Communication and Design Practices Group

advertisement
Communication and Design
Practices Group
 Team Members










Dan Vargas -Group Leader
Peter Hurley
Joe Golley
John Ojala
Allen Stewart
Mike Quary
Curtis Byrd
Kevin Luschei
Sam Movsesian
Tom Aliffi
Teac
Rockwell Collins
Thomson - CFS
BCAG
MAS
Weber Aircraft
BAS
BCAG
BAS
Delta Air Lines
Communication and Design
Process Group
 Mission Statement
 To define a Process and Vehicle that will identify roles,
responsibilities,activities and information required from all
participants to support the total program from pre-kickoff
to aircraft delivery
Communication and Design
Process Group
 Responsibility Matrix
 A brainstorming session produced the basic requirements
of each party to prepare for and participate in an ITCM for
seat integration
 The draft material produced will be formatted and updated
individually via e-mail
Communication and Design
Process Group
Airline







Supplier Selections (adhere to selection dates)
Supplier notification
Inter-Supplier communication
Equipment definition finalized
Contractual agreement between customers and suppliers
LOPA
System requirements
Communication and Design
Process Group
 Airframer and/or System Integrator





Adhere to supplier select dates
Seat and equipment Installation specifications
Integration and Installation schedule
ITCM Checklist
(Boeing Cabin systems Seat/IFE integration procedure IV)
• Coordination meeting expectations
 Notification of schedule and long lead requirements
Communication and Design
Process Group
IFE Supplier











NDAs
List of IFE equipment and part numbers
Seat equipment installation specification and requirements
Seat Equipment Interface control documents
ITCM Checklist
Functional Test Procedure
Seat equipment wiring block diagram and installation template
Seat supplier requirements list request:
Data requirements and schedule
Coordination meeting expectations
Notification of schedule and long lead requirements
Communication and Design
Process Group
Seat Supplier
 List of fit and test equipment requirements
 Preliminary Seat envelope drawings with electrical component
layout:

IFE components, Seat power, PC power, monitor arms,
console stowage, telephones, reading lights, seat and
accessory control buttons and switches.

List of electrical components including supplier names

Notification of schedule and long lead requirements
Communication and Design
Process Group
 Resource Material
 Boeing Cabin Systems Payloads Integration Team Interim
Agreement
 This document will be edited to be a general reference
guideline for cabin systems/IFE/seat integration and
provided to waea.org/workinggroups web site in January.
Communication and Design
Process Group
 Future Plans
 The completed matrix will be published on the
waea.org/workinggroups web site.
 The draft material produced will be formatted and updated
individually via e-mail
Download