ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO. Web site : www.egcoegypt.com Email : egco @ egcoegypt.com More than twenty years of experience ENGINEER GENERAL CON.CO.(EGCO): ENG.ABDEL MOUTY AMER. EGCO, OUR COMPANY, HAS BEEN ESTABLISHED IN 1985, BY A VERY HIGH QUALIFIED GROUP OF CIVIL, MECHANICAL, ELECTRICAL AND ARCHITECTURAL ENGINEERS. WE HAVE A VERY GOOD EXPERIENCE OVER 20 YEARS IN THE CONSTRUCTION OF PROJECTS FOR WATER SUPPLY AND WASTE WATER FACILITIES. WE ARE WORKING HARD TO KEEP A GREAT COORDINATION BETWEEN OUR PROFESSIONAL EMPLOYEES AND THE MANAGEMENT OF OUR DEPARTMENTS, MAINTAINING THE HIGHTEST STANDARD OF QUALITY. SO WE INVITE YOU TO TAKE A LOOK AT OUR BROCHURE, WISHING ALL PROGRESS AND SUCCESS FOR EGCO. COMMITMENT TO QUALITY, SERVICE, FUNCTION AND VALUE REMAINS AT THE HEART OF EVERYTHING WE DO. ENG.ABDEL MOُُETY AMER CHAIRMAN OF THE BOARD CHAIRMAN AND MANAGING DIRECTOR PUBLIC RELATION TECHNICAL MANAGER ADMINISTRATIVE MANAGER PLANNING CONTRACTS TENDERS RESEARCH GENERAL PROJECTS MANAGER EXECUTIVE MANAGER HUMAN RESOURCES AND TRAINING LEGAL AFFAIRS IT MANAGER EXECUTIVE SECRETARY QUALITY CONTROL MANAGER FINANCIAL MANAGER SUBCONTRACTORS CASH STORES ACCOUNTS SECRETERIAL INTERNAL PREVIEW ADVANCE GENERAL LEDGER AUDITING TENDERS RESEARCH DOCUMENTATION CONTROL CONTRACTS, OFFERS & CASHIER QUALITY CONTROL PURCHASING INFORMATION STATICS STORAGE EXECUTIVE WORKS PREVIEW SITE ENGINEER MANAGERS PROJECTS COSTS MECHANICAL EQUIPEMENTS MANAGERS BANKS & INVESTMENTS Sr. Quality ( Item ) Quantity 1 Excavator ( Komatsu ) PC 200/2 2 2 Excavator ( Komatsu ) PC 200/3 2 3 Excavator ( Komatsu ) PC 120/5 5 4 Excavator ( Komatsu ) PC 120/6 2 5 Loader ( Komatsu ) WA 350 2 6 Loader ( Komatsu ) W 60 2 7 Loader ( Komatsu ) WA 40 1 8 Crane FMC ( 18 Ton ) 2 9 Moving mixer 1m 3 4 10 Well point system with accessories 32 11 Jet pump 4 inch 6 12 Deep well pump (Ferbank ) 30 H.P 100 m3/h with accessories 20 13 Generator ( Komatsu ) 230 K.V.A 4 14 Generator ( Helwan ) 60 K.V.A 3 15 Distribution panels for operation pumps 3 16 Air compressor( Atlas ) 3 Sr. Quality ( Item ) Quantity 17 Concrete Vibrator ( Honda5 ) 5.5 H.P 8 18 Submersible pump (Tesromi ) 220 Volt 13 19 Dewatering pump ( kobbota ) 6 20 Truck ( 3 Ton ) 6 21 Water truck 6 22 Diesel truck 3 23 Welding Machine Doeits 400 Amb 3 24 Mercedes Car ML 320 1 25 Peugeot car GLX 405 1 26 Mitsubishi Lancer 1 27 Mitsubishi truck car ( 5 Ton ) 1 28 Pick up Chevrolet car 8 29 Dogan car SLX 1600 1 30 Shaheen car 1400 1 31 Computer Network 1 32 Personal Computer 22 33 Printer 8 NO NAME POSITION YEARS OF EXPERIENCE QUALIFICATION YEARS WITH THE FIRM 1 Abdel Moety Mohamed Amer Chairman of the board. 36 B.Sc. of Mechanical Eng. Cairo Univ. 1968 19 Years 2 Ahmed El Sayed Amer General Executive Manager 19 B.Sc. of Science, 1985 16 Years 3 Abdel Moneim Zayed Technical Dept. Manager 29 B.Sc. of Mechanical Eng. 1975 6 Years 4 Mohsen El Shabrawi Project Manager 21 B.Sc. of Civil Eng. 1983 3 Years 5 Helal Aziz Sharobim Maintenance Engineer 27 B.Sc. of Mechanical Eng. 1977 6 Years 6 Mostapha EL Tabei Chemical Engineer 26 B.Sc. of chemical Eng. 1978 8 Years 7 Ahmed Sabry NourEldeen Project Manager 21 B.Sc. of Civil Eng. 1983 6 Years 8 Ahmed Mohamed Elbieh Site Engineer 16 B.Sc. of Civil Eng. 1987 1 Year 9 Baher Mikhaeil Shenouda Site Engineer 15 B.Sc. of Civil Eng. 1988 4 Years 10 Fathy Elsaid Almoursy Site Engineer 6 B.Sc. of civil Eng. 1997 4 months 11 Mohamed Bayomi Ramadan Computer Engineer 9 B.Sc. of Science Technology 1995 3 Years 12 Ahmed Adel Mahmoud Technical Dept. Engineer 1 B.Sc. of civil Eng. 2003 18 months 13 Sameh Nabil Abdel Hadi Site Engineer 3 B.Sc. of civil Eng. 2000 6 months NAME 14 Hassan Moh. Mohei El Din Accountant 16 Faculty of Commerce 1985 10 Years 15 Mohamed Omar Financial Manager 26 Faculty of Commerce 1975 10 Years 16 Ali Abdel Al Saleh Financial & Admin. 10 Faculty of Commerce 90 7 Years 17 Ibrahim Abdel Halim Accountant 10 Faculty of Commerce 91 4 Years 18 Magdy Abou El Magd Accountant 9 Faculty of Commerce 1992 1 months 19 Mohamed Seliman Eliwa Accountant 4 Faculty of Commerce 1985 4 Years 20 Onsi Anwar Ali Personnel 20 Technical Commercial High School 1881 5 Years 21 Safwat Abdel naieem Financial & Admin. 9 Technical Commercial High School 1881 7 Years 22 Osama Anwar Ali Admin. Manager 20 Faculty of Commerce 1985 20 23 Hisham Helal Accountant 1 Faculty of Commerce 2003 1 24 Amal Abdel Megeed Accountant 4 Faculty of Commerce 2000 1 25 Heba Ali Mourad Special Secretary 4 Faculty of Agriculture 2000 1 26 Ebtihal Gamal Eldeen General Secretary 10 Faculty of Law 1993 2 27 Yasmien Saleh Mahmoud Receptionist 2 Faculty of Law 2002 1 moniem QUALIFICATION YEARS WITH THE FIRM NO Abdel POSITION YEARS OF EXPERIENCE NO NAME POSITION YEARS OF EXPERIENCE QUALIFICATION YEARS WITH THE FIRM 28 Fouad Nabil Sobhy Surveyor 8 Industrial High School 1993 3 Years 29 Ezzat Khalaf Hassan Surveyor 5 High School for Area measurements 1996 4 Years 30 Ahmed Abdel Hafiz Surveyor 4 Technical Industrial high school 1997 4 Years 31 Mohamed Roshdy Ahmed Surveyor 4 High School for Area measurements 1997 4 Years 32 Taha Bassiouny Mohamed Surveyor 4 Technical Industrial high school 1997 4 Years 33 Moustafa Wakeel Technical Supervisor 13 Technical Industrial high school 1988 7 Years 34 Hazem Abdalla El Mougi Technical Supervisor 13 Technical high School 1988 3 Years 35 Ibrahim El Sayed Bayoumy Technical Supervisor 12 Technical Industrial high school 1989 5 Years 36 Mohamed El Sherbini Technical Supervisor 9 Technical Industrial