資訊人才在封裝測試業之角色 Ming-Cheng Sheng ASEKH-IT April 9, 2003 1 ASEKH-Test Agenda • IT Requirement for Assembly & Testing House – Business Model • ASEKH-Test IT Systems – – – – CIM/MES EIT ERP B2B • The Role of IT – Some Lessons from Our OJT 2 ASEKH-Test 半導體封裝製造價值鏈 Product Design Front Eng Design House Fab IC Design Test Program Materials Fab Program Development 3 Wafer Bank Wafer Sort Assembly Probing Assembly Wafer Fab Wafer Sort Die Bank Wafer Sort Laser Repair Assembly Final Test Final Test Final Test Bin Inventor y Final Test Burn In Top Mark Lead Scan Tape & Reel Board Assembly B/L Assembly Board Insertion & Assembly Board Testing Finished Goods Inventory Warehousing Drop Ship ASEKH-Test 半導體封裝測試業產品生產流程 • • • • • • • • • 6 ASSEMBLY HOUSE (封裝廠) 晶粒切割 (Wafer Saw) 黏晶 (Die Attach) 焊線 (Wire bond) 封膠 (Molding) 化學處理 (電鍍/合成/酸洗..) 切腳成型 (Trim form) 印字 (Top Mark) 檢測 (Inspection) ASEKH-Test 半導體封裝測試業產品生產流程 • TESTING HOUSE (測試廠) • • • • 晶圓測試 (Wafer Sort) 老化實驗 (Burn In) 最終測試 (Final Test) 外觀檢測 (V/M Inspection) • B/L ASSEMBLY (板子組裝廠) • 表面粘著 (Surface Mount Technology) • 板子組裝 (PCB Module) • PRODUCTION LINE (成品組裝廠) • 最終產品 (Final Product) 7 ASEKH-Test Process Flow Introduction Incoming material MES & Subsystem Report & EDI Outputs Receiving Process Incoming Material Type: Wafer from Fab. 70% Package from ASEK. 30% Package from other Assembly House. Process Flow Wafer Sort Final Test Burn In (TDBI) Lead Scan T&R (Dry pack) Outputs: Summary Wafer Map Yield Report QC Data TESTING HOUSE Turn Key Business Solution Wafer Sort Operation Calculation & Analysis • Wafer Incoming Inspection • ESD & Grounding Protection • Inkless Operation • Wafer Mapping & Trace Form • Wafer Sort Set Up Procedure • In-Process Statistical Process Control (SPC) • Manufacturing Execution System (MES) Lot Tracking & Reporting • Probe Card Maintenance Clean & Calibration Preventive Maintenance • In-Line Yield SPC Chart • Stack Wafer Map • Yield Report and Trend Chart Charts & Controls • Correlation Process Control Wafer Sort Process Flow Foundry Wafer Sorting Sorter capability Sorter PM Vacuum pen handling N2 cabinet handling IQA Incoming Quality Gate Loader/Unloader PM Microscope handling De-pack handling Wafer V/M check ID Sorting CP (1) Wafer Map control Data confirmation Data transfer Wafer Map Circuit Probing Prober PM and calibration Set-up procedure and handling Yield monitor Probe mark and wafer V/M check Data collection procedure Wafer Sort Process Flow Laser Repair Fuse Cutting ESI-9200/9300 Laser Trim Wafer Baking Oven PM and Calibration Cassette transfer handling Temp. and Time definition Visual Inspection Inking Wafer Inking Prober PM and calibration Inking operation Ink related specification Ink check procedure Bake (2) Wafer outing packing Material storage Cassette transfer handling Sorter PM and operation Shipping data preparation Packing procedure QA Quality Gate Loader/Unloader PM Microscope handling Wafer V/M check CP data confirmation and update Pack OQA Outgoing shipping gate Packing material check Shipping data Wafer Sort Capability (1) Probing Temperature (℃ ) (2) In Line Pad Pitch (μm) 40 Industrial Level 200 150 130 100 +200℃ 50 150 Consumer Level 45 60 Military Level 25 0 50 um available 70 80 90 -80 -80℃ -20 100 (um) 120 1992 1995 1998 2001 2004 1992 1995 1998 (4) Probing Wafer Size (inch) (3) Wafer Thickness (mil) 5 12" 12" 10 15 15 mil 20 thickness handling 2000 8" 26 6" 30 5" (mil) 120 1992 1995 1998 2001 Year 2001 Year 4"~12" are available on Q3'00 4" 4" 1992 1995 1998 2001 2004 Final Test Operation Calculation & Analysis Charts & Controls • IC Incoming Inspection • ESD & Grounding Protection • In Process Visual Mechanical (V/M) • Monitoring • In Process Yield Monitor & Socket • Cycle Time Control • Final Test Set Up Procedure • MES Lot Tracking & Reporting • Load Board Maintenance Clean & Calibration Preventive Maintenance • In-Line VM & Yield Control Chart • Daily/Weekly/Monthly Yield • Report and Trend Chart Final Test Process Flow (1) ASE & Other Assembly House Burn In Capability BIB Design & Build Auto Load/Unload Test During Burn In. Burn In Set Up Sheet IQA Incoming Quality Gate Lead Scanning Visual Eye Inspection Incoming Data Check Wafer Inspection Capability Burn In Electrical QA Gate AQL= 0.1% QA Reject Handling Procedure Quality Report Final Test QA Final Test ESD & Grounding Protection In Process V/M SPC Control Bin Operation Control Yield Control Procedure Fast TAT and Cycle Time Control TESTING HOUSE Turn Key Business Solution Provider Final Test Process Flow (2) Front End: W/S, F/T, B/I Lead Scan Capability Copl. & Bend Lead Stand Off / Skew Ball Quality Inspect. Visual Inspection Top_mark Top Mark Capability Ink mark & Laser mark Control by Set up procedure / SOP/TCM/ Package from other Assembly House. Lead Scan Tape & Reel Capability Multi-Material Source Kit Availability Peel Strength SPC. Drop Test Qualification Bake Bake Capability Bake Temp: 125 C Bake Hour: 8 Hrs Window Time: 4Hrs Real Time Bake Oven Monitoring System T&R Pack Pack & Drop Ship Dry Pack Pack MTL Design Label Design & Data Linking Colorful Packing System TESTING HOUSE Turn Key Business Solution Provider 半導體封裝測試業產品生產流程 • IC封裝測試業現場生產流程之特色 – – – – – – – – 16 服務性質的製造業 特殊的出貨方式(Drop shipment service) 委測產品測試流程的多樣性 測試批的Hold 住現象,造成測試流程相依於測試結果 測試機台的跨機問題 客戶化之產品生產流程 (Subcon) 同時上線的IC 封裝產品形式多,批量多寡不一 須提供客戶現場即時生產資訊 ASEKH-Test 拆批 Manual splitting Testing splitting LOT.1 LOT.1 Test Split (for speed sort) Split (for sub-lot) Split LOT.1 LOT.1 Split Split Split Split LOT.11 LOT.1A LOT.12 LOT.1R LOT.1B RECP.01 17 RECP.02 RECP.03 RECP.04 RECP.05 RECP.06 ASEKH-Test Yield Judgment & Handling Pre-Test IF Pre-Test $Yield > 90% Test IF True $Yield < 90% $Yield GT 90% False Test Hold Inv ELSE Test 2 True END_IF ELSE Hold Inv $Yield LT 90% False Test 2 Hold Inv Hold Inv END_IF Burn In Burn In 18 ASEKH-Test MIS System Architecture CRM B2Bi,Virtual Factory(quick respond system),IRS,Standard report,KM ERP SD FI/CO PP MM QM CIM PT SFC EDC/SPC Alarm FA PDM Document Management •Product Data •Product Structure Management EC Management OA Workflow(HR,QA,CS,ENG) E-mail FTP Document center Web(intranet/internet) Infrastructure (1) Common Business Services Infrastructure (virus,firewall) 19 (2) Messaging Information Distribution Infrastructure (EDI,e-mail,FTP,E-FAX) (3) Multimedia Content and Network Publishing Infrastructure (HTML,JAVA,World Wide Web,ASP) MANAGEMENT (4) Network Infrastructure (Internet,WAN,LAN Intranet Extranet VLAN,ISDN) (5) Interfacing Infrastructure (To:databases, customers,and applications) ASEKH-Test CIM Hardware Architecture Report Server CELL Server 18 GB HD*11 (Disk Array0+1) Oracle Data 8.0.5(Rpt) 9.1 GB HD*4 (Disk Array5) INTENCH AP 18 GBHD * 2 DB Backup HSJ 50 10.12.20.6 CROSS Reference HSJ 50 HSZ 80 HSG 80 ASETRPT1 10.12.20.7 4.3 GB HD*20(Disk Array) 9GB HD *4 18GB HD *2 OpenVMS 7.1 C, DEC C++ FORTRAN 7.1-1 PROMIS 5.5 TIB/RV4.2 Report Gateway v2.2 9.1 GB HD*12 (Disk Array0+1) ORACLE DB 8.0.5 9 GB HD* 4 (Mirror) DB Backup 9 GB HD*2 (Mirror) Redo Log & Rollback segment 9 GB HD*2(Mirror) Archive Log 9 GB * 1 (Standalone) Oracle Data (Webdb) (Primary) Alpha ES40-1 2GB RAM 18 GB*2 local HD (OS,ORACLE) PROMIS Server (Secondary) Alpha ES40-2 1GB RAM 18 GB*2 local HD (OS,ORACLE) (Primary) Alpha ES40-1 2GB RAM 9.1GB*2 local HD(OS) ASETRPT2 10.12.20.9 ASE4 10.12.20.21 MEMOR Y CHANNE L (Secondary) Alpha ES40-2 2GB RAM 9.1GB*2 local HD(OS) ASE3 10.12.20. 31 (Primary) Alpha 4100(5/400)1 2GB RAM ASE1 10.12.20.2 DECNE T (Secondary) Alpha 4100(5/400)-2 2GB RAM ASE2 10.12.20.4 Gateway: 10.12.20.254 Mask:255.255.255.0 TCP/IP TIB/RV4.2 ASET-WS1 10.12.51.4 10.12.20.16 S/W Setup Procedure Server P3 Xeon 700Hz / 1MB NetServe r LT 6000r 9.1G Hot Swap X3 Storage: 18G Hot Swap X4 20 ASET-WS2 10.12.51.5 P3 Xeon 700Hz / 1MB NetServer LT 6000r 9.1G Hot Swap X3 ASET-WS1 10.12.51.3 ASET-AP1 10.12.15.23 NetServer LC II P II 266Hz 160M ECC SDRAM 18GB X3,Ultra160 68 pin,10,000RP M ASET-AP 10.12.15.13 NetServer LC II P II 266Hz 160M ECC SDRAM 9.1G 4.2G MES_CELL_1 10.12.20.8 PIII-550*2 NT 4.0C 1GB RAM 9.1GB HDD *3 Oracle 8.0.4 TIB/RV4.2 TP Server Alarmsvr DBsvr VGS TP Server ASEKH-Test CIM Current System Architecture VMS Server MES Database(PROMIS) Reporting Server Lot Information ,Recipe Report Client 雷射印表機 Reporting Transaction .Setup .Track In .Maintenance .Data collected .Track Out Data Collection .Wafer Map .Bin Summary .SPC Data .UPH Prober GUI Client Handler Shunt-Box .WIP Data .Yield Data .Cycle Time .Output .Performance FT Cell Server WS Cell Server MES Cell Server PT,Setup,Maintenance, Test Result,SPC Wafer Map Probe Data Configuration Table Data,UPH data Raw Data Auto Data Collection System 21 ASEKH-Test CIM Future System Architecture VMS Server MES Database(PROMIS) Reporting Server Lot Information ,Recipe Report Client 雷射印表機 Reporting Transaction .Setup .Track In .Maintenance .Data collected .Track Out Data Collection .Wafer Map .Bin Summary .SPC Data .UPH EAP Cell Server .Recipe download Data Collection .Engineering data .Equipment data GUI Client Tester Tester Handler Auto Data Collection System 22 Prober Setup M/C Shunt-Box .WIP Data .Yield Data .Cycle Time .Output .Performance FT Cell Server WS Cell Server MES Cell Server PT,Setup,Maintenance, Test Result,SPC Wafer Map Probe Data Configuration Table Data,UPH data Raw Data ASEKH-Test CIM F/E Framework Layer 3 Planning layer (ERP/SCM) Layer 2 Execute layer Planning data Shop floor data CIM server WS Online FT Online Yield Management EMS SPC RMS EDA Server FAB Resource Management (MES) WS File Server Layer 1 WS AP Server LAN EDC Server Summary data Panel PC LAN Program download Tester Workstation Shunt Box Control layer SECS Automation TTL/GPIB (PC/EPQ) GPIB 23 Prober Tester Handler ASEKH-Test CIM B/E Framework Layer 3 Planning layer (ERP/SCM) Layer 2 Execute layer (MES) Planning data Shop floor data CIM server WS Online FT Online SPC File Server EMS Management SPC RMS FAB Resource Management SPC Database LAN LAN Layer 1 Yield EDC Server Panel PC LAN SPC