ENKA

advertisement
A subsidiary of ENKA
Çimtafl
Engineer Fabricator Contractor
References
International
Engineering
• BECHTEL
• AALBORG
• KLÖCKNER INA
• BOUYGUES
• TOYO
• CMI
• CHEVRON
• DONG AH
• NISSHO IWAI
• AXSIA
• EGI
• AIR LIQUIDE
• SPIE CAPAG
• FCB
• BBC/ABB
• HITACHI ZOSEN
• KCC
• STONE & WEBSTER
• STANDARD FASEL
• NUOVO PIGNONE
• FOSTER WHEELER
• IHI
• AUSTRIAN ENERGY
• NOOTER/ERIKSEN
• INGRA
• KTI
• ITOCHU
• KOBE STEEL
• SAUDI-CHEVRON
• PARSONS FLOUR DANIEL
• PWH
• TECHNIP
• KRUPP
• GENERAL ELECTRIC
• VOEST ALPINE
• MHI
• FOCHI
• MITSUBISHI CORP.
• GE ENERGY
• BASSE SAMBRE
• TENGIZ CHEVROIL
• PHB
• MASTERFOODS
• PREUSSAG
• LUMMUS
2D & 3D
STRUCTURAL STEEL
PRESSURE VESSELS
STORAGE TANKS
OVERHEAD CRANES
POWER and PROCESS PIPING
GAS PROCESSING EQUIPMENT
BOP EQUIPMENT
Fabrication
275.000 tons
BUILDING STRUCTURAL STEEL
STEEL BRIDGES
ARCHITECTURAL STRUCTURES
HIGHRISE STRUCTURES
HEAT EXCHANGERS
PRESSURE VESSELS
SPHERICAL TANKS
CYLINDRICAL TANKS
REACTORS
PROCESS SK‹DS
STAINLESS STEEL WATER TANKS
PENSTOCK PIPES and FITTINGS
POWER and PROCESS PIPING (SPOOL)
OVERHEAD CRANES
HATCH COVERS
SHIP HULLS
GAS PROCESSING EQUIPMENT
HEPP HYDRO MECHANICAL EQUIPMENT
HEAT RECOVERY STEAM GENERATORS
STEEL WIND TOWERS
Erection
625.000 tons
THERMAL & HYDRAULIC POWER PLANTS
PETROCHEMICAL PLANTS
REFINERIES
PIPELINES
TANK FARMS
PUMP & COMPRESSOR STATIONS
INDUSTRIAL PLANTS
CEMENT PLANTS
WATER TREATMENT PLANTS
AMMONIA & FERTILIZER PLANTS
HOUSING and HOSPITAL PROJECTS
STEEL BRIDGES
Incorporated in 1973
as of May 2005
• PROSER
• SALZGITTER
• ELECTRIM
• STEINMULLER
• UOP
• NEM
• BETS BV
Local
• AS‹L ÇEL‹K
• AYGAZ
• B‹S ENERJ‹
• B‹Z‹MGAZ
• BORUSAN
• BOTAfi
• BP GAZ
• DHMI
• DS‹
• EGEGAZ
• ENKA
• ERDEM‹R
• ERGAZ
• ET‹BANK
• ‹PRAGAZ
• ‹SDEM‹R
• ‹SK‹
• ‹fi-DO⁄AN
• KARBOGAZ
• KORAY
• L‹PETGAZ
• M‹LANGAZ
• MOGAZ
• OCAKGAZ
• PETK‹M
• SABANCI
• SHELL
• S‹H‹RGAZ
• TCKGM
• TEAfi
• TK‹
• TOTALGAZ
• TOYOTASA
• TPAO
• TRAKYA CAM
• TÜGSAfi
• TÜPRAfi
Gemlik Works
Awards
This is a highly advanced facility: located 200 km
GE Power Systems & GE Energy
rom ‹stanbul, within two km of international
2002 Supplier of Year
deep-sea ports, built on a 150.000 sqm fenced
yard with 41.000 sqm covered fabrication shop
space, 16 bays and 62 overhead cranes and has
a 25.000 tons/ year production capacity. It is
equipped with the latest technology including
automated and robotic welding, various CNC,
NC, PLC, DNC, on-line machines, integrated
2003 Excellence in Delivery
QA/QC systems, certified destructive and nondestructive examination laboratories, heat treatment
urnaces as well as advanced information technology
and management information systems and powerful
computer hardware with associated design,
engineering and simulation software.
