Final Evaluation Report Community-led Climate Change Adaptation -- CCA Project -- Submitted to Committee for the Promotion of Public Awareness And Development Studies COPPADES, Lamjung, Nepal Submitted by Evaluation team Krishna R Tiwari, PhD, Team Leader Suresh K Shrestha, PhD, Team Member November 2014 1 Abbreviations and Acronyms AEPC Alternative Energy Promotion Center BSP Bio-gas Support Program CCA Community-led Climate Change Adaptation Project CDF Community development facilitator COPPADES Committee for the Promotion of Public Awareness and Development Studies CFUG Community forest user group DADO District Agriculture Development Officer DDC District development committee DRR Disaster risk reduction GO Government HH Household IAPFZ Indoor Air Pollution Free Zone IGA Income generation activities ICS Improved cooking stove LDO Local Development Officer LWR Lutheran World Relief NEA Nepal Electricity Authority M&E Monitoring and evaluation MFSC Ministry of Forest and Soil Conservation MH Micro-hydro NEA NGO Nepal Electricity Authority Non-government organization ODFZ Open defecation free zone ODF PMC Overseas Development Fund Project management committee R&D Research and development SACCO Saving and credit cooperatives TOR Terms of reference VEEC VDC Village energy environment committee Village development committee 2 Acknowledgement We would like to express our gratitude to all respondents and participants of Rainas Mohariyakot, Pyarjung, Gaunda, Kolki, Ilampokhari and Bichaur VDCs who spared their valuable time to travel long distances and provide useful information on the works and achievements made through CCA project. The Final EvaluationTeam would like to extend its sincere appreciation and thanks to the District Agriculture Officer, Engineer from District Drinking Water and Sanitation Office, District Forest Officer and VDC secretary of Rainas Mohoriyakot. We are also grateful to Mr. Dikendra Raj Kandel, Project Director and Executive Chairman of COPPADES, CCA Project, for entrusting this work for the final evaluation of the project implemented by the organization and for his valuable information about the CCA implementation works and suggestions. We are thankful to Mr. Bijaya Gurung, Program Coordinator, CCA Project and Ms Fulmaya Thakuri and Ms Rachana Khanal, Account Officer, CCA Project for their valuable information and facilitation towards completion of this assignment. We would also like to thank the social mobilizes, Ms. Radha Thapa, Ms. Kalabati Magar and Ms. Kamala Gurung for arranging all field level meetings and facilitating field level observations effectively. Finally, our sincere thanks also goes to Kiran Ojha from LWR, Kathmandu for providing valuable comments and suggestions towards finalize this report. Krishna R Tiwari, PhD, Team Leader Suresh K Shrestha, PhD, Team Member 3 Contents Executive Summary ........................................................................................................................................... 7 1. Background .................................................................................................................................................. 10 1.1. Climate Change Adaptation (CCA) project ......................................................................................... 10 1.2. Rationale of the CCA project intervention and target population ........................................................ 11 2. Result Framework 11 2.1 Goal and Objectives of the Project........................................................................................................ 11 2.1.1. The specific objectives of the CCA project are stated as: ................................................................. 11 2.1.2. Expected outcomes of the project ..................................................................................................... 12 2.1.3. Beneficiaries of the Project ............................................................................................................... 12 2.1.4. Project strategy .................................................................................................................................. 12 2.1.5. Project assumptions........................................................................................................................... 12 2.2: Project Management ............................................................................................................................ 13 2.2.1: Project Implementation Organization ............................................................................................... 13 2.2.2.Donor information.............................................................................................................................. 13 2.2.3. Key Partners ...................................................................................................................................... 13 2.2.4.Financing arrangements ..................................................................................................................... 13 3. Final evaluation............................................................................................................................................ 14 3.1. Objectives of the Final Evaluation ....................................................................................................... 14 3.2. Scope of the Final Evaluation .............................................................................................................. 14 3.3. Evaluation Research Questions ............................................................................................................ 16 4. Methodology of Evaluation ......................................................................................................................... 16 4.1 Evaluation approach and design............................................................................................................ 16 4.2. Work schedule...................................................................................................................................... 17 4.3. Data analysis and presentation ............................................................................................................. 18 4.4. Limitations of the Study ....................................................................................................................... 18 5. Project Approach, Strategy, and Targets and Indicators .............................................................................. 18 5.1. Project Approach.................................................................................................................................. 18 5.2. Project Strategy .................................................................................................................................... 18 5.3. Project Indicators and Activity Targets................................................................................................ 19 6. Demographic features of the target area ...................................................................................................... 19 7. Major findings related to specific outcome, outputs and activities targets: ................................................. 21 7.2.1 Progress related to specific Outcome under objective 1 .................................................................... 24 7.2.2: Progress related to specific Outcome under objective 2 ................................................................... 27 7.2.3: Progress related to specific Outcome under objective 3 ................................................................... 29 7.3 Analysis from field study: ..................................................................................................................... 32 7.3.1 Climate Change adaptation strategy: ................................................................................................. 32 7.3.2 Community perception related to impact/ achievement of the project: ............................................. 32 7.3.3: Community motivation on the project: ............................................................................................. 32 8. Project partnership, organization, management and monitoring.................................................................. 33 8.1 Partnership modalities ........................................................................................................................... 33 8.2. Finance management............................................................................................................................ 33 4 8.2.1.Basis of financial evaluation: ............................................................................................................. 33 8.2.2. Accountability and transparency ....................................................................................................... 33 8.2.3. Book keeping system ........................................................................................................................ 34 8.2.4.Compliance with General Agreement ................................................................................................ 34 8.2.5 Compliance with Tax Laws ............................................................................................................... 34 8.2.6 Internal Control System ..................................................................................................................... 34 8.2.7Auditing .............................................................................................................................................. 34 8.2.8 Program and Administrative Budget .................................................................................................. 34 9. Project reporting and monitoring ................................................................................................................. 34 10. Assessment of Project response to challenges and gaps ............................................................................ 34 11. Project relevance, efficiency, effectiveness, sustainability and replicability ............................................. 35 11.1. Relevance ........................................................................................................................................... 35 11.2. Efficiency and effectiveness .............................................................................................................. 36 11.3 Sustainability....................................................................................................................................... 37 11.4: Replicability ....................................................................................................................................... 38 11.5:Synergy of the Project ......................................................................................................................... 38 12. Conclusion ................................................................................................................................................. 38 12.1 Lessons learnt...................................................................................................................................... 39 12.2 Recommendations ............................................................................................................................... 39 Reference ......................................................................................................................................................... 40 Appendix .......................................................................................................................................................... 41 List of Annex .............................................................................................................................................. 41 5 List of the Table Title of the Table Table 1. Social characteristics of the respondents Table 2. Physical and economic resources of the respondents Table 3. Activity wise project target and achievement Table 4: Perceived benefits at HH level Table 5. Motivation to participate in CCA programs Table 6. Perception: Can CCA program sustain w/o external support Page no 18 22 22 29 33 37 6 Executive Summary Climate change adaptation is the major development agenda in many developing countries like Nepal where majority of the population depends on farming. In order to address the climate change issues in the remote mountain area of Nepal, COPPADES, an NGO based in the Lamjung District of Nepal launched the CCA Project in six VDCs of Lamjung from October 2011 to September 2014 with the financial support from LWR-USA. The overall goal of this three year project was to increase the disaster resiliency of the communities so that they are better able to cope with risks due to disasters, such as landslide, drought as well as to improve the environmental and livelihood condition of the local communities. The project was prepared in line with global and national agenda on climate change issue. This evaluation was commissioned at the end of the project to get independent perspective from the outside consultants. The evaluation period was allocated for one month from September 1st to 30th September, 2014. As per the TOR provided, the primary purpose of the final evaluation was to assess the progress of the activities, outcomes and impacts of the project as planned over the last three years and document the learning and experiences for the sustainability of the program. Both the participatory and survey design approaches were employed to generate the qualitative and quantitative data but more emphasis was given to the qualitative information collected through participatory approach. The evaluation team conducted evaluation at three levels, i.e., district level interactions, VDC level interactions and community level interactions through formal and informal meetings, key informant interviews, and focus group discussions held in two VDCs. In addition, a questionnaire survey was conducted with 200 randomly selected households. Review of project document including progress reports and financial reports and audit reports were also done. The three objectives of the CCA project were i) to provide access to at least one form of alternative and clean energy and reducing their dependency on fuel source ii) promote agriculture-based income generation and self-employment opportunities and iii) enhance the capacity of community-based organizations to conserve forest and prevent and prepare for disaster risk reduction during the project period. The findings indicated that the project was very effectively managed and was successful in meeting the targets. The project has adopted participatory approach involving district and local partners and relevant government and nongovernment stakeholders to implement the project. The project has achieved considerable success in achieving the targets. In some cases, the project has achieved more than the targets especially in micro-hydro (micro-hydro) and alternative energy area, sanitation area, and plantation and forest conservation. Capacity enhancement training and income generation and self-employment opportunities, and cooperative formation have also been completed as planned. The evaluation showed that the project has made significant impacts from the Micro hydro(MH) power, alternative energy, and Declaration of Open Defecation Free (ODF) zones program on the rural community. These outcomes had multiple effects on conservation and community development through reduction in firewood consumption, reduction in workload, particularly for women and improving health and sanitation conditions of the community members and overall improved environmental services and human well-beings in the area. These outcomes improved the basic requirements of the villages and opened opportunities for diversified farm and off-farm income generation opportunities. Additionally, promotion of agriculture-based income generation activities showed that farmers have shifted to cash crop farming such as organic vegetables, and off- season vegetables and crops such as potato and ginger farming and bee keeping. These activities have increased the total farm income by 7 about 8 to 11 % that will help local communities to realize how they can better adapt to climatic variation and vulnerabilities through income diversification. Furthermore, capacity enhancement through training and exposure visit programs enhanced the leadership quality and empowered the women and Dalit groups as they have started to take part on community development activities and hence, have better access to natural and financial resources. Household level data analysis showed that majority of the households felt that improvement in health and sanitation condition of the community was the most important contribution of the project followed by reduction of workload (time save). The time saving was due to availability of the facilities for milling, less use of time for firewood collection due to electrification, installation of ICS and biogas plants. It also showed that majority of the respondents were motivated in the CCA project activities due to opportunity for gaining knowledge and skills through training events and support for seeds and implements (tools) for farming which have increased employment opportunities and income for them. This indicated that training and skill enhancement activities were effective and sustainable involving rural people in the development projects. In the context of financial management, the project report showed that the CCA project had very efficiently mobilized resources