Control layer Automation LAN summary Upload Job download Flag File RS-232 Job download LAN Temp. monitor SPC summary Flag File Upload (PC/EPQ) 24 Scanner Marking Bake T&R ASEKH-Test ASET Engineering Information System Relation Diagram PCS PEDB TEV APQP MM(BOM) Color Packing F/E MES B/E ERP/SCM Spec Setup procedure BIMS BCS B/I Oven monitor Setup Matrix Spare board Correlation sample H/W config. Tooling [Product Testing Engineer] Asset Control Diagram [Testing Engineering Control Center] TECC CUSTOMER PTE Verify Incoming Send Back Tester Production Engineering Use Repair PM L/B Repair Room 26 MFG Control Center ASEKH-Test Glance at Setup Procedure Device Name IBM610* Lead Count 256 IB-HP1-001-P* PKG BGA Version Insertion Test Program FT1 tmb610_ft1 QA1 tmb610_qa1 Tooling Info. Test Time Hold Yield 1.1 90 1.1 100 Bin# 1 2 Status Good Fail Remark Pass O/S Serial# Tester Code Customer Code S/W Bin information 27 ASEKH-Test SCM ERP/FRP H/W Tooling Logistic FT/WS/BI setup procedure BI MFG Disposition Tooling oven MM •Matrix •MFG/LB •BCS •Disposition •BI oven •Spare board •Correlation •Tools •PM •Test prgm mgem. •H/W config. PDM • SPEC • PCS • EC • APQP • TEV • PEDB • FT/WS/BI Spec TEV (BOM/color MBOM ENG Routing packing • Routing E Yield/Setup RBOM I S PEDB SPEC Color packing MES FT/WS/BI setup procedure MFG Capability of PDM • • • • • • • 29 New Version Control Event Alert APQP / EC Monitor Internet Approval Available Better Turn-key Service Collaboration Mechanism Efficiency Manufacturing ASEKH-Test (Current ERP System Architecture) TDRP ASRS Label Shipping Plan Price MES PO MM E-PR SAP/FI HR E-HR PEDB Invoice Packing AOL Cost Hold Bank Intranet Bonus TEV Internet FCST CAR By ASET Package Setup Procedure PT Notes AP GUI Equ Time Record Extricity SPEC Spare Parts TSMC Ship Instr. TesterConfig Tooling MES Menu Hold Lot ERP Applications SCM Distribution • Forecast • PC Plan • HR • Bonus • Program Version Control System • Cust. PO Control • Quotation • Pricing • Shipping Notice • Invoicing • Packing List • Labeling 31 Operation • Finance • Cost • GUI • Purchase • Inventory Man. • Bond ASEKH-Test ERP Capability • Flexible PO/Pricing Control to meet Customer requirement • Flexible Shipping Doc to meet Customer req. including : Invoice Packing List Inner box Label Outer box Label • Material Control • Inventory Management • Good AP/Report Version Control 32 ASEKH-Test GRP Project Scope Capacity Planning / Production Scheduling SCM Middleware TIBCO Quotation Purchase PR •Material Control •Purchase Production Planning Sales/Distribution • Scheduling • Material Planning • Order Entry • Pricing • Service Quotation PO Production Order Production Control Wafer Sort Final Test ASSY Wafer issue ERP (SAP) Vendor Receive Finish Goods Warehouse Management Inventory Control Pick / Pack Shipping 發料記錄 RT Invoice Validate Customer Material/FG/Shipping Records Invoicing invoice invoice Invoice Finance/Costing Payment 33 • GL • AR • AP • Asset Management • Budget/Cost Control • Treasury Payment ASEKH-Test Future System Architecture Other Notes AP MM/QM E-PUR 34 SD AS/RS IRS FI/CO Label HR PP 1.Setup Proc. 2.PEDB 3.Tooling …. SCM MES 1.借機管理 2.