WFC3
FSW/GS Splinter Meeting
Agenda
3rd FSW/GS Splinter
November 8, 2001 @ Ball
(morning session, auditorium)
Review of Goals and Action Items from last time (O. Lupie)--5 min
WFC3 and COS Instrument Development Status (G. Blue)--10 min
WFC3 FSW Status and Schedule (G. Blue)--20 min
WFC3 MOU & Ground System Development Status (O. Lupie & W. Baggett)--15 min
Consolidated WFC3 Schedule (B. Rehm) --20 min
Break  20 minutes
COS FSW Status and Schedule (G. Blue) --20 min
COS MOU & Ground System Development Status (C. Keyes & Wayne Baggett)--15 min
WFC3 ICAL Status and Schedule (D. Fineberg) – 15 minutes
Transition Planning (Grant Blue) --15 min
Discussion & Lunch
1
11/08/2001
O. Lupie, WFC3 STScI
WFC3
FSW/GS Splinter Meeting
3rd FSW/GS Splinter
November 8, 2001 @ Ball
(morning session, auditorium)
Revisit Goals:
Schedule and schedule drivers review.
Provide forum for discussion.
Linkages and Interface clarification.
Improve Information flow.
Next splinter meeting planning.
Talk directly with team counterparts.
Establish perspective – how each piece fits into whole.
Renew commitment for timely information exchange.
2
11/08/2001
O. Lupie, WFC3 STScI
WFC3
FSW/GS Splinter Meeting
3rd FSW/GS Splinter
November 8, 2001 @ Ball
(morning session, auditorium)
Revisit Goals:
Schedule and schedule drivers review.
Provide forum for discussion.
Linkages and Interface clarification.
Improve Information flow.
Next splinter meeting planning.
Talk directly with team counterparts.
Establish perspective – how each piece fits into whole.
Renew commitment for timely information exchange.
3
11/08/2001
O. Lupie, WFC3 STScI
WFC3
FSW/GS Splinter Meeting
3rd FSW/GS Splinter
November 8, 2001 @ Ball
(morning session, auditorium)
Action Items from March 27th Splinter
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Plan for WFC3 and COS splinter at Ball Summer 2001  CLOSED
Initiate Tracking of WFC3 FSW and Ground System Development  CLOSED (Brian, Grant, Olivia, Wayne)
[tracking and dependencies now included in Thai’s development schedule]
Initiate Tracking of COS FSW and Ground System Development  OPEN (unassigned)
WFC3 and COS need updated schedules for the delivery of test data suites  CLOSED (G. Blue)
Investigate merging of stimulus keywords with science data keywords – CLOSED – Plan OK (ICAL)
WFC3 MOU updated to reflect new schedules and March 27 splinter  CLOSED - O. Lupie
WFC3 MOU to address real-time TV support and connection to STScI  CLOSED – O. Lupie
Investigate COS and WFC3 Transition Plan Requirements  IN WORK B. Friedman to present @ splinter.
Scrub DRD Delivery Dates  CLOSED (G. Blue)
Get COS and WFC3 Timing Tests on Grant’s Schedule – Grant to work with Tom Wheeler  INWORK
Address Fire-Wall issues for remote access to COS and WFC3 Telemetry  CLOSED
Closed Actions from previous splinters:
Have SISEs participate in WOWG and COWG  CLOSED (R. Henry, STScI)
Address details of Tom Wheelers’ support of ACS, COS< and WFC3 timing tests  CLOSED (C. Blades, STScI)
Link from GSFC Private WFC3 pages to GSFC FSW/OPS site  CLOSED (Ball)
Provide Instructions to Ball and GSFC for accessing the STScI OPR system  CLOSED (W. Baggett, STScI)
DM-05 to be placed on Web  CLOSED (M. Draugelis, Ball)
11/08/2001
O. Lupie, WFC3 STScI
WFC3
FSW/GS Splinter Meeting
3rd FSW/GS Splinter
November 8, 2001 @ Ball
(morning session, auditorium)
ICAL
Pipeline
Front-end
STScI - WFC3 Achievements since last time:
Ops Telecon support: New error message review process is working well.
Ground System: functionality available for basic UVIS Accum, IR MultiAccum, Lamp Operation, Darks/Biases (Mike Robinson, Wayne
Baggett).
WFC3 Pipeline and Archive CDR – held on 10/16/2001 (Howard Bushouse)
Delivery of AV-03 (Calibration Requirements) – October, 2001.
TV Science Calibration report submission (Neill Reid, Frank Bartko).
TV software support information gathering meeting – 08/2001.
Recommendation for TV Data Handling System submission – 10/2001.
5
11/08/2001
O. Lupie, WFC3 STScI
WFC3
FSW/GS Splinter Meeting
3rd FSW/GS Splinter
November 8, 2001 @ Ball
(morning session, auditorium)
STScI WFC3 Memorandum of Understanding:
Driven by Thermal Vac.