High School 1992 7 Years 37 Ramadan Shaaban Technical Supervisor 10 Technical Industrial high school 1991 7 Years 38 Maged Abdel Moneim Technical Supervisor 7 Technical Industrial high school 94 5 Years 39 Mohsen Aboul Leil Technical Supervisor 18 Agriculture Science high school 1994 40 Nabil Aboul Leil Store Keeper 15 Technical Commercial high school 1986 6 Years 41 Mohamed Badr El Din Purchasing Representative 12 Technical Commercial high school 1989 5 Years 42 Mohamed Ibrahim Moustafa Store Keeper 14 Agriculture Science high school 1987 5 Years 43 Ali El Sayed Ali Store Keeper 14 Agriculture Science high school 1987 5 Years 44 Aref Sabry Sharaf Store Keeper 8 Faculty of letter 1993 4 Years A. Fatah El 4 months NO NAME POSITION YEARS OF EXPERIENCE QUALIFICATION YEARS WITH THE FIRM 45 Wael Ahmed El Sheikh Plumber 9 Technical Industrial high school 1992 4 Years 46 Attia Mansour Ahmed Plumber 6 47 Essam Abdel Moety Plumber 9 Technical commercial high school 93 6 Years 48 Abdel Nasser Abdel Khalek Plumber - - 5 Years 49 Amgad El Shahat Plumber - - 4 Years 50 Mosaad Sallam carpenter 9 Preparatory School 1992 4 Years 51 Gamal Hussein Electrician 21 Industrial High School 1980 7 Years 52 Wagih Mansour Electrician 16 Industrial High School 1985 5 Years 53 Hesham Taha Electrician 14 Technical Industrial High School 1987 5 Years 54 Hassan Abdel Azim Electrician - Industrial High School 1979 5 Years 55 Khaled Galal El Din Electrician 4 Technical Industrial High School 1997 3 Years 56 Alaa Abdel Gawaad Technician - - 5 Years 57 Mohamed Mekki Mechanic - - 1 Year 58 Atif Abdel Hamid Mechanic - - 9 Years 59 Mahmoud Hafez Mahmoud Mechanic - - 6 Years 60 Emad El Sayed Attia Mechanic - Primary school 1982 5 Years Carpentry high school 1996 7 Years NO 1 2 3 PERIOD NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLIO N 1985- 1986 POTABLE WATER PIPES AT: MEET MAZAH & MEET ALI VILLAGES DAKAHLIA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF ASBESTOS CEMENT PIPES LINE, DIAMETERS 150 MM & 200 MM INCLUDING VALVES, SPECIAL PIECES, VALVES CHAMBERS AND HOUSE CONNECTIONS. MINISTRY OF RECONSTRUCTIO N AND HOUSING AT DAKAHLIA GOVERNORATE. 1.5 1985-1986 SEWAGE DRAINAGE NETWORK AT 10TH OF RAMADAN AREA GAMASSA CITY. DAKAHLIA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 175 MM UP TO 600 MM INCLUDING THE INSTALLATION OF SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. MINISTRY OF RECONSTRUCTIO N AND HOUSING AT DAKAHLIA GOVERNORATE. 2.0 1985-1986 SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT THE 10TH OF RAMADAN AREA - GAMASSA CITY . DAKAHLIA GOVERNORATE – EGYPT. SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION WORKS, PLAIN & REINFORCED CONCRETE WORKS, PUMPS-ROOM, BUILDINGS AND FINISHINGS. PLUS OF SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL EQUIPMENTS, BASED ON WELL–POINT SYSTEM DEWATERING. MINISTRY OF RECONSTRUCTIO N AND HOUSING AT DAKAHLIA GOVERNORATE. 2.0 NO 4 5 6 PERIOD NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLION 1986-1987 POTABLE WATER PIPES LINE AT NEW EZBET EL SAIIDIA VILLAGE. DAKAHLIA GOVERNORATE. EGYPT. SUPPLY AND INSTALL OF ASBESTOS CEMENT PIPES LINE, DIAMETERS 150 MM & 200 MM INCLUDING VALVES, SPECIAL PIECES, VALVES CHAMBERS AND HOUSE CONNECTIONS. MINISTRY OF RECONSTRUCTI ON AND HOUSING AT DAKAHLIA GOVERNORATE . 1.5 1986-1987 SEWAGE DRAINAGE NETWORK AT 5TH AREA – GAMASSA TOURIST AREA. DAKAHLIA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 175 MM UP TO 450 MM INCLUDING THE INSTALLATION OF SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. MINISTRY OF RECONSTRUCTI ON AND HOUSING AT DAKAHLIA GOVERNORATE . 1.5 1986- 1987 SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT 5TH AREA - GAMASSA CITY. DAKAHLIA GOVERNORATEEGYPT. SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE BUILDINGS, ISOLATIONS, FINISHINGS AND OUTSIDE FENCE. PLUS OF SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL EQUIPMENTS FOR THE STATION, BASED ON WELL-POINT SYSTEM DEWATERING. MINISTRY OF RECONSTRUCTI ON AND HOUSING AT DAKAHLIA GOVERNORATE . 1.5 NO 7 8 9 PERIOD NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLION 1986-1987 SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT 2ND AREA -GAMASSA CITY DAKAHLIA GOVERNORATEEGYPT. SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE BUILDINGS, ISOLATIONS, FINISHINGS AND OUTSIDE FENCE. PLUS OF SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL EQUIPMENTS FOR THE STATION, BASED ON WELL-POINT SYSTEM DEWATERING. MINISTRY OF RECONSTRUCTIO N AND HOUSING AT DAKAHLIA GOVERNORATE. 1.5 1987-1988 SEWAGE DRAINAGE NETWORK AND DEWATERING FOR INDUSTRIAL AREA AT NEW DAMIETTA CITY. DAMIETTA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF GRP, PVC AND PRE-STRESS PIPES, DIAMETERS FROM 200 MM UP TO 1000 MM INCLUDING SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES, BASED ON WELLPOINT SYSTEM DEWATERING. ARAB CONTRACTORTANTA BRANCH. AUTHORITY OF RECONSTRUCTIO N OF NEW DAMIETTA CITY. 5.5 1988 POTABLE WATER PIPES LINE DIAMETER 1000 MM AND DEWATERING AT NEW DAMIETTA CITY. DAMIETTA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF PRE-STRESS CONCRETE PIPES, DIAMETER 1000 MM. PLUS OF SUPPLY AND INSTALL OF VALVES CHAMBERS AND SPECIAL PIECES, BASED ON WELL-POINT SYSTEM DEWATERING. ARAB CONTRACTORTANTA BRANCH. AUTHORITY OF RECONSTRUCTIO N OF NEW DAMIETTA CITY. 4.5 NO 10 11 12 PERIOD NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLION 1989-1990 SEWAGE DRAINAGE NETWORK AND DEWATERING AT DELENGATE CITY (PART 1). EL BEHERA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 200 MM UP TO 500 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES BASED ON WELL-POINT SYSTEM DEWATERING. ARAB CONTRACTORSALEX BRANCH. FOR THE (NOPWASD). 