IT Services 2005 – 2006 PBA IT PBA IT Overview & Resources IT Accountability IT Funding Requests ITSC & College Department’s Requests The IT Problem, Planning, Solutions Summary of Top Priority Requests Information Technology Overview and Resources Divisions Infrastructure Services User Services Other Office of IT Information Technology Services Infrastructure Services User Services Other Areas Infrastructure Division Infrastructure Services 1.5 FT Networking and Servers 3 FT Email, backup, & NOC 1 FT 1 PT Supports Network Switches Servers Wiring, etc. Supports Email Backup NOC (tier 2) Critical Needs Training Network Upgrade Critical Needs New positions Hardware Backup system Training software UVSCNET Automation, reporting 2 FT 1 Temp Supports UVSCNet Wireless Crystal Reports Workflow Self-funded prj Critical Needs Positions Training Hardware software Administrative Programming 9 FT (adding) Supports Banner Plus legacy sys Campus Scheduling LMS, FSAAtlas Teacher Evals Teacher Verification Data feeds to systems Critical Needs Oracle Training Current expense User Services Division User Services 1.5 FT IT Help Desk 4 FT 10 PT 5 WS Supports All desktop users Campus wide tech. Standards Wireless signup One Stop Student connections Overhead projectors Critical Needs Full-time people Center for Student Computing 4 FT 12 PT Supports Open Labs Some dept labs Kiosks Student accounts Student requests Portal Critical Needs Consulting hours Lab strategy Funded by FEES Web Development Services 4 FT 5 PT Supports Web sites 58 mil hits 52% growth this year 60,000 pages in 200 dept. CMS 150 Users 102 sites 10,000 pages WebCT 4600 sects 116 sites & 14,480 pgs produced in year Critical Needs Positions Hardware, space (Adding) Media 1 FT Supports Media in classrooms Media Engineering TV/VCR/DVD Sound/Projectors Overhead repair Critical Needs Positions!!!!! Equipment Plan Space Other Areas OIT 1.5 FTE Telephone Services 4 FT 5 PT Supports Operators Telephone Infrastructure Campus Wiring Critical Needs Personnel Training Auto attendant Banner Project Project Management 1 FT 1 PT Supports Banner Special Projects Grants Critical Needs Banner needs IT Security Officer 1 FT Supports Network Security Data Security Security training Critical Needs Firewall Security tools Forensic tools User Training Database Administrator 1 FT Supports Banner All Databases Oracle Critical Needs Assistant DBA Training RAC technology Administrative Systems and Operations 4 FT 2 PT Supports Administrative Systems hardware Administrative Backup Administrative Jobs, printing 24x6 Critical Needs Training Hardware Dat Employees Full-time Employees – 41.5 Part-time Employees – 29 Work Study Employees – 12 full time part time work study We Support campus technical staff Coordinate with Campus Department’s Technical Staff 42 FT, 22 PT, additional Work Study Coordinate with Studios & Engineering Was dual report - moved during 2004 under Ian Wilson Studios and Engineering includes Broadcasts Studios Fiber external to campus UEN TOC & Distance Ed. Support Cable system Video Conferencing support Classroom technology, Media services & support 1 FT for all of campus classroom technology Designs, installs, maintains, repairs, trains ITS Budget Total On-Going Budget - $3,776,337 Wages, Salaries & Benefits $2,772,456 $150,000 Software $103,000 Telephone lines $24,000 Media contingency/projects $22,081 $480,000 Banner on-going $124,000 current expense (at $3K/FTE should be $168,000) $100,000 infrastructure Wages Banner on-going Software current expense telephone lines infrastructure media Contingency Budgets… Soft Budgets - self-funding for : UVSCNet & wireless CSC (open labs, etc. from student fees) New computer New port fee ($100/new computer) Self-funded projects One-time Funding (Average over 1 million per year) 1999 for Y2K servers & systems (2 million+) 2001 for phone switch/network (4 million) 2002 – 2004 Administrative Systems(1million per year) IT Accountability 2004-2005 Goals (working on) IT Strategic Plan Finish IT re-organization IT Policies (6 submitted & approved with 6 more coming) Banner Migration (currently working on Student/FinAid) Security (Network and Data) – hired security officer Security assessment of network & systems currently underway Network Infrastructure (Used $150,000 & patch design) Backup System (implemented patch for aging system) Better Academic Support for Technology (using HelpDesk to supplement Media) Web Strategic Plan (working on with WAC) Disk Space on Servers (Created self-funding procedure - in process of implementing) Software budget shortfall fund from vacated position funds Work with Academics on Computer rotation proposal (in process) SPAM System RFP 2004-2005 PBA Requests *Funded IT Security Position Not funded $20,000 operating budget Security audit of server systems & vulnerabilities *Funded Projector bulbs ($25,000 one-time) Purchase replacement bulbs for LA building Need Network project $500,000 (not funded) Need 7 positions in addition to Security Position Not funded Funded 2 programmers for Banner 2004-2005 Funding Needs 7 Positions not funded were Infrastructure (systems) NOC Web Center Student Computing Media Engineering Telephone Services HelpDesk (Still need all of these!) Backup