WFC3 FSW/GS Splinter Meeting Agenda 3rd FSW/GS Splinter November 8, 2001 @ Ball (morning session, auditorium) Review of Goals and Action Items from last time (O. Lupie)--5 min WFC3 and COS Instrument Development Status (G. Blue)--10 min WFC3 FSW Status and Schedule (G. Blue)--20 min WFC3 MOU & Ground System Development Status (O. Lupie & W. Baggett)--15 min Consolidated WFC3 Schedule (B. Rehm) --20 min Break 20 minutes COS FSW Status and Schedule (G. Blue) --20 min COS MOU & Ground System Development Status (C. Keyes & Wayne Baggett)--15 min WFC3 ICAL Status and Schedule (D. Fineberg) – 15 minutes Transition Planning (Grant Blue) --15 min Discussion & Lunch 1 11/08/2001 O. Lupie, WFC3 STScI WFC3 FSW/GS Splinter Meeting 3rd FSW/GS Splinter November 8, 2001 @ Ball (morning session, auditorium) Revisit Goals: Schedule and schedule drivers review. Provide forum for discussion. Linkages and Interface clarification. Improve Information flow. Next splinter meeting planning. Talk directly with team counterparts. Establish perspective – how each piece fits into whole. Renew commitment for timely information exchange. 2 11/08/2001 O. Lupie, WFC3 STScI WFC3 FSW/GS Splinter Meeting 3rd FSW/GS Splinter November 8, 2001 @ Ball (morning session, auditorium) Revisit Goals: Schedule and schedule drivers review. Provide forum for discussion. Linkages and Interface clarification. Improve Information flow. Next splinter meeting planning. Talk directly with team counterparts. Establish perspective – how each piece fits into whole. Renew commitment for timely information exchange. 3 11/08/2001 O. Lupie, WFC3 STScI WFC3 FSW/GS Splinter Meeting 3rd FSW/GS Splinter November 8, 2001 @ Ball (morning session, auditorium) Action Items from March 27th Splinter 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Plan for WFC3 and COS splinter at Ball Summer 2001 CLOSED Initiate Tracking of WFC3 FSW and Ground System Development CLOSED (Brian, Grant, Olivia, Wayne) [tracking and dependencies now included in Thai’s development schedule] Initiate Tracking of COS FSW and Ground System Development OPEN (unassigned) WFC3 and COS need updated schedules for the delivery of test data suites CLOSED (G. Blue) Investigate merging of stimulus keywords with science data keywords – CLOSED – Plan OK (ICAL) WFC3 MOU updated to reflect new schedules and March 27 splinter CLOSED - O. Lupie WFC3 MOU to address real-time TV support and connection to STScI CLOSED – O. Lupie Investigate COS and WFC3 Transition Plan Requirements IN WORK B. Friedman to present @ splinter. Scrub DRD Delivery Dates CLOSED (G. Blue) Get COS and WFC3 Timing Tests on Grant’s Schedule – Grant to work with Tom Wheeler INWORK Address Fire-Wall issues for remote access to COS and WFC3 Telemetry CLOSED Closed Actions from previous splinters: Have SISEs participate in WOWG and COWG CLOSED (R. Henry, STScI) Address details of Tom Wheelers’ support of ACS, COS< and WFC3 timing tests CLOSED (C. Blades, STScI) Link from GSFC Private WFC3 pages to GSFC FSW/OPS site CLOSED (Ball) Provide Instructions to Ball and GSFC for accessing the STScI OPR system CLOSED (W. Baggett, STScI) DM-05 to be placed on Web CLOSED (M. Draugelis, Ball) 11/08/2001 O. Lupie, WFC3 STScI WFC3 FSW/GS Splinter Meeting 3rd FSW/GS Splinter November 8, 2001 @ Ball (morning session, auditorium) ICAL Pipeline Front-end STScI - WFC3 Achievements since last time: Ops Telecon support: New error message review process is working well. Ground System: functionality available for basic UVIS Accum, IR MultiAccum, Lamp Operation, Darks/Biases (Mike Robinson, Wayne Baggett). WFC3 Pipeline and Archive CDR – held on 10/16/2001 (Howard Bushouse) Delivery of AV-03 (Calibration Requirements) – October, 2001. TV Science Calibration report submission (Neill Reid, Frank Bartko). TV software support information gathering meeting – 08/2001. Recommendation for TV Data Handling System submission – 10/2001. 