3.0 1990-1991 SEWAGE DRAINAGE NETWORK AND DEWATERING AT DELENGATE CITY (PART 2). EL BEHERA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 200 MM UP TO 500 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. ARAB CONTRACTORS – ALEX BRANCH. FOR THE (NOPWASD). 3.5 1991-1992 SEWAGE DRAINAGE NETWORK AND DEWATERING AT KHANKA CITY. GREAT CAIRO-EGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 200 MM UP TO 600 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. ARAB CONTRACTORS – ALEX BRANCH. FOR THE (NOPWASD). 2.0 NO 13 14 15 PERIOD NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLION 1992-1993 SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY (PART 1). EL BEHERA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 200 MM UP TO 750 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. ARAB CONTRACTORSALEX BRANCH. FOR THE (NOPWASD). 3.0 1992-1993 SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY (PART 2). EL BEHERA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 200 MM UP TO 750 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING. ARAB CONTRACTORS – ALEX BRANCH. FOR THE (NOPWASD). 3,0 1992- 1994 GRAVITY PIPES LINE DIAMETER 1400 MM AND DEWATERING AT DAMIETTA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 1400 MM TO JOIN THE PARTIAL STATION AND THE MAIN STATION. PLUS OF SUPPLY AND INSTALL OF VALVES CHAMBERS INCLUDING THE SPECIAL PIECES, BASED ON THE WELL- POINT SYSTEM DEWATERING. ARAB CONTRACTORS – ALEX BRANCH. FOR THE (NOPWASD). 8.5 NO 16 17 18 PERIOD NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLION 1992-1993 FORCE MAIN PIPES LINE FOR THE SEWAGE DRAINAGE AND DEWATERING AT RASSEL BAR. DAMIETTA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF DUCTILE CASTIRON PIPES LINE, DIAMETER 900 MM. PLUS OF SUPPLY AND INSTALL OF VALVES CHAMBERS, SPECIAL PIECES, BASED ON WELL-POINT SYSTEM DEWATERING. ARAB CONTRACTORSTANTA BRANCH. FOR THE (NOPWASD). 9,00 1995-1997 SEWAGE DRAINAGE NETWORK AND DEWATERING AT EZBET EL BORG CITY. DAMIETTA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 175 MM UP TO 750 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON WELL -POINT SYSTEM DEWATERING. ARAB CONTRACTORSTANTA BRANCH. FOR THE (NOPWASD). 9.0 1995-1997 SEWAGE DRAINAGE NETWORK, FORCE MAIN PIPELINES AND DEWATERING AT HORANI CITY. DAMIETTA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM 175 MM UP TO 600 MM FOR THE SEWAGE DRAINAGE NETWORK. PLUS OF SUPPLY SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, FLEXIBLE CAST IRON FORCE MAIN PIPES LINE DIAMETERS FROM 150 MM UP TO 200 MM, VALVES CHAMBERS AND ITS SPECIAL PARTS. EL NASR COMPANY FOR BUILDINGS AND CONSTRUCTIONS . FOR THE (NOPWASD). 13.0 NO 19 20 21 PERIOD NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLION 1996 SEWAGE PUMPING STATIONS AT HORANI CITY (1, 2). DAMIETTA GOVERNORATEEGYPT. SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATIONS INCLUDING EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE WORKS, WELLS, BUILDINGS, FINISHING AND OUTSIDE FENCE. EL NASR COMPANY FOR BUILDINGS AND CONSTRUCTIONS . FOR THE (NOPWASD). 3.0 1997 SUPPLY AND ERECTION FOR MECHANICAL AND ELECTRICAL EQUIPMENTS FOR SEWAGE PUMPING STATIONS AT HORANI CITY. DAMIETTA GOVERNORATE-EGYPT. SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL EQUIPMENTS INCLUDING PUMPS, DISTRIBUTION BOARDS, GENERATOR UNITS, VALVES & SPECIAL PIECES IN VALVES CHAMBERS. EL NASR COMPANY FOR BUILDINGS AND CONSTRUCTIONS . FOR THE (NOPWASD). 3.0 1997-2001 GRAVITY PIPE NETWORKS AND DEWATERING AT BALTIME CITY. KAFREL SHEIKH GOVERNORATE EGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS FROM 175 MM UP TO 750 MM. PLUS OF SUPPLY AND INSTALL OF SQUARE & CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT & DEEP-WELL SYSTEMS DEWATERING. INDUSTRIAL & ENGINEERING PROJECTS COMPANY. FOR THE (NOPWASD) 42.0 NO 22 23 24 PERIOD NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLION 1998-2001 SEWAGE PUMPING STATIONS (1,2) AT BALTIME CITY. KAFREL SHEIKH GOVERNORATE EGYPT. SUPPLY AND CONSTRUCTION OF ENGINEERING WORKS FOR PUMPING STATIONS INCLUDING EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE WORKS, WELL WORKS, BUILDINGS, FINISHING AND OUTSIDE FENCE. INDUSTRIAL & ENGINEERING PROJECTS COMPANY. FOR THE (NOPWASD). 6.0 1999-2000 PILES FOR CROSSING CANAL OF MAHMOUDIA AT ABOU HOMOSSZAWYETTE GHAZAL. EL BEHERA GOVERNORATEEGYPT. SUPPLY AND CONSTRUCTION OF 16 M LENGTH OF PILES FROM IRON PIPES, DIAMETER 600 MM. PLUS OF CONSTRUCTION OF REINFORCED CONCRETE COLUMNS AND RETAINING WALLS OF AN IRON BRIDGE TO SUPPORT FLEXIBLE CAST IRON PIPES. INDUSTRIAL & ENGINEERING PROJECTS COMPANY. FOR THE (NOPWASD). 3.0 1999-2001 SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL MAASARA & HELWAN. CAIRO GOVERNORATEEGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS FROM 200 MM UP TO 500 MM. PLUS OF CONSTRUCTION OF SQUARE & CIRCULAR CONCRETE MANHOLES, BASED ON DEEP- WELL SYSTEM DEWATERING. ARAB CONTRACTORS – HELWAN BRANCH. GREAT CAIRO RECONSTRUCTIO N AUTHORITY 9.0 NO 25 26 27 NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLION 1999-2000 POTABLE WATER PIPES LINE AT EAST KANTARA CITYEGYPT. SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 500MM. PLUS OF CONSTRUCTION OF CONCRETE CHAMBERS, SPECIAL PIECES, UNDER CROSSING ABOVE CANALS AND DRAINAGES. ENGINEERING INDUSTRIAL PROJECTS COMPANY. SOUTH SINAI RECONSTRUCTIO N AUTHORITY. 