 012 525 588
Total for Roads and Stormwater
Transport
C0500658F3
N2 Gateway:TR&S Services:CMTF
CGD
4 CMTF PG:WC
DOT&PW
1 062 232
0
0
21 462 232
Multi
New
C0501010F1
Somerset West PTI
CGD
4 CMTF PG:WC
DOT&PW
0
3 500 000
0
3 500 000
84
New
C0501012F1
Station Deck Long Distance
CGD
4 CMTF PG:WC
DOT&PW
500 000
1 000 000
1 000 000
4 108 128
77
New
C0501035F1
Provision of Bus/Taxi shelters
CGD
4 CMTF PG:WC
DOT&PW
0
500 000
0
500 000
Multi
New
C0501045F1
Parking Development:City Wide
CRR
3 PRK AREAS DEV
FUND
3 700 000
0
0
5 786 601
Multi
New
C0580007F1
General PTI Improvements
CGD
4 CMTF PG:WC
DOT&PW
6 600 000
0
0
15 239 140
49
Renewal
C0601138F1
ATC: System Upgrades (SCOOT)
EFF
1 EFF
1 000 000
1 000 000
1 000 000
5 583 148
Multi
Renewal
C0641752F2
Lentegeur & Mandalay Station PTI's:Dsg
CGD
4 NT NDPG
2 700 000
18 000 000
15 000 000
36 000 000
Multi
Renewal
C0642313F1
Claremont CBD:Taxi Facilities
CGD
4 CMTF PG:WC
DOT&PW
1 000 000
0
0
8 070 871
59
New
C0642322F1
Khayelitsha CBD PTI (CMIP)
CGD
4 MIG
C0700007F2
WC:Traffic Management Centre:PTIF
CGD
C0700007F3
WC:Traffic Management Centre:PGWC
C0700083F1
1 500 000
1 500 000
0
6 203 796
94
Renewal
4 NG DOT PTI&SG
35 000 000
0
0
60 000 000
Multi
New
CGD
4 CMTF PG:WC
DOT&PW
19 900 000
0
0
20 900 000
Multi
New
Klipfontein Rd CCTV Cam
CGD
4 CMTF PG:WC
DOT&PW
2 952 920
0
0
17 952 921
Multi
New
C0701059F2
Mitchell's Plain Station TI
CGD
4 NT NDPG
22 581 670
15 000 000
15 000 000
78 714 063
78
Renewal
C0800193F1
WC:Rail based Park&Ride Facilties:PTIF
CGD
4 NG DOT PTI&SG
10 000 000
18 500 000
0
29 500 000
Multi
Renewal
C0800193F2
WC:Rail based Park&Ride Facilties:EFF
EFF
1 EFF
500 000
0
0
600 000
Multi
New
C0800193F3
WC:Rail based Park&Ride Facilties:PGWC
CGD
4 CMTF PG:WC
DOT&PW
7 000 000
6 000 000
0
13 000 000
Multi
Renewal
C0810506F1
WC:Intelligent Transport Systems:PTIF
CGD
4 NG DOT PTI&SG
11 075 200
7 069 109
0
24 000 001
Multi
New
Transport , Roads & Stormwater
47
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0810506F3
WC:Intelligent Transport Systems:PGWC
CGD
4 CMTF PG:WC
DOT&PW
9 000 000
10 000 000
0
19 000 000
Multi
New
C0810512F1
WC:Informal Prking for 3000 Veh:PTIF
CGD
4 NG DOT PTI&SG
1 600 000
0
0
2 100 000
Multi
New
C0810512F3
WC:Informal Prking for 3000 Veh:PGWC
CGD
4 CMTF PG:WC
DOT&PW
450 000
0
0
450 000
Multi
New
C0810518F1
WC:Long Distance Coach Terminals:PTIF
CGD
4 NG DOT PTI&SG
2 000 000
3 000 000
0
5 000 000
Multi
New
C0810518F2
WC:Long Distance Coach Terminals:EFF
EFF
1 EFF
200 000
0
0
200 000
Multi
New
C0810518F3
WC:Long Distance Coach Terminals:PGWC
CGD
4 CMTF PG:WC
DOT&PW
4 000 000
8 000 000
0
12 000 000
Multi
New
C0900410F1
WC:IntegratedFareManagementSystem:PTIF
CGD
4 NG DOT PTI&SG
5 000 000
5 000 000
0
10 000 000
Multi
New
C0900489F1
IRT:IntegratedFareManagement System:PTIF
CGD
4 NG DOT PTI&SG
2 000 000
0
0
2 000 000
Multi
New
C0900498F1
IRT:VehicleAcquisition:PTIF
CGD
4 NG DOT PTI&SG
100 000 000
50 000 000
50 000 000
200 000 000
Multi
New
C0900498F2
IRT:VehicleAcquisition:CRR
CRR
3 CRR: BRT System
25 000 000
0
0
25 000 000
Multi
New
Multi
New
C0900501F1
IRT:AirportService:PTIF
CGD
4 NG DOT PTI&SG
1 000 000
0
0
1 000 000
C0910506F1
Public transport & Related Infra Improv
CGD
4 PRIVATE SECTOR
FIN
1 700 000
0
0
1 700 000
Corp Inf
Renewal
C1010524F1
Parking Development : City Wide
CRR
3 PRK AREAS DEV
FUND
1 000 000
0
0
1 000 000
Multi
New
C1010525F1
Parking Development : City Wide
CRR
3 PRK AREAS DEV
FUND
0
258 723
0
258 723
Multi
New
C1010527F1
Transport Active Network Systems
EFF
1 EFF
1 000 000
0
0
1 000 000
Multi
New
C1010528F1
Transport Active Network Systems
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
C1010529F1
Transport Active Network Systems
EFF
1 EFF
0
0
500 000
500 000
Multi
New
C1010530F1
Traffic Signal and system upgrade
EFF
1 EFF
3 500 000
0
0
3 500 000
Multi
New
C1010531F1
Traffic Signal and system upgrade
EFF
1 EFF
0
1 500 000
0
1 500 000
Multi
New
C1010532F1
Traffic Signal and system upgrade
EFF
1 EFF
0
0
1 500 000
1 500 000
Multi
New
C1010533F1
Traffic Signals Dev (Recoverable Works)
CGD
4 PRIVATE SECTOR
FIN
1 500 000
0
0
1 500 000
Multi
New
C1010534F1
Traffic Signals Dev (Recoverable Works)
CGD
4 PRIVATE SECTOR
FIN
0
1 500 000
0
1 500 000
Multi
New
C1010535F1
Traffic Signals Dev (Recoverable Works)
CGD
4 PRIVATE SECTOR
FIN
0
0
1 500 000
1 500 000
Multi
New
C1010536F1
General PTI Improvements
CGD
4 CMTF PG:WC
DOT&PW
3 000 000
0
0
3 000 000
Multi
Renewal
Transport , Roads & Stormwater
48
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1010537F1
General PTI Improvements
CGD
4 CMTF PG:WC
DOT&PW
0
1 000 000
0
1 000 000
Multi
Renewal
C1010538F1
General PTI Improvements
CGD
4 CMTF PG:WC
DOT&PW
0
0
1 000 000
1 000 000
Multi
Renewal
C1010539F1
TR&S: Acquisition of computer hardware
EFF
1 EFF
400 000
0
0
400 000
Multi
Renewal
C1010540F1
TR&S: Acquisition of computer hardware
EFF
1 EFF
0
100 000
0
100 000
Multi
Renewal
C1010541F1
TR&S: Acquisition of computer hardware
EFF
1 EFF
0
0
500 000
500 000
Multi
Renewal
C1010542F1
IRT:AirportService:PTIF
CGD
4 NG DOT PTI&SG
11 500 000
0
0
11 500 000
Multi
New
C1010545F1
Public Transport Facilities: Sign (CMTF)
CGD
4 CMTF PG:WC
DOT&PW
150 000
0
0
150 000
Multi
New
C1010546F1
Public Transport Facilities: Sign (CMTF)
CGD
4 CMTF PG:WC
DOT&PW
0
500 000
0
500 000
Multi
New
C1010547F1
Public Transport Facilities: Sign (CMTF)
CGD
4 CMTF PG:WC
DOT&PW
0
0
500 000
500 000
Multi
New
C1010548F1
Bus/Taxi Embyments: General Prvsn (CMTF)
CGD
4 CMTF PG:WC
DOT&PW
500 000
0
0
500 000
Multi
Renewal
C1010549F1
Bus/Taxi Embyments: General Prvsn (CMTF)
CGD
4 CMTF PG:WC
DOT&PW
0
500 000
0
500 000
Multi
Renewal
C1010550F1
Bus/Taxi Embyments: General Prvsn (CMTF)
CGD
4 CMTF PG:WC
DOT&PW
0
0
500 000
500 000
Multi
Renewal
C1010551F1
Traffic Safety Bureau - Projects
CGD
4 CMTF OTHER
2 000 000
0
0
2 000 000
Multi
Renewal
C1010552F1
Traffic Safety Bureau - Projects
CGD
4 CMTF OTHER
0
2 000 000
0
2 000 000
Multi
Renewal
C1010553F1
Traffic Safety Bureau - Projects
CGD
4 CMTF OTHER
0
0
2 000 000
2 000 000
Multi
Renewal
C1010554F1
Transport Systems Management Projects
EFF
1 EFF
1 200 000
0
0
1 200 000
Multi
New
C1010555F1
Transport Systems Management Projects
EFF
1 EFF
0
1 500 000
0
1 500 000
Multi
New
C1010556F1
Transport Systems Management Projects
EFF
1 EFF
0
0
1 500 000
1 500 000
Multi
New
C1010557F1
Transport Systems Management Projects
CGD
4 CMTF PG:WC
DOT&PW
0
1 000 000
0
1 000 000
Multi
New
C1010558F1
Transport Systems Management Projects
CGD
4 CMTF PG:WC
DOT&PW
0
0
1 500 000
1 500 000
Multi
New
C1010566F1
WC:Intelligent Transport Systems:EFF
EFF
1 EFF
3 500 000
0
0
3 500 000
Multi
New
C1010569F1
Support Services: Photocopiers
EFF
1 EFF
300 000
0
0
300 000
Corp Inf
New
C1010570F1
Support Services: Photocopiers
EFF
1 EFF
0
150 000
0
150 000
Corp Inf
New
C1010571F1
Support Services: Photocopiers
EFF
1 EFF
0
0
300 000
300 000
Corp Inf
New
C1010572F1
Furn, Fittings, Tools & Equip -Transport
REVENUE
2 REVENUE
200 000
0
0
200 000
Corp Inf
New
Transport , Roads & Stormwater
49
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
C1010573F1
Furn, Fittings, Tools & Equip -Transport
REVENUE
2 REVENUE
C1010574F1
Furn, Fittings, Tools & Equip -Transport
REVENUE
2 REVENUE
Proposed Provision
2009/2010
0
Proposed Provision Proposed Provision
2010/2011
2011/2012
200 000
0
Total Project
Cost
200 000
Ward
Corp Inf
New/Renewal
New
0
0
200 000
200 000
Corp Inf
New
0
0
400 000
Corp Inf
New
200 000
0
200 000
Corp Inf
New
C1010575F1
Furn, Fittings, Tools & Equip -Transport
EFF
1 EFF
400 000
C1010576F1
Furn, Fittings, Tools & Equip -Transport
EFF
1 EFF
0
C1010577F1
Furn, Fittings, Tools & Equip -Transport
EFF
1 EFF
C1010579F1
IRT: Traffic Management Centre: CRR
CRR
C1010581F1
IRT:Public Trsprt&Bus Upgr on Corr:PTIF
C1010582F1
C1010584F1
0
0
150 000
150 000
Corp Inf
New
3 CRR: BRT System
35 000 000
10 000 000
0
45 000 000
Multi
New
CGD
4 NG DOT PTI&SG
4 500 000
0
0
4 500 000
Multi
New
IRT:IntegratedFareManagement System:PTIF
CGD
4 NG DOT PTI&SG
18 000 000
20 000 000
0
38 000 000
Multi
New
Site C Transport Infrastructure D
CGD
4 NT NDPG
0
0
10 570 000
10 570 000
90
New
C1010585F1
Site C TPI
CGD
4 NT NDPG
0
0
10 000 000
10 000 000
90
New
C1010586F1
Bicycle & Peds Facilities:PGWC
CGD
4 CMTF PG:WC
DOT&PW
8 500 000
0
0
8 500 000
Multi
New
C1010587F1
Bicycle & Peds Facilities:PGWC
CGD
4 CMTF PG:WC
DOT&PW
0
8 000 000
0
8 000 000
Multi
New
C1010588F1
Bicycle & Peds Facilities:PGWC
CGD
4 CMTF PG:WC
DOT&PW
0
0
3 000 000
3 000 000
Multi
New
C1010590F1
Refurbish bus shelters & PT Ward 5
CRR
3 AFF:WardAllocation
40 000
0
0
40 000
5
Renewal
375 212 022
197 477 832
117 220 000
1 722 074 358
1 137 256 378
1 129 745 588
20 000
0
0
20 000
Corp Inf
Renewal
20 000
0
0
Total for Transport
Total for Transport , Roads & Stormwater
Finance Services
Finance Management - FS
C1011013F1
Furniture & Equipment
REVENUE
2 REVENUE
Total for Finance Management - FS
Financial Support
C0911202F1
Storage System
EFF
1 EFF
40 000
0
0
40 000
Corp Inf
New
C0911203F1
Specialised Computer Equipment
EFF
1 EFF
20 000
0
0
20 000
Corp Inf
Renewal
C1011201F1
Specialised Computer Equipment
EFF
1 EFF
0
32 000
0
32 000
Corp Inf
Renewal
C1011202F1
Specialised Computer Equipment
EFF
1 EFF
0
0
268 000
268 000
Corp Inf
Renewal
C1011204F1
Furniture & Equipment
REVENUE
2 REVENUE
65 000
0
0
65 000
Corp Inf
Renewal
Finance Services
50
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
C1011205F1
Computer Equipment
GAMAP
Fund Source
REVENUE
Fund Source
description
Proposed Provision
2009/2010
2 REVENUE
Total for Financial Support
Proposed Provision Proposed Provision
2010/2011
2011/2012
40 000
0
0
165 000
32 000
268 000
1 000 000
0
0
1 000 000
0
0
Total Project
Cost
Ward
New/Renewal
40 000
Corp Inf
Renewal
1 000 000
Corp Inf
New
Budgets
C1011302F1
MTREF Model
CGD
4 NT BUDGET
REFORM
Total for Budgets
Revenue
C0994034F1
New Cash (MVR) Office - Tableview
EFF
1 EFF
1 200 000
1 300 000
1 000 000
4 500 000
4
New
C1011406F1
Furniture, Fittings and Tools
REVENUE
2 REVENUE
1 152 730
0
0
2 487 170
Corp Inf
New
C1011410F1
Security at Cash (MVR) Offices
EFF
1 EFF
250 000
0
0
250 000
Corp Inf
New
0
300 000
Corp Inf
New
C1011411F1
Security at Cash (MVR) Offices
EFF
1 EFF
0
300 000
C1011412F1
Security at Cash (MVR) Offices
EFF
1 EFF
0
0
300 000
300 000
Corp Inf
New
C1011413F1
Replacement of vehicles
EFF
1 EFF
1 000 000
0
0
1 000 000
Corp Inf
New
1 000 000
0
1 000 000
Corp Inf
New
0
1 000 000
1 000 000
Corp Inf
New
C1011414F1
Replacement of vehicles
EFF
1 EFF
0
C1011415F1
Replacement of vehicles
EFF
1 EFF
0
C1011416F1
Replacement Furniture
EFF
1 EFF
120 000
0
0
120 000
Corp Inf
New
C1011417F1
Replacement Furniture
EFF
1 EFF
0
150 000
0
150 000
Corp Inf
New
C1011418F1
Replacement Furniture
EFF
1 EFF
0
0
250 000
250 000
Corp Inf
New
C1011419F1
Office Furniture - new
EFF
1 EFF
220 000
0
0
220 000
Corp Inf
New
C1011420F1
Office Furniture - new
EFF
1 EFF
0
250 000
0
250 000
Corp Inf
New
C1011421F1
Office Furniture - new
