BB Configuration Guide - SAP Best Practices for SAP S/4HANA, on

SAP S/4HANA
November 2015
English
Rework Production Order
Sample Master Data Local
(BJY)
Building Block Configuration Guide
SAP SE
Dietmar-Hopp-Allee 16
69190 Walldorf
Germany
SAP Best Practices Rework Production Order Sample Master Data Local (BJY): Configuration Guide
Copyright
© 2015 SAP SE or an SAP affiliate company. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the
express permission of SAP SE or an SAP affiliate company.
SAP and other SAP products and services mentioned herein as well as their respective logos are
trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other
countries. Please see http://global.sap.com/corporate-en/legal/copyright/index.epx#trademark for
additional trademark information and notices.
Some software products marketed by SAP SE and its distributors contain proprietary software
components of other software vendors.
National product specifications may vary.
These materials are provided by SAP SE or an SAP affiliate company for informational purposes only,
without representation or warranty of any kind, and SAP SE or its affiliated companies shall not be liable
for errors or omissions with respect to the materials. The only warranties for SAP SE or SAP affiliate
company products and services are those that are set forth in the express warranty statements
accompanying such products and services, if any. Nothing herein should be construed as constituting
an additional warranty.
In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business
outlined in this document or any related presentation, or to develop or release any functionality
mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated
companies’ strategy and possible future developments, products, and/or platform directions and
functionality are all subject to change and may be changed by SAP SE or its affiliated companies at any
time for any reason without notice. The information in this document is not a commitment, promise, or
legal obligation to deliver any material, code, or functionality. All forward-looking statements are subject
to various risks and uncertainties that could cause actual results to differ materially from expectations.
Readers are cautioned not to place undue reliance on these forward-looking statements, which speak
only as of their dates, and they should not be relied upon in making purchasing decisions.
© SAP SE
Page 2 of 8
SAP Best Practices Rework Production Order Sample Master Data Local (BJY): Configuration Guide
Icons
Icon
Meaning
Caution
Example
Note
Recommendation
Syntax
Typographic Conventions
Type Style
Description
Example text
Words or characters that appear on the screen. These include field
names, screen titles, buttons as well as menu names, paths and
options.
Cross-references to other documentation.
Example text
Emphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXT
Names of elements in the system. These include report names,
program names, transaction codes, table names, and individual key
words of a programming language, when surrounded by body text, for
example, SELECT and INCLUDE.
Example text
Screen output. This includes file and directory names and their paths,
messages, source code, names of variables and parameters as well as
names of installation, upgrade and database tools.
EXAMPLE TEXT
Keys on the keyboard, for example, function keys (such as F2) or the
ENTER key.
Example text
Exact user entry. These are words or characters that you enter in the
system exactly as they appear in the documentation.
<Example text>
Variable user entry. Pointed brackets indicate that you replace these
words and characters with appropriate entries.
© SAP SE
Page 3 of 8
SAP Best Practices Rework Production Order Sample Master Data Local (BJY): Configuration Guide
Content
Rework Production Order Sample Master Data Local .............................................................. 5
1
Purpose .............................................................................................................................. 5
2
Preparation ......................................................................................................................... 5
3
2.1
Prerequisites ............................................................................................................ 5
2.2
Deployment Options ................................................................................................. 5
2.3
Configuration ............................................................................................................ 5
Master Data –OP ................................................................................................................ 6
3.1.1
Create Routing - Finished Product ...................................................................... 6
3.1.2
Create BOMs - Finished Products ....................................................................... 7
3.1.3
Create Production Version for Finished Product ................................................. 8
© SAP SE
Page 4 of 8
SAP Best Practices Rework Production Order Sample Master Data Local (BJY): Configuration Guide
Rework Production Order Sample Master Data
Local
1
Purpose
The purpose of this document is to describe the general configuration steps required to
manually set up the configuration within the system landscape that has already been installed
using the corresponding installation or configuration guides for installation.
If you do not want to configure manually and prefer an automated installation process using
BC Sets and other tools, refer to the Configuration Guide – Getting Started of your SAP rapiddeployment solution that is attached to the SAP Note.
This document supplements the existing Customizing documentation in the Implementation
Guide (IMG) and provides additional information where required.
2
Preparation
2.1 Prerequisites
Before you start installing this scenario, you must install the prerequisite building blocks. For
more information, see the Building Block Prerequisites Matrix.
2.2 Deployment Options
The configuration guide provides the implementation content for the different deployment
options/SAP Products S/4HANA

Public cloud (PC) – minimal scope & content

On-premise (OP) – full scope and content coverage
Depending on the use case/deployment option/ S/4HANA product version, you need to
implement the required scope/content starting with the Public cloud chapter and proceed with
the next required chapters.

