PRODUCTION AND OPERATION MANAGEMENT GET SUBMIT SCDL ASSIGNMENT ON YOUR BEHALF AND ANY INFORMATION CALL ME ON 09873779091 LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of design , Quality of conformance , Purpose of product Your Answer Quality of conformance , Quality of design Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer Network Multiple Choice Multiple Answer Question Which of the following cases indicates change in physical characteristic? Correct Answer Turning , Grinding , Drilling Your Answer Turning , Grinding , Drilling Multiple Choice Single Answer Question What do you mean by the verification of object against predetermined standards of quality or quantity or both? Correct Answer Inspection Your Answer Quality assurance Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective Multiple Choice Single Answer Question How non-critical activities are shown in the time chart during project scheduling? Correct Answer Thin lines Your Answer Thin lines PRODUCTION AND OPERATION MANAGEMENT GET SUBMIT SCDL ASSIGNMENT ON YOUR BEHALF AND ANY INFORMATION CALL ME ON 09873779091 Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment history card Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Shop Supervisor Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Motion True/False Question Every network does not necessarily have a critical path. Correct Answer False Your Answer False Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Answer Backward pass computation Your Answer Backward pass computation True/False Question Scrap allowance is added to net requirement of material while ordering for material Correct Answer True Your Answer True True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs PRODUCTION AND OPERATION MANAGEMENT GET SUBMIT SCDL ASSIGNMENT ON YOUR BEHALF AND ANY INFORMATION CALL ME ON 09873779091 True/False Question It would not affect the project completion time if non-critical activities take little loner time than planned. Correct Answer True Your Answer True Select The Blank Question The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies. Correct Answer Reconditioning Your Answer Reconditioning True/False Question Flow process charts do record movements as well as visual pictures. Correct Answer False Your Answer False True/False Question Process Planning is concerned with decisions regarding requirement of machines and manpower for meeting customer demand Correct Answer False Your Answer False Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer MRP Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Drilling True/False Question Objective of Work Study is to improve Productivity Correct Answer True Your Answer True Multiple Choice Multiple Answer PRODUCTION AND OPERATION MANAGEMENT GET SUBMIT SCDL ASSIGNMENT ON YOUR BEHALF AND ANY INFORMATION CALL ME ON 09873779091 Question Which three of the following options can be used to reduce the duration of activity during project crashing? Correct Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Your Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Multiple Choice Single Answer Question Which is the next stage to the inspection based quality control in the historical development of quality management. Correct Answer Quality assurance Your Answer Quality assurance Match The Following Question Correct Answer Bottom compartment of control board sequence in which they are to be processed. sequence in which they are to be processed. Your Answer Bunch of work orders arranged in a Bunch of work orders arranged in a Control board Pictorial view of machine loading activity view of machine loading activity Pictorial Top compartment of control board Work order of item currently being worked on the machine Work order of item currently being worked on the machine Middle compartment of control board Work order of item to be processed next on the machine Work order of item to be processed next on the machine Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen PRODUCTION AND OPERATION MANAGEMENT GET SUBMIT SCDL ASSIGNMENT ON YOUR BEHALF AND ANY INFORMATION CALL ME ON 09873779091 Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Multiple Choice Multiple Answer Question How the concept of float is helpful to planners? Correct Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources Your Answer To decide priorities in allocation of resources , To minimize the requirement of resources Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation Multiple Choice Single Answer Question Which kind of defect can be called as minor defect? Correct Answer Which does not reduce the usability of the product for its intended use Your Answer Which does not reduce the usability of the product for its intended use Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer Tolerance True/False Question Sampling inspection is best suited when cost of inspection is much higher than the loss arising from the acceptance of a defective part. Correct Answer True Your Answer False Multiple Choice Single Answer Question Which element of a network represents a task which has got a definite beginning and definite end? Correct Answer Activity Your Answer Activity Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Your Answer Flow of material , Equipment utilization , Working condition Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity PRODUCTION AND OPERATION MANAGEMENT GET SUBMIT SCDL ASSIGNMENT ON YOUR BEHALF AND ANY INFORMATION CALL ME ON 09873779091 Your Answer Necessity Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Standards Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Any heat treatment if required Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity True/False Question F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Your Answer False Multiple Choice Single Answer Question Which portion of the perforated route sheet should be signed by the operator or supervisor? Correct Answer Lower portion Your Answer Lower portion True/False Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer True Match The Following Question Correct Answer Your Answer Scale model Layout analysis Modelling approach to layouts Factor Analysis Method to evaluate layouts Technique for evolving and analysis of layouts Minimization of production delays of good layout Objective of good layout Objective PRODUCTION AND OPERATION MANAGEMENT GET SUBMIT SCDL ASSIGNMENT ON YOUR BEHALF AND ANY INFORMATION CALL ME ON 09873779091 Maximum visibility Principles of good layout Principles of good layout True/False Question Maintenance function must be decentralised apart from a size of a manufacturing organisation for it's better functioning. Correct Answer False Your Answer True