from different sources (from community to national government). It has also maintained its accountability and transparency as expected. However, the total administrative cost was found slightly higher in ratio than the other development project norms although some of the budgeted administrative costs could well be justified within the program activities budget. The team noticed that some activities were less efficient in terms of their sustainability, such as forest nursery, and entrepreneurship development activities like potato and ginger farming, and construction of small bioengineering structure in rural motor able road. The input support to the farmers and short term capacity enhancement activities seemed to need further emphasis and support to sustain the income generation program activities. High degree of ownership, active participation of local communities and resource generation are some of the remarkable contributions that have contributed to the success of micro-hydro and rural electrification programs and become sustainable. Involvement of local government agencies such as DDC and VDC from planning to implementation of the project and institutionalization of different cooperatives are also the efforts made towards sustainability of the program. However, the team noticed that limited mobilization of resources, youth migration, weak governance, poor market network, geographical remoteness and relatively short duration of the project have posed challenges to their sustainability. Since the CCA project goals, objectives and activities were designed and implemented based on local needs and with alignment with the national and district level policies and programs, the project has its relevance at all levels, i.e. local, regional and national level. Successful conservation of forest is in line with the global policy of mitigating carbon emission. The evaluation showed that overall project performance is satisfactory and such type of project model could be replicated in other similar remote areas in- or outside Lamjung District. A number of lessons have been learnt from the implementation of the project, such as high level of community mobilization and contribution can be achieved through small contribution in the areas where communities have realized the needs. Income generation activities were implemented for a very short period of time and were highly labor intensive while labor shortage is a big issue in the mountains of Nepal at present. Major 8 recommendations include:(a) development of trained micro-hydro technician from among the local community for sustenance of repair and maintenance work, (b) continuation of the follow-up along with technical and marketing support for sustainability of the agriculture programs and (c) aligning the programs of the climate change adaptation and DRR with the programs of line agencies at VDC and district level which would have greater impact and sustainability. 9 1. Background Climate change adaptation is the major development agenda in many developing countries including Nepal where majority of the population depends on farming (Tiwari et al., 2014). It is reported that the agriculture dependent communities are more affected by the climate change impacts. Existing evidences indicate that there is a significant risk that many of the trends of climate change and associated impacts will accelerate leading to extreme climatic events and to an increasing risk of abrupt or irreversible climatic shifts (IPCC, 2007, 2013). Global climate change can be expected to threaten food production and supply through changing patterns of rainfall, increasing incidence of extreme weather conditions and changing distribution of diseases and their vectors (IPCC, 2007). Findings from the National Adaptation Program of Action (NAPA) showed that Nepal is extremely vulnerable to climate change impacts because it heavily depends on natural resources, particularly water, soils, and forests (MOE, 2010). The situation is made worse by excessive exploitation of natural resources by the growing population and associated poverty, food insecurity, illiteracy and low levels of awareness. Furthermore, the unplanned development activities such as rural road construction in fragile mountains without any conservation measures are adding to deforestation and land degradation phenomena making Nepalese peoples’ lives and their livelihood resources more vulnerable to climate change related disasters such as floods, drought and landslides, etc. The risk of adverse effects of climate change is especially serious in a county like Nepal where institutional frameworks for disaster management and climate change adaptation are weak. Adaptation to climate change impacts is an emerging area of research and development (R&D) in Nepal. Most of the government institutions and communities have limited knowledge and capacity to design and implement climate change adaptation approach to their development programs. In order to improve the ability of communities and households to adjust to ongoing and future climate changes, there is an urgent need to conserve the environment and improve livelihood of the people as measures for mitigation and adaptation to the climate change impact and disaster management. Climate change may significantly impact on assets, access, activities, outcomes and incomes of households throughout the rural areas. This is particularly true for households with low adaptive capacity, i.e. having limited level of abilities to cope with the impacts and risks of climate change (Smit et al., 2001). In this context, there is an urgent need to implement the mitigation and adaptation practices to improve the environment and livelihood of the rural communities. 1.1. Climate Change Adaptation (CCA) project In the line with international agenda and national government policy and program priorities, Community-led Climate Change Adaptation (CCA) project was designed and launched in six Village Development Committees (VDCs) of Lamjung District in Nepal with an overall goal of increasing resilience of the communities to climate change impact and disaster in the mountain communities. The project aimed atmaking people better able to cope with risks from different types of disasters, such as landslides and droughts, while improving the environment and livelihood of the local communities. The project also attempted to empower people and reduce their vulnerability to climate change impacts through awareness, skills development, and livelihood improvements. It also aimed at strengthening the capacity of the districts and local institutions and communities in disaster risk reduction (DRR). The duration of the project was from October 2011 to September 2014. The project was implemented by 10 COPPADES Nepal in collaboration with district level government agencies, VDCs and local communities with the financial support from Lutheran World Relief (LWR), USA. 1.2. Rationale of the CCA project intervention and target population Remoteness, fragility, poverty, social discrimination and environmental degradation are some of the major problems in the rural communities of Nepal. In recent years, the communities living in the hills of Nepal have become more vulnerable to disaster not only due to changing climatic pattern but also due to human induced disaster such as rural road constructions without planning in the hills triggering landslide. In the south eastern Lamjung due to construction of rural road, a large area of forest has been denuded. The haphazard construction of road has triggered landslide, and, due to lack of awareness people are not able to measure the increasing vulnerabilities they are facing. To improve the resiliency of the people to disaster the project included the components of awareness on climate change adaptation, disaster risk reduction, environmental improvement and improving the rural livelihood. The change rendered its impact not only on biophysical aspects of the VDCs, but also on the socio-economic aspects which remained distressing to the local people due to their poor ability to adapt to the austerities. The project was implemented in six VDCs of south eastern Lamjung District, where communities were not aware of their vulnerabilities due to climate change. Based on the project report, the majority of the inhabitants in the project area in the VDCs are Gurung, Tamang, Brahmin, Chhetri, as well as Dalit communities. The people are poor and vulnerable to different types of disasters. According to the District Development Committee data the percentage of poor people in the VDCs is40% in Bichaur, 44% in Gaunda, 62.4% in Ilampokhari,51.5% in Kolki and 33.9% in Rainas Mohoriaykot VDC. Their literacy rate is low, and they have very limited access to basic needs. The main occupation of people is traditional agriculture. The project area is located at the foothills of high mountains which have abundant of natural resources if properly managed. The altitude of the project area varies from 1500m to 2000m above sea level. People's livelihoods and safety are vulnerable to the effects of deforestation and climate change impacts. 2. Result Framework 2.1 Goal and Objectives of the Project The overall goal of the project is “to increase the disaster resiliency of 2,448 families in 6 VDCs of Lamjung District”. The project strategies are to (a) provide access to renewable energy through infrastructure development; (b) diversify the source of income of the poor and marginal families living in the area; (c) prevent deforestation and promote reforestation and (d) enhance capacity of the community organizations. 2.1.1. The specific objectives of the CCA project are stated as: 2,448 households have access to at least one form of alternative and clean energy, reducing their dependence on lumber as a fuel source in three years. 11 Promote agriculture-based income generation and self-employment opportunities to 2,448 households in 6 VDCs of Lamjung in three years. Capacitate at least 50 community organizations in six VDCs of Lamjung District to conserve forest, and prevent and prepare for disaster risk reduction in three years. 2.1.2. Expected outcomes of the project Target households have access to alternative and clean energy sources for cooking and lighting. Improved health and sanitary condition of the target communities. Community members have diversified their diet, agriculture production and have at least one alternative employment opportunity for each family. Inclusive and empowered community organizations capable of conserving natural resources and contributing to energy conservation and management. Communities have taken resilience measures on climate change adaptation and DRR. 2.1.3. Beneficiaries of the Project The Project has covered 2,448 families of six VDCs (Gauda, Pyarjung, Mohariyakot, Ilampokhari, Kolki and Bichaur) of the Lamjung District. Project activities have focused on improving livelihood of the poor and marginalized communities of the remote rural areas of the district. 2.1.4. Project strategy The project has the strategy to promote energy use practices and livelihood practices in consonance with the environment conservation, so that the adaptability to climate change problems is properly addressed. 2.1.5. Project assumptions The project has made the following assumptions to achieve its intended results. The assumptions are linked with the outcome and output targets. Government subsidy is made available as per the subsidy policy. Community people are willing to make labour contribution. Community people are able to access government funds and the project proposed fund is made available. Community people are able to access biogas subsidy from the bio-gas support program (BSP). Community people are willing to take ICS building as their profession. Community people are willing to build and use ICS. Community people are willing to participate. Community people are willing to build toilet. Community people are willing to change their behavior. 12 2.2: Project Management 2.2.1: Project Implementation Organization The CCA project is implemented by COPPADES, which was registered at the Government of Nepal, Lamjung District Administration Office, Lamjung in B.S. 2047 (1991) with the Registration Number 36/047 (36/1991) as an NGO. It is also registered with the Social Welfare Council, the NGO regulatory authority of the Government of Nepal (with Registration Number 878/049). COPPADES is a national level NGO, actively working in the area of social development in the rural communities in Nepal. It has over 20 years of experience working with communities in Lamjung and over 7 years of working with rural schools and communities in over 45 districts across the country. Throughout these 20 years of operation, COPPADES's focus has consistently remained on the improvement of the lives of the people below the poverty line. COPPADES works with a strong conviction that educational opportunities, economic development and organizational empowerment are like the three pillars of a tripod with respect to sustainable development of rural communities. To implement the CCA project COPPADES was assigned with the project director and coordinator to implement overall project activities, and one administration and finance officer in the office. Similarly, at the field level, there was one Enterprise Development Facilitator and four Community Mobilizers. The project successfully maintained the gender balance in staff recruitment. 2.2.2.Donor information The Lutheran World Relief (LWR) is the USA- based International Humanitarian and Development Organization, and is working in Nepal and around the world. One of the goals of this organization is to improve the lives of millions of small-scale farmers and their families, and to help them adapt to and mitigate the effects of changing weather and environmental conditions. 2.2.3. Key Partners The key partners of the project are COPPADES as the implementing agency and LWR, USA as the funding agency. Other partners and stakeholders of the project are the district level offices like DDC, DFO, DADO, NGOs, village level offices like VDCs, Agriculture Service Centre, and social groups like CFUGs, VEEC, MHMCs, PMCs, SACOOs, Women Groups, Farmer Groups, etc. Alternative Energy Promotion Centre (AEPC), the government agency for promoting renewable and clean energy and Nepal Electricity Authority (NEA), the national electricity supply agency are its central level partners on alternative energy. 2.2.4.Financing arrangements The total budget of the project was US $ 368,280.48 and LWR provided a financial grant amounting to US $ 298,155.3. As per the agreement, LWR had to provide the aforementioned committed fund in the form of financial grant for the CCA project. The project budget consisted of program activities cost (68 %) and administrative cost (32 %), which included equipment and support staff cost. 13 3. Final evaluation The purpose of the final evaluation is to assess the effectiveness, efficiency, replicability and sustainability of the project. The main audience of this evaluation includes COPPADES, Lutheran World Relief as funding agency and district level stakeholders such as government agency who will be interested to know the performance of the project. 3.1. Objectives of the Final Evaluation According to the TOR provided by COPPADES (Annex Table 1), the primary purpose of the final evaluation is to assess the progress of the activities, outcomes and impacts of the project as planned over the last three years of project implementation and document the learning and experiences for the sustainability and replication of the program. The project evaluation team carried out the following: Assess the project performance and achievements against the project objective and logical framework based indicators in terms of relevance, effectiveness, efficiency, impact and sustainability. Explore the level of progress/change made by the project and analyse the extent to which the achievements have supported the program goals and their objectives. Evaluate the project effectiveness- longitudinal effect and continuity of the project activities/services as well as the scope and extent of the institutionalization of the project. Identify the target and level of achievements as specified in the project agreement. Explore the coordination between the concerned line agencies in the district. Assess the good lessons to be replicated in other projects and aspects to be improved in the days ahead. Find out the income and expenditure in compliance with the project agreement and proportion of programmatic and administrative cost incurred by the project. 3.2. Scope of the Final Evaluation Basically, the evaluation was conducted based on some evaluation criteria, i.e. relevance, effectiveness, efficiency, outcomes, impact, substantiality and replicability. Impact and outcomes are measured with standard indicators. The study also tried to evaluate final progress as planned and targeted as well as furnished the information with regard to the aforementioned criteria. This evaluation covers all completed activities of the project from October , 2011 to the end of the project (September 30, 2014) in the target areas of Rainas Mauriyakot, Pyarjung, Gaunda, Kolki, Ilampokhari and Bichour VDCs. The main audiences of the evaluation are COPPADES, local implementing partners and donor agencies. The findings and conclusions obtained from the study are expected to enhance accountability of implementing agencies and help contribute in completing progress as targeted and achieve the objectives of the project within the project period and in the future in other projects. Evaluation criteria, questions and findings of the evaluation are based on TOR. Relevance Relevance was measured based on the following questions: How was the CCA project relevant at the local, national and global level? How relevant were the overall project goal and objectives? Was it appropriate to the area, communities and time of project implementation? 