20.0 1999-2002 SEWAGE DRAINAGE NETWORK AND SEWAGE PUMPING STATIONS AT BATANOUN CITY. MOUNIFIA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS FROM 200 MM UP TO 750 MM INCLUDING THE SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES. PLUS OF CONSTRUCTION OF SEWAGE PUMPING STATIONS INCLUDING THE CIVIL WORKS, BASED ON THE DEEP WELL SYSTEM DEWATERING. ENGINEERING AND INDUSTRIAL PROJECTS COMPANY. FOR THE (NOPWASD). 10.0 2001-2002 IRRIGATION PIPE LINES AT AHMED DAWOUD CANAL – DEWIDAR AREA. NORTH SINAI GOVERNORATEEGYPT. SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 700 MM, 1200MM, 1400MM, 1600MM, 1800 MM AT DIFFERENT DEPTHS UP TO 8M. ENGINEERING & INDUSTRIAL PROJECTS COMPANY. NORTH SINAI IRRIGATION AUTHORITY. 2,00 PERIOD NO 28 29 30 NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLION 2002-2004 FORCE MAIN PIPELINE FOR SEWAGE DRAINAGE STATIONS AT BALTIME. KAFREL SHEIKH GOVERNORATE EGYPT. SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 600MM INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS, THE SPECIAL PIECES, UNDER CROSSINGS, ABOVE CANALS AND DRAINAGES. ENGINEERING & INDUSTRIAL PROJECTS COMPANY. FOR THE (NOPWASD). 12,00 2002-2003 DEVELOPMENT OF IRRIGATION LINES AT EL HAMAMI CANALABOU HOMOSS. BEHIRA GOVERNORATEEGYPT. SUPPLY AND INSTALL OF PLASTIC PIPES, DIAMETERS FROM 315MM UP TO 500 MM INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS AND THE SPECIAL PIECES. ENGINEERING & INDUSTRIAL PROJECTS COMPANY. BEHIRA GOVERNORATE IRRIGATION AUTHORITY. 6,00 2002-2003 DEVELOPMENT OF IRRIGATION AT KHAWALID CANAL-SIDI SALEM. KAFREL SHEIKH GOVERNORATEEGYPT. SUPPLY AND INSTALL OF PLASTIC PIPES, DIAMETERS FROM 315 MM UP TO 500 MM INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS AND SPECIAL PIECES. ENGINEERING & INDUSTRIAL PROJECTS COMPANY. KAFREL SHEIKH GOVERNORATE. 13,00 PERIOD NO 31 PERIOD 2003-2006 NAME & LOCATION DESCRIPTION OF PROJECT OWNER COST PER MILLION GRAVITY PIPE NETWORKS, SEWAGE PUMPING STATIONS, DEWATERING AND FORCE MAIN PIPELINE FOR SEWAGE DRAINAGE STATIONS AT TABLOUHA VILLAGE. MENOFYA GOVERNORATE EGYPT. SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS FROM 175 MM UP TO 800 MM INCLUDING THE SUPPLY AND INSTALL OF SQUARE AND CIRCULAR CONCRETE MANHOLES. PLUS OF CONSTRUCTION OF SEWAGE PUMPING STATIONS INCLUDING THE CIVIL WORKS, BASED ON THE DEEP WELL SYSTEM DEWATERING. PLUS SUPPLY AND INSTALL FORCE MAIN OF PIPE LINES, INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS, THE SPECIAL PIECES, UNDER CROSSINGS AND OVER CROSSINGS. EL NASR COMPANY FOR BUILDINGS AND CONSTRUCTIONS . FOR THE (NOPWASD). 12,00 SEWAGE DRAINAGE NETWORKS AT 5TH AREA AT GAMASSA TOURIST CITY, DAKAHLIA GOVERNORATE. PROJECT DESCRIPTION: Construction of sewage drainage network at the 5th area, Gamassa Touristic city, to protect the city from pollution as well as encouraging resorting and tourism. MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate. EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 450 mm, length of 8000 m and depths up to 6,50 m. Supply and installation of 320 square & circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m. The construction was based on the well-point system dewatering according to the high water level at this area. COST: 1.5 Million EGP. SEWAGE DRAINAGE NETWORK AT THE INDUSTRIAL CITY , NEW DAMIETTA CITY PROJECT DESCRIPTION: Construction of sewage drainage network for the industrial area at Damietta city to complete the existing drainage project at the city. MAIN CONTRACTOR : Arab contractors – Tanta branch OWNER : National Organization for Potable Water and Sanitary Drainage. EGCO SERVICES : Supply and installation of GRP & PVC pipes, diameters from 175 mm up to 600 mm , length of 10000 m and depths up to 8,50 m. Supply and installation of 400 square and circular plain concrete manholes, internal diameters from 1,20 m up to 1,50 m and depths up to 8,50 m. The construction was based on the well-point system dewatering according to the high water level at this area. COST: 5.5 Million EGP. WATER PIPELINES AT NEW DAMIETTA CITY,DAMIETTA GOVERNORATE. PROJECT DESCRIPTION: CONSTRUCTION OF A POTABLE WATER PIPES LINE NETWORK, DIAMETER OF 1000 MM, FOR THE NEW DAMIETTA CITY, TO COMPLETE THE EXISTING SERVICES AT THE CITY. MAIN CONTRACTOR : Arab contractors – Tanta branch OWNER : National Organization for Potable Water and Sanitary Drainage COST: 4.5 Million EGP. EGCO SERVICES : Supply and installation of pre-stress reinforced concrete pipes, diameter of 1000 mm and length of 1200 m including bends and plugs, etc. Supply and installation of sluice, wash and air valves chambers including special pieces, valves and dismantling pieces. The construction was based on the well-point system dewatering according to the high water level at this area. SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL DELENGAT CITY,EL BEHIRA,(PART ONE) PROJECT DESCRIPTION: CONSTRUCTION OF SEWAGE DRAINAGE NETWORK AT EL DELENGAT CITY TO COMPLETE THE EXISTING NETWORK AT EL BEHIRA GOVERNORATE. MAIN CONTRACTOR : Arab contractors – Alex branch. OWNER : National Organization for Potable Water and Sanitary Drainage COST: 3 million EGP EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 375 mm, length of 8500 m and depths up to 6,50 m. Supply and installation of 340 square and circular plain concrete manholes, internal diameters from 1,20 m up to 1,50 m and depths up to 6,50 m. The construction was based on the well-point system dewatering