機台進出 ASEKH-Test Future Capability Data Report Data As-is Report Data Report Report Data Report Report Data Report Data • Utilization • Configure • Auto linkage Report To-be Data Data Report 35 • Speed up Cust. Req. • Reduce Manpower ASEKH-Test ASE B2B Architecture Private Process IC Industry Supply Chain ISE Lab Extricity Alliance RosettaNet TXXX ASEKH - Assembly Extricity Alliance ASE Group CXXX ASEKH - Test RosettaNet Public Process Public Process IXXX ASE - Korean ASE - CL RosettaNet ExtricityHu b IXXX RosettaNet WXXX ASE - Malaysia ASEKH-Material Private Process 36 Coverage - Forecast - Order Management - Engineer Specification - Manufacturing Information - Inventory Management -etc. ASEKH-Test RosettaNet PIPs Supported PIP Description Supported PIP 3D8 V01.00 Distribute Work In Process 2001 PIP 3B2 V01.00 Notify of Advance Shipment 2001 PIP 3A4 V02.00 Request Purchase Order 2001 PIP 3A7 V02.00 Notify of Purchase Order Acknowledgement 2001 PIP 3A8 V01.00 Request Purchase Order Change 2001 PIP 3A9 V01.00 Request Purchase Order Cancellation 2001 PIP 3C3 Notify of Invoice 2002 Q3 PIP 3C4 Notify of Invoice Reject 2002 Q3 PIP 7B5 Notify/Request Work Order 2002 Q4 PIP 7B6 Request Work Order Status 2002 Q4 37 ASEKH-Test B2B BUSINESS PROCESS INTEGRATION ASE Test Customer Business Application system •Purchase order •Forecast •Shipping Instruction •Eng. Spec End_Customer Business Application system Business Application system Internet Internet •PO confirmation •S.O.D reply •WIP / Inventory •Yield Data, QC data •Shipping documents •Invoice •Shipping documents The data interchange would be performed by Extricity, FTP protocol. 38 ASEKH-Test File Transfer Protocol 39 1.FTP (File Transfer Protocol) 2.HTTPS (File upload Web server) 3.B2B (Platform Extricity) 4.E_mail: 5.Web Site ASEKH-Test Data Format RosettaNet & XML are our preferred approach Txt file (ASCII) Most popular XML (DTD) Data Type Definition, easy to de_code RosettaNet XML channel Secured system environment High system availability Flat File(Excel File) Easy to use for end user 40 ASEKH-Test CIM/ERP/SCM/PDM/CRM Integration Customer/vendor FTP Mail Customer/Vendor CRM QRS(Virtual Factory) Marking Sales Service EDI Web-Service B2Bi XML Rosentanet Data Order Customer Mining business Process Customer Order SD Modeling I R S Data Part Mining Customer E-BOM->M-BOM BOM FI/CO PP For Casting capacity Capacity A Pie TEV Planning E-Routing M-Routing Setup Matrix Setup Procedure Low Yield Disposition PEDB Constraint-Based Supply Planning (capacity order) Scheduling QM WIP Forcasting TDRP (Shipping/cost data ) F/G & Dispatching EQP status CIM K M FA MES Order tracking Management EAP F/T Semi-Auto Quality Management W/S DCOP SPC SCP PP Scheduling AMHS Data W/O Actual order Production Planning forcast MM Purchase Part Demand Planning Purchase TEV PDM SP SCM ERP Work Flow F/T & W/S SFC SFS Cross Site Plan Site Plan Detail Plan The Role of IT • Service – Passion • Key on Process Integration – Communication facilitator – Conceptual Modeling 42 ASEKH-Test What IT Can Server for You • 以管理方式主導資訊流通和資訊科技的 應用‚來促進部門間的有效溝通 – 科技層面 • 開發和應用資訊科技‚來幫助人際溝通 – 經濟層面 • 成本低而效率高的方法 – 行為層面 • 改善個人‚組織的溝通意願與溝通方式‚來促進人 際間的有效溝通 43 ASEKH-Test Our Policy and Challenge • Win-Win-Win Policy – You Pay Some but Win More – I Pay Some and Win More, Also – Our Customers Win, Our Mission • Key Success Factors – Best Practices – Effective/Efficient Information Chain – Learning and Improvement 44 ASEKH-Test Q&A Thanks for your attention. 45 ASEKH-Test