TEMPLATE October 2013 ACT 381 COMBINED BROWNFIELD PLAN TO CONDUCT ELIGIBLE DEQ RESPONSE AND/OR MSF NON-ENVIRONMENTAL ACTIVITIES [PROJECT NAME] [PROJECT ADDRESS] [County, City, Township] Brownfield Redevelopment Authority Date Prepared by: ACT 381 COMBINED PLAN OUTLINE TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Proposed Redevelopment and Future Use 1.2 Eligible Property Information 1.2.1 Location/Address -Includes legal description(s) as shown on deed 1.2.2 Current Ownership 1.2.3 Proposed Future Ownership 1.2.4 Delinquent Taxes, Interest, and Penalties 1.2.5 Existing and Proposed Future Zoning for Each Eligible Property 1.3 Historical & Previous Use and Ownership of Each Eligible Property 1.4 Current Use of Each Eligible Property 1.5 Summary of Liability 1.6 Summary of Environmental Study Documents 1.7 Summary of Environmental/Brownfield Conditions 1.8 Summary of Functionally Obsolete Blighted and/or Historic Conditions 1.9 Summary of Historic Qualities 2.0 DESCRIPTION OF COSTS & SCOPE OF WORK 2.1 DEQ Eligible Activities 2.1.1 Baseline Environmental Assessment 2.1.2 Due Care 2.1.3 Additional Response Activities 2.1.4 Environmental Insurance 2.1.5 Interest 2.1.6 Develop/Prepare Combined Brownfield Plan 2.2 MSF Eligible Activities 2.2.1 Infrastructure Improvements 2.2.2 Demolition that is not a response activity 2.2.3 Lead Abatement 2.2.4 Asbestos Abatement 2.2.5 Site Preparation that is not a response activity 2.2.6 Interest 2.2.7 Assistance to a land bank fast track authority 2.2.8 Relocation of Public Buildings or Operations 2.2.9 Develop/Prepare Combined Brownfield Plan 2.3 Local Only Eligible Activities 2.3.1 Baseline Environmental Assessment 2.3.2 Due Care 2.3.3 Additional Response Activities 2.3.4 Environmental Insurance 2.3.5 Interest 2.3.6 Develop/Prepare Combined Brownfield Plan 2.3.7 Infrastructure Improvements 2.3.8 Demolition that is not a response activity 2.3.9 2.3.10 2.3.11 2.3.12 2.3.13 2.3.14 Lead Abatement Asbestos Abatement Site Preparation that is not a response activity Interest Assistance to a land bank fast track authority Relocation of Public Buildings or Operations 3.0 TAX INCREMENT REVENUE ANALYSIS 3.1 Estimate of Captured Taxable Value and Tax Increment Revenues 3.2 Method of Financing and Description of Advances Made by the Municipality 3.3 Maximum Amount of Note or Bonded Indebtedness 3.4 Duration of Brownfield Plan 3.5 Estimated Impact of Tax Increment Financing on Revenues of Taxing Jurisdictions 4.0 INFORMATION REQUIRED BY SECTION 15(15) OF THE STATUTE FOR NON-ENVIRONMENTAL ACTIVITIES 4.1 How are the individual activities included in the work plan sufficient to complete the eligible activity? 4.2 How is each individual activity included in the work plan required to complete the eligible activity? 4.3 How were the costs for each individual activity determined to be reasonable? 4.4 What is the overall benefit to the public? 4.5 To what extent will vacant buildings be reused and redevelopment of blighted property occur? 4.6 How many and what type of jobs will be created by the project? 4.7 Is the eligible property in an area of high unemployment? 4.8 What is the level and extent of contamination alleviated by or in connection with the eligible activities? 4.9 What is the level of private sector contribution to the project? 4.10 If a greenfield site was considered, what is the cost gap between the site and a similar greenfield site? Alternatively, what extraordinary costs for this site are related to it being a brownfield? 4.11 If the developer or projected occupant of the new development is moving from another location in this state, will the move create a brownfield? 