14 Effectiveness Effectiveness was measured based on the following objectives: To determine the achievement of project objectives. To discover whether or not an intervention has achieved the outputs and outcomes it originally intended. To identify strengths and weaknesses of the program. To determine if the needs of beneficiaries are being met. Effciency Efficiency was measured based on the following objectives: To determine the cost-effectiveness of the program. To analyse how the project has mobilized other stakeholders’ resources to implement the project activities. To assess how efficiently did COPPADES manage the project. Impacts Impact was measured based on the following questions: To examine how the project functions within the economic, social, and political environment of its community and project setting (context evaluation). To examine whether the project was on track to achieving its intended outcomes. To evaluate the outcomes at the individual level, community level outcomes. What are the indicators of the outcomes? What were the impacts of the project? Was the project on track to achieving a change in knowledge, behavior and practice in climate change adaptation? Did the project contribute to any important unintended outcomes, either positive or negative? To assess the short- and long-term results of the project and to seek to measure the changes brought about by the project? Partnership and coordination Partnership and coordination was measured based on the following questions: To assess how the project mobilized all its GOs and communities to implement the program? Has the project contributed to strengthening the partnership between community organizations and government agencies? Beneficiary participation and satisfaction Beneficiary participation and satisfaction was measured based on the following questions: Who were the beneficiaries of the project? How did beneficiaries respond to the project in terms of project implementation and outcomes? Sustainability and resilience Sustainability and resilience was measured based on the following questions: 15 Were the Project activities institutionalized at the local level? What are the indicators for continuation of the activities? Do the local communities have capacity to run the project intervention? How has the project developed the resilience to the community from multiple disaster? What are the interventions by the project to minimize the disaster risk reduction and climate change adaptation? What exit strategies are incorporated into the project design and to what extent are they going to contribute to sustainability? Replicability Replicability was measured based on the following questions: Is the project model replicable by COPPADES in the future? If yes, what factors contribute to the replicability and if not, why? What can we learn from this project that would help for climate change adaptation? What are the lessons learned in terms of project implementation, coordination, and beneficiary satisfaction? What are the key challenges to successful program implementation and how can they be improved? Synergy of the project Synergy of the project measured based on the following questions: Did the project achieve the multiple benefits? How did the project intervention synergise to the environment and human wellbeings? 3.3. Evaluation Research Questions Considering the Terms of Reference (ToR, Annex 1) and timing of field visit, the evaluation team prepared a household survey, and comprehensive checklist/evaluation format (Annex Table 2) to gather pertinent information. It was targeted for project beneficiaries, DDCs and government line agencies in VDCs and district level key persons, project staff and community organization members. A commonly used approach in evaluations is to assess performance against a baseline: a ‘snapshot’ of conditions, established before the start of an intervention, from which progress can be assessed. 4. Methodology of Evaluation 4.1 Evaluation approach and design The Project objectives and the log frame made the basis of designing the evaluation process. It employed multiple means and methods for gathering information needed for analysis of various aspects of project performance including sustainability and replicability (Annex 2). These included both the qualitative and quantitative methods, namely, collection of secondary information, formal and informal meetings, semi-structured interviews and focus group discussions, direct field observation and household questionnaire (HH) survey (Annex 3). 16 The secondary information collection process consisted of review of various project documents including project proposals, series of project reports, audit reports, and other documents and publications available at project headquarters. The evaluation team spent 5 days (1st September to 5th September 2014)Annex 4) visiting project sites and activities in the target VDCs of Lamjung District. The plan for collecting primary data from field wasfinalized in consultation with COPPADES staff. As mentioned above, the field data collection employed both quantitative and qualitative methods. Project evaluation team, however, gave more focus on the qualitative information generated from participatory process. The evaluation team conducted field evaluation at three levels, i.e. district level, VDC and community level interactions and household level interactions. Evaluation team met with district level line agencies, communities, GOs/NGOs and key personnel as well as field observation were made as presented in Annex 4. A checklist was prepared to collect the information from the key informant and focus group discussion. The team held a series of formal and informal consultative meetings with the number of key informants. These included project staff, DDC and VDC officials, micro- hydro management committee members, and district level line agencies officials in Besisahar before visiting the project sites. Key informant interviews were conducted with VDC representatives, District Agriculture Development Officer, District Forest Officer, District Water and Sanitation Engineer, and field staff of COPPADES. Two focus group discussions were organized at VDC level at the field sites- one in Pyarjung VDC and another in Udi of Ilampokhari VDC. The participants of focus group discussions were VDC level PMC members, saving credit group members, mother group members, community forest user group members, micro-hydro and electricity management group members, vegetable growers, project beneficiaries and people representing Dalit communities. A questionnaire survey was conducted with about 8% of households (200) of the target area using the semi-structured questionnaire. Two enumerators were selected and trained with the help of project officials for conducting the HH survey. The sample households were selected randomly. The purpose of the household survey was to triangulate the information generated from participatory methods and to obtain information on project performance, impacts and benefits realized at household level by people of different ethnic groups and socio-economic classes in all target VDCs. Furthermore, visits were made to different project sites for direct observation of field evidences and assess the quality of work. During the entire survey process, emphasis was given to collect the information about the parameters like relevance, efficiency, effectiveness, impact, sustainability, replicability and synergy of the CCA activities. The findings of the project evaluation survey were debriefed with the project officials and draft report was presented at COPPADES headquarters among the project staff for their comments and suggestions. The final report is submitted to the project implementer and donor after incorporating comments and suggestions received on draft report. 4.2. Work schedule There was a 30-day time period including travelling days. However, draft report was shared with project personnel before tentative date of submission of the report. The team conducted 17 the field work from 1 to 5th September, 2014. The details of work schedule for this task is shown in Annex 4. 4.3. Data analysis and presentation Both the qualitative and quantitative data collected from participatory methods and HH survey were analyzed and presented in descriptive format. The qualitative data collected from the secondary source were manually processed and triangulated to the project logframe. Similarly, qualitative data obtained from key informant interview, focus group discussion, and field observation we reanalyzed by using matrix method with activities, output, outcomes and impact and triangulated with the project progress report. Appropriate measurable indicators were developed to analyze the project outcomes data. The HH survey data were analyzed and presented as descriptive statistics, such as percentage, frequencies, means, and cross tabulation in the form of tables and graphs using SPSS version 16 and Microsoft Excel software. 4.4. Limitations of the Study It is difficult, if not impossible to visit all villages of target VDCs and interact with all community members within the timeframe of evaluation study because of the difficult access to the area due to remoteness, rainy season and busy schedule of the community members in rice fields. The evaluation team, however, made genuine effort to cover as much area as possible to visit and interact with the community members. Had the timing been favorable, perhaps more information could have been collected in various aspects of project performance. The analysis thus, could have missed some important components. However, the 200 questionnaires filled out through the HH survey should reflect and complement the above mentioned limitation of the evaluation process. Additionally, financial activities were not dealt and evaluated in detail as it was not within the scope of evaluation as per the TOR. 5. Project Approach, Strategy, and Targets and Indicators 5.1. Project Approach The CCA program had two major themes, i.e. natural resource conservation and livelihood improvement. The project has adopted egalitarian approach to implement the program. The project has focused on community development and capacity enhancement of the local communities with the objective of enhancing their ability to cope with risks due to climate change, specifically the poor, disadvantaged and vulnerable communities of the remote village of Lamjung District, Nepal. It was, therefore, relevant for the evaluation team to look at whether the project has been able to increase the disaster resiliency at the community and household level and enhance the capacity of the local communities to improve their livelihood. 5.2. Project Strategy The working strategy of the project was to implement the project activities by developing partnership with the local community-based institutions and enhancing their human and physical resources in the field of alternative energy management and livelihood improvement. Further, the project aimed at working in close cooperation with the District 18 Development Committee (DDC) to institutionalize the program in the local institutions such as Saving Credit Groups, VDC level electricity supply groups, vegetable groups, and community forest user groups. The evaluation team, therefore, looked at partnership modalities and success in both field implementation of the program and overall program management in order to assess the project strategy. 5.3. Project Indicators and Activity Targets The project has clear and measurable targets or indicators for all activities under the program components and activities (Annex-5). Rather than developing outcome indicators the project document includes a verbal description of expected impact on target groups/beneficiaries. This description covers “outcomes” related to the situation of the target area/beneficiaries and technical and management capacities of the local partner(s). The evaluation team has tried to follow these “outcomes” in assessing project impact and progress towards the development goal. 6. Demographic features of the target area Table 1 below portrays the socio-cultural characteristics of the respondents, who participated in the household survey. Consistent to the features of the area about one-half of the respondents are of Gurung ethnicity (52 %) followed by Brahmin/Chhetri, and Dalit. The mean family size of the respondent is 6.2 and about one-half of the respondents lived in medium size family, i.e. 4-6 members. Majority of the respondents (86%) reported agriculture as their main occupation and only about 26% respondents have education level of SLC or higher. Nearly one-half of the participants (46 %) have primary level education or below. The mean age of the respondents is 44 years. Analysis of age groups shows the representation of the youths (30 years or below) is just 19%. The crosstab analysis of age group with sex, however, showed that the mean age of the female participants is much lower than the male respondents and the number of male youths is just one-half of the female youths in the villages. These findings perhaps implied that majority of the male youths do not stay in the villages due to the lack of higher educational facilities and lack of income opportunities for better life. Table 1: Social characteristics of the respondents Bichaur Ilampokhari Gauda Pyarjung Rainas Mohariyakot (14%) (22%) (24%) (24%) (16%) Gurung Brahmin/Chhetr Magar i Dalits Tamang (52%) (16%) (16%) (14%) Remittance Teaching VDC Caste (2%) Male Female (68%) (32%) Sex Occupation Agriculture Labor Livestock 19 (86%) (2%) (4%) Family Size (6%) Youth (<30) Adults (31-45) Mature (46Old (>60) 60) Mean age (19%) (25%) 44 years Age Groups Education (4%) (41%) Self Literate Middle to Primary (6-8) School (15%) School High School SLC (9-10) above (19%) and (46%) (9%) Small family(4) Medium family Large family Mean Family size size (4-6) (>.6) (21%) (44%) (35%) (26%) 6.2 Table 2 shows the physical and economical characteristics of the respondents. It shows that the mean landholding of the respondents is 5.5 ropani (1 ha = 20 ropani) with an average landholding of 15 ropani per family. Only 20% HH have landholding higher than 20 ropani and have food security for year around. Nearly 80% HH have landholding less than 20 ropani and they do not have enough land to produce food to feed the family members for entire year. Income data shows that the mean annual income of the respondents is NRs. 242,000, which is good for a remote rural mountain area (Table 2). A closer look, however, showed that the mean was skewed due to presence of a few HHs having income more than millions of NRs. Removal of those outliers showed that the mean income of the respondents is NRs. 185,191. More than one-half of the HHs has income higher than NRs. 150,000 and only 20% HHs belonged to very poor category. Table 2: Physical and economic resources of respondents (Income in NRs.) Poor income Low income Medium income High income family family family Mean Income family>300,000 =<75000 75001 – 150000 150,001 300,000 Income Class NRs. 9 13 15 9 242,000 19.6% 28.3% 32.6% 19.6% (185191)1 Livestock holding Land Holding Class 1 - 2 livestock 3 - 5 livestock 6 - 10 livestock 21.7% 26.1.0% 43.5% > 10 Livestock Mean livestock 8.7% Very small Small farmers farmer 5.1 - 10 ropani =< 5 ropani Medium farmer Big farmer 10.1 - 20 ropani > 20 ropani 24.0% 34.0% 5.5 Livestock Mean holding 14 Ropani 24.0% 18.0% 20 land Food Security 1-3 months 4 -8 months 8 - 11 months Whole year 22.0% 48.0% 6.0% 24.0% Mean security 6.6 months Note: 1 Mean income after removeal of outlier 7. Major findings related to specific outcome, outputs and activities targets: Review of project progress reports indicated that the project has successfully met most of the project targets ( Table 3., and Annex5). The evaluation team, after field visits and interactions with all concerned stakeholders including line agencies and local community members, also came to the conclusion that COPPADES has done commendable job in the area and achieved most of the project targets. The team found that most of the project activities were well planned and effectively implemented. In many areas, the team noticed that the project achievements exceeded the set targets. However, the team also noted a few shortcomings which might be largely due to the short duration of the project because the capability of three year-long project is questionable for achieving conservation and livelihood improvement goals and objectives especially while working with poor and marginalized communities in remote area. The other possible reasons for seemingly moderate success of some activities might be due to the fact that the effects become evident only after quite a long time. The following paragraphs discuss the objective-wise outcomes and achievements. 7.1 Activity wise analysis of achievement Table 3. Activity wise project target and achievement Activity Description Target Actual % Objective 1: 2448 households have access to at least one form of alternative and clean energy, reducing their dependence on timber as a fuel source in 3 years ACTIVITIES PROGRESS SUMMARY 1.1: 1.1 Build one micro hydro plant in the target area 1 1 100.0% 1.2 Assist 2260 households to have access to electricity grid 2260 1936 85.7% 1.3 Provide bio-gas operation training and plant installation 250 support 223 89.2% 1.4 Provide training and installation support for thirty-five 35 (35) solar PV systems 35 100.0% 21 food 1.5 Conduct one event of ICS promoter’s training for five 1 days for 15 persons (1 event) 1.6 Conduct eight (8) events ICS demonstration and one day 8 orientation program for 2448 households 1.7 Construction of 2448 Improved Cook Stoves 2448 1.8 Conduct two (2) events of micro hydro project 2 management and operation training 1.9 Support on construction of two hundred and fifty (250) latrines with connection to biogas pit and 250 without 500 connection to bio-gas pit 1.10 Conduct one day behaviour change campaign to promote the practice of using toilet and stopping open 6 defecation practice 1 100.0% 8 100.0% 1639 67.0% 2 100.0% 500 100.0% 6 100.0% Objective 2 Objective 2: Promote agriculture based income generation and self-employment opportunities to 2448 households in 6 VDCs of Lamjung in 3 years. 