2004 Excellence in Delivery
Çimtafl and Cimtas Pipe facilities
Gemlik Works Machinery
and Equipment
Best Performance (2001)
Total Fabrication
25.000 tons
Structural Steel
5.000 tons
Steel Wind Towers
6.500 tons
Heat Recovery Steam Generators
2.500 tons
Process and Power Pipe Spools
2.500 tons
Pressure Vessels
1.000 tons
Spherical Gas Tanks
4.000 tons
Cylindrical Gas Tanks and Tankers
1.500 tons
Cooling Water Pipes
2.000 tons
3
4
1
7
2
9
10
1. Multitorch Portal Welding Machine 2. CNC Flame Cutting
Machine 3. Robot Aided Welding 4. CNC Drilling Machine
5. Column and Boom SAW/MIG Welding Machine 6. Plasma
Cutting Machine 7. Dishing Machine 8. Hydraulic Press
9-10. Plate Bending Machine
Pressure Vessels and
Heat Exchangers
The design, engineering, supply and fabrication
with ASME U, U2, Stamp and CE Marking, where
applicable, of Pressure Vessels including columns,
drums and heat exchangers with deliveries for
Bechtel, Framatome-Prosernat, Air Liquide, NEM
Austria, GE Hydro, KBR, Kobe Steel, Nuovo
Pignone, FWI, KTI, Technip and UOP in Turkey,
Egypt, Italy, Qatar, Nigeria, Kazakhstan, Saudi
Arabia, Tunisia, Spain, USA, Romania, Portugal,
Germany, Russia, Holland, Sweden, Belgium and
Venezuela.
4
6
1
9
10
2
11
3
12
1. Naphta Splitter (475 cum-147 tons) 2. Stabiliser Tower (62 cum70 tons) 3. Debutaniser Column (79 cum-42 tons) 4. H2 Adsorber Vessel
5. Fuel Gas Scrubber (Nuovo Pignone-GE) 6. H2 Adsorber Vessel
7. Vent Gas Wash Tower 8. Heat Exchangers (TEMA Type AES)
9. H 2 Adsorber Vessel 10. Stainless Steel Separator Tank
11. 250 cum H2 Storage Tank 12. 300 cum CO2 Storage Tank
Pressure Vessels and
Heat Exchangers
The end-users, to whom Çimtafl supplied and
abricated pressure vessels and heat exchangers,
nclude both major local and foreign ownersoperators such as BOTAfi, TEAfi, Tügsafl, Tüprafl
and Petkim (Turkey) as well as Agip (Nigeria),
AMOC and M.E. Oil Refinery (Egypt), JMPC
(Jordan), BP (Spain), Petrogal (Portugal), Edelca
(Venezuela), BASF (Germany), Q-Chem (Qatar),
DOW Chemical (USA) and Tyumen Oil (Russia),
Tengizchevroil (Kazakhstan), BG (Tunusia).
7
1
4
8
9
10
11
2
12
13
3
14
15
5
16
17
6
18
1. Blowdown Drum 2. HP Steam Drums 3. CO 2 Absorber
4. Flare Knockout Drum 5. Process Gas Scrubbers 6. Debuteniser
7-8. Heat Exchangers (Tüprafl Kırıkkale) 9.Propane Compressor
Suction Drum 10.High Pressure Treated Gas Separator
11.Regeneration Tower 12.Surge Drum 13. Sweet Gas Separator
14. Mercury Removal Bed Vessels 15. Treated Gas K.O. Drums
16. Pressure Vessel Fabrication 17.Hydrogenation Burner
Chamber 18. Amine Stripper Columns
Reactors
The design, engineering, supply and fabrication
with ASME U Stamp of 4 nos of Reactors under a
purchase order awarded by Parsons Fluor Daniel
(PFD) for Second Generation Project, Tengizchevroil
(TCO) Kazakhstan.
These Reactors are 280 tons each, 7500mm dia,
33mt long and are the heaviest pressure vessels
ever manufactured at Çimtafl Gemlik Works.
Process Skids
The assembly and testing of process skids and
modules mainly for oil and gas industries, including
supply and fabrication of associated structural
steel, pressure vessels and piping systems as
well as complete E&I installation and insulation.