EFF
1 EFF
0
0
100 000
100 000
Corp Inf
New
C1011423F1
Furniture, Fittings and Tools
REVENUE
2 REVENUE
0
1 210 370
0
1 210 370
Corp Inf
New
C1011424F1
Furniture, Fittings and Tools
REVENUE
2 REVENUE
0
0
1 270 890
1 270 890
Corp Inf
New
3 942 730
4 210 370
3 920 890
10 605 800
0
0
14 932 011
53
New
50 000
0
0
50 000
Corp Inf
Renewal
Corp Inf
Renewal
Total for Revenue
Supply Chain Management
C0811504F2
Buliding new Warehouse
EFF
1 EFF
C1011502F1
Computer Equipment
REVENUE
2 REVENUE
C1011503F1
Warehouse Equipment
EFF
1 EFF
1 638 270
0
0
1 638 270
C1011504F1
Warehouse Equipment
EFF
1 EFF
0
1 201 200
0
1 201 200
Corp Inf
Renewal
C1011505F1
Warehouse Equipment
EFF
1 EFF
0
0
1 110 000
1 110 000
Corp Inf
Renewal
Finance Services
51
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Total for Supply Chain Management
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
12 294 070
1 201 200
1 110 000
200 000
0
0
500 000
Corp Inf
New
16 000
0
0
16 000
Corp Inf
New
0
0
5 000
5 000
Corp Inf
New
122 000
0
0
122 000
Corp Inf
Renewal
Treasury
C0911605F1
ERM Software and Programme
CGD
4 NT RESTRUCTURING
C1011600F1
Furniture and Equipment
CGD
4 NT BUDGET
REFORM
C1011603F1
Computer Equipment
EFF
1 EFF
C1011605F1
Furniture & Equipment
REVENUE
2 REVENUE:
INSURANCE
C1011606F1
Computer Equipment
EFF
1 EFF
38 000
0
0
38 000
Corp Inf
New
38 000
0
38 000
Corp Inf
New
0
60 000
60 000
Corp Inf
New
C1011607F1
Computer Equipment
EFF
1 EFF
0
C1011608F1
Computer Equipment
EFF
1 EFF
0
C1011609F1
Computer Equipment
EFF
1 EFF
40 000
0
0
40 000
Corp Inf
New
C1011610F1
Contingency Provision - Insurance
REVENUE
2 REVENUE:
INSURANCE
7 300 000
0
0
7 300 000
Corp Inf
Renewal
C1011611F1
Contingency Provision - Insurance
REVENUE
2 REVENUE:
INSURANCE
0
7 300 000
0
7 300 000
Corp Inf
Renewal
C1011612F1
Contingency Provision - Insurance
REVENUE
2 REVENUE:
INSURANCE
0
0
7 300 000
7 300 000
Corp Inf
Renewal
C1011613F1
Computer Equipment
REVENUE
2 REVENUE:
INSURANCE
75 000
0
0
75 000
Corp Inf
New
C1011614F1
Computer Equipment
REVENUE
2 REVENUE:
INSURANCE
0
70 000
0
70 000
Corp Inf
New
C1011615F1
Computer Equipment
REVENUE
2 REVENUE:
INSURANCE
0
0
75 000
75 000
Corp Inf
New
C1011617F1
Furniture and Equipment
CGD
4 NT RESTRUCTURING
100 000
0
0
100 000
Corp Inf
New
C1011618F1
IT Equipment
CGD
4 NT RESTRUCTURING
65 000
0
0
65 000
Corp Inf
New
7 956 000
7 408 000
7 440 000
2 REVENUE
220 000
0
0
220 000
Corp Inf
Renewal
0
0
397 600
Corp Inf
Renewal
Total for Treasury
Valuations
C1011704F1
Furniture & Equipment
C1011705F1
Specialised Computer Equipment
EFF
1 EFF
397 600
C1011706F1
Specialised Computer Equipment
EFF
1 EFF
0
649 000
0
649 000
Corp Inf
Renewal
C1011707F1
Specialised Computer Equipment
EFF
1 EFF
0
0
670 000
670 000
Corp Inf
Renewal
617 600
649 000
670 000
REVENUE
Total for Valuations
Finance Services
52
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
Expenditure
C0911802F1
Cheque signing machine
EFF
1 EFF
46 000
0
0
46 000
Corp Inf
Renewal
C0911803F1
Computer Equipment
EFF
1 EFF
18 000
0
0
18 000
Corp Inf
Renewal
C1011804F1
Furniture & Equipment
REVENUE
2 REVENUE
68 000
0
0
68 000
Corp Inf
Renewal
C1011805F1
Furniture & Equipment
REVENUE
2 REVENUE
20 000
0
0
20 000
Corp Inf
Renewal
0
0
22 000
Corp Inf
Renewal
C1011806F1
Photocopy Machine
EFF
1 EFF
22 000
C1011807F1
Photocopy Machine
EFF
1 EFF
0
22 500
0
22 500
Corp Inf
Renewal
C1011809F1
Computer Equipment
EFF
1 EFF
0
0
179 700
179 700
Corp Inf
Renewal
174 000
22 500
179 700
20 000
0
0
20 000
Corp Inf
Renewal
20 000
0
0
18 000
0
0
18 000
Corp Inf
Renewal
15 000
0
0
15 000
Corp Inf
Renewal
33 000
0
0
26 222 400
13 523 070
13 588 590
1 EFF
20 000
0
0
20 000
Corp Inf
Renewal
10 500
0
0
10 500
Corp Inf
New
20 000
0
20 000
Corp Inf
Renewal
Total for Expenditure
Shareholders Management Unit
C1011101F1
Furniture & Equipment
REVENUE
2 REVENUE
Total for Shareholders Management Unit
Housing Finance & Leases
C1011121F1
C1011122F1
Furniture & Equipment
Furniture & Equipment
REVENUE
EFF
2 REVENUE
1 EFF
Total for Housing Finance & Leases
Total for Finance Services
Corporate Services
Corporate Services Management
C1012011F1
IT Equipment
C1012012F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
C1012013F1
IT Equipment
EFF
1 EFF
0
C1012014F1
IT Equipment
EFF
1 EFF
0
0
20 000
20 000
Corp Inf
Renewal
C1012015F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
11 000
0
11 000
Corp Inf
New
C1012016F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
0
11 500
11 500
Corp Inf
New
30 500
31 000
31 500
EFF
Total for Corporate Services Management
Corporate Services
53
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
Corporate Services Management Support
0
0
10 000
Corp Inf
New
C1012201F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
10 000
C1012202F1
IT Equipment
REVENUE
2 REVENUE
20 000
0
0
20 000
Corp Inf
New
C1012203F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
15 000
0
15 000
Corp Inf
New
C1012204F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
0
20 000
20 000
Corp Inf
New
25 000
0
25 000
Corp Inf
New
30 000
Corp Inf
New
C1012205F1
IT Equipment
REVENUE
2 REVENUE
0
C1012206F1
IT Equipment
REVENUE
2 REVENUE
0
0
30 000
30 000
40 000
50 000
Total for Corporate Services Management Support
Legal Services
C1012302F1
Office Furniture and Equipment
EFF
1 EFF
153 000
0
0
153 000
Corp Inf
New
C1012303F1
IT Equipment
EFF
1 EFF
25 500
0
0
25 500
Corp Inf
New
51 000
0
0
51 000
Corp Inf
New
C1012304F1
IT Equipment
EFF
1 EFF
C1012305F1
IT Equipment
REVENUE
2 REVENUE
100 000
0
0
100 000
Corp Inf
New
C1012306F1
Furniture and Equipment
REVENUE
2 REVENUE
100 000
0
0
100 000
Corp Inf
New
C1012307F1
Furniture and Equipment
EFF
1 EFF
76 500
0
0
76 500
Corp Inf
New
C1012308F1
Purchase of computer infrastructure.
EFF
1 EFF
76 500
0
0
76 500
Corp Inf
New
C1012309F1
Purchase of computer infrastructure.
EFF
1 EFF
0
90 000
0
90 000
Corp Inf
New
C1012310F1
Purchase of computer infrastructure.
EFF
1 EFF
0
0
90 000
90 000
Corp Inf
New
C1012311F1
Office Furniture and Equipment
EFF
1 EFF
0
180 000
0
180 000
Corp Inf
New
C1012312F1
Office Furniture and Equipment
EFF
1 EFF
0
0
180 000
180 000
Corp Inf
New
C1012313F1
IT Equipment
EFF
1 EFF
0
30 000
0
30 000
Corp Inf
New
C1012314F1
IT Equipment
EFF
1 EFF
0
0
30 000
30 000
Corp Inf
New
60 000
0
60 000
Corp Inf
New
60 000
60 000
Corp Inf
New
C1012315F1
IT Equipment
EFF
1 EFF
0
C1012316F1
IT Equipment
EFF
1 EFF
0
0
C1012317F1
Furniture and Equipment
EFF
1 EFF
0
90 000
0
90 000
Corp Inf
New
C1012318F1
Furniture and Equipment
EFF
1 EFF
0
0
90 000
90 000
Corp Inf
New
C1012319F1
IT Equipment
REVENUE
2 REVENUE
0
105 000
0
105 000
Corp Inf
New
C1012320F1
IT Equipment
REVENUE
2 REVENUE
0
0
110 000
110 000
Corp Inf
New
C1012321F1
Furniture and Equipment
REVENUE
2 REVENUE
0
105 000
0
105 000
Corp Inf
New
C1012322F1
Furniture and Equipment
REVENUE
2 REVENUE
0
0
110 000
110 000
Corp Inf
New
C1012323F1
Municipal Court infrastructure
EFF
1 EFF
1 000 000
0
0
1 000 000
Corp Inf
Renewal
Corporate Services
54
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1012324F1
Municipal Court infrastructure
EFF
1 EFF
0
1 000 000
0
1 000 000
Corp Inf
Renewal
C1012325F1
Municipal Court infrastructure
EFF
1 EFF
0
0
1 000 000
1 000 000
Corp Inf
Renewal
1 582 500
1 660 000
1 670 000
2 000 000
2 000 000
50 557 072
Corp Inf
Renewal
Total for Legal Services
Specialised Technical Services
C0700621F1
Radio Trunking Infrastructure
EFF
1 EFF
0
C0812510F1
Expand NCC Facility -Hardekraaltjie
EFF
1 EFF
2 300 000
0
0
15 800 000
Corp Inf
Renewal
C1012501F1
FM Infrastructure
EFF
1 EFF
2 389 999
3 840 000
3 840 000
10 069 999
Corp Inf
Renewal
C1012502F1
FM Communication Systems
EFF
1 EFF
1 600 000
1 500 000
1 500 000
4 600 000
Corp Inf
Renewal
800 000
800 000
2 240 000
Corp Inf
Renewal
C1012503F1
FM Security and Access
EFF
1 EFF
640 000
C1012504F1
FM BM Equipment
EFF
1 EFF
480 000
0
0
480 000
Corp Inf
New
C1012510F1
FS Replacement Vehicles
EFF
1 EFF
3 269 430
0
0
3 269 430
Corp Inf
New
C1012511F1
FS Replacement Plant
EFF
1 EFF
2 850 000
0
0
2 850 000
Corp Inf
New
C1012512F1
FS Replacements AFF
CRR
3 ASSETS SALE:FIN
2 000 000
0
0
2 000 000
Corp Inf
New
C1012513F1
2010 Metro Police Vehicles
EFF
1 EFF
3 000 000
0
0
3 000 000
Corp Inf
New
C1012514F1
2010 Traffic Vehicles
EFF
1 EFF
3 498 000
0
0
3 498 000
Corp Inf
New
C1012515F1
2010 Traffic M/Cycles
EFF
1 EFF
2 260 000
0
0
2 260 000
Corp Inf
New
C1012516F1
FM BM Equipment
EFF
1 EFF
0
500 000
0
500 000
Corp Inf
New
C1012517F1
FM BM Equipment
EFF
1 EFF
0
0
500 000
500 000
Corp Inf
New
C1012520F1
Office Equipment
EFF
1 EFF
185 000
0
0
185 000
Corp Inf
New
0
0
130 000
Corp Inf
New
C1012521F1
Computer Equipment
EFF
1 EFF
130 000
C1012522F1
Plant & Equipment
EFF
1 EFF
100 000
0
0
100 000
Corp Inf
New
C1012523F1
Computer Equipment ex 412300
REVENUE
2 REVENUE
704 419
0
0
704 419
Corp Inf
New
C1012524F1
Office Equipment ex 421300
REVENUE
2 REVENUE
469 612
0
0
469 612
Corp Inf
New
C1012525F1
FS Replacement Vehicles
EFF
1 EFF
0
5 659 430
0
5 659 430
Corp Inf
New
C1012526F1
FS Vehicle Replacements
EFF
1 EFF
0
0
5 659 430
5 659 430
Corp Inf
New
C1012530F1
FS Replacement Plant
EFF
1 EFF
0
2 850 000
0
2 850 000
Corp Inf
New
C1012531F1
FS Replacement Plant
EFF
1 EFF
0
0
2 850 000
2 850 000
Corp Inf
New
C1012532F1
Office Equipment
EFF
1 EFF
0
185 000
0
185 000
Corp Inf
New
C1012533F1
Computer Equipment
EFF
1 EFF
0
130 000
0
130 000
Corp Inf
New
C1012534F1
Computer Equipment
EFF
1 EFF
0
0
130 000
130 000
Corp Inf
New
1 EFF
0
100 000
0
100 000
Corp Inf
New
C1012535F1
Plant & Equipment
Corporate Services
EFF
55
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Corp Inf
New/Renewal
C1012536F1
Plant & Equipment
EFF
1 EFF
0
0
C1012537F1
Computer Equipment ex 412300
REVENUE
2 REVENUE
0
739 640
0
739 640
Corp Inf
New
0
776 622
776 622
Corp Inf
New
493 093
0
493 093
Corp Inf
New
100 000
100 000
Ward
New
C1012538F1
Computer Equipment ex 412300
REVENUE
2 REVENUE
0
C1012539F1
Office Equipment ex 421300
REVENUE
2 REVENUE
0
C1012540F1
Office Equipment ex 421300
REVENUE
2 REVENUE
0
0
517 747
517 747
Corp Inf
New
C1012541F1
FS Replacements AFF
CRR
3 ASSETS SALE:FIN
0
2 000 000
0
2 000 000
Corp Inf
New
C1012542F1
FS Replacements AFF
CRR
3 ASSETS SALE:FIN
0
0
2 000 000
2 000 000
Corp Inf
New
C1012543F1
Office Equipment
EFF
1 EFF
0
0
185 000
185 000
Corp Inf
New
C1012544F1
IRP, Film Taxi Units Additional Vehicles
EFF
1 EFF
19 000 000
0
0
19 000 000
Corp Inf
New
44 876 460
20 797 163
20 858 799
Total for Specialised Technical Services
Personnel Services
C1012601F1
Replacement of Equipment
EFF
1 EFF
127 500
0
0
127 500
Corp Inf
Renewal
C1012602F1
Furniture and Equipment
EFF
1 EFF
42 500
0
0
42 500
Corp Inf
New
C1012603F1
Computer Equipment
EFF
1 EFF
127 500
0
0
127 500
Corp Inf
New
C1012604F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
100 000
0
0
100 000
Corp Inf
New
C1012605F1
IT Equipment
REVENUE
2 REVENUE
307 400
0
0
307 400
Corp Inf
New
C1012606F1
Replacement of Equipment
EFF
1 EFF
0
150 000
0
150 000