System $200,000 (requested but did not make top priority) Generator $100,000 (requested but did not make top priority) IT Funding Requests 2005-2006 Prioritized On-going priorities Prioritized One-time priorities Top priorities at the end of the presentation On-going priorities IT Network equipment funds $150,000 To be used for Network Infrastructure (fiber, switches, etc.) upgrades and finish build out. On-going priorities Temporary 1 year soft funded position to permanent position $50,000 Position for Crystal Reports, WorkFlow, Automation (one of seven requested last year) On-going priorities Software fund shortfall $49,470 Immediate need This year and On-going Current shortfall without any expansion or increases (averages about 5% per year) SOFTWARE Includes: Microsoft, Virus software, Scheduling software, Lab support software, WebCT, Novell, Trouble ticket software, Printing software, Micrograde, etc. On-going priorities Support position for MacIntosh (40% of salary) $22,710 MUST DO! Aviation & Fire Science were paying On-going priorities System Adminstrator for Web & WebCT servers $52,587 Currently one employee (not adequate) (one of seven requested last year) On-going priorities Increase to Infrastructure funding $100,000 For replacement/repair/upgrades of aging servers Training needs for all of IT $85,000 Convert 3 part-time helpdesk positions to fulltime $57,000 (one of seven requested last year) Current expense shortfall $20,000 Administrative assistant for ITS software and projects $22,187 On-going priorities Position for email manager $50,000 (one of seven requested last year) Position for NOC manager $50,000 (one of seven requested last year) Administrative assistant for Web Development Service $42,030 DBA Assistant (2nd DBA) – possible internal reallocation/reclass One-time priorities Generator for Admin building $75,000 One-time priorities Layer Seven Campus Firewall $125,000 One-time priorities Voice Activated operator $60,000 Save on-going costs of additional operators for overflow and after hours calls One-time priorities Blade servers for RAC Phase I $150,000 RAC license to Oracle $120,000 100 SCT consulting hours (Luminis) $16,500 Forensics Software $5,000 Backup Software $ 50,000 Radius Software $10,000 Media Carts for self checkout $40,000 1st year of 3 year build-out plan Cell phone Neutral Hosting project Other IT priorities that didn’t make the top list Telephone Services 2 FT technicians** (one of seven requested last year) Media Services 1 FT 2 PT**(one of seven requested last year) Open Port & authentication solution for college***** Network position 1 FT** Web Developers 2 FT Campus ID system & database** PatchLink patch management software** $27,000 Web-based application server* Web server updates to hardware & software Campus desktop backup solutions Hardware for data warehouse Banner data security position additional positions in Infrastructure 3 FT Ongoing Maintenance budget for telephone Infrastructure Campus backup hardware Hard Funding for Wireless instead of soft funding Laptop computers shared across for employees travel & portability Future projects Title III grant UVCN & UTOPIA Cell phone Neutral Hosting Wireless external to campus Data warehouse or Data Mart Digital Learning Center Building ITSC & College Department’s Requests Student Services SCT Extender imaging system 2 Programmers for Banner ID card system and ID database On-line Ticket sales system Cell phone coverage on campus Wireless networking improvement at no cost Open port authentication 24X7 support Students Alumni & Development Media and broadcast split – 1 position Web resource center – 1 position Email for life Help with Blackbaud Administrative Services New server for parking 4 new PCs Automated billing system Firewall TouchNet phase II Generator Time clock system Security cameras People Admin Software BPA & WorkFlow assistance Campus Ticket sales system Student ID/financial Card system Academics WebCT support – 1 position Media support people & equipment Plan for media in all classrooms Plan for computer purchase/rotation School’s Requests HASS IT position for HASS (half-time to full-time) Gunther Trades classrooms media equipment New server/network upgrade for Gunther Trades Mac support Open lab MAC computers & software Science & Health Backup for staff RAM for lab computers Additional Storage space in SANs General Academics & Library AdvisorTrak/TutorTrak Software New Sun Server E-commons 2 ½ of position for technical help Firewall Port Authentication for library 14 additional PCs Server hardware $2500 TTI Hourly Position for Provo airport 40% of salary of technician picked up by IT Technician Position for TTI Process for computer upgrades for Lab Gunther trades building network Projectors in Gunther trades area Wireless in Gunther trades area Firewall New Server Business 12 notebooks 79 desktops SPSS license (5 additional) 5 Macromedia licenses PatchLink – patch management Education Tech position needed but not requested Classroom Media for New Education building $5k – 10K per classroom plus installation charges/personnel? CSE Computer replacement for labs & staff Open Port and authentication solution Continuing Education 30 computers Fiber to National Guard building