WaterFirst Workshop September 9, 2015 Wastewater Treatment and Management System Overview Wastewater Collection North Fulton County, Sandy Springs, and South Fulton County Approximately 2,400 miles of interceptor, trunk and sanitary sewers, force mains and 48 sewage lift stations 62,000 manholes, service connections, and related appurtenances Water Reclamation North Fulton County and South Fulton County 3 – in North Fulton County (40 MGD) 2 – in South Fulton County (24.1 MGD) Contracts with surrounding municipalities System Overview County owns and operates wastewater collection systems and treatment plants that serve customers north and south of the City of Atlanta Approximately 285 square mile total service area Approximately 86,500 residential customers receive wastewater collection and treatment services 71,500 customers in North Service Area 15,000 customers in South Service Area Plus: Industrial and commercial customers Plus: Neighboring jurisdictions via inter-jurisdictional agreement System Overview Sewerage System consists of: 5 treatment plants Approximately 2,400 miles of interceptor, trunk and sanitary sewers, and force mains Approximately 62,000 manholes 48 sewage lift stations • Firm capacities range from 0.12 MGD to 95 MGD Wastewater Planning Service Areas Agreements with Neighboring Jurisdictions Jurisdiction Flow From Flow To Receiving WRF Flow Allotment City of Atlanta City of Atlanta City of Atlanta Cherokee County Clayton County Cobb County Cobb County DeKalb County DeKalb County Forsyth County Forsyth County City of Fairburn City of Palmetto City of Union City City of College Park Fulton County Fulton County City of Atlanta Cherokee County Fulton County Cobb County Fulton County DeKalb County DeKalb County Forsyth County Forsyth County Fairburn Palmetto Union City College Park City of Atlanta City of Atlanta Fulton County Fulton County Clayton County Fulton County Cobb County Fulton County Fulton County Fulton County Fulton County Fulton County Fulton County Fulton County Fulton County R.M. Clayton WRC Utoy Creek WRC Camp Creek WRF Little River WRF R.L. Jackson WRF Big Creek WRF R.L. Sutton WRF Big Creek WRF JCEC Big Creek WRF JCEC Camp Creek WRF Camp Creek WRF Camp Creek WRF Camp Creek WRF 7.0 7.5 3.61 0.1 1.0 4.19 13.82 0.5 1.0 1.25 1.37 1.0 1.0 3.0 2.23 1. Max Month Flow (MGD) Existing Facilities Current Volumes Treated Permitted Facility Average Flow Treated Capacity 2013 2014 MGD MGD MGD Big Creek WRF 24.0 18.5 18.35 Camp Creek WRF 24.0 16.3 15.70 Johns Creek Environmental Campus 15.0 8.7 8.62 Little River WRF 1.0 0.85 0.90 Settindown Creek LAS 0.2 0.18 0.17 Little Bear Creek WPCP 0.1 0.02 0.027 Total Average Volume Treated (MGD) = Total Volume Treated (MG) = MGD is Million Gallons Per Day, MG is Million Gallons 64.3 44.5 16,252 43.7 15,975 Existing Facilities Big Creek Water Reclamation Facility Current Capacity 24 MGD When Last Expanded 1991 Expected Near-Term Capacity Needed 38 MGD Expected Near-Term Expansion 2020 Existing Facilities Camp Creek Water Reclamation Facility Current Capacity 24 MGD When Last Expanded 2005 Expected Near-Term Capacity Needed 2025 Expected Near-Term Expansion 2020 Existing Facilities Johns Creek Environmental Campus Current Capacity 15 MGD Completed 2009 Expected Near-Term Capacity Needed 2035 Expected Near-Term Expansion 2030 Reclaimed water is currently only used for onsite purposes. Existing Facilities Little River Water Reclamation Facility Current Capacity 1.0 MGD When Last Expanded 1988 Expected Near-Term Capacity Needed 2.6 MGD Expected Near-Term Expansion 2016 Plant has a 0.200 MGD LAS permit to supply reuse water to a neighboring golf course. Existing Facilities Little Bear Water Reclamation Facility Current Capacity 0.10 MGD When Last Expanded Never Expected Near-Term Capacity Needed None Expected Near-Term Expansion None Facility is a package plant. Future plan is to decommission and send flow to Camp Creek. Existing Facilities Facility condition assessments are conducted on an annual basis Big Creek WRF is currently preparing to award construction contract for rehabilitation Little River WRF is currently finishing design for expansion Corrective action taken on all equipment as recommended by condition assessments Existing Facilities Facility Conditions 2014 CLOSED WORK ORDERS Facilities are covered by ongoing maintenance programs Chart is inclusive of 5 treatment plants and 48 pump stations 7% 93% CORRECTIVE MAINTENANCE