Corp Inf
Renewal
C1012607F1
Replacement of Equipment
EFF
1 EFF
0
0
150 000
150 000
Corp Inf
Renewal
C1012608F1
Furniture and Equipment
EFF
1 EFF
0
50 000
0
50 000
Corp Inf
New
0
50 000
50 000
Corp Inf
New
150 000
0
150 000
Corp Inf
New
C1012609F1
Furniture and Equipment
EFF
1 EFF
0
C1012610F1
Computer Equipment
EFF
1 EFF
0
C1012611F1
Computer Equipment
EFF
1 EFF
0
0
150 000
150 000
Corp Inf
New
C1012612F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
120 000
0
120 000
Corp Inf
New
C1012613F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
0
250 000
250 000
Corp Inf
New
C1012614F1
IT Equipment
REVENUE
2 REVENUE
0
303 000
0
303 000
Corp Inf
New
C1012615F1
IT Equipment
REVENUE
2 REVENUE
0
0
200 000
200 000
Corp Inf
New
704 900
773 000
800 000
153 000
0
0
153 000
Corp Inf
Renewal
15 000
0
0
15 000
Corp Inf
New
Total for Personnel Services
Employment Equity
C1012701F1
Computer Equipment
EFF
1 EFF
C1012702F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
Corporate Services
56
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
0
1 EFF
0
180 000
0
180 000
Corp Inf
Renewal
0
180 000
180 000
Corp Inf
Renewal
15 750
0
15 750
Corp Inf
New
IT Equipment
REVENUE
2 REVENUE
C1012704F1
Computer Equipment
EFF
0
Corp Inf
New/Renewal
21 750
C1012703F1
21 750
Ward
New
C1012705F1
Computer Equipment
EFF
1 EFF
0
C1012706F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
C1012707F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
0
16 000
16 000
Corp Inf
New
C1012708F1
IT Equipment
REVENUE
2 REVENUE
0
23 000
0
23 000
Corp Inf
New
C1012709F1
IT Equipment
REVENUE
2 REVENUE
0
0
24 000
24 000
Corp Inf
New
189 750
218 750
220 000
Total for Employment Equity
Citizen Relationship Management
C1012801F1
IT Equipment
EFF
1 EFF
80 000
0
0
80 000
Corp Inf
Renewal
C1012802F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
30 000
0
0
30 000
Corp Inf
New
C1012803F1
IT Equipment
REVENUE
2 REVENUE
45 000
0
0
45 000
Corp Inf
New
C1012804F1
IT Equipment
EFF
1 EFF
0
80 000
0
80 000
Corp Inf
Renewal
C1012805F1
IT Equipment
EFF
1 EFF
0
0
80 000
80 000
Corp Inf
Renewal
C1012806F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
35 000
0
35 000
Corp Inf
New
C1012807F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
0
40 000
40 000
Corp Inf
New
C1012808F1
IT Equipment
REVENUE
2 REVENUE
0
50 000
0
50 000
Corp Inf
New
C1012809F1
IT Equipment
REVENUE
2 REVENUE
0
0
50 000
50 000
Corp Inf
New
155 000
165 000
170 000
Total for Citizen Relationship Management
Communication
C1012901F1
Replace Photocopiers
EFF
1 EFF
0
350 000
0
350 000
Corp Inf
Renewal
C1012902F1
Furniture and Communication Equipment
EFF
1 EFF
153 000
0
0
153 000
Corp Inf
New
0
0
270 000
Corp Inf
New
0
0
180 000
Corp Inf
New
C1012903F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
270 000
C1012904F1
IT Equipment
REVENUE
2 REVENUE
180 000
C1012905F1
Replace Photocopiers
EFF
1 EFF
0
0
350 000
350 000
Corp Inf
Renewal
180 000
0
180 000
Corp Inf
New
180 000
180 000
Corp Inf
New
C1012906F1
Furniture and Communication Equipment
EFF
1 EFF
0
C1012907F1
Furniture and Communication Equipment
EFF
1 EFF
0
0
C1012908F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
100 000
0
100 000
Corp Inf
New
C1012909F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
0
100 000
100 000
Corp Inf
New
C1012910F1
IT Equipment
REVENUE
2 REVENUE
0
180 000
0
180 000
Corp Inf
New
Corporate Services
57
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
C1012911F1
IT Equipment
GAMAP
Fund Source
REVENUE
Fund Source
description
Proposed Provision
2009/2010
2 REVENUE
Total for Communication
Proposed Provision Proposed Provision
2010/2011
2011/2012
0
0
180 000
603 000
810 000
810 000
4 000 000
0
11 702 564
Total Project
Cost
Ward
New/Renewal
180 000
Corp Inf
New
0
4 000 000
Corp Inf
New
0
0
13 202 564
Corp Inf
New
150 000
0
0
150 000
Corp Inf
Renewal
50 000
0
0
50 000
Corp Inf
New
Strategic HR
C0912115F1
e-HR
EFF
1 EFF
C0912115F2
e-HR
CGD
4 NT RESTRUCTURING
C1012111F1
IT Equipment
EFF
1 EFF
C1012112F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
C1012113F1
IT Equipment
REVENUE
2 REVENUE
300 000
0
0
300 000
Corp Inf
New
3 520 000
3 850 000
42 000 000
Corp Inf
Renewal
150 000
0
150 000
Corp Inf
Renewal
C1012114F1
e-HR
EFF
1 EFF
1 040 000
C1012115F1
IT Equipment
EFF
1 EFF
0
C1012116F1
IT Equipment
EFF
1 EFF
0
0
150 000
150 000
Corp Inf
Renewal
C1012117F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
55 000
0
55 000
Corp Inf
New
C1012118F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
0
60 000
60 000
Corp Inf
New
C1012119F1
IT Equipment
REVENUE
2 REVENUE
0
315 000
0
315 000
Corp Inf
New
C1012120F1
IT Equipment
REVENUE
2 REVENUE
0
0
330 000
330 000
Corp Inf
New
17 242 564
4 040 000
4 390 000
Total for Strategic HR
Support Services - CS
C0700690F1
Record Management Storage
EFF
1 EFF
450 000
300 000
300 000
2 496 368
Corp Inf
New
C1012131F1
IT Equipment
EFF
1 EFF
60 000
0
0
60 000
Corp Inf
Renewal
C1012132F1
Furniture and Equipment
EFF
1 EFF
40 000
0
0
40 000
Corp Inf
Renewal
C1012133F1
IT Equipment
EFF
1 EFF
25 000
0
0
25 000
Corp Inf
Renewal
C1012134F1
Furniture and Equipment
EFF
1 EFF
15 000
0
0
15 000
Corp Inf
Renewal
120 000
0
0
120 000
Corp Inf
Renewal
50 000
0
0
50 000
Corp Inf
Renewal
C1012135F1
Printing Equipment
EFF
1 EFF
C1012136F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
C1012137F1
IT Equipment
REVENUE
2 REVENUE
60 000
0
0
60 000
Corp Inf
Renewal
200 000
200 000
900 000
Corp Inf
New
0
1 500 000
Corp Inf
New
C1012138F1
Fire and Security Protection
EFF
1 EFF
500 000
C1012139F1
Record Management Archiving Hardware
EFF
1 EFF
1 500 000
0
C1012140F1
IT Equipment
EFF
1 EFF
0
60 000
0
60 000
Corp Inf
Renewal
C1012141F1
IT Equipment
EFF
1 EFF
0
0
60 000
60 000
Corp Inf
Renewal
C1012142F1
Furniture and Equipment
EFF
1 EFF
0
60 000
0
60 000
Corp Inf
Renewal
Corporate Services
58
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
C1012143F1
Furniture and Equipment
EFF
1 EFF
0
0
C1012144F1
IT Equipment
EFF
1 EFF
0
Total Project
Cost
Ward
New/Renewal
60 000
60 000
Corp Inf
Renewal
30 000
0
30 000
Corp Inf
Renewal
0
80 000
80 000
Corp Inf
Renewal
30 000
0
30 000
Corp Inf
Renewal
C1012145F1
IT Equipment
EFF
1 EFF
0
C1012146F1
Furniture and Equipment
EFF
1 EFF
0
C1012147F1
Furniture and Equipment
EFF
1 EFF
0
0
50 000
50 000
Corp Inf
Renewal
C1012148F1
Printing Equipment
EFF
1 EFF
0
1 200 000
0
1 200 000
Corp Inf
Renewal
C1012149F1
Printing Equipment
EFF
1 EFF
0
0
800 000
800 000
Corp Inf
Renewal
C1012150F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
50 000
0
50 000
Corp Inf
Renewal
C1012151F1
Furniture, Fittings and Equipment
REVENUE
2 REVENUE
0
0
50 000
50 000
Corp Inf
Renewal
C1012152F1
IT Equipment
REVENUE
2 REVENUE
0
60 000
0
60 000
Corp Inf
Renewal
C1012153F1
IT Equipment
REVENUE
2 REVENUE
0
0
60 000
60 000
Corp Inf
Renewal
2 820 000
1 990 000
1 660 000
68 234 674
30 524 913
30 660 299
Total for Support Services - CS
Total for Corporate Services
Health
Health Services
C0501374F1
Westbank Clinic - Replacement
EFF
1 EFF
1 178 490
0
0
10 326 196
19
New
1 000 000
2 000 000
5 359 687
86
Renewal
2 500 000
2 000 000
17 887 262
93
New
C0601017F1
Ikhwezi Clinic extensions
EFF
1 EFF
202 567
C0601022F1
New Khayelitsha - Town II clinic
EFF
1 EFF
12 667 653
C0601022F2
New Khayelitsha - Town II clinic
CGD
4 PAWC - HEALTH
477 046
0
0
6 000 000
93
New
C0601025F1
New facility Eerste River
EFF
1 EFF
2 281 000
6 000 000
2 000 000
10 767 040
16
New
C0601661F2
Masincedane clinic - Extensions ex N2
CGD
4 MIG
792 705
0
0
1 000 000
39
New
C0601661F3
Masincedane clinic - Extensions
EFF
1 EFF
263 004
0
0
263 004
33
Renewal
C0700343F1
Kasselsvlei Clinic: Extensions
EFF
1 EFF
14 427
0
0
555 765
9
Renewal
C0700409F1
Nolungile Clinic - extensions
CGD
4 PAWC - iSLP
450 214
0
0
489 688
89
New
89
Renewal
Renewal
C0700409F2
Nolungile Clinic - extensions
EFF
1 EFF
400 000
0
0
600 000
C0700409F3
Nolungile Clinic - extensions
CGD
4 STATE_NT_URP
214 540
0
0
280 001
89
C0700410F1
Weltevreden Valley clinic - Extensions
CGD
4 PAWC - iSLP
177 622
0
0
399 840
33
New
250 000
0
0
668 949
33
Renewal
1 195 000
0
0
1 195 000
33
Renewal
C0700410F2
Weltevreden Valley clinic - Extensions
EFF
1 EFF
C0700410F3
Weltevreden Valley Clinic - Extensions
CGD
4 PAWC - HEALTH
Health
59
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0700613F2
Bloekombos Clinic:Site Works & Extension
CGD
4 PAWC - HEALTH
243 002
0
0
1 200 000
101
Renewal
C0700636F1
Adriaanse Clinic - Upgrade TB room
EFF
1 EFF
497 678
0
0
1 111 896
28
Renewal
0
0
6 611 952
55
Renewal
C0700638F1
Albow Gardens\Goodhope CHC extensions
EFF
1 EFF
515 925
C0813104F1
Upgrade of TB area Elsies River Clinic
EFF
1 EFF
200 000
0
1 000 000
1 200 000
28
Renewal
C0900001F1
Delft South - Pharmacy upgrade
EFF
1 EFF
700 000
0
0
950 000
20
Renewal
C0900001F2
Delft south - Extensions for ARV service
CGD
4 PAWC - HEALTH
581 740
0
0
700 000
20
Renewal
C0900004F1
Wallacedene Clinic - Pharmacy
EFF
1 EFF
550 000
0
0
750 000
6
Renewal
C0900004F2
Wallacedene Clinic - Pharmacy
CGD
4 PAWC - HEALTH
306 798
0
0
400 000
6
Renewal
C0913102F1
Mayenzeke Clinic -Upgrade of TB area
EFF
1 EFF
200 000
0
0
200 000
95
Renewal
C0913107F1
Equipment
EFF
1 EFF
572 255
0
0
572 255
Multi
New
C0913108F1
Equipment
EFF
1 EFF
0
550 000
0
550 000
Multi
New
C0913110F1
2010 Food Testing Equipment - Env.Health
EFF
1 EFF
90 000
0
0
90 000
Multi
New
C1013101F1
Furniture Fittings, Tools and Equipment
REVENUE
2 REVENUE
1 265 567
0
0
1 265 567
Multi
New
0
1 337 704
Multi
New
Multi
New
C1013102F1
Furniture Fittings, Tools and Equipment
REVENUE
2 REVENUE
0
1 337 704
C1013103F1
Furniture Fittings, Tools and Equipment
REVENUE
2 REVENUE
0
0
1 415 291
1 415 291
C1013104F1
Dr Ivan Toms Clinic - upgrade Pharmacy
EFF
1 EFF
0
0
200 000
200 000
18
Renewal
C1013105F1
Equipment
EFF
1 EFF
0
0
558 247
558 247
Multi
New
C1013109F1
Air Pollution control equipment
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
New
C1013110F1
Replacement Vehicles
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
New
C1013111F1
New x-ray equipment
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
New
C1013114F1
Bluedowns clinic - upgrade of security
EFF
1 EFF
0
0
200 000
200 000
18
Renewal
C1013119F1
Air Pollution control equipment
EFF
1 EFF
400 000
0
0
400 000
Multi
New
C1013120F1
Air Pollution control equipment
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
New
C1013121F1
St Vincent Clinic - Extensions
EFF
1 EFF
0
360 000
900 000
1 260 000
12
Renewal
0
448 247
0
448 247
Multi
New
C1013122F1
Replacement Vehicles
EFF
1 EFF
C1013123F1
Extension of Reception area : Parow Clin
CRR
3 AFF:WardAllocation
215 000
0
0
215 000
26
Renewal
C1013124F1
Erecting of shelter at Ravensmead Clinic
CRR
3 AFF:WardAllocation
107 000
0
0
107 000
25
Renewal
Total for Health Services
27 009 233
13 195 951
13 273 538
Total for Health
27 009 233
13 195 951
13 273 538
Health
60
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
Safety & Security