2.1 Bee keeping training for 70 community members for five 2 days 3 150.0% 2.2 Distribution of 2 beehives for each of the 70 bee 70 entrepreneurs including transportation 130 185.7% 180 442 245.6% 180 442 245.6% 8 8 100.0% 8 8 100.0% 400 460 115.0% 642 706 110.0% 2.7 Savings and Credit Cooperative (SACCO) management 2 and business planning training for 55 members for three days 10 500.0% 2.8 Women from 2448 households involved in SACCOs have increased their saving at least 20% compared to before the 490 project (LWR specific Indicator) 458 93.5% 2.3 Vegetable farming training and seed support to 180 people (30 members participate per training organized in each of the six villages within the project period for one day) 2.3.1. One General vegetable seed support with Rs 2500 per cluster area 2.4 Nursery training and nursery establishment support for eight persons for three days 2.4.1. Financial Support for eight community nursery establishment 2.5 Potato growing training and financial support for 400 community members 2.6 Ginger farming training and seed support for 642 community members Objective 3 At least 50 community organizations from 6 VDCs in Lamjung District have enhanced capacity to conserve forest, prevent and prepare for disaster risk reduction in 3 years. 3. 1 Support on institutional development of 42 PMCs and 1 one VEEC 1 100.0% 3.2 VEEC Management training for 11 Executive Committee 1 members. for three days 1 100.0% 22 3.3 Support VEEC to maintain the rural infrastructure 1 through labour intensive employment practice 1 100.0% 13 162.5% 7 116.7% 3.6 Advocacy training for VEEC, SACCOs and CFUCs 4 members 5 125.0% 3.7 Four Exposure Visits for community representatives to 4 relevant destinations for five (5) days 6 150.0% 3.8 Conduct training for Community Forest User Committees (CFUCs) on conservation, Climate change and plantation for 2 two days 3 150.0% 3.9 Involve CFUCs to plant six thousand (6000) sapling of 6000 fruit forest and fodder trees by September 2012 190400 3173.3% 3.10 Financial support youth groups (sports and cultural 30000 groups ) from the target VDCs to plant 30000 plants 39276 130.9% 3.11 Support six (6) schools in the project area to plant three 9000 thousand (3000) plants annually 51464 571.8% 3.12 Climate change adaptation training to a total of 140 4 community members (through four 4 events) 10 250.0% 7 350.0% 2 200.0% 4 133.3% 1 100.0% 0 0.0% 3 50.0% 3.4 Organize group management and leadership training for Mother’s groups, PMC and other community groups for one 8 day 3.5 Organize gender equity training for community people for 6 two (2) days 3.13 Disaster Risk Reduction training for seventy (70) representatives of social groups for two (2) days two (2) 2 events) 4.1 Organize one event of program orientation for 1 COPPADES board and staff for two days 4.2 Three events of detailed project planning for four days 3 4. 3 Conduct one day district level project appraisal 1 workshop 4.4 Conduct One day Project review and experience meeting 1 at the district level 4.7 Social Audit of the project activities 6 4.8 Mid term evaluation 1 1 100.0% 4.9 Final evaluation 1 1 100.0% 7.2 Outcome wise achievement Objective 1.1: 2448 households have access to at least one form of alternative and clean energy, reducing their dependence on lumber as a fuel source in 3 years 23 7.2.1 Progress related to specific Outcome under objective 1 7.2.1.1:Access to clean energy sources and establishment of small industry through install micro- hydro (MH) power The CCA Project has achieved significant success in installing micro- hydro plants, more than double as planned by mobilizing resources from national government, local communities and the project resources. Project has conceptualized and initiated the MH projects through feasibility study and sensitizing and mobilizing local community for resource generation from different sources governmental, non-governmental community contribution and donations from individuals. Through the project six (6) micro-hydro projects were installed compared to four (4) planned and served more people than targeted (Annex 5). This output forms an exemplary case in exhibiting how small monetary/financial contributions could lead to achieving big and expensive goals by wisely mobilizing the communities. For example, in case of Ilampokhari MH, the total cost of the project was about NRs 2.75 million. The CCA Project had supported only NRs. 350,000 while the remaining amount was contributed from VDC, DDC, and local community members (beneficiaries) as well as donations from people living away from the villages including in foreign countries. According to the most recent project progress report 186households have access to clean energy through micro- hydro projects supported by the CCA project. This does not include the benefitting households from all the MH projects that included the ones built from the earlier fifteen month CCA project implemented in Ilampokhari and Kolki VDCs. If those households included the MH project beneficiaries amount to six hundred and fifty two (652). The value addition of electricity in the rural area is much higher than just lighting. It provides multiple benefits at the HH and community level such as lighting, triggering small industries such as furniture, grain mill and computer classes for kids. Furthermore, it helps for cooking rice with rice cookers in some villages. The women group reported that grain mills and electric rice cookers have provided great relief to the women. According to them, the increasing use of electric cooker has reduced firewood consumption while reducing the smoke level in the house providing health benefits. Reduced consumption of firewood saved time, which the women spent in collecting firewood from forests. It also helped in forest resources conservation. It is true for the impacts of rice mills also. Women participants in focus group meeting claimed that the grain mills have saved female family members’ time, which they otherwise would have to spend in milling and grinding using traditional mills for hours. Impacts of micro-hydro could be an interesting research topic for women welfare groups. The villagers told that the use of TV is increasing as a popular family entertainment medium. The use of TV is not only providing entertainment but also helping to educate and raising the awareness of people especially the kids through news and educational shows. Micro-hydro has also improved communication level of the villagers with the outside world through the mobile phones as they can now charge their cell phones in their own houses. They reported that the saved time is used for other income generation activities (IGAs) and community development works. Furthermore, water from MH collection is used for irrigating farmland in the Illampokhari and Bichaur VDCs. Local people from Udi village of Illampokari VDC reported that they have utilized MH water for irrigation of rice field this year because of late monsoon. However, the energy supply still is not sufficient for meeting other needs such as heating and operating cottage industries in a bigger scale. The people reported that unavailability of the 24 well-trained technician at the local level is a constraint for repair and maintenance of the MH plant and extension lines including transformers. The team realized that at least one technician from their locality should be trained from the joint support of 3-4 MH projects of the area for repair and maintenance and he/she should be well- paid so that one does not leave the area for higher pay. There were some negative impacts of TV reported by some culturally sensitive people as the popularity of TV is creating social disruptions. For example, the villagers used to gather in Chautari or village square and shared their feelings among themselves but because of presence of TVs this kind of gathering has decreased. Five small scale industries have been powered by micro hydro against two (2) planned. 7.2.1.2:Use of 250 watt of electricity and 6 industries powered by national grid supply: Community managed rural electrification is another successful activity of the CCA project. It is reported that 86 % of the HHs (1936 HHs against 2260 HH planned for electricity connectivity) are connected to national electricity supply grid ( Annex Table- 1) and the task of connecting the remaining HHs is under process. In the community managed rural electrification scheme, NEA covered 90 % of the cost and the remaining 10% of the cost is borne by local users. The CCA project has provided the support of NRs. 350,000 to Rainas Mohariyakot to the community fund and mobilised the community to generate the remaining NRs. 3,200,000 from different sources for linking the villages with national electricity grid. Similar to the MH plant, rural electrification program not only provided lighting but also, helped implement different industries such as milling and grinding, operating computer classes, raising poultry farm and operating slaughter house etc. along with the use of TVs. The Chairperson of the Rainas Mohariyakot rural electricity committee, Purna Gurung reported that they were responsible for collecting electric bills from user HHs of which 50% goes to committee fund for repair and maintenance and staff salary. It helps for immediate repair if problems arise and at present there is no electricity leakage problem in their area. The evaluation team recommends for providing scholarship for technical education (overseer level) to one or two persons so that the committee has a human resource locally available for regular maintenance. It is estimated that households have been using power as planned. 12 industries have been powered by national grid supply against sic (6) planned. 7.2.1.3: 35 households having 20 watt of electricity: Those HHs who were inaccessible to link with national grid and MH power supply were provided with solar PVs. There is 35 such HHs in Ilampokhari VDC. Lighting from solar energy has limited use and is costly for repair and maintenance. The power is not sufficient for household use as 20 watt seemed to be insufficient to the households. It is better to link these HHs to the national grid for electricity in the future. There has been 100% reduction on use of kerosene for lighting among the households having solar power. 7.2.1.4: 40% and 80% reduction in use of firewood among 2448 families having ICS and 250 families having bio gas: Alternative energy programs such as installation of biogas plants and ICS are also very successful programs of the CCA project in the study area. Installation of biogas plants and ICS for cooking at HH level have significantly reduced use of firewood for cooking and contributed to better health due to smoke free environment. According to the project progress report there has been about 40% reduction in the use of firewood among 2448 families using ICS and saving the associated labor of collecting the firewood. The reduction in the use of firewood has not only contributed towards conserving the local forest resources but also 25 helped to mitigate CO2 gas reduction while providing health benefits from the smokeless ovens. As per discussion held in the community there has been 40% reduction in the use of firewood among families having ICS and 80% reduction in the use of firewood among those having biogas 7.2.1.5: ICS promoter earn RS 12000 per year ICS promoters have gained self-employment and have made supplementary income of around NRs. 16544 per year. 7.2.1.6: Reduction in workload of women by 25% Improved cooking stoves and installation of biogas is helping to save time of women on an average of one hour per day. The women have been able to utilize the saved time for income generating activities and community development. 7.2.1.7: Micro hydro management committees have maintenance guideline and collect tariff: The micro hydro management committes have formed guideline to collect tariff and collecting it on regular basis. 7.2.1.8:500 families have used toilets: Construction of the concrete toilet in the rural areas and declaration of Open Defecation Free Zone (ODFZ) is one of the major agenda in the Lamjung District. The CCA project has supported the district agenda of ODFZ and implemented program in collaboration with VDC, District Water Supply and Sanitation office in three VDCs. Until now, 500 permanent toilets have been constructed and households are using toilets regularly. Kolki, Pyarjung and Rainas Mohariyakot VDCs have been already declared as an ODFZ VDCs. Programs on hygiene and sanitation were conducted to bring about the change in behavior of the people through running campaigns in Kolki, Rainas Mohariyakot, Pyarjung, Bichaur and Gauda VDCs. This has contributed to improved behavior of the people in health and sanitation and helped to make villages in the target area cleaner. Field visits showed that sanitation program significantly improved the cleanliness, hygiene and improved outlook of the village. 7.2.1.9 In addition some unintended impacts were also created by the project. Water from MHs provide irrigation facilities for rice farming (area) About 2 hours increased time in evening for income generating activities and other works Number of hours increased (time) to study for children at home Improved health conditions through smokeless and increased awareness Increased participation of women in different community development works Financial contributions obtained from different sources such as DDC, VDC on expansion of electricity, micro hydro, biogas construction as well as ICS making. Pyarjung, Rainas Mohoriyakot and Kolki VDCs declared as ODFZs Contribution from Government and VDCsmade available in support ofprojectactivities Utilizing excesss electricity in the day time it was possible to operate computer classes in Bichaur VDC. 26 The above discussion signifies that most of the activities have successfully been completed and targets have been achieved under objective 1.Significant improvements have been made in the rural area through the supply of alternative clean energy which has also brought positive changes in health and sanitation condition of the villagers. The situation has also resulted in the reduced use of firewood, conserving forest while reducing workload of women. These outcomes might open a new avenue to attract youths back to villages for overall development of the area and may promote eco-tourism and other feasible businesses. Objective 2. Promote agriculture-based income generation and self-employment opportunities to2448 households in 6 VDCs of Lamjung in 3 years. 7.2.2: Progress related to specific Outcome under objective 2 The livelihood improvement through crop diversification, increased farm production and household is the climate change adaptation strategies in the rural area. The agriculture-based income generation and self-employment opportunities in the project area are the important activities in climate change adaptation project that are alsohighly relevant in the context of the project site. Farm diversification and income diversification are two major adaptation strategies to minimize the impact of climate change in the rural livelihood. The project has implemented different activities at the HH level to increase the farm income and selfemployment opportunities such as bee keeping, vegetable farming, ginger and potato farming, etc. through training, field visit, and input supports (seed, materials support, technical support). 7.2.2.1:The income is increased by at least 20% among the families involved in bee keeping: Promotion of bee farming is very potential in the area, and it is one of the climate-led adaptation strategy to increase the farm income. Seventy farmers were trained on bee keeping and provided with two bee hives each. The project reports and field interaction showed that it was of limited success and income from the bee keeping was insignificant. Few farmers made some additional income from bee keeping (i.e. about 8%). The local people reported that only five farmers adopted bee keeping for income diversification. They complained that occurrence of heavy hailstone in the area in the year of bee-hives distribution destroyed many bee-hives and the bees died without any food. Some farmers also reportd that Chibe Chari (bird) also created problems in bee keeping by plucking them. Furthermore, no follow-up programs were implemented for retrieving bee keeping by the project. The evaluation team is of the opinion that the bee keeping has good potential in the area and it should be restarted with proper follow-up programs. More trainingshould be provided to increase bee keeping in the area. 7.2.2.2 Dietary diversity is increased by 2: Some changes were evident in dietary pattern of the local people especially diversification in vegetable consumption and improved nutrition intake in their diet. The women also reported 27 that it was easy for them as they have been getting vegetables in their farms. The baseline data on dietary diversity collected with the vegetable farming households was tallied with the endline data collected at the end of the project. The dietary diversity data that was calculated and analyzed showed that the dietary score improved to nearly (10.6) compared to six (6) at the pre project stage. 