4.12 Provide project pro forma, financial statements or other acceptable documentation, which demonstrates that the project is financially and economically sound. 4.13 Identify the amount of all other anticipated state or local incentives that directly or indirectly benefit this project. 4.14 Provide any additional information you want MSF to consider while reviewing this work plan. 5.0 SCHEDULE of Activities 5.1 Schedule 5.2 Estimated Costs 5.2.1 Summary of Total Project Costs 5.2.2 Sources and Uses of Incentives and Funds 5.3 Summary of Relocation Actions 5.3.1 Estimates of Residents and Displacement of Individuals/Families 5.4 5.5 5.3.2 Plan for Relocation of Displaced Persons 5.3.3 Provisions for Relocation Costs 5.3.4 Strategy for Compliance with Michigan’s Relocation Assistance Law Description of Proposed Use of Local Site Remediation Revolving Fund Other Material that the Authority or Governing Body Considers Pertinent EXHIBITS Figures Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Scaled Property Location Map Eligibility Property Map(s) Sampling Location Map Map of Known Extent of Vertical & Horizontal Contamination Color Site Photographs Infrastructure Improvement(s) Map(s) Redevelopment Project Renderings(s) Engineering Site Plan(s) Tables Table 1 Table 2 Summary of Costs for Eligible Activities Tax Capture/Reimbursement Schedule Attachments Attachment A Attachment B Attachment C Attachment D Resolution(s) Approving Combined Brownfield Plan Development Reimbursement Agreement Declaration of Dangerous Building Declaration of Blighted Condition and/or Level 3 or Level 4 (Master or Advanced) Assessor’s Signed Affidavit for Functionally Obsolete FIGURES Figure 1 Scaled Property Location Map Figure 2 Eligible Property Map(s) Figure 3 Sampling Location Map Figure 4 Map of Known Extent of Vertical & Horizontal Contamination Figure 5 Color Site Photographs Figure 6 Infrastructure Improvement(s) Map(s) Figure 7 Redevelopment Project Renderings(s) Figure 8 Engineering Site Plan(s) or Site Plan(s) TABLES Table 1 Summary of Costs for Eligible Activities Table 1 Summary of Costs for Eligible Activities MSF Eligible Activities MSF Request Demolition $ ____________ Lead and/or Asbestos Abatement $ ____________ Infrastructure Improvements $ ____________ Site Preparation $ ____________ Sub-Total $ ____________ Contingency (indicate %)* Sub-Total $ ____________ $ ____________ Interest** $ ____________ Brownfield/Work Plan Preparation*** $ ____________ MSF TOTAL DEQ Eligible Activities $ ____________ DEQ Request Baseline Environmental Assessment $ ____________ Due Care Activities $ ____________ Additional Response Activities $ ____________ Environmental Insurance $ ____________ Sub-Total Contingency (indicate %)* Sub-Total Brownfield/Work Plan Preparation*** DEQ TOTAL GRAND TOTAL OF ELIGIBLE ACTIVITES (MSF + DEQ) $ ____________ $ ____________ $ ____________ $ ____________ $ ____________ $ ____________ *The DEQ and MEDC allow up to a 15% contingency. **Upon request, the MSF Board will consider interest in accordance with the current MEDC Brownfield Program Guidelines. ***The DEQ and MEDC allow an agency-combined total of up to $20,000 for preparation of Brownfield Plans and/or Act 381 Work Plans. This should be appropriately split between the agencies. Table 2 Tax Capture/ Reimbursement Schedule ATTACHMENTS Attachment A Resolution(s) Approving Attachment B Development Reimbursement Agreement Attachment C Declaration of Dangerous Building Attachment D Declaration of Blighted Condition and/or Level 3 or Level 4 (Master or Advanced) Assessor’s Signed Affidavit for Functionally Obsolete