Emergency Services
C0601009F1
DisMan Centre Additions/Alterations
EFF
1 EFF
1 955 945
0
0
8 024 944
Corp Inf
Renewal
C0700713F1
Upgrade Melkbosstrand Fire Station
EFF
1 EFF
6 552 583
0
0
7 309 928
23
Renewal
C0700720F1
Upgrade Sommerset West Fire Station
EFF
1 EFF
2 271 576
0
0
2 728 683
85
Renewal
C0701024F1
Disaster Incident Command Bus
CGD
4 PRIVATE SECTOR
FIN
1 183 465
0
0
1 233 299
Multi
New
C0800206F1
Disaster Management Equipment
CGD
4 NT RESTRUCTURING
1 006 469
0
0
6 375 507
Multi
New
C0800213F1
Refurbishment of Brackenfell Fire Statio
CGD
4 NT RESTRUCTURING
2 656 454
0
0
3 300 000
102
Renewal
C0800321F1
Add/Alter: DisMan Infr Blgs & Infrastruc
CGD
4 NT RESTRUCTURING
2 806 366
0
0
3 000 000
Multi
Renewal
C0800321F3
Add/Alter: DisMan Infr Blgs & Infrastruc
CGD
4 PRIVATE SECTOR
FIN
3 553 268
0
0
3 553 268
Multi
Renewal
C0800435F1
2010: Fire & Rescue Equipment
EFF
1 EFF
7 195 267
0
0
28 527 908
Multi
New
C0814308F1
Replace Hydraulic Platform
EFF
1 EFF
6 578 947
0
0
6 578 947
Multi
Renewal
C0814310F1
Replace Rescue Diving Boat
EFF
1 EFF
470 196
0
0
470 196
Multi
Renewal
C0814311F1
Intergration of Dispatching Systems
EFF
1 EFF
228 070
0
0
228 070
77
Renewal
C0814312F1
Replacement of Simulation System
EFF
1 EFF
87 719
0
0
87 719
77
Renewal
C0814313F1
Upgrade of Call Assesment System
EFF
1 EFF
263 158
0
0
263 158
77
Renewal
C0814314F1
Replacement of LDV Reg: CL19770
EFF
1 EFF
157 895
0
0
157 895
77
Renewal
C0814315F1
Replacement of Voice Recorder
EFF
1 EFF
219 298
0
0
219 298
77
Renewal
C0814316F1
Establish New Centre and Relocate
EFF
1 EFF
3 508 772
3 464 912
0
6 973 684
1
Renewal
0
70 175
Multi
Renewal
C0814317F1
Disman Risk Mapping GIS Server
EFF
1 EFF
70 175
0
C0814318F1
Disman Server
EFF
1 EFF
35 088
0
0
35 088
Multi
Renewal
C0814319F1
GEMC System Enhancement
EFF
1 EFF
35 088
0
0
35 088
Multi
Renewal
C0814320F1
HP Design Jet Printer GIS Maps
EFF
1 EFF
78 947
0
0
78 947
Multi
Renewal
C0814321F1
Training Interactive Whiteboard
EFF
1 EFF
21 930
0
0
21 930
Multi
Renewal
C0814322F1
Dedicated E-Mail Exchange Server
EFF
1 EFF
26 316
0
0
26 316
Multi
Renewal
C0814323F1
Wireless IT Connectivity
EFF
1 EFF
438 596
0
0
4 430 155
Multi
Renewal
C0814324F1
VOIP PABX Expansion
EFF
1 EFF
175 439
0
0
175 439
Multi
Renewal
C0814325F1
Laptops for DisMan Field Officers
EFF
1 EFF
131 579
0
0
131 579
Multi
New
C0814326F1
Replacement of Furniture and Fittings
EFF
1 EFF
438 596
0
0
438 596
Multi
Renewal
Safety & Security
61
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0814327F1
Dis Man Vehicles Replacement
EFF
1 EFF
438 596
0
0
438 596
Multi
Renewal
C0814328F1
DisMan Offices Air Con Replacements
EFF
1 EFF
307 018
0
0
307 018
Multi
Renewal
0
0
52 632
Multi
New
0
0
438 596
Multi
Renewal
2 759 147
0
0
4 000 000
56
New
1 000 000
0
1 000 000
53
New
C0814329F1
Personal Digital Assistant with GPS
EFF
1 EFF
52 632
C0814330F1
Upgrade of Dis Man Facilities
EFF
1 EFF
438 596
C0914300F1
Completion of Emergency Services Headqua
CGD
4 NT RESTRUCTURING
C0914303F1
New Training Centre ( Phase 1 )
EFF
1 EFF
0
C0914304F1
Replace Engine room doors Simonstown
EFF
1 EFF
0
70 000
0
70 000
61
New
C0914305F1
Replace Engine room doors Fish Hoek
EFF
1 EFF
0
280 000
0
280 000
61
Renewal
C0914306F1
Replace Engine room doors Mitchells Plai
EFF
1 EFF
0
90 000
0
90 000
81
Renewal
C0914307F1
Replace Engine room doors Khayelitsha
EFF
1 EFF
0
210 000
0
210 000
87
Renewal
C0914308F1
Replace & Integrate PABX Equip
EFF
1 EFF
0
1 200 000
0
1 200 000
77
New
C0914309F1
Replace Radio Equipment
EFF
1 EFF
0
36 000
0
36 000
77
New
C0914310F1
Replace Sedan CA 699497
EFF
1 EFF
0
184 000
0
184 000
77
Renewal
0
90 000
77
Renewal
0
250 000
77
Renewal
C0914311F1
Upgrade of Access Control System
EFF
1 EFF
0
90 000
C0914312F1
Replace Computer Equipment
EFF
1 EFF
0
250 000
C0914313F1
Replace Screen Recording System
EFF
1 EFF
0
240 000
0
240 000
77
Renewal
C0914314F1
Specialised Fire Engines Replacement
EFF
1 EFF
536 569
6 400 000
0
6 936 569
Multi
New
C0914315F1
Replacement of Water/Foam Tankers
EFF
1 EFF
0
2 200 000
0
2 200 000
Multi
New
C0914316F1
Upgrading of Fire Stations
EFF
1 EFF
0
2 000 000
0
2 000 000
Multi
New
C0914326F2
Construction of Brackenfell Fire Station
EFF
1 EFF
3 928 497
0
0
3 928 497
102
New
C1000009F1
Furniture, Fittings, Tools & Equipment
REVENUE
2 REVENUE
89 398
0
0
89 398
Corp Inf
New
C1014309F1
Furniture Fittings Tools
REVENUE
2 REVENUE
379 425
0
0
379 425
Corp Inf
New
C1014310F1
Furniture Fittings Tool
REVENUE
2 REVENUE
100 109
0
0
100 109
Corp Inf
New
C1014312F1
Furniture, Fittings & Tools
REVENUE
2 REVENUE
126 194
0
0
126 194
77
New
0
0
60 239
Corp Inf
New
0
120 000
Corp Inf
New
C1014313F1
Furniture, Fittings, Tools & Equipment
REVENUE
2 REVENUE
60 239
C1014314F1
Furniture, Fittings, Tools & Equipment
REVENUE
2 REVENUE
120 000
0
C1014316F1
Fire Stations : Refurbishment
EFF
1 EFF
613 396
0
0
613 396
23
Renewal
0
1 500 000
1 500 000
23
Renewal
0
0
2 000 000
Corp Inf
Renewal
C1014317F1
Fire Stations : Refurbishment
EFF
1 EFF
0
C1014318F1
DisMan Centre Additions/Alterations
EFF
1 EFF
2 000 000
C1014319F1
DisMan Centre Additions/Alterations
EFF
1 EFF
0
0
1 500 000
1 500 000
Corp Inf
Renewal
C1014320F1
Major Additions: Refurbishment
EFF
1 EFF
1 759 849
0
0
1 759 849
Multi
Renewal
Safety & Security
62
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
C1014321F1
Major Additions: Refurbishment
EFF
1 EFF
0
C1014322F1
2010: Fire & Rescue Equipment
EFF
1 EFF
10 872 092
Proposed Provision Proposed Provision
2010/2011
2011/2012
0
Total Project
Cost
Ward
Multi
New/Renewal
1 000 000
1 000 000
Renewal
0
0
10 872 092
Multi
New
0
0
657 895
Multi
Renewal
Multi
Renewal
C1014323F1
Replace Fire Fighting Equipment
EFF
1 EFF
657 895
C1014324F1
Replace Fire Fighting Equipment
EFF
1 EFF
0
505 526
0
505 526
C1014325F1
Replace Fire Fighting Equipment
EFF
1 EFF
0
0
2 541 000
2 541 000
Multi
Renewal
C1014326F1
Replace Rescue/Hazmat/Tech Equipment
EFF
1 EFF
0
0
877 000
877 000
Corp Inf
Renewal
C1014327F1
Replace Communication Equipment
EFF
1 EFF
0
0
750 000
750 000
1
Renewal
C1014328F1
Replace Furniture and Fittings
EFF
1 EFF
0
200 000
0
200 000
Multi
Renewal
C1014329F1
Replace Furniture and Fittings
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
Renewal
C1014330F1
Replace Rescue Vehicles
EFF
1 EFF
0
0
850 000
850 000
Multi
Renewal
C1014331F1
Mechanical Equipment
EFF
1 EFF
0
0
244 000
244 000
Multi
Renewal
C1014332F1
Upgrade Security of Fire Stations
EFF
1 EFF
0
500 000
0
500 000
Multi
Renewal
C1014333F1
Upgrade Security of Fire Stations
EFF
1 EFF
0
0
250 000
250 000
Multi
Renewal
150 000
150 000
Multi
Renewal
C1014334F1
Replace Rescue Diving Boat
EFF
1 EFF
0
0
C1014335F1
Disman Risk Mapping GIS Server
EFF
1 EFF
0
0
35 000
35 000
Multi
Renewal
C1014336F1
Disman Server
EFF
1 EFF
0
0
100 000
100 000
Multi
Renewal
C1014337F1
GEMC System Enhancement
EFF
1 EFF
0
0
500 000
500 000
Multi
Renewal
C1014338F1
HP Design Jet Printer GIS Maps
EFF
1 EFF
0
0
100 000
100 000
Multi
Renewal
C1014339F1
Training Interactive Whiteboard
EFF
1 EFF
0
0
50 000
50 000
Multi
Renewal
C1014340F1
Dedicated E-Mail Exchange Server
EFF
1 EFF
0
0
250 000
250 000
Multi
Renewal
C1014341F1
Wireless IT Connectivity
EFF
1 EFF
0
0
300 000
300 000
Multi
Renewal
C1014342F1
VOIP PABX Expansion
EFF
1 EFF
0
0
500 000
500 000
Multi
Renewal
C1014343F1
Laptops for DisMan Field Officers
EFF
1 EFF
0
0
200 000
200 000
Multi
New
C1014344F1
Replacement of Furniture and Fittings
EFF
1 EFF
0
0
200 000
200 000
Multi
Renewal
0
250 000
250 000
Multi
Renewal
Renewal
C1014345F1
Dis Man Vehicles Replacement
EFF
1 EFF
0
C1014346F1
DisMan Offices Air Con Replacements
EFF
1 EFF
0
0
100 000
100 000
Multi
C1014347F1
Personal Digital Assistant with GPS
EFF
1 EFF
0
0
100 000
100 000
Multi
New
0
181 438
181 438
Multi
Renewal
77
New
Multi
New
C1014348F1
Upgrade of Dis Man Facilities
EFF
1 EFF
0
C1014349F1
Replace Radio Equipment
EFF
1 EFF
0
0
296 000
296 000
C1014350F1
Upgrading of Fire Stations
EFF
1 EFF
0
0
1 500 000
1 500 000
67 386 854
18 920 438
15 324 438
Total for Emergency Services
Safety & Security
63
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
Metro Police
C0700551F1
CCTV-Control Room Security Upgrade
EFF
1 EFF
1 000 000
0
0
5 258 134
Multi
New
C0914402F1
Equipment
EFF
1 EFF
50 000
0
0
50 000
Multi
New
C0914403F1
Horse stable equipment
EFF
1 EFF
70 000
0
0
70 000
77
New
C0914404F1
Horses additional
EFF
1 EFF
56 000
0
0
56 000
Multi
New
0
0
36 000
77
New
C0914405F1
Bicycles additional
EFF
1 EFF
36 000
C0914411F1
Milnerton security upgrade
EFF
1 EFF
100 000
0
0
100 000
55
Renewal
C0914421F1
IT Equipment
EFF
1 EFF
50 000
0
0
50 000
Multi
New
0
0
50 000
Multi
New
C0914422F1
Equipment
EFF
1 EFF
50 000
C0914425F1
CCTV CBD Upgrade
EFF
1 EFF
1 827 500
0
0
3 227 500
77
New
C0914427F1
Khayelitsha Bldg improvement
EFF
1 EFF
771 000
500 000
500 000
1 771 000
89
Renewal
C0914428F1
Milnerton sprinkler replacement
EFF
1 EFF
80 000
0
0
80 000
4
Renewal
C0914429F1
Milnerton New Carport
EFF
1 EFF
150 000
0
0
150 000
4
New
C1000012F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
5 940
0
0
5 940
Multi
New
C1000013F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
7 560
0
0
7 560
Multi
New
C1000014F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
25 967
0
0
25 967
Multi
New
0
77 976
Multi
New
C1000015F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
77 976
0
C1000016F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
37 173
0
0
37 173
Multi
New
C1000017F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
29 691
0
0
29 691
Multi
New
0
0
75 601
Multi
New
C1000018F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
75 601
C1000019F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
10 800
0
0
10 800
Multi
New
C1000020F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
41 580
0
0
41 580
Multi
New
C1000021F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
62 593
0
0
62 593
Multi
New
C1000022F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
57 412
0
0
57 412
Multi
New
C1000023F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
220 147
0
0
220 147
Multi
New
C1000024F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
64 543
0
0
64 543
Multi
New
C1000025F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
341 107
0
0
341 107
Multi
New
C1000026F1
Furniture, Fittings, tools and equipment
REVENUE
2 REVENUE
C1000055F1
Upgrading equipCCTV Khayelitsha/ M Plain
CRR
3 AFF:WardAllocation
C1021202F1
Head Office office equipment
EFF
C1021203F1
Head Office office equipment
Safety & Security
EFF
25 602
0
0
25 602
Multi
New
100 000
0
0
100 000
82
Renewal
1 EFF
0
85 000
0
85 000
Multi
New
1 EFF
0
0
85 000
85 000
Multi
New
64
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1021204F1
Equipment
EFF
1 EFF
0
85 000
0
85 000
Multi
New
C1021205F1
Equipment
EFF
1 EFF
0
0
100 000
100 000
Multi
New
0
76 000
76 000
Multi
New
0
67 000
67 000
Multi
New
C1021206F1
Specialised equipment
EFF
1 EFF
0
C1021207F1
Equipment
EFF
1 EFF
0