7.2.2.3 Nursery entrepreneurs have raised their income by at least 40% and 50% of the need for fodder and trees met by the nurseries: The CCA project has supported the establishment of multipurpose nursery for supplying fodder, fruits and minor products seedlings in the local area by providing training and material supports to the farmers. The purpose of the nursery was to develop an entrepreneurship at the local level. Eight (8) people were trained and supported to establish nursery but only one farmer is running the nursery in Pyarjung village. Field observation revealed that the income from the nursery is low and less demand for fodder and fruit tree seedling existed in the local area. According to the nursery owner, Mr. Gobardhan Gurung of Pyarjung village, the income earned from the nursery last year was about NRs.18 000. Altogether the income of the nursery entrepreneur is NRs. 93075. It is 28% increase from the baseline. However, if we consider all the entrepreneurs who started and dropped out the income from nursery seems negligible. 7.2.2.4:400 potato farmers have increased their production by 50% income by at least 40% through the sale of potatoes 400 potato farmers received support from the project and the annual income of 246 farmers involved in it increased by 8%. The seed was supplied in coordination with District Agriculture Development Office but the quality of seed was not good, and therefore, the germination was poor thereby leading to low production and low income for the participating families. 7.2.2.5:642 ginger farmers have increase their production and income by at least by 50% Six hundred and forty two (642) farmers were trained in ginger cultivation along with seed support. The ginger production in the area has increased by 50% and the average HH income raised by about 11.5%. The harvesting season is yet to come for this year, and therefore, the income at present seems low. With what is seen as the status of the ginger farm the income seems to be much higher although the projection of income increase by 50% by the end of the project may still not be accurate 7.2.2.6: 2448 households involved in SACCOs have increased their saving at least 20% The project has taken initiation to establish a Saving and Credit Cooperatives (SACCOs) as well as strengthening the ongoing cooperatives. The project has supported to strengthen the existing cooperatives at Udi village, Ilampokhari VDC. Majority of the women members from Ilampokhari VDC are involved in SACCOs and have increased their saving by 44% as compared to before the project. 28 7.2.2.7: 80% of the loans disbursed by SACCOs are for income generating purposes and loan recovery rate is 95%: Both the loan disbursement and loan repayments are above the target being loan disbursement for income generation 112% and repayment rate of the loan 113%. The group discussion revealed that the interest rate charged by SACCO on the loan ranged from 15 to 18%, which is high as compared to the rates charged by the commercial banks. The team suggests that Nepal government is providing agriculture loan at 6% interest rate, which can be tapped and utilized by the cooperatives to provide loans to the members at lower interest rate. The loan receivers, however, seemed happy and looked unconcerned about the interest rate. For them getting the loan easily in their own area without complicated paper work was more valuable than the interest rate. The Cooperative in Udi of Ilampokhari VDC is providing loan to the micro hydro project also. This cooperative was however, established about two decades before the CCA project was initiated in the area. The cooperative interestingly being managed by women leadership has a huge sum of money and loans are being given even for those who wanted to go for foreign jobs. Recently one Agriculture Cooperative has been registered in Pyarjung VDC with the support from the CCA project. It includes 222 members from all six VDCs. The total share amount is NRs. 781,300.00 and the saving amount is NRs. 59265.00, which leads to the total fund of NRs. 1,094,615.00. Out of that total fund, NRs. 980,000.00 has been provided to the members as loan for income generation enterprises. This new Agriculture Cooperative in Pyarjung VDC needs further support for enhancing its capacity in book-keeping and accounting and office management. At the present stage, it is too early to make final conclusion about this Agriculture Cooperative. Objective 3.3: Capacitate at least 50 community organizations from 6 VDCs in Lamjung District to conserve forest, prevent and prepare for disaster risk reduction in 3 years. 7.2.3: Progress related to specific Outcome under objective 3 7.2.3.1 VEEC in consultation with PMCs has prepared at least two proposals and submitted to funding agencies The CCA project has supported the Village Energy and Environment Committee (VEEC) in consultation with PMCs to develop proposal for conservation activities for funding from different sources. The VEEC prepared and submitted seven (7) proposals to the VDCs and DDCs and secured funding for three (3) programs. At the present state, they are not capable to develop such proposal independtly and require more training to make them ready to do this job without the external support.The project organized different types of trainings to enhance capacity of the CBOs in different areas to make them able to lead and manage projects locally. 29 7.2.3.2 VEEC has developed and is capable of enforcing environmental and safety guidelines: VEEC guidelines for environmentally sensitive infrastructure development practices are developed and agreed and available for use. 7.2.3.3 At least three identified risk and vulnerabilities created through unplanned road construction Four locations were identified as landslide prone road sides in the road construction area and are reduced by erecting retaining walls and plantation around. 7.2.3.4: 130 people are employed for three months 135 people have been employed with a total of 965 man days of employment to generate income from work locally. 7.2.3.4: 50% of the executive members in the groups in the communities come from women and Dalits, participation of women in social institutions, business and politics is increased by at least 50% 13.3% of the executive members in the groups and social committees are elected from women and Dalits (a total of 96 out of 729 members are elected in different social committees till date). 12.6 % percent of executive members in the social committees (92 out of 729 such members) come from women. 7.2.3.5 VEEC, SACCOs and CFUCs will advocate for at least one common issue related to forest conservation, climate change, DRR and energy use issue each year: VEEC, has been raising issues related to these local manpower for road construction and women groups have been raising issues that women should be represented in at least one vital post (Chairperson, secretary and treasure) in local level institutions. 7.2.3.6 At least SALT(Slope land Agriculture Technology) is adopted in each VDC: One community in the project area has adopted SLAT methodology of agri-business through the plantation of broom grass. Sagrabas Bangswanra is designated as SLAT implementation site. One hundred and sixty (160) community members gained confidence in activities they are involved in from demonstration effects during four (4) exposure visits for adopting SALT technology in their degraded land. The team observed that the community has planted broom grass in the Sagrabas Bangswanra area community forest. Though this activity is commendable, the team is concerned about the SALT technology as it is just a bioengineering or vegetative method of restoration of degraded land and landslide control, rather than an agricultural technology. 7.2.3.7: 20% increase in vegetation (CFUG, youth club and school) Community-based forest conservation and management is one of the successful programs in Nepal. CCA project has achieved the target of commuity-based forest management program 30 more than its target. The community organizations operating in the project area are 28 CFUGs, 6 PMCs 15 Women’s Groups and 1 VEEC. The project has sensitized these organizations on natural resources conservation and disaster management by providing training on forest conservation and climate change adaptation along with exposure. These have helped in enhancing capacity of the local community, and have empowered community organizations to conserve forest, and contributed to energy conservation and management. The project has organized training for community forest user Groups (CFUCs) on conservation, climate change and plantation for 2 days. The training encouraged the CFUG members for the plantation in the fallow and degraded lands in the conmmunity forest. Due to plantation activities the forest area has increased by 34%. Community members of all socioeconomic groups were mobilized ranging from mothers’ groups to CFUG members to youth clubs and school children onplantation program. It is reported that the forest area cover increased additionally by 178 hectatres through plantation in marginal land by CFUGs and schools. The team concludes that the forest development is a long term program and hence, needs more time to make its impacts visible. 7.2.3.8: Community people have adopted climate change adaptation strategies in the choice of crops, forest conservation and the use and conservation of water resources Community people have adopted climate resilient measures in the choice of crops such as ginger farming and the use of plastic tunnel to regulate water and temperature for vegetable farming. The project has conducted training in climate change adaptation to make the community members aware about the climate change issues, impacts and adaptation strategy in crop production. Altogether 368persons were trained on climate change adaptation on ten events. The local respondents during the group discussion reported that different strategies were adopted on climate impact mitigation in their area. The team noticed that the local farmers needed further training to provide different adaptation strategies to cope with climate change impact. 7.2.3.9: 42 PMCs and one VEEC in the project area has a disaster risk reduction plan As per Ministry of Federal Affairs and Local Development guideline one local disaster risk management plan (LDRMP) has to be prepared per VDC. Following the ministry guideline one LDRMP has been prepared per VDC. Total five numbers of VDC level committees formed till date and each those five VDCs have developed disaster risk reduction plan as well. CCA project has provided training on disaster risk reduction (DRR) managementstrategies to reduce vulnerability from multiple hazards. Some 182community people were trained on DRR. The study team did not findany activities related to DRR. The evaluation team suggests that the DRR plan and programs should be institutionalized in the VDC level program and budget. 31 7.3 Analysis from field study: During the course of study few questions were asked to the communities to measure the relevance and effectiveness of the project as follows. 7.3.1 Climate Change adaptation strategy: Communities were asked what actually could be the strategy for adaption to climate change related hazards. Following were the perception from the community that serves as adaptation strategy in case of climate change. List of CC adaptation strategy 1. Forest conservation 2. Alternative energy 3. Water transportation for Irrigation from stream 4. Off season crop 5. Plantation/fodder/fruit trees 6. Environmental conservation activities 7. Reduced wood consumption 7.3.2 Community perception related to impact/ achievement of the project: The majority of the HHs (66%) reported that lighting in the village and sanitation were the main improvement they have felt due to the project, followed by time saving (46% HH) from milling, and firewood collection, particularly for the women due to rural electrification, installation of ICS, and biogas as summarized in table 3 below. Table 4: Perceived benefits at HH level Perceived benefits Increased income Saved time Lighting &sanitation Education, information, Percent 30% 46% 66% 38% 7.3.3: Community motivation on the project: Majority of the respondent (88%) were motivated in the CCA project activities due to the training and skill development programs through the project. For about 34 % respondents the cash crop seeds and material supports were the motivating factors (Table 4). It seems that the training and skill enhancement activities will be more fruitful and sustainable to design and execute future programs. Table :5 Motivation to participate in CCA programs Motivating factors Percent Seed and materials supports 34% 32 Training and skill Electricity Health and sanitation ICS 88% 18% 24% 28% 8. Project partnership, organization, management and monitoring 8.1 Partnership modalities The project was mainly funded by LWR and implemented by COPPADES Nepal in partnership with community-based organizations in the respective VDCs at the local level and district level government organizations. The district level government partner organizations were the District Development Committee, District Water Supply and Sanitation Office, District Agriculture Office, District Forest Office and Nepal Electricity Authority. COPPADES has maintained working relationship with these agencies and have been working more closely with Village Development Committee. Because of close collaboration and relationship, COPPADES has been able to align its program with Nepal government policy and has been successful in acquiring support from the government to agencies such as DDC and VDC to implement the alternative energy program. Similarly, the programs are being implemented in partnership with local CBOs, mother groups, and cooperatives. The evaluation team found that CBOs, VDC and District level government offices including DDC have been involved in the implementation, which has contributed to make the program successful such as electricity, biogas, and sanitation (ODF) programs including the operation of cooperatives. It has increased the ownership among the partners and communities. The team recommends continuing this relationship at the district and local level including private sectors (market) and working together to run the program for improving the rural livelihood and sustainable development. 8.2. Finance management 8.2.1.Basis of financial evaluation: The evaluation team conducted the financial evaluation on the basis of documents made available by COPPADES. As per the report provided the evaluation team didn’t find any major concerns regarding project financial management as the process followed were enough to ensure transparency and accuracy of document. 8.2.2. Accountability and transparency The project has made effort to maintain transparency and accountability towards stakeholders, donors and communities. COPPADES submits project progress in the review meeting of the DDC, and the project is listed in the district plan of Lamjung DDC. COPPADES board is also informed about the project progress periodically. At the community level COPPADES conducts social audit where communities have opportunity to critique on the project. 33 8.2.3. Book keeping system Double entry book keeping system is followed by the project. The accounting system follows the generally accepted standards and process. 8.2.4.Compliance with General Agreement Financial and project progress reporting are maintained at fairly good level of compliance with the norms of the Project Agreement. 8.2.5 Compliance with Tax Laws Local tax rules and process have been followed as per in country tax law and policy. 8.2.6 Internal Control System Adequate mechanisms have been made to ensure the internal control mechanism of the project. 8.2.7 Auditing Statutory Audit of COPPEDES Nepal has been carried out annually by registered auditors decided by COPPADES board. Evaluators did not notice any major discrepancies in the accounting and internal control system by the evaluators. 8.2.8 Program and Administrative Budget As per the cash flow table data reviewed the total administrative cost was 32% and the program cost was 68%. From the above figure, the evaluators are of the opinion that the administrative cost of CCA project is slightly higher in ratio than normal practice of most of the development projects where the administrative costs normally do not exceed 20% of the total project budget. However, it should be noted that some of the costs that could be well justified under program activities cost heading are found to be listed under administrative cost. This has made impact on administration/program cost ratio. Due to exchange gain there has been last minute spending pressure on COPPADES as huge amount has to be spent in last quarter of the project. Nevertheless, it would be desirable to use such leftover money in the project activities within the set time frame. 9. Project reporting and monitoring The project has produced regular reports, posters, leaflets and audio-visual monitoring tool as planned. The reports give an idea of work-in-progress, further; the project has produced reports of the project on quarterly and yearly basis. The team recommends combination of staff meeting of the project progress along with participatory monitoring to enhance the reliability and ownership of the project among project beneficiaries. Preparing baseline at the beginning of the project is crucial for comparing the progress of the project. In addition, it is recommended to use participatory self-monitoring, public auditing regularly for cost efficient monitoring and to increase the feeling of ownership among the stakeholders. 