Çimtafl has assembled process skids up to 610
ons with 65m in length, 13m in width and 7m in
height.
6
1
2
4
3
1. Skid Package 2-3. Gas Filter Scrubber Skids 4. Process Skids
5. Platforming Process Skid Unit (module fabrication) 6. Process
Skids & Burner Skids 7-8. Skid Package 9. Gas Filter Scrubber
Skids
HRSG (Heat Recovery
Steam Generators)
The ASME S stamped fabrication of modules
ncluding header fabrication where required for
Heat Recovery Steam Generators with horizontal and
vertical gas path for major boiler suppliers
ncluding NEM Austria, Austrian Energy, Deltak,
CMI, Aalborg and Nooter-Eriksen with deliveries
o Turkey, Kazakhstan, Switzerland, USA and
Canada.
• 1 unit Vertical type-Fr6
(Nooter/Eriksen, Turkey)
• 1 unit Horizontal type-Fr6
(Aalborg, Turkey)
• 1 unit Vertical type-Fr9
(nine out of twelve modules)
(CMI, Turkey)
• 4 units Horizontal type-Fr7
(Austrian Energy, USA)
• 2 units Vertical type-Fr7
(NEM Austria, Canada)
Cylindrical
Gas Storage Tanks
The design, engineering, supply, fabrication and
ield assembly, where applicable, of Small Bulk
(1-10 cum), Large Bulk (10-180 cum), Very
Large Bulk (250-500 cum) and Autogas (10 and
22 cum) Tanks for local and overseas gas storage
and distribution industry with a production
capacity of 3.500 units/year and after-sales
maintenance service.
6
1
2
3
4
1. 500 cum Mounded Storage Tank Fabrication 2. 10 cum Autogas
Storage Tanks 3. 22 cum Autogas Storage Tanks 4. 5 cum LPG
Storage Tank 5. 1,75 cum LPG Storage Tanks 6. 115 cum Propane
Storage Tank 7. 25 cum LPG Storage Tank 8. 10 cum Autogas Tanks
9. Cylindrical Gas Storage Tanks at Gemlik Works Storage Yard
Pressurised Road Tankers
The design, engineering, supply and fabrication
of Pressurised Road Tankers complete with LPG
System (10-45 cum) for local gas storage and
distribution industry with a production capacity
of 100 units/year and after-sales maintenance
service.
3
1
1. LPG Road Tanker Installation Hall 2. 23 cum LPG Road Tanker
Complete with LPG System 3. 22 cum CO2 Semi-trailer Tanker
4. 32 cum LPG Road Tanker Complete with LPG System 5. 23 cum
LPG Road Tanker 6. 16 cum, 22 cum and 32 cum Road Tankers
Steel Wind Towers
The supply and fabrication of wind turbine conical
steel towers for the market-leading contractor
Enercon GmbH of Germany through a mass
production line with 90% welding automation,
ncluding shop installation of the electrical and
mechanical accessories to enable a plug-in connection
o the wind generator at the erection site.
The towers are delivered in two sectors, each 2025 m in length and weighing 20-30 tons. In total
320 units and 14.000 tons have been delivered to
Turkey, Portugal, Japan, Ireland, Germany,
Taiwan, Italy, Greece, Canada and Spain.
Special
Fabrication Projects
The design, engineering, supply and fabrication
capability for Overhead Cranes, Gantry Cranes,
Tower Cranes, Cooling Water Pipes, Penstock
Pipe and Fittings, Process Skids and Moduls,
Gas Processing Equipment including Gas Heaters,
Gas Filters & Scrubbers, Launcher & Receivers
and HEPP Hydro Mechanical Equipment including
Francis Turbine and Generator parts and Butterfly
Valves with deliveries to Turkey, Syria, Libya,
Russia and Egypt.
Recent major special fabrication projects include
Gebze, Adapazar› and ‹zmir Combined Cycle
Power Plants, Bursa Combined Cycle Power
Plant, Menzelet Hydroelectric Power Plant, CS-3
Pendik Compressor Station, Great Man-Made
River Benghazi End Reservoir (Libya), Amerya
New Western Desert Gas Complex (Egypt) and
Al-Zara Combined Cycle Power Plant (Syria).