Documents interfaces/dependencies  Ball, STScI, GSFC,
ICAL.
Now focuses on two categories of STScI support:
Long-Term – OPUS Pipeline processing and long term Hubble Archive Storage.
Time-Critical- Specialized system for quick-look analysis with real-time
archive.
6
11/08/2001
O. Lupie, WFC3 STScI
WFC3
FSW/GS Splinter Meeting
3rd FSW/GS Splinter
November 8, 2001 @ Ball
(morning session, auditorium)
Key MOU Items – version 10/15/2001
5.
Delivery of WFC3 OPS Test Bench Images – March 1, 2002
Source: Grant Blue, Ball
Recipient: WFC3 Science IPT
6.
Completion of Code and Unit Test Build 3.0 – March 30, 2002
Source: Grant Blue, Ball
Recipient: STScI – ESS (T. Wheeler & FSET )
7.
Delivery of Images from the Integrated Optical Bench - June 1, 2002.
Source: Grant Blue, Ball
Recipient: WFC3 Science IPT
8.
Delivery of TV-Specific and Optical Stimulus Keywords
Initial version –October 31, 2001, Complete version – May, 2002
Source: WFC3 ICAL
Recipient: WFC3 Science IPT
7
11/08/2001
O. Lupie, WFC3 STScI
WFC3
FSW/GS Splinter Meeting
3rd FSW/GS Splinter
November 8, 2001 @ Ball
(morning session, auditorium)
Key MOU Items – version 10/15/2001
9. Delivery of TV-Specific and Optical Stimulus Keywords
Initial version 10/31/2001, Complete version 05/2002.
Source: WFC3 ICAL
Recipient: WFC3 Science IPT (H. Bushouse, WFC3 Pipeline and Archive)
11. OPUS Staging Disk Implementation – December, 2002
Source: WFC3 ICAL
Recipient: STScI OPUS
12. Delivery of Beta Version of OPUS - June 1, 2002 (Final Version October 2002)
Source: STScI OPUS
Recipient: WFC3 Science IPT and WFC3 ICAL
8
11/08/2001
O. Lupie, WFC3 STScI
SEPT, 2001
WFC3
FSW/GS Splinter
OPUS
Keywords
OS, TV
Keywords
3rd FSW/GS Splinter
Meeting and internalNovember
header data 8, 2001 @ Ball
DM-06 – snapshot telemetry
(morning session, auditorium)
DEC, 2001
SMS timing
trials
ICAL
Development
MAR, 2002
Science SMS
Testing
Begins
Beta OPUS
ICAL
Proto
Testing
JUN, 2002
Test Bench “Early” Images
Test Bench Image Suite
Build 3 C/U Complete
Integrated Optical Bench
Images
SEPT, 2002
Final OPUS
KEY
Archive
TV Readiness Test
Thermal
VAC
DEC, 2002
Version October 15, 2001
MAR, 2003
Complete SMS
Testing for SMGT
SMGT
11/08/2001
Front End
Pipeline/Archive
TV Cal Support
TV
9
JUN, 2003
O. Lupie, WFC3 STScI
WFC3
FSW/GS Splinter Meeting
3rd FSW/GS Splinter
November 8, 2001 @ Ball
(morning session, auditorium)
STScI Ground System Development Linkages:
1yr between Build 3 C/U & SMGT
2mo between Full Suite Ops Bench Images and Beta OPUS
4mo between Beta OPUS and Final OPUS Deliveries
Final Opus ready for TV Readiness Test – Dec, 2002
2mo from TV Readiness Test to start of TV.
10
11/08/2001
O. Lupie, WFC3 STScI
SEPT, 2001
WFC3
FSW/GS Splinter Meeting
OPUS
Keywords
OS, TV
Keywords
DEC, 2001
3rd FSW/GS Splinter
November 8, 2001 @ Ball
(morning session, auditorium)
SMS timing
trials
ICAL
Development
ICAL
limited to
test of realtime system
DM-06
MAR, 2002
Start SMS
Testing
ICAL
Proto
Testing
Test Bench “Early” Images
Test Bench Image Suite
Build 3 C/U Complete
JUN, 2002
Integrated Optical Bench
Images
BETA OPUS
SEPT, 2002
KEY
Minimal testing of Final
OPUS; no ICAL tests
Final OPUS
TV Readiness Test
Archive not ready for
TV Readiness. No test-time
DEC, 2002
TV Cal Support
TV
Archive
Thermal VAC
@ GSFC
SMGT
Complete SMS Testing
11/08/2001
Front End
Pipeline/Archive
ScheduleIncompatibility
MAR, 2003
Version November 1, 2001
JUN,
2003
Incomplete
SMS testing.
O. Lupie, WFC3
STScI
Risk final Phase development effort.
11