10. Assessment of Project response to challenges and gaps The team has identified the following main challenges for the project implementation. Generally, the project has implemented most of its activities successfully according to the 34 plan and turned most of the challenges into opportunities. The highlight features in this respect are as follows: Despite unstable political situation and increasing influences of the party politics and remoteness of the area, the CCA project has successfully faced these challenges and implemented the activities effectively and empowered local communities by developing a working environment and establishing close coordination among different concerned partners and developmental agencies and political parties. In the absence of elected district and local bodies and limited capacity of the local government staff at VDC level to address emerging issues on climate change disaster reduction programs and income generating activities could not be institutionalized effectively. It was also a challenge to implement the different activities mentioned in DRR plan at VDC level because of limited capacity of the VDC. Youth migration, labour shortage and limited marketing opportunities for agricultural products were the challenges to increase the farm income through agriculture-based farming activities and livelihood improvement. The project seemed to achieve limited success to handle this situation. Short term (three years) project activities in remote area with limited knowledge and capacity in the agriculture farming, micro-hydro power and cooperatives may not continue to function in the future if the project wraps- up without any follow up support program. Additionally, the team noticed that some specific objectives and outcomes were partly addressed within the project time periods such as climate change adaptation strategies and disaster risk reduction plan and activities. 11. Project relevance, efficiency, effectiveness, sustainability and replicability 11.1. Relevance Overall, the team found that clean energy and livelihood support activities of the project such as village electrification through micro-hydro, national grid extension, solar PV installation biogas and ICS installation, sanitation and formation of the cooperatives and CBOs and livelihood improvement activities were very relevant in this area. The project is in line with the government policies to increase rural electrification, forest conservation, enhancing health and sanitation condition and reducing vulnerability from the climate change impact including the global objectives of reducing carbon emission. Global level relevance: The project is relevant at the global level as the activities of the project led to forest conservation and development, which are the most effective methods available at present to mitigate the CO2 emission. Some of the noticeable activities contributing to mitigating carbon emission are clean energy programs (MH, biogas and ICS) and forest conservation program. National level relevance: The project has also supported national policy and programs such as the rural electrification, sanitation, forest conservation, climate change adaptation and livelihood improvement programs. Recently, the Ministry of Forest and Soil conservation has 35 declared Forest decade (2071- 2081 BS) and project activities have supported the forest conservation and management. Local level relevance: The project has high relevance and multiple benefits from activities like rural electrification, sanitation and energy use for cooking at local level. Additionally, the project activities on sensitization of climate change adaptation, income generating activities, capacity enhancement of the rural communities particularly, women and cooperative formation are considered locally relevant activities. The project has demonstrated how work at a small unit of area can contribute to achieve national and global goals and successfully capture the meaning of the popular saying “think globally and act locally”. 11.2. Efficiency and effectiveness The project has high level of efficiency as most of the program activities were accomplished as planned and the budget spending is also 100% against the target. Although the project is effective in reaching the most marginalized target communities, it is not that cost effective as the proportion of administrative cost is nearly 32%. The team found that the project has been implemented with a high degree of efficiency and has been effective in reaching target group as planned, mainly due to the following factors: The project has implemented its programs in remote villages where rural people are deprived of many basic infrastructures with activities to support their livelihood Clear working modality with district government agencies (DDC), VDC and local CBO partners based on joint yearly work plans. Highly efficient because the project was able to mobilize more external resources from the local and government agencies to implement the project programs particularly on micro- hydro, biogas and toilet construction. Establishment of good professional relations and coordination among the GOs, CBOs, and project staff. Field activities implemented through local level institutions and participation of targeted group members including VDC personnel. All the stakeholders (GOs), local leaders, communities and women internalized the project and were actively involved in the project activities. The project staff team is qualified, well trained, committed and efficient. Most of the members are local, young and energetic. Presence of young, energetic and dedicated women staffs also played important role in the success of the project. All activities were linked-up with the district line agencies from the very beginning. The VDC and community level committees such as the rural electricity consumer committees, micro-hydro management committees, cooperatives, mother's groups and so on are relatively easy to work with compared to any rigid formal groups particularly on dealing with community issues even in the absence of elected local government. The activities such as rural electrification, ICS construction and sanitation were found highly effective particularly for women because of the multiple benefits associated with these programs. It saved significant amount of women’s time for milling and grinding, firewood collection, cooking, sanitation and cleaning. The use of electricity also has provided them exposure to the outside world through the TV and other forms of communication such as mobile phones and radios. 36 The team noticed that some activities were relatively less effective, for example, forest nursery management and entrepreneurship development, potato and ginger farming and small structure for bio-engineering along the rural road. The short term input supports and capacity enhancement activities and lack of follow up might have constrained their full success. We recommend for the continuation of this program for additional period and with a focus on income generative activities useful for retaining community youths in the villages... 11.3 Sustainability The team’s field visit confirmed the expectations of sustainability expressed in earlier reviews and reports. The chance of sustainability of most of the project achievements is assessed as relatively good as they are in line with the government policy and program. Local institutions and CBOs are actively working in the programs and thus can be said that project interventions are sustainable from the ownership viewpoint. The project has provided support to the PMCs, VEEC, CFUGs, SACOS, Farmers' Groups and Women Groups. Such supports are in the form of capacity building training, exposure visits and material supports to enhance local capacity and involve them in the project activities. Furthermore, the project activities are need-based in rural areas where utilization of local resources and rural livelihood improvement activities are vital. Therefore, activities implemented by the project should not have any serious problem to run continuously in the future. Sustainability of the interventions assumed on the basis of the following: Institutional setup for running the program activities such as micro-hydro (MH), rural electrification, cooperatives along with representation from all groups, gender and caste are in place and properly functioning. High degree of ownership of the project achievements and active participation by the local communities. The local communities are trained for maintenance and operation activities in MH and rural electrification. Resource generation is continuous particularly in micro-hydro and rural electrification to run the project. The Government offices (DDC, VDC) are closely involved in coordination and implementation of project activities. The team noticed that within three years period, it is difficult to expect sustainability in livelihood programs which require support and follow up for some additional years, for example, commercial farming may not sustain without adequate financial and technical resources in the face of limited labor force (in the purview of youth migration), accessibility and the link to the market. Similarly, the six cooperatives formed need continuous follow up for few years to become mature. In the household survey conducted in the course of the survey 44% HHs requested for follow-up activities by the project for sustaining ongoing initiatives (Table 6). The project team has been working in close collaboration with the DDC, DADO, DFO, local VDCs and other GOs and NGOs, and therefore, have chances of continuation of the program even after COPPADES presence phases out from the area. These strategies should help in achieving sustainability of the project activities, outputs and outcomes. 37 Table 5: Perception: Can CCA program sustain without external support? Perception Percent No 44.0 Yes 56.0 11.4: Replicability The scope of replication of successful project approach, various strategies and activities have already been described in previous paragraphs. The rural electrification program that has been initiated generating resources from different sources such as government and nongovernment organizations can be a model for other communities across Nepal. Combination of open defecation free zones (ODFZs), indoor air pollution free zones (IAPFZs) and rural electrification can be a model program for other villages. Construction of ICS covering whole community and declaring the entire community smoke free is a good initiative that can be replicated in other places as well. 11.5:Synergy of the Project Natural resource conservation and management and livelihood improvement through community mobilization exihibited to have synergic efffect on community mobilization and development activities as a whole. The community-based project activities such as micro hydro, biogas, improved cooking stoves, sanitation, and rural electrification with income generating activities have significantly changed the appearance of the village and enhanced the quality of life while reducing workload ofwomen. As a reuslt of the project forest resources are better conserved and new income opportunities have been created in the village in the form of commericial farming and enterpunership development. Development of village tourism also seems to be a feasible opportunity in the future. Installation of clean energy and alternative energy infrastructure and sanitation progarmshave resulted in multiple benefits in the project sites. 12. Conclusion The project has adopted participatory approach involving local and district level government organizations and community organizations from planning to implementation of the project activities. The CCA project was found relevant and has generally been implemented in an effective and efficient way. It was especially efficient because it has successfully been mobilizing resources from local to district level authorities to implement the project program particularly on micro-hydro, biogas and toilet construction. The project has duly supported the government policy and programs in the development of remote area of the district. The project has achieved considerable success in promoting alternative energy, hygiene and sanitation, reduction in firewood consumption and improvement in forest conservation as well as income generating activities through diversified farm income. The evaluation showed that most of the activities have been accomplished as targeted. The project has achieved a high degree success on awareness about sanitation, environment conservation, climate change impacts, reduction in workload of women, increased employment opportunities and income, and enhancing ownership of the program among the communities. The programs on micro hydro promotion and sanitation are replicable to other communities and areas. HH data shows that project activities should prioritize to ensure the food security of many HHs especially the marginalized HHs such as disadvantaged groups. They should be provided with income 38 generation opportunities through off- farm activities. The area has a high potential for organic farming and off-season vegetable production, and so, the activities should be linked to the government’s present policy on agriculture sector development particularly in enhancing youth employment. Mobilizing the communities and local resources to promote micro hydro in the remote area is very impressive and can be replicated in similar kind of setting in the country. The provision of electricity and access of agriculture products to the market should be encouraged. The villagers of the CCA project area should be engaged in commercial farming and other income generating activities to motivate youths to stay in their villages and contribute to the development of the area. The project should not be just confined to subsistence farming but also focus on large scale production so that employment can be generated at the community level. The financial evaluation of the project has shown that CCA project has followed good accounting practice and kept every financial record up-to-date. However, the financial statement showed that project operating cost is relatively higher in general than normal practice of developmental projects. There is need to expedite project implementation as the budget not been fully utilized at the time of final evaluation. 12.1 Lessons learnt The rural communities have limited resources and they are unaware about resource mobilization and climate change issues. The team learnt that coordination and collaboration with local and district level government organizations, stakeholders and community organizations have significant impact on resource mobilization. A large amount of resources have been mobilized on promotion of micro-hydro, sanitation, and alternative energy areas. Due to provision of alternative powered sources young people have found their village more attractive than before, women are experiencing less work burden and forest resources are being conserved, and therefore, it can be said that power has multiple dimensions. Even in the absence of elected government at the local level and district level it has been possible to generate fair amount of resources locally as a result of good social mobilization. 12.2 Recommendations The following recommendations have been made for the continuation of the program: It would be good if CCA program was designed in a detailed manner making it more location specific. More detailed planning makes it possible to address local needs more precisely and it is also possible to institutionalize it for sustainability. Technical training should be provided for maintenance of the micro hydro. Entrepreneurship should be developed in cash crop farming and linked to the market. Possibility of better coordination exists for increased participation/ ownership by district level line agencies to address the issue of climate change adaptation and employment generation at local level. Additional efforts have to be made to link some of the activities such as training, skill development initiatives, agriculture activities with the mainstream programs of Nepal government and emphasis should also be laid on the formation of the cooperatives. 39 Reference 1.ProgressReport, CCA Project, COPPADES in different time Periods 2. Project Proposal of the CCA Project, COPPADES, Lamjung 3. Midterm Evaluation Report, CCA Project, COPPADES, Lamjung 4. Financial Report, CCA Project, 2014 COPPADES, Lamjung 5. IPCC 2013 Report. 6. MOE, 2010. NAPA Report, Minsitry of Environment, GON, Nepal. 7. Tiwari,K.R., Rayamajhi, S.R, Pokharel, R.K., Balla, M.K. (2014). Does Nepal’s Climate Change Adaptation Policy and Practices Address Poor and Vulnerable Communities?Journal of Law, Policy and Globalization, Vol 23. Pp 28-38. 8. Tiwari,K.R.,Rayamajhi, S.R, Pokharel, R.K., Balla, M.K. (2014). Determinants of the Climate Change Adaptation in Rural Farming in Nepal Himalaya. International Journal of Multidisciplinary and Current Research,Vol 2Pp 334-340. 40 Appendix List of Annex 1. 2. 3. 4. 5. 6. 7. Term of Reference (TOR) for Final Evaluation Evaluation format Household level questionnaire Field visit plan Project Target and Achievement Analysis Interactions with community members at Field visit list Field photo during field visit 41 Annex 1. Term of Reference (TOR) for Final Evaluation of CCA Project implemented by COPPADES in Lamjung District 1. BACKGROUND AND CONTEXT COPPADES has implemented Community Led Climate Change Adaptation Project (CCA Project) for the last four and a half years with the financial support of Lutheran World Relief. The objectives of the project have been to provide access to renewable energy through infrastructure development; increase income of the community people through the development of sustainable sources of income; prevent deforestation by promoting reforestation and using newly created infrastructure; and, enhance capacity of the community organizations to address issues related with climate change and disasters. The project was agreed upon by COPPADES and Lutheran World Relief, USA with the funding support of USD$ USD $ 298155 to cover the five VDCs, namely, Ilampokhari, Kolki, Gauda, Pyarjung, Rainas Mohariyakot and 7, 8 and 9 wards of Bichour VDC.. The overall goal of the project has been “to increase the disaster resiliency of 2,448 families and 6 VDCs of Lamjung District” and the specific objectives are: 1. 