1
2
3
4
5
6
8
10
11
1. Turbine Spiral Case 2. Self-reinforced forged nozzle to scrubber
shell weld 3. Natural Gas Scrubber 4. Penstock Bifurcation
5. Penstock Y-Branch 6. Launcher and Receiver 7-8. Natural
Gas Combined Cycle Power Plant Projects, GT and ST Building
Overhead Cranes 9. Gebze Natural Gas Combined Cycle Power
Plant Gantry Crane 10. Penstock Bifurcation with Crotch Plate
11. Kemerköy TPP Water Intake Heads
Structural Steel
The design, engineering, supply and fabrication of
building structural steel, high-rise structures, architectural
structures, plate works, casings, ducts and chimneys,
hatch covers and ship hulls.
Since its foundation, Çimtafl has made more than
200.000 tons of deliveries to Turkey, Libya, Algeria,
Egypt, Ethiopia, Jordan, Iraq, Saudi Arabia, the
Russian Federation, Belarus and Kazakhstan.
Recent major fabrication projects include Afflin
Elbistan-B Thermal Power Plant, Bursa Combined
Cycle Power Plant, Kemerköy Thermal Power Plant,
Orhaneli Thermal Power Plant, Silopi Diesel Generator
Power Plant, Toyota Car Factory, Sabanc› Center, Set
Ankara Cement Plant (Turkey), Messebo Cement Plant
Ethiopia), Baiji Fertiliser Plant (Iraq), Al-Khoms
Cement Plant (Libya), Amerya New Western Desert
Gas Complex (Egypt), MasterFoods Confectionery
Plant and Pedreskova Ceramic Production Plant (the
Russian Federation) and Tschist Building Materials
Production Complex (Belarus).
5
1
6
2
3
7
4
TUCSAmark
Structural Steel Qualification Certificate
8
1. Ship Block Fabrication 2. Hatch Cover for Ship Industry
3. Toyota Car Factory 4. Ship Block Robot Aided Welding
5. Badoosh Cement Plant (Iraq) 6. Orhaneli TPP Boiler Supporting
Steel Structure 7. Building Structural Steel 8. Hatch Cover for
Ship Industry
Steel Bridges
The supply, fabrication, trial assembly, transport
and erection of highway and railway steel
bridges.
The fabrication and erection of the New Golden
Horn Steel Bridges, ordered by IHI of Japan, one
of the world’s leading steel bridge contractors,
were completed by Çimtafl in 16 months, combining
advanced engineering expertise with a highly
skilled workforce and the latest manufacturing,
erection and information technologies.
Using advanced technology including CNC, PLC
equipment and nine-axis robots, Çimtafl Gemlik
Works fabricated two units of steel bridges over
he Golden Horn in ‹stanbul in 11 months. They
had a total weight of 7.340 tons, composed of
74.000 steel elements, assembled by 242.000 m
of welding and sustaining 462.500 bolt holes in
SNTF Railway Bridge (Algeria)
a configuration of 184 blocks, each of which was
3,2x4,0x9,0 m. Following the on-shore preassembly of the blocks, which involved pairing
up two blocks into one of 18.0 m length, erection
was also completed in 11 months over eight
spans on both land and sea by means of bolting
and welding, with the longest span reaching
139,5 m and the heaviest lift weighing 100 tons.
New Golden Horn Steel Bridges Fabrication
Spherical
Gas Storage Tanks
he design and engineering according to A.D.
Merkblätter and ASME Sec. VIII, supply, fabrication
nd construction, including PWHT at site after
rection where required of Spherical Gas Storage
anks up to 5.000 cum, in total 52 units and
10.000 cum, with leg supports or skirt-support
n turn-key basis.
1
2
3
4
5
1. 2 x 3.100 cum Propane Storage Tanks 2. 5.000 cum LPG Storage
Tank 3. 3 x 5.000 cum Propane Storage Tanks 4. 4.000 cum
Propane Storage Tank 5. Spiral Ladder on a 5.000 cum Tank
6. 4 x 5.000 cum LPG Storage Tanks 7. 5 x 5.000 cum Propane
Storage Tanks with Skirt Supports
Cylindrical
LNG, Fuel-Oil & LPG
Storage Tanks
The design, engineering, supply, fabrication and
assembly of field-erected storage tanks with various
capacities for gas and petrochemical industries.