C1021208F1
Purchase of Specialised Equipment
EFF
1 EFF
471 906
0
0
471 906
Multi
Renewal
C1021209F1
CCTV:Radio and Related Equipment
EFF
1 EFF
1 000 000
0
0
1 000 000
Multi
New
C1021210F1
CCTV cameras for Wynberg & Claremont
EFF
1 EFF
0
3 000 000
0
3 000 000
58
New
C1021211F1
CCTV cameras for Wynberg & Claremont
EFF
1 EFF
0
0
3 000 000
3 000 000
58
New
C1021212F1
Replacement of CCTV equipment
EFF
1 EFF
0
3 000 000
0
3 000 000
Multi
Renewal
C1021213F1
Replacement of CCTV equipment
EFF
1 EFF
0
0
3 000 000
3 000 000
Multi
Renewal
C1021214F1
Horse stable equipment
EFF
1 EFF
70 000
0
0
70 000
77
New
C1021215F1
Horse stable equipment
EFF
1 EFF
0
40 000
0
40 000
77
New
C1021216F1
Horses additional
EFF
1 EFF
0
28 000
0
28 000
Multi
New
45 000
45 000
Multi
New
0
18 000
77
New
C1021217F1
Horses additional
EFF
1 EFF
0
0
C1021218F1
Bicycles additional
EFF
1 EFF
0
18 000
C1021219F1
Tactical Response equipment
EFF
1 EFF
0
25 000
0
25 000
Multi
New
C1021220F1
Tactical Response equipment
EFF
1 EFF
0
0
25 000
25 000
Multi
New
C1021221F1
Head Office office equipment
EFF
1 EFF
50 000
0
0
50 000
Multi
New
C1021401F1
Specialised equipment
EFF
1 EFF
0
70 000
0
70 000
Multi
New
C1021402F1
Equipment
EFF
1 EFF
0
57 000
0
57 000
Multi
New
C1021601F1
Harmony Park Switchboard
EFF
1 EFF
60 000
0
0
60 000
83
New
C1021602F1
Radio and related equipment
EFF
1 EFF
2 214 000
0
0
2 214 000
Multi
New
C1021603F1
Firearms and related equipment
EFF
1 EFF
1 900 000
0
0
1 900 000
Multi
New
11 190 098
6 908 000
6 898 000
Total for Metro Police
Operational Coordination
C0700688F1
Property Improvement: M'Plain Drive Test
EFF
1 EFF
0
1 824 000
500 000
2 759 365
79
Renewal
C0814409F1
Traffic Licencing Eastern Prop Improve
EFF
1 EFF
35 000
0
0
35 000
100
New
C0814440F1
Licensing M/Plain HMV testing yard
EFF
1 EFF
2 000 000
0
500 000
2 500 000
77
New
C0914502F1
Specialised Equipment
EFF
1 EFF
98 501
0
0
98 501
Multi
New
C0914601F1
Upgrade offices - Licensing Atlantis
EFF
1 EFF
0
200 000
0
200 000
55
Renewal
1 EFF
400 000
0
0
400 000
Multi
Renewal
C0914602F1
Equipment DLTC and VTC City Wide
Safety & Security
EFF
65
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
1 000 000
0
1 EFF
147 328
C0914606F1
Licence Renewal Facility: Noordhoek
CRR
3 AFF:WardAllocation
C1014351F1
Traffic Licencing Central Equipment
EFF
Total Project
Cost
0
1 875 000
0
0
0
500 000
1 000 000
Ward
New/Renewal
Multi
New
147 328
74
New
500 000
74
New
1 000 000
100
New
C1014352F1
Traffic Licencing Central Equipment
EFF
1 EFF
0
C1014353F1
Traffic Licencing Eastern Prop Improve
EFF
1 EFF
0
0
C1014354F1
Traffic Licencing Equipment
EFF
1 EFF
0
300 000
0
300 000
Multi
New
C1014355F1
Traffic Licencing Equipment
EFF
1 EFF
0
0
300 000
300 000
Multi
New
C1014356F1
Spec Serv Anti-land invasion Equipment
EFF
1 EFF
0
0
300 000
300 000
Multi
New
C1014357F1
Spec Serv Public Safety Equipment
EFF
1 EFF
500 000
0
0
500 000
Multi
New
C1014358F1
Spec Serv Public Safety Equipment
EFF
1 EFF
0
0
500 000
500 000
Multi
New
C1014359F1
Blue Lights and Sirens: Traffic Services
EFF
1 EFF
166 700
0
0
166 700
Multi
Renewal
C1014360F1
Blue Lights and Sirens: Law Enforcement
EFF
1 EFF
166 700
0
0
166 700
Multi
Renewal
C1014361F1
Training and Development equipment
EFF
1 EFF
165 000
0
0
165 000
Multi
New
C1014362F1
Training and Development equipment
EFF
1 EFF
0
180 000
0
180 000
Multi
New
Multi
New
Multi
New
C1014363F1
Training and Development equipment
EFF
1 EFF
0
0
500 000
500 000
C1014364F1
Specialised IT Equipment
EFF
1 EFF
0
0
500 000
500 000
C1014365F1
Upgrade offices - Licensing Atlantis
EFF
1 EFF
0
0
500 000
500 000
55
Renewal
C1014366F1
Equipment DLTC and VTC City Wide
EFF
1 EFF
0
0
400 000
400 000
Multi
Renewal
C1014701F1
Prop Improvement Operations North
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
New
C1014703F1
Furniture fittings, tools and equipment
REVENUE
2 REVENUE
415 841
0
0
415 841
Multi
New
C1014704F1
Furniture fittings, tools and equipment
REVENUE
2 REVENUE
100 000
0
0
100 000
Multi
New
C1014705F1
Furniture fittings, tools and equipment
REVENUE
2 REVENUE
75 600
0
0
75 600
Multi
New
C1014706F1
Furniture fittings, tools and equipment
REVENUE
2 REVENUE
98 160
0
0
98 160
Multi
New
C1014707F1
Furniture fittings, tools and equipment
REVENUE
2 REVENUE
200 000
0
0
200 000
Multi
New
C1014708F1
Specialised Equipment
EFF
1 EFF
200 000
0
0
200 000
Multi
New
0
0
400 000
Multi
Renewal
360 000
Multi
New
C1014710F1
Building Impovements
EFF
1 EFF
400 000
C1014711F1
Acquisition of Dogs
EFF
1 EFF
360 000
0
0
6 528 830
2 504 000
6 500 000
85 105 782
28 332 438
28 722 438
Total for Operational Coordination
Total for Safety & Security
Safety & Security
66
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
Housing
Support Services - HSG
1 000 000
0
0
1 000 000
1 EFF
0
1 EFF
700 000
1 000 000
0
1 000 000
Corp Inf
Renewal
0
0
700 000
Corp Inf
Renewal
REVENUE
2 REVENUE
230 000
0
0
230 000
Corp Inf
Renewal
Furniture & Fittings
EFF
Furniture & Fittings
REVENUE
1 EFF
0
700 000
0
700 000
Corp Inf
Renewal
2 REVENUE
0
245 000
0
245 000
Corp Inf
Renewal
Trunking Radios
EFF
1 EFF
50 000
0
0
50 000
Corp Inf
Renewal
50 000
0
50 000
Corp Inf
Renewal
0
1 000 000
Corp Inf
Renewal
C0915202F1
Computer Equipment
EFF
1 EFF
C0915203F1
Computer Equipment
EFF
C0915205F1
Furniture & Fittings
EFF
C0915205F2
Furniture & Fittings
C0915206F1
C0915206F2
C0915208F1
Corp Inf
Renewal
C0915209F1
Trunking Radios
EFF
1 EFF
0
C0915211F1
Vehicles
EFF
1 EFF
1 000 000
0
C0915212F1
Vehicles
EFF
1 EFF
0
1 000 000
0
1 000 000
Corp Inf
Renewal
0
1 000 000
1 000 000
Corp Inf
New
C1015201F1
Computer Equipment
EFF
1 EFF
0
C1015202F1
Furniture & Fittings
EFF
1 EFF
0
0
700 000
700 000
Corp Inf
New
C1015202F2
Furniture & Fittings
REVENUE
2 REVENUE
0
0
260 000
536 000
Corp Inf
Renewal
C1015203F1
Trunking Radios
EFF
1 EFF
0
0
50 000
50 000
Corp Inf
New
C1015204F1
Vehicles
EFF
1 EFF
0
0
1 000 000
1 000 000
Corp Inf
New
2 980 000
2 995 000
3 010 000
50 000
0
0
50 000
Corp Inf
New
50 000
0
0
Total for Support Services - HSG
Strategy Support & Co-Ordination
C1015301F1
Office Equipment -Hsg Consumer Education
CGD
4 PROV HOUSE DEV
BRD
Total for Strategy Support & Co-Ordination
Existing Settlements
C0815428F1
New Manenberg Housing Admin Office
CGD
4 NT RESTRUCTURING
3 250 000
0
0
3 300 000
Corp Inf
New
C0815428F2
New Manenberg Housing Admin Office (EFF)
EFF
1 EFF
4 528 800
1 473 600
457 600
6 460 000
Corp Inf
New
C0915402F1
Major Upgrading of Offices
EFF
1 EFF
1 000 000
0
0
1 000 000
Corp Inf
Renewal
C0915403F1
Major Upgrading of Offices
EFF
1 EFF
0
1 000 000
0
1 000 000
Corp Inf
Renewal
C0915405F1
Major Upgrading of Depots
EFF
1 EFF
600 000
0
0
600 000
Corp Inf
Renewal
C0915406F1
Major Upgrading of Depots
EFF
1 EFF
0
600 000
0
600 000
Corp Inf
Renewal
C0915408F1
Plant & Equipment
EFF
1 EFF
50 000
0
0
50 000
Corp Inf
Renewal
Housing
67
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
0
50 000
0
50 000
Corp Inf
Renewal
3 HOUSE DEV CPT
FND
150 000
0
0
150 000
Multi
New
CRR
3 HOUSE DEV CPT
FND
0
150 000
0
150 000
Multi
New
EFF
1 EFF
1 000 000
0
0
1 000 000
Multi
Renewal
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
Development of new Rental Units&Hostels
CGD
4 PROV HOUSE DEV
BRD
0
2 000 000
2 500 000
24 500 000
Multi
New
C0915418F1
Major Upgrading - Rental Units (HDF)
CRR
3 HOUSE DEV CPT
FND
4 700 000
0
0
4 700 000
Multi
Renewal
C0915419F1
Major Upgrading - Rental Units (HDF)
CRR
3 HOUSE DEV CPT
FND
0
4 650 000
0
4 650 000
Multi
Renewal
C0915425F1
General Upgrading of flats in Avon
CRR
3 AFF:WardAllocation
187 405
0
0
358 647
26
Renewal
3 000 000
5 400 000
0
8 400 000
Multi
Renewal
C0915409F1
Plant & Equipment
EFF
1 EFF
C0915411F1
Land Acquisition - Buy Back
CRR
C0915412F1
Land Acquisition - Buy Back
C0915414F1
Major Upgrading - Rental Units (EFF)
C0915415F1
Major Upgrading - Rental Units (EFF)
C0915416F1
C1015401F1
Hostels - Ilinge Labahlali Project Ph2
CGD
4 PROV HOUSE DEV
BRD
C1015402F1
Major Upgrading of Offices
EFF
1 EFF
0
0
1 000 000
1 000 000
Corp Inf
New
C1015403F1
Major Upgrading of Depots
EFF
1 EFF
0
0
600 000
600 000
Corp Inf
Renewal
C1015404F1
Plant & Equipment
EFF
1 EFF
0
0
50 000
50 000
Corp Inf
Renewal
C1015405F1
Land Acquisition - Buy Back
CRR
3 HOUSE DEV CPT
FND
0
0
150 000
150 000
Multi
New
C1015406F1
Major Upgrading of City Rental Propertie
EFF
1 EFF
0
0
1 000 000
1 000 000
Multi
Renewal
C1015407F1
Major Upgrading - Rental Units (HDF)
CRR
3 HOUSE DEV CPT
FND
0
0
4 650 000
4 650 000
Multi
Renewal
C1015408F1
Cont. of stoep enclosure at House Morea
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
67
Renewal
C1015409F1
Upgr Council Bldng: Botma Str, Steenberg
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
68
Renewal
C1015410F1
Upgrade bathroom/kitchen Bishop Lavis
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
30
Renewal
C1015411F1
Study Rooms: Pink Flats, Nooitgedacht
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
24
Renewal
0
0
100 000
31
Renewal
50 000
15
Renewal
5 000 000
69
New
C1015412F1
Study Rooms: Pebble Flats, Nooitgedacht
CRR
3 AFF:WardAllocation
100 000
C1015413F1
Recon of tarred surfaces - Macasser Flts
CRR
3 AFF:WardAllocation
50 000
0
0
18 966 205
16 323 600
10 407 600
0
0
5 000 000
Total for Existing Settlements
New Settlements
C0601097F1
Housing
Masiphumelele Housing Project - Phase 4
CGD
4 PROV HOUSE DEV
BRD
68
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
28 000 000
2 000 000
0
48 099 721
95
New
Total Project
Cost
Ward
New/Renewal
C0601523F1
Enkanini UISP Project (1600 Units)
CGD
4 PAWC - HSRP
C0601621F1
Nooitgedacht- Retreat Housing Project
CGD
4 PROV HOUSE DEV
BRD
1 964 000
0
0
2 014 000
68
New
C0601622F1
Rondevlei Housing Project
CGD
4 PROV HOUSE DEV
BRD
4 800 000
1 000 000
0
6 050 000
67
New
C0630881F1
Wallacedene Phase 10A (PLS)
CGD
4 PROV HOUSE DEV
BRD
5 000 000
2 000 000
0
7 500 000
6
New
C0630892F1
Edward Street: Grassy Park Development
CGD
4 PROV HOUSE DEV
BRD
0
500 000
2 000 000
2 550 000
66
New
C0641496F1
Nonqubela Ph2(UISP)
CGD
4 PROV HOUSE DEV
BRD
14 000 000
0
0
41 308 841
93
New
C0641499F1
Wallacedene Phase 9 (UISP)
CGD
4 PROV HOUSE DEV
BRD
12 000 000
2 000 000
0
24 076 232
101
New
C0641500F1
Witsand Housing Project - Phase 2
CGD
4 PROV HOUSE DEV
BRD
9 000 000
17 250 000
7 998 000
41 948 000
32
New
C0641502F1
Nyanga Upgrading Project(PLF&UISP)
CGD
4 PROV HOUSE DEV
BRD
5 000 000
9 491 000
4 000 000
43 027 652
Multi
New
C0641509F1
Mitchells Plain Infill PH 2: 1000 sites
CGD
4 PROV HOUSE DEV
BRD
0
500 000
5 000 000
11 280 000
99
New
C0641511F1
Pelican Park Phase 1 Housing Project
CGD
4 PROV HOUSE DEV
BRD
3 500 000
30 000 000
40 000 000
85 000 000
67
New
C0641512F1
Mfuleni Ext 2 - 1500 Units
CGD
4 PROV HOUSE DEV
BRD
0
0
5 000 000
5 500 000
16
New
C0641518F1
Belhar/Pentech Strip: 350 Units
CGD
4 PROV HOUSE DEV
BRD
2 000 000
5 000 000
0
7 000 000
13
New
C0641525F1
Site C (PHDB - 3641 Units)
CGD
4 PROV HOUSE DEV
BRD
5 000 000
500 000
0
23 753 144
89
New
C0641530F1
Temperance Town: 70 Housing Units