2448 households have access to at least one form of alternative and clean energy, reducing their dependence on lumber as a fuel source in 3 years 2. Promote agriculture based income generation and self-employment opportunities to 2448 households in 6 VDCs of Lamjung in 3 years. 3. Capacitate at least 50 community organizations from 6 VDCs in Lamjung District to conserve forest, prevent and prepare for disaster risk reduction in 3 years. 2. EVALUATION PURPOSE Purpose of evaluation The purpose of this evaluation is to assess the effectiveness of the project, evaluate the intended results and provide an insight on the project design and project implementation thereby shedding light on the outcomes achieved. This is also to provide feedback for the organization (COPPADES) on how to carry forward the positive results and give proper directions to the future projects it plans to implement. Objectives of project evaluation: 1. To Assess and describe the outcome and impact level results with given respective indicators of the CCA project –, as well as the major factors that influenced results 2. To assess the overall extent of the project performance considering the relevancy, efficiency and effectiveness, impact and sustainability of the interventions 3. To document and highlight the evidence based project, strength best learning , implementing approach, weaknesses, and challenges on the major components of the CCA project and provide specific and clear recommendations for the future 42 3. EVALUATION P SCO E Geographically, the CCA Project has reached to six VDCs in Lamjung District, namely, Bichour, Ilampokhari, Kolki, Pyarjung, Gauda and Mohariyakot. Among these six VDCs only three wards of Bichour are included and in Kolki some words are included at a later stage of the project except the one initially included. The reason for this later inclusion is that the VDC was under impact with a similar project with the funding support of Give2Asia, another donor organization based in the USA. The project has its focus on reforestation and strengthening social committees in the area to promote and manage local natural resources. Appropriate training and agro based incomegenerating activities are encouraged by the project in order to contributive to environmental conservation and local capacity to adapt to climate change and coping with disasters. The evaluator needs to assess the project based on project objectives, major components and given evaluation objectives – ToR. The assessment will include the preparatory phase, field work and analysis and write up phases. 4. EVALUATION QUESTIONS 43 Evaluation criteria and questions Key Question for evaluation objective 1: • To what extent intended outcome are achieved by the project • What are the significant changes in the life of target beneficiaries and communities? • Are there any behavioral and intuitional changes occurred at the community level due to this project? Key Question for evaluation objective 2: • • • • • • Relevance: assessment of the relevance of the project with respect to the needs and aspirations of the beneficiaries and with the project documents. Efficiency: assessment of the project’s success in producing each of the programmed outputs to date, both in terms of quantity and quality as well as their usefulness and timeliness. Effectiveness: assessment of the extent to which project objectives have been achieved and to what extent the achievement is the result of the program. Impact: evaluation of the project success so far in achieving its impacts and how project affects to other constituencies than the targeted. Sustainability: analysis of the persistence of project results and impact in the medium and long term and main risks, which might affect the sustainability. Coordination, collaboration, complementarities, coherence: the assessment shall verify the feasibility of the Project’s institutional framework and identify any needs to improve it and way forward. How can we make policy advocacy for change through the learning from this project? Key Question for evaluation objective 3: • • • What are the key strength, best learning, and implementing approach of the project? What are the major issues and challenges faced by the project management? What are the specific and clear recommendations for consideration for future i. 5. EVALUATION METHODOLOGY COPPADES prefers to use the mixed methods - quantitative and qualitative for this evaluation however, the evaluation team may use any other techniques as deemed appropriate and . The evaluator need to prepare evaluation plan or matrix ), which includes what is being evaluated and why, showing how each evaluation question will be answered by way of: proposed methods, proposed sources of data, sampling methodology, and data collection procedures. We also encourage to evaluator to use some standard evaluation methods like “With and Without; “Before and After using baseline data”; also using proper sampling techniques etc for justifying the attribution of the project covers the project results. 44 1. Desk review of key project documents 2. Literature search and review of material on the environment in which the project operates 3. Review of evaluations and annual reports of other projects in the same sector and with the same/similar target population 4. Interviews of representatives of other project stakeholders 5. Focus groups and key informant interviews of the beneficiary population 6. Physical site inspections 6. EVALUATION DELIVERABLES We expect the following deliverables from the entire exercise: 1. Inception report 2. Finalized data collection tools 3.Draft report 4.Final report (with methodologies, questions, field notes and work documents as appropriate) 7. IMPLEMENTATION ARRANGEMENTS The evaluation contract will be finalized based on the standard service contract as per this Term of Reference (TOR). The payment for the service can be agreed between parties of the service contract. It is expected that the entire evaluation must be completed by the end of September 2014. COPPADES personnel will assist the evaluation team for any logistics as requested with proper distance between implementing staff and the evaluation team so as to allow a free and fair working environment for the evaluators. Hence, the evaluator is expected to outline their expectation for the sake of effective operation of the evaluation exercise and let COPPADES know in advance. 8. EVALUATION TIMEFRAME The evaluation is expected to start by the 15th of August 2014 and be completed no later than 28 September 2014. The timeframe could look like this: 45 Contract agreement with the consultant 17 August 2014 Mobilization for the assignment by consultant 20 August 2014 Inception report 30 August 2014 Finalization of Data collection tools by consultant 5 September 2014 Draft Report submission by consultant 20 September 2014 Final report submission by consultant 29 September 2014 9. EVALUATOR UALIFICATIONS AND APPLICATION PROCESS COPPADES is open to an individual or a team of consultants for this assignment. An Expression of Interest should demonstrate the following criteria: 1. Demonstrated capacity of the consultant (s) to conduct evaluation, research/studies/assessments of similar magnitude and development themes ( especially in climate change and climate smart agriculture and similar areas) 2. Technical proposal outlining understanding of the assignment and proposed evaluation plan and methodology 3. Cost effectiveness of the proposed budget to achieve the assessment objectives Ideally, the consultant should have the following qualification and experiences: • • • • • • Seven years of professional experience in conducting project evaluation. The team leader must have solid experience in conducting evaluation of climate change, smart agriculture development and similar activities. (CVs of team members to recommended) Extensive knowledge on agriculture, climate adaptation, food security and livelihoods, agro-forestry etc. systems Experience applying participatory evaluation methodologies Capacity to analyze qualitative and quantitative data in a systematic way Ability to present complex information in a concise, clear and accessible way Be an excellent writer (in English), and have outstanding analysis, and communication skills Interested consultants are requested to prepare an Expression of Interest and provide evidence to support claims of knowledge, skills and experience: • A proposal on how to fulfill the TOR, including sample timeline and budgetary requirements. • Resumes of potential consulting team members, and references • Feedback on this TOR, and questions 46 Expression of Interest should be sent to Dikendra Kandel, Executive Chairman of COPPADES at email: coppades.lamjung@gmail.com by August 15, 2014. COPPADES Lamjung (for hand delivery) Sera Bazaar, Besisahar, Lamjung Phone Number: 066520769 COST The cost would be negotiated between COPPADES and the contractor and based on the qualification and experience of the contractor to do the job. DISSEMINATION AND USE The main audience of the evaluation include the COPPADES board and staff that are responsible for supervising and implementing the project. The report will also be made available to Social Welfare Council (SWC). Also intent on seeing the report would be Lutheran world Relief, the funding organization for the CCA Project. The report will also be used for other donors, funding partners and regulatory authorities wanting to see the performance of COPPADES as a community development organization. The summary of the evaluation will also be shared among VDC, district agencies and other collaborating partners. Annex 2. Final Evaluation- format 47 Project title: Community led climate change adaptation Objective 1. 2448 households have access to at least one form of alternative and clean energy 1.Major activities: Built Micro Hydro Plant…… Activities Base line study Activiti estools Target Achievement Gap/Progr ess Outcomes Remark s 1.1 MH 1.2 Grid Sustainability of the program Coordination with other programs/ GO/NGOs Replication for success Sensitization to GO and other stakeholders Policy influence (Does institutionalized practice) Overall impact in the community What about vulnerable groups, women role and participation in plan Others…. 2.Major activities: ICS/ Biogas Activities Base line study Activitie s-tools Targ et Achievemen t Gap/Pro gress Outcomes Remark s 1.1 ICS 1.2 Biogas 1.3 Sustainability of the program Coordination with other programs/ GO/NGOs Replication for success Sensitization to GO and other stakeholders Policy influence (Does institutionalized practice) Overall impact in the community What about vulnerable groups,women role and participation Others…. 3. Major activities: Solar PV system Activi ties Base line study Activitiestools Targe t Achievemen t Gap/Progre ss Outcomes Remark s 1.1 1.2 48 Sustainability of the program Coordination with other programs/ GO/NGOs Replication for success Sensitization to GO and other stakeholders Policy influence (Does institutionalized practice) Overall impact in the community Others…. Objectives 2: Promote agriculture based income generation and self-employment opportunities to 2448 households in 6 VDCs Major Activities: Training for Vegetable/potato/ ginger production/ forest nursery Activi ties Base study line Activities-tools Target Achievemen t Gap/Progre ss Outcome s Remarks 1.1 1.2 Major Activities: Training and support for Bee keeping Activi ties Base study line Activitiestools Target Achievement Gap/Progres s Outcome s Rema rks 1.1 1.2 Major Activities: Training and support for Cooperative management Activi ties Base study line Activitiestools Target Achievemen t Gap/Progre ss Outcome s Remark s 1.1 1.2 49 Objective 3. At least 50 community organizations from 6 VDCs in Lamjung District have enhanced capacity to conserve forest, prevent and prepare for disaster risk reduction in 3 years. Major Activities: Support on institutional development Activi ties Base line study Activitiestools Targe t Achievemen t Gap/Progres s Outcomes Remark s 1.1 1.2 Major Activities: VEEC Management training and others trainings Activi ties Base line study Activitiestools Targe t Achievemen t Gap/Progres s Outcomes Remark s 1.1 1.2 Major Activities: Support VEEC to maintain the rural infrastructure through labor intensive employment practice Activi ties Base line study Activitiestools Targe t Achievemen t Gap/Progres s Outcomes Remark s 1.1 1.2 Over all assessment in each activities and outcomes with following parameters Relevancy Efficiency and effectiveness Sustainability of the program Coordination with other programs/ GO/NGOs Replication for success Sensitization to GO and other stakeholders Policy influence (Does institutionalized practice) Overall impact in the community What about vulnerable groups,women role and participation Others…. 50 Annex 3. Questionnaire for Household Survey Greetings!Final Evaluation of Climate Change Adaptation Project implemented by COPPADES, Lamjung. The information filled in this questionnaire will be confidential and will be used for project evaluation purpose. Name of any individual will not be published anywhere relating to information given in this questionnaire. Please feel free to answer the questions regarding beneficiaries and livelihood improvement from the project at your HH level. Village Ward Section 1. HH Characteristics 1. Beneficiaries Name: 2 Sexes: A. Female B. Male Q. No.4: Age: 3.Main occupation? Family members occupation 4. Education (Yrs of school): 5. Family members in your house: a. Male: b. Female 6. Please explain area of your land by land type? (Ropani) Bari in ……… Irrigated khet in …… Others… Total area ….. 7. Main Cropping Patterns Bari: Yield per Ropani: Khet (Kg) in bari land 8. Do you have livestock? a. Yes b. No Khet (Kg) of Livestock 9. Please describe your household cash income in last year (in Rs) Farm source Sale of food grains Pulses/Oilseed Vegetable Fruits Livestock sale Livestock products NTFP/forest product Other Total Grand total Rs. Off farm sources Rs. Business Salary Off farm wage Remittance Pension Bank interest Bonus Other Total 51 10. Whether your farm production is sufficient for your annual HH consumptions? a.Yes b. no If no, No of months sufficient 11. Alternatives to fulfill the food requirements at HH level 1………………………. 2. 3. Section 2. Project activities, beneficiaries and impact on livelihood 12.Do you know about Community Led Climate Change Adaptation Project ? a. Yes If yes , What are the activities done in your village? 1. 2. 3. 4. 13.Are you benefitted from the project ? a. Yes B. No If Yes, How you benefit ? 1. 2 3 4. 14 Does this benefit improved your livelihood? a. Yes B. No B. No If Yes: How If No : Why 15. What are the motivating factors that encouraged you to adopt these activities? 1. 2 3 4. 16. Are you able to continue implement these activities in your HH level without any support? a.Yes b. NO If no. What are the difficulties? 17 . What are the climate-related hazards faced in the last 5 years? 18. Are you affected from these hazards? If yes , how you affected ? 19. What are the adaptations practices in your farm level to minimized hazards? 1. 2. 3. QNo.20. Is there any institutions that help to in farming in your locality? A. Yes QNo.21 . Are you member of any organization or groups? QNo. 23. If yes since how long you are members? a. Yes B. No B. No Since………..years QNo 24. Pls. kindly explain that you benefitted from that organization ? 52 QNo. 25. What are the opportunities and constraints for integration of climate change adaption measures by local farmers? Opportunities 1 2 Constraints 1. 2. Thank you Annex 4 Field Visit plan and activities Bhadra 15 to 20, 2071. (31 August to 5th Sept, 2014). Date Time/ Place Activities/ consultations 31 August Around 3-4 PM project office, Beshishar, Lamjung Meeting with project personals and collect project report, discuss field visit sites 1September 10.30 to 11.30, DDC, and Meeting with district line agencies (DDC, ADO, DFO …), 12.30 departure for field Departure for field visit 2nd. September VDC 1 Meeting and consultation with VDC level ( proposed three VDC), different community groups: Hydro power, ICS, vegetable groups, Ginger groups, youth and mother groups….. 3rd VDC 2 Do 4th VDC 3 Do 5th Sept Return from field Review the field plan Household survey from local enumerators from project staffs at least 200 HH covering all six VDC (one week) 23rd. Sept First Draft report submission and presentation Details field sites will be finalized after consultation with Project personals. 