Terms of Reference Project Manager for the Colombia Country Programme 1. Background Since late 2010, CDKN and the Colombian Government have collaborated in order to design and implement pilot projects in Colombia as well as to design a Country Programme that guides CDKN’s support to Colombia’s efforts to towards a climate compatible development. In late 2011, the government issued The Colombia National Climate Change Strategy (CONPES), which has three key areas: 1) Development of the National Policy on Climate Change; 2) Creating of the National Climate Change System (NCCS); and 3) To mainstream climate change adaptation into sectors (agriculture, energy, housing, infrastructure, etc.) The CDKN Colombia Country Programme, has been designed in response to the priorities identified in CONPES. The CDKN Colombia programme overarching goal is to build capacity of key institutions that form the National Climate Change System (NCCS) to support collaboration for mainstreaming of climate change adaptation into sectors and territories. To this extent, the programme has 5 work streams, described in the diagram in Annex 1. 1.1. Work stream 5 - Overall Programme Management, Communications and M&E The overall objective of work stream 5 is to develop overall policy coordination to assure engaging policy makers in climate change decisions and planning, develop a communication strategy and an overall information and monitoring system of CDKNs activities in the country. This Terms of Reference have been prepared by E3 Asesorias, based on the TOR which are described in CDKN’s contract with E3 Asesorias, in order to recruit a Program Manager. 2. Objective for Project Manager of Colombia Country Program The Program Manager will assist, Claudia Martinez, CDKN’s Country Engagement Leader, in implementing the Colombia Country Programme, and to deliver the products described in the Contract between PWC and E3 Asesorias (see appendix 2). 3. Sepcific Responsabilities for the Project Manager • • • • • • • • • • • • • • • • • Being the contact and focal point for project or programme – managing service recipients, wider stakeholders, suppliers, partners Developing work plans and schedules with the Country Engagement Leader to ensure proper management, follow-up and QA of CDKN projects in Colombia. Developing the technical content for Terms of Reference that may be required and getting these approved by CDKN Procurement, TA and LAC offices. Taking projects through PAG and the procurement process in coordination with CDKN LAC Office. Holding the project inception meeting and related processes Overseeing M&E objectives and completion of baselines Capturing progress and stories of change – and communicating these stories of change. Review and draft policy briefs and other materials. Coordinate the work of the part time communications officer. Owning the contract management – including regular (bi monthly) reporting, managing risks, scaling up, contract variations (new Project Review Group), PM input into contract reviews Reviewing deliverables manage the quality assurance processes throughout the project lifecycle. Making sure complete records of each project are up to date on Huddle / Compass Capturing wider “level 2” learning – for the programme, country, region, theme? Coordinating with the suppliers to create the M&E Objectives form and other M&E related data. Raising invoices in line with payment schedule. Managing financial reports for projects and country programme. Provide timely information when required by CDKN. Assist in developing bi-monthly reports and weekly updates for CDKN Assist project coordinator in every-day activities. This includes assist with Office activities as required by the Country Engagement Leader and the CDKN team. Provide inputs to CDKN Global documents and efforts as requested. Travel may be necessary to join CDKN meetings or share lessons from CDKN-funded projects in Colombia. APENDIX 1 – Diagram of Colombia Country Programme Colombia’s national action on climate change (CONPES No. 3700) Area 1 Developing National Policy on Climate Change -National Adaptation Plan -National REDD Strategy -National Strategy for Low Carbon Development Area 2 Creating the National Climate Change System (NCCS) institutional arrangements Other donor programmes: Are supporting other Areas of work. CDKN should continue to be an active part of LEDS coordination processes in country CDKN Colombia Programme high-level objective: To support Colombia to mainstream climate change, by developing the institutional arrangements and working with particular sectors and territories, with a particular focus on climate change adaptation CDKN Workstream 1: Supporting sectoral mainstreaming •Choose 2 ministry sectors •Develop programs to help building adaptation strategies •Prioritise activities for further work •Coordinate activities with National Adaptation Strategy CDKN Workstream 4: Policy research • Research on impacts of low carbon policy on trade barriers to export of Colombian goods CDKN Workstream 2:Supporting IDEAM in their NCCS role •Appoint technical expert to give institution capacity to deliver what is being asked from it as a key player in the NCCS process Area 3 Mainstream climate change into sectors (agriculture, energy, housing, infrastructure, health) and territories, including development of Sector-level Adaptation Strategies CDKN Workstream 3: Supporting pilot projects for sectoral and territorial mainstreaming •TALA 0006 (underway) – Integrating climate change into spatial planning in Cartagena •TALA 0009 (underway) – Agriculture Adaptation Plan in Upper Cauca + Further Phase 2 work on these projects to continue progress and link them to the broader sectoral and territorial mainstreaming work CDKN Workstream 5: Programme management, coordination and engagement • Country engagement • Country programme management • Communications and learning • Development of an Action Lab in coordination with the climate Congress 2012 • M&E support • Oversight and scoping of any further work subject to changes in demand and availability of CDKN funds APENDIX 2 – Objectives and Deliverables Agreed between PWC and E3 Asesorias 1. Scope work stream 1 to develop new projects with Transport and Housing Sectors Activities to attain objective: A1.1 Preparation of Terms of reference for sectoral expertise required for each Ministry in consultation with the appropriate ministries/gov stakeholders A1.2 Political engagement with Ministries in the process to ensure buy-in to workstream objectives, terms of reference, and outputs that result from the projects. A1.3 Continued oversight and QA of workstreem 1 projects. This includes assisting suppliers liase with relevant national authorities to ensure results and generating final deliverables that are usefull to political audiences. A1.4. Ensure appropriate quality assurance of deliverables, coordinating internal and/or external review of high risk deliverables. Deliverables: D1.1 ToRs D1.2 QA of deliverables as described in the ToR that will be created for work with each Ministry. D1.3 ToR (or EOP) for internal/external QA reviewers D1.4. Project Progress Reports about workstream 1 projects D1.5. Invoice Validation Reports for all Payments to suppliers. 