CGD
4 PROV HOUSE DEV
BRD
1 805 000
0
0
1 849 170
100
New
C0641530F2
Temperance Town: 70 Housing Units (EFF)
EFF
1 EFF
600 000
0
0
600 000
100
New
C0641531F1
The Downs : Housing Project
CGD
4 PROV HOUSE DEV
BRD
5 000 000
10 000 000
3 500 000
18 500 000
45
New
C0641533F1
Vlakteplaas : 500 Housing Units
CGD
4 PROV HOUSE DEV
BRD
560 000
5 000 000
15 000 000
20 560 000
100
New
C0641540F1
Bardale / Fairdale: Develop 4000 Units
CGD
4 PROV HOUSE DEV
BRD
20 000 000
60 000 000
52 000 000
190 828 405
18
New
C0641549F1
Dido Valley Housing Development
CGD
4 PROV HOUSE DEV
BRD
500 000
1 000 000
1 000 000
15 700 000
61
New
Housing
69
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0641557F1
Melkbos Housing Project
CGD
4 PROV HOUSE DEV
BRD
1 300 000
0
0
2 500 000
23
New
C0641565F1
Kalkfontein Ph 3: 1000 Units
CGD
4 PROV HOUSE DEV
BRD
0
0
5 000 000
5 000 000
11
New
C0641567F1
Imizamo Yethu - Ph 2: New Services
CGD
4 PROV HOUSE DEV
BRD
5 000 000
15 000 000
20 000 000
41 321 273
74
New
C0641568F1
Happy Valley Phase 2 - 1000 Units
CGD
4 PROV HOUSE DEV
BRD
6 000 000
10 000 000
14 000 000
31 000 000
14
New
C0641570F1
Ocean View Housing Project - 500 Units
CGD
4 PROV HOUSE DEV
BRD
1 500 000
5 000 000
4 000 000
10 500 000
61
New
C0642371F1
10 Ha Somerset West Housing Project
CGD
4 PROV HOUSE DEV
BRD
8 000 000
1 050 000
0
9 050 000
83
New
C0642371F2
Somerset West Housing Project
EFF
1 EFF
4 000 000
0
0
4 000 000
83
New
C0700027F1
Wallacedene Ph10B(UISP)
CGD
4 PROV HOUSE DEV
BRD
5 758 400
0
0
6 360 537
6
New
C0700246F1
Valhalla Park infill 500 units
CGD
4 PROV HOUSE DEV
BRD
4 000 000
6 000 000
1 000 000
11 000 000
Multi
New
C0700437F1
Bokmakierie Housing Project
CGD
4 PROV HOUSE DEV
BRD
0
2 000 000
9 000 000
11 000 000
49
New
C0700438F1
Driftsands Housing Project
CGD
4 PROV HOUSE DEV
BRD
2 000 000
2 000 000
8 000 000
42 238 001
18
New
C0700546F1
Milnerton: Joe Slovo Infill 62 units
CGD
4 PROV HOUSE DEV
BRD
660 000
0
0
660 000
4
New
C0815506F1
Sercor Park Phase II
CGD
4 PROV HOUSE DEV
BRD
500 000
0
0
600 000
100
New
C0815507F1
Morkel's Cottage: 700 Units
CGD
4 PROV HOUSE DEV
BRD
2 000 000
10 000 000
0
12 000 000
86
New
C0815508F1
Delft - The Hague 750 Units - Pilot
CGD
4 PROV HOUSE DEV
BRD
15 000 000
10 000 000
0
25 000 000
13
New
C0815509F1
Atlantis Housing Project
CGD
4 PROV HOUSE DEV
BRD
1 000 000
7 000 000
0
8 000 000
32
New
C0815515F1
Hangberg Housing Project: 302 units
CGD
4 PROV HOUSE DEV
BRD
2 000 000
1 700 000
0
4 200 000
74
New
C0815516F1
Morning Star Housing Project
CGD
4 PROV HOUSE DEV
BRD
5 000 000
20 000 000
5 000 000
30 000 000
103
New
C0915502F1
Land Acquisition (EFF)
EFF
1 EFF
27 900 016
0
0
27 900 016
Multi
New
C0915502F2
Land Acquisition (SDF)
CRR
3 SOC DEV CPT
FUND:G
5 000 000
0
0
5 000 000
Multi
New
Housing
70
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C0915502F3
Land Acquisition (HDF)
CRR
3 HOUSE DEV CPT
FND
25 000 000
0
0
25 000 000
Multi
New
C0915502F4
Land Acquisition (PHDB)
CGD
4 PROV HOUSE DEV
BRD
10 000 000
0
0
10 000 000
Multi
New
C0915503F1
Land Acquisition (EFF)
EFF
1 EFF
0
33 526 400
0
33 526 400
Multi
New
C0915503F2
Land Acquisition (SDF)
CRR
3 SOC DEV CPT
FUND:G
0
5 000 000
0
5 000 000
Multi
New
C0915503F3
Land Acquisition (HDF)
CRR
3 HOUSE DEV CPT
FND
0
25 000 000
0
25 000 000
Multi
New
C0915503F4
Land Acquisition (PHDB)
CGD
4 PROV HOUSE DEV
BRD
0
10 000 000
0
10 000 000
Multi
New
C0915505F1
BNG: Housing Developments
EFF
1 EFF
3 265 351
0
0
3 265 351
Multi
New
C0915506F1
BNG: Housing Developments
EFF
1 EFF
0
5 865 351
0
5 865 351
Multi
New
C0915510F1
Macassar Erf 3968 Phase 1 - 500 Units
CGD
4 PROV HOUSE DEV
BRD
1 000 000
20 000 000
17 000 000
38 000 000
15
New
C0915512F1
Masiphumelele School Site - 380 Units
CGD
4 PROV HOUSE DEV
BRD
15 000 000
0
0
15 000 000
69
New
C0915513F1
Sir Lowrys Pass (Pinetown & Balestra)
CGD
4 PROV HOUSE DEV
BRD
0
0
2 000 000
2 000 000
100
New
C0915514F1
Ocean View Infill Housing Project
CGD
4 PROV HOUSE DEV
BRD
1 500 000
5 000 000
4 000 000
10 500 000
61
New
C0915515F1
Gugulethu Infill Project - 1500 Units
CGD
4 PROV HOUSE DEV
BRD
8 000 000
17 000 000
9 000 000
34 000 000
38
New
C1015501F1
Belhar-Pentech CRU Project
CGD
4 PROV HOUSE DEV
BRD
0
0
1 000 000
1 000 000
13
New
C1015502F1
Joe Slovo Freedom Way Mixed-use
CGD
4 PROV HOUSE DEV
BRD
0
0
2 000 000
22 000 000
4
New
C1015503F1
Eureka-Uitsig CRU Project
CGD
4 PROV HOUSE DEV
BRD
500 000
20 000 000
20 000 000
40 500 000
22
New
C1015505F1
Darwin Road Housing Project
CGD
4 PROV HOUSE DEV
BRD
0
0
5 000 000
33 560 000
105
New
C1015507F1
Land Acquisition (EFF)
EFF
1 EFF
0
0
34 542 400
34 542 400
Multi
New
C1015507F2
Land Acquisition (SDF)
CRR
3 SOC DEV CPT
FUND:G
0
0
5 000 000
5 000 000
Multi
New
C1015507F3
Land Acquisition (HDF)
CRR
3 HOUSE DEV CPT
FND
0
0
25 000 000
25 000 000
Multi
New
C1015507F4
Land Acquisition (PHDB)
CGD
4 PROV HOUSE DEV
BRD
0
0
10 000 000
10 000 000
Multi
New
Housing
71
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1015508F1
BNG: Housing Developments
EFF
1 EFF
0
0
5 865 351
5 865 351
Multi
New
C1015509F1
Hangberg CRU 70 Units
CGD
4 PROV HOUSE DEV
BRD
0
500 000
7 000 000
7 500 000
74
New
C1015510F1
Heideveld Duinefontein 500 units
CGD
4 PROV HOUSE DEV
BRD
0
500 000
2 000 000
2 500 000
44
New
C1015511F1
Kapteinsklip Housing Development 1000
CGD
4 PROV HOUSE DEV
BRD
0
0
5 000 000
5 000 000
74
New
C1015512F1
Nooiensfontein Bluedowns 1100 units
CGD
4 PROV HOUSE DEV
BRD
0
500 000
2 000 000
2 500 000
19
New
C1015513F1
Sweet Homes Housing Development
CGD
4 PROV HOUSE DEV
BRD
5 000 000
5 000 000
0
10 000 000
284 612 767
383 882 751
362 905 751
Total for New Settlements
New
Housing Land & Forward Planning
C0700434F1
Bowood Road Restitution (35 Subsidies)
CGD
4 PROV HOUSE DEV
BRD
500 000
0
0
500 000
59
New
C0700436F1
District Six Restitution (600 Subsidies)
CGD
4 PROV HOUSE DEV
BRD
1 000 000
5 000 000
10 000 000
16 000 000
77
New
C0700439F1
Tramway Road Restitution (20 Subsidies)
CGD
4 PROV HOUSE DEV
BRD
0
390 000
0
390 000
54
New
C0915602F1
Development in Urban Core - Restitution
EFF
1 EFF
500 000
0
0
500 000
Multi
New
0
500 000
0
500 000
Multi
New
C0915603F1
Development in Urban Core - Restitution
EFF
1 EFF
C0915604F1
Steenberg Social Housing Dev: 450 Units
CGD
4 PROV HOUSE DEV
BRD
3 960 000
0
0
9 900 000
64
New
C0915605F1
Drommedaris Social Hsg Dev: 250 Units
CGD
4 PROV HOUSE DEV
BRD
1 500 000
3 500 000
0
5 100 000
55
New
C0915607F1
Scottsdene Housing Project
CGD
4 PROV HOUSE DEV
BRD
5 000 000
7 890 000
4 000 000
17 090 000
6
New
C0915608F1
Development in Urban Core - Restitution
EFF
1 EFF
0
0
500 000
500 000
Multi
New
12 460 000
17 280 000
14 500 000
Total for Housing Land & Forward Planning
Informal Settlements
C0915702F1
Inform. Hsg - Upgr on Council Land
CRR
3 SOC DEV CPT
FUND:G
500 000
0
0
500 000
Multi
New
C0915703F1
Inform. Hsg - Upgr on Council Land
CRR
3 SOC DEV CPT
FUND:G
0
500 000
0
500 000
Multi
New
Housing
72
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
C0915704F1
Enkanini In-situ Upgrading - 9500 Units
CGD
4 PROV HOUSE DEV
BRD
10 000 000
0
0
160 000 000
C0915705F1
Barney Molekwana Upgr. Projct 4720 units
CGD
4 PROV HOUSE DEV
BRD
0
10 000 000
10 000 000
20 000 000
C1015702F1
Inform. Hsg - Upgr on Council Land
CRR
3 SOC DEV CPT
FUND:G
0
0
500 000
500 000
10 500 000
10 500 000
10 500 000
329 568 972
430 981 351
401 323 351
Total for Informal Settlements
Total for Housing
Ward
New/Renewal
New
91
New
Multi
New
Service Delivery Integration
Service Delivery Integration Management
C1016101F1
Furniture & Fittings
REVENUE
2 REVENUE
43 121
0
0
43 121
Corp Inf
Renewal
C1016102F1
Furniture & Fittings
REVENUE
2 REVENUE
0
43 121
0
43 121
Corp Inf
Renewal
C1016103F1
Furniture & Fittings
REVENUE
2 REVENUE
0
0
43 121
43 121
Corp Inf
New
43 121
43 121
43 121
0
81 534
Corp Inf
New
Total for Service Delivery Integration Management
Service Delivery Integration Strat Supp
C1016201F1
Furniture & Fittings
REVENUE
2 REVENUE
81 534
0
C1016202F1
Furniture & Fittings
REVENUE
2 REVENUE
0
81 534
0
81 534
Corp Inf
New
C1016203F1
Furniture & Fittings
REVENUE
2 REVENUE
0
0
81 534
81 534
Corp Inf
New
81 534
81 534
81 534
Total for Service Delivery Integration Strat Supp
2010 FIFA World Cup
C0716301F2
2010 Greenpoint Stadium
CGD
4 STATE: SPORT &
REC
545 336 790
0
0
3 074 000 064
54
New
C0716301F4
2010 Greenpoint Stadium
EFF
1 EFF
440 000 000
0
0
660 000 000
54
New
C0716302F1
2010 Reconfiguration of Common
EFF
1 EFF
200 456 686
95 000 000
0
353 000 000
54
New
54
Renewal
77
Renewal
C0916303F1
2010 Greenpoint Promenade
EFF
1 EFF
3 000 000
27 000 000
0
30 000 000
C0916304F1
2010 Office Accommodation LOC
EFF
1 EFF
200 000
0
0
1 000 000
C0916306F1
GP Stadium Equipment
EFF
1 EFF
24 600 000
0
0
24 600 000
54
New
C1016305F1
Furniture & Fittings
REVENUE
2 REVENUE
86 142
0
0
86 142
Corp Inf
New
C1016306F1
Furniture & Fittings
REVENUE
2 REVENUE
0
86 142
0
86 142
Corp Inf
New
Service Delivery Integration
73
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
C1016307F1
Furniture & Fittings
GAMAP
Fund Source
REVENUE
Fund Source
description
Proposed Provision
2009/2010
0
0
86 142
1 213 679 618
122 086 142
86 142
2 REVENUE
Total for 2010 FIFA World Cup
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
86 142
Corp Inf
New
Development Services
C1016403F1
Furniture & Fittings
REVENUE
2 REVENUE
8 000
0
0
8 000
Corp Inf
New
C1016404F1
Furniture & Fittings
REVENUE
2 REVENUE
0
8 000
0
8 000
Corp Inf
New
C1016405F1
Furniture & Fittings
REVENUE
2 REVENUE
0
0
8 000
8 000
Corp Inf
New
C1016406F1
MIG Project Management Unit
CGD
4 MIG
300 000
0
0
300 000
Corp Inf
New
C1116406F1
MIG Project Management Unit
CGD
4 MIG
0
300 000
0
300 000
Corp Inf
New
4 MIG
0
0
300 000
300 000
Corp Inf
New
308 000
308 000
308 000
C1216406F1
MIG Project Management Unit
CGD
Total for Development Services
IDP/OPM
C1016502F1
Furniture & Fittings
REVENUE
2 REVENUE
77 158
0
0
77 158
Corp Inf
New
C1016503F1
Furniture & Fittings
REVENUE
2 REVENUE
0
77 158
0
77 158
Corp Inf
New
C1016504F1
Furniture & Fittings
REVENUE
2 REVENUE
0
0
77 158
77 158
Corp Inf
New
77 158
77 158
77 158
Total for IDP/OPM
Informations Systems and Technology
C0500027F1
Smart City Project
EFF
1 EFF
1 000 000
1 000 000
1 000 000
6 030 078
Corp Inf
Renewal
2 294 000
2 294 000
118 366 000
Corp Inf
New
2 000 000
2 000 000
7 983 746
Corp Inf
New
C0800389F1
Dark Fibre Broadband Infrastructure
EFF
1 EFF
107 778 000
C0816602F1
Microsoft LCS 2007
EFF
1 EFF
2 000 000
C0916607F1
2010 ICT Infrastructure & Equipment
EFF
1 EFF
20 900 000
0
0
20 951 893
Corp Inf
New
C1016601F1
Microsoft Infrastructure Services
EFF
1 EFF
6 000 000
0
0
6 000 000
Corp Inf
Renewal
C1016602F1
ERP Business Systems
EFF
1 EFF
10 000 000
0
0
10 000 000
Corp Inf
Renewal
C1016603F1
Furniture & Fittings
REVENUE
2 REVENUE
474 081
0
0
474 081
Corp Inf
Renewal
C1016604F1
Furniture & Fittings
REVENUE
2 REVENUE
0
474 081
0
474 081
Corp Inf
Renewal
C1016605F1
Furniture & Fittings
REVENUE
2 REVENUE
0
0
474 081
474 081
Corp Inf
Renewal
C1016606F1