5 11/08/2001 O. Lupie, WFC3 STScI WFC3 FSW/GS Splinter Meeting 3rd FSW/GS Splinter November 8, 2001 @ Ball (morning session, auditorium) STScI WFC3 Memorandum of Understanding: Driven by Thermal Vac. Documents interfaces/dependencies Ball, STScI, GSFC, ICAL. Now focuses on two categories of STScI support: Long-Term – OPUS Pipeline processing and long term Hubble Archive Storage. Time-Critical- Specialized system for quick-look analysis with real-time archive. 6 11/08/2001 O. Lupie, WFC3 STScI WFC3 FSW/GS Splinter Meeting 3rd FSW/GS Splinter November 8, 2001 @ Ball (morning session, auditorium) Key MOU Items – version 10/15/2001 5. Delivery of WFC3 OPS Test Bench Images – March 1, 2002 Source: Grant Blue, Ball Recipient: WFC3 Science IPT 6. Completion of Code and Unit Test Build 3.0 – March 30, 2002 Source: Grant Blue, Ball Recipient: STScI – ESS (T. Wheeler & FSET ) 7. Delivery of Images from the Integrated Optical Bench - June 1, 2002. Source: Grant Blue, Ball Recipient: WFC3 Science IPT 8. Delivery of TV-Specific and Optical Stimulus Keywords Initial version –October 31, 2001, Complete version – May, 2002 Source: WFC3 ICAL Recipient: WFC3 Science IPT 7 11/08/2001 O. Lupie, WFC3 STScI WFC3 FSW/GS Splinter Meeting 3rd FSW/GS Splinter November 8, 2001 @ Ball (morning session, auditorium) Key MOU Items – version 10/15/2001 9. Delivery of TV-Specific and Optical Stimulus Keywords Initial version 10/31/2001, Complete version 05/2002. Source: WFC3 ICAL Recipient: WFC3 Science IPT (H. Bushouse, WFC3 Pipeline and Archive) 11. OPUS Staging Disk Implementation – December, 2002 Source: WFC3 ICAL Recipient: STScI OPUS 12. Delivery of Beta Version of OPUS - June 1, 2002 (Final Version October 2002) Source: STScI OPUS Recipient: WFC3 Science IPT and WFC3 ICAL 8 11/08/2001 O. Lupie, WFC3 STScI SEPT, 2001 WFC3 FSW/GS Splinter OPUS Keywords OS, TV Keywords 3rd FSW/GS Splinter Meeting and internalNovember header data 8, 2001 @ Ball DM-06 – snapshot telemetry (morning session, auditorium) DEC, 2001 SMS timing trials ICAL Development MAR, 2002 Science SMS Testing Begins Beta OPUS ICAL Proto Testing JUN, 2002 Test Bench “Early” Images Test Bench Image Suite Build 3 C/U Complete Integrated Optical Bench Images SEPT, 2002 Final OPUS KEY Archive TV Readiness Test Thermal VAC DEC, 2002 Version October 15, 2001 MAR, 2003 Complete SMS Testing for SMGT SMGT 11/08/2001 Front End Pipeline/Archive TV Cal Support TV 9 JUN, 2003 O. Lupie, WFC3 STScI WFC3 FSW/GS Splinter Meeting 3rd FSW/GS Splinter November 8, 2001 @ Ball (morning session, auditorium) STScI Ground System Development Linkages: 1yr between Build 3 C/U & SMGT 2mo between Full Suite Ops Bench Images and Beta OPUS 4mo between Beta OPUS and Final OPUS Deliveries Final Opus ready for TV Readiness Test – Dec, 2002 2mo from TV Readiness Test to start of TV. 10 11/08/2001 O. Lupie, WFC3 STScI SEPT, 2001 WFC3 FSW/GS Splinter Meeting OPUS Keywords OS, TV Keywords DEC, 2001 3rd FSW/GS Splinter November 8, 2001 @ Ball (morning session, auditorium) SMS timing trials ICAL Development ICAL limited to test of realtime system DM-06 MAR, 2002 Start SMS Testing ICAL Proto Testing Test Bench “Early” Images Test Bench Image Suite Build 3 C/U Complete JUN, 2002 Integrated Optical Bench Images BETA OPUS SEPT, 2002 KEY Minimal testing of Final OPUS; no ICAL tests Final OPUS TV Readiness Test Archive not ready for TV Readiness. No test-time DEC, 2002 TV Cal Support TV Archive Thermal VAC @ GSFC SMGT Complete SMS Testing 11/08/2001 Front End Pipeline/Archive ScheduleIncompatibility MAR, 2003 Version November 1, 2001 JUN, 2003 Incomplete SMS testing. O. Lupie, WFC3 STScI Risk final Phase development effort. 11