The most recent cylindrical storage tank project
ncludes the field erection of 2x140.000 cum
LNG Storage Tanks, capacity wise the second
argest in the world as of 2001, for EGEGAZ LNG
Terminal located at Alia¤a-‹zmir, Turkey, successfully
completed within 18 months. The LNG Storage
Tanks are designed by CBI as per API 620 and
have a total steel weight of 7.000 tons, the inner
ank steel material being ASTM A553 Type 1
requiring advanced welding technology. The very
unique feature of the project is the lifting operation
of the tank roofs. Following the ground assembly,
he tank roof with a single piece weight of 800
ons and a diameter of 80 m has been lifted to its
inal position at +35 m by means of compressed
air blowing.
3
1
4
2
5
1-2. 2 x 140.000 cum LNG Storage Tanks 3. Fuel-Oil Storage Tanks
4. 3.500 cum (8 m dia x 72 m long) Mounded LPG Storage Tank
5. 3 x 500 cum Mounded LPG Storage Tanks
Erection Works
Best Performance (2001)
Total Erected
75.000 tons at 9 sites
Combined Cycle Power Plants
62.000 tons
10 x Fr9FA CTGs
5 x 50 STF30C STGs
10 x Vertical HRSGs
3 x Natural Draught Cooling System
2 x Forced Draught Cooling System
5.000 tons Power and Process Piping
Spherical LPG Tanks
6.000 tons
Cylindrical LNG Tanks
5.000 tons
Cement Plants
2.000 tons
4.3 million man-hours
without Lost Time Accident (LTA)
6
1
3
2
4
5
1. Adapazar› 780MW Natural Gas CCPP 2. Gebze 1555MW
Natural Gas CCPP 3. Rijnmond (Holland) 770MW Natural Gas
CCPP 4. ‹zmir 1525MW Natural Gas CCPP 5. Bursa 1400MW
Natural Gas CCPP 6. Trakya 1200MW Natural Gas CCPP 7. PS-3
Silopi 45MW Thermal Power Plant 8. 1360MW Afflin Elbistan-B
Thermal Power Plant 9. Kemerköy Thermal Power Plant
Erection Works
Over 600.000 tons of structural steel, mechanical
and electrical erection have been undertaken in
hermal and hydraulic power plants, cement plants,
ammonia and fertiliser plants, water and waste
water treatment plants, pipelines, refineries and
petrochemical plants, tank farms, pumping and
compressor stations, industrial plants and steel
bridges at jobsites in Turkey, Saudi Arabia, Iraq,
Jordan, Sudan, Libya, Algeria, Kuwait, UK,
Holland, Belarus, Kazakhstan, Kyrgyzstan and the
Russian Federation.
1
2
3
1-2-3. Gemlik Ammonia Plant 4. Benghazi End Reservoirs (Libya)
5. Alia¤a Aromatics Plant 6. Central Anatolian Refinery Process
Units
Welding
Heat Treatment and Testing
ASME (U, U2, S, PP)
NBPV (NB, R)
Bureau Veritas (CE-PED-H)
Turkish Lloyd
German Lloyd
ISO-9000, ISO-9001:2000
TÜV AD-MERKBLATT HP
0 / TRD201 / DIN EN 729-2
TUCSAmark
OHSAS 18001:1999
GTAW, GTAW Hotwire, Orbital GTAW, GMAW, Robotic GMAW
SAW, SMAW, FCAW, MCAW
Engineering
The engineering range of Çimtafl includes
structural steel, pressure vessels, storage tanks,
overhead cranes, process piping, gas processing
equipment, BOP equipment and 2D & 3D plant
design, utilizing the latest versions of STAAD-III,
SAP 2000, Xsteel, AutoCAD, PDMS, Review
Reality, IsoDraw, PDS, CAD Works Pipe, SpoolGen, Compress, Winshell, Caesar. The design and
engineering information is shared by the engineering
offices, the Gemlik Works and the jobsites via a
well-established communication network and
advanced information systems on a one PC per
desk basis.