Data storage- security and accessibility
EFF
1 EFF
3 000 000
0
0
3 000 000
Corp Inf
New
C1016607F1
Enterprise monitoring & mgt solution
EFF
1 EFF
5 000 000
0
0
5 000 000
Corp Inf
New
C1016608F1
ERP Annual Disaster Recovery Growth
EFF
1 EFF
2 000 000
0
0
2 000 000
Corp Inf
New
0
0
2 000 000
Corp Inf
New
0
0
1 000 000
Corp Inf
New
C1016609F1
ERP Annual Capacity Growth
EFF
1 EFF
2 000 000
C1016610F1
Renewal of back end IT Infrastructure
EFF
1 EFF
1 000 000
Service Delivery Integration
74
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1016611F1
Upgrade of Exchange
EFF
1 EFF
2 000 000
0
0
2 000 000
Corp Inf
New
C1016612F1
Business Continuity
EFF
1 EFF
1 000 000
0
0
1 000 000
Corp Inf
New
0
0
2 000 000
Corp Inf
New
C1016614F1
SCAP Back-end Technology
CGD
4 PRIVATE SECTOR
FIN
2 000 000
C1016615F1
SCAP Furniture & Equipment
CGD
4 PRIVATE SECTOR
FIN
500 000
0
0
500 000
Corp Inf
New
C1016616F1
SCAP Computers & Equipment
CGD
4 PRIVATE SECTOR
FIN
1 400 000
0
0
1 400 000
Corp Inf
New
C1016617F1
SCAP Site Equipment
CGD
4 PRIVATE SECTOR
FIN
1 250 000
0
0
1 250 000
Corp Inf
New
C1116601F1
Microsoft Infrastructure Services
EFF
1 EFF
0
6 000 000
0
6 000 000
Corp Inf
New
C1116602F1
ERP Business Systems
EFF
1 EFF
0
10 000 000
0
10 000 000
Corp Inf
New
C1116606F1
Data storage- security and accessibility
EFF
1 EFF
0
3 000 000
0
3 000 000
Corp Inf
New
C1116607F1
Enterprise monitoring & mgt solution
EFF
1 EFF
0
5 000 000
0
5 000 000
Corp Inf
New
C1116608F1
ERP Annual Disaster Recovery Growth
EFF
1 EFF
0
2 000 000
0
2 000 000
Corp Inf
New
2 000 000
0
2 000 000
Corp Inf
New
C1116609F1
ERP Annual Capacity Growth
EFF
1 EFF
0
C1116610F1
Renewal of back end IT Infrastructure
EFF
1 EFF
0
1 000 000
0
1 000 000
Corp Inf
New
C1116611F1
Upgrade of Exchange
EFF
1 EFF
0
2 000 000
0
2 000 000
Corp Inf
New
C1116612F1
Business Continuity
EFF
1 EFF
0
1 000 000
0
1 000 000
Corp Inf
New
C1216601F1
Microsoft Infrastructure Services
EFF
1 EFF
0
0
6 000 000
6 000 000
Corp Inf
New
C1216602F1
ERP Business Systems
EFF
1 EFF
0
0
10 000 000
10 000 000
Corp Inf
New
C1216606F1
Data storage- security and accessibility
EFF
1 EFF
0
0
3 000 000
3 000 000
Corp Inf
New
C1216607F1
Enterprise monitoring & mgt solution
EFF
1 EFF
0
0
5 000 000
5 000 000
Corp Inf
New
C1216608F1
ERP Annual Disaster Recovery Growth
EFF
1 EFF
0
0
2 000 000
2 000 000
Corp Inf
New
C1216609F1
ERP Annual Capacity Growth
EFF
1 EFF
0
0
2 000 000
2 000 000
Corp Inf
New
C1216610F1
Renewal of back end IT Infrastructure
EFF
1 EFF
0
0
1 000 000
1 000 000
Corp Inf
New
0
2 000 000
2 000 000
Corp Inf
New
1 000 000
Corp Inf
New
C1216611F1
Upgrade of Exchange
EFF
1 EFF
0
C1216612F1
Business Continuity
EFF
1 EFF
0
0
1 000 000
169 302 081
37 768 081
37 768 081
Total for Informations Systems and Technology
Urban Renewal Programme
C1016801F1
Computers and Equipment
CGD
4 STATE_NT_URP
50 000
0
0
50 000
Corp Inf
New
C1016802F1
Furniture and Equipment
CGD
4 STATE_NT_URP
100 000
0
0
100 000
Corp Inf
New
Service Delivery Integration
75
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
C1016804F1
Furniture & Fittings
REVENUE
2 REVENUE
11 318
0
C1016805F1
Furniture & Fittings
REVENUE
2 REVENUE
0
0
Total Project
Cost
Ward
New/Renewal
0
11 318
Corp Inf
New
11 318
0
11 318
Corp Inf
New
0
11 318
11 318
Corp Inf
New
C1016806F1
Furniture & Fittings
REVENUE
2 REVENUE
C1016807F1
Upgrade of Training Centres
CGD
4 STATE_NT_URP
1 500 000
150 000
0
1 650 000
Corp Inf
New
C1116801F1
Computers and Equipment
CGD
4 STATE_NT_URP
0
50 000
0
50 000
Corp Inf
New
C1116802F1
Computers and Equipment
CGD
4 STATE_NT_URP
0
50 000
0
50 000
Corp Inf
New
C1216801F1
Computers and Equipment
CGD
4 STATE_NT_URP
0
0
50 000
50 000
Corp Inf
New
C1216802F1
Furniture and Equipment
CGD
4 STATE_NT_URP
0
0
50 000
50 000
Corp Inf
New
Total for Urban Renewal Programme
1 661 318
261 318
111 318
Total for Service Delivery Integration
1 385 152 830
160 625 354
38 475 354
0
23 892 983
0
23 892 983
Multi
New
0
85 000
77
New
23 892 983
Multi
New
New
Economic and Social Development
Economic and Social Dev Management
C0900018F1
Developmental Projects
EFF
1 EFF
C1031009F1
IT Equipment & Furniture & Equipment
EFF
1 EFF
85 000
0
C1031016F1
Developmental Projects
EFF
1 EFF
0
0
23 892 983
85 000
23 892 983
23 892 983
Total for Economic and Social Dev Management
Economic and Human Development
C0601526F1
Business Support/SMME Facilities
EFF
1 EFF
2 500 000
0
0
19 497 556
Multi
C0642568F1
Nonkqubela Market Stalls
EFF
1 EFF
730 000
0
0
3 061 605
Multi
New
0
0
80 000
101
Renewal
C0900401F1
Upgrading of Uluntu Plaza, Bloekombos
CRR
3 AFF:WardAllocation
80 000
C0900414F1
Provision of roof at PRECO site
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
22
Renewal
C0900465F1
3 Containers: Asanda Village
CRR
3 AFF:WardAllocation
80 203
0
0
80 203
85
New
C0995069F1
2 containers for Lwandle skills dev
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
86
New
C0999957F1
Business Support SMME
EFF
1 EFF
9 050 000
0
0
9 050 000
Multi
New
C1000087F1
Installation-trading bay in Park Road
CRR
3 AFF:WardAllocation
C1031002F1
IT Equipment
EFF
1 EFF
Total for Economic and Human Development
Economic and Social Development
76
30 000
0
0
30 000
58
Renewal
500 000
0
0
500 000
Corp Inf
New
13 070 203
0
0
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
Property
50 000
0
0
50 000
1 EFF
300 000
0
0
1 EFF
300 000
0
0
1 EFF
300 000
0
50 000
0
1 000 000
0
0
C0999915F1
Upgrade Of Chreche Facilities
CRR
3 AFF:WardAllocation
C1000951F1
Acquisition of land
EFF
C1031003F1
IT Equipment
EFF
C1031010F1
Furniture & Equipment
EFF
C1099915F1
Upgrading of chreche facility
CRR
3 AFF:WardAllocation
Total for Property
12
Renewal
300 000
Multi
Renewal
300 000
Corp Inf
New
0
300 000
Corp Inf
New
0
50 000
12
Renewal
Tourism Development
C0601533F1
Tourism Development Facilities
EFF
1 EFF
155 000
0
0
1 834 061
Multi
New
C1000452F1
Tourism Development
EFF
1 EFF
1 650 000
0
0
1 650 000
Multi
New
C1001533F1
Tourism Development Facilities
EFF
1 EFF
250 000
0
0
250 000
Multi
New
0
0
100 000
Corp Inf
New
205 000
Corp Inf
New
Renewal
C1031004F1
IT Equipment
EFF
1 EFF
100 000
C1031011F1
Furniture & Equipment
EFF
1 EFF
205 000
0
0
2 360 000
0
0
Total for Tourism Development
Social Development , Arts & Culture
C0600680F1
Extend of creche in R59 section, ward 91
CRR
3 AFF:WardAllocation
160 000
0
0
160 000
91
C0600697F1
Creche in Kuyasa: Ward 98
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
98
New
0
0
400 000
16
Renewal
C0700852F1
Community Facility : Ward 16
CRR
3 AFF:WardAllocation
400 000
C0700859F1
Community Facility (Youth Cent): Ward 97
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
97
Renewal
C0701117F1
Extention of Council Facility: Ward 98
CRR
3 AFF:WardAllocation
160 000
0
0
160 000
98
Renewal
C0701119F1
Community Facility: Ward 99
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
99
New
C0701135F1
Purchase brick making machine
CRR
3 AFF:WardAllocation
60 000
0
0
60 000
33
New
C0701136F1
Community multipurpose centre: Ward 34
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
34
New
C0800054F1
Community Facility
CRR
3 AFF:WardAllocation
300 000
0
0
300 000
96
New
C0800056F1
Community Facility
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
99
New
C0800355F1
Construction of com fac - Ward 91
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
91
New
C0800358F1
Construction of com fac - Ward 92
CRR
3 AFF:WardAllocation
300 000
0
0
300 000
92
New
C0800367F1
Container for Soup Kitchen - Ward 13
CRR
3 AFF:WardAllocation
17 000
0
0
17 000
13
New
0
0
250 000
88
Renewal
0
0
18 000
34
Renewal
C0800379F1
Extension of Modular Shack - Ward 88
CRR
3 AFF:WardAllocation
250 000
C0800466F1
Fencing of multi purpose structure
CRR
3 AFF:WardAllocation
18 000
Economic and Social Development
77
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
600 000
0
0
600 000
1 EFF
5 000 000
0
0
5 320 000
52
New
1 100 000
0
0
1 500 000
Corp Inf
Renewal
50 000
0
0
50 000
16
Renewal
5 300 000
0
0
5 300 000
Multi
New
0
0
200 000
9
Renewal
C0800470F1
Construction of community facility
CRR
3 AFF:WardAllocation
C0817502F1
Guga s'thebe Arts Centre 2nd Phase
EFF
97
New/Renewal
New
C0896015F1
ECD Centres
EFF
1 EFF
C0896019F1
Fencing: Drivers Licence Practice Ground
CRR
3 AFF:WardAllocation
C0900014F1
Early Childhood Dev Centres
EFF
1 EFF
C0900424F1
Phase 2: Rennovations to comm. centre
CRR
3 AFF:WardAllocation
200 000
C0900475F1
Comm Facility at G-Section
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
94
New
C0900476F1
Extension of youth centre
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
92
Renewal
C0900477F1
Extension of facility - TR Section
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
90
Renewal
C0900478F1
Extension of comm facility
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
97
Renewal
C0900537F1
Community Facility: Pama Road
CRR
3 AFF:WardAllocation
250 000
0
0
250 000
Multi
New
C0900538F1
Furniture for com facility: Pama Road
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
Multi
New
C0900547F1
5 Shipping Containers
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
35
New
0
15 000
91
New
Multi
New
C0995070F1
Installation of toilets at R59
CRR
3 AFF:WardAllocation
15 000
0
C0999910F1
Community Wellness Centre
CRR
3 AFF:WardAllocation
2 400 000
0
0
2 400 000
C0999914F1
Construction of chreche
CRR
3 AFF:WardAllocation
540 000
0
0
540 000
89
New
C0999919F1
Youth Centre - Prefab Structure
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
18
New
C0999924F1
Modular shack in the leagues
CRR
3 AFF:WardAllocation
300 000
0
0
300 000
88
New
C0999926F1
Community Facility
CRR
3 AFF:WardAllocation
300 000
0
0
300 000
97
New
C0999927F1
Drivers Licence Practice Ground
CRR
3 AFF:WardAllocation
100 000
0
0
100 000
16
New
C0999953F1
Constr. of facility - V-East Section
CRR
3 AFF:WardAllocation
400 000
0
0
400 000
91
New
C1000044F1
Erection of public art - Sea Point
CRR
3 AFF:WardAllocation
45 000
0
0
45 000
54
New
C1000046F1
Sewing Machines: Asanda Village
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
85
Renewal
C1000047F1
Containers for chreche: Morkels Cottage
CRR
3 AFF:WardAllocation
140 000
0
0
140 000
86
New
0
0
200 000
34
New
C1000059F1
3 Containers with inside fittings
CRR
3 AFF:WardAllocation
200 000
C1000857F1
Extension of community youth centre
CRR
3 AFF:WardAllocation
120 000
0
0
120 000
95
Renewal
C1000858F1
Completion of community facility
CRR
3 AFF:WardAllocation
200 000
0
0
200 000
96
Renewal
90 000
0
0
90 000
85
New
C1000859F1
Containers: Wag n Bietjie & Chris Nissan
CRR
3 AFF:WardAllocation
C1031005F1
Customised Containers-Emerging EP
EFF
1 EFF
150 000
0
0
150 000
Corp Inf
New
C1031006F1
Customised Containers - Coord Centres
EFF
1 EFF
150 000
0
0
150 000
Corp Inf
New
C1031007F1
Customised Containers - Soup Kitchens
EFF
1 EFF
200 000
0
0
200 000
Corp Inf
New
Economic and Social Development
78
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1031008F1
