Establishing SEA Guideline for Environment friendly Water Resource Development Young-Il Song Outline of presentation 1 2 Strategic Environmental Assessment Overview of Plans for Water Resources Overview of Long-Term Plans for Dam Construction 3 SEA of Long-Term Plans for Dam Construction 4 Conclusion 1 Overview of Plans for Water Resources Overview Function - Establish the Strategies for National Water Resource Management - Supervise Water Use and Flood Control Legal Bases - Consist of 4 laws : River law, Stream Improvement law, Rural Improvement law, Dam Construction & Surrounding Area Support law - Includes 14 Administrative Plans Target Area for Planning 1) Multi purpose Dam Construction 2) Dam Construction for Agriculture Use 3) River Maintenance 4) Stream Restoration System of Plans for Water Resources Longtime Master Plans for Water Resources Flood Control Master Plans for Stream Improvement Master Plans for Rural Improvement Water Utilization Master Plans for River Basin of Flood Control River Maintenance Long-Term Plan for Dam construction Improvement Plans for Agriculture Production Dam Mid-Term Master Plans for Stream Improvement Basic Plans for River Improvement Basis Plans for Dam Construction Basic Plans for Improvement Project Implementation Plans for Stream Improvement Implementation Plans for River Improvement Implementation Plans for Dam Construction Implementation Plans for Improvement Project 2 Overview of Long-Term Plans for Dam Construction Overview Longtime Master Plan for Water Resources • Supreme Plan for Water Resource Management including Development, conservation maintenance • Formulate Every 20 Years • Establish Strategy for Water & Conservation Development Long-Term Plan for Dam construction • Establish Strategy for Environmental-friendly Dam Construction • Formulate Every 10 years Long-Term Plan for Dam construction : Planning Procedure Flood Control Counter plan for Basin Longtime Master Plan for Water Resources Water Shortage Regional SEA (Review of Possibility of Supplement Water Resources: Consider Alternatives) Regional Demand for Dam Construction Purpose of Water utilization Purpose of Flood Control Review of Potential Dam Site SEA (Review of National Environmental Map) Flood Control Dam Singular Purpose Dam: Household, Industry and etc. Multi Purpose Dam Selection of Dam Site(1st) SEA (Field Survey: Biodiversity, Geology, Landscape, etc) Selection of Dam Site(2nd) SEA (Technical Review : Amount of Water Supply and etc.) Plan for regional Development Site (Final) Financial Plan Plan for Environmental friendly Development Long-Term Plan for Dam construction (Draft) • Public Hearing • Consultation with Relative Agencies Professional Consultation Deliberation of Central River Council Confirmation of the plan Analysis of Alternatives for Water utilization Water Shortage for use YES Review the Possibility of Water Transfer NO Review the Possibility of Additional Water Intake YES NO YES Check the New Water Resource Development (Underground Dam, etc) NO Potential Site Reconstruction of Existing Dam Construction of New Dam Confirmation of Alternative Water Utilization 3 SEA of Long-Term Plans for Dam Construction Contents of SEA Report 1.1 Background of Plan 1. Overview of Long-Term Plan For Dam Construction 1.2 Substance of the Plan 1.3 Implementation Strategy of the Plan 2.1 Legal Basis for SEA Implementation 2. Overview of SEA for the Plan 2.2 Procedures of SEA 2.3 Target Area 3.1 Management of SEA Council 3. Determination of Alternatives and Environmental Indicators 3.2 Scoping and Selection of Analyzing Methods 3.3 Confirmation of Alternatives 4. Prediction and Evaluation 4.1 Appropriateness of the Plan 4.2 Adequacy of the Site 5.1 Committee 5. Collection of Opinion 5.2 Consultation 5.3 Public Hearing Meeting 6. Conclusion 5.1 Evaluation 5.2 Monitoring SEA Process Conceptual Stage of Planning Process Formation of PERS Committee PERS Committee Consultation Preparation of Alternative of Plan Environmental Assessment Draft PERS Statement Collection of Opinions Final PERS Statement Review and Consultation of PERS Statement Conformation of the Plan by Reflection of the PERS results Presidential decree, Article 8-2 -Formulate the PERS Committee consist of Expert, NGO, Officials, Representative of Civil Group, Stakeholder, and etc. - Scoping - Alternatives of Plan - Determine the Range of Public Participation Presidential decree, Article 8-2 -Demonstrate the draft PERS statement for more than 20days - Public hearing should be hold upon request FAEP, Article 25-3 Presidential decree, Article 8-2 Consultation Periods should not exceed 30 days SEA Committee Formation of SEA Committee Consist of 10 members including government officer, NGO, experts and etc Management SEA Committee Review of General Subjects for SEA - Review of General Aspects of the Plan - Review of Environmental Indicators for SEA - Review of Alternatives Confirmation for General Procedure for SEA - Scoping - Methods for Analysis - Scope of Analysis, etc Selection of Indications for the SEA (Scoping)-1 Appropriateness of the Plan Preparation of Check-List Indicators Assessment Area ∙ Analysis of the Background and Purpose of the Plan on Environmental Aspect ◦ Policy for Dam Construction ∙ Improvement of Policy for Dam Construction ∙ Correspondence with Environment Policy ∙ Sustainability ◦ Consistency of the Plan ∙ Consistency with Existing Plan relation & relation between relevant plans ◦ Dam Site ∙ Environmental Appropriateness of the Sites Selection of Indications for the SEA (Scoping)-2 Environmental Adequacy Indicators Assessment Area ∙ Impacts to Ecological Soundness ◦ Natural Environment ∙ Impacts to the habitat (Flood, fauna) ∙ Impacts to the natural landscape ∙ Impacts to the Environmental Standard ◦ Ambient Environment ∙ Impacts to the Human ∙ Impacts to the Conservation Area ◦ Land use ∙ Possibility of Urban sprawl Prediction and Evaluation-Appropriateness of the Sites Evaluation of Alternatives Selected Sites on 4 Major River Basin Where Water Shortage Happened Compare the Sites with National Environmental Map Exclusion of Sites (Environmentally Sensitive Area) Selection of Sites through Field Survey Selected 8 Sites from 4 Major River Basin Assessment Methods for SEA & EIA EIA PERS Geology & Topography Climate Biodiversity Geology & Topography Environmental Environment Land use Flora & Fauna indicators for al Indicators Climate & Air Quality Marine Ecosystem natural Hydrology resources for natural resources & Local environment Water Soil Waste Noisy Landscape Land use Air Quality Water Quality Soil Waste Noisy Link of Assessment Items for SEA & EIA Odor Electric Wave Shading Landscape Health Environmental Indicators for local environment Assessment Methods for Each Environmental Indicators Items SEA EIA Geology, topography o Description of geology & topography necessary to preserve o Characterization of geology & topography o Affected area and measures o Loss prevention and use of surficial soil or fertile soil o Restoration or use plan of borrow pit o Estimation & measures due to soil loss and sedimentation o Conservation of excessively slant area Flora, Fauna o Identification of species distribution, species diversity, and designation of conservation sites o Establishment of conservation measures 8th grade of degree of green naturality o Establishment of conservation measures in 1st grade of ecologial degree of naturality o Change estimation and measures of flora and fauna o Estimation and measures due to hot water discharge o Consideration of breeding season, habitat of migrant birds and so on o Effects and estimation due to habitat destruction of flora and fauna o Measures of natural vegetation conservation and share of green zone Hydrology o Status of water resource use and water supply plan o Effect and measure of quantity on river network o Effects and measures of river bed and watershed o Estimation and measures of rive maintenance flow Assessment Methods for Each Environmental Indicators Items Land use SEA o Analysis & evaluation considering near land use EIA of site selection Air Quality o Investigation for sufficient distance from the project site to the impact area, and formation of buffer zone o Identification the relationship between wind velocity and pollutant dispersion o Identification emission source o Comparison of emission source and emission rate with national ambient levels o Identification of mitigation measures o Estimation effects of scattering dust at construction or operation o Review of fuel plan and heat supply process Water o Analysis of relationship between water supply plan and water consumption o Relationship between master plan of sewer and wastewater treatment plan o Analysis & measures of determining to meet the total water pollution load management standard o Measure of wastewater treatment o Estimation of water quality and measure of water quality conservation o Mitigation measures of non-point source pollution o Measure of leachate treatment o Conservation measures of ground water quality and quantity Noise, Vibration o Estimation & measures of mobile source (traffic, airplane and so on) noise levels o Identification & measures of Noise source o Estimation & mitigation measures of noise and vibration due to explosive use and so on o Layout plan on fixed source pollution (Factory, facilities and so on) Landscape o Use of the existing landscape and making plan considering the characteristics of land use are o Quantitative review and measures of effects due to change in main view points Assessment Methods for Each Environmental Indicators Items SEA EIA Population o Measures to densely in habitual district o Environmental effects & measures to densely in habitual district Housing o Connection plan of road network in residential area o Environmental effects estimation & measures of residential area Industry o Estimate the change in industrial structure o Estimation & measures to fishing right, farms, crop and so on Public Facilities o Effects & measures of capacity to public facilities Education o Effects & measures of capacity to education facilities Traffic Cultural properties O Analysis & measure of relationship between change of traffic volume and transportation plan o Review of the suitability of site, and capacity for parking lots and transfer o Selection and adequate lay out of line of trees o Effects & measures of cultural or historic sites in relation to the project o Identification of surficial geology in historic sites o Protection measure of any historical or cultural resources etc. Implementation of SEA & EIA Achieve systematical management of SEA and EIA • Links between EIA & SEA SEA EIA Policy Policy Review Plan SEA Results Plan Review Program SEA Results SEA Results Program Review Public Consultation Baseline Study Project SEA Results SEA Results SEA Results Possible to skip Simplification EIA 4 Conclusion Government established policy direction for implementation of the SEA by enhancing the PERS The new PERS has been implemented by June, 2006 Established the implementation methods for SEA and EIA to cope with the dispute associated with implementation of the two EA system Developed assessment methods for the SEA and EIA based on the characteristics and data availability at the stage of policy, plan, program, and project-established tiering system SEA Guideline for water resources is under developing