according to the high water level at this area. SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL DELENGAT CITY, EL BEHIRA, (PART TWO) PROJECT DESCRIPTION: CONSTRUCTION OF THE SECOND PART OF SEWAGE DRAINAGE NETWORK AT EL DELENGAT CITY EL BEHIRA TO COMPLETE THE EXISTING NETWORK AT GOVERNORATE EGCO SERVICES: Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 375 mm, length of 8500 m and depths up to 4.50 m. Supply and installation of 320 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 4,50 m. The construction was based on the well-point system dewatering. MAIN CONTRACTOR : Arab contractors – Alex branch OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 3.5 million EGP. SEWAGE DRAINAGE NETWORK AND DEWATERIND AT EL KHANKA CITY, GREAT CAIRO. PROJECT DESCRIPTION: Construction of sewage drainage network at El Khanka City to complete the existing network at Great Cairo. MAIN CONTRACTOR : Arab contractors – Nasr City branch. OWNER : National Organization for Potable Water and Sanitary Drainage. EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, length of 1200 m and depths up to 6,50 m. Supply and installation of 48 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m. The construction was based on the well-point system dewatering according to the high water level at this area. COST: 2.0 million EGP. GRAVITY PIPELINES NETWORK, 1400 MM DIAMETER, AND DEWATERING AT RAS EL BAR, DAMIETTA GOVERNORATE. PROJECT DESCRIPTION: This project was constructed to join the partial stations with the main station by gravity pipes line, diameter of 1400 mm. MAIN CONTRACTOR : Arab contractors – Tanta branch. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 8.5 million EGP. EGCO SERVICES : Supply and installation of GRP pipes, diameter of 1400 mm, to join the partial stations with the main station. Supply and installation of slow down and sluice valves chambers including the special pieces, valves and paddle pieces. The construction was based on the well-point system dewatering according to the high water level at this area. SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH GOVERNORATE. PROJECT DESCRIPTION: CONSTRUCTION OF GRAVITY PIPELINES, DIAMETER OF 900 MM, AT RAS EL BAR CITY, TO TRANSPORT SEWAGE TO THE TREATMENT STATION AND TO COMPLETE THE EXISTING SEWAGE DRAINAGE NETWORK AT THE CITY. MAIN CONTRACTOR : Arab contractors – Tanta branch. OWNER : National Organization for Potable Water and Sanitary Drainage EGCO SERVICES : Supply and installation of ductile cast iron pipes, diameter of 900 mm, depths from 2,50 m up to 3,5 m and length of 9000 m. Supply and installation of sluice, wash and air valves chambers including the special pieces, valves, paddle and dismantling pieces. The construction was based on the well-point system dewatering according to the high water level at this area. COST: 9 million EGP. GRAVITY PIPELINES AND DEWATERING AT EZBET EL BORG CITY, DAMIETTA GOVERNORATE. PROJECT DESCRIPTION: Construction of the first part of gravity Pipes line at Ezbet El Borg according To the need of a sewage drainage network at this area. EGCO SERVICES: Supply and installation of vitrified clay pipes with rigid joints, diameter from 175 mm up to 750 mm, length of 6000 m and depths up to 6,50 m. Supply and installation of 400 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m. The construction was based on the well-point system dewatering according to the high water level at this area. MAIN CONTRACTOR : Arab contractors – Tanta branch. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 9.0 million EGP. POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT THE EAST EL TAFREAA AREA. PROJECT DESCRIPTION: Construction of force main pipelines, from GRP pipes, diameter of 600 mm and length of 14000 m, to transport the sewage from the sewage drainage stations. Including the construction of valves chambers, special pieces, valves and dismantling pieces. EGCO SERVICES: Supply and installation of force main pipelines from GRP pipes, diameter of 600 mm and length of 14000 m including excavation works, installation, test, washing, cleaning and transportation Supply and installation of sluice, wash and air valves chambers valves including the special pieces, valves, dismantling and wall paddle pieces. The construction was based on the well-point system dewatering for levels up to 3.50 m and on the deep-well system dewatering for levels more than 3.50 m. MAIN CONTRACTOR : Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage COST: 12 million EGP SEWAGE DRAINAGE NETWORK AND SEWAGE PUMPING STATIONS AT EL BATANOUN CITY. MAIN CONTRACTOR : PROJECT DESCRIPTION: Construction of sewage drainage network at Batanoun, Menoufia Governorate according to the Government’s policy concerning supplying all villages and cities at Cairo by the Gravity pipes networks. Industrial and Engineering Projects Company. EGCO SERVICES : OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 6 million EGP. Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 8000 m and depths up to 8.50 m. Supply and installation of 320 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 and depths up to 8.50 m. Supply and construction of 4 sewage pumping stations including wells works, diameters from 3 m up to 8 m, plus of construction of extension buildings as workshops, generator room, storage, administration building and outside fences. The construction was based on the deep-well system dewatering according to the high water level at this area. SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL MAASARA AND HELWAN. PROJECT DESCRIPTION: Construction of sewage drainage Network At El Maasara and Helwan areas to complete the existing network at the Great Cairo. EGCO SERVICES: Supply and installation of vitrified clay pipes with flexible joints, diameters from 200 mm up to 550 mm, length of 6500 m and depths up to 6,50 m. Supply and installation of 260 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m The construction was based on the deep-well system dewatering according to the high water level at this area. COST: MAIN CONTRACTOR : Arab contractors – Helwan branch. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 9.0 million EGP. SEWAGE DRAINAGE NETWORK AT 10TH OF RAMADAN AREA, GAMASSA CITY, DAKAHLIA GOVERNORATE PROJECT DESCRIPTION: Construction of 2 sewage pumping stations to transport sewage to the treatment station to complete the existing network project at Balteem. MAIN CONTRACTOR : Engineer General Con. Co OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, length of 1200 m and depths up to 6,50 m. Supply and installation of 320 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m. The construction was based on the well-point system dewatering according to the high water level at this area. COST: 2.0 million EGB. SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT THE 5 TH AREA AT GAMSSA CITY, DAKAHLIA GOVERNORATE PROJECT DESCRIPTION: Construction of sewage drainage network at Gamassa, Dakahlia Governorate to complete the network of the city. MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate COST: 1.5 Million EGP EGCO SERVICES : Supply and installation of a well for the pumping station, internal diameter of 3 m including the reinforced concrete works and the penetration until the well settles at the required level. Construction of the extension buildings as the workshop, the generator building, storage, security room and outside fences. Supply and erection of mechanical and electrical equipments including submersible pumps, generator unit, distribution boards, transformers, valves, special parts, dismantling pieces and the installation at the valves chambers. SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL & ELECTRICAL EQIPMENTS AT THE 2ND AREA, GAMASSA CITY, DAKAHLIA GOVERNORATE. PROJECT DESCRIPTION: Construction of a sewage pumping station and supply of mechanical & electrical equipments at the 2nd area to complete the sewage drainage network at Gamassa city. MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate.. EGCO SERVICES : Supply and installation of a well for the pumping station, internal diameter of 4 m, including the reinforced concrete works and the penetration until the well settles at the required level. Construction of administrative units at the station as the workshop, the generator building, storage, security room and outside fences. Supply and erection of mechanical & electrical equipments including submersible pumps, generator unit, distribution boards, transformers, valves, special pieces, dismantling pieces and the installationation at the valves chambers COST: 2.0 million EGP SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY, EL BEHIRA, (PART ONE) MAIN CONTRACTOR : PROJECT DESCRIPTION: Construction of a sewage drainage Network at Damanhour (Part one) to complete the existing network at middle Delta. EGCO SERVICES: Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 10500 m and depths up to 8,50 m. Arab contractors – Alex branch OWNER : National Organization for Potable Water and Sanitary Drainage. . COST: Supply and installation of 420 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m. The construction was based on the well-point system dewatering according to the high water level at this area 3.0 million EGP SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY, EL BEHIRA, (PART TWO). PROJECT DESCRIPTION: construction of the second part of sewage drainage network at Damanhour City to complete the existing network project at El Behira Governorate. MAIN CONTRACTOR : Arab contractors – Alex branch OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 3.0 million EGP EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 4800 m and depths up to 8,50 m. Supply and installation of 190 square and circular plain concrete manholes, internal diameters of 1,20 mm and depths up to 8,50 m. The construction was based on the well-point system dewatering according to the high water level at this area. SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH GOVERNORATE. PROJECT DESCRIPTION: Construction of 2 sewage pumping stations to transport sewage to the treatment station to complete the existing network project at Bal teem. MAIN CONTRACTOR : Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage EGCO SERVICES : Supply and Construction of concrete wells, diameters of 12 m including the penetration for wells settlement at the required level. Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room and the outside fences. The construction was based on the well-point system dewatering according to the high water level at this area. COST: 6.0 million EGP. Sewage pumping stations (1,2) at El Horaniy city, Damietta Governorate PROJECT DESCRIPTION: MAIN CONTRACTOR : Construction of the sewage pumping stations (1,2) and supply of mechanical & electrical equipments, to complete the sewage drainage network project at El Horaniy city. El Nasr Company for Buildings and constructions. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 3.0 million EGP. EGCO SERVICES : Supply and Construction of reinforced concrete wells and the penetration until the wells settles at the required level. Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room, the administration building and the outside fences. Supply and erection of electrical and mechanical equipments at the stations including submersible pumps, generator unit, distribution board, transformers and special pieces, valves, dismantling pieces at the valves chambers AHMED DAOUD CANAL IRRIGATION PIPELINES AT EL DOWAIDAR AREA, NORTH SINAI. PROJECT DESCRIPTION: Construction of irrigation lines for the agriculture areas at north Sinai in accordance with the development scheme of this area. MAIN CONTRACTOR : Industrial and Engineering Projects Company. OWNER : North Sinai Reconstruction Authority. EGCO SERVICES : Supply and installation of GRP pipes, diameters of 700 mm, 1200 mm and 1400 mm, depths from 4 m up to 7 m and length of 12000 m. COST: 2 million EGP. POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT THE EAST EL TAFREAA AREA. PROJECT DESCRIPTION: Construction of a potable water Pipelines from El kantara East at EastEl Tafreaa Area to complete the needs and the services at this area. EGCO SERVICES: Supply and installation of GRP pipes, diameter of 500 mm, depths from 2,50 m up to 3,50 m and length of 25000 m. Supply and installation of 65 sluice, wash and air valves chambers including special pieces, valves and dismantling pieces. Supply and construction of under crossing roads and over crossing canals, using excavation for the roads and piles for the canals. MAIN CONTRACTOR : Industrial and Engineering Projects Company. OWNER : North Sinai Reconstruction Authority. COST: 15 million EGP PILES FOR OVER CROSSING CANAL AT EL MAHMOUDIA, ABOU HOMOUS AND ZAWIAT GHAZAL, EL BEHIRA GOVERNORATE.. PROJECT DESCRIPTION: In view of the need of "Abou Homuos city" for potable water supply, especially the east area of El Mahmoudia canal, it was necessary to construct an over crossing for ductile cast iron pipes, diameter of 600 mm. MAIN CONTRACTOR : Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage.. EGCO SERVICES : Supply and installation of 64 reinforced piles, diameter of 600 mm, length of 16 m including tests of loading and pouring of the reinforced concrete into the piles. Supply and construction of walls and reinforced concrete piles heads to hold the steel bridge. COST: 3 million EGP GRAVITY PIPELINES NETWORK AND DEWATERING AT BALTEEM CITY, KAFR EL SHEIKH GOVERNORATE. PROJECT DESCRIPTION: Construction of a sewage drainage network at Balteem city to complete services at all villages and cities in Egypt. EGCO SERVICES: Supply and installation of vitrified clay pipes with flexible joints, diameters from 175 mm up to 750 mm, depths up to 8,50 m and length of 30000 m. Supply and installation of 1200 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m. 4 The construction was based on the well-point system dewatering for depths up to 3,50 m and on the deep well system dewatering for depths more than 3,50 m. Demolition and reconstruction of water supply networks which facing the execution of the network project. MAIN CONTRACTOR : Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 42.0 million EGP. Sewage Drainage network, force main pipelines and Dewaterimg at El Horani city, Damietta Governorate.. PROJECT DESCRIPTION: Construction of a sewage drainage network at El Horani city, Damietta Governorate, according to the Government policy to complete the construction of all sewage drainage networks at all villages and cities in Egypt EGCO SERVICES: Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, depths up to 6,50 m and length of 12500 m. Supply and installation of 500 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m. Supply and installation of ductile cast iron pipes, diameters of 150 mm & 200 mm and length of 6000 m including valves chambers, special pieces, valves and dismantling pieces. Supply and construction of under crossing roads and over crossing canals including isolated iron pipes, diameters of 200 mm & 150 mm and the chambers on the crossing sides. MAIN CONTRACTOR : El Nasr for buildings and Constructions. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 13.0 million EGP. WATER PIPELINES AT MEETMAZAH AND MEETALI VILLAGES, DAKAHLIA GOVERNORATE. PROJECT DESCRIPTION: Supply and modification of Potable water network at Meetmazah and villages. Meetali EGCO SERVICES: Supply and installation of potable water network from Asbestos pipes, diameters of 150 mm & 200 mm and lenglh of 18000 m. Supply and installation of valve diameters of 150 mm & 200 mm including special pieces of bends, tees and reducers, etc, along the network. Joining the housing connections with the main network. MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate. COST: 1.5 Million EGP. POTABLE WATER PIPELINES AT NEW SAIIDIA VILLAGE, DAKAHLIA GOVERNORATE. PROJECT DESCRIPTION: Modification of the existing potable water network at El Saiidia Governorate. village, Dakahlia EGCO SERVICES: Supply and installation of potable water network from Asbestos pipes, diameters of 150 mm and 200 mm and length of 6500 m. Supply and installation of valves, diameters of 150 mm & 200 mm including bends, tees and reducers, Etc. Supply and installation of potable water pipes for the house connections. MAIN CONTRACTOR : Engineer General Con. Co. OWNER : Authority of Reconstruction and Housing at El Dakahlia Governorate. COST: 