Fencing of Food Gardens
EFF
1 EFF
150 000
0
0
150 000
Corp Inf
New
C1031012F1
IT Equipment
EFF
1 EFF
400 000
0
0
400 000
Corp Inf
New
1 EFF
200 000
0
0
200 000
Corp Inf
New
Total for Social Development , Arts & Culture
22 625 000
0
0
Total for Economic and Social Development
39 140 203
23 892 983
23 892 983
100 000
0
0
100 000
Corp Inf
New
100 000
0
0
C1031013F1
Furniture & Equipment
EFF
Strategy and Planning
Strategy & Planning Management
C1018101F1
Furniture and Equipment
REVENUE
2 REVENUE
Total for Strategy & Planning Management
Spatial Planning and Urban Design
1 EFF
2 750 560
0
0
4 707 204
35
Renewal
EFF
1 EFF
2 534 515
5 653 947
6 000 000
33 091 161
77
Renewal
EFF
1 EFF
23 096 222
0
0
45 379 485
Multi
Renewal
Station-V&AW Pedestrian link
EFF
1 EFF
1 754 386
3 500 000
0
8 680 375
54
Renewal
Claremont Landscaping
EFF
1 EFF
4 368 000
3 070 175
0
9 015 925
59
Renewal
C0818330F1
Lentegeur Public Space & Civic Office Up
CGD
4 NT NDPG
6 023 045
0
0
8 350 000
76
Renewal
C0918301F1
Cape Town CBD Upgrade Pedstrian Links
EFF
1 EFF
0
500 000
2 000 000
2 500 000
77
Renewal
C0918303F1
Quality Public Spaces:Du Noon
EFF
1 EFF
0
0
1 754 386
1 754 386
104
Renewal
C0918304F1
Quality Public Spaces:False Bay Ecology
EFF
1 EFF
2 552 629
1 754 386
0
4 307 015
67
Renewal
877 193
0
877 193
46
Renewal
0
8 495 176
Multi
Renewal
C0600590F1
Philippi East Uluntu Plaza
C0601046F1
Grand Parade Revitalisation
C0700253F1
Quality Public Spaces
C0818301F1
C0818303F1
EFF
C0918308F1
Quality Public SpacesManenberg
EFF
1 EFF
0
C0918312F1
Special Place Projects
EFF
1 EFF
0
8 495 176
C0918313F1
Urban Node Regenration-Urban Development
EFF
1 EFF
0
5 008 772
0
5 008 772
Multi
Renewal
C0918315F1
Computer Equipment
EFF
1 EFF
438 596
0
0
438 596
Corp Inf
New
C0918316F1
Computer Equipment
EFF
1 EFF
0
438 596
0
438 596
Corp Inf
New
C0918320F1
Urban Node Regeneration - Urban Dev
EFF
1 EFF
247 582
0
0
750 000
Multi
New
C0918321F1
Urban Node Regeneration - Urban Dev
EFF
1 EFF
4 407 894
0
0
4 407 894
Multi
New
C0918322F1
Uluntu Plaza Projects
EFF
1 EFF
4 385 965
0
0
4 385 965
Multi
Renewal
C0918323F1
Zones of Actions (ZACS)
EFF
1 EFF
2 631 579
0
0
2 631 579
Multi
Renewal
Strategy and Planning
79
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
C0918325F1
Public Spaces Informal Settlement Upgr
EFF
1 EFF
C0918328F1
Public Spaces Strategic Housing Projects
EFF
1 EFF
Proposed Provision
2009/2010
0
Proposed Provision Proposed Provision
2010/2011
2011/2012
2 631 579
0
Total Project
Cost
Ward
New/Renewal
2 631 579
Multi
Renewal
0
2 631 579
0
2 631 579
Multi
Renewal
3 446 285
8 005 000
0
13 456 000
42
New
Multi
Renewal
C0918331F1
Nyanga Civic&Transport Interchange Node
CGD
4 NT NDPG
C1018300F1
Special Place Projects
EFF
1 EFF
0
0
8 385 965
8 385 965
C1018301F1
Quality Public Space: Langa
EFF
1 EFF
0
500 000
3 000 000
3 500 000
52
New
C1018302F1
Urban Node Regenration-Urban Development
EFF
1 EFF
0
0
8 868 421
8 868 421
Multi
Renewal
C1018304F1
Public Spaces Informal Settlement Upgr
EFF
1 EFF
0
0
2 631 579
2 631 579
Multi
New
C1018305F1
Public Spaces Strategic Housing Projects
EFF
1 EFF
0
0
2 631 579
2 631 579
48
New
C1018306F1
Quality Public Spaces: BRT
EFF
1 EFF
0
0
3 500 000
3 500 000
Multi
New
C1018307F1
Computer Equipment
EFF
1 EFF
0
0
438 596
438 596
Multi
New
C1018308F1
Upgr of Dignified Place - Mc Donald St
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
27
New
C1018310F1
Quality Public Spaces: Legacy Projects
EFF
1 EFF
0
3 649 123
0
3 649 123
Multi
New
C1018311F1
Quality Public Spaces: BRT
EFF
1 EFF
0
500 000
0
500 000
Multi
New
0
0
10 000 000
10 000 000
97
New
58 687 258
47 215 526
49 210 526
C1218300F2
Site C - Public Square footways and Land
CGD
4 NT NDPG
Total for Spatial Planning and Urban Design
Environmental Resource Management
C0641454F1
Local Agenda 21 Capital
EFF
1 EFF
50 000
0
0
1 650 543
Multi
Renewal
C0641459F2
Blaauwberg Conservation Area
CRR
3
AFF_BLAAU_CON_AR
EA
52 400
0
0
205 000
23
New
C0818404F1
Mamre Heritage Resources
EFF
1 EFF
594 596
438 596
438 596
2 217 130
29
Renewal
C0818405F1
Local Environment and Heritage Projects
EFF
1 EFF
250 000
0
0
1 830 703
Multi
New
C0918403F1
IT and Office Equipment
EFF
1 EFF
0
200 000
0
200 000
C0918408F1
Upgrade of Reserves Infrastructure
EFF
1 EFF
565 818
0
0
2 620 000
C0918412F1
UDF Memorial Site
REVENUE
2 REVENUE
500 000
0
0
500 000
C0918414F1
Langa Memorial
REVENUE
2 REVENUE
500 000
0
0
C1018401F1
Biodiversity : Strategic Implementation
EFF
1 EFF
145 614
0
0
C1018402F1
False Bay Ecology Park: Various Projects
EFF
1 EFF
964 912
0
C1018403F1
Blaauwberg Conservation Area
EFF
1 EFF
1 754 193
C1018404F1
Fencing
EFF
1 EFF
500 000
C1018405F1
Local Environment and Heritage Projects
EFF
1 EFF
1 140 351
1 EFF
0
C1018406F1
IT and Office Equipment
Strategy and Planning
EFF
80
Corp Inf
New
Multi
Renewal
81
New
500 000
51
New
145 614
Multi
New
0
964 912
Multi
New
0
0
1 754 193
0
0
500 000
0
0
1 140 351
0
200 000
200 000
23
Renewal
Multi
Renewal
Multi
New
Corp Inf
New
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1018407F1
Furniture and Fittings
EFF
1 EFF
400 000
0
0
400 000
Corp Inf
New
C1018408F1
Plant and Vehicles
EFF
1 EFF
623 000
0
0
623 000
Corp Inf
New
0
0
150 000
Corp Inf
New
0
0
2 000 000
Multi
Renewal
C1018409F1
IT Equipment
EFF
1 EFF
150 000
C1018410F1
Upgrade of reserves Infrastructure
EFF
1 EFF
2 000 000
C1018411F1
Furniture & Equipment
REVENUE
2 REVENUE
65 712
0
0
65 712
Corp Inf
New
C1018413F1
Furniture & Equipment
REVENUE
2 REVENUE
0
72 283
0
72 283
Corp Inf
New
C1018414F1
Furniture & Equipment
REVENUE
2 REVENUE
0
0
79 511
79 511
Corp Inf
New
C1018415F1
Local Agenda 21 Capital
EFF
1 EFF
1 052 632
0
0
1 052 632
Multi
Renewal
C1018416F1
Local Agenda 21 Capital
EFF
1 EFF
0
952 632
0
952 632
Multi
Renewal
C1018417F1
Local Agenda 21 Capital
EFF
1 EFF
0
0
952 632
952 632
Multi
Renewal
C1018418F1
Biodiversity : Strategic Implementation
EFF
1 EFF
0
145 614
0
145 614
Multi
New
C1018419F1
Biodiversity : Strategic Implementation
EFF
1 EFF
0
0
145 614
145 614
Multi
New
C1018420F1
False Bay Ecology Park: Various Projects
EFF
1 EFF
0
964 912
0
964 912
Multi
New
Multi
New
23
Renewal
C1018421F1
False Bay Ecology Park: Various Projects
EFF
1 EFF
0
0
964 912
964 912
C1018422F1
Blaauwberg Conservation Area
EFF
1 EFF
0
877 193
0
877 193
C1018423F1
Blaauwberg Conservation Area
EFF
1 EFF
0
0
877 193
877 193
23
Renewal
C1018424F1
Fencing
EFF
1 EFF
0
1 000 000
0
1 000 000
Multi
Renewal
C1018425F1
Fencing
EFF
1 EFF
0
0
1 100 000
1 100 000
Multi
Renewal
C1018426F1
Local Environment and Heritage Projects
EFF
1 EFF
0
1 140 351
0
1 140 351
Multi
New
C1018427F1
Local Environment and Heritage Projects
EFF
1 EFF
0
0
1 140 351
1 140 351
Multi
New
C1018428F1
Furniture and Fittings
EFF
1 EFF
0
300 000
0
300 000
Corp Inf
New
C1018429F1
Furniture and Fittings
EFF
1 EFF
0
0
150 000
150 000
Corp Inf
New
C1018430F1
Plant and Vehicles
EFF
1 EFF
0
1 000 000
0
1 000 000
Corp Inf
New
C1018431F1
Plant and Vehicles
EFF
1 EFF
0
0
1 000 000
1 000 000
Corp Inf
New
150 000
0
150 000
Corp Inf
New
150 000
150 000
Corp Inf
New
C1018432F1
IT Equipment
EFF
1 EFF
0
C1018433F1
IT Equipment
EFF
1 EFF
0
0
C1018434F1
Upgrade of reserves Infrastructure
EFF
1 EFF
0
2 000 000
0
2 000 000
Multi
Renewal
0
0
2 050 000
2 050 000
Multi
Renewal
C1018435F1
Upgrade of reserves Infrastructure
EFF
1 EFF
C1018436F1
Upgrade of infrastructure : Helderberg N
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
84
Renewal
C1018437F1
Provision of new fence between Nerina &
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
21
Renewal
C1018438F1
New Toilet Facilities for the disabled a
CRR
3 AFF:WardAllocation
45 000
0
0
45 000
70
Renewal
Strategy and Planning
81
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
Total Project
Cost
Ward
New/Renewal
C1018439F1
Upgrade Access and Signage to Danie Mill
CRR
3 AFF:WardAllocation
10 000
0
0
10 000
100
Renewal
C1018440F1
Langa Initiation Site - Berm & Landscapi
CRR
3 AFF:WardAllocation
50 000
0
0
50 000
53
Renewal
3 AFF:WardAllocation
15 000
0
0
15 000
54
New
11 529 228
9 241 581
9 248 809
C1018441F1
Interpretive signage of shipwrecks,etc :
CRR
Total for Environmental Resource Management
Planning and Building Development Management
C0800209F1
Office Accommodation Projects
CGD
4 NT RESTRUCTURING
6 400 000
0
0
10 700 000
Corp Inf
Renewal
C0918504F1
Furniture and Equipment
EFF
1 EFF
438 596
0
0
438 596
Corp Inf
New
C0918505F1
Computer Equipment
EFF
1 EFF
823 554
0
0
823 554
Corp Inf
New
438 596
0
438 596
Corp Inf
New
Corp Inf
New
C0918506F1
Furniture and Equipment
EFF
1 EFF
0
C0918507F1
Computer Equipment
EFF
1 EFF
0
1 315 789
0
1 315 789
C1018501F1
Computer Equipment
EFF
1 EFF
0
0
945 550
945 550
Multi
New
C1018502F1
Vehicle Replacement
EFF
1 EFF
0
0
370 239
370 239
Multi
New
C1018503F1
Furniture and Equipment
EFF
1 EFF
0
0
438 596
438 596
Multi
New
C1018507F2
Furniture and Equipment
REVENUE
2 REVENUE
262 774
0
0
262 774
Multi
New
C1018508F2
Computer Equipment
REVENUE
2 REVENUE
216 000
0
0
216 000
Multi
New
8 140 924
1 754 385
1 754 385
Total for Planning and Building Development Management
Strategic Development Information & GIS
C0700433F2
ISIS project
EFF
1 EFF
29 928 585
0
0
42 200 000
Corp Inf
Renewal
C0818603F1
Integrated Spatial Information System
EFF
1 EFF
500 000
0
0
500 000
Corp Inf
Renewal
C0918604F1
GIS and IT equipment
EFF
1 EFF
155 000
0
0
155 000
Corp Inf
New
C0918605F1
Office Furniture
EFF
1 EFF
35 000
0
0
35 000
Corp Inf
New
C0918606F1
Office Equipment
EFF
1 EFF
30 000
0
0
30 000
Corp Inf
New
640 000
0
640 000
Corp Inf
New
C0918607F1
GIS and IT equipment
EFF
1 EFF
0
C0918608F1
Office Furniture
EFF
1 EFF
0
30 000
0
30 000
Corp Inf
New
C0918609F1
Office Equipment
EFF
1 EFF
0
50 000
0
50 000
Corp Inf
New
63 223
0
0
63 223
Corp Inf
New
C1018601F1
IT Equipment
REVENUE
2 REVENUE
C1018602F1
GIS and IT equipment
EFF
1 EFF
0
0
400 000
400 000
Corp Inf
New
C1018603F1
Office Furniture
EFF
1 EFF
0
0
50 000
50 000
Corp Inf
New
C1018604F1
Office Equipment
EFF
1 EFF
0
0
70 000
70 000
Corp Inf
New
C1018605F1
IT equipment
REVENUE
2 REVENUE
0
69 545
0
69 545
Corp Inf
New
Strategy and Planning
82
2009/2010 - 2011/2012 Capital Budget
WBS Element Project Description
GAMAP
Fund Source
Fund Source
description
C1018606F1
IT equipment
REVENUE
2 REVENUE
C1018607F1
Audit of Informal Settlements
EFF
1 EFF
Proposed Provision
2009/2010
Proposed Provision Proposed Provision
2010/2011
2011/2012
0
76 499
76 499
1 200 000
0
0
1 200 000
0
0
C1018608F1
Audit of Informal Settlements
EFF
1 EFF
0
C1018609F1
Audit of Informal Settlements
EFF
1 EFF
0
0
1 400 000
31 911 808
1 989 545
1 996 499
110 369 218
60 201 037
62 210 219
6 202 463 857
4 203 574 807
4 164 563 434
Total for Strategic Development Information & GIS
Total for Strategy and Planning
Grand Total
Strategy and Planning
83
Total Project
Cost
Ward
New/Renewal
Corp Inf
New
1 200 000
Multi
Renewal
1 200 000
Multi
Renewal
1 400 000
Multi
Renewal
2009/2010 - 2011/2012 Capital Budget
Download