5
1
2
3
4
6
7
8
9
10
1. 3D Spool Design 2. Amerya New Western Desert Gas Complex
Project 3. 3D Building Structural Steel Design 4. 1400MW Bursa
Natural Gas Combined Cycle Power Plant Project 5. Alia¤a
Complex 2 x 1500 tons VCM Storage Tanks Project 6. Akkim Heat
Exchanger SAP2000 finite element analysis 7. Compress finite element
analysis of a nozzle 8. KCC Tengizchevroil Compressor Manifold
Skid 9. FWI Stabilizer Column SAP2000 finite element analysis
10. 1360MW Afflin Elbistan-B TPP Steam Turbine Building Structural
Steel
QC Services
• Coating Inspection
• Crack Depth Measurement
• Dimensional Inspection
• Leak Test with Ultra Probe
• Mechanical (Destructive) Testing
• NDT (Nondestructive) Testing
• Portable Hardness Measurement
(HV, HB, HRb, HRc)
• Portable Spectral Analysis & PMI
• Portable Ferrite Measurement
• Pressure Test with Recorder
• Temperature Measurement
(from -500 C to +10000C)
• Vacuum Box Testing (up to -760mmHg)
• Welding Procedure Qualification
• Weight Measurement / Center of Gravity
Determination (up to 360tons)
Cimtas Pipe Fabrication and Trading Ltd. Co. has
been incorporated in February 2002 to provide
ntegrated design, engineering, procurement,
abrication, painting and FOB delivery services for
power, process and OEM piping systems. The
Company’s state-of-the-art facility is located at 1 km
rom Çimtafl Works in Gemlik, Turkey and 3 km
rom international deep sea ports, built on a
41.500 sqm fenced yard with 10.740 sqm covered
abrication shop and office space with 7 bays, 25
overhead cranes, 5 portal cranes, 1 tower crane,
10.000 tons/year production capacity, dedicated
blasting, painting, passivation and pickling facilities,
heat treatment and RT cabins, most modern welding
echnology, CNC and NC cold bending from 1/2"
o 10" dia, e-nabled QA/QC systems, destructive
and non-destructive examination laboratories,
advanced information technology, enterprise
resource planning and management information
systems.
Egyptian LNG Project
Supplier Excellence-2004
Cimtas (Ningbo) Steel Processing Co., Ltd. is a fully-owned
Cimtas Mechanical Contracting B.V. is a fully
Chinese subsidiary, engaged in power and process pipe
owned subsidiary incorporated in the Netherlands
spool fabrication and skid-mounted process equipment
to provide international customers with world-
assembly for local and overseas customers. The
class structural, mechanical and electrical erection
Company is located in the city of Ningbo, half an hour
services from this base on a global scale with a
light distance from Shanghai. Established in the Ningbo
Free Trade Zone, the Company enjoys the “Inside the
Territory, Outside the Customs” status of the Chinese
government. The workshop is within walking distance of
he Beilun Port, the second largest deep-sea port of the
People’s Republic of China, serviced by 15 top global shipping lines.
commitment to safety, quality and timely project
completion.
Based on Çimtafl’s proven experience gained over
the last thirty years to mobilise within a relatively
short time qualified non manual staff, supervisors,
skilled manual labor, temporary site facilities and
The 6.000 sqm operational workshop incorporates 100%
construction equipment into remote areas, this
segregated carbon and stainless steel fabrication and
specialised subsidiary company extends the already
storage areas, high-end welding technology, cold bending
existing and proven erection know-how and
capacity, dedicated blasting, painting, acid & phosphate
capacity to international projects with the ultimate
cleaning facilities and RT cabins as well as integrated
aim of serving worldwide government entities,
QA/QC systems, environmental friendly fabrication
private end users and prime contractors on a
processes, advanced information technologies and ERP
least total cost basis.
systems.
The workshop is supported by a 1200 sqm office area, a
7000 sqm adjacent workshop currently used for warehousing,
wo fully-equipped employee kitchens and cafeterias and
dormitories for all employees.
Cimtas (Ningbo) continues to be operated with a corporate
plan based on the transfer of proven and seamless business
systems from the existing operations in Turkey. For any
company doing business in China, Cimtas (Ningbo) is a
partner with:
• world-class quality,
• first-time-right capability,
• on-time delivery,
• a great willingness to solve problems quickly,
• an ability and willingness to excel and improve, and
• full back-up systems and man-power in place from
parent company in Turkey.
Cimtas BV successfully completed the Primary
Mechanical Erection Works of 770 MW Rijnmond
Energy Center (Holland) in 2004.
Pressure Vessels
HRSG
Reactors
Process Skids
Storage Tanks
Wind Towers
Structural Steel
Erection
Download