2. Continue coordinating current CDKN projects in Cartagena and Upper Cauca Basin. Activities to attain Objective: A2.1 Development of activities including meetings with suppliers to review and assist in project implementation, committees in charge of political guidance (with MADS, IDEAM and Ministry of agriculture and others) activities with relevant stakeholders, donors, and other relevant actors. A2.2 Review technical outcomes of the projects and assist in transforming them in political outcomes that could be used by relevant stakeholders. A2.3 Scope second phases of the Cartagena and Adaptation projects Deliverables: D2.1 Reports of project advances D2.2 ToRs for second phases of the project discussed with relevant government entities and approved by CDKN. D2.3 Invoice Validation Reports for all Payments to suppliers. 3. Coordinate an “Action Lab” type workshop and develop ToRs for a competitive tender for delivery Activities to attain objective A3.1 Develop the strategy with CDKN London A3.2 Select participants and invite them with Government A3.3 Co-develop the 3 days action Lab with a supplier that will run the event Deliverables: D3.1 3 days event in August-September, with the appropriate level of participation from across the country NOTE: Grupo E3 SAS will provide oversight, advice for design and concept, recommend the list of participants. Coordination and Implementation of the Action Lab itself will be contracted out. 4. Coordinate donor activities and projects together with the climate change office of Ministry of Environment Activities to attain objective A4.1 Develop regular meetings with other donors and financial sources such as the adaptation fund in order to coordinate programs. A4.2 Develop joint activities with other donors and institutions that could sum up to the projects CDKN is developing in Colombia. Deliverables: D4.1 Bimonthly reports on the different coordinating activities with other donors. 5. Develop diverse communication activities in order to raise awareness to specific stakeholders about CDKN projects and impacts in Colombia Activities to attain objective A5.1 Develop together with SPPN (Peru) a communication strategy for each CDKN project in Colombia, and an overall strategy for the country A5.2 In consultation with CDKN KM, develop communication tools and innovative media outreach to communicate the relevant outcomes of CDKNs activities in Colombia A5.3 Assure that the project outcomes are translated in a political language that could reach decision makers. A5.4 Assist the Office of Climate Change of the Ministry of Environment and Sustainable Development (MADS) in the implementation of their communication strategy as possible. Deliverables D5.1 Communication strategy which has been discussed and approved by CDKN KM team D5.2. A digital file with a copy of communications products which have been generated as planned in the Communication Strategy, including printed material, newspaper articles, etc. D5.3. Review the CDKN website related to the Country Programme and ensure it is upto-date. D5.4. A blog for CDKN website once every 2 months. We should aim at capturing stories of change that can de shared with an external audience D5.5 Project updates to be used in CDKN’s internal weekly update report. D5.6 2 events (such as breakfasts) convened by CDKN in Colombia to discuss relevant CCD issues with a high level audience of policy makers. 6. Collaborate with CDKN LAC and London team in several overarching activities and projects in the region and in the world Activities to attain objective A6.1 Assist the LAC team developing general objectives and coherence of relevant CDKN projects in the region A6.2 Assist in the general implementation of the Amazon project on climate security A6.3 Coordinate actions and ideas with CDKN team, finding opportunities of collaboration of the different regions and programs that could use the Colombian experience or could enrich the Colombian program. A6.4 Assist in developing CDKN theme strategy on strengthening resilience through climate related disaster risk management, with the Colombian experience. Deliverables D6.1 Review relevant policy briefs, LAC strategy and other CDKN strategy documents as required. D7.2 Represent CDKN team in forums, projects and meetings as needed and request by CDKN LAC. 7. To Develop and coordinate Monitoring and Evaluation activities of CDKN program in Colombia Activities to attain Objective A7.1 Bi monthly Reports to CDKN capturing progress in all areas described above. The last report to CDKN should capture the lessons learned of the project (reflections / lessons learned on the whole country process) A7.2 In collaboration with project suppliers and clients, complete CDKN M&E objectives form, supplier report form and other reporting tools for all CDKN activities in Colombia. A7.3. In collaboration with project suppliers and CDKN M&E experts determine what projects need to collect baseline date and how. If necessary prepare TOR for M&E related subcontracts (chase study, baseline collection,etc). Deliverables D7.1 CDKN M&E forms completed D7.2 Complete the section about Colombia that is needed for Quarterly reports, Country Reports and other CDKN reports. D7.3. M&E objectives forms, suppliers report form, client report form for all projects in Colombia D7.4 Participate in Project Review Group as required