53 Annex 5 : Project Target and Achievement analysis Objective 1: 2448 households have access to at least one form of alternative and clean energy, reducing their dependence on timber as a fuel source in 3 years Activity Target/Indicator(s) Outputs Outcomes Achievement Remarks 1.1Build 1 micro hydro Electricity to 150 households One micro hydro plant installed At least two local industries 2micro hydro established Four local industries from micro hydro and computer class in one school 186 households have access to clean energy from.. micro hydro Four husking mills, one (1) furniture mills and one computer class Achieved Limited supply Energy supply insufficient for many other uses and industries Maintenance/repair – too long to fix due to lack of technical knowledge 1.2Link to National electricity grid 2260 households connected to national grid Six small industries powered by national grid Connected 1 VDC Under process in 2 VDC 1936 households have access to clean energy 86% target achieved Maintenance/repair – too long to fix Training to 250 household Installation in 250 household 223households trained and installed biogas plant 89.2% target met Limited adapted Winter season little production Suitable more on lower altitude 1.3Biogas operation training and support biogas plant installation 12 small industries powered by electricity 223household have access to clean energy Overall Impact 1. Households have access to alternative energy for light and cooking (electric pressure cooker) 2. Dependency on forest for fuel reduced by 40%percent. 3. 100 percent reduction in kerosene use 4. Forests are protected 5. Alternative income opportunity –from electricity powered small industries (2 from micro hydro and 6 from national grid 6. Income of ICS promoters 7. Woman specially benefitted – workload for firewood collection and grain milling time drastically reduced 8. Improvement in 54 Objective 1: 2448 households have access to at least one form of alternative and clean energy, reducing their dependence on timber as a fuel source in 3 years Activity Target/Indicator(s) Outputs Outcomes Achievement Remarks 1.4Provide training and support for solar PV system 35 household 35 household trained and 20 Watt solar PV system installed 35 household have access to clean energy 100% reduction in use of kerosene 100% target household are benefitting 100% reduction in use of kerosene Frequent battery failure Maintenance costly Of limited use (20 Watts) Available for limited time 1.5One event of ICS promoter’s training Train 15 persons 15 persons trained Self employment for ICS of promoters (supplemental income of 12,000/year) 40% reduction on the use of fire wood among 2448 families using ICS and the associated cost of collecting the fire wood Reduction in workload of women by at least one hour per day (to be collected from 25% sample households) 100% target met. Promoters earned RS 40% reduction in firewood Workload reduced for woman – Per day 1 hour time spent on firewood collection is saved (more time is saved for household who also installed biogas) 1639 ICS constructed 40% reduction in firewood Workload reduced for woman – Per day 1 hour time spent on firewood collection is saved (more time is saved for household who also installed biogas) Less smoke – health 100% target achieved One committee formed to declare Bichaur VDC as Indoor Air Pollution Free (IAPF) Zone by Aug last 2014. – Sanitation improved Animal feed and raksi for household need are still prepared in open in traditional oven All CCA project VDCs 6 VDCs are declared Indoor Air Pollution Free zone (IAPFZ) 1.6Eight ICS demonstration events and one day orientation 2448 families 2448 familes motivated families for ICS installation 1.7Construct 2448 ICS 2448 families. All 2448 household installed ICS 16544/year Overall Impact communication: mobile 9. TV – while helping in education, it is also brining social disruption and additional costs to poor families 10.In long run link to national grid would be more sustainable 11.Promote sanitation also from Biogas 55 Objective 1: Activity 2448 households have access to at least one form of alternative and clean energy, reducing their dependence on timber as a fuel source in 3 years Target/Indicator(s) Outputs 1.8Conduct 1 micro hydro project management and operation training for 2 days 55 Committee members of five MHMCs Maintenance guidelines develoepd 55 Committee members of 5 MHMCs trained on operation and management of micro hydro projects in 2 events Not yet developed 1.9Support construction of: a. 250 latrines with biogas connection, 500 latrines in the target communities 500 latrines constructed in three VDCs 500 persons of Kolki and Bichaur VDCs 2 BCC in 1VDC 408 community people (107 male and 341 female) participated in the BCC campaign Outcomes benefits for family MHMCs collect electricity tariff regularly MHMCs have maintenance guidelines and followed. 500 families of a VDC have toilet Achievement MHMCs are collecting tariff from user household (NRs. 7/unit) Guidelines yet to developed and implemented Timely maintenance is an issue Guidelines have been developed 100% target achieved Remarks Keeping records t seems challenging Uniformity in tariff – Tariff varies across different Micro Hydro Management Committees Should be launched for other VDCs as well. b. 250 latrines without connection Bio-gas 1.10 Conduct oneday behavior change campaign (BCC) for adopting use of toilet (hygiene and sanitation) NA NA Overall Impact Skill human resource available at local level Repair and Maintenance cost reduce Job creation Time saved in repair and maintenance Improved Livelihood through income diversification Increased food security and diversity food and nutrition Better knowledge on climate change impact and adaptaion Increase the resilience to the agriculture farming Developed enterpenureship may attarect youth to work in village Motivation to commercilize organic product 56 Objective 2: Activity 2.1 Bee keeping training for 5 days in 2 events 2.2 Distribution of 2 beehives for 70 bee entrepreneurs including transportation 2.3 Vegetable farming training and seed support to 180 people (30 participants per training in 6 villages Promote agriculture based income generation and self-employment opportunities to 2448 households in 6 VDCs of Lamjung in 3 years. Target/Indicator(s) Outputs 70 farmers of 5 VDCs trained in bee keeping Income of family involved in bee keeping increased by at least 20% 70 bee farmers have received modern bee hives 70 farmers trained 180 farmers trained on vegetable farming in 6 slots and provided with seeds. (Potato and Ginger) Only 90 farmers adopted vegetable farming Only 35 bee farmers were supported Outcomes Achievement 70 farmers motivated and trained in bee keeping Alternative income opportunity created Income increased for bee farmers The income is increased by at least 20% among the families involved in bee keeping Additional/alternative Income from bee farmers Diversified diet/extra nutrition 100 % target achieved Diversified diet/Improved nutrition intake Income of vegetable farmers increased (90 farmers earned NRs. 481727 Dietary Diversity survey data is collected Only 8.8% increase in income Out of expected 70 bee entrepreneur, development, only 5 adopted Overall Impact Remarks/Limitation Diversified economy Employment should be provide not in basic No follow on up for need better life in supporting bee keeping village to encourage youth No followup training on Increased the resilience insect and disease, post from the disaster harvesting, storage Enhanced both climate change mitigation and Limited study before adaptation at community implementing new crop level and Household cultivation level. Improved the forest Availability of human condition and reduced resources for farming CO2 emmission from forest land Selection of climate Easily access the forest resilient species is resources crucial Enhanced the leadership and Access to market need empowered different improvement CBOs as well as women and dalit Reliable source for groups also quality seeds for forest trees and cash crops for forests 57 Objective 2: Promote agriculture based income generation and self-employment opportunities to 2448 households in 6 VDCs of Lamjung in 3 years. Activity Target/Indicator(s) Outputs Outcomes Achievement Remarks/Limitation 2.4 Nursery training and support establishment to 8 persons for three days 8 persons trained in nursery management. 8 nurseries established. Out of 8 nurseries established, only 1 continues Tree seedlings and cash crops produced Income of nursery farmers increased by 40% At least 50% local needs of fruit, fodder, and minor forest products fulfilled from locally grown tress/plants Only one nursery exists (Only 12% target achieved) Less seedlings supplied than demand Income of nursery farmer increased by NRs. 15,575 Forest Nursery for seedling production may not sustain 400 farmers trained and received potato seeds Potato production of participants increased by 50% Income of 400 potato farmers increased by 40%Improved potato farming skill developed and practiced Ginger production and sale increased at least by 50% Increase in household income by 11.5% for ginger farmers 61% among 460 farmers involved in potato cultivation earned 8.2% more income than before 2.5 Potato growing training for one day and support for 400 community members 2.6 Ginger farming training and seed support for 642 community members 400 farmers trained on potato farming in 20 slots 400 Supported with potato seeds 642 farmers trained on ginger farming in 26 slots along with seed support 706 farmers trained and received support for ginger farming Increased annual income of 200 (30% participants) farmers by 11.5%. Overall Impact Less interest to plant tree in farm land Regular coordination and monitoring with the support of line agencies is vital More time needed to adopt new technologies, so the program need continuation Establishment of Participatory research plots before recommending to farmers in large scale Establishment of Demo Sites would be beneficial to motivate farmers Coordinate with Universities for agricultural and forest research such as Institute of Forestry, Institute of 58 Objective 2: Activity Promote agriculture based income generation and self-employment opportunities to 2448 households in 6 VDCs of Lamjung in 3 years. Target/Indicator(s) Outputs Outcomes Achievement Overall Impact Remarks/Limitation Agriculture and Animal Sciences 2.7 Savings & Credit Cooperatives (SACCOs) management, training for 55 members for three days (business planning and loan management) 55 members enhanced skills on SACCOs management 55 SACCO members trained in SACCO management Saving of women from 2448 household involved in SACCO increased at least by 20% Of the total fund, at least 80% will be disbursed in loan Loan payment rate stands at least at 95% Increase in saving by 44% One agricultural Co-op registered 122% of total fund disbursed in loan. Loan return rate 113% of the target SACCOs are newly established hence impossible to assess their sustainability and impacts on income generation Book keeping and accounting need improvement 18 % interest rate charged to loan. Too early to make any conclusion. Impacts may be visible at least 2-3 years later after in Increased awareness among community members for saving. Community capacity enhancement Increased saving Loans available locally for the community members for income generation specially women 59 Objective 3: At least 50 community organizations from 6 VDCs in Lamjung District have enhanced capacity to conserve forest, prevent and prepare for disaster risk reduction in 3 years. Activity Target/Indicator(s) Outputs Outcomes Achievement Remarks 3.1 Support on institutional development of 42 PMCs and 1 VEEC 42 PMCs and one VEECs Training conducted for PMC and VEEC VEEC prepared at least 2 proposals and submitted for funding VEEC prepared and submitted 7 proposals to VDCs and DDC and funding secured for 3 proposals. Need external support and refresher training 3.2 VEEC Management training for 11 Executive Committee members for three days Management capacity of 11 VEEC executive members enhanced VEEC implemented environmentally sensitive and employment generating road maintenance policy VEEC has developed and enforced environmental and safety guidelines VEEC has developed and enforced environmental and safety guidelines. Damage from road construction reduced to same extent Rods still need improvement specially drainage system along road 3.3 Support VEEC to maintain the rural infrastructure through labor intensive employment practice Support VEEC to maintain the rural infrastructure through labor intensive employment practice manmade hazard 4 rural infrastructures were carried. At least three identified risk and vulnerabilities created through unplanned road construction 4 land slide prone sites along road construction area were identified. One retaining wall was constructed Employment generation too ambition 210 At least 130 people are employed for three months People were employed for 9 days in an average in 3 months Overall Impact Capacity of the local community need be support. Bioengineering work for road maintenance is costly. It is better to aware local leaders to construct with applying conservation measures. Forest conditions has improved. Leadership capacity of community organizations enhanced, specially those of women and Dalits. Entrepreneurship capacity of women and Dalits enhanced CFUGs’ capacity in forest conservation enhanced Reduced from vulnerability from the disaster Community has 60 3.4 Organize group management and leadership training for Mother’s groups, PMC and other community groups for one day 280 community group members trained in 8 slots 280 persons trained.About 300% more participants came from Women and Dalit groups At least 50% of the executive members in the groups in the communities come from women and Dalits 26.4% of the executive members are women and Dalits. 3.5 Organize Gender Equity training for community people for 2 days 210 community members are trained on gender issues, 210 community members Entrepreneurship capacity of women and Dalits enhanced Awareness of gender issues such as gender discrimination, gender equity and gender balance Gender equity and leadership still need backing for women and Dalits Five events (5) organized on advocacy and lobbying for 161persons Still the capacity and level of confidence among women in engaging in dialogue not up to the mark Six numbers Training in six events. 3.6 Advocacy training for VEEC, SACCOs and CFUCs members on environmental conservation related issues 140 person from VEEC, SACCOs and CFUCs trained on environmental lobbying and advocacy 4 training slots. Participation of women and Dalits in business and politics increased NA Community organizations’ lobbying and advocacy capacity for environmental issues enhanced managed the forest level of awareness on their rights among community people has increased Environmental lobbying increased Brought support for environmental programs from DDC, VDCs and Line agencies 61 3.7 Four exposure visits for community representatives to relevant destinations for 5 days. 160 community members gained confidence in activities they are involved from demonstration effects during 4 exposure visits. At least one SALT (Slope Land Agriculture Technology) in each VDC 3.8 Conduct training for Community Forest User Committees (CFUCs) on conservation, Climate change and plantation for 2 days. 70 members of CFUCs are trained in conservation, plantation and climate change in 2 events. At least 20% increase in vegetation coverage of community forest Four observation visits organized against four (4) targeted for for 179community members including seventeen (17) COPPADES board members Four events of climate change training for 140 CFUG members Forest area increased by 34.47%. Forest over increased additionally by119 hectares of Community Forest alone Confidence of participants enhanced Target50 %achieved 112% achievement increased confidence among community people on changing agricultural enterprises and conservation One SALT area 1 area in Sagrabas Bhangswanra designated as SALT implementation and broom grass plantation Increased involvement of various sectors of community people in forest conservation CFUG's capacity in forest conservation enhanced Forest coverage increased Total forest area increased by 34.47% compared to preproject forest area Forest area increased in community forest Target achieved Community participation in forest conservation and Forest development is long term program hence need more time to make any conclusion Survival of tree and casual Participation of 62 various community groups in plantation (mothers group, youth clubs, and schools) contributing 27 hectares of plantation by youth clubs and 33 hectares by schools 3.9 Involve CFUCs to plant 6000 saplings of fruit, forest and fodder trees by September 2012 6000 plants are planted by the CFUCs 3.10 Financial Support for youth groups (sports and cultural groups ) from the target VDCs to plant 30000 plants 30000 tree saplings planted by youth groups 3.11 Support six schools in the project area to plant 3000 plants annually Six schools in program VDCs have planted 9000 tree saplings. At least 20% increase in vegetation coverage of community forest development increased replacements should be followed up regularly Forest area increased Forest area increased from 921.39 ha to 957.39. Actual coverage of forest area in community forest is 30% of which 13.04% is CCA’s contribution 27 hectares of land covered by youth group plantation which makes 9.17% increase in forest area in community land 33 hectares area planted by school groups making contribution of 63 7.63% increase in forest cover in the area 3.12 Climate change adaptation training to a total of 140 community members 140 persons trained on climate change adaptation in 4 events. NA NA NA NA 3.13 Disaster Risk Reduction training for seventy (70) representatives of social groups for 2 days 70 community people trained on disaster risks and their reduction strategies. NA NA NA NA 42 PMCs have disaster risk reduction plan in place 64 Annex 6. Field photo visit Interaction with Nursery owner at Pyarjung Village 65 Improve Cooking Stove supported by CCA project Group meeting 66 Grain mill at Sanokavre, Illampokhari VDC Electricity, sanitation and all communication with outlook of village- Sano Kavre 67