High speed to Mall Fiber to ALL 1 technical position for Banner etc. The IT Resource Story (the “black hole”) Infrastructure Value Server & Wiring Rooms $930,050 (life 10 yr) Fiber Plant $226,755 (life 15 yr) Copper Plant $3,074,400 (life 10 yr) (Cat 3 needs replacement) Wireless $97,675 (life 3 yr) (self-funded) Switches $2,315,000 (life 5 yr) (some over 7 years old) Servers $721,000 (life 4 yr) (last purchase 1999) Total Network Infrastructure - $7.4 million Does not include Administrative Systems, Security, Phone Systems, Classroom Media Systems, Software, maintenance, support etc. College-wide IT expenditures 2003-2004 Software – $916,895 Hardware network parts $354,531 Hardware computer parts $2,041,163 AV $103,327 AV Supplies $586,702 Telephone Equipment $48,136 Capital Data & computer $651,786 TOTAL = $4,702,540 (IT accounts for only $776,881) Does not include procard purchases! Does not include Instructional Equipment $319,594 Telephone carriers $217,458 Telephone cell phone $294,763 Pagers $7,902 Budget & Employees ITS Total Budget $3,776,337 All on-going funding including salaries, Banner, etc. IT staff in Central IT 41.5 Full time 29 Part time Work Study Employees – 12 One-time Funding (Average over 1 million per year) Rest of College `Total Budget over 4 million (not salaries) IT staff in departments across campus 42 Full time 22 Part time Additional work study Buy equipment but not pay for support ITS Spending ITS accounts for 25% of campus Technology spending (Includes Banner funding) ITS accounts for 50% of IT personnel ITS Infrastructure funded by one-time spending model Computers Purchased 2003-2004 Computer Shop sold about 800 computers Additional Notebooks Additional Name brands (not standard) Approximately $2 million spent Total desktop computers on campus = 4,029+ Computer Lease (Business/CSE) & purchase with buildings Desktop Computer Replacement? 4000 computers at an average of $1500 each over a 3,4,5 year rotation cycle ($6 million) 3 year – $2 million/year 4 year – $1.5 million/year 5 year – $1.2 million/year We spent $2 million last year! The IT Challenge Not Fully funding IT costs Example cost of media equipment only but not support! Can’t say NO and don’t fund YES Departments want more and if ITS can’t service them, they do it themselves or complaints. Then ITS must support. Personnel needs and costs Dependency on PT and high cost of FT One-time funding model Cost of Infrastructure and Technology Change and Growth of IT industry training, update, outdate, new technology IT growth at UVSC in requests & expectations WebCT should be up 24x7 but no-one is here on Sundays! IT Solution 1. IT Strategic Plan (not funding but mission and philosophy) 2. Examine everything! (use task force) 3. Reorganize IT using consultants recommendations 4. Examine and Implement Funding options 1. IT Strategic Plan Never approved because cost too much! Avoided Need direction even if there is no funding! We spend the money even if we don’t plan it! (~ 5 million last year - not on salaries) 2. Examine everything IT Task Force Look at IT personnel from campus-wide perspective Re-organize IT personnel for efficiency Identify and prioritize IT issues Look at all expenses and suggest cost savings Create centralized system for requests Create self-funding mechanisms for requests Set limits on departments without identifying real costs. (fund support as well as technology) Look at Technology fee Create Strategic Plan Grants and External Funding Sources 3. Reorganization of IT Consultants recommendations 3 divisions in ITS Centralize Academic IT division 4. Examine and Implement Funding options Student Technology Fee of $25/semester Generates approximately $875,000 per year Fund additional Infrastructure & support needs through a Port Charge of $125/every computer/year (cost of dial-up ISP) Generates approximately $500,000 per year Other Possible Funding Sources for IT Consistent Lab access fee for all computer labs with part to infrastructure Fees to departments based on number of phones. Charge for projects that are not funded through campus priority Required Service Level Agreements for support Full-funding when systems are brought on Increase one-time fee for new computer & make it for all purchased computers (currently $100 for new only). Grants – Title III, etc. Strategic Alignment for IT priorities Manage Enrollment Positive Image and Awareness of UVSC Develop, retain and attract exceptional Faculty & Staff Expand & Reallocate Institutional resources Realize a comprehensive four-year college mission Infrastructure! Top priorities On-going Infrastructure funds $150,000 1 position $50,000 Software index deficit $49,470 40% Contract obligation $22,710 One-time Generator $75,000 Layer Seven Firewall $125,000 Voice activated operator $60,000 Total $532,180 on-going $272,180 one-time $260,000) Greatest Need Approved Strategic Plan Alignment of IT with Institutional priorities The UVSC Model for IT Strategic direction on how to use IT funds Strategic direction on how to fund T Biggest Challenge Trying to service all of campus’s expectations without the resources needed and with the ability of the departments to go outside and spend more and create hidden costs that IT must absorb.