PREVENTATIVE MAINTENANCE Existing Facilities Infiltration & Inflow as received at the WRFs Quantity is decreasing with ongoing work Facility Annual Daily Average Big Creek Water Reclamation Facility 0.5 MGD Camp Creek Water Reclamation Facility 0.5 MGD Johns Creek Environmental Campus (JCEC) 0.4 MGD Little River Water Reclamation Facility 0.2 MGD Facility Upgrades and Expansions Analyses conducted for each facility to: Cost effectively meet NPDES & Regulatory requirements Meet possible future requirements Part of plant upgrade & expansion designs Includes alternatives analysis evaluating various requirements, effectiveness, and constraints Facility Upgrades and Expansions Treatment and Capacity aren’t the only issues to be addressed Odor, Noise, and Aesthetics are additional issues These have been successfully addressed at JCEC No odors beyond 25 Feet from any building Average of 10 dBA reduction in ambient sound level from before construction to after construction Architecture and Landscaping used to blend into neighboring locations Recent Capital Improvement Projects Game Creek Improvements Extreme Makeover! New MCC & VFDs Replacement of pumps, motor control center and control system Bypass pumping connections New backup generator New odor control system Landscape Improvements $652,250.00 budget Recent Capital Improvement Projects South Fulton Pump Station Odor Control Upgrades at Seven Pump Stations $2,218,777 Budget Regulatory Issues Regulatory Changes are addressed during NPDES Discharge Permit Renewals Includes: flow quantity, pollutant identification, loading and concentrations Changes drive plant expansions & upgrades All Regulatory & NPDES Permit requirements are met or exceeded. The KPI is the “Wastewater Effectiveness Rate” The goal is 100% treatment Current Wastewater Effectiveness Rate is 99.62% Regulatory Issues Watershed Protection Plan Completed February 2006 Assessed treatment level impacts upon receiving water bodies Implemented MS4 & annual storm water permit for all wastewater facilities o Storm water is monitored per permit Wastewater Treatment Systems Wastewater Treatment Reliability Plant operations & maintenance staff are constantly trained to advance knowledge and maintain certifications. Certification status is updated monthly Backup systems, equipment & software used for monitoring wastewater facilities CMMS, SCADA, operations data analysis & storage, web-based telemetry, onsite & remote access Treatment Plants Beneficial reuse of bio-solids Johns Creek Environmental Campus sludge is sent to compost facility Capacity, Maintenance, Operation, and Management (CMOM) CMOM program approved by Georgia EPD Audits successfully completed in 2011 & 2012 by EPD Internal audits are done on annual basis o City Works and Datastream 7i are the CMMS software used CMOM Data is used to determine capacity needs for wastewater facilities and collection system and to keep track of maintenance programs, equipment & inventories Inspection & repairs of: Creek crossings Manholes SSOs Sanitary Sewer Lines & easements Sewer system cleaning and chemical root control programs CMOM Infiltration & Inflow Reduction Majority of sewer lines have been visually inspected via CCTV Defects given a PACP coding & ratings Used to prioritize corrections Ongoing inspection & repair program to ensure reduction of inflow & infiltration CMOM Root Control To apply chemical root control to sewer lines and manholes to kill root growth Plan to treat up to 80,000 feet of sewer line per year Cleaning To remove sedimentation, debris, and grease from sewer lines and manholes Plan to clean up to 110,000 feet of sewer line per year CMOM Key Performance Indicators for 2014 Key Performance Indicator Actual Rate Measured Target Less Than Sewer Overflow Rate 2.0 3 /100 Miles of Piping Less Than Collection System Integrity 1.11 10 /100 Miles of Piping O & M Cost Per Account $ 166.00 Less Than $ 550 /Account O & M Cost Per Million Equal to or $ 1,935.00 Less Than $ 2,800 Gallons Treated Direct Cost of Treatment per Equal to or $ 2,474.00 Less Than $ 2,800 Million Gallons Treated Wastewater Treatment Equal To 100% 100% Effective Rate * All plants except for Camp Creek meet 100% wastewater treatment effectiveness rate. Status Meets Criteria Meets Criteria Meets Criteria Meets Criteria Meets Criteria Close to Criteria* GIS and Computerized Maintenance Management System (CMMS) Geographic Information System Maintain inventory