Domestic Construction – Pre-Commencement Checklist Owner: Builder : Project : Site Address: Supervisor: Date: Component QBCC Licence: Phone: Job No: / Action/Comment Plastering commencement date Sub-contract agreement in place Construction Safety Plan received from builder Approved plans on site Electricity available Water available Toilet on site and stocked Site sign clear and visible Car parking arrangements Car parking and materials storage Requirements for rubbish removal Work Method Statements for hazards Check plans and contract documents for extent of work, any special requirements and any variations Check for any special design loads and thermal and acoustic performance requirements Check level of finish required Determine extent of water resistant plasterboard Check if there are any fire separating walls Building sufficiently water resistant to permit installation of plasterboard Timber frame plumb and correctly aligned Internal walls sufficiently set down at This example is a guide only and not a QBCC recommendation Current as at: 21 Feb 2012 Domestic Construction – Pre-Commencement Checklist Owner: Builder : Project : Site Address: Supervisor: Date: Component QBCC Licence: Phone: Job No: / Action/Comment least the thickness of the ceiling batten + 10mm below the underside of the bottom chord of the truss. Check ceiling battens installed level and at the correct height. Trimmer battens provided to ceiling at change of direction of roof frame Plumbing, gas, electrical, air conditioning and telecommunication rough in complete Plasterboard supply Plan for reduced manual handling of plasterboard Cornice supply Supply of adhesive and accessories Wall insulation installed Check any requirements for movement joints in walls and ceilings in contract documents and with supervisor. Sub-Contractor : QBCC Licence: This example is a guide only and not a QBCC recommendation Current as at: 21 Feb 2012