2.0 Million EGP. DEVELOPING OF THE IRRIGATION PROJECT AT EL HAMAMI CANAL, ABOU HOMOUS, EL BEHIRA GOVERNORATE. PROJECT DESCRIPTION: Construction of irrigation pipeline system at EL Hamami canal, Abou Homos, to save the waste water resulting from the use of old-fashioned irrigation system. EGCO SERVICES: Construction of irrigation pipeline system at EL Hamami canal, Abou Homos, to save the waste water resulting from the use of old-fashioned irrigation system. Supply and installation of 240 valves chambers including valves, diameter of 250 mm. Supply and construction of 38 irrigation stations, wells for pulling, places for the pumps and horizontal containers including excavation works and reinforced & plain concrete foundations, walls and ceilings. MAIN CONTRACTOR : Industrial and Engineering Projects Company. OWNER : Irrigation development Authority at the Ministry of the General affairs. COST: 6 million EGP DEVELOPMENT OF IRRIGATION PROJECT AT EL KHAWALED CANAL, SEDY SALEM, KAFR EL SHIEKH GOVERNORATE. PROJECT DESCRIPTION: Construction of irrigation pipeline system at El Khawaled canal, Sedy Salem, to save the waste water resulting from the use of old-fashioned irrigation system EGCO SERVICES: Supply and installation of plastic pipes, diameters of 315 mm, 355 mm, 400mm & 500 mm and length of 49000 m including excavation works, installationations and tests. Supply and installation of 680 valves chambers including valves, diameter of 250 mm. Supply and construction of 78 irrigation stations, wells for pulling, places for the pumps and horizontal containers including excavation works, reinforced & plain concrete foundations, walls and ceilings. MAIN CONTRACTOR : Industrial and Engineering Projects Company. OWNER : Irrigation development Authority at the Ministry of General affairs. COST: 13.0 million EGP CONSTRUCTION OF GRAVITY PIPES NETWORK FOR TABLOUHA CITY WITH THE WELL POINT IN KAFR EL SHEIKH PROJECT DESCRIPTION: Construction of a sewage drainage network at Tablouha city to complete services at all villages and cities in Egypt. MAIN CONTRACTOR : Industrial and Engineering Projects Company OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 30 million EGP. EGCO SERVICES : Supply and installation of vitrified clay pipes with flexible joints, diameters from 175 mm up to 750 mm, depths up to 8,50 m and length of 30000 m. Supply and installation of 1200 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m. The construction was based on the well-point system dewatering for depths up to 3,50 m and on the deep well system dewatering for depths more than 3,50 m. Demolition and reconstruction of water supply networks which facing the execution of the network project. SEWAGE PUMPING STATIONS (1,2) AT TABLOHA, KAFR EL SHEIKH GOVERNORATE. PROJECT DESCRIPTION: Construction of 2 sewage pumping stations totransport sewage to the treatment station to complete the existing network project at Tablouha. MAIN CONTRACTOR Industrial and Engineering Projects Company. OWNER : National Organization for Potable Water and Sanitary Drainage. COST: 4 million EGP EGCO SERVICES : Supply and Construction of concrete wells, diameters of 12 m including the penetration for wells settlement at the required level. Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room and the outside fences. The construction was based on the well-point system dewatering according to the high water level at this area. Arabian Cement Project Water Transmission Pipe Line ( Kattamia - Ein ELsokhna road) . PROJECT DESCRIPTION: Supply and install upvc water pipes with diameter 355 mm of working pressure 10 ,16 bar length of 15 km including Wash, Air chambers and Tunnels . In addition to supply and build reinforced concrete ground tanks capacity of 4000 m3 within the factory and another 750 m3 capacity in pumping stations.In addition to the ordinary work including excavation , PC , RC ,and finishing the work and including the supply and install of Pumps ,generators, cranes, chlorination systems, water hammer systems , the earthing and fire alarm systems Inside Pumping stations.In addition to the supply and installation of internal water networks of diameters 160 mm , 110 mm and 63 mm for all the buildings inside the factory and connecting the ground tank to cement product water tanks and build Pump chambers for water transfer from the ground tank to the internal water networks. EGCO SERVICES : MAIN CONTRACTOR : Engineer General Contracting Company OWNER : Arabian Cement Company Consultant : Arab Consulting Engineers – Reliance Heavy Industries COST: 20 million EGP. Supply and install upvc water pipes with diameter 355 mm length of 15 km including Wash , air chambers and Tunnels ( Kattamia – Ein El El sokhna road ) the Arab cement company – ( quarries road) . Supply and install RC ground tank with capacity of 4000 m3 including all concrete works . inlet and outlet chambers and their Pipe works . Supply and install all the ordinary works for the Pumping stations including ground tanks with capacity of 750 m3, Pumps chambers , Cranes , Gates , Garde room , Fence , and Generating chambers . Supply and install the Mechanical and Electrical equipments for Pumping stations including Pumps , Generators , Cranes , Panel boards , Cables , Earthing systems , Water hummer systems , Fire alarm and Control system . Supply and install PVC pipes for the internal water pipe network with diameters of (160,110,63 )mm with length of 2500 m including Chambers , Valves and Internal connections .