For the full scope of the on-premise scope & content – PC and OP are required

For the public cloud scope & content – PC is required; OP is not required
2.3 Configuration
The following section describes the complete settings for this building block. These settings
can be divided into three main groups:

Prerequisite settings that have to be checked and which were delivered by SAP (as part
of the standard delivery)
The term Check refers to these prerequisite settings.

Settings defined by the customer (in the customer namespace and customer-specific):
The system uses automation to request individual customer settings during the
personalization process. These settings can be initial or reused from existing SAP ERP
layers and are indicated in the text by <your value>.
© SAP SE
Page 5 of 8
SAP Best Practices Rework Production Order Sample Master Data Local (BJY): Configuration Guide

Additional settings that need to be made, covered either by automation or manual
configuration (in the customer namespace).
The term Create refers to these additional settings in the text.
Master Data –OP
3
3.1.1 Create Routing - Finished Product
Use
The purpose of this activity is to create routings for the finished product.
Procedure
1. Access the activity using one of the following navigation options:
SAP Menu
Logistics  Production  Master Data  Routings 
Routings  Standard Routings  Create
Transaction Code
CA01
2. On the Create Routing: Initial screen, enter the following values and choose Enter.
Field Name
Description
Values
Material number
FG126
Plant
Plant 1 (1710)
Group
4171000
Key Date
<Today’s date>
Comment
3. Choose Header Details, on the Create Routing: Header Details screen, enter the
following 7alues.
Field Name
Description
Values
Group Counter
99
Task list description
Packaging Line 1
Task list usage
Production (1)
Status
Released (general)
From Lot Size
0
To Lot Size
99999999
Comment
4. Choose Operation Overview, on the Create Routing: Operation Overview screen, enter
the following values for each single Operation/Activity Number.
Field Name
Values
Operation/Activity
Number
010
Work center
WORK
Plant
Plant 1 (1710)
Control Key
YBP1
Operation short text
Base Quantity
Unit of Measure for
WORK
1
PC
© SAP SE
Page 6 of 8
SAP Best Practices Rework Production Order Sample Master Data Local (BJY): Configuration Guide
Operation
5. Double-click on the table to move to the Operation Details, on the Create Routing:
Operation Details screen, enter the following values for each single Operation/Activity
Number.
Field
Values
Setup
Unit of measure for Setup
Activity Type
Machine
Unit of measure for Setup
Activity Type
Labor
Unit of measure for Setup
Activity Type
30
min
3
10
min
1
10
min
11
6. Save your entries.
3.1.2 Create BOMs - Finished Products
Use
The purpose of this activity is to create a BOM for materials FG126 and SG124.
Procedure
1. Access the activity using one of the following navigation options:
SAP Menu
Logistics  Production  Master Data  Bills of Material 
Bill of Material  Material BOM  Create
Transaction Code
CS01
2. On the Create material BOM: Initial screen, enter the following values and choose Enter.
Field Name
Description
Values
Comment
Material number
FG126
Plant
Plant 1 (1710)
BOM usage
Production (1)
Valid From
<any date>
e.g. 01.01.2007
3. On the Create material BOM: General Item Overview screen, choose Header (F6) and
enter the following values:
Field Name
Description
Values
Base quantity
1
BOM Status
Active (1)
Comment
4. Choose Item Overview (F5), enter the following values:
BOM Item
Number
Item Category
(Bill of Material)
BOM
Component
Component
quantity
Component unit
of measure
010
Stock item (L)
FG126
1
PC
5. Save your entries.
© SAP SE
Page 7 of 8
SAP Best Practices Rework Production Order Sample Master Data Local (BJY): Configuration Guide
3.1.3 Create Production Version for Finished Product
Use
You use production versions to determine which alternative BOM is used with an alternative
routing to produce a material.
The purpose of this activity is to create a production version for the material Finished Good
MTS (FG126).
Procedure
1. Access the activity using one of the following navigation options:
SAP Menu
Logistics  Production  Master Data  Production Versions
Transaction Code
C223
2. On the Create material BOM: Initial screen, enter the following values and choose Enter:
Field Name
Description
Plant
Values
Comment
Plant 1
(1710)
FG126
Material number
Today’s Date
Key date for the selection of production
versions
3. On the Production Versions table, enter the following values:
Field Name
Description
Values
Plant
Plant 1 (1710)
Material Number
Finished Good
MTS (FG126)
0099
Production Version
Short text on the
production version
Valid-from date of
production version
Run-time end:
production version
Lot Size from
To Lot Size
Alternative BOM
BOM Usage
Key for Task List
Group
Production
Version 99
Today’s Date
Group Counter
Task List Type
99
N
Comment
31.12.9999
0
99999999
99
1 (Production)
417100XX
Enter the group number from
the Routing of your finished
product.
4. Save your entries.
© SAP SE