of Water, Waste Water, and Storm Water systems Complete system that supports asset management, spatial analyses related to the watersheds, and operational maintenance and construction Includes material, diameter and size, installation date, status, location notes, special conditions, special functionality, etc. Updated continuously as repairs to the system are completed, the system is expanded, the system is reconfigured, or supporting information is discovered Field survey work is continuously in process to improve or record the locations of assets CMMS Work Order Management The work order management system is tied directly to the GIS. This gives all work orders a place on the map and an asset in the system for tracking purposes. CMMS Work Order Management Reports are generated from the work orders that track productivity, KPIs, and assist in managing the work that must get done. Public Education and Outreach Fats, Roots, Rags, Oils, and Grease (F.R.O.G.) Educate about proper disposal and maintenance Provide information about wastewater treatment standards and practices Program is offered to schools throughout the County & information is available on Fulton County’s website Promote internships & have a dedicated education center at Johns Creek Environmental Campus Septic Tanks Fulton County Code of Laws establishes: Prevention of installation in floodplains & stream buffers Limitations on density in siting septic tanks Residents may petition for sewer connection Connection to sewer is not required unless the septic system has failed. Fulton County uses the Garrison software called Digital Health Department. For septic tank conversion tracking purposes, files are organized alphabetically by address. Pumped septic tank waste is accepted at the Camp Creek WRF Public Education plays a key role in: Proper use Inspection, Maintenance & Cleaning Staff attends community meetings, provides information via the Environmental Health webpage Industrial Monitoring and Commercial Pretreatment Program allows for monitoring and reducing pollutant load and hazardous substances being introduced into the collection system and treatment plants. Guided by Fulton County’s Sewer Use Ordinance. EPD approved Industrial Pretreatment Program. Details, Sewer Use Ordinance, & permit applications available through Fulton County’s website Industrial Monitoring This program was created to meet a State and Federal regulatory requirement to monitor what industries discharge into the County sewer system The Industrial Monitoring section issues permits to industries to limit the pollutants discharged into the sewer system, inspects the industries for compliance with County guidelines, and takes action against industries that violate their permits 34 Permitted (significant) industrial users 31 Non-permitted industrial users Commercial Pretreatment Monitoring & inspection of approximately 1,805 commercial waste generators & pretreatment systems Pretreatment systems are grease traps for restaurants, schools, churches, hotels, etc., and oil separators for car maintenance and car/truck washes All new commercial development with a pretreatment system must be reviewed to ensure it meets County standards by the commercial pretreatment program before discharging to Fulton County sewer This includes plan review and inspection Separators discharging to sanitary sewer are covered under this program Commercial Pretreatment All commercial waste generators with a grease trap, oil separator or sand trap that discharge to the county sanitary sewer system are required to have a permit for their pretreatment systems. Inspections Quarterly & random inspections Verify maintenance is done by owner Nearby grease traps of F.O.G. induced spills Shares information with sewer maintenance Diverted Water Program Available to commercial & industrial users of Fulton County’s sewer system Removes sewer service fee on flows not sent into the collection system Customer must divert at least 25% or more of their annual water consumption Program is useful for cooling tower operations or manufacturing processes which consume potable water 22 properties participating in program Approximately 47,644,640 gallons diverted for an amount of $61,540.76 Water Reclamation and Reuse Current Uses Landscaping irrigation, fire protection and toilet flushing at JCEC Settin Down Golf Course adjacent to Little River WRF